EXECUTIVE SUMMARY FLORIDA A & M UNIVERSITY FACILITY CONDITION ASSESSMENT OCTOBER 2012

Size: px
Start display at page:

Download "EXECUTIVE SUMMARY FLORIDA A & M UNIVERSITY FACILITY CONDITION ASSESSMENT OCTOBER 2012"

Transcription

1 EXECUTIVE SUMMARY FLORIDA A & M UNIVERSITY FACILITY CONDITION ASSESSMENT OCTOBER 2012 PREPARED BY: JONATHAN C. THOMAS, PE DIRECTOR OF SPECIAL OPERATIONS

2 TABLE OF CONTENTS SECTION ONE: SUMMARY OF CONDITIONS AND CONCLUSIONS 1.1 Introduction Summary of Findings... 2 A. CRV and FCNI Definition and Utilization... 3 B. Analysis of Building Conditions... 3 C. Analysis of System Codes... 4 D. Analysis of Project Classifications... 6 E. Analysis of Priority Classifications Conclusions and Recommendations for Facility Improvement Additional Considerations... 9 SECTION TWO: FCA DATA AND COMPARISONS Figure 2.1 Detailed Facility Inventory Figure 2.2 Detailed Project Totals Matrix Figure 2.3 ISES Client History and FCNI Comparison Table and Charts Figure 2.4 System Code Project Cost Distribution Chart Figure 2.5 Project Classification Project Cost Distribution Chart Figure 2.6 Priority Class Project Cost Distribution Chart Figure 2.7 Summary of FCNI and Project Cost by Facility Figure 2.8 Summary of Average Age Figure 2.9 Summary of Facility Use Types Figure 2.10 Life Cycle Model Expenditure Projections Figure 2.11 Geographical FCNI Range Map... 22

3 SECTION ONE SUMMARY OF CONDITIONS AND CONCLUSIONS 1.1 Introduction Florida Agricultural and Mechanical University (FAMU) is the country s largest historically black university by enrollment. It is the only historically black university in the State University System of Florida. FAMU is prominently located on the highest hill in Tallahassee, Florida. The university was originally founded as the State Normal College for Colored Students in Around 1891, the College moved to its current location, and in the 1920s it experienced growth in programs and physical plant. In 1953, the College was elevated to university status and became FAMU. From this point and into the early 1970s, FAMU experienced robust growth in programs and physical plant. Growth tapered off in the 1970s. However, there was a resurgence of physical plant expansion in the 1980s, which continued through the 2000s. Currently, the FAMU Tallahassee Campus spans 420 acres and consists of 132 buildings. A portion of the campus is listed on the United States National Register of Historic Places as the Florida Agricultural and Mechanical College Historic District. This district represents the majority of the campus at 370 acres. In May of 2012, FAMU Plant Operations engaged in a facilities capital planning effort with ISES Corporation. Major Education and General (E&G) buildings located at the main campus were included in this study. The College of Law building in Orlando, FL was excluded from this study. Housing, auxiliary, and athletics facilities were not included in the study. Utilities generation and transmission assets were also not included in this assessment. The following observations and conclusions are based on a thorough of 40 major E&G assets by ISES Corporation, and represent the evaluation of 1.4 million gross square feet. The breakdown of general building usage of the assessed facilities is as follows: Building Use Distribution GSF % Classroom / Academic 21 Gymnasium / Athletics 3 Laboratory 18 Library 9 Office / Administration 47 Shops and Trades 2 1

4 The FCA process was supervised by Kendall D. Jones, Director of Physical Plant for FAMU Plant Operations. The analysis was directed by Jonathan C. Thomas, PE, Director of Special Operations, ISES Corporation. Survey team members consisting of architectural and engineering inspectors collected, evaluated, and compiled the data for the study. 1.2 Summary of Findings The Facility Condition Needs Index (FCNI) provides a relative measure for the objective comparison of building condition. The index is a simple calculation, derived by dividing total project costs (for the total ten-year window covered by the FCA) by the total Current Replacement Value (CRV). When applying the index as an evaluation tool, the lower the number, the better the facility condition. It should also be noted that this is an index, not a percentage. It can, and often does in the case of historic facilities, exceed The CRV represents the cost to replace an existing building with one of similar use type and size on the same site. This includes demolition, site preparation, professional fees, and construction costs. There are two main methods of applying the FCNI in analyzing the data derived from an FCA. The first method involves looking at individual facilities. When applying it to a single facility, the lower the FCNI, the better. In terms of assessing where a facility falls within a range of conditions, the following standards can be applied. Individual Building FCNI Range Condition Description Excellent condition, typically new construction Good condition, renovations occur on schedule Fair condition, in need of normal renovation Below average condition, major renovation required Poor condition, total renovation indicated 0.60 and above Complete facility replacement indicated The above ranges represent averages based upon ISES Corporation s experience extending over 8,500 facilities and more than one billion gross square feet, and associated infrastructure evaluations. The reader is cautioned, however, to examine each facility independently for mitigating factors (i.e., historic structures, temporary structures, facilities with abnormally low replacement costs, such as warehouses, etc.). 2

5 Another application for the FCNI is for comparing groups of facilities to other groupings. Comparisons in this vein do not yield hard data, but rather form the basis of analysis for comparing the overall state of facilities to another comparable grouping. Figure 2.3 of this document provides a listing of relevant ISES Corporation historical data of other institutions for which we have provided FCA services. A. Analysis of Overall Campus Conditions The FCA process for FAMU culminated in a database of deficiencies that need to be addressed over the next ten years. For the 40 buildings in the study that were evaluated during the facility condition assessment (FCA) effort, ISES identified almost $112 million dollars in project recommendations for over the next ten years. When compared to the $484 million dollar replacement value for the facilities in the study, the subsequent FCNI equals This FCNI figure is lower than the mean of 0.29 typically experienced by ISES Corporation. This indicates that the buildings within this FCA study are in better than average condition. The FCNI for the campus is in the top 24 percentile as displayed in Figure The FCNI is within the normal range of expectation. With regards to age, FAMU is within the youngest 17 percentile of the sample set. For a complete analysis, it is necessary to look at individual components and classifications and then compare them to the mean. B. Analysis of Building Conditions The FCNI Report Cumulative in Subsection 2.1 outlines the conditions of the individual facilities by asset number. If all facilities in the list carried equal weight with regards to campus master plan and University mission, one part of a prudent approach would be to apply funding in the order of the buildings on that list. The original buildings in the Deve Research School (DRS) exhibit the worst conditions on campus. The following table outlines the twelve buildings with the highest FCNIs. BLDG CODE BUILDING NAME BLDG USE YEAR BUILT GSF CRV TOTAL PROJECT COSTS 0064 OLD DRS 64 LB ,560 $6,873,000 $3,539, OLD DRS 66 CL ,862 $2,964,000 $1,376, OLD DRS 61 OF ,400 $429,000 $191, OLD DRS 65 CL ,832 $933,000 $405, PERRY SOUTH OF ,893 $22,042,000 $8,580, LS BARTLEY WOMENS ATHLETIC OF ,696 $2,114,000 $819, COMPLEX 0561 PAIGE NORTH OF ,551 $6,568,000 $2,487, BENJAMIN BANNEKER-A CL ,604 $9,081,000 $3,429, BENJAMIN BANNEKER-B CL ,512 $11,991,000 $4,456, DYSON PHARMACY BUILDING LB ,500 $27,141,000 $9,473, GAITHER OFFICE AND OF ,903 $9,123,000 $3,107, CLASSROOM 0068 FOSTER-TANNER MUSIC CENTER OF ,598 $10,812,000 $3,676, FCNI 3

6 For example, a building-level approach could yield the potential strategy that the four original DRS structures are candidates for demolition. This is due to the fact that their needs represent around half of their total replacement value. Raze and replace or comprehensive gut and renovation within the next ten years will likely be more economically favorable options than piecemeal renewal over the next ten years. Although in theory this approach seems prudent, it doesn t really hold true in reality. There are factors to consider such as academics, research funding, donor funding, campus appearance, campus politics, etc. ISES encourages and can assist FAMU in developing a priority system for the buildings. This priority system can be incorporated into the reporting processes of the ISES Asset Management System (AMS) and can allow for more intelligent information. This priority system can also be applied externally of the AMS, if preferred. C. Analysis of System Codes Another potential strategy for capital planning is to analyze common building systems for needs. The table below summarizes system project backlog by weight of total backlog. This information was derived from a review of the data in subsections 2.2 and 2.4. Data representing ISES client history statistics has been included for comparative purposes. Note that the basis for the qualitative judgments in the following analyses is based on statistical metrics. If a proportion is between 0.5 and 0.9 standard deviations away from the mean, it is regarded as being close to out of range. If a proportion is between 1.0 and 1.9 standard deviations away from the mean, it is regarded as being out of range. If proportion is 2.0 standard deviations away or higher, it is regarded as being considerably, or significantly, out of range. AC EL ES FS HE HV IS PL SI VT ALL NUMBERS IN PERCENTAGES FLORIDA A & M UNIVERSITY ISES Historical Average (AC-Handicapped Accessibility, EL-Electrical, ES-Exterior Structure, FS-Fire / Life Safety, HE-Health, HV-HVAC, IS-Interior Finishes / Systems, PL- Plumbing, SI-Site, VT-Vertical Transportation) Accessibility projects are designed as such to eliminate barriers to disabled individuals and are typically relatively low-cost initiatives. These projects comprise 1.6 percent of the project backlog. Compared with a typical 4 percent of the project backlog, FAMU appears to be in a relatively solid position with regards to 4

7 having accessible facilities. Over the entire portfolio, interior amenity upgrades to include drinking fountains, kitchenettes, service counters, etc. and stair safety upgrades are the most prevalent projects. Interior door hardware projects are the next most frequent recommendations. The electrical project backlog, at 15.9 percent, is higher than the mean and close to being out of range. This is consistent with the HVAC project backlog proportion which will be explained later in this section of the report. The most frequently occurring electrical projects, at approximately 93 percent of the buildings, are interior lighting upgrades. It is also notable that approximately 50 percent of the facilities are candidates for full power distribution system renovations within the next ten years. Exterior structure projects are concerned with exterior envelope systems primarily consisting of roofs, exterior walls and finishes, and fenestrations. The proportion of these projects is 6.2 percent, which is lower than expected as well as being out of range from the mean. There are 23 roofing projects recommended, which equates to approximately 58 percent of the portfolio. The next most prevalent projects are related to window replacements and occur at a rate of approximately 38 percent in the buildings. Fire and life safety projects comprise 7.4 percent of the project backlog, which is in line with the expected value. The most frequently occurring fire life safety projects are fire alarm system replacements and installations. These occur at a rate of 83 percent of the buildings. Fire alarm systems are typically recommended for replacement at a minimum of fifteen years regardless of component condition. Other aspects, such as technological obsolescence, factor into such recommendations. Sprinkler system improvements, at a rate of 65 percent, are the next most frequently occurring fire and life safety project recommendations. Health related project recommendations within the FAMU portfolio are low relative to the sample set at 0.1 percent. In fact, there is only one related project recommendation. Health projects typically revolve around kitchen or laboratory cold box equipment and, in some cases, abatement of asbestos-containing materials (ACM). In most cases, abatement of ACM is included in the project related to the system that has ACM applied. The one health-related project in the backlog pertains to food service cold boxes in the Old DRS 66 building. Heating, ventilation, and air-conditioning (HVAC) projects comprise 40.9 percent of the backlog, which is above the sample set average of 33.9 percent. It is also close to out of range from the mean. HVAC 5

8 projects are typically the most expensive project per square foot. Comprehensive HVAC system renovations are recommended for approximately 65 percent of the facilities. The remainder of the projects are for piecemeal upgrades. Interior finish and system projects comprise 15.9 percent of the project backlog, which is lower but within range of the expected proportion of 17.0 percent. The most frequently occurring interior finish and system projects are related to the interior floor, wall, and ceiling finishes. Costly interior door upgrades are recommended in approximately 53 percent of the facilities. The next most prevalent interior finish and system projects are finished-based, as opposed to accessibility-based, restroom upgrades at a rate of 43 percent. Plumbing system projects comprise 8.2 percent of the project backlog, which is lower than the expected 9 percent but within range. The most prevalent plumbing projects within the backlog involve supply and drain piping networks at a rate of 63 percent each. The next most prevalent plumbing projects include water heating equipment replacements and occur at a rate of 38 percent. Site projects make up less than 1 percent of the project backlog and are in line with the expected value. The most prevalent site projects are paving-related. These projects occur at a rate of 40 percent of the buildings. There are two buildings with landscaping upgrade recommendations that make up the remainder of the site project backlog. Vertical transportation projects generally pertain to elevators, escalators, and dumb waiters. All of these projects in the FAMU backlog pertain to passenger or freight elevators. At 2.8 percent, the proportion of vertical transportation projects is higher and out of range of the expected 1.1 percent proportion. Reinvestment in the elevators across the campus should be considered. D. Analysis of Project Classifications The ISES project classifications can indicate the severity of the recommendations within the project backlog. Three project classifications have been applied as follows: A. Plant / Program Adaption: Expenditures required to adapt the physical plant to the evolving needs of the institution and to changing codes or standards. These are expenditures beyond normal maintenance. Examples include compliance with changing codes (e.g. accessibility), facility alterations 6

9 required by changed teaching or research methods, and improvements occasioned by the adoption of modern technology (e.g., the use of personal computer networks). B. Deferred Maintenance: Refers to expenditures for repairs which were not accomplished as a part of normal maintenance or capital repair which have accumulated to the point that facility deterioration is evident and could impair the proper functioning of the facility. Costs estimated for deferred maintenance projects should include compliance with applicable codes, even if such compliance requires expenditures beyond those essential to affect the needed repairs. Deferred maintenance projects represent catch up expenses. C. Capital Renewal: A subset of regular or normal facility maintenance which refers to major repairs or the replacement / rebuilding of major facility components (e.g., roof replacement at the end of its normal useful life is capital repair; roof replacement several years after its normal useful life is deferred maintenance). Plant / Program Adaption Deferred Maintenance Capital Renewal ALL NUMBERS IN PERCENTAGES FLORIDA A & M UNIVERSITY ISES Historical Average FAMU has a lower than average Plant / Program Adaption need at 6.1 percent. This proportion is also out of range of the mean. Deferred Maintenance and Capital Renewal projects are typically inversely proportional. The ratio is typically three Capital Renewal need dollars to every two Deferred Maintenance need dollars. The FAMU project backlog is inconsistent with this proportion. The ratio is near one to one with Capital Renewal being slightly higher. Deferred Maintenance projects are above the mean and close to being out of range. The Capital Renewal projects are below the mean but within range. E. Analysis of Priority Classifications Analysis of the project priority classes yields data regarding the urgency of the project backlog. The following table identifies the priority classes in which the projects were placed. The priority classes are time based as indicated in the table. Priority Class 1 houses projects that are recommended to be completed on an immediate basis. Priority Class 2 contains projects that are recommended to be completed within Year 1. Since these projects typically represent a small part of the total project backlog, they have been combined into the Year 1 category. 7

10 Priority 1 and 2 (Year 1) Priority 3 (Years 2-5) Priority 4 (Years 6-10) ALL NUMBERS IN PERCENTAGES FLORIDA A & M UNIVERSITY ISES Historical Average The analyses of the priority classes and project classifications typically yield corresponding inferences. Priorities 1 and 2 house a high proportion of Plant / Program Adaption projects as well as Deferred Maintenance. Priority 3 houses a combination of all project classifications. Priority 4 houses mostly Capital Renewal projects since these are recommended on the basis of statistical projections. Deferred Maintenance and Plant / Program Adaption projects, by typical definition, are more urgent than Priority 4 allows. The Priority 1 and Priority 2 proportion comprises 7.9 percent of the FAMU project backlog. This is close to out of range of and below the 15.4 percent mean. This statistic is in-line with the proportion of Plant Adaption projects being below and out of range of the mean. Similar to the Capital Renewal and Deferred Maintenance relationship, Priority 3 and Priority 4 projects are also inversely proportional. There are typically three Priority 3 dollars to every Priority 4 dollar. In the case of the FAMU project backlog, there are two Priority 3 dollars to every Priority 4 dollar. The Priority 3 project backlog proportion is lower than the mean but within range. The Priority 4 backlog proportion is higher than the mean and out of range. This indicates more dollars than normal are needed towards the end of the ten-year assessment scope and are, thus, less critical needs. 1.3 Conclusions and Recommendations for Facility Improvement The preceding sections of this report, supported by the graphs and charts contained in Section 2, illustrate that the current overall condition of the FAMU facilities is relatively average. There are several current and specific needs on campus. At the building level, there are four buildings with FCNIs of 0.40 or higher. A handful of other buildings are getting close to that condition. From a building perspective, the facilities with the highest FCNIs are candidates for renewal funding or other methods of management. With regards to FCNI, the most effective method of keeping it down is to holistically reinvest in existing facilities. This means either razing and rebuilding or gut and renovating them. If done correctly, such project work will also make maintenance organizations more effective. Note that this new construction will have a positive effect on the FCNI only if existing buildings are replaced with new. If new structures 8

11 are built but the older facilities are kept in service, any existing FCNI problems will be exacerbated. In addition, if the maintenance staff is not expanded in the event of adding incremental square footage to the portfolio, the FCNI issues will become more difficult to manage. The current project backlog consists of a high amount of projects that are meant to remedy current needs. There is a large proportion of projects which can be justified for funding today. However, there are fewer projects needed in Year 1 and more projects needed in Years 6-10 than is typical and FAMU Plant Operations has time to plan and fund these projects. From a system perspective, campus elevators represent an opportunity for near-term funding. Campuswide HVAC and electrical projects should also be considered as one of the first steps in developing a capital plan. Although there is a relatively low proportion of accessibility-based project recommendations, a prudent strategy is to fund these projects. Accessibility projects are typically relatively inexpensive. The benefit of completing them includes reduced liability to FAMU and improved building user safety and experience. In addition, even though there is not an inordinately high proportion of fire and life safety projects recommended, investment in these projects should be considered. These systems are also relatively inexpensive but yield immeasurable gains in reduction of University liability and user safety. If it is impossible to fully gut and renovate or raze and replace a facility, consider bundling ISES projects intelligently. For example, if an expensive HVAC system renewal project is justified and funded, consider undertaking any exterior envelope projects in concert with it. Replacing roofs, windows, and exterior doors will produce maximum energy savings, which will allow for as short a payback period as possible. For economies of scale, electrical and plumbing projects could also be combined. 1.4 Financial Modeling The ISES Asset Management System (AMS) software and database application features a funding modeling tool. Utilizing this tool, it was calculated that, in order for FAMU to maintain the current FCNI of 0.23, $7.7 million will have to be reinvested annually. This equates to 1.60 percent of plant value on an annual basis. Note that this figure is an annuity and does account for 3 percent inflation. The model also incorporates a 1 percent portfolio growth rate (the rate at which square footage is added), and a 1.5 percent plant deterioration rate (the rate at which new capital projects crop up). 9

12 If the reinvestment rate is lower than 1.60 percent of plant value, then the FCNI at the end of the tenth year will be higher than it was in the first. For instance, if 1 percent of plant value or $4.8 million is reinvested annually, then the resultant FCNI is estimated to be Conversely, if 2.5 percent of plant value, or $12.0 million, is reinvested annually, then the resultant FCNI is estimated to be Note that this model takes into account all money that makes it to the facility, which includes funding from all sources such as annual Deferred Maintenance and Capital Renewal funding, major renovation funding, donor funding, program-related grant funding, etc. which provides for space renewal, etc. 10

13 SECTION TWO FCA DATA AND COMPARISONS Figure 2.1 BLDG CODE NAME Detailed Facility Inventory BLDG USE YEAR BUILT GSF CRV TOTAL PROJECT COSTS 0001 LEE HALL OF ,052 $15,994,000 $5,370, JACKSON DAVIS HALL OF ,473 $5,496,000 $1,615, SCHOOL OF BUSINESS AND CL ,260 $16,220,000 $4,533, INDUSTRY SOUTH 0007 CARNEGIE CENTER OF ,125 $7,345,000 $536, WARE-RHANEY LB ,576 $36,494,000 $4,476, GEORGE W CONOLY GREENHOUSE OF ,697 $2,000,000 $422, SCHOOL OF ARCHITECTURE OF ,526 $34,475,000 $4,573, SWIMMING POOL LOCKER HOUSE GM ,455 $5,346,000 $1,506, GAITHER GYMNASIUM COMPLEX GM ,730 $8,122,000 $1,545, GAITHER OFFICE AND CLASSROOM OF ,903 $9,123,000 $3,107, LS BARTLEY WOMENS ATHLETIC OF ,696 $2,114,000 $819, COMPLEX 0036 SBI-WEST/NORTH CL ,386 $16,248,000 $1,372, SCHOOL OF JOURNALISM OF ,500 $34,477,000 $736, COUNSELING CENTER OF ,985 $1,528,000 $391, COLEMAN LIBRARY LY ,445 $43,253,000 $8,578, SCHOOL OF BUSINESS AND CL ,000 $12,842,000 $2,709, INDUSTRY EAST 0054 FOOTE-HILYER ADMIN CENTER OF ,251 $24,909,000 $7,452, FRED S HUMPHRIES (SCI RE) LB ,738 $38,049,000 $10,078, HOWARD HALL CL ,158 $7,048,000 $1,912, OLD DRS 61 OF ,400 $429,000 $191, OLD DRS 62 OF ,110 $1,330,000 $353, OLD DRS 63 CL ,953 $949,000 $306, OLD DRS 64 LB ,560 $6,873,000 $3,539, OLD DRS 65 CL ,832 $933,000 $405, OLD DRS 66 CL ,862 $2,964,000 $1,376, BENJAMIN L PERRY JR GENERAL CL ,409 $14,952,000 $3,331, CLASSROOM 0068 FOSTER-TANNER MUSIC CENTER OF ,598 $10,812,000 $3,676, FOSTER-TANNER CERAMIC CENTER OF ,178 $9,825,000 $2,034, FOSTER-TANNER ART CENTER OF ,936 $5,139,000 $1,078, FOSTER-TANNER BAND OF ,532 $6,210,000 $1,550, DYSON PHARMACY BUILDING LB ,500 $27,141,000 $9,473, PLANT OPERATIONS AND MAINTENANCE - A 0081 PLANT OPERATIONS AND MAINTENANCE - B FCNI OF ,771 $6,674,000 $1,170, OF ,003 $7,542,000 $816,

14 BLDG CODE NAME BLDG USE YEAR BUILT GSF CRV TOTAL PROJECT COSTS 0111 BENJAMIN BANNEKER-A CL ,604 $9,081,000 $3,429, BENJAMIN BANNEKER-B CL ,512 $11,991,000 $4,456, BENJAMIN BANNEKER-C CL ,724 $2,310,000 $737, BENJAMIN BANNEKER-D OF ,724 $2,360,000 $552, PAIGE NORTH OF ,551 $6,568,000 $2,487, PERRY SOUTH OF ,893 $22,042,000 $8,580, FCNI GRAND TOTALS 1,430,308 $483,613,000 $111,855,

15 Figure 2.2 Detailed Project Totals Matrix SYSTEM PRIORITIES DESCRIPTION TOTALS ACCESSIBILITY 0 23,400 1,369, ,850 $1,756,305 ELECTRICAL 0 1,716,961 10,283,446 5,835,391 $17,835,798 EXTERIOR 0 0 3,767,187 3,208,903 $6,976,090 FIRE/LIFE SAFETY 0 4,554,693 1,565,970 2,147,412 $8,268,074 HEALTH ,207 0 $79,207 HVAC 0 2,426,343 28,281,367 15,047,569 $45,755,279 INTERIOR FINISHES/SYS ,775,203 2,980,288 $17,755,491 PLUMBING 0 0 6,096,389 3,101,708 $9,198,097 SITE 0 0 1,061,814 0 $1,061,814 VERT. TRANSPORTATION 0 159,938 1,108,484 1,901,173 $3,169,595 TOTALS $0 $8,881,336 $68,388,121 $34,586,296 $111,855,752 CAPITAL RENEWAL $55,158,076 DEFERRED MAINTENANCE $49,928,718 PLANT/PROGRAM ADAPTION $6,768,958 CURRENT REPLACEMENT VALUE $483,613,000 FACILITY CONDITION NEEDS INDEX (FCNI) $55,158,076 GROSS SQUARE FEET 1,430,308 TOTAL PROJECT COST PER SQUARE FOOT $

16 Figure ISES Client History and FCNI Comparison Table Client Name Year of Inspection Sampling of ISES Client History List Facility Condition Needs Index Gross Square Feet Asset Count Average Year Built Avg. Age at Insp. Project Backlog per Square Foot Total Backlog FCNI Percent Rank University of Notre Dame ,096, $34.85 $317,037, % 67% Rice University ,037, $30.72 $277,629, % 12% North Carolina State University ,332, $30.24 $191,477,735 97% 97% University of Central Florida ,995, $50.90 $203,387,274 97% 0% University of North Florida ,720, $40.40 $69,498,230 93% 2% Vanderbilt University ,256, $47.45 $439,186,038 91% 82% Pepperdine University ,483, $61.59 $91,362,453 89% 4% Florida State University ,899, $58.31 $402,295,512 87% 17% University of Southern California ,195, $76.05 $1,079,541,148 85% 91% University of Iowa ,987, $83.99 $1,258,766,171 85% 82% Pennsylvania State University ,112, $81.62 $1,723,103,317 85% 53% Tulane University Uptown Campus ,018, $71.26 $286,356,411 80% 53% Washington University Main Campus ,304, $63.13 $461,126,432 78% 29% California Institute of Technology ,120, $69.66 $287,049,757 76% 89% Florida A&M University ,430, $78.20 $111,855,752 76% 17% Tulane University Downtown Campus (Health Sciences) ,151, $88.04 $189,423,119 72% 34% California State University Long Beach ,673, $56.34 $206,952,566 72% 21% University of Chicago ,880, $ $1,004,423,333 68% 82% University of Michigan ,782, $ $2,441,174,884 68% 85% San Francisco State University ,908, $70.16 $133,898,966 65% 72% University of Missouri Kansas City ,419, $79.96 $193,486,256 63% 52% University of West Georgia ,334, $45.01 $60,061,598 63% 67% Nevada System of Higher Education ,169, $ $869,951,341 63% 10% Portland Community College ,055, $93.49 $192,190,548 63% 6% East Carolina University ,003, $92.83 $371,660,376 55% 63% University of Rochester ,387, $91.78 $494,470,898 55% 58% Chapman University ,209, $48.30 $58,426,248 55% 8% University of Missouri Columbia ,993, $80.81 $645,928,221 50% 82% Portland State University ,062, $70.03 $284,495,209 50% 34% Valdosta State University , $46.06 $45,409,388 50% 52% University of Hawai i at Mānoa ,998, $ $538,771,415 50% 17% Morehouse College , $66.97 $56,583,054 42% 25% Rowan University ,940, $74.51 $144,619,873 42% 73% Kenyon College , $84.38 $69,612,041 38% 97% Oklahoma State University ,086, $ $343,450,807 38% 73% California State University Los Angeles ,908, $99.30 $189,533,235 34% 52% Princeton University ,188, $55.13 $120,630,439 33% 99% University of Connecticut ,758, $85.11 $1,000,773,188 33% 41% Texas A&M University ,451, $89.87 $1,568,245,670 33% 21% University of the Arts , $ $124,617,342 27% 100% Oakland University , $69.71 $31,310,078 27% 52% University of Massachusetts Lowell ,066, $ $452,572,591 23% 59% California Polytechnic State University San Luis Obispo , $77.06 $66,198,105 23% 34% University of Nebraska - Omaha , $76.81 $53,013,995 23% 25% University of Minnesota ,573, $99.41 $2,641,730,320 17% 84% University of California Irvine , $89.47 $30,082,075 17% 26% University of Missouri-St. Louis ,750, $ $270,494,377 14% 41% University of South Carolina ,780, $57.51 $504,990,688 12% 41% Pitzer College , $63.29 $17,746,437 10% 63% University of Miami - Coral Gables ,485, $89.45 $311,769,384 8% 58% George Washington University, The ,623, $82.16 $297,694,823 6% 75% University of Alabama ,509, $51.75 $285,113,705 4% 93% San Diego State University ,619, $ $170,118,528 4% 41% Miami University, Ohio ,527, $94.23 $143,963,945 0% 89% Averages ,473, $80.61 $441,208,563 Avg Year Built Percent Rank 14

17 FCNI FLORIDA A & M UNIVERSITY Figure Sampling of ISES Client History-FCNI vs. Campus Size Campus FCNI Comparison Showing Average Quadrants FCNI Florida A&M University Average Age/gsf Figure Sampling of ISES Client History-FCNI vs. Average Facility Age Campus FCNI Comparison Showing Trend Bands Florida A&M University Average Age/gsf 15

18 Figure 2.4 System Code Project Cost Distribution Chart 8.2% 0.9% 2.8% 1.6% 15.9% 15.9% 6.2% 7.4% 0.1% ACCESSIBILITY ELECTRICAL EXTERIOR FIRE/LIFE SAFETY HEALTH HVAC INTERIOR/FINISH SYS. PLUMBING SITE VERT. TRANSPORTATION 40.9% Figure 2.5 Project Classification Project Cost Distribution Chart 6.1% 49.3% Capital Renewal Deferred Maintenance 44.6% Plant Adaption 16

19 Figure 2.6 Priority Class Project Cost Distribution Chart 0.0% 7.9% 30.9% Priority 1 Priority 2 Priority 3 Priority % 17

20 Figure 2.7 Summary of FCNI and Project Cost by Facility BLDG BLDG YEAR TOTAL PROJECT NAME GSF CRV FCNI CODE USE BUILT COSTS FCNI > OLD DRS 64 LB ,560 $6,873,000 $3,539, FCNI 0.31 to BENJAMIN BANNEKER-C CL ,724 $2,310,000 $737, OLD DRS 63 CL ,953 $949,000 $306, LEE HALL OF ,052 $15,994,000 $5,370, FOSTER-TANNER MUSIC CENTER OF ,598 $10,812,000 $3,676, GAITHER OFFICE AND OF ,903 $9,123,000 $3,107, CLASSROOM 0074 DYSON PHARMACY BUILDING LB ,500 $27,141,000 $9,473, BENJAMIN BANNEKER-B CL ,512 $11,991,000 $4,456, BENJAMIN BANNEKER-A CL ,604 $9,081,000 $3,429, PAIGE NORTH OF ,551 $6,568,000 $2,487, LS BARTLEY WOMENS ATHLETIC OF ,696 $2,114,000 $819, COMPLEX 0562 PERRY SOUTH OF ,893 $22,042,000 $8,580, OLD DRS 65 CL ,832 $933,000 $405, OLD DRS 61 OF ,400 $429,000 $191, OLD DRS 66 CL ,862 $2,964,000 $1,376, FCNI 0.21 to FOSTER-TANNER CERAMIC OF ,178 $9,825,000 $2,034, CENTER 0070 FOSTER-TANNER ART CENTER OF ,936 $5,139,000 $1,078, SCHOOL OF BUSINESS AND CL ,000 $12,842,000 $2,709, INDUSTRY EAST 0012 GEORGE W CONOLY OF ,697 $2,000,000 $422, GREENHOUSE 0067 BENJAMIN L PERRY JR GENERAL CL ,409 $14,952,000 $3,331, CLASSROOM 0114 BENJAMIN BANNEKER-D OF ,724 $2,360,000 $552, FOSTER-TANNER BAND OF ,532 $6,210,000 $1,550, COUNSELING CENTER OF ,985 $1,528,000 $391, FRED S HUMPHRIES (SCI RE) LB ,738 $38,049,000 $10,078, OLD DRS 62 OF ,110 $1,330,000 $353, HOWARD HALL CL ,158 $7,048,000 $1,912, SCHOOL OF BUSINESS AND CL ,260 $16,220,000 $4,533, INDUSTRY SOUTH 0020 SWIMMING POOL LOCKER GM ,455 $5,346,000 $1,506, HOUSE 0002 JACKSON DAVIS HALL OF ,473 $5,496,000 $1,615, FOOTE-HILYER ADMIN CENTER OF ,251 $24,909,000 $7,452,

21 BLDG BLDG YEAR TOTAL PROJECT NAME GSF CRV FCNI CODE USE BUILT COSTS FCNI 0.11 to PLANT OPERATIONS AND OF ,003 $7,542,000 $816, MAINTENANCE - B 0009 WARE-RHANEY LB ,576 $36,494,000 $4,476, SCHOOL OF ARCHITECTURE OF ,526 $34,475,000 $4,573, PLANT OPERATIONS AND OF ,771 $6,674,000 $1,170, MAINTENANCE - A 0021 GAITHER GYMNASIUM COMPLEX GM ,730 $8,122,000 $1,545, COLEMAN LIBRARY LY ,445 $43,253,000 $8,578, FCNI 0.0 to SCHOOL OF JOURNALISM OF ,500 $34,477,000 $736, CARNEGIE CENTER OF ,125 $7,345,000 $536, SBI-WEST/NORTH CL ,386 $16,248,000 $1,372, PLANT OPERATIONS AND MAINTENANCE - C ST ,700 $6,405,000 $568,

22 Figure 2.8 Summary of Average Age # OF % OF AVG. YEAR GSF FACILITIES GSF AGE Pre % 67, % 4, % 210, % 141, % 213, % 65, % 272, % 271, Present % 183,011 8 TOTALS 40 1,430, Figure 2.9 Summary of Facility Use Types FACILITY # OF % OF DESCRIPTION TYPE CODE FACILITIES GSF GSF CL Classroom / Academic 11 21% 294,700 GM Gymnasium / Athletic 2 3% 44,185 LB Laboratory 4 18% 262,374 LY Library 1 9% 129,445 OF Office / Administrative 21 47% 675,904 ST Shops / Trades 1 2% 23,700 TOTALS 40 1,430,308 20

23 Figure 2.10 Life Cycle Model Expenditure Projections All Buildings 50M 40M 30M 20M 10M 0M Future Year Average Annual Renewal Cost per Square Foot: $

24 Figure 2.11 Geographical FCNI Range Map 22

25 FCNI INDEX KEY <0.10, EXCELLENT CONDITION <0.20, GOOD CONDITION <0.30, FAIR CONDITION <0.50, BELOW AVERAGE <0.60, POOR CONDITION 0.601, REPLACEMENT INDICATED

6.0 Support Facilities Element

6.0 Support Facilities Element 6.0 PURPOSE The purpose of this element is to ensure the provision of support facilities to meet University needs during the planning period. (1) DATA REQUIREMENTS. This element shall be based on the following

More information

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

Developing the Capital Plan is only Half the Battle

Developing the Capital Plan is only Half the Battle Western Connecticut State University Western Oregon University Westfield State University Widener University Williams College Worcester Polytechnic Institute Worcester State University Xavier University

More information

BEFORE THE ROOF CAVES IN II: APPA

BEFORE THE ROOF CAVES IN II: APPA BEFORE THE ROOF CAVES IN II: APPA PUBLISHED BY: RICK BIEDENWEG AND ROBERT HUTSON This article was originally published by APPA (www.appa.org) and was authored by Rick Biedenweg and Robert Hutson with assistance

More information

OAKLAND COMMUNITY COLLEGE A VISION OF EXCELLENCE IN THE 21 st CENTURY

OAKLAND COMMUNITY COLLEGE A VISION OF EXCELLENCE IN THE 21 st CENTURY A VISION OF EXCELLENCE IN THE 21 st CENTURY FIVE YEAR CAPITAL OUTLAY MASTER PLAN Fiscal Year 2018 (7/1/17 6/30/18) Through Fiscal Year 2022 (7/1/21 6/30/22) Section I Mission Statement Mission Statement

More information

Sightlines, LLC University of Alaska System Presentation FY2012

Sightlines, LLC University of Alaska System Presentation FY2012 Sightlines, LLC University of Alaska System Presentation FY2012 Date: April 3, 2013 Presented by: Colin Sanders, Laura Vassilowitch & Sheena Salsberry University of Illinois at Urbana-Champaign The University

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

Funding for Maintenance and Repair at UMKC. Faculty Senate November 4, 2014

Funding for Maintenance and Repair at UMKC. Faculty Senate November 4, 2014 Funding for Maintenance and Repair at UMKC Faculty Senate November 4, 2014 Changing the Conversation Space Understand how age profile drives capital and operational demands Capital Multiyear plans that

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN

CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN 4.1 Overview 4.2 Master Plan Summary 4.3 List of Projects in Order of Priority 4.4 Cumulative Capacities and Loads for each Space Type 4.5 The Capacity of Existing

More information

University of Virginia Status Report on the Plan to Address Deferred Maintenance

University of Virginia Status Report on the Plan to Address Deferred Maintenance Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 552 buildings and related infrastructure, encompassing

More information

Informational Session for Fiscal Year Budget

Informational Session for Fiscal Year Budget Informational Session for Fiscal Year 2016-2017 Budget PRESENTED BY Angela M. Poole, CPA Acting Vice President for Finance and Administration Florida Agricultural and Mechanical University Budget and Finance

More information

Facility Condition Assessment Report. Coast Community College District

Facility Condition Assessment Report. Coast Community College District Facility Condition Assessment Report Coast Community College District February 28, 2003 Introduction To help document the need for funding the necessary replacement and upgrading of facilities within California

More information

University of Virginia Status Report on the Plan to Address Deferred Maintenance

University of Virginia Status Report on the Plan to Address Deferred Maintenance Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 540 buildings and related infrastructure, encompassing

More information

CH-UH Board of Education Meeting. June 27, 2017

CH-UH Board of Education Meeting. June 27, 2017 CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle

More information

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES SECTION: Facilities Number: 09.04.04 AREA: Facilities Management and Maintenance Information SUBJECT: Maintenance Project Evaluation

More information

Deferred Maintenance Phase I Report

Deferred Maintenance Phase I Report Ohio University Deferred Maintenance Phase I Report A Case for Addressing Deferred Maintenance Needs at Ohio University Prepared by: University Planning and Implementation and Facilities Management Ohio

More information

State Minimum Wage Chart (See below for Local/City Minimum Wage Chart)

State Minimum Wage Chart (See below for Local/City Minimum Wage Chart) State Current Minimum Wage State Minimum Wage Chart (See below for Local/City Minimum Wage Chart) Maximum Tip Credit Allowed for Tipped Employees Federal $7.25 $5.12 $2.13 Minimum Cash Wage for Tipped

More information

2014 U.S. Census (2015) Median African-American Household Income Rank, Memphis Included. Household Median Income Ranking, African American Population

2014 U.S. Census (2015) Median African-American Household Income Rank, Memphis Included. Household Median Income Ranking, African American Population 2015 2015 Rankings Report Prepared by Elena Delavega, PhD, MSW Department of Social Work Benjamin L. Hooks Institute for Social Change University of Memphis 2014 U.S. Census (2015) - Rank, Memphis Included

More information

Facility Condition Assessment. Facility Condition Assessment 8/13/2013 AGENDA

Facility Condition Assessment. Facility Condition Assessment 8/13/2013 AGENDA AGENDA benefits & limitations Rod Moore, RA, LEED AP, PMP Georgia Tech Benjamin Dutton, FFB, MCIOB, MRICS Faithful+Gould GT Facilities GT Program What is GT FCA Deliverables How GT uses FCA Information

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

Making the Case for Funding Deferred Maintenance Before it s Too Late

Making the Case for Funding Deferred Maintenance Before it s Too Late Making the Case for Funding Deferred Maintenance Before it s Too Late Jim Kadamus Vice President Sightlines Cuba Plain Assistant Vice President for Budget Planning and Development University of Missouri

More information

FREQUENTLY ASKED QUESTIONS (FAQs)

FREQUENTLY ASKED QUESTIONS (FAQs) FREQUENTLY ASKED QUESTIONS (FAQs) Q. What is a school bond? A. A bond election requires the voter to express support for or against the district selling school bonds. If the bond election is approved,

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program May 6, 2016 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

Deferred Maintenance and Renewal Program Briefing

Deferred Maintenance and Renewal Program Briefing Deferred Maintenance and Renewal Program Briefing Business and Finance December 2007 1 Briefing Overview Nature of the challenge How we compare Progress to date Remaining barriers What s next? 2 Context

More information

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,

More information

Rhode Island School of Design

Rhode Island School of Design Rhode Island School of Design FY17 ROPA+ Final Presentation October 19, 217 University of Southern University of Southern Maine University of St. Thomas University of Tennessee, Knoxville University of

More information

Department Chair Online Resource Center Facility Maintenance or Facility Improvement? Taking a Responsible Approach

Department Chair Online Resource Center Facility Maintenance or Facility Improvement? Taking a Responsible Approach Department Chair Online Resource Center Facility Maintenance or Facility Improvement? Taking a Responsible Approach Richard Bettega, associate vice president for facilities, Lewis and Clark College. Facility

More information

Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019

Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019 Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019 PRESENTED BY Finance and Administration Florida Agricultural and Mechanical University 1 ACTION ITEM IV: Approval of

More information

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017 A. Approval - New (Non-State and Other State Funds) Name (Other State) (Other State) Non-State Funds/ Undetermined 1 N/A B. Approval - Amended (Non-State and Other State Funds) 1 Coastal Carolina Main

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15 Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings

More information

Capital Projects Fund. Board Work Session August 9, 2007

Capital Projects Fund. Board Work Session August 9, 2007 Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting

More information

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters

More information

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT.

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT. (MEASURE R, NOVEMBER 2001) (MEASURE R, NOVEMBER 2001) CONTENTS Page Independent Auditor s Report... 1 Objectives... 2 Scope of the Audit... 2 Background Information... 3 Procedures Performed... 3 Results

More information

SBA should aid and assist small businesses to increase their ability to compete in international markets.

SBA should aid and assist small businesses to increase their ability to compete in international markets. Authority of Office of International Trade 1 SBA should aid and assist small businesses to increase their ability to compete in international markets. SMALL BUSINESS ACT [The Act of July 18, 1958] Small

More information

2019 U.S. Minimum Wage Chart

2019 U.S. Minimum Wage Chart Alabama No provision. Alaska $9.89 Arizona $11.00 - Flagstaff $12.00 Indexed to inflation or $1 more than the federal minimum wage, whichever is higher. Increasing to $12.00 on and after January 1, 2020.

More information

Robert Shaw Theme Elementary

Robert Shaw Theme Elementary DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects

More information

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017 Summary of Capital Budget Request 2018-2019 of the Tennessee Board of Regents September 21, 2017 1 This is the Summary of the Capital Budget Request for Fiscal Year 2018-2019 for the Finance and Business

More information

Minimum Wage per State

Minimum Wage per State per State Future and Notes ALABAMA NONE Federal minimum applies. BIRMINGHAM: July 2016 $ 8.50; July 2017: $10.10 ALASKA $8.75 ARIZONA $8.05 ARKANSAS $7.50 Nov. 4 2014 ballot measure approved to raise minimum

More information

EBRI Databook on Employee Benefits Chapter 6: Employment-Based Retirement Plan Participation

EBRI Databook on Employee Benefits Chapter 6: Employment-Based Retirement Plan Participation EBRI Databook on Employee Benefits Chapter 6: Employment-Based Retirement Plan Participation UPDATED July 2014 This chapter looks at the percentage of American workers who work for an employer who sponsors

More information

Hurricane Charley - Executive summary. Hurricane Charley. Nature s Force vs. Structural Strength

Hurricane Charley - Executive summary. Hurricane Charley. Nature s Force vs. Structural Strength Hurricane Charley - Executive summary Hurricane Charley Nature s Force vs. Structural Strength Charlotte County, Florida August 13, 2004 Introduction The devastation left behind by Hurricane Andrew when

More information

U.S. Minimum Wage Chart

U.S. Minimum Wage Chart Alabama No provision. Alaska $9.75 Arizona $8.05 - Flagstaff Increasing to $9.80 on January 1, 2017. Indexed to inflation or $1 more than the federal minimum wage, whichever is higher. Increasing to $10.00

More information

The Real Meaning of Total Cost of Ownership (TCO)

The Real Meaning of Total Cost of Ownership (TCO) The Real Meaning of Total Cost of Ownership (TCO) Presented by David Patnaude Director of Plant and Sustainability Riverdale Country School Lawrence Eighmy Managing Principle 1 The Real Meaning of Total

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM 104 Office of the President TO MEMBERS OF THE COMMITTEE ON : For Meeting of ACTION ITEM AMENDMENT OF THE BUDGET FOR CAPITAL IMPROVEMENTS AND THE CAPITAL IMPROVEMENT PROGRAM AND APPROVAL OF EXTERNAL FINANCING

More information

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual SOUTH DAKOTA BOARD OF REGENTS Policy Manual SUBJECT: NUMBER: A. PURPOSE To provide guidance on what constitutes maintenance and repair and the process used to document and approve projects. B. DEFINITIONS

More information

Contractor's Pollution Liability Questionnaire Page 1

Contractor's Pollution Liability Questionnaire Page 1 Contractor's Pollution Liability Questionnaire Page 1 APPLICANT INFORMATION Applicant Name Address City, State, Zip Address City, State, Zip Applicant's Website Year Business Started Physical Address Mailing

More information

Los Angeles Unified School District Page 1 of 3

Los Angeles Unified School District Page 1 of 3 Los Angeles Unified School District 333 South Beaudry Ave, Los Angeles, CA 90017 Board of Education Report File #: Rep-201-16/17, Version: 1 Amendment to the Facilities Services Division Strategic Execution

More information

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S

More information

Central Michigan University Capital Budget

Central Michigan University Capital Budget Central Michigan University Capital Budget 1999-2000 Table of Contents Central Michigan University Capital Budget Table of Contents I. Narrative A. Overview and Process...1 B. Funding Sources...2 C. Capital

More information

Basic Economic Security in the United States: How Much Income Do Working Adults Need in Each State?

Basic Economic Security in the United States: How Much Income Do Working Adults Need in Each State? IWPR R590 October 2018 Basic Economic Security in the United States: How Much Income Do Working Adults Need in Each State? Economic security is a critical part of the overall health and well-being of women,

More information

DRAFT. Los Angeles Community College District

DRAFT. Los Angeles Community College District Los Angeles Community College District Statement of Expenditures of Bond Proceeds and Unaudited Supplementary Schedules for Propositions A, AA and J June 30, 2017 (With Independent Auditors Report Thereon)

More information

SHEEO Information Request Regarding Deferred Maintenance October 29, 2015

SHEEO Information Request Regarding Deferred Maintenance October 29, 2015 SHEEO Information Request Regarding Deferred Maintenance October 29, 2015 SHEEO Query: Members: Peter Blake of Virginia has a question about how common it is for states to appropriate money (cash or debt

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. On November 4, 2014, Broward County voters approved a

More information

Today I will go over space modeling and its uses as well as present the conceptual differences between the space model we currently use and the space

Today I will go over space modeling and its uses as well as present the conceptual differences between the space model we currently use and the space Today I will go over space modeling and its uses as well as present the conceptual differences between the space model we currently use and the space planning guidelines as outlined by the CEFPI organization.

More information

10 Year OSU Capital Forecast

10 Year OSU Capital Forecast 10 Year OSU Capital Forecast Presentation 2004-17 Define financial boundaries Describe criteria Identify data sources Summarize proposed capital projects Financial boundaries Forecast to align with financial

More information

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development Georgia Institute of Technology Advanced Computing Technology Building Draft Program Initial Program Development Issued April 2, 2001 Introduction Scope This document is a summary of the Session for the

More information

I. PROJECT DESCRIPTION

I. PROJECT DESCRIPTION REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms

More information

Business Planning for the New Economic Era

Business Planning for the New Economic Era Business Planning for the New Economic Era A Quick Overview of the PayNet Database One of the largest databases of private financial obligations: o Over 21 million term debt contracts o Over $1.1 trillion

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

Commonfund Higher Education Price Index Update

Commonfund Higher Education Price Index Update Commonfund Higher Education Price Index 2017 Update Table of Contents EXECUTIVE SUMMARY 1 INTRODUCTION: THE HIGHER EDUCATION PRICE INDEX 1 About HEPI 1 The HEPI Tables 2 HIGHER EDUCATION PRICE INDEX ANALYSIS

More information

DeKalb Elementary School of the Arts at Terry Mills

DeKalb Elementary School of the Arts at Terry Mills DeKalb County School District/Elementary Schools DeKalb Elementary School of the Arts at Terry Mills Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School

More information

LOS ANGELES COMMUNITY COLLEGE DISTRICT PROPOSITION AA BOND CONSTRUCTION PROGRAM

LOS ANGELES COMMUNITY COLLEGE DISTRICT PROPOSITION AA BOND CONSTRUCTION PROGRAM Statement of Expenditures of Bond Proceeds and Unaudited Supplementary Schedule Year Ended June 30, 2017 (With Independent Auditors Report Thereon) Table of Contents Independent Auditors Report 1 Statement

More information

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,

More information

Capital Maintenance. 2. Deferred Maintenance, May 18, 2009 <http://en.wikipedia.org/wiki/deferred_maintenance>

Capital Maintenance. 2. Deferred Maintenance, May 18, 2009 <http://en.wikipedia.org/wiki/deferred_maintenance> Capital Maintenance Capital Maintenance Capital maintenance has previously been known as deferred maintenance, the act of postponing maintenance in order to save money or avoid costs. 2 At NYU, the term

More information

William Bradley Bryant Center

William Bradley Bryant Center DeKalb County School District/Education Other William Bradley Bryant Center Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

AMERICAN INVESTMENT COUNCIL. Public Pension Study May 2018

AMERICAN INVESTMENT COUNCIL. Public Pension Study May 2018 AMERICAN INVESTMENT COUNCIL Public Pension Study May 2018 Methodology This study conducted by the American Investment Council examines the private equity investments of 163 U.S. public pension funds. The

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'

More information

CAPITAL FUNDING SUMMARY

CAPITAL FUNDING SUMMARY CAPITAL SUMMARY SCC (School Consolidation Capital ) CAPITAL : B19 -December 1, Specifically to address a school board s excess capacity : B11 -May 26, Opportunity to identify most urgent & pressing accommodations

More information

Legislative Trends: Upcoming Increases to Minimum Wage Round-Up 2019

Legislative Trends: Upcoming Increases to Minimum Wage Round-Up 2019 Legislative Trends: Upcoming Increases to Minimum Wage Round-Up 2019 The following chart shows the current minimum wage for non-tipped and tipped employees and the next scheduled increase (if any) for

More information

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)

More information

Rockville Science Center (P036600)

Rockville Science Center (P036600) Rockville Science Center (P036600) (AAGE15) Rockville Date Last Modified 2/26/14 N/A-PS Planning, Design and Supervision 6,492 6,477 15 0 0 0 0 0 0 0 0 Construction 56,300 56,272 28 0 0 0 0 0 0 0 0 6,598

More information

LOS ANGELES COMMUNITY COLLEGE DISTRICT BOND CONSTRUCTION PROGRAMS: PROPOSITION A PROPOSITION AA MEASURE J

LOS ANGELES COMMUNITY COLLEGE DISTRICT BOND CONSTRUCTION PROGRAMS: PROPOSITION A PROPOSITION AA MEASURE J BOND CONSTRUCTION PROGRAMS: PROPOSITION A PROPOSITION AA MEASURE J Statements of Expenditures of Bond Proceeds and Supplementary Schedules Year ended June 30, 2016 BOND CONSTRUCTION PROGRAMS Table of Contents

More information

October Persistent Gaps: State Child Care Assistance Policies Karen Schulman and Helen Blank

October Persistent Gaps: State Child Care Assistance Policies Karen Schulman and Helen Blank October 2017 Persistent Gaps: State Child Care Assistance Policies 2017 Karen Schulman and Helen Blank ABOUT THE CENTER The National Women s Law Center is a non-profit organization working to expand the

More information

LOS ANGELES COMMUNITY COLLEGE DISTRICT PROPOSITION AA BOND CONSTRUCTION PROGRAM

LOS ANGELES COMMUNITY COLLEGE DISTRICT PROPOSITION AA BOND CONSTRUCTION PROGRAM Final Editorial Review Completed NDPPS USE ONLY NDPPS ID: 615509 Contact Name: Kristen Olko Special Instructions Version: 2 Statement of Expenditures of Bond Proceeds and Unaudited Supplementary Schedule

More information

STATE EMPLOYMENT AND UNEMPLOYMENT JUNE 2018

STATE EMPLOYMENT AND UNEMPLOYMENT JUNE 2018 For release 10:00 a.m. (EDT) Friday, July 20, USDL-18-1183 Technical information: Employment: Unemployment: Media contact: (202) 691-6559 sminfo@bls.gov www.bls.gov/sae (202) 691-6392 lausinfo@bls.gov

More information

Local Government Use of Preventive Maintenance. This chapter provides additional information on preventive maintenance for

Local Government Use of Preventive Maintenance. This chapter provides additional information on preventive maintenance for 3 Local Government Use of Preventive Maintenance SUMMARY Most school districts, cities, and counties reported that they perform some preventive maintenance on their buildings, but only about 15 percent

More information

Harnett Central High

Harnett Central High NC School District/430 Harnett County/High School Harnett Central High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

Checkpoint Payroll Sources All Payroll Sources

Checkpoint Payroll Sources All Payroll Sources Checkpoint Payroll Sources All Payroll Sources Alabama Alaska Announcements Arizona Arkansas California Colorado Connecticut Source Foreign Account Tax Compliance Act ( FATCA ) Under Chapter 4 of the Code

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

Physical Plant. Detailed Assessment Report

Physical Plant. Detailed Assessment Report Physical Plant Detailed Assessment Report 2011-2012 Mission / Purpose The Physical Plant Department enhances the University of West Alabama's mission to provide opportunities for students to pursue a quality

More information

Highlights financial report. June 30 June (in thousands)

Highlights financial report. June 30 June (in thousands) Highlights FINANCIAL (in thousands) June 30 June 30 2000 1999 Total revenues $1,680,943 $1,367,175 Total cash gifts and equipment gifts $220,642 $211,215 Capital expenditures $118,799 $94,896 Total assets

More information

STATE EMPLOYMENT AND UNEMPLOYMENT OCTOBER 2018

STATE EMPLOYMENT AND UNEMPLOYMENT OCTOBER 2018 For release 10:00 a.m. (EST) Friday, November 16, USDL-18-1826 Technical information: Employment: Unemployment: Media contact: (202) 691-6559 sminfo@bls.gov www.bls.gov/sae (202) 691-6392 lausinfo@bls.gov

More information

Overview of Public Schools CIP

Overview of Public Schools CIP Overview of Public Schools CIP The Public Schools Community Investment Plan (CIP) includes school construction, such as additions and modernizations, as well as other school-related projects. School construction

More information

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp State Academies Projects

More information

Division of Finance and Administration Financial Update. Karol Kain Gray Vice Chancellor for Finance and Administration September 25, 2013

Division of Finance and Administration Financial Update. Karol Kain Gray Vice Chancellor for Finance and Administration September 25, 2013 Division of Finance and Administration Financial Update September 25, 2013 CAFR AWARD o The UNC Finance Division earned the University s 18 th consecutive Certificate of Achievement for Excellence in Financial

More information

RESERVE FUND STUDY. Reserve Fund Study

RESERVE FUND STUDY. Reserve Fund Study RESERVE FUND STUDY Reserve Fund Study The reserve fund study for the condominium corporation is prepared in a format to be presented to the Condominium Corporation s Board of Directors or for use in delayed

More information

STATE EMPLOYMENT AND UNEMPLOYMENT JANUARY 2019

STATE EMPLOYMENT AND UNEMPLOYMENT JANUARY 2019 For release 10:00 a.m. (EDT) Monday, March 11, 2019 USDL-19-0398 Technical information: Employment: Unemployment: Media contact: (202) 691-6559 sminfo@bls.gov www.bls.gov/sae (202) 691-6392 lausinfo@bls.gov

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'

More information

Impacts of Prepayment Penalties and Balloon Loans on Foreclosure Starts, in Selected States: Supplemental Tables

Impacts of Prepayment Penalties and Balloon Loans on Foreclosure Starts, in Selected States: Supplemental Tables THE UNIVERSITY NORTH CAROLINA at CHAPEL HILL T H E F R A N K H A W K I N S K E N A N I N S T I T U T E DR. MICHAEL A. STEGMAN, DIRECTOR T 919-962-8201 OF PRIVATE ENTERPRISE CENTER FOR COMMUNITY CAPITALISM

More information

Commercial Real Estate Lending Patterns and Distressed Residential Mortgage Markets

Commercial Real Estate Lending Patterns and Distressed Residential Mortgage Markets Commercial Real Estate Lending Patterns and Distressed Residential Mortgage Markets Donald R. Cavan 1 This article discusses residential mortgage distress which continues to in uence not only the parties

More information

ADVANCING CAPITAL OUTLAY

ADVANCING CAPITAL OUTLAY ADVANCING CAPITAL OUTLAY Robert R. Broyden Assistant Vice President for Capital Assets and Financial Management 1 Major Topics Today: 1) Commitment to long-range planning processes 2) Update on 2012 General

More information

CRS Report for Congress

CRS Report for Congress Order Code RL32477 CRS Report for Congress Received through the CRS Web Social Security: The Public Servant Retirement Protection Act (H.R. 4391/S. 2455) July 19, 2004 Laura Haltzel Specialist in Social

More information

Consumer Returns in the Retail Industry

Consumer Returns in the Retail Industry 2011 Consumer Returns in the Retail Industry Introduction The Retail Equation (TRE) is pleased to incorporate the results of the National Retail Federation (NRF) 2011 Return Fraud Survey into the 2011

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895