1 PPP Projects in the Slovak Republic Bratislava, JUDr. Ján Azud

2 Who we are Ružička Csekes law firm has been present on the market since 1992 A member of CMS Alliance asocciated with Cameron McKenna Extensive international and local experience with providing advise to all regular PPP participants (governments, lenders, private sector) Cameron McKenna a leading provider of legal services in the PPP market in the UK, Central and Eastern Europe Local PPP experience: Advising the Ministry of Transport, Postal Services and Telecommunications during the tenders for concession for design, construction, financing, operation and maintenance of the D1 motorway (Phase 1 and Phase 2) and the R1 expressway Advising the Ministry of Finance during preparation of an analysis of Slovak legal environment designed to facilitate PPP projects in Slovakia Advising Národná diaľničná spoločnosť, a.s. (National Motorway Company) with respect to preparation of tender documents and negotiation of a contract with an electronic toll collection service operator

3 Content PPP Projects - Introduction PPP Projects in Practice Course of a PPP Project The Slovak Experience PPP Projects in the Healthcare Sector

4 PPP Projects - Introduction Public-Private Partnership (PPP): a long-term partnership of the public and private sector aimed at efficient provision of quality public infrastructure or service The Definition of the European Commision (Green Book on Public-Private Partnerships): form of cooperation between public authorities (communities, regions, ministries, etc.) and economic operators (firms or consortia). The primary aims of this cooperation are to fund, construct, renovate or operate an infrastructure or the provision of a service.

5 PPP Projects - Introduction provision of public service long-term cooperation between a public and a private partner typically from 10 to 30 years (chiefly based on the life cycle of the infrastructure in question) involvement of the private partner into several phases of a project the private partner may for example design, construct, finance, operate and maintain the construction under a prescribed service and quality level a way to finance the project normally wholy or at least partially financed by the private partner the private partner receives compensation for the services provided payments from the public partner (availability payments in availability based projects) or directly from end-users (for example toll revenues in demand based projects), or combination of both sharing of project risks between the partners risks (in particular the construction risk, the availability risk and the demand risk) are taken over by the partner who is best suited to manage it for example, the private partner may bear the construction risk (including cost overruns), operation and maintenance of a hospital

6 PPP Projects - Introduction Public Sector RISK Public Private Partnerships Private Sector Public Authorities OM BOT DBFO BOO Privatisation Involvement of the Private Partner Typical PPP models: OM Operate Maintain BOT Build Operate Transfer DBFO Design Build Finance Operate BOO Build Own Operate

7 PPP Projects Upsides and Downsides Main Upsides: normally finished on time normally without cost-overruns more efficient / better / cheaper provision of public service compared to the public sector the public sector retains control over the project solution to budgetary restraints fixed price known in advance either party can focus on its core business room for innovation socio-ekonomic benefits Main Downsides: complexity and time for preparation higher cost of financing lower flexibility during the project based on a long-term contract strong public interest and scrutiny

8 When to Go for a PPP Project a need for a long term provision of a public service the private partner is likely to provide the service in a more efficient / cheaper way (Value for Money) clear and objective need for the project political support and wide consensus previously tested sector proper magnitude and complexity of the project lack of or restraints with respect to own finance targets and outputs of the project can be clearly and easily defined quality preparation (Feasibility Study) clear notion of financial requirements ability to form a suitable project team and willingness to engage experienced experts proper time period

9 What to Expect from a PPP Project in Practice Please Do Not Expect Too Much! Be prepared for things you have never encountered and you will not understand Try to forget what you know of regular infrastructure projects Be ready to lead a dialogue, face extravagant requirements and accept compromise Be ready to be flexible Be ready to be tough

10 Stages of a Project No legal definition of PPP projects in Slovak laws The definition of concession (includes both contractual types of PPP projects) - availability based and demand based No precise catalogue of rights and obligations of public and local authorities with respect to PPP projects Regulation of various stages of PPP projects is dispersed through different laws The most precise regulation is probably contained in methodical guidance of the Ministry of Finance Guidance on the Management of Preparation of a PPP Project Feasibility Study and Public Sector Comparator Contents and Requirements Guidance on Preparation and Implementation of a PPP project and Review Procedure Template for a PPP Business Plan and Selection Criteria Risk Management in PPP Projects

11 Stages of a Project Preparation of a Project Procurement Approval of a Project and Contract Signature Implementation of a Contract

12 Stages of a Project Preparation of a Project: Act on Public Works (Zákon o verejných prácach) Construction Act (Stavebný zákon) Environmental Impact Assessment Act (Zákon o posudzovaní vplyvov na životné prostredie) Nature and Country Protection Act (Zákon o ochrane prírody a krajiny) Sector-specific regulations (Act on One-Off Extraordinary Measures related to Construction of Certain Motorways and Expressways, healthcare regulations) Methodical guidance issued by the Ministry of Finance Public Procurement Public Procurement Act Approval of a Project and Contract Signature Act on Public Administration Budget Rules Act on Local Administration Budget Rules Implementation of a Contract Construction Act (Stavebný zákon) State Property Administration Act (Zákon o správe majetku štátu) Act on Accounting (Zákon o účtovníctve) Tax laws

13 Preparation of a Project A thorough preparation is inevitable Internal identification of a proper project, distribution of responsibilities, setting up of project organisation and management, selection of advisors External - technical and legal preparation of documents for the project Pre-project documents business case, feasibility study Project documents EIA, zoning permits, construction permits Compliance with laws including the EC law is key Speedy adoption of ad hoc laws without consideration of broader context is not recommended Environmental compliance is critical Construction Act (Stavebný zákon) Environmental Impact Assessment Act (Zákon o posudzovaní vplyvov na životné prostredie) Nature and Country Protection Act (Zákon o ochrane prírody a krajiny) Land Identification and plan of acqusition and its implementation should be secured and carried out in sufficient advance

14 Procurement Considering the subject and scope of a contract, procurement will always have to follow the Public Procurement Act rules Given the specifics of the PPP projects, tenders will be lengthy, complicated and costly processess which will demand a lot with respect to preparation, capacities and flexibility of all parties The aim is to select the fittest partner and a project agreement acceptable to all project parties Concession agreement pursuant to the Public Procurement Act or aninnominate contract pursuant to the Commercial Code

15 Procurement Methods Open procedure Restricted procedure Negotiated procedure Competitive dialogue Which one to choose In principle any will do Formalised procedure vs need to be flexible Need to reflect comments of the private partner and its funders Need to maintain transparency and comply with EU laws Competitive dialogue

16 Procurement Competitive dialogue Proper solution for particularly complex projects Preferred by EU law Enables to seek mutually acceptable solutions Allows for the private sector and lenders to present their comments and reflect them Supports identification and correction of errors Secures better value for money Traditional sequence Preparation of a contract notice and informative document Shortlisting and distribution of the informative document Interim submissions Dialogue Final tender documents Tenders and appointment of a preferred bidder Negotiation with the preferred bidder on a project agreement

17 Procurement Core of the dialogue project agreement (part of the informative document, part of the interim submissions, basis for the final tender documents) and related agreements Slovak laws neither detail the scope nor specify essentials of such agreements Contractual terms may be created on a principle of contractual autonomy Related agreements Direct agreement Independent engineer agreement Loan documentation Need to involve internal team and individuals who will implement the project and the agreement

18 )

19 Procurement Particulars of the project agreement Not a contract for work typically used on investment projects An agreement which is not agreed to only by its parties Key aspect - BANKABILITY Typical legal instruments and content throughout the European PPP market Conditions precedent predominantly financing Detailed allocation of responsibilities and risks of the parties Output oriented Detailed mechanisms of addressing the consequences of risks Increased focus on financial parameters of the project Normally without deterring sanctions

20 Procurement Competitive dialogue does the trick Practical problems associated with external factors and the very nature of the PPP projects Despite relative flexibility, innovative solutions need to be sought Market practice submission of tenders and appointment of a preffered bidder do not automatically mean that the project is completed Need to reflect requirements of lenders and time period between appointment of a preffered bidder and financial close Changes compared to the tender documents, the tender and the project agreement Changes to the price

21 Approval of a Project and Contract Signature Approval of a Project and Contract Signature Act on Local Administration Budget Rules (583/2004 Z.z.) Project approval rules are specified only for construction works concesions Conditions under which a contract may be entered into are set out in law Municipalities and regions notify the Ministry of Finance on a launch of an award procedure and request Ministry of Finance s positions on draft agreements from the perspective of their consequences on public debt reporting in a uniform standard applicable in the EU Methodical guidance issued by the Ministry of Finance - IRA

22 Implementation of a Contract Before financial close After financial close During construction Project manager (contract manager), team responsible for protection of interests of the public authority individuals who participated on the project in its preceding phases Preparation of tools enabling smooth performance of the contract by the public authority during the operation period Continuation of partnership and dialogue During operation Project manager (contract manager), team responsible for protection of interests of the public authority individuals who participated on the project during the construction phase Consequent application of the tools Continuation of partnership and dialogue

23 The Slovak Experience Major investment projects motorways; electronic toll collection Smaller projects repair and maintenance of 2nd and 3rd class roads in KE region; media complex; Central Military Hospital in Ružomberok, revitalisation of railway stations; multimedia complex in KE. Positive international feedback Negative label at home Success stories: R1 completion of expressway between Nitra and Banská Bystrica financial close in August 2009 D1 completion of tunnel sections of Failures: motorway in the Žilina region financial close expected in spring 2011 D1 completion of motorway to Košice Central Military Hospital Ružomberok

24 Reasons of Success R1 and D1 Pragmatism, flexibility and willingness to find a way Rational commercial approach, willingness to play the hard ball and cancel the project if necessary Political support Magnitude of projects Experienced advisors

25 Reasons of Failure - D1 Time pressure Limited scope for negotiation Hostage of political rivalry Loss of political support Magnitude and complexity of the project, improper time period Short-sighted addressing of environmental issues

26 PPP Projects in the Healthcare Sector Tested teritorry Many success stories abroad Buildings, cars, services, equipment Privatisation-like benefits with lower political costs

27 Various Options for PPP Projects in the Healthcare Sector Design and construction Non healthcare services Supporting healthcare services Specialized healthcare services Hospital management Design Construction Healthcare technology Investment financing IT services and equipment Maintenance Catering Laundry Room service Laboratories Diagnostic tests Healthcare technology maintenance Hemodialysis Radiotherapy Suregery Internal Other Hospital or hospital network management

28 Rázsochy PPP is an option All pros and cons need to be carefully considered as in any other PPP project Need to clearly identify the scope Need to assess feasibility and value for money Need of clear notion about financial demands Need of wider consensus on a public and expert level and subsequent support for the project

29 Thank you very much for your kind attention! Ružička Csekes s.r.o. Vysoká 2/B Bratislava T: (0) F: (0) office-ba@rc-cms.sk Ružička Csekes s.r.o. Vysoká 2/B Bratislava Slovak Republic JUDr. Ján Azud Junior Partner jan.azud@rc-cms.sk T: (0) F: (0)

Undertaking Successful PPPs in Kazakhstan

Undertaking Successful PPPs in Kazakhstan Undertaking Successful PPPs in Kazakhstan Stephen Watson Head of Service PPP Astana, Kazakhstan 24 October 2013 image courtesy of stock.xchng Contents PPP Principles PPPs in Kazakhstan Renewables in Kazakhstan

More information

welcome! An overview of the regulatory framework for PPPs with specific analysis in Hospital PPPs by Tomurcuk EROGLU

welcome! An overview of the regulatory framework for PPPs with specific analysis in Hospital PPPs by Tomurcuk EROGLU welcome! An overview of the regulatory framework for PPPs with specific analysis in Hospital PPPs by Tomurcuk EROGLU Why PPPs? Investment structures Healthcare In Numbers Hospital Campus PPP BLT Model

More information

Success story: Slovak D4 R7 PPP & lessons learnt for Czech PPPs

Success story: Slovak D4 R7 PPP & lessons learnt for Czech PPPs www.pwc.com Success story: Slovak D4 R7 PPP & lessons learnt for Czech PPPs November 2016 Jan Brazda, (Head of PPP in CEE) Agenda 1 Key highlights of the D4/R7 PPP project 2 EU financial instruments 3

More information

EIB Procurement Policy and Best Practice

EIB Procurement Policy and Best Practice EIB Procurement Policy and Best Practice José Luis Alfaro, Head of Procurement 1 Table of Contents EIB EIB Procurement Policy Best practice Procurement of services Tender documents Prequalification criteria

More information

Czech D4 Highway PPP Project

Czech D4 Highway PPP Project The Ministry of Transport of the Czech Republic has begun to prepare a tender for a concession for the construction and operation of the D4 Highway using a PPP model. The D4 Highway PPP project consists

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

Delivering Public Private Partnerships in PNG

Delivering Public Private Partnerships in PNG Port Moresby Chamber of Commerce-INA Public Private Partnership Seminar Pt Moresby, 22 nd February, 2012 1.4 Delivering Public Private Partnerships in PNG Michael Regan Professor of Infrastructure Institute

More information

CHAPTER 6 Public Private Partnership

CHAPTER 6 Public Private Partnership CHAPTER 6 Public Private Partnership Dr. Nabil Elsawalhi Associate Professor of Construction Management CM 6 1 Project Procurement Methods There are several methods of how to procure projects: 1. Traditional

More information

People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing

People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing Consultant s Report Project Number: 49166-001 People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing PPP Project Cycle Checklists and

More information

PPP initiative in the health sector

PPP initiative in the health sector PPP initiative in the health sector Stephen Batts PPP Key Consultant, EU Health Facility Day 2-3rd December 2016 EU Health Facility, Vietnam A Project funded by the European Union 1 2 Demand and Supply

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

An Introduction to PPP s

An Introduction to PPP s An Introduction to PPP s AAPA Facilities Engineering Seminar San Diego November 8 th, 2007 Presented by Manju Chandrasekhar Vice President Halcrow, Inc. Outline A Definition of PPP s Principles of PPP

More information

Financing Transport Infrastructure. September 2014

Financing Transport Infrastructure. September 2014 Financing Transport Infrastructure September 2014 Financing Transport Infrastructure PPP Definition Project Risks Contract Structures Case Studies Key Issues Conclusions 2 PPP Definition Public Private

More information

Project Development Under PPPs

Project Development Under PPPs Project Development Under PPPs Presented by: Afzal Dar Senior Infrastructure Specialist Infrastructure Project Development Facility (IPDF) afzal.dar@ipdf.gov.pk Outline Understanding PPPs- what they are;

More information

Keynote Address: Legal Issues for PPP Transactions

Keynote Address: Legal Issues for PPP Transactions Keynote Address: Legal Issues for PPP Transactions Asia PPP Practitioners Network 2016 Conference Korea Development Institute, 30 November 2016 M. Moseley Lead Lawyer Public Private Partnerships Group

More information

PPP Project - D4 Highway INDUSTRY DAY.

PPP Project - D4 Highway INDUSTRY DAY. INDUSTRY DAY www.pppd4.cz February 12 th, 2018 Introduction to Project 32 km greenfield part (DBFOM) 16 km brownfield part (O&M) Public Authority Ministry of Transport of the Czech Republic (MoT) State

More information

INFRASTRUCTURE INVESTMENT

INFRASTRUCTURE INVESTMENT ANNEX MAJOR PROJECT 1 NOTIFICATION TO THE COMMISSION OF THE SELECTED MAJOR PROJECT UNDER ARTICLE 92.1. OF COMMON PROVISIONS REGULATION (CPR) (EC) NO ( ) 2 EUROPEAN REGIONAL DEVELOPMENT FUND / COHESION

More information

New Financing Trends Impact on Tunnelling Contracts

New Financing Trends Impact on Tunnelling Contracts Martin Holfelder, Dipl.-Ing., Member of Management, Bilfinger Berger AG, Civil Tunnelling Arne Speer, Dipl.-Ing., Regional Director East, Bilfinger Berger BOT Europe GmbH Contents of PPP Projects Return

More information

PPP Project - D4 Motorway CZE. ARI PPP conference. November 27 th,

PPP Project - D4 Motorway CZE. ARI PPP conference. November 27 th, CZE ARI PPP conference www.pppd4.cz/en November 27 th, 2018 Introduction to Project 32 km greenfield part (DBFOM) 16 km brownfield part (O&M) Public Authority Ministry of Transport of the Czech Republic

More information

Version Three offer rules - modifications about beneficiaries asking for offers instead of collecting them.

Version Three offer rules - modifications about beneficiaries asking for offers instead of collecting them. - Tender procedures Valid from Valid to Main changes Version 2 27.04.15 23.05.18 Specified that the 5,000 threshold for the 3-offer rule is excluding VAT. Clarified the situation regarding use of existing

More information

Sameh I. Mobarek Senior Counsel Energy, LEGPS Member, Global Expert Team on Public-Private Partnerships. PPP Financing Overview

Sameh I. Mobarek Senior Counsel Energy, LEGPS Member, Global Expert Team on Public-Private Partnerships. PPP Financing Overview Sameh I. Mobarek Senior Counsel Energy, LEGPS Member, Global Expert Team on Public-Private Partnerships PPP Financing Overview What is a Public-Private Partnership? A PPP is a long-term (5 to 30 year)

More information

transport consultancy and engineering The 3rd of may of 2012

transport consultancy and engineering The 3rd of may of 2012 P3: A Strategic Decision for Infrastructure Development Spanish Ministry of Civil Works The 3rd of may of 2012 0 INTRODUCCION DEVELOPED COUNTRIES HAVE NEW CHALLENGES Governments budget constraints: They

More information

Financial Instruments in Energy Efficiency in Lithuania Agnė KAZLAUSKAITĖ, Ministry of Finance Junona BUMELYTĖ, EIB

Financial Instruments in Energy Efficiency in Lithuania Agnė KAZLAUSKAITĖ, Ministry of Finance Junona BUMELYTĖ, EIB Financial Instruments in Energy Efficiency in Lithuania Agnė KAZLAUSKAITĖ, Ministry of Finance Junona BUMELYTĖ, EIB Strategic context: EU funds investment over 2 PP 2007 2013 EUR 6,775.5m 2014 2020 EUR

More information

PPP in Airport Infrastructure Business

PPP in Airport Infrastructure Business PPP in Airport Infrastructure Business British council Seminar on Public Private Partnerships Damascus, Syria - 31 October 2009 Jacques FOLLAIN Managing Director 1 PPP in Airport Infrastructure Business

More information

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES April 2005 Introduction This document has been published by the Project Preparation Committee (PPC) within the framework of the DABLAS Task Force

More information

PPP for European Road Projects

PPP for European Road Projects Ways to Successful Preparation and Financing 1st European Road Congress 24-26 November 2004 Lisbon Congress Centre Dipl.-Ing. Wilfried Rammler Rosario Victoria Bridge, Argentina 1 HOCHTIEF...worldwide

More information

Equitable Financial Evaluation Method for Public-Private Partnership Projects *

Equitable Financial Evaluation Method for Public-Private Partnership Projects * TSINGHUA SCIENCE AND TECHNOLOGY ISSN 1007-0214 20/25 pp702-707 Volume 13, Number 5, October 2008 Equitable Financial Evaluation Method for Public-Private Partnership Projects * KE Yongjian ( ), LIU Xinping

More information

Preparation and implementation of public investments

Preparation and implementation of public investments Manuals for preparation and implementation of the Public Private Partnership Program Diskontiranje i diskontna stopa kod projekata javnoprivatnog partnerstva Manuals for preparation and implementation

More information

Finance Committee. Inquiry into methods of funding capital investment projects. Submission from PPP Forum

Finance Committee. Inquiry into methods of funding capital investment projects. Submission from PPP Forum About Finance Committee Inquiry into methods of funding capital investment projects Submission from Established in 2001, the is an industry body representing over 110 private sector companies involved

More information

INFRASTRUCTURE FINANCE AND PPP

INFRASTRUCTURE FINANCE AND PPP INFRASTRUCTURE FINANCE AND PPP INFRASTRUCTURE FINANCE AND PPP (Course Director: Meg Osius) Program Overview and Objectives In this three-day program participants will become familiar with the wide array

More information

MEGAPROJECT Case Study

MEGAPROJECT Case Study SECTION 1 - BASIC PROJECT INFORMATION MEGAPROJECT Case Study Case compiled by: Milen Baltov Contact details: mbaltov@bfu.bg Basic Project Information 1 Project Title Location Purpose Scope Total Project

More information

World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program

World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects Workshop Program 3 June, 2015 Richard MacGeorge Successful preparation of bankable projects Getting Projects From Fairway

More information

Public Private Partnerships. Gautrain Rapid Rail Link. in St Petersburg. World Bank Institute. CEO: Gautrain Management Agency

Public Private Partnerships. Gautrain Rapid Rail Link. in St Petersburg. World Bank Institute. CEO: Gautrain Management Agency Public Private Partnerships in St Petersburg Gautrain Rapid Rail Link World Bank Institute Jack van der Merwe (Pr.Eng) CEO: Gautrain Management Agency 07-08 December 2007 Why Gauteng... why Gautrain? The

More information

PFI Procurement. Centralisation and Modernisation of Acute Services on the Broomfield Hospital Site

PFI Procurement. Centralisation and Modernisation of Acute Services on the Broomfield Hospital Site PFI Procurement Centralisation and Modernisation of Acute Services on the Broomfield Hospital Site Pre-Qualification Questionnaire January 2003 Version 1.00 INTRODUCTION 1 Responses 2 Layout of PQQ 3 SECTION

More information

PPPs in CEE/CIS Is the king naked? Is world of consultants ready for a new challenge?

PPPs in CEE/CIS Is the king naked? Is world of consultants ready for a new challenge? PPPs in CEE/CIS Is the king naked? Is world of consultants ready for a new challenge? PricewaterhouseCoopers Peter Mitka Content Budapest 2006 1. Setting the scene 2. PPPs - solving all problems? 3. Tendering

More information

Training on EU policies for Directors of the Region of Sicily. Brussels Office of the Region of Sicily Rue Belliard 12

Training on EU policies for Directors of the Region of Sicily. Brussels Office of the Region of Sicily Rue Belliard 12 Training on EU policies for Directors of the Region of Sicily Brussels Office of the Region of Sicily Rue Belliard 12 EU Budget CZ state budget Other public budgets Direct gains to contractors Transfers

More information

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. If yes, please specify the relevant regulatory

More information

Plenary 2: Public-Private Partnerships. Monday, 12:00 to 13:00

Plenary 2: Public-Private Partnerships. Monday, 12:00 to 13:00 Plenary 2: Public-Private Partnerships Monday, 12:00 to 13:00 Session agenda 1. What is PPP? 2. When are PPPs appropriate and where have they been used? 3. PPI in South Asia 4. Key terms 5. Summary and

More information

Training workshop PPP in health sector

Training workshop PPP in health sector EU Health Facility, Vietnam Training workshop PPP in health sector Session 9 Tran Duy Hung Senior PPP and Finance Expert Da Nang, 1-3 December, 2016 1 Content Healthcare PPP structures/options Financing

More information

MANDAT news. Fresh tax, legal and economic information APRIL 2013

MANDAT news. Fresh tax, legal and economic information APRIL 2013 Fresh tax, legal and economic information MANDAT news The April issue includes: Income Tax Prepayments Payments to Health Insurance Companies Not to be missed Important Dates MANDAT CONSULTING, k.s., Nám.

More information

City Policy & Procedure

City Policy & Procedure City Policy & Procedure Subject: PUBLIC-PRIVATE PARTNERSHIP (P3) POLICY Policy Number: #1011 Effective: September 3rd, 2014 Purpose: The City of Brandon Public-Private Partnership (P3) Policy intends to

More information

Headline Verdana Bold. Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited

Headline Verdana Bold. Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited Headline Verdana Bold Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited About us Kenneth Legesi Infrastructure and Capital Projects / PPP Advisory Deloitte

More information

Infrastructure - Changing procurement models

Infrastructure - Changing procurement models Infrastructure - Changing procurement models Angus Foley, Partner 4 September 2015 AUSTRALIA BELGIUM CHINA FRANCE GERMANY HONG KONG SAR INDONESIA (ASSOCIATED OFFICE) ITALY JAPAN PAPUA NEW GUINEA SAUDI

More information

Prioritisation Methodology

Prioritisation Methodology Prioritisation Methodology March 2014 PRIORITISATION METHODOLOGY Table of contents 1 Introduction... 5 2 The Projects Prioritisation Process... 7 3 The Methodological Assumptions... 8 3.1 Background...

More information

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships Budapest, Hungary March 7 8, 2007 The views expressed in this paper are those of the

More information

Public Private Partnerships. Virginia GFOA s 2015 Fall Conference. prepared for. by JoAnne Carter, Managing Director.

Public Private Partnerships. Virginia GFOA s 2015 Fall Conference. prepared for. by JoAnne Carter, Managing Director. Public Private Partnerships prepared for Virginia GFOA s 2015 Fall Conference by JoAnne Carter, Managing Director October 21, 2015 4350 North Fairfax Drive, Suite 580 Arlington, Virginia 22203 2015 Public

More information

Fiscal and Budgetary treatment of PPP pilot projects

Fiscal and Budgetary treatment of PPP pilot projects Final Report Appendix 3 ASSESSMENT REPORT Fiscal and Budgetary treatment of PPP pilot projects Prepared as part of the Twinning Project CZ04/IBI/FI/02-TL Document Number Status Authors Checked by Approved

More information

Classification of Government Procurement Regulations and Administrative Procedures Challenges and Proposals

Classification of Government Procurement Regulations and Administrative Procedures Challenges and Proposals Classification of Government Procurement Regulations and Administrative Procedures Challenges and Proposals Julien Gourdon and James Messent OECD Trade and Agriculture Directorate Ad-Hoc Expert Meeting

More information

Public Private Partnerships IFC s Global Experience

Public Private Partnerships IFC s Global Experience Public Private Partnerships IFC s Global Experience Martin Spicer Principal Investment Officer Municipal Fund International Finance Corporation Moscow, February 10, 2005 1 Presentation Outline Introduction

More information

Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations

Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations December 2017 1 1. THE CONTRACTING AUTHORITY... 4 2. REGULATION

More information

How to Develop High-Quality Full Application Writing a Winning Proposal

How to Develop High-Quality Full Application Writing a Winning Proposal How to Develop High-Quality Full Application Writing a Winning Proposal Information and Training Workshop Presentations held at the Country Workshops in Moldova, Ukraine and Georgia Day 1 Day!One!!!! Workshop

More information

The Benefits of P3s. Why do P3s work?

The Benefits of P3s. Why do P3s work? The Benefits of P3s Why do P3s work? P3s are a long-term performance-based approach for procuring public infrastructure where the private sector assumes a major share of the responsibility in terms of

More information

This Legal Update provides information on some important legislative changes which have been passed in October, November and December 2010.

This Legal Update provides information on some important legislative changes which have been passed in October, November and December 2010. 1 January 2011 LEGAL UPDATE 4/2010 This Legal Update provides information on some important legislative changes which have been passed in October, November and December 2010. Change in names of ministries

More information

Public Private Partnerships A New Zealand Overview

Public Private Partnerships A New Zealand Overview Public Private Partnerships A New Zealand Overview PECC Workshop on PPPs 13 December 2004 Presented by Michael Weatherall Partner AK041960066 Public Private Partnerships Terminology Recent PPP projects

More information

Notifying Unqualified Trade for Legal Entities Not Residing in the Czech Republic, EU, EEA and Switzerland (Foreign Legal Entity)

Notifying Unqualified Trade for Legal Entities Not Residing in the Czech Republic, EU, EEA and Switzerland (Foreign Legal Entity) Notifying Unqualified Trade for Legal Entities Not Residing in the Czech Republic, EU, EEA and Switzerland (Foreign Legal Entity) As provided for in section 2 of the Trade Licensing Act, the trade is a

More information

Workshop on PPP in Roads and Highways

Workshop on PPP in Roads and Highways Workshop on PPP in Roads and Highways Vickram Cuttaree, PPP-Coordinator, Europe & Central Asia Member of the Global Expert Team on PPP June 7, 2011 Agenda Rationale for PPP and International Experience

More information

JASPERS Networking Platform

JASPERS Networking Platform JASPERS Networking Platform Supporting investments in Smart Grids in 2014-2020 Background and Introduction Massimo Marra, Senior Officer JASPERS Networking and Competence Center Brussels, 25 March 2015

More information

Public Private Partnerships (PPP)- The Financial Perspective October 2014

Public Private Partnerships (PPP)- The Financial Perspective October 2014 Public Private Partnerships (PPP)- The Financial Perspective October 2014 The Logo is a trademark of Canadian Imperial Bank of Commerce, used by FirstCaribbean International Bank under license Table of

More information

Public Private Partnership in Highway Sector in Punjab, India

Public Private Partnership in Highway Sector in Punjab, India Public Private Partnership in Highway Sector in Punjab, India Infrastructure Governance Roundtable March 24 th, 2006 Kulwinder Singh Rao Deputy Project Director Punjab Roads & Bridges Development Board

More information

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS 29/03/2012 COCOF_12-0047-02-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DIRECTORATE-GENERAL EMPLOYMENT, SOCIAL AFFAIRS and EQUAL OPPORTUNITIES GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER

More information

Incorporation of Publicly Owned Enterprises in Kosovo. Frequently Asked Questions

Incorporation of Publicly Owned Enterprises in Kosovo. Frequently Asked Questions Incorporation of Publicly Owned Enterprises in Kosovo Frequently Asked Questions What is incorporation? In legal terms, incorporation literally means the creation of a company or a new legal entity. It

More information

THE PRIME MINISTER ------- No. 71/2010/QD-TTg SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- Hanoi, November 09, 2010 DECISION PROMULGATING THE REGULATION ON PILOT INVESTMENT

More information

Global Infrastructure Hub Norton Rose Fulbright Risk Allocation in Public Private Partnerships. IPFA Risk Allocation Webinar, 21 June 2017

Global Infrastructure Hub Norton Rose Fulbright Risk Allocation in Public Private Partnerships. IPFA Risk Allocation Webinar, 21 June 2017 Global Infrastructure Hub Norton Rose Fulbright Risk Allocation in Public Private Partnerships IPFA Risk Allocation Webinar, 21 June 2017 Mark Moseley, Chief Operating Officer, GI Hub and Nick Merritt,

More information

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Mid Term Review of Project 00059714 Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Final Evaluation Report Date of Report: 8 August 2013 Authors of Report:

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

AIM To develop awareness of the financial aspects relevant to engineers in brownfield regeneration

AIM To develop awareness of the financial aspects relevant to engineers in brownfield regeneration Modules 4 Financial Aspects Before you attempt to study or to deliver this module, please make sure that you understand the LEPOP Brownfields Handbook and the overall LEPOB Brownfields Course. Much of

More information

Authorised Officer is any officer permitted by an Appropriate Officer to authorise orders and contracts as per clause 2.5.

Authorised Officer is any officer permitted by an Appropriate Officer to authorise orders and contracts as per clause 2.5. PART 3G Contracts Standing Orders 2018/19 Definitions Aggregation is the combining together of the total contract valuespend from separate contracts where they meet a single requirement for works, goods

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE ON INVESTMENT IN THE FORM OF PUBLIC-PRIVATE PARTNERSHIP

More information

1 Introduction Purpose of the Guidelines Scope of the Guidelines Structure of the Guidelines PPP models...

1 Introduction Purpose of the Guidelines Scope of the Guidelines Structure of the Guidelines PPP models... Table of Contents 1 Introduction... 5 1.1 Purpose of the Guidelines... 5 1.2 Scope of the Guidelines... 5 1.3 Structure of the Guidelines... 7 2 PPP models... 8 3 PPP Critical Success Factors... 15 4 Overview

More information

CANDIDATE INFORMATION BOOKLET. Please Read Carefully. Permanent Position of Business Advisor Local Enterprise Officer (Grade VI)

CANDIDATE INFORMATION BOOKLET. Please Read Carefully. Permanent Position of Business Advisor Local Enterprise Officer (Grade VI) CANDIDATE INFORMATION BOOKLET Please Read Carefully Permanent Position of Business Advisor Local Enterprise Officer (Grade VI) Closing Date: 4p.m. on Friday the 22 nd of September, 2017 POST OF BUSINESS

More information

Public Private Partnerships An overview from the legal perspective

Public Private Partnerships An overview from the legal perspective Public Private Partnerships An overview from the legal perspective Ren Niemann Partner Allens is an independent partnership operating in alliance with Linklaters LLP. 1 What is a public private partnership?

More information

Public Private Partnerships in Greece

Public Private Partnerships in Greece Public Private Partnerships in Greece Nikos Mantzoufas Special Secretary for PPPs 14 th Annual Investor Forum Building a New Greece Capital Link Forum Thursday, November 29, 2012 New York City Hellenic

More information

Guidelines for brief feasibility study

Guidelines for brief feasibility study Guidelines for brief feasibility study 1. The executive summary This point shall provide a clear description of the activities which are planned to be implemented within the project. In case of more complex

More information

Competitive Procurement Of Energy Efficiency

Competitive Procurement Of Energy Efficiency Competitive Procurement Of Energy Efficiency Public Procurement of Energy Efficiency Services e-learning Course To learn more about this series or other WBI activities, visit us at:http://wbi.worldbank.org/wbi

More information

Guidelines for Formulation, Appraisal and Approval of

Guidelines for Formulation, Appraisal and Approval of Government of India Ministry of Finance Department of Economic Affairs Guidelines for Formulation, Appraisal and Approval of Central Sector Public Private Partnership Projects INFRASTRUCTURE Building for

More information

Better Life Time June "AA constructive response to the demographic challenge"

Better Life Time June AA constructive response to the demographic challenge Public Private Partnerships (PPPs) Better Life Time 2007-15 June 2007 "AA constructive response to the demographic challenge" André Autrand Head of European Public Sector Department «The different forms

More information

An international call for research. Taking Stock of Public Private Partnerships and Private Finance Initiatives Around the World

An international call for research. Taking Stock of Public Private Partnerships and Private Finance Initiatives Around the World An international call for research Taking Stock of Public Private Partnerships and Private Finance Initiatives Around the World 2 An international call for research ACCA wishes to commission research with

More information

ŽELEZNIČNÁ SPOLOČNOSŤ SLOVENSKO, a.s. SEPARATE FINANCIAL STATEMENTS PREPARED IN ACCORDANCE WITH THE INTERNATIONAL FINANCIAL REPORTING STANDARDS

ŽELEZNIČNÁ SPOLOČNOSŤ SLOVENSKO, a.s. SEPARATE FINANCIAL STATEMENTS PREPARED IN ACCORDANCE WITH THE INTERNATIONAL FINANCIAL REPORTING STANDARDS ŽELEZNIČNÁ SPOLOČNOSŤ SLOVENSKO, a.s. SEPARATE PREPARED IN ACCORDANCE WITH THE INTERNATIONAL FINANCIAL REPORTING STANDARDS As on SEPARATE PREPARED IN ACCORDANCE WITH THE INTERNATIONAL FINANCIAL REPORTING

More information

Keywords: recycling, lead acid battery, PPP, Jordan

Keywords: recycling, lead acid battery, PPP, Jordan Assessment of Sustainable Used Lead Acid Battery Collection and Recycling Scheme in Jordan G. Iliopoulos 1, M.Dimitropoulou 1, D.Bourkas 1, A.Bourka 1, V.Stergiou 1, 1 EPTA Environmental Consultants Engineers,

More information

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010 Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri

More information

Public Private Partnerships in Real Estate. 28 th, Sep 2017

Public Private Partnerships in Real Estate. 28 th, Sep 2017 Public Private Partnerships in Real Estate 28 th, Sep 2017 First and foremost Objective Table of contents In KPMG s rationale for developing KSA s Temporary Workforce, it was established: Thank you for

More information

Ethical Rules for Collaboration between Patient Organisations, etc., and the Pharmaceutical Industry

Ethical Rules for Collaboration between Patient Organisations, etc., and the Pharmaceutical Industry Ethical Rules for Collaboration between Patient Organisations, etc., and the Pharmaceutical Industry Art. 1. Purpose The ethical rules provides a framework for collaboration between the pharmaceutical

More information

UNIVERSAL SERVICE AND ACCESS FINAL REPORT

UNIVERSAL SERVICE AND ACCESS FINAL REPORT UNIVERSAL SERVICE AND ACCESS FINAL REPORT 0 1 Contents INTRODUCTION... 2 Updates... 4 Electronic Communications Bill... 4 Electronic Communications (Universal Service and Access Fund) Regulations... 12

More information

REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT. on the feasibility of a network of smaller credit rating agencies

REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT. on the feasibility of a network of smaller credit rating agencies EUROPEAN COMMISSION Brussels, 5.5.2014 COM(2014) 248 final REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT on the feasibility of a network of smaller credit rating agencies {SWD(2014)

More information

LAW OF THE REPUBLIC OF TAJIKISTAN ON FREE ECONOMIC ZONES

LAW OF THE REPUBLIC OF TAJIKISTAN ON FREE ECONOMIC ZONES LAW OF THE REPUBLIC OF TAJIKISTAN ON FREE ECONOMIC ZONES The present law defines the organizational, legal, economic principles of establishment, management, operation and termination of free economic

More information

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS MINISTRY OF FINANCE AND ECONOMIC AFFAIRS Contents 1. PREAMBLE 4 2. THE POLICY OBJECTIVES 5 3. DEFINITION OF PPP 5 4. BENEFITS OF PPP 6 5. KEY GUIDING PRINCIPLES 7 6. SCOPE AND APPLICATION OF PPP PROJECTS

More information

Assistance to NERC: Regulatory Support Program

Assistance to NERC: Regulatory Support Program Assistance to NERC: Regulatory Support Program Regulatory framework for E-RES support in Ukraine Kiev, October 5th AF-MERCADOS ENERGY MARKETS INTERNATIONAL Finding new paths for energy markets AF-Mercados

More information

Draft PPP Policy Outline

Draft PPP Policy Outline Note 7 May 2012 Draft PPP Policy Outline This note is the seventh in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership (PPP) programs.

More information

Mr Kevin DIXON Managing Director Asia Pacific Mott MacDonald

Mr Kevin DIXON Managing Director Asia Pacific Mott MacDonald Attracting investors - Issues in preparing business cases Mr Kevin DIXON Managing Director Asia Pacific Mott MacDonald Kevin.Dixon@mottmac.com +65 62839100 Mott MacDonald does not accept any liability

More information

Problems and Prospects of Public Private Partnership in Bangladesh

Problems and Prospects of Public Private Partnership in Bangladesh Problems and Prospects of Public Private Partnership in Bangladesh M. Fouzul Kabir Khan North South University Dhaka, 16 July 2012 What is PPP? PPP is a form of medium/long term contractual arrangement

More information

B I L F I N G E R B E R G E R

B I L F I N G E R B E R G E R Capital Markets Day Concessions 22 November 2006 Phases of a PPP-Project Jürgen Schönwasser, Managing Director 1 The Task: Define the process Structure the process Manage the process Conclude the process

More information

Inspired by Hinterland Who s Who

Inspired by Hinterland Who s Who Observing Public Private Partnerships David Little, Partner (with analysis by Fergus McDonnell, summer student) September 19, 2013 Inspired by Hinterland Who s Who WhoTube http://www.hww.ca/en/videos/beaver.html

More information

A new approach to public private partnerships: PF2. OECD Annual Meeting of Senior PPP Officials

A new approach to public private partnerships: PF2. OECD Annual Meeting of Senior PPP Officials A new approach to public private partnerships: PF2 OECD Annual Meeting of Senior PPP Officials 15 April 2013 Concerns with the Private Finance Initiative In some cases the returns to equity investors in

More information

«Kekava Bypass» Case Study

«Kekava Bypass» Case Study «Kekava Bypass» Case Study 28 September, 2017 Contents Introduction 3 Project details 6 Legal aspects Procurement procedure 15 Legal aspects PPP Agreement 22 Finance aspects 26 Off balance sheet treatment

More information

GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS

GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS (i) (ii) OF ALL SECTORS COSTING MORE THAN RS.100 CRORE AND LESS THAN RS.250 CRORE UNDER NHDP COSTING RS.250

More information

WHAT IS PROJECT FINANCE? BANKING HANDY GUIDE

WHAT IS PROJECT FINANCE? BANKING HANDY GUIDE WHAT IS PROJECT FINANCE? BANKING HANDY GUIDE An introduction The project finance model is typically used for the purpose of financing the delivery of long-term infrastructure or natural resource projects,

More information

AGENDA ITEM #9 SUMMARY

AGENDA ITEM #9 SUMMARY AGENDA ITEM #9 SUMMARY Briefing on business considerations and state law requirements for the use of a comprehensive development agreement to develop a transportation project. Strategic Plan Relevance:

More information

Annual Implementation Report 2015

Annual Implementation Report 2015 Annual Implementation Report 215 of the INTERREG V-A SLOVAKIA-HUNGARY COOPERATION PROGRAMME Content 1. Identification of the annual implementation report... 4 2. Overview of the implementation... 4 3.

More information

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF)

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF) Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF) PPP Cell Planning Department Government of Rajasthan Contents 1. The RIPDF and its Role 2 i. Background of the RIPDF ---------------------------

More information

Manoj Kumar Dubey Executive Director Finance/ Public Private Partnership Ministry of Railways

Manoj Kumar Dubey Executive Director Finance/ Public Private Partnership Ministry of Railways Manoj Kumar Dubey Executive Director Finance/ Public Private Partnership Ministry of Railways Model Concession Agreements Finalised and Issued under Policy for Participative Models for Rail Connectivity