The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174)

The World Bank Municipal Services Improvement (P096481)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

Implementation Status & Results India Assam State Roads Project (P096018)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Improving Maternal and Child Health through Integrated Social Services (P123706)

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614)

STATUS OF PROJECTS IN EXECUTION FY10 SOPE SOUTH ASIA REGION. Nepal. Public Disclosure Authorized. Public Disclosure Authorized

Implementation Status & Results Chad Public Financial Management Capacity Building (P090265)

The World Bank CG Rep. Skills Development for Employability Project (P128628)

Second Public Financial Management Capacity Strengthening Project (P151492)

Public Disclosure Copy

Implementation Status & Results Report Niger Disaster Risk Management and Urban Development Project (P145268)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

Public Disclosure Copy

STATUS OF PROJECTS IN EXECUTION FY08 SOUTH ASIA REGION COUNTRY: BANGLADESH. Public Disclosure Authorized. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

The World Bank Ghana - PPP Project (P125595)

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663)

Implementation Status & Results Sri Lanka Public Sector Capacity Building (P097329)

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313)

Public Disclosure Copy

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272)

Myanmar Southeast Asia Disaster Risk Management Project (P160931)

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Public Disclosure Copy

Public Disclosure Copy

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

The World Bank MW: Mining Governance and Growth Support Project (P120825)

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

STATUS OF PROJECTS IN EXECUTION FY09 SOPE

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Public Disclosure Copy

Implementation Status & Results Burkina Faso Local Government Support Project (P120517)

Public Disclosure Copy

Public Disclosure Copy

Second Disaster Risk Management Development Policy Loan with a CAT-DDO (P155656)

Public Disclosure Copy

Mongolia: Social Security Sector Development Program

Public Disclosure Copy

Public Disclosure Copy

Transformation of Agriculture Sector Program Phase 3 PforR (P148927)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank MN-Mining Infrastructure Investment Supp (P118109) (P118109)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

Implementation Status & Results Philippines Rural Power Project (P066397)

Implementation Status & Results Mozambique Health Commodity Security Project (P121060)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Public Disclosure Copy

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Bangladesh Insurance Sector Development Project (P156823)

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

Implementation Status & Results Tajikistan Tax Administration (P127807)

Implementation Status & Results Cambodia Cambodia Trade Facilitation and Competitiveness (Julian Clark co-ttl) (P089196)

Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Public Disclosure Copy

Box 1. Indonesia: The Economic Program for Sustaining Recovery

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

The World Bank Financial Education and Financial Literacy (P120338)

West Bengal PRI (P105990)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

Public Disclosure Copy. Implementation Status & Results Report FATA Rural Livelihoods and Community Infrastructure Project (RLCIP) (P126833)

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415)

TA for Capacity Development in Hydropower and Mining Sector (P109736)

The World Bank Income Support and Employability Project (P117440)

Afghanistan: Transition to Transformation Update. January 29, 2014 JCMB Meeting. The World Bank

Big Walnut Local School District

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Public Disclosure Copy. Implementation Status & Results Report Pacific Regional Connectivity Program 2:Palau-FSM Connectivity Project (P130592)

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized STATUS OF PROJECTS IN EXECUTION FY09 SOPE COUNTRY: RWANDA Operations Policy and Country Services OCTOBER 02, 2009

Introduction The Status of Projects in Execution (SOPE) Report for FY09 provides information on all IBRD/IDA projects that were active as of June 30, 2009. The World Bank has issued a SOPE Report every year as an internal communication to the Board of Executive Directors. In accordance with the Bank s revised disclosure policy, since FY02, the SOPE Report is available to the public. The report is intended to bridge the gap in information available to the public between the Project Appraisal Document or Program Document, disclosed after the Bank approves a project, and the Implementation Completion Report, disclosed after the project closes. In addition to the project progress description, the FY09 SOPE report 1 contains project level comparisons of disbursement estimates and actual disbursements, and a table showing the loan/credit/grant amount and disbursements to date. 1 Notes: Amounts and Graphs for loans/credits/grants in currencies other than U.S. dollars may not match exactly due to exchange rate fluctuations over the life of the project. Disbursement graphs are not included for Development Policy Operations, which provide quick-disbursing financing to support policy and institutional reforms. For these operations, funds are disbursed in one or more stages (tranches), released when the borrower complies with agreed prior actions. Projects which are not yet effective may not have a planned disbursement schedule and thus will not include a graph. EAST ASIA AND PACIFIC REGION

Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-Decentr & Community Dev Prj (FY04) (P074102) 15-Jun-2004 01-Nov-2007 31-Dec-2010 Sub-national government administration (50%); Other social services (30%); Central government administration (20%) no The Project Development Objectives are to: (i) strengthen District capacity to lead a process of planning and consultation with local communities, translating their local development priorities into subprojects which are incorporated into Districts' strategic development plans, (ii). Develop a matching grants system to finance the subprojects, (iii). Validate procedures for project cycle management and financial management, through implementing the sub-projects, to replicate as basic operating procedure in 's overall decentralization program; and (iv). Introduce and promote public awareness programs to maintain a broad enabling environment of common understanding. Project is achieving its development objectives. Project results are mostly visible in terms of support to decentralization and capacity building to the local government staff and local communities. Preliminary evidence indicates that human development indicators have improved in areas of project interventions resulting from community development initiatives investments which were largely schools and health facilities. The Project is also helping communities to actively participate in making decisions on interventions that are intended for them. In the spirit of deepening decentralized service delivery for the poor, the project is also supporting capacity building and technical assistance to implementation of the Vision 2020 Umurenge Program, termed Economic Development and Poverty Reduction Strategy (EDPRS) which targets the most vulnerable segments of the population amongst the 37% of the population. IDA-H0940 Effective XDR 21.37 18.34 2.76 0.00 IDA-Q3860 Closed USD 0.46 0.00 0.00 0.46 TF-51879 Closed USD 0.73 0.34 0.00 0.39

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Lending Information/Disbursement Summary (in millions USD)

Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-Transport Sector Development Project (P079414) 28-Aug-2007 28-Aug-2007 30-Jun-2012 Central government administration (60%); Roads and highways (40%) no The objectives of the project are to improve the quality of 's paved road network and to generate sustained employment in rural areas through road maintenance works. There has been slow progress in the implementation of the project. However the Project's Development Objectives (PDOs) remains relevant and with recent agreements on the mode of implementation of the major sub-component of the project, rehabilitation of the Kigali-Ruhengeri road, the project is on track to achieving its PDO. Good progress has also been made on the formation of Road Agency envisaged in the design of the project and the relevant legislation is at parliament level. In addition, the government has adopted an increase in fuel levy for road maintenance which raises the existing tariff to 11 US cents equivalent and which will also make more funding available for maintenance of rural roads and hence creation of employment. These two actions together with proposed enactment of a Road Act, that will provide the framework for road development, should impact positively on road management in and increase the chances of the overall project PDO being achieved. IDA-H3310 Effective XDR 11.21 1.95 9.39 0.00 IDA-Q5000 Closed USD 0.60 0.00 0.00 0.60 TF-52925 Closed USD 0.90 0.89 0.00 0.01 TF-90451 Effective USD 38.00 0.00 38.00 0.00

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Lending Information/Disbursement Summary (in millions USD)

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-Rural Sector Supt APL2 (FY08) (P105176) 24-Jun-2008 31-Oct-2012 General agriculture, fishing and forestry sector (50%); Irrigation and drainage (30%); Agricultural marketing and trade (20%) no The Project Development Objective is to increase agricultural production and marketing in marshland and hillside areas targeted for development under the Project in an environmentally sustainable manner. The project became effective in the latter part of the reporting period and was still in too early a stage for meaningful progress. IDA-H4080 Effective XDR 33.10 4.36 28.54 0.00 IDA-Q6040 Closed USD 0.58 0.00 0.00 0.58 TF-90403 Closed USD 0.51 0.50 0.00 0.02 Lending Information/Disbursement Summary (in millions USD)

Project Name(ID): Sector: RW:EFA-FTI Catalytic Fund Bridge Grant (P115816) 04-Jun-2009 Primary education (65%); Secondary education (30%); Pre-primary education (5%) The Program Development Objective is to support the GoR's policy reforms on Teacher Development and Management, Textbooks, and Girls' Education with the overall aim to improve the quality of basic education. The project was not effective before the close of the reporting period.

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-Urgent Electricity Rehab SIL (FY05) (P090194) 27-Jan-2005 15-Apr-2008 30-Apr-2010 Power (83%); Renewable energy (12%); Central government administration (5%) no The objectives are to alleviate power shortages and to enhance the capabilities of energy sector institutions. The project is making good progress toward achievement of its development objectives. The Jabana HFO (Heavy Fuel Oil) thermal power plant has been commissioned and the two rehabilitation and reinforcement projects are advancing at a good pace. There is currently no load shedding in the Electrogaz Network. Additional sector legislation is moving toward parliamentary approval and once enacted, will enhance the capabilities of energy sector institutions. The successful Kivu pilot has resulted in a Gas to Power Independent Power Producer agreement, which is expected to provide about 100MW for the foreseeable future. IDA-40320 Effective XDR 25.94 23.88 2.40 0.00 Lending Information/Disbursement Summary (in millions USD)

Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-Compet & Enterprise Dev (FY01) (P057295) 19-Apr-2001 14-Feb-2005 31-Jul-2011 General finance sector (39%); General public administration sector (25%); Power (22%); General industry and trade sector (9%); General information and communications sector (5%) no The project overall objective is to establish an enabling environment for private sector-led economic growth and poverty reduction in. The project will focus on promoting a competitive climate by (a) streamlining the business environment; (b) reducing the costs and increasing the efficiency of telecommunications, water and electricity utilities, and the tea industry; and (c) improving access to financial services and provide support services to local entrepreneurs. Implementation progress towards meeting the project development objectives is going well. The legal framework for private sector development has considerably improved with the review and improvement of 14 major business laws. The financial sector is in a better shape with the reduction of nonperforming loans and an improved supervision of the banking sector. Private investment rate continues to improve, but more needs to be done to strengthen investors aftercare. The privatization program is almost completed. IDA-34990 Effective XDR 35.14 33.60 1.57 0.12 IDA-3499A Closed XDR 12.60 11.62 0.00 0.00 IDA-H3630 Effective XDR 5.61 0.60 5.29 0.00 IDA-Q2320 Closed USD 0.60 0.00 0.00 0.60

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Lending Information/Disbursement Summary (in millions USD)

Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-e TAL (FY07) (P098926) 07-Sep-2006 31-Dec-2010 Central government administration (68%); Sub-national government administration (24%); Postal services (8%) no The key objective is to improve the efficiency and effectiveness of internal government processes and to better deliver services and information in key sectors through the use of technology. The Mid-Term Review was held in July 2009; one of the recommendations was to restructure Component 3 of the project. This will be completed in September 2009. The changes only affect Component 3 and will not affect the PDO. In terms of progress towards reaching the PDO, the following has occurred: 12 Ministries and 12 District Offices have received office automation equipment allowing them to process transactions more efficiently. Furthermore, the government portal is now ready, with back end databases, to securely process and deliver the government's information to itself, to citizens, and the private sector. Over 10 Ministries and 5 Districts now have dedicated and well-updated websites, allowing them to deliver better information to citizens. One mobile application (esoko) enables the Ministry of Agriculture to deliver better service in the form of provision of market prices for commodities as well as use the data for internal processing and effectiveness. The Ministry of Health has been supplied with telemedicine equipment to allow them to deliver health services to two rural areas. IDA-H2530 Effective XDR 10.69 3.67 7.05 0.00

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Lending Information/Disbursement Summary (in millions USD)

Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-Pub Sec CB TAL (FY05) (P066386) 08-Jul-2004 01-Dec-2007 31-Dec-2009 Central government administration (83%); Vocational training (7%); Information technology (5%); Law and justice (5%) no The objectives are to enhance the capacity of public sector entities for: (a) efficient and effective performance in their redefined roles; and (b) transparency and accountability in the use of public resource. Progress towards achievement of project objectives is slow but steady. A comprehensive public financial management reform package is being implemented. This has helped to improve macroeconomic management, budget management, intergovernmental fiscal relations, accounting and reporting, integrated financial management systems, public procurement, internal and external auditing. The Government prepared its first consolidated financial statements for 2006 and has since continued the practice annually. An ambitious capacity building program for parliament was launched in 2009 aiming at reinforcing parliament's oversight function, public outreach and legislative drafting. Innovative approaches have been initiated to fast track service delivery through rapid results initiatives. IDA-39550 Effective XDR 21.28 9.41 11.66 0.00 IDA-Q3020 Closed USD 0.49 0.00 0.00 0.49 IDA-Q3021 Closed USD 0.39 0.00 0.00 0.39 TF-57314 Effective USD 3.35 0.40 2.95 0.00

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Lending Information/Disbursement Summary (in millions USD)

Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-Human Res Dev (FY00) (P045091) 06-Jun-2000 02-Dec-2003 31-Dec-2009 Secondary education (39%); Primary education (39%); Tertiary education (10%); Sub-national government administration (8%); Central government administration (4%) no The objective is to develop a long-term financing strategy for education while providing short-term resources to restore basic services. The majority of the expected results have been achieved. A larger number of community-based subprojects for primary school construction, rehabilitation and equipment were approved (125 subprojects versus 60 planned) and have contributed to increased school access. In addition, the quality of education has improved, as judged by the increased transition rate from primary to secondary education, passing from 35% at the onset of the Project to 50% now. Also, the proportion of qualified teachers has increased. As a consequence of the Project, anti-aids clubs have been established in the majority of schools in the country, increasing awareness of HIV/AIDS among students, teachers and the population at large. In terms of institutional capacity building of the education system, the Project has been instrumental in helping the government establish a Sector-Wide Approach, thus creating a venue for the donor community to provide support to the development of 's education system. Nearly 3.5 million primary school textbooks (of which 2.7 million mathematics textbooks) were distributed to schools across the country. This accomplishment contributed significantly to the government's objective of improving pupil: textbooks ratios, particularly in the area of mathematics. IDA-33670 Effective XDR 27.69 23.45 1.27 1.56 IDA-3367A Closed XDR 13.25 11.57 0.00 0.00 IDA-Q2100 Closed USD 0.60 0.00 0.00 0.60 TF-90848 Effective USD 70.00 70.00 0.00 0.00

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Lending Information/Disbursement Summary (in millions USD)

Project Name(ID): RW-1st Comm Living Standards (FY09) (P106834) 02-Apr-2009 30-Jun-2010 Sector: Other social services (50%); Health (50%) The project was restructured, or received Additional Financing during FY09: no The Program Development Objective is to support the Government of 's social protection and health policy reforms designed to reduce extreme poverty, initially in 30 pilot sectors, and to expand access to high-impact health, nutrition and population interventions at the community level. The project was not effective before the close of the reporting period. IDA-H4580 Not Effective XDR 5.97 0.00 5.97 0.00

Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-GEF Crit Ecosystm Intgrtd Mgmt (FY05) (P070700) 30-Jun-2005 16-Oct-2008 15-Oct-2009 Central government administration (40%); Sub-national government administration (32%); General agriculture, fishing and forestry sector (20%); Other social services (5%); Agricultural extension and research (3%) no The objective is to promote the adoption of ecosystem management interventions through capacity strengthening, the formulation and implementation of community-based integrated ecosystems management plans (watershed management plans, wetland catchment management plans) that achieve local, national and global benefits. Progress toward meeting the project development objective has been good. Within the first component relating to a policy framework, notable achievements continue to be made as a draft law on marshlands has been completed, and as regulatory guidelines for marshland management were adopted in early 2009. Planning for establishing a Biodiversity Information System at a national level is also completed. The second component regarding capacity building and training continues apace in 10 partner districts where recent work has focused on a series of workshops for validating watershed management plans; some additional training at the central level will be undertaken under a revised work plan adopted in early 2009. Acceptance by communities of the watershed plans has permitted start-up of investments in the third component which addresses priority investments that serve as the foundation for communitybased interventions in the remaining project period. TF-55471 Effective USD 4.30 2.21 2.09 0.00

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the co Lending Information/Disbursement Summary (in millions USD)

Project Name(ID): Sector: The project was restructured, or received Additional Financing during FY09: RW-Urb Infrastr & City Mgmt APL (FY06) (P060005) 10-Nov-2005 24-Mar-2008 31-Dec-2009 Sub-national government administration (38%); Roads and highways (30%); Other social services (20%); Sanitation (12%) no The project development objective is to increase access to priority urban infrastructure services in Kigali and two other secondary cities. The project already achieved its development objectives in terms of increased access to urban infrastructure. The end-of-project targets have been outperformed in terms of additional population having access to social infrastructure and roads and resource allocation to maintenance program. About 96,000 people have access to improved municipal social facilities in Ruhengeri and about 488,000 people in Kigali and 47,000 in Butare have access to paved roads. On the safeguards aspect, the project has laid the ground for reforms and improved resettlement policy, practices and compensation in, and has streamlined environmental management at both beneficiaries and institutional level. IDA-H1880 Effective XDR 21.67 19.92 1.69 0.00 IDA-Q3830 Closed USD 0.88 0.00 0.00 0.88 IDA-Q3831 Closed USD 0.39 0.00 0.00 0.39 TF-52413 Closed USD 0.45 0.45 0.00 0.01