Appendices. Program Reviews and Benchmarking (LED, CFL, SUCH)

Size: px
Start display at page:

Download "Appendices. Program Reviews and Benchmarking (LED, CFL, SUCH)"

Transcription

1 Appendices Program Reviews and Benchmarking (LED, CFL, SUCH)

2 Appendices - Light Emitting Diode (LED) Program Program Goals and Design Process Goals are well defined and communicated, however, focus is on near-term (immediate) outcomes. Expanded vision, program logic assessment, and intentional identification and tracking of intermediate and longer-term market transformation indicators could prove useful along with more careful consideration of a prudent exit strategy. Budgets Well documented but based on conversion of 95% of all intersections to LED technology, does not seem to recognize the potential baseline level penetration of LEDs at existing intersections. Potential exists for lowering BC Hydro s contribution toward up front capital costs, elimination of plans to subsidize conversion of any new Ministry of Transportation (MOT) intersections (since they have mandate for LEDs), and reduction of 95% target to some lower (i.e., 60%), but defensibly sustainable level. Savings Estimates - BC Hydro energy savings estimates and measure lives associated with LED traffic light technologies are consistent with those used by other similar programs in North America. BC Hydro has not calculated demand savings for this program as other utilities do. Program Implementation Plans and Staffing Resources Well developed and communicated and sufficient for achieving current stated goals. Consider conducting process evaluation 6 months into program to help determine if program is being delivered as proposed, and to identify potential opportunities for efficiency and effectiveness improvements or program design modifications. Program Evaluation Plans Plans for tracking progress toward near-term (# of intersections) goal are thorough and database mechanisms seem to be in place. More effort could be focused on identifying and tracking intermediate and longer-term market transformation indicators. Cost Effectiveness Periodic benefit/cost analyses should be considered and expanded to recognize the significant and predictable capacity (demand reduction) benefits associated with LED traffic light technologies. Freeridership assumption of 3% should be re-assessed due to plans already in place (without the program) by the MOT in BC. Page A1

3 Appendices - Compact Fluorescent Light Bulb Program Program Goals and Design Process Program goals for the CCQ pilot are well defined. However, to ensure consistent understanding of key goals and objectives, a single page summary should be developed and made readily available for all staff and contractors. Quantity goals are typically well communicated but critical objectives such as education of retail staff and consumers can be lost in the effort to achieve the level of CFLs distributed. Savings Estimates Assumptions used in deriving the per CFL energy savings estimate of 69 kwh/year are consistent with those used in similar U.S. programs. Demand savings were mentioned in the evaluation plan and are based on wattage difference of standard bulb and CFL (initial estimate of 55 watt difference is consistent with programs reviewed). CFL measure life of 6.3 years is also consistent with other programs involving CFLs. Demand savings (KW) exist but have not been estimated, tracked, or reported. Budgets Total CCQ pilot budget appears reasonable but there was no documentation reflecting the breakdown of the budget. Assumed an average CFL cost of $12 yields an estimate of 38% of budget for rebates/discounts, which is reasonable for a pilot. Program Implementation Plans CCQ pilot plans are well developed and will offer an excellent template for Phase 2 of the CFL program. Program Evaluation Plans Plans for evaluating the CCQ pilot are detailed and comprehensive. Both process and impact areas seem to be well addressed. Consider adding a sales data reporting requirement to retailer Memorandum of Agreement (MOA) to assist in obtaining this critical but elusive information. Cost Effectiveness Benefit /cost analysis should be revisited in light of pilot evaluation results. Demand savings (KW) should be explicitly tracked and reported, and the value of these demand savings included in the cost effectiveness calculation for the TRC B/C ratio. Page A2

4 3c. Program Review - Schools, Universities, Colleges and Hospitals Program Goals and Design Process Goals are well defined and communicated, however, focus is on near-term (immediate) outcomes. A good set of program components are identified, however, the plans do not integrate the components in a strategic fashion. Expanded vision, program logic assessment, and intentional identification and tracking of intermediate and longerterm market transformation indicators could prove useful along with more careful consideration of a prudent exit strategy. More accurate and up to date market baseline and characterization research is needed. Budgets Well documented and indicates a reasonable split between the labor versus nonlabor shares of the budget. Staff resources committed to the project appear to be reasonable for the number of audits, projects, workshops, etc. indicated in the Implementation Plan. Savings Estimates In the first inspection by Audit Services, energy savings estimates for the retrofit component were found to be extremely optimistic. The original energy savings goals would have been difficult to achieve without specifically targeting highly energy intensive and larger facilities. In consultation with the Audit Services department, the basis for projected energy savings has been revised by Power Smart staff to be realistic but still aggressive. Demand savings (KW) at the overall program level have not been estimated, tracked, or reported. Program Implementation Plans and Staffing Resources Well developed, communicated, and sufficient for achieving current stated goals. Consider conducting process evaluation 6 months into program to help determine if program is being delivered as proposed, and to identify potential opportunities for efficiency and effectiveness improvements or program design modifications. Program Evaluation Plans Plans were not available for review. Cost Effectiveness Periodic benefit/cost analyses should be considered, and these analyses should include valuing demand savings. Particular attention should be paid to the Retrofit program. Refer to previous comments on Savings Estimates. Page A3

5 Appendices - Table 1 Table 1 Best Practices for Program Plans/Business Cases Program Plan Description of Program Plan LED CFL SUCH Understanding Market / Market Assessment Program plan provides a summary of the market, identifies the key market actors and decision makers, and provides citation to more detailed market assessment research Research done but not documented More research may be needed Understanding Market Actors Program plan describes the roles of key market actors in this market Need market characterization map Need market characterizatio n map and documentation of the actors Identified Market Barriers Program plan identifies the market barriers that hinder the adoption of energy efficiency measures and practices Assessing Efficient Technologies Program plan provides information on the efficiency measures and practices promoted by the program, measure energy and/or demand savings, useful lives, incremental capital and installation costs, etc. Page A4

6 Appendices Program Plan Program Logic presented & Indicators of market transformation identified Measurable and Verifiable Goals & Objectives Clearly Assigned Roles & Responsibilities for Implementation/Staffing Plan Operational Procedures Plan Description of Program Plan LED CFL SUCH A logic model for a program includes each of the following elements: the structure and decision influences currently operating in the market the intervention design and its underlying logic the expected results of the intervention (program) including a description of what will happen and how the program will achieve the desired outcomes (including indicators of market transformation, mileposts, penetration expected with and without the program, etc.) an explicit description of what should happen under different contingency situations (program ramp-up, ramp-down, etc.), and a description of what indictors can be used to signal the need for changes in program strategy The program plan clearly states the goals and objectives of the program, and these goals and objectives are reasonable, understandable, measurable, believable and achievable (RUMBA) The program plan explains what key strategies will be deployed, who will implement these strategies, and will explain the staffing resources needed for the program The program plan describes necessary operational procedures (for example, the RFP development and issue process, the incentive application and approval process, procedures for telemarketing or direct mail, approval process for the program budget, procedures for data collection and tracking, etc.) Need mid-term and longer term indicators of market transformation Need tracking of longer-term indicators of market transformation Goals need to be stated in one place too scattered Goals are realistic but aggressive Page A5

7 Appendices Program Plan Plan for Addressing Training Requirements Marketing Strategy Assessment of Risks / Contingency Planning Well-Defined Short and Long Term Budget Assessment of Benefit/Cost Analysis and Projected Savings Transition Strategy Operational Procedures Plan Description of Program Plan LED CFL SUCH The program plan describes training requirements for program staff, trade allies, program participants, and other key market actors The plan describes all marketing strategies to be used (direct mail, telemarketing, public relations, trade shows, one on one site visits, incentives, etc.) The program plan describes key risks to the program and contingency plans for key risks The program plan provides the annual budget for the program for one to three years The program plan presents a cost effectiveness analysis for the program according to BC Hydro required cost effectiveness tests (the Total Resource Test >= 1; utility cost per kwh saved < $.02 (Canadian $) A transition strategy explains how a program will evolve, ramp up or ramp down based upon movements in indicators of market transformation over time The program plan describes necessary operational procedures (for example, the RFP development and issue process, the incentive application and approval process, procedures for telemarketing or direct mail, approval process for the program budget, procedures for data collection and tracking, etc.) Follow through required Demand savings need to be recognized and valued. Freeridership assumption of 3% needs to be re-assessed (too low) Need plan to lock in savings (plan for sustainability) No documentation available to review Demand savings need to be recognized and valued. Need plan to lock in savings (plan for sustainability) Page A6

8 Appendices - Table 2 TABLE 2 Best Practices for Program Implementation Plans Program Implementation Encourage Sustainable Market Clear Program Schedule Description LED CFL SUCH Implementation strategies are targeted to create a market that will sustain energy efficiency awareness and energy efficient purchasing decisions and practices A detailed program schedule with key milestones exists Needs more attention Needs more attention Budget Tracking Mechanism in Place Operational Procedures in Place/Flow charts Competitive Bidding Procedures are in place to track and report to BC Hydro management actual program expenditures versus budgeted amounts on a monthly basis Clear operating procedures exist for major processes, major processes have been flow-charted, staff has received training on all operating procedures (the RFP development and issue process, the incentive application and approval process, procedures for telemarketing or direct mail, approval process for the program budget, procedures for data collection and tracking, etc.). Data tracking is in place to monitor cycle times of key processes and to ensure that backlogs are minimized or eliminated. Attention given to continuous improvement of processes. Contracts for outside services are accomplished through a well-defined competitive bidding process (RFP process has been flowcharted, operating procedures exist, staff has been trained on these procedures) Need to monitor cycle times for key processes to eliminate backlogs and bottlenecks Need to monitor cycle times for key processes to eliminate backlogs and bottlenecks Need to monitor cycle times for key processes to eliminate backlogs and bottlenecks Page A7

9 Appendices Program Implementation M&V Plan / Output Tracking / Collection of Necessary Program Data Feedback Loop to Facilitate Interim Design Modifications based on Field Experience Description LED CFL SUCH Data tracking mechanisms are in place to track program activity and outputs (number of participants, trade ally partners, identified energy savings, committed savings, implemented savings, implemented and verified savings) The program and/or implementation plan explains how program evaluation results will be reviewed and used to make mid-course corrections in program design, targeting, strategies, etc. Needs more work; M&V plans will be written Need to monitor mid and longerterm indicators of MT Needs more work; M&V plans will be written Need to monitor mid and longerterm indicators of MT Needs more work; M&V plans will be written Need to monitor mid and longerterm indicators of MT Page A8

10 Appendices - Table 3 TABLE 3 Best Practices for Program Evaluation Plans Program Evaluation Plan Program evaluation goals Identify Key Indicators of MT Compile Baseline Data on Indicators Develop Market Progress Reports Track and Assess Market Transformation Indicators Description LED CFL SUCH The evaluation plan for a program presents the overall goals of the evaluation (process analysis, impact analysis, market indicator analysis, benefit/cost analysis, etc.), focusing on the audience for the report The evaluation plan describes the key indicators of market transformation that are being tracked for a program The plan describes how the baseline for indicators of market transformation or for energy savings measurement will be accomplished Market progress reports summarize periodic or on-going market assessment and measurement to provide feedback for the logic model, refining program interventions as necessary and documenting progress to date. Progress reports focus on changes that have occurred in a market (not program outputs) and attribution of those changes. Once indicators of market transformation have been identified, the evaluation plan describes the necessary research approaches and methods to collect indicator data over time. The research approaches to be used may include consumer surveys, depth interviews, content analyses and secondary research. Evaluation plan needs to be developed Evaluation plan needs to be developed Page A9

11 Appendices Program Evaluation Plan Process evaluation plan Impact evaluation plan Risk Assessment Periodic Review of Cost Effectiveness Description LED CFL SUCH Process evaluations examine the efficiency and effectiveness of program delivery, including the effectives of communication among program staff, program participants, non-participants and key market actors. Process evaluations ensure that program delivery is continuously improved, assess whether customers are satisfied with products and services provided, assess any program backlogs or bottlenecks, and whether program communications are effective. Impact evaluations assess the energy benefits, non-energy benefits, and market effects due to a program, and are thus essential for determining the cost effectiveness of a program. An assessment to the major risks and uncertainties that may affect the successful implementation of a program. These risks include internal and external events, controllable and non-controllable events. A detailed cost effectiveness analysis examines whether program benefits on a life cycle basis are likely to exceed program costs Page A10

FIVE YEAR PLAN FOR ENERGY EFFICIENCY

FIVE YEAR PLAN FOR ENERGY EFFICIENCY FIVE YEAR PLAN FOR ENERGY EFFICIENCY Executive Summary Prepared for: Holy Cross Energy Navigant Consulting, Inc. 1375 Walnut Street Suite 200 Boulder, CO 80302 303.728.2500 www.navigant.com July 15, 2011

More information

Evaluation, Measurement & Verification Framework for Washington

Evaluation, Measurement & Verification Framework for Washington Evaluation, Measurement & Verification Framework for Washington Issued September 8, 2011 SOURCE DOCUMENTS Information used in the development of this document came from PacifiCorp practices and experience,

More information

Revenue Requirement Application. 2004/05 and 2005/06. Volume 2. Appendix I. Power Smart 10-Year Plan

Revenue Requirement Application. 2004/05 and 2005/06. Volume 2. Appendix I. Power Smart 10-Year Plan Revenue Requirement Application 2004/05 and 2005/06 Volume 2 Appendix I. Power Smart 10-Year Plan 10-Year Plan: 2002/03 through 2011/12 December 2, 2003 Table of Contents 1 PLAN SUMMARY...1 2 PLAN COST-EFFECTIVENESS

More information

EVALUATION, MEASUREMENT & VERIFICATION PLAN. For Hawaii Energy Conservation and Efficiency Programs. Program Year 2010 (July 1, 2010-June 30, 2011)

EVALUATION, MEASUREMENT & VERIFICATION PLAN. For Hawaii Energy Conservation and Efficiency Programs. Program Year 2010 (July 1, 2010-June 30, 2011) EVALUATION, MEASUREMENT & VERIFICATION PLAN For Hawaii Energy Conservation and Efficiency Programs Program Year 2010 (July 1, 2010-June 30, 2011) Activities, Priorities and Schedule 3 March 2011 James

More information

Toronto Hydro Electric System Limited

Toronto Hydro Electric System Limited Toronto Hydro Electric System Limited Draft Evaluation, Measurement and Verification Plan: Commercial, Institutional and Small Industrial Monitoring & Targeting ( M&T ) Submitted to: Ontario Energy Board

More information

Developing a Performance Assessment Framework for Canada's Energy Efficiency Programs: Results and Challenges

Developing a Performance Assessment Framework for Canada's Energy Efficiency Programs: Results and Challenges Developing a Performance Assessment Framework for Canada's Energy Efficiency Programs: Results and Challenges By Mallika Nanduri Office of Energy Efficiency, Natural Resources Canada Ottawa, Ontario ABSTRACT

More information

2014 Annual Update of the Electric and Natural Gas Conservation and Load Management Plan

2014 Annual Update of the Electric and Natural Gas Conservation and Load Management Plan Docket No. 13-03-02 Compliance Filing 2014 Annual Update of the 2013-2015 Electric and Natural Gas Conservation and Load Management Plan Submitted by: The Connecticut Light and Power Company The United

More information

Portfolio Application Outline Energy Efficiency PY

Portfolio Application Outline Energy Efficiency PY Portfolio Application Outline Energy Efficiency PY 2006 2008 Section I. Portfolio Outline 1. Executive Summary This chapter is a short summary of the request including the key elements of the portfolio

More information

BPA Energy Efficiency Option 1 Custom Project Calculator Instructions

BPA Energy Efficiency Option 1 Custom Project Calculator Instructions B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Energy Efficiency Option 1 Custom Project Calculator Instructions Revised 12/3/2012 Table of Contents Purpose of Option 1 Custom Project Calculator

More information

Energy Efficiency Resource Ramping Assumptions

Energy Efficiency Resource Ramping Assumptions Energy Efficiency Resource Ramping Assumptions Class 2 DSM Resource Ramping This document presents the methods used by The Cadmus Group, Inc. (Cadmus) and the Energy Trust of Oregon (Energy Trust) to develop

More information

Annual Report to the Pennsylvania Public Utility Commission For the period December 2009 to May 2010 Program Year 2009

Annual Report to the Pennsylvania Public Utility Commission For the period December 2009 to May 2010 Program Year 2009 Annual Report to the Pennsylvania Public Utility Commission For the period December 2009 to May 2010 Program Year 2009 For Act 129 of 2008 Energy Efficiency and Conservation Program Prepared by Duquesne

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2015 through November 30, 2015 Program Year 7, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period June 1, 2015 through August 31, 2015 Program Year 7, Quarter 1 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2015 through November 30, 2015 Program Year 7, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and

More information

Exhibit DAS-1. Tucson Electric Power Company Demand-Side Management Program Portfolio Plan

Exhibit DAS-1. Tucson Electric Power Company Demand-Side Management Program Portfolio Plan Exhibit DAS-1 Tucson Electric Power Company Demand-Side Management Program Portfolio Plan 2008-2012 TABLE OF CONTENTS 1. Introduction...3 2. DSM Portfolio Performance Costs, Savings and Net Benefits...3

More information

SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO

SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO First Revision Sheet 90 I.P.U.C. No.28 Substitute Original Sheet 90 90 SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO 1. Availability The services described herein are available to specified residential,

More information

CAPITAL BUDGET NUCLEAR

CAPITAL BUDGET NUCLEAR Updated: 00-0- EB-00-00 Tab Page of 0 0 CAPITAL BUDGET NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear capital project budget for the historical year,

More information

Project Theft Management,

Project Theft Management, Project Theft Management, by applying best practises of Project Risk Management Philip Rosslee, BEng. PrEng. MBA PMP PMO Projects South Africa PMO Projects Group www.pmo-projects.co.za philip.rosslee@pmo-projects.com

More information

Costing National Agriculture Investment Plans (NAIPs)

Costing National Agriculture Investment Plans (NAIPs) Capacity Development Project for Investment and Policy - CDPIP Costing National Agriculture Investment Plans (NAIPs) Introduction and Guide to the NAIP Costing Template for National Technical Commissions

More information

Third-Year Program Results for a Utility Recommissioning Program

Third-Year Program Results for a Utility Recommissioning Program Third-Year Program Results for a Utility Recommissioning Program Ellen Franconi, PhD, Martin Selch, Jim Bradford PhD, PE Nexant, Inc. Bill Gruen Xcel Energy Synopsis Xcel Energy offers the Recommissioning

More information

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 100 1975 Springfield Road Kelowna, BC V1Y 7V7 Tel: (250) 717-0890 Fax: 1-866-335-6295 www.fortisbc.com Regulatory Affairs Correspondence

More information

The University of Leeds Guidelines on Investment Decision Making: Building and Refurbishment Projects

The University of Leeds Guidelines on Investment Decision Making: Building and Refurbishment Projects The University of Leeds Guidelines on Investment Decision Making: Building and Refurbishment Projects Advice may be obtained from Clive Smith (Treasury Manager) E-mail: c.r.smith@adm.leeds.ac.uk Introduction

More information

Richmond Building Energy Challenge

Richmond Building Energy Challenge Richmond Building Energy Challenge Robert Greenwald, P.Eng., MBA, President (Principal) Robert Greenwald has 25 years of energy management experience including developing energy plans, determining opportunities,

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period November 05 through February 06 Program Year 7, Quarter For Pennsylvania Act 9 of 008 Energy Efficiency and Conservation Plan

More information

Scientific Council Forty-sixth Session 07/12/2009. KEY PERFORMANCE INDICATORS (KPIs) FOR THE AGENCY

Scientific Council Forty-sixth Session 07/12/2009. KEY PERFORMANCE INDICATORS (KPIs) FOR THE AGENCY Forty-sixth Session 07/12/2009 Lyon, 27 29 January 2010 Princess Takamatsu Hall KEY PERFORMANCE INDICATORS (KPIs) FOR THE AGENCY What are Key Performance Indicators (KPIs)? 1. KPIs represent a set of measures

More information

DOCKET NO. 13A-0773EG DIRECT TESTIMONY AND EXHIBITS OF LEE E. GABLER

DOCKET NO. 13A-0773EG DIRECT TESTIMONY AND EXHIBITS OF LEE E. GABLER IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF ITS ELECTRIC AND NATURAL GAS DEMAND-SIDE MANAGEMENT (DSM PLAN FOR THE CALENDAR YEAR 0 AND TO CHANGE ITS ELECTRIC AND

More information

Terms of Reference. Contract #: (to be provided by PSU)

Terms of Reference. Contract #: (to be provided by PSU) Independent Evaluation of the Accelerating the Implementation of the Investment Case for Maternal, Newborn and Child Health in Asia and the Pacific Programme Terms of Reference Contract #: (to be provided

More information

Stanford Life Cycle Cost Analysis Guide. Introduction & Methodology Interpreting LCCA Results LCCA Timeline Tool Instructions

Stanford Life Cycle Cost Analysis Guide. Introduction & Methodology Interpreting LCCA Results LCCA Timeline Tool Instructions Stanford Life Cycle Cost Analysis Guide Introduction & Methodology Interpreting LCCA Results LCCA Timeline Tool Instructions January 2016 Introduction & Methodology Stanford University has an ongoing commitment

More information

Retro-Commissioning Draft Impact Evaluation Plan

Retro-Commissioning Draft Impact Evaluation Plan Prepared by SBW Consulting, Inc. PWP, Inc. For the California Public Utilities Commission December 19, 2007 TABLE OF CONTENTS EXECUTIVE SUMMARY... 5 1. PROGRAMS EVALUATED... 8 2. EVALUATOR CONTACT INFORMATION...

More information

PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011

PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011 PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011 OBJECTIVES OF THE PRESENTATION By the end of the presentation,

More information

Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado

Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado March 31, 2018 / Proceeding No. 16A-0512EG 2017 xcelenergy.com 2018 Xcel Energy Inc. Xcel Energy

More information

Natural Gas Demand Side Management Evaluation, Measurement, and Verification (EM&V) Plan

Natural Gas Demand Side Management Evaluation, Measurement, and Verification (EM&V) Plan 2016-2018 Natural Gas Demand Side Management Evaluation, Measurement, and Verification (EM&V) Plan submitted to the Ontario Energy Board Date: November 10, 2016 DNV GL - Energy www.dnvgl.com/energy Table

More information

DUQUESNE LIGHT COMPANY PROGRAM YEAR 7 ANNUAL REPORT

DUQUESNE LIGHT COMPANY PROGRAM YEAR 7 ANNUAL REPORT DUQUESNE LIGHT COMPANY PROGRAM YEAR 7 ANNUAL REPORT Program Year 7: June 1, 2015 May 31, 2016 Presented to: PENNSYLVANIA PUBLIC UTILITY COMMISSION Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period June 2014 through August 2014 Program Year 6, Quarter 1 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2012 through November 30, 2012 Program Year 4, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and

More information

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES GEF/C.8/4 GEF Council October 8-10, 1996 Agenda Item 6 FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES RECOMMENDED DRAFT COUNCIL DECISION The Council reviewed document

More information

Sheila Belayutham CHAPTER 6 CONTROL

Sheila Belayutham CHAPTER 6 CONTROL CHAPTER 6 CONTROL LEARNING OUTCOME Students will be able to: Understand monitoring and control in construction. Understand the monitoring and control methods in construction. MONITORING & CONTROL It s

More information

2011 Prescriptive Lighting Incentive Worksheet

2011 Prescriptive Lighting Incentive Worksheet 2011 Prescriptive Lighting Incentive Worksheet Customer Information Company Check here if multiple worksheets are being submitted for one project/building. Facility Address Date Submitted Prescriptive

More information

Evaluation and Research Plan

Evaluation and Research Plan 2004 2005 Evaluation and Research Plan Phase 2: Activities to be Initiated 2005 New Jersey s Clean Energy Program Energy Efficiency and Renewable Energy Programs February 4, 2005 Edward J. Bloustein School

More information

September Preparing a Government Debt Management Reform Plan

September Preparing a Government Debt Management Reform Plan September 2012 Preparing a Government Debt Management Reform Plan Introduction Preparing a Government Debt Management Reform Plan The World Bank supports the strengthening of government debt management

More information

RISK MANAGEMENT GUIDE FOR DOD ACQUISITION

RISK MANAGEMENT GUIDE FOR DOD ACQUISITION RISK MANAGEMENT GUIDE FOR DOD ACQUISITION Sixth Edition (Version 1.0) August, 2006 Department of Defense Table of Contents. Key Activity - Risk Analysis... 11.1. Purpose... 11.2. Risk Reporting Matrix...

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (CAPITAL MARKET) 1. Sector Performance, Problems, and Opportunities 1

SECTOR ASSESSMENT (SUMMARY): FINANCE (CAPITAL MARKET) 1. Sector Performance, Problems, and Opportunities 1 Capital Market Development Program (RRP SRI 49365) Sector Road Map SECTOR ASSESSMENT (SUMMARY): FINANCE (CAPITAL MARKET) 1. Sector Performance, Problems, and Opportunities 1 1. Market development. From

More information

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND Type of Position: Local consultant Sustainable finance expert Location: Ulaanbaatar, Mongolia Type of Contract: Individual contract Expected

More information

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012.

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012. Janet Fraser Chief Regulatory Officer Phone: 60-6-06 Fax: 60-6-07 bchydroregulatorygroup@bchydro.com July 0, 01 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor

More information

B.29[17d] Medium-term planning in government departments: Four-year plans

B.29[17d] Medium-term planning in government departments: Four-year plans B.29[17d] Medium-term planning in government departments: Four-year plans Photo acknowledgement: mychillybin.co.nz Phil Armitage B.29[17d] Medium-term planning in government departments: Four-year plans

More information

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction

More information

Final Collaborative Report. DSM Administrative Issues Analysis

Final Collaborative Report. DSM Administrative Issues Analysis Demand Side Management Final Collaborative Report DSM Administrative Issues Analysis Volume I of III A Joint Report of NSPI, UARB Staff and Consultants January 1, 00 1 1 1 1 1 1 1 1 0 1 0 TABLE OF CONTENTS

More information

Transfer Payment Agency Accountability and Governance

Transfer Payment Agency Accountability and Governance MINISTRY OF COMMUNITY AND SOCIAL SERVICES Transfer Payment Agency Accountability and Governance The Ministry of Community and Social Services plans and arranges for a wide variety of social services throughout

More information

Prioritization Matrix

Prioritization Matrix Prioritization Matrix Project Name: Date: FACTOR SCALE SCORE WEIGHT WEIGHTED SCORE Linkage to Objectives - To what extent will this project help achieve one or more corporate objectives? 5=Key to success

More information

Ameren Missouri MEEIA Energy Efficiency Plan

Ameren Missouri MEEIA Energy Efficiency Plan 2019-24 MEEIA Energy Efficiency Plan PUBLIC Table of Contents 1.0 Key Aspects of the Plan... 5 2.0 Portfolio Summary... 6 3.0 Sector Programs... 14 3.1 Low-Income Sector Programs... 15 3.1.1 Low-Income

More information

REQUEST FOR LETTERS OF INTEREST TO PERFORM PROFESSIONAL ENGINEERING SERVICES

REQUEST FOR LETTERS OF INTEREST TO PERFORM PROFESSIONAL ENGINEERING SERVICES REQUEST FOR LETTERS OF INTEREST TO PERFORM PROFESSIONAL ENGINEERING SERVICES Bridge Deck Replacements Project Nos. 71-19-03 and 71-19-04 Bridge Deck Replacements and Structural Repairs of the Ohio Turnpike

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SECTION 109 MEASUREMENT AND PAYMENT

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SECTION 109 MEASUREMENT AND PAYMENT SECTION 102.01 PREQUALIFICATION OF BIDDERS of the Specifications is amended as follows: The eighth paragraph is replaced by the following: When the Contractor's actual progress is more than 10 percent

More information

MASSACHUSETTS CROSS-CUTTING BEHAVIORAL PROGRAM EVALUATION

MASSACHUSETTS CROSS-CUTTING BEHAVIORAL PROGRAM EVALUATION MASSACHUSETTS CROSS-CUTTING BEHAVIORAL PROGRAM EVALUATION Volume I Final Prepared for: MASSACHUSETTS ENERGY EFFICIENCY ADVISORY COUNCIL Prepared by: OPINION DYNAMICS CORPORATION 230 Third Avenue Third

More information

Financing Options for Energy Efficiency

Financing Options for Energy Efficiency Financing Options for Energy Efficiency Presentation by Saurabh Kumar Managing Director Date: 31 st October, 2014 EESL Business - Objectives Create market access in public and private facilities handholding,

More information

Muskrat Falls Project

Muskrat Falls Project Review of project cost, schedule and related risks Interim report April 8, 2016 Julia Mullaley Clerk of the Executive Council & Secretary to Cabinet Government of Newfoundland and Labrador P.O. Box 8700

More information

Template for Pennsylvania EDC Energy Efficiency and Conservation Plans. 1. Overview of Plan... 5

Template for Pennsylvania EDC Energy Efficiency and Conservation Plans. 1. Overview of Plan... 5 Energy Efficiency and Conservation Plan Page 1 of 162 Template for Pennsylvania EDC Energy Efficiency and Conservation Plans To be submitted by EDCs by November 30, 2015 Contents Transmittal Letter Table

More information

MANAGING FOR RESULTS: An Implementation Plan for the City of Portland

MANAGING FOR RESULTS: An Implementation Plan for the City of Portland MANAGING FOR RESULTS: An Implementation Plan for the City of Portland Office of Management and Finance City Auditor s Office Bureau of Planning City of Portland, Oregon June, 2003 Managing for Results

More information

JUNE 2015 STRATEGIC PLAN

JUNE 2015 STRATEGIC PLAN JUNE 2015 STRATEGIC PLAN LOOKING TOWARDS 2025 INDEX 1. Introduction 2. Strategic Plan Process a. Strategic Plan Workshop b. Strategic Plan Alignment c. Strategic Plan Process d. Strategic Initiatives Report

More information

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment 3 1.3

More information

BUSINESS INCENTIVE PROGRAM APPLICATION

BUSINESS INCENTIVE PROGRAM APPLICATION BUSINESS INCENTIVE PROGRAM APPLICATION PART A APPLICANT INFORMATION (Financial incentive payment will be made to Applicant ONLY.) 1. Applicant: Legal Name of Business (the "Applicant"): Address: City:

More information

STATEWIDE EVALUATION TEAM PRELIMINARY ANNUAL REPORT TO THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

STATEWIDE EVALUATION TEAM PRELIMINARY ANNUAL REPORT TO THE PENNSYLVANIA PUBLIC UTILITY COMMISSION STATEWIDE EVALUATION TEAM PRELIMINARY ANNUAL REPORT TO THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Year 5 June 1, 2013 through May 31, 2014 Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

New Jersey Clean Energy Collaborative. Regulatory Reporting

New Jersey Clean Energy Collaborative. Regulatory Reporting New Jersey Clean Energy Collaborative New Jersey Clean Energy Collaborative Table of Contents Overview...1 Contents and Timetables...1 Quarterly Reports...1 Annual Reports...2 Performance Reports...2 Evaluation

More information

Integrated Planning: Consolidating Annual Facility Planning More Time for Execution

Integrated Planning: Consolidating Annual Facility Planning More Time for Execution Integrated Planning: Consolidating Annual Facility Planning More Time for Execution - 11562 Jerel G. Nelson*, R. Lee Morton*, Carlos Ramirez*, Patrick S. Morris**, James T. McSwain*** *WorleyParsons Polestar,

More information

CLIMATE INVESTMENT READINESS INDEX (CIRI) - A Tool to Assess Investment Climate for Climate Investments

CLIMATE INVESTMENT READINESS INDEX (CIRI) - A Tool to Assess Investment Climate for Climate Investments CLIMATE INVESTMENT READINESS INDEX (CIRI) - A Tool to Assess Investment Climate for Climate Investments Background Mitigating climate-change while addressing development needs will involve massive scale-up

More information

INTRODUCTION TO CAPITAL IMPROVEMENTS PROGRAMMING

INTRODUCTION TO CAPITAL IMPROVEMENTS PROGRAMMING INTRODUCTION TO CAPITAL IMPROVEMENTS PROGRAMMING Jerry Hiebert, AICP (Updated by V. Rosales, AICP in 2007) Planners often hear the complaint that their plans sit on shelves gathering dust and are not implemented

More information

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda. Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda 21 July, 2017 Introduction: The Ministry of Water and Environment (MWE) is implementing

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY : COMPANY FOR APPROVAL OF ITS : ACT 129 PHASE III ENERGY : DOCKET NO. M-2015 EFFICIENCY AND CONSERVATION : PLAN : PETITION OF PECO

More information

Energy Conservation Resource Strategy

Energy Conservation Resource Strategy Energy Conservation Resource Strategy 2008-2012 April 15, 2008 In December 2004, EWEB adopted the most recent update to the Integrated Electric Resource Plan (IERP). Consistent with EWEB s three prior

More information

SUBMISSION DOCUMENT EXECUTIVE SUMMARY

SUBMISSION DOCUMENT EXECUTIVE SUMMARY Unique Identifier 221-222 SUBMISSION DOCUMENT Document Type CCGTE Revision 1 Effective Date June 2011 Regulation & Governance SUBMISSION TO ICAS on 28 June 2011 EXECUTIVE SUMMARY 1. TITLE OF THE SUBMISSION

More information

Earned Value Management. Danielle Kellogg. Hodges University

Earned Value Management. Danielle Kellogg. Hodges University Earned Value Management 1 EARNED VALUE MANAGEMENT Earned Value Management Danielle Kellogg Hodges University Earned Value Management 2 Abstract Earned Value Management has been used with enterprise-level

More information

Request for Proposals Drainage Master Plan

Request for Proposals Drainage Master Plan Request for Proposals 201-15 Drainage Master Plan The City of Dawson Creek invites proposals from qualified professionals or firms to undertake a drainage master plan. This master plan will include an

More information

Debt Statistics and Management: Issues at the National Level

Debt Statistics and Management: Issues at the National Level Debt Statistics and Management: Issues at the National Level Punam Chuhan-Pole Development Economics Fiscal Transparency and Data Management Workshop For Delegation from the Ministry of Finance, China

More information

NCHRP Consequences of Delayed Maintenance

NCHRP Consequences of Delayed Maintenance NCHRP 14-20 Consequences of Delayed Maintenance Recommended Process for Bridges and Pavements prepared for NCHRP prepared by Cambridge Systematics, Inc. with Applied Research Associates, Inc. Spy Pond

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

ISC: UNRESTRICTED AC Attachment. Hedging Audit (Foreign Exchange and Fuel)

ISC: UNRESTRICTED AC Attachment. Hedging Audit (Foreign Exchange and Fuel) Hedging Audit (Foreign Exchange and Fuel) July 8, 2016 THIS PAGE LEFT INTENTIONALLY BLANK ISC: UNRESTRICTED Table of Contents Executive Summary... 5 1.0 Background... 7 2.0 Audit Objectives, Scope and

More information

Integrated Capital Planning Manual

Integrated Capital Planning Manual 0 Integrated Capital Planning Manual August 2017 0 Contents Introduction... 1 Annual Integrated Capital Planning Cycle... 3 Integrated Capital Plan Submission... 8 Business Case Guide and Template... 11

More information

Risk Management Plan for the Ocean Observatories Initiative

Risk Management Plan for the Ocean Observatories Initiative Risk Management Plan for the Ocean Observatories Initiative Version 1.0 Issued by the ORION Program Office July 2006 Joint Oceanographic Institutions, Inc. 1201 New York Ave NW, Suite 400, Washington,

More information

A New Construction Price Comparison Methodology for. The International Comparison Program: Concept Note

A New Construction Price Comparison Methodology for. The International Comparison Program: Concept Note Public Disclosure Authorized I n t e r n a t i o n a l C o m p a r i s o n P r o g r a m Public Disclosure Authorized Public Disclosure Authorized A New Construction Price Comparison Methodology for The

More information

Judicial Council of California Administrative Office of the Courts Court Case Management System (CCMS)

Judicial Council of California Administrative Office of the Courts Court Case Management System (CCMS) Judicial Council of California Administrative Office of the Courts Court Case Management System (CCMS) Recommended CCMS V4 Deployment Plan and Approach Final March 19 2012 1 Table of Contents 1.0 Introduction

More information

EEAC EM&V Briefing. Ralph Prahl EEAC Consultant EM&V Team Leader July 9th, 2013

EEAC EM&V Briefing. Ralph Prahl EEAC Consultant EM&V Team Leader July 9th, 2013 EEAC EM&V Briefing Ralph Prahl EEAC Consultant EM&V Team Leader July 9th, 2013 Organization of Presentation EM&V in Massachusetts: Past, Present and Future Past Background Review of MA EM&V Framework Current

More information

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project

More information

Review of the Federal Transit Administration s Transit Economic Requirements Model. Contents

Review of the Federal Transit Administration s Transit Economic Requirements Model. Contents Review of the Federal Transit Administration s Transit Economic Requirements Model Contents Summary Introduction 1 TERM History: Legislative Requirement; Conditions and Performance Reports Committee Activities

More information

Chapter-8 Risk Management

Chapter-8 Risk Management Chapter-8 Risk Management 8.1 Concept of Risk Management Risk management is a proactive process that focuses on identifying risk events and developing strategies to respond and control risks. It is not

More information

General Plan Update: Progress Report to City Council and Solicitation of Input on Planning in the Marinship

General Plan Update: Progress Report to City Council and Solicitation of Input on Planning in the Marinship Date: October 9, 2018 To: From: Subject: Sausalito City Council M-Group : Progress Report to City Council and Solicitation of Input on Planning in the Marinship This Progress Report to the City Council

More information

Management Audit of the Justice Court Second Follow-Up

Management Audit of the Justice Court Second Follow-Up May 13, 2013 TO: FROM: SUBJECT: Board of Commissioners John Hutzler, County Auditor Management Audit of the Justice Court Second Follow-Up The Washington County Justice Court is a limited jurisdiction

More information

View from The Northeast: Benchmarking the Costs and Savings from the Most Aggressive Energy Efficiency Programs

View from The Northeast: Benchmarking the Costs and Savings from the Most Aggressive Energy Efficiency Programs View from The Northeast: Benchmarking the Costs and Savings from the Most Aggressive Energy Efficiency Programs Toben Galvin Navigant Consulting Presented at the 2015 ACEEE National Conference on Energy

More information

COPYRIGHTED MATERIAL. Index

COPYRIGHTED MATERIAL. Index Index Note to the reader: Throughout this index boldfaced page numbers indicate primary discussions of a topic. Italicized page numbers indicate illustrations. A A+ certification, 28 acceptance criteria

More information

CORPORATE AND EMERGENCY SERVICES

CORPORATE AND EMERGENCY SERVICES CORPORATE AND EMERGENCY SERVICES Asset Management Plan April 19, 2018 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management

More information

INTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process

INTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process INTERNAL AUDIT DIVISION REPORT 2016/155 Audit of the United Nations Human Settlements Programme project management process Established policies and procedures need to be further strengthened, particularly

More information

REPORT 2015/115 INTERNAL AUDIT DIVISION

REPORT 2015/115 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/115 Audit of the statistics subprogramme and related technical cooperation projects in the Economic Commission for Africa Overall results relating to effective management

More information

Request for Proposal Health Attitudes and Beliefs Research. Request for Proposals (RFP)

Request for Proposal Health Attitudes and Beliefs Research. Request for Proposals (RFP) Scope of Service RFP # RFP issued by Request for Proposals (RFP) Health Attitudes and Beliefs Research 2018RFP-38 First Nations Health Authority (FNHA) Issue date January 3, 2018 Closing date/time Proposals

More information

Follow-Up on VFM Section 3.05, 2014 Annual Report RECOMMENDATION STATUS OVERVIEW

Follow-Up on VFM Section 3.05, 2014 Annual Report RECOMMENDATION STATUS OVERVIEW Chapter 1 Section 1.05 Ministry of Infrastructure (formerly the Ministry of Economic Development, Employment and Infrastructure) Infrastructure Ontario Alternative Financing and Procurement Follow-Up on

More information

The Company appreciates the Roundtable s interest in our DSM products and provides the following response to comments:

The Company appreciates the Roundtable s interest in our DSM products and provides the following response to comments: January 29, 2015 On December 1, 2014, Public Service Company of Colorado (PSCo) issued a 60-Day Notice to apply programmatic and related technical assumption changes to the ENERGY STAR New Homes (ESNH)

More information

BAE Systems SCAF Presentation June BAE SYSTEMS 2013, all rights reserved Unclassified 31/07/2013 1

BAE Systems SCAF Presentation June BAE SYSTEMS 2013, all rights reserved Unclassified 31/07/2013 1 BAE Systems SCAF Presentation June 2013 BAE SYSTEMS 2013, all rights reserved Unclassified 31/07/2013 1 Agenda An Alternative Approach to Cost and Schedule Integration BAE Systems Commercial Estimating

More information

CAL FIRE RFP 7CA02043 Helicopter Study Questions and Answers May 10, 2013

CAL FIRE RFP 7CA02043 Helicopter Study Questions and Answers May 10, 2013 CAL FIRE RFP 7CA02043 Helicopter Study Questions and Answers May 10, 2013 Question 1: In order to develop a helicopter study that provides aircraft options that are feasible for CAL FIRE, can you share

More information

Five-Day Schedule and Course Content

Five-Day Schedule and Course Content Five-Day Schedule and Course Content The following sequence is suggested to balance out the material over five sessions. Note that Chapter 10 is placed with Chapters 12 and 13 on Day 5. DAY 1 DAY 1 Course

More information

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012 PacifiCorp Utah All Source Request for Proposal 2016 Resource Issued January 6, 2012 Responses May 9, 2012 TABLE OF CONTENTS Page SECTION 1. INTRODUCTION... 7 SECTION 2. RESOURCE ALTERNATIVES AND PROPOSAL

More information

3.11. Real Estate Services. Chapter 3 Section. 1.0 Summary. Ministry of Infrastructure

3.11. Real Estate Services. Chapter 3 Section. 1.0 Summary. Ministry of Infrastructure Chapter 3 Section 3.11 Ministry of Infrastructure Real Estate Services Chapter 3 VFM Section 3.11 1.0 Summary The Ontario Infrastructure and Lands Corporation (Infrastructure Ontario) is a Crown agency

More information

Kent County Performance Management Journey

Kent County Performance Management Journey Kent County Performance Management Journey Kent County Performance Management Journey Performance Excellence Culture 3 1997: Counting Things 1 2 2008: Migrated to Outcomes Strategic Vision 2020 Kent County

More information