Association of Consulting Engineering Companies
|
|
- Samantha Merritt
- 5 years ago
- Views:
Transcription
1 Association of Consulting Engineering Companies Cheryl Moon-Sirianni, PE Assistant District Engineer, Design Victor DeFazio, P.E. Design Services Engineer Dina A. Salemi, P.E. Contract & Consultant Agreement Engineer March 7, 2014
2 PENNDOT District 11-0
3 Time Extensions Friendly reminder 4 weeks prior to expiration of Agreement Part, consultant must initiate a time extension request in the form of a letter. Provide justification and reasoning why work cannot be completed within agreed time frame. Please monitor your expiration dates.
4 Advertisement/Statement of Interest There is a General Requirements link in the advertisement under Requirements: Max file size for SOI is 500 kilobytes Max size for Organization Chart 500 kilobytes Limited to max (3) pages (8 ½ x 11 ) using 12 font size or larger Number of Resumes-if not stated, no more than 5 and limited to 2 pages
5 Statement of Interest Must include Disclosure Statements: Potential Conflict of Interest : "I have reviewed Publication 93 (02-11) Section 1.5 Engineering Involvement Restrictions and determined that there are no potential conflicts of interest for anyone on this Agreement team." State Adverse Interest - "I have reviewed the State Adverse Interest Statute and determined that there is no adverse interest for anyone on this Agreement team."
6 Statement of Interest Pub 93, Section Disqualification Of A SOI A SOI that includes or considers a firm s costs as a factor must be disqualified. Examples of these costs include: a firm s overhead rate no charge for direct or indirect costs an indication of money returned to PennDOT for work not performed employee hourly rates.
7 Statement of Interest Cost References References to cost-effective solutions, reduced construction project costs, or minimizing future maintenance costs are permitted. References to not exceeding or maintaining budget are permitted. References to reducing or minimizing costs are grounds for SOI disqualification.
8 Statement of Interest Oversight costs, work orders, and DBE participations have exceeded department expectations Acceptable language for SOI?
9 Statement of Interest Oversight costs, work orders, and DBE participations have exceeded department expectations Acceptable
10 Statement of Interest The individual skill sets and knowledge of our assembled team will allow for multiple operations to be covered, reducing inspection oversight costs Acceptable language for SOI?
11 Statement of Interest The individual skill sets and knowledge of our assembled team will allow for multiple operations to be covered, reducing inspection oversight costs Disqualified
12 Statement of Interest Please don t give us multiple pages discussing past projects and consultant philosophy
13 Statements of Interest Don t reference wrong District or project Don t ignore sub-consultant team members Do elaborate on the Project Manager Do discuss ALL critical team members and their roles in the project delivery/inspection process
14 Overhead Rates Price Proposals cannot be submitted without an approved overhead rate. Invoices cannot be paid without an approved overhead rate. Agreement Execution can be delayed if an overhead rate is not approved.
15 Agreement Execution Normal Selection Process Maximum time frame of 12 months from the date of advertisement to the date of Agreement Execution Modified Selection Process Maximum time frame of 8 months from the date of advertisement to the date of Agreement Execution
16 Project Closeouts Strike Off Letter , issued June 6, 2013, was incorporated into the November 2013 Edition of Publication 93: Consultant required to submit a Final invoice within fourteen (14) calendar days of receipt of PennDOT s written acceptance of work. suffices as written acceptance. This is intended to facilitate the finalization of construction projects.
17 Utility Issues Cost Sharing Incentive Pilot Program for Municipal/Authority owned utilities Voluntary program allows up to 75% reimbursement Must meet agreed upon milestones in project schedule Must incorporate work, complete work prior and can incorporate design. Miss dates- reimbursement drops to 25%
18 Utility Issues Cost Sharing For Water and Sewer Public Utilities Result of the Legislation passed for additional funding Only for water (PA American/Aqua) No Sewer in 11-0 Only for work involving state owned highways 50%( 90% interstate) Utility must meet project milestones or incorporate
19 Utility Issues SUE Impact form-revised in 2012
20 Local Projects Publication 740 issued November, 2013 Eliminated Pub. 39, 541,535 and 98 Permits PENNDOT administration of Local Projects Permits sponsor to use PENNDOT Open End if advertised as such Allows for Simplified Review(State funded non complex) or Minor Projects procedures (Federal funding) when consultant demonstrates sufficient ECMS experience Bridge Bundling
21 Local Projects ECMS for Local Engineering Agreements! Went live 2/25/14 Advertisements, Statements of Interest, Selections, Agreements and Supplements now through ECMS Expected to save time and money. More familiar for you Phase 2 being worked on for Reimbursement Agreements Phase 3 down the road will be for invoicing and payment Allegheny County will use it for Homeville Viaduct and Bridge Preservation CM/CI, SEA for 579 CAP and others
22 Mutual Gains What Is Mutual Gains Negotiations? Mutual Gains Negotiations is a collaborative approach to negotiating contracts, involving a consensus-building team approach to developing scope and associated level of effort. Why are Negotiations important? Determines a Consultant s business success which affects livelihood of individuals. PennDOT has a legal and fiduciary obligation to safeguard the taxpayers hard earned money.
23 Funding Federal Funding Map-21 signed into law on July 6, 2012 Reallocates funding into specific pots Interstates and Enhanced NHS routes primary focus 60% of funds for 16% of road network Local projects allocated less funding Discussions going on regarding future Transportation bill but many questions???
24 Funding Thank you Governor Corbett and the State legislators!!! State Funding- Act 89 $2.3 Billion Transportation Bill signed November 24, 2013 Allocates additional $230M for State Highway and Roads this fiscal year Dollars increase through years Limited immediate dollars for projects for delivery this year District 11 focus on system preservation roadway paving and bridge rehab/replacements in kind
25 Current Design Projects Method to our Madness Started PE on 22 projects as Secretary requested in Spring and Fall of 2013 Assumed PE costs Once consultants selected, costs were greater than budgeted-couldn t fund all selected projects until/unless add l funds available Successfully completed PE on some, couldn t move into FD because of no add l funding for other phases Still can t move to FD on some because can t fund construction on TIP Not in a hurry for some projects because they are funded in the out years of the TIP
26 Consultant Payouts Consultant Payouts
27 2013 vs Bid 58 projects Construction Bid costs - $277M Potential Construction Oversight Cost - $35M 2014 Proposed Projects 62 projects* Construction Costs - $259M Construction Oversight costs - $34M *Subject to change depending upon potential projects
28 2014 Construction Projects SR 286-A09-Recon/Widening 1/31/2014 SR 60-A49 Resurfacing 1/30/2014 SR 376-L04 Resurfacing 1/30/2014 SR 3003-A06- Resurf/Bridge 3/13/2014 SR 51-A86 Resurfacing 3/27/2014 SR 376-A49 Resurfacing 6/19/2014 SR 18-B45 Reconstruction 4/10/2014 SR 885-A38- Culvert Replacements 6/19/2014 SR 8-A58 Intersection Improvement 5/08/2014 SR Birmingham Bridge 5/22/2014
29 Birmingham Bridge
30 SR 18-B45
31 SR 19-A64
32 SR 50-A23
33 SR 68-B35
34 SR 51-A86
35 SR 65-B28
36 SR 60-A49
37 SR 3020-B05
38 SR 158-L08
39 SR 3072-A10
40 SR 108-L15
41 Business Opportunities Construction Inspection Agreements Future Advertisements: E03199 SR 68 B35 & Group Job Construction Value $6M E03200 SR 50 A23 Construction Value $16M E03201 SR 2085 A05 Construction Value $40M
42 Upcoming Design Consultant Agreements SR 279- North Shore to Camp Horne Road South Hills Intersection Improvements 3 intersections SR 28 at Highland Park SR 837-A42 Safety Improvement (33 rd St. to Smithfield St) Potential for a few design open ends and multiple bridge packages
43 Questions????
44 Thank you!!!!
Act 89 of January 2014
Act 89 of 2013 January 2014 Act 89 Basics Passed by the Legislature November 21, 2013 Signed by Governor into law November 25, 2013 Increase funding for transportation by $2.3 Billion annually Address
More informationPENNSYLVANIA TRANSPORTATION AND INFRASTRUCTURE FINANCING
PENNSYLVANIA TRANSPORTATION AND INFRASTRUCTURE FINANCING C O M M I S S I O N E R G E O R G E P. H A R T W I C K, I I I D A U P H I N C O U N T Y, P E N N S Y L V A N I A www.dauphincounty.org WHAT IS
More informationLikewise, consultant employee substitutions require resume and wage rate approvals prior to any work being completed by that person.
person qualified at a higher classification (i.e. TCIS in lieu of the requested TCI), PennDOT reserves the right to pay the firm for the classification originally requested. Under the terms and conditions
More informationMassDOT Highway ACEC State Markets Conference April 5, Jonathan Gulliver, Highway Administrator John J. Bechard, P.E., Deputy Chief Engineer
MassDOT Highway ACEC State Markets Conference April 5, 2018 Jonathan Gulliver, Highway Administrator John J. Bechard, P.E., Deputy Chief Engineer About MassDOT Highway 9,561 Lane Miles of Interstate, Numbered
More informationCapital Program Committee Personnel Cost Discussion April 4, 2017
Capital Program Committee Personnel Cost Discussion April 4, 2017 Personnel Cost Allocation Current DOT Legislative Requirements Required transfer of salaries from capital back to operating budget M.G.L.
More informationREQUEST FOR QUALIFICATIONS. For ON-CALL DESIGN ENGINEERING SUPPORT SERVICES. For DESIGN ENGINEERING DIVISION STOCKTON, CALIFORNIA MAY 21, 2018
REQUEST FOR QUALIFICATIONS For ON-CALL DESIGN ENGINEERING SUPPORT SERVICES For DESIGN ENGINEERING DIVISION STOCKTON, CALIFORNIA MAY 21, 2018 San Joaquin County Department of Public Works 1810 East Hazelton
More information2018 Purdue Road School Community Crossings - Funding Techniques Indiana Roads, Highways & Bridges
2018 Purdue Road School Community Crossings - Funding Techniques Indiana Roads, Highways & Bridges Speakers: Otto W. Buzz Krohn, CPA, CGMA, MA CPA & SEC Registered Municipal Advisor O. W. Krohn & Associates,
More informationSan Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form
FY of Allocation Action: 2009/10 Project Name: Implementing Agency: Curb Ramps Department of Public Works Category: Subcategory: EXPENDITURE PLAN INFORMATION C. Street & Traffic Safety iv. Bicycle and
More informationTracker. Fast Projects That Are of Great Value. Tangible Result Driver Dave Nichols, Chief Engineer
Fast Projects That Are of Great Value Tangible Result Driver Dave Nichols, Chief Engineer MoDOT customers expect that transportation projects be completed quickly and provide major improvements for travelers.
More informationA Bill Regular Session, 2017 HOUSE BILL 1726
Stricken language would be deleted from and underlined language would be added to present law. 0 0 0 State of Arkansas st General Assembly As Engrossed: H/0/ A Bill Regular Session, 0 HOUSE BILL By: Representative
More informationUTILITIES INTERNAL POLICIES AND PROCEDURES MANUAL
UTILITIES INTERNAL POLICIES AND PROCEDURES MANUAL Arkansas State Highway and Transportation Department Right of Way Division September 2011 Table of Contents 1.00 GENERAL... 1 1.01 ORGANIZATION... 1 1.02
More informationCash Management Update SCDOT Commission Workshop. October 20, 2011
Cash Management Update SCDOT Commission Workshop 1 Current Cash Status Cash balance as of Wednesday, Oct 19 was $70.8M Debt/SCTIB payments current Update on other payments SCEIS Implementation 2 Information
More informationGeneral Discussion A&E Services Consultants
WSDOT Local Agency Guidelines M 36-63.01 Chapter 31 Chapter 31 General Discussion To be eligible for reimbursement of Federal Highway Administration (FHWA) funds for payments to a consultant, the procedures
More informationTotal Current Revenue: $450 million Current need: $1.12 Billion Funding Deficiency: 60%
Chris E. Bauserman, P.E., P.S., Delaware County Engineer, President CEAO Testimony House Bill 26 Ohio House of Representatives Finance Committee February 14, 2017 Chairman Smith, Ranking Member Cera, Sub.
More information2012 APC Liaison Meeting February 24, 2012
District 9-0 2012-13 Letting Schedule Update District 9-09 2012 APC Liaison Meeting February 24, 2012 Brad J. Brumbaugh, P.E. Assistant District Executive - Construction District 9-0 2012 Letting Summary
More informationManheim Central School District 66%
Manheim Borough 2018/2019 Budget Summary Report James R. Fisher, PE, CBO Chief Administrative Officer, Borough Manager, Treasurer Council and staff continue to place an emphasis on maintaining and improving
More informationOverview How We Do Things
Effective Practices for Municipal Operations 101 Process Principles How We Do Things Pete Pyrzenski, City Manager, City of Tifton Overview How We Do Things Acting Strategically Operational Effectiveness
More informationVERMONT AGENCY OF TRANSPORTATION. FY2016 Budget. Sue Minter, Secretary of Transportation House Transportation Committee
VERMONT AGENCY OF TRANSPORTATION FY2016 Budget Sue Minter, Secretary of Transportation House Transportation Committee February 19, 2015 FY2016 Budget 1 Five Year Budget History $ millions $658.1 $653.1
More informationPROJECT COST REPORTING
Approved: Effective: May 18, 2016 Review: April 1, 2016 Office: Comptroller Financial Management Topic No.: 360-050-005-h Department of Transportation PROJECT COST REPORTING PURPOSE: Project Cost Reporting
More informationNASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY
NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board
More informationCHAPTER 14 ACCIDENT DAMAGE CLAIMS
CHAPTER 14 ACCIDENT DAMAGE CLAIMS TABLE OF CONTENTS 14.1 Introduction............................................. 14-1 14.2 Policy.................................................... 14-2 14.3 Completion
More informationAppendix E: Revenues and Cost Estimates
Appendix E: Revenues and Cost Estimates Photo Source: Mission Media Regional Financial Plan 2020-2040 Each metropolitan transportation plan must include a financial plan. In this financial plan, the region
More informationLehigh Valley Transportation Study s Procedures for Transportation Improvement Program Revisions
Purpose MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study s Procedures for 2019-2022 Transportation Improvement Program Revisions This Memorandum of Understanding (MOU) between the Pennsylvania
More informationSOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY. Financial Statements June 30, 2017 and (With Independent Auditors Report Thereon)
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY Financial Statements June 30, 2017 and 2016 (With Independent Auditors Report Thereon) SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY YEARS ENDED
More informationRevenue Sharing Program Guidelines
Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219
More informationSOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania
SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project
More information77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 2800 CHAPTER... AN ACT
77th OREGON LEGISLATIVE ASSEMBLY--2013 Regular Session Enrolled House Bill 2800 Sponsored by Representatives READ, BENTZ, Senators BEYER, STARR CHAPTER... AN ACT Relating to the Interstate 5 bridge replacement
More informationPennsylvania Department of Transportation s Statewide Procedures for STIP and TIP Revisions
MEMORANDUM OF UNDERSTANDING Pennsylvania Department of Transportation s Statewide Procedures for 2017-2020 STIP and TIP Revisions Purpose This Memorandum of Understanding (MOU) establishes a set of procedures
More informationTitle 24-A: MAINE INSURANCE CODE
Maine Revised Statutes Title 24-A: MAINE INSURANCE CODE Chapter 87: DIRIGO HEALTH 6981. DIRIGO HEALTH SELF-ADMINISTERED PLAN Notwithstanding section 6910, subsection 2, Dirigo Health may provide access
More informationPUB 408 SECTION (d) FORCE ACCOUNT SPECIFICATION CHANGES
PUB 408 SECTION 110.03(d) FORCE ACCOUNT SPECIFICATION CHANGES Jim Foringer, PE ADEC District 11-0 Craig Hoogstraten APC/James J. Anderson Construction Co., Inc. HISTORY Annually, PennDOT spends ± $160
More informationPerformance Management Accountability Meeting Data as of October, 2012
Performance Management Accountability Meeting Data as of October, 2012 Richard A. Davey, Secretary & CEO Office of Performance Management and Innovation Celia J. Blue, Assistant Secretary November 27,
More informationDELAWARE RIVER JOINT TOLL BRIDGE COMMISSION
DELAWARE RIVER JOINT TOLL BRIDGE COMMISSION REQUEST FOR PROPOSAL (RFP) FOR INSURANCE BROKERAGE AND PROGRAM ADMINISTRATION SERVICES FOR AN OWNER-CONTROLLED INSURANCE PROGRAM () CONTRACT No. C-674A; CAPITAL
More informationLetter of Transmittal
Letter of Transmittal October 25, 2019 To: New Hanover Township Board of Supervisors Introduction I am pleased to submit the proposed 2019 Budget for your consideration. The budget document consists of
More informationSOUTH DAKOTA DEPARTMENT OF TRANSPORTATION CONSULTANT SERVICES MANUAL
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION CONSULTANT SERVICES MANUAL 2017 Approved by FHWA on March 1, 2017 THIS PAGE INTENTIONALLY LEFT BLANK INDEX Chapter Section Title PAGE ACRONYMS i DEFINITIONS ii
More informationRevenue Sharing Program Guidelines
Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219
More informationDepartment of the Auditor General. Highlights
Department of the Auditor General The Pennsylvania Turnpike s financial obligation under Act 44 is unsustainable, causing the deterioration of the financial condition of the Turnpike, while placing an
More informationRE: Request for Proposals (RFP) Consultant Services for Public Transit Board Training
State of Vermont Agency of Transportation Contract Administration Finance & Administration One National Life Drive [phone] 802-828-2641 Montpelier VT 05633-5001 [fax] 802-828-5545 http://vtrans.vermont.gov/
More informationStatement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.
Milwaukee Metropolitan Sewerage District s 2011-2020 Private Property Inflow and Infiltration Reduction Program Introduction Infiltration is the quantity of water entering a sewer system through such sources
More informationLetter of Transmittal
Letter of Transmittal November 15, 2017 To: New Hanover Township Board of Supervisors Introduction I am pleased to submit the proposed 2018 Budget for your consideration. The budget document consists of
More informationPioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017
2017-2021 Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 HIGHWAY AMENDMENTS FEDERAL FISCAL YEAR 2017 Part 1A: Federal Aid Target Projects Increase cost of (604033)
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More informationOmni Circular Key Area #5 Indirect Costs and the Omni Circular: What to Expect. Total Cost of Federal Awards. Costing Options:
Omni Circular Key Area #5 Indirect Costs and the Omni Circular: What to Expect Leigh Manasevit, Esq. lmanasevit@bruman.com Spring Forum 2014 Total Cost of Federal Awards Indirect 10% Direct Indirect Direct
More informationSelf-Supported Municipal Improvement districts
Self-Supported Municipal Improvement districts Combined Annual Report Downtown Highland Park Ingersoll Sherman Hill June 30, 2012 FAQ s What is a self-supported municipal improvement district or SSMID?
More informationDepartment of Legislative Services Maryland General Assembly 2012 Session
Department of Legislative Services Maryland General Assembly 2012 Session SB 824 FISCAL AND POLICY NOTE Senate Bill 824 (Senator Pipkin, et al.) Budget and Taxation and Finance Transportation - Chesapeake
More informationManaging Utility Cuts:
Managing Utility Cuts: A Roundtable Discussion on How Connecticut Towns Coordinate Utility and Contractor Excavations in the Public Right-of-Way Summary of discussion held on November 14, 2007 as part
More informationRoute 228 Corridor. Beaver and Butler Counties: Partnering to Impact the Region's Infrastructure
Enclosure 4 Route 228 Corridor Beaver and Butler Counties: Partnering to Impact the Region's Infrastructure This intersection safety and mobility improvement project will enhance travel on the vital Route
More informationPotential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3
Potential Changes to the 2015 to 2018 TIP Highway List Proposed Administrative Adjustment # PROJECT #60644, WORCESTER CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS Move the FY 2015 Statewide Transportation
More informationRequest for Proposal for Professional Services for Trust and Investment Services. Prepared by Avalon Borough, Allegheny County, Pennsylvania.
Request for Proposal for Professional Services for Trust and Investment Services Prepared by Avalon Borough, Allegheny County, Pennsylvania for POLICE AND NON-UNIFORM PENSION PLANS OCTOBER 2017 Lorraine
More informationREQUEST FOR PROPOSALS FOR CIVIL ENGINEERING SERVICES
Saddle Creek Community Services District 1000 Saddle Creek Drive - Copperopolis, CA 95228 (209) 785-0100 saddlecreekcsd.org DIRECTORS Larry Hoffman, President Ken Albertson, Vice President Darlene, DeBaldo,
More informationThe Transportation Partnership Opportunity Fund
The Commonwealth of Virginia The Transportation Partnership Opportunity Fund Assistance Application September 2005 THE COMMONWEALTH OF VIRGINIA All applicants must complete Sections 1 and 2. Private entities
More informationPerformance After Funding Breakout Session #4. Thursday, September 20, 2018 Michaela McCain Moderator Outreach Manager Local Assistance Division
Performance After Funding Breakout Session #4 Thursday, September 20, 2018 Michaela McCain Moderator Outreach Manager Local Assistance Division Federal Funds Management Wendy E. Thomas Director of Federal
More informationRegulatory Notice 17-06
Regulatory Notice 17-06 Communications with the Public FINRA Requests Comment on Proposed Amendments to Rules Governing Communications with the Public Comment Period Expires: March 27, 2017 Executive Summary
More informationPrioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016
Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization
More informationTRANSPORTATION CAPITAL PROGRAM
TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily
More informationPENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE
November 20, 2015 Revised December 18, 2015 to reflect FAST Act PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE This is a collaborative product jointly developed by the Pennsylvania Planning
More informationCentral Florida Regional Planning Model 2045 Socio-Economic Data Development
Central Florida Regional Planning Model 2045 Socio-Economic Data Development Flagler County 2045 Population and Employment s Volusia County A: BEBR Population B: Woods & Poole Employment C: Population
More informationHIV/AIDS Bureau, Division of Service Systems Monitoring Standards for Ryan White Part A and B Grantees: Part A Fiscal Monitoring Standards
HIV/AIDS Bureau, Division of Service Systems Monitoring s for Ryan White Part A and B Grantees: Part A Fiscal Monitoring s Table of Contents Section A: Limitation on Uses of Part A funding Section B: Unallowable
More informationCOUNTY ADMINISTRATOR PUBLIC WORKS
COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm
More informationFAQs on Fee for Local Use. Vehicle Code, Section 1935 Added by Act 89 of 2013
FAQs on Fee for Local Use Vehicle Code, Section 1935 Added by Act 89 of 2013 Q. When can counties pass ordinances imposing the fee for local use? A. On or after January 1, 2015, the effective date of Section
More informationFAQ on Public Improvement Least Cost Contracting Requirements
LEAGUE OF OREGON CITIES FAQ FAQ on Public Improvement Least Cost Contracting Requirements DECEMBER 2017 Prepared in Cooperation with Bill Kirby, Beaverton City Attorney s Office FAQ Public Improvement
More informationMorgan County Engineer 2017 Annual Report Stevan Hook PE, PS - January 17, 2018
Morgan County Engineer 2017 Annual Report Stevan Hook PE, PS - January 17, 2018 In accordance with the provisions of the Ohio Revised Code an annual report must be submitted to the Board of County Commissioners
More information2016 Boston Region MPO Transportation Improvement Program
Adjustment Type Project ID Project Description Funding District Source Information Section 1A / Federal Aid Target Projects Indicates a change in project cost Indicates removed from TIP (cost not reflected
More informationFRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 12, 2017
FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 12, 2017 ROLL CALL Present were Supervisors David Sprigg, Naomi Decker, Kevin Cummings, Eric Stonesifer and Michael Ryan. Also present were
More informationPUBLIC WORKS - ENGINEERING
PUBLIC WORKS - ENGINEERING 4 DIVISIONS: CAPITAL IMPROVEMENT PROGRAM (CIP) TRAFFIC ENGINEERING DEVELOPMENT ENGINEERING SEWER & STORM DRAIN ENGINEERING 18 FTE s, 2 Hourly s In FY 14/15 Expended approximately
More informationNHS Confederation Group. Standing Orders - an aide memoire. Last updated: November 2012
NHS Confederation Group Standing Orders - an aide memoire Last updated: November 2012 Concept and some drafting taken from Brighton and Sussex University Hospitals Rules of Procedure 1 CONTENTS 4 Introduction
More informationMEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for TIP M odifications
MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for 2017-2020 TIP M odifications Purpose This Memorandum of Understanding (MOU) establishes a set of procedures to be used by
More informationBRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION
BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)
More informationFY 2017 Annual Financial Report
STATE OF ILLINOIS COMPTROLLER SUSANA A. MENDOZA DO NOT SEND THIS PAPER COPY - THIS IS YOUR COPY. MAKE SURE YOU HAVE CLICKED THE SUBMIT BUTTON IN THE COMPTROLLER CONNECT PROGRAM. THIS WILL PROVIDE THE COMPTROLLER'S
More informationPenalties and Interest Project Update. Employer Advisory Committee May 9, 2012
Penalties and Interest Project Update Employer Advisory Committee May 9, 2012 > Agenda Contribution Account Portal update Regulations update Penalty & Interest Regulations Compliance (PIRC) Questions 2
More informationSBCTA REQUEST FOR PROPOSALS (RFP) FOR CONSTRUCTION MANAGEMENT SERVICES STATE ROUTE 60/ARCHIBALD AVENUE INTERCHANGE IMPROVEMENT PROJECT
SBCTA REQUEST FOR PROPOSALS (RFP) 18-1001876 FOR CONSTRUCTION MANAGEMENT SERVICES STATE ROUTE 60/ARCHIBALD AVENUE INTERCHANGE IMPROVEMENT PROJECT KEY RFP DATES RFP Issue Date: April 11, 2018 Pre-Proposal
More informationSSA#42 is issuing this RFP to secure a contractor to plan and coordinate the 2017 South Shore Summer Festival. The event date is TBD.
1 SSA #42 RFP 2017 South Shore Summer Festival Contract Period: January through September 30, 2017 Full Service Event Manager/Coordinator Request For Proposal (RFP) Two hard copy proposals are due no later
More informationRegulatory Notice 17-38
Regulatory Notice 17-38 Remote Branch Office Inspections FINRA Requests Comment on a Proposal to Amend Rule 3110 (Supervision) to Provide Firms the Option to Conduct Remote Inspections of Offices and Locations
More informationOHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY
OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY Revised 9/19/2017 TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW... 3 MPO AND LARGE CITY SFY 2017 STBG BUDGET SUMMARY... 4 MPO AND LARGE CITY
More informationChairman Wathan Spade, Executive Director
- Senator John C. Rafferty, Jr. Chairman Wathan Spade, Executive Director 20 East Wing State Capitol Building Harrisburg, PA I 71 20 Phone: (717) 787-1398 FAX: (717) 783-4587 Bill Summary Senate Bill 1
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More informationREQUEST FOR PROPOSALS For. Guaranteed Energy Savings Contract
702 KAR 4:160 REQUEST FOR PROPOSALS For Guaranteed Energy Savings Contracts School District Name: Garrard County Schools School District Address: 322 West Maple Avenue, Lancaster, KY 40444 Project: Guaranteed
More informationREQUEST FOR STATEMENTS OF QUALIFICATIONS Construction Manager at Risk for Las Vegas Wash Main Branch Channel & Trail Improvements
REQUEST FOR STATEMENTS OF QUALIFICATIONS Construction Manager at Risk for Las Vegas Wash Main Branch Channel & Trail Improvements RSOQ NO. 007 040 PWP CL 2011 181 May 2, 2011 CITY OF NORTH LAS VEGAS REQUEST
More informationHIV/AIDS Bureau, Division of Metropolitan HIV/AIDS Programs National Monitoring Standards for Ryan White Part A Grantees: Fiscal Part A
HIV/AIDS Bureau, Division of Metropolitan HIV/AIDS Programs National Monitoring Standards for Ryan White Part A Grantees: Fiscal Part A Table of Contents Section A: Limitation on Uses of Part A funding
More informationCoweta County Single County TSPLOST
Instructions: In order for a TSPLOST project to be considered eligible, completed Project Request Forms must be submitted electronically (attached) addressed to tsplost2019@coweta.ga.us prior to the deadline
More informationTransportation Primer
Transportation Primer Joint Appropriations Committee on Transportation February 11, 2015 Amna Cameron Fiscal Research Division Agenda Background Transportation Revenues Items for Consideration Transportation
More informationSTAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION
STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July
More informationSection 406 Hazard Mitigation
The Role of Mitigation in Public Assistance By: Mohammad Farhoud, P.E. Administrator, Engineering Section - TDEM 512/486-6474 mohammad.farhoud@dps.texas.gov Goal To provide tools and knowledge to successfully
More informationAnalysis of Act 89 of 2013
Analysis of Act 89 of 2013 (HB 1060, PR # 2697) Transportation Funding Package SUMMARY: Act 89 of 2013 amends Titles 74 (Transportation) and 75 (Vehicles) in order to provide a comprehensive transportation
More informationFlowchart: Sources of Drugs Dispensed to Kane Residents 5. II. Objectives, Scope, and Methodology 6
Contents Letter 1 I. Introduction 3 Flowchart: Sources of Drugs Dispensed to Kane Residents 5 II. Objectives, Scope, and Methodology 6 III. Findings and Recommendations: Finding #1: The Kane Regional Centers
More informationTOWN OF SHARON, VT Request for Proposals Engineering Services highway construction RFP Issued: November 14, 2018 Re-Issued November 29, 2018
Services Requested: TOWN OF SHARON, VT Request for Proposals Engineering Services highway construction RFP Issued: November 14, 2018 Re-Issued November 29, 2018 REVISED BID DEADLINE: NOON Thursday, December
More informationRegion 5 Upcoming Projects for Summer/Fall 2018
Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The
More informationImproving Management Presentations
Southeastern States Equipment Managers Conference EMTSP Improving Management Presentations 2016 National Conference June 29, 2016 John F. White, PE 803 737 6675 Challenge You have a story to tell. The
More informationSummary Narrative of Amendment 3 to the FFY Transportation Improvement Program for the Northern Middlesex Region
Summary Narrative of Amendment 3 to the FFY 2017 2021 Transportation Improvement Program for the Northern Middlesex Region The following summarizes a proposed amendment to Fiscal Year 2017 of the FFY 2017
More informationSTANDARD PROCEDURE FOR PROCESSING CHANGE ORDERS
Approved: Standard Procedure No. 510-010(SP) Effective: 06/18/2010 Responsible Division: Construction Management Supersedes Standard Procedure: 510-010(SIP) Dated: 05/29/2008 William H. Lindenbaum, P.E.,
More informationLifecycle. https://www.occ.gov/news-issuances/bulletins/2013/bulletin html
Vendor Management Vendor Matchmaking 1. Determining the banks needs and wants. 2. Searching for a vendor to fill that need or want. 3. Request for Proposals 4. Selecting Vendor 5. Contract Negotiations
More informationRequest for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion
Page 1 of 11 Request for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion The Town of Wilton (the Town) will receive sealed qualifications
More informationJoint Appropriations Subcommittee on Transportation
Joint Appropriations Subcommittee on Transportation Funding Overview February 21, 2013 H. Tasaico, PE 1 NCDOT Funding Overview - Agenda State Transportation Comparative Data Transportation Funding Sources
More informationVILLAGE OF CARY REQUEST FOR PROPOSALS FOR Utility Billing Audit
1 VILLAGE OF CARY REQUEST FOR PROPOSALS FOR Utility Billing Audit Sealed proposals will be received at the Village of Cary, 655 Village Hall Drive, Cary Illinois, 60013, until July 24, 2015 at 10:00 a.m.
More informationRequest for Proposal Snow Plowing Services for the Seasons For the Cohoes Housing Authority
Request for Proposal Snow Plowing Services for the 2015-2018 Seasons For the Cohoes Housing Authority The Cohoes Housing Authority (CHA) is seeking bids for snowplowing services and removal, when required,
More informationEnhancing Public Trust in Government
Enhancing Public Trust in Government SIX MONTH STATUS REPORT February 18, 2014 Sheryl G. Steckler, Inspector General OUTLINE ANNUAL REPORT HIGHLIGHTS (October 1, 2012-September 30, 2013) OIG SIX MONTH
More informationMONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting
MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting Monte Sereno City Council Chambers 18041 Saratoga-Los Gatos Road, Monte Sereno, CA 95030 MEETING CALLED TO
More informationSENATE APPROPRIATIONS COMMITTEE FISCAL NOTE
BILL NO. House Bill 674 PRINTER NO. 2624 AMOUNT See Fiscal Impact DATE INTRODUCED March 2, 2017 FUND General Fund PRIME SPONSOR Representative Bernstine DESCRIPTION AND PURPOSE OF BILL House Bill 674 addresses
More information10-Year Capital Highway Investment Plan DRAFT
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway
More informationNOTICE OF REQUEST FOR PROPOSALS PREPARATION OF ZONING ORDINANCE UPDATE
NOTICE OF REQUEST FOR PROPOSALS PREPARATION OF ZONING ORDINANCE UPDATE NOTICE IS HEREBY GIVEN that the (City) is requesting proposals for the preparation of an update to the Coalinga Zoning Ordinance.
More informationTraffic Impact Analysis Guidelines Methodology
York County Government Traffic Impact Analysis Guidelines Methodology Implementation Guide for Section 154.037 Traffic Impact Analysis of the York County Code of Ordinances 11/1/2017 TABLE OF CONTENTS
More information