1 Sustainable Transport Infrastructure Improvement Program (RRP SOL 46499) A. Background and Information Sources PROGRAM FIDUCIARY SYSTEMS ASSESSMENT 1. Under the proposed program, country public financial management (PFM) systems will be used. The assessment of the program financial management and procurement systems is intended to determine how well the Government of Solomon Islands will manage fiduciary risks and provide reasonable assurance that program funds will be used appropriately and in line with the sound procurement principles of competition, economy and efficiency, transparency, and fairness. The fiduciary systems assessment (FSA) was also informed by the extensive experience of the Asian Development Bank (ADB) in supporting the transport sector in Solomon Islands. The detailed financial management assessment was conducted with reference to ADB s Guidelines for the Financial Management and Analysis of Projects 1 and Financial Due Diligence: A Methodology Note. 2 As required by ADB s results-based lending (RBL) policy, the financial management systems assessment emphasizes accountability and transparency. The procurement assessment is based on a detailed review of procurement systems, capacities, and practices of the Solomon Islands Ministry of Infrastructure Development (MID) and Ministry of Finance and Treasury (MOFT). It follows the methodologies prescribed in the program s procurement capacity assessment questionnaires and tools. 2. The FSA focuses on areas that are relevant to the RBL program. It assesses budgeting, financial reporting, internal and external audit, internal control, and information technology systems to determine their strength, relevance, and adequacy for the RBL program. The FSA used (i) the most recent Public Expenditure and Financial Accountability (PEFA) assessment, (ii) the financial management assessment for MOFT as the identified executing agency, (iii) the updated financial management assessment for MID as the implementing agency, and (iv) the report on the joint review of the National Transport Fund (NTF) conducted in September To improve capacity and compliance, action plans that include measures to improve financial management and procurement systems were developed to reduce implementation risks under the program. 3. Country PFM arrangements were assessed in 2012 using the PEFA PFM Performance Measurement Framework. 3 The assessment noted that, compared with the original PEFA assessment conducted in 2008, the repeat assessment in 2012 reveals an overall improvement across most performance indicators with slippage in some areas and no change in the rating for others. 4 However, PEFA noted that the repeat assessment was done in 2012 during a time of transition, when the government was to implement various PFM reforms. The government recognizes that changes and improvements have not been as fast as desired, but progress is nonetheless satisfactory. To strengthen ownership and coordination of PFM reforms, the Solomon Islands cabinet endorsed the PFM Reform Road Map in June The road map draws on all relevant actions to strengthen PFM over a 3-year implementation framework. The key priorities for implementation in the next months include implementation of the PFM Act, systems development, compliance with controls on budget and management of cash flows, and strengthened nontax revenue collection. 1 ADB Guidelines for the Financial Management and Analysis of Projects. Manila. 2 ADB Financial Due Diligence: A Methodology Note. Manila. 3 Under the PEFA framework, performance is assessed in relation to seven dimensions of PFM: (i) credibility of the budget; (ii) comprehensiveness and transparency; (iii) degree to which the budget is prepared with due regard to government policy; (iv) predictability and control in budget execution; (v) accounting, recording, and reporting; (vi) external scrutiny and audit operations; and (vii) appropriateness of development partner practices in country. 4 Government of Solomon Islands PEFA Assessment Final Report. Honiara (11 December).

2 2 4. Accounting and financial reporting. The government has a centralized accounting and financial reporting system. MOFT is tasked with the responsibility of preparing all financial reports for all government line ministries and state enterprises. Financial statements are prepared using cash basis accounting. MOFT is undertaking reforms and developing a framework to move toward the International Public Sector Accounting Standards (IPSAS) cash basis norm. In 2013, the government passed the new PFMA. With full impementation of the act from 1 January 2014, the government is preparing financial statements in accordance with IPSAS. MOFT has been involved in a number of projects funded by development partners and has undertaken the financial management responsibility for these projects. 5. Internal audit. MOFT has an Internal Audit Division (IAD) created under the new PFMA. 5 The IAD is responsible for advising accountable officers of all government ministries on their internal controls. The active involvement of the internal audit division will complement the audits done by the Office of the Auditor General (OAG) and further improve on its anticorruption initiatives. The new PFMA also requires the appointment of an audit committee that will review, appraise, and advise the minister of finance through the permanent secretary of MOFT. However, the audit committee is to be operationalized. IAD can also conduct internal audits at the NTF (para. 11) 6 and, as an added measure, annual fiduciary reviews will be conducted under the program to manage key risks identified through external and/or internal audits and other sources of information. 6. Institutional capacity. As with many developing member countries, Solomon Islands has a shortage of skills in financial management, financial and economic analysis, and procurement. Continuous training on financial management and accounting practices is urgently needed to improve the capacity of the finance and/or accounting staff across all government ministries. 7 However, stiff competition with the private sector for highly qualified and trained individuals makes it difficult for the government to hire and retain more qualified staff for accounting and procurement. But the government is committed to building capacity at all levels, and this is one of the main objectives of the PFM Reform Road Map. 7. Budget. The credibility of the central budget has improved thanks to better forecasting and compliance, compared with the earlier PEFA review, when Solomon Islands was emerging from ethnic conflict. Although variances between budget estimates and actuals remain, these are significantly lower when compared with the earlier PEFA report. Budget comprehensiveness and transparency have also improved with the introduction of the budget strategy and outlook, which gives the public an understanding of the government s fiscal strategy and policy priorities. 8. Information systems. The government started using the financial information system Microsoft Dynamics AX in late 2011, replacing the MAXIMISE software. MOFT shifted to AX because MAXIMISE could no longer be updated to accommodate the proposed changes to the chart of accounts as part of the government reform process. Aside from the new financial management information system, AX, the government also introduced Aurion as its new payroll software and BERT for its budget programming system. 5 Public Finance and Management Act, part 4, clauses PFM Reform Road Map, Matrix 3.6: Audit, legally establishes internal audit functions in line ministries through regulations, and clarifies authority, accountabilities, and reporting lines. The line ministries internal audit will be functionally responsible to the IAD. 7 The PFM Reform Road Map, June 2014 recognizes the major issues that involve human resources, such as (i) building capacity at all levels, (ii) getting the right skills, and (iii) boosting performance through incentives as a priority and one of the guiding principles in the preparation of the PFM Reform Road Map.

3 3 9. External audit. NTF financial statements are audited and prepared in accordance with cash basis IPSAS. The external audit reports of the NTF for 2012 and 2013 are unqualified. However, the audit management letter identifies various internal control weaknesses, which are summarized in Table 1. As part of program risk mitigating actions, MOFT and MID will resolve all external audit observations prior to loan disbursement. The OAG serves as the external auditor of the government, with a duty to report independently and directly to Parliament. The PEFA report notes that the timeliness and quality of annual financial statements is improving over time, and IPSAS cash is now being used. However, in past reports, the OAG found issues across government line ministries, e.g., in relation to missing documentation, lack of internal controls, and non-preparation of financial statements as per a recognized framework. 8 The establishment of an internal audit unit at MOFT as well as the formation of an Audit Committee, under the new PFMA, is expected to help improve the internal control environment. Table 1: Summary of National Transport Fund Management Letter Recommendations Summary of Findings Bank reconciliations from MOFT are not provided to MID or Central Project Implementation Unit on time. Implication The delay will affect the timely and accurate reporting of the financial position of the NTF, as accurate bank reconciliation statements are pivotal to the preparation of NTF financial statements. Remarks MOFT is now providing monthly bank reconciliation statements. However, the 2013 external audit report submitted to the Government of Solomon Islands, the Asian Development Bank, and development partners revealed that there was significant variance between the reconciliations of MOFT and MID (SI$3.8 million). MOFT and MID are to resolve the bank reconciliation issues in accordance with the recommendations of the external auditor, prior to Board submission. Missing original documents at MOFT Non-NTF expenses were paid using NTF funds. Unidentified debits amounting to SI$4.8 million arising from MOFT advices The lack of a proper record-keeping and/or filing system at MOFT causes lack of an audit trail for financial transactions. There was a breakdown in internal control processes at MID and MOFT. Accumulation of unidentified payments or deposits indicates lack of internal controls at MOFT. MOFT requires original documents to process payments but photocopies are maintained by MID/Central Project Implementation Unit. This issue was already identified in the 2010 OAG annual report as prevalent in most line ministries, and remains an issue up to the present. As revealed in the 2013 audit report, a total of SI$9.1 million was paid on behalf of the government. The government has confirmed that the amount will be settled in Up to the time of the issuance of the 2013 audit report, the amount remained outstanding. In 2013, technical assistance support provided for payment validation. Unidentified balance has not yet been cleared as of May MOFT and MID will resolve this issue, in accordance with the recommendations of the external auditor prior to Board submission. MID = Ministry of Infrastructure Development, MOFT = Ministry of Finance and Treasury, NTF = National Transport Fund, OAG = Office of the Auditor General. Source: Asian Development Bank. 10. Funds flow. The National Transport Fund Act established the NTF for the purpose of developing and managing transport infrastructure and services in Solomon Islands. The NTF is only one part of the sector-wide approach to transport infrastructure and services in Solomon 8 Ministry of Finance and Treasury, Government of Solomon Islands, Public Expenditure and Financial Accountability Assessment: Final Report.

4 4 Islands. 9 Funds paid into the NTF are provided by the government and development partners. The NTF Act provides for MOFT to make regulations for the establishment of an NTF board to manage the fund. The NTF (Fund Management) Regulations 2010 provide that the National Transport Fund Board (NTFB) shall be responsible for all aspects of the management of the fund and shall ensure that the fund is managed in accordance with any requirements under the NTF Act. 10 The act also provides that the NTFB will be supported by a secretariat, 11 with the personnel coming from the respective ministries, for the proper management and effective operation of the fund. The joint NTF review commissioned by ADB and the Government of Australia s Department of Foreign Affairs and Trade (DFAT) in September 2013 highlighted 12 that due to the structural limitations of the Government of Solomon Islands chart of accounts in 2011, MOFT financial reporting for NTF was restricted to a summary statement of receipts and payments only. This form of reporting lacked sufficient detail and could not meet the NTFB s need for financial reporting. Subsequently, MID s Central Project Implementation Unit (CPIU) was appointed as the NTF secretariat in February 2012 and has taken a number of practical steps to find solutions to overcome these weaknesses, leading to unqualified audit reports on NTF financial statements for 2012 and Financial reporting responsibilities are expected to be discharged in future by MID s Accounting Division. 11. The joint NTF review also highlighted concerns on board governance. However, the NTF remains the most viable funding vehicle to consolidate efforts to fund the transport sector in Solomon Islands, and MID has taken concrete steps in 2014 to improve board governance at the NTF. The NTFB now meets on a regular basis and has appointed a transport policy advisor within the NTFB secretariat who is in charge of preparing the NTF annual work program, based on the National Transport Plan, as well as presenting the status of all NTF-funded projects to the NTFB. The NTFB secretariat is also recruiting two more Solomon Islands nationals to strengthen capacity. 12. The program funds will flow directly to the NTF. The proposed funding arrangement will generally follow the existing procedure for the NTF. The program flow of program funds to the NTF is detailed in the next page. 13. Program accounting and financial reporting. Program accounting and financial reporting will use the NTF financial statements prepared by MID. The NTF financial statements are audited by Deloitte and are prepared in accordance with cash basis IPSAS. However, the preparation of the financial statements is complex and involves both MID and MOFT. The MID CPIU is heavily dependent on MOFT and MID accounting for financial reporting. All supporting documents are subject to a pre-audit by a compliance or financial management advisor. If the compliance review determines that payment requests are for valid NTF projects, these are forwarded to the MOFT payment section, where they undergo another compliance check by an advisor at MOFT. MOFT manages all the bank accounts and also undertakes its own monthly bank reconciliations. 14. Risk management action plans. This assessment proposes the following action plans to mitigate fiduciary risks to the RBL program: (i) conduct of regular internal audits of NTF by MOFT s IAD; 9 Ministry of Finance and Treasury, Government of Solomon Islands, National Transport Fund Act, Honiara. 10 Regulation 4, NTF (Fund Management) Regulations The head of the NTFB Secretariat is the Under Secretary Technical of MID. 12 Appendixes 8 and 9 of the joint review report.

5 5 (ii) provision of rigorous training on financial management and accounting procedures to upgrade staff capacity in MOFT and MID, as outlined in the PFM Reform Road Map; Proposed National Transport Fund Flow SIG Budget DFAT Grant ADB Loan Contractor/ SIG CBSI NTF CBSI NTF DLI Yes CBSI NTF NTF Requisition Form Sends MID Finance with NTF CBSI NTF MID/ MOFT Issues MOFT Payment Section with NTF Compliance NTF Operating Account SBD MOFT A ADB = Asian Development Bank, ANZ = Australia and New Zealand Banking Group Limited, CBSI = Central Bank of Solomon Islands, DFAT = Department of Foreign Affairs and Trade, DLI = disbursement-linked indicator, NTF = National Transport Fund, SBD= Solomon Islands dollar, SIG=Solomon Islands government. Source: Asian Development Bank. (iii) development of a financial management manual for MID accounting staff involved in NTF finanical reporting to strengthen accounting and internal control processes, and provision of guidance for the preparation of NTF financial statements (based on NTF finanical management needs to be reflected in the NTF procedural guidelines and as considered and approved by the NTF board); 13 (iv) outsourcing of the conduct of an annual fiduciary review, 14 which will include review and follow-up audit recommendations and compliance with internal controls processes; (v) continued review by NTF financial management advisor(s); (vi) complete recruitement of the NTFB secretariat staff; 13 The Transport Sector Development Project (TSDP) supports the formulation of the financial management manual. 14 A fiduciary review is more focused on the internal control environment and procedures. The previous year s audit reports have identified various internal control weaknesses.

6 6 (vii) (viii) (ix) resolution by MOFT and MID of all external audit observations, including, importantly, the issues pertaining to bank reconcilations and unidentified debits prior to loan disbursement, in accordance with auditor recommendations; preparation of the NTF annual plan with requisite financial data (investment earnings, receipts from donors, approved expenditures, and monthly cash-flow forecasts) in accoridance with the NTF Fund Management Regulations 2010; and regular external audit of NTF financial statements. B. Procurement Systems 15. Country procurement systems. The Public Finance Management Act (PFMA) 2014 provides the framework for the public procurement regulations, while a Procurement and Contract Administration Manual 2013; associated standard bidding documents for the procurement of works, goods, and services; and sample bid evaluation reports constitute the documentation. 16. Program procurement profile. The procurement aspects under the proposed program involve (i) annual routine maintenance and localized repair of 700 kilometers (km) of roads, 130 bridges and 81 wharves; (ii) rehabilitation of 10 km of roads and reconstruction of four wharves; and (iii) corresponding consulting services for feasibility studies, design, and work supervision, as well as technical assistance. The program will support meeting NTP targets and will transition seamlessly with ongoing ADB, DFAT, and government-funded efforts to strengthen country systems and capacity to implement the NTF work program. Procurement of all goods, works, and consulting services will be conducted using country procurement systems. These follow national procurement regulations which are in line with sound procurement principles of open competition, economy and efficiency, and transparency and fairness. 17. Key findings of recent procurement assessments. The procurement functions will be carried out by MID through its CPIU, following national procurement regulations set out by MOFT. Therefore, a procurement assessment based on a detailed review of procurement systems, capacities, and practices at MID and MOFT was carried out in accordance with methodologies prescribed in ADB s Procurement Capacity Assessment and Procurement Review for Effective Implementation questionnaires and tools. The assessment also benefited from two procurement assessments conducted in the recent past. 15 Overall the PFMA instructions and associated procurement documentation have been found adequate to conduct the procurement of works, goods, and services successfully in MID, provided certain actions and risk mitigation measures are taken under the proposed program, as shown in Table 2. Details on the Procurement Assessment can be found in the supplementary document Program Procurement Systems Assessment World Bank Solomon Islands Operational Procurement Review. Central Operations Service Unit, East Asia and Pacific Region Report No SB and Australian Department of Foreign Affairs and Trade Joint Review of the Solomon Islands National Transport Fund Section 6: Key Findings and Recommendations Procurement, November Accessible from the list of linked documents in Appendix 2 of the main text.

7 7 Table 2: Procurement Constraints and Mitigation Measures Constraint Actions Responsibility 1. Inadequate staffing and weak 1 2 procurement staff appointed; procurement MID and Public Service procurement capacity and capacity building training to be provided Commission 2. Protracted preparation of Technical specialist to guide and train MID MID technical specification for bid project engineers documents 3. Actual cost of works often Tighten contract management and oversight of MID exceeds contract price outsourced work supervision 4. Weak contract management Procurement and Administration TA to set up a contract management monitoring system and provide relevant training MID 5. Lack of procurement performance monitoring Procurement expert to set up a procurement performance monitoring system CPIU director to implement it MID MOFT 6. Grievance mechanism lacks independency and transparency Reform the grievance mechanism as per the PFM Reform Road Map 7. Quality of works is uneven Outsource work supervision with effective MID oversight from CPIU 8. Inefficient contract packaging Enlarge the size of labor-based contracts MID CPIU=central program implementation unit, MID=Ministry of Infrastructure and Development, MOFT=Ministry of Finance and Treasury, PFM=public financial management. 18. Key Risks. While MID s procurement system was found to be adequate, the assessment determined the risks to the implementation of the results-based program and the necessary mitigation measures, as shown in Table 3. Key Risk Areas Lack of qualified procurement staff and dependence on technical assistance Weak supervision of works leading to poor quality and cost increase Weak procurement compliance monitoring Lack of independence and transparency of the grievance mechanism Lack of independency of the Risk Type H S S S S Table 3: Procurement Risks Mitigation Measures Appointment of 1 2 procurement staff from the 2015 cohort of MID staff; and qualified TA with in-line and capacity building responsibility Outsourced work supervision combined to tighter oversight and improved contract management Procurement performance monitoring system, on-going partner programs monitoring compliance to remain in place, planned enhancement of compliance monitoring in the PFM Road Map Planned enhancement of grievance mechanism in the PFM Road Map Planned modification of the MTB and CTB membership in the PFM Road Map MTB and CTB CTB=Central Tender Board, H=high, MID=Ministry of Infrastructure and Development, MTB=Ministerial Tender Board, PFM=public financial management, S=Substantial. C. Anticorruption Systems 19. OAG plays a crucial role in the framework of public accountability. It serves as the external auditor of the government and has the duty to report independently and directly to Parliament on the results of the audits performed, which ensures government transparency and accountability to the public through the Parliament. However, OAG is understaffed and the

8 8 current staff members are lacking in experience. Furthermore, OAG also recognizes that many government entities are unable to produce auditable financial statements and that internal controls are weak. Submission of financial statements is also delayed. No statistics are available, but OAG recognizes that corruption is an issue in public sector procurement Conclusion. With the currently limited auditing capacity of OAG, the risk is substantial that corruption will be a major concern under the program. To improve anticorruption mitigation, the following measures will be undertaken under the program: (i) Include a procurement review as part of the scope of the annual fiduciary review. This audit will determine if the established procurement procedures were followed and also compare if the actual works conducted and materials used are those specified in the approved contracts. (ii) Define and establish threshold limits for the bid price that go beyond the engineering estimate to deter against overpricing. (iii) (iv) Establish and strictly enforce time limits in conducting bid evaluations. Continue the conduct of annual external audits of the NTF by an internationally reputable accounting and audit firm. 21. With these mitigation measures in place, the risks will be manageable. 17 Corporate plan , Office of the Auditor General of Solomon Islands.

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT kills ector Enhancement Program (RRP RI 42251) PROGRAM FIDUCIARY YTEM AEMENT A. Background and Information ources 1. The kills ector Enhancement Program (EP) will finance the government s kills ector Development

More information

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program Country Public Financial Management System Assessment Project Number: 49078 Loan Number(s): June 2015 Republic of Armenia: Seismic Safety Improvement Program ABBREVIATIONS ADS - Armenian Development Strategy

More information

LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1

LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1 Policy-Based Lending 2008 2017: Performance, Results, and Issues of Design, Linked Document 2 LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1 A. Armenia: 2008 and 2013 1. Overall,

More information

PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT. Operations Policy and Country Services

PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT. Operations Policy and Country Services PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT These interim guidance notes are intended for internal use by Bank staff to provide a framework to conduct assessments

More information

PUBLIC FINANCIAL MANAGEMENT ADVISER BUDGET SUPPORT (Short-term)

PUBLIC FINANCIAL MANAGEMENT ADVISER BUDGET SUPPORT (Short-term) PUBLIC FINANCIAL MANAGEMENT ADVISER BUDGET SUPPORT (Short-term) Position: Public Finance Management Adviser Budget Support (Shortterm) Duration: 120 days, with a combination of incountry and home-based

More information

JOINT POLICY REFORM MATRIX, FY2016 FY2018

JOINT POLICY REFORM MATRIX, FY2016 FY2018 Building Macroeconomic Resilience Subprogram 2 (RRP TON 48361-002) JOINT POLICY REFORM MATRIX, FY2016 FY2018 Version: March 2017 I. SUPPORTING FISCAL RESILIENCE Fiscal strategy Partners: ADB, IMF, PFTAC,

More information

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY Emergency Assistance Project (RRP BAN 52174-001) FINANCIAL ANAGEENT ASSESSENT EXECUTIVE SUARY I. Introduction 1. An updated financial management assessment (FA) has been conducted for the four implementing

More information

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY Earthquake Emergency Assistance Project (RRP NEP 49215) FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY 1. An updated financial management assessment (FMA) has been conducted for the four Implementing

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Solomon Islands: Transport Sector Development Project

Solomon Islands: Transport Sector Development Project Validation Report September 2018 Solomon Islands: Transport Sector Development Project Reference Number: PVR-582 Project Number: 41171-022 Grant Number: 0243 ABBREVIATIONS ADB Asian Development Bank ADF

More information

SUMMARY FINANCIAL MANAGEMENT ASSESSMENT

SUMMARY FINANCIAL MANAGEMENT ASSESSMENT A. Introduction Emergency Assistance for Relief and Recovery from Typhoon Yolanda (RRP PHI 47337) UMMARY FINANCIAL MANAGEMENT AEMENT 1. This financial management assessment was prepared in accordance with

More information

Reforming Public Financial Management in Papua New Guinea: The Role of Accountants. Dr Ken Ngangan Secretary for Finance

Reforming Public Financial Management in Papua New Guinea: The Role of Accountants. Dr Ken Ngangan Secretary for Finance Reforming Public Financial Management in Papua New Guinea: The Role of Accountants Dr Ken Ngangan Secretary for Finance DEPARTMENT OF FINANCE PFM REFORMS Outline key PFM reforms that the Department of

More information

JOINT POLICY REFORM MATRIX, 2015/ /18 Version: March 2016

JOINT POLICY REFORM MATRIX, 2015/ /18 Version: March 2016 Building Macroeconomic Resilience Program, SP1 (RRP TON 48361) JOINT POLICY REFORM MATRIX, 2015/16 2017/18 Version: March 2016 Reform area FY2015/16 Actions FY2016/17 Actions FY2017/18 Actions Results

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

Validation Report. Tonga: Economic Support Program. Independent Evaluation Department

Validation Report. Tonga: Economic Support Program. Independent Evaluation Department Validation Report Reference Number: PVR-318 Program Number: 43152-01 Grant Number: 0185 September 2014 Tonga: Economic Support Program Independent Evaluation Department ABBREVIATIONS ADB Asian Development

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2010 International Monetary Fund May 2010 IMF Country Report No. 10/138 November 2009 January 29, 2001 January 29, 2001 January 29, 2001 January 29, 2001 Maldives: Action Plan for PFM Reforms Based on

More information

RISK ASSESSMENT AND RISK MANAGEMENT PLAN

RISK ASSESSMENT AND RISK MANAGEMENT PLAN Primary Health Care Improvement Project (RRP UZB 50190-002) RISK ASSESSMENT AND RISK MANAGEMENT PLAN 1. This Risk Assessment and Risk Management Plan (RAMP) for the Primary Health Care Improvement Project

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat www.pefa.org #PEFA PEFA Training Dakar, Senegal January 30-31 & February 1, 2019 PEFA Secretariat Improving public financial management. Supporting sustainable development. INTRODUCTION Introductions Participant

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

GAMAS means Mongolia Customs Automated Data Processing

GAMAS means Mongolia Customs Automated Data Processing 2 System; (c) GAMAS means Mongolia Customs Automated Data Processing (d) Grant Account means the account opened by ADB on its books in the name of Mongolia for the purposes of the Project and to which

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Solar Power Development Project (RRP SOL 48346) A. Introduction FINANCIAL ANALYSIS 1. The scope of the financial analysis for the Solomon Islands Solar Power Development project includes (i) an estimate

More information

Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands

Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands Consultant Recruitment Announcement Project to Strengthen Budget Execution and Financial Reporting Systems (BEFR) Project

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed

More information

TAJ: Water Resources Management in Pyanj River Basin

TAJ: Water Resources Management in Pyanj River Basin Water Resource Management in Pyanj River Basin (RRP TAJ 47181) Supplementary Document 14 Financial Management Assessment September 2016 TAJ: Water Resources Management in Pyanj River Basin ABBREVIATIONS

More information

Institutional Strengthening for Aviation Regulation

Institutional Strengthening for Aviation Regulation Technical Assistance Report Project Number: 43429 Regional capacity development technical assistance (R-CDTA) December 2010 Institutional Strengthening for Aviation Regulation The views expressed herein

More information

Solomon Islands: Economic Recovery Support Program Subprograms 1 and 2

Solomon Islands: Economic Recovery Support Program Subprograms 1 and 2 Completion Report Project Number: 43186 Grant Numbers: 0197/0255 September 2012 Solomon Islands: Economic Recovery Support Program Subprograms 1 and 2 CURRENCY EQUIVALENTS Currency Unit Solomon Islands

More information

REPORT 2014/024 INTERNAL AUDIT DIVISION

REPORT 2014/024 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2014/024 Audit of the United Nations Environment Programme Secretariat of the Basel, Rotterdam and Stockholm Conventions Overall results relating to the efficient and effective

More information

Development Policy Instruments to Support Decentralization and Local Governance Reforms Bruno Carrasco

Development Policy Instruments to Support Decentralization and Local Governance Reforms Bruno Carrasco Development Policy Instruments to Support Decentralization and Local Governance Reforms Bruno Carrasco Director Public Management, Financial Sector and Trade Division South Asia Department Asian Development

More information

II. Public Sector Accounting. A. Institutional Framework for Public Sector Accounting

II. Public Sector Accounting. A. Institutional Framework for Public Sector Accounting II. Public Sector Accounting A. Institutional Framework for Public Sector Accounting 8. The institutional framework should include adherence to international accounting standards and use of qualified accounting

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

FRAMEWORK FINANCING AGREEMENT

FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT (Second Power Transmission Enhancement Investment Program) Parties This Framework Financing Agreement ( FFA ) dated 15 July 2016 is between

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Country Partnership Strategy: Papua New Guinea, 2016 2020 Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1. Sector Performance, Problems, and Opportunities 1. Strengthening public

More information

Pakistan: Road Sector Development Program

Pakistan: Road Sector Development Program Validation Report Reference Number: PCV: PAK 2010-69 Project Number: 32058 Loan Number: 1891 December 2010 Pakistan: Road Sector Development Program Independent Evaluation Department ABBREVIATIONS ADB

More information

Draft Policy Brief: Revised Indicator 9a for the Global Partnership Monitoring Framework

Draft Policy Brief: Revised Indicator 9a for the Global Partnership Monitoring Framework Draft Policy Brief: Revised Indicator 9a for the Global Partnership Monitoring Framework March 2015 This policy brief has been produced with the kind assistance of the European Union and the German Ministry

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

Petroleum Revenue Bill

Petroleum Revenue Bill THE REPUBLIC OF SOMALILAND MINISTER OF ENERGY AND MINERALS Petroleum Revenue Bill 20 August 2014 Contents Part I - Introductory provisions... 4 1. Definitions... 4 2. Scope... 6 Part II National Petroleum

More information

Governance Assessment (Summary) Nepal

Governance Assessment (Summary) Nepal Governance Assessment (Summary) Nepal Country Partnership Strategy: Nepal, 2013 2017 A. Current State of Governance GOVERNANCE ASSESSMENT 1. Nepal is passing through a historic political transition. The

More information

OPERATIONS MANUAL BANK POLICIES AND PROCEDURES NONSOVEREIGN OPERATIONS

OPERATIONS MANUAL BANK POLICIES AND PROCEDURES NONSOVEREIGN OPERATIONS Page 1 of 7 These policies and procedures were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. This Operations Manual is issued by the Strategy and Policy Department

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Country Partnership Strategy: Cambodia, 2014 2018 Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Lagging public sector management

More information

GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND

GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND 1. This case study reviews the efforts of Government of Bangladesh (GoB) to develop capacity in and

More information

ASIAN DEVELOPMENT BANK TAR:UZB 36498

ASIAN DEVELOPMENT BANK TAR:UZB 36498 ASIAN DEVELOPMENT BANK TAR:UZB 36498 TECHNICAL ASSISTANCE TO THE REPUBLIC OF UZBEKISTAN FOR DEVELOPMENT OF THE CAPITAL MARKET July 2003 CURRENCY EQUIVALENTS (as of 30 June 2003) Currency Unit sum SUM1.00

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY]

QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY] QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY] This questionnaire is designed to gather basic information on fiscal institutions and practices as a basis for review of a country's fiscal management system

More information

March Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist

March Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist March 2015 Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist Page 1 of 7 REVISED GUIDANCE ON USING THE APFS STANDARD REVIEW CHECKLIST Please note: The review checklist

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:ETM 34402 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO EAST TIMOR FOR TRANSPORT SECTOR IMPROVEMENT October 2001 ABBREVIATIONS ADB Asian Development Bank ETTA

More information

FINANCIAL MANAGEMENT ASSESSMENT REPORT (MICROFINANCE INSTITUTIONS)

FINANCIAL MANAGEMENT ASSESSMENT REPORT (MICROFINANCE INSTITUTIONS) Access to Green Finance Project (RRP TAJ 45229) Supplementary Document 17 FINANCIAL MANAGEMENT ASSESSMENT REPORT (MICROFINANCE INSTITUTIONS) A. Executive Summary 1. As of February 2013, there are 126 licensed

More information

ASIAN DEVELOPMENT BANK TAR: TRA 31389

ASIAN DEVELOPMENT BANK TAR: TRA 31389 ASIAN DEVELOPMENT BANK TAR: TRA 31389 TECHNICAL ASSISTANCE FOR SECURED TRANSACTIONS LAW REFORM January 1998 ABBREVIATIONS ASEAN - Association of Southeast Asian Nations AUSAID - Australian Agency for International

More information

PUBLIC SECTOR ACCOUNTING DEVELOPMENTS. Credibility. Professionalism. AccountAbility

PUBLIC SECTOR ACCOUNTING DEVELOPMENTS. Credibility. Professionalism. AccountAbility PUBLIC SECTOR ACCOUNTING DEVELOPMENTS Credibility. Professionalism. AccountAbility Session Objectives Legal framework of public sector accounting standards PSASB (K) and ICPAK PSASB s strategic direction

More information

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization Technical Assistance Report Project Number: 42226 Capacity Development Technical Assistance (CDTA) September 2011 Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

Validation Report. Nauru: Public Financial Management Reform Program. Independent Evaluation Department

Validation Report. Nauru: Public Financial Management Reform Program. Independent Evaluation Department Validation Report Reference Number: PVR-475 Project Number: 45032-001 Grant Number: 0300 December 2016 Nauru: Public Financial Management Reform Program Independent Evaluation Department ABBREVIATIONS

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Cambodia: Small and Medium Enterprise Development Program

Cambodia: Small and Medium Enterprise Development Program Validation Report Reference Number: PCV: CAM 2010-73 Program Number: 36383 Loan Number: 2129(SF) December 2010 Cambodia: Small and Medium Enterprise Development Program Independent Evaluation Department

More information

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations INTERNAL AUDIT DIVISION REPORT 2015/041 Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations Overall results relating to the effective management of mine action

More information

Islamic Republic of Pakistan: Pehur High Level Canal Extension Project

Islamic Republic of Pakistan: Pehur High Level Canal Extension Project Pehur High Level Canal Extension Project (RRP PAK 47024) (Supplementary Appendix A) Financial Management Assessment June 2016 Project Number 47024-004 Islamic Republic of Pakistan: Pehur High Level Canal

More information

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities State Accountability Revitalization Project (RRP INO 38354) Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

Maldives: Enhancing Tax Administration Capacity

Maldives: Enhancing Tax Administration Capacity Completion Report Project Number: 47150-001 Technical Assistance Number: 8525 August 2018 Maldives: Enhancing Tax Administration Capacity This document is being disclosed to the public in accordance with

More information

TAX RISK MANAGEMENT POLICY

TAX RISK MANAGEMENT POLICY TAX RISK MANAGEMENT POLICY 1.1 Introduction As with the management of other risks, the Company considers tax risk management fundamental to maintaining efficient and effective operations. This Policy outlines

More information

CONTENTS. Page EXECUTIVE SUMMARY I. OVERVIEW 1 II. FINDINGS AND RECOMMENDATIONS 2 III. CONCLUDING REMARKS 19

CONTENTS. Page EXECUTIVE SUMMARY I. OVERVIEW 1 II. FINDINGS AND RECOMMENDATIONS 2 III. CONCLUDING REMARKS 19 CONTENTS Page EXECUTIVE SUMMARY i I. OVERVIEW 1 II. FINDINGS AND RECOMMENDATIONS 2 III. CONCLUDING REMARKS 19 CURRENCY EQUIVALENTS (as of 28 February 2016) Currency unit = Papua New Guinea Kina (PGK) 1

More information

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls Technical Assistance Report Project Number: 50258-001 Cluster Regional Capacity Development Technical Assistance (C-R-CDTA) December 2016 Developing Anti-Money Laundering and Combating the Financing of

More information

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2835-PRC PROJECT AGREEMENT (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and HEBEI PROVINCIAL GOVERNMENT DATED 6 MARCH 2012 PRC 44012 PROJECT

More information

Sustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda

Sustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda Sustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda Marko Markov, St. John`s, 23 February 2016 1 WHAT IS SIRFF Special Fund established under the EPMA Independent

More information

INSTITUTION BUILDING IN INFRASTRUCTURE SECTOR 1 I. ISSUES TO ADDRESS

INSTITUTION BUILDING IN INFRASTRUCTURE SECTOR 1 I. ISSUES TO ADDRESS Country Partnership Strategy: Papua New Guinea, 2011 2015 Supplementary Document INSTITUTION BUILDING IN INFRASTRUCTURE SECTOR 1 I. ISSUES TO ADDRESS 1. A policy reform agenda is needed to ensure infrastructure

More information

OFFICE OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA UGANDA HIGH COMMISSION, CANBERRA

OFFICE OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA UGANDA HIGH COMMISSION, CANBERRA OFFICE OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA UGANDA HIGH COMMISSION, CANBERRA REPORT AND OPINION OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA HIGH COMMISSION, CANBERRA FOR THE

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06-Dec-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021292 Public Disclosure Authorized Public Disclosure Authorized Project ID P120427 Project Name AF: ARTF-Public Fin. Mgmt. Reform II Country

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Kenya Infrastructure Finance/PPP project (P121019) Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private

More information

CENTRAL BANK OF SOLOMON ISLANDS 2004 MONETARY POLICY STANCE STATEMENT. Issued by Governor of the Central Bank of Solomon Islands

CENTRAL BANK OF SOLOMON ISLANDS 2004 MONETARY POLICY STANCE STATEMENT. Issued by Governor of the Central Bank of Solomon Islands CENTRAL BANK OF SOLOMON ISLANDS 2004 MONETARY POLICY STANCE STATEMENT Issued by Governor of the Central Bank of Solomon Islands Mr. Rick N Houenipwela Honiara 8 th April 2004 - 2 Box 1. OBJECTIVES OF THE

More information

REPORT 2015/079 INTERNAL AUDIT DIVISION. Audit of United Nations Office on Drugs and Crime operations in Peru

REPORT 2015/079 INTERNAL AUDIT DIVISION. Audit of United Nations Office on Drugs and Crime operations in Peru INTERNAL AUDIT DIVISION REPORT 2015/079 Audit of United Nations Office on Drugs and Crime operations in Peru Overall results relating to the management of operations in Peru were initially assessed as

More information

PREPARATION AND PRESENTATION OF PUBLIC SECTOR FINANCIAL STATEMENTS

PREPARATION AND PRESENTATION OF PUBLIC SECTOR FINANCIAL STATEMENTS PREPARATION AND PRESENTATION OF PUBLIC SECTOR FINANCIAL STATEMENTS APPLICATION OF IPSAS (CASH/ACCRUAL) CPA MUMO Credibility. Professionalism. AccountAbility Presentation Outline Legal foundation Constitution

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

Indicator 5.c.1: Percentage of countries with systems to track and make public allocations for gender equality and women s empowerment

Indicator 5.c.1: Percentage of countries with systems to track and make public allocations for gender equality and women s empowerment Goal 5: Achieve gender equality and empower all women and girls Target 5.c: Adopt and strengthen sound policies and enforceable legislation for the promotion of gender equality and the empowerment of all

More information

2. PEFA indicators and report

2. PEFA indicators and report 2. PEFA indicators and report Introduction to PEFA (2011 version) Skopje, Macedonia February 2015 PEFA Secretariat The PEFA Framework Launched in June 2005, updated 2011 (upgraded extensively 2015 - draft)

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program Project Design Advance Project Administration Manual Project Number: 47243-003 June 2016 People s Republic of Bangladesh: Rural Infrastructure Maintenance Program CONTENTS I. PROPOSED PROJECT DESCRIPTION

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

Nauru: Sustainable and Climate-Resilient Connectivity Project

Nauru: Sustainable and Climate-Resilient Connectivity Project Sustainable and Climate-Resilient Connectivity Project (RRP NAU 48480-003) Project Administration Manual Project Number: 48480-003 Grant Numbers: GXXXX; GXXXX; GXXXX December 2017 Nauru: Sustainable and

More information

Liberia Reconstruction Trust Fund Implementation Manual

Liberia Reconstruction Trust Fund Implementation Manual Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development

More information

AUDIT. UNDP Pakistan. Early Recovery Programme in Pakistan (Directly Implemented Project No ) Report No. 990 Issue Date: 19 June 2013

AUDIT. UNDP Pakistan. Early Recovery Programme in Pakistan (Directly Implemented Project No ) Report No. 990 Issue Date: 19 June 2013 UNITED NATIONS DEVELOPMENT PROGRAMME Office of Audit and Investigations AUDIT OF UNDP Pakistan Early Recovery Programme in Pakistan (Directly Implemented Project No. 76295) Report No. 990 Issue Date: 19

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MDTF GRANT NUMBER TF013825 Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program

More information

Project Number: March Audited Project Financial Statements (APFS) Standard Review Checklist

Project Number: March Audited Project Financial Statements (APFS) Standard Review Checklist Project Number: March 2015 Audited Project Financial Statements (APFS) Standard Review Checklist Page 1 of 4 REVISED AUDITED PROJECT FINANCIAL STATEMENTS (APFS) STANDARD REVIEW CHECKLIST Project Number/Title:

More information

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN AFGHANISTAN FINANCIAL MANAGEMENT Report No. 1233 Issue Date: 10 December 2013 Table of Contents Executive Summary i I. Introduction

More information

REPORT 2015/174 INTERNAL AUDIT DIVISION

REPORT 2015/174 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/174 Audit of management of selected subprogrammes and related capacity development projects in the United Nations Economic and Social Commission for Asia and the Pacific

More information

Report on the annual accounts of the European Schools for the financial year together with the Schools replies

Report on the annual accounts of the European Schools for the financial year together with the Schools replies Report on the annual accounts of the European Schools for the financial year 2016 together with the Schools replies 12, rue Alcide De Gasperi - L - 1615 Luxembourg T (+352) 4398 1 E eca-info@eca.europa.eu

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 3 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

NONCOMPLIANCE IN PROCUREMENT GUIDANCE NOTE ON PROCUREMENT JUNE 2018 ASIAN DEVELOPMENT BANK

NONCOMPLIANCE IN PROCUREMENT GUIDANCE NOTE ON PROCUREMENT JUNE 2018 ASIAN DEVELOPMENT BANK NONCOMPLIANCE IN PROCUREMENT GUIDANCE NOTE ON PROCUREMENT JUNE 2018 ASIAN DEVELOPMENT BANK NONCOMPLIANCE IN PROCUREMENT GUIDANCE NOTE ON PROCUREMENT JUNE 2018 ASIAN DEVELOPMENT BANK Creative Commons Attribution-NonCommercial-NoDerivs

More information