1 District Letting Schedule Update District APC Liaison Meeting February 24, 2012 Brad J. Brumbaugh, P.E. Assistant District Executive - Construction
2 District Letting Summary Estimated Total Construction Amt: $94 Million Total Number of Projects: 77 US 219 Garrett Earthwork Potential Miles of Resurfacing: 74 Two-Lane Miles Bridges Replacements: 35 (1 Local) Rehabilitations: 7 (1 Local) Preservations: 16 Safety Projects: 5 Projects Enhancements: 12 Projects
3 Bedford County Projects
4 Bedford County Lettings Maintenance Contracts (MC) Estimated 6.5 Miles of Resurfacing Estimated Construction: $ $2.5 Million S Centervillle MC Resurface (220-MC1) Milling and Resurfacing Anticipated Let: 2 nd Quarter 2012 Brumbaugh Mountain MC Resurface (869-MC2) Milling and Resurfacing Anticipated Let: 2 nd Quarter 2012
5 Trib W Sideling Hill Creek Bridge Scope: Bridge Replacement Traffic Control: Detour using SR 2008, SR 2011, SR 2007, Rice Rd Construction Estimate: Less than $1.0 Million Anticipated Let: 2 nd Quarter 2012
6 Trib W Sideling Hill Creek Bridge Big Creek Rd over Trib West Branch of Sideling Hill Creek in Monroe Township
7 I-99 over PA 869 Scope: New strip seal expansion dams Traffic Control: Phased Construction Construction Estimate: Less than $1.0 Million Anticipated Let: 2 nd Quarter 2012
8 I-99 over PA 869 East St. Clair Township
9 PA 26 Pipers Run to Plank Road Scope: Resurface Traffic Control: Short term phased construction Construction Estimate: $1.0 - $5.0 Million Anticipated Let: 2 nd Quarter 2012
10 PA 26 Pipers Run to Plank Road Hopewell Township
11 PA 56 Resurfacing Scope: Overlay and Guide Rail and Bridge Replacement Traffic Control: Short term phased Construction Construction Estimate: $1.0 - $5.0 Million Anticipated Let: 3 rd Quarter 2012
12 PA 56 Resurfacing East St Clair Township
13 PA 96 Pooles Run Bridge Scope: Bridge Replacement Traffic Control: Detour using PA 56, PA 869, SR 4032, SR 4019 Construction Estimate: Less than $1.0 Million Anticipated Let: 3 rd Quarter 2012
14 Pooles Run Bridge PA 96 over Pooles Run in King Township
15 SR 3017 Sulphur Springs Culvert Scope: Culvert Replacement Traffic Control: Detour using PA 96, SR 3017, SR 3014 Construction Estimate: Less than $1.0 Million Anticipated Let: 3 rd Quarter 2012
16 Sulphur Springs Culvert SR 3017 over Trib of Buffalo Run in Harrison Township
17 SR 4009 Tributary Shobers Run Culvert Scope: Bridge Replacement Traffic Control: Detour using SR 4009, SR 4008, SR 4010, US 220, SR 8003 (I-99 Ramps) Construction Estimate: Less than $1.0 Million Anticipated Let: 3 rd Quarter 2012
18 Tributary Shobers Run Culvert Spring Drive over Tributary to Shobers Run in Bedford Township
19 T-701 Beaver Dam Bridge Scope: Bridge Replacement Traffic Control: Short Detour Construction Estimate: Less than $1.0 Million Anticipated Let: 3 rd Quarter 2012
20 T-701 Beaver Dam Bridge Queen Road over Beaverdam Creek in Kimmel Township
21 SR 3009 Lake Gordon Bridge Scope: Bridge Replacement Traffic Control: Detour using SR 3003, US 220, SR 3009 Construction Estimate: $1.0 - $5.0 Million Anticipated Let: 4 th Quarter 2012
22 Lake Gordon Bridge Evitts Creek Rd over Lake Gordon in Cumberland Valley Township
23 Ashcom Bridge Scope: Bridge Replacement Traffic Control: Half width construction Construction Estimate: $1.0 - $5.0 Million Anticipated Let: 1 st Quarter 2013
24 Ashcom Bridge Ashcom Rd over Cove Creek in Snake Spring Township
25 SR 3006 Wolf Camp Run Bridge Scope: Superstructure Replacement Traffic Control: Detour using PA 26, Tar Water Rd, Madley Hollow Rd, SR 3006 Construction Estimate: Less than $1.0 Million Anticipated Let: 1 Quarter 2013
26 Wolf Camp Run Bridge Camp Hill Rd over Wolf Camp Run in Londonderry Township
27 Blair County Projects
28 PA 764 N Greenwood Sandy Run Culvert Scope: Culvert Replacement Traffic Control: Phased construction Construction Estimate: $1.0 - $5.0 Million Anticipated Let: 1 st Quarter 2012 (Advertised)
29 N Greenwood Sandy Run Culvert PA 764 over Tributary of Sandy Run in Antis Township
Region 5 Upcoming Projects for Summer/Fall 2018
Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The
More informationBRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION
BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)
More information$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids.
ST AVE TH AVE TH AVE BIG SIOUX RD TH AVE TH AVE TH AVE TH AVE TH AVE 9 9 0 Miles TH AVE $+ 0 $+ 0 TH AVE TH AVE 9 Humboldt TH ST TH AVE $+ 0 0 0-0-00 0 Construction 09 Construction 00 Construction 0 Construction
More informationCapital Budgeting and Programming
Capital Budgeting and Programming Presented by the Southern Windsor County Regional Planning Commission with support from the Vermont Agency of Commerce and Community Development and the US Department
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More information2018 Employer s EIT and LST Report Form Booklet
21 Waterford Drive Suite 201 Mechanicsburg, PA 17050 Tele (717) 590-7997 Fax (717) 590-7998 www.cumberlandtax.org 2018 Employer s EIT and LST Report Form Booklet Employer Packet Instructions EIT and LST
More informationLAKE~SUMTER MPO - COST FEASIBLE PROJECTS
- COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS
More informationProgramed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0
WCOG Managed WHATCOM COUNCIL OF GOVERNMENTS 2014 Transportation Improvement Program Amendment #1 (1401) MPO Financial Feasibility Summary Anticipated Federal Funding* & Programmed Expenditures (in Thousands)
More informationThe Northern Municipalities Revenue Sharing Program Regulations, 1988
NORTHERN MUNICIPALITIES 1 The Northern Municipalities Revenue Sharing Program Regulations, 1988 Repealed by Chapter N-5.1 Reg 13 (effective July 28, 2004). Formerly Chapter N-5.1 Reg 8 (effective October
More informationAGENDA ITEM CITY COUNCIL MEETING DATE OCTOBER 18, 2016 BUSINESS ITEMS
AGENDA ITEM CITY COUNCIL MEETING DATE OCTOBER 18, 2016 BUSINESS ITEMS DATE : October 7, 2016 TO : City Manager FROM : Public Works Director SUBJECT : CITYWIDE STREET RESURFACING PROGRAM AND REQUEST FOR
More informationBHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM
TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM
More informationAssociation of Consulting Engineering Companies
Association of Consulting Engineering Companies Cheryl Moon-Sirianni, PE Assistant District Engineer, Design Victor DeFazio, P.E. Design Services Engineer Dina A. Salemi, P.E. Contract & Consultant Agreement
More informationADVANCE ENCUMBRANCE & ACCOUNT
Accounts Needed, 2.1, 2.10, 3.2, 4.1, 5.1, 6.2, 6.15, 6.48, 7.3, 8.1, 11.2 Accounts Payable, 19.4 Accounts Payable/Other Liabilities, 19.10 Accounts Receivable, 19.2, 19.8 Accrued Interest Receivable,
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One
DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee
More informationFISCAL YEAR ANNUAL FINANCIAL REPORT. St. Clair County. Michigan. Year Ended 2017
2017 FISCAL YEAR ANNUAL FINANCIAL REPORT BOARD OF COUNTY ROAD COMMISSIONERS County Michigan Year Ended 2017 The financial report accurately reflects the Revenues and Expenditures of all road work and funds
More informationBike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300
Match 2018 2019 2020 M08-19 Goshen 1900739 Added Travel Lanes College Ave from US 33 to NS Railroad Line (East Entrance of parking lot) STBG PE $ 300,000 $ 75,000 $ 375,000 Add Des to TIP M07-19 MACOG
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six
DISTRICT SIX PROJECT OVERVIE Florida s Turnpike Enterprise continues to make project investments in District Six. In FY 2017 and FY 2018, current Turnpike projects total over $109 million within Miami-Dade
More informationOFFICIAL ELECTION INFORMATION
OFFICIAL ELECTION INFORMATION April 18, 2012 TO: County Election Officials and County Registrars FROM: Linda Ford, Director of Elections RE: T-SPLOST, Election Supplies and Ballot Information Thank you
More informationGovernor s Working Group on Highway Funding Tuesday, July 28, 2015
Governor s Working Group on Highway Funding Tuesday, July 28, 2015 Sources and Distribution of Highway Revenue Highway User Revenues Receipts & Distribution Fiscal Year 2014 Highway User Revenues Receipts
More informationWAKULLA COUNTY PROJECTS
DRAFT WAKULLA COUNTY PROJECTS PROGRAM ADOPTED: AMENDED: ADOPTED: AMENDED: FISCAL YEAR 2019 FISCAL YEAR 2023 TRANSPORTATION IMPROVEMENT PROGRAM Page 1 of 9 SR 30 (US 98) COASTAL HWY FROM CR 372 SURF RD
More informationThe Northern Municipalities Revenue Sharing Program Regulations, 2004
Consolidated to April 7, 2009 1 REVENUE SHARING PROGRAM N-5.1 REG 13 The Northern Municipalities Revenue Sharing Program Regulations, 2004 being Chapter N-5.1 Reg 13 (effective July 28, 2004) as amended
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationMICROMARKET REPORT EVERGREEN
quarter 3 2012 www.coloradomicroreports.com EVERGREEN NEIGHBORHOODS 12 11 15 16 13 7 17 18 9 10 1 8 19 4 2 14 6 5 3 1. Bear Mountain 2. Brook Forest 3. Conifer Mountain 4. Evergreen Highlands 5. Evergreen
More informationOklahoma Transportation Authority Report to Bondholders Second Quarter Phil Tomlinson, Director and Secretary of Transportation
Governor Brad Henry, Member Ex-Officio Douglas F. Riebel, Chairman Mike Leonard, Vice-Chairman Greg Massey, Secretary & Treasurer Clark Brewster, Member Hal Ellis, Member C. Kendric Fergeson, Member Phil
More informationCapital Improvements Program. City Council October 14, 2014
Capital Improvements Program City Council October 14, 2014 Neighborhood Attendees ~15 (Paul Kaspar) Presentation Today CIP Advantages/Process Approved CIP Program (FY14 - FY18 CIP) Financial Forecast Projects
More informationTOWN OF BEEKMAN TOWN BOARD MEETING - Agenda January 24, 2018
7:00PM TOWN OF BEEKMAN TOWN BOARD MEETING - Agenda January 24, 2018 Meeting called to order Pledge of Allegiance Administrative Announcement--Fire Exits PUBLIC HEARING 7:00 P.M. Solar Energy (Continued)
More informationHighway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Cambria MPMS #: 87593
MPMS #: 87593 Johnstown (City) Title: Jtown Bridge Open End Route: Section: A/Q Status: Improvement Type: Bridge Preservation Activities Est. Let Date: Actual Let Date: Geographic Limits: Various bridges
More informationRevenue Sharing Program Guidelines
Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219
More informationFY Annual Budget Presentation
COWLEY COUNTY FY 2017 Annual Budget Presentation Cowley County Sesquicentennial Chart of County Employees Reg. of Deeds 1.71% MIS/GIS 3.02% Appraiser 5.71% Community Corr. 3.99% CDDO 1 71% Sheriff County
More informationTransportation Improvement Program FY 2018 FY 2022
DRAFT Transportation Improvement Program FY 2018 FY 2022 WAKULLA COUNTY PROJECTS ADOPTED: AMENDED: 5-Year Summary of ing Source Wakulla County ing Federal 38,844,480 6,323,416 34,273,829 0 0 79,441,725
More informationManheim Borough 2017/2018 Budget Summary Report
Manheim Borough 2017/2018 Budget Summary Report James R. Fisher, PE, CBO Chief Administrative Officer, Borough Manager, Treasurer 2017 has been a year of building on the changes that occurred in 2015/2016.
More informationDRIVES THE ECONOMY 2019 ECONOMIC IMPACT REPORT
DRIVES THE ECONOMY 2019 ECONOMIC IMPACT REPORT Photo By: Bill Monaghan 41/32/5 Southeastern PA is the Commonwealth s key economic engine. THE FIVE COUNTIES GENERATE 41% OF STATE S ECONOMIC ACTIVITY WITH
More informationJANUARY 10, :30 P.M. Main Assembly Room City County Building
Consent Approval List Planning Commission Meeting JANUARY 10, 2019 1:30 P.M. Main Assembly Room City County Building Consent Approval List These items are recommended for approval on consent and are marked
More information10-Year Capital Highway Investment Plan
10-Year Capital Highway Investment Plan 2016-2025 DECEMBER 2015 1 This page intentionally left blank. TABLE OF CONTENTS Purpose of 10-Year Capital Highway Investment Plan...1 Summary of 10 Year Plan Investments...5
More informationABILENE MPO TRANSPORTATION POLICY BOARD MEETING
ABILENE MPO TRANSPORTATION POLICY BOARD MEETING Tuesday, October 16, 2018 at 1:30 pm City Council Chambers Abilene City Hall 555 Walnut Street, Abilene, Texas 1. Call to Order. Public comment may be taken
More informationApproved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019
3116-151 Hwy 169 from Taconite to Pengilly, Safety Improvements 5409-32 Concrete resurface, raise grade at levee's, install lighting, improve drainage and pedestrian accessibility on Hwy 75 in Halstad
More informationORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY Traffic Volumes At Mainline Toll Plazas Existing System
Traffic Volumes At Mainline Toll Plazas Existing System John Land Apopka Expressway Beachline Expressway (SR 528) East-West Expressway (SR 408) Central Florida Greenway (SR 417) Western Beltway (SR 429)
More informationCapital District Transportation Committee March 3, Amendments to the TIP
Capital District Transportation Committee March 3, 2017 Amendments to the 2016-21 TIP At its March 1, 2017 and March 2, 2017 meetings, CDTC made the following amendments to the Transportation Improvement
More informationInstructions for Completing the Annual Road and Street Finance Report
Instructions for Completing the Annual Road and Street Finance Report Additional information you wish to submit may be attached to the report on 8.5" by 11" paper. Please round all amounts up or down to
More informationFY 16 - FY 18 Capital Fund Revenues
FY 16 - FY 18 Capital Fund Revenues Fiscal Year $ Change 2016 2017 2018 FY 17 to Revenue Source Budget Budget Budget FY 18 Local Transfer from General Fund $3,136,950 $2,977,556 $6,087,130 $3,109,574 Local
More informationLocal Government Conference White Paper on Prevailing Wage
Local Government Conference White Paper on Prevailing Wage Who we are: The Local Government Conference is made up of the County Commissioners Association of Pennsylvania, the Pennsylvania State Association
More informationI ** Line (C) must be smaller than line (B) **
D. A.C. I P.C.C. PAVEMENT I. BRIDGES ( 1) (2) (3) ( 4) /PROJECT NAME AND LOCATION PROGRAM NO. NO. NO. MP's or Bridge t) (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column ( 15) (5) (6) (7) ( 8) ( 9) (1)
More informationWaterway Improvement Class Project Title Page Appendix
Project Title Page Appendix Waterway Improvement Class Project Title Page Appendix Aurora Hills SD Rehb 252 2-252 Beacrane Road Bog Rehab 266 2-266 Bodkin/Main 276 2-276 Brady Cove Dredging 305 2-305 Broadneck
More informationCIP. February,
2018-2022 CIP February, 21 2017 Agenda Biennial Budget 2018/2019 Budget Calendar 2018-2022 CIP Process Prioritized List of Projects Biennial Budgeting Strategic Culture in Olathe Strategic Culture in Olathe
More informationAlabama Transportation Conference. February 9 th, 2015
Alabama Transportation Conference February 9 th, 2015 2 3 4 5 Transportation in Georgia 10 th Largest Road System in Nation 17,967 Centerline Miles of State Routes/Interstates 85,738 Centerline Miles of
More informationAnalysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan
Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan Photo Credit: Alcona County Road Commission Andy Manty, PE, Research Engineer Center for
More information10-Year Capital Highway Investment Plan
10-Year Capital Highway Investment Plan 2017-2026 OCTOBER 2016 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN...1 This page intentionally left blank. SUMMARY OF INVESTMENT PLANS...6
More information2019 Proposed Budget Garfield County, Colorado. Presented on October 8, 2018
2019 Proposed Budget Garfield County, Colorado Presented on October 8, 2018 Budget Direction Balanced operating budget Any requested increases need full and detailed justification Look for efficiencies
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More informationAnalysis of Act 89 of 2013
Analysis of Act 89 of 2013 (HB 1060, PR # 2697) Transportation Funding Package SUMMARY: Act 89 of 2013 amends Titles 74 (Transportation) and 75 (Vehicles) in order to provide a comprehensive transportation
More informationMontour Area Recreation Commission (MARC) North Branch Canal Trail Construction Invitation to Bid. Application Terms and Conditions
(MARC) North Branch Canal Trail Construction Invitation to Bid Application Terms and Conditions Sealed bids for North Branch Canal Trail construction will be received by MARC at any time until Monday,
More informationSTAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION
STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July
More informationRoute 228 Corridor. Beaver and Butler Counties: Partnering to Impact the Region's Infrastructure
Enclosure 4 Route 228 Corridor Beaver and Butler Counties: Partnering to Impact the Region's Infrastructure This intersection safety and mobility improvement project will enhance travel on the vital Route
More informationFRESNO COUNTY ROAD IMPROVEMENT PROGRAM INTRODUCTION
4 ),! % 1 2 4 8 - - 6 2 4 / 4 ), - 2 ) 4 6-6. 2 7 * 1 + 9 4 5 2 ) 1 / FRESNO COUNTY 2003 2007 ROAD IMPROVEMENT PROGRAM INTRODUCTION The Road Improvement Program (RIP) is a multi-year road maintenance and
More informationINFORMATION RELEASE. Contact: NR Danny Straessle September 1, 2015
INFORMATION RELEASE Office of the Director A RKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT P. O. Box 2261 Little Rock, Arkansas ArkansasHighways.com Telephone (501) 569-2227 Twitter: @ A HTD Contact:
More informationPioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017
2017-2021 Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 HIGHWAY AMENDMENTS FEDERAL FISCAL YEAR 2017 Part 1A: Federal Aid Target Projects Increase cost of (604033)
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationPavement Preservation
Road Foreman Meeting West Windsor, Vermont March 24, 2015 Dan Patenaude, P.E. Hometown: Chester, VT Pavement Preservation Your Key to Pavement Management Success Since 1957 Corporate Headquarters Braintree,
More informationREQUEST FOR COUNCIL ACTION
REQUEST FOR COUNCIL ACTION Date: 6/23/14 Item No.: 7.f Department Approval City Manager Approval Item Description: Consider Resolution Requesting Jurisdictional Transfer of County Road B from its Western
More information~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount
CITYOFWOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rct Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US To: Honorable City Council Date: April 5, 2016 By Thomas E Hansen P E., Public Works
More informationAttachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis
Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA
More informationCity of Piedmont COUNCIL AGENDA REPORT
City of Piedmont COUNCIL AGENDA REPORT DATE: April 20, 2015 TO: FROM: Mayor and Council Paul Benoit, City Administrator SUBJECT: Street Selection Criteria and Discussion of Budget for the Proposed 2015
More information2016 Boston Region MPO Transportation Improvement Program
Adjustment Type Project ID Project Description Funding District Source Information Section 1A / Federal Aid Target Projects Indicates a change in project cost Indicates removed from TIP (cost not reflected
More informationDRAFT. Hominy Indian Village ON $1,080,000 $0 $0 $0 $0 $1,080,000 $0 $60,000 $0 $600,000 $0 $660,000
Summary of Projects List Osage Nation Project Name Project No. Const. Yr 2018 2019 2020 2021 2022 Total Hominy Indian Village ON-1062 2018 $1,080,000 $0 $0 $0 $0 $1,080,000 Tallgrass Prairie Chip Seal
More informationEarned Income Tax (EIT) Collections, Receipts, Distributions and Disbursements for TCD
Earned Income Tax (EIT) Collections, Receipts, Distributions and Disbursements for TCD Collections and Receipts: Collections: Monthly Total Year-to-Date Total Resident EIT From Employers/Taxpayers within
More information2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits
2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits Prepared For: 601 East Kennedy Boulevard Tampa, FL 33602 Prepared by: Jacobs
More informationLondonderry Budget Committee Minutes May 27, 2010
Londonderry Budget Committee Minutes May 27, 2010 The Budget Committee meeting was held in the Moose Hill Chambers, Londonderry Town Hall, 268B Mammoth Road, Londonderry, NH 03053. Committee Members present:
More informationEarned Income Tax (EIT) Collections, Receipts, Distributions and Disbursements for TCD
Earned Income Tax (EIT) Collections, Receipts, Distributions and Disbursements for TCD Collections and Receipts: Collections: Monthly Total Year-to-Date Total Resident EIT From Employers/Taxpayers within
More informationVILLAGE OF BARRINGTON HILLS
VILLAGE OF BARRINGTON HILLS Roads & Bridges Committee NOTICE OF SPECIAL MEETING Tuesday, October 20, 2015 ~ 3:00 pm 112 Algonquin Road 1. Call to Order & Roll Call 2. Public Comments 3. [Vote] Minutes
More informationRETAIL AT ANSON I-65 at State Road 334
Space Available for Lease I- - 78,274 ADT Outlots Available for Sale Over 12,400 Homes Under Development in Anson and the Immediate Trade Area Join Anson s Major Anchors: Anchoring Phase 2 Retail S.R.
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Four
DISTICT FOU POJECT OVEVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In FY 2017 and FY 2018, current Turnpike projects total over $490 million within
More information2017 Truckee Market Report
GLADES LODGE, NORTHSTAR SOLD BY DAVID GEMME Truckee Market Report 11890 DONNER PASS RD., CA 1 9 1 2 3 Truckee 4 5 7 10 6 8 11 12 1 Donner Summit 2 Donner Lake 3 Tahoe Donner 6 Gray s Crossing 7 Prosser
More informationTEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET
TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET DIST COUNTY NAME HIGHWAY NUMBER CONTROLLING PROJECT NO. LOW BID
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create
More informationI-64 Capacity Improvements Segment III Initial Financial Plan
I-64 Capacity Improvements Segment III Initial Financial Plan State Project # 0064-965-229/0064-099-229 P101, R201, C501, B638, B639, B640, B641, B642, B643, D609, D610, D611 Federal # NHPP-064-3(498)/
More informationDraft List of Proposed Infrastructure Projects for Possible Bond Election
Draft List of Proposed Infrastructure Projects for Possible Bond Election Over the past three or four years, the City has been conducting a review of its infrastructure specifically streets, drainage improvements,
More informationChair and Members Engineering and Public Works Committee. Sharon Donald Director of Budgets and Financial Planning. DATE: June 18, 2014
TO: FROM: Chair and Members Engineering and Public Works Committee Sharon Donald Director of s and Financial Planning DATE: June 18, SUBJECT: of Tax Supported Capital March 31, REPORT NO: PW-7--1 RECOMMENDATION
More informationTENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS
TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 CHARLOTTE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide
More informationCounty Administrator s Office Department of Transportation & Public Works
County Administrator s Office Department of Transportation & Public Works Long-Term Road Ad Hoc Committee Update Current Roads Funding 2014 Proposed Pavement Preservation Program Pavement Management Program
More informationSustainable Fire Department Funding
Sustainable Fire Department Funding Union County, North Carolina, Administrative Services Budget Focus Area #3: Discussion of Sustainable Fire Department Funding Models 1 Funding Analysis Goals for Today
More informationPENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING MARCH 4, :00 A.M. A G E N D A
PENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING MARCH 4, 2014 10:00 A.M. A G E N D A A. Roll Call Sunshine Announcement Public Participation B. Minutes-February 18, 2014
More informationDATE COUNTED DAY OF WEEK EQUIPMENT NBEB VOL AGENCY
ON BETWEEN AND NBEB SBWB 'RAW' UME BAILEY AUBURN OLD AUBURN P 14-Nov-12 Wednesday T 1,059 943 182 177 54 2,002 1,942 BAILEY OLD AUBURN FENCE P 8-Nov-12 Thursday T 1,504 1,348 296 287 65 2,852 2,767 BAILEY
More informationYork Region Rapid Transit Corporation Board of Directors. YRRTC 2016 Metrolinx Multi-Year Capital Expenditures Budget
Meeting of the Board of Directors on November 19, 2015 To: From: Subject: Ref: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President YRRTC 2016 Metrolinx Multi-Year Capital
More informationMeeting the State s Transportation Needs Julie Brogan Deputy Director, ODOT Division of Innovative Delivery
Meeting the State s Transportation Needs Julie Brogan Deputy Director, ODOT Division of Innovative Delivery Give it some Gas tax is not enough $1.6B shortfall in shovel-ready projects $10B need in future
More informationRevenue Sharing Program Guidelines
Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219
More informationEVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS
EXECUTIVE SUMMARY EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS by Stephen A. Cross, P.E. Associate Professor University of Kansas Lawrence, Kansas and Robert L. Parsons, P.E. Assistant
More informationWednesday, June 6, 2018
Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018
More informationDanny Straessle. Public Information Officer. Paragould Chamber of Commerce
Danny Straessle Public Information Officer Paragould Chamber of Commerce Tuesday, September 26, 2017 New Name New Identity 1929 Arkansas Highway and Department of Lands 1977 Arkansas State Highway and
More informationMemo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:
To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan
More informationTaylor Township % Wells Township % Southern Fulton School District
HUNTINGDON COUNTY FULTON COUNTY FULTON COUNTY (29) Central Fulton School District 2901 Ayr Township 290101 1.00% Licking Creek Township 290102 1.00% McConnellsburg Borough 290103 1.00% Todd Township 290104
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create
More informationTENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS
TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 OKEECHOBEE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide
More informationDIVISION OF WATER RESOURCES
DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES John W. Hickenlooper Governor Mike King Executive Director Dick Wolfe, P.E. Director/State Engineer Alan C. Martellaro, P.E. Division Engineer
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: November 16 2016 Effective Date: March 31 2017 Case No: 16-06-2056P LOMR-APP Follows Conditional Case No: 10-06-3320R Federal Emergency Management Agency Washington DC 20472 LETTER
More informationFigure 1-1 I-73 PROJECT MAP FOR BENEFIT COST ANALYSIS!"c$ IÉ Glenvar Wabun Bent Mountain I¼ Is Salem!"c$ %&n( IÉ Roanoke I¼ Cave Spring Is Roanoke County Franklin County River Iº 375 118C Is 374 Iº Troutville
More informationCOUNTY ADMINISTRATOR PUBLIC WORKS
COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm
More informationNortheastern Pennsylvania Alliance Metropolitan Planning Organization Transportation Programming for the Counties of: Carbon Monroe Pike Schuylkill
Northeastern Pennsylvania Alliance Metropolitan Planning Organization Transportation Programming for the Counties of: Carbon Monroe Pike Schuylkill September 20, 2016 Technical Planning Committee Meeting
More informationHAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE
HAZARD MITIGATION PLAN POINT OF CONTACT assistmanager@lowermilford.net publicworks@lowermilford.org MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP)
More informationReview and Update of Year 2035 Regional Transportation Plan
Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation
More information