1 Carlsborg Sewer Financial Plan February 2014

2 Outline Approximately how much will Carlsborg sewer customers have to pay each month? Key Assumptions Costs and Number of Connections Projected rates County subsidy needed Sensitivity analysis impact of faster or slower growth How much might it cost to connect? Connection charge Connection policies and incentives Get Connected Loan Program Page 2

3 Basic Assumptions Carlsborg system is a new utility Independent of Sequim Eventually independent of the County County subsidies are explicit and limited-term Carlsborg system must plan ahead for operating reserves and future capital costs Connection policies will be designed to encourage new connections up front Voluntary at first, but not indefinitely Wholesale agreement with Sequim for treatment and transmission Construction year is 2015; initial connection period is two years from availability Page 3

4 Assumptions Costs Paid to City Treatment Operating &Maintenance (O&M) charge Per-gallon rate paid to Sequim, based on the City s treatment O&M costs per gallon, minus State tax, plus 1.15 out-of-city multiplier Because City doesn t have to pay State tax on its revenue from Carlsborg, there is no need for Carlsborg to pay the City for that tax If the law is ever changed to make Carlsborg revenue taxable, then it should be added to the City s O&M charges Estimated for each year, with after-the-fact true up based on actual expenditures and relative flows from each party Current forecast: $.0092 per gallon (just under a penny per gallon) in 2016 Page 4

5 Assumptions Costs Paid to City Pipe charge for Sequim transmission O&M costs Flat rate paid to Sequim, based on [Estimated Carlsborg % of flows through shared pipe] multiplied by [Shared pipe lineal feet as % of total collection system lineal feet] The resulting % is multiplied by Sequim costs for collection, pumping & transmission, minus State tax, plus 1.15 multiplier Estimated for each year, with after-the-fact true up based on actual City expenditures O&M costs include proportionate share of City overhead O&M costs exclude customer billing and meter reading, because that service is not expected to be provided by the City Current forecast: Carlsborg share is 1.71% of Sequim collection system O&M after markup, $14,000/year in 2016 Page 5

6 Assumptions Costs Paid to City Initial Capacity Charge One-time buy-in payment, based on depreciated value of treatment capital assets, Estimated $1.7-$2.0 million, paid as part of project cost Future Capital Cost Share - % share depends on type of capital: Treatment capital : Based on relative projected flows in 20- year forecast, current estimate 6.3% Capital related to collection system as a whole: Same as O&M pipe charge, current estimate 1.71% Transmission route: Based on Carlsborg % of flow through particular segment to be upgraded or replaced current weighted average is 44.1% Page 6

7 Assumptions Costs Paid to City Out-of-City Multiplier Common practice with City owned utilities, can be applied to both retail and wholesale customers Recognizes risk borne by in-city ratepayers in creating and managing the system City s current out-of-city multiplier is 2.0, except where set at a different level by contract Bell Hill currently pays multiplier of 1.5 All other out-of-city customers of Sequim pay 2.0 times in-city rates We believe that City would support a reduced multiplier for Carlsborg of 1.15, subject to City Council approval Pending further discussions, forecast assumes that it applies to O&M charge but not to capital cost share or initial capacity charge Page 7

8 Assumptions Costs Paid to City City Utility Tax Paid by Sequim s in-city customers as well as out-of-city customers Calculated as 8% of gross receipts, which is equivalent to an 8.8% markup on the sewer bill before the tax When combined with the out-of-city multiplier of 1.15, the total City markup on O&M costs is 25%. City utility tax does not apply to future capital cost share, nor to initial capacity charge Page 8

9 Assumptions Capital Costs Initial project: $14.1 million in 2015 dollars Initial project funding: $14.3 million Actual project costs could be higher (if higher inflation) or lower (if capacity charge estimate is too high) Future Capital Costs (in 2013 constant dollars) Sequim Capital Cost Share: Differs by year, ranges from $5,000 in 2016 to $87,000 in 2019 Future Carlsborg system expansion: Assume beginning in 2026 (year 11) at $272,000 per year; two pump stations in 2030 (year 15) $763,000. Page 9

10 Assumptions Operating Costs Treatment O&M Cost: $82,000/year assuming 125 gpd average domestic flow Sequim pipe charge: $14,000/year Administration and billing: $16,000/year Collection system and pump station maintenance: $98,000/year State taxes (payments to Sequim can be deducted from gross revenue): $6,000/year Total O&M: about $216,000/year, of which $82,000 is variable (depends of customer growth and flows), while $134,000 is relatively fixed Page 10

11 Assumptions County Subsidy Assumptions: County is committed to getting the Carlsborg system launched, but in the future, it needs to be self-supporting Types of subsidies or potential subsidies: Initial construction - debt service on $10 million PWTF loan about $513,000 per year Initial construction shortfall in construction budget, if any currently showing a slight surplus 3-year operating subsidy, until number of customers grows and rate stabilizes current estimate about $122,000 Get Connected loan program for private plumbing costs Current assumption is about $600,000 to be repaid over ten years with 3% interest ($3,000 max loan) Page 11

12 Growth and Flow Assumptions Assumed average Equivalent Residential Unit (ERU) generates domestic flow of 125 gallons per day Equivalent to winter average metered water consumption of 5.08 ccfs per month Existing structures within range of initial sewer lines: estimate 484 ERUs, of which 78 are residential and 406 are commercial Base Case scenario assumes 75% of those 484 ERUs connect in first two years, during the Initial Connection Period The remainder connects over next 18 years, by 2035 In addition, assume 2.15% annual growth from new development 677 total ERUs by 2035 Page 12

13 Other Assumptions Financial policies Operating reserve: days of operating expenses Rate-funded capital reinvestment: 5% of annual depreciation initially Beginning in 2021: 10% of annual depreciation Beginning in 2026: 15% of annual depreciation Beginning in 2031: 20% of annual depreciation Economic assumptions Inflation 2.5% CPI, 3.5% construction inflation (ENR) Future debt (if needed) 4.75%, 20 years Initial $10 million PWTF loan 20-year payoff,.25% Page 13

14 Forecast Results Monthly Rates Basic Summary ERUs ERU Forecast (Cumulative) Percentage growth in ERUs 99.5% 3.9% 3.7% 3.6% 3.6% 3.4% County Funds County Subsidy - Debt Service 513, , , , , ,229 - County Subsidy - Get Connected Loan Program 300, , County Subsidy - Capital Project Costs County Subsidy - Operating Subsidy 101,814 15,326 4, Connection Charges Connection Charge - Existing Structures $ 500 $ 500 $ 8,109 $ 8,272 $ 8,438 $ 9,320 $ 11,370 Connection Charge - New Development $ 7,793 $ 7,949 $ 8,109 $ 8,272 $ 8,438 $ 9,320 $ 11,370 Monthly Rates Volume Rate (per ccf winter average) $7.43 $ 6.92 $ 6.89 $ 6.86 $ 6.83 $ 6.69 $ 6.43 Monthly Base Charge per ERU $30.24 $ $ $ $ $ $ Avg Volume Charge/ERU (125 gpd winter avg) $37.76 $ $ $ $ $ $ Total Monthly Charge/ERU (125 gpd winter avg) $68.00 $ $ $ $ $ $ Increase/(decrease) in monthly rate 0.0% 0.0% 0.8% -0.8% -0.7% 1.2% Total Monthly Charge/ERU (constant 2014 dollars) $64.72 $63.14 $61.60 $60.58 $58.65 $51.78 $65.43 Flat Rate for Properties on Wells (@175 gpd) $83.10 $82.07 $82.01 $82.49 $81.91 $81.54 $ Note: 2015 is assumed to be the construction year Page 14

15 Sensitivity Analysis Summary - Total Monthly Charge per ERU Base Case $68.00 $68.00 $68.00 $68.54 $68.01 $67.94 $ % Connected in first two years 75% Converted ERUs - annual growth 1.61% New Development - annual growth 2.15% Slower Growth $87.00 $87.00 $87.00 $86.62 $86.14 $87.96 $ % Connected in first two years 50% Converted ERUs - annual growth 1.50% New Development - annual growth 1.50% Faster Growth $62.00 $62.00 $62.00 $61.92 $61.10 $60.38 $89.61 % Connected in first two years 90% Converted ERUs - annual growth 2.00% New Development - annual growth 3.00% Take-home messages: This would not be possible without the County Without debt service subsidy, initial rate would be $142 instead of $68/month Keeping monthly rates manageable depends on getting existing properties connected as soon as possible Page 15

16 Connection Charge Connection Charge 2015 Calculations Notes Capital Projects (2013 Dollars) $ 16,573,895 Inflation to Convert to 2015 $ 1,180,476 Adds two years of inflation to escalate to system construction year Capital Projects (2015 Dollars) $ 17,754,371 Initial System Built in Construction Year (2015) plus collection system for UGA Estimated ERUs 2,324 Estimated ERUs in 40 years Connection Charge $ 7,640 Maximum Connection Charge per ERU in 2015 Connection Charge 2025 Calculations Notes Existing Cost Basis Existing Assets (2013 Dollars) $ 13,094,595 Inflation to Convert to 2015 $ 932, $ 14,027,257 Plus: 10 Years of Interest Weighted Interest Rate 1.69% $10M with 0.25%, $4M with 5.30% (1/30/14 Bond Buyer Revenue Bond Index) Applied to Existing Assets $ 2,374,614 Interest on Existing Assets per (10 Years worth) Total Existing Cost Basis $ 16,401,872 Future Cost Basis Planned Capital Projects (2025 Dollars) $ 5,257,461 Carlsborg capital projects planned but not yet built Total Cost Basis $ 21,659,333 Estimated ERUs Projected Connection Charge 2025 $ 9, Year Average Increase per Year 2.01% 2,324 Estimated ERUs in 40 years Page 16

17 Connection Charge Connection Charge Schedule 10-Year Average Annual Increase 2.01% $ 7,640 $ 7,793 $ 7,949 $ 8,109 $ 8, $ 8,438 $ 8,607 $ 8,780 $ 8,957 $ 9,136 $ 9,320 Page 17

18 Rate Comparison Rate and Connection Charge Comparison Connection Charge Carlsborg Projected Existing Structures $ 500 $ 500 $ 8,109 New Development $ 7,793 $ 7,949 $ 8,109 Sequim In-City $ 8,550 $ 8,800 $ 9,050 Out-of-City assuming 1.15 multiplier $ 9,833 $ 10,120 $ 10,408 Monthly Sewer Charges per ERU Carlsborg (assuming 5.08 ccf/month winter avg) $68.00 $68.00 $68.00 Carlsborg (assuming 8 ccf/month winter avg) $89.67 $88.19 $88.10 Sequim In-City Low Volume SF Res (<8 ccf/mo winter avg) $62.25 $64.74 $67.33 High Volume SF Res (>8 ccf/mo winter avg) $72.23 $75.12 $78.12 Sequim Out-of-City (assuming 1.15 multiplier) Low Volume SF Res (<8 ccf/mo winter avg) $71.58 $74.45 $77.42 High Volume SF Res (>8 ccf/mo winter avg) $83.06 $86.39 $89.84 Projected monthly rate is higher than Sequim Projected connection charge is lower than Sequim Page 18

19 Potential Revisions to Forecast Estimate of initial capacity buy-in charge to Sequim needs to be updated Need to factor in existing properties with wells Recommend assuming 175 gpd instead of 125 gpd Page 19

20 Connection Policies Need to balance desire for voluntary connections with the goal of avoiding extremely high rates Suggested policy No new septic systems; if existing septic system fails, must extend the line (if necessary) and connect The property owner(s) who extend a line can enter into developer reimbursement agreements and receive latecomer fees Potential hardship exception, if cost of extending line would be over 125% of cost of an approved septic system, and if property owner signs a nonprotest agreement for a future ULID to extend the line (similar to EUGA provision) If sewer is <200 feet, must connect within one year unless: It has been less than 20 years since existing septic system has been constructed or substantially renovated, and the septic system is designed to remove 50% of nitrates After the 20-year point, the property must be connected, at thenprevailing connection charges Page 20

21 Incentives In order to scale up, we need both carrot and stick The connection policy creates the certainty that eventually the property will have to be connected However, there should also be an incentive to connect for those property owners who have an option Recommend connection charge for existing structures (with septic systems) who connect within Initial Connection Period of 2 years: $500 Page 21

22 Incentives Property Owner Decision-Making - Example Example: Based on age of septic system, could wait until Cost of side sewer & septic decommissioning is $3,000. Connection charge up-front is $500. Connection charge in 2025 would be $8,571. Assumed average monthly sewer charge is $68.00/month. Assume inflation for private plumbing costs is 3% per year. Connection Year: Cost to Customer Connection charge $ 500 $ 8,571 Private plumbing costs 3,000 4,032 Monthly sewer bills for ten years 8,160 - Total Cost to Customer $ 11,660 $ 12,603 Savings from connecting in 2015 $ 943 Page 22

23 Get Connected Loan Program A way to make it possible for property owners to connect who are motivated to do so Private plumbing costs are an especially significant factor for single-family residential customers Assumed maximum $3,000 loan for 10 years at 3% Monthly payment to customer: $28.97 added to sewer bill County can opt to offer coordinated bidding and construction management as well If 200 properties take advantage of option, up-front cost to County $600,000; repayments $70,000/year Page 23

MONROE CITY COUNCIL. Agenda Bill No

MONROE CITY COUNCIL. Agenda Bill No MONROE CITY COUNCIL Agenda Bill No. 15149 TITLE: Discussion: Impact Fees DATE: DEPT: CONTACT: PRESENTER: ITEM: 08/25/2015 Public Works Brad Feilberg Brad Feilberg Discussion: 08/25/2015 Attachments: 1.

More information

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc.

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc. 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 Date: June 21, 2016 To: Mr. Bob Walker, Executive Director From: Lex Warmath and Elaine Conti,

More information

Rates and Fees for New Connections (Developer Fees)

Rates and Fees for New Connections (Developer Fees) Rates and Fees for New Connections (Developer Fees) Table V: New Connection (Developer) Rates and Fees Effective Date 1/1/2019 1/1/2020 1/1/2021 A. Plan Review Fees Per Linear Foot (LF) - Water $0.65 $0.65

More information

Financial Analysis INTRODUCTION FINDINGS AND TRENDS PAST FINANCIAL PERFORMANCE. Comparative Financial Statement

Financial Analysis INTRODUCTION FINDINGS AND TRENDS PAST FINANCIAL PERFORMANCE. Comparative Financial Statement 9 INTRODUCTION This chapter has been prepared by FCS Group to provide a financial program that enables the City of Sultan (City) to remain financially viable through the next 6-year planning period and

More information

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015 Stormwater Utility & Water Utility Charges & Rates October 20, 2015 1 Agenda Fiscal Policies/Goals System Development Charge Stormwater Utility Charges & Rates Water Utility Charges & Rates 2 Fiscal Policies/Goals

More information

Sewer Master Plan BCC Workshop November 15, 2016

Sewer Master Plan BCC Workshop November 15, 2016 Updated 11/10/16 BOARD OF COUNTY COMMISSIONERS (BCC) CHARLOTTE COUNTY UTILITIES DEPARTMENT Sewer Master Plan BCC Workshop November 15, 2016 C h a r l otte Count y Utilities D e pt. 1 SEWER SYSTEM EXPANSION

More information

Rate Comparison & Benchmarking Analysis

Rate Comparison & Benchmarking Analysis + Rate Comparison & Benchmarking Analysis Final Report September 2016 Firm Headquarters Redmond Town Center 7525 166 th Ave. NE Suite D-215 Redmond, WA 98052 T: (425) 867-1802 F: (425) 867-1937 www.fcsgroup.com

More information

MONROE CITY COUNCIL. Agenda Bill No

MONROE CITY COUNCIL. Agenda Bill No MONROE CITY COUNCIL Agenda Bill No. 15-145 TITLE: Discussion: Utility Rates (Postponed from August 18, 2015) 1 DATE: DEPT: CONTACT: PRESENTER: ITEM: 08/18/2015 Public Works Brad Feilberg Brad Feilberg

More information

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente Final COST OF SERVICE STUDY SEPTEMBER 2017 City of San Clemente Contents CONTENTS Executive Summary... 1 Study Goals and Drivers... 1 Water Rate Analysis & Adoption... 2 Recycled Water Rate Analysis &

More information

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY T a p p i n g F e e C a l c u l a t i o n A p r i l 2 0 1 8 5 1 7 3 C A M P B E L L S R U N R O A D P I T T S B U R G H, P A 1 5 2 0 5-9 7 3 3 Table of Contents

More information

WATER AND SEWER RATE STUDY

WATER AND SEWER RATE STUDY FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO. 179322.0100 PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company 2011. All rights reserved. City of Lynwood, CA WATER AND SEWER

More information

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study Capital Region Water Water and Wastewater Rate Study Report November 22, 2017 Capital Region Water Water and Wastewater Rate Study TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 RATE STUDY SCOPE AND OBJECTIVES...1

More information

FY 2018 and FY 2019 Public Hearing, Rates & Charges. Board of Directors Meeting July 11, 2017

FY 2018 and FY 2019 Public Hearing, Rates & Charges. Board of Directors Meeting July 11, 2017 FY 2018 and FY 2019 Public Hearing, Rates & Charges Board of Directors Meeting July 11, 2017 FY18 & FY19 Public Hearing, Rates & Charges Agenda Item 14 Conduct a public hearing to consider Water System

More information

McKenzie Surface Water Source Alternatives

McKenzie Surface Water Source Alternatives McKenzie Surface Water Source Alternatives Springfield Utility Board May 2017 Purpose & Scope The purpose of this analysis is to provide the Springfield Utility Board (SUB) Board of Directors information

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information

PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES

PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES Burlingame Hills Sewer Maintenance District (District) Burlingame Public Library Lane Community Room 480 Primrose Road Burlingame, CA January 14, 2009

More information

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017 City Council Public Hearing February 13, 2017 Public Hearing on Proposed Water Rates PRESENTED BY Kelly J. Salt Partner 2016 Best Best & Krieger LLP Article X, section 2 (1928) The general welfare requires

More information

March 25, To the Honorable, the City Council: RECOMMENDATIONS

March 25, To the Honorable, the City Council: RECOMMENDATIONS To the Honorable, the City Council: March 25, 2019 RECOMMENDATIONS The City administration and City Council continue to recognize the importance of minimizing increases in water and sewer rates. I recommend

More information

Regional Wastewater System Financial Assessment Technical Memorandum

Regional Wastewater System Financial Assessment Technical Memorandum Regional Wastewater System Financial Assessment Technical Memorandum To: From: CC: Project: Subject: Sarpy County Tom Gould - HDR David Dechant HDR Judy Dean HDR Joe Roberts HDR File Southern Sarpy County

More information

Peters Township Sanitary Authority. Summary Report of Tapping Fee Calculation and Connection Charges

Peters Township Sanitary Authority. Summary Report of Tapping Fee Calculation and Connection Charges Peters Township Sanitary Authority Summary Report of Tapping Fee Calculation and Connection Charges June 30, 2008 Update No. 2 August 12, 2008 Summary Report Tapping Fee Calculation and Connection Charges

More information

FY18 SCHEDULE OF USER FEES October 1, 2017 September 30, UTILITIES - RECLAIMED WATER Adopted

FY18 SCHEDULE OF USER FEES October 1, 2017 September 30, UTILITIES - RECLAIMED WATER Adopted UTILITIES - RECLAIMED WATER I. New Service Connection Fees for Systems on Existing Mains A. Unmetered Service 1. Service connection - unmetered service 1" $790 2. Service connection - unmetered service

More information

Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems

Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems 1) How much revenue does Chatham Borough need to collect to operate and maintain its water and sewer systems? A:

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

Final Report Water and Sewer Rate Model Town of Denton, MD

Final Report Water and Sewer Rate Model Town of Denton, MD Final Report Water and Sewer Rate Model Town of Denton, MD January 30, 2014 MCET Water and Sewer Rate Model for Denton, MD Page 1 Table of Contents Water and Sewer Rate Model Study Town of Denton, MD January

More information

YORK COUNTY, SOUTH CAROLINA

YORK COUNTY, SOUTH CAROLINA YORK COUNTY, SOUTH CAROLINA Water and Sewer Financial Planning and Rate Study Report October 25, 2017 1031 S. Caldwell Street Suite 100 Charlotte, NC 28203 Phone 704.373.1199 Fax 704.373.1113 www.raftelis.com

More information

SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014

SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014 SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014 Adopted May 20, 2014 TABLE OF CONTENTS IMPACT FEE CERTIFICATION... 3 SECTION 1: EXECUTIVE SUMMARY... 4 PROPOSED CULINARY WATER IMPACT

More information

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS B&V PROJECT NO. 179801.0100 PREPARED FOR Vallecitos Water District,

More information

La Cañada Irrigation District

La Cañada Irrigation District La Cañada Irrigation District Water Rate Study Report - 2009 March, 2009 201 S. Lake Blvd, Suite 803 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com March 30, 2009 Mr. Douglas M.

More information

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges UNC School of Government EFC 2017 Water & Wastewater Finance Workshop February 28 March 1, 2017 The William & Ida Friday

More information

UTILITY RATE STUDY. Public Hearing

UTILITY RATE STUDY. Public Hearing UTILITY RATE STUDY Public Hearing. Public January 23, 2018 Resources Management Group, Inc. Utility, Rate, Financial, and Management Consultants Rate Guiding Principles Recognized Revenues Should Be Sufficient

More information

Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1. A Division of NewGen Strategies & Solutions, LLC

Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1. A Division of NewGen Strategies & Solutions, LLC Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of NewGen Strategies & Solutions, LLC Revised: October 23, 2013 Agenda Fundamental Assumptions Key Issues Recommendations

More information

City of Snoqualmie. Water, Sewer and Storm Utilities Rate Study Update. Council Meeting. January 23, Sergey Tarasov, Project Manager

City of Snoqualmie. Water, Sewer and Storm Utilities Rate Study Update. Council Meeting. January 23, Sergey Tarasov, Project Manager City of Snoqualmie Water, Sewer and Storm Utilities Rate Study Update Council Meeting January 23, 2017 Sergey Tarasov, Project Manager Discussion Outline Revenue requirement Rate design New customer charges

More information

City of Sanibel. Sewer Expansion Feasibility Study Update GAI #A

City of Sanibel. Sewer Expansion Feasibility Study Update GAI #A City of Sanibel Sewer Expansion Feasibility Study 2011 Update GAI # July 2011 July 12, 2011 GAI Proj. # Mr. Gates Castle Utility Director City of Sanibel 800 Dunlop Road Sanibel, FL 33957 Subject: Sewer

More information

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013 MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA

More information

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY Summary of Findings October 2003 Financial Consulting Solutions Group, Inc. 8201 -- 164th Ave. NE, Suite 300, Redmond, WA

More information

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260 April 6, 2016 Katherine Godbey Director of Finance, Coachella Valley Water District 75515 Hovley Lane East Palm Desert, CA 92260 Dear Ms. Godbey: Hawksley Consulting (a subsidiary of MWH Global) is pleased

More information

LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO

LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO 2019-02 A RESOLUTION OF THE AUTHORITY BOARD ESTABLISHING WASTERWATER SYSTEM TAPPING FEES IN ACCORDANCE WITH ACT 57 OF 2003 WHEREAS, London Grove

More information

TOWN OF PRESCOTT VALLEY

TOWN OF PRESCOTT VALLEY TOWN OF PRESCOTT VALLEY Management Services Department WATER & SEWER RATE STUDY July 27, 2017 TOWN OF PRESCOTT VALLEY REPORT OF PROPOSAL TO REVISE CERTAIN WATER AND WASTEWATER RATES, FEES AND SERVICE CHARGES

More information

Meeting & Outreach efforts

Meeting & Outreach efforts May 30, 2014 Meeting & Outreach efforts February 27th Proposed Compensation Plan Distributed to Joint Admin/WWOC March 5th Joint Admin/WWOC Meeting First discussion on proposed Compensation Plan April

More information

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT February 2, 218 This page was intentionally left blank. City of Calistoga Water Rate Study Report Page 2 February 2, 218 Dylan Feik City Manager City of

More information

INSTITUTE AND FACULTY OF ACTUARIES AUDIT TRAIL

INSTITUTE AND FACULTY OF ACTUARIES AUDIT TRAIL INSTITUTE AND FACULTY OF ACTUARIES AUDIT TRAIL April 2017 CA2: Model Documentation, Analysis and Reporting Paper 1 Institute and Faculty of Actuaries Student loan repayment model Objective The Dean of

More information

Water Rates Adjustments Phase 2

Water Rates Adjustments Phase 2 Water Rates Adjustments Phase 2 Presented by Shana E. Epstein Director of Public Works, City of Beverly Hills Background Phase 1-Effective January 18, 2018 5-year revenue requirement 3% annual increase

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday July

More information

Water and Sewer Rate Study

Water and Sewer Rate Study Water and Sewer Rate Study Presentation to the Village Board April 26, 2016 Presented by: Eric Callocchia Manager Contents 1 2 3 4 5 6 7 8 Rate Study Background and Purpose Projected Expenses Projected

More information

Budgeting for Municipal Enterprises

Budgeting for Municipal Enterprises Budgeting for Municipal Enterprises Glenn Barnes & Shadi Eskaf Senior Project Directors Environmental Finance Center at UNC School of Government SOG Course: Budgeting in Local Government Chapel Hill, NC

More information

2019 BUDGET EXECUTIVE SUMMARY Submitted by: Liesel M. Gross, Chief Executive Officer October 16, 2018

2019 BUDGET EXECUTIVE SUMMARY Submitted by: Liesel M. Gross, Chief Executive Officer October 16, 2018 LEHIGH COUNTY AUTHORITY 1053 SPRUCE ROAD * P.O. BOX 3348 * ALLENTOWN, PA 18106-0348 610-398-2503 * FAX 610-398-8413 * www.lehighcountyauthority.org email: service@lehighcountyauthority.org 2019 BUDGET

More information

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District 3585 Maple Street, Suite 250 Ventura, CA 93003 805-404-1467 Montecito Sanitary District Wastewater Rate Study Report March 2016 Montecito Sanitary District 1042 Monte Cristo Lane Santa Barbara CA 93108

More information

Presented By: L. Carson Bise II, AICP President

Presented By: L. Carson Bise II, AICP President Impact Fee Basics: Methodology and Fee Design Presented By: L. Carson Bise II, AICP President Basic Options for One-Time Infrastructure Charges Funding from broad-based revenues (general taxes) Growth

More information

Budgeting for Municipal Enterprises

Budgeting for Municipal Enterprises Budgeting for Municipal Enterprises Glenn Barnes & Shadi Eskaf Senior Project Directors Environmental Finance Center at UNC School of Government SOG Course: Budgeting in Local Government Chapel Hill, NC

More information

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE Mid Flat Rate Increases Limited CIP through Year 5 Reserves recover by Year 10 Phased In CIP Spending 2. 10 Year Phase In 100% of CIP by Year 10 100% of Reserves by Year 10 3. 5 Year Phase In 100% of CIP

More information

CITY OF NEWPORT NEWS

CITY OF NEWPORT NEWS CITY OF NEWPORT NEWS OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: The Honorable City Council City Manager This third quarter forecast of revenues and expenditures, prepared by the Department of Budget

More information

Lorie Tinfow, City Manager, City of Pacifica Lorenzo Hines Jr., Assistant City Manager, City of Pacifica

Lorie Tinfow, City Manager, City of Pacifica Lorenzo Hines Jr., Assistant City Manager, City of Pacifica DATE: March 7, 2017 TO: FROM: SUBJECT: Lorie Tinfow, City Manager, Lorenzo Hines Jr., Assistant City Manager, Douglas Dove, President Michael DeGroot, Financial Analyst Abigail Seaman, Financial Analyst

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

FORT COLLINS- LOVELAND WATER DISTRICT

FORT COLLINS- LOVELAND WATER DISTRICT FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors

More information

City of Cocoa FY 2010 Utility Rate Study. Final Report. Water, Sewer & Reclaimed Water Rates, Fees & Charges Study. Prepared by:

City of Cocoa FY 2010 Utility Rate Study. Final Report. Water, Sewer & Reclaimed Water Rates, Fees & Charges Study. Prepared by: p FY 2010 Utility Rate Study Water, Sewer & Reclaimed Water Rates, Fees & Charges Study June 29, 2010 Prepared by: June 29, 2010 W.E. Mack Finance Director 65 Stone Street Cocoa, FL 32922 Re: FY 2010

More information

Water & Sewer Rate Presentation

Water & Sewer Rate Presentation Water & Sewer Rate Presentation Financial Analysis Adam Brown, City Manager Kari Ott, CPA 1 2 Two things you don t want to worry about: 3 Ontario Water System 97 miles of water line 4 Ontario Sanitary

More information

WATER RATE AND FINANCIAL POLICY TACOMA PUBLIC UTILITIES WATER DIVISION

WATER RATE AND FINANCIAL POLICY TACOMA PUBLIC UTILITIES WATER DIVISION WATER RATE AND FINANCIAL POLICY TACOMA PUBLIC UTILITIES WATER DIVISION March 2017 Adopted by Public Utility Board Resolution U-10910 on February 22, 2017 Adopted by City Council Ordinance No. 28413 on

More information

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Phase 2 Cost of Service and Rate Design BLACK & VEATCH PROJECT NO. 192366 Black & Veatch Holding Company 2017. All rights

More information

Table 2-2 Projected Water Production and Costs

Table 2-2 Projected Water Production and Costs Table 2-2 Projected Water Production and Costs Recorded Estimated Budget Forecast Description FY 2007-08 FY 2008-09 FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 Well Production (OCWD, A-F, a)

More information

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016 WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results January 5, 2016. Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants Utility

More information

City of Newport News Virginia. Waterworks Ratings Presentation. April 27, 2017

City of Newport News Virginia. Waterworks Ratings Presentation. April 27, 2017 City of Newport News Virginia Waterworks Ratings Presentation April 27, 2017 I. Overview Newport News Waterworks Mission Statement: To provide high quality drinking water and support public health, safety,

More information

Santa Clarita Water Division

Santa Clarita Water Division Santa Clarita Water Division Retail Water Rate Cost of Service Study Report September 2017 445 S Figueroa St Suite 2270 Los Angeles, CA 90039 Phone 213.262.9300 www.raftelis.com September 11, 2017 Mr.

More information

The City of Sierra Madre

The City of Sierra Madre The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December

More information

Page 2 of 11. Operating Fund Current Plan Last Plan Target 25. Rev vs. Exp 50 CIP. Long-Term Borrowing Current Plan Last Plan

Page 2 of 11. Operating Fund Current Plan Last Plan Target 25. Rev vs. Exp 50 CIP. Long-Term Borrowing Current Plan Last Plan Ann Arbor Water and Wastewater Cost of Service Study and Rate Analysis Advisory Committee Meeting Summary Tuesday, September 19, 2017 4:00 p.m. to 6:00 p.m. 1. Participant List See Attachment #1 2. Welcome

More information

Water and Sewer Rate Study Trophy Club MUD No. 1. A Division of NewGen Strategies & Solutions, LLC

Water and Sewer Rate Study Trophy Club MUD No. 1. A Division of NewGen Strategies & Solutions, LLC Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of NewGen Strategies & Solutions, LLC February 18, 2014 Agenda Fundamental Assumptions Key Issues Recommendations Monthly

More information

City of Riverbank. Water Rate Study FINAL 6/18/2015

City of Riverbank. Water Rate Study FINAL 6/18/2015 Water Rate Study FINAL 6/18/2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 June 18, 2015 6707

More information

Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014

Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014 Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014 I. FLAT FEES Certificate of Availability Fee - New (W & S each) Residential - Single family residence $70.00 Commercial

More information

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives Table of Contents Executive Summary ES.1 Findings and Recommendations... ES-1 Chapter 1. Introduction 1.1 Overview... 1-1 1.2 Current Rates... 1-1 1.3 Rate Making Objectives... 1-1 Chapter 2. Revenue Requirement

More information

City of Seward. 2012/2013 Budget Worksession #7 Harbor, SMIC, Electric, Debt, CIP

City of Seward. 2012/2013 Budget Worksession #7 Harbor, SMIC, Electric, Debt, CIP City of Seward 2012/2013 Budget Worksession #7 Harbor, SMIC, Electric, Debt, CIP Harbor Enterprise Fund Harbor-related cash, p. 53 Harbor Enterprise Fund = $505,871 (9/11) versus assets of $32.3M HC; $22.3M

More information

APPENDIX B. Water/Wastewater Connection Fees. 1. Basis B Authority B Connection Fees B-1thru B Calculating Connection Fees B-2

APPENDIX B. Water/Wastewater Connection Fees. 1. Basis B Authority B Connection Fees B-1thru B Calculating Connection Fees B-2 APPENDIX B Water/Wastewater Connection Fees Article Page 1. Basis B-1 2. Authority B-1 3. Connection Fees B-1thru B-2 4. Calculating Connection Fees B-2 5. Connection Fee Worksheet, Residential Water B-3

More information

Important information from the City of Clawson. So, What s Happening With My Water Bill?

Important information from the City of Clawson. So, What s Happening With My Water Bill? Important information from the City of Clawson So, What s Happening With My Water Bill? Although this is a somewhat lengthy document, it will explain the water and sewer bill and some of the history of

More information

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services

More information

Fair Hydro Plan. An Assessment of the Fiscal Impact of the Province s Fair Hydro Plan

Fair Hydro Plan. An Assessment of the Fiscal Impact of the Province s Fair Hydro Plan Fair Hydro Plan An Assessment of the Fiscal Impact of the Province s Fair Hydro Plan Spring 2017 About this Document Established by the Financial Accountability Officer Act, 2013, the Financial Accountability

More information

RATE & FEE SCHEDULE AMENDED July 1, 2018

RATE & FEE SCHEDULE AMENDED July 1, 2018 RATE & FEE SCHEDULE AMENDED July 1, 2018 I. FLAT FEES & CHARGES Certificate of Availability Fee - New (Water & Sewer Each) Residential - Single Family Residence $70.00 Commercial & Short Plats $200.00

More information

Valencia Water Company. Cost of Service Study

Valencia Water Company. Cost of Service Study Valencia Water Company Cost of Service Study 2018 2020 Prepared By: Kenneth J. Petersen, P.E. Beverly Johnson, CPA John Garon, Consultant September 2017 1 P age Contents EXECUTIVE SUMMARY... 1 INTRODUCTION...

More information

Managing Financial Risk and Declining Demand. Presentation Outline

Managing Financial Risk and Declining Demand. Presentation Outline Managing Financial Risk and Declining Demand Washington Association of Sewer & Water Districts Spring Conference April 13, 2012 John Ghilarducci Presentation Outline 1. Why Consumption is Declining Potential

More information

Lake Powell Pipeline Economic Feasibility Analysis for Washington County, UT

Lake Powell Pipeline Economic Feasibility Analysis for Washington County, UT Lake Powell Pipeline Economic Feasibility Analysis for Washington County, UT October 2015 Lake Powell Pipeline Feasibility for Washington County Water District The following summarizes concerns about

More information

WASTEWATER FINANCIAL PLAN STUDY REPORT

WASTEWATER FINANCIAL PLAN STUDY REPORT WASTEWATER FINANCIAL PLAN STUDY REPORT FINAL October 7, 2013 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583. 1894 Fax 626.583. 1411 www.raftelis.com October 7, 2013 Mr.

More information

Sewer Rate Study CRESCENT CITY CALIFORNIA

Sewer Rate Study CRESCENT CITY CALIFORNIA CRESCENT CITY CALIFORNIA Sewer Rate Study 27368 Via Industria, Suite 110, Temecula, California 925904856 T 951.587.3500 800.755.6864 F 888.326.6864 www.willdan.com Mr. Eugene Palazzo City Manager City

More information

Winnetka Village Council STUDY SESSION Village Hall 510 Green Bay Road Tuesday, December 13, :00 PM AGENDA. 2) Water Rate Study...

Winnetka Village Council STUDY SESSION Village Hall 510 Green Bay Road Tuesday, December 13, :00 PM AGENDA. 2) Water Rate Study... Winnetka Village Council STUDY SESSION Village Hall 510 Green Bay Road Tuesday, December 13, 2016 7:00 PM Emails regarding any agenda item are welcomed. Please email contactcouncil@winnetka.org, and your

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday November

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $10.82 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.86 per 1,000 gallons 8,001 gallons through

More information

Due to the numerous sections and comprehensiveness of this PP/OP, the following index is provided for quick reference and clarity:

Due to the numerous sections and comprehensiveness of this PP/OP, the following index is provided for quick reference and clarity: PHYSICAL PLANT OPERATING POLICY AND PROCEDURE : Utility Cost Projection DATE: September 7, 2007 PURPOSE The purpose of this Physical Plant Operating Policy and Procedure (PP/OP) is to establish a standard

More information

Utility Rate Discussion. Edmonds City Council October 11, 2016

Utility Rate Discussion. Edmonds City Council October 11, 2016 Utility Rate Discussion Edmonds City Council October 11, 2016 Sewer Rates Assume a monthly rate Assume 1,000 cubic feet of water usage per month Includes all applicable taxes Current Sewer Rates Seattle

More information

Eugene Water & Electric Board Adopted Budget. December 5, 2017

Eugene Water & Electric Board Adopted Budget. December 5, 2017 Eugene Water & Electric Board 208 Adopted Budget December 5, 207 Eugene Water & Electric Board 500 East 4 th Avenue/Post Office Box 048 Eugene, Oregon 97440-248 54-685-7000 www.eweb.org Board of Commissioners

More information

Sewer Rate Study July 2016

Sewer Rate Study July 2016 July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1

More information

CITY OF THOUSAND OAKS

CITY OF THOUSAND OAKS CITY OF THOUSAND OAKS 2018 Wastewater Financial Plan Update Final Report / June 23, 2017 445 S. Figueroa Street Suite #2270 Los Angeles, CA 90071 Phone 213.262.9300 Fax 213.262.9303 www.raftelis.com June

More information

FINANCIAL PLAN REVIEW AND FORECAST

FINANCIAL PLAN REVIEW AND FORECAST Napa Sanitation District Cost of Service Rate and Capacity Charge Study Technical Memorandum #2 FINANCIAL PLAN REVIEW AND FORECAST DRAFT March 2018 Contents 1 Introduction 1 1.1 Project Background 1 1.1.1

More information

Water and Sewer Rates in the Carson River Watershed

Water and Sewer Rates in the Carson River Watershed Water and Sewer Rates in the Carson River Watershed April 20, 2016 Advisory Report prepared by: Contents Introduction... 4 Summary of Water Rate Changes... 6 Summary of Sewer Rate Changes... 7 Carson

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

M A N I T O B A ) Order No. 93/09 ) THE PUBLIC UTILITIES BOARD ACT ) June 9, 2009

M A N I T O B A ) Order No. 93/09 ) THE PUBLIC UTILITIES BOARD ACT ) June 9, 2009 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) June 9, 2009 BEFORE: Graham Lane, CA, Chairman Susan Proven, P.H.Ec., Member Monica Girouard, C.G.A., Member REGULATORY REQUIREMENTS - RATE SETTING,

More information

SAN FRANCISCO WATER ENTERPRISE AND HETCH HETCHY WATER AND POWER. Statement of Changes in the Balancing Account. June 30, 2009

SAN FRANCISCO WATER ENTERPRISE AND HETCH HETCHY WATER AND POWER. Statement of Changes in the Balancing Account. June 30, 2009 Statement of Changes in the Balancing Account (With Independent Auditors Report Thereon) kpmg Independent Auditors Report The City and County of San Francisco and the Suburban Purchasers: KPMG LLP has

More information

LCA Lease Concession Financial Study Summary of Results

LCA Lease Concession Financial Study Summary of Results LCA Lease Concession Financial Study Summary of Results April 23, 2018 www.jacobs.com worldwide Agenda 1. Safety Minute 2. Project Overview 3. Debt Management 4. Capex 5. Revenue Sufficiency 6. Model Scenarios

More information

RATE SCHEDULE

RATE SCHEDULE 2013-2014 RATE SCHEDULE WATER NATURAL GAS SEWER Revision Dates from 1993 to 2013 Effective October 1, 2013 June 29, 1993 August 1, 1993 June 1, 1994 August 1, 1994 January 26, 1995 September 25, 1995 September

More information

Water & Sewer System

Water & Sewer System Water & Sewer System FY 2017 Revenue Sufficiency Analysis City Council Workshop: August 9, 2016 Presentation By: Vita Paltridge, Consultant Background & Scope 2015 Financial Condition Assessment No rate

More information

FUNDING SOURCES Restricted vs. Un-Restricted Funding Sources Fund Balances and Projected Funding Availability IBank Loan

FUNDING SOURCES Restricted vs. Un-Restricted Funding Sources Fund Balances and Projected Funding Availability IBank Loan FUNDING SOURCES The following section discusses the major funding sources available to fund projects. ing amounts included in the s column are those that are available for use as of preparation of this

More information

NOTIFICATION OF INTENTION TO BEGIN OPERATIONS IN AREA CONTIGUOUS TO PRESENT SERVICE AREA UTILITY

NOTIFICATION OF INTENTION TO BEGIN OPERATIONS IN AREA CONTIGUOUS TO PRESENT SERVICE AREA UTILITY FORM REVISED 8/00 DOCKET NO. Date submitted: Date proposed for service to begin: NOTIFICATION OF INTENTION TO BEGIN OPERATIONS IN AREA CONTIGUOUS TO PRESENT SERVICE AREA UTILITY 1. Trade name used for

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT

DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION of the MUNICIPALITY OF THE COUNTY OF PICTOU, on behalf

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information