Summary Details of All Recommended Amendments to the Proposed Variations IN SUPPORT OF THE. FOR THE Alterations. To the PROPOSED VARIATIONS

Size: px
Start display at page:

Download "Summary Details of All Recommended Amendments to the Proposed Variations IN SUPPORT OF THE. FOR THE Alterations. To the PROPOSED VARIATIONS"

Transcription

1 Screening Report - APPENDIX II Summary Details of All Recommended Amendments to the Proposed Variations IN SUPPORT OF THE APPROPRIATE ASSESSMENT FOR THE Alterations To the PROPOSED VARIATIONS TO THE NORTH TIPPERARY COUNTY DEVELOPMENT PLAN (AS VARIED) AND THE SOUTH TIPPERARY COUNTY DEVELOPMENT PLAN (AS VARIED) IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU HABITATS DIRECTIVE for: Tipperary County Council Civic Offices, Nenagh, County Tipperary by: CAAS Ltd. 1st Floor, Ormond Quay, Dublin 7. October 2017

2 Table of Tables Table 1 North Tipperary Chief Executive Recommendations included in the Proposed Variation to the CDP and their interaction with the Appropriate Assessment... 3 Table 2 North Tipperary Members Amendments included in the Proposed Variation to the CDP and their interaction with the Appropriate Assessment Table 3 South Tipperary Chief Executive Recommendations included in the Proposed Variation to the CDP and their interaction with the Appropriate Assessment Table 4 South Tipperary Members Amendments included in the Proposed Variation to the CDP and their interaction with the Appropriate Assessment Process... 25

3 Table 1 North Tipperary Chief Executive Recommendations included in the Proposed Variation to the CDP and their interaction with the Appropriate Assessment North Tipperary Chief Executive Recommendations included in the Proposed Variation to the CDP Interactions with the Appropriate Assessment Table 2.1 Regional Planning Guidelines Population Targets Census 2006 Census 2011 Census Target 2022 North 66,023 70,322 78,145 82,123 Tipperary South 83,221 88,432 96, ,483 Tipperary Total County 149, , , , ,606 Settlement Tier Regional Town Table 2.2 Population Targets and Quantum of Zoned Land: Main Towns Town Population 2006 Population 2011[1] Population 2016[1][3] Population Target 2022 Total Land Zoned (per ha)[2] Clonmel 18,889 18, , Sub- Regional Town District Towns Nenagh 7,751 8,439 8,968 9, Thurles 7,685 7,933 7,940 9, Carrick-On 5,856 5,931 5,771 6, Suir Roscrea 4,910 5,403 5,446 5,858 58

4 Tipperary 4,415 5,310 4,979 5, Town Cashel 2,936 4,501 4, Cahir 3,381 3,578 3,593 3, Templemore 2,270 2,071 1,939 2, ] 80 legal towns were abolished under the Local Government Reform Act Census towns which previously combined legal towns and their environs have been newly defined using the standard census town criteria (with the 100 metres proximity rule). For some towns the impact of this has been to lose area and population, compared with previous computations. This is reflected in the population declines highlight above. To facilitate growth in these settlements land is zoned for new residential development as part of village settlement plans and equates to approximately ha. The Variation has included a new approach to the land use framework in terms of applying a consistent zoning framework across the county and also promoting residential and commercial development on all sites in Settlement Nodes by not applying a specific zoning to land. c) Small cluster housing developments (i) in line with Specific Objective SO4-3, on unzoned lands outside of, and directly adjoining the village boundary may be considered where it is demonstrated to the satisfaction of the Council that suitably zoned lands are have not been released for development available within the village boundary, the development is of a high quality and can link effectively with and contribute positively to the village form. A DIS shall be submitted in support of any such proposal. SO4-3 It is an objective of the Council to prepare Cluster and Serviced Site Guidelines over the lifetime of the Plan (as varied). SO4-3 It is an objective of the Planning Authority to implement the Councils Cluster Housing Guidelines when prepared, in the assessment of planning applications which are being considered under Policy SC4 (c). This is a text amendment that relates to a definition of a term that does not interact with ecological Clarification of approximate land mass zoned for residential. This does not introduce an additional source for effects. This text related to the process by which land use is assigned, however this process does not introduce any additional source for effects. This is a text amendment that does not interact with ecological This text amendment clarifies the process by which the Cluster Housing Guidelines will be implemented and

5 Policy ED10: Non Conforming Uses It is the policy of the Council, where commercial/industrial/agricultural enterprises exist as non-conforming but long established uses, to support their continued operation and expansion provided such does not result in; loss of amenity to adjoining properties, adverse impact on the environment, visual detriment to the character of the area or creation of a traffic hazard. Policy CEF8: Management of Flood Risk: It is the policy of the Council to apply a sequential approach to the assessment of developments in areas of flood risk. Developments shall not be permitted, unless the Justification Test is satisfied as outlined in The Planning System and Flood Risk Management Guidelines for Planning Authorities, (DEHLG 2009) and any amendment thereof 1. Policy CEF8: Management of Flood Risk: It is the policy of the Council to apply a sequential approach to the assessment of developments in areas of flood risk. Developments on lands identified as being at risk of flooding shall be subject to a Flood Risk Assessment in accordance with The Planning System and Flood Risk Management Guidelines for Planning Authorities, (DEHLG 2009) and any amendment thereof 2, and shall include a Justification Test and have regard to non-vulnerable uses. does not introduce any effects. Text amendment with no interaction with ecological Clarity of text detailing the approach for flood risk assessment. This process does not introduce any Ballina Borrisokane Year Number % Change % % % % 1 Flood Risk Assessments will be required, as appropriate, in areas identified to be of ri sk of flooding. 2 Flood Risk Assessments will be required, as appropriate, in areas identified to be of risk of flooding.

6 SO14: Access to lands north east of the town, zoned for Enterprise and Employment and Agricultural uses shall be from the Ballyhayden road only. Borrisoleigh Access directionality does not introduce any % % % % Cloughjordan

7 Holycross % % % % Littleton % % % %

8 Newport Newtown Table 1.1: Population Trends Year Number % Change % % % % Portroe % % %

9 Puckaun SO 10: To ensure that proposals for new development in the village have regard to the Puckaun Village Design Statement. Amend Proposed Puckaun Settlement Plan Silvermines This text does not introduce any The amendment does not introduce any % % %

10 Toomevara % % % % Templetuohy % % % % Amend Zoning map for Templetuohy The amendment does not introduce any

11 Two Mile Borris % % % % Amend the Two Mile Borris Settlement Plan zoning map to reflect the proposed graveyard extension SO 5: To support the preparation of an Enhancement Scheme for Dromineer, which includes a focus on enhancement of entry points to the village and also focuses on the village centre providing definition of core area by way of paving, street lighting, street furniture etc. etc subject to resource being available SO2: Where development is proposed on lands zoned for Low/Medium New Residential adjacent to Farmleigh, access will only be permitted through the existing estate. Amend Zoning map for Riverstown Amend Proposed Aglish Settlement Plan The amendment does not introduce any This text does not introduce any Access conditions does not introduce any The amendment does not introduce any The amendment does not introduce any

12 SO 2: To facilitate the redevelopment of underused village centre sites. The Council will support and encourage the re-use of the former shop and petrol station within the village centre for appropriate use. SO 1: To facilitate the carrying out of streetscape enhancement works, including improvements to surface water drainage network, subject to resources being available Proposed developments shall support the implementation of the relevant recommendations and measures as outlined in the relevant River Basin Management Plan(s)(including the upcoming national River Basin Management Plan), and associated Programmes of Measures, as well as relevant recommendations contained in the Water Quality in Ireland (EPA, 2015, and any updated/superseding document).these recommendations include the need for a catchment management approach to protecting and managing waters to maintain and improve water quality status. Proposals for development shall not have an unacceptable impact on the water environment, including surface waters, groundwater quality and quantity, river corridors and associated woodlands. National Climate Change Adaptation Framework and Mitigation Plan To implement relevant provisions contained in the National Climate Change Adaptation Framework - Building Resilience to Climate Change (DECLG, 2012) and support the recommendations of the National Mitigation Plan (in particular aspects relating to land use, transport and energy efficiency). The text clarification to ensure surface water drainage works are improved will have a positive effect on ecological The amendment to clarify the use of a catchment management approach to improve water quality introduced a positive effect to the ecological integrity of the receiving environment Clarification of compliance with the NMP will ensure additional measures for environmental protection will be observed.

13 Table 2 North Tipperary Members Amendments included in the Proposed Variation to the CDP and their interaction with the Appropriate Assessment North Tipperary Members Amendments included in the Proposed Variation to the CDP Interactions with the Appropriate Assessment To amend the proposed Settlement Plan map of Moyne to include additional lands to the north of the village. The amendment does not introduce additional effects to the ecological integrity of any European Site Promoting regeneration, renewal and redevelopment of land The plan aims to set out a strategy for the development and regeneration of vacant, brownfield and underused lands in order to The process behind the activation of inactive promote and facilitate the rejuvenation and regeneration of areas within the county. The implementation of this strategy and the sites does not objectives of the development plan will be pursued by active land management, whereby the Council, through its departments and introduce additional in collaboration with other agencies, will pro-actively work to achieve the aims of the core strategy. This will promote and facilitate sources for effects. the rejuvenation of regeneration areas, increase housing supply and create more opportunity for employment. To this end the Council will work with landowners, stakeholders and the community in relation to achieving its objective and may consider using legislative measure as appropriate such as: Compulsory Purchase Order, Urban Regeneration and Housing Act - Vacant Sites levy, Derelict Sites Act, Dangerous Sites legislation. Objective: regeneration, renewal and redevelopment of land It is an objective of the Council to seek to develop and improve areas in need of regeneration, renewal and redevelopment. To this end Council will engage in active land management, including Compulsory Purchase Order, Urban Regeneration and Housing Act - Vacant Sites levy, Derelict Sites Act, and Dangerous Sites legislation, to promote and facilitate the rejuvenation and regeneration of areas, increase housing supply, create more opportunity for employment and provide community facilities. The process behind the activation of inactive sites does not introduce additional sources for effects.

14 Table 3 South Tipperary Chief Executive Recommendations included in the Proposed Variation to the CDP and their interaction with the Appropriate Assessment South Tipperary Chief Executive Recommendations included in the Proposed Variation to the CDP Interactions with the Appropriate Assessment Table 2.1 Regional Planning Guidelines Population Targets Census 2006 Census 2011 Census Target 2022 North 66,023 70,322 78,145 82,123 Tipperary South 83,221 88,432 96, ,483 Tipperary Total County 149, , , , ,606 Settlement Tier Regional Town Table 2.2 Population Targets and Quantum of Zoned Land: Main Towns Town Population 2006 Population 2011[1] Population 2016[1][3] Population Target 2022 Total Land Zoned (per ha)[2] Clonmel 18,889 18, , Sub- Regional Town District Towns Nenagh 7,751 8,439 8,968 9, Thurles 7,685 7,933 7,940 9, Carrick-On 5,856 5,931 5,771 6, Suir Roscrea 4,910 5,403 5,446 5,858 58

15 Tipperary 4,415 5,310 4,979 5, Town Cashel 2,936 4,501 4, Cahir 3,381 3,578 3,593 3, Templemore 2,270 2,071 1,939 2, ] 80 legal towns were abolished under the Local Government Reform Act Census towns which previously combined legal towns and their environs have been newly defined using the standard census town criteria (with the 100 metres proximity rule). For some towns the impact of this has been to lose area and population, compared with previous computations. This is reflected in the population declines highlight above. To facilitate growth in these settlements land is zoned for new residential development as part of village settlement plans and equates to approximately ha. The Variation has included a new approach to the land use framework in terms of applying a consistent zoning framework across the county and also promoting residential and commercial development on all sites in Settlement Nodes by not applying a specific zoning to land. (c) Small cluster housing developments (i) in line with Specific Objective SO4-3, on unzoned lands outside of, and directly adjoining the village boundary may be considered where it is demonstrated to the satisfaction of the Council that suitably zoned lands are have not been released for development available within the village boundary, the development is of a high quality and can link effectively with and contribute positively to the village form. A DIS shall be submitted in support of any such proposal. SO4-3 It is an objective of the Council to prepare Cluster and Serviced Site Guidelines over the lifetime of the Plan (as varied). SO4-3 It is an objective of the Planning Authority to implement the Councils Cluster Housing Guidelines when prepared, in the assessment of planning applications which are being considered under Policy SC4 (c). This is a text amendment that relates to a definition of a term that does not interact with ecological Clarification of approximate land mass zoned for residential. This does not introduce an additional source for effects. This text related to the process by which land use is assigned, however this process does not introduce any additional source for effects. This is a text amendment that does not interact with ecological This text amendment clarifies the process by which the Cluster Housing Guidelines will be implemented and

16 Policy CEF8: Management of Flood Risk: It is the policy of the Council to apply a sequential approach to the assessment of developments in areas of flood risk. Developments shall not be permitted, unless the Justification Test is satisfied as outlined in The Planning System and Flood Risk Management Guidelines for Planning Authorities, (DEHLG 2009) and any amendment thereof 3. Policy CEF8: Management of Flood Risk: It is the policy of the Council to apply a sequential approach to the assessment of developments in areas of flood risk. Developments on lands identified as being at risk of flooding shall be subject to a Flood Risk Assessment in accordance with The Planning System and Flood Risk Management Guidelines for Planning Authorities, (DEHLG 2009) and any amendment thereof 4, and shall include a Justification Test and have regard to non-vulnerable uses. does not introduce any effects. Clarity of text detailing the approach for flood risk assessment. This process does not introduce any Ardfinnan Ballyclerihan 3 Flood Risk Assessments will be required, as appropriate, in areas identified to be of risk of flooding. 4 Flood Risk Assessments will be required, as appropriate, in areas identified to be of risk of flooding.

17 1996 Figures not available % % % Ballyporeen The village has a post office, medical centre, childcare facility, school, church and community hall. Bansha Text clarification that does not introduce effects.

18 Cappawhite Clogheen % % % %

19 The village has a number of community facilities including a school, church and graveyard, health centre and day care centre, fire depot and Co. Co. depot. St Theresas hospital is also located in the village. The local community centre and adjacent playground is also located within the village centre. SO 6: Where development is proposed on land zoned for new residential uses adjoining Clashaphoca House, the Council will seek the following: i. Lands to the front of the main house shall be developed as parkland/amenity space and may include playing fields. ii. Residential development shall consist of high quality low density mixed housing, to be setback from Clashaphoca House. iii. iv. Clashaphoca House shall be incorporated into the overall scheme. A single vehicular access shall be provided which shall facilitate future access to lands to the north and an eventual link in order to bypass the village centre. v. Development shall take place on a phased basis. Full details of the proposed phasing to be submitted and agreed and in any event shall ensure that amenity spaces are provided at an early stage. Text clarification that does not introduce any effects. Additional residential zoning conditions which do not introduce any additional sources for effects. Dundrum % % % Emly

20 % %% % % Golden % % % % Gortnahoe % % %

21 Holycross % % % % Killenaule Kilsheelan %

22 % % % Amend Kilsheelan Settlement Plan Mullinahone The amendment does not introduce any Amend the Mullinhone Settlement Plan Newcastle The amendment does not introduce any

23 % % % % Community Facilities: The village has a church and graveyard, a school with ASD Unit, a community hall, 2 public houses, a shop with fuel pumps and bring bank facilities. Amend SO2 in the Limerick Junction Settlement Plan as follows: SO2: To facilitate the future development of the Master Plan lands in accordance with the following principles: a) Access shall be from the N24 and shall cater for the entire Master Plan area. A traffic impact assessment may be required to demonstrate that the proposed development is acceptable in the context of impact on the carrying capacity of the National Route. b) The design and layout of development proposals for the Master Plan site shall consider the character of the village and the visual amenity of the area. c) Proposals shall include a comprehensive phasing plan for the overall development of the lands. d) The development of the lands shall be subject to a Flood Risk Assessment and flood risk management measures shall be incorporated into the design of the proposed scheme. A transport assessment to demonstrate that the capacity and function of the national road is not undermined by the plan proposals Amend the Limerick Junction Settlement Plan zoning map Ballylooby is located in the Galty Vee valley between the Galty and Knockmealdown Mountains, approximately 7km south-west of Cahir. Key Community Facilities: There is a school, community hall, church and graveyard, 2 pubs, shop and fuel pumps. GAA facilities are located outside the village to the west. Text clarification that does not introduce any effects. Process clarification that does not introduce any additional sources for effects. The amendment does not introduce any Text clarification that does not introduce any effects. Text clarification that does not introduce any effects.

24 Amend the Moyglass Settlement Plan The amendment does not introduce any

25 Table 4 South Tipperary Members Amendments included in the Proposed Variation to the CDP and their interaction with the Appropriate Assessment Process South Tipperary Members Amendments included in the Proposed Variation to the CDP Interactions with the Appropriate Assessment SO 11: The Council will investigate the feasibility of installing a public footpath across the bridge to calm traffic and to enhance pedestrian safety or an alternative pedestrian access across the River Suir subject to funding being approved. This feasibility study will have to comply with the development framework and national legislation and be subject to its own AA process when full details are known. This is not a commitment for development and therefore does not introduce likely significant adverse effects. Promoting regeneration, renewal and redevelopment of land The plan aims to set out a strategy for the development and regeneration of vacant, brownfield and underused lands in order to promote and facilitate the rejuvenation and regeneration of areas within the county. The implementation of this strategy and the objectives of the development plan will be pursued by active land management, whereby the Council, through its departments and in collaboration with other agencies, will pro-actively work to achieve the aims of the core strategy. This will promote and facilitate the rejuvenation of regeneration areas, increase housing supply and create more opportunity for employment. To this end the Council will work with landowners, stakeholders and the community in relation to achieving its objective and may consider using legislative measure as appropriate such as: Compulsory Purchase Order, Urban Regeneration and Housing Act - Vacant Sites levy, Derelict Sites Act, Dangerous Sites legislation. The process behind the activation of inactive sites does not introduce additional sources for effects. Objective: regeneration, renewal and redevelopment of land It is an objective of the Council to seek to develop and improve areas in need of regeneration, renewal and redevelopment. To this end Council will engage in active land management, including Compulsory Purchase Order, Urban Regeneration and Housing Act - Vacant Sites levy, Derelict Sites Act, and Dangerous Sites legislation, to promote and facilitate the rejuvenation and regeneration of areas, increase housing supply, create more opportunity for employment and provide community facilities. The process behind the activation of inactive sites does not introduce additional sources for effects.

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED VARIATION NO. 1 (CORE STRATEGY) TO THE LONGFORD TOWN DEVELOPMENT PLAN 2009-2015 for: Longford Local Authorities Great Water Street, Longford, Co. Longford by:

More information

Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan

Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan Forward Planning Kilkenny County Council 18/8/2011 1 Introduction

More information

Chapter 8 Development Management & Zoning Objectives

Chapter 8 Development Management & Zoning Objectives Chapter 8 Development Management & Zoning Objectives 8.0 Introduction The Council, using its statutory powers granted under the Planning and Development Act 2000 (as amended) guides new development by

More information

Comhairle Baile Cheanntair~ Nás na Ríogh

Comhairle Baile Cheanntair~ Nás na Ríogh Comhairle Baile Cheanntair~ Nás na Ríogh DRAFT STRATEGIC FLOOD RISK ASSESSMENT NAAS TOWN DEVELOPMENT PLAN 2011 ~ 2017 Kildare County Council Water Services Department Aras Chill Dara Devoy Park Naas County

More information

BLESSINGTON LOCAL AREA PLAN FLOOD RISK ASSESSMENT

BLESSINGTON LOCAL AREA PLAN FLOOD RISK ASSESSMENT BLESSINGTON LOCAL AREA PLAN 2013-2019 FLOOD RISK ASSESSMENT Table of Contents Page Number 1.0 INTRODUCTION 1 1.1 Definition of Flooding 2 1.2 Policy Framework 2 1.3 Flood Risk Identification 3 1.4 Mapping

More information

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE Chapter VIII General Plan Implementation A. INTRODUCTION This chapter presents a variety of tools available to the (City) to help build the physical city envisioned in Chapter III. While the Modesto provides

More information

2. Group 1: Cashel, Cahir and Thurles Co. Tipperary.

2. Group 1: Cashel, Cahir and Thurles Co. Tipperary. 2. Group 1: Cashel, Cahir and Thurles Co. Tipperary. 2.1. Cashel, Co. Tipperary 2.1.1. Summary Details: Cashel is situated on the N8 Cork to Dublin National primary Route and N74 Secondary Route and is

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Strategic Flood Risk Assessment Draft Claremorris Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 1 Table of Contents Section 1: Overview of the Guidelines... 4 1.1 Introduction...

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment PLANNING DEPARTMENT, KILKENNY COUNTY COUNCIL Strategic Flood Risk Assessment Proposed Amendment No. 2 of Callan Local Area Plan 2009-2020 Forward Planning January 2016 This Strategic Flood Risk Assessment

More information

Strategic Flood Risk Assessment. SFRA Report

Strategic Flood Risk Assessment. SFRA Report Strategic Flood Risk Assessment SFRA Report on Strandhill Mini-Plan Variation No.1 of the Sligo County Development Plan 2011-2017 Prepared by Contents 1. The context for the Flood Risk Assessment 1 2.

More information

Strategic Flood Risk Assessment for SDCC Development Plan

Strategic Flood Risk Assessment for SDCC Development Plan Strategic Flood Risk Assessment for SDCC Development Plan Detailed Report on Flood Risk in the Baldonnell Area 8 th May 2015 rpsgroup.com/ireland Strategic Flood Risk Assessment for SDCC Development Plan

More information

Oran Park and Turner Road Precincts Section 94 Contributions Plan

Oran Park and Turner Road Precincts Section 94 Contributions Plan Oran Park and Turner Road Precincts Section 94 Contributions Plan Prepared for The Council of Camden Contents Page Number 1. Summary 1 1.1 Overview of this Plan 1 1.2 Works schedule and contribution rates

More information

Fiskerton Parish Council - Neighbourhood Development Plan FAQ Contents - click heading to go to text

Fiskerton Parish Council - Neighbourhood Development Plan FAQ Contents - click heading to go to text Fiskerton Parish Council - Neighbourhood Development Plan FAQ Contents - click heading to go to text What is a neighbourhood Development Plan? 2 Why is it important? 2 Can a Neighbourhood Plan be used

More information

Dublin City Council Development Contribution Scheme (under Section 48, Planning & Development Act, 2000 as amended)

Dublin City Council Development Contribution Scheme (under Section 48, Planning & Development Act, 2000 as amended) Dublin City Council Development Contribution Scheme 2010-2017 (under Section 48, Planning & Development Act, 2000 as amended) 1 of 10 INTRODUCTION 1. Sub-section (1) of section 48 of the Planning and Development

More information

Land use Zoning Objectives North Tipperary County Development Plan 2010 (as varied)

Land use Zoning Objectives North Tipperary County Development Plan 2010 (as varied) Land use Zoning Objectives North Tipperary County Development Plan 2010 (as varied) The purpose of land-use zoning is to indicate the development management objectives of the Council for all zoned lands

More information

Development Contributions Scheme 2014 under Section 48 of the Planning & Development Acts

Development Contributions Scheme 2014 under Section 48 of the Planning & Development Acts ROSCOMMON COUNTY COUNCIL Comhairle Chontae Roscomáin Development Contributions Scheme 2014 under Section 48 of the Planning & Development Acts 2000 2014 1. INTRODUCTION The Planning & Development Acts

More information

Strategic Flood Risk Management

Strategic Flood Risk Management Strategic Management Duncan McLuckie (NSW Department of Infrastructure and Natural Resources) Introduction This paper discusses what is meant by strategic flood risk management, who is responsible in New

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Strategic Flood Risk Assessment Ireland West Airport Knock Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 0 1 Table of Contents Section 1: Overview of the Guidelines...

More information

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner Nairn Central (Potentially Vulnerable Area 01/18) Local authority The Highland Council Main catchment Moray coastal Summary of flooding impacts At risk of flooding 350 residential 30 non-residential 340,000

More information

STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED)

STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED) STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED) FOR PROPOSED AMENDMENTS TO THE CLIFDEN LOCAL AREA PLAN 2009-2015 for: Galway County Council County Buildings Prospect Hill Galway by: CAAS Ltd. 2 nd

More information

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council Main catchment River Clyde Summary of flooding impacts At risk of

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 29 November 2016 by David Cliff BA Hons MSc MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 22 nd December

More information

DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT

DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT Climate Change Sectoral Adaptation Plan for Flood Risk Management (2014-2019) 2538_RP/003/C FRAM Section Office of Public Works 2538_RP/003/D CONTENTS 1.0

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Gorey Town and Environs Local Area Plan 207-2023 Appendix 4 Strategic Flood Risk Assessment April 207 Table of Contents Introduction and Context.... Introduction....2 Legislative and Planning context....2.

More information

Flood Risk Sequential Test

Flood Risk Sequential Test Flood Risk Sequential Test Assessment of Proposed Development Sites Stroud District Council Evidence Base (December 2013) Development and Flood Risk Sequential Test 1.0 Introduction 1.1 This document considers

More information

Planning Policy and Projects Unit Update

Planning Policy and Projects Unit Update Nuala O Connell Senior Executive Planner nuala.oconnell@tipperarycoco.ie Planning Policy and Projects Unit Update Presentation Outline Who are the Planning Policy team? Up-Date on National and Regional

More information

Project Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m)

Project Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m) Project Appraisal Guidelines for National Roads Unit 14.0 - Minor Projects ( 0.5m to 5m) February 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)

More information

Decision Statement Regarding Longdon Neighbourhood Plan Proceeding to Referendum

Decision Statement Regarding Longdon Neighbourhood Plan Proceeding to Referendum Decision Statement Regarding Longdon Neighbourhood Plan Proceeding to Referendum 1. Summary 1.1 Following an Independent Examination, Lichfield District Council has recommended that the Longdon Neighbourhood

More information

Upper Warrell Creek Road Developer Contributions Plan August 2013

Upper Warrell Creek Road Developer Contributions Plan August 2013 Developer Contributions Plan August 2013 Nambucca Shire Council Administration Centre 44 Princess Street Macksville Contents Part A: Introduction, Operation and Administration of the Plan 1. Introduction

More information

DUBLIN CITY COUNCIL. SUPPLEMENTARY DEVELOPMENT CONTRIBUTION SCHEME (under Section 49, Planning & Development Act, 2000 as amended)

DUBLIN CITY COUNCIL. SUPPLEMENTARY DEVELOPMENT CONTRIBUTION SCHEME (under Section 49, Planning & Development Act, 2000 as amended) DUBLIN CITY COUNCIL SUPPLEMENTARY DEVELOPMENT CONTRIBUTION SCHEME (under Section 49, Planning & Development Act, 2000 as amended) LUAS CROSS CITY (ST. STEPHEN S GREEN TO BROOMBRIDGE LINE) 1. Definition

More information

Report to City of Bradford Metropolitan District Council

Report to City of Bradford Metropolitan District Council Appendix 1 Report to City of Bradford Metropolitan District Council by Louise Nurser BA (Hons) Dip UP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Date 2

More information

Dublin City Council Development Contribution Scheme (under Section 48, Planning & Development Act, 2000 as amended) Page 1 of 11

Dublin City Council Development Contribution Scheme (under Section 48, Planning & Development Act, 2000 as amended) Page 1 of 11 Dublin City Council Development Contribution Scheme 2013-2015 (under Section 48, Planning & Development Act, 2000 as amended) Page 1 of 11 INTRODUCTION 1. Sub-section (1) of Section 48 of the Planning

More information

Flood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment

Flood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment Flood Risk Assessment Cobh Town Plan 2013 Cobh Town Development Plan 2013 Volume 2: Strategic Flood Risk Assessment Cobh Town Plan 2013 Flood Risk Assessment Document Verification Page 1 of 1 Job Title:

More information

Planning and Flood Risk

Planning and Flood Risk Planning and Flood Risk Patricia Calleary BE MEngSc MSc CEng MIEI After the Beast from the East Patricia Calleary Flood Risk and Planning Flooding in Ireland» Floods are a natural and inevitable part of

More information

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back Alyth (Potentially Vulnerable Area 08/04) Local Plan District Tay Local authority Perth and Kinross Council Main catchment Alyth Burn (River Tay) Summary of flooding impacts 50 residential properties 20

More information

LIMERICK CITY & COUNTY COUNCIL

LIMERICK CITY & COUNTY COUNCIL LIMERICK CITY & COUNTY COUNCIL DEVELOPMENT CONTRIBUTION SCHEME 2017 2021 1 DEVELOPMENT CONTRIBUTION SCHEME LIMERICK CITY & COUNTY COUNCIL 2017 2021 Contents Page 1. Introduction... 3 2. Definitions 3 3.

More information

National Report on Regional Planning Guidelines Implementation

National Report on Regional Planning Guidelines Implementation Regional Authorities of Ireland National Report on Regional Planning Guidelines Implementation 2012-2014 Border Region West Region Midland Region Mid-East Region Dublin Region Mid-West Region South-East

More information

Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Local authority Main catchment

Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Local authority Main catchment Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Tweed Local authority Scottish Borders Council Main catchment River Tweed Summary

More information

Appendix 12.3 Flood Risk Assessment

Appendix 12.3 Flood Risk Assessment Appendix 12.3 Flood Risk Assessment Contents A12.3-1.1 Scope of Work 1 A12.3-1.2 Summary of Data Used 1 A12.3-1.3 Proposed Project 2 A12.3-2.1 The Planning System and Flood Risk Management Guidelines 2

More information

Ballina Shire Car Parking Contributions Plan Prepared for: Ballina Shire Council Date: May 2014 Project No 10084

Ballina Shire Car Parking Contributions Plan Prepared for: Ballina Shire Council Date: May 2014 Project No 10084 Ballina Shire Car Parking Contributions Plan 2014 Prepared for: Date: May 2014 Project No 10084 Ballina Shire Car Parking Contributions Plan 2014 Prepared for By GLN Planning Pty Ltd ABN 39 585 269 237

More information

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013 APPENDIX II TO THE SEA ENVIRONMENTAL REPORT STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED AMENDMENT TO THE GAELTACHT LOCAL AREA PLAN 2008-2014 for: Galway County Council County Buildings Prospect

More information

Engineers Ireland Annual Conference

Engineers Ireland Annual Conference Engineers Ireland Annual Conference MANAGING FLOOD RISK AND BUILDING SUSTAINABLE COMMUNITIES Mark Adamson Office of Public Works 15 th May, 2015 FLOOD RISK IN IRELAND RECENT FLOODS November 2009: >1,600

More information

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment River Cree Summary of flooding impacts 210 residential properties

More information

City of Prince Albert YEAR STRATEGIC PLAN

City of Prince Albert YEAR STRATEGIC PLAN 5 City of Prince Albert YEAR STRATEGIC PLAN 2015-2020 City of Prince Albert Introduction Members of City Council, along with Senior Administration, attended a two-day Strategic Planning Session for the

More information

DEVELOPMENT CONTRIBUTION SCHEME. 23 rd of September, Limerick City Council Planning & Economic Development Department

DEVELOPMENT CONTRIBUTION SCHEME. 23 rd of September, Limerick City Council Planning & Economic Development Department DEVELOPMENT CONTRIBUTION SCHEME 23 rd of September, 2013. Limerick City Council Planning & Economic Development Department Development Contribution Scheme 2013-2016 Section 48, Planning & Development Acts,

More information

Document Control Sheet

Document Control Sheet Strategic Flood Risk Assessment of the Maynooth Local Area Plan 2013-2019 Proposed Amendment No. 1 Document Control Sheet Client: Project Title: Document Title: Document No: Kildare County Council Strategic

More information

REGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit

REGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit Edmonton Metropolitan Region Planning Toolkit Re-imagine. Plan. Build. Edmonton Metropolitan Region Growth Plan 1.0 INTRODUCTION On October 26, 2017, the Government of Alberta approved the Edmonton Metropolitan

More information

Monaghan County Council Comhairle Contae Mhuineacháin

Monaghan County Council Comhairle Contae Mhuineacháin Monaghan County Council Comhairle Contae Mhuineacháin Monaghan County Council General Development Contributions Scheme 2013-2019 1 st December 2014 Revision Contents 1. Introduction... 3 2. General Development

More information

GENERAL PLAN AMENDMENT # FLOOD HAZARDS

GENERAL PLAN AMENDMENT # FLOOD HAZARDS GENERAL PLAN AMENDMENT #2011-03 FLOOD HAZARDS The following text that appears on pages HS 3-4 of the Health and Safety Element in the Yolo 2030 Countywide General Plan has been amended. New language is

More information

Slaugham Neighbourhood Plan Working Group response to MSDC comments on draft Submission Documents: September 2018

Slaugham Neighbourhood Plan Working Group response to MSDC comments on draft Submission Documents: September 2018 Slaugham Neighbourhood Plan Working Group response to MSDC comments on draft Submission Documents: September 2018 Para/Policy 1.7-1.10 page 2 Given the District Plan is now adopted, MSDC advised it is

More information

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Orkney Local authority Orkney Islands Council Main catchment Orkney coastal Summary of flooding impacts 490 residential properties 460 non-residential

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (A) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 BEARNA PLAN for: Galway County Council Áras an Chontae

More information

South Dublin County Council Development Contribution Scheme

South Dublin County Council Development Contribution Scheme South Dublin County Council (under Section 48, Planning & Development Act, 2000 as amended) 1 of 9 INTRODUCTION 1. Sub-section (1) of section 48 of the Planning and Development Act, 2000 enables a planning

More information

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06 21a TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06 SUBJECT: 901 SAN ANTONIO ROAD [06PLN-00031, 06PLN-00050]: REQUEST BY

More information

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Council, Renfrewshire Council Main catchment Firth of Clyde

More information

2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK

2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK Ireland Water 2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK Mark Adamson Office of Public Works 25 th April, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 & 2017

More information

Report to: Development Services Committee Date: June 26, 2017

Report to: Development Services Committee Date: June 26, 2017 SUBJECT: New Provincial Plans Release of the 2017 Growth Plan, Greenbelt Plan and Oak Ridges Moraine Conservation Plan PREPARED BY: Policy and Research, Planning and Urban Design REVIEWED BY: Marg Wouters,

More information

Toukley District Development Contributions Plan No 6

Toukley District Development Contributions Plan No 6 Toukley District Development Contributions Plan No 6 September 2013 Table of Contents Contents 1 Administration and Operation of this Plan 5 1.1 Introduction 5 1.2 Relationship to Other Plans 5 1.3 Area

More information

LAOIS COUNTY COUNCIL DEVELOPMENT CONTRIBUTION SCHEME. Effective from 1 st November 2013

LAOIS COUNTY COUNCIL DEVELOPMENT CONTRIBUTION SCHEME. Effective from 1 st November 2013 LAOIS COUNTY COUNCIL DEVELOPMENT CONTRIBUTION SCHEME 2013 2017 ADOPTED 21 st October 2013 Effective from 1 st November 2013 PLANNING & DEVELOPMENT ACTS 2000-2013 ADOPTED GENERAL DEVELOPMENT CONTRIBUTION

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 19 December 2016 by Geoff Underwood BA(Hons) PGDip(Urb Cons) MRTPI IHBC an Inspector appointed by the Secretary of State for Communities and Local Government Decision

More information

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England 25 January 2017 We are the Environment Agency. We protect and improve the

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

Much Wenlock Neighbourhood Plan

Much Wenlock Neighbourhood Plan Much Wenlock Neighbourhood Plan Submission Version Report by Independent Examiner Andrew Ashcroft Andrew Ashcroft BA (Hons) MA, DMS, MRTPI Assistant Director Economic, Environment & Cultural Services Herefordshire

More information

DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( )

DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( ) Office of Public Works DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT Climate Change Sectoral Adaptation Plan for Flood Risk Management (2014-2019) Determination of the need for strategic environmental

More information

Louth County Council. Development Contribution Scheme Section 48, Planning and Development Act, 2000 (As Amended)

Louth County Council. Development Contribution Scheme Section 48, Planning and Development Act, 2000 (As Amended) Louth County Council Development Contribution Scheme 2016 2021 Section 48, Planning and Development Act, 2000 (As Amended) Adopted 19 th September 2016 ARTICLE 1.0 INTRODUCTION 1.1 This Louth Development

More information

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Tay Estuary and Montrose Basin Local authority Angus Council Main catchment Brothock Water Summary of flooding impacts 250 residential properties

More information

in hereplanning Pilots Programme TOWN CENTRE 1ST PRINCIPLE Fife Council Reducing Planning Obligations to attract town centre investment

in hereplanning Pilots Programme TOWN CENTRE 1ST PRINCIPLE Fife Council Reducing Planning Obligations to attract town centre investment Heading Town text Centre in hereplanning Pilots Programme TOWN CENTRE 1ST PRINCIPLE Fife Council Reducing Planning Obligations to attract town centre investment Town Centres Planning Pilots Programme Town

More information

Flood Risk Management Planning in Scotland: Arrangements for February 2012

Flood Risk Management Planning in Scotland: Arrangements for February 2012 Flood Risk Management Planning in Scotland: Arrangements for 2012 2016 February 2012 Flood Risk Management (Scotland) Act 2009 1 Contents Forewords 1. Introduction to this document... 5 2. Sustainable

More information

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014 Shropshire Local Flood Risk Management Strategy Summary for Consultation July 2014 SHROPSHIRE LOCAL FLOOD RISK MANAGEMENT STRATEGY 1 Introduction This Strategy is about managing flooding in Shropshire.

More information

THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER

THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER 12-2017 A by-law to adopt Amendment Number 27 to the Region of Peel Official Plan in order to revise and add policies in respect of health and the built

More information

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Tay Local authority Perth and Kinross Council Main catchment River Tay Summary of flooding impacts

More information

Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Local authority Main catchment Forth Stirling Council Stirlin

Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Local authority Main catchment Forth Stirling Council Stirlin Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Forth Local authority Stirling Council Main catchment Stirling coastal Summary of flooding impacts At risk of flooding

More information

POLICY TOPIC PAPER 1.0: SPECIFIC PLANS AND SPECIAL PLANNING AREAS

POLICY TOPIC PAPER 1.0: SPECIFIC PLANS AND SPECIAL PLANNING AREAS POLICY TOPIC PAPER 1.0: SPECIFIC PLANS AND SPECIAL PLANNING AREAS BACKGROUND The City uses a number of tools to guide and manage development. In addition to the General Plan, there are a number of Specific

More information

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba Creetown (Potentially Vulnerable Area 14/17) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment Moneypool Burn Summary of flooding impacts 90 residential properties

More information

Barry Island and Docks (2)

Barry Island and Docks (2) Barry Island and Docks (2) Draft Recommendations: Long Term Plan It has been assumed that the structures associated with Barry Docks will be maintained and upgraded in the long term, but this is subject

More information

Development Contributions Plan

Development Contributions Plan Development Contributions Plan Canterbury Town Centre & Riverfront Precinct * Adopted by Council: 11 August 2011 Effective from: 1 September 2011 Jim Montague GENERAL MANAGER City Planning Division Canterbury

More information

Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling C

Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling C Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catchment River Forth Summary of flooding

More information

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016 Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report January 2016 What is this document? This document provides a summary of Guildford Borough Strategic Flood Risk Assessment (SFRA,

More information

CITY OF PITT MEADOWS

CITY OF PITT MEADOWS RECOMMENDATIONS: THAT Council: CITY OF PITT MEADOWS COUNCIL IN COMMITTEE REPORT To: Chief Administrative Officer File No: From: Acting Director of Bylaw/Policy No: 2635- Operations and 2013 Development

More information

Orange Development Contributions Plan 2015

Orange Development Contributions Plan 2015 Orange Development Contributions Plan 2015 Adopted by on 3 November 2015 F1783 0.0% Orange Development Contributions Plan 2015 Prepared for By GLN Planning Pty Ltd ABN 39 585 269 237 Level 10, 66 King

More information

This report will be made public on 19 May 2014.

This report will be made public on 19 May 2014. This report will be made public on 19 May 2014. Report Number C/14/01 To: Cabinet Date: 28 th May 2014 Status: Key Decision Director: Jeremy Chambers, Policy and Strategic Initiatives Cabinet Member: Councillor

More information

GRADUATE ENGINEER (MECHANICAL) (TEMPORARY)

GRADUATE ENGINEER (MECHANICAL) (TEMPORARY) CANDIDATES INFORMATION BOOKLET PLEASE READ CAREFULLY GRADUATE ENGINEER (MECHANICAL) (TEMPORARY) CLOSING DATE: 5.00 PM ON FRIDAY 5 TH AUGUST 2016 Dublin City Council is committed to a policy of equal opportunity

More information

September 2014 Pagham Neighbourhood Plan

September 2014 Pagham Neighbourhood Plan September 2014 Pagham Neighbourhood Plan 2014-2029 Basic Conditions Statement Published by Pagham Parish Council for Consultation under the Neighbourhood Planning (General) Regulations 2012. 1 Pagham Neighbourhood

More information

Decision by Richard Dent, a reporter appointed by the Scottish Ministers

Decision by Richard Dent, a reporter appointed by the Scottish Ministers Directorate for Planning and Environmental Appeals Appeal Decision Notice T: 01324 696 400 F: 01324 696 444 E: dpea@scotland.gsi.gov.uk Decision by Richard Dent, a reporter appointed by the Scottish Ministers

More information

Sequential Flood Risk Test for Mid Sussex Neighbourhood Plans

Sequential Flood Risk Test for Mid Sussex Neighbourhood Plans Sequential Flood Risk Test for Mid Sussex Neighbourhood Plans Introduction This Sequential Test has been prepared to assess the flood risk of sites within the parish that have been identified as suitable,

More information

Information document for the post of Assistant Environmental Scientist (Integrated Catchment Management)

Information document for the post of Assistant Environmental Scientist (Integrated Catchment Management) Information document for the post of Assistant Environmental Scientist (Integrated Catchment Management) INTRODUCTION The EU Water Framework Directive (WFD) 2000 seeks to protect and improve our natural

More information

South Derbyshire Local Plan Part 2 Examination

South Derbyshire Local Plan Part 2 Examination South Derbyshire Local Plan Part 2 Examination Inspector Mike Hayden BSc (Hons) DipTP MRTPI Programme Officer Helen Wilson Email: progofficer@aol.com Tel: 01527 65741 MATTERS, ISSUES AND QUESTIONS (MIQs)

More information

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanarkshire Council, South Lanarkshire Council Main catchment

More information

Regulations Regarding Preliminary Flood Risk Assessment, Flood Maps and Flood Risk Management Plan

Regulations Regarding Preliminary Flood Risk Assessment, Flood Maps and Flood Risk Management Plan Text consolidated by Valsts valodas centrs (State Language Centre) with amending regulations of: 20 March 2012 [shall come into force from 23 March 2012]. If a whole or part of a paragraph has been amended,

More information

Flood Risk Management in Ireland. The National CFRAM Programme & overview of the Capital Works Programme. Click to add text

Flood Risk Management in Ireland. The National CFRAM Programme & overview of the Capital Works Programme. Click to add text Flood Risk Management in Ireland The National CFRAM Programme & overview of the Capital Works Programme Click to add text Dr. John Martin Office of Public Works Engineers Ireland's Local Government Seminar

More information

Irish Rail Kildare Route Project

Irish Rail Kildare Route Project Irish Rail Kildare Route Project Supplementary Development Contributions Scheme (SDCS) Planning and Development Act 2000 December 2007 South Dublin County Council Comhairle Chontae Atha Cliath Theas CONTENTS

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (B) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 GAELTACHT PLAN (INCLUDING SETTLEMENTS OF AN CHEATHRÚ

More information

FLOOD RISK MANAGEMENT IN IRELAND

FLOOD RISK MANAGEMENT IN IRELAND National Flood Management Conference 2018 FLOOD RISK MANAGEMENT IN IRELAND Mark Adamson Office of Public Works 15 th March, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 Flooding: Joint

More information

I546. Warkworth 3 Precinct

I546. Warkworth 3 Precinct I546. Warkworth 3 Precinct I546.1. Precinct Description The purpose of this precinct is to protect the character of the older parts of the Warkworth town centre by requiring new development to be of a

More information

National Flood Risk Management Plan. CFRAM Programme

National Flood Risk Management Plan. CFRAM Programme National Flood Risk Management Plan AND THE CFRAM Programme Gerard O Connell, Engineer-in-Charge, Regional Projects & Flood Advisory Office Environmental SPC, 27 th June, 2018 HISTORIC & POLICY CONTEXT

More information

Gorokan District Development Contributions Plan 2013

Gorokan District Development Contributions Plan 2013 Gorokan District Development Contributions Plan 2013 September 2013 Table of Contents Contents Summary Schedules 1 1 Administration and Operation of this Plan 2 1.1 Name of this Plan 2 1.2 Area to which

More information

DEVELOPMENT CHARGES BACKGROUND STUDY

DEVELOPMENT CHARGES BACKGROUND STUDY DEVELOPMENT CHARGES BACKGROUND STUDY Town of New Tecumseth C o n s u l t i n g L t d. May 29, 2013 Amended June 18, 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I INTRODUCTION... 10 II THE METHODOLOGY

More information

POLICY STATEMENT: ESTABLISHING STATUTORY DISTRICTS IN DENVER

POLICY STATEMENT: ESTABLISHING STATUTORY DISTRICTS IN DENVER CITY AND COUNTY OF DENVER Department of Public Works Infrastructure Planning & Programming, Dept. 509 POLICY STATEMENT: ESTABLISHING STATUTORY DISTRICTS IN DENVER The magnitude of local and regional infrastructure

More information

THE EU FLOODS DIRECTIVE:

THE EU FLOODS DIRECTIVE: Sixth Bulgarian Austrian Seminar THE EU FLOODS DIRECTIVE: EUROPEAN PRACTICE AND RESEARCH IN FLOOD RISK MANAGEMENT Mark Adamson Co-Chair, Working Group F Office of Public Works, IE 7 th November, 2013 PRESENTATION

More information

Fingal County Council Development Contribution Scheme (under Section 48, Planning and Development Act, 2000 as amended)

Fingal County Council Development Contribution Scheme (under Section 48, Planning and Development Act, 2000 as amended) Fingal County Council Development Contribution Scheme 2010 2017 (under Section 48, Planning and Development Act, 2000 as amended) INTRODUCTION 1. Sub-section (1) of section 48 of the Planning and Development

More information