Final Report Water and Sewer Rate Model Town of Denton, MD

Size: px
Start display at page:

Download "Final Report Water and Sewer Rate Model Town of Denton, MD"

Transcription

1 Final Report Water and Sewer Rate Model Town of Denton, MD January 30, 2014 MCET Water and Sewer Rate Model for Denton, MD Page 1

2 Table of Contents Water and Sewer Rate Model Study Town of Denton, MD January 30, 2014 Page Table of Contents. 2 Purpose of Study.. 3 Introduction. 4 Executive Summary and Recommendations. 5 Description of Rate Model Description of Systems Water System.. 10 Sewer System Demographics. 11 System Users and ERUs 12 Water Usage, gpd/user and gpd/eru 14 Adequacy of Rates and Revenues References and Source Information MCET Water and Sewer Rate Model for Denton, MD Page 2

3 Water and Sewer Rate Model Study Town of Denton, MD Purpose of Study In October 2013, the Town of Denton requested MCET s assistance to update the Town s water and sewer rate model. MCET originally developed a rate model for the Town in Since then, the Denton Utility Commission developed another model. This study developed a new rate model using the best of both rate models. MCET is pleased to submit to the Town of Denton an updated water and sewer rate model for use by Town officials. This document represents the results of our modeling effort and the adequacy of service rates to cover the cost of providing water and sewer service to the Town s customers. The study should provide a clear path for the Town to ensure the future financial health and stability of the Town s water and sewer systems. The assistance provided by the Town staff, particularly Scott Getchell, Director of Public Works and Karen Monteith, the Town s Clerk-Treasurer, was essential in the completion of this study. The dedication provided by Town staff during this study process should be acknowledged and was vital to the success of the study. Thank you for the opportunity to work with and for the Town of Denton on this study. MCET Water and Sewer Rate Model for Denton, MD Page 3

4 Introduction Water and sewer Enterprise Funds must each be self-supporting. The cost of operating and maintaining the water system must be supported by water fees and charges collected from water customers. Likewise, the cost of operating and maintaining the sewer system must be supported by sewer fees and charges collected from sewer customers. Service rates for the Town include Base Fees and Usage Charges. Ten (10) years (FY 2004 FY 2013) of rates and charges are available. Fixed Base Fees ($/Quarter/ERU) are determined on an Equivalent Residential Unit (ERU) basis. Variable Usage Charges ($/1,000 gallons) are determined based on metered water consumption. Annual Financial Statements (provided by the Town s Finance Department) report audited information on revenues, expenses, and cash balances. Ten (10) years of Annual Financial Statements (FY 2004 FY 2013) are available. Annual charges for services (Base Fee and Usage Charge revenues combined) are shown in a line item on the Statement of Revenues, Expenses, and Changes in Fund Position for both Water and Sewer Funds. Operating expenses, debt, and capital expenses are shown separately. The Statement of Cash Flows shows revenues and expenses on a cash basis. System Users (billing accounts) and ERUs are used for trending the number of customers in the system. Ten (10) years (FY 2004 FY 2013) of customer information is available. Users are identified in the Management s Discussion and Analysis (MDA) in the Annual Financial Statements. The Town assigns ERUs to users based on criteria provided in rate ordinances (Water Ordinance 645; Sewer Ordinance 646). The number of active ERUs for any year is calculated by dividing annual Base Fee revenues by four times the Base Fee Rate (Number of ERUs = annual Base Fee Revenue/(4 x Base Fee rate, $/quarter)). Metered water data is provided by the Town s Department of Public Works. Fourteen (14) years ( ) of water consumption data is available. Water consumption data is used to determine water usage per User (gpd/user) and per ERU (gpd/eru). For modeling purposes, water consumption in gpd/eru is preferred over gpd/user for the Town of Denton. MCET Water and Sewer Rate Model for Denton, MD Page 4

5 Executive Summary and Recommendations Rate increases in FY 2010, FY 2011, and FY 2013 were very timely in reversing the decline of cash balances and creating financial conditions that increased cash balances. TABLE 1 Summary of Denton Water and Sewer Rates, FY 2009 FY 2013 Service Rates Fiscal Year Water Base Fee, $/ERU/Quarter Usage Charge, $/1,000 gallons Meter Replacement Fee, $/Quarter (For water meters < 1-inch) Sewer Base Fee, $/ERU/Quarter Usage Charge, $/1,000 gallons MCET Water and Sewer Rate Model for Denton, MD Page 5

6 Current Water Fund rates (Base Fee - $25/quarter/ERU and Usage Charge - $3.45/1000 gallons) are adequate until FY The model is indicating Water Fund cash balances greater than targeted levels (cash balances equal to six months of operating and debt expenses), even at current low growth (low connection fee revenue) levels. Sewer Fund operating and debt expenses are roughly twice those of the Water Fund. Consequently, sewer rates should be about twice that of water rates. The Sewer Fund Usage Charge ($6.41/1,000 gallons) is adequately priced, but the Base Fee (also $25/quarter/ERU) is under priced. A Sewer Fund Base Fee rate increase can be delayed until FY 2017, if annual transfers from the Water Fund to the Sewer Fund are increased to pay down the outstanding inter-fund liability. The liability shown on the FY 2013 Financial Statements is $352,657. Along with avoiding sewer rate increases before FY 2017, an early pay down of the liability will provide additional time to collect and analyze WWTP operating costs data and the expense impact on Sewer Fund cash balances. If the inter-fund transfer is not increased with pay off by FY 2017, the Sewer Fund may need to raise its Base Fee rate sooner, incrementally from the current rate of $25/quarter/ERU to as high as $50/quarter/ERU or depend on growth related connection fee revenues to maintain adequate cash balances in the Sewer Fund. MCET Water and Sewer Rate Model for Denton, MD Page 6

7 Description of Rate Model The rate model consists of input and output worksheets. Input worksheets are used to load information into the model. Output worksheets are used to calculate and analyze data needed for expense coverage and rate adequacy determination purposes. The model has six Input worksheets, which include: 1. Customer Base: Input Worksheets a. Number of users or billing accounts User counts are reported in Annual Financial Statement MDAs; used for determining unit user costs, $/User/year b. Number of ERUs Derived from Base Fee revenues; used for determining annual costs per ERU, $/ERU/year c. Number of water meters Provided by Public Works; used as a check in determining current number of ERUs 2. Rainfall Provided by Public Works; used to correlate high and low water consumption unit flow data (Typically, more water is used during dry weather conditions than in normal and wet weather conditions) 3. Water Consumption Provided by Public Works; used with number of system Users and ERU data to determine unit flows; gpd/user and gpd/eru (Again, gpd/eru is preferred) 4. Wastewater Flows Provided by Public Works; used to determine wastewater unit costs, $/MG treated, $/TG of water consumed, and $/User/year or $/ERU/year 5. Annual Financial Statements Provided by Finance; used to determine audited revenue, expense, and cash balances for the Water and Sewer Funds 6. Actual-to-budget Revenues Provided by Finance; used to split revenues between different revenue sources for modeling Water and Sewer revenues; customer service charges (Base Fees and Usage Charges) were combined in budgets before FY 2012; Base Fee revenues and Usage Charge revenues were reported separately beginning in FY Output worksheets include an Interface worksheet, a Rate Adequacy worksheet, and eight (8) supporting summary and trending worksheets. The Interface worksheet has been provided as a convenience for Town users to test various what if scenarios. Six (6) variables can be changed at the model Interface : MCET Water and Sewer Rate Model for Denton, MD Page 7

8 Interface Worksheet Variables 1. Base Fees and Usage Charges for each projected year, FY 2014 FY 2020 (Model is showing no Water Fund rate increases, only Sewer Base fee increases to $40/quarter/ERU in FY 2017 and $50/quarter/ERU in FY Water usage rates, gpd/eru (Model is currently using 145 gpd/eru, the most recent 5-year average under normal precipitation conditions) 3. FY 2014 Water and Sewer Fund O&M expenses (Employee and vendor) 4. Annual percent increases in projected employee and vendor expenses; different inputs for the Water Fund and the Sewer Fund have been provided (Model is currently showing Employee expense increases of 0.25% for both Funds; Vendor expense increases of 0.25% for Water and 0.50% for Sewer, respectively) 5. Number of ERUs added to the system for each projected year, FY 2014 FY 2020 (Model is currently showing 5 new ERUs/year) 6. Pay-down period of Water Fund s $352,657 liability to the Sewer Fund and the annual transfer amount (Model is currently showing liability pay-down by FY 2017) Changes in cash balances are visible on the Interface worksheet when any model variable is changed. Following is a bar chart showing projected yearend cash balances based on modeling assumptions listed above. MCET Water and Sewer Rate Model for Denton, MD Page 8

9 The Rate Adequacy worksheet analyzes past year rates and charges for expense coverage. The primary test for rate adequacy is available cash balance. Target cash balances should be equal to or greater than six months of expenses - considered a best management practice. Maintaining cash balances is also an indicator that adequate customer revenues are collected to cover system operating expenses and debt. As cash balances rise, revenues exceed expenses; as cash balances fall, expenses exceed revenues. Again, rate increases adopted in recent years have improved current cash positions in both the Water Fund and the Sewer Fund. However, the Sewer Fund Base Fee will need to be increased to cover debt expenses, if growth (and related connection fee revenue) doesn t improve in the near future. The second test for measuring rate adequacies is expense coverage. Both rates and combined revenues can be tested for coverage. The three (3) supporting Summary worksheets include: Summary Worksheets 1. Rates and Charges Main analysis worksheet 2. Revenues versus Expenses Determines changes in cash position 3. Long Term Debt Summaries Outstanding debt on capital projects a. Water Fund debt schedules three (3) debt issues b. Sewer Fund debt schedules five (5) debt issues The five (5) Trending worksheets include: Trend Worksheets 1. Cash balances 2. Rates 3. Revenues 4. Expenses a. Water expense details b. Sewer expense details 5. Unit flows, gpd/user and gpd/eru MCET Water and Sewer Rate Model for Denton, MD Page 9

10 Description of Systems Water Water for the Town of Denton is pumped from two wells drilled into the Piney Point Aquifer. Well #3, drilled in 1970, is located off of Kerr Avenue and Md. Rt. 404 (Pumping capacity gpm). Well #5, drilled in 2000, is located south of Engerman Avenue and West of Park Lane (Pumping capacity gpm). The 3-year average of water pumped from the wells was 327,000 gpd, or approximately 42% of the system s 770,000 gpd permitted capacity. The 3-year average of water metered to customers was 280,000 gpd. The unaccounted for water loss of 47,000 gpd represents a loss of only 14%. Table 2. Pumped Water and Metered Water 3-year Average (gpd) FY 2011 FY 2013 Permitted Capacity (gpd) Maximum Demand (gpd) Available Capacity (gpd) Pumped from wells 326, ,000 1,000, ,342 Metered to customers 280,062 Unaccounted for 46,596 % Loss 14% Water losses in most water systems average 20%. The Town s unaccounted for water is well below national averages. The Town has three water storage tanks, one with 100,000 gallons of capacity and two with 300,000 gallons of capacity. Sewer The Town of Denton s WWTP was upgraded to Biological Nutrient Removal (BNR) in 1999 and then to Enhanced Nutrient Removal (ENR) in The treatment plant uses an activated sludge process (Biolac) to biologically remove nitrogen. Phosphorus is removed chemically. As required by the WWTP s NPDES permit, total nitrogen (TN) and total phosphorus (TP) discharges from the plant must be less than 9,746 lbs/yr (<4.0 mg/l) and 731 lbs/yr (<0.3 mg/l), respectively. Permitted capacity of the WWTP is 0.8 MGD with a peak of 2.67 MGD. The most recent 3-year average of wastewater treated was 387,000 gpd or approximately 48% of the system s 800,000 gpd permitted capacity. Excess inflow/infiltration of 107,000 gpd represents an I/I of 27%. MCET Water and Sewer Rate Model for Denton, MD Page 10

11 Table 3. Wastewater Treated 3-year Average (gpd) FY 2011 FY 2013 Permitted Capacity (gpd) Peak Capacity (gpd) Available Capacity (gpd) Wastewater Treated 386, ,000 2,670, ,189 Water to customers 280,062 Average I/I in most wastewater systems is Excess I/I 106,749 approximately 30%. The Town s %I/I is slightly below % I/I 27% national averages. Demographics Currently, Town water and sewer connections (1595) are split 79% residential and 21% nonresidential based on water meter counts. Residential connections (1256) consist of single and multi-family (apartments) facilities. Non-residential connections (339) consist of commercial, industrial, institutional, schools, churches, and governmental facilities. Because the Town of Denton is the County seat of Caroline County, a 100-resident correctional facility and 24 other Town, county, state, and federal governmental facilities are located in the Town. The Town has an historic down-town district as well as a central business district. Town growth will consist of Town infill along with suburban and mixed residential, commercial, and industrial development on the outskirts of Town. From 2010 census data, the population of Denton has grown to The number of residential housing units has increased to Following is a table comparing 2000 and 2010 Census data for the Town of Denton. Table 4. Census Data - Town of Denton Population year Increase (17) 1458 Percent Increase, % (0.6)% 49.3% Housing Units year Increase Percent Increase, % 15.8% 41.7% Housing Units Occupied Percent Occupied,% 90.2% 89.7% MCET Water and Sewer Rate Model for Denton, MD Page 11

12 System Users and Equivalent Residential Units (ERUs) Users of the Town's water and sewer system are tracked three (3) ways; (1) number of water meter connections (Currently 1595) based on meter inventory; (2) number of users (Currently 1651) based on billing accounts; (3) number of active Equivalent Residential Units (ERUs, currently 1931) based on Base Fee revenues collected. Number of water meters is inventoried by the Town's Public Works Department. Users of the system are billed by the Town's Finance Department and reported in the Management, Discussion, and Analysis (MDA) section of the Town's Annual Financial Statements. The number of system ERUs is calculated from annual Base Fee revenues. The Town assigns ERUs to each facility type user in the system as prescribed in tables attached to water and sewer rate ordinances. The Town then bills a quarterly Base Fee to each user. The actual number of system ERUs connected to the system is calculated by dividing the Base Fee Rate into Base Fee revenues collected for any particular year. Base Fee revenues can are determined from revenue data in Annual Financial Statements. Since Annual Financial Statements are available for FY FY 2013, actual system users and ERUs can be tracked for ten years. Following is a trend analysis for user accounts and active ERUs for the past ten (10) years (FY 2004 FY 2013). Note that growth and development was strong during the FY FY 2008 period, but limited after FY MCET Water and Sewer Rate Model for Denton, MD Page 12

13 As a check on current ERU levels, the number of active ERUs can be calculated from water meter counts and sizes with an adjustment for percent occupancy. ERUs for water meters larger than 3/4-inch, which represents one ERU, can be calculated based on American Water Works Association (AWWA) ERUs to meter size ratios (AWWA ERU ratio method). The number of active system ERUs based on water meter counts and sizes can then be adjusted for percent occupancy of served facilities, typically 90%. Table 5. - Number of Town Water Meters, by Size and EDU Meter Size AWWA Rated Capacity (GPM) EDUs per Meter Number of Meters FY 2013 Number of EDUs FY 2013 Comments 1 5/8-inch SF, NR 3/4-inch SF, MF, NR 1-inch SF, NR 1 1/2- inch NR 2-inch NR 3-inch Group Facilities 4-inch Group Facilities 6-inch 1, Large Group Fac s Total No. of Active ERUs derived from Base Fee revenues 1931 Active EDUs 91% 1. SF Single Family dwelling; MF Multi-family dwelling; NR - Non-residential units; Group facilities include schools, correctional, institutional, and government complexes Using Meter Replacement Fee (MRF) revenues provides a second, but partial check on the number of system ERUs. The Town charges quarterly MRFs to all system users with water meters less than 1-inch, which represents more than 95% of water meters in the system. Currently, the system has 1539 water meters less than 1-inch, which checks out with meter counts derived from MRFs. MCET Water and Sewer Rate Model for Denton, MD Page 13

14 Water Consumption - gpd/user and gpd/eru Water usage per User, gpd/user is calculated by dividing water consumption (gpd) by the number of Users or billing accounts in the system. The most recent 5-year water usage average was 170 gpd/user. ERU water usage is calculated by dividing water consumption (gpd) by the number of ERUs in the system. The most recent 5-year water usage average was 145 gpd/eru. As noted in the figure that follows, water usage in terms of gpd/eru is less erratic than gpd/user, since Users vary in size from a 100-resident correctional facility to a 1-occupant residential unit. The downward trend of both water usage factors reflects water conservation, but the steeper slope of the water usage per User factor reflects the influence of roughly 500 residential units added to the system in the past ten years. Water usage per ERU is the preferred unit factor, since it compensates for the mix of residential and non-residential units in the system. MCET Water and Sewer Rate Model for Denton, MD Page 14

15 Using ERUs to forecast Base Fee revenues and using water usage in terms of gpd/eru to forecast Usage Charge revenues is convenient for forecasting service revenues. The number of ERUs is the common variable for forecasting both revenue sources. If the Base Fee was a quarterly per bill charge, as is the case in some communities, then the number of Users would have been the common variable for forecasting revenues. Adequacy of Water and Sewer Charges to Cover Water and sewer service charges are designed to recover O&M expenses (employee and vendor expenses) and debt. Some capital expenses are paid for from cash balances (PAYGO or Pay-As-You-GO using cash), but most capital projects are funded through debt financing. Also, the Sewer Fund collects a Bay Restoration Fee (BRF) for the State of Maryland, which is included as a vendor expense. The BRF expense is subtracted out of Sewer Fund expenses, since it is not an expense to operate the wastewater system. During the past five years, O&M and debt expenses averaged $464,000/year and $840,000/year for the Water Fund and Sewer Fund, respectively. During that same time, annual costs averaged $240/ERU and $434/ERU, respectively for the Water and the Sewer expenses. The combined annual cost of $674/ERU is a very reasonable. The combined annual cost of $793/User is also reasonable considering most major cities charge more - New York City ($725), Baltimore and Philadelphia ($800), Boston ($850), and DC and Richmond, VA ($900). Table 6. 5-year Annual Average O&M and Debt Expenses Recent 5-year Averages FY 2009 FY 2013 ($000) Operating Expenses Water Sewer Combined Employee Expenses $255 $411 $666 Vendor Expenses Less Bay Restoration Fees - (66) (66) Total O&M $418 $699 $1,117 Debt Expenses Total $464 $840 $1,304 Unit Cost Factors ($) $/1,000 Consumed $4.54 $8.22 $12.76 $/User/year $282 $511 $793 $/ERU/year $240 $434 $674 MCET Water and Sewer Rate Model for Denton, MD Page 15

16 If revenues exceed expenses and cash balances are available to cover emergency and other unexpected expenses, then service charges are adequately priced. Typically, rate structures are designed to recover variable (vendor) expenses through water Usage Charges and fixed (employee and debt) expenses through Base Fees. For the Town of Denton, water Meter Replacement Fees are set to cover water meter repairs. Following is a table showing rate and combined revenue coverage tests for recent (FY 2009 FY 2013) water and sewer expenses (5-year average expenses). Minimum coverage ratio should be greater than 1.1, preferably greater than 1.25 to maintain cash balances for unexpected and emergency expenses. Table 7. Determination of O&M and Debt Coverage Ratios Assumptions Water Sewer Average Number of ERUs ERUs on septic Water usage, gpd/eru year average Usage Charge, $/1000 gallons $3.45 $6.41 Quarterly Base Fee, $/ERU $25 $25 FY 2014 rates Rate Coverage Test Water Sewer Usage Charge Revenue, $000/yr $352 $626 At FY 2014 rates Vendor Expenses, $000/year year averages Rate Coverage Coverage - OK Base Fee Revenue, $000/year $193 $185 At FY 2014 rates Employee Expenses, $000/year $255 $411 Debt Expenses, $000/year Less BRFs, $000/yr - (66) 5-year averages Total Fixed Costs, $000/year $301 $486 Rate Coverage Coverage not OK Revenue Coverage Test: Usage Charge Revenue, $000/yr $352 $626 Base Fee Revenue, $000/year $193 $185 At FY 2014 rates Combined Revenues, $000/year $545 $811 O&M and Debt Expenses $464 $840 5-year averages Revenue Coverage Sewer Rate needs to increase MCET Water and Sewer Rate Model for Denton, MD Page 16

17 Water Usage Charge rates are priced well and cover (2.16 times) variable operating expenses. Water Base Fee rates could be increased, since coverage (0.64 times) is less than targets, but when combined with the strong water Usage Charge revenues, usage and base fee rates adequately cover (1.17 times) water O&M and debt expenses. Cash balances will continue to increase. Sewer Usage Charge rates are adequate to cover (1.76 times) variable operating expenses. However, Sewer Base Fee rates need to be increased; coverage is only 0.38 times. Even when combined with the sewer Usage Charge revenues, usage and base fee rates are not adequate to cover (0.97 times) sewer O&M and debt expenses. Cash balances will likely drop unless growth related revenues increase. To satisfy revenue coverage ratios of 1.25, quarterly Base fee rates must be increased. Water rates can be delayed, but sewer rates need to be increased within the next seven years depending on growth revenue. Table 8. Base Fee Rates to Provide 1.25 Coverage Revenue Coverage Test Water Sewer Comments Average Number of ERUs ERUs on septic Revenue Coverage Target O&M and Debt Expenses $464 $840 Needed Revenues, $000/year $580 $1, x Total Expenses Usage Charge Revenue, $000/yr $352 $626 Assume no change in Usage Charge Needed Base Fees, $000/year $228 $424 Needed revenues less Usage revenues Target Base Fee, $/ERU $30 $57 Base Fee Revenues/(4 x ERUs) MCET Water and Sewer Rate Model for Denton, MD Page 17

18 References and Source Information A. Town of Denton Water Ordinance 645, effective 9/13/2012 B. Town of Denton Sewer Ordinance 646, effective 9/13/2012 C. Annual Financial Statements for Town of Denton, FY 2004 to FY 2013, Enterprise Fund Exhibits D. Annual Operating Budgets for Town of Denton, FY 2009 to FY 2013 E. Town of Denton s, 1997 Comprehensive Plan, Chapter 5 - Community Facilities Element F. Town of Denton s, 2010 Comprehensive Plan, Chapter 5 - Water Resources Element G. Debt Schedules: 1. MDE s $2,332,577 loan for WWTP construction (2005) 20 years, $127,972/year (Sewer Fund) 2. MDE s $53,500 loan for WWTP-ENR (2010) 20 years, $3,175/year (Sewer Fund) 3. Rural Development loan of $140,000 (2007) 20 years, $7,568/year (Sewer Fund) 4. USDA s $623,560 loan (2011) 40 years, $26,837/year (Water and Sewer Funds) 5. $500,000 issued, Series 2008 Maryland Public Improvement Bonds, 40 years, $26,542/year (Water Fund) 6. Provident State Bank s $76,850 loan (2013) 15 years, $6,772/year (Water and Sewer Funds) H. Maryland s, 2010 Census Profile of General Population and Housing Characteristics for the Town of Denton I. AWWA s, Principles of Water Rates, Fees, and Charges, Manual of Water Supply Practices M1, 2000 J. WEF s, Financing and Charges for Wastewater Systems, Manual of Practice No. 27, 2004 K. ICMA s, Evaluating Financial Condition, A Handbook for Local Government, 2003 MCET Water and Sewer Rate Model for Denton, MD Page 18

MDE FINANCIAL ASSISTANCE FOR CHASEPEAKE BAY WATERSHED IMPLEMENTATION PLAN CAPITAL PROJECTS

MDE FINANCIAL ASSISTANCE FOR CHASEPEAKE BAY WATERSHED IMPLEMENTATION PLAN CAPITAL PROJECTS MDE FINANCIAL ASSISTANCE FOR CHASEPEAKE BAY WATERSHED IMPLEMENTATION PLAN CAPITAL PROJECTS Jag Khuman, Director Maryland Water Quality Financing Administration MDE Key Water Quality Financing Programs

More information

MDE FINANCIAL ASSISTANCE FOR SEPTIC TO SEWER CONNECTION CAPITAL PROJECTS

MDE FINANCIAL ASSISTANCE FOR SEPTIC TO SEWER CONNECTION CAPITAL PROJECTS MDE FINANCIAL ASSISTANCE FOR SEPTIC TO SEWER CONNECTION CAPITAL PROJECTS Jag Khuman, Director Maryland Water Quality Financing Administration December 14, 2016 MDE Key Water Quality Financing Programs

More information

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013 MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA

More information

APPENDIX B. Water/Wastewater Connection Fees. 1. Basis B Authority B Connection Fees B-1thru B Calculating Connection Fees B-2

APPENDIX B. Water/Wastewater Connection Fees. 1. Basis B Authority B Connection Fees B-1thru B Calculating Connection Fees B-2 APPENDIX B Water/Wastewater Connection Fees Article Page 1. Basis B-1 2. Authority B-1 3. Connection Fees B-1thru B-2 4. Calculating Connection Fees B-2 5. Connection Fee Worksheet, Residential Water B-3

More information

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District 3585 Maple Street, Suite 250 Ventura, CA 93003 805-404-1467 Montecito Sanitary District Wastewater Rate Study Report March 2016 Montecito Sanitary District 1042 Monte Cristo Lane Santa Barbara CA 93108

More information

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS Black & Veatch Holding Company 2011. All rights reserved. COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 26 MAY 2015 B&V PROJECT NO.

More information

Department of Legislative Services Maryland General Assembly 2009 Session

Department of Legislative Services Maryland General Assembly 2009 Session Department of Legislative Services Maryland General Assembly 2009 Session SB 554 FISCAL AND POLICY NOTE Revised Senate Bill 554 (Senator Lenett, et al.) Education, Health, and Environmental Affairs Environmental

More information

Rates and Fees for New Connections (Developer Fees)

Rates and Fees for New Connections (Developer Fees) Rates and Fees for New Connections (Developer Fees) Table V: New Connection (Developer) Rates and Fees Effective Date 1/1/2019 1/1/2020 1/1/2021 A. Plan Review Fees Per Linear Foot (LF) - Water $0.65 $0.65

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR Black & Veatch Holding Company 2011. All rights reserved. DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 21 MAY 2015 B&V PROJECT

More information

PETERS TOWNSHIP SANITARY AUTHORITY 2011 BUDGET WORKSHOP. November 30, 2010

PETERS TOWNSHIP SANITARY AUTHORITY 2011 BUDGET WORKSHOP. November 30, 2010 PETERS TOWNSHIP SANITARY AUTHORITY 2011 BUDGET WORKSHOP November 30, 2010 Agenda A. 2010 Budget Performance Summary B. 2011 Budget Request C. 2011 Capital Plan D. Consulting Engineer s Annual Report Preliminary

More information

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Squaw Valley PSD Water & Sewer Rate and Connection Fee Study February 15, 2017 Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Purpose of the District s Study Provide sufficient

More information

Rate Schedule. Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia

Rate Schedule. Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia Rate Schedule Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia 23471-0911 757.460.2491 www.hrsd.com HRSD Rate Schedule Fiscal Year-2018 (July 1, 2017 June 30, 2018)

More information

Rate Schedule. Fiscal Year-2015 (July 1, 2014 June 30, 2015) Amended July 22, 2014 Amended August 26, 2014

Rate Schedule. Fiscal Year-2015 (July 1, 2014 June 30, 2015) Amended July 22, 2014 Amended August 26, 2014 Rate Schedule Fiscal Year-2015 (July 1, 2014 June 30, 2015) Amended July 22, 2014 Amended August 26, 2014 P.O. Box 5911 Virginia Beach, Virginia 23471-0911 757.460.2491 www.hrsd.com HRSD Rate Schedule

More information

Table 2-2 Projected Water Production and Costs

Table 2-2 Projected Water Production and Costs Table 2-2 Projected Water Production and Costs Recorded Estimated Budget Forecast Description FY 2007-08 FY 2008-09 FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 Well Production (OCWD, A-F, a)

More information

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 The Financial Link Executive Summary - Water In May 2015, the City of Whitefish (City) retained AE2S to complete a Water and

More information

Sewer Rates. General Information Sheet. July 18, 2017

Sewer Rates. General Information Sheet. July 18, 2017 Sewer Rates General Information Sheet July 18, 2017 Welcome to the City of O'Fallon's sewer rates public hearing. This meeting presents the preliminary findings to revise the sewer rates. In this public

More information

SAVANNAH GAINESVILLE CHARLESTON COLUMBIA

SAVANNAH GAINESVILLE CHARLESTON COLUMBIA LETTER REPORT for Transient Rental Unit Rates for Broad Creek Public Service District Hilton Head Island, SC August 20, 2004 Revised November 30, 2005 Hussey, Gay, Bell & DeYoung SAVANNAH GAINESVILLE CHARLESTON

More information

Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors.

Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors. February 21, 2019 Board of Directors County Sanitation District No. 20 of Los Angeles County Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors. Dear

More information

Wastewater Utilities. FY Budget Presentation

Wastewater Utilities. FY Budget Presentation Utilities FY 2018-19 Budget Presentation 1 Volume Forecast Wastewater Customers by Class Fiscal Year Residential Commercial Wholesale Total Growth 2013 26,995 1.1% 3,091 0.8% 4 30,090 1.1% 2014 27,548

More information

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Phase 2 Cost of Service and Rate Design BLACK & VEATCH PROJECT NO. 192366 Black & Veatch Holding Company 2017. All rights

More information

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc.

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc. 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 Date: June 21, 2016 To: Mr. Bob Walker, Executive Director From: Lex Warmath and Elaine Conti,

More information

Managing Financial Risk and Declining Demand. Presentation Outline

Managing Financial Risk and Declining Demand. Presentation Outline Managing Financial Risk and Declining Demand Washington Association of Sewer & Water Districts Spring Conference April 13, 2012 John Ghilarducci Presentation Outline 1. Why Consumption is Declining Potential

More information

FY 2018 and FY 2019 Public Hearing, Rates & Charges. Board of Directors Meeting July 11, 2017

FY 2018 and FY 2019 Public Hearing, Rates & Charges. Board of Directors Meeting July 11, 2017 FY 2018 and FY 2019 Public Hearing, Rates & Charges Board of Directors Meeting July 11, 2017 FY18 & FY19 Public Hearing, Rates & Charges Agenda Item 14 Conduct a public hearing to consider Water System

More information

Financial Management, Capital Planning, Need for Inflation Adjustments

Financial Management, Capital Planning, Need for Inflation Adjustments Your Utility Uses Money as Fuel- Financial Management, Capital Planning, Need for Inflation Adjustments MWEA Lagoon Seminar Presented by: Rich Grant, PE February 2013 Proposed Agenda CONCEPTS User Charges

More information

CITY OF FRUITLAND FISCAL YEAR BUDGET

CITY OF FRUITLAND FISCAL YEAR BUDGET CITY OF FRUITLAND FISCAL YEAR 2018 2019 BUDGET June 12, 2018 CITY OF FRUITLAND, MD UTILITIES DEPARTMENT BUDGET FISCAL YEAR 2019 FISCAL YEAR 2018 FISCAL YEAR 2017 SANITATION WATER SEWER SANITATION WATER

More information

Sanitation Rate Study Final Report

Sanitation Rate Study Final Report Sanitation Rate Study Final Report City of Simi Valley April 24, 2015 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com April 24,

More information

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016 WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results January 5, 2016. Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants Utility

More information

The City of Sierra Madre

The City of Sierra Madre The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December

More information

2017 WATER AND WASTEWATER IMPACT FEE STUDY CITY OF AZLE, TEXAS

2017 WATER AND WASTEWATER IMPACT FEE STUDY CITY OF AZLE, TEXAS 2017 WATER AND WASTEWATER IMPACT FEE STUDY CITY OF AZLE, TEXAS JULY 2017 Prepared by: Weatherford Office Address: 1508 Santa Fe Drive, Suite 203 Weatherford, Texas 76086 (817) 594-9880 www.jacobmartin.com

More information

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY T a p p i n g F e e C a l c u l a t i o n A p r i l 2 0 1 8 5 1 7 3 C A M P B E L L S R U N R O A D P I T T S B U R G H, P A 1 5 2 0 5-9 7 3 3 Table of Contents

More information

Debt Service. Recordation Tax. Transfer Tax. Impact Fee. County Practice

Debt Service. Recordation Tax. Transfer Tax. Impact Fee. County Practice Debt Service Debt Service is required to be reported in the budget certification statement to the Maryland State Department of Education under the Public School Laws of Maryland 1978, Chapter 22 of the

More information

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260 April 6, 2016 Katherine Godbey Director of Finance, Coachella Valley Water District 75515 Hovley Lane East Palm Desert, CA 92260 Dear Ms. Godbey: Hawksley Consulting (a subsidiary of MWH Global) is pleased

More information

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018 West Valley Sanitation District FINANCIAL PLAN & RATE STUDY January 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com

More information

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 April 19, 2018 Mr. Jerry Hatton City Engineer City of Belmont P.O. Box 431 Belmont, NC 28012 Subject:

More information

LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO

LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO 2019-02 A RESOLUTION OF THE AUTHORITY BOARD ESTABLISHING WASTERWATER SYSTEM TAPPING FEES IN ACCORDANCE WITH ACT 57 OF 2003 WHEREAS, London Grove

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1. A Division of NewGen Strategies & Solutions, LLC

Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1. A Division of NewGen Strategies & Solutions, LLC Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of NewGen Strategies & Solutions, LLC Revised: October 23, 2013 Agenda Fundamental Assumptions Key Issues Recommendations

More information

UNIFORM APPLICATION FORM FOR MONTANA PUBLIC FACILITY PROJECTS

UNIFORM APPLICATION FORM FOR MONTANA PUBLIC FACILITY PROJECTS UNIFORM APPLICATION FORM FOR MONTANA PUBLIC FACILITY PROJECTS SECTION A - CERTIFICATION (Please type or print legibly) To the best of my knowledge and belief, the information provided in this application

More information

Water, Sewer and Storm Sewer Rate Analysis

Water, Sewer and Storm Sewer Rate Analysis Water, Sewer and Storm Sewer Rate Analysis August 8, 207 68 North Main Street Bowling Green, Ohio 43402 49-352-7537 www.poggemeyer.com Table of Contents Introduction................................................................

More information

City of Rohnert Park SEWER FINANCIAL PLAN

City of Rohnert Park SEWER FINANCIAL PLAN City of Rohnert Park SEWER FINANCIAL PLAN AND RATE STUDY February 17, 2011 3053 Freeport Boulevard #158 Sacramento, CA 95818-4346 (916) 444-9622 www.thereedgroup.org TABLE OF CONTENTS I. EXECUTIVE SUMMARY...1

More information

Peters Township Sanitary Authority. Summary Report of Tapping Fee Calculation and Connection Charges

Peters Township Sanitary Authority. Summary Report of Tapping Fee Calculation and Connection Charges Peters Township Sanitary Authority Summary Report of Tapping Fee Calculation and Connection Charges June 30, 2008 Update No. 2 August 12, 2008 Summary Report Tapping Fee Calculation and Connection Charges

More information

WASTEWATER FINANCIAL PLAN STUDY REPORT

WASTEWATER FINANCIAL PLAN STUDY REPORT WASTEWATER FINANCIAL PLAN STUDY REPORT FINAL October 7, 2013 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583. 1894 Fax 626.583. 1411 www.raftelis.com October 7, 2013 Mr.

More information

Temescal Valley Water District

Temescal Valley Water District Temescal Valley Water District Comprehensive Water, Recycled Water, and Wastewater Cost of Service Study Draft Report / December 7, 2016 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145

More information

Water Rate Study for City of Lemoore

Water Rate Study for City of Lemoore Water Rate Study for City of Lemoore June 17, 2016 Prepared by: Dan Bergmann, Principal 15 Shasta Lane, Walnut Creek, CA 94597 Email: dan@igservice.com Office: 925-946-9090 Water Rate Study for City of

More information

CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES. New Water Connection Fees. Inside City Limits

CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES. New Water Connection Fees. Inside City Limits CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES Section 1. New Water Connection Fees Limits Service Complete Service Connection Installation (Potable or Irrigation) Meter Only Installation for

More information

CITY OF CHARLES TOWN, a municipal utility WATER

CITY OF CHARLES TOWN, a municipal utility WATER P.S.C. W. Va. No. 13 Canceling P.S.C. W. Va. No. 12 CITY OF CHARLES TOWN, a municipal utility OF CHARLES TOWN, WEST VIRGINIA RATES, RULES AND REGULATIONS FOR FURNISHING WATER at Charles Town, Ranson and

More information

WATER AND SEWER UTILITIES RATE STUDY

WATER AND SEWER UTILITIES RATE STUDY WATER AND SEWER UTILITIES RATE STUDY RATE DESIGN WORKSHOP WITHCITYCOUNCIL / UTILITIES COMMISSION March 6, 2014 Agenda Overview of Rate Study Process Water / Sewer Developer Impact Fees Sewer Rates Water

More information

Water and Sewer Rates in the Carson River Watershed

Water and Sewer Rates in the Carson River Watershed Water and Sewer Rates in the Carson River Watershed April 20, 2016 Advisory Report prepared by: Contents Introduction... 4 Summary of Water Rate Changes... 6 Summary of Sewer Rate Changes... 7 Carson

More information

CAPITAL RECOVERY POLICY TABLE OF CONTENTS

CAPITAL RECOVERY POLICY TABLE OF CONTENTS TABLE OF CONTENTS ARTICLE I GENERAL PROVISIONS Section 1.01 General Policy Statement... 1 Section 1.02 Authority... 1 Section 1.03 Definitions... 1 Section 1.04 Capital Recovery Fees as Conditions of Development

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

ALEXANDRIA RENEW ENTERPRISES

ALEXANDRIA RENEW ENTERPRISES ALEXANDRIA RENEW ENTERPRISES Alexandria, Virginia COMPREHENSIVE ANNUAL FINANCIAL REPORT FOR THE YEARS ENDED SEPTEMBER 30, 2015 AND 2014 Prepared by the Finance Department TABLE OF CONTENTS INTRODUCTORY

More information

Town of Orange Park Water & Wastewater Rate Study. Town Council Meeting. March 19, 2019

Town of Orange Park Water & Wastewater Rate Study. Town Council Meeting. March 19, 2019 Town of Orange Park Water & Wastewater Rate Study Town Council Meeting March 19, 2019 Rate Setting Rate Setting Rate Making Process Revenue Requirements Cost Allocation Rate Design Communication Operating

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information

FORT COLLINS- LOVELAND WATER DISTRICT

FORT COLLINS- LOVELAND WATER DISTRICT FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors

More information

The Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund.

The Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund. Attachment 1 O16-19 BACKGROUND REPORT The Utilities Fund is an enterprise fund. An enterprise fund establishes a separate accounting financial reporting mechanism for municipal services for which a fee

More information

MARYLAND WATER POLLUTION CONTROL FUND ANNUAL REPORT

MARYLAND WATER POLLUTION CONTROL FUND ANNUAL REPORT MARYLAND WATER POLLUTION CONTROL FUND ANNUAL REPORT FISCAL YEAR 2009 MARYLAND DEPARTMENT OF THE ENVIRONMENT JANUARY 15, 2010 Shari T. Wilson SECRETARY TABLE OF CONTENTS INTRODUCTION... 1 SECTION I -- OVERVIEW

More information

WATER AND WASTEWATER RATE STUDY

WATER AND WASTEWATER RATE STUDY WATER AND WASTEWATER RATE STUDY Draft July 3, 2013 Prepared by: Page 1 Page 2 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626. 583. 1894 Fax 626. 583. 1411 www.raftelis.com July 1, 2013 Mr. Don

More information

WATER AND SEWER RATE STUDY

WATER AND SEWER RATE STUDY FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO. 179322.0100 PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company 2011. All rights reserved. City of Lynwood, CA WATER AND SEWER

More information

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study Capital Region Water Water and Wastewater Rate Study Report November 22, 2017 Capital Region Water Water and Wastewater Rate Study TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 RATE STUDY SCOPE AND OBJECTIVES...1

More information

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017 City Council Public Hearing February 13, 2017 Public Hearing on Proposed Water Rates PRESENTED BY Kelly J. Salt Partner 2016 Best Best & Krieger LLP Article X, section 2 (1928) The general welfare requires

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

Water Services Rate Study

Water Services Rate Study Report on the Water Services Rate Study Town of Telluride, Colorado Project No. 72447 August 2013 Water Services Rate Study prepared for Town of Telluride, Colorado August 2013 Project No. 72447 prepared

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $10.82 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.86 per 1,000 gallons 8,001 gallons through

More information

WATER/SEWER RATE ANALYSIS PROCESS

WATER/SEWER RATE ANALYSIS PROCESS WATER/SEWER RATE ANALYSIS PROCESS SELECTED BLACK & VEATCH AS CONSULTING FIRM NOVEMBER 2017 DATA COLLECTION FOR ANALYSIS NOVEMBER 2017-JANUARY 2018 IDENTIFY CUSTOMER BASE COUNTS AND TYPES COMPILE BUDGET

More information

City of Riverbank. Sewer Rate Study June 18, 2015 FINAL

City of Riverbank. Sewer Rate Study June 18, 2015 FINAL Sewer Rate Study June 18, 2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 FINAL Historical & Current

More information

Marina Coast Water District Marina, California

Marina Coast Water District Marina, California Marina Coast Water District Marina, California Comprehensive Annual Financial Report For The Fiscal Year Ended June 30, 2011 11 Reservation Road, Marina California 93933 Marina Coast Water District Marina,

More information

Meeting & Outreach efforts

Meeting & Outreach efforts May 30, 2014 Meeting & Outreach efforts February 27th Proposed Compensation Plan Distributed to Joint Admin/WWOC March 5th Joint Admin/WWOC Meeting First discussion on proposed Compensation Plan April

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415)

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415) 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) 332-0244 Fax: (415) 332-0453 Budget FY 2017/18 Adopted by Board on June 5, 2017 BUDGET EXECUTIVE SUMMARY FISCAL YEAR 2017/18 DISTRICT OVERVIEW The Sausalito-Marin

More information

SUMMERLAND SANITARY DISTRICT

SUMMERLAND SANITARY DISTRICT SUMMERLAND SANITARY DISTRICT Financial Plan and Rate Study December 6, 2017 445 S. Figueroa Street Suite #2270 Los Angeles, CA 90071 Phone 213.262.9300 Fax 213.262.9303 www.raftelis.com December 6, 2017

More information

TOWN OF PRESCOTT VALLEY

TOWN OF PRESCOTT VALLEY TOWN OF PRESCOTT VALLEY Management Services Department WATER & SEWER RATE STUDY July 27, 2017 TOWN OF PRESCOTT VALLEY REPORT OF PROPOSAL TO REVISE CERTAIN WATER AND WASTEWATER RATES, FEES AND SERVICE CHARGES

More information

Water and Wastewater Utility Rates

Water and Wastewater Utility Rates Water and Wastewater Utility Rates March 1, 2016 Presented By: Diana Langley Public Works Director 1 OVERVIEW 2 Uses of Funds Capital Investment Debt Service Operating Cost = Revenue Requirement 3 Source

More information

Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona

Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona Prepared for: Central Arizona Partnership August 2008 Prepared by: 7505 East 6 th Avenue, Suite 100 Scottsdale, Arizona

More information

:;ols. Name of Community Carroll Township Authority Charleroi Authority. Rostraver Authority. Monongahela Authority Belle Vernon Authority

:;ols. Name of Community Carroll Township Authority Charleroi Authority. Rostraver Authority. Monongahela Authority Belle Vernon Authority FUTURE RATE INCREASES The Authority is currently working with its consulting engineering firm Gannett Fleming, Inc. to revise its current rate structure. The new rates are expected to be approved in October

More information

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES... Table of Contents 1. CHARGES FOR WATER SERVICE... 3 1.1. Metered Service:... 3 1.2. Water Commodity Charge:... 3 1.3. SDCWA and Metropolitan Water District (MWD) Charges:... 4 1.4. Separate Private Fire

More information

YORK COUNTY, SOUTH CAROLINA

YORK COUNTY, SOUTH CAROLINA YORK COUNTY, SOUTH CAROLINA Water and Sewer Financial Planning and Rate Study Report October 25, 2017 1031 S. Caldwell Street Suite 100 Charlotte, NC 28203 Phone 704.373.1199 Fax 704.373.1113 www.raftelis.com

More information

REPORT NO CALCULATION OF 2009 USER CHARGE RATES

REPORT NO CALCULATION OF 2009 USER CHARGE RATES MONITORING AND RESEARCH DEPARTMENT REPORT NO. 09-13 CALCULATION OF 2009 USER CHARGE RATES NOVEMBER 2008 Metropolitan Water Reclamation District of Greater Chicago 100 East Erie Street Chicago, IL 60611-2803

More information

Presented By: L. Carson Bise II, AICP President

Presented By: L. Carson Bise II, AICP President Impact Fee Basics: Methodology and Fee Design Presented By: L. Carson Bise II, AICP President Basic Options for One-Time Infrastructure Charges Funding from broad-based revenues (general taxes) Growth

More information

ORDINANCE NO AN ORDINANCE To Be Entitled:

ORDINANCE NO AN ORDINANCE To Be Entitled: AN ORDINANCE To Be Entitled: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF FORT MYERS, FLORIDA, AMENDING THE CITY CODE, CHAPTER 90, UTILITIES, ARTICLE II WATER, SECTION 90-35 RATES AND CHARGES ESTABLISHED;

More information

Santa Clarita Water Division

Santa Clarita Water Division Santa Clarita Water Division Retail Water Rate Cost of Service Study Report September 2017 445 S Figueroa St Suite 2270 Los Angeles, CA 90039 Phone 213.262.9300 www.raftelis.com September 11, 2017 Mr.

More information

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for Water & Sewer Cost of Service Rate Study for City of Norco, CA October 11, 2016 Table of Contents October 11, 2016 Chad Blais Director of Public Works City of Norco 2870 Clark Avenue Norco, CA 92860 Re:

More information

CONSULTING ENGINEERS ANNUAL REPORT FOR THE SEWER SYSTEM. 369 East Park Drive Harrisburg, PA (717)

CONSULTING ENGINEERS ANNUAL REPORT FOR THE SEWER SYSTEM. 369 East Park Drive Harrisburg, PA (717) 369 East Park Drive Harrisburg, PA 17111 (717) 564-1121 www.hrg-inc.com OCTOBER 2014 CONSULTING ENGINEERS ANNUAL REPORT FOR THE SEWER SYSTEM CAPITAL REGION WATER DAUPHIN COUNTY, PENNSYLVANIA HRG Project

More information

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study FINAL REPORT March 22, 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley, CA 94703-2714 Tel.

More information

Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems

Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems 1) How much revenue does Chatham Borough need to collect to operate and maintain its water and sewer systems? A:

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday November

More information

Regional Wastewater System Financial Assessment Technical Memorandum

Regional Wastewater System Financial Assessment Technical Memorandum Regional Wastewater System Financial Assessment Technical Memorandum To: From: CC: Project: Subject: Sarpy County Tom Gould - HDR David Dechant HDR Judy Dean HDR Joe Roberts HDR File Southern Sarpy County

More information

STEGE SANITARY DISTRICT FINANCIAL PLAN AND RATE REVIEW

STEGE SANITARY DISTRICT FINANCIAL PLAN AND RATE REVIEW STEGE SANITARY DISTRICT FINANCIAL PLAN AND RATE REVIEW June 2014 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley CA 94703 Tel. 510/653-3399 TABLE OF CONTENTS

More information

Presentation Outline. Asset Management Workshop. Benefits of Asset Management. What is Asset Management? 4/17/2015

Presentation Outline. Asset Management Workshop. Benefits of Asset Management. What is Asset Management? 4/17/2015 Presentation Outline Asset Management Workshop What is Asset Management? Present results of facilities evaluation Discuss funding scenarios Effort funded with 50% grant from NHDES April 21, 2015 Preface

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $11.14 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.95 per 1,000 gallons 8,001 gallons through

More information

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente Final COST OF SERVICE STUDY SEPTEMBER 2017 City of San Clemente Contents CONTENTS Executive Summary... 1 Study Goals and Drivers... 1 Water Rate Analysis & Adoption... 2 Recycled Water Rate Analysis &

More information

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016 2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016 Agenda Financial Policy & Financial Plan Capacity Fees Preliminary Results Tier Definitions Next Steps 2016 Water & RW

More information

Development Impact Fee Adjustment Effective July 1, 2017

Development Impact Fee Adjustment Effective July 1, 2017 Fee Adj ustment Calculation Fee Adjustment Per Resolution - Section 12 * Component Beginning Factor Ending Factor Difference % Increase Notes Construction costs - Apr '16 to Apr '17 10280 10678 398 3.87%

More information

Carlsborg Sewer Financial Plan February 2014

Carlsborg Sewer Financial Plan February 2014 Carlsborg Sewer Financial Plan February 2014 Outline Approximately how much will Carlsborg sewer customers have to pay each month? Key Assumptions Costs and Number of Connections Projected rates County

More information

Phase II WIP Informational Meetings February 7,

Phase II WIP Informational Meetings February 7, Phase II WIP Informational Meetings February 7, 2012 1 Acknowledgments The Bay Cabinet expresses its appreciation to the Town Creek Foundation for providing funding to the Harry R. Hughes Center for Agro-

More information

Rockdale County, Georgia

Rockdale County, Georgia Rockdale County, Georgia 1 Association County Commissioners of Georgia Leasing Program Refunding Certificates of Participation (Rockdale County, Georgia Public Purpose Projects), Series 2006, $8,155,000

More information

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010.

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010. UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010 Overview The service area of the Utility District s Water System includes the entire City of Riviera Beach (approximately

More information

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1 VOLUME 2 - RULES AND REGULATIONS Part B - Schedule of Rates, Fees and Other Charges Table of Contents 1. Definitions... 1 1.1 Applicant... 1 1.2 Availability... 1 1.3 Availability Fees... 1 1.4 Availability

More information

Rate Comparison & Benchmarking Analysis

Rate Comparison & Benchmarking Analysis + Rate Comparison & Benchmarking Analysis Final Report September 2016 Firm Headquarters Redmond Town Center 7525 166 th Ave. NE Suite D-215 Redmond, WA 98052 T: (425) 867-1802 F: (425) 867-1937 www.fcsgroup.com

More information

WATER USER RATES & FEE STUDY

WATER USER RATES & FEE STUDY WATER USER RATES & FEE STUDY FINAL REPORT February 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399

More information

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420

More information