1 Karen W. Morse President An equal opportunity university 56 High Street Bellingham, Washington Fax: October 6, 007 The Honorable Christine Gregoire Governor of the State of Washington PO Box 000 Olympia, WA Dear Governor Gregoire: It is my privilege to submit to you Western s 008 supplemental capital budget request. This will be the last capital request I will be making and working for as President of Western Washington University. I am confident you know that I have carefully marshaled our requests so that we have been able to serve the state in its quest for quality education. This year s request is no different and I ask for your support so we can continue to support your initiatives and move forward. Our request is propelled by several factors: Western s critical need to stay on track with our overall expansion of access and orderly phased development throughout campus; our immediate need to provide a safe campus that is capable of communicating messages in many formats throughout campus in the case of an emergency; the rapidly accelerating development efforts at the former Georgia-Pacific property on Bellingham s Waterfront and supporting Western s plans there; and the critical need to expand Western s Child Care Development Center to help deal with increased child care demand, which directly impacts successful recruitment and retention of a talented and diverse faculty, staff and student body. The following is a more detailed description of the projects the Board of Trustees determined were crucial to put forward in this capital supplemental budget request: ) Parks Hall Ground Floor Renovation: $,700,000 Request The Parks Hall Ground Floor Renovation project provides for effective reuse and adaptation of much needed growth space for the expansion of the College of Business and Economics. Parks Hall was completed in 98 and the only significant work to the building was restoration back to its original condition after the Parks Hall fire in 00. The College of Business and Economics currently resides on the top three floors of the Parks Hall Building and due to lack of space, some faculty and classrooms are located elsewhere on campus. Once the Academic Instructional Center (AIC) is complete and

2 Governor Gregoire October 6, 007 Page the department of Communication Sciences and Disorders relocates, the entire ground floor will be available for renovation into much needed classrooms, faculty offices and computer labs which will allow the College of Business and Economics to reside in one space on campus. The renovation of Parks Hall was originally scheduled to immediately follow the completion of the AIC in summer of 008. This is a top priority item for WWU and was the number 5 ranked priority project in the COP s priority ranking. The full funding for this project was approved by OFM and the Governor s Office for the biennium as part of the $6,000,000 request for Aggregated Intermediate Projects. The funding was then reduced by the legislature to $,000,000 and the $5,000,000 was redirected for Equipment and Furnishings for the AIC. ) Safe Campus Initiative Distributed Antenna System Project: $,96,000 Request The University requires a level of response to more effectively alert, respond and manage emergency situations. This level of response requires significant investment in the infrastructure to distribute radio frequency signals on campus. Currently, cell phone, wireless computers and business related two-way radios are only functional in certain areas of campus and buildings. This request implements a system to distribute signals to all areas of buildings including basements and utility tunnels as well as exterior areas of campus including roadways, parking lots and public spaces. In light of the tragedy at Virginia Tech University and Washington s own tragedy at the University of Washington, WWU immediately began an evaluation of our notification, prevention and response abilities. We have implemented the first phase of notification through text messaging; acquired a large steam whistle for emergency use; participated in active shooter drills; and reevaluated and improved our procedures to identify and counsel students before a situation escalates. In response to your interest in safe campuses, interest from the legislative members, and working with the Council of Presidents, we have submitted supplemental budget requests on both the operating and capital side to improve our abilities. Through our review of emergency procedures and testing, it became painfully obvious that even the best notification system for emergencies becomes irrelevant if the message is not received. This is especially true for technologies that depend upon some type of radio frequency (RF) distribution (cell phones, public safety radios, network access, etc.). Because of the topology of the Western campus and the normal difficulty of RF signals to penetrate buildings, utility tunnels, basements, etc., we found that not all areas of campus could receive emergency signals. Our current procedures require us to select the best method to notify students, staff and faculty of emergency situations with safety instructions. This request implements a system to distribute signals to all areas of buildings including basements and utility tunnels as well as exterior areas of campus

3 Governor Gregoire October 6, 007 Page including roadways, parking lots, and public spaces. The system would enhance all RF signals including cell phones, wireless computing and business related two-way radios. ) Academic Center at Bellingham Waterfront $6,00,000 Request WWU proposes to purchase up to -acres of land from the Port of Bellingham to establish an academic center that will be integral to a 7-acre redevelopment of the waterfront. The acquisition will permit the University to expand enrollment; provide and enhance significant research opportunities in partnership with federal and state agencies; and provide community based educational and public services that are limited on the main campus. Western s ability to expand enrollment, academic and research programs on its main campus is significantly constrained by limited space in an area surrounded by intense residential development. Participation in the redevelopment of the Bellingham waterfront will permit the University to be a major partner in the revitalization of an important community resource as well as to establish a major center for instruction and research programs that are consistent with and stimulate economic and cultural development for the region. ) Child Development Center Expansion: $95,000 Request The WWU Child Development Center (CDC) is a model program that achieves multiple state-wide and strategic goals: to provide additional quality Early Childhood Education opportunities as called for in the Governor s Washington Learns document, to serve as a recruitment and retention tool for WWU faculty and staff, to provide cost-effective child care and parent learning opportunities for the changing demographic student body who otherwise might not be able to attend college, and to increase learning opportunities for future early childhood educators (students in the Woodring College of Education). With the retirement of an aging faculty and staff, the hiring of younger professionals, the growth of student enrollment, and the shifting demographics toward at-risk and underrepresented populations, demand for campus childcare has reached a critical state. Only two spaces have been added to the capacity of the CDC since 996 (from 5 to 56) when consultants Burud & Associates studied WWU childcare and recommended the University secure additional funding sources and enlarge capacity. Capacity has been a long-standing need; no other funding has been available to expand the physical capacity of the CDC by 5%. University Residences and the Associated Students have already been fully tapped for ongoing operating support; state funding is needed for both construction and program expansion (see the 008 Supplemental

4 Governor Gregoire October 6, 007 Page Operating Request) to enable the University to keep parent fees affordable and provide quality staffing. The addition of a class lab to Western s CDC will resolve a critical need based on increased faculty, staff and student childcare demand as well as better serve student learning. Thank you for your continuing and strong commitment to public higher education and your support of Western Washington University. We stand ready to answer your questions and to help you however possible. Sincerely, Karen W. Morse President

5 WESTERN WASHINGTON UNIVERSITY 008 SUPPLEMENTAL CAPITAL BUDGET REQUEST TABLE OF CONTENTS Letter of Transmittal Ten-Year Capital Program Summary (Form C-) Programmatic Projects Parks Hall Ground Floor Renovation Distributed Antenna System Project Academic Center at Bellingham Waterfront Child Development Center Expansion

6 CBS State of Washington :56:6PM 0//007 C - Ten Year Capital Program Summary Budget Period: Agency: 80 Western Washington University Version: SS Agency Supplemental Submittal 008 Agency New Priority Project by Fund/Appropriation Type Estimated Prior Reapprop Approp Estimated Estimated Estimated Estimated Total Expenditures Project Class: Program Parks Hall Ground Floor Renovation 057- State Bldg Constr-State,700,000,700, Distributed Antenna System Project 057- State Bldg Constr-State,96,000,96, Academic Center at Bellingham Waterfront 057- State Bldg Constr-State 6,00,000 6,00, Child Development Center Expansion 057- State Bldg Constr-State 95,000 95,000 Total: Program 5,85, ,85, New Estimated Prior Reapprop Approp Estimated Estimated Estimated Estimated Total Fund Summary Total Expenditures State Bldg Constr-State 5,85,000 5,85,000 Total 5,85, ,85,

7 CBS Budget Period: Agency: Version: State of Washington C - CAPITAL PROJECT REQUEST Western Washington University SS Agency Supplemental Submittal 008 :6:5PM 0//007 Page of Project Number: Agency Priority: Project Title: Parks Hall Ground Floor Renovation Description Project Class: Type of Project: OFM Priority: Program City: Bellingham Program (Minor Works) Postsecondary Learning County: Legislative District: Whatcom 00 Project was requested in a previous biennium: Compliant with Growth Management Act: Yes Previous Project ID: Yes Project Published Summary: The Parks Hall Ground Floor Renovation provides for the effective reuse and adaptation of much needed growth space for the College of Business and Economics. This project was approved as part of a group of Intermediate projects by the Governor and OFM as part of the Capital Budget Request. However, a legislative redirection of funding decreased the funding for the group of Intermediate projects and this project had to be delayed. Project Description: The ground floor of Parks Hall will be vacated in the summer of 008 as the current occupants move to the new AIC building. The College of Business and Economics is currently housed in the top floors of Parks Hall and due to lack of space, has offices and classrooms outside of Parks Hall. This renovation will allow CBE to expand into this much needed space with the additions of classrooms, offices and computer labs. Operating Impact Fund Estimated Code Fund Title Total Annual Average FTEs General Fund-State 6,000,00 5,00 59,00 6,900 7,00 Total Funds 6,000,00 5,00 59,00 6,900 7,00 Project Funding Fund Code Fund Title Estimated Total Prior Biennium Expenditures Fiscal Period Current Biennium Reapprops New Approps 057- State Bldg Constr-State,700,000,700,000,700, ,700,000 Total Funds Fund Code Fund Title 057- State Bldg Constr-State Total Funds Future Fiscal Periods

8 CBS Budget Period: Agency: Version: State of Washington C - CAPITAL PROJECT REQUEST Western Washington University SS Agency Supplemental Submittal 008 :7:0PM 0//007 Page of Project Number: Agency Priority: Project Title: Parks Hall Ground Floor Renovation Project Statistics Total Primary Secondary Gross Square Feet Net Square Feet Efficiency Escalated MACC Cost per Sq. Ft.,5 8, % 5,5 0 8, % 0.0 % 5 0 Project Schedule Predesign Design Construction Start Date 09/0/008 08/0/009 End Date 05/0/009 0/0/00 Cost Summary Total Escalated Cost % of Project Consultant Services,55,000.0% Pre-Schematic Design Services A/E Basic Design Services 5,000.% A/E Extra Services/Reimbursables 8, % Other Services 67, % Design Services Contingency 9,000.% Construction,98,000 5.% MACC - Primary,00,000.6% MACC - Secondary GC/CM Risk Contingency GC/CM or Design Build Contingencies 0,000 6.% Sales Tax 9,000.% Other 77, % Acquisition Equipment,000.9% Equipment Tax 9,000 0.% Artwork 9,000 0.% Agency Project Administration 8, % Other 69,000.6% TOTAL ESCALATED COST,700,000

9 STATE OF WASHINGTON AGENCY/INSTITUTION PROJECT COST ESTIMATE C-00 Version.6. July, 005 FORM AGENCY: PROJECT NAME: PROJECT NUMBER: LOCATION: WWU Parks Hall Ground Floor Renovation Bellingham, Washington Analysis Date: 9/0/007 Analysis By: R. Benner Contact Phone #: STATISTICS: Gross Square Feet Net Square Feet Efficiency Estimated Cost per S.F. Building Type: Is project a remodel? A/E Fee Class A/E Fee Percentage: Contingency Rate: Management Reserve: Tax Rate: Art Requirement Applies: Project Admin by GA: Higher Ed. Institution: Alternative Public Works Project: Primary Secondary Project Schedule Start Date End Date,5 8,000. Predesign (mm-yyyy):. Design (mm-yyyy): Sep-008 May % 0%. Construction (mm-yyyy): Aug-009 Apr Construction Duration (in Months): 8 Other Schedule B projects State Construction Inflation Rate:.00% Yes No Base Month: Mar-006 B.6% 0.00% Project Cost Summary Primary MACC (escalated): $,00, % Secondary MACC (escalated): 0.00% Current Project Total: $,68, % Escalated Project Total: $,700,000 Yes No Yes Includes Formula Overrides: Yes No A. 5 INSERT BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST ACQUISITION COSTS Purchase/Lease Cost Appraisal and Closing Costs Right-of-Way Costs Offsite Mitigation <--Double-Click Here to Insert a Row Total: Acquisition Costs.0000 B. CONSULTANT SERVICES Pre-Schematic Design Services a. Programming/Site Analysis b. Environmental Analysis c. Predesign Study d. SubTotal: Pre-Schematic Design Services.0769 Construction Documents a. A/E Basic Design Services - Up to Bidding (69%) $,96 $,96 b. A/E Basic Design Services - Secondary (69%) SubTotal: Construction Documents $, $5,000 Extra Services a. Civil Design (Above Basic Services) $0,000 b. Geotechnical Investigation c. Commissioning $0,000 d. Site Survey e. Testing $85,000 f. Energy Conservation Report g. Voice/Data Consultant $0,000 h. VE Participation & Implementation $7,500 i. Constructability Review Participation $0,000 j. Environmental Mitigation Services (EIS) k. Landscape Consultant l. As-Builting $0,000 m. Acoustical Consultant $0,000 n. Alternate Cost Studies $85,000 o. Travel & Per Diem $5,000 p. Renderings, Presentations, & Models $,500 q. Document Reproduction $7,500 r. Advertising $,000 s. Cost Consultant $85,000 t. Electronics/AV Consultant $0,000 u. Elevator Consultant $7,500 v. Hazmat Consultant $65,000 w. Wind Tunnel Consultant x. Lab Consultant y. Interior Design Consultant $0,000 z. Security Consultant aa. Energy/LCCA Consultant CBE Occupying PH Ground Flr Supplemental Version.xls (C00 ()) PAGE OF

10 BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST ab. Value Engineering Consultant $0,000 ac. Constructability Review Consultant $0,000 SubTotal: Extra Services $77, $8,000 Other Services a. Bid/Construction/Closeout - % of basic services $6,759 $6,759 b. Bid/Construction/Closeout - Secondary c. HVAC Balancing $85,000 d. Commissioning and Training $0,000 e. On-Site Rep. $50,000 f. SubTotal: Other Services $8,759.7 $67,000 5 Design Services Contingency 5.00% $7,05 $7,05 a. SubTotal: Design Services Contingency $7,05.7 $9,000 Total: Consultant Services $,6,76 $,55,000 C. CONSTRUCTION CONTRACTS Site Work a. G0 - Site Preparation b. G0 - Site Improvements c. G0 - Site Mechanical Utilities d. G0 - Site Electrical Utilities e. G60 - Other Site Construction f. SubTotal: Site Work.06 Related Project Costs a. Off site improvements b. City Utilities Relocation c. Parking Mitigation $5,000 d. Stormwater Retention/Detention e. Wetland Mitigation f. SubTotal: Related Project Costs $5, $7,000 A Facility Construction - Primary a. A0 - Foundations b. A0 - Basement Construction c. B0 - Superstructure d. B0 - Exterior Closure e. B0 - Roofing f. C0 - Interior Construction g. C0 - Stairs h. C0 - Interior Finishes i. D0 - Conveying j. D0 - Plumbing Systems k. D0 - HVAC Systems l. D0 - Fire Protection Systems m. D50 - Electrical Systems n.. F0 - Special Construction o.. F0 - Selective Demolition p. General Conditions q. Construction w/o equipment $,550,000 r. Equipment SubTotal: Facility Construction - Primary $,550,000.7 $,7,000 Maximum Allowable Construction Cost (MACC) - Primary B Facility Construction -Secondary (By Building System) a. A0 - Foundations b. A0 - Basement Construction c. B0 - Superstructure d. B0 - Exterior Closure e. B0 - Roofing f. C0 - Interior Construction g. C0 - Stairs h. C0 - Interior Finishes i. D0 - Conveying j. D0 - Plumbing Systems k. D0 - HVAC Systems l. D0 - Fire Protection Systems m. D50 - Electrical Systems n.. F0 - Special Construction o.. F0 - Selective Demolition p. General Conditions q. SubTotal: Facility Construction -Secondary (By Building System) $,795,000 $,00,000.7 CBE Occupying PH Ground Flr Supplemental 5 PAGE OF

11 BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST Maximum Allowable Construction Cost (MACC) - Secondary 5 GC/CM Risk Contingency - NOT APPLICABLE GC/CM or Design Build Costs - NOT APPLICABLE 6 Construction Contingencies a. Management Reserve 0.00% b. Allowance for Change Orders 5.00% $69,50 $69,50 c. SubTotal: Construction Contingencies $69,50.7 $0,000 7 Sales Tax 8.0% $7,97 $7,97 a. SubTotal: Sales Tax $7,97.7 $9,000 Total: Construction Contracts $,7,67 $,98,000 D. EQUIPMENT E0 - Equipment $07,500 E0 - Furnishings INSERT F0 - Special Construction <--Double-Click Here to Insert a Row SubTotal: Equipment $07,500.7 $, Sales Tax 8.0% $7,0 $7,0 00 SubTotal: Sales Tax $7,0.7 $9,000 Total: Equipment $,90 $5,000 E. ARTWORK Project Artwork $8,975 $8,975 Higher Education Artwork N/A N/A Total: Artwork $8, $9,000 F. OTHER COSTS Mitigation Costs Hazardous Material Remediation\Removal Physical Plant Support $75,000 Building Permit/Plan Review $77,500 Total: Other Costs $5, $69,000 G. PROJECT MANAGEMENT Agency Project Management $8,000 $8,000 $8,06 Total: Project Management $8, $8,000 G R A N D T O T A L $,68,778 $,700,000 NOTES CBE Occupying PH Ground Flr Supplemental Version.xls (C00 ()) 6 PAGE OF

12 CBS Budget Period: Agency: Version: State of Washington C - CAPITAL PROJECT REQUEST Western Washington University SS Agency Supplemental Submittal 008 :59:PM 0//007 Page of Project Number: Agency Priority: Project Title: Distributed Antenna System Project Description Project Class: Type of Project: OFM Priority: Program City: Bellingham Health, Safety and Code Requirements (Minor Works) Safety of People and Property County: Legislative District: Whatcom 00 Project was requested in a previous biennium: Compliant with Growth Management Act: Yes Previous Project ID: Yes Project Published Summary: To support WWU's Safe Campus Initiatives, this request implements a system to distribute signals to all areas of buildings including basements and utility tunnels as well as exterior areas of campus including roadways, parking lots, and public spaces. Project Description: The Distributed Antenna System project will install campus wide antenna systems to support, distribute and enhance radio frequency signals for wireless computers, cell phones and business related two-way radios as a part of our Safe Campus Initiatives. Currently there are many areas throughout campus including basements and utility tunnels as well as exterior areas of campus such as roadways, parking lots and public spaces where signals are lost. This will allow WWU, in the event of an emergency, to push critical information out to all corners of our campus. Operating Impact Fund Estimated Code Fund Title Total General Fund-State 89,900 67,00 8,800 87,900 9,00 98,900 Total Funds 89,900 67,00 8,800 87,900 9,00 98,900 Project Funding Fund Code Fund Title Estimated Total Prior Biennium Expenditures Fiscal Period Current Biennium Reapprops New Approps 057- State Bldg Constr-State,96,000,96,000,96, ,96,000 Total Funds Fund Code Fund Title 057- State Bldg Constr-State Total Funds Future Fiscal Periods

13 CBS Budget Period: Agency: Version: State of Washington C - CAPITAL PROJECT REQUEST Western Washington University SS Agency Supplemental Submittal 008 :59:7PM 0//007 Page of Project Number: Agency Priority: Project Title: Distributed Antenna System Project Project Statistics Total Primary Secondary Gross Square Feet Net Square Feet Efficiency Escalated MACC Cost per Sq. Ft % % 0.0 % 0 0 Project Schedule Predesign Design Construction Start Date 09/0/008 07/0/009 End Date 05/0/009 0/0/009 Cost Summary Total Escalated Cost % of Project Consultant Services 57,000.6% Pre-Schematic Design Services A/E Basic Design Services 9,000.9% A/E Extra Services/Reimbursables 0,000.6% Other Services 00,000.5% Design Services Contingency 60,000.5% Construction,76, % MACC - Primary,58, % MACC - Secondary GC/CM Risk Contingency GC/CM or Design Build Contingencies 8, % Sales Tax 6,000 6.% Other 9, % Acquisition Equipment Equipment Tax Artwork Agency Project Administration 5, % Other 9,000.0% TOTAL ESCALATED COST,96,000 8

14 STATE OF WASHINGTON AGENCY/INSTITUTION PROJECT COST ESTIMATE C-00 Version.6. July, 005 FORM AGENCY: PROJECT NAME: PROJECT NUMBER: LOCATION: WWU Distributed Antenna System Supplemental Version Bellingham, Washington Analysis Date: 0//007 Analysis By: R. Benner Contact Phone #: STATISTICS: Gross Square Feet Net Square Feet Efficiency Estimated Cost per S.F. Building Type: Is project a remodel? A/E Fee Class A/E Fee Percentage: Contingency Rate: Management Reserve: Tax Rate: Art Requirement Applies: Project Admin by GA: Higher Ed. Institution: Alternative Public Works Project: Primary Secondary Project Schedule Start Date End Date. Predesign (mm-yyyy):. Design (mm-yyyy): Sep-008 May-009 0% 0%. Construction (mm-yyyy): Jul-009 Oct Construction Duration (in Months): Other Schedule B projects State Construction Inflation Rate:.00% Yes No Base Month: Mar-006 B.% 0.00% Project Cost Summary Primary MACC (escalated): $,58, % Secondary MACC (escalated): 0.00% Current Project Total: $,57,06 8.0% Escalated Project Total: $,96,000 No No Yes Includes Formula Overrides: Yes No A. 5 INSERT BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST ACQUISITION COSTS Purchase/Lease Cost Appraisal and Closing Costs Right-of-Way Costs Offsite Mitigation <--Double-Click Here to Insert a Row Total: Acquisition Costs.0000 B. CONSULTANT SERVICES Pre-Schematic Design Services a. Programming/Site Analysis b. Environmental Analysis c. Predesign Study d. SubTotal: Pre-Schematic Design Services.0769 Construction Documents a. A/E Basic Design Services - Up to Bidding (69%) $78,00 $78,00 b. A/E Basic Design Services - Secondary (69%) SubTotal: Construction Documents $78, $9,000 Extra Services a. Civil Design (Above Basic Services) b. Geotechnical Investigation c. Commissioning $5,000 d. Site Survey e. Testing $5,000 f. Energy Conservation Report g. Voice/Data Consultant $5,000 h. VE Participation & Implementation i. Constructability Review Participation j. Environmental Mitigation Services (EIS) k. Landscape Consultant l. As-Builting $0,000 m. Acoustical Consultant n. Alternate Cost Studies $0,000 o. Travel & Per Diem $0,000 p. Renderings, Presentations, & Models q. Document Reproduction $,500 r. Advertising $,000 s. Cost Consultant t. Electronics/AV Consultant u. Elevator Consultant v. Hazmat Consultant $5,000 w. Wind Tunnel Consultant x. Lab Consultant y. Interior Design Consultant z. Security Consultant aa. Energy/LCCA Consultant Distributed Antenna System Supplemental Version R.xls (C00 ()) 9 PAGE OF

15 BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST ab. Value Engineering Consultant ac. Constructability Review Consultant SubTotal: Extra Services $9, $0,000 Other Services a. Bid/Construction/Closeout - % of basic services $79,97 $79,97 b. Bid/Construction/Closeout - Secondary c. HVAC Balancing d. Commissioning and Training $0,000 e. On-Site Rep. f. SubTotal: Other Services $89, $00,000 5 Design Services Contingency 5.00% $5,7 $5,7 a. SubTotal: Design Services Contingency $5,7.078 $60,000 Total: Consultant Services $6,86 $57,000 C. CONSTRUCTION CONTRACTS Site Work a. G0 - Site Preparation b. G0 - Site Improvements c. G0 - Site Mechanical Utilities d. G0 - Site Electrical Utilities e. G60 - Other Site Construction f. SubTotal: Site Work Related Project Costs a. Off site improvements b. City Utilities Relocation c. Parking Mitigation d. Stormwater Retention/Detention e. Wetland Mitigation f. SubTotal: Related Project Costs A Facility Construction - Primary a. A0 - Foundations b. A0 - Basement Construction c. B0 - Superstructure d. B0 - Exterior Closure e. B0 - Roofing f. C0 - Interior Construction g. C0 - Stairs h. C0 - Interior Finishes i. D0 - Conveying j. D0 - Plumbing Systems k. D0 - HVAC Systems l. D0 - Fire Protection Systems m. D50 - Electrical Systems n.. F0 - Special Construction o.. F0 - Selective Demolition p. General Conditions q. Construction w/o equipment $,00,000 r. Equipment SubTotal: Facility Construction - Primary $,00, $,58,000 Maximum Allowable Construction Cost (MACC) - Primary B Facility Construction -Secondary (By Building System) a. A0 - Foundations b. A0 - Basement Construction c. B0 - Superstructure d. B0 - Exterior Closure e. B0 - Roofing f. C0 - Interior Construction g. C0 - Stairs h. C0 - Interior Finishes i. D0 - Conveying j. D0 - Plumbing Systems k. D0 - HVAC Systems l. D0 - Fire Protection Systems m. D50 - Electrical Systems n.. F0 - Special Construction o.. F0 - Selective Demolition p. General Conditions q. SubTotal: Facility Construction -Secondary (By Building System) $,00,000 $,58, Distributed Antenna System Supplemental Version R.xls (C00 () 0 PAGE OF

16 BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST Maximum Allowable Construction Cost (MACC) - Secondary 5 GC/CM Risk Contingency - NOT APPLICABLE GC/CM or Design Build Costs - NOT APPLICABLE 6 Construction Contingencies a. Management Reserve 0.00% b. Allowance for Change Orders 5.00% $5,000 $5,000 c. SubTotal: Construction Contingencies $5, $8,000 7 Sales Tax 8.0% $,80 $,80 a. SubTotal: Sales Tax $, $6,000 Total: Construction Contracts $,867,80 $,76,000 D. INSERT EQUIPMENT E0 - Equipment E0 - Furnishings F0 - Special Construction <--Double-Click Here to Insert a Row SubTotal: Equipment Sales Tax 8.0% 00 SubTotal: Sales Tax.078 Total: Equipment E. ARTWORK Project Artwork N/A N/A Higher Education Artwork N/A N/A Total: Artwork.0000 F. OTHER COSTS Mitigation Costs Hazardous Material Remediation\Removal Physical Plant Support $5,000 INSERT Building Permit/Plan Review <--Double-Click Here to Insert a Row Total: Other Costs $5, $9,000 G. PROJECT MANAGEMENT Agency Project Management $5,000 $5,000 $5,7 Total: Project Management $5, $5,000 G R A N D T O T A L $,57,06 $,96,000 NOTES Distributed Antenna System Supplemental Version R.xls (C00 ()) PAGE OF

17 CBS Budget Period: Agency: Version: State of Washington C - CAPITAL PROJECT REQUEST Western Washington University SS Agency Supplemental Submittal 008 :08:05PM 0//007 Page of Project Number: Agency Priority: Project Title: Academic Center at Bellingham Waterfront Description Project Class: Type of Project: OFM Priority: Program City: Bellingham Acquisition - Land Economic Vitality County: Legislative District: Whatcom 00 Project was requested in a previous biennium: Compliant with Growth Management Act: No N/A Previous Project ID: Project Published Summary: WWU proposes to purchase a -acre parcel of land from the Port of Bellingham to establish an academic center that will be integral to a 7-acre redevelopment of the waterfront. The acquisition will permit the University to expand enrollment; provide and enhance significant research opportunities in partnership with federal and state agencies; and provide community based educational and public services that are limited on the main campus. Project Description: Western's ability to expand enrollment, academic and research programs on its main campus is significantly constrained by limited space in an area surrounded by intense residential development. Participation in the redevelopment of the Bellingham waterfront will permit the University to be a major partner in the revitalization of an important community resource as well as to establish a major center for instruction and research programs that are consistent with and stimulate economic and cultural development for the region. The Port of Bellingham has agreed to, and is implementing, a comprehensive cleaning of the entire 7-acre waterfront development area so that it will meet or exceed State of Washington Department of Ecology standards. In addition, an Environmental Impact Study (EIS) is currently underway, funded by the Port, and rezoning by the City of Bellingham will take place to ensure that real estate development for educational purposes may take place on the site. Once the Waterfront Master Plan and EIS are complete, compliancy with the Growth Management Act is expected. Operating Impact No Operating Impact Project Funding Fund Code Fund Title Estimated Total Prior Biennium Expenditures Fiscal Period Current New Biennium Reapprops Approps 057- State Bldg Constr-State 6,00,000 6,00,000 6,00, ,00,000 Total Funds

18 CBS Budget Period: Agency: Version: State of Washington C - CAPITAL PROJECT REQUEST Western Washington University SS Agency Supplemental Submittal 008 :08:0PM 0//007 Page of Project Number: Agency Priority: Project Title: Academic Center at Bellingham Waterfront Fund Code Fund Title 057- State Bldg Constr-State Total Funds Future Fiscal Periods Project Statistics Total Primary Secondary Gross Square Feet Net Square Feet Efficiency Escalated MACC Cost per Sq. Ft % % 0.0 % 0 0 Project Schedule Predesign Design Construction Start Date 09/0/008 0/0/009 End Date /0/008 06/0/009 Cost Summary Total Escalated Cost % of Project Consultant Services Pre-Schematic Design Services A/E Basic Design Services A/E Extra Services/Reimbursables Other Services Design Services Contingency Construction MACC - Primary MACC - Secondary GC/CM Risk Contingency GC/CM or Design Build Contingencies Sales Tax Other 6,00, % Acquisition 6,, % Equipment Equipment Tax Artwork Agency Project Administration 89,000.0% Other TOTAL ESCALATED COST 6,00,000

19 STATE OF WASHINGTON AGENCY/INSTITUTION PROJECT COST ESTIMATE C-00 Version.6. July, 005 FORM AGENCY: PROJECT NAME: PROJECT NUMBER: LOCATION: WWU Academic Center at Bellingham Waterfront Bellingham, Washington Analysis Date: 0/0/007 Analysis By: R. Benner Contact Phone #: STATISTICS: Gross Square Feet Net Square Feet Efficiency Estimated Cost per S.F. Building Type: Is project a remodel? A/E Fee Class A/E Fee Percentage: Contingency Rate: Management Reserve: Tax Rate: Art Requirement Applies: Project Admin by GA: Higher Ed. Institution: Alternative Public Works Project: Primary Secondary Project Schedule Start Date End Date. Predesign (mm-yyyy):. Design (mm-yyyy): Sep-008 Dec-008 0% 0%. Construction (mm-yyyy): Jan-009 Jun Construction Duration (in Months): 6 Other Schedule B projects State Construction Inflation Rate:.00% No No Base Month: Mar-006 B 0.00% 0.00% Project Cost Summary Primary MACC (escalated): 0.00% Secondary MACC (escalated): 0.00% Current Project Total: $6,00, % Escalated Project Total: $6,00,000 No No Yes Includes Formula Overrides: No No BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST A. ACQUISITION COSTS 5 Purchase/Lease Cost Appraisal and Closing Costs Right-of-Way Costs Offsite Mitigation Land Acquisition $6,,000 Total: Acquisition Costs $6,, $6,,000 B. CONSULTANT SERVICES Pre-Schematic Design Services a. Programming/Site Analysis b. Environmental Analysis c. Predesign Study d. SubTotal: Pre-Schematic Design Services.0769 Construction Documents a. A/E Basic Design Services - Up to Bidding (69%) b. A/E Basic Design Services - Secondary (69%) SubTotal: Construction Documents.0809 Extra Services a. Civil Design (Above Basic Services) b. Geotechnical Investigation c. Commissioning d. Site Survey e. Testing f. Energy Conservation Report g. Voice/Data Consultant h. VE Participation & Implementation i. Constructability Review Participation j. Environmental Mitigation Services (EIS) k. Landscape Consultant l. As-Builting m. Acoustical Consultant n. Alternate Cost Studies o. Travel & Per Diem p. Renderings, Presentations, & Models q. Document Reproduction r. Advertising s. Cost Consultant t. Electronics/AV Consultant u. Elevator Consultant v. Hazmat Consultant w. Wind Tunnel Consultant x Lab Consultant y. Interior Design Consultant z. Security Consultant aa. Energy/LCCA Consultant Land Acquisition Supplemental Version R.xls (C00 ()) PAGE OF

20 BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST ab. Value Engineering Consultant ac. Constructability Review Consultant SubTotal: Extra Services.0809 Other Services a. Bid/Construction/Closeout - % of basic services b. Bid/Construction/Closeout - Secondary c. HVAC Balancing d. Commissioning and Training e. On-Site Rep. f. SubTotal: Other Services Design Services Contingency 0.00% a. SubTotal: Design Services Contingency.0956 Total: Consultant Services C. CONSTRUCTION CONTRACTS Site Work a. G0 - Site Preparation b. G0 - Site Improvements c. G0 - Site Mechanical Utilities d. G0 - Site Electrical Utilities e. G60 - Other Site Construction f. SubTotal: Site Work Related Project Costs a. Off site improvements b. City Utilities Relocation c. Parking Mitigation d. Stormwater Retention/Detention e. Wetland Mitigation f. SubTotal: Related Project Costs A Facility Construction - Primary a. A0 - Foundations b. A0 - Basement Construction c. B0 - Superstructure d. B0 - Exterior Closure e. B0 - Roofing f. C0 - Interior Construction g. C0 - Stairs h. C0 - Interior Finishes i. D0 - Conveying j. D0 - Plumbing Systems k. D0 - HVAC Systems l. D0 - Fire Protection Systems m. D50 - Electrical Systems n.. F0 - Special Construction o.. F0 - Selective Demolition p. General Conditions q. Construction w/o equipment r. Equipment SubTotal: Facility Construction - Primary.0956 Maximum Allowable Construction Cost (MACC) - Primary B Facility Construction -Secondary (By Building System) a. A0 - Foundations b. A0 - Basement Construction c. B0 - Superstructure d. B0 - Exterior Closure e. B0 - Roofing f. C0 - Interior Construction g. C0 - Stairs h. C0 - Interior Finishes i. D0 - Conveying j. D0 - Plumbing Systems k. D0 - HVAC Systems l. D0 - Fire Protection Systems m. D50 - Electrical Systems n.. F0 - Special Construction o.. F0 - Selective Demolition p. General Conditions q. SubTotal: Facility Construction -Secondary (By Building System).0956 Land Acquisition Supplemental Version R.xls (C00 ()) 5 PAGE OF

21 BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST Maximum Allowable Construction Cost (MACC) - Secondary 5 GC/CM Risk Contingency - NOT APPLICABLE GC/CM or Design Build Costs - NOT APPLICABLE 6 Construction Contingencies a. Management Reserve 0.00% b. Allowance for Change Orders 0.00% c. SubTotal: Construction Contingencies Sales Tax 8.0% a. SubTotal: Sales Tax.0956 Total: Construction Contracts D. INSERT EQUIPMENT E0 - Equipment E0 - Furnishings F0 - Special Construction <--Double-Click Here to Insert a Row SubTotal: Equipment Sales Tax 8.0% 00 SubTotal: Sales Tax.0956 Total: Equipment E. ARTWORK Project Artwork N/A N/A Higher Education Artwork N/A N/A Total: Artwork.0000 F. OTHER COSTS Mitigation Costs Hazardous Material Remediation\Removal Physical Plant Support Building Permit/Plan Review Total: Other Costs.0876 G. PROJECT MANAGEMENT Agency Project Management % PM Fee $89,000 Total: Project Management $89, $89,000 G R A N D T O T A L $6,00,000 $6,00,000 NOTES Land Acquisition Supplemental Version R.xls (C00 ()) 6 PAGE OF

22 CBS Budget Period: Agency: Version: State of Washington C - CAPITAL PROJECT REQUEST Western Washington University SS Agency Supplemental Submittal 008 9::AM 0/5/007 Page of Project Number: Agency Priority: Project Title: Child Development Center Expansion Description Project Class: Type of Project: OFM Priority: Program City: Bellingham Program (Minor Works) Mobility of People, Goods &Services County: Legislative District: Whatcom 00 Project was requested in a previous biennium: Compliant with Growth Management Act: No Yes Previous Project ID: Project Published Summary: The addition of a classroom lab to Western's Child Development Center will resolve a critical need based on increased Faculty, Staff and Student child care demand as well as better serve student learning. This addition would allow the Center to expand its capacity by 5%, adding the ability to serve an additional to 5 children. Project Description: The WWU Child Development Center (CDC) provides a four-fold benefit for the University. It provides quality early childhood education to children, aids in the successful recruitment and retention of a talented and diverse faculty and staff, supports the success of student parents and provides a program where future Early Childhood Educators can develop effective teaching skills. There are 68 children on the current waiting list indicating an inability to fulfill the needs of this program. The immediate need is to serve more children on behalf of existing and future student, faculty and staff and better serve student learning with an additional classroom lab. There is no State operating impact because maintenance and utility costs are paid by the university auxiliary program, University Residences. Operating Impact No Operating Impact Project Funding Fund Code Fund Title Estimated Total Prior Biennium Expenditures Fiscal Period Current New Biennium Reapprops Approps 057- State Bldg Constr-State 95,000 95,000 95, ,000 Total Funds 7

23 CBS Budget Period: Agency: Version: State of Washington C - CAPITAL PROJECT REQUEST Western Washington University SS Agency Supplemental Submittal 008 9::AM 0/5/007 Page of Project Number: Agency Priority: Project Title: Child Development Center Expansion Fund Code Fund Title 057- State Bldg Constr-State Total Funds Future Fiscal Periods Project Statistics Total Primary Secondary Gross Square Feet Net Square Feet Efficiency Escalated MACC Cost per Sq. Ft.,000, % 50,000 0, % 0.0 % 50 0 Project Schedule Predesign Design Construction Start Date 09/0/008 07/0/009 End Date 05/0/009 /0/009 Cost Summary Total Escalated Cost % of Project Consultant Services, % Pre-Schematic Design Services A/E Basic Design Services 6,000.9% A/E Extra Services/Reimbursables 96,000 0.% Other Services 78,000 8.% Design Services Contingency,000.% Construction 596,000 6.% MACC - Primary 500,000 5.% MACC - Secondary GC/CM Risk Contingency GC/CM or Design Build Contingencies 50,000 5.% Sales Tax 6, % Other 98, % Acquisition Equipment Equipment Tax Artwork,000 0.% Agency Project Administration 57,000 6.% Other 9,000.% TOTAL ESCALATED COST 95,000 8

24 STATE OF WASHINGTON AGENCY/INSTITUTION PROJECT COST ESTIMATE C-00 Version.6. July, 005 FORM AGENCY: PROJECT NAME: PROJECT NUMBER: LOCATION: WWU Child Development Center Expansion Bellingham Washington Analysis Date: 0/5/007 Analysis By: R. Benner Contact Phone #: STATISTICS: Gross Square Feet Net Square Feet Efficiency Estimated Cost per S.F. Building Type: Is project a remodel? A/E Fee Class A/E Fee Percentage: Contingency Rate: Management Reserve: Tax Rate: Art Requirement Applies: Project Admin by GA: Higher Ed. Institution: Alternative Public Works Project: Primary Secondary Project Schedule Start Date End Date,000,00. Predesign (mm-yyyy):. Design (mm-yyyy): Sep-008 May % 0%. Construction (mm-yyyy): Jul-009 Dec Construction Duration (in Months): 6 Day Care Facilities State Construction Inflation Rate:.00% No No Base Month: Mar-006 B 0.66% 0.00% Project Cost Summary Primary MACC (escalated): $500, % Secondary MACC (escalated): 0.00% Current Project Total: $80,5 8.0% Escalated Project Total: $95,000 Yes No Yes Includes Formula Overrides: Yes No A. 5 INSERT BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST ACQUISITION COSTS Purchase/Lease Cost Appraisal and Closing Costs Right-of-Way Costs Offsite Mitigation <--Double-Click Here to Insert a Row Total: Acquisition Costs.0000 B. CONSULTANT SERVICES Pre-Schematic Design Services a. Programming/Site Analysis b. Environmental Analysis c. Predesign Study d. SubTotal: Pre-Schematic Design Services.0769 Construction Documents a. A/E Basic Design Services - Up to Bidding (69%) $,09 $,09 b. A/E Basic Design Services - Secondary (69%) SubTotal: Construction Documents $, $6,000 Extra Services a. Civil Design (Above Basic Services) $0,000 b. Geotechnical Investigation $0,000 c. Commissioning $5,000 d. Site Survey $5,000 e. Testing $0,000 f. Energy Conservation Report g. Voice/Data Consultant h. VE Participation & Implementation i. Constructability Review Participation j. Environmental Mitigation Services (EIS) k. Landscape Consultant $5,000 l. As-Builting $,500 m. Acoustical Consultant n. Alternate Cost Studies $0,000 o. Travel & Per Diem $0,000 p. Renderings, Presentations, & Models q. Document Reproduction $,500 r. Advertising $,000 s. Cost Consultant $0,000 t. Electronics/AV Consultant u. Elevator Consultant v. Hazmat Consultant $5,000 w. Wind Tunnel Consultant x. Lab Consultant y. Interior Design Consultant z. Security Consultant aa. Energy/LCCA Consultant CDC Expansion Supplemental Version.xls (C00 ()) 9 PAGE OF

25 BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST ab. Value Engineering Consultant ac. Constructability Review Consultant SubTotal: Extra Services $88, $96,000 Other Services a. Bid/Construction/Closeout - % of basic services $,867 $,867 b. Bid/Construction/Closeout - Secondary c. HVAC Balancing $5,000 d. Commissioning and Training $5,000 e. On-Site Rep. $5,000 f. SubTotal: Other Services $69,867.9 $78,000 5 Design Services Contingency 0.00% $9,096 $9,096 a. SubTotal: Design Services Contingency $9,096.9 $,000 Total: Consultant Services $0,055 $,000 C. CONSTRUCTION CONTRACTS Site Work a. G0 - Site Preparation b. G0 - Site Improvements c. G0 - Site Mechanical Utilities d. G0 - Site Electrical Utilities e. G60 - Other Site Construction f. SubTotal: Site Work Related Project Costs a. Off site improvements b. City Utilities Relocation c. Parking Mitigation d. Stormwater Retention/Detention e. Wetland Mitigation f. SubTotal: Related Project Costs A Facility Construction - Primary a. A0 - Foundations b. A0 - Basement Construction c. B0 - Superstructure d. B0 - Exterior Closure e. B0 - Roofing f. C0 - Interior Construction g. C0 - Stairs h. C0 - Interior Finishes i. D0 - Conveying j. D0 - Plumbing Systems k. D0 - HVAC Systems l. D0 - Fire Protection Systems m. D50 - Electrical Systems n.. F0 - Special Construction o.. F0 - Selective Demolition p. General Conditions q. Construction w/o equipment $50,000 r. Equipment SubTotal: Facility Construction - Primary $50,000.9 $500,000 Maximum Allowable Construction Cost (MACC) - Primary B Facility Construction -Secondary (By Building System) a. A0 - Foundations b. A0 - Basement Construction c. B0 - Superstructure d. B0 - Exterior Closure e. B0 - Roofing f. C0 - Interior Construction g. C0 - Stairs h. C0 - Interior Finishes i. D0 - Conveying j. D0 - Plumbing Systems k. D0 - HVAC Systems l. D0 - Fire Protection Systems m. D50 - Electrical Systems n.. F0 - Special Construction o.. F0 - Selective Demolition p. General Conditions q. SubTotal: Facility Construction -Secondary (By Building System) $50,000 $500,000.9 CDC Expansion Supplemental Version.xls (C00 ()) 0 PAGE OF

26 BASE MONTH FORMULA STANDARD ESCALATION ESCALATED ITEM AMOUNT OVERRIDE FORMULA FACTOR COST Maximum Allowable Construction Cost (MACC) - Secondary 5 GC/CM Risk Contingency - NOT APPLICABLE GC/CM or Design Build Costs - NOT APPLICABLE 6 Construction Contingencies a. Management Reserve 0.00% b. Allowance for Change Orders 0.00% $5,000 $5,000 c. SubTotal: Construction Contingencies $5,000.9 $50,000 7 Sales Tax 8.0% $,580 $,580 a. SubTotal: Sales Tax $,580.9 $6,000 Total: Construction Contracts $56,580 $596,000 D. INSERT EQUIPMENT E0 - Equipment E0 - Furnishings F0 - Special Construction <--Double-Click Here to Insert a Row SubTotal: Equipment.9 99 Sales Tax 8.0% 00 SubTotal: Sales Tax.9 Total: Equipment E. ARTWORK Project Artwork $,000 $,000 $,50 Higher Education Artwork N/A N/A Total: Artwork $, $,000 F. OTHER COSTS Mitigation Costs Hazardous Material Remediation\Removal Physical Plant Support $5,000 Building Permit/Plan Review $0,000 Total: Other Costs $5, $9,000 G. PROJECT MANAGEMENT Agency Project Management $56,600 $56,600 $56,8 Total: Project Management $56, $57,000 G R A N D T O T A L $80,5 $95,000 NOTES CDC Expansion Supplemental Version.xls (C00 ()) PAGE OF

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

365 - Washington State University Capital Project Request Biennium

365 - Washington State University Capital Project Request Biennium 365 - Washington State University Capital Project Request Version: 1 219-21 WSU Capital Budget Request Report Number: CBS2 Date Run: 8/21/218 11:14AM Project Number: 9137 Project Title: Preventive Facility

More information

The Beverly Middle School Flexible Learning Academy

The Beverly Middle School Flexible Learning Academy Transformative Learning Through Architecture The Beverly Middle School Flexible Learning Academy Flexible Classroom Studios FLEXIBLE ACADEMY Flexible Configurations Flexible Support Exhibits Cross Discipline

More information

July 2011 Review Lander Schematic. Design. Presentation. Pre-design / Design / Construction

July 2011 Review Lander Schematic. Design. Presentation. Pre-design / Design / Construction F 6 Phase, Reduce Project Budget and Reduce Debt Funding Regents Action and Information Timeline November 2009 HFS Master Plan Phase II & III Update Mercer Site 30W Project Concept March 2011 Mercer Presentation

More information

University of Houston Student Leadership Forum Budget and Legislative Processes

University of Houston Student Leadership Forum Budget and Legislative Processes University of Houston Student Leadership Forum Budget and Legislative Processes June 13, 2012 Overview of the Planning and Budget Process 2 Multiple Cycles January 2012 February 2012 March 2012 April 2012

More information

Presentation to the UH Faculty Senate. University of Houston FY 2016 Budget For current information see

Presentation to the UH Faculty Senate. University of Houston FY 2016 Budget For current information see Presentation to the UH Faculty Senate University of Houston FY 2016 Budget For current information see http://www.uh.edu/af/budget/index.htm 1 Contents Background and Process Slides 3-12 Budget Topic:

More information

Oceanside Gateway Business Park O. A.

Oceanside Gateway Business Park O. A. Operating Budget-Final Parcel Parcel Address Parcel / Bldg / Unit Sq. Ft. % of project Total Monthly Assessment Total Quarterly Assessment PSF/Mo. 1 Hamann Co 33,100 6.78% $ 1,735 $ 5,205 $ 0.052 2-1 BP

More information

WHY WE DO WHAT WE DO FOR CAPITAL FUNDING Capital funding drivers and issues for BAR

WHY WE DO WHAT WE DO FOR CAPITAL FUNDING Capital funding drivers and issues for BAR WHY WE DO WHAT WE DO FOR CAPITAL FUNDING Capital funding drivers and issues for BAR Wayne Doty, SBCTC Capital Budget Director October 17, 2018 OUTLINE State capital versus operating funding Overarching

More information

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development Georgia Institute of Technology Advanced Computing Technology Building Draft Program Initial Program Development Issued April 2, 2001 Introduction Scope This document is a summary of the Session for the

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Sciences Building Addition Request for Qualifications February 2018

Sciences Building Addition Request for Qualifications February 2018 Sciences Building Addition Request for Qualifications February 2018 Office of Facilities Development & Capital Budget TABLE OF CONTENTS Page Section 3 0.0 Introduction 4 1.0 Background 6 2.0 Project Description

More information

UNC System Building Reserve Model Instructions

UNC System Building Reserve Model Instructions Instructions Introduction: These are instructions for filling out the two building reserve templates. One template is for new buildings - UNC System Building Reserve Model for New Buildings; and one template

More information

Food Services Advisory Committee. UH Planning and Budgeting

Food Services Advisory Committee. UH Planning and Budgeting Food Services Advisory Committee UH Planning and Budgeting November 12, 2010 Food Services Advisory Committee UH Planning and Budgeting Budgeting Process 2 Overview of the Planning and Budget Process Internal

More information

PROJECT BUDGET PRESENTATION

PROJECT BUDGET PRESENTATION PROJECT BUDGET PRESENTATION Monomoy Regional High School Building Committee Meeting June 19, 2012 Project Features Serves 700 Students Grades 8-12 8 th Grade Wing located near main entrance 168,000 GSF

More information

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp State Academies Projects

More information

CAPITAL PROJECT PROCESS

CAPITAL PROJECT PROCESS CAPITAL PROJECT PROCESS May 2009 GETTING STARTED What is a project? A project is defined as all work (maintenance & repair or renovation) that requires 5,000 or more in time and materials and/or is sufficiently

More information

ORANGE UNIFIED SCHOOL DISTRICT Measure S Bond Program September 2017 Monthly Progress Report

ORANGE UNIFIED SCHOOL DISTRICT Measure S Bond Program September 2017 Monthly Progress Report ORANGE UNIFIED SCHOOL DISTRICT Measure S Bond Program September 2017 Monthly Progress Report PERIOD COVERED: September 1 30, 2017 FISCAL YEAR FY 2017 2018 PROGRESS REPORT NO. PR 03 1718 003 PREPARED BY:

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

VALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR As of March 31, 2016

VALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR As of March 31, 2016 VALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR 2015-16 As of March 31, 2016 Budgeted Annual Collected % Collected Revenue Year To Date Of Annual Enrollment Based 94,185,539 94,205,294 100% State Funding

More information

Capital Budget Request and Capital Plan

Capital Budget Request and Capital Plan 2017-2019 Capital Budget Request and 2017-2027 Capital Plan TABLE OF CONTENTS TAB A 1 UW Capital Budget Introduction 3 Ten Year Capital Plan by Priority CBS001 Report 5 UW 2017-2019 State Capital Budget

More information

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved

More information

REGISTER OF IOWA STATE UNIVERSITY CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS

REGISTER OF IOWA STATE UNIVERSITY CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS OCTOBER 18-19, 2017 REGISTER OF IOWA STATE UNIVERSITY CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS Actions Requested: Consider recommending to the Board approval of the: 1. Following actions for the Knoll

More information

($ in Thousands) Governor s Planning Estimates. Governor s Rec. Agency Request

($ in Thousands) Governor s Planning Estimates. Governor s Rec. Agency Request Project Funding Summary ($ in Thousands) Agency Request Governor s Rec Governor s Planning Estimates Project Title Agency Strategic Funding Priority Score Source 2004 2006 2008 2004 2006 2008 Asset Preservation

More information

University of Colorado Capital Construction Project Status SUMMARY - May 2017 (accounting noted by campus)

University of Colorado Capital Construction Project Status SUMMARY - May 2017 (accounting noted by campus) of Colorado Capital Project Status SUMMARY - May (accounting noted by campus) Legend On-Track Risks Approved - Adjustments Needed Awaiting $ Start-Up Phase In Bidding Phase In Closeout Project Completed

More information

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s MANAGING RISK v. REWARD HOW TO BALANCE CREATIVE DESIGN WITH THE REALITIES OF PROJECT BUDGETS, SCHEDULES & SCOPE 38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s Panel Moderator:

More information

CONTRA COSTA COMMUNITY COLLEGE DISTRICT CAPITAL OUTLAY BOND FUND 2002 ELECTION FINANCIAL REPORT

CONTRA COSTA COMMUNITY COLLEGE DISTRICT CAPITAL OUTLAY BOND FUND 2002 ELECTION FINANCIAL REPORT CONTRA COSTA COMMUNITY COLLEGE DISTRICT CAPITAL OUTLAY BOND FUND 2002 ELECTION FINANCIAL REPORT CONTRA COSTA COMMUNITY COLLEGE DISTRICT CAPITAL OUTLAY BOND FUND 2002 ELECTION TABLE OF CONTENTS FINANCIAL

More information

CAPITAL OVERVIEW AND ALLOCATIONS

CAPITAL OVERVIEW AND ALLOCATIONS CAPITAL OVERVIEW AND ALLOCATIONS for BAR January 25, 2018 Cheryl Bivens (360) 704-4386 cbivens@sbctc.edu OWNED AND LEASED SQUARE FOOTAGE Square Feet 1,143,706 Leased 20,529,467 Owned 21,673,173 Total 2

More information

REPORT OF ACTIONS TAKEN UNDER GENERAL DELEGATED AUTHORITY CAPITAL PROJECT BUDGETS

REPORT OF ACTIONS TAKEN UNDER GENERAL DELEGATED AUTHORITY CAPITAL PROJECT BUDGETS F 4 Actions Taken Under Delegated Authority Pursuant to the Standing Orders of the Board of Regents, Delegation of Authority, and to the delegation of authority from the President of the University to

More information

Comprehensive Facilities Assessment School Committee

Comprehensive Facilities Assessment School Committee C A N T O N P U B L I C S C H O O L S Comprehensive Facilities Assessment 3.23.2017 School Committee A g e n d a Introductions Schedule & Process Overview Progress Update Enrollment Targets Facilities

More information

Midtown Row. Fiscal Impact Study. BSV Colonial Owner, LLC. Ted Figura Consulting. City of Williamsburg, Virginia. Prepared by. For. Bethesda, Maryland

Midtown Row. Fiscal Impact Study. BSV Colonial Owner, LLC. Ted Figura Consulting. City of Williamsburg, Virginia. Prepared by. For. Bethesda, Maryland Midtown Row Fiscal Impact Study City of Williamsburg, Virginia Prepared by Ted Figura Consulting For BSV Colonial Owner, LLC Bethesda, Maryland August 1 2017 Table of Contents Executive Summary. 4 Background......

More information

2020 Capital Budget For Architects & Engineers

2020 Capital Budget For Architects & Engineers 2020 Capital Budget For Architects & Engineers What you need to know about the 2020 Capital Budget Process with Minnesota State MINNESOTA STATE May 2018 Greg Ewig, System Director, Capital Development

More information

Sacramento City College Strategic Planning System

Sacramento City College Strategic Planning System Sacramento City College Strategic Planning System Title: Plan Type: OPR: Collaborative Groups: Resource Management and Capital Outlay Master Plan 2018 Institutional VPA Resource Allocation Groups: Budget

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program May 6, 2016 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

Budget Presentation. Chemeketa Community College April 13, 2016

Budget Presentation. Chemeketa Community College April 13, 2016 2016-2017 Budget Presentation Chemeketa Community College April 13, 2016 Budget Publications 2 Budget Committee Reference Handbook A handbook for Budget Committee members of reference materials that includes:

More information

Budget Presentation. Chemeketa Community College April 12, 2017

Budget Presentation. Chemeketa Community College April 12, 2017 2017-2018 Budget Presentation Chemeketa Community College April 12, 2017 Budget Publications 2 Budget Committee Reference Handbook A handbook for Budget Committee members of reference materials that includes:

More information

14 Capital Improvements

14 Capital Improvements Capital Improvements Supporting Data The purpose of the Capital Improvements element is to evaluate the need for public facilities as identified in other campus master plan elements; to estimate the cost

More information

11 May Report.xls Office of Budget & Fiscal Planning

11 May Report.xls Office of Budget & Fiscal Planning Education and General Fund Actual Revenues and s by Month MTD YTD Change Revenue Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Per 14 Total over FY06 Enrollment Fees $ 8,211 $ 219 $ 41,952 ($ 818) $

More information

CAPITAL FUNDING SUMMARY

CAPITAL FUNDING SUMMARY CAPITAL SUMMARY SCC (School Consolidation Capital ) CAPITAL : B19 -December 1, Specifically to address a school board s excess capacity : B11 -May 26, Opportunity to identify most urgent & pressing accommodations

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Facilities Development and Operations

Facilities Development and Operations Facilities Development and Operations Dashboard/Metrics Report California State University, East Bay July 1, 2016 to June 30, 2017 1 Who We Are: Vice President Administration & Finance Division Associate

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL For Construction Manager as Constructor for Tri-North Middle School Response Due: April 2, 2018, 1:00 pm MCCSC Service Building 560 E. Miller Drive Bloomington, IN 47401. REQUEST FOR

More information

Original Revision Total Project Budget: $52,234,000 $ 8,308,000 $67,358,000 District Funding Commitment: $15,670,000 $51,688,000 $67,358,000

Original Revision Total Project Budget: $52,234,000 $ 8,308,000 $67,358,000 District Funding Commitment: $15,670,000 $51,688,000 $67,358,000 Page 1 of 20 FACILITIES PLAN STATUS REPORT June 27, 2016 CAPITAL IMPROVEMENT PLANNING The decision to design and construct capital improvement projects begins with the Education and Facilities Master Planning

More information

MnSCU Predesign Guidelines and Review Form

MnSCU Predesign Guidelines and Review Form MnSCU Guidelines and Form Last Revision: February, 2006 PREDESIGN INSTITUTION PROJECT REVIEW NAME DEPARTMENT Facilities Programming and Planning RECEIVED 01/01/2006 REVIEWED 01/01/2006 REVIEWER Sally Grans

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

Board of Trustees and Administrative Officers FINANCIAL REPORT. Financial Report 2016

Board of Trustees and Administrative Officers FINANCIAL REPORT. Financial Report 2016 Board of Trustees and Administrative Officers FINANCIAL REPORT 2016 June 30, 2016 and 2015 1 President s Letter of Transmittal FINANCIAL STATEMENTS AND REQUIRED SUPPLEMENTARY INFORMATION President s Letter

More information

Facilities Services: The Next Generation. November 8, 2017

Facilities Services: The Next Generation. November 8, 2017 Facilities Services: The Next Generation November 8, 2017 THANK YOU!!! WE MADE IT HAPPEN! 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Square Footage (millions) Square Footage 16.50 16.00 Dip in 2016

More information

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING Request for Qualifications (RFQ) due: 3:00pm local time, August 17, 2018 Page 1 of 8 Section One Introduction

More information

UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 09/30/2018

UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 09/30/2018 UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 09/30/2018 OVERVIEW Financial highlights of the fiscal year 2018-19 1 st quarter financial report are summarized below: Cash (pages 2-3) The University

More information

BRIDGEWATER STATE UNIVERSITY (an Agency of the Commonwealth of Massachusetts)

BRIDGEWATER STATE UNIVERSITY (an Agency of the Commonwealth of Massachusetts) (an Agency of the Commonwealth of Massachusetts) INDEPENDENT AUDITORS REPORTS AS REQUIRED BY THE UNIFORM GUIDANCE AND GOVERNMENT AUDITING STANDARDS AND RELATED INFORMATION JUNE 30, 2017 (an Agency of the

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 03/31/2013

UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 03/31/2013 UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT OVERVIEW Financial highlights of the Fiscal Year 2012-13 3 rd quarter financial report are summarized below: Cash (pages 2-3) The University s cash position

More information

University of Connecticut Fiscal Year 2015 Budget Highlights

University of Connecticut Fiscal Year 2015 Budget Highlights University of Connecticut Fiscal Year 2015 Budget Highlights The FY15 budget supports the President s four priority areas: student success, strengthening research and economic development, increasing philanthropy

More information

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete.

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete. Page 1 of 14 FACILITIES PLAN STATUS REPORT August 24, 2015 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Project Budget: $52,234,000 $8,308,000 $67,358,000 State Match: $36,564,000 ($36,564,000) - Basic Aid

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

Vacant Properties Initiative Private Entity Application

Vacant Properties Initiative Private Entity Application City of Cleveland Department of Economic Development 601 Lakeside Ave, Room 210 Cleveland, Ohio 44114 Phone: 216.664.2406 Hours of Operation: 8 am to 5 pm Fax: 216.664.3681 Vacant Properties Initiative

More information

Facilities Planning & Construction Report nd Quarter Ending December 31, 2017

Facilities Planning & Construction Report nd Quarter Ending December 31, 2017 Facilities Planning & Construction Report 2017 18 2 nd Quarter Ending December 31, 2017 Overview District SRID Spending (MG100) Summary By College By Site District Measure J Spending (MJ100) Summary By

More information

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 16, 2018

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 16, 2018 SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 16, 2018 1 PROJECTS Dunlap Hall Renovation - Completed Central Plant & Infrastructure - Completed Johnson Student Center & Demolition Science Center

More information

UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 12/31/2010

UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 12/31/2010 UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 12/31/2010 OVERVIEW The following is a summary of the financial highlights contained in the second quarter report for fiscal year 2010-11: Cash and Accounts

More information

EAST TENNESSEE STATE UNIVERSITY BOARD OF TRUSTEES FINANCE AND ADMINISTRATION COMMITTEE MARCH 2018 SPECIAL CALLED MEETING AGENDA

EAST TENNESSEE STATE UNIVERSITY BOARD OF TRUSTEES FINANCE AND ADMINISTRATION COMMITTEE MARCH 2018 SPECIAL CALLED MEETING AGENDA EAST TENNESSEE STATE UNIVERSITY BOARD OF TRUSTEES FINANCE AND ADMINISTRATION COMMITTEE MARCH 2018 SPECIAL CALLED MEETING 3:00-4:00pm EDT Thursday March 29, 2018 President s Conference Room Burgin Dossett

More information

HOLYOKE COMMUNITY COLLEGE (an agency of the Commonwealth of Massachusetts)

HOLYOKE COMMUNITY COLLEGE (an agency of the Commonwealth of Massachusetts) HOLYOKE COMMUNITY COLLEGE INDEPENDENT AUDITORS' REPORTS AS REQUIRED BY THE UNIFORM GUIDANCE AND GOVERNMENT AUDITING STANDARDS AND RELATED INFORMATION JUNE 30, 2016 Independent Auditors' Reports as Required

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017 Summary of Capital Budget Request 2018-2019 of the Tennessee Board of Regents September 21, 2017 1 This is the Summary of the Capital Budget Request for Fiscal Year 2018-2019 for the Finance and Business

More information

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget?

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget? Over the last few weeks the Board of Education has received a number of questions regarding the proposed 2018-19 budget. We hope that the Frequently Asked Questions and our Answers below will help to shed

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Maricopa Financial Plan

Maricopa Financial Plan ChandlerGilbert Estrella Mountain GateWay Glendale Mesa Phoenix Paradise Valley Rio Salado Scottsdale South Mountain Maricopa Financial Plan Fiscal Years 19992013 Table of Contents Introduction and Summary

More information

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Workshop Items Citizens Oversight Committee Measure K Next Steps Projects in Planning Milestones Board s Vision

More information

Developing the Capital Plan is only Half the Battle

Developing the Capital Plan is only Half the Battle Western Connecticut State University Western Oregon University Westfield State University Widener University Williams College Worcester Polytechnic Institute Worcester State University Xavier University

More information

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2010

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2010 (MEASURE B, MARCH 2004) (MEASURE B, MARCH 2004) TABLE OF CONTENTS Page Independent Auditors Report 1 Objectives... 2 Scope of the Audit.. 2 Background Information. 2-3 Procedures Performed... 3-4 Results

More information

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT.

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT. (MEASURE R, NOVEMBER 2001) (MEASURE R, NOVEMBER 2001) CONTENTS Page Independent Auditor s Report... 1 Objectives... 2 Scope of the Audit... 2 Background Information... 3 Procedures Performed... 3 Results

More information

STATE OF ILLINOIS ILLINOIS BOARD OF HIGHER EDUCATION GUIDELINES FOR SUBMISSION OF CAPITAL RESOURCE ALLOCATION AND MANAGEMENT PROGRAM

STATE OF ILLINOIS ILLINOIS BOARD OF HIGHER EDUCATION GUIDELINES FOR SUBMISSION OF CAPITAL RESOURCE ALLOCATION AND MANAGEMENT PROGRAM STATE OF ILLINOIS ILLINOIS BOARD OF HIGHER EDUCATION GUIDELINES FOR SUBMISSION OF CAPITAL RESOURCE ALLOCATION AND MANAGEMENT PROGRAM Public Universities AUGUST 2013 CAPITAL RESOURCE ALLOCATION AND MANAGEMENT

More information

Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019

Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019 Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019 PRESENTED BY Finance and Administration Florida Agricultural and Mechanical University 1 ACTION ITEM IV: Approval of

More information

EASTERN WASHINGTON UNIVERSITY BUDGET PRIMER

EASTERN WASHINGTON UNIVERSITY BUDGET PRIMER EASTERN WASHINGTON UNIVERSITY BUDGET PRIMER STATE BIENNIAL BUDGET CYCLE OFM issues budget instructions EVEN YEARS JUN EWU BIENNIAL BUDGET CYCLE ONGOING Agency Strategic Planning Agencies submit budget

More information

VALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR As of April 30, 2016

VALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR As of April 30, 2016 VALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR 201516 As of April 30, 2016 Budgeted Annual Collected % Collected Revenue Year To Date Of Annual Enrollment Based 94,185,539 96,696,137 103% State Funding

More information

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,

More information

Fiscal Year Budget

Fiscal Year Budget Fiscal Year 2019 Budget Fiscal Year 2019 Project 3 Annual Budget Project 3 Fiscal Year 2019 Table of Contents Table Page Summary 3 Summary of Costs Table 1 4 Summary of Full Time Equivalent Table 2 5 Positions

More information

Total Revenues $363,312 $426,353 $574,863 $690,185 $808,369 $2,863,082. Total Project Costs $0 $0 $0 $0 $0 $0

Total Revenues $363,312 $426,353 $574,863 $690,185 $808,369 $2,863,082. Total Project Costs $0 $0 $0 $0 $0 $0 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

DALLAS COUNTY DISTRICT COURT ADMINISTRATION

DALLAS COUNTY DISTRICT COURT ADMINISTRATION DALLAS COUNTY DISTRICT COURT ADMINISTRATION April 14, 2009 BRIEFING MEMORANDUM TO: FROM: Honorable Commissioners Court Duane Allen Gallup ADR Coordinator SUBJECT: ADR Program & Dispute Mediation Services

More information

John Jay College of Criminal Justice. FY All Funds Financial Plan and 1 st Quarter Report. November 6, 2012

John Jay College of Criminal Justice. FY All Funds Financial Plan and 1 st Quarter Report. November 6, 2012 of Criminal Justice FY 2012-2013 All Funds Financial Plan and 1 st Quarter Report November 6, 2012 Entity Page Research Foundation 1 The Research Foundation of CUNY administers all the grants of the college

More information

Earthquake Safety and Emergency Response Bond Program 2010 & 2014

Earthquake Safety and Emergency Response Bond Program 2010 & 2014 Earthquake Safety and Emergency Response Bond Program 2010 & 2014 Quarterly Status Report Presented to the Citizens General Obligation Bond Oversight Committee as of March 2017 Overview of ESER 2010 Scope

More information

$115,492 $2,963,834 $7,464,804 $7,856,304 $8,404,085 $26,804,519

$115,492 $2,963,834 $7,464,804 $7,856,304 $8,404,085 $26,804,519 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

BUDGET MESSAGE FISCAL YEAR Presented May 13, 2015

BUDGET MESSAGE FISCAL YEAR Presented May 13, 2015 BUDGET MESSAGE FISCAL YEAR 2015-16 Presented May 13, 2015 The fiscal year 2015-16 budget reflects a year-long process of analysis, review, and application of our budget development principles, criteria

More information

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

WESTERN ILLINOIS UNIVERSITY BOARD OF TRUSTEES September 28, 2018

WESTERN ILLINOIS UNIVERSITY BOARD OF TRUSTEES September 28, 2018 WESTERN ILLINOIS UNIVERSITY BOARD OF TRUSTEES September 28, 2018 Resolution No. 18.9/3 FY2019 All-Funds Budget Resolution: WHEREAS must prepare an annual all-funds budget for Appropriated Funds, University

More information

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T Under this measure, the Hueneme Elementary School District ( District ) is submitting a bond measure, described below,

More information

Total Revenues $2,305,895 ($122,050) ($119,269) ($93,522) $334,119 $2,305,173. Total Project Costs $2,305,000 $0 $0 $0 $0 $2,305,000

Total Revenues $2,305,895 ($122,050) ($119,269) ($93,522) $334,119 $2,305,173. Total Project Costs $2,305,000 $0 $0 $0 $0 $2,305,000 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Original Revision Total Project Budget: $52,234,000 $8,308,000 $67,358,000 District Funding Commitment: Anticipated State Match:

Original Revision Total Project Budget: $52,234,000 $8,308,000 $67,358,000 District Funding Commitment: Anticipated State Match: Page 1 of 17 FACILITIES PLAN STATUS REPORT August 21, 2017 CAPITAL IMPROVEMENT PLANNING The decision to design and construct capital improvement projects begins with the Education and Facilities Master

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

UMass Lowell A Strategic Plan for the Next Decade. Committee on Financial Planning & Budget Review Organizational Meeting

UMass Lowell A Strategic Plan for the Next Decade. Committee on Financial Planning & Budget Review Organizational Meeting UMass Lowell 2020 A Strategic Plan for the Next Decade Committee on Financial Planning & Budget Review Organizational Meeting March 6, 2009 Agenda Summary of Committee Charge Budget Planning Context Overview

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

I. ACTION ITEM PRESENTATION

I. ACTION ITEM PRESENTATION M E M O R A N D U M TO: FROM: Members of the Administration and Finance Committee Robert M. Tata, Chair Larry R. Hill, Vice Chair Carlton F. Bennett (ex-officio) Lisa B. Smith (ex-officio) Yvonne T. Allmond

More information

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects

More information

UT Capital Budget Instructions for Fiscal Year

UT Capital Budget Instructions for Fiscal Year UT Capital Budget Instructions for Fiscal Year 217-218 Preparation Instructions Goals for the Instructions: Provide information on the capital budget process. Enable planning for allocation of time and

More information

Operating & Capital Budget Plan May 2017

Operating & Capital Budget Plan May 2017 2017-2018 Operating & Capital Budget Plan May 2017 Operating and Capital Budget Plan FY 2018 Operating Budget - Highlights Table 1: Composite Operating Budget 4 Table 2: Composite Operating Budget - by

More information

Total Revenues $6,275,083 $2,394,299 $2,301,985 $2,481,307 $2,587,681 $16,040,355

Total Revenues $6,275,083 $2,394,299 $2,301,985 $2,481,307 $2,587,681 $16,040,355 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Harleton ISD May 7, 2016 Bond Proposal FAQs

Harleton ISD May 7, 2016 Bond Proposal FAQs Harleton May 7, 2016 Bond Proposal FAQs How was the total projected cost of the project developed? The cost of the project was based upon data concerning average costs of school construction found on the

More information

Human Services and Public Health

Human Services and Public Health Human Services and Public Health The Human Services line of business encompasses the administration of categorical assistance programs to eligible, needy individuals and families. The program also includes

More information