WATER UTILITY FUND 501

Size: px
Start display at page:

Download "WATER UTILITY FUND 501"

Transcription

1 WATER UTILITY FUND 501 DEPARTMENT: Public Works DIVISION: Water Utility PROGRAM MANAGER: Water Superintendent PROGRAM DESCRIPTION: The City of Brookfield Water Utility supplies, stores, treats and distributes potable drinking water to approximately 82% of City properties (80% of single-family residential, 85% of multi-family residential and 90% of commercial/industrial properties). The utility s system of accounts records all costs related to the operation and maintenance of the water utility s 22 wells, five towers, six reservoirs, nine booster stations and the water distribution SERVICES: Pump 1.24 billion gallons of water this past year. Maintain and operate 22 ground water well stations. Responsible for maintaining over 249 miles of water main in Brookfield. Repair an average of 20 water main breaks per year. Read meters on a quarterly basis. Monitor and test on a regular basis for compliance with Environmental Protection Agency (EPA) and Wisconsin Department of Natural Resources (DNR) requirements. Hydrant flushing semi-annually. Exercise at least one quarter of 6731 water main valves per year. Maintain records on the water system, as well as valve repairs. Operate three iron filters and one radium reducing filter. Treat the well water with chemical additions of chlorine and polyphosphate. STAFFING: Positions (FTE) 2014 Actual 2015 Actual 2016 Actual 2017 Actual 2018 Budget Water Utility Superintendent Water Operations Supervisor Administrative Assistant Water Utility Specialist II Water Utility Specialist I Lead Water Operator Water Utility Operator Seasonal Employees Total Note: In addition to the above, costs equal to 4.02 FTE are allocated to the Water Utility budget for support services received from the Finance, Human Resources, Information Technology and Engineering Departments. Costs equal to 0.25 FTE are allocated from the City Hall maintenance staff for Facility Maintenance Services. 187

2 ACTIVITY MEASURES: Activity 2014 Actual 2015 Actual 2016 Actual 2017 Projected 2018 Budgeted Number of water main break repairs Number of water valves exercised 1,966 1,992 2,199 1,631 1,900 Number of hydrants rebuilt Number of hydrants replaced Number of valves repaired/replaced Number of hydrants flushed 5,606 5,682 5,778 5,800 5,880 Number of meters tested 2,001 1,876 2,649 2,400 2,500 Number of customers 1 11,418 11,647 11,820 12,018 12,236 Number of standby customers 1,198 1,126 1,134 1,084 1,044 Number of gallons sold (in millions) 1,020 1,074 1,109 1,096 1,112 Average residential gallons sold per household (thousand) Average residential charges per household 2 $ $ $ $ $ Reflects actual and projected number of customers at end of year; revenue estimates discussed in budget summary below are based on changes in average number of customers connected to the water 2 Residential charges in 2016 reflect a simplified rate increase effective beginning of OBJECTIVES ACCOMPLISHED IN 2017: * Indicates if associated with one of the City s Comprehensive Plan short-term focus initiatives. 1. Assist with various electrical upgrades to the Utility s electrical components such as: Variable Frequency Drive (VFD) installation, station and booster power supplies, Transient Voltage Surge Suppressor (TVSS) and surge suppressors. Utility has completed or is scheduled to complete by year end: Chadwick Green VFD installation Lamplighter VFD installation Electrical service upgrades to Hawk s Ridge booster station, Parc du Chateau booster station, Mt. Pleasant booster station, Arrowhead well and Stonebrook well. The Water Utility also added touch screen control panels to the Chadwick Green, Pilgrim, Brookfield Academy and Arrowhead well sites. 2. Survey easements and other areas in the distribution system for possible leaks with Gutermann equipment that was purchased in Utility staff continues to use this equipment throughout the system for leak detection. The system has proven effective in a.) finding leaks and b.) proving that there are no leaks in a particular area. Utility staff will continue to focus on leak detection within easement areas. 3. Perform water main lining study for possible rehabilitation of old mains. Study completed City will re-bid project this year to line a portion of the 16-inch water main on Capitol Drive. 4. Perform system-wide arc flash survey/study of all water facilities to maximize safety for employees. 188

3 Utility retained engineering consultant to perform study study will be completed this year. 5. Complete compliance with the initial cross connection control program instituted 4 years ago. Designate high and low priority sites so the Utility can do more of the inspections to minimize those to be done by outside contractor. Utility s consultant previously completed a cross connection control inspection of Brookfield s commercial and industrial sites. In 2017 the consultant re-inspected previously identified high hazard sites per DNR requirements. Utility is reviewing low priority sites that can be inspected by Utility staff. OBJECTIVES TO BE ACCOMPLISHED IN 2018: * Indicates if associated with one of the City s Comprehensive Plan short-term focus initiatives. 1. Continue with various electrical upgrades to the Utility s electrical components such as VFD installs, station and booster power supplies, TVSS and surge suppressors. 2. Begin a focus on valve replacement as well as hydrant replacement review valve repair list, prioritize valve replacement/repair, and repair/replace valves. 3. Continue cross-connection control program; begin to use Utility staff to inspect low priority sites. 4. Assist Engineering to complete the painting of the Burleigh water tower. 5. Initiate study of the City s water meter reading system discuss the feasibility of moving from an Automatic Meter Reading (AMR) system to an Advanced Metering Infrastructure (AMI) 6. Begin process of planning for general rate case filing to be effective in BUDGET SUMMARY: 1). The 2018 revenue budget is based upon an estimated increase of 218 new customers (210 residential, 8 commercial) and sales of billion gallons of water. Although the number of customers continues to increase, conservation efforts and consumer product innovations tend to offset most of the increase in customers resulting in flat water sales. No rate increase is assumed for the 2018 budget. The utility is not permitted to pursue a simplified rate case (cost of living) increase, as it has been too long since the last general rate case was approved for A general rate case filing may need to be considered within the next year to recover the increased operating costs since the last rate filing, including the water tower paintings completed in 2015 and scheduled for In addition, there are projects included in the capital improvement program that may need to be reflected in rates. Any changes in rates from a general rate case filing likely will not be effective until late 2018 at the earliest. Rents from water property show a slight increase in accordance with the lease agreements with the wireless carriers. 2). Salary budgets include estimated salary adjustments for non-represented staff as per the 2018 salary ordinance adopted by the Human Resources and Public Safety Committee and Common Council, including a 2.0% general salary increase for those in the management pay plan and 2.0% movement in pay ranges for those in the clerical/technical pay plan. Actual salary amounts for individual employees and the impact on department salary budgets depend on the position in salary grades, including the impact of step increases for eligible employees, and 189

4 determination of satisfactory performance. Total water utility salaries charged to expense accounts and capital projects are budgeted to increase approximately $2,301 for 2018, or 0.2% over ). The decrease in the pension budget (926100) includes the estimated impact of employer pension contribution rates from the Wisconsin Retirement System (WRS) applied to budgeted wages for eligible employees, reflecting a slight decrease in the contribution rate for utility employees. Changes in contribution rates are shared between the City and all employees. 4). Group insurance health (926700) reflects an overall 10% change from the premium contribution charges in the 2017 budget rates were derived based on projections from the City s insurance consultant reflecting favorable health claims experience reflecting a degradation in the City s recent health claims experience and projection of health care cost trend. Budgets also reflect any changes in plan coverage elections for utility staff. 5). Purchased power expense (623000) electricity budgets have been developed utilizing the WE Energies forecasting tool. Estimates for these budgets are based upon historical consumption and WE Energies pricing predictions. 6). Maintenance of pumping equipment (633000) remains increased to include the purchase of a spare booster pump for station maintenance as well as the continuation of the system-wide Arc Flash study. 7). The decrease in transmission and distribution operating expenses (662000) is due to the completion of upgrades at transfer stations in 2017, along with a decrease in anticipated fuel and labor expenses on vehicles allocated to the Water utility. 8). Maintenance of distribution reservoirs (672000) includes $142,160 for amortization of the 2015 painting of the Capitol Drive water tower. The budgeted amount has increased from 2017 due to the projected cost of the amortization for the 2018 painting of the Burleigh water tower. PSC guidelines provide for amortization of actual painting cost over a 5 year period. The Sunnyslope standpipe is also expected to be painted in the next five years. 9). The decrease in outside services employed (923000) results from the completion of the 2017 water main lining study, which had a higher budget than the 2018 program to study the effects of transitioning from automatic meter reading to an automatic meter infrastructure. 10). The following capital purchases are proposed for funding from utility reserves for 2018: Item Cost Water meters (large & small) $340,000 Hydrants 34,000 Water Utility vehicles 27,500 Bishops Woods well pump and motor 100,000 Electrical upgrades for well stations & boosters 62,500 Total $564,

5 CITY OF BROOKFIELD 2018 Water Utility Summary Budget WATER UTILITY YTD Percent FUND Actual Adopted 08/31/17 Estimated Adopted Change OPERATING REVENUES METERED WATER SALES 100 4,070,411 4,091,328 1,745,359 3,971,188 4,132,458 FIRE PROTECTION 100 1,164,837 1,164, ,981 1,164,309 1,168,413 OTHER INCOME , , , , ,804 TOTAL OPERATING REVENUE 5,758,013 5,741,167 2,782,145 5,638,470 5,786, % OPERATING EXPENSES SOURCE OF SUPPLY ,000-3,000 15,000 PUMPING 920 1,046,944 1,147, ,067 1,078,108 1,133,587 WATER TREATMENT , , , , ,664 TRANSMISSION & DISTRIBUTION , , , , ,922 CUSTOMER ACCOUNTS , ,216 71, , ,085 ADMINISTRATION & GENERAL , , , , ,145 Sub-total Operations and Maintenance 3,040,334 3,194,673 1,817,824 2,945,760 3,230, % DEPRECIATION/TAXES 970 3,057,493 3,064,837 1,536,034 3,017,245 3,186,936 TOTAL OPERATING EXPENSES 6,097,827 6,259,510 3,353,858 5,963,005 6,417, % NET OPERATING INCOME (LOSS) (339,814) (518,343) (571,713) (324,535) (630,664) 21.7% NON- OPERATING REVENUE/EXPENSES: PLUS - INTEREST INCOME , ,600 39, , ,300 LESS - INTEREST EXPENSE , , , , ,181 WATER UTILITY NET INCOME (LOSS) (613,569) (701,919) (738,764) (526,593) (820,545) 16.9% SPECIAL ASSESSMENTS/CAPITAL CONTRIBUTIONS 2,175,405 1,530, ,946 1,768,705 1,530,000 TOTAL NET POSITION, JANUARY 1 55,091,534 56,653,369 56,653,369 57,895,481 TOTAL NET POSITION, DECEMBER 31 56,653,369 57,481,450 57,895,481 58,604,936 CASH FLOW ADJUSTMENTS PLUS: DEPRECIATION 1,809,234 1,762,276 1,762,276 1,901,693 AMORTIZATION OF EXPENSES 61,272 62,206 63,149 63,306 ASSESSMENTS COLLECTED 1,821,933 1,500,000 1,500,000 1,600,000 LESS: NON-BONDED CAPITAL OUTLAY 701, , , ,200 DEBT REDUCTION 3,640,000 2,490,000 2,490,000 2,300,000 NET CHANGE IN CASH (1,263,071) (542,637) (366,368) (230,746) RETURN ON RATE BASE COMPUTATION AVERAGE NET RATE BASE 20,114,014 20,705,000 20,450,000 21,275,000 ADJUSTED NET OPERATING INCOME 512, , , ,472 RATE OF RETURN 2.6% 1.6% 2.6% 1.4% 191

6 WATER UTILITY YTD Percent FUND Actual Adopted 08/31/17 Estimated Adopted Change OPERATING REVENUES OPERATING INCOME METERED WATER SALES RESIDENTIAL ,709,046 2,761,768 1,156,215 2,612,498 2,766,128 COMMERCIAL ,028,767 1,014, ,987 1,006,581 1,032,484 INDUSTRIAL ,333 17,266 10,047 20,364 18,161 MULTI-FAMILY , , , , ,408 PUBLIC AUTHORITY ,733 79,540 37,504 85,980 86,277 Total Metered Water Sales 4,070,411 4,091,328 1,745,359 3,971,188 4,132, % FIRE PROTECTION PRIVATE FIRE PROTECTION , , , , ,352 PUBLIC FIRE PROTECTION , , , , ,061 Total Fire Protection 1,164,837 1,164, ,981 1,164,309 1,168, % OTHER INCOME LATE CHARGES ,952 33,000 13,060 29,378 33,000 RENTS FROM WATER PROPERTY , , , , ,284 OTHER REVENUES ,126 84,000 36, ,065 83,520 Total Other Income 522, , , , , % TOTAL OPERATING REVENUE 5,758,013 5,741,167 2,782,145 5,638,470 5,786, % OPERATING EXPENSES SOURCE OF SUPPLY MAINTENANCE EXPENSES MAINTENANCE OF WELLS ,000-3,000 15,000 Sub-total - 15,000-3,000 15, % TOTAL SOURCE OF SUPPLY - 15,000-3,000 15, % PUMPING OPERATING SALARIES OPERATIONS SUPERVISION ,280 90,302 51,394 83,169 92,990 PUMPING LABOR ,096 87,147 65, ,254 97,708 MISCELLANEOUS LABOR ,465 79,469 39,451 59,289 71,533 Sub-total 249, , , , , % OPERATING EXPENSES FUEL OR POWER PURCHASED , , , , ,819 PUMPING ,049 25,829 13,441 25,940 24,304 MISCELLANEOUS ,856 25,097 15,114 27,271 22,076 Sub-total 629, , , , , % MAINTENANCE SALARIES MAINTENANCE SUPERVISION ,378 23,469 13,428 20,303 22,506 MAINTENANCE OF STRUCTURES - LABOR ,096 18,607 4,101 5,402 15,635 MAINTENANCE PUMPING EQUIP. - LABOR ,111 97,944 44,981 67,554 86,366 Sub-total 86, ,020 62,510 93, , % MAINTENANCE EXPENSES MAINTENANCE OF STRUCTURES ,291 12,500 3,116 12,300 13,500 MAINTENANCE PUMPING EQUIPMENT ,170 88,450 54,428 88,000 94,150 Sub-total 81, ,950 57, , , % TOTAL PUMPING 1,046,944 1,147, ,067 1,078,108 1,133, % 192

7 WATER UTILITY YTD Percent FUND Actual Adopted 08/31/17 Estimated Adopted Change WATER TREATMENT OPERATING SALARIES OPERATION SUPERVISION ,775 19,571 12,124 18,233 19,487 OPERATION LABOR ,815 59,275 39,611 60,967 64,460 Sub-total 79,590 78,846 51,735 79,200 83, % OPERATING EXPENSES CHEMICALS , ,375 69, , ,000 OPERATION , ,062 75, , ,770 MISCELLANEOUS ,383 3, ,198 3,250 Sub-total 257, , , , , % MAINTENANCE SALARIES MAINTENANCE SUPERVISION ,139 3,746 2,535 2,266 3,272 MAINT. TREATMENT EQUIP. - LABOR ,616 12,640 5,847 12,065 13,925 Sub-total 17,756 16,386 8,382 14,331 17, % MAINTENANCE EXPENSES MAINTENANCE TREATMENT EQUIPMENT ,652 7,500 4,572 7,000 7,500 Sub-total 9,652 7,500 4,572 7,000 7, % TOTAL WATER TREATMENT 364, , , , , % TRANSMISSION & DISTRIBUTION OPERATING SALARIES OPERATION SUPERVISION ,346 6,007 6,833 8,186 7,667 STORAGE FACILITIES - LABOR ,051 6,860 5,871 5,885 7,795 TRANSMISSION & DISTRIBUTION - LABOR , ,500 64, , ,118 CUSTOMER INSTALLATIONS - LABOR ,278 12,259 12,035 18,889 12,903 MISCELLANEOUS LABOR ,430 45,498 29,620 36,990 50,355 Sub-total 176, , , , , % OPERATING EXPENSES STORAGE FACILITIES ,085 6,000 5,128 5,900 6,250 TRANSMISSION & DISTRIBUTION ,089 38,329 12,528 37,000 33,711 CUSTOMER INSTALLATIONS ,297 5,000 5,576 5,600 5,600 MISCELLANEOUS ,158 4,940 3,182 4,900 5,990 Sub-total 37,628 54,269 26,414 53,400 51, % MAINTENANCE SALARIES MAINTENANCE SUPERVISION ,916 8,267 11,762 16,142 8,600 MAINT. DISTR. RESERVOIRS - LABOR ,687 14,387 7,219 12,659 13,467 MAINT. TRANSMISSION & DISTR. - LABOR ,284 60,223 20,744 31,312 51,750 MAINTENANCE OF SERVICES - LABOR ,488 30,897 11,726 23,809 33,300 MAINTENANCE OF METERS - LABOR ,102 31,618 21,295 33,164 31,778 MAINTENANCE OF HYDRANTS - LABOR ,561 38,583 24,400 22,127 41,108 Sub-total 156, ,975 97, , , % MAINTENANCE EXPENSES MAINTENANCE DISTR. - RESERVOIRS , ,160 79, , ,860 MAINT. TRANSMISSION & DISTR. MAINS ,575 44,350 16,582 40,000 54,370 MAINTENANCE OF SERVICES ,499 10,000 5,490 9,000 10,300 MAINTENANCE OF METERS ,683 12, ,000 5,500 MAINTENANCE OF HYDRANTS ,758 23,500 23,071 23,000 23,500 Sub-total 347, , , , , % TOTAL TRANSMISSION & DISTRIBUTION 718, , , , , % 193

8 WATER UTILITY YTD Percent FUND Actual Adopted 08/31/17 Estimated Adopted Change CUSTOMER ACCOUNTS OPERATING SALARIES SUPERVISION ,394 18,839 13,354 19,070 20,422 METER READING LABOR ,171 7,789 3,697 2,148 7,642 CUSTOMER RECORDS - LABOR ,633 67,963 36,698 56,636 60,336 Sub-total 82,198 94,591 53,749 77,854 88, % OPERATING EXPENSES METER READING ,431 4,013 1,737 3,500 4,852 CUSTOMER RECORDS ,655 20,612 13,540 20,000 20,833 UNCOLLECTABLE ACCOUNTS , Sub-total 21,686 24,625 17,310 23,500 25, % TOTAL CUSTOMER ACCOUNTS 103, ,216 71, , , % ADMINISTRATION & GENERAL OPERATING SALARIES ADMINISTRATION & GENERAL SALARIES , , , , ,608 Sub-total 192, , , , , % OPERATING EXPENSES OFFICE SUPPLIES & EXPENSES ,474 30,360 21,666 27,500 34,118 OUTSIDE SERVICES EMPLOYED ,756 26,340 5,845 12,000 22,000 PROPERTY INSURANCE ,548 49,112 32,741 49,112 52,070 FICA TAX ,892 85,982 55,446 82,402 86,486 PENSION ,599 78,031 49,536 86,748 76,236 GROUP INSURANCE-OTHER ,399 18,451 11,119 16,329 15,882 RHS PAYMENTS ,709 53,086 34,891 51,218 53,224 GROUP INSURANCE-HEALTH , , , , ,933 REGULATORY COMMISSION , MISCELLANEOUS GENERAL ,310 7,068 9,650 10,000 8,187 Sub-total 587, , , , , % MAINTENANCE SALARIES MAINTENANCE OF GEN PLANT - LABOR ,212 7,773 4,115 5,929 7,332 Sub-total 5,212 7,773 4,115 5,929 7, % MAINTENANCE EXPENSES MAINTENANCE OF GEN PLANT ,778 24,050 10,781 15,552 24,069 Sub-total 20,778 24,050 10,781 15,552 24, % TOTAL ADMINISTRATION & GENERAL 806, , , , , % 194

9 WATER UTILITY YTD Percent FUND Actual Adopted 08/31/17 Estimated Adopted Change OTHER EXPENSES OTHER EXPENSES DEPRECIATION - PLT FINANCED BY UTILITY , , , , ,557 DEPRECIATION - PLT FINANCED BY CONTR , , , , ,136 TAXES ,248,259 1,302, ,951 1,254,969 1,285,243 Sub-total 3,057,493 3,064,837 1,536,034 3,017,245 3,186, % TOTAL OTHER EXPENSES 3,057,493 3,064,837 1,536,034 3,017,245 3,186, % TOTAL OPERATING EXPENSES 6,097,827 6,259,510 3,353,858 5,963,005 6,417, % NET OPERATING INCOME (339,814) (518,343) (571,713) (324,535) (630,664) 21.7% NON-OPERATING REVENUE/EXPENSES: OTHER INCOME OTHER INCOME INTEREST INCOME ON INVESTMENTS ,228 69,600 36,612 62,190 65,300 INTEREST INCOME ON ASSESSMENTS , ,000 3, , ,000 Sub-total 181, ,600 39, , , % NON-OPERATING EXPENSES NON-OPERATING EXPENSES AMORTIZATION OF DEBT ,272 62,206 42,577 63,149 63,306 AMORTIZATION OF PREMIUM ON DEBT (12,713) (14,397) (9,988) (19,977) (19,980) INTEREST ON DEBT TO MUNICIPALITY , , , , ,855 Sub-total 455, , , , , % WATER UTILITY NET INCOME (LOSS) (613,569) (701,919) (738,764) (526,593) (820,545) 16.9% 195

10 City of Brookfield, WI Capital Improvement Program 2018 thru 2022 FUNDING SOURCE SUMMARY Source Total 2018 Water bond proceeds 3,110,000 3,110, Water bond proceeds 2,465,000 2,465, Water Bond proceeds 3,285,000 3,285, Water Bond proceeds 2,980,000 2,980, Water Bond proceeds 3,300,000 3,300,000 Water fund balance 564, , , , ,000 2,310,000 GRAND TOTAL 3,674,000 2,884,000 3,716,000 3,422,000 3,754,000 17,450,

11 City of Brookfield, WI Capital Improvement Program thru PROJECTS BY CATEGORY AND DEPARTMENT Department Category Total Future Water Water mains as needed Replace failing water main Cherokee Hills Subd. Southeast of Brookfield / Lisbon (fill in) Ranch Rd., N. 143rd St., N. 145th St. Willow Ridge Ln and N.147th St. & Cameron Dr. Lwr Morningview Ct. El Rancho Heights / Greenview Acres subd. Midland, Newberry Ct., Glen Echo Ct., Pilgrim Rd. Willow Ridge subdivision water main Cumberland Tr and Bradee Rd Lone Oak Circle East and West water main Hillsdale Drive, East and West water main Wilderness Way area & Quail Hollow Dr water main Columbia Gardens water main Town & Country subd. Water main Sub-Total Water mains prior to road work North Ave: Hillsdale Dr. W. to Hillsdale Dr. E. Sub-Total 850, , ,000 1,000,000 1,000,000 4,700,000 2,000, , ,000 1,150,000 1,150, , , , , , , , , , ,000 1,050,000 1,050, , , , ,000 1,050,000 1,050, , , , ,000 2,300,000 2,300,000 3,110,000 2,465,000 2,910,000 2,980,000 3,300,000 14,765,000 2,000, , , , ,000 Water Utility - other Water Utility vehicles/equipment Water - meters Water - hydrants / valves Sub-Total 27,500 34,000 35,000 35,000 36, ,500 73, , , , , ,000 1,800, ,000 34,000 35,000 36,000 37,000 38, ,000 79, , , , , ,000 2,147, ,000 Water Utility - wells/supply source Electrical upgrades - wells / booster stations Bishops Woods well pump and motor Sub-Total Department Total: 62,500 62, , , , ,500 3,674,000 2,884,000 3,716,000 3,422,000 3,754,000 17,450,000 2,942,000 GRAND TOTAL 3,674,000 2,884,000 3,716,000 3,422,000 3,754,000 17,450,000 2,942,

12 CITY OF BROOKFIELD Water Utility Fund CIP Project Descriptions Project Name/Funding Source Water Mains, etc. Replace failing water main (utility borrowing) Cherokee Hills Subdivision Water main southeast of Brookfield/Lisbon (fill in gaps) Ranch Road, 143 rd Street and 145 th Street Willow Ridge Lane, 147 th Street and Cameron Drive Lower Morningview Court El Rancho Heights/Greenview Acres subdivision Midland, Newberry Court, Glen Echo Court, and Pilgrim Road Willow Ridge subdivision Cumberland Trail and Bradee Road Lone Oak Circle East and West Hillsdale Drive East and West Wilderness Way area and Quail Hollow Drive Columbia Gardens Town and Country subdivision North Avenue Hillsdale Drive West to East Project Description Replace water main in areas where excessive break history exists and 2019 anticipates work on water main in the Imperial Estates subdivision and adjacent areas. Install new water main in Cherokee Drive and Cherokee Lane. Install new water main to fill in water main gaps in the area southeast of Brookfield Road and Lisbon Road includes the following streets: Lisbon Road, Shasta Drive, Brookridge, Nicholas Court, Arden Avenue, 187 th Street, Glenwood Lane, 184 th Street, Hazel Court, Redvere Drive and Williams Court. Install new water main in Morningview Court in advance of the Calhoun Road widening project. Install new water main in Golf Parkway east of Elm Grove Road and Columbia Boulevard. This will serve as a second source of supply for retail development on Bluemound Road near 124th St. Install water main in conjunction with County project to widen North Avenue. 198

13 Water Utility other Water Utility vehicles/equipment (utility fund balance) Water meters (utility fund balance) Water hydrants/valves (utility fund balance) Electrical upgrades - wells/booster stations (utility fund balance) Bishops Woods well pump and motor (utility fund balance) 2018 request includes funding for a replacement pickup truck. Provides funding for new meters to be installed with radio read meters. Annual funding for hydrant replacement. Program has been modified to provide funding for ten hydrants and valves every year to accelerate replacement of older facilities and reduce leaks/lost water. Funding for various equipment and electrical upgrades as noted above in the utility budget summary. Upgrades improve safety, system operations, and improve to current technology. Replace failing pump and motor at the Bishops Woods well. 199

14 This page intentionally left blank.

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS TABLE OF CONTENTS ENTERPRISE FUNDS Storm Drainage Fund... 121-124 Off Street Parking Fund... 125-126 Airport Fund... 127-131 Water Service Fund... 132-145 STORM DRAINAGE FUND CURRENT OPERATIONS This fund

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

WATER ASSET MANAGEMENT PLAN

WATER ASSET MANAGEMENT PLAN WATER ASSET MANAGEMENT PLAN Georgetown Charter Township Ottawa County, Michigan November 2017 Where we re going: System Goals INTRODUCTION About this Document This document is our Water Asset Management

More information

WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT

WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT UTILITY NO. 5370 Class AB WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT OF SHEBOYGAN WATER UTILITY 72 PARK AVE SHEBOYGAN, WI 53081-2958 For the Year Ended: DECEMBER 31, 2017 TO PUBLIC SERVICE COMMISSION

More information

DEPARTMENT OF PUBLIC WORKS UTILITIES

DEPARTMENT OF PUBLIC WORKS UTILITIES DEPARTMENT OF PUBLIC WORKS UTILITIES Mission Statement: Public Works - Utilities is dedicated to providing water, wastewater, and environmental services to the citizens of Rio Rancho and other City Departments.

More information

WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT

WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT UTILITY NO. 3140 Class AB WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT OF LITTLE CHUTE MUNICIPAL WATER DEPT 108 W MAIN ST LITTLE CHUTE, WI 54140-1750 For the Year Ended: DECEMBER 31, 2016 TO PUBLIC

More information

WATER UTILITY. Board of Public Works/ Public Service Commission. City Administrator (.17) Utility Director (.50) Administrative Assistant II

WATER UTILITY. Board of Public Works/ Public Service Commission. City Administrator (.17) Utility Director (.50) Administrative Assistant II Board of Public Works/ Public Service Commission City Administrator (.17) Utility Director (.50) Manager Account Clerk Administrative Assistant II Operations Coordinator Part-Time Meter Reader Part-Time

More information

Utilities - Water and Sewer Funds

Utilities - Water and Sewer Funds Utilities - Water and Sewer Funds Summary of Expenditures by Fund: Water Funds: Actual Adopted Amended Adopted Amended Estimated Proposed Water Administration $ 158,511 $ 199,100 $ 199,100 $ 198,400 (0.4)

More information

WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT

WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT UTILITY NO. 5370 Class AB WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT OF SHEBOYGAN WATER UTILITY 72 PARK AVE SHEBOYGAN, WI 53081-2958 For the Year Ended: DECEMBER 31, 2016 TO PUBLIC SERVICE COMMISSION

More information

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS

More information

Water Rates DETERMINING THE REAL COST OF POTABLE WATER

Water Rates DETERMINING THE REAL COST OF POTABLE WATER Water Rates DETERMINING THE REAL COST OF POTABLE WATER Rates adopted in 2007 began producing sufficient revenue coverage to begin to develop an amount in the Water Capital Fund to be used on projects identified

More information

Operating Budget and Capital Improvement Program for Fiscal Year 2018

Operating Budget and Capital Improvement Program for Fiscal Year 2018 12770 Second Street, Yucaipa, California 92399 Operating Budget and Capital Improvement Program for Fiscal Year July 1, to June 30, Adopted June 20, Fiscal Year Table of Contents CHAPTER ONE Table of Contents...

More information

July 9, 2014 Thurston, Grays Harbor and Mason County Community Meeting with PUD Commissioners. PUD Cost of Service Presentation

July 9, 2014 Thurston, Grays Harbor and Mason County Community Meeting with PUD Commissioners. PUD Cost of Service Presentation July 9, 2014 Thurston, Grays Harbor and Mason County Community Meeting with PUD Commissioners PUD Cost of Service Presentation 1 1. Discuss the PUD s current rates and fees 2. PUD services and history

More information

PUBLIC MEETING DOCUMENTATION 2011 BUDGETS AND RATES

PUBLIC MEETING DOCUMENTATION 2011 BUDGETS AND RATES PUBLIC MEETING DOCUMENTATION 2011 BUDGETS AND RATES December 9, 2010 @ 6:00 p.m. Board Room Peterborough Utilities Office 1867 Ashburnham Drive NOTICE OF SPECIAL MEETING PETERBOROUGH UTILITIES COMMISSION

More information

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015 Stormwater Utility & Water Utility Charges & Rates October 20, 2015 1 Agenda Fiscal Policies/Goals System Development Charge Stormwater Utility Charges & Rates Water Utility Charges & Rates 2 Fiscal Policies/Goals

More information

Lookout Mountain Water District: Genesis and Evolution

Lookout Mountain Water District: Genesis and Evolution Lookout Mountain Water District: Presented by: Genesis and Evolution John Roscoe, President of the Board and Panel: Board of Directors and Contractors September 30, 2010 1 Introduction Purpose: Update

More information

DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT

DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION of the MUNICIPALITY OF THE COUNTY OF PICTOU, on behalf

More information

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016 WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results January 5, 2016. Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants Utility

More information

CIP. February,

CIP. February, 2018-2022 CIP February, 21 2017 Agenda Biennial Budget 2018/2019 Budget Calendar 2018-2022 CIP Process Prioritized List of Projects Biennial Budgeting Strategic Culture in Olathe Strategic Culture in Olathe

More information

Water Services Rate Study

Water Services Rate Study Report on the Water Services Rate Study Town of Telluride, Colorado Project No. 72447 August 2013 Water Services Rate Study prepared for Town of Telluride, Colorado August 2013 Project No. 72447 prepared

More information

COASTSIDE COUNTY WATER DISTRICT

COASTSIDE COUNTY WATER DISTRICT COASTSIDE COUNTY WATER DISTRICT 766 MAIN STREET HALF MOON BAY, CA 94019 SPECIAL MEETING OF THE BOARD OF DIRECTORS Monday, January 26, 2009 2:00 p.m. AGENDA The Coastside County Water District (CCWD) does

More information

2008 Water System Annual Report and 2009 Operating Budget

2008 Water System Annual Report and 2009 Operating Budget DRAFT The Greenville Water Authority Mercer County, Pennsylvania 2008 Water System Annual Report and 2009 Operating Budget February 2009 1. INTRODUCTION 1.1 Introduction... 1.1 1.2 Greenville Water Authority

More information

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010.

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010. UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010 Overview The service area of the Utility District s Water System includes the entire City of Riviera Beach (approximately

More information

Water Rate Study for City of Lemoore

Water Rate Study for City of Lemoore Water Rate Study for City of Lemoore June 17, 2016 Prepared by: Dan Bergmann, Principal 15 Shasta Lane, Walnut Creek, CA 94597 Email: dan@igservice.com Office: 925-946-9090 Water Rate Study for City of

More information

FINANCIAL REPORT. Report o verv. ~ ~~W - August General Fund Governmental Capital Fund. Water Fund Sewer Fund

FINANCIAL REPORT. Report o verv. ~ ~~W - August General Fund Governmental Capital Fund. Water Fund Sewer Fund ~,.;!\.city~~---.'. _. T1i~~rl)~on -.,-' ''"---,--~ ~-- Report o verv. ~ ~~W - FINANCIAL REPORT ~:-----~ ;-;;:.-. '. August 2018 General Fund Governmental Capital Fund Water Fund Sewer Fund Thornton Development

More information

2019 Capital Improvement Plan 2018 Adopted vs 2019 Request 20,000,000 15,000,000 10,000,000 5,000,

2019 Capital Improvement Plan 2018 Adopted vs 2019 Request 20,000,000 15,000,000 10,000,000 5,000, Water Utility Capital Improvement Plan Project Summary Agency Priority # Booster Pump Station 109 (Spaanem Ave) 8 - - - - 345,000 2,873,000 # Booster Pump Station 129 Reconstruction 7 - - - 384,240 4,330,000

More information

MUNICIPALITY OF ARRAN-ELDERSLIE TARA DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE TARA DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE TARA DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS EXECUTIVE

More information

DEPARTMENT SUMMARY DEPT. NO. : 85-90

DEPARTMENT SUMMARY DEPT. NO. : 85-90 DEPARTMENT SUMMARY DEPT: Municipal Water Department DEPT. NO. : 85-90 PURPOSE: The Water Department is responsible for implementing the City's utility services programs and billing. To achieve the objectives

More information

ENGINEERING AND OPERATIONS COMMITTEE. November 27, :30 PM Greenspot Road, Highland CA AGENDA

ENGINEERING AND OPERATIONS COMMITTEE. November 27, :30 PM Greenspot Road, Highland CA AGENDA ENGINEERING AND OPERATIONS COMMITTEE November 27, 2017-2:30 PM 31111 Greenspot Road, Highland CA 92346 CALL TO ORDER PLEDGE OF ALLEGIANCE PUBLIC COMMENTS NEW BUSINESS AGENDA 1. Approve the September 25,

More information

CITY OF ANAHEIM WATER UTILITY FUND. Financial Statements. June 30, 2014 and (With Independent Auditors Report Thereon)

CITY OF ANAHEIM WATER UTILITY FUND. Financial Statements. June 30, 2014 and (With Independent Auditors Report Thereon) Financial Statements (With Independent Auditors Report Thereon) Table of Contents Page Independent Auditors Report 1 Management s Discussion and Analysis (Unaudited) 3 Financial Statements: Statements

More information

ANNUAL REPORT WATER, ELECTRIC, OR JOINT UTILITY TO PUBLIC SERVICE COMMISSION OF WISCONSIN

ANNUAL REPORT WATER, ELECTRIC, OR JOINT UTILITY TO PUBLIC SERVICE COMMISSION OF WISCONSIN UTILITY NO. 398 Class C 314 (2-5-9) ANNUAL REPORT OF Name: MUKWONAGO MUNICIPAL WATER UTILITY Principal Office: 44 RIVER CREST COURT P.O. BOX 26 MUKWONAGO, WI 53149 For the Year Ended: DECEMBER 31, 28 WATER,

More information

La Cañada Irrigation District

La Cañada Irrigation District La Cañada Irrigation District Water Rate Study Report - 2009 March, 2009 201 S. Lake Blvd, Suite 803 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com March 30, 2009 Mr. Douglas M.

More information

Public Utility District #1 of Ferry County Budget. December 17, 2018

Public Utility District #1 of Ferry County Budget. December 17, 2018 Public Utility District #1 of Ferry County 2019 Budget December 17, 2018 The Approved Budget for 2019 reflects an overall reduction of approximately 3.2 percent from the 2018 Budget. The District is predicting

More information

LAKE WATER COMPANY, LLC AUG A WYOMING LIMITED LIABILITY COMPANY P0 BOX 453 WHEATLAND, WY Voo

LAKE WATER COMPANY, LLC AUG A WYOMING LIMITED LIABILITY COMPANY P0 BOX 453 WHEATLAND, WY Voo PUBLIC SERCMISON LAKE WATER COMPANY, LLC AUG 1 92010 A WYOMING LIMITED LIABILITY COMPANY P0 BOX 453 WHEATLAND, WY 82201 Public Service Commission Hansen Building, Suite 300 2515 Warren Ave. Cheyenne, WY

More information

LOUISVILLE WATER COMPANY 2018 TARIFF, RATE SCHEDULE, AND CUSTOMER FEES AND CHARGES

LOUISVILLE WATER COMPANY 2018 TARIFF, RATE SCHEDULE, AND CUSTOMER FEES AND CHARGES LOUISVILLE WATER COMPANY 2018 TARIFF, RATE SCHEDULE, AND CUSTOMER FEES AND CHARGES Presented to: Louisville Water Company Board of Water Works December 18, 2017 WATER RATES LOUISVILLE WATER COMPANY LOUISVILLE,

More information

CITY COMMISSION AGENDA MEMO March 6, BJ Edmonston, P.E., Management Assistant

CITY COMMISSION AGENDA MEMO March 6, BJ Edmonston, P.E., Management Assistant CITY COMMISSION AGENDA MEMO March 6, 2014 FROM: BJ Edmonston, P.E., Management Assistant MEETING: March 25, 2014 SUBJECT: PRESENTERS: Award Contract for Water Meter Replacement and Automation (WA1114)

More information

Beaumont-Cherry Valley Water District 2018 Operating Budget

Beaumont-Cherry Valley Water District 2018 Operating Budget Beaumont-Cherry Valley Water District 2018 Operating Budget Table of Contents Introduction Section... 1 Executive Summary... 2 Background... 4 Organization... 5 Basis of Budgeting and Accounting... 6 Budget

More information

CROMWELL FIRE DISTRICT MEETING OF THE BOARD OF COMMISSIONERS

CROMWELL FIRE DISTRICT MEETING OF THE BOARD OF COMMISSIONERS CROMWELL FIRE DISTRICT MEETING OF THE BOARD OF COMMISSIONERS Tuesday, December 18, 2018, 7:00 PM Coles Road Firehouse, 105 Coles Road Cromwell, CT 06416 AGENDA I. Call to Order and Attendance - Pledge

More information

NOTIFICATION OF INTENTION TO BEGIN OPERATIONS IN AREA CONTIGUOUS TO PRESENT SERVICE AREA UTILITY

NOTIFICATION OF INTENTION TO BEGIN OPERATIONS IN AREA CONTIGUOUS TO PRESENT SERVICE AREA UTILITY FORM REVISED 8/00 DOCKET NO. Date submitted: Date proposed for service to begin: NOTIFICATION OF INTENTION TO BEGIN OPERATIONS IN AREA CONTIGUOUS TO PRESENT SERVICE AREA UTILITY 1. Trade name used for

More information

Operating and Capital Budget. Fiscal Year July 1, 2017 June 30, 2018

Operating and Capital Budget. Fiscal Year July 1, 2017 June 30, 2018 Operating and Capital Budget Fiscal Year July 1, 2017 June 30, 2018 Budget prepared by Ralph Felix, General Manager, District Staff, and District Engineer 6/19/2017 TABLE OF CONTENTS Letter of Transmittal...

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

Module 8 Rate Design Overview for Small Water Systems

Module 8 Rate Design Overview for Small Water Systems Module 8 Rate Design Overview for Small Water Systems Workbook Financial/Managerial Series This course includes content developed by the Pennsylvania Department of Environmental Protection in cooperation

More information

2016 WATER SYSTEM ANNUAL REPORT & 2017 OPERATING BUDGET

2016 WATER SYSTEM ANNUAL REPORT & 2017 OPERATING BUDGET THE GREENVILLE WATER AUTHORITY M E RCER COUNTY, PENNS YLV AN I A 2016 WATER SYSTEM ANNUAL REPORT & 2017 OPERATING BUDGET Prepared by: Robert J. Horvat www.entecheng.com Project No.: 4631.01 Dated: Entech

More information

Capital Region Water Proposed 2019 Budget and Rates. November 20, 2018

Capital Region Water Proposed 2019 Budget and Rates. November 20, 2018 Capital Region Water Proposed 2019 Budget and Rates November 20, 2018 Road Map Successes to Date and Challenges Ahead Budget and Rate Setting Process Proposed 2019 Budgets and Rates Questions and Comments

More information

Cromwell Fire District Financial Statements March 31, 2019

Cromwell Fire District Financial Statements March 31, 2019 Financial Statements March 31, 2019 Table of Contents Executive Overview 1-4 General Fund Budget Report - Summary Budget Report - Detail EMS Billing Report Projected Fund Balance Water Division Enterprise

More information

Doña Ana Mutual Domestic Water Consumers Association INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN FY

Doña Ana Mutual Domestic Water Consumers Association INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN FY Doña Ana Mutual Domestic Water Consumers Association INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN FY 2020-2024 Infrastructure Capital Improvement Plan FY 2020-2024 ICIP for Dona Ana MDWCA Contact: Jennifer

More information

SIGNIFICANT BUDGET CHANGES

SIGNIFICANT BUDGET CHANGES Department of Environmental Services Our Mission: To build and maintain water delivery, sanitary sewer collection, and wastewater treatment systems that provide high-quality water and sewer services and

More information

THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON

THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON ALLEGHENY COUNTY, PENNSYLVANIA ANNUAL CONSULTING ENGINEER S REPORT FOR OPERATING YEAR 6-30-14 TO 6-30-15 AND BUDGET FOR FISCAL YEAR ENDING 6-30-16 NIRA

More information

Rule No. 16 Service Connections, Meters, and Customer s Facilities

Rule No. 16 Service Connections, Meters, and Customer s Facilities Sierra Park Water Company ORIGINAL SHEET Sheet #: 58-W Rule No. 16 Service Connections, Meters, and Customer s Facilities A. General 1. Utility s Responsibility a. In urban areas with dedicated front streets,

More information

BOARD OF DIRECTORS METROPOLITAN DOMESTIC WATER IMPROVEMENT DISTRICT PIMA COUNTY, ARIZONA. November 9, 2015

BOARD OF DIRECTORS METROPOLITAN DOMESTIC WATER IMPROVEMENT DISTRICT PIMA COUNTY, ARIZONA. November 9, 2015 BOARD OF DIRECTORS METROPOLITAN DOMESTIC WATER IMPROVEMENT DISTRICT PIMA COUNTY, ARIZONA ** Board Room ** Metropolitan Domestic Water Improvement District 6265 N. La Cañada Drive Tucson, AZ 85704 MINUTES

More information

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY T a p p i n g F e e C a l c u l a t i o n A p r i l 2 0 1 8 5 1 7 3 C A M P B E L L S R U N R O A D P I T T S B U R G H, P A 1 5 2 0 5-9 7 3 3 Table of Contents

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

San Antonio Water System

San Antonio Water System CONDENSED MONTHLY FINANCIAL REPORT December 2018 San Antonio, Texas CONDENSED MONTHLY FINANCIAL REPORT SAN ANTONIO WATER SYSTEM DECEMBER 31, 2018 Attached is the monthly financial report of the (SAWS)

More information

ANNUAL REPORT WATER, ELECTRIC, OR JOINT UTILITY TO PUBLIC SERVICE COMMISSION OF WISCONSIN

ANNUAL REPORT WATER, ELECTRIC, OR JOINT UTILITY TO PUBLIC SERVICE COMMISSION OF WISCONSIN UTILITY NO. 328 Class AB 313 (2-5-9) ANNUAL REPORT OF Name: MADISON WATER UTILITY Principal Office: 119 E OLIN AVENUE MADISON, WI 53713-1431 For the Year Ended: DECEMBER 31, 29 WATER,, OR JOINT UTILITY

More information

Budget Development

Budget Development 2018 2019 Budget Development Budget Reductions Since 2010 School Year Reductions Enrollment 2010-2011 $2,018,287 1986 2011-2012 $1,468,541 1990 2012-2013 $603,876 1932 2013-2014 $584,748 1850 2014-2015

More information

City of Riverbank. Water Rate Study FINAL 6/18/2015

City of Riverbank. Water Rate Study FINAL 6/18/2015 Water Rate Study FINAL 6/18/2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 June 18, 2015 6707

More information

June. Tacoma Power FINANCIAL REPORT

June. Tacoma Power FINANCIAL REPORT June Tacoma Power 2018 FINANCIAL REPORT Public Utility Board MONIQUE TRUDNOWSKI Chair WOODROW JONES Vice-Chair KAREN LARKIN Secretary BRYAN FLINT Member MARK PATTERSON Member JACKIE FLOWERS Director of

More information

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC: To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan

More information

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT 11.1 INTRODUCTION A is one of eight elements required by the Growth Management Act (GMA) to be included in Yakima County s comprehensive plan. The reason for

More information

SIGNIFICANT BUDGET CHANGES

SIGNIFICANT BUDGET CHANGES Department of Environmental Services Our Mission: To build and maintain water delivery, sanitary sewer collection, and wastewater treatment systems that provide high-quality water and sewer services and

More information

SIGNIFICANT BUDGET CHANGES

SIGNIFICANT BUDGET CHANGES Department of Environmental Services Our Mission: To build and maintain water delivery, sanitary sewer collection, and wastewater treatment systems that provide high-quality water and sewer services and

More information

TOWN OF BOILING SPRINGS NC

TOWN OF BOILING SPRINGS NC TOWN OF BOILING SPRINGS NC ANNUAL BUDGET FISCAL YEAR 2018-2019 TABLE OF CONTENTS TABLE OF CONTENTS... 2 BUDGET ORDINANCE... 3 BUDGET MESSAGE... 8 GENERAL FUND REVENUES... 10 GENERAL FUND EXPENSES... 11

More information

Official Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS. July 18, 2011

Official Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS. July 18, 2011 Official Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS July 18, 2011 The Marion County Board of County Commissioners met in a workshop session in Commission Chambers at 1:10 p.m. on Monday, July

More information

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws 216-RICR-50-05-7 TITLE 216 DEPARTMENT OF HEALTH CHAPTER 50 ENVIRONMENTAL HEALTH SUBCHAPTER 05 - WATER QUALITY PART 7 Clean Water Infrastructure Plans 7.1 AUTHORITY A. These rules and regulations are promulgated

More information

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study Capital Region Water Water and Wastewater Rate Study Report November 22, 2017 Capital Region Water Water and Wastewater Rate Study TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 RATE STUDY SCOPE AND OBJECTIVES...1

More information

Budget Public Hearing 6/16/2015

Budget Public Hearing 6/16/2015 Agenda Brea Community Benefit Financing Authority Budget FY 2014-15 Operating Budget Successor Agency Budget Brea Public Financing Authority Budget Brea Community Benefit Financing Authority Budget Midbury

More information

Eugene Water & Electric Board Adopted Budget. December 5, 2017

Eugene Water & Electric Board Adopted Budget. December 5, 2017 Eugene Water & Electric Board 208 Adopted Budget December 5, 207 Eugene Water & Electric Board 500 East 4 th Avenue/Post Office Box 048 Eugene, Oregon 97440-248 54-685-7000 www.eweb.org Board of Commissioners

More information

Budget Development

Budget Development 2018 2019 Budget Development State Aid: Update and phase-in the Foundation Aid formula. Tax Cap: Amend the formula to support multi-year planning (Allowing for more exemptions). Mandate Relief: Maximizing

More information

CLASS "C" WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT. Exact Legal Name of Respondent

CLASS C WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT. Exact Legal Name of Respondent CLASS "C" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT OF Exact Legal Name of Respondent Certificate Number(s) Submitted To The Charlotte County Budget Office

More information

CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014

CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014 CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014 CONTENTS Independent Auditors Report 2-3 Management s Discussion and Analysis 4-7 BASIC FINANCIAL STATEMENTS Statements of

More information

City Council Budget Work Session. City of McKinney August 4, 2017

City Council Budget Work Session. City of McKinney August 4, 2017 City Council Budget Work Session City of McKinney August 4, 2017 Agenda Budget Process & FY18 Overview Property Tax General Fund Revenues & Expenditures Capital Improvements Program Debt Service Water

More information

2017 Budget & Capital Improvement Plan AUGUST 29, 2017

2017 Budget & Capital Improvement Plan AUGUST 29, 2017 2017 Budget & Capital Improvement Plan AUGUST 29, 2017 FY 2017 Budget Calendar May June July August September October November December Financial Forecast & Public Safety Staffing Priorities, Programs,

More information

HILLCREST UTILITY OPERATING COMPANY CUSTOMER RIGHTS AND RESPONSIBILITIES

HILLCREST UTILITY OPERATING COMPANY CUSTOMER RIGHTS AND RESPONSIBILITIES HILLCREST UTILITY OPERATING COMPANY CUSTOMER RIGHTS AND RESPONSIBILITIES Central States Water Resources Welcome Hillcrest Utility Customers Hillcrest Utility Operating Company Inc. (Hillcrest) has improved

More information

City of Madison 2018 Capital Improvement Plan Agency Request Summary

City of Madison 2018 Capital Improvement Plan Agency Request Summary City of Madison 2018 Capital Improvement Plan Agency Request Summary Agency : Agency Request by Project (All Funds) Project 2230 Broadway ## Booster Pump Station 109 (Spaanem Ave) - 284,000 2,364,000 744,000

More information

City of Vacaville FY 2017/2018 CIP Budget, General Plan Consistency and CEQA Review Parks and Recreation

City of Vacaville FY 2017/2018 CIP Budget, General Plan Consistency and CEQA Review Parks and Recreation Parks and Recreation Park & Recreation Housing 14160 Grant Total Fund Balance $3,916,598 $3,916,598 Prior Budget Commitments ($2,770,788) ($2,770,788) Other Budget Commitments ($126,482) ($126,482) Other

More information

December February Budget & Forecast Development March 6 th Finance Committee Review of Budget & Financial Forecast March 20 th Budget Workshop March

December February Budget & Forecast Development March 6 th Finance Committee Review of Budget & Financial Forecast March 20 th Budget Workshop March December February Budget & Forecast Development March 6 th Finance Committee Review of Budget & Financial Forecast March 20 th Budget Workshop March 27 th Tentative Budget Review April 10 th Public Hearing

More information

BAYTOWN AREA WATER AUTHORITY (BAWA)

BAYTOWN AREA WATER AUTHORITY (BAWA) BAYTOWN AREA WATER AUTHORITY (BAWA) ANNUAL PROGRAM OF SERVICES 2015-16 ADOPTED BUDGET BAYTOWN AREA WATER AUTHORITY BOARD OF DIRECTORS BRENDA BRADLEY SMITH, President MIKE WILSON, Vice President WAYNE BALDWIN,

More information

Utility Enterprise Fund Water/Wastewater

Utility Enterprise Fund Water/Wastewater City of Temple Annual Budget 28 29 Utility Enterprise Fund Water/Wastewater To budget for the provision of water and sewer services to the residents of the City. All activities necessary to provide such

More information

MONROE COUNTY WATER AUTHORITY (A Discretely Presented Component Unit of the County of Monroe, New York)

MONROE COUNTY WATER AUTHORITY (A Discretely Presented Component Unit of the County of Monroe, New York) MONROE COUNTY WATER AUTHORITY (A Discretely Presented Component Unit of the County of Monroe, New York) Financial Statements as of December 31, 2017 Together with Independent Auditor s Report MONROE COUNTY

More information

The Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund.

The Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund. Attachment 1 O16-19 BACKGROUND REPORT The Utilities Fund is an enterprise fund. An enterprise fund establishes a separate accounting financial reporting mechanism for municipal services for which a fee

More information

REQUEST FOR COUNCIL ACTION

REQUEST FOR COUNCIL ACTION REQUEST FOR COUNCIL ACTION To: Mayor & City Council From: Bob Wylie, Finance Director Date: March 17, 2015 Subject: 3rd Quarter (March 2015) Budget Amendment for FY 2014-2015 Applicant Presentation: None

More information

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL City of Signal Hill 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: SUBJECT: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL BARBARA MUÑOZ DIRECTOR OF PUBLIC WORKS RESOLUTION DECLARING

More information

BEST PRACTICE 3: System Water Loss Control Overview Why a Best Practice? State Planning Requirements

BEST PRACTICE 3: System Water Loss Control Overview Why a Best Practice? State Planning Requirements BEST PRACTICE 3: System Loss Control Foundational best practice Utility operations - implemented by water utilities on their own system Customer participation not applicable Overview loss control is the

More information

FINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS

FINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS FINAL RATE SUPPORTED BUDGET TABLE OF CONTENTS Final Operating Budget WATER & WASTEWATER SUMMARY PSAB Format... 1 WATER & WASTEWATER SUMMARY... 2 Water & Wastewater Administration Summary... 3 Water Operations

More information

LaCrosse Back-flow Services 2005

LaCrosse Back-flow Services 2005 LaCrosse Back-flow Services 2005 Scope of Services: The City of LaCrosse has backflow preventers in various locations throughout the City that require annual testing, appropriate service, and reporting

More information

City of Ocoee Quarterly Report First Quarter Fiscal Year

City of Ocoee Quarterly Report First Quarter Fiscal Year City of Ocoee Quarterly Report First Quarter Fiscal Year 2008-2009 Prepared by the Finance Department February 2009 TABLE OF CONTENTS Quarterly Overview...i-iii General Fund... 1 Revenue Comparison Graph...

More information

I. INTRODUCTORY SECTION

I. INTRODUCTORY SECTION Spartanburg Water System Spartanburg, South Carolina Comprehensive Annual Financial Report For the Year Ending June 30, 2017 I. INTRODUCTORY SECTION SPARTANBURG WATER SYSTEM SPARTANBURG, SOUTH CAROLINA

More information

INTERDEPARTMENTAL SERVICES

INTERDEPARTMENTAL SERVICES INTERDEPARTMENTAL SERVICES Office of the City Engineer... 160 Mail and Printing Services... 163 Property and Facilities Management (PFM)... 164 Information Systems... 169 Interdepartmental Services Non-Departmental...

More information

Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, :00PM - 8:00PM at Seasons Lakehouse 1048 N.

Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, :00PM - 8:00PM at Seasons Lakehouse 1048 N. Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, 2018 7:00PM - 8:00PM at Seasons Lakehouse 1048 N. Lakeshore Drive, Crown Point, Indiana Community Utilities of Indiana, Inc.

More information

TOWN OF PRESCOTT VALLEY

TOWN OF PRESCOTT VALLEY TOWN OF PRESCOTT VALLEY Management Services Department WATER & SEWER RATE STUDY July 27, 2017 TOWN OF PRESCOTT VALLEY REPORT OF PROPOSAL TO REVISE CERTAIN WATER AND WASTEWATER RATES, FEES AND SERVICE CHARGES

More information

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations Town of Boones Mill Water and Sewer Ordinance Rules and Regulations SUPERVISION The Town of Boones Mill (Town) Water and Sewer Department shall be under the supervision of the Town Manager, who shall exercise

More information

BEFORE THE NORTH CAROLINA UTILITIES COMMISSION APPLICATION FOR TRANSFER OF PUBLIC UTILITY FRANCHISE AND FOR APPROVAL OF RATES INSTRUCTIONS

BEFORE THE NORTH CAROLINA UTILITIES COMMISSION APPLICATION FOR TRANSFER OF PUBLIC UTILITY FRANCHISE AND FOR APPROVAL OF RATES INSTRUCTIONS FORM REVISED 6/04 SELLER DOCKET NO. PURCHASER DOCKET NO. FILING FEE RECEIVED BEFORE THE NORTH CAROLINA UTILITIES COMMISSION APPLICATION FOR TRANSFER OF PUBLIC UTILITY FRANCHISE AND FOR APPROVAL OF RATES

More information

Staff Report. PLN , Prince William County Proposed Capital Improvement Program FY (All Magisterial Districts)

Staff Report. PLN , Prince William County Proposed Capital Improvement Program FY (All Magisterial Districts) COUNTY OF PRINCE WILLIAM 1 County Complex Court, Prince William, Virginia 22192-9201 PLANNING (703) 792-6830 Metro 631-1703, Ext. 6830 FAX (703) 792-4758 OFFICE Internet www.pwcgov.org Stephen K. Griffin,

More information

Proposed Budget. Budget Committee Meeting & Public Hearing

Proposed Budget. Budget Committee Meeting & Public Hearing Proposed 2017 19 Budget Budget Committee Meeting & Public Hearing May 31, 2017 Agenda Safety Minute Budget Committee Procedures Election of Budget Committee Chair Consider approving minutes from the March

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

CITY OF MUSKEGO WATER PUBLIC UTILITY

CITY OF MUSKEGO WATER PUBLIC UTILITY WATER PUBLIC UTILITY Muskego, Wisconsin FINANCIAL STATEMENTS WATER PUBLIC UTILITY TABLE OF CONTENTS Independent Auditors Report 1 Financial Statements Statements of Net Assets 2 3 Statements Revenues,

More information

Village of Kenilworth Fiscal Year 2019 Adopted Budget

Village of Kenilworth Fiscal Year 2019 Adopted Budget F Village of Kenilworth Fiscal Year 2019 Adopted FY 16 Delta FY18B v. FY19P 23 GENERAL FUND Total General Operating Revenues: 4,793,044 4,514,062 4,429,149 3,993,544 4,584,330 4,491,415 62,266 Administration

More information

Village of Baltimore Water & Wastewater Analysis. July 2018

Village of Baltimore Water & Wastewater Analysis. July 2018 Village of Baltimore Water & Wastewater Analysis July 2018 Table of Contents Introductory Summary... 1 Data... 1 Water Treatment Plant (WTP)... 1 Production... 2 Costs & Debts... 2 Wastewater Treatment

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

Budget Development

Budget Development 2018 2019 Budget Development State Aid: Update and phase-in the Foundation Aid formula. Tax Cap: Amend the formula to support multi-year planning (Allowing for more exemptions). Mandate Relief: Maximizing

More information