Document of The World Bank FOR OFFICIAL USE ONLY STAFF APPRAISAL REPORT INDONESIA DAM SAFETY PROJECT MAY 6, 1994

Size: px
Start display at page:

Download "Document of The World Bank FOR OFFICIAL USE ONLY STAFF APPRAISAL REPORT INDONESIA DAM SAFETY PROJECT MAY 6, 1994"

Transcription

1 Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No IND Public Disclosure Authorized STAFF APPRAISAL REPORT INDONESIA Public Disclosure Authorized DAM SAFETY PROJECT MAY 6, 1994 Public Disclosure Authorized Agriculture Operations Division Country Department III East Asia and Pacific Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 CURRENCY (As of February 1994) Currency Unit = Rupiah (Rp) US$1.00 = Rp 2,105 Rp 1,000 = US$0.475 Rp 1 million = US$ WEIGHTS AND MEASURES The metric system is used throughout the report INDONESIAN FISCAL YEAR April 1 - March 31 ABBREVIATIONS BAPEDAL - Environmental Impact Control Agency BAPPENAS - National Development Planning Agency BPKP - Government Audit Agency DGWRD - Directorate General of Water Resources Development DMU - Dam Monitoring Unit DSC - Dam Safety Commission DSU - Dam Safety Unit EAP - Emergency Action Plan EIA - Environmental Impact Assessment GOI - Government of Indonesia ICB - International Competitive Bidding ICOLD - International Commission on Large Dams LCB - Local Competitive Bidding MOF - Ministry of Finance MPW - Ministry of Public Works O&M - Operation and Maintenance PIMPRO - Pimpinan Proyek (Project Manager) PLN - State Electricity Corporation PWRS - Provincial Water Resources Services SOE - Statement of Expenses

3 FOR OFFICIAL USE ONLY INDONESIA DAM SAFETY PROJECT LOAN AND PRoJEwr SuMMARY Borrower: Loan Amount: Terms: Project Description: Benefits and Risks: Republic of Indonesia US$55.0 million equivalent Twenty years, including five years of grace, at the Bank's standard variable interest rate. The main objective of the project is to reduce the risk of dam failures in Indonesia through establishment of national dam safety institutions and carrying out a program to improve the safety of existing dams. The project would be implemented over a six-year period ( ) and include the following main components: (a) support for the recently established Dam Safety Commission (DSC) and Dam Safety Unit (DSU) at central Government level and Dam Monitoring Units (DMU) at central and local dam owners' levels; (b) provision of basic dam safety facilities at dams where at present such facilities are lacking; and (c) implementation of remedial works at dams with safety deficiencies. Training and technical assistance would be provided to assist the Directorate General of Water Resources Development (DGWRD) with the implementation of the proposed project. The project's main benefit would be a reduction in the risk of dam failures and there are no major risks associated with its implementation. There is a relatively small risk that it may take longer than at present anticipated for the new dam safety institutions to become fully operational and for their staff to be trained to the level required to manage a nation-wide program. However, Government fully recognizes the importance of setting up a regulatory body to enhance the safety of the nation's dams. The Dam Safety Commission would be the key body to guide the dam safety program toward a national level with clear public accountability for safety while leaving operational accountability with the dam owners. Proper orientation and training of the members of the Dam Safety Commission would be a critical element of the project during the first one or two years of its implementation. This document has a restricted distribution and may be used by recipients only in the perfonnance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.l

4 Estimated Costs: Lg Local Foreign Total US$ million Dam Safety Institutions Remedial Works Basic Safety Facilities Project Management Total Baseline Cost Physical Contingencies Price Contingencies Total Project Cost La Inclusive of taxes and duties estimated at US$7.6 million equivalent. Financing Plan: Local Foreign Total US$ million Government IBRD Total i9 97 Estimated IBRD Disbursements: Bank FY FY95 FY96 FY97 FY98 FY99 FY00 FY01 Annual Cumulative Economic Rate of Return: Poverty Category: Not applicable. Not applicable Map: IBRD 25605

5 INDONESIA DAM SAFETY PROJECT CONTENTS Page No. 1 PROJECT AND SUBSECTOR BACKGROUND Background Dams in Indonesia... 1 Institutional Framework for Dam Safety BANK INVOLVEMENT. 4 Bank Involvement in Dams in Indonesia. 4 Issues and Lessons Learned.5 Government Strategy. 5 Bank Strategy and Rationale for Bank Involvement.5 3 THE PROJECT. 8 Project Objectives. 8 Project Area. 8 Project Description. 8 Detailed Features. 8 Status of Preparation and Implementation Schedule.11 Environmental Impact PROJECT COSTS AND FINANCING Project Costs Financing Plan Procurement Disbursements Accounts and Audits This report is based on the findings of an appraisal mission which visited Indonesia in October/November 1993 comprising Messrs. William Price (Mission Leader) and Hendrik van Voorthuizen (Task Manager), Ms. Salenna Wong (Bank) and Mr. Jeris Danielson (Consultant). Peer Reviewers were Messrs. P.N. Gupta and Guy Le Moigne. Ms. Marianne Haug, Director, EA3, and Mr. Antony Cole, Chief, EA3AG, have endorsed the project.

6 - Iv- Page No. 5 ORGANIZATION AND MANAGEMENT..G.EMENT Organization and Management Monitoring and Evaluation Annual Work Plan and Budgets Supervision Missions PROJECT JUSTIFICATION AND RISKS Benefits and Justification Project Sustainability Project Risks AGREEMENTS REACHED AND RECOMMENDATION Tables in Text Table 2.1 Irrigation Subsector - Project Completion and Performance Audit Reports Project Cost Summary Project Financing Plan Procurement Arrangements Annexes 1. Background of Dams in Indonesia Figure 1: Age Distribution of Large Dams in Indonesia Table 1: List of Dams in Indonesia Organizations and Responsibilities A. Dam Safety Commission B. Dam Safety Unit C. Dam Monitoring Units Training Figure 1: Training Program Table 1: Training Matrix Basic Dam Safety Facilities Table 1: Basic Dam Safety Requirements Remedial Works Consultant Services Table 1: Technical Assistance Requirements

7 - v - 7. Project Cost Table 101: Dam Safety Unit Table 102: Dam Monitoring Units Table 103: Technical Assistance and Training Table 201: Remedial Works - Jatiluhur Dam Table 202: Remedial Works - Category A Dams Table 203: Remedial Works - Category B Dams Table 204: Remedial Works - Category C Dams Table 301: Basic Dam Safety Facilities Table 401: Project Management Project Financing and Disbursements Table 1: Proposed Allocation of Loan Table 2: Estimated Disbursement Schedule Procurement Packages for Civil Works Implementation Schedule Project Supervision Plan Selected Documents in Project File Charts 1. Proposed Structural Organization of MPW Showing DSO Relations 2. Proposed Structural Organization of the Dam Safety Unit 3. Proposed Structural Organization of the Subdirectorate of Large Structures Map IBRD Location of Dams

8

9 - 1 - CHAPTER 1 PROJECT AND SUBSECTOR BACKGROUND Background 1.1 Dams have been constructed in Indonesia since the early 1900s, initially for irrigation purposes, but increasingly as multi-purpose dams for irrigation, power generation and flood control. The development of Indonesia's water resources has been a key factor for rapid rural development, transition to rice self-sufficiency, and a notable drop in poverty levels. Agricultural growth has outpaced population growth by 1 percent per year for two decades, while even more rapid expansion of the services and manufacturing sectors have shrunk agriculture's share of GDP to 20 percent. Faced with growing non-agriculture water demands and diminished prospects for new irrigation, particularly on Java, the main challenges are sustaining existing infrastructure and increasing the efficiency of water use. The rapid economic development also has increased the awareness among the public for the need to protect society against potential disasters due to dam failures. The Government of Indonesia (GOI) has therefore requested Bank assistance for a Dam Safety Project which would help establish permanent dam safety institutions, provide basic safety facilities to all dams where such facilities currently are lacking, and implement remedial works at schemes with safety deficiencies. Dams in Indonesia 1.2 At present about 120 large 1/ and numerous small dams and weirs are in operation in Indonesia. The dams have significantly contributed to the country's development: they serve about 1 million hectares of irrigated lands, generate 6,000 GwH of electricity, protect large downstream areas from floods, and are a major source of water supply for urban centers. Over 100 of the dams are single purpose, of which over 90 serve irrigation schemes and 10 generate power. There are about 15 multi-purpose dams, serving irrigation and power, and in 10 cases also serving flood control and/or water supply. Some 100 of the 120 dams are located on Java, including 13 of the 15 multipurpose dams. The largest arable land resources are on Java and over 90 of the dams are being used for irrigation. Most of the older dams on Java are relatively small and were built to supply local irrigation systems and villages. The more recently built dams tend to be larger and serve larger areas. About one-third of the existing large dams were built before / Dams having a height of 15 meters or more and/or a reservoir capacity of at least 500,000 cubic meters.

10 About 95 of the dams are owned by the Ministry of Public Works (MPW) and operated by the Provincial Water Resources Services (PWRS) with technical oversight by MPW's Directorate General of Water Resources Development (DGWRD). Prior to 1965 almost all dam projects were planned, constructed and operated under the direction of MPW. Since then the hydropower facilities were separated from MPW and placed under the State Electricity Corporation (PLN). The PLN is the second largest dam owner and operates at present nine dams. The Jatiluhur Authority operates 1 dam, the Jasa Tirta (Brantas Authority) 6 dams, and other public and private owners another 10 dams. Details on age, size and ownership of Indonesia's large dams are given in Annex 1, Table Several technical factors need to be considered with regard to the safety of the existing dams. First, where past maintenance programs have been weak, the probability of failures increases. Second, potential losses below dams due to failures are increasing with expanding populations and property development, often located near the banks of the downstream river channels. Third, the technical knowledge of dam design, hydrologic analysis, monitoring instrumentation, and quality control of materials and construction have improved over the past three decades. Many of these advances have occurred after the completion of some of the older facilities. Moreover, Indonesia is located in an active seismic zone which requires special attention in dam design and maintenance to assure greater strength or flexibility of the dams. The knowledge and methodology of estimating the potential magnitude of floods and earthquakes has improved over the past two decades and the stability and safety of some of the older facilities need to be reassessed in regard to these two factors. Institutional Framework for Damn Safety 1.5 The responsibility for inspection and monitoring of dams for safety lies at present entirely with the owner-operators. At most of the larger power and irrigation dams, staff is assigned full time to read monitoring instruments, keep operational records, and inspect the facilities for signs of distress. While these activities are vital for ensuring safety, a clear need exists for the establishment of a formal system of independent inspections and reporting on the safety and operational condition of the darns. Many countries have adopted formal dam safety regulations and publicly supported programs of inspection, evaluation and regulation to consistent standards in order to ensure adequate flood handling capabilities and structural soundness of the existing dams. In Indonesia the requisite regulations and organizational arrangements to ensure consistent dam safety actions still are lacking at this time. The DGWRD has therefore been charged with the preparation of a dam safety program which initially would cover all MPW-owned dams and eventually be expanded to include all large dams in Indonesia (see para. 5.1). This would require the establishment of a separate dam safety organization with a staff of technical specialists who are independent from the operating units. The envisaged dam safety organization would be a regulatory agency with the task of setting standards, making periodic inspections, conducting evaluation of the safety status, issuing notices of deficiencies to the owners, followed by monitoring of the corrective work performed. Such an organization should also review the designs and construction of new dams to assure that the necessary safety features are included.

11 The International Commission of Large Dams (ICOLD), made up of technical professionals and multi-country commissions from all over the world, produces technical guidelines and model dam safety programs. The ICOLD guidelines and other technical publications comprise the basic requirements for successful dam safety programs which Indonesia intends to follow. However, there are regional and local conditions that must be considered in the process of specifying the guidelines and standards for Indonesia. A country-wide commission of large dams exists in Indonesia which has access to all ICOLD reference materials. 1.7 Over the last decade staff of the Research Institute of Water Resources Development located in Bandung have received training in dam safety inspections and evaluation procedures. In some situations they have carried out safety assessments on MPW dams. However, they have not the administrative authority to direct owner agencies to take the necessary remedial actions. Many of the staff of the Institute are now involved in research programs and are qualified to provide the nucleus for a new dam safety organization.

12

13 -4 - Bank Involvement in Dams in Indonesia CHAPTER 2 BANK INVOLVEMENT 2.1 The Bank has supported a large number of irrigation, hydropower and water supply projects in Indonesia during the past 25 years. Some of these projects included the construction of dams but in most projects the head works already existed and the investments involved only down stream conveyance and distribution facilities. As the demand for dry season water supplies and power continues to increase in the country, the long-term operation of storage dams and ensuring their safety gains more importance. A summary of irrigation lending appears in Table During the last decade, the Bank has assisted GOI in carrying out regular safety evaluations on existing dams that would serve new Bank funded irrigation and municipal water projects. Under the agreement for the West Tarum Canal Improvement Project (Loan 2560-IND), the Bank required a safety evaluation of the Jatiluhur Darn whose operation was to provide the water for a new irrigation system as well as for expanding municipal supplies for the Jakarta metropolitan area. The Jatiluhur Dam has a net storage capacity of 2.4 billion cubic meters, a potential irrigated area of 300,000 hectares, and a power generating capacity of 900 Gwh per year. The safety inspection, investigation and evaluation was performed in 1992/93 by a foreign consultant firm which concluded that the dam was not of sufficient strength to withstand some of the loading conditions that could occur. The consultants also noted that for a number of years the dam's operators had been restricting releases because of apparent weaknesses observed when the reservoir level was lowered. Subsequently, a dam review panel was created to advise MPW on the results and conclusions of the investigations. In January 1993, MPW (the owner of Jatiluhur Dam), the consultant, the panel, the original design firm, and the Bank held a joint meeting to review the history of design and construction of the dan, discuss the subsequent observations and records, review the results of the current investigations, and evaluate the appropriateness of the proposed remedial actions. Based on the evaluations made by the consultant and the panel, MPW concluded that major remedial work should be performed at the dam. 2.3 The Bank's involvement in the inspection and safety evaluation at Jatiluhur led to detailed discussions with MPW on the broader issue of country-wide dam safety. During 1992, MPW employed foreign consultants to inspect and assess the safety status of several other dams under its jurisdiction. The extent of remedial work needed for these dams led to a full evaluation of Indonesia's dam safety procedures and a decision to institute a country-wide dam safety program. In February of 1993, the MPW issued a decree setting out the basic provisions for expanded dam safety activities and for the

14 -5 - creation of a dam safety organization. Subsequently, a special committee of MPW staff was assigned to outline a program for dam safety and propose a program suitable for funding by the Bank. Assisted by two consulting firms, the Directorate of Irrigation-I (DOI-1) prepared an initiating report for a proposed dam safety project which would include the establishment and support of a dam safety organization and implementation of remedial work for dams with identified deficiencies, including Jatiluhur Dam. During 1992 and 1993, about 36 MPW-owned dams were inspected and evaluated by consultants. Subsequently, designs for remedial works have been prepared for 13 dams, including Jatiluhur. Issues and Lessons Learned 2.4 While dam safety measures have been addressed in past Bank-funded projects with dams, available evidence suggests that maintenance programs have declined over time resulting mainly from financial constraints. There are no mandatory government policies and procedures requiring continuation of timely monitoring, analysis and evaluations of the safety status of dams. Many of the staff that had been trained for these activities have by now left for other organizations, taken jobs in the private sector, or have been given other assignments. Consequently, the degree of attention now being given to each dam varies considerably and is quite inconsistent. The large dams, especially PLN's revenue earning power dams which can support good maintenance programs, appear to have been cared for quite well and have good monitoring and record systems in place. However, on irrigation projects with older dams, scant financial resources have been applied toward maintenance and as a result many of them show deterioration and signs of distress. The lesson learned in countries with well established dam safety programs is that regulatory agencies responsible for overseeing the programs are indispensable. Government Strategy 2.5 The Government wishes to upgrade its capability to manage the country's water resources in order to: (a) ensure adequate supplies for human consumption; (b) maintain food security; (c) relieve poverty; (d) balance regional development; and (e) utilize water resources efficiently and in an integrated and sustainable manner. With the increasing demands for water, Government gives priority to upgrading operations of existing infrastructure. The Government proposes to establish a regulatory body to ensure safety of existing and future dams, starting with those owned and operated by MPW/PWRS and eventually expanding the oversight function to cover all dams in Indonesia. Bank Strategy and Rationale for Bank Involvement 2.6 The Bank is in broad agreement with the Government's objectives for irrigation and water resources development. The project is fully consistent with the Bank's Country Assistance Strategy discussed by the Board on April 12, The project would: (a) strengthen public sector management by establishing regulatory institutions to protect the country against the risk of dam failures; and (b) contribute to effective management of water resources through the provision of basic safety facilities and implementation of remedial works at Indonesia's existing large dams to enhance their

15 -6 - safety status. The project is part of a coordinated lending program for water resources development, with each operation focussed on important and complementary objectives. The other projects are: (a) (b) (c) the approved Groundwater Development Project (Loan 3588-IND) and the appraised Integrated Swamps Development Project (FY94) would both exploit the natural resources in less developed regions and promote the objectives of regional equity and poverty; the approved Watershed Conservation Project (Loan 3658-IND) focuses on natural resources management in critical watersheds; and the appraised Java Irrigation Improvement and Water Management Project (FY94) would focus on efficient water resource utilization in selected Java basins and improve the productivity of existing infrastructure. Due to its close association with water resources related programs in Indonesia, and given its support for the establishment of dam safety institutions in several other borrowing countries, the Bank is well placed to assist Indonesia with the development of a national dam safety program.

16 -7- Table 2.1: JItGATION SUBSECToR - PROJECT COLETION AND PERFORMANCE AuDrr REPORTS CroditLmAn _ Dab Original PPAR/PCR Ref. No. Effective Closing Project Loan Report Date (US$M) No. 1. Cr Irrigation Rehabilitation I May Cr Irrigation Rehabilitation I Dec Cr Irrigation Rehabilitation I Dec Cr Irrigation Rehabilitation IV Dec. 80 S. Cr Jatiluhur Irrig. Extension Jun Cr Irrigation XV Jun Cr Irrigation VI Jun Ln Irrigation VII Oct LA Irrigation Vm Jun Ln Irrigation IX Jun Ln Irrigation X Jun Ln Irrigation XI Jun Ln Irrigation XII Jun Ln Cimanuk Flood Control (XI) Jun Ln Irrigation XIV Jun La Swamp Reclamation I Dec Ln Irrigation XVI May Ln Irrigation XVI May Ln Second Prov. Irrigation Jan Ln Swamp Reclamation II LA Multipurpose Dam & Irrigation Ln West Tarum Canal Improvement 43.4 Draft Jun La Central & Wegt Java Prov Ln Irrigation Subsector Dec La Prov. Irrigation Agric. Dev * 26. La Irrigation Subsector II * 27. La Groundwater Development 54.0 Total * Indicates ongoing projects.

17 -8- CEHAPER 3 TIE PROJECT Project Objectives 3.1 The main objective of the project is to reduce the risk of dam failures in Indonesia through: (a) establishment of dam safety institutions; (b) periodic inspections and safety evaluations of all large dams; (c) provision of basic safety facilities at existing dams where such provisions are now lacking; and (d) implementation of remedial works at dams with safety deficiencies. The dam safety program would start with inspection, evaluation and remedial work on the MPW dams and in due course be expanded into a national program covering all dams in Indonesia. Project Area 3.2 The project area encompasses the entire country of Indonesia. Due to the concentration of the population and extensive agricultural operations in Java, over 80 percent of the large dams are located there, with the remainder scattered geographically around the country (Annex 1). Project Description 3.3 The proposed project would be implemented over a six-year period ( ) and support the recently established Dam Safety Commission (DSC) and a Dam Safety Unit (DSU), and one central and about 11 local Dam Monitoring Units (DMU). Equipment, staff training and technical assistance would be provided by the project in support of this effort. The project would also provide basic safety facilities for all existing dams now lacking such facilities, and carry out remedial works at Jatiluhur Dam and other MPW dams with safety deficiencies. Detailed Features 3.4 Dam Safety Institutions (Base Cost US$2.6 million, see Annex 2). The project would provide office space, computers, printers, files, technical reference materials, transport and basic office and field equipment for the operation of the following dam safety institutions: (a) Dam Safety Commission, consisting of representatives of all dam owners, Indonesia's Commission of Large Dams, and other agencies with public safety interests; the DSC would oversee the activities of the DSU, review

18 9- and approve dam safety guidelines and standards, and supervise enforcement of dam safety legislation; (b) (c) (d) Dam Safety Unit, established initially as an entity within DGWRD under the new Directorate of Water Utilization and Conservation and which eventually would evolve into an independent regulatory agency; the DSU, with an initial technical staff of about 20 persons would conduct inspections and evaluate the safety status of all dams in Indonesia, prepare guidelines and standards for dam safety requirements, and provide technical training and guidance to owners' staff in charge of operation and maintenance of the dams. central Dam Monitoring Unit in Jakarta, to be established within DGWRD under the new Directorate of Technical Guidance and which would consist of three technical staff; the central DMU would direct the routine safety inspections and evaluations for all MPW/PWRS dams, keep basic records for the dams as specified by DSU, and liaise with DSU on all safety matters; and about eleven local Dam Monitoring Units, of which about eight in the provinces and three for large schemes (i.e., Jatiluhur, Solo and Brantas); the local DMUs would have about two to four technical staff each and be responsible for routine surveillance, inspection and accurate reporting of all required information. 3.5 Training (Base Cost US$1.2 million, Annex 3). The training would include on-the-job training by consultants during the early years of the project, formal workshops, seminars and instruction provided by visiting specialists, and study tours for the selected engineering personnel to other countries that have active and effective dam safety programs and agencies that manage them. Training equipment and materials would be provided by the project. The training activities would be more prominent in the early years of the project but would continue throughout the project period. 3.6 Basic Safety Facilities (Base Cost US$7.2 million, see Annex 4). The project would provide basic safety facilities for all dams where such facilities are now lacking. This would include: (a) (b) (c) carrying out of surveys of all dams and associated structures to provide information for detailed inspection; installation of communications equipment to improve routine operational communications and ensure advance notice of flood conditions; installation of instrumentation, including seepage recorders, stand pipe piezometers, reservoir level gauges and recorders, and rain gauges, in order to improve the recording of basic data relevant to the safe operation of the dam and reservoir;

19 - 10- (d) (e) clearance of dam and surrounding areas to allow detailed inspection of dam and associated structures; and emergency actions, where required, to ensure safety of dam and associated structures. The central DMU would collaborate with dam operating units and/or consultants to collect the required information and to procure and install the needed basic safety facilities. The basic facilities would be identified and installed early in the project period in order to assist in the collection of data needed to determine if any major remedial works are required. 3.7 Remedial Works (Base Cost US$59.5 million, see Annex 5). Following detailed safety inspections carried out in 1992 and 1993, the project would provide for remedial works on 22 dams in order to upgrade their safety condition. The largest portion of the identified work is for the Jatiluhur Dam and adjacent facilities (base cost of about US$19.5 million). The works would include strengthening of the main dam, raising and strengthening of the reservoir embankments, repair of two tail race conduits, and improving access roads. Under the Central and West Java Irrigation Development Project (Loan 2649-IND) and West Tarum Canal Improvement Project (Loan 2560-IND) final or preliminary designs have been prepared for remedial works at another 11 dams (Category A), and preliminary cost estimates following detailed inspection have been prepared for another 10 dams (Category B). During project implementation inventories and hazard rankings would be prepared, safety inspections conducted, and remedial works requirements identified, at all other large MPW/PWRS dams (Category C). A provision equal to about 40 percent of the total cost of the remedial works has been made for works at the Category C dams. 3.8 Project Management (Base Cost US$0.3 million). The project would provide for office space, equipment, transport, and other facilities for a small project management team, comprising about ten staff, which would be located in a new Subdirectorate of Large Structures under the Directorate of Technical Guidance. 3.9 Consultants Services (Annex 6). The project would provide for the following consultants services: (a) (b) for institutional capacity building: assistance in establishing dam safety institutions and training of staff, requiring about 150 foreign and 280 local staff months (base cost US$4.7 million); for implementation support: (i) (ii) construction supervision of remedial works at Jatiluhur Dam, requiring about 65 foreign and 150 local staff months (base cost US$1.8 million); and surveys, investigations, designs and supervision of installation of basic dam safety facilities, and design and construction supervision for remedial works at dams other than Jatiluhur; DGWRD's own staff are expected to perform up to 25 percent of this work while

20 local consultants, in some instances assisted by foreign consultants, would perform the balance through a series of annual contracts (base cost US$4.7 million). In order to expedite the start of project activities after project approval, the consultants referred to under (a) and (b)(i) above should be employed by January 15, An assurance to that effect has been obtained from GOI during negotiations. Status of Preparation and Implementation Schedule 3.10 The project has been prepared by DGWRD assisted by several teams of consultants. The draft preparation report covering institutional strengthening, basic dam safety facilities, and remedial works for dams, other than Jatiluhur, was issued in September 1993 and formed the basis for the appraisal. Designs for remedial works for 11 dams have been completed while the detailed inspection has been completed for another 10 dams. With regard to Jatiluhur Dam, the draft tender documents for remedial works were completed in December 1993 and are now being finalized following comments by the Bank. Prequalification of contractors has been completed. Remedial works at Jatiluhur Dam are scheduled to start in mid-95. Terms of Reference for the two main consultancies have been reviewed by the Bank and are now finalized. The short lists of firms have been approved by the Bank. The project implementation schedule is at Annex 10. Environmental Impact 3.11 The project would help protect the environment through the establishment of permanent dam safety institutions and by raising the safety level of the country's existing dams. The Subdirectorate of Large Structures of DGWRD would conduct a field review and environmental screening, to be documented in a brief report, for each dam to be included in the remedial works program. If the screening would reveal potential negative environmental impacts, an Environmental Impact Assessment (EIA) would be prepared in accordance with MPW standard procedures (PP51) and processed through the Environmental Control Agency (BAPEDAL). Any mitigation measures required would be performed prior to signing of the remedial works contract, or made a part of the remedial works contract and performed by the contractor The remedial works on the dams are not expected to necessitate the acquisition of additional land for new rights-of-way, and therefore the issue of resettlement of people is not expected to arise. However, should land acquisition be required, GOI would notify the Bank on the acreage of acquisition, the present use and ownership of the land, and the effects on people, including relocation, if needed. A determination would be made at that time of the necessity for MWP to prepare a resettlement plan. GOI has agreed that such plan, if needed, would be prepared in accordance with policies, planning principles, institutional arrangements, and design criteria agreed with the Bank (see Annex 5) and would be subject to review and approval by the Bank. Assurances to this effect have been obtained from GOI during negotiations.

21 CHAPTER 4 PROJECT COSTS AND FINANCING Project Costs 4.1 Total project cost, including contingencies, is estimated at US$97.4 million of which US$27.9 million would be foreign exchange and US$7.6 million duties and taxes. Base costs are expressed in 1994 values. Physical contingencies are estimated at 5 percent for remedial works at the Jatiluhur main dam, 15 percent for identified but as yet not fully studied remedial works at ten dams, and 10 percent for all other civil works and for equipment and vehicles. No physical contingency has been added to the global cost estimate for unidentified civil works (Category C dams). Price contingencies are based on an estimated annual local inflation rate of 5.5 percent and a foreign inflation rate of 2.5 percent from FY95. Project costs are summarized in Table 4.1 below and detailed in Annex 7. Table 4.1: PRoJECT Cosn SUMMARY % %Total MR million) (USS million) Foreign Baae Local Forcign Total Local Foreign Total Exchange Costs Dam Safety Institutions 5,823 2,256 8, Remedial Works 96,912 40, , Basic Safety Facilities 12,334 4,111 16, Project Management 4,613 5,971 10, Total Baseline Costs 119,682 52, , Physical Contingencies 5,460 2,497 7, Pnce Contingencies 21,178 3,802 24, Total Project Costs Financing Plan 4.2 The proposed Bank loan of US$55.0 million equivalent would finance about 56 percent of total project cost, or 62 percent of project cost exclusive of taxes, duties and vehicles which would be purchased by GOI. GOI would finance the balance of US$42.4 million equivalent, or 44 percent of project cost. The project financing plan is summarized in Table 4.2 below and detailed in Annex 9, Table 1.

22 Table 4.2: PROJECr FINANCING PLAN (US$ million) Source of Finance Local Foreign Taxes Total Percentage GOI Bank Total C. 27M9 Li 22 s Procurement 4.3 General. Procurement of goods, works and services, with the exception of vehicles, would be undertaken by DGWRD units at the national and provincial levels in accordance with procedures acceptable to the Bank. GOI would use its own resources to fund the purchase of vehicles (US$0.5 million) in accordance with a schedule agreed with the Bank. An assurance to that effect has been obtained from GOI during negotiations. 4.4 Civil Works. International competitive bidding (ICB) procedures would be used for the award of three separate contracts for the remedial works at Jatiluhur Dam and reservoir (US$23.0 million). Prequalification of contractors for these works has been completed which was acceptable to the Bank. Remedial works at the other dams (US$43.6 million) and the provision of basic dam safety facilities (US$7.2 million) would be individually much smaller in scope than the works at Jatiluhur. Also, these works would be geographically dispersed and thus unlikely to attract interest from foreign contractors. Therefore the works would be awarded under local competitive bidding (LCB) procedures acceptable to the Bank and open to foreign contractors. However, ICB procedures would be followed when the cost estimate of the works would exceed US$3.0 million per contract. Where feasible, remedial works at adjacent dam sites would be combined in one contract. For bid comparisons under ICB procedures, local contractors would be allowed a 7.5 percent margin of preference. Small remedial works and provision of basic safety facilities up to a maximum of US$50,000 for each dam may be executed by the owners' own maintenance crews on force account. The Bank's standard bidding documents would be used for ICB contracts and GOI's standard bidding documents, acceptable to the Bank, would be used for LCB contracts. 4.5 Equipment. Equipment (US$0.7 million) would be procured following LCB procedures acceptable to the Bank, or on the basis of international and for local shopping for items estimated to cost less than US$50,000 per contract up to an aggregate amount of US$500,000. In the latter case at least three quotations from foreign and/or local suppliers would be obtained. 4.6 Training and Consultants Services. All training activities (US$1.3 million) would be carried out by direct contracting, or within existing Government training facilities. Consultants providing technical assistance for the establishment of dam safety institutions (US$5.2 million) and for construction supervision of remedial works at Jatiluhur Dam (US$1.8 million) would be selected after inviting proposals from international and national firms which already have been shortlisted by GOI, and are

23 acceptable to the Bank. Other consulting services for surveys, investigations, designs and construction supervision (US$6.1 million) are relatively small in size and scheme specific and would be arranged primarily through national consultants. An assurance has been obtained from GOI during negotiations that all consultants would be selected in accordance with the Bank's Guidelines and engaged according to the Bank's Standard Conditions of Contract for Consultants. 4.7 Review of Procurement. Bank prior review would apply to the following contracts: (a) civil works US$1,000,000 and above; (b) equipment US$100,000 and above; and (c) consultants US$100,000 and above for firms and US$50,000 and above for individuals. Other contracts would be reviewed ex-post and at random. Prior review is expected to cover 50 percent of all civil works and LCB procured equipment by value. These percentages are acceptable in view of the demonstrated experience of the borrower in procurement matters and previous practice on similar Bank-financed projects in Indonesia. A summary of the procurement arrangements is shown in Table 4.3 below. Table 4.3: PROCuREmENr ARRANGEMETS (US$ million) International Local co titive Competitive Item Bidding Bidding Other N.B.F. Total Land Acquisition Civil Works OL (12.1) (26.1) (1.7) (39.9) Vehicles /b 0.5 Equipment L (0.2) (0.4) (0.6) Technical Assistance (a) Implementation Support (b) Institutional Cap. Building d L - 6. (incl. Training) (6.5) (65) Incremental O&M Establishment Costs Total (12.1) (26.3) (16.5) (55.0 Note: Figures in parenthesis are the respective amounts financed by IBRD. /a Force account for remedial works and provision of dam safety facilities up to a mimum of US$50,000 for each dam. Lb Vehicles to be financed by GOI. LTLocal shopping for item costing less than US$50,000 per contract. Consultants would be welected fter inviting proposals from national and inteantional firms which would be shortlisted by 001 and acceptabue to the Bank. Selection would be in accordance with Bank guidelines. L2 Training activities (US$1.2 miflion) would be carried out by direct contrcting or within existing Govermmentraining facilities.

24 Disbursements 4.8 All project activities are expected to be completed by March 31, 2000, and the Loan closing date would be September 30, Disbursements from the Loan would be made for: (a) (b) (c) 55 percent of expenditures on civil works; 100 percent of foreign expenditures (CIF) for directly imported equipment and materials, 100 percent of local expenditures (ex-factory) for locally manufactured equipment and materials, and 65 percent of locally procured items; and 100 percent of expenditures on consultants services and training. 4.9 Disbursements under the project would be made against Statement of Expenditures (SOE) for contracts for works valued at less than US$1,000,000, equipment valued at less than US$100,000, consultants services valued at less than US$100,000 for firms and US$50,000 for individuals, and for training activities. Contracts disbursed under SOEs would be based on model bid documentation approved by the Bank. Disbursement for all other expenditures would be on the basis of full documentation. Documentation for SOE expenditures would be retained by implementing agencies and the Directorate General of Budget (Ministry of Finance) and be made available for review by Bank supervision missions Special Account. To facilitate disbursements, a Special Account would be established in the Bank of Indonesia to be maintained by the Director General Budget in the Ministry of Finance (MOF). The Special Account would be maintained in US dollars with an initial deposit of US$3.0 million (equivalent to the average disbursements during a four month period). The Special Account would be for withdrawals, in all categories, relating to all foreign and local currency expenditures as long as the withdrawals do not substantially deplete the balance in the Special Account. The Government would request once per month replenishment of the Special Account or if its balance falls below 80 percent of the initial deposit, whichever occurs first. Accounts and Audits 4.11 The Project Manager in the new Subdirectorate of Large Structures in DGWRD would have overall responsibility for setting up and monitoring the use of an uniform project accounting system for all project expenditures incurred at the national and provincial levels. The Subdirectorate in Large Structures would maintain accounts for equipment procured on behalf of the project and for training and technical assistance. The Kanwil offices of MPW in the provinces would maintain accounts of project related expenditures incurred on the various dam schemes, and transmit accounts reports to the Subdirectorate of Large Structures on a regular basis. Assurances have been obtained from GOI during negotiations that: (a) the project's records and accounts, including the SOEs and Special Account, would be audited annually by the Government Audit Agency (BPKP), or another qualified auditor acceptable to the Bank; and (b) certified copies of the audit reports would be submitted to the Bank starting December 31, 1995 for fiscal year 1994/95, and subsequently no later than six months after the end of each fiscal year. The

25 audit reports would contain a separate opinion as to whether the SOEs submitted during each fiscal year, together with the procedures and internal controls involved in their preparation, can be relied upon to support the related withdrawals DGWRD would carry out technical audits of the remedial works, basic safety facilities and training components of the project. The terms of reference for these audits would be prepared, and organizational arrangements proposed, by GOI not later than June 1, The technical audits, acceptable to the Bank, would be carried out every twelve months during the implementation of the project, commencing not later than April 1, 1996, and copies of the audit reports would be furnished to the Bank for information commencing not later than October 1, Assurances to this effect have been obtained from GOI during negotiations.

26

27 CHAPTER 5 ORGANIZATION AND MANAGEMENT Organization and Management 5.1 The Directorate General of Water Resource Development (DGWRD) in the Ministry of Public Works would be the executing agency for the project. A major reorganization of DGWRD is currently underway and is scheduled to be completed by June 15, Understandings were reached during project appraisal, and confirmed during negotiations, that the new Dam Safety Unit (DSU) would be located in a different DGWRD directorate than the central Dam Monitoring Unit (DMU) and project management. The DSU, together with the Dam Safety Commission (DSC) were established under a Public Works Ministerial Decree issued in February The two entities would constitute the nucleus for an independent public dam regulatory agency covering all dams in Indonesia and is expected to be located initially within the new Directorate of Water Utilization and Conservation of DGWRD. An assurance has been obtained from GOI during negotiations that not later than April 1, 1997 GOI would establish a national dam safety regulatory agency with jurisdiction over all dams in Indonesia. Eventually, it is expected that the dam regulatory agency would be organizationally separated from DGWRD. The central DMU would monitor all MPW/PWRS dams on behalf of the owner and, together with project management, be located in a proposed new Subdirectorate of Large Structures in the new Directorate of Technical Guidance of DGWRD (see Chart 1). 5.2 The DSC would have a membership of about persons and serve as the advisory board for the dam safety program. The Chairman and members of the DSC have been appointed under a Decree of the Minister of Public Works issued in April The Chief of the DSU would be the Secretary of the DSC and the Director General of DGWRD would initially be the Chairman. The DSC would meet at least quarterly. 5.3 The DSU is the technical agency responsible for carrying out the inspections, evaluations, reviews, preparation of guidelines and standards, safety training for the dam owners' O&M staff and preparation of annual program reports. The DSU would be organized in four sections, i.e., field monitoring and inspection, dam design and review, data and records, and training coordination. Its staff of about 20 technical persons would be assigned on a project basis according to experience and availability (see Chart 2). An assurance has been obtained from GOI during negotiations that operational guidelines for DSC and DSU, acceptable to the Bank, would be issued not later than May 31, 1995.

28 The central DMU and project management would be located in the proposed new Subdirectorate of Large Structures in the Directorate of Technical Guidance. The Chief of the subdirectorate would be the Project Manager (PIMPRO) and be responsible for the planning and implementation of all project components, including contracting of remedial works, procurement and installation of basic dam safety facilities, and organization of the staff training program. He would direct the project consultants, coordinate work programming and reporting, and would be the primary liaison with the Bank (see Chart 3). The Chief of the DSU and the Project Manager were appointed in April The DGWRD has a good record in the execution of works. The main objective of the ongoing reorganization is to strengthen and integrate planning and design of water resources at the regional level. As a result, DGWRD is likely to emerge stronger once the process has been completed. Monitoring and Evaluation 5.5 During project implementation, and also thereafter, DSU would keep detailed records of the dam safety program activities. Annually, the DSU would prepare a report summarizing the year's activities, progress made, and details on the dams requiring remedial work still to be carried out. The records system would include the key information on remedial work performed along with the inspection records. One of DSU's primary activities is to continually evaluate the effectiveness and impact of the dam safety program. As development below dams increases and the dams age, risks would need to be assessed continuously and policies possibly adjusted. The DSC would evaluate these data and the DSU's overall performance and decide on any adjustments in the program that may be needed. Annual Work Plan and Budgets 5.6 Project activities would be financed in accordance with existing GOI procedures for financing Bank-assisted projects. Budget allocations for project activities would be based on annual work programs prepared by DGWRD and agreed to by BAPPENAS. To ensure that adequate funds would be provided for planned project activities, GOI would submit to the Bank for its review and comments: (a) not later than September 30 each year, a work program and cost estimates for the following fiscal year; and (b) by December 31 each year, budget proposals for the agreed work programs. Budget allocations would be based on the agreed work programs taking into account the Bank's comments. Assurances to this effect have been obtained from GOI during negotiations. 5.7 During the project period, the operating cost of the DSU and the DSC would be covered under MPW's annual budget. Eventually, when the DSU would have developed into a national dam regulatory agency, the possibility of establishing an independent source of funding for its operating cost, preferably by the dam owners, would be determined. A transparent fee structure for certification of new dams or reissuance of inspection certificates for existing dams, would help ensure the independence and sustainability of the regulatory agency and indicate to present and future owners the costs and risks of operating their dams. Assurances have been obtained from GOI at negotiations that by March 31, 1998 a proposal for a funding structure for the operation

29 of the national dam safety program would be sent to the Bank for review and comment, and that thereafter an action plan would be prepared and carried out taking into account the comments of the Bank. 5.8 The large majority of the dams, where remedial works would be carried out under the project, are used for irrigation. Recovery of capital cost is as yet not considered a feasible proposition. Priority is being given to the financing of the cost of system operation and maintenance through the introduction of a user fee system. A major portion of the remedial works would be carried out at the multi-purpose Jatiluhur Dam and reservoir which, in addition to supplying at present some 260,000 ha with irrigation water, generates about 900 Gwh annually and supplies raw water to the Jakarta Metropolitan area. The facilities at Jatiluhur are operated and maintained by the parastatal Jatiluhur Authority. This Authority owns the power station, offices, staff houses and O&M facilities, while GOI owns the main dam, dikes and access roads. The Authority sells raw water to Jakarta and power to PLN at contracted rates and cost sharing arrangements which do not include depreciation or capital cost of the GOI-owned facilities at Jatiluhur. Taking into account these existing arrangements, the Bank agrees that the Government funds the remedial works at Jatiluhur at 100 percent equity, as for all other Government-owned irrigation dams. Supervision Missions 5.9 The Bank would supervise the project semi-annually. Details on timing and proposed composition of the missions is presented in Annex 11.

30 I

31 Benefilts and Justification CHAPTER 6 PROJECT JUSTIFICATION AND RISKS 6.1 The project would increase efficiency in the safe operation and maintenance of dams. The main benefit would be a reduction of risks of dam failure. Such a failure would result in: (a) damage to downstream property and environment; (b) possible loss of life; (c) sudden loss of benefits from the reservoir supply; and (d) replacement cost of the dam itself or construction of an alternate water supply. The project provides public safety and to postulate benefits on the basis of the probabilistic computation for the potential of a dam failure is not common practice. However, during the final design, alternatives would be compared and least cost solutions would be sought for the needed remedial works. Project Sustainability 6.2 The Dam Safety Unit to be established under the project would evolve into a public regulatory agency and require continuous funding by GOI of its recurrent costs. The annual operating expenses would be relatively small when compared to the potential losses due to dam failures in the absence of a national dam safety program. The owner agencies would remain legally responsible for the performance of their dams. They would have the obligation to fund remedial works, either from their revenues (PLN, private owners) or through annual budget allocations (MPW), as deficiencies are discovered by the safety inspections and evaluations. Project Risks 6.3 There are no major risks for the project. The introduction of a formal dam safety program would reduce the probability of dam failure and the associated loss of life and property. There is a relatively small risk that it may take longer than at present anticipated for the new dam safety institutions to become fully operational and for their staff to be trained to the level required to manage a nation-wide program. However, Government fully recognizes the importance of setting up a regulatory body to enhance the safety of the nation's dams. There is no reason to expect GOI to reduce its support. The Dam Safety Commission would be the key body to guide the dam safety program toward a national level with clear public accountability for safety while leaving operational accountability with the dam owners. Proper orientation and training of the members of the Dam Safety Commission would be a critical element of the project during the first one or two years of its implementation.

32 CHAPTER 7 AGREEMENTS REACHED AND RECOMMENDATION Asurances 7.1 Assurances have been obtained from GOI during negotiations that: (a) (b) (c) (d) (e) consultants for institutional strengthening and training and for construction supervision of Jatiluhur Dam remedial works would be employed by January 15, 1995 (para. 3.9); GOI would submit resettlement plans to the Bank for review and approval for any works requiring the resettlement of people (para. 3.12); vehicles required for the project would be procured from Government budgetary resources under a schedule agreed with the Bank (para. 4.3); all consultants would be selected in accordance with the Bank's Guidelines and engaged according to the Bank's Standard Conditions of Contract for Consultants (para. 4.6); GOI and its agencies would comply with the reporting and auditing requirements specified in para. 4.11; (f) GOI would carry out, every 12 months starting not later than April 1, 1996, technical audits acceptable to the Bank, and send copies of the audit reports to the Bank for review and comments, commencing not later than October 1, 1996; to that end GOI would submit to the Bank for review and comments not later than June 1, 1995, draft terms of reference and proposed organizational arrangements for the performance of technical audits (para. 4.12); (g) (h) GOI would establish, not later than April 1, 1997 a national dam safety regulatory agency with jurisdiction over all dams in Indonesia (para. 5.1); GOI would, not later than May 31, 1995, issue operational guidelines for the Dam Safety Commission and Dam Safety Unit, acceptable to the Bank (para. 5.3);

33 (i) (j) GOI would submit to the Bank for its review and comments: (i) not later than September 30 each year, a work program and cost estimates for the following fiscal year; and (ii) by December 31 each year, budget proposals for the agreed work program, taking into account the Bank's comments (para. 5.6); GOI would submit to the Bank for review and comments not later than March 31, 1998, a proposal for a funding structure for operation of the national dam safety program, by the designated authority, and thereafter prepare and carry out an action plan taking into account the comments by the Bank (para. 5.7). Recommendation 7.2 Subject to the above agreements, the project would be suitable for a loan of US$55.0 million equivalent to the Republic of Indonesia for 20 years, including a grace period of 5 years, at the Bank's standard variable interest rate.

34

35 ANNEX 1 INDONESIA DAM SAFETY PROJECT BACKGROuND OF DAMs IN INDONEsiA 1. Dams for storing water have been built in Indonesia since the early 1900s, with the older dams primarily serving irrigation schemes. Today there are more than 120 large and numerous small dams and weirs in Indonesia. Of these about 60 are greater than 15 meters in height and are considered to be large dams by the International Commission on Large Dams (ICOLD). Another 60 dams with a height of less than 15 meters have a gross reservoir capacity of at least 500,000 cubic meters. Approximately one-third of the 60 large dams were constructed prior to Almost all of the older dams were earthfill or rockfill and most were single purpose for irrigation. During the post-1970 period however, several multipurpose dams have been constructed. Figure 1 below shows the age distribution of the 60 large dams and illustrates that more than half of the large dams in Indonesia are older that 15 years. Figure 1: Age Distribution of Large Dams in Indonesia D15 U. 0 z TIME IN DECADES (4 DAMS UNDER CONSTRUCTION)

36 ANNEX 1 2. For much of the 1970's Indonesia was the world's largest importer of rice, but by the mid-1980's it had achieved self sufficiency in rice production. Dry season irrigation has significantly contributed to this expanded production and reliable water storage facilities are now critically important for sustaining agricultural production. In addition, the country depends on dams for hydropower production, flood control and municipal and industrial water supplies. With a rapid expansion of the urban population, the need increases for reallocation of water from irrigation to municipal use, as well as expansion of storage capacity to serve all users. The safe condition of the country's dams is of major importance and has been receiving increased attention by the Ministry of Public Works over the past few years. 3. Indonesia has not as yet experienced major dam failures. However, it is acknowledged that the safety status of dams often change over time and frequent checks are needed to confirm their condition. The country is located in a region of active seismicity which contributes to the difficulty of estimating the forces to apply in the original designs and in the assessment an existing dam's stability. It is not uncommon for technical methods of analysis to change with time, based on experiences in other seismic regions, and new criteria should be used. Although the dams are subject to routine surveillance by the operating personnel, there is no formal consistent and comprehensive system of inspection, reporting and evaluation. The valleys downstream of the dams continue to attract additional population and in many river basins, large numbers of people are now exposed to the risk of dam failure. The hazard level below most of the dams has increased over the last two to three decades and this trend will continue in the future. Some dams represented only small hazard levels when initially constructed but are now positioned above considerable property and business development and populations. The combination of increased hazard and the natural tendency for dams to deteriorate structurally with time, results in an increased risk of greater potential loss of life and property due to dam failures. 4. ICOLD has produced international standards for dam safety, guidelines for governig legislation and descriptions of dam safety programs. Indonesia is represented in ICOLD and normally sends representatives to conferences and annual ICOLD meetings. These representatives have become very supportive of a national dam safety program. 5. The larger dams associated with the expansion of hydropower and the large irrigation projects have typically been designed by foreign consulting firms. There is, however, an expanding technical expertise within the country of engineers with technical training and experience of working with foreign engineers on projects with dams. This project targets that base of technical expertise for the selection of staff for the dam safety unit. 6. The following Table 1 presents pertinent data on the location, type, size, function, spillway capacity and ownership of Indonesia's large dams.

37 INDONESIA DAM SAFETY PROJECT List of Dams in Indonesia SWS No NameofDam Yearof Location Type Posiron Founda- Height Length Volume Gross Resermoir Purpose Maximum Type Management Com - River Neares Province and nature lion above of cresl condend capacity area discharge of spill by pietion Cey of sealing lo-est of dam of reservoir capacity way elament foundation of SpiIlw2y% (1) (2) (3) (m,) (m) (burnt) (O"ti') (losmt) (4) (m n) (5) Siruar 1981 Asahan P. Siantar N. Sumatra PG hc R H 293 V PT Inlum 2 Sigura-Gura 1982 Asahan P. S1antar N Sumatra PG hc R H 770 V PT Inalum 3 Tangga 1983 Asahan P. Siantar N. Sumatra VA hc R Hi 980 V PT Inalum Way Rarem 1982 Rarem Kotabum, Lampung ER ie S L PRIS W'ay Jepra 1976 Jepara B Lampung Lampung TIE IC S L PRIS Ra%a Dukuh Si. Cibtung Wet Java TE he , I PRIS 7 RaAa Bendungan K. Jambe West Java TE he S I PRIS 8 Rawa Czbaung K. Sandang dan AWet Java TE he S PRIS Ujung Cikedokan 9 Ra%a Garukgak CIsogC \S'esl Java Ti he (K I PRIs 10 Rawa Patrasana Kunar West Java TE he i I PRIS II St. Kelapadua Cigung/ 'ea Java TE he I PRIS Cisa%angan WeC Java TE he 12 Ra%a Pamulang Pemb. Sawah Wet Java TE he I PRIS 13 St. Kemang Angke Wets Java TIE he IS0 I PRIS Sol. Barat 14 St. Kemuring S.d.a. SB. III TE he PRIS Kamojung 1910 Cigelax Cikampak West Java TE he ,500 I PRIS 16 St. Lembang Water sources %et Java TiE he I PRIS 17 St. Ciburuy SungalCimena Wet Java TE he S I PRIS Sal. Pengasi Ps. Kunmul 18 Cipancuh 1938 a. Cibiuh Wet Java TiE he I PRIS d Cipancuh Haurgeulis _ b. Ciseuseupan c. Cisalam 19 Ctltunca 1924 Cileunca l'angalengan West Java TE he R H 31 V PLN 20 Cipanunjang 1930 Cipanunjang Pangalengan West Java TE he S SH 7 V PLN 21 Saguling 1984 Csarum Cianjur Wet Java ER te R H 2400 V PL N 22 Ir. H. Juanda 1967 Ciarum Purwakana 'Ae Java ER Ie R ,000 88U320 SIHR 3lO0 PO] (Jatiluhur) Ubrug Purwakana West Java TE Ie S 20 POJ Pasir Goambong PurAakarla WOetl Java ER IC S 19 POJ 23 Cirata 1987 Ciartgn Bandung W'el Java ER fe R H V PLN Silugede Saluran Ciakunen Tasakmalava y 5 es Java TE he 3 10, I PRIS Malahayu 1940 Kebuyutaa Brebes Central Java TE it S PMIS Sal. Ciabilan Selan w Ln 0 HII g.m

38 SWS No NmeoDan Yearof Location Type Posgion Founda- Height Length Volume Gross Reservu Purpose Maximu Cor Tm pe - Rivet Management Nearet Province and nature Dton above o crt content cencity area diacharge ofspil by pleiot Ciy ofaseling lowet ofdam of drsvoir carpcity -ay ektnent foundation of spillway (1) (2) (3) (a) (m) (0'.') (LO0m.) (10'.') (4) (-t) (5) 26 SL gst Sal Ciojrdon West Java TE he S I PRIS 27 WatDama 1962 Ci_aagpung Datra/Kunpnn Wet Java ER fc IZ I PRIS 2S Setuptot 1927 Mundu b. Cibeleadung Cirebon Wes Java TE ic S 27 S I PRIS 29 Sedaq Av%or a. Cissak Wet Java TE he I PRIS Pe*ln 1934 Pe*nlin Purwokeato Central Jva TE he ' L PRIS 31 Ctcabm 198 Cabmn Tepl Central Java TE he S I PRIS Sempor 1978 Setper Gomnbomg Central Java ER IC S IHCR 500 L PRIS 33 Garnw 1963 Mener Wonowsobo Centrahlava PG hc S 36 9t I H 16 L PLN 34 Wadau;lbang 19S7 Bedegotan Kebumen CentralJava ER le S ICH L PKS 35 Mfict I98 Serayu Banjamegara CentralJava ER i S H 4890 %' PLN Tempwan 2928 Kd. Padas Blora Central Java TE he L PRIS 37 Gmbeag 1933 Sani Pati Central Jm ER ie S I L PRIS 38 Gungra-o 1925 Rowo Pati Centra Java TE it S L PRIS 39 Ng1un 1914 Nglasgon Purvodadi CentralJava TE he S 2' , L PRIS 40 Raawpcmng 1936 Water sources Satatip Central Java - - _ I PRIS 41 Gebjr 1955 Bajut Kec. Samb.rejo CentralJava I PRIS 42 Kemlsaganr 1941 Kenatan Kr. Malang Central Java I PRIS 0' 43 Botok 1942 Sragen Kedasaurng Central2iav TE he S I PRIS I 44 KedungOmbo 2989 Serang Purtodadi K. 'Al. Lurung Central Jaa ER ie S ICH L Jratunscluna K. Waturame K. Kuntulan (kota kecamatanl 45 Greneca 2918 K Goo.ak Tunjungan Central Java TE he S I PRIS Lalung Si%aluh Karanganya Centralava I PRIS 47 Jarak(Npncar) t26 Belikurip Batu.arno Central Java TE he S I PRIS 4P Ngncar 1946 larak Wonogira Central Java ER ie S I - L PRIS 49 Wd.KdMling 1917 Juruk Wurjarsoro CentralJava TE he S I PRIS 50 Pluanbon 1928 Baran v;'onogirs Central Java TE he S L PRIS 51 Krisak 1943 Krisak Wonogiri Central Java TE he S I L PRIS 52 Delinan 1923 Tempuran Surakana Central Java TE it S V PRIS O 0 '-dl- 0

39 SWS No Nme ofdam Yeardf Location Type Posiion Founda- Height Length Volume Grost Reservoir Purpose Maximum TMpe Management Cown- River Nearest Province and nature tion above odrest content cpacity are diseharge ofspill by pletion Cty of aling lowet of dam ofreservoir capacity wy elcmein foundation of spillwas (1) (2) (3) (m) (m) (10 5 m) (IC'sn" (10'1u) (4) (m) (55 53 Mulur 1940 Jiatah Sk,haraja Central Java J I PRIS 54 Ceugklik Rainwater I. madu CentralJava I PRIS 55 RowoJoambordike 1967 a. K.Baljing Klien CentralJava TE he S I PRIS b. Arv. Geobg.AN. Gedanpn d. AN. Jajan e. ANv. Winong 56 Nawangan 1976 Kd. Nungku Wonogiri CentralJava TE Ie S L PRIS 57 Parangioho 1980 Tempuran Wonogiri CentralJava ER IC S , L PBS 58 Ketro 1981 Ketro Sragen Central Java TE he S L PRIS 59 Wonogirn 1981 B. Solo Wonogirt Central Java ER IC S CIIISR PBS 60 Song Putri 1985 Melati Wonogirn Central Java ER ic L PBS 61 Klego 1989 Kuak Bovolal Central Java TE ie S I L PRIS 62 Waduk Naopuro K. Ka%ung Madiun East Java I PRIS K. Jomblang Notopuro K. Pelem K. Sampunt Pilangkeceng Balerejo Dungbento 63 Waduk Kedungbendo K.Ked. Menjangan Madiun East Java I PRIS (Ulum ti) Saradan 64 Waduk Saradan K. Bendo Madiun Eat Java , I PRIS K. Anvar Balerojo 65 'd. Daw-uhan K. Puser Madiun East Java ,160 I PRIS K. Kuncil Da-uhan 66 Tlogo Pasir Sn. Pengisi East Java I PRIS K. Gendong kd. Ngfuweng 67 Ngebel 1930 Ngrbel Ponorogo East Java CB hc S 19 5,000 23, Hi PLN 68 Prijetan 1917 Prijetan Babar East Java TE IC R , I PRIS 69 Pacal 192? K. Pacal Bojonegoro East Java ER IC 5 J PRIS Kuvu 70 Jabung Tepon pasing East Java 1'E he S ,700 I PRIS Slengeng AL. 71 Lo%aju K. Bortel Mojokeno East Java _ I PRIS K. Jangkong Ds. klis 72 Boao Rainwater Lamongan Eag Java ie he S - 1, ( 710 I PRIS Kcc. Modo Ds. Sidodowo 73 Prnjetan Prijetan Babat East Java TE ic S ,700 I PRIS 74 Sogo Rainvater East Java - he S I PRIS 75 Semondo Rainwater East Java TE he S I PRIS 76 Meduran K. Solo Lamongan East Java TE he S I PRIS Sekaran ' F-3 m >4 L.) 0 1-h LA

40 SWS 14N NMum udam Year of Location Type Post ion Founda- Heighe Length Volume Gross Remnoir Pwuose Maiiaum Type Management Ce- Rivei Nearet Province and nture tion above o(crest content capscity areas diwurge ofspill by pletion Cay of saling lowt ofdam odreservoir capacity wray element foudbtion of spill%%vp. (I) (2) (3) (m) (m) (0"'m') (IO'm') (10'tM) (4) (m) (5) 77 Manya Rainwater EastJava TE he S _ I PRIS 78 Bul K. Wau East Java TE he S ,260 I PRIS 79 Sekaran Rain water East Java TE he S I PRtIS 80 Bogo Rainwater East Java TE he S I PRIS 81 Legoh K. Solo Lamongan East Java TE he S I PRIS Kr. Geneng 82 Singet Rain water East Java TE he S I PRIS 83 German Rainwater Lamongan East Java TE he S I PRls 84 Gempol Rainwater Lamongan East Java TE he S I PRIS 85 BI Ganggang Rainwater Lamongan East Java TE he S ,420 I PRIS 86 Rancang Rainwater Lamongan East Java TE he S O I PRIS 87 Joto Rainwater Lamongan Eat Java TE he S I PRIS 88 Takeran Rainwater Lamongan Easu Java TE he S - 2, I PRIS 89 Delikguno Rain water Lamongan East Java TE he S I PRIS 90 Tuwiri Rainwater Lamongan East Java TE he S PRIS Sampevan 91 Rande Rainwater Mojokerto East Java TE he S - 6, I PRIS 92 Kalicmbo Rainwater Mojokeno East Java TE he S I PRIS 93 Sumengko Rainwater Mojokeno East Java TE he S U I PRIS Tikung Cenma 94 Banjaranvar Rainwater Mojokento Eat Java TE he S , PRIS Cenna 95 Gedongulu Rain %ater Mojokeno East Java TE he S I PRIS 96 Gondang 1987 Gondang Bojonegoro E ava TE he S CIR 183 L PRIS Ir. Suaami 1972 Brantas Malang E. Java ER le IHCR V Jaua Tirta (Kr. Kates) 98 Selorejo 1961 Konto Malang E. Java TE ie s IHCR 360 V Jas TrSa 99 Sengguruh 1989 Brantas Malang E. Java ER le R IHC 3 V Jasa Tiria 100 Wlingi 1978 Brantas Bliar E. Java TE e IHC v Jasa Tina 101 Lahor 1977 Lahor Malang E. Java ER ic S IHCR 400 L Jasa Tirta 102 Wonlarejo C Gondang Tulungagung E. Java ER le S I BRBDP 103 B3ening/Widas 1984 Bening Nganjuk E Java ER le S S0 3' CI 510 V Jata Tina Sampean Baru 1982 Sampean Jetnber E. Java PG h ,600 IHR 3 V PRIS Palasari 1989 Sangiang Gde Ncgara Bali ER ie S L PRIS Embung Bringe 1982 Bringe Mataram W.N. Tenggara TE Ic R 20 S0 412 I L PRIS 107 Batugai 1983 Panurijak Mstaram W.N. Tengsara ER it S V PRIS 108 Penga c Panunjak Mataram W.N. Tenggars Ti S I DG WRD 0-dI} '95

41 SWS No Name of Dam Yearof Location Type Postion Founda- Height Length Volume Gross ReservDir Purpose Maximum Type Managesment Com - River Nearest Province and nature tion above of crest entema capacity area discharge o(spill by pletion Ciy oftcaling lowet of dam of reservoir capacity way element foundation of spillwayt (1) (2) (3) (m) (m) (IO t i) (IO t m t ) (1O'm j (4) (m) (5) 109 Embung Kembar I Malaran W.N. Tengara TE ic S 16 36,000 I PRIS 110 EmbungGtuungPauk Mgaratn W.N. Tenggara TE ie S ,00 I PRIS 111 EmbungPare Maaram W.N. Ten"ara TE it S I PRIS 112 EmbungSepit Maaram W.N. Tenggara TE ic S ,000 I PRIS 113 EmbungSelantai Sumnbasa Besar W.N. Tengapra TE ie 5 I I PRIS Tiu Kulit C Tiu Kutit Plampang W.N. Tengpra ER ic R I 270 L PRIS Besar 115 Mamak 1992 'v1amak Sumbava W.N Tenggara ER ie S L PRIS Klampis 1976 Klampis Sampan 8 E Java PG hc R L PRIS P. Moch Noor Banjarmasin S. Kalimantan TE - S IH - - PLN (Riam Kanan) Samboja 1979 Serayu Balikpapan E Kalimantan TE IC S I PRIS 119 Manggr 1986 Manggar Balikpapan E. Kslimautnan TE it S S PRIS Batu Besi 1978 Larona Soroako S. Sulawesi PG hc R ,000 H - - INCO (Larona) Bakaru 1991 Mamasa Pinang S. Sulawesi PG hc R ,990 H 2,500 V PULN Bili-Bili C Jekeberang Uj. Pandang S. Sulawesi ER Ie R HICRS L Notes: (I)TE -Earth (2)he - Homogencous eanh (315 -Soil (4)1 - lrrigiaion (51L -Uncontrolledspill.av ER - Rockfill IC - Internal core eanh R -RRock H - Hydro-electric V -Controlled spillay PG - Concrete gravay hc - Homogeneous concrete C - Flood control CB - Concrete buttress tc - Concrete face S - Water supply VA - Concrete arch fe - Earth face R - Recreational purpose IM 1 0U' it

42

43 ANNEX 2 INDONESIA DAM SAFETY PROJECT ORGANZATIONS AN RESONSIBXTES A. DAM SAFETY COMMISSION.The Dam Safety Commission (DSC), established under Decree 98/KPTS/1993, is charged with making recommendations to the Minister of Public Works on dam safety issues. Implementation of the various activities of the DSC is governed by Decree 378/KPTS/1987 and SKBI , Guidelines on Dam Safety. Under these authorizations the DSC is responsible for: (a) (b) (c) (d) overseeing the activities of the Dam Safety Unit (DSU); reviewing and approving dam safety guidelines and standards prepared by the DSU; reporting to the Minister of Public Works on the activities of the DSC and the DSU; and supervising enforcement of dam safety legislation. Summary of Dam Safety Commission Activities 2. The following activities would be undertaken by DSC: (a) (b) (c) (d) (e) (f) (g) (h) (i) preparation of guidelines for DSC activities; appointment of DSC members; organizational meeting and orientation; establishment of quarterly meeting and training schedules; commencement of training; review of DSU activities; approval of dam safety guidelines prepared by DSU; development and approval of national dam safety regulations (PERMEN) and national legislation; and development of the national program for dam safety awareness.

44 Detailed Description of Dam Safety Commission Activities ANNEX 2 3. Preparation of Guidelines. The guidelines would be prepared as early as possible and issued by the Minister of Public Works. The guidelines must be sufficiently flexible to allow the DSC to adjust to its role. Elements to be included are: (a) a statement of the charter creating the DSC; (b) a statement of goals and objectives for the DSC; (c) a definition of the DSC's structure; (d) meeting locations and frequency; (e) procedures for administrative support; (f) compensation of DSC members; (g) requirements for attendance; (h) procedures for the conduct of DSC meetings; (i) meeting formats; (j) recurring items to be reported upon by DSU; (k) working relationships with DSU; (1) procedures for reimbursement of expenses; (m) travel procedures and regulations; (n) reporting requirements to the Minister of Public Works; (o) procedures for the adoption of regulations; (p) availability of technical assistance; and (q) availability of legal assistance. 4. Appointment of Members. The proposed membership of the DSC would consist of one person from each of the following agencies or organizations: (a) Ministry of Public Works (DGWRD), (Chairman of DSC); (b) Ministry of Home Affairs (Civil Defense Agency); (c) Ministry of Mining and Energy; (d) Ministry of Industry; (e) Ministry of Environment; (f) State Electricity Corporation PLN (Perusahaan Umum Listrik National); (g) Asahan River Authority (PT Inalum); (h) Indonesian National Committee on Large Dams (INACOLD/KNIBB); (i) Research Institute of Water Resources Development (RIWRD/IHE); () Legal Advisor (Dept. of Justice); (k) Law Enforcement Agency; and (l) Chief, Dam Safety Unit, (Secretary of DSC). 5. The Chairman, members and Secretary of the DSC have been be appointed under a Decree of the Minister of Public Works issued in April The Chief of the Dam Safety Unit will be the permanent secretary of the DSC. In the early stages, the Chairmanship would be held by the Director General of Water Resources Development (DGWRD).

45 ANNEX 2 6. Establishment of Quarterly Meeting and Training Schedules. The DSC members will receive extensive training both in Indonesia and in foreign countries. Training topics will include: (a) (b) (c) (d) the importance of dam safety; the causes and consequences of dam failures; the responsibilities of dam owners, dam safety officials and government officials; public safety considerations; and the elements of an effective dam safety programn; guidance on the requirements and resources necessary to establish an effective dam safety program; the importance of dam maintenance and its relationship to dam safety; the development of dam operations and maintenance procedures necessary to ensure dam safety; and the necessity for dam inspection programs; the critical importance of emergency action plans and the numerous and varied governmental entities involved in the successful development and implementation of such plans; and the procedures involved in the promulgation of dam safety regulations and legislation necessary for the implementation of the national dam safety program; the responsibilities and liabilities inherent in the role of dam owner; and the legal consequences of dam failures. 7. Commencement of Training. Training activities will commence upon establishment of the full DSC membership and will be conducted at periodic intervals in order to orient new DSC members and to keep established DSC members current on the latest dam safety concepts. 8. Review of Dam Safety Unit Activities. The DSC will establish the general guidelines that govern DSU operations and will review DSU activities for compliance with established national dam safety goals; approve proposals from the DSU for regulations and guidelines; provide advice and recommendations to the Minister for Public Works on suggested resource allocation requests developed by the DSU; and, in general, be responsible to the Minister for the achievement of national dam safety goals. 9. Approval of Dam Safety Guidelines Prepared by the Dam Safety Unit. Upon receipt of draft regulations and guidelines from the DSU, the DSC will conduct a complete review to ensure compliance with established dam safety policies. Such review will not only utilize the broad professional experience and knowledge of the DSC members themselves, but may utilize special skills from legal advisers and technical consultants that are made available on an ad-hoc basis to deal with a particular technical issue. 10. Development and Approval of National Dam Safety Regulations (PERMEN) and National Legislation. As the dam safety program develops from the initial start through the integration and incorporation of all darns throughout the nation it will be necessary to draft and implement regulations and legislation at the national level. This process will begin in the DSU with identification of needs that become evident as

46 ANNEX 2 DSU develops its regulatory capacity. These needs may range from establishing technical criteria that are applicable to all dam owners and which will provide uniform standards throughout the country to establishing regulatory criteria which set forth what legal authorities exist to enforce dam safety laws and decrees and what sanctions should be imposed upon dam owners that do not comply with findings of the DSU and/or DSC. 11. Based upon operational experience the Chief, DSU, will draft proposed regulations or legislation. These proposals will be presented to the full Dam Safety Commission with a request for adoption. The DSC will evaluate the proposal and may choose to seek outside technical assistance. The DSC may also conduct hearings or other fact finding activities in order to be more fully advised on the impact and need for the proposed regulations. Along with technical and legal considerations, the DSC will consider economic and environmental impacts and implications of the proposal. Once all relevant facts are considered, the DSC may recommend that the proposed regulations or legislation be enacted as drafted, or amend the proposal to conform more closely with the national interest, or return the proposal to the Chief, DSU, for further evaluation, or simply choose not to proceed with the proposal at the present time. 12. Develop the National Program for Dam Safety Awareness. Due to the high visibility of the DSC and its ability to access the national government at the decisionmaking level, the DSC is uniquely positioned to have a major impact on dam safety awareness. Dams play a very important role in the economic life of Indonesia by providing irrigation water for crop production, water for the industrial sector, electricity generated by hydro-electric facilities and used for private and industrial purposes, drinking water supplies to major cities and towns, flood control benefits, and, recreation opportunities. Yet, dams if left poorly maintained can be serious threats to life and property. These facts must be made known to the general population of Indonesia through a well-planned and executed public awareness program. The DSC, utilizing the technical proficiency of the DSU and by calling upon public relations specialists within the government and the private sector, will develop an integrated national dam safety awareness program that can be used in the school system, the public and private work force and the national media. B. DAM SAFETY UNrr 13. The Dam Safety Unit (DSU) is a regulatory agency and, as such, must remain separated, as much as possible, from dam owner agencies in order to provide an unbiased and objective assessment of the true status of the dams within the jurisdiction of the program. With regulatory responsibility comes enforcement authority. The DSU will be expected to provide the necessary technical evidence that will be the basis for sanctions against dam owners in the event of non-compliance with program mandates. 14. The proposed DSU structure comprises five sections as follows: (a) (b) (c) Field Monitoring and Inspection; Dam Design Review; Data and Records;

47 ANNEX 2 (d) (e) Training Coordination; and Administration. 15. In operational terms, the DSU would adopt a matrix organizational structure with project teams selected for specific duties on the basis of technical requirements of specific tasks. The specific technical capabilities of the DSU staff would be expected to fall within the following main categories: (a) (b) (c) (d) Hydraulics and Hydrology; Geotechnical and Geological Engineering; Mechanical and Electrical Engineering; and Materials and Construction Engineering. Staffing levels are projected to be 16 full-time equivalents during the first 3-4 years of the progran with these levels expanding to approximately 20 full-time equivalents as the programn assumes true national level status and begins to conduct its regulatory role over all jurisdictional dams within Indonesia (see Charts 1 and 2). Summary of Dam Safety Unit Activities 16. The DSU will participate in the following activities: (a) initial establishment of the dam safety progran; (b) development of the dam inventory and records management progrun; (c) preparation of hazard classification and inspection priority; (d) carry out dam safety inspection program; (e) development of dam safety assessments; (f) owner notification of required actions; (g) review and approval of remediation plans; (h) review and approval of final plans and specifications; (i) construction inspection; (j) enforcement actions; (k) development and approval of emergency action plans; (1) preparation of guidelines and procedures; (m) budgeting and programming; (n) reporting; (o) training; and (p) development of a public awareness strategy. Detailed Description of Dam Safety Unit Activities 17. Initial Establishment of the Dam Safety Unit. The DSU must be viewed by dam owners as being extremely competent from a technical standpoint in order to gain the respect of the community that it is expected to regulate. Selection of highly qualified technical personnel who are then provided additional training, in-country as well as overseas, is a key requiremento ensure the necessary level of expertise. A strong sense of technical competence combined with a high 'esprit de corps" will enable the DSU to

48 ANNEX 2 resist the inevitable pressures brought about by vigorous enforcement of the dam safety regulations. 18. Development of the Dam Inventory and Records Management Program. A complete inventory of dams must be conducted nation-wide. This inventory will form the basis for all further actions relating to dam-safety. During the inventory process the physical parameters of the dams will be ascertained, estimates of hazard-classification made, initial assessment of conditions and need for rehabilitation developed, and a priority for comprehensive safety inspections established. The inventory will rely upon dam owners to furnish as much information as is available for each dam and the physical site visit should be conducted jointly by DSU personnel and owner staff. 19. Of parallel importance to the inventory process is the development of a complete records maintenance program that logically catalogs all information pertaining to a particular dam and makes the information readily available. This records maintenance system will consist of computerized data bases as well as hard-copy material that must be preserved. Before each dam safety inspection, the inspection team will review all documents pertaining to the dam that are relevant to the inspection including previous inspection notes and reports. These files are not simply archival in nature but are a dynamic history of each dam that grows and changes with each event that affects the structure itself or creates knowledge about the structure. Photographs should be taken during construction and inventory inspections and included in the record files. 20. Hazard Classification and Priority Listing. To assist in the ranking of dams for inspection and to determine the various technical criteria that are to be applied to dams, it is necessary that a hazard classification be assigned. The hazard classification is developed, predicated upon what results would occur in terms of loss of life and property damage if the reservoir were full and the dam failed under non-storm event conditions. Hazard rating does not refer to the present condition of the dam. 21. Normal hazard classification ratings are as follows: (a) High Hazard: Normally utilized when failure of the structure can reasonably be expected to cause significant loss of life and create severe property damage and economic dislocation. (b) Moderate Hazard: Utilized when failure of the structure is expected to cause minimal loss of life, but substantial property damage. (c) Low Hazard: Assigned to dams whose failure will not cause loss of life and the property damage and economic consequences of failure are small. 22. The hazard classification is a subjective assessment based upon evaluation of the downstream conditions and the determination of the economic consequences of loss of the use of the dam. Hazard classification is the primary indicator of priority for dam safety inspections as well as for allocation of fiscal resources needed for remedial work for the dam.

49 ANNEX Dam Safety Inspection Program. Periodic safety inspections are conducted by DSU experts independently of the inspections performed by the dam owner staff. The dam owner is encouraged to have personnel accompany the DSU staff as a training opportunity and to allow face-to-face communication at the site. The frequency of inspection for each dam is controlled by the hazard classification and the condition of the structure itself. The goal of the dam safety program is to inspect all dams on the inventory at least once every five years but dams in the high hazard category may need to be inspected more frequently. If the dam has certain features that require skills not existent in the DSU, a special consultant will be retained to provide the necessary technical evaluation. During the initial start-up period for the DSU, consultants will be required on all inspections as a way to train the DSU staff and to assess the skill acquisition process of the individual staff members. 24. Development of Dam Safety Assessments. Upon completion of the Report of Inspection, the DSU staff must develop a documented assessment report of all actions required to be taken to bring the dam into compliance with established policies and guidelines. The recommendations must be broadly written so as to allow the owner the flexibility of utilizing all acceptable engineering solutions but must be precise in stating what must be achieved. An implementation schedule must be provided notifying the owner of the latest times that certain activities must be accomplished. The assessment report is forwarded to the Chief, DSU, for his review and concurrence in the findings and recommendations. 25. Owner Notification of Required Actions. Upon completion of the Dam Safety Assessment Report by the DSU, it must be forwarded immediately to the dam owner for implementation. The implementation schedule may be negotiated if the owner can demonstrate cogent reasons that prevent completion of work items on the schedule set out in the report. 26. Review and Approval of Remediation Plans. Upon receipt of the Dam Safety Assessment Report, the owner will develop a comprehensive remediation plan to implement the dam safety measures required. This plan must accompany preliminary designs for structural remediation and will include procedures and schedules to ensure compliance within the time-frame set out in the assessment report. The DSU review remains broadly focused on dam safety goals and objectives and does not dictate how the task will be done. This allows maximum flexibility for the owners to develop innovative and cost-effective solutions. When the DSU determines that the remediation plan meets all relevant dam safety guidelines, written approval is forwarded to the owner authorizing preparation of final designs and specifications and implementation of other remedial actions. 27. Review and Approval of Final Plans and Specifications. The DSU has the responsibility to review and approve all final designs and specifications for work that affects the structural integrity of any jurisdictional dam, whether the work contemplated is remediation of an existing dam or construction of a new one. Standards for review should be established early in the development of the DSU in order to provide dam owners with guidelines within which to operate.

50 -37 - ANNEX Construction Inspection. Construction supervision and inspection is the responsibility of the dam owner but the DSU has the obligation, in its regulatory role, to monitor construction activities. This monitoring role should be performed by members of the DSU that have been involved in the inspection of the dan and in the review and approval of the plans and specifications because of the in-depth knowledge that these staff members possess with respect to the dam. Construction inspection activities performed by the DSU are not continuous in nature but are performed periodically as time and resources permit. Often they are guided by critical construction activities that are important to observe. 29. Enforcement Actions. As a regulatory agency, the DSU will be required to enforce the various regulations that are promulgated by the Darn Safety Commission as well as those which originate from the DSU. Because of this requirement it is very important that the DSU personnel be well qualified in their respective fields of expertise in order to have credibility with owners and with the court as they can be expected to give expert testimony in any action brought against owners. 30. Development and Approval of Emergency Action Plans. Even though the probability of dam failures is usually small, planning is required to: (a) (b) identify conditions that could lead to failure and initiate emergency measures to prevent such failure; and, if this is not possible, identify ways to minimize the extent and effects of such failures. Tlhe operating and mobilizing procedures to be followed upon indication of an impending dam failure or major flood should be carefully predetermined and documented. 31. An Emergency Action Plan (EAP) commensurate with the dam size, location and hazard classification should be formulated for each dam. The plan should require an evaluation of the damage potential created from a postulated dam failure by use of flood inundation maps, should develop a sequential list of emergency actions, coordinated with local civil preparedness and law enforcement officials, and should contain a formal procedure to detect, evaluate and mitigate any potential safety problem. Owners of dams should evaluate the possible modes of failure for each dam, be aware of indicators or precursors of failure for each mode, and consider the possible emergency actions appropriate for each mode and the effects on downstream areas of failure by each mode. Evaluation should recognize the possibility of failure during flood events as well as during normal operating conditions and should provide a basis for emergency planning actions in terms of notification and evacuation procedures where failure would pose a significant danger to human life and property. Plans should be prepared in a degree of detail commensurate with the hazard and instructions should be provided to dam operators and attendants regarding the actions to be taken in an emergency. Planning must be coordinated with local civil defense and police officials to enable those officials to become aware of the catastrophic nature of dam failures and to develop workable plans for notification and evacuation of local communities when conditions threatening dam failure become apparent.

51 ANNEX While development of EAPs is a responsibility of the dam owner, the DSU must provide guidelines for their development and should be available to assist with technical advice during the plan formulation. Once the plan is developed to the satisfaction of the owner, including coordination with local officials, it should be submitted to the DSU for formal approval. 33. Preparation of Guidelines and Procedures. An important aspect of the DSU function will be to prepare guidelines and procedures in support of the various dam safety related activities. These documents are essential in order to provide uniform implementation of dam safety policy and will ensure that the information and procedures established during the development of the national program can be readily reviewed and amended as the dam safety program develops. 34. As a minimum, guidelines covering the following topics will be developed: (a) (b) (c) (d) (e) (f) (g) inspection and reporting guidelines; instrumentation and monitoring guidelines; stability requirements for design loads; operation and maintenance guidelines; emergency action plan guidelines; inflow design flood and seismic criteria; and other technical guidelines and criteria relating to dam design and dam safety. Documentation will include procedures, guidelines, forms of records, reporting form formats and standard forms and checklists as required to enable the DSU to perform its mission. 35. Budgeting and Programming. As the executive arm for the national dam safety program, it will be the responsibility of the DSU to develop a comprehensive annual budget to ensure full implementation of the program. This budget must cover the operational requirements of the DSU staff as well as the needs of the DSU. 36. Reporting. The DSU will be involved in substantial reporting requirements to the DSC to other elements of the Government, to the general public, and to the national and international dam safety community. Periodic reports will be required from the DSU by the DSC in order to allow the DSC to perform its oversight function of the dam safety programn. Budget, personnel, and other administrative reporting will be required of the DSU from the Ministry of Public Works. Additional reports will be necessary to inform the general public of the dam safety assurance program and because of the high level of technical expertise of the DSU staff, technical reports on various technical matters will be of great interest to the consulting and academic communities on both a national and international level. 37. Training. The DSU will be responsible for arranging for, and in some cases conducting, training for the DSC members, dam owners staff, provincial dam safety personnel, DSU's own staff, and consultants. The objective of the training program is to upgrade the expertise of all those involved in dam safety by presenting courses dealing

52 ANNEX 2 with dam safety assurance and organization, dam safety inspections, design aspects of dams including hydrology and geotechnical issues, construction techniques, instrumentation of dams, maintenance and operational aspects of dams, and design and monitoring of dam remedial works. 38. It is essential that a comprehensive long-term training plan be developed that will enable those concerned with dam safety to remain current with accepted technical procedures pertaining to dam safety and to provide training for new personnel entering the arena of dam safety. 39. Development of a Public Awareness Strategy. The DSC is responsible for developing a national dam safety awareness program designed to inform the general population of the importance of dams to the economic well-being of Indonesia and to advise the public of dam safety procedures and activities. The responsibility of the DSU will be to assist the DSC in these activities by providing technical assistance where needed and by conducting training programs that benefit all segments of society. C. DAM MoNIToRING UNITS 40. There is a need to strengthen the owners' capacity to implement the necessary remedial works. The inspections and evaluations of the DSU would identify the items that are deficient and it then becomes the owners' responsibility to respond. MPW agencies need more capacity to carry out the surveys, investigations, designs of remedial works, contract administration and construction supervision. A proposed new Subdirectorate of Large Structures would be in charge of implementing the remedial works program for MPW dams. In addition, a central Dam Monitoring Unit (DMU) to be located in this subdirectorate, and a number of provincial DMUs, would assist in coordinating the initial inventory of MPW dams, gathering data, selecting basic safety facilities and collecting and evaluating field monitoring information. After the project is completed, this monitoring activity will continue under the direction of the central DMU. 41. For the duration of the implementation period of this project, the Head of the proposed new Subdirectorate of Large Structures would be the Project Manager. This person would direct the entire range of activities from establishing the dam safety institutions, arranging for dam inspections and evaluations, to the implementation of the remedial works program. The Project Manager would also direct the procurement of associated equipment for the project and be the primary contact person with the Bank. The DSU on the regulatory side would be separate organizationally from the proposed new Subdirectorate of Large Structures charged with handling of construction and maintenance. The Subdirectorate of Large Structures would be responsible for construction of new dam projects as well as implementation of remedial works on existing dams. The proposed organizational arrangements are shown in Charts 1 and The proposed new Subdirectorate of Large Structures would be responsible for environmental screening of dams, and for preparation of Environmental Impact Assessments, Environmental Action Plans and Resettlement Plans, should they be required.

53 ANNEX 3 INDONESIA DAM SAFETY PROJECr TRAINING 1. The objective of the proposed training program is to develop a high level of expertise in the dam safety institutions (DSC and DSU) and to upgrade the expertise of Ministry of Public Works and other dam owners' staff capability in dam safety assurance matters. Training of the members of the DSC and the staff of the DSU and the dam owners is considered to be of fundamental importance both in terms of the immediate requirement for inspection and safety assessments of dams and in terms of the programs' long-term sustainability. The strategy, approach and methodology proposed for the training program include extensive over-seas and in-country training, broad coverage of all technical disciplines in a class-room environment, and extensive hands-on field experiences guided by experienced international consultants. Training topics include dam safety inspections, design aspects of dams (structural, hydrologic and hydraulic), construction techniques, instrumentation, and design and monitoring of dam remedial works. 2. Technology for design, construction and inspection of dams continues to develop. Staff engaged in dam safety matters must be educated in new techniques and trained in their use as an on-going activity. The strategic aim of the proposed training program, therefore, is to promote a shift from dependency on external expertise across the range of dam inspection, surveillance and operation and maintenance activities to a position of greater self-sufficiency and capability of MPW staff to address the longer term needs of the dam safety program. The selection and retention of skilled individuals is the most critical factor in the successful implementation of this strategy. 3. The key elements of the training program will include the following topics: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) dam safety program establishment, including the organization, function and responsibilities of the DSC, DSU and DMUs; inventory, registration and hazard classification; detailed site inspections; stability evaluations; hydrologic assessment and evaluation of flood handling capability; dam design and construction; dam rehabilitation; emergency action planning; operation, maintenance and surveillance; environmental screening; and resettlement plans.

54 - 41- ANNEX 3 The consultants for institutional strengthening and training will prepare and arrange for the delivery of the training programs. 4. Figure 1 presents the timeframe for conducting the key training activities. This includes the more formal courses, seminars and study tours, and also includes the element of on-the-job training. The on-the-job training will be provided by working alongside the consultant team. Table 1 indicates the approximate number of recipients and their organizations, who will be trained over the course of the project.

55 DAM SAFETY PROJECT-TRAINING PROGRAM ACTIVITY RECEPIENT TRAINER IN COUNTRY TRAINING COURSE D-1 Dam Safety Program Functions DSC/DSU CONSLT D-2 Dam Safety Assuwance DSC/DSU CONSLT _Z D-3 Dam Surveillance and O&M DSUWIDMU CONSLT/DSU D-4 Dam Degn and Construction DSU CONSLT D-5 Data Collection and Analysis DSU/DMU/O&M CONSLT/DSU 22_ D-6 Emergency WORKSHOPS Acion Planning DSU/DMU/O&M CONSLT/DSU _ I I Dam Safety Inspection DSU CONSLT Monitoring and Surveillance DMUIO&M CONSLT/DSU.1 O&M of Dams DMU/O&M CONSLT/DSU SEMINARS Dam Safety Assurance DSU/DSC/DMU CONSLT Dam Safety Guidelines DSU CONSLT ON JOB TRAINING Dam and Reservoir Inspections DSU CONSLT _ 222 OSM. Monitoring and Surveillance DMU/O&M CONSLT/DSU Site Surveys and Investigations DSU CONSLTI Stability Assessmfents DSU CONSIT Hydrologic Assessments DSU CONSLT )z) Review of Remedial Works Desings DSU CONSLT Monitoring Remedial Works Construdion DSU CONSLT Preparation of Guidelines and Standards DSU/DSC CONSTL FOREIGN STUDY TOURS Dam Safety Programs and Organizations Dam Safety Standards and Regiatlaons DSU/DSC DSU/DSC/DMU I I I I II I I L I II I I II I I ~~~~~

56 " o o. W _ Number of Penoms _.. * Regulations and Guidelines Prepqation * * * * * * Dam Inventory Md Resration I 1 1*z.. T l I Hazard AsseunentClaailcation d * * * } * * * * } Emergetncy Action Planning -; e *~~ _ *.---. * *-- Data Management L CT ~m Dam Rawervoir napeiona > * * *..*O&M and Dam Surveillance m = *.. Survey and Investigaion Works * _* * * * * _ Dam Rehabilitaion Works Deaign * * * * * * Environmental Saeaing and Monioing = -CouncD I Couae D Course D -23 _ * * * Coure D C~~~~~~~~ D - ~ ~ ~~~~~~Course a * * *-. _WoukAoD * *. * overenaus y T 8Tq1ej X3UN - a

57 ANNEX 4 INDONESIA DAM SAFETY PROJECT BASIC DAM SAFErY FACIxITIES 1. Many of the older dams in Indonesia were not originally equipped with features that are now considered indispensable. In addition, after long use with minimal maintenance and care, there is frequently very little left of the original records and drawings that define the dam's physical characteristics. In other cases, erosion, wear and tear, and deterioration of portions of dams have modified the basic conditions of the dam over the years. An assessment will be made of missing basic facilities and basic data of the dam and appurtenances early in the project period. A program will then be initiated to add these basic facilities and to gather the technical data prior to the more formal safety inspections and design of remedial work. Most common deficiencies are measuring devices and instrumentation, communications equipment, back-up operations equipment, the original drawings of the dam, and records of past physical modifications. The needs for each dam will vary and it will require a process of careful inventory, prioritization and allocation of funds to implement this component of the project. The objective is to start with the activities which can reduce the risk of dam failure, prior to the time more extensive remedial works can be carried out. In some cases the addition of the basic safety facilities may be the only action required for an existing dam. 2. Early in the project period, one of the primary activities will be the overall inventory of dams throughout the country. This inventory will be conducted under the direction of the Dam Safety Unit (DSU) in close cooperation with the Dam Monitoring Unit (DMU), the operations staff at each dam and the consultants. The inventory will involve a visit to each dam and collection of as much information as possible on the dam's physical features from the existing operating personnel at the dam site. These inventory inspections will not make a full evaluation of the dam's safety status but will determine the additional information needed, and will outline the basic facilities needed for future detailed inspections and evaluations. 3. Once the inventory process is nearly complete, the DSU and DMUs will consult to determine the priority of sites to receive the basic safety facilities and to outline a program for implementation. The new Subdirectorate of Large Structures will be in charge of implementing the program and may use a series of consultancy contracts to assist in this process. These facilities should be in place and the data collection initiated prior to the formal inspection by the DSU. Any additional facilities that may be required would be included in the subsequent dam remedial work for the inspected dam. The Dam Safety Unit will also give the dam operations and maintenance staff advice and guidance on monitoring and protection of the instrumentation or equipment provided.

58 ANNEX 4 4. The basic dam safety facilities are broadly defined as items that assist the operation and maintenance personnel at the dam to assess emergency situations and to respond with timely actions that can often mean the difference between failure or saving a dam. One of the more critical aspects of most dams is to be able to monitor and control the flow releases during a major flood. Thus equipment that can assure that the operator has access to information at this time and can quickly respond is important. Reservoir level markers, data on the storage volume for every increment of reservoir rise, backup operator devices such as handwheels, gate motor operators, standby power supplies for flood gates, and communications equipment to allow those at the site to report and coordinate critical actions during flood operations. 5. Another type of basic facilities is adequate instrumentation for monitoring the dam's performance. The most common items needed to be measured at a dam are the seepage and main dam section movement or settlement. Sudden changes in these two elements are very positive indicators that something is happening to the dam that requires either investigation or remedial action. During the inspection for the inventory, an assessment will be made of the instrumentation for seepage flow measurements. Probable measuring points and size of the measuring devise will be noted. In larger earth embankments, peizometers may be needed to measure hydrostatic pressures within the embankment at various locations. These will be noted and added under basic safety facilities. A system for establishing an elevation control and measuring the dam settlements, crest erosion or structural deformation will often be required. In some cases it may be practical to install this only after remedial work is performed if such remedial work requires major additions or raising of the embankment sections. In all cases the furnishing and installation of these additional measuring devices will be provided if they do not presently exist in the dams. 6. Table 1 of this Annex presents a categorization of the types of equipment and actions that would be provided under this component of work. It is estimated that basic facilities would be provided, or additional survey and data gathering performed, for about 60 percent of the dams within the project period.

59 INDONESIA DAM SAFETY PROJECT BASIC DAM SAFETY REQuumET Safety Feature Possible Requirements Purpose 1. Surveys Survey of dam and ancillary structures including To provide information for detailed inspection, dam preparation of key drawings. data book, dam break analysis, reservoir yield, inundation mapping, and emergency action plan. Survey of reservoir capacity and sedimentation. Survey of conditions downstream of dam. 2. Communications Prmary and secondary communication links for To improve routine operational communications and operational and flood warning purposes, including ensure advance notice of flood conditions is available communication with any upstream observation stations and to the dam operational staff and downstream with downstream communities. communities. Visual and audible communications and alarm systems. 3. Instrumentation Seepage To improve the recording of basic data relevant to the V-notch weirs and collection systems for measuring safe operation of the dam and reservoir, and to provide seepage flow. key data required for improved flood studies and Recorders to provide continuous record of seepage flows reservoir yield evaluations. Dam instrumentation Stand pipe piezometer to measure pore water pressures in dam, foundation, etc. Reservoir Reservoir level gauge and recorder Meteorological measurenent Rain gauges (catchment and dam site) 4. Site Preparation Clearance of dam and surrounding area, including To allow detailed inspection of dam and appurtenant desilting of drainage ditches, channels, etc. structures. I 5. Emergency Actions Immediate actions. To ensure safety of dam and appurtenant structus. -

60

61 -47- ANNEX 5 INDONESIA DAM SAFETY PROJECT REMEDIAL WORKS Nature of Works 1. Many of the dams in Indonesia have not received the needed level of maintenance and care to keep the facilities in top working and safety conditions. With water resources utilization and management becoming more vital to the future development of the country, it is imperative that the country's dams be made safe and upgraded to provide continued service. The process of inventory and prioritization of the inspection and evaluation program by the Dam Safety Unit will be dependent on the hazard classification and the initially noted deficiencies. There may be a number of dams which have been neglected in regard to maintenance but still are stable and effective in their function. While lack of maintenance will eventually weaken a dam's performance capability, it may still pose only a small risk from the standpoint of dam safety. The project purpose is not to rehabilitate all dams to their original condition but to assess their safety and assure they do not present a high public risk due to their condition. It will be difficult to separate items of work on the dams between what is rehabilitative and what is remedial for the purpose of safety. 2. The remedial work to upgrade dams for safety reasons most commonly involve their structural elements or their capability to safely pass the appropriate flood events. The proper functioning of control valves and other electrical and mechanical equipment is also important as is the capability of the dam operation and maintenance staff to know the physical condition of their dam at all times. The nature of the remedial work to be performed under the project will vary considerably from dam to dam and the specific design is determined only after detailed investigations, analysis and evaluation by competent dam engineers. The project therefore includes a provision for consultant services in regard to detailed surveys, field investigations (and possible field exploration and materials testing), and professional dam engineering analysis. The preparation of the remedial designs is often as difficult as the preparation of the original dam design. In some cases the technical analysis may require the services of highly specialized dam engineers, available only from foreign sources. It is therefore expected that foreign engineers, local engineers and in-house MPW staff will all participate in preparation of remedial works designs and contract documentation preparation. Implementation 3. Implementation of the remedial works component may take a variety of forms. The most common will be to prepare a civil works type contract and solicit bids from firms with the capacity and experience to carry out the remedial work. This will

62 ANNEX 5 require professional construction supervision by DGWRD and in most cases close cooperation with the dam operations staff. In addition the continuing operational requirements of the dam often limits or restricts the actions that can be taken or requires the remedial work to be spread over a longer time period to avoid serious disruption of water deliveries. On the construction side there is the possibility that the maintenance crews can implement some of the desired work. Under this project the general dam safety consultant will need to provide guidance to the Subdirectorate of Large Structures in determining how each remedial work should be carried out. There will also be situations where the survey, investigations and designs for three to five dams might be contracted to one consultant. In other cases the work may be highly complex and of a high level of importance and thus require the services of an experienced international consultant firm. Readiness for Implementation 4. The most prominent dam to receive remedial action is the Jatiluhur Dam which is located on the Citarum River, approximately 150 kilometers upstream of Jakarta. All other dams have been placed in categories by degree of readiness for implementation of remedial works (Categories A, B, and C). Remedial works for Jatiluhur and 11 other dams have been designed. These 'Category A" dams are the following: Cacaban Malayahu Penjalin Nglangon Darma Ngancar Cengklik Greneng Simo Batok Sanggeh It is expected that the remedial works for these dams could be tendered and placed under contract within the first six months of the project. Construction periods will be different for each but the average time for completion after start of work is estimated to be approximately nine months. Due to these dams having near final designs backed by field surveys, a physical contingency factor of 10 percent has been applied to the cost estimates. For Jatiluhur Dam, the main contract for the strengthened rockfill section has been prepared following detailed surveys and estimates, thus a 5 percent physical contingency factor was used in the cost estimate. For the two other contracts at Jatiluhur, a 10 percent factor was employed. 5. In April-June 1992, 25 dams were inspected by the project preparation consultant team. Ten of those dams were deemed to be in need of remedial work in advance of the others and conceptual designs were outlined and rough cost estimates prepared. Additional investigations and design work will be needed at such sites. The following dams have been placed in 'Category B" in regard to the degree of readiness: Gembong Krisak Batujai Pacal Gondang Ketro Klego Embung Bringe Sampean Baru Setu Patok

63 -49- ANNEX 5 Due to the need for more investigations and designs for these dams, a 15 percent physical contingency factor was used in the cost estimates. It is estimated that four of these dams could be investigated, surveyed, designed and remedial works performed within a year of project initiation. The other six are estimated to require two years for complete implementation. The location of the Category A and B dams is shown in Map attached to this report. 6. About 70 dams have been classified as 'Category C" dams. Some 20 ICOLD dams are included in this category. Subject to inspection, investigation and completion of design, required remedial works would be undertaken from FY1996/97 through FY 1999/2000. Land Acquisition and Resettlement 7. The remedial works are not expected to necessitate the acquisition of addidonal land for new rights-of-way, and therefore the issue of resettlement of people is not expected to arise. No additional land is required for Jatiluhur or any of the Category A dams for which works designs have been completed. 8. Should land be needed for any of the Category B and C dams, a plan would be prepared in accordance with the following requirements to be agreed at negotiations: (a) (b) (c) (d) (e) (f) Remedial works will be designed in a manner which will help minimize displacement and adverse effect on incomes of affected people. All remedial works requiring resettlement/relocation will provide for appropriate compensation for assets based on market value (including logistical support for moving, and relocation as required). Action plans will provide for all measures and compensation required to restore the standard of living of all affected people, as fairly and equally as possible, whether their land rights are customary or formal. Preparation of these action plans will be based, inter alia, on consultation of affected people, surveys of land titles and ownership of dwellings and of affected residents. The action plans will have a clear implementation timeframe and construction works will not start within or adjacent to the relocation area before required resettlement has been completed. The process will be transparent. Information relating to the people affected, the compensation they are entitled to, the available options or alternatives and the grievance and appeals procedures will be provided by the project manager and made readily available to the executing agency and the Bank.

64 ANNEX 5 (g) (h) The action plans will specify the organizational responsibilities for implementation and supervision and measures needed to strengthen the capabilities of agencies involved in accordance with the requirements of the prevailing GOI laws and regulations. The final cost estimates will include all costs required for the satisfactory implementation, and the management and monitoring of the land acquisition and resettlement/relocation plans and Bank approval will be subject to all necessary funds having been budgeted for. 9. With regard to the question of appropriate compensation based on market value [item (b) above], before developing methodologies to be used for establishing market value of properties, DGWRD will seek relevant information from the Bureau of Statistics, the taxation authorities and the Land Agency, and will exchange views with the Bank on the findings and proposals developed based on these findings.

65 ANNEX 6 INDONESIA DAM SAFETY PROJECT CONSLTANT SERVICES 1. Four types of consultant services will be required for the planning and implementation of the Dam Safety Project: (a) (b) (c) (d) institutional strengthening and training; construction supervision of remedial works at Jatiluhur; surveys, investigations, designs, and supervision of installation of basic dam safety facilities; and design and construction supervision for remedial works at dams other than Jatiluhur. Two multi-year contracts will be required for the first two consultancies, while a series of annual contracts will be let for the last two items. Institutional Strengthening and Training 2. The consultant services for institutional strengthening and training are scheduled over a period of 5 years, starting January 15, 1995, and involving about 430 staff-months (150 foreign and 280 local - see Annex 7, Table 3 for details on proposed specializations and deployment schedules for the various experts). The consultants' advise and assistance is required for: (a) (b) (c) (d) (e) support of the Dam Safety Commission (DSC), Dam Safety Unit (DSU), and Dam Monitoring Units (DMU); preparation by DSU of Ministerial instructions and regulations for implementation of the dam safety program; preparation by the DSU of a database on dams and reservoirs, including registration details and records of measures recommended in the interests of safety; preparation by DSU and DMUs of inventories of dams, field verification and hazard classification, preliminary inspections, and review of adequacy of basic dam safety facilities; preparation by DSU of criteria for safety evaluation, including guidelines for format of reports, and check lists for safety inspections;

66 ANNEX 6 (f) (g) (h) (i) (j) (k) (I) (m) (n) (o) (p) formal safety inspections of existing dams and reservoirs by the DSU, including preparation of flood studies and stability analyses, and preparation of dam safety reports for issue to owners with appropriate certification; first level inspections of existing dams and reservoirs by the DMUs including preparation of reports, and setting up procedures and standards for recording data relevant to safety and the operation of the dam and reservoir; review and evaluation by the DSU of data and reports provided by the dam owners; preparation by DSU of technical guidelines and standards for dam safety and emergency action plans; safety reviews for the design and construction of new dams; review by owners of reservoir operations procedures, including preparation of guidelines and proposals for establishment of programs and preparation of emergency action plans; preparation and delivery of training programs for DSC, DSU, DMU and dam owners O&M staff on implementation of the dam safety programs; preparation by the Subdirectorate of Large Structures of terms of reference for works to be included in the dam rehabilitation program, including selection of method for implementing the works and review of design and construction supervision of the rehabilitation works; identification by DSU and dam owners of requirements for the improvement of basic dam safety facilities, including preparation of check lists, selection of method for implementing the works (by dam owner, local consultants, etc.), review of design by others, and supervision of implementation; review of dam owners' O&M procedures and manuals and emergency action plans; and project management by the Subdirectorate of Large Structures, including programming the various activities listed above (preparation of annual workplans, environmental reports, budgets and project reports). Construction Supervision at Jatiluhur 3. The consultant services for construction supervision of remedial works at Jatiluhur Dam are scheduled over a period of about 27 months, starting January 15, 1995, and involving about 215 staff-months. The team is expected to include four senior expatriate engineers with expertise in dams, construction, concrete and geotechnics, for

67 ANNEX 6 a total of about 65 staff-months. There would be ten Indonesian engineers on the team, covering dams, construction (3), concrete, contracts, roads, quality control, geodetic, and environment, for a total of about 150 staff-months. The consultants' expertise is required for: (a) (b) (c) (d) (e) (f) assistance and advice to the Project Manager during the tendering process, including tender evaluation, if and when required; day-to-day assistance and advice in construction supervision and quality control; carrying out of design modifications, when needed; assistance and advice in testing, commissioning and completion certification of the works; transfer of knowledge; and assistance and advice in minimizing environmental impact caused by construction activities. Other Services 4. Short-term (up to one year) specialized consultant services will be required throughout the project period for the planning, investigation, design, and implementation of the remedial works and basic safety facilities components at dams other than Jatiluhur. Normally, the required services will be available from Indonesian firms. However, occasionally the need for foreign technical advice may arise during project implementation. The main consultant for institutional strengthening and training will assist DGWRD with the drafting of terms of reference for the various services needed. The areas of expertise will cover: (a) (b) (c) (d) (e) surveys, e.g., site surveys of existing structures, cross sections and longitudinal profiles of existing embankments and channels; investigations, e.g., foundation, soil mechanics, and hydrological studies; designs, covering hydraulic, structural, mechanic and electrical requirements of the proposed works; preparation of Environmental Impact Assessments and Environmental Action Plans; and supervision of construction, including installation of instruments for upgrading the safety features of the dams.

68 INDONESIA DAM SAFETY PROJECT TECHNICAL ASSISTANCE REQUIREMENTS Standard Estimated Staff Status Contract Responsibility Implementing Cost /a months of TOR (date) Prepared for Supervision Activity Purpose Agency (US$ '000) /b Prepared Expected (Y/N) RSI HQ A. Implementation Support: 1. Jatilihur Dam Supervision of DGWRD 1,780 { 65 F 12/93 N X remedial works {151 L 2. Other Dams Survey, design & DGWRD 4,700 TBD /c /c N X supervision of works B. Institutional Assist in estab- DGWRD 4,680 (152 F 12/93 N X Capacity Building lishing dam {281 L safety institutions /a Base cost estimates. /b F & L: foreign and local professional staff, respectively. /c TBD: to be determined; one or more contracts would be awarded yearly to qualified local firms. February 8, 1994.

69 Indonesia Dam Safety Project Table 101. Dam Safety Unit Detailed Costs (Rp Million) Parameters (in 8) Phy. Gross Quantities Unit Base Cost Cont. For. Tax Unit 94/95 95/96 96/97 97/98 98/99 99/00 Total Cost 94/95 95/96 96/91 97/98 98/99 99/00 Total Rate Exch. Rate I. IXWatnrent Costs A. Office Building B. Sqau±st amount Computers G Softwar Computer amount CAD station amount Other Comp. Equip. amount Software amount _ Subtotal Cutex r- Softwar Office amount Communication amount Technical Library amount Field/Monitoring Equip. amount Subtotal qnpyt C. Vebol-S 4 WD number Minibus number Motorcycles number Subtotal Vesholea Total Zuvea-nt Costs ,218.5 II. Reaurrent Costs A. Staff Head of unit Staffmonth Sr. Engineer Staffmonth Engineer Staffmonth Ln Asst. Engineer Staffmonth Ln Admin./Clerical Staffmonth Subtotal Staff I S. operating costs Dam Safety Commission amount Dam Safety Unit amount 60.0 S Subtotal Operating costs Total Recurrent Costs ,059.0 Total ,277.5 Tue Apr 26 14:09: O _ h S.D 1-1 Dam Safety Unit

70 I ndones i a Dam Safety Project Table 102. Dam Monitoring Units Detailed CoSts (Rp Million) Parameters (in *1 Phy. Gross Quantities Unit Base Cost Cont. For. Tax Unit 94/95 95/96 96/97 97/98 98/99 99/00 Total Cost 94/95 95/96 96/97 97/98 98/99 99/00 Total Rate Exch. Rate I. lives*ts-t Costs A. 2quitnt 1. Cputers G Software Computer amount Other Comp. Equip. amount Software amount Subtotal Ccuters 6 Software Office amount Communication amount Technical Library amount Field/Monitoring Equip. amount Subtotal 3qu1iymt S. Vehiolos 4 WD number Motorcycles number Subtotal Vbisoles Total Imv.s nt Costs , RDaurraut Costs A. Staff Supervising Engineers Staffmonth Technicians Staffmonth , Admin./Clerical Staffmonth Subtotal Staff B. Operating costs amount , I Total VAW=rrnt Costs ,192.7 Total ,210.2 Tue Apr 26 14:00: (<7 O _ Dam Monitoring Units

71 Indonesia Dam Safety Project Table 103. Tech. Asst. & Training Detailed Costs (Rp Million) Parameters (in 1) Phy. Gross Quantities Unit Base Cost Cont. For. Tax Unit 94/95 95/96 96/97 91/98 98/99 99/00 Total Cost 94/95 95/96 96/97 97/98 98/99 99/00 Total Rate Exch. Rate I. Xnves nt Costs T. Thniasl Asistance 1. rozeigu coosultants Project Director Staffmonth Sr. Dae Engineer Staffmonth Dam Eng./Geotech. Spec./TL Staffmonth , Daz Eng./Inspection Spec. Staffionth , Elec./ Hoch. Eng. Staffmonth Hydrology/Hydraulics Spec. Staffmonth O) Specialist Staffmonth Dan Safety Insti. Spec. Staffmonth Training Spec. Staffmonth Subtotal Vozign oaultants , , , , Local Consultants Dam Eng./Geotech. Spec./TL Staffmonth Dam Eng./Inspection Spec. Staffmonth , Elec./ )4ech. Eng. Staffmonth Hydrology/Hydraulics Spec. Staffmonth OiM Specialist Staffmonth Dam Safety Inati. Spec. Staffmonth Training Spec. Staffmonth Subtotal Local Consultants ,922.4 Subtotal Tobr4oJ hasistano , , , , , irandg, Equipment - amount Workshops amount _J Domestic trng. courses amount , Overseas study tour amount , I Training materials amount Seminars amount Subtotal TrainiW , ,590.4 Total 1, , , , , ,444.0 Tue Apr 26 14:02: U.) 1-1 Tech. Asst. & Training

72 Indonesia Dam Safety Project Table 201. Remedial Works - Jatiluhur Dam Detailed Coats (Rp Million) Parameters (in I) Phy. Gross Quantities -Unit Base Cost Cont. For. Tax Unit 94/95 95/96 96/97 97/98 98/99 99/00 Total Cost /96 96/91 97/98 98/99 99/00 Total Rate Exch. Rate I. Imves,-t Costs A. Construction supervlsion amount - 1, , , S. Civil wokxa Main dam amount - 7, , , , Pasir Gombong dike amount - 5, , , Pasir Gombong road amount - 2, , , Ubrug Dike amount - 1, , , Ubrug road amount - 1,471, , Talirace conduits amount - 1, , , subtotal Civil wozk- - 20, , , ,032.0 C. Vek iole 4 WD number Speedboat number Total Invt_ant Costs , , , ,033.0 II. laarent Coat- Incremental O0M /a amount - _ , Total Raaurzent Costs , Total , , , ,277.0 \a 1I of civil works costs of Main dam and 2% of other dams per year starting the year after completion of construction. Tue Apr 26 14:03: I-h 1-1 Remedial Works\ - Jatiluhur Dam

73 Indonesia Dam Safety Project Table 202. Remdial Works - Category A Dams Detailed Costs (Rp Million) Parameters (in *) Phy. Gross Quantities Unit Base Cost Cont. For. Unit Tax 94/95 95/96 96/97 91/98 98/99 99/00 Total Cost 94/95 95/96 96/97 97/98 98/99 99/00 Total Rate Exch. Rate X. Ivestmant Coots A. Civil wzka Cacaban amount , Malahayu - 4, amount , Penjalin - 1,686.0 amount , ,693.0 Nglangon amount Darma amount , Ngancar - 3, amount - 2, Cengklik - - 2, amount , Greneng - 1, amount Sio amount Butak amount Sanggeh amount _ - - subtotal - Civil works , , ,228.0 B. - Construction - supervision - 16,982.0 /a amount , C. Land - acquisition - 1,698.2 /b 0.0 amount Total - Investmt - Cost , , , XI. RIaurrmt - 18,765.1 Costs Incremental OeH /c amount Total oazzmt Cot 1, Total , , , , ,785.1 \a 10 of civil works to be spent in the same year as construction. \b 0.54 of civil works to be spent the year before construction. \c 2% of civil works per year starting the year after completion of construction. 'n '. Tue Apr 26 14:03: n 0 1h I'D 1-1 Remedial Works'\ Category A Dams

74 Indonesia Dam safety Project Table 203. Remedial Works - Category B Dams Detailed Costs (Rp Million) Parameters (in t) Phy. Gross Quantities Unit Base Cost Cont. For. Tax Unit 94/95 95/96 96/97 97/98 98/99 99/00 Total Cost 94/95 95/96 96/97 97/98 98/99 99/00 Total Rate Exch. Rate X. Invest t Costs A. SID /a amount B. CS /b amount C. Land acquisition /c amount D. Civil Wozks Gembong amount - - 1, , Ketro amount Krisak amount Klego amount Batujai amount - 1, , Embung Bringe anount Pacal amount - - 1, , Gondang amount Sampean Baru amount Setu Patok amount Subtotal Civil Works 3, , ,225.0 Total Iovestmt Costs , , , U. aeersant Costs Incremental OM /d amount Total R3aouzret Cost Total , , ,413.0 \a 7i of civil works to be expended the year before construction. \b 10% of civil works to be spent in the same year as construction. \c 0.54 of civil works to be spent in the year before construction. \d 24 of civil works per year starting the year after construction. Tue Apr 26 14:11: Remedial Works\ - Category B Dams

75 Indonesia Dam Safety Project Table 204. Remedial Works - Category C Dams Detailed Costs (Rp Million) Parameters (in 4) Phy. Gross Quantities Unit Base Cost Cont. For. Tax Unit 94/95 95/96 96/97 97/98 98/99 99/00 Total Cost 94/95 95/96 96/97 97/98 98/99 99/00 Total Rate Exch. Rate X. Iv&st_nt Costs A. SiDCS SID /a amount _ , CS /b amount , , , , Subtotal S=hS , , , , ,417.0 B. Land acquisition /c amount C. Civil works ICOLD Dams amount - - 5, , , , , Non-ICOLD Dams amount - - 2, , , , , Total Inve_-t m Costs , , , , ,165.0 II. eoerremt C0ate Incremental O0M /d amount , Total , , , , ,485.0 \a 74 of civil works to be expended the year before construction. \b 104 of civil works to be expended in the same year as construction. \c 0.5t of civil works to be expended in the year before construction. \d 2% of civil works per year starting the year after completion of construction. Tue Apr 26 14:06: Fd I-' '0 1-1 Remedial Works\ - Category C Dams

76 Indonesia Dam Safety Project Table 301. Basic Dam Safety Facilities D.tail.d Costs (Rp Million) Parameters (in t) Phy. Grosz Quantities Unit Base Cost Unit 94/95 95/96 Cont. 96/97 For. 97/98 Tax 98/99 99/00 Total Cost 94/95 95/96 96/97 97/98 98/99 99/00 Total Rate Exch. Rate 1. Inv.teat Costs Dam s 3tructures surveys amount - 1, , Comm unications - equlpment - amount 3, Instrumentation amount 1, ,600.0 Site 1,600.0 preparation amount - - 4, Emerqency actions - - 2,000.0 amount ,350.0 Technical services /a 4,950.0 amount Total , , , , ,445.0 \a 10 of investment costs. Tue Apr 26 14:07: a. D l co Basic Dam Saf.ty Facilities

77 Indonesia Dam Safety Project Table 401. Project Management D.tail.d Costs (Rp Million) Parameters (in 8) Phy. Gross Quantities Unit Base Cost Cont. For. Tax Unit 94/95 95/96 96/97 97/98 98/99 99/00 Total Co3t 94/95 95/96 96/97 97/98 98/99 99/00 Total Rate Exch. Rate X. Invo-sntnt Coats A. Squi3smnt 1. Coutors * Software Computer amount Other Comp. Equip. amount Software amount Subtotal C<utrs a Software Office amount Comnunication amount Technical Library amount Subtotal quiment B. Vehicles 4 WD number Motorcycles number Subtotal Vehi.les Total Investnt Costs II. Recurrent Costs A. Staff Project manager staffmonth supervising engineer staffmonth Asst. engineer staffmonth Admin./clerical staffmonth Subtotal Staff B. Operating costs amount I Total Rscurrent Costs Total Tue Apr 26 14:08: kd Project Management

78 ANNEXI8 Table 1 INDONESIA DAM SAFETY PROJECT PROPOSED ALLOCATION OF LOAN Percentage of Amount Expenditures Category (US$ million) to be Financed 1. Civil Works % 2. Equipment La lb %; 100%; 65% 3. Training % 4. Engineering Services % 5. Consultants Services % 6. Unallocated 5.5 Total 55.0 L/ Excluding vehicles which are financed by GOI /b 100% of foreign expenditures for directly imported equipment, 100% of local expenditures (ex-factory prices) for locally manufactured equipment, and 65 % of locally procured off-the-shelf items. April 25, 1994.

79 ANNEX 8 Table 2 INDONESIA DAM SAFETY PROJECT ESTIMATED DISBURSEMENT SCHEDULE During IBRD Fiscal Profile Lg Semester Cumulative Cumulative Year and Semester (%) (US$ million) (US$ million) (%) st nd st nd st nd st nd st nd st nd st nd st 94 2nd st 100 /a Standard disbursement profile for Indonesia, agriculture projects, by semester after Board approval, COMDO, August Lb Loan effectiveness date assumed as September 1, 1994; Loan closing date as September 30, April 25, 1994

80 ANNEX 9 INDONESIA DAM SAFETY PROJECT PROCUREMENT PACKAGES FOR CIVIL WORKS Contract Base Cost La Construction Schedule No. Dam (US$ million) (mo/year) A. Remedial Works Lb 1. Jatiluhur - Main Dam 9.4 9/95-8/97 2. Jatiluhur - Pasir Gombong 6.1 9/95-3/97 3. Jatiluhur - Ubrug 3.9 9/95-3/97 4. Cacaban /94-6/95 5. Malahaya /94-12/95 6. Penjalin /94-12/95 7. Nglangon /94-12/95 8. Darma 1.5 4/95-12/96 9. Ngancar 1.1 4/95-1/ Cengklik 0.5 4/95-1/ Greneng 0.3 4/95-9/ Simo /95-9/ Batok 0.1 4/95-9/ Sanggeh 0.1 4/95-9/ Ketro 0.4 4/95-12/ Krisak 0.3 4/95-12/ Klego 0.4 4/95-12/ Batujai 0.8 4/95-12/ Embung Bringe 0.1 4/96-9/ Pacal 0.9 4/96-12/ Gondang 0.3 4/96-12/ Sampean Baru 0.4 4/96-12/ Setu Patok 0.4 4/96-12/ Gembong 0.5 4/96-12/ Category C dams /96-3/00 B. Basic Dam Safety Facilities L TBD Year 1 Program /94-3/95 TBD Year 2 Program 1.7 4/95-3/96 TBD Year 3 Program 1.7 4/96-3/97 TBD Year 4 Program 0.6 4/97-3/98 TBD Year 5 Program 0.4 4/98-3/99 TBD Year 6 Program 0.4 4/99-3/00 /a Including any special works, valued up to 10 percent of the estimated cost of civil works for each dam, which may be executed on force account. /b For the majority of the dams all civil works will be combined in one contract. However, for Jatiluhur Dam three contracts will be awarded. In some instances works on two or more adjacent dams may be combined into one contract. /c The number of packages to be awarded each year remains still to be determined (TBD). April 25, 1994

81 Indonesia: Dam Safety Project Implementatidon Sehedule ID Name Q21Q31Q4 QI1Q21Q31Q4Q Q QI:QQ3 Q4QIQ2Q3Q4Q1_Q2Q3Q4QIQ2Q3 4Q1Q2Q3Q4 I PROJECT PREPARATION STAGE - DAM SAFETY PROJEC _ 2 Project Preparation Repor 3 Subnmission dralft Preparation Report 4 Project Appraisal 5 Preparation of Final Report i 6 Technical Assistance 7 Preparation TOR Consulancy Services l m 8 Preparation shortlist of Consultants l 9 Letters of Invitation 10 Tender period and evaluation TA Proposals 1 Appointrnent of Consultant f C a _C _..~~~~~~ Mobilization periodsta = 13 Proj Loan P T D t 14 I,oan _ 15 Loan effectiveness_ * _ 16 LoP a closure D - 17 Continuing Preparation Activities 18 Draft regulation on National Darn Safety PrograntrnC 19 Annual Work Plan 1994/95 r. 20 DIP 1994/95 _.._ 21 Procurerrtent Plan witht SBD for LCB and ICB 22 ACE Five Danns _..~~~~~~~~~ 0_ 0_ 23 Review moniitoring data l $.. _ 24 Firnsise SID and costs i_ 25 DIP and Tender Documents 26 PT Indrah Karya Six Darms _ CO 27 Review design o 28 Finalise SID and costs DIP and Tender Documents

82 Indonesia: Dam Safety Project tmplementation Schedule _ ID Name 02 Q3 Q4 Q!Q2 Q3 Q4 Ql Q2 Q3 Q4 01 Q2 Q3 :Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 30 JIWMP Four Dans 31 Review desigh_ 32 Finalise SID and costs 33 DIP and Tender Documents 34 JIWMP Six Dams 35 DIP 36 Additional Investigation and TOR for SID 37 IMPLEMENTATION STAGE - DAM SAFETY PROJECT 38 Institutional Strengthening and Traiing Component 39 DSO establishment _ Preparation of TOR for DSC 41 Preparation TOR for DSU 42 Preparation TOR for DMU 43 Preparation job descritpionrs 44 Staftselection co 45 Staffappointment 46 Procuremnent of DSO equipment 47 Legislation and regulations 48 Preparation of draf National Regulations 49 Approval of National Regulations 50 Preparation of DSO operational procedures 51 Guidelines and Procedures 52 Review of existing guidelines and procedures Review of existing guidelines and procedures 96 l 54 Review of_ xistng guidelines and procedures 97 O 55 Review of existing guidelines and procedures 98 _tx 56 Review of existing guidelines and procedures Preparation of DMU operational procedures 58 Preparation of Darn Safety Organization Manual

83 Indonesia: Dam Safety Project Iuplenentation Schedule ID Namfe Q2TQ3 Q4 QI Q2 IQ3 IQ Q Q2 Q3TQ4 QI Q Q3 TQ4 QI 2 T Q Q4 Q I Q2 Q Q4 QI IQ2 T Q I Q2 Q3 Q4 59 Review existing tecchnical guidelines 95 _ 60 Review existing teechnical guidelines Review existing tecchnical guidelines Review existing tetchnical guidelines Review existing teccnical guidelines Preparation oftechnical guidelines/st ndards 65 Dan Inventory _ 66 Definition of qualifying criteria 67 Development of screening system for selection 68 Preparation data formut by DSU 69 Data compilation by dam owners 70 Field verification ofdata 71 Preparation of computer database 72 Hazard Assessment 73 Definition of hazard criteria 74 Definition of hazard classification 75 Hazad assessment 76 Emergency Action Plans (EAP) 77 Review requirements for EAP 78 Definition of qualifying criteria 79 Preparation of EAP guidelines 80 Preparation of EAPs 81 D and Reservoir 82 Definition qualifying criteria 83 Preparation of priority list for inspection 84 Preliminary (brief) inspections Preliminary (brief) inspections 96 0 O 86 Preliminary (brief) inspections Identification of dans for detailed inspection 95..i I _

84 Indonesia: Dam Safety Project lmplemnentatlon Schedule ID Narne Q2Q3Q4 QIQ2Q3Q4 QIQ2Q3Q4 IQ2Q3Q4QQ2Q3Q4QQ2Q3Q4QIQ2Q3Q4 Q2Q3Q4 88 Identification of dams for detailed inspection Identification of dams for detailed inspection Prepaation inspection programme Preparation inspection programme Preparation inspection progranum Preparation of inspection and reporting guidelines 94 Detailed Inspectior 95 Detailed inpections Detailed inspections Electrical/mechanical uinspedions Electrical/mechanical inspedions Electrical/mechanical inspedions Flood studies/review of spillway hydraulics 101 Flood studies/review of spillway hydraulics 102 O&M and Surveillance C 103 Review current O&M practices and organization 104 Formulation of O&M organization structure 105 Preparation O&M/surveillance guidelines 106 Preparation instrumentation /monitoring guideliner 107 Review of dam owners O&M manuals 108 Training 109 Preparation of training materials 110 Courses III DSO training 112 Dam O&M nd safety assurance 113 Dam surveillance and O&M _ O O 114 Elements of darn design and construction 115 Workshops 116 DarnO&Mandcsurveillance 97

85 Indonesia: Dam Safety Project Implementation Schedule ID Name Q2Q3Q4QIQ2Q3JQ4QlQ2Q3Q4QlQ2Q3Q4QlQ2Q3Q4 Q2Q3Q4QQ2 Q3Q4QlQ2Q3Q4 117 Dam O&M and surveillance Dan safety inspections Dam safty inspections Semninars 121 Darn safety assurance programme 122 Study tours 123 Overseas study tours 124 Overseas study tours 125 On-job-training 126 Dam and reservoir inspections 127 O&M and darn surveillance 128 Survey and investigation works 129 Damrehabilitation works design 130 Monitoring 131 DSU Developnment Plan 132 Preparation of annual workplans Preparation of annual workplans Preparation of annual workplans Preparation of annual workplans Preparation of annual workplans Preparation of annual workplans Preparation of annual workplans Prepartion of budgets Preparation of budgets Preparation of budgets Preparation of budgets Preparaion of budgets 97 _=_ 144 Preparation of budgets Preparation of budgets 99

86 Indonesia: Dam Safety Project Implementation Schedule QQ3 Q2 lq3 lq4 IQ4 -QI[Q2lQ3 Q4 QI IQ2 Q3 Q4 Ql Q2 ID Namc Q2 1Q3 Q4 Ql IQ2 Q4 QIQ2 {Q3 Q4 QI [Q2 Q4 ~QfI 146 Preparation of 10 year plan Preparation of 10 year plan Preparation of 10 year plan Preparation of IO year plan Preparation of 10 year plan Preparation of 0 year plan Dam Rehabilitation Programnum 153 Prepaation TOR consulting services 154 Survey, Invesigation ad Design (SID) 155 Survey of dams and appurtenant structures 94 FM 156 Survey of dams and appurtenant structures 95 FM 157 Survey of dams and appurtenant structures Survey of damns and appurtenant structures Survey of damns and appurenant structures Draft survey report Draft survey report Draft survey report Draft survey report Draft survey report Approval survey report Approval survey report Approval survey report Approval survey report Approval survey report Preparation design and drawings Preparation design and drawsngs 95 _ 172 Preparation design and drawings 96 ( CDM t 173 Preparation design and drawing Preparation design and drawings 98 r

87 Indonesia: Dam Safety Project Implementation Schedule ID Name Q2Q3Q4QIQ2Q3Q4Q1Q2 Q3Q4 Q2Q3Q4QIQ2Q3Q4Q1Q2Q3Q4Q1Q2Q3 QI Q2Q3Q4 175 Approval of rehabilitation proposals Approval of rehabilitation proposals Approval of rehabilitation proposals Approval ofrehabilitation proposals Approval of rehabilitation proposals Preparation tender documients and cost estimnases Preparation tender documents and cost estimates Preparation tender documents and cost estimates Preparation tender documents and cost estimates Preparation tender documents and cost estimates DIP and tender document preparation 186 Tender rehabilitaion work 187 Tender evaluation 188 Appointment of contractor - rehabilitation works 189 Construction - _ Commissioning and handover Monitoring 192 Dam rehabilitation works implementation 193 Category A dans 194 Jatiluhur 195 Cacaban 196 Malahayu 197 Penjalmt 198 Nglangon 199 Darma 200 Ngancar 201 Cengklik _i 202 Greneng 203 Simo

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized CIA LOAN NUMBER 3888-IND Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Village Infrastructure Project for Java) between REPUBLIC OF INDONESIA and

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Loan Agreement -77- I. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1435 IND. Public Disclosure Authorized. (Ninth Irrigation Project)

Loan Agreement -77- I. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1435 IND. Public Disclosure Authorized. (Ninth Irrigation Project) Public Disclosure Authorized CONFORMED COPY -77- I Public Disclosure Authorized Loan Agreement (Ninth Irrigation Project) LOAN NUMBER 1435 IND Public Disclosure Authorized between REPUBLIC OF INDONESIA

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic

More information

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND Public Disclosure Authorized Loan Agreement CONFORMED COPY LOAN NUMBER 4100 IND Public Disclosure Authorized (Second Village Infrastructure Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

Country Practice Area(Lead) Additional Financing Indonesia Water P161514

Country Practice Area(Lead) Additional Financing Indonesia Water P161514 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020651 Public Disclosure Authorized Public Disclosure Authorized Project ID P096532 Project Name ID:

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3305 IND Public Disclosure Authorized (Yogyakarta Upland Area Development Project) between Public Disclosure Authorized REPUBLIC OF INDONESIA and

More information

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3381 IND Public Disclosure Authorized Development Credit Agreement (Provincial Health Project) between REPUBLIC OF INDONESIA and Public Disclosure

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE ON INVESTMENT IN THE FORM OF PUBLIC-PRIVATE PARTNERSHIP

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

Development Credit Agreement. (Urban Poverty Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION. Dated May 28, 1999

Development Credit Agreement. (Urban Poverty Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION. Dated May 28, 1999 Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3210 IND Public Disclosure Authorized Development Credit Agreement (Urban Poverty Project) between REPUBLIC OF INDONESIA and Public Disclosure

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID6725 Project Name Indonesia-Urban Poverty Project (+) Region Sector Project

More information

ANNEX. Objectives, Terms, and Conditions of the Grant

ANNEX. Objectives, Terms, and Conditions of the Grant Public Disclosure Authorized August 30, 2001 His Excellency DR. Boediono Minister of Finance Ministry of Finance Jakarta, Indonesia Dear Mr. Minister: Public Disclosure Authorized Public Disclosure Authorized

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Program Name

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER IQ. (Dokan and Derbandikhan Emergency Hydropower Project) between REPUBLIC OF IRAQ.

Financing Agreement CONFORMED COPY CREDIT NUMBER IQ. (Dokan and Derbandikhan Emergency Hydropower Project) between REPUBLIC OF IRAQ. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4249 - IQ Public Disclosure Authorized Financing Agreement (Dokan and Derbandikhan Emergency Hydropower Project) Public Disclosure Authorized between

More information

Regulatory Framework for Dam Safety

Regulatory Framework for Dam Safety Regulatory Framework for Dam Safety Preliminary Results of the WB Global Dam Safety Legal & Institutional Framework Study Satoru Ueda, Lead Dam Specialist Sofia Grand Hotel, September 19, 2017 www.worldbank.org/water

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

ON A LOAN IN THE AMOUNT OF US$50 MILLION TO THE REPUBLIC OF INDONESIA FOR A DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT (DOISP) P096532

ON A LOAN IN THE AMOUNT OF US$50 MILLION TO THE REPUBLIC OF INDONESIA FOR A DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT (DOISP) P096532 Public Disclosure Authorized Document of The World Bank Report No: ICR00003347 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-76690) ON A LOAN IN THE AMOUNT OF US$50 MILLION

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2930 IND Public Disclosure Authorized (Forestry Institutions and Conservation Project) between REPUBLIC OF INDONESIA Public Disclosure Authorized

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3691 TUN Public Disclosure Authorized Project Agreement (Northwest Mountainous Areas Development Project) between Public Disclosure Authorized INTERNATIONAL

More information

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 4643 IND Loan Agreement (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated January 22,

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 12 ARCHIVED on 08-Dec-2017

More information

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. (Rainfed Agricultural Development (Iloilo) Project)

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. (Rainfed Agricultural Development (Iloilo) Project) Public Disclosure Authorized t J. LOANNUMBER 1815 PH Public Disclosure Authorized Loan Agreement (Rainfed Agricultural Development (Iloilo) Project) Public Disclosure Authorized between REPUBLIC OF THE

More information

Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1236 IND. Public Disclosure Authorized LOAN AGREEMENT. (Fourth Highway Project)

Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1236 IND. Public Disclosure Authorized LOAN AGREEMENT. (Fourth Highway Project) Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1236 IND Public Disclosure Authorized Public Disclosure Authorized LOAN AGREEMENT (Fourth Highway Project) between REPUBLIC OF INDONESIA and INTERNATIONAL

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF GRANT NUMBER TF092100 Public Disclosure Authorized Global Environment Facility Grant Agreement (Agricultural Development Program Support Project) Public

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS)

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) OPERATIONS POLICY AND COUNTRY SERVICES APRIL 2, 2002 FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) CONTENTS Page I. Introduction..1 II.

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

CONFORMED COPY LOAN NUMBER 1267 IND LOAN AGREEMENT. (National Food Crops Extension Project) between REPUBLIC OF INDONESIA. and

CONFORMED COPY LOAN NUMBER 1267 IND LOAN AGREEMENT. (National Food Crops Extension Project) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1267 IND Public Disclosure Authorized Public Disclosure Authorized LOAN AGREEMENT (National Food Crops Extension Project) between REPUBLIC OF INDONESIA

More information

Financing Agreement,.

Financing Agreement,. OJFFlo0AL- SOC MEN CREDIT NUMBER 5445-LK Financing Agreement,. (Additional Financing for Dam Safety and Water Resources Planning Project) between DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA and INTERNATIONAL

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Beneficiaries Implementing Agency Report No. PID10910 India-Andhra Pradesh Economic Reform... Loan/Credit South Asia Poverty Reduction and Economic Management

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7882-CN Public Disclosure Authorized Loan Agreement (Shandong Ecological Afforestation Project) Public Disclosure Authorized between PEOPLE S REPUBLIC

More information

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT PROPOSAL PAGE 1 OF 10 Country

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:LAO 29284 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO ThE LAO PEOPLE'S DEMOCRATIC REPUBLIC FOR ThE CORPORATE AND FINANCIAL DEVELOPMENT OF ELECTRICIT DU LAO LI LI May 1996 - -I CURRENCY EQUIVALENTS

More information

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project:

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project: Summary of Project/Program PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project/Program Approval Request 1. Country/Region: Zambia 2. CIF Project ID#: XPCRZM041A 3. Project/Program Title: Zambia Strengthening

More information

SECTOR K ORGANIZATION, INSTITUTION AND LEGAL SYSTEMS

SECTOR K ORGANIZATION, INSTITUTION AND LEGAL SYSTEMS SECTOR K ORGANIZATION, INSTITUTION AND LEGAL SYSTEMS The Study on Comprehensive Water Management of Sector K THE STUDY ON COMPREHENSIVE WATER MANAGEMENT OF MUSI RIVER BASIN IN THE REPUBLIC OF INDONESIA

More information

Annex C. Sample ToR for Independent Procurement Review

Annex C. Sample ToR for Independent Procurement Review 1. Introduction Annex C. Sample ToR for Independent Procurement Review TERMS OF REFERENCE INDEPENDENT PROCUREMENT REVIEW (IPR) 1.1. The procurement team of the World Bank requires an independent review

More information

Indonesia Government Financial Management and Revenue Administration Project (GFMRAP)

Indonesia Government Financial Management and Revenue Administration Project (GFMRAP) Indonesia Government Financial Management and Revenue Administration Project (GFMRAP) Terms of Reference Assessing Capacity Building Needs for Effective Legislative Oversight of the Budget Process Office

More information

Summary. I. Outline of the Project

Summary. I. Outline of the Project Summary I. Outline of the Project Country:Republic of Indonesia Issue / Sector:Environmental Management Environmental Administration Division in charge: JICA Indonesia Office Period of March 2009 to Cooperation

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and CONFORMED COPY LOAN NUMBER 7716-ME Loan Agreement (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated May

More information

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7900-PK Public Disclosure Authorized Project Agreement (Punjab Barrages Improvement Phase-II Project) Public Disclosure Authorized between INTERNATIONAL

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Ebola Recovery and Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER: TFOA1023 Public Disclosure Authorized Ebola Recovery and Reconstruction Trust Fund Grant Agreement (LABOR-INTENSIVE PUBLIC WORKS TO MITIGATE

More information

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H732 -AF Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Financial Sector Rapid Response Project) between ISLAMIC

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

DOCUMENTS CO-FINANCING FRAMEWORK AGREEMENT. between ASIAN INFRASTRUCTURE INVESTMENT BANK. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

DOCUMENTS CO-FINANCING FRAMEWORK AGREEMENT. between ASIAN INFRASTRUCTURE INVESTMENT BANK. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT IOFFICIA DOCUMENTS CO-FINANCING FRAMEWORK AGREEMENT between ASIAN INFRASTRUCTURE INVESTMENT BANK and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and INTERNATIONAL DEVELOPMENT ASSOCIATION April

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government

More information

Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006

Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Loan Agreement. (Xiaolangdi Multipurpose Project: Stage II) between PEOPLE S REPUBLIC OF CHINA. and

Loan Agreement. (Xiaolangdi Multipurpose Project: Stage II) between PEOPLE S REPUBLIC OF CHINA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4200 CHA Public Disclosure Authorized Loan Agreement (Xiaolangdi Multipurpose Project: Stage II) between PEOPLE S REPUBLIC OF CHINA and Public Disclosure

More information

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Background Context Draft Terms of Reference Mozambique Climate Change Technical Assistance

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT Sustainable Transport Infrastructure Improvement Program (RRP SOL 46499) A. Background and Information Sources PROGRAM FIDUCIARY SYSTEMS ASSESSMENT 1. Under the proposed program, country public financial

More information

Environmental Assessment

Environmental Assessment OP 4.01 January 1999 These policies were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and BP

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4078-IND Public Disclosure Authorized Development Credit Agreement (Initiatives for Local Governance Reform Project) between Public Disclosure

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category

More information

Loan Agreement CONFORMED COPY LOAN NUMBER 1146 JM INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT THE WATER COMMISSION, KINGSTON, JAMAICA

Loan Agreement CONFORMED COPY LOAN NUMBER 1146 JM INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT THE WATER COMMISSION, KINGSTON, JAMAICA Public Disclosure Authorized LOAN NUMBER 1146 JM CONFORMED COPY Public Disclosure Authorized Loan Agreement (Kingston Sewerage and Water Supply Project) Public Disclosure Authorized BETWEEN INTERNATIONAL

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

Bone Bolango, Indonesia

Bone Bolango, Indonesia Bone Bolango, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

The World Bank and Road Infrastructure Investment. October 8, Chanin Manopiniwes World Bank

The World Bank and Road Infrastructure Investment. October 8, Chanin Manopiniwes World Bank The World Bank and Road Infrastructure Investment October 8, 2013 Chanin Manopiniwes World Bank Outline 1. The Project Cycle 2. Roles of the World Bank in Road Infrastructure 3. Program for Result (P4R)

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

REVENUE AND EXPENDITURE MANAGEMENT

REVENUE AND EXPENDITURE MANAGEMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TECHNICAL BRIEF REVENUE AND EXPENDITURE MANAGEMENT Nam Theun 2 Hydroelectric Project

More information

REQUEST FOR PROPOSALS Consulting Engineering Services for: Troutdale Water Master Plan

REQUEST FOR PROPOSALS Consulting Engineering Services for: Troutdale Water Master Plan REQUEST FOR PROPOSALS Consulting Engineering Services for: Troutdale Water Master Plan I. Project Background The City of Troutdale is in need of the services of a qualified Professional Engineer, licensed

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

ARTICLE I. Loan Regulations; Definitions

ARTICLE I. Loan Regulations; Definitions 2 ARTICLE I Loan Regulations; Definitions Section 1.01. All provisions of the Special Operations Loan Regulations of ADB, dated 1 January 2006 (the Loan Regulations ), are hereby made applicable to this

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Project Agreement OFFICIAL. Public Disclosure Authorized. onr'unients LOAN NUMBER 2300 IND. Public Disclosure Authorized. (Thirteenth Power Project)

Project Agreement OFFICIAL. Public Disclosure Authorized. onr'unients LOAN NUMBER 2300 IND. Public Disclosure Authorized. (Thirteenth Power Project) Public Disclosure Authorized Public Disclosure Authorized OFFICIAL onr'unients LOAN NUMBER 2300 IND Project Agreement (Thirteenth Power Project) Public Disclosure Authorized between INTERNATIONAL BANK

More information

CONFORMED COPY LOAN NUMBER 4043 IND LOAN NUMBER 4043 IND

CONFORMED COPY LOAN NUMBER 4043 IND LOAN NUMBER 4043 IND Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4043 IND Loan Agreement Public Disclosure Authorized (Higher Education Support Project - Development of Undergraduate Education) between REPUBLIC

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK PCR: THA 27262 PROJECT COMPLETION REPORT ON THE CHONBURI WATER SUPPLY PROJECT (Loan 1326-THA) IN THAILAND March 2002 CURRENCY EQUIVALENTS Currency Unit Baht (B) At Appraisal (August

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

Document of FL COPY The World Bank

Document of FL COPY The World Bank Public Disclosure Authorized Document of FL COPY The World Bank FOR OFFICIAL USE ONLY Report No. 2398-PH Public Disclosure Authorized PHILIPPINES PROVINCIAL CITIES WATER SUPPLY PROJECT II Public Disclosure

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. Title: Reinforcement of institutional and administrative capacity of the financial sector 2. Project nº: ES 9904 3. Location: Ministry of Finance, Securities Inspectorate, (Bank

More information

Human Settlements Improvement Project (2)

Human Settlements Improvement Project (2) INDONESIA Human Settlements Improvement Project (2) Report Date: March 2000 1 Project Summary and Japan s ODA Loan This project aimed to provide water supply systems, environmental sanitation facilities,

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized NEGOTIATED TEXT June 2, 2003 CREDIT NUMBER -IND Public Disclosure Authorized Development Credit Agreement (Third Kecamatan Development Project) between Public Disclosure Authorized

More information

Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR

Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia Janelle Plummer, WSP-EAP Bill Paterson, EASTR 2 3 4 5 6 7 In Aceh The disaster was caused by a tsunami and an

More information