1 Open Government Status NuSAC/SCR/06/06 OPEN HEALTH AND SAFETY COMMISSION NUCLEAR SAFETY ADVISORY COMMITTEE SUB-COMMITTEE ON RESEARCH 4 TH APRIL 2006 UKAEA: 2006/7 PROGRAMME OF NUCLEAR SAFETY RELATED RESEARCH PAPER BY UKAEA BACKGROUND 1 UKAEA is the Site Licensee Company for Dounreay, Windscale, Harwell and Winfrith, as well as managing the programme for the Culham site. 2 The UKAEA arrangements for the management of nuclear safety research require that UKAEA submits a copy of the UKAEA Technology Plan to the HSE and to the NDA. 3 Site Technology Plans were first produced in September 2005 to meet the NDA requirement to identify key research and development activities needed to support the delivery of the site lifecycle baseline. The UKAEA Technology Plan (1) is primarily a summary of the Site Technology Plans. 4 The aim of the UKAEA Technology Plan is to help ensure that appropriate development work is being identified and planned for implementation in the site programmes. Collation of the site plans also allows for synergies between the sites to be identified enabling transfer of technology and avoiding duplication of effort. The UKAEA Technology Plan is also intended to provide reassurance to NII that adequate nuclear safety research is being undertaken by UKAEA. 5 As well as collating the technology needs from all the sites in one document, the UKAEA Technology Plan incorporates cross-site and generic development work requirements, technical exchange and collaboration initiatives and potential cross-industry development needs. The intention is to update the UKAEA Technology Plan on an annual 1

2 basis following the production of the site technology plans for the lifetime plan. UKAEA TECHNOLOGY PLAN 6 In developing the overarching UKAEA Technology Plan, the technology requirements in the site plans have been segregated into the topics and sub-categories as outlined in the Quintessa report QRS-1131b-2, A Workshop on Technical Issues in Nuclear Liabilities Management in the UK, 24th and 25th November This segregation is aimed at facilitating the identification of synergies, duplication and opportunities for technology transfer. The list of topic areas is given below. 1. Radioactive materials inventory, characterisation and behaviour 2. The management of radioactive waste and other nuclear materials 3. Plant termination and decommissioning 4. Site restoration management 5. Asset management 6. Organisation and communication 7. Policy and regulatory-driven issues 7 The full list of UKAEA technology requirements currently envisaged has been compiled from the tables in each Site Technology Plan (STP) supplemented with items of key generic development work managed by Technical Services Group of Major Projects and Engineering Division. 8 The document remains Restricted Commercial. SUMMARY OF UKAEA TECHNOLOGY PLAN 9. The individual Site Technology Plans have been reviewed and the key research and development activities in the site 2005/2006 LCBLs are summarised below. At Dounreay: - Waste characterisation and assessment Wasteform development work Robotics Remote handling technology Ion exchange technology Waste retrieval systems Size reduction techniques At Culham: - Remote handling equipment Waste handling facilities Techniques for the detritiation of wastes Package development for tritiated ILW At Harwell: - 2

3 Waste characterisation and assessment Wasteform development work In-cell decontamination equipment Robotics for operation of remote decommissioning/sampling equipment At Windscale: - Knowledge base of the piles (radiological and chemical data maps) Visual survey techniques Dismantling equipment for Pile 1 fuel and isotopes Safe Storage of Piles, B14 Cells and WAGR Wastes Surface decontamination techniques At Winfrith: - Development of 3-D models and radiological data maps of SGHWR and Dragon Development of full scale models of SGHWR and Dragon core and spatial surrounds Cementation trials for thorium grouting Development of ILW containers for decommissioning wastes. KEY GENERIC DEVELOPMENT WORK 9 The programme of generic development work managed by TSG has been reviewed and is summarised below: Encapsulation grout development and performance Development of land remediation techniques including land quality characterisation, remediation and records management Assessment of remediation technologies Development of the parametric cost estimating system PRICE Development of Geographical Information Systems (GIS) Development of land quality data management system IMAGES Input to development of the British Radioactive Waste Management System (BRIMS) TECHNICAL EXCHANGES 10 UKAEA recognises the need for external benchmarking, collaboration and sharing of information. This provides opportunities for accessing new ideas and technologies and benefiting from others experience. Information exchange agreements form part of the UKAEA s strategy to adopt solutions and practices which have been developed and proven by others, or share development costs. 11 UKAEA has signed formal Collaboration agreements in the fields of decommissioning and waste management with the following organisations: CEA Commissariat à l Energie Atomique 3

4 EDF Electricité de France INEEL Idaho National Engineering and Environmental Laboratory Sogin Società gestione impianti nucleari USDoE United States Department of Energy 12 In the past UKAEA has taken the lead in the UK for international collaboration on: Fast breeder reactors Destruction of alkali metals Geographical Information System (GIS) - IMAGES (Information Management & Geographical Evaluation System) Parametric cost estimating system PRICE FUTURE DEVELOPMENTS /07 will be a year of significant change for UKAEA as the company is separated into the Site Licence Companies, the NewCo which will function as the Management and Operations contractor to the NDA and Culham which will remain with the remainder of UKAEA as an NDPB. Despite these changes the safety related responsibilities of the site licensee remain largely as before. 14 The management of research and technology development may change within the company as will the future representation at NuSAC. This will become clear as the year progresses. CONCLUSIONS 15 It can be concluded that 15.1 UKAEA continues to recognise the fundamental importance of appropriate nuclear safety research, although it is difficult to separate this from the fundamental development work being undertaken to support waste management and decommissioning. All of these activities are progressing continued hazard reduction on UKAEA sites UKAEA have provided a copy of the UKAEA Technology Plan to the NII and NDA The arrangements are underpinned by close and detailed exchanges with NII for both technical and co-ordination issues The arrangements are also underpinned by continued dialogue with the NDA and other Site Licence Companies. ACTION REQUIRED 16 The sub-committee is invited to note and comment on the paper. 4

5 REFERENCES 1. CTTF(05)P25 Issue 2 UKAEA Technology Plan, February

UKAEA s strategy for the decommissioning of its nuclear licensed sites. A review by HM Nuclear Installations Inspectorate

UKAEA s strategy for the decommissioning of its nuclear licensed sites. A review by HM Nuclear Installations Inspectorate UKAEA s strategy for the decommissioning of its nuclear licensed sites A review by HM Nuclear Installations Inspectorate Published by the Health and Safety Executive October 2002 Further copies of this

More information

Legal and Regulatory Frameworks for Decommissioning and Waste Management

Legal and Regulatory Frameworks for Decommissioning and Waste Management Legal and Regulatory Frameworks for Decommissioning and Waste Management Jonathan leech February 2016 +44 7825 171093 jonathan.leech@dentons.com Legal and Regulatory Frameworks for Decommissioning and

More information

Dounreay - The nature of the new contract & how it may impact the DSG.

Dounreay - The nature of the new contract & how it may impact the DSG. DSG(2012)C053 Dounreay - nature of the new contract & how it may impact the DSG. Presentation to the DSG 13 th June 2012 Nigel Lowe NDA Head of Programme DSRL 1 Agenda Historic Perspective Types of Contract

More information

UKAEA, Windscale Report to the West Cumbria Sites Stakeholder Group Date: October 2007

UKAEA, Windscale Report to the West Cumbria Sites Stakeholder Group Date: October 2007 UKAEA, Windscale Report to the West Cumbria Sites Stakeholder Group Date: October 2007 This report covers the period from 1 st April 2007 30 th September 2007 UKAEA In June, UKAEA opened an office at Westlakes.

More information

NUCLEAR WASTE MANAGEMENT AND DECOMMISSIONING BACKGROUND INFORMATION

NUCLEAR WASTE MANAGEMENT AND DECOMMISSIONING BACKGROUND INFORMATION Filed: 00-0- EB-00-000 Exhibit C Page of 0 0 0 NUCLEAR WASTE MANAGEMENT AND DECOMMISSIONING BACKGROUND INFORMATION.0 PURPOSE This evidence provides background information regarding OPG s nuclear waste

More information

OFFICIAL OFFICIAL. LC35 decommissioning programmes for Chapelcross and Hunterston A

OFFICIAL OFFICIAL. LC35 decommissioning programmes for Chapelcross and Hunterston A Title of document LC35 decommissioning programmes for Chapelcross and Hunterston A Request for Agreement under LC35(2) arrangements to change the LC35 decommissioning programmes to align them with Scottish

More information

Division for Europe STRATEGY FOR THE TECHNICAL COOPERATION PROGRAMME IN THE EUROPE REGION

Division for Europe STRATEGY FOR THE TECHNICAL COOPERATION PROGRAMME IN THE EUROPE REGION Division for Europe STRATEGY FOR THE TECHNICAL COOPERATION PROGRAMME IN THE EUROPE REGION (As adopted at the Europe Region National Liaison Officers Meeting, Vienna, Austria, on 19 February 2010) I. BACKGROUND

More information

LLWR Ltd NDA Head of Programme Report to WCSSG

LLWR Ltd NDA Head of Programme Report to WCSSG LLWR Ltd NDA Head of Programme Report to WCSSG 1 st August 2017 Cleator Moor Civic and Masonic Centre Page 1 of 4 LLWR Ltd NDA Head of National Programmes Report to WCSSG Contents Progress against NDA

More information

Instrument for Nuclear Safety Cooperation

Instrument for Nuclear Safety Cooperation Instrument for Nuclear Safety Cooperation Strategy for a Community Cooperation Programme in the field of Nuclear Safety 2014-2020 1 Instrument for Nuclear Safety Cooperation Strategy for a Community Cooperation

More information

MEMORANDUM OF UNDERSTANDING BETWEEN NDA AND SEPA

MEMORANDUM OF UNDERSTANDING BETWEEN NDA AND SEPA MEMORANDUM OF UNDERSTANDING BETWEEN NDA AND SEPA 1 Introduction 1.1. This Memorandum of Understanding ( MoU ) is between the Nuclear Decommissioning Authority ( NDA ) and the Scottish Environment Protection

More information

The Work of the NDA and UKAEA: Government Response to the Committee s Sixth Report of Session

The Work of the NDA and UKAEA: Government Response to the Committee s Sixth Report of Session House of Commons Trade and Industry Committee The Work of the NDA and UKAEA: Government Response to the Committee s Sixth Report of Session 2005-06 Sixteenth Special Report of Session 2004 05 Ordered by

More information

Managing risk reduction at Sellafield

Managing risk reduction at Sellafield REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 630 SESSION 2012-13 7 NOVEMBER 2012 Nuclear Decommissioning Authority Managing risk reduction at Sellafield Our vision is to help the nation spend wisely.

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 5.9.2013 C(2013) 5641 final COMMISSION DECISION of 5.9.2013 on the conclusion of a Memorandum of Understanding for a partnership between the European Atomic Energy Community

More information

Nuclear safeguards and security activities under Euratom research and training programme

Nuclear safeguards and security activities under Euratom research and training programme Nuclear safeguards and security activities under Euratom research and training programme Symposium on International Safeguards Vienna, 23 October 2014 S. Abousahl European Commission, Joint Research Centre

More information

TITLE IV NUCLEAR MATTERS Subtitle A Price-Anderson Act Amendments

TITLE IV NUCLEAR MATTERS Subtitle A Price-Anderson Act Amendments REDLINE OF CHAIRMAN S MARK 0 SEC. 0. SHORT TITLE. TITLE IV NUCLEAR MATTERS Subtitle A Price-Anderson Act Amendments This subtitle may be cited as the Price-Anderson Amendments Act of 00. SEC. 0. EXTENSION

More information

Proposal for a COUNCIL REGULATION. establishing an Instrument for Nuclear Safety Cooperation. {SEC(2011) 1472 final} {SEC(2011) 1473 final}

Proposal for a COUNCIL REGULATION. establishing an Instrument for Nuclear Safety Cooperation. {SEC(2011) 1472 final} {SEC(2011) 1473 final} EUROPEAN COMMISSION Brussels, 7.12.2011 COM(2011) 841 final 2011/0414 (NLE) Proposal for a COUNCIL REGULATION establishing an Instrument for Nuclear Safety Cooperation {SEC(2011) 1472 final} {SEC(2011)

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 26.10.2004 COM(2004) 719 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Report on the use of financial resources earmarked

More information

Official Journal of the European Union L 330/31 COMMISSION

Official Journal of the European Union L 330/31 COMMISSION 28.11.2006 Official Journal of the European Union L 330/31 COMMISSION COMMISSION RECOMMDATION of 24 October 2006 on the management of financial resources for the decommissioning of nuclear installations,

More information

Having regard to the Treaty establishing the European Atomic Energy Community, and in particular Articles 31 and 32 thereof,

Having regard to the Treaty establishing the European Atomic Energy Community, and in particular Articles 31 and 32 thereof, L 219/42 COUNCIL DIRECTIVE 2014/87/EURATOM of 8 July 2014 amending Directive 2009/71/Euratom establishing a Community framework for the nuclear safety of nuclear installations THE COUNCIL OF THE EUROPEAN

More information

COMPROMISE AMENDMENTS 1-8

COMPROMISE AMENDMENTS 1-8 EUROPEAN PARLIAMT 2009-2014 Committee on Industry, Research and Energy 2013/0340(NLE) 7.3.2014 COMPROMISE AMDMTS 1-8 Draft report Romana Jordan (PE526.123v02-00) on the proposal for a Council directive

More information

HORIZON 2020 Research & Innovation

HORIZON 2020 Research & Innovation HORIZON 2020 Euratom Research and Training Programme Work Programme 2018 Mykola DŽUBINSKÝ DG RTD/Directorate Energy/Unit G.4 NFRP-2018 call Instruments [1/3] Research and innovation actions Basic and applied

More information

LEAVING THE EU THE EURATOM TREATY PART 2: A FRAMEWORK FOR THE FUTURE

LEAVING THE EU THE EURATOM TREATY PART 2: A FRAMEWORK FOR THE FUTURE LEAVING THE EU THE EURATOM TREATY PART 2: A FRAMEWORK FOR THE FUTURE The nuclear industry is facing huge uncertainties, as the UK leaves the Euratom Treaty at the same time as the European Union. No amendment

More information

NEI [Revision 0] Use of the Nuclear Decommissioning Trust Fund

NEI [Revision 0] Use of the Nuclear Decommissioning Trust Fund NEI 15-06 [Revision 0] Use of the Nuclear Decommissioning Trust Fund [THIS PAGE IS LEFT BLANK INTENTIONALLY] NEI 15-06 [Revision 0] Nuclear Energy Institute Use of the Nuclear Decommissioning Trust Fund

More information

The SME Challenge A brief summary of the NDA Estate s approach to promote discussion and look to the future

The SME Challenge A brief summary of the NDA Estate s approach to promote discussion and look to the future The SME Challenge A brief summary of the NDA Estate s approach to promote discussion and look to the future Ron Gorham NDA Head of Supply Chain Optimisation and SME Champion Agenda Short introduction to

More information

Policy framework in Canada for mine closure and management of long term liabilities

Policy framework in Canada for mine closure and management of long term liabilities Policy framework in Canada for mine closure and management of long term liabilities Gilles A. Tremblay and Charlene M. Hogan Natural Resources Canada, Canada W.R. Cowan Cowan Minerals Ltd., Canada ABSTRACT

More information

Long term Plutonium management: Pre-consultation discussion paper covering decision methodology and timetable for decision making

Long term Plutonium management: Pre-consultation discussion paper covering decision methodology and timetable for decision making Long term Plutonium management: Pre-consultation discussion paper covering decision methodology and timetable for decision making October 2009 URN 09D/735 CONTENTS Section 1: Introduction Section 2: Background

More information

Statement on behalf of the Euratom Community

Statement on behalf of the Euratom Community Statement on behalf of the Euratom Community delivered on 27 September 2016 by Mr Gerassimos Thomas, Deputy Director-General, Directorate-General for Energy, European Commission on the occasion of the

More information

MAINE YANKEE LTP SECTION 7 UPDATE OF SITE- SPECIFIC DECOMMISSIONING COSTS

MAINE YANKEE LTP SECTION 7 UPDATE OF SITE- SPECIFIC DECOMMISSIONING COSTS MYAPC License Termination Plan MAINE YANKEE LTP SECTION 7 UPDATE OF SITE- SPECIFIC DECOMMISSIONING COSTS MYAPC License Termination Plan Page 7-i TABLE OF CONTENTS 7.0 UPDATE OF SITE- SPECIFIC DECOMMISSIONING

More information

Implementation of Financial Guarantees for Licensees

Implementation of Financial Guarantees for Licensees Implementation of Financial Guarantees for Licensees Discussion Paper DIS-11-01 Implementation of Financial Guarantees for Licensees Discussion Paper DIS-11-01 Minister of Public Works and Government Services

More information

Pickering Whole-Site Risk

Pickering Whole-Site Risk Pickering Whole-Site Risk Jack Vecchiarelli Manager, Pickering Relicensing Update to Commission Members December 14, 2017 CMD 17-M64.1 Outline Background Whole-site risk considerations Use of Probabilistic

More information

The Work of the Nuclear Decommissioning Authority (NDA) and the United Kingdom Atomic Energy Authority (UKAEA)

The Work of the Nuclear Decommissioning Authority (NDA) and the United Kingdom Atomic Energy Authority (UKAEA) The Work of the Nuclear Decommissioning Authority (NDA) and the United Kingdom Atomic Energy Authority (UKAEA) An Inquiry by the United Kingdom Parliament Trade and Industry Committee Memorandum by the

More information

The UK Nuclear Decommissioning Authority

The UK Nuclear Decommissioning Authority Public Services International Research Unit (PSIRU) The UK Nuclear Decommissioning Authority By Steve Thomas December 2004 Public Services International Research Unit (PSIRU), Business School, University

More information

Project Assessment Report ONR-SEL-PAR Revision 0B 29 February 2016 OFFICIAL. Template Ref.: ONR-DOC-TEMP-005 Revision 11 Page 1 of 13

Project Assessment Report ONR-SEL-PAR Revision 0B 29 February 2016 OFFICIAL. Template Ref.: ONR-DOC-TEMP-005 Revision 11 Page 1 of 13 Project Assessment Revision 0B 29 February 2016 Template Ref.: ONRDOCTEMP005 Revision 11 Page 1 of 13 Office for Nuclear Regulation, 2016 If you wish to reuse this information visit www.onr.org.uk/copyright

More information

NUCLEAR WASTE MANAGEMENT AND DECOMMISSIONING REVENUE REQUIREMENT IMPACT OF NUCLEAR LIABILITIES

NUCLEAR WASTE MANAGEMENT AND DECOMMISSIONING REVENUE REQUIREMENT IMPACT OF NUCLEAR LIABILITIES Filed: -0- Page of 0 0 NUCLEAR WASTE MANAGEMENT AND DECOMMISSIONING REVENUE REQUIREMENT IMPACT OF NUCLEAR LIABILITIES.0 PURPOSE The purpose of this evidence is to outline the OEB-approved revenue requirement

More information

LEGAL ASPECTS OF STRATEGIC PARTNERSHIPS

LEGAL ASPECTS OF STRATEGIC PARTNERSHIPS LEGAL ASPECTS OF STRATEGIC PARTNERSHIPS IAEA TM-52851 Anne-Lise Teani 10 FEBRUARY 2016 4 FÉVRIER 2016 CEA 10 AVRIL 2012 PAGE 1 INTRODUCTION What is a strategic partnership? Not a legal concept no definition

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 4 June /14 Interinstitutional File: 2013/0340 (NLE) ATO 45

COUNCIL OF THE EUROPEAN UNION. Brussels, 4 June /14 Interinstitutional File: 2013/0340 (NLE) ATO 45 COUNCIL OF THE EUROPEAN UNION Brussels, 4 June 2014 10410/14 Interinstitutional File: 2013/0340 (NLE) ATO 45 NOTE from: General Secretariat of the Council to: Delegations No. Cion prop.: 15030/13 ATO 119

More information

MAGNOX APPOINTMENT OF MANAGING DIRECTOR APPOINTMENT BRIEF MAY 2018

MAGNOX APPOINTMENT OF MANAGING DIRECTOR APPOINTMENT BRIEF MAY 2018 MAGNOX APPOINTMENT OF MANAGING DIRECTOR APPOINTMENT BRIEF MAY 2018 AN INTRODUCTION The Nuclear Decommissioning Authority (NDA) is a non-departmental public body created through the Energy Act 2004. Its

More information

Request for Acceptance of OPG s Financial Guarantee

Request for Acceptance of OPG s Financial Guarantee John Mauti VP Finance, Chief Controller & Accounting Officer 700 University Avenue, H17-G25 Toronto, Ontario M5G 1X6 Tel: (416) 592-4046 john.mauti@opg.com August 4, 2017 CD# N-CORR-00531-18741 MR. M.

More information

BREXIT BRIEFING. Euratom and Brexit. British Medical Association bma.org.uk

BREXIT BRIEFING. Euratom and Brexit. British Medical Association bma.org.uk BREXIT BRIEFING Euratom and Brexit British Medical Association bma.org.uk 2 British Medical Association Euratom and Brexit Key points Euratom facilitates a secure and consistent supply of radioisotopes

More information

Nuclear Innovation Cooperation In the Low-Carbon Perspective

Nuclear Innovation Cooperation In the Low-Carbon Perspective Nuclear Innovation Cooperation In the Low-Carbon Perspective NEA NI2050 Initiative Scope and Organisation Marc Deffrennes NI2050 Workshop July 2015 OECD/IEA 2010 OECD/IEA 2015 Nuclear Innovation 2050 A

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 11.4.2016 C(2016) 2182 final COMMISSION IMPLEMENTING DECISION of 11.4.2016 on the Annual Action Programme 2016 for Nuclear Safety Cooperation to be financed from the general

More information

MAIN BOARD LISTING RULES. Chapter 13

MAIN BOARD LISTING RULES. Chapter 13 MAIN BOARD LISTING RULES Chapter 13 EQUITY SECURITIES CONTINUING OBLIGATIONS Environmental and Social Matters 13.91 (1) The Environmental, Social and Governance ( ESG ) Reporting Guide in Appendix 27 comprises

More information

RADIOACTIVE SUBSTANCES FEES AND CHARGES (SCOTLAND) SCHEME 2015

RADIOACTIVE SUBSTANCES FEES AND CHARGES (SCOTLAND) SCHEME 2015 The Scottish Environment Protection Agency, in exercise of its powers under Section 41 of the Environment Act 1995 and in accordance with Section 42 thereof HEREBY with the approval of the Scottish Ministers,

More information

The Nuclear Decommissioning Authority s Magnox contract

The Nuclear Decommissioning Authority s Magnox contract A picture of the National Audit Office Logo Report by the Comptroller and Auditor General Department for Business, Energy & Industrial Strategy The Nuclear Decommissioning Authority s Magnox contract HC

More information

Responsible Property Investment (RPI) policy

Responsible Property Investment (RPI) policy Responsible Property Investment (RPI) policy Introduction Ardstone Capital is an independently owned property investment manager entirely focused on UK and European real estate. Ardstone act on behalf

More information

THE CEA FINANCIAL REPORT 2016

THE CEA FINANCIAL REPORT 2016 THE CEA FINANCIAL REPORT 2016 CEA FINANCIAL REPORT > WWW.CEA.FR CONTENT MANAGEMENT REPORT Implementation of the budget... page 1 Income... page 2 Expenditure... page 3 Staff... page 4 Investments... page

More information

Office for Nuclear Regulation

Office for Nuclear Regulation Office for Nuclear Regulation Civil Nuclear Reactor Programme Control and Instrumentation (C&I) workstream assessment to inform nuclear site licensing of NNB GenCo Hinkley Point C Assessment Report: ONR-CNRP-AR-12-092

More information

Environmental Permitting Charging Guidance

Environmental Permitting Charging Guidance Environmental Permitting Charging Guidance Effective from 1 April 2016 Contents Introduction 3 Part A Background to Regulation and Charging 5 What we for 9 Application. 10 Subsistence... 12 Variation.

More information

Information to shareholders

Information to shareholders Annual Report 2012 Information to shareholders ANNUAL GENERAL MEETING OF SHAREHOLDERS, APRIL 22, 2013 The Annual General Meeting will be held in Stockholm, World Trade Center, Klarabergs viadukten 70 /

More information

for the Oak Ridge Environmental Restoration Program Joyce L. Dail

for the Oak Ridge Environmental Restoration Program Joyce L. Dail -. \-- -_ ",TheBevelopment and Application of a Risk-based Prioritization Model *- DE%:2 8 19% for the Oak Ridge Environmental Restoration Program Joyce L. Dail University of Tennessee, Knoxville, Tennessee

More information

SET-PLAN IMPLEMENTATION

SET-PLAN IMPLEMENTATION SET-PLAN IMPLEMENTATION The Steering Group of the SET-Plan in its last meeting on October 28 th, 2010 agreed to speed-up the execution of activities of the Implementation Plans (IPs) of the European Industrial

More information

Legal and Regulatory Frameworks for Decommissioning and Waste Management

Legal and Regulatory Frameworks for Decommissioning and Waste Management PREDEC 2016: February 16-18, Lyon, France Legal and Regulatory Frameworks for Decommissioning and Waste Management 1 Introduction and abstract Jonathan LEECH Dentons UKMEA LLP, One Fleet Place, London,

More information

ANNEXES. to the. Proposal for a COUNCIL REGULATION

ANNEXES. to the. Proposal for a COUNCIL REGULATION EUROPEAN COMMISSION Brussels, 7.6.2018 COM(2018) 437 final ANNEXES 1 to 2 ANNEXES to the Proposal for a COUNCIL REGULATION establishing the Research and Training Programme of the European Atomic Energy

More information

Regulation of Commonwealth Radiation and Nuclear Activities

Regulation of Commonwealth Radiation and Nuclear Activities The Auditor-General Audit Report No.30 2004 05 Performance Audit Regulation of Commonwealth Radiation and Nuclear Activities Australian Radiation Protection and Nuclear Safety Agency Australian National

More information

Guide. Commission Recommendation

Guide. Commission Recommendation Guide to the Commission Recommendation on the management of financial resources for the decommissioning of nuclear installations, spent fuel and radioactive waste (2006/851/Euratom) 1 2 Objective of the

More information

Rainier, OR March 31, 2005 _ (503) VPN

Rainier, OR March 31, 2005 _ (503) VPN PG/N Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River HMhy Rainier, OR 97048 March 31, 2005 _ (503) 556-3713 VPN-012-2005 U. S. Nuclear Regulatory Commission ATTN: Document Control

More information

Proposal for a COUNCIL REGULATION. establishing an Instrument for Nuclear Safety Cooperation. {SEC(2011) 1472 final} {SEC(2011) 1473 final}

Proposal for a COUNCIL REGULATION. establishing an Instrument for Nuclear Safety Cooperation. {SEC(2011) 1472 final} {SEC(2011) 1473 final} EUROPEAN COMMISSION Brussels, 7.12.2011 COM(2011) 841 final 2011/0414 (CNS) Proposal for a COUNCIL REGULATION establishing an Instrument for Nuclear Safety Cooperation {SEC(2011) 1472 final} {SEC(2011)

More information

Period safety review PSR2015 concerning the Loviisa nuclear power plant Background

Period safety review PSR2015 concerning the Loviisa nuclear power plant Background Decision 1 (6) Fortum Power and Heat Oy Loviisa Nuclear Power Plant P.O. Box 23 FI-07901 LOVIISA Fortum letters LO1-A4-18360, 15 April 2015; LO1-A4-18117, 22 December 2014; LO1-A4-17995, 16 September 2014;

More information

Integrated Priority List (IPL) Discussion

Integrated Priority List (IPL) Discussion Integrated Priority List (IPL) Discussion John Lopez Office of Integration & Planning DOE-Savannah River Savannah River Site Citizens Advisory Board January 25, 2016 www.energy.gov/em 1 Purpose Provide

More information

Council of the European Union Brussels, 31 March 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Council of the European Union Brussels, 31 March 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union Council of the European Union Brussels, 31 March 2017 (OR. en) Interinstitutional File: 2017/0036 (NLE) 7892/17 RECH 100 ATO 12 PROPOSAL From: date of receipt: 23 February 2017 To: No. Cion doc.: Secretary-General

More information

RECORDS MANAGEMENT GUIDANCE & RETENTION SCHEDULE

RECORDS MANAGEMENT GUIDANCE & RETENTION SCHEDULE RECORDS MANAGEMENT GUIDANCE & RETENTION SCHEDULE Purpose This document is to be used as guidance for the retention of all records across the organisation. Included is a retention schedule in two formats,

More information

Elements of National Law and Decommissioning

Elements of National Law and Decommissioning Elements of National Law and Decommissioning By Carlton Stoiber IAEA Regional Workshop on Legal and Regulatory Aspects of Decommissioning of Research Reactors Manila June 2006 1 Definition of Nuclear Law

More information

Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection

Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection 1. Basic information 1.1 CRIS Number: 2007/019-301 1.2 Title: Assessment

More information

1. Delegations will find in the Annex the fifth revision of the above-mentioned proposal.

1. Delegations will find in the Annex the fifth revision of the above-mentioned proposal. Council of the European Union Brussels, 18 December 2018 (OR. en) Interinstitutional File: 2018/0252(NLE) 11126/5/18 REV 5 ATO 51 CADREFIN 159 NOTE From: To: General Secretariat of the Council Delegations

More information

Justification, Optimization and Dose Limits: The recent evolutions of National Regulations in European Countries

Justification, Optimization and Dose Limits: The recent evolutions of National Regulations in European Countries Justification, Optimization and Dose Limits: The recent evolutions of National Regulations in European Countries Caroline SCHIEBER 2011 ISOE NATC ALARA Symposium & EPRI Radiation Protection Conference

More information

Enterprise Risk Management process at Dragon Oil

Enterprise Risk Management process at Dragon Oil Enterprise Risk Management Risk Management Process Dragon Oil s business is potentially exposed to different risks. However, some business risks can be accepted by the Group provided that acceptance of

More information

Studsvik AB (publ) Interim Report, January September 2003

Studsvik AB (publ) Interim Report, January September 2003 PRESS RELEASE 1 (10) Studsvik AB (publ) Interim Report, January September 2003 Net sales for the Group amounted to SEK 832.3 million (743.2). Profit before tax improved and amounted to SEK 46.1 million

More information

Flood Risk Management Planning in Scotland: Arrangements for February 2012

Flood Risk Management Planning in Scotland: Arrangements for February 2012 Flood Risk Management Planning in Scotland: Arrangements for 2012 2016 February 2012 Flood Risk Management (Scotland) Act 2009 1 Contents Forewords 1. Introduction to this document... 5 2. Sustainable

More information

a GAO GAO NUCLEAR REGULATION NRC Needs More Effective Analysis to Ensure Accumulation of Funds to Decommission Nuclear Power Plants

a GAO GAO NUCLEAR REGULATION NRC Needs More Effective Analysis to Ensure Accumulation of Funds to Decommission Nuclear Power Plants GAO United States General Accounting Office Report to the Honorable Edward J. Markey, House of Representatives October 2003 NUCLEAR REGULATION NRC Needs More Effective Analysis to Ensure Accumulation of

More information

HINKLEY POINT C, a project of the EDF Group for the future. 27 June 2016

HINKLEY POINT C, a project of the EDF Group for the future. 27 June 2016 HINKLEY POINT C, a project of the EDF Group for the future 27 June 2016 Vincent de RIVAZ, Group Executive Director, CEO of EDF Energy 2 General information on the HPC project Location Technology Capacity

More information

Prepared in accordance with section 21(2) of the Hazardous Substances and New Organisms Act 1996

Prepared in accordance with section 21(2) of the Hazardous Substances and New Organisms Act 1996 Quick summary of consultation paper: Our fees are changing Prepared in accordance with section 21(2) of the Hazardous Substances and New Organisms Act 1996 Contact details Environmental Protection Authority

More information

U.S. NUCLEAR REGULATORY COMMISSION EXPERIENCE IMPLEMENTING A RISK-INFORMED GRADED APPROACH FOR INSTITUTIONAL CONTROLS TO RESTRICT SITE USE

U.S. NUCLEAR REGULATORY COMMISSION EXPERIENCE IMPLEMENTING A RISK-INFORMED GRADED APPROACH FOR INSTITUTIONAL CONTROLS TO RESTRICT SITE USE U.S. NUCLEAR REGULATORY COMMISSION EXPERIENCE IMPLEMENTING A RISK-INFORMED GRADED APPROACH FOR INSTITUTIONAL CONTROLS TO RESTRICT SITE USE R. L. Johnson U.S. Nuclear Regulatory Commission ABSTRACT The

More information

Registration application fee to be paid by Small-Scale Embedded Generator Applicants

Registration application fee to be paid by Small-Scale Embedded Generator Applicants Consultation Paper: Registration application fee to be paid by Small-Scale Embedded Generator Applicants Published 16 December 2018 Version 1 December 2018 Issued by The National Energy Regulator of South

More information

SECTION PS 3260 liability for contaminated sites

SECTION PS 3260 liability for contaminated sites SECTION PS 3260 liability for contaminated sites TABLE OF CONTENTS Paragraph Purpose and scope.01-.07 Recognition.08-.39 Environmental standard.09-.13 Contamination.14-.17 Direct responsibility.18-.22

More information

FERMA European Risk Manager Survey 2018

FERMA European Risk Manager Survey 2018 FERMA European Risk Manager Survey 2018 9 th Edition Table of contents Part I: The European Risk Manager Profile Part II: The risk conductor Part III: A challenging environment Part IV: Insurance management

More information

AIG Global Property Construction Risk Engineering

AIG Global Property Construction Risk Engineering AIG Global Property Construction Risk Engineering AIG is a leading provider of risk management and loss prevention services for Commercial Property, Energy and Construction risks worldwide. Through the

More information

Asset Stewardship Strategy

Asset Stewardship Strategy Asset Stewardship Strategy Contents 1. Foreword 3 2. Executive summary 4 3. Introduction 5 4. Current status 8 5. Implementing the Strategy 9 5.1 Delivery programme 9 5.2 The MER UK Asset Stewardship Board

More information

PART I PURPOSE AND SCOPE

PART I PURPOSE AND SCOPE PROCEDURE TITLE Executive Sponsor RESEARCH ASSET MANAGEMENT PROCEDURE - Vice-Principal Administration and Finance - Vice-Principal Research and Innovation Initial Approval Date February 13, 2018 Date of

More information

State and Tribal Government Working Group

State and Tribal Government Working Group State and Tribal Government Working Group Steve Trischman Director, Office of Budget and Planning May 2017 www.energy.gov/em 1 Agenda Primary Phases of Budget Planning and Budget Timeline How and When

More information

Approval of Licensee Arrangements Under LC35(4) (Decommissioning) and Withdrawal of Existing LC35(3) Approvals

Approval of Licensee Arrangements Under LC35(4) (Decommissioning) and Withdrawal of Existing LC35(3) Approvals Title of document Amendment to AWE approved LC35 arrangements 2018 Approval of Licensee Arrangements Under LC35(4) (Decommissioning) and Withdrawal of Existing LC35(3) Approvals Project Assessment Report

More information

HM Nuclear Installations Inspectorate

HM Nuclear Installations Inspectorate http://www.hse.gov.uk/nuclear/awe/awe00-02.htm HM Nuclear Installations Inspectorate Weapons Establishment Sites to AWE plc EXECUTIVE SUMMARY The safety of licensed nuclear installations in the UK is the

More information

The European Waste Directive: Gunnar Buckau, JRC-ITU

The European Waste Directive: Gunnar Buckau, JRC-ITU The European Waste Directive: Structure, Content and Implementation Guidance Operational Issues in Radioactive Waste Management and Nuclear Decommissioning Summer School September 2014, ISPRA The European

More information

REFURBISHMENT AND NEW GENERATION NUCLEAR

REFURBISHMENT AND NEW GENERATION NUCLEAR Filed: 00--0 EB-00-00 Exhibit D Tab Page of 0 0 0 REFURBISHMENT AND NEW GENERATION NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear plant refurbishment

More information

Policy and Procedures on Risk Management

Policy and Procedures on Risk Management Policy and Procedures on Risk Management 4 th January 2008 Policy... 1 Procedures... 1 Appointment of assessors and training... 2 Risk Assessment... 2 Health and Safety Action Plans... 4 Background information

More information

DATA ANALYSIS AND COLLECTION FOR COSTING OF RESEARCH REACTOR DECOMMISSIONING ( DACCORD PROJECT, PHASE 2)

DATA ANALYSIS AND COLLECTION FOR COSTING OF RESEARCH REACTOR DECOMMISSIONING ( DACCORD PROJECT, PHASE 2) INTERNATIONAL ATOMIC ENERGY AGENCY DATA ANALYSIS AND COLLECTION FOR COSTING OF RESEARCH REACTOR DECOMMISSIONING ( DACCORD PROJECT, PHASE 2) TERMS OF REFERENCE September, 2016 01 S e p t e m b e r 2 0 1

More information

Spinifex Ridge Molybdenum Project

Spinifex Ridge Molybdenum Project Spinifex Ridge Molybdenum Project MOLY MINES LIMITED Annual Environmental Report Ministerial Statement 772 (5 th August 2008) Ministerial Statement 948 (2 nd September 2013) June 2017 Document history

More information

EUROPEAN ATOMIC ENERGY COMMUNITY REPORT. On the implementation of the obligations under the Convention on Nuclear Safety

EUROPEAN ATOMIC ENERGY COMMUNITY REPORT. On the implementation of the obligations under the Convention on Nuclear Safety EUROPEAN COMMISSION EUROPEAN ATOMIC ENERGY COMMUNITY REPORT On the implementation of the obligations under the Convention on Nuclear Safety 7 th Review meeting of the Contracting Parties to the Convention

More information

European Court of Auditors

European Court of Auditors 21 September 2016 European Court of Auditors International Conference on Financing of Decommissioning, OECD Stockholm, Sweden 20-21 September 2016 Session 3: Risk Management The European Court of Auditors

More information

Quantitative Risk Assessment Process of Fuel Assembly Retrieval from Spent Fuel Pool in Fukushima Daiichi Nuclear Power Plant Decommissioning

Quantitative Risk Assessment Process of Fuel Assembly Retrieval from Spent Fuel Pool in Fukushima Daiichi Nuclear Power Plant Decommissioning PSA 2017 September 25-28, 2017 Quantitative Risk Assessment Process of Fuel Assembly Retrieval from Spent Fuel Pool in Fukushima Daiichi Nuclear Power Plant Decommissioning Presented by Akira Yamaguchi

More information

GLOSSARY - ENERGY NORTHWEST Fiscal Year 2016

GLOSSARY - ENERGY NORTHWEST Fiscal Year 2016 ALLOCATION: A process to spread indirect overhead costs to other business units based on a common cost pool. AMORTIZATION: A method of allocating (accruing) costs to fiscal periods to match costs with

More information

EU Council Adopts Revised Nuclear Safety Directive

EU Council Adopts Revised Nuclear Safety Directive GLOBAL NUCLEAR GROUP CLIENT PUBLICATION 14 August 2014 EU Council Adopts Revised Nuclear Safety Directive If you wish to receive more information on the topics covered in this publication, you may contact

More information

PART O DECOMMISSIONING

PART O DECOMMISSIONING Sec. O.1 - O.3 SSRCR Volume I August 2000 PART O DECOMMISSIONING Sec. O.1 - Purpose. This Part provides for removing safely from service a facility or site having radioactive material, a radiation-producing

More information

EUROPEAN ATOMIC ENERGY COMMUNITY REPORT

EUROPEAN ATOMIC ENERGY COMMUNITY REPORT EUROPEAN ATOMIC ENERGY COMMUNITY REPORT On the implementation of the obligations under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management ------------------------------------------

More information

Coalition for Epidemic Preparedness Innovations. CEPI Cost Guidance Version:

Coalition for Epidemic Preparedness Innovations. CEPI Cost Guidance Version: Coalition for Epidemic Preparedness Innovations CEPI Cost Guidance Version: 29.06.2018 Contents Direct eligible costs... 2 Indirect costs... 2 Sub-awardee costs... 3 Non-eligible costs... 3 In-kind contributions...

More information

Infrastructure ESG policy guidelines

Infrastructure ESG policy guidelines Infrastructure policy guidelines At AMP Capital Investors Limited (AMP Capital), we recognise that environmental, social and governance () issues can impact the long-term performance of our investment

More information

The financing system for nuclear waste management

The financing system for nuclear waste management RiR 2017:31 The financing system for nuclear waste management Summary and recommendations Audit background Up to now the costs in Sweden for dismantling, research and management of nuclear waste and spent

More information

Decommissioning Funding: Ethics, Implementation, Uncertainties

Decommissioning Funding: Ethics, Implementation, Uncertainties Radioactive Waste Management ISBN 92-64-02312-7 Decommissioning Funding: Ethics, Implementation, Uncertainties A Status Report OECD 2006 NEA No. 5996 NUCLEAR ENERGY AGENCY ORGANISATION FOR ECONOMIC CO-OPERATION

More information

November 2016 Revision

November 2016 Revision APPENDIX C - SAFETY AND ENVIRONMENTAL ISSUES LICENSING AND OPERATORSHIP LICENSING AND OPERATORSHIP The Offshore Petroleum Licensing (Offshore Safety Directive) Regulations 2015 (the OSD Licensing Regulations)

More information

Provisions, Contingent Liabilities and Contingent Assets

Provisions, Contingent Liabilities and Contingent Assets Indian Accounting Standard (Ind AS) 37 Provisions, Contingent Liabilities and Contingent Assets (This Indian Accounting Standard includes paragraphs set in bold type and plain type, which have equal authority.

More information

Wayne Pearson, Chief Executive Officer Chris Kelly, Group Finance Director. Interim Results. for the six months ended 31 March 2018.

Wayne Pearson, Chief Executive Officer Chris Kelly, Group Finance Director. Interim Results. for the six months ended 31 March 2018. Wayne Pearson, Chief Executive Officer Chris Kelly, Group Finance Director Interim Results for the six months ended 31 March 2018 June 2018 Agenda Highlights Strategic update Operational overview Financial

More information