Retro-Commissioning Draft Impact Evaluation Plan
|
|
- Ashley Dalton
- 6 years ago
- Views:
Transcription
1 Prepared by SBW Consulting, Inc. PWP, Inc. For the California Public Utilities Commission December 19, 2007
2 TABLE OF CONTENTS EXECUTIVE SUMMARY PROGRAMS EVALUATED EVALUATOR CONTACT INFORMATION INTRODUCTION AND OVERVIEW OF THE EVALUATION APPROACH Overview of the Evaluation Effort Goal of the Evaluation Sample Design Site Specific Evaluation Methods Evaluation products Researchable Issues Evaluation Protocols Applicable DESCRIPTION OF PROGRAMS AND EVALUATION ORGANIZATION General Overview of Type of Programs Included in the Plan Program-Specific Program Descriptions and Summary Program Theories PGE2056 Monitoring-Based Persistence Commissioning (MBPCx) PGE2070 Data Center Cooling Controls Program (DCCCP) PGE2071 Hospitality Energy Efficiency Program (HEEP) PGE2072 Hospital Pilot Program (HPP) PGE2090 Airflow/Fume Hood Control Systems Re-Commissioning PGE2091 Services and Incentives PGE2094 Macy s Comprehensive Energy Management Program (MCEMP) SCE2508 (RCx) SCG3528 Joint SCE Program SDGE3027 Program (RCx) Evaluation Type and Rigor Assignments VERIFICATION PLAN EVALUATION METHODOLOGY: TASKS, STEPS AND ACTIVITIES Baseline Assessment Gross Energy (kwh and Therm) Assessment Protocol-guided direct impact methodology Protocol-guided indirect impact methodology Spillover methodology SBW Consulting, Inc. 2 December 19, 2007
3 Program-Level Gross Impacts Effective Useful Life Gross Peak Demand (kw) Assessment Up-Dating Energy Savings Goals Overall Measurement and Verification (M&V) Plan Independent Evaluator Developed Definitions of Participant and Non-Participant Net-To-Gross (Net of Free-Riders) Assessment Participant Spillover Reliability, Bias and Uncertainty Sampling Plan Data Requests EVALUATION COORDINATION EFFORTS The CPUC s Market Effects Evaluation DEER Up-Date Data Needs Inter-Contract Group Coordination Early Feedback to IOUs Feedback on Key Verification and Evaluation Findings Feedback on Data Collection Approach and Instrumentation EVALUATION TIMELINE EVALUATION WORKPLAN AND BUDGET Workplan Conduct Project Initiation Meetings and Conduct Initial Data Collection Develop Final Evaluation Plan Develop Detailed Procedures and Handbook Develop Program Database Sample Selection Conduct Pretests and Finalize Data Collection Instrument Data Collection Review of Ex-Ante Savings Estimates Ex Post Gross and Net Savings Estimates Project-specific Reports Program-Level Estimates of Gross and Net Savings Evaluation Report Budget SBW Consulting, Inc. 3 December 19, 2007
4 Appendix A: Key Terms Appendix B: Project-Specific Evaluation Plan Template Appendix C: Project-Specific Evaluation Report Template SBW Consulting, Inc. 4 December 19, 2007
5 EXECUTIVE SUMMARY This plan describes how we will evaluate kwh, kw and therm impacts of the Retro- Commissioning (RCx) programs. Collectively, the four IOUs and their contractors are operating ten RCx programs that strive to improve the energy performance of existing plant and equipment for participating customers. They all assist participants via investigations (audits or performance assessments) that identify opportunities for improving the operations or maintenance of existing assets, and provide incentives to reduce the barriers to adopting the program s recommendations. Many provide other forms of educational and training support for the participants. In some cases, these programs also identify opportunities for conventional retrofit technologies, such as high efficiency chillers or new control systems, and either provide incentives directly to motivate adoption or refer customers to other efficiency programs. A number of the programs serve small specialized markets such as Data Centers or target specific end uses, such as fume hoods. One program from each IOU serves a broad market and deals broadly with the energy end uses found at participating sites The total estimated budget for this evaluation, less contingency, is $2,370,101. The following programs will be covered by this evaluation: Monitoring-Based Persistence Commissioning (PGE2056) is a third party program operated by Enovity that combines RCx services (audits and implementation support) with ongoing monitoring to improve savings persistence for a wide variety of improvements implemented by large public and private sector facilities. Data Centers (PGE2070) is a third party program operated by QuEST that intends to improve energy efficiency at up to 40 data center and server farm facilities. The program helps customers implement cooling system energy efficiency improvements by providing audits, installation services and staff training. Hospitality Energy Efficiency Program (PGE2071) is a third party program operated by QuEST that intends to improve energy efficiency for approximately 35 hotel properties. The program provides audits, engineering and design support, and third party financing. In addition, the program will evaluate demand response opportunities. Hospitals Pilot (PGE2072) is a third party program operated by QuEST. The program plans to serve approximately 12 hospitals with detailed analysis of their energy systems, identification of efficiency measures, assistance with implementing these measures and operator training. In addition, the program will evaluate demand response opportunities. Airflow and Fume Hood Control Systems Re-Commissioning (PGE2090) is a third party program operated by Newmatic Engineering (NE). The program intends to optimize energy efficiency for laboratory fume hoods through audits, implementation support, and monitoring and verification services Retrocommissioning Services and Incentives Program (PGE2091) is a third party program operated by Portland Energy Conservation, Inc. (PECI). The program targets its SBW Consulting, Inc. 5 December 19, 2007
6 services to buildings that have a high potential for savings. Services include audits, implementation support and training. Macy s Comprehensive Energy Management (PGE2094) is a third party program operated by QuEST to deliver energy efficiency services to approximately nine Macy s retail stores. The program provides audits, implementation support, staff training and plans for periodic maintenance. Retro-commissioning (SCE2508) is a local program operated by SCE designed to serve buildings. PECI is the primary contractor, responsible for day-to-day program operations. The program targets buildings with high potential for savings. Services include audits, implementation support and operator training. Recommended retrofit measures are referred to other utility programs. Retro-commissioning Partnership with Southern California Edison (SCG3528) is a local program operated by SCG which works through SCE2508. The program provides funding for gas efficiency improvements implemented by SCG customers that are participating in the SCE program. Retro-commissioning Program (SDGE3027) is a local program operated by SDG&E. PECI is the primary contractor responsible for day-to-day program operations. The program targets buildings with high potential for savings. Services include audits, implementation support and operator training. Recommended retrofit measures are referred to other utility programs. To estimate gross impacts for each of these programs, we will study a stratified random sample drawn from each program s list of participants. In total a sample size of 84 is proposed out of an expected population of 382 projects, across all ten programs. Projects will be sampled as they reach the stage where the program has developed estimates of the likely savings, but prior to work commencing on improvements. This will allow us to collect data both before and after improvements are implemented. Project-specific Measurement and Verification (M&V) plans will be prepared for each participant that will specify the pre and post data to be collected via on-site inspections, operator interviews, and key parameter data logging from customer control systems or special metering installed by the evaluation team. The plan for each project will also specify the engineering methods to be used in estimating gross savings for each of the measures that comprise the project. Gross impacts will be estimated by implementing the data collection and analysis described in the M&V plans. Indirect (measures recommended by the program but implemented without an incentive) and spillover (measures implemented as a result of education or training provided by the program, but not specifically recommended by the program) measures will also be covered by these project-specific M&V plans. In addition, there will be a sample for estimating net impacts, via self-report methods. This sample will conform to the Protocols requirement for 300 sample points or a census. As none of these programs is expected to exceed 300 projects, this sample will be a census for all programs. Detailed telephone or in-person interviews will be conducted with decision-makers, building SBW Consulting, Inc. 6 December 19, 2007
7 operators, and vendors associated with each project to provide the data needed to estimate net savings. Impact evaluations serve many purposes including improving the programs, supporting the costeffectiveness analyses, providing data for future programs and strategic planning, and helping to determine share-holder incentives/penalties in California. With finite resources, this plan has been developed to reflect the highest priority uses of evaluation, which involve providing adjustments to the gross savings claimed by the utilities, the net savings after accounting for freeridership (through self-reported surveys), and information essential to valuing the savings, such as the annual load shapes of the savings. In addition to the primary goal of program level evaluation, the evaluation may also provide supporting data for (1) a study of incremental costs, (2) a series of Market Effects studies, (3) participant spillover, (4) potential inputs to measure life studies, and (5) other efforts as needed and requested to support the shareholder incentive process. Because many of the above priorities are best met by producing data at the measure or end use level, our contract group will focus the limited evaluation resources on detailed project-specific field data collection and analysis. The following table summarizes the data collection approach that is currently planned for this contact group. Table ES 1: Measure Level Efforts Programs with Key Measures Measure / End-use Sector/ Area Sample Sizes Measurement Techniques Energy Measurement for 8760/DEER kw Retrocommissioning (RCx) PGE2056 PGE2070 PGE2071 PGE2072 PGE2090 PGE2091 PGE2094 SCE2508 SCG3528 SDGE3027 HVAC and other Key Energy Systems Non Residential 84 participants Project-Specific M&V plans with pre and post data collected as needed from on-site inspections, operator interviews and key parameter data logging via customer control systems or special metering installed by evaluation team. Project-Specific engineering models used to estimate load shape and kw impacts of RCx measures. SBW Consulting, Inc. 7 December 19, 2007
8 1. PROGRAMS EVALUATED This plan describes how the following programs will be evaluated. Table 1: Programs to be Evaluated Utility Program ID Program Name PGE PGE2056 Monitoring-Based Persistence Commissioning PGE PGE2070 Data Centers PGE PGE2071 Hospitality Energy Efficiency Program PGE PGE2072 Hospitals Pilot PGE PGE2090 Airflow and Fume Hood Control Systems Re-Commissioning PGE PGE2091 Retrocommissioning Services and Incentives Program PGE PGE2094 Macy s Comprehensive Energy Management SCE SCE2508 Retro-commissioning SCG SCG3528 Retro-commissioning Partnership with Southern California Edison SDGE SDGE3027 Retro-commissioning Program 2. EVALUATOR CONTACT INFORMATION Following is contact information for the key staff that assisted in developing this plan. Table 2: Key Evaluation Planning Staff Firm Topic Area Lead Staff Phone Number SBW Overall research design Michael mbaker@sbwconsulting.com Baker Gross savings analysis Bing Tso btso@sbwconsulting.com PWP Sampling and program Phil philwillems@comcast.net estimates Willems Net-to-gross Phil philwillems@comcast.net Willems Spillover Phil philwillems@comcast.net Willems Itron Uncertainty Mike Rufo Mike.rufo@itron.com 3. INTRODUCTION AND OVERVIEW OF THE EVALUATION APPROACH 3.1. Overview of the Evaluation Effort Goal of the Evaluation This plan describes how we will evaluate kwh, kw and therm impacts of the Retro- Commissioning (RCx) programs. RCx is the expert and systematic evaluation of HVAC, lighting and some process systems with an emphasis on low-cost solutions easily implemented in the SBW Consulting, Inc. 8 December 19, 2007
9 course of the RCx process. Collectively, the four IOUs are operating ten RCx programs that strive to improve the energy performance of existing plant and equipment for participating customers. These RCx programs all assist participants via investigations (audits or performance assessments) that identify opportunities for improving the operations or maintenance of existing assets, and provide incentives to reduce the barriers to adopting the program s recommendations. Many provide other forms of educational and training support for the participants. In some cases, these programs also identify opportunities for conventional retrofit technologies, such as high efficiency chillers or new control systems, and either provide incentives directly to motivate adoption or refer customers to other efficiency programs. A number of the programs serve small specialized markets such as Data Centers or target specific end uses, such as fume hoods. One program from each IOU serves a broad market and deals broadly with the energy end uses found at participating sites Sample Design To estimate gross impacts, we propose to select stratified random samples of participants, with stratification based on our best estimate of likely savings from each project, which will represent separately each of the ten programs. In total a sample size of 84 is proposed out of an expected population of 382 projects. Projects will be sampled as they reach the stage where the program has developed estimates of the likely savings, but prior to work commencing on improvements. This will allow for both pre and post improvement data collection. In addition, there will be a sample for estimating net impacts. This sample will conform to the Protocols requirement for 300 sample points or a census. As none of these programs is expected to exceed 300 projects, this sample will be a census for all programs Site Specific Evaluation Methods Baseline. These programs provide customized treatment for each sampled project. For each project, we will review available baseline data provided by the program. As necessary, we will collect additional baseline data, from visual inspection of affected systems, one-time measurements, short-term trend logging (customer control system trend logs or special metering), manufacturers specifications, and self-reports from building operators and tenants. Gross Savings. A site-specific M&V plan will be prepared for all measures (direct, indirect and spillover) associated with each of the sampled RCx projects. These plans will document the data collection and analysis methods used by the IOU in preparing the ex ante savings (kwh, kw and therms) estimates. The plan will also document the data collection and analysis methods that will be used by the evaluation team to prepare the ex post savings (kwh, kw and therms) savings estimates. These plans will be implemented, resulting in ex post savings estimates for each project. Net Savings. We will implement three levels of free-ridership analysis. The most detailed level of analysis, Standard Very Large Project NTG, will be applied to the largest projects in the gross impact sample. Standard NTG with a less detailed level of data collection and analysis will be applied to all remaining projects in the Gross Impact sample. The least detailed analysis, Basic NTG, which is the level of rigor specified for all the programs in this contract group, will be applied to all remaining projects (those that are not in the gross impact sample, as the net impact sample is larger than the gross impact sample). SBW Consulting, Inc. 9 December 19, 2007
10 Evaluation products The protocol-guided direct and indirect project-specific evaluations will provide an estimate of gross savings for each sample project. Our free-rider 1 data collection and analysis will also provide an estimate of net to gross ratio for each project, and subsequently an estimate of net savings. Overall kwh, kw and therm savings both net and gross will be estimated for the population of participants in each program and by utility using appropriate sample estimation methods. These findings, along with a full description of our methodology will be documented and presented to the CPUC Researchable Issues This evaluation is designed to address several research issues, as described below. Gross savings realized by RCx programs. This evaluation will produce estimates of gross savings 2 achieved from the programs in the RCx contract group that are consistent with the California Evaluation Protocols and the International Performance Measurement and Verification Protocol (IPMVP). The sample of projects that are analyzed in this evaluation will be carefully selected to be representative of the program populations so that the evaluation will produce accurate program level estimates of gross savings. The gross impact estimates for sampled projects will be based on field inspections and preretrofit and post-retrofit measurements so that they accurately reflect the gross savings achieved. The estimation of gross savings is a high priority issue to be addressed by the evaluation. The effects of free-ridership on the net savings from RCx programs. This evaluation will also produce estimates of net savings 3 achieved from the programs in the RCx contract group that are consistent with the California Evaluation Protocols and reflect the recent efforts of the MECT lead cross-contract workgroup on this topic. The estimation of net savings is a high priority issue to be addressed by the evaluation. The cost-effectiveness of RCx programs. The accurate estimates of gross and net savings will provide valuable inputs to the calculation of program cost-effectiveness (Total Resource Cost). Separate savings estimates will be produced for each of the programs, so that cost-effectiveness can be assessed by the IOUs at the individual program level. In addition, this evaluation will include a study of RCx Effective Useful Life (Section 6.2.5) that will further improve the estimates of cost-effectiveness. The value of the results from this impact evaluation in supporting other efforts of interest to the CPUC, such as DEER database development and the market effects evaluation. The primary purpose of this evaluation is to produce program level estimates of gross and net savings. However, within reasonable limits, the evaluation can also 1 A program participant who would have implemented the recommended program measure or practice in the absence of the incentives, audits or technical assistance offered as part of the program being evaluated. 2 The change in energy consumption and peak demand that results directly from program-related actions taken by program participants, regardless of why they participated. The change in energy consumption is calculated as the difference between annual energy consumption with the installed program measure and baseline energy consumption. 3 The change in energy consumption and peak demand that accounts for program influenced free-ridership. It is calculated by applying the net-to-gross ratio to the gross savings. SBW Consulting, Inc. 10 December 19, 2007
11 support other activities of interest to the CPUC. For example, the results might be used in forming normalized estimates of RCx impacts for various types of buildings that could be incorporated into the DEER database. Similar site-specific NTGR (net to gross ratio) data and other important site level data could be made available to the market effects evaluation contractor to support the needs of that evaluation, or used in revising the default NTGR table used by the CPUC and the IOUs in planning new programs. This is a lower priority issue for the evaluation. The presence of spillover from programs of this type and the significance of the savings generated from spillover measures. The scope of this evaluation includes an explicit analysis of energy and peak demand savings from spillover 4 measures. For spillover measures with significant savings the evaluation will produce gross savings estimates that are compliant with the California Evaluation Protocols and the International Performance Measurement and Verification Protocol (IPMVP). This information will be useful input to an assessment of the spillover effect across the portfolios of the IOUs Evaluation Protocols Applicable The MECT/CPUC specified the evaluation type and rigor levels for these RCx programs either in the RFP or in subsequent guidance. Rigor levels were assigned for energy savings, demand savings, Net-to-Gross (NTG) and Indirect impacts. As shown in Table 4, we propose some changes be made to the assigned evaluation types and rigor levels. First, we propose that all programs be assigned the protocol-guided direct impact evaluation type. This evaluation type is appropriate because these programs implement complex, controlsintensive changes to complex buildings and systems. Custom engineering analysis of savings is required to understand the impact of the program on participating facilities. Such projects do not lend themselves to a simplified verification-guided analysis. Second, we propose that all gross kwh savings estimates have enhanced rigor. Accurate estimation of RCx savings require measured data from pre and post configurations of affected systems. This is fundamentally consistent with IPMVP Option B and thus is consistent with enhanced gross savings impact rigor. Most of the RCx programs had been assigned basic kw rigor. We proposed that these be changed to enhanced to be consistent with the treatment of gross kwh savings. We believe this is appropriate as it is consistent with their expected treatment with Option B. Net rigor was set to basic. RCx tends to target large savings per project and to be conducted in the context of large and complex organizations and facilities. The cross-cutting workgroup dealing with large non-residential NTG issues has recently developed a new NTG rigor 4 Any non-rebated measure implemented during the program cycle that the customer attributes to participation in the program (including audits, education, and training) but that was not specifically recommended. The scope of spillover is determined by the knowledge and influence of the decision maker. Spillover applies to measures installed at the same site as direct or indirect measures and at other facilities of the customer located in the IOU service areas. SBW Consulting, Inc. 11 December 19, 2007
12 designated Standard Very Large. We recommend that this be used for all RCx projects in our gross saving sample with large savings, as it allow us to tell the full story behind each organization s decision to proceed with RCx recommendations and the role that the programs play in the causing the work to occur. For the rest of the impact sample we will apply Standard rigor to NTG, while for that portion of the NTG sample that is not part of the gross savings sample we propose that NTG basic rigor be applied in order to control the cost of these evaluations while still complying with the NTG sampling guidelines in the protocols. 4. DESCRIPTION OF PROGRAMS AND EVALUATION ORGANIZATION 4.1. General Overview of Type of Programs Included in the Plan This impact evaluation is being conducted for the ten RCx programs that were grouped by the MECT/CPUC under the contract group called. Each of the four IOUs offer one or more of these programs. These programs range from small 3 rd party programs dealing with very specific market segments and technologies, e.g, specific control strategies at Data Centers, to those which address many types of performance problems for a broad range of non-residential buildings and are operated as IOU Local Programs. As shown in Table 3, budgets range from less than one million dollars to near 12 million dollars. Even though these programs as a group are a small portion of the overall IOU portfolio budgets, they represent a dramatic increase in level of commitment in California to RCx programs. In fact, given the dramatic increase in spending represented by these programs and the highly specialized nature of the engineering skills needed to complete successful RCx programs, there is a legitimate concern that there may not be sufficient engineering talent available to deliver high quality services to all of the participants. This is primarily a question to be addressed by the IOU s process evaluations, however, if proven true; the effects of such a talent shortage may be experienced directly in reduced gross and net impacts of the programs. Further, RCx as a separate and distinct engineering practice specialty is a relatively new concept, having only taken hold in the last five years. This is especially true for the form of RCx promoted by these programs which is focused on energy savings as opposed to the broader, more well established practice of whole building commissioning that seeks to rectify all substantial deficiencies in building performance regardless of whether they have energy impacts. Again, the question of whether these RCx services are being provided in a fashion consistent with a well established engineering specialty is a question to be addressed by the IOU process evaluations, but as we explore the energy impacts of these programs we will be looking for any factors that explain poor results, and this may be among them Program-Specific Program Descriptions and Summary Program Theories This section provides a brief description of each of the programs in the contract group. The table below summarizes the three-year budget and savings goals for each of these programs, and the progress toward these goals from the IOU s September Monthly Report. In general, at this time, most of the IOU program managers feel the programs are on track with their respective implementation plans, even though all except one have not yet completed and paid for any projects. Based on our prior experience with similar programs it is not unusual for SBW Consulting, Inc. 12 December 19, 2007
13 project implementation to take a substantial period of time following the RCx investigation and the delivery of recommendations to participating customers. This is consistent with a finding that few or no project completions have yet occurred, especially if some of these programs did not start until late in In general, these RCx programs strive to improve the energy performance of existing plant and equipment for participating customers. However, most of them conduct investigations (audit or performance assessments) that identify opportunities for improving the operations or maintenance of existing assets, and in addition, they identify opportunities for replacing or adding new equipment, i.e., capital measures. In some cases, capital measures, such as the installation of variable speed motor drives are required if the building is to implement new strategies for controlling important systems. These rightly belong within the definition of RCx activities. Other capital improvements, for example more efficient motors or new lighting fixtures, rightly belong in the domain of more conventional retrofit programs (programs that provide incentives to reduce the cost of adding or replacing equipment). These RCx programs take different approaches to handling non-rcx capital improvements. In some cases, to reduce the transaction costs for the participants the program helps them implement all identified measures. In other cases, the participant is referred to another retrofit program. To the extent possible, we will attempt to isolate the impact of these non-rcx measures in our impact analysis for each of these programs. Table 3: September Status of Programs Spent / Installed as of 3-Year Budget and Net Savings September 2007 ID Program Name $ kw MWh Therm $ kw kwh Therm PGE2056 Monitoring-Based Persistence Commissioning 1,623, ,320 96,000 22% 0% 0% 0% PGE2070 Data Centers 1,800, ,384-25% 0% 0% 0% PGE2071 Hospitality Energy 2,772,521 1,965 9,689-12% 0% 0% 0% Efficiency Program PGE2072 Hospitals Pilot 2,352, , ,000 21% 0% 0% 0% PGE2090 Airflow and Fume 3,150,000 1,370 12, ,000 15% 0% 0% 0% Hood Control Systems Re-Commissioning PGE2091 Retrocommissioning 7,890,750 5,500 28, ,590 13% 0% 0% 0% Services and Incentives Program PGE2094 Macy s 2,578, ,271 61,600 2% 0% 0% 0% Comprehensive Energy Management SCE2508 Retro-commissioning 11,626,203 9,600 39,040-18% 3% 3% NA SCG3528 Retro-commissioning 147, ,000 1% NA NA 0% Partnership with SCE SDGE3027 Retro-commissioning Program 3,184,267 2,496 2, ,168 19% 0% 0% 0% All All 37,125,235 24, ,134,577 1,456,358 16% 1% 1% 0% SBW Consulting, Inc. 13 December 19, 2007
14 There are characteristics common to all large commercial-type buildings that provide the basis for the ten RCx programs. All building systems exhibit degraded performance over time, often undetected. Equipment fails or significantly degrades, control sequences and settings are temporarily changed then forgotten, maintenance is deferred or problems with original design and/or installation exist undetected for years. RCx is the expert and systematic evaluation of HVAC, lighting and some process systems with an emphasis on low-cost solutions easily implemented in the course of the RCx process. Further details about the specific operation and theory of these ten programs is provided below PGE2056 Monitoring-Based Persistence Commissioning (MBPCx) MBPCx is a third party program operated by Enovity that combines traditional RCx activities with ongoing monitoring to improve savings persistence. The program begins with 70 potential sites and after a two-stage screening process, ultimately completes approximately 13 projects. Project sites may include a wide variety of large public and private sector facilities, all with good potential for reducing energy use. MBPCx initially focuses on low-cost improvements and optimization of the building systems. A detailed engineering study quantifies savings attributed to fixes done in the investigation phase, recommends additional operation and maintenance improvements and capital retrofit measures. Enovity, at the customer s discretion, can proceed with installation of capital measures, providing turnkey service. Additional program benefits include building operator training, improvements in system documentation and system monitoring. Long-term monitoring capability is achieved through a diagnostic and tracking software system, PACRAT. This software program increases long-term savings persistence through data mining, analysis and reporting features utilizing the infrastructure provided by the existing building automation system. PACRAT identifies control strategies not performing optimally and equipment performance anomalies. Program theory: In addition to the General RCx program theory (above) the MBPCx program adds the benefit of maintaining the accrued energy savings over time through the installation of the PACRAT monitoring and feedback system. Progress to date toward goals: The PGE narrative for Q reports the program is on target to achieve savings goals PGE2070 Data Center Cooling Controls Program (DCCCP) DCCCP is a third party program operated by QuEST. The project will improve energy efficiency at up to 40 data center and server farm facilities. The program begins with a comprehensive auditing process. Based on audit results and recommendations, cooling system energy efficiency retrofits can be implemented to, for example, increase the precision of cooling system controls through addition of wireless temperature sensors or to add speed control to cooling unit fans. There is an emphasis on implementing measures which will not disrupt facility operations. QuEST, at the customer s discretion, can provide turnkey service from auditing through installation and staff training. Program funds are used to buy measure costs down to a one year payback SBW Consulting, Inc. 14 December 19, 2007
15 Program theory: Data centers are energy intensive, 24/7 operations that present significant opportunities for energy efficiency improvements. Parts of PG&E s service territory are a targetrich environment for data centers and server farms. Marketing efforts are leveraged by concentrating on organizations with multiple facilities. The program design anticipates known barriers to marketing energy efficiency services to this sector by offering full turnkey services including EEM design, bid specifications, installation and construction management as it suits the customer s needs. Progress to date toward goals: The PGE narrative for Q reports the program is on target to achieve savings goals PGE2071 Hospitality Energy Efficiency Program (HEEP) HEEP is a third party program operated by QuEST to improve energy efficiency at hotel properties and plans to serve approximately 35 buildings. The program begins with a comprehensive audit of building HVAC systems, identification of low-cost energy efficiency measures and deferred maintenance items which must be completed prior to moving to the next phase. Engineering and Design Activities are the next step, where RCx activities are conducted with low-cost measures immediately implemented by QuEST, a list is developed of additional RCx activities with cost and savings estimates and an EEM list is developed with detailed financial analysis and specifications. Third party financing is available to help mitigate any remaining financial barriers. Demand response opportunities are addressed with estimated savings and costs. Measures are selected by the owner for the Implementation stage. QuEST can provide full turnkey service for final implementation or assist the owner and their contractor through project completion and inspection. Program theory: The marketing effort is focused on large chains that manage their own properties and is designed to address and overcome known barriers to working with hospitality sector, e.g., limited staff availability, stiff competition for limited budget dollars and, occasionally, diffuse management/owner structures which complicate the decision-making process. Early adopters will receive public recognition for their efforts, hopefully generating interest among other owners. Progress to date toward goals: The PGE narrative for Q reports the program is falling short of expectations resulting from lack of interest by the larger hotel chains PGE2072 Hospital Pilot Program (HPP) HPP is a third party program operated by QuEST. The program plans to serve approximately 12 hospitals. HHP is implemented in four phases. Phase I includes analysis of facility energy use, building systems inspection and identification of low-cost energy efficiency measures (EEMs). Deferred maintenance items identified in the inspection must be completed by the owner prior to moving to the second phase. Additional areas for investigation and specific EEMs are detailed for follow up in Phase II. Phase II is a targeted investigation of promising areas identified in the first phase for the development of a detailed EEM list including itemized cost-benefit analysis. The third phase, Implementation, is a joint effort with facility staff and QuEST personnel to complete RCx activities and install EEMs. The fourth phase, the Hand-off, involves a final asbuilt calculation of measure savings, documentation and staff training to help maintain measure SBW Consulting, Inc. 15 December 19, 2007
16 savings persistence. The program also features a component where demand response opportunities are evaluated. Program theory: Hospitals are energy intensive facilities presenting significant opportunities for energy conservation. Marketing activities are leveraged by targeting organizations with multiple facilities. HPP offers a comprehensive array of services to best meet the variety of needs presented by individual facilities. To allocate program resources most efficiently, owners must demonstrate commitment by correcting all maintenance deficiencies noted in the Phase I inspection before proceeding to subsequent phases. Progress to date toward goals: The PGE narrative for Q reports the program is on target to achieve savings goals PGE2090 Airflow/Fume Hood Control Systems Re-Commissioning The program is marketed under the title Lab-RCx. It is a third party program operated by Newmatic Engineering (NE). The program is a comprehensive suite of engineered options to optimize energy efficiency in laboratories through RCx activities focusing on controls (constant air volume to variable volume), installation of usage-based controls, air change rate reductions and static pressure setpoint reductions. A detailed audit will be conducted in participating labs, resulting in a list of RCx activities and capital EEMs, estimated savings, costs and incentives. The owner will select the measures for implementation. NE, or another installation contractor, will proceed with the implementation phase. NE will provide quality assurance support, inspection, monitoring and verification services. Program theory: Laboratories use a great deal of single-pass outside air, often requiring heating and/or cooling, which presents big opportunities for energy efficiency improvements. Lab administrators tend to be focused on the activities within the lab and are frequently unaware of best practices which reduce energy use. The program seeks to establish a long-term awareness in the laboratory-operating community of the benefits of bringing specialized technical expertise into the facility to conduct RCx. Progress to date toward goals: The PGE narrative for Q reports the program is on target to achieve savings goals PGE2091 Services and Incentives This is a third party program operated by Portland Energy Conservation Inc. (PECI). The program strategy includes a careful screening process to assure that selected buildings have a high potential for realizable savings. The owner selects a RCx service provider from a prescreened list. The RCx provider conducts a comprehensive onsite investigation and analysis of building equipment and operations, identifying deficiencies and operational improvement opportunities. The results are summarized in a report with estimated cost, savings and incentives. PECI reviews the findings with the owner. The owner approves the final implementation list and selects a contractor. The contractor may be the RCx provider, another contractor or in-house staff. The RCx provider provides a final report summarizing all improvements to the facility. Documentation and training are provided for all implemented measures. SBW Consulting, Inc. 16 December 19, 2007
17 Program theory: The program is designed to overcome a common barrier to participation, which is the reluctance to engage with an unfamiliar service with an undefined outcome. PECI addresses this barrier through multiple marketing channels, e.g. in-person, professional organizations, conferences, phone, on-line, and frequent ongoing communication with the owners through the term of the project. Progress to date toward goals: The PGE narrative for Q reports the program is on target to achieve savings goals PGE2094 Macy s Comprehensive Energy Management Program (MCEMP) MCEMP is a third party program operated by QuEST to deliver comprehensive energy efficiency services to approximately nine Macy s retail stores in the PG&E service territory. The program begins with an Initial Analysis Phase, an audit followed by the delivery of a preliminary report detailing RCx and retrofit measures, along with identification of deferred maintenance items requiring correction before proceeding. Upon approval by Macy s staff, QuEST will proceed to the Detailed Investigation Phase, where a comprehensive energy study on the items approved by Macy s is completed. The study details RCx and capital retrofit measures with associated costs, savings and incentives. Project implementation commences with RCx activities and retrofit installation, as directed by the customer. QuEST provides technical support to Macy s staff through implementation by a third-party contractor, or provides construction services themselves. Staff training and periodic maintenance plans are provided at the end of the program to help maintain savings persistence. Program theory - This program builds on Macy s successful participation in earlier PG&E programs. The program is designed to overcome common market barriers with retail facilities, i.e., limited operations staff and budgets and lack of awareness of best practices in energy efficient operation and maintenance. The program takes an incremental approach to RCx and EEM development, requiring customer engagement and sign-off at each phase to ensure their commitment and to make the best use of program funds. Progress to date toward goals: The PGE narrative for Q reports the program is on target to achieve savings goals SCE2508 (RCx) This local program operated by SCE is designed to serve buildings. PECI is the primary contractor for SCE and is responsible for day-to-day program operations. The program strategy includes a careful screening process to assure that selected buildings have a high potential for realizable savings and that the building owners and operators have the motivation that will contribute to the success of the project. The owner selects a RCx service provider from a pre-qualified list and contracts directly with them. Incentive payments are made to the owner with the exception of the investigation scope and bid payment. After the investigation scope and bid, a customer with non-functioning equipment is required to make repairs necessary to allow the RCx services to be performed. The RCx provider then completes the investigation, helps the facility staff select measures for implementation, provides technical support for the owner and sets up an energy performance tracking system. Documentation and monitoring requirements SBW Consulting, Inc. 17 December 19, 2007
18 and staff RCx training ensure the program delivers persistence of savings in a cost-effective manner. Recommended retrofit measures are referred to applicable utility programs. Program theory: The program seeks to address and overcome a number of significant market barriers to customer participation in RCx programs through targeted marketing, frequently through existing business relationships. The program is supported by a web page with marketing materials, program requirements and protocols, case studies and RCx resources for owners and operators. Persistence of savings is a key goal of the program. Best practice tracking systems and monitoring and verification methodologies are implemented. Documentation and monitoring requirements ensure the program delivers persistence of savings in a cost-effective manner. Progress to date toward goals: The SCE narrative for Q reports the program is falling short of expectations due to numerous marketing and implementation challenges. The narrative provided a detailed list defining problems and potential solutions SCG3528 Joint SCE Program This is a local program operated by SCG which works through SCE s RCx program. Please refer to program description SCE2508 (RCx). SCE customers with SCG natural gas will receive funding support for natural gas related RCx efforts. Program theory: SCG has leveraged the resources of SCE s RCx program to provide a comprehensive RCx service to their joint customers. The relatively modest budget reflects this is a pilot-like effort to test the viability of the approach in the program cycle. Progress to date toward goals: The SCG narrative for Q reports the program is on target to achieve savings goals SDGE3027 Program (RCx) This is a local program operated by SDG&E. PECI is the primary contractor for SDG&E and is responsible for day-to-day program operations. The program strategy includes a screening process to assure that selected buildings have a high potential for realizable savings and demand response potential. The program selects a RCx service provider with skills best matching the customer s facility and sets the incentive for the investigation phase. The provider develops a scope of work which is the basis for the contract between the provider and the program. The customer is required to repair non-functioning equipment and perform maintenance activities necessary to performance of the RCx services. The RCx provider conducts the investigation and documents the results, including a cost-benefit analysis by measure. The report is submitted to the program for review and incentive calculation for measures selected for implementation. Selected RCx measures center on operational improvements with short paybacks. Major retrofit and demand response opportunities are referred to the appropriate utility programs for implementation. The RCx provider will oversee the implementation phase and verify postproject savings. At the owner s discretion, the measures may be implemented by in-house staff, another contactor, the RCx provider or a combination of these. Program theory: The program incorporates flexibility into the design to accommodate individual customer requirements. New approaches can be incorporated to continuously improve program SBW Consulting, Inc. 18 December 19, 2007
19 performance. Maintaining the energy savings over time is a key program goal. Strategies employed to ensure long-term savings persistence are a combination of documentation, training and system/building performance tracking to support ongoing measurement and verification. Progress to date toward goals: The SDGE (via PECI) narrative for Q reports the program is falling short of expectations but anticipates being on track by the end of Q Evaluation Type and Rigor Assignments Table 4 shows our proposed evaluation type and rigor assignments for each of the RCx programs. This table also notes the RCx programs that have been added to this group since the RFP and for which we have proposed changes. First, we propose that all programs be assigned the protocol-guided direct impact evaluation type. This evaluation type is appropriate because these programs implement complex, controlsintensive changes to complex buildings and systems. Custom engineering analysis of savings is required to understand the impact of the program on participating facilities. Such projects do not lend themselves to a simplified verification-guided analysis. Second, we proposed that all gross energy savings estimates have enhanced rigor. Accurate estimation of RCx energy savings require measured data from pre and post configurations of affected systems. This is fundamentally consistent with IPMVP Option B and thus is consistent with enhanced gross energy savings impact rigor. Most of the RCx programs had been assigned basic demand rigor. We propose that this be changed to enhanced Rigor, consistent with their expected treatment with Option B. Although Option B will be applied to all RCx projects, we propose to apply it in a cost-effective and strategic fashion. The level of detail in the pre and post investigation will vary depending on the expected size of the savings from the various specific actions recommended by the program to each participant. RCx programs are unusual, as they can provide many specific recommendations to a participant. Some of these may involve expensive and complex interventions for large systems within a building. Others may be important, but minor and immediate repairs, e.g., replacing filters for a critical fan or changing the position of a pressure rake or temperature sensor. We will group actions into significant measure groups that are amenable to impact modeling. Across these measure groups we will apply our engineering resources in a strategic fashion so that we minimize the overall uncertainty in our estimate of the impact on each participant. This may mean for some minor measure groups that we will do little more than inspect and verify that the changes have occurred and largely accept the program s estimate of the small savings that have accrued. For the measure groups with large savings, we will devote significant measurement and analytic resources to the examination of both pre and post performance and the resultant savings. Programs assigned an energy impact Rigor of enhanced are expected to achieve 90/10 level of precision as specified in the sampling protocols. However, given the number of RCx programs and the budget assigned to this contract group, it will not be possible to reach this level of sampling precision. To achieve 90/10, it would be necessary to reduce dramatically the engineering effort devoted to each sampled project. This would inevitably lead to much high SBW Consulting, Inc. 19 December 19, 2007
2013 Custom Impact Evaluation Industrial, Agricultural, and Large Commercial
Final Report 2013 Custom Impact Evaluation Industrial, Agricultural, and Large Commercial Submitted to: California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102 Submitted by:
More information2016 Statewide Retrocommissioning Policy & Procedures Manual
2016 Statewide Retrocommissioning Policy & Procedures Manual Version 1.0 Effective Date: July 19, 2016 Utility Administrators: Pacific Gas and Electric San Diego Gas & Electric Southern California Edison
More informationThird-Year Program Results for a Utility Recommissioning Program
Third-Year Program Results for a Utility Recommissioning Program Ellen Franconi, PhD, Martin Selch, Jim Bradford PhD, PE Nexant, Inc. Bill Gruen Xcel Energy Synopsis Xcel Energy offers the Recommissioning
More informationFIVE YEAR PLAN FOR ENERGY EFFICIENCY
FIVE YEAR PLAN FOR ENERGY EFFICIENCY Executive Summary Prepared for: Holy Cross Energy Navigant Consulting, Inc. 1375 Walnut Street Suite 200 Boulder, CO 80302 303.728.2500 www.navigant.com July 15, 2011
More informationEVALUATION, MEASUREMENT & VERIFICATION PLAN. For Hawaii Energy Conservation and Efficiency Programs. Program Year 2010 (July 1, 2010-June 30, 2011)
EVALUATION, MEASUREMENT & VERIFICATION PLAN For Hawaii Energy Conservation and Efficiency Programs Program Year 2010 (July 1, 2010-June 30, 2011) Activities, Priorities and Schedule 3 March 2011 James
More informationEvaluation, Measurement & Verification Framework for Washington
Evaluation, Measurement & Verification Framework for Washington Issued September 8, 2011 SOURCE DOCUMENTS Information used in the development of this document came from PacifiCorp practices and experience,
More informationExhibit DAS-1. Tucson Electric Power Company Demand-Side Management Program Portfolio Plan
Exhibit DAS-1 Tucson Electric Power Company Demand-Side Management Program Portfolio Plan 2008-2012 TABLE OF CONTENTS 1. Introduction...3 2. DSM Portfolio Performance Costs, Savings and Net Benefits...3
More informationSUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES.
25.181. Energy Efficiency Goal. (a) (b) (c) Purpose. The purposes of this section are to ensure that: (1) electric utilities administer energy savings incentive programs in a market-neutral, nondiscriminatory
More informationToronto Hydro Electric System Limited
Toronto Hydro Electric System Limited Draft Evaluation, Measurement and Verification Plan: Commercial, Institutional and Small Industrial Monitoring & Targeting ( M&T ) Submitted to: Ontario Energy Board
More informationIndustry Drivers of Commissioning: Programs & Legislation
Industry Drivers of Commissioning: Programs & Legislation Michael C. English, PE, CCP, LEED AP Senior Partner, Horizon Engineering Associates, LLP Randy Gunn Managing Director, Navigant George Malek, PE,
More informationBuilding Systems and Performance: an Introduction to Building Operator Certification Lesson 19: Energy Audits
Building Systems and Performance: an Introduction to Building Operator Certification Lesson 19: Energy Audits CUNY Institute for Urban Systems Building Performance Lab Introduction to Energy Audits 2 Topic
More informationProposition 39. Years 4, 5 and Beyond. Fall ACBO Conference October 25, 2016
Proposition 39 Years 4, 5 and Beyond Fall ACBO Conference October 25, 2016 JoAnn Higdon VP Administrative Services El Camino College Bob Bradshaw Manager Design & Construction El Camino College Lisa Hannaman
More informationBuilding Optimization Analysis (BOA) Tool Training
Building Optimization Analysis (BOA) Tool Training Dave Moser, Senior Engineer, PECI Michelle Lichtenfels, Program Manager, PECI September 8 and 13, 2010 Training Objectives Use the BOA Tool to calculate
More informationDouble Ratio Estimation: Friend or Foe?
Double Ratio Estimation: Friend or Foe? Jenna Bagnall-Reilly, West Hill Energy and Computing, Brattleboro, VT Kathryn Parlin, West Hill Energy and Computing, Brattleboro, VT ABSTRACT Double ratio estimation
More informationSOUTHERN CALIFORNIA GAS COMPANY LOW INCOME ASSISTANCE PROGRAMS & BUDGETS FOR PROGRAM YEARS (A )
QUESTION NCLC-SoCalGas-1-1: (Application p. 18, Attachment A-4) You provide the number of eligible and treated units broken down by single family versus multifamily and by owner versus renter for each
More informationLoad and Billing Impact Findings from California Residential Opt-in TOU Pilots
Load and Billing Impact Findings from California Residential Opt-in TOU Pilots Stephen George, Eric Bell, Aimee Savage, Nexant, San Francisco, CA ABSTRACT Three large investor owned utilities (IOUs) launched
More informationSTANDARD AND CUSTOM INCENTIVES PRE-APPROVAL AND FINAL APPLICATION FORM
PRE-APPROVAL AND FINAL APPLICATION FORM The ComEd Energy Efficiency Program offers incentives to help facilities save money by improving the efficiency of their equipment. Receive standard cash incentives
More informationFinancing or Incentives: Disentangling Attribution
Financing or Incentives: Disentangling Attribution Antje S. Flanders, Opinion Dynamics Corporation, Waltham, MA ABSTRACT Financing programs are getting more and more attention as program administrators
More informationENERGY EFFICIENCY POLICY MANUAL
ENERGY EFFICIENCY POLICY MANUAL Version 5 July 2013 Applicable to post-2012 Energy Efficiency Programs Table of Contents i. Introduction ii. Common Terms and Definitions iii. Reference Documents I. Energy
More informationEvaluation and Research Plan
2004 2005 Evaluation and Research Plan Phase 2: Activities to be Initiated 2005 New Jersey s Clean Energy Program Energy Efficiency and Renewable Energy Programs February 4, 2005 Edward J. Bloustein School
More informationFY2010. Energy Efficiency Portfolio. Evaluation Summary. Prepared by: The SRP Measurement & Evaluation Department and The Cadmus Group, Inc.
FY2010 Energy Efficiency Portfolio Evaluation Summary Prepared by: The SRP Measurement & Evaluation Department and The Cadmus Group, Inc. August, 2010 INTRODUCTION AND PURPOSE... 3 SRP s Sustainable Portfolio...
More informationIMPACT AND PROCESS EVALUATION OF AMEREN ILLINOIS COMPANY BEHAVIORAL MODIFICATION PROGRAM (PY5) FINAL OPINION DYNAMICS. Prepared for: Prepared by:
IMPACT AND PROCESS EVALUATION OF AMEREN ILLINOIS COMPANY S BEHAVIORAL MODIFICATION PROGRAM (PY5) FINAL Prepared for: AMEREN ILLINOIS COMPANY Prepared by: OPINION DYNAMICS 1999 Harrison Street Suite 1420
More informationThe Sensitive Side of Cost Effectiveness
The Sensitive Side of Cost Effectiveness Christine Hungeling, Itron, San Diego, CA Jean Shelton PhD, Itron, San Diego, CA ABSTRACT The cost effectiveness of energy efficiency (EE) measures, programs, and
More informationPortfolio Application Outline Energy Efficiency PY
Portfolio Application Outline Energy Efficiency PY 2006 2008 Section I. Portfolio Outline 1. Executive Summary This chapter is a short summary of the request including the key elements of the portfolio
More informationMEASUREMENT AND VERIFICATION AND THE IPMVP
MEASUREMENT AND VERIFICATION AND THE IPMVP EPC TOOLKIT FOR HIGHER EDUCATION APRIL 2009 INDEX IPMVP: THE PRINCIPLES IPMVP: THE DIFFERENT OPTIONS THE COSTS OF M&V 3 4 7 With permission from the author, this
More informationIndependent Audit of Enbridge Gas Distribution 2013 DSM Program Results FINAL REPORT. Prepared for the Enbridge Gas Distribution Audit Committee
Independent Audit of Enbridge Gas Distribution 2013 DSM Program Results FINAL REPORT Prepared for the Enbridge Gas Distribution Audit Committee by Optimal Energy, Inc. June 24, 2014 Optimal Energy, Inc.
More informationIncentive Scenarios in Potential Studies: A Smarter Approach
Incentive Scenarios in Potential Studies: A Smarter Approach Cory Welch, Navigant Consulting, Inc. Denise Richerson-Smith, UNS Energy Corporation ABSTRACT Utilities can easily spend tens or even hundreds
More information16 th Revision of Sheet No. 83 Canceling 15 th Revision of Sheet No. 83, 7 th Revision WN U-60 of Sheet No. 255 and 2 nd Revision of Sheet No.
16 th Revision of Sheet No. 83 Canceling 15 th Revision of Sheet No. 83, 7 th Revision WN U-60 of Sheet No. 255 and 2 nd Revision of Sheet No. 255-a, INC. ELECTRICITY CONSERVATION SERVICE 1. PURPOSE: To
More informationPUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA
STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor Advice Letter: 3460-E-A (U 338-E) February 17, 2017 Russell G. Worden Managing
More informationUpcoming Deadlines October 29 In progress Report writing None None Submit final December first year report 2012
NMR: CL&P and UI Behavior (Home Energy Reports) Pilot Studies CL&P Behavior Year 1 Delivered draft report October 29 Report writing None None Submit final December first year report TOTAL Budget $370,750
More informationCPUC Energy Efficiency Policies and Investor-Owned Utility (IOU) Programs
CPUC Energy Efficiency Policies and Investor-Owned Utility (IOU) Programs Presentation for WHPA Executive Committee March 26, 2013 Simon Baker Energy Division California Public Utilities Commission (CPUC)
More informationImpact Evaluation Plan for Home Upgrade Programs
Impact Evaluation Plan for 2013-2015 Home Upgrade Programs California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102 Date: 6/30/16 CALMAC Study ID TBD LEGAL NOTICE This report
More informationApplication Terms & Conditions and Final Payment Agreement
Prescriptive, Self-Direct Custom Program & Self-Direct Application Terms & Conditions and Final Payment Agreement Version: January 1, 2015 January 2017 TERMS AND CONDITIONS AEP Ohio offers Efficient Products
More informationNEW DIRECTIONS IN MEASUREMENT AND VERIFICATION FOR PERFORMANCE CONTRACTS
NEW DIRECTIONS IN MEASUREMENT AND VERIFICATION FOR PERFORMANCE CONTRACTS John M. Avina, CEM (President, Abraxas Energy Consulting) John A. Shonder (Senior Mechanical Engineer, Oak Ridge National Laboratory)
More informationNiagara Mohawk Power Corporation d/b/a National Grid Residential Building Practices and Demonstration Program: Impact Evaluation Summary
Niagara Mohawk Power Corporation d/b/a National Grid Residential Building Practices and Demonstration Program: Impact Evaluation Summary PROGRAM SUMMARY Prepared by: DNV KEMA, January 15, 2014 The OPower-administered
More informationDirect Install (DI) Program. Program Guide. Fiscal Year 2018 (7/1/2017 through 6/30/2018)
Direct Install (DI) Program Program Guide Fiscal Year 2018 (7/1/2017 through 6/30/2018) Table of Contents 1. Overall Program Description... 3 2. Target Market & Eligibility... 3 3. Program Website Link...
More informationProvince-Wide Pay-For-Performance (P4P) Draft Program Documents Webinar: IESO response to input received
Province-Wide Pay-For-Performance (P4P) Draft Program Documents Webinar: IESO response to input received The IESO is designing a new province-wide pay-for-performance program for Multi Distributor Customers
More information2018 New Construction Rebate Application
BUSINESS 2018 New Construction Rebate Application Save money on qualified construction projects Read about rebates for your home and business at mid.org/rebates REV01.2018 PURPOSE The MPower Business:
More informationSOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER II SUMMARY OF AMI BUSINESS CASE
Application No.: A.0-0-0 Exhibit No.: SCG Date: March, 00 Witness: Edward Fong SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER II SUMMARY OF AMI BUSINESS CASE Errata to Prepared
More informationQuarterly Report to the Pennsylvania Public Utility Commission
Quarterly Report to the Pennsylvania Public Utility Commission For the Period June 2014 through August 2014 Program Year 6, Quarter 1 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation
More informationProposition 39 Implementation Guidelines
Proposition 39: Clean Energy Jobs Act of 2012 California Community Colleges Proposition 39 Implementation Guidelines ADDENDUM TO THE MAY 29, 2013 CCC ENERGY PROJECT GUIDANCE Prepared by the California
More informationENERGY EFFICIENCY AND
2018 ENERGY EFFICIENCY AND LOAD MANAGEMENT PROGRAM PLAN NMPRC CASE NO. 17-00 -UT APRIL 14, 2017 Table of Contents 1 EXECUTIVE SUMMARY... 3 1.1 SUMMARY OF CHANGES FROM PREVIOUS PLAN... 5 2 PROGRAM GOALS...
More informationAppendices. Program Reviews and Benchmarking (LED, CFL, SUCH)
Appendices Program Reviews and Benchmarking (LED, CFL, SUCH) Appendices - Light Emitting Diode (LED) Program Program Goals and Design Process Goals are well defined and communicated, however, focus is
More informationEvaluation Status Report: November 2012 Progress Viridian December 5, 2012
NMR: CL&P Behavior (Home Energy Reports) Pilot Studies CL&P Behavior Year 1 Delivered draft report October 29 Revising report Reporting None None Submit final December first year report 2012 TOTAL Budget
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO Proceeding No. A- E IN THE MATTER OF THE APPLICATION OF BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, LP FOR APPROVAL OF ITS ELECTRIC DEMAND
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U 338-E) for Approval of Energy Efficiency Rolling Portfolio Business Plan. A.17-01-013
More informationVerification of Savings Project Update to CCC
Verification of Savings Project Update to CCC April 21, 2007 Project Team David Jump, QuEST, project lead Ken Gillespie, PG&E Hannah Friedman, PECI, CCC Technical Manager Kirstin Pinit, PECI, CCC Project
More informationRichmond Building Energy Challenge
Richmond Building Energy Challenge Robert Greenwald, P.Eng., MBA, President (Principal) Robert Greenwald has 25 years of energy management experience including developing energy plans, determining opportunities,
More informationPUBLIC UTILITIES COMMISSION
STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 REVISED Edmund G. Brown Jr., Governor July 12, 2016 Advice Letter, PG&E 3697-G /4812-E, 3697-G-A/4812-E-A
More informationSeptember 4, Advice Letter 3622-G/4693-E
STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor September 4, 2015 Erik Jacobson Director, Regulatory Relations Pacific Gas
More informationEvaluation Report: June 2012 Viridian July 6, 2012
NMR: CL&P and UI Behavior (Home Energy Reports) Pilot Studies 2011 CL&P Behavior draft interim Full year billing analysis Analysis in progress Prepped data; started analysis Data delivery delays and questions
More informationReview and Validation of 2014 Southern California Edison Home Energy Reports Program Impacts (Final Report)
Review and Validation of 2014 Southern California Edison Home Energy Reports Program Impacts (Final Report) California Public Utilities Commission Date: 04/01/2016 CALMAC Study ID LEGAL NOTICE This report
More informationSTATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES
ATTACHMENT 1 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF PUBLIC SERVICE ELECTRIC AND GAS COMPANY FOR APPROVAL OF ITS ENERGY EFFICIENCY 2017 PROGRAM AND RECOVERY OF ASSOCIATED
More informationDUQUESNE LIGHT COMPANY PROGRAM YEAR 7 ANNUAL REPORT
DUQUESNE LIGHT COMPANY PROGRAM YEAR 7 ANNUAL REPORT Program Year 7: June 1, 2015 May 31, 2016 Presented to: PENNSYLVANIA PUBLIC UTILITY COMMISSION Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation
More informationImpact Evaluation of 2014 San Diego Gas & Electric Home Energy Reports Program (Final Report)
Impact Evaluation of 2014 San Diego Gas & Electric Home Energy Reports Program (Final Report) California Public Utilities Commission Date: 04/01/2016 CALMAC Study ID LEGAL NOTICE This report was prepared
More informationTECHNICAL GUIDE A GUIDE TO FINANCING ENERGY MANAGEMENT
TECHNICAL GUIDE A GUIDE TO FINANCING ENERGY MANAGEMENT Table of Contents 1. Introduction 1 2. What is Energy Management Financing? 2 3. Barriers to Investing in Energy Management 3 1. Initial Costs 3 2.
More informationQuarterly Report to the Pennsylvania Public Utility Commission
Quarterly Report to the Pennsylvania Public Utility Commission For the Period November 05 through February 06 Program Year 7, Quarter For Pennsylvania Act 9 of 008 Energy Efficiency and Conservation Plan
More informationDOCKET NO. 13A-0773EG DIRECT TESTIMONY AND EXHIBITS OF LEE E. GABLER
IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF ITS ELECTRIC AND NATURAL GAS DEMAND-SIDE MANAGEMENT (DSM PLAN FOR THE CALENDAR YEAR 0 AND TO CHANGE ITS ELECTRIC AND
More informationCalculated Incentives for Energy Efficiency and Automated Demand Response Program Application
Calculated Incentives for Energy Efficiency and Automated Demand Response Program Application Contact PG&E before submitting your information You must contact a Pacific Gas and Electric Company (PG&E)
More informationAnnual Report to the Pennsylvania Public Utility Commission For the period December 2009 to May 2010 Program Year 2009
Annual Report to the Pennsylvania Public Utility Commission For the period December 2009 to May 2010 Program Year 2009 For Act 129 of 2008 Energy Efficiency and Conservation Program Prepared by Duquesne
More informationBUSINESS INCENTIVE PROGRAM APPLICATION
BUSINESS INCENTIVE PROGRAM APPLICATION PART A APPLICANT INFORMATION (Financial incentive payment will be made to Applicant ONLY.) 1. Applicant: Legal Name of Business (the "Applicant"): Address: City:
More informationEnergy Trust of Oregon Request for Proposals: Impact Evaluation of the New Buildings Program
Energy Trust of Oregon Request for Proposals: Impact Evaluation of the 2015-2016 New Buildings Program Posted: January 4, 2018 Proposals Due: February 2, 2018 Dan Rubado 421 SW Oak St., Suite 300 Portland,
More informationAll text in Red Italics is sample verbiage or instructions and may to be removed from the final document.
ESA / IGA Schedules Project Documents include the following Schedules which are incorporated herein and made a part of the IGA and ESA when approved by the ISSUER and ESCO: Schedule A Schedule B Schedule
More informationQuarterly Report to the Pennsylvania Public Utility Commission
Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2012 through November 30, 2012 Program Year 4, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and
More informationOverview of the California Utilities and Their DSM Programs
4-7he submitted manuscript has been authored by a contractor of the US. Government under contract No. DEAC05-840R21400. Accordingly, the US. Government retains a nonaxcl~~i~, royalty-free b w a to publish
More information2014 Annual Update of the Electric and Natural Gas Conservation and Load Management Plan
Docket No. 13-03-02 Compliance Filing 2014 Annual Update of the 2013-2015 Electric and Natural Gas Conservation and Load Management Plan Submitted by: The Connecticut Light and Power Company The United
More informationTECHNICAL BRIEF PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES
TECHNICAL BRIEF PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES TECHNICAL BRIEF V1.0 The Pay for Performance Strategies for Western States project is
More informationPay-for-Performance Pilot Conceptual Framework
Pay-for-Performance Pilot Conceptual Framework Home Performance Conference February 14, 2018 What is Pay-for-Performance (P4P)? 2 Simple Idea: Pay for ACTUAL energy savings What is Pay-for-Performance
More informationEconomic Impacts of Oregon Energy Tax Credit Programs in 2006 (BETC/RETC) Final Report
Economic Impacts of Oregon Energy Tax Credit Programs in 2006 (BETC/RETC) Final Report ECONOMICS FINANCE PLANNING 888 SW Fifth Avenue, Suite 1460 Portland, Oregon 97204 503-222-6060 May 30, 2007 Acknowledgements
More informationBuilding Tune-Up and Operations Program Evaluation
FINAL REPORT Building Tune-Up and Operations Program Evaluation Prepared for: Phil Degens, Evaluation Manager Energy Trust of Oregon Portland, Oregon Prepared by: Linda Dethman Dethman & Associates Rick
More informationProgram: Resource Conservation Manager. Program Year: Contents: Evaluation Report PSE Evaluation Report Response
Program: Resource Conservation Manager Program Year: 2015-2016 Contents: Evaluation Report PSE Evaluation Report Response This document contains Cadmus Resource Conservation Manager Program Evaluation
More informationNEW CONSTRUCTION PARTICIPATION CHECKLIST
NEW CONSTRUCTION PARTICIPATION CHECKLIST June 1, 2017 through December 31, 2017 DIRECTIONS: Please save a copy of this form to your computer by selecting FILE/SAVE AS before entering text and numbers.
More informationQuarterly Report to the Pennsylvania Public Utility Commission
Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2015 through November 30, 2015 Program Year 7, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and
More informationJanuary 17, 2004 Revision 4
Self-Generation Incentive Program Handbook Table of Contents 1. INTRODUCTION...5 1.1 Program Summary...5 1.2 Program Background...5 1.3 Program Modification...6 2. PROGRAM ELIGIBILITY CRITERIA AND REQUIREMENTS...7
More informationEFFECTIVE IMPLEMENTATION OF IPMVP OPTION C- WHOLE BUILDING MEASUREMENT MEASUREMENT AND VERIFICATION PLANS
EFFECTIVE IMPLEMENTATION OF IPMVP OPTION C- WHOLE BUILDING MEASUREMENT MEASUREMENT AND VERIFICATION PLANS PREPARED BY TAC-TOUR ANDOVER CONTROLS TODD PORTER, KLIP WEAVER, KEVIN VAUGHN AUGUST 12, 2005 1
More informationHistorical Performance of the U.S. ESCO Industry: Results from the NAESCO Project Database
LBNL-46070 Historical Performance of the U.S. ESCO Industry: Results from the NAESCO Project Database C.A. Goldman, P. Juergens, M. Fowlie, J. Osborn & K. Kawamoto,LBNL, Terry Singer, NAESCO Environmental
More informationFREQUENTLY ASKED QUESTIONS: COMPREHENSIVENESS BONUS & ENERGY EFFICIENCY BUSINESS INCENTIVES (EEBI) CALCULATED PROGRAM CHANGES
FAQ 1. How does a customer know if they qualify for a bonus? a. SDGE: Program participants that submit an application between March 1, 2013 and December 2, 2016 are eligible for a 20% bonus based on the
More informationEnergy Efficiency Insurance. Global & Indian scenario
Energy Efficiency Insurance Global & Indian scenario International Energy Efficiency Insurance Product Scenario Some international products studied were: 1. Energy Savings Insurance Implementing Agency:
More informationEEAC EM&V Briefing. Ralph Prahl EEAC Consultant EM&V Team Leader July 9th, 2013
EEAC EM&V Briefing Ralph Prahl EEAC Consultant EM&V Team Leader July 9th, 2013 Organization of Presentation EM&V in Massachusetts: Past, Present and Future Past Background Review of MA EM&V Framework Current
More informationDelaware Public and Institutional Energy Performance Contracting Program Guidebook ~ 2016
Delaware Public and Institutional Energy Performance Contracting Program Guidebook ~ 2016 Delaware Sustainable Energy Utility 500 West Loockerman Street, Suite 400 Dover, DE 19904 302-883-3048 1 Public
More informationNatural Gas Demand Side Management Evaluation, Measurement, and Verification (EM&V) Plan
2016-2018 Natural Gas Demand Side Management Evaluation, Measurement, and Verification (EM&V) Plan submitted to the Ontario Energy Board Date: November 10, 2016 DNV GL - Energy www.dnvgl.com/energy Table
More informationQuarterly Report to the Pennsylvania Public Utility Commission
Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2015 through November 30, 2015 Program Year 7, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and
More informationBriefing to the Dallas City Council s Budget, Finance and Audit Committee June 18, 2012
Briefing to the Dallas City Council s Budget, Finance and Audit Committee June 18, 2012 Energy Conservation is largely based on behavioral practices to use [energy] in a more efficient manner it is essential
More informationOntario Energy Board EB Filing Guidelines to the Demand Side Management Framework for Natural Gas Distributors ( )
Filing Guidelines to the Demand Side Management Framework for Natural Gas Distributors (2015-2020) December 22, 2014 intentionally blank TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 GUIDING PRINCIPLES...
More informationQuarterly Report to the Pennsylvania Public Utility Commission
Quarterly Report to the Pennsylvania Public Utility Commission For the Period June 1, 2015 through August 31, 2015 Program Year 7, Quarter 1 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation
More informationSMUD Home Performance Program: Neighborhoods Frequently Asked Questions (FAQs)
SMUD Home Performance Program: Neighborhoods Frequently Asked Questions (FAQs) THE PROGRAM Q) What is the neighborhood program in a nutshell? A) The Neighborhood program is a simple, low cost, retrofit
More informationOn-Bill Financing of Small Business Energy-Efficiency: An Evolving Success Story
On-Bill Financing of Small Business Energy-Efficiency: An Evolving Success Story Nikhil Gandhi, Strategic Energy Technologies, Inc. Paul Gray and Dennis O Connor, United Illuminating Company Randall Vagnini,
More informationBetter Buildings Neighborhood Program: An Economic Impact Analysis of a Whole-Building Retrofit Program
Better Buildings Neighborhood Program: An Economic Impact Analysis of a Whole-Building Retrofit Program Matthew Koson, Evergreen Economics, Portland, OR Stephen Grover, Evergreen Economics, Portland, OR
More informationDraft Small Customer Aggregation Program Rules
Draft Small Customer Aggregation Program Rules 1. Aggregations must be at least 2.0 MW for DADRP, 1.0 MW for RTDRP, 100 kw for SCR and 100 kw for EDRP. In each case the requirement is zone-specific. The
More informationDetailed Recommendations 10: Develop Environmental Cost Analysis
Detailed Recommendations 10: Develop Environmental Cost Analysis 10 This is a background paper to the report: Establishing China s Green Financial System published by the Research Bureau of the People
More informationA Decade of Construction Inspections. Quality Built, LLC November 2011
A Decade of Construction Inspections Quality Built, LLC November 2011 Background Quality Built, LLC is one of the largest and most respected third-party quality assurance firms in the country. Over the
More informationCA IOU Programs for Low Income Energy Efficiency
CA IOU Programs for Low Income Energy Efficiency Energy Efficiency and Weatherization Programs Forum on Affordable Multifamily Housing February 10, 2011 San Francisco, CA 1 CA IOU Low Income Energy Efficiency
More informationEvaluation, Measurement, & Verification Principles and Vermont Examples
Evaluation, Measurement, & Verification Principles and Vermont Examples Walter Poor, Vermont Public Service Department December 4, 2014 Topics EM&V Resources Evaluation Fundamentals Definitions Why Evaluate
More informationSCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO
First Revision Sheet 90 I.P.U.C. No.28 Substitute Original Sheet 90 90 SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO 1. Availability The services described herein are available to specified residential,
More informationEnergy Management Solutions Incentives Application for Business Customers
Follow the simple steps below to complete your Incentives Application: SEND TO: Southern California Edison, Business Incentives P.O. Box 800, Rosemead, CA 9770-0800 Fax: 626-6-24 E-mail: BusinessIncentives@sce.com
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U 338-E) for Approval of its Energy Savings Assistance and California Alternate Rates
More informationCommercial and Industrial Energy Efficiency Program Manual
Commercial and Industrial Energy Efficiency Program Manual - 2018 Table of Contents Commercial & Industrial Energy Efficiency Program Manual Section 1: Introduction... 3 1.1 Program Overview... 3 Section
More informationCommonwealth Edison Company Energy Efficiency and Demand Response Plan Settlement Stipulation
I. INTRODUCTION Commonwealth Edison Company 2018-2021 Energy Efficiency and Demand Response Plan Settlement Stipulation This Settlement Stipulation ( Stipulation ), when fully executed and accepted, will
More informationHERO Program Profile Final Report
HERO Program Profile Final Report CALMAC ID: PGE0388.01 October 3, 2016 Pacific Gas and Electric Company, San Diego Gas & Electric, Southern California Edison, and Southern California Gas Company This
More informationParticipation: A Performance Goal or Evaluation Challenge?
Participation: A Performance Goal or Evaluation Challenge? Sean Murphy, National Grid ABSTRACT Reaching customers who have not participated in energy efficiency programs provides an opportunity for program
More information