This page was intentionally left blank.

Size: px
Start display at page:

Download "This page was intentionally left blank."

Transcription

1

2 This page was intentionally left blank.

3 Table of Contents Capital Budget and Forecast 5 One Capital Budget 5 Long-term Capital Plan 7 Programs of Work 9 Corporate Administration 11 Contaminated Sites 17 Downtown Implementation 20 Economic Development 24 Full Corridor Reconstruction 27 Stormwater Management 30 Transportation 33 Wastewater Management 37 Water Services 41 Emergency Services 45 Active Transportation 48 Parks & Open Spaces 51 Recreation and Culture 55 Transit 59 Solid Waste 62 Appendix 1: Debt Continuity Schedule ( 000s) 66 Appendix 2: Council Shared Agenda 67 Appendix 3: 2018 Project List and Forecast Summary 68 Appendix 4: Reserve Fund Continuity (forecasted) Capital Budget and Forecast 3

4 This page was intentionally left blank Capital Budget and Forecast 4

5 Capital Budget and Forecast The following elements were considered by staff when prioritizing capital investments for 2018 and identifying investments for 2019 through Health and safety of our community Legislated or regulatory environment mandated Contractual obligations Council Shared Agenda, previous Council decisions and the Corporate Administrative Plan Enterprise Risk Management Criterion Ensure there is capacity to successfully execute capital projects One Capital Budget For the first time we are providing Council with a single, fully integrated capital budget for approval separate from the respective Operating budgets that fund the various capital reserves. The 2018 Capital budget of $90,788,062 is funded from numerous sources and combining all projects into one document demonstrates the complete integration of those funding sources. The capital budget will also be approved in advance of the Operating budget, which further demonstrates the distinction between capital reserve transfers (operating budget) and capital expenditures (capital budget). As we work to achieve sustainable levels of capital funding for all City assets this distinction will assist in focusing on the long-term funding needs vs. the short-term project priorities. In line with the recently approved capital transfer allocation policy, the ten year forecast shows the tax funded reserves being closely aligned with the policy. Figure 1, Tax Funding Allocation % 12% Infrastructure Renewal, 79% City Building, 9% Growth, 12% 79% The total 2018 budget, including all sources of funding, is heavily focused on infrastructure renewal, with 79 per cent of the requested budget going towards projects that will provide for the replacement, renewal or reconstruction of existing City assets. These projects ensure that the City is able to deliver services while maintaining health and safety standards and meeting legislative requirements. The 17 per cent of the budget attributed to growth is primarily funded from Development Charges and supports projects required to meet the increased demands on City services by new residents and businesses. The 4 per cent of the budget invested in City building reflects ongoing projects to enhance City services to improve the overall benefit to all citizens Capital Budget and Forecast 5

6 Figure 2, 2018 Capital Expenditure Type Figure 3, Capital Expenditure Type 17% 4% 26% 10% 64% 79% Infrastructure Renewal, 79% City Building, 4% Growth, 17% Infrastructure Renewal, 64% City Building, 10% Growth, 26% The recommended Capital Budget and Forecast represents administration s response to the challenge of balancing a wide and complex range of short-term and longterm needs within existing resources. The 2018 capital requirements are 100 per cent funded based on current funding levels meaning that through prioritization, some projects were deferred to future years. The approval of the Dedicated Infrastructure Levy in 2017 enabled the City to step in the right direction towards funding tax supported capital at a sustainable level but we have not yet met this target. Capital reserves are important to address unexpected events such as asset breakdown, partnerships with other levels of government such as GO/Metrolinx and to plan for long term large asset replacement such as major facilities. Part of the sustainable funding approach is to ensure capital reserves are built to accommodate these activities and to mitigate against fluctuations in the tax rate in any given year. The Dedicated Infrastructure Levy assists in building tax supported funding to this sustainable level based on a 100 year capital replacement forecast. Reserve Fund Forecasted Balances Tax Funded 2018 Year End Contaminated Sites $133,000 Infrastructure Renewal $2,550,000 Growth $1,050,000 City Building $250,000 Rate Funded Stormwater $50,000 Wastewater $50,650,000 Water $31,175, Capital Budget and Forecast 6

7 Long-term Capital Plan As previously highlighted the Capital forecast is not fully funded, the main shortage in funding is related to tax funded transfers from operating. Even with a continuation of an annual 0.5 per cent increase via the Dedicated Infrastructure Levy until 2026 the level of funding would not be sufficient to accommodate all the projects identified. Significant re-sequencing of projects is required in order to make the long-term capital plan sustainable. This work will be carried out by staff throughout 2019, with interaction with Council to discuss impacts to project timing and scope. The goal is to provide Council with a realistic and fully funded capital forecast as part of the 2019 Capital budget. One key element to this forecast is funding certainty; Councils commitment to the annual approval of a 0.5per cent increase in the tax levy to provide additional funding to capital reserves until Without certainty in the base funding assumptions, the capital forecast to be built by staff will not be meaningful. Staff will be seeking clarity on this through the operating budget deliberations in December Debt The appropriate use of debt to cash flow large scale projects is a key part of the long-term capital plan. Currently forecasted in the 10 year plan is the use of debt for three significant projects; South End Community Centre ($43,400,000), new Main Library ($35,000,000) and Downtown Redevelopment ($9,000,000). Current Approved and Forecasted Debt Funding ( 000s) Table 1, Current Approved Obligations Description Year of Issue Amount Tax, DC or Other Previously issued debt Various $133,495 Various Previously approved 2019 $28,349 Tax Previously approved 2019 $12,200 DC Total $181,193 Table 2, 2018 Proposed Description Year of Issue Amount Tax, DC or Other Fuel tank 2019 $250 Tax replacement Total $ Capital Budget and Forecast 7

8 Table 3, Forecast Description Year of Issue Amount Tax, DC or Other South End Rec 2020 $11,400 Tax Centre South End Rec 2020 $32,000 DC Centre Downtown Library 2022 $35,000 Tax Downtown 2022 $9,000 Tax Redevelopments Total $87,400 In addition, the City is reserving a portion of debt capacity for the potential purchase of land needed as per the facility needs assessment mentioned earlier. For complete debt continuity schedule see appendix Capital Budget and Forecast 8

9 Programs of Work The following programs have been laid out to more closely align with front facing service delivery. This is intended to provide the public and Council with a clearer picture of the capital needs of the City s core services. Each program has a lead area(s) identified but is supported by a number of departments. New for 2018 is the Corporate Administration Program, this program is focused on providing the capital infrastructure that City departments rely on to provide services to their customers. The departments that support this program are focused on key initiatives to support the long-term operations and efficiency of the corporation. Operating Impacts City Building and Growth projects directly impact department operating budgets in order to support or deliver the enhanced or expanded service projects that will have a direct impact on future operating budgets have been identified. These items will come forward as part of the base budget and not as individual expansions as part of the 2019 operating budget. Departments continue to work at projecting out long term impacts of future capital work as well as the impacts of delaying capital projects into future years. As the 2019 capital budget is developed, these items will be refined and shared as part of the long-term capital plan. Table 4, 2019 Operating Impacts Program of Work Division 2019 Operating Impact Corporate Administration IT Licencing $80,000 Corporate Administration Corporate Asset Management $60,000 Downtown Implementation Parks Operations $15,000 Transportation System Road & Right of way $28,700 Water Services Water Services $209,600 Active Transportation Parks Operations $14,160 Parks & Open Spaces Parks Operations $7,500 Transit Mobility Transit $145,000 Total Tax Supported $350,360 Total Non-tax Supported $209, Capital Budget and Forecast 9

10 Table 5, Directory of Programs of Work Program of Work 2018 Capital Budget 2019 Operating Impact Page Corporate Administration $6,601,600 $140, Contaminated Sites $2,645,000 $0 17 Downtown Implementation $6,704,000 $15, Economic Development $625,000 $0 24 Full Corridor Reconstruction $20,440,000 $0 27 Stormwater Management $1,295,000 $0 30 Transportation $5,705,000 $28, Wastewater $9,737,700 $0 37 Water $15,320,060 $209, Emergency Services $3,523,700 $0 45 Active Transportation $1,214,000 $14, Parks & Open Spaces $5,195,500 $7, Recreation & Culture $2,201,200 $0 55 Transit $6,460,802 $145, Solid Waste $3,719,500 $0 62 Total $90,788,062 $559,960 Each program contains highlights of the 2018 projects, a summary of 2018 budgets and funding and a summary of the forecast. For additional details see appendix 3. Abbreviations used in the Programs of work Corporate Services Public Services Infrastructure, Development and Enterprise CS PS IDE Capital Budget and Forecast 10

11 Corporate Administration Lead departments: Engineering and Capital Infrastructure, IDE Facilities Management, IDE Information Technology, CS Planning, Building and Urban Design, IDE 2018 Capital investment: $6,601, Operating budget investment: $140, to 2027 Capital investment: $52,881,405 Figure 4, 2018 Capital Expenditure Type 6% 3% Figure 5, 2019 to 2027 Capital Expenditure Type 11% 2% 91% Infrastructure Renewal, 91% City Building, 6% Growth, 3% 87% Infrastructure Renewal, 87% City Building, 2% Growth, 11% Description Focused on ensuring the overall administrative operations of the corporation are able to effectively deliver service and guidance to the City s service delivery areas. Four key areas: Corporate Asset Management Facilities Management Information Technology Planning, Building and Urban Design The Corporate Asset Management division through the implementation of the asset management program provides better accountability, sustainability, risk management, Capital Budget and Forecast 11

12 service management and financial efficiency. This is accomplished by leading and assisting service areas through the exercises required to develop a comprehensive asset management plan. These include, risk assessments, inventory collection and recording, asset condition assessments, level of service studies and integrated asset investment decision making. The Facilities Management department is responsible for ensuring the ongoing operations of all City facilities, ensuring that all health and safety, accessibility and operational needs are met. This includes planning for the long-term needs of service areas. One current focus is on the need to replace a number of significant facilities within the next 10 to 20 years; this includes main operating facilities for Operations, Park Operations, Fire, Paramedics and Transit. Corporate Facilities Management is currently undertaking a comprehensive space needs assessment involving all these groups as well as considering impacts to other facilities. The outcome of this study will inform capital needs over the next 20 years and will be reflected in the long-term capital plan presented as part of the development of the 2019 capital budget. The Information Technology department is working to implement the final stages of the Corporate Technology Strategic Plan that was approved several years ago. Completion of this plan will see the City having introduced new technology and enhanced capabilities as well as maximizing the value of current systems through improved integration and expanded capacity. This work will allow service areas to access information easier, provide better information and plan for the future with more reliability. The Planning department is responsible for leading and coordinating a number of studies and plans related to the City s Official Plan with respect to development of policies and plans as well as the implementation of policy directions through the development of manuals/guidelines/area specific studies. These plans have a significant impact on the City s growth related infrastructure needs based on levels of intensification and zoning policies. Further these plans contribute to the assumptions used in setting development charge rates; a significant capital revenue stream for the City. Each department ensures a consistent corporate approach with respect to the assets under their area of expertise. Where applicable, service specific capital budgets related to facilities, equipment and planning have been included in the appropriate program of work Capital Budget and Forecast 12

13 Benefits and Risks Providing corporate standards and consistency in these areas ensures that citizens experience a consistent look and feel in there interactions with the corporation. Risks of not ensuring corporate approach to these areas may lead to incompatible systems and strategies which may lead to decreases in overall service efficiency and increased costs of delivery. Facilities Management Enhancing community experience by maintaining the buildings in good working condition Ensuring that the City is able to provide services without interruption to laid out programs. Providing the functions needed, at the right levels of comfort, so that staff are able to maintain the levels of service that they are required to Ensuring that these facilities are accessible to community members with special needs and comply with Accessibility for Ontarians with Disabilities Act requirements Providing a safe environment for community in keeping with Crime Prevention Through Environmental Design (CPTED) requirements Ensuring facilities are sustainable and efficient in terms of energy and water usage Delays in replacement and repair of facilities can lead to increased operating costs Prevention again lost revenue due to unscheduled or unplanned shutdowns Human rights challenges where accessibility requirements do not meet the current legislation can be costly i.e. Accessibility for Ontarians with Disabilities Act(AODA) or Facility Accessibility Design Manual (FADM) Information Technology Completion of critical work to provide the benefits envisioned by the Corporate Technology Strategic Plan Continued momentum of progress from recent activities to maximize the investment to date Best practice lifecycle program of equipment ensures City staff area able to deliver required services Delays in project approval may result in lost value, time and missed opportunities Legislative non-compliance for critical data and systems can be costly Service delivery interruption due to unavailable data and tools to front line staff can mean lost revenues, increased costs and reputational concerns Planning Studies are essential in both the capital and operating planning processes for front line service delivery departments. Provide Council with critical decision-making information for long-range planning of the City Assist in aligning the desires of the public, development and business communities and Council Ensure compliance with provincial plans and legislation Capital Budget and Forecast 13

14 Uncertainty in future plans may lead to inefficient use of resources or poor outcomes Lack of clarity in future needs impacts the City s ability to effectively plan for future financial requirements Corporate Asset Management The asset management program provides better accountability, sustainability, risk management, service management and financial efficiency through: improved financial performance; informed asset investment decisions; managed risk; improved services and outputs; demonstrated social responsibility; demonstrated compliance; enhanced reputation; improved organisational sustainability, and improved efficiency and effectiveness highlights Facilities Management Building condition assessments Needs assessments for space and location efficiency Structural repairs to ensure integrity of all facilities Accessible facilities in terms of AODA within available budgets Energy/water and material efficiency is built into all new construction and renovations Information Technology Council Chamber updates Audio/visual and systems enhancements Electronic meeting management Physical remodeling of Council Chambers Enterprise systems modernization Citizen relationship management (CRM) Digital services and online citizen portal (myguelph) Automating business processes and data integration (Service Oriented Architecture [SOA]) New system functionality to manage Human Resources and Finance workflow Data management and enhanced reporting Lifecycle and asset management Computers, mobility, network, software and telephony lifecycle Regulatory compliance and efficiency measures Capital Budget and Forecast 14

15 Cybersecurity enhancements Network modernization (ex. Virtual Desktop Infrastructure [VDI]) Server virtualization and private cloud technologies ( pay for use efficiencies) Planning Environmental Initiatives Zoning By-law Review Official Plan Review Corporate Asset Management Completion of the implementation of the Enterprise Asset Management System Analysis, selection and implementation of an IT based Decision Support System to aid in the City wide asset related decision making Operating impacts Forecasted 2019 impacts from 2018 recommended capital spending will be $140,000 CRM: $80,000 annually for licencing and maintenance Decision Support System:$60,000 annually for licencing and maintenance Operating impacts from future year s capital budget will be identified as work progresses on the Corporate Asset Management Plan. These impacts will be shared with Council as they are developed and in future budgets. Table 6, 10 Year Financial Investment ('000s) Corporate Asset Management Equipment & Vehicles 3,138 3,851 2,952 2,206 2,795 12,719 Facilities Management 1,474 4,984 2,208 1,709 1,520 8,791 Planning & Studies 465 1,195 1, ,285 4,275 Total 6,002 10,330 6,510 4,665 5,600 25, Capital Budget and Forecast 15

16 Table 7, 2018 Budget Approval ('000s) Project Budget Corporate Asset Management Levels of Service 75 Decision Support System 650 Enterprise Asset Management Optimization 200 Equipment & Vehicles Council Chamber Upgrades 480 Court Building Equipment 40 Information Technology Lifecycle 2,508 Information Technology Strategic Plan 110 Facilities Management Corporate Wide Accessibility 536 Court Facility 15 Security Infrastructure Replacement 73 Structural Assessment & Repairs 850 Planning & Studies City Planning 465 Table 8, 2018 Budget Approval ('000s) Funding source Funding amount Tax reserves 4,717 Development charges 157 Grants 160 Own revenue 39 Rate Reserves 848 Partner 81 Total 6,002 Figure 6, 2018 Funding Sources 1% 14% 1% 3% 3% 78% Tax Reserves, 79% Development Charges, 3% Grants, 3% Own Revenues, 1% Rate Reserves, 14% Partner, 1% Capital Budget and Forecast 16

17 Contaminated Sites Lead departments: Engineering and Capital Infrastructure, IDE 2018 Capital investment: $2,645, Operating budget investment: $ to 2027 Capital investment: $24,230,000 Figure 7, 2018 Capital Expenditure Type Figure 8, 2019 to 2027 Capital Expenditure Type 40% 60% Infrastructure Renewal, 60% City Building, 40% Growth, 0% 100% Infrastructure Renewal, 0% City Building, 100% Growth, 0% Description Consists of the investments required to manage and mitigate the City s liabilities associated with city owned environmentally contaminated sites. There are at least 43 City owned properties, roads and/or right-of-way (ROW) that are known to be contaminated or are potentially contaminated based on their historical usage (e.g. as former industrial or commercial uses or historical landfill sites). The financial liability associated with these sites was identified and accounted for under the Public Sector Accounting Board (PSAB) Standard PS 3260 Liability for Contaminated Sites in 2015 and the City estimates it could cost up to $30 million to maintain, mitigate, or remediate these properties based on current information. The main focus is to manage the City s contaminated site liabilities from an engineering perspective Capital Budget and Forecast 17

18 Benefits and associated risks The benefits to managing these sites include: investing in our assets to prepare them for potential divestiture or redevelopment, working towards revitalizing neighborhoods, reducing the city's liability for contaminated sites, protecting the city's groundwater, managing public health/safety, compliance with the Ministry of the Environment and Climate Change (MOECC). A second focus is on cultivation of potential investment partnerships with other levels of government and/or the private sector. Active discussion and promotion of the potential for redevelopment of sites is key to accessing external sources of funding. The risks of not managing the contaminated site portfolio include: fines for non compliance with MOECC orders, issuance of future orders (loss of control of scope, schedule, and cost), stalling redevelopment, exacerbation of contamination (i.e., making the problem worse), continued liability (reported in City s Financial Statements)), and risk to public health/safety and environmental protection will not be managed. Inadequate funding of redevelopment promotion may impede the City s ability to respond in a business like manner with the Council-approved development partners. It may also put the City s ability to re act quickly to Provincial/Federal funding program announcements, which may benefit the remediation of these brownfield properties highlights Environmental Due Diligence Environmental Data Management Contaminated Site Operations Maintenance &Management Phase I Environmental Site Assessments Operating impacts No forecasted 2019 impacts from 2018 recommended capital spending. As additional investigation work is undertaken on the various sites, potential operating impacts may be identified and brought forward as part of future capital budgets. Table 9, 10 Year Financial investment ('000s) Beverley St 1, Baker St Parking Lot 550 1, Fountain St Parking Lot ,075 9,650 Municipal St Other Environmental Work ,400 1,485 1,885 2,630 Total 2,645 3,380 2,525 1,835 3,135 13, Capital Budget and Forecast 18

19 Table 10, 2018 Budget Approval ('000s) Project Budget 200 Beverley St. 1,150 Baker St Parking Lot 550 Fountain St Parking Lot 100 Municipal St. 250 Other Environmental Work 595 Table 11, 2018 Budget Funding ('000s) Figure 9, 2018 Funding Sources Funding source Funding amount Tax reserves 1,045 Development charges Grants Own revenue Rate Reserves 1,350 Partner Debt 250 Total 2,645 9% 40% 51% Tax Reserves, 40% Development Charges, 0% Grants, 0% Own Revenues, 0% Rate Reserves, 51% Partner, 0% Debt, 9% Capital Budget and Forecast 19

20 Downtown Implementation Lead departments: Business, Development and Enterprise, IDE 2018 Capital investment: $6,704, Operating budget investment: $15, to 2027 Capital investment: $115,756,100 Figure 10, 2018 Capital Expenditure Type 2% 3% Figure 11, 2019 to 2027 Capital Expenditure Type 22% 34% 95% Infrastructure Renewal, 95% City Building, 2% Growth, 3% 44% Infrastructure Renewal, 34% City Building, 44% Growth, 22% Description The Downtown Secondary Plan is a comprehensive vision for revitalizing and intensifying the population and economic activity levels of downtown Guelph through to It addresses the requirements of both municipal and provincial growth plans by planning for increased residential development to complement the growth of our commercial, employment and cultural activities in the downtown core. The implementation of the Secondary Plan is complex, requiring the alignment of projects and partnerships between the City, private landowners, institutions, downtown businesses, neighbours and others. Benefits and associated risks Significant private sector development momentum has been created around the Downtown Secondary Plan since There are over 1,000 housing units and over 100,000sqft of commercial space that has been approved, is in development, or has been constructed over the past five years. This progress represents approximately one-third of the growth targets in the 2031 planning horizon and has created significant new assessment growth and economic activation in the downtown for the benefit of the city as a whole Capital Budget and Forecast 20

21 The downtown has a new role as a contributor to new, dense assessment growth which supports the City meeting its budget targets and community objectives. Major components to implementation consist of the continuation of: Vision and Policy Alignment (Downtown Secondary Plan, Downtown Zoning By-law Update, etc.) Infrastructure Renewal (Street and Linear Infrastructure reconstructions) Land Availability (both publicly and privately held) Access and Transportation investments, including Guelph Central Station, Parking and Transit Private investment (supported and shaped through the Downtown Community Improvement Plan programs) Public investment (in such things as our major anchor visitation drivers and community assets such as the Guelph Public Library, Sleeman Centre and RiverRun Centre) 2018 and 2019 priorities have been set through recent Council direction on the Parking Master Plan, including the Wilson Street Parkade, as well as the marketing of Baker Street as a development opportunity, which come with the interconnected investments in on-street reconstructions and program elements such as the Guelph Public Library. Related documents to Downtown Implementation Downtown Parking Master Plan Award of Wilson Street Parkade Design-Build Contract (page 3) Downtown Guelph Secondary Plan Implementation (page 11) GPL Presentation to City Council 2018 highlights Main Branch Library, Continued work on the business case and RFP participation details as part of the Baker District Redevelopment. Parking As per the Parking Master Plan, this funding is for the continued reinvestment in the existing parking system, particularly in IT systems upgrades and existing parkade restoration work. Parks & Open Spaces Phase 2 Riverwalk implementation this is the ongoing partnership contribution with The Metalworks on Arthur Street for the construction of the Speed River public space between Elizabeth and Neeve Streets Capital Budget and Forecast 21

22 Planning & Studies Funding to support the RFP process and partnership evaluation for Baker District Redevelopment process. Transportation and Utilities The major project for 2018 is Phase 4 of the Arthur Street Trunk Re-alignment project (from Cross to Elizabeth) In addition, the design phase of Wyndham Street North reconstruction will be commenced (in preparation for future phased reconstruction projects from Carden to Woolwich Street, including St. George s Square) Operating impacts Forecasted 2019 impacts from 2018 recommended capital spending will be $15,000 Park & Recreation Department - $15,000 Riverwalk Trail Operations and maintenance Guelph Public Library any impacts to the capital spending will be discovered during the completed Business Case for the new Main Library as per the Tier-1 capital project. Estimated impacts from forecasted capital spending will be included in future years capital budgets as they are more clearly defined through current work being undertaken. Table 12, 10 Year Financial Investment ('000s) Main Library 100 1,900 55,200 Parking 1,325 1, ,340 1,341 5,221 Parks & Open Spaces 100 1, ,700 1,000 Planning & Studies 126 Transportation & Utilities 5, ,958 10,748 5,546 4,967 Total 6,704 5,498 63,220 12,263 23,587 11, Capital Budget and Forecast 22

23 Table 13, 2018 Budget Approval ('000s) Project Budget Main Library Main Branch Library Business Case 100 Parking Parkade Facility Lifecycle 1,325 Parks & Open Spaces Downtown Riverwalk 100 Planning & Studies Baker Street 126 Transportation & Utilities Wyndham St. Planning & Design 400 Arthur Trunk Sewer: Howitt St. to Wyndham St. 100 Arthur Trunk Sewer: Cross St. to Macdonell St 4,553 Table 14, 2018 Budget Funding ('000s) Funding source Funding amount Tax reserves 1,769 Development 223 charges Grants 2,094 Own revenue Rate Reserves 2,618 Partner Total 6,704 Figure 12, 2018 Funding Sources 39% 27% 3% 31% Tax Reserves, 26% Development Charges, 3% Grants, 31% Own Revenues, 0% Rate Reserves, 39% Partner, 0% Capital Budget and Forecast 23

24 Economic Development Lead department: Business Development and Enterprise 2018 Capital investment: $625, Operating budget investment: $ to 2027 Capital investment: $19,140,500 Figure 13, 2018 Capital Expenditure Type Figure 14, 2019 to 2027 Capital Expenditure Type 100% Infrasturcture Renewal, 0% City Building, 100% Growth, 0% 100% Infrastructure Renewal, 0% City Building, 100% Growth, 0% Description Economic development requires the City to invest in studies and assets that support the growth of businesses and residents within the City. Two key initiatives are the Hanlon Creek Business Park (HCBP) and the completion of the new Prosperity 2030 Plan. The Hanlon Creek Business Park is a joint venture business park subdivision between the City and three private property owners. Prosperity 2030 is a key guide for businesses when making long-term investments in the City. Benefits and associated risks HCBP work ensures the City is being compliant with environmental conditions of subdivision approval for Phase 1 as provided by the Ontario Municipal Board. The resulting work will also allow for the pre-engineering/environmental assessment work that is required to achieve final development approvals for Phase Capital Budget and Forecast 24

25 Failure to complete the Prosperity 2030 plan will create uncertainty which may delay or inhibit investment in the City highlights Environmental Monitoring Programs Annual Groundwater & Wetland Monitoring Annual Aquatic, Terrestrial & Wildlife Movement Monitoring Real Estate Marketing and Transactional Costs Legal Survey Costs Marketing Costs Professional Services & Commissions Prosperity 2030 In-depth analysis of quantitative and qualitative outcomes of Prosperity 2020 Communication with the community and Council of these outcomes Development of economic baseline based on outcomes to inform the direction, recommendations and goals of the City's next 10-year economic development strategy Operating impacts No forecasted impacts from 2018 recommended capital spending. No expected operating impacts from future capital budgets forecasted at this time. Table 15, 10 Year Financial Investment ('000s) HCBP ,250 7,666 Planning & Studies 150 Total ,250 7, Capital Budget and Forecast 25

26 Table 16, 2018 Budget Approval ('000s) Project Budget HCBP Hanlon Creek Business Park 475 Planning & Studies Prosperity Table 17, 2018 Budget Funding ('000s) Figure 15, Funding Sources Funding source Funding amount Tax reserves 150 Development charges Grants Own revenue 475 Rate Reserves Partners Total % 76% Tax reserves, 24% Development charges, 0% Grants, 0% Own revenue, 76% Rate Reserves, 0% Partner, 0% Capital Budget and Forecast 26

27 Full Corridor Reconstruction Lead department: Engineering & Capital Infrastructure, IDE 2018 Capital investment: $20,440, Operating budget investment: $ to 2027 Capital investment: $191,653,500 Figure 16, 2018 Capital Expenditure Type Figure 17, 2019 to 2027 Capital Expenditure Type 15% 39% 0% 61% Infrastructure Renewal, 61% City Building, 0% Growth, 39% 85% Infrastructure Renewal, 85% City Building, 0% Growth, 15% Description The full corridor reconstruction program includes the replacement of the road, sidewalk, water, wastewater and stormwater infrastructure within the municipal right-of-way. When identifying candidate projects for this program, a full analysis of all data available, for each of the these infrastructure items, will be completed. This includes a review of historical data, work orders, condition data, industry standards, anticipated future deterioration and more, to develop a complete picture of all the needs associated with that corridor in order to evaluate the option of rehabilitating or repairing a single asset group against the need for a complete reconstruction. These projects have been included in this program of work because this integration analysis has indicated that the best decision is to complete a full reconstruction of the corridor rather than focused repairs for a single asset group Capital Budget and Forecast 27

28 Benefits and associated risks The integrated capital budgeting approach that was used for this year s capital budget aims to optimize the project list to ensure that levels of service are being maintained and risks are being minimized in the most cost effective manner. It coordinates work between various service areas, allowing staff to realize efficiencies in capacity as well as costs, while effectively managing risk by prioritizing work. There are a number of risks faced by both the public and the City if work is not completed. Maintenance and operation costs increase as assets age, and the chance of unexpected failures are associated with higher repair costs, with an overall lower level of service available to the user. Additionally, assets that have experienced unexpected failure remain out of service for a longer period of time, so decreased levels of service are experienced. The consequences of underground infrastructure failure can potentially include contamination of the drinking water supply, water service interruptions, sink holes, vehicle damage (due to pot holes), property damage, sewer backups, or basement flooding highlights Growth Niska Road: City Boundary to Downey Road Bristol Street Phase 2: Yorkshire Street to Wellington Street West Elizabeth Street: Splitter installation York Road: Victoria Road South to East City Limits Detailed Design York Trunk Phase 2b - Waterworks Place to Victoria Road South Renewal Alma Street North: Willow To Paisley Design Bagot Street: Drew Street To Mercer Street Pre-design For right-of-way construction projects Operating impacts No forecasted impacts from 2018 recommended capital spending. Operating impacts from future year s capital budget will be identified as work progresses on the Corporate Asset Management Plan. These impacts will be shared with Council as they are developed and in future budgets. Table 18, 10 Year Financial Investment ('000s) Transportation 4,014 6,146 8,840 8,882 7,154 69,401 Stormwater 1,117 1, ,115 1,428 13,729 Wastewater 1,139 2,139 1,699 3,193 2,298 26,766 Water 14,171 2,347 4,688 4,456 3,087 20,648 Total 20,440 12,427 16,069 18,646 13, , Capital Budget and Forecast 28

29 Table 19, 2018 Budget Approval ('000s) Project Budget Transportation & Utilities Combined Alma St. N: Willow St. to Paisley St. 40 Bagot St: Drew St. to Mercer St 2,600 Niska Rd: City Boundary to Downey Rd 3,000 Bristol St Trunk Sewer: Yorkshire St to Wellington St 1,000 Bullfrog Stormwater Upgrade: Elizabeth St Splitter 700 York Trunk Sewer to Victoria Rd 12,600 Pre-design for road construction projects 500 Table 20, 2018 Budget Funding ('000s) Figure 18, 2018 Funding Sources Funding source Funding amount Tax reserves 1,399 Development charges 7,917 Grants 733 Own revenue Rate Reserves 10,259 Partner 132 Total 20,440 50% 1% 7% 39% 3% Tax Reserves, 7% Development Charges, 39% Grants, 4% Own Revenues, 0% Rate Reserves, 50% Partner, 1% Capital Budget and Forecast 29

30 Stormwater Management Lead department: Engineering & Capital Infrastructure, IDE 2018 Capital investment: $1,295, Operating budget investment: $ to 2027 Capital investment: $22,330,000 Figure 19, 2018 Capital Expenditure Type Figure 20, 2019 to 2027 Capital Expenditure Type 8% 100% Infrasturcture Renewal, 100% City Building, 0% Growth, 0% 92% Infrastructure Renewal, 92% City Building, 0% Growth, 8% Description The City of Guelph s first stormwater management (SWM) facility was built in Today, the City currently owns and operates 118 SWM facilities including 39 wet ponds, 42 dry ponds and 37 greenways. The City also owns and operates 25 stormwater drainage channels of varying age and design as well as 153 oil/grit separators (OGS). This group of infrastructure forms the SWM facility assets. The program of work involves constructing, operating, maintaining and improving the City s existing SWM infrastructure for the purpose of providing flood and erosion control, water quality treatment, and environmental protection Capital Budget and Forecast 30

31 Benefits and associated risks The benefits of managing these assets: improving stormwater runoff quality thus protecting the health of our streams and rivers, mitigating flooding in extreme weather (reducing property damage or risk to human life), maintaining SWM facility assets to function as designed and in some cases comply with regulations set by the Ministry of the Environment and Climate Change (MOECC). The risks of not managing these assets includes: assets deteriorating to a state of disrepair and ceasing to meet the performance expected; potentially causing harm to property, the environment, and human life. In addition, without continued maintenance and monitoring the City will be in a state of non compliance with the MOECC. Non compliance with regulations set forth by the MOECC can result in charges and/or fines against the City highlights Storm Sewer Investigation Oil-grit Separator Condition Assessment Program River Outlet Condition Assessment Program Oil Grit Separator Operations And Maintenance Program Cost Of Service Study Storm Sewer Reline/Repair Benchmarking & Performance Measurement Storm System Upgrades SWM Pond Retrofits Pond Monitoring Operating impacts No forecasted impacts from 2018 recommended capital spending. Estimated impacts from forecasted capital spending will be determined as continued review of the current system is undertaken throughout Table 21, 10 Year Financial Investment ('000s) Facilities 450 1,575 1,575 1,010 1,290 4,910 Linear 140 1, ,600 Planning & Studies 705 1,130 1, ,350 Total 1,295 3,720 3,720 2,850 2,180 9, Capital Budget and Forecast 31

32 Table 22, 2018 Budget Approval ('000s) Project Budget Facilities SWM Pond Retrofits 200 SWM Pond Monitoring 250 Linear Oil Grit Separator Operations & Maintenance 10 Stormwater Sewer Reline & Repair 100 Stormwater System Upgrades 30 Planning & Studies Benchmarking & Performance Measurement 30 Condition Assessment Program 500 Cost of Service Study 25 Stormwater Sewer Investigation 150 Table 23, 2018 Budget Funding ('000s) Figure 21, 2018 Funding Sources Funding source Funding amount Tax reserve Development charges Grants Own revenue Rate Reserves 1,295 Partner Total 1, % Tax reserves, 0% Development charges, 0% Grants, 0% Own revenue, 0% Rate Reserves, 100% Partner, 0% Capital Budget and Forecast 32

33 Transportation Lead departments: Engineering and Capital Infrastructure, IDE Operations, PS 2018 Capital investment: $5,705, Operating budget investment: $28, to 2027 Capital investment: $137,937,100 Figure 22, 2018 Capital Expenditure Type 6% 5% Figure 23, 2019 to 2027 Capital Expenditure Type 3% 6% 89% Infrastructure Renewal, 89% City Building, 6% Growth, 5% 91% Infrastructure Renewal, 91% City Building, 3% Growth, 6% Description This program of work captures the City wide road restoration and resurfacing program and the expansion and improvements of the road surface including road widening, installation of turning lanes, design and installation of bike facilities, installation of new and modernization of existing traffic control signals and localized road improvements identified through the Neighborhood Traffic Management Program. The City's paved road surface should provide a durable even running surface with adequate skid resistance. Over time, the pavement surface becomes worn or damaged, resulting in pot holes, rutting, cracking and many other defects. Rehabilitating the road extends the life of the road, and restores the road surfaces level of service. The road segments to be rehabilitated have been identified based on available road condition information, number of work orders for cracks and pot holes based on the Minimum Maintenance Standard (MMS) for Municipal Highways, and operational input. All projects identified for resurfacing have Capital Budget and Forecast 33

34 been assessed to ensure that the underground and adjacent infrastructure do not require replacement or rehabilitation The need for road widening, turning lanes or bike facilities is determined by the City s Master Plans as well as overall growth plans. Implementation of City wide new traffic control signals, existing improvements to signalized locations as a result of customer requests, overall network improvements, and traffic signal enhancements. Neighborhood traffic management initiatives are proposed to be implemented on Local and collector roads that qualify The City owns and maintains a large number of bridges, culverts, retaining walls, and stairs, many of which are over 50 years old and require ongoing operation and maintenance activities to ensure public safety. Currently, the estimated value all bridges and culverts over three metres in diameter included in the inspection program is valued at $65M. Provincial regulations require that all bridges be inspected at least once every two years, and it is through these inspections that the capital budget is developed. Capital projects are based on the recommended life cycle rehabilitation work as reported in the structure inspection reports. These projects are then aligned with the reconstruction of streets, underground infrastructure improvements, and active transportation planning to prioritize work and optimize planning. Benefits and associated risks An active restoration and resurfacing program ensures that all road surfaces are maintained at the desired condition levels, improving traffic flow and safety. Work is also undertaken to improve adjoining storm water infrastructure and pedestrian usage. Improvements through road reconstruction improve the connections between roads and development for motorists, active transportation users and those accessing public transit. These programs align with Strategic Directions 3.1. If funding is not obtained there is a health and safety risk to our customers and a greater potential for sections of the traffic signal network to be inefficient, creating delays, congestion and driver frustration as well as not address neighborhood issues regarding traffic speeds and cut through traffic Pedestrian and vehicle bridges are a substantial and vital part of the City's transportation infrastructure system. In many cases, the bridges span over watercourses and roadways, and require regular maintenance, rehabilitation, and eventual replacement to minimize the risk of failure, and ensure levels of service. Ensuring that the City s bridges and structures are maintained consistently and according to industry standards also minimizes operational costs, and costs associated with unexpected failure, as well as to realize efficiencies in both scheduling and pricing by coordinating with other similar works Capital Budget and Forecast 34

35 2018 highlights Road Restoration and Resurfacing Program Roadway Preventative Crack Sealing Road Reconstruction Surface Asphalt Operations Road Infrastructure Sustainability Traffic Signal Equip Replacement Intersection - Signal Rebuild Well St W: Imperial Rd S to City Limit Widening Design Downey Rd: Niska to Teal Dr. Transportation Improvement (Phase 2 Vertical Deflection) New Sidewalk Construction Transportation Master Plan 2018 New Signal Installation Pedestrian Crossovers Speed River Retaining Wall Rehabilitation Operating impacts Forecasted 2019 impacts from 2018 recommended capital spending will be $4,700 Operations Department - $28,700 o Maintenance of expanded road network o Maintenance of additional signalized intersections Operating impacts from future year s capital budget will be identified as work progresses on the Corporate Asset Management Plan. These impacts will be shared with Council as they are developed and in future budgets. Table 24, 10 Year Financial Investment ('000s) Bridges & Structures 165 2,915 1,473 16, ,969 Operations 1,399 4,821 6,614 3,706 3,377 19,144 Planning & Studies ,180 Right of Way 2,150 6,231 4,170 6,349 3,710 33,157 Traffic Signals & Controls 1,791 1,773 1,616 2,587 1,759 6,419 Total 5,705 15,990 13,973 28,776 10,332 68, Capital Budget and Forecast 35

36 Table 25, 2018 Budget Approval ('000s) Project Budget Bridges & Structures Structural Rehabilitation & Renewal 165 Operations Equipment & Vehicles replacement 1,399 Planning & Studies Transportation Master Plan 200 Right of Way Road Surface Maintenance, Renewal & Reconstruction 1,660 Wellington St W: Imperial Rd to City Limits 140 Downey Rd: Niska Rd to Teal Dr 50 Guelph Hydro Lighting 300 Traffic Signals & Controls Traffic Signal Controller Replacement 175 Intersection Signal Rebuild 1,030 New Signal Installation 180 Pedestrian Crossings 85 Table 26, 2018 Budget Funding ('000s) Funding source Funding amount Tax reserves 4,102 Development charges 262 Grants 1,341 Own revenue Rate Reserves Partner Total 5,705 Figure 24, 2018 Funding Sources 5% 25% 70% Tax Reserves, 70% Development Charges, 5% Grants, 25% Own Revenues, 0% Rate Reserves, 0% Partner, 0% Capital Budget and Forecast 36

37 Wastewater Management Lead departments: Engineering and Capital Infrastructure, IDE Environmental Services, IDE 2018 Capital investment: $9,737, Operating budget investment: $ to 2027 Capital investment: $127,308,292 Figure 26, 2018 Capital Expenditure Type Figure 25, 2019 to 2027 Capital Expenditure Type 33% 2% 6% 67% Infrastructure Renewal, 67% City Building, 0% Growth, 33% 92% Infrastructure Renewal, 92% City Building, 2% Growth, 6% Description Wastewater Services is responsible for ensuring the City has sufficient wastewater treatment and biosolids management capacity to meet the needs of the community. This includes proactively maintaining and renewing existing facilities and increasing capacity as needed for growth. Wastewater Treatment Growth Includes evaluation of the biosolids storage facility (ST0003) to ensure the overall solution and timing provides value, financial accountability and is the best option for solids management moving forward. Related to this project, and of additional benefit to the plant is a planned upgrade of the plant automation system and programmable logic controllers (PLC s). This upgrade will ensure that the automation technology responsible for the continuous operation of the treatment process is current and reliable (ST0006) Capital Budget and Forecast 37

38 Renewal Includes studies and maintenance/replacement work to meet industry best practice for asset management. The digester maintenance program will continue by completing the work as recommended by the structural assessment of digester #3 (ST0014). Back-up generators (ST0001) will be installed to mitigate risks to the treatment process caused by intermittent and extended power outages. Wastewater Collection The City of Guelph has approximately 530 km of sanitary sewers and five sewage pump stations, all delivering sanitary sewage flows from the city to a central wastewater treatment facility located at the southwest corner of Wellington Street and the Hanlon Expressway. Treated effluent (outflow) from the treatment facility is discharged to the Speed River. Planning, expansion and renewal of the collection system is the responsibility of Engineering and Capital Infrastructure in conjunction with Wastewater Services. Growth Includes projects to assess current hydraulic conditions within the sanitary sewer system, determine the relative amount of dry weather and wet weather flow that may be entering the system, and to determine how this flow could be mitigated or eliminated to free up sewer capacity for improved operations under current conditions, and/or to facilitate growth. Renewal Trenchless sewer lining is non invasive and does not require significant closures of roads or areas used by the public. The sewer lining activities will be bundled together in order to gain efficiencies and economies of scale. Assessment programs for maintenance holes and wastewater sewers, and inflow and infiltration locations within the city will improve capital planning and inform future budgets. Benefits and associated risks Critical infrastructure must be maintained to mitigate the risk and the higher costs of unplanned maintenance. Proactive investment in wastewater infrastructure renewal and expansion provides long term reliability of assets and capacity. A reliable and upgraded Programmable Logic Controller (PLC) network will reduce unexpected downtime. This capital program of work supports the facility s Environmental Compliance Approval (ECA) requirement to exercise due diligence in ensuring that works and related equipment used to achieve compliance are properly operated and maintained at all times. Optimizing existing systems, increasing capacities of existing systems, reducing water loss, increasing water conservation, protecting the natural environment, enhancing asset Capital Budget and Forecast 38

2017 Year-end Capital Variance. That the 2017 Year-end Capital Variance Report (CS ), dated May 7, 2018, be received.

2017 Year-end Capital Variance. That the 2017 Year-end Capital Variance Report (CS ), dated May 7, 2018, be received. Staff Report To Service Area Committee of the Whole Corporate Services Date Monday, May 7, 2018 Subject Report Number 2017 Year-end Capital Variance CS-2018-15 Recommendation That the 2017 Year-end Capital

More information

Special City Council Meeting Agenda

Special City Council Meeting Agenda Special City Council Meeting Agenda Wednesday, January 16, 2019 6:00 p.m. Council Chambers, Guelph City Hall, 1 Carden Street Consolidated as of January 11, 2019 Please turn off or place on non-audible

More information

Report to Committee of the Whole

Report to Committee of the Whole Report to Committee of the Whole To: Mayor Linton and Members of Council Prepared By: Dan Wilson, Managing Director of Corporate Services / Treasurer Report: COR2018-10 Date: 19 Mar 2018 RE: Asset Management

More information

Special City Council Meeting Agenda Consolidated as of November 3, 2017

Special City Council Meeting Agenda Consolidated as of November 3, 2017 Special City Council Meeting Agenda Consolidated as of November 3, 2017 Wednesday, November 8, 2017 2:00 p.m. Council Chambers, Guelph City Hall, 1 Carden Street Please turn off or place on non-audible

More information

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london. 6 MULTI-YEAR BUDGET FOR THE 2019 ANNUAL UPDATE INVESTING IN OUR FUTURE london.ca/budget DRAFT 2019 Water and Wastewater & Treatment Budget December 17, 2018 Table of Contents Recommendations... 1 WATER

More information

City of Markham Asset Management Plan

City of Markham Asset Management Plan 2016 City of Markham Asset Management Plan Table of Content 1. Executive Summary...4 2. Introduction...7 2.1 Provincial Guidelines on Asset Management Plans...7 2.2 City of Markham Goals / Strategic Plan...7

More information

2018 CAPITAL BUDGET CAPITAL PLAN

2018 CAPITAL BUDGET CAPITAL PLAN 2018 CAPITAL BUDGET 2019-2027 CAPITAL PLAN This is administrations recommended 2018 Capital Budget to Red Deer City Council. Final decisions will be made as a part of Councils review changes may occur.

More information

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3 ASSET MANAGEMENT PLAN C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3 March 2017 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 A. STATE OF THE LOCAL INFRASTRUCTURE... 1 B.

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

MUNICIPALITY OF MISSISSIPPI MILLS. plan. December, 2016

MUNICIPALITY OF MISSISSIPPI MILLS. plan. December, 2016 MUNICIPALITY OF MISSISSIPPI MILLS plan December, 2016 PREFACE This Asset Management Plan is intended to describe the infrastructure owned, operated and maintained by the Municipality of Mississippi Mills

More information

City Services Appendix

City Services Appendix Technical vices 1.0 Introduction... 1 1.1 The Capital Facilities Plan... 1 1.2 Utilities Plan... 2 1.3 Key Principles Guiding Bremerton s Capital Investments... 3 1.4 Capital Facilities and Utilities Addressed

More information

Nith Peninsula, Brant County Fiscal Impact Study

Nith Peninsula, Brant County Fiscal Impact Study Fiscal Impact Study October 25, 2017 Fiscal Impact Study Prepared for: Losani Homes Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641 9500 Fax: (416) 641 9501 economics@altusgroup.com

More information

CITY OF KELOWNA FINANCIAL PLAN

CITY OF KELOWNA FINANCIAL PLAN CITY OF KELOWNA FINANCIAL PLAN 2014-2018 The City of Kelowna has developed a comprehensive Financial Plan that provides a five year summary of general revenues, operating expenditures and capital expenditures.

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

Special City Council Meeting Agenda Consolidated as of February 1, 2019

Special City Council Meeting Agenda Consolidated as of February 1, 2019 Special City Council Meeting Agenda Consolidated as of February 1, 2019 Thursday, February 7, 2019 4:00 p.m. Council Chambers, Guelph City Hall, 1 Carden Street Please turn off or place on non-audible

More information

RE:EX Toronto Water CAPITAL BUDGET NOTES CONTENTS CONTACTS CAPITAL BUDGET AND PLAN OVERVIEW. Overview

RE:EX Toronto Water CAPITAL BUDGET NOTES CONTENTS CONTACTS CAPITAL BUDGET AND PLAN OVERVIEW. Overview RE:EX29.18 CAPITAL BUDGET NOTES CONTENTS Overview 1: Recommended 10-Year Capital Plan 5 2: Issues for Discussion 22 Appendices: 1. 2017 Performance 30 2. Recommended 10-Year Capital Plan Summary 32 Toronto

More information

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN JUNE 24, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management Plan 1-2 1.4

More information

2017 ENTERPRISE ASSET MANAGEMENT PLAN

2017 ENTERPRISE ASSET MANAGEMENT PLAN Corporate Asset Management 2017 ENTERPRISE ASSET MANAGEMENT PLAN Investments in Peel s Infrastructure We are all asset managers! Executive Summary The Region s infrastructure is a public investment with

More information

City of Prince Albert YEAR STRATEGIC PLAN

City of Prince Albert YEAR STRATEGIC PLAN 5 City of Prince Albert YEAR STRATEGIC PLAN 2015-2020 City of Prince Albert Introduction Members of City Council, along with Senior Administration, attended a two-day Strategic Planning Session for the

More information

Guelph/Eramosa 2016 Budget Presentation. Thursday, February 18, 2016

Guelph/Eramosa 2016 Budget Presentation. Thursday, February 18, 2016 Guelph/Eramosa 2016 Budget Presentation Thursday, February 18, 2016 1 Our Township We cover 292 km 2 and provide services to 12,380 residents The Township is responsible for maintaining: 225 km of roads

More information

2018 Development Charges Background Study. Stakeholder Meeting #3. May 28, 2018

2018 Development Charges Background Study. Stakeholder Meeting #3. May 28, 2018 Development Charges Background Study Stakeholder Meeting #3 May 28, 1 Agenda Timeline Summary of Correspondence Capital Summary Changes Next Steps 2 Project Schedule Jun 201 7 Dec 2017 Feb Mar Apr May

More information

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Impacts from the July 8, 2013 Storm Event on the City of Toronto STAFF REPORT ACTION REQUIRED Impacts from the July 8, 2013 Storm Event on the City of Toronto Date: September 10, 2013 To: From: Wards: Executive Committee City Manager All Reference Number: SUMMARY The

More information

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management

More information

Drainage Services. AMPW - Drainage Services 2010 Operating Budget. Table of Contents

Drainage Services. AMPW - Drainage Services 2010 Operating Budget. Table of Contents Drainage Services AMPW - Drainage Services 2010 Operating Budget Table of Contents 1.0 Branch Overview 1 1.1 Branch Profile 1 1.2 Description of Operations 1 1.3 Major Services 2 1.4 Strategic Road Map

More information

Environment and Climate Protection Committee. Tax Supported Programs

Environment and Climate Protection Committee. Tax Supported Programs Environment and Climate Protection Committee Tax Supported Programs Tabled November 8, 2017 Table of Contents Environment and Climate Protection Committe - Tax Supported Briefing Notes... 1 Infrastructure

More information

REGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit

REGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit Edmonton Metropolitan Region Planning Toolkit Re-imagine. Plan. Build. Edmonton Metropolitan Region Growth Plan 1.0 INTRODUCTION On October 26, 2017, the Government of Alberta approved the Edmonton Metropolitan

More information

2018 Development Charges Background Study The Cost of Growth. Council Workshop #2

2018 Development Charges Background Study The Cost of Growth. Council Workshop #2 Development Charges Background Study The Cost of Growth Council Workshop #2 June 27, 1 Agenda Review of development charges, legislated requirements and influencing factors City s DC study schedule and

More information

TRUST AND CONFIDENCE

TRUST AND CONFIDENCE Torontonians City Council TRUST AND CONFIDENCE STRATEGY Public Service 2 2.9 million people call Toronto home each night 3.1 million people call Toronto home each day 3.8 million people will call Toronto

More information

This page intentionally blank. Capital Facilities Chapter Relationship to Vision. Capital Facilities Chapter Concepts

This page intentionally blank. Capital Facilities Chapter Relationship to Vision. Capital Facilities Chapter Concepts This page intentionally blank. Capital Facilities Chapter Relationship to Vision Vision County Government. County government that is accountable and accessible; encourages citizen participation; seeks

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

City of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By:

City of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By: Prepared By: City of Welland Comprehensive Asset Management Plan GMBP File: 614013 January 13, 2015 GUELPH OWEN SOUND LISTOWEL KITCHENER EXETER HAMILTON GTA 650 WOODLAWN RD. W., BLOCK C, UNIT 2, GUELPH

More information

Asset Management Plan 2016 Township of King

Asset Management Plan 2016 Township of King Asset Management Plan 206 Township of King GHD Allstate Parkway Suite 30 Markham Ontario L3R 9T8 T 905 752 4300 F 905 752 430 5432 Table of Contents. 2. 3. 4. 5. 6. Executive Summary. Introduction.2 State

More information

2018 Budget Public Budget Consultation Meeting November 16 th, 2017

2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2 1. 2018 Budget Process and Communications Plan 2. 2018 Proposed Capital Budget a. Funding Sources b. Expenditures c. Life Cycle Reserve

More information

TRUST AND CONFIDENCE

TRUST AND CONFIDENCE -2019- BU1.3 Torontonians City Council TRUST AND CONFIDENCE STRATEGY Public Service 2 2.9 million 3.1 million 3.8 million people call Toronto people call Toronto people will call Toronto home each night

More information

City Council Meeting Agenda Consolidated as of October 21, 2016

City Council Meeting Agenda Consolidated as of October 21, 2016 City Council Meeting Agenda Consolidated as of October 21, 2016 Wednesday, October 26, 2016 6:00 p.m. Council Chambers, Guelph City Hall, 1 Carden Street Please turn off or place on non-audible all electronic

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

INTRODUCTION TABLE OF CONTENTS

INTRODUCTION TABLE OF CONTENTS INTRODUCTION TABLE OF CONTENTS PAGE Overview... 3 Capital Improvement Policy... 5 Relationship Between Capital Projects and Operating Budgets... 7 Art in Public Places Program... 8 Categorization of Capital

More information

Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during the meeting.

Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during the meeting. CITY COUNCIL AGENDA Council Chambers, Guelph City Hall, 1 Carden Street DATE Tuesday, November 5, 2013 6:00 p.m. Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during

More information

Municipal Asset Management Plans

Municipal Asset Management Plans Municipal Asset Management Plans AMCTO Webinar October 12, 2012 Agenda Introduction Municipal Infrastructure Investment Initiative Asset Management Scoping Asset Management Approaches State of Local Infrastructure

More information

2030 Infrastructure Plan Introduction

2030 Infrastructure Plan Introduction 2 nd Draft February 25, 2016 Infrastructure Plan Introduction 1.0 INTRODUCTION The Infrastructure Plan covers the City s infrastructure investment needs for the next 15 years (2016-) and was developed

More information

Residential Street Improvement Plan

Residential Street Improvement Plan Residential Street Improvement Plan Introduction Aging infrastructure, including streets, is a nationwide problem and it is one of the biggest challenges facing many cities and counties throughout the

More information

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE Chapter VIII General Plan Implementation A. INTRODUCTION This chapter presents a variety of tools available to the (City) to help build the physical city envisioned in Chapter III. While the Modesto provides

More information

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012 OFFICE OF THE CITY MANAGER CALIFORNIA April 27, 2012 CITY HALL 5 th FLOOR 915 I STREET SACRAMENTO, CA 95814-2684 PH 916-808-5704 FAX 916-808-7618 Honorable Mayor and City Council Sacramento, California

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during the meeting.

Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during the meeting. CITY COUNCIL AGENDA DATE February 14, 2011 6 p.m. Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during the meeting. PRESENTATIONS RE: 2011 TAX SUPPORTED OPERATING

More information

HEMSON C o n s u l t i n g L t d

HEMSON C o n s u l t i n g L t d DEVELOPMENT CHARGES BACKGROUND STUDY Town of Gravenhurst C o n s u l t i n g L t d April, 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I INTRODUCTION... 7 II A TOWN-WIDE UNIFORM CHARGE APPROACH TO ALIGN

More information

That the report from the Director of Finance regarding the Strategic Asset Management Policy, dated June 20, 2018, be received; and

That the report from the Director of Finance regarding the Strategic Asset Management Policy, dated June 20, 2018, be received; and Staff Report To: From: Mayor and Council Jeff Schmidt, Director of Finance Date: June 20, 2018 Subject: Strategic Asset Management Policy Report Highlights Provincial regulation (O.Reg. 588/17 - Asset

More information

The regulation proposes that municipalities must prepare asset management plans which would meet the requirements of the regulation, such as:

The regulation proposes that municipalities must prepare asset management plans which would meet the requirements of the regulation, such as: PROPOSED ASSET MANAGEMENT PLANNING REGULATION BACKGROUND On May 25, 2017, the Ministry of Infrastructure released a proposed regulation under the Infrastructure for Jobs and Prosperity Act, 2015. The proposed

More information

TOWNSHIP OF WEST LINCOLN

TOWNSHIP OF WEST LINCOLN TOWNSHIP OF WEST LINCOLN April 18, 2016 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 664-B Vine Street St. Catharines Ontario Canada L2M 7L8 Telephone: (905) 938-0965

More information

Update on Municipal Asset Management Planning

Update on Municipal Asset Management Planning Update on Municipal Asset Management Planning Municipal Finance Officers Association Conference Ontario Ministry of Infrastructure September 20, 2017 Overview Municipal asset management planning in Ontario

More information

Implementation Project Development and Review 255

Implementation Project Development and Review 255 Introduction 248 Implementation Principles 249 Public Agency Fiduciary Responsibilities 250 Project Development and Review Process 252 Project Development and Review 255 Maintenance 23 Implementation Implementation

More information

DEPARTMENT OF PUBLIC WORKS

DEPARTMENT OF PUBLIC WORKS DEPARTMENT OF PUBLIC WORKS Mission Statement: Public Works is dedicated to providing transportation, drainage, facilities and fleet services to the citizens of Rio Rancho and other City Departments. Primary

More information

Studies, Initiatives and Reserve Transfers

Studies, Initiatives and Reserve Transfers Asset Overview, Initiatives and Reserve Transfers Includes Corporate Accessibility Reserve Contribution Downtown Improvement Reserve Contribution Other Reserve Transfers External Contributions Asset Overview

More information

CITY FUNDS & FUND ACCOUNTING TAB 19

CITY FUNDS & FUND ACCOUNTING TAB 19 CITY FUNDS & FUND ACCOUNTING TAB 19 This page intentionally left blank. Special Revenue Funds Special Revenue Funds are used to account for proceeds of specific revenue sources (other than major capital

More information

Planning and Infrastructure Services Department

Planning and Infrastructure Services Department Planning and Infrastructure Services Department Table of Contents Organizational Structure Departmental Overview Planning and Building Division Engineering and Development Services Division Public Works

More information

City of Mississauga Municipal Performance Measurements Program (MPMP) Results. For the period ending December 31, 2013

City of Mississauga Municipal Performance Measurements Program (MPMP) Results. For the period ending December 31, 2013 City of Mississauga Municipal Performance Measurements Program (MPMP) For the period ending December 31, Prepared by: Finance Division, Corporate Services Department City of Mississauga CITY OF MISSISSAUGA

More information

In addition to embarking on a new dialogue on Ohio s transportation priorities,

In addition to embarking on a new dialogue on Ohio s transportation priorities, Strategic Initiatives for 2008-2009 ODOT Action to Answer the Challenges of Today In addition to embarking on a new dialogue on Ohio s transportation priorities, the Strategic Initiatives set forth by

More information

Asset Management Plan Public Works, Social Housing, Parks and Recreation Infrastructure City of Brantford, Ontario

Asset Management Plan Public Works, Social Housing, Parks and Recreation Infrastructure City of Brantford, Ontario 2017 Asset Management Plan Public Works, Parks and Recreation and Social Housing Infrastructure Asset Management Plan Public Works, Social Housing, Parks and Recreation Infrastructure City of Brantford,

More information

WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017

WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017 WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017 TABLE OF CONTENTS Recommendations... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview... 6 2016-2019 Water Staffing

More information

Operating Budget Overview 2019

Operating Budget Overview 2019 OPERATING BUDGET Operating Overview 2019 Introduction In planning for a vibrant, healthy and sustainable community, the Town of Halton Hills is committed to providing community leadership on issues of

More information

2017 Operating Variance Report and Surplus and Deficit Allocation

2017 Operating Variance Report and Surplus and Deficit Allocation Staff Report To Service Area Committee of the Whole Corporate Services Date Monday, May 7, 2018 Subject Report Number 2017 Operating Variance Report and Surplus and Deficit Allocation CS-2018-14 Recommendation

More information

PDS-1. Planning & Development

PDS-1. Planning & Development PDS1 Planning & Development Table of Contents Departmental Overview Divisions Building Development Services Policy Planning Transportation Planning Urban Design Operating Budget Overview Capital Budget

More information

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards; DIVISION 4.200 CAPITAL IMPROVEMENTS ELEMENT SECTION 4.201 INTRODUCTION The purpose of the Capital Improvements Element (CIE) is to tie the capital improvement needs identified in the other elements to

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

Capital Improvements

Capital Improvements Capital Improvements CAPITAL IMPROVEMENT ELEMENT GOAL 7-1: PROVIDE & MAINTAIN PUBLIC FACILITIES AND SERVICES Provide and maintain public facilities and services which protect and promote the public health,

More information

Asset Management Plan - Introduction

Asset Management Plan - Introduction Asset Management Plan - Introduction In 2008 the Town of Oakville made a choice to leverage the PSAB 3150 initiative with a comprehensive Asset Management plan. The Town of Oakville has been integrating

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

Asset Management Investment Plan

Asset Management Investment Plan Asset Management Plan Prepared for the City of Kimberley 304-1353 Ellis Street Kelowna, BC, V1Y 1Z9 T: 250.762.2517 F: 250.763.5266 June 2016 File: 1162.0014.01 A s s e t M a n a g e m e n t I n v e s

More information

2019 PRELIMINARY OPERATING AND CAPITAL BUDGETS

2019 PRELIMINARY OPERATING AND CAPITAL BUDGETS 2019 PRELIMINARY OPERATING AND CAPITAL BUDGETS Overview Budget Consultation Public Engagement Budget Context and Highlights Context Preliminary Operating and Capital Budgets Highlights Revenue Expenditure

More information

PUBLIC FACILITIES ELEMENT

PUBLIC FACILITIES ELEMENT PUBLIC FACILITIES ELEMENT E l C e n t r o G e n e r a l P l a n This Implementation Program provides actions to implement the adopted policies and plans identified in the Public Facilities Element. The

More information

2017 Draft Budget Presentation

2017 Draft Budget Presentation Green And Growing 2017 Draft Budget Presentation January 23, 2017 2017 Draft Budget Presentation AGENDA 1) Introduction 2) 2017 Survey Results 3) 2017 Budget Pressures & Drivers 4) 2017 Budget Highlights

More information

Budget 2015 and capital plan. August 2015

Budget 2015 and capital plan. August 2015 Budget 2015 and capital plan August 2015 Contents The imperative for municipal infrastructure investment... 3 Municipal priorities for 2015 provincial budget... 7 Diverse municipalities need diverse revenues...

More information

Asset Management Plan

Asset Management Plan 2016 Asset Management Plan United Counties of Prescott and Russell 6/1/2016 Preface This Asset Management Plan is intended to describe the infrastructure owned, operated, and maintained by the United Counties

More information

DEVELOPMENT CHARGES BACKGROUND STUDY

DEVELOPMENT CHARGES BACKGROUND STUDY DEVELOPMENT CHARGES BACKGROUND STUDY Town of New Tecumseth C o n s u l t i n g L t d. May 29, 2013 Amended June 18, 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I INTRODUCTION... 10 II THE METHODOLOGY

More information

Reserves & Reserve Funds Business Plan & 2016 Budget

Reserves & Reserve Funds Business Plan & 2016 Budget Reserves & Reserve Funds 2018 Business Plan & Budget Table of Contents Executive Summary of Reserves and Reserve Funds... 3 Overview... 4 Forecast Changes... 6 Operating Reserves and Reserve Funds... 7

More information

DEVELOPMENT CHARGES BACKGROUND STUDY

DEVELOPMENT CHARGES BACKGROUND STUDY DEVELOPMENT CHARGES BACKGROUND STUDY Town of Innisfil C o n s u l t i n g L t d. July 19, 2018 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I PURPOSE OF THE DEVELOPMENT CHARGES BACKGROUND STUDY... 6 A. INTRODUCTION

More information

CORPORATION OF THE CITY OF CORNWALL CONSOLIDATED FINANCIAL STATEMENTS

CORPORATION OF THE CITY OF CORNWALL CONSOLIDATED FINANCIAL STATEMENTS CONSOLIDATED FINANCIAL STATEMENTS December 31, 2014 December 31, 2014 CONTENTS Page INDEPENDENT AUDITORS' REPORT 1 FINANCIAL STATEMENTS Consolidated Statement of Financial Position 2 Consolidated Statement

More information

Where are your taxes going?

Where are your taxes going? BUDGET HIGHLIGHTS Building for the Future The City s 2017 proposed Budget continues to build for the future, investing in community priorities essential to Regina s continued growth. The Budget goals were

More information

Capital Budget Summary

Capital Budget Summary 02 Capital Budget Summary Municipal infrastructure forms the foundation upon which great communities are built. It drives our economy, supports and enhances our quality of life and increases prosperity

More information

TOWN OF CARY CAPITAL IMPROVEMENTS BUDGET OVERVIEW FOR FISCAL YEAR 2015

TOWN OF CARY CAPITAL IMPROVEMENTS BUDGET OVERVIEW FOR FISCAL YEAR 2015 TOWN OF CARY CAPITAL IMPROVEMENTS BUDGET OVERVIEW FOR FISCAL YEAR 2015 The Capital Improvements Budget/Plan Process Each year, staff prepares a capital improvements budget and a long range capital improvements

More information

Executive Summary Operating Budget and Forecast

Executive Summary Operating Budget and Forecast The 2014 Budget Discussion Document presents the proposed 2014 operating budget, 2015-2016 forecasts and the 2014 Capital Budget for the Town of Oakville. The document represents the outcome of the 2014

More information

2014 Net Budget = $498.7 million 2015 Net Budget = $513.2 million. Capital Financing & Contingencies, 22.6% Planning & Development Services, 1.

2014 Net Budget = $498.7 million 2015 Net Budget = $513.2 million. Capital Financing & Contingencies, 22.6% Planning & Development Services, 1. 1 Budget Overview 2014 Net Budget = $498.7 million 2015 Net Budget = $513.2 million Corporate, Operational & Council Services, 5.2% Capital Financing & Contingencies, 21.3% Culture, 4.6% Economic Prosperity,

More information

TABLE OF CONTENTS LIST OF TABLES

TABLE OF CONTENTS LIST OF TABLES TABLE OF CONTENTS A. GOALS, OBJECTIVES, AND POLICIES... 3 B. SUMMARY... 17 LIST OF TABLES Table IX 1: City of Winter Springs Five-Year Schedule of Capital Improvements (SCI) FY 2013/14-2017/18... 11 Table

More information

Manheim Borough 2017/2018 Budget Summary Report

Manheim Borough 2017/2018 Budget Summary Report Manheim Borough 2017/2018 Budget Summary Report James R. Fisher, PE, CBO Chief Administrative Officer, Borough Manager, Treasurer 2017 has been a year of building on the changes that occurred in 2015/2016.

More information

2019 Draft Capital Budget and Forecast

2019 Draft Capital Budget and Forecast 2019 Draft Capital Budget and Forecast Budget Committee of the Whole Tuesday, January 22, 2019 1 Agenda A review of how capital projects are developed How are capital projects funded 2019 Capital Budget

More information

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability FY 2018-19 Annual Budget: Mobility Solutions, Infrastructure, & Sustainability City Council Briefing August 15, 2018 Majed Al-Ghafry, Assistant City Manager Overview FY 2018-19 Budget by Strategic Priority

More information

Recommended Capital Budget and Plan, and Proposed Capital Forecast

Recommended Capital Budget and Plan, and Proposed Capital Forecast 2009 2018 Recommended Capital Budget, Plan & Forecast 2009 2013 Recommended Capital Budget and Plan, and 2014 2018 Proposed Capital Forecast December 10, 2008 2009 2018 Staff Recommended Capital Budget

More information

The 2018 Budget Table of Contents

The 2018 Budget Table of Contents The Budget Table of Contents General Purposes Budget (approved March 27, ) General Purposes Budget Table of Contents Schedule A General Purposes Budget Expense Summary Schedule B General Purposes Budget

More information

Article 23-6 FLOODPLAIN DISTRICT

Article 23-6 FLOODPLAIN DISTRICT AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:

More information

CAPITAL IMPROVEMENTS ELEMENT

CAPITAL IMPROVEMENTS ELEMENT Goals, Objectives and Policies CAPITAL IMPROVEMENTS ELEMENT GOAL 9.1.: USE SOUND FISCAL POLICIES TO PROVIDE ADEQUATE PUBLIC FACILITIES TO ALL RESIDENTS WITHIN THE CITY. FISCAL POLICIES MUST PROTECT INVESTMENTS

More information

DEVELOPMENT CHARGES BACKGROUND STUDY

DEVELOPMENT CHARGES BACKGROUND STUDY DEVELOPMENT CHARGES BACKGROUND STUDY CONSOLIDATION STUDY C o n s u l t i n g L t d. April 25, 2018 TABLE OF CONTENTS Executive Summary... 1 I Introduction... 12 II III The Methodology Combines A CityWide

More information

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC: To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan

More information

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS 2013 THE CITY OF NIAGARA FALLS 4310 QUEEN STREET NIAGARA FALLS, ONTARIO, L2E 6X5 SUBMITTED DECEMBER 2013 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET,

More information

2016 Asset Management Plan

2016 Asset Management Plan R I C H M O N D H I L L 2016 Asset Management Plan Richmond Hill, where people come together to build our community. The 2016 Asset Management Plan was received by Richmond Hill Council on December 12,

More information

Bylaw No The Capital Reserve Bylaw. Codified to Bylaw No (December 18, 2017)

Bylaw No The Capital Reserve Bylaw. Codified to Bylaw No (December 18, 2017) Bylaw No. 6774 The Capital Reserve Bylaw Codified to Bylaw No. 9476 (December 18, 2017) Page 1 Bylaw No. 6774 The Capital Reserve Bylaw The Council of The City of Saskatoon enacts: Purpose 1. The purpose

More information

Common budget and Forecast Terms

Common budget and Forecast Terms The Corporation of The Township of Brock in the Regional Municipality of Durham P.O. Box 10, Cannington, Ontario L0E 1E0 2018 Budget Information This package is part of the Township s continuing efforts

More information

CAPITAL IMPROVEMENT ELEMENT Inventory Analysis

CAPITAL IMPROVEMENT ELEMENT Inventory Analysis CAPITAL IMPROVEMENT ELEMENT Inventory Analysis 2.191 INTRODUCTION The principal purpose of this element is to identify the capital improvements that are needed to implement the comprehensive plan and ensure

More information

2015 Preliminary Operating and Capital Budgets. March 3, 2015

2015 Preliminary Operating and Capital Budgets. March 3, 2015 1 2015 Preliminary Operating and Capital Budgets March 3, 2015 2 2015 Budget Process Multi-year view Standing Policy Committee Review Council debate and adoption 3 Overview Budget Process Priorities Operating

More information

WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017

WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 TABLE OF CONTENTS Approval of 2018 Annual Update... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview...

More information

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate 2017 BU25.1 Toronto Water Budget 2017 Recommended Operating Budget 2017 2026 Recommended Capital Plan 2017 Recommended Water Rate Lou Di Gironimo, General Manager, Toronto Water Budget Committee, November

More information