1 MnSCU Guidelines and Form Last Revision: February, 2006 PREDESIGN INSTITUTION PROJECT REVIEW NAME DEPARTMENT Facilities Programming and Planning RECEIVED 01/01/2006 REVIEWED 01/01/2006 REVIEWER Sally Grans (651) CONSULTANT Gillian Machacek (651) CONTACT Submittal Requirements Format Resources / Special Considerations 1. 50% submittal: 1 copy % submittal: 3 copies in binders + 1 pdf. file on CD Clearly label both front and spine of binders with - institution name - submission status (50%, 100%) - consulting company name - date Use a text font no less than10 points Number each page per section Ensure entire document is black/white reproduceable Organize in the following Sections: 1. Cover Letter (2) 2. Summary Statement 3. Project Background Narrative 4. Project Description 5. Sustainability: Energy Standards 6. Information Technology Plan/Budget 6. Financial Information Capital Expenditures 7. Financial Information Operating Expenditures 8. Project Schedule 9. Appendix Resources: Previously submitted s are filed at the Office of the Chancellor, Facilities Office. These are available for your review; contact Facilities Staff Mailor or Nancy to confirm hours of operation. However, it is important to have professional staff guide and suggest similar or other predesign documents that have similarity or validity for your project. Thus, please contact Gillian Machacek (651) or Sally Grans ( ) to schedule a time when one of them may assist your review. MnSCU Facilities website under heading ( - Form (Feb, 2006) - Update to the Guidelines presentation (Jan, 2006) Manual for Capital Budget Projects (Revised July 2002) (provide website here) review sg/gm Page 1

2 MnSCU Guidelines and Form Last Revision: February, Cover Letters Following Facilities approval of the 100% review; cover letters to be submitted for inclusion in the document: Letter #1 Consultant to campus president affirming that the report meets MnSCU criteria, signed by a registered architect/engineer with accompanying registration number. Letter#2 Formal submission letter from the Campus President to Al Johnson, Associate Vice Chancellor of Facilities, MnSCU 2. Summary Statement Provide a concise overview of the project describing: scope of work academic and operational programs affected project size and major components of the work deferred maintenance, renewal issues and FCI addressed in the project scope cost breakdown relating to demolition, new construction and renovation where applicable. project schedule including milestone dates funding sources for the project. include the building Project Data Sheet in the appendix Explain the basic information: who, what, where, how, why and when? : 3. Project Background Narrative Provide the detail relating to the project process and academic and operational programs. Restatement of the statutory requirements that drive the project s operational program. Include any past appropriations. State There are no statutory requirements tied to this project. if not applicable. Statement of the relationship between this project and the updated Facilities Master Plan. Specific academic operational programs being provided for by the project. Note other issues relating to strategic plan: access, enhanced, learning or workforce and economic vitality. List alternative program delivery, site or building options. Course schedule and academic program information related to the project program. Summary of the project planning process, participants and significant outcomes during the process. Facilities systems summary including, - Deferred maintenance backlog - FCI (Facilities Condition Index). FCI=deferred maintenance/replacement value. - Future renewal needs data obtained from the FRRM, Facilities Reinvestment Renewal Model. Space utilization analysis based on current data: include any pertinent sheets. Verify that the data used is from the most recent Office of the Chancellor studies. Note the requirement for consideration of MINNCOR Industry products for the project. This requirement is set forth in the Laws of 2002, Chapter 393, Section 39 which amend Minnesota Statute 16B.335, Subdivision 3c. Place detailed information, including meeting minutes, in appendix. review sg/gm Page 2

3 4. Project Description Provide detailed information relating to the design intent, project program and project process. 1. State the purpose and rationale of the projects. Explain the project relationship to the updated facilities master and academic plans, workforce and economic development, access goals and objectives. Describe academic, operational, workforce or access needs fulfilled by the project. Describe site selection criteria, analyses and evaluation of alternative options. Include site plan of proposed project site and all other graphics that can visually assist in describing the project. 2. Provide complete program detail. Physical condition audit and recommendations. Note: any renovation project must include detailed photos of the interior and exterior spaces. Deferred maintenance backlog and renewal data. Space Utilization Analysis. Obtain (from campus) and utilize the most current ISRS database information in analysis. Current conditions, adjacencies, spatial issues and user needs. Incorporate Room Data Sheets for each space. Contact Facilities Planning and Programming for examples of Room Data Sheets. Specialty Requirements: State design standards, space guidelines and performance characteristics for site and building programs. Bibliography of applicable codes, standards, cited research and publications referenced. 3. Provide process and options information. Detail the project process. Include supporting materials such as meeting minutes, studies, etc. Provide project alternative analyses relating to program delivery, site options, building options, etc. 5.Sustainability/ Energy Standards Address energy conservation and sustainability issues/solutions that may or could be applicable to this project. Factor in additional funding in response to legislation that will outline sustainability guidelines for all state projects. Beta (test) guidelines are available at Note that the B3 Guidelines are applicable to all new buildings and must also be implemented where feasible in renovations. The following list outlines the major sustainability categories: - energy modeling of building design and operations - energy load reduction - increased efficiency, mechanical systems - use of renewable energy sources - improving air quality - building materials; conservation of building material resources - managing water; emissions to air, water - enhancing bio-diversity and ecology - site design and operations - waste reduction and recycling - designing for increased flexibility - improving human design factors review sg/gm Page 3

4 6. Information Technology/Plan Budget 7. Financial Capital Expenditures 8. Financial Operating Expenditures Briefly summarize the institution s Technology plan and current Information Technology infrastructure. Describe the technology applications and associated budget detail included in the scope of this project. Describe the impact and improvements, including cost effectiveness, that the project will have on current and future infrastructure. Detail additional positive outcomes that may be a direct or indirect consequence of technology implementation associated with this project. Example: providing more services electronically increases access (internet courses) which increases student enrollment. A longer term outcome of this may be a potential reduction in space requirements. Estimate the capital expenditures for the project. Include a cost plan using the approved state forms and a schedule displaying all capital funding requirements through the life of the project. Campus and Office of the Chancellor to assist in the various non-construction categories. Provide project gross square footage and separate line items for new construction cost and renovation costs. Document budget and schedule impact for atypical considerations/circumstances that may affect the project. Note: if any variances to the MnSCU Design Guidelines are assumed to be part of this construction budget then approval from Office of Chancellor required. When available, include actual cost histories, adjusted for program variations, that support the proposed budget. Identify project funding sources including state capital bond, revenue bond, etc. Reference other cost estimation examples - i.e. other campuses or other regional facilities whose construction cost impact relate to the project. Identify any alternative delivery methods such as design build, construction management, etc. that impact the schedule or overall budget. Estimate the project effects on operating budgets associated with the design, construction, occupancy and on-going operation of the project area. Quantify the on-going operating expenditures and revenues. Use a state form to describe and schedule operating revenues and expenditures associated with the occupancy and operation of the project area. Include staffing levels and corresponding salaries, building repair, replacement and maintenance. Example 1: impact of additional maintenance engineers required during and/or after new building construction. Example 2: Operating cost for energy (HVAC, electrical and other utilities). $5-$9 is suggested to reflect these associated costs. Campus to address debt capacity and the institution s ability to pay debt. Verify information with Facilities Business Support Unit. review sg/gm Page 4

5 9. Project Schedule Appendix General Graphically convey a realistic schedule for all project stages including site selection and acquisition, required government actions and proceedings at all levels, designer selection, design approvals, construction occupancy and commissioning. Suggest incorporation of a bar chart as this best illustrates the project schedule from schematic design through completion. Include review time after each design phase for the appropriate campus staff, project manager and Office of the Chancellor Program Manager: 2 weeks to 6 weeks depending on size and complexity of project. Approval by the Office of the Chancellor of all projects after Schematic Design phase is required. This is a two step process. Project documents are submitted to the Program Manager and two-three weeks following there is a meeting with the consultant and campus. Issues are discussed and upon agreement there is a formal presentation for actual approval of the Schematic Design to the Associate Vice Chancellor for Facilities and the Vice Chancellor CEO. Schedule to note 16.B335 Legislative approval after Schematic Design which runs concurrent with Design Development - but which must be approved from Legislature prior to starting Contract Documents. Designer Selection Board required on projects over $2 million in cost. Selection of a designer may begin prior to the actual appropriation (although no work can begin until it is approved). All supporting information should be included in appendices that will assist in the development of the project as it proceeds into design, construction and on-going operations: Include all research and reference material meeting minutes, academic master plan reference material, technology master plan reference material, ISRS Space Utilization data, FRRM Data, workforce or demographics data, other studies or related supporting information, project visit notes, websites. Additionally, in the appendix place minutes of meetings as appropriate which document who was involved and how the decision making process was derived. Include any pertinent notes of other informational pursuit, project visits, websites, etc. review sg/gm Page 5

Facility Condition Assessment Report. Coast Community College District

Facility Condition Assessment Report. Coast Community College District Facility Condition Assessment Report Coast Community College District February 28, 2003 Introduction To help document the need for funding the necessary replacement and upgrading of facilities within California

More information

THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL CAPITAL IMPROVEMENT PROJECT PROCESS

THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL CAPITAL IMPROVEMENT PROJECT PROCESS Rev. 08/01/07 THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL CAPITAL IMPROVEMENT PROJECT PROCESS This document describes the project development and approval process for Capital Improvement Projects,

More information

Office for Capital Facilities

Office for Capital Facilities Guidance Document July 2016 Requesting Capital Appropriation A guide for community colleges Contents Attachments 1. Foreword 1. Project Action Form 2. Introduction 3. Qualified Capital Projects 4. Developing

More information

CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN

CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN 4.1 Overview 4.2 Master Plan Summary 4.3 List of Projects in Order of Priority 4.4 Cumulative Capacities and Loads for each Space Type 4.5 The Capacity of Existing

More information

CAPITAL PLANNING, DESIGN AND CONSTRUCTION SECTION I -CAPITAL OUTLAY AND PUBLIC WORKS CONTRACTS SECTIONS TABLE OF CONTENTS

CAPITAL PLANNING, DESIGN AND CONSTRUCTION SECTION I -CAPITAL OUTLAY AND PUBLIC WORKS CONTRACTS SECTIONS TABLE OF CONTENTS TABLE OF CONTENTS SECTION PAGE Capital Outlay and Public Works Contracts 9000 1 Capital Outlay 9001 1 Decentralized Capital Outlay Process 9002 2 Public Works Construction Contracts 9003 4 Public Works-Related

More information

Tracking Expenses in Facilities

Tracking Expenses in Facilities Tracking Expenses in Facilities Requirements for Tracking Expenses when maintaining, building or improving a facility Minnesota State Colleges and Universities The Minnesota State Colleges and Universities

More information

2020 Capital Budget For Architects & Engineers

2020 Capital Budget For Architects & Engineers 2020 Capital Budget For Architects & Engineers What you need to know about the 2020 Capital Budget Process with Minnesota State MINNESOTA STATE May 2018 Greg Ewig, System Director, Capital Development

More information

Facilities Planning (Revised 2016)

Facilities Planning (Revised 2016) Facilities Planning (Revised 2016) Chapter 7830 Draft Revision November 2016 Table of Contents.010 Campus Planning & Project Management.020 Definitions.030 Small/Medium Projects Project Decision Process

More information

MINNESOTA STATE COLLEGES AND UNIVERSITIES. System Office. REQUEST FOR PROPOSAL (RFP) FOR Facilities Capital Planning Software

MINNESOTA STATE COLLEGES AND UNIVERSITIES. System Office. REQUEST FOR PROPOSAL (RFP) FOR Facilities Capital Planning Software MINNESOTA STATE COLLEGES AND UNIVERSITIES System Office REQUEST FOR PROPOSAL (RFP) FOR Facilities Capital Planning Software SPECIAL NOTE: This Request for Proposal (RFP) does not obligate the Minnesota

More information

Stanford Life Cycle Cost Analysis Guide. Introduction & Methodology Interpreting LCCA Results LCCA Timeline Tool Instructions

Stanford Life Cycle Cost Analysis Guide. Introduction & Methodology Interpreting LCCA Results LCCA Timeline Tool Instructions Stanford Life Cycle Cost Analysis Guide Introduction & Methodology Interpreting LCCA Results LCCA Timeline Tool Instructions January 2016 Introduction & Methodology Stanford University has an ongoing commitment

More information

Section 05 PRE-PLANNING AND BUILDING PROGRAMMING TABLE OF CONTENTS

Section 05 PRE-PLANNING AND BUILDING PROGRAMMING TABLE OF CONTENTS Section 05 PRE-PLANNING AND BUILDING PROGRAMMING TABLE OF CONTENTS 05.01 GENERAL... 2 A. AGREEMENT BASIS... 2 B. DESIGN PROFESSIONAL RESPONSIBILITIES... 2 C. OWNER RESPONSIBILITIES... 2 05.02 INTRODUCTION...

More information

California Community Colleges

California Community Colleges California Community Colleges Capital Outlay Planning Background California Community Colleges capital outlay demands far exceed the available state resources to fund them. Currently, there is a backlog

More information

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp State Academies Projects

More information

ANNUAL FINANCIAL REPORT For the Fiscal Year Ended June 30, 2015

ANNUAL FINANCIAL REPORT For the Fiscal Year Ended June 30, 2015 Hutchinson and Willmar, MN ANNUAL FINANCIAL REPORT For the Fiscal Creating Opportunities, Changing Lives. ANNUAL FINANCIAL REPORT For the year ended June 30, 2015 TABLE OF CONTENTS Page College Administration

More information

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

Guidelines for Space Needs Studies

Guidelines for Space Needs Studies Guidelines for Space Needs Studies Approved by the Space Use Advisory Committee 1 ; 3/28/19 INTENT Develop a standard process, including standardized documentation, to assess existing space utilization

More information

{Company.Name} {ToContact.DisplayAddress} {Projects.Name}

{Company.Name} {ToContact.DisplayAddress} {Projects.Name} ARCHITECT/ENGINEER AGREEMENT This Architect/Engineer Agreement ( Agreement or Contract ) is entered into effective as of day of, 2014 ( Effective Date ), by and between the Houston Independent School District,

More information

5 1 7 e a s t m e n o m o n e e s t r e e t M I L W A U K E E w i

5 1 7 e a s t m e n o m o n e e s t r e e t M I L W A U K E E w i MEETING MINUTES Program Verification Mtg #1 Project Name: UW-L Student Center Project Location/Agency: University of Wisconsin La Crosse DSF Project Number: 12H2W A/E Project Number: 13-105 Meeting Date/Time/Room

More information

Policy Number: Policy Name: Capital Development Plan

Policy Number: Policy Name: Capital Development Plan Page 1 7-107 Capital Development Plan A. Applicability: The Capital Development Plan Phase will be used for those projects meeting the requirements as previously defined in this chapter. B. Schedule: 1.

More information

STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM DESIGN/BUILD LUMP SUM (LS) AGREEMENT (STATE FORM SC-8.

STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM DESIGN/BUILD LUMP SUM (LS) AGREEMENT (STATE FORM SC-8. STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM DESIGN/BUILD LUMP SUM (LS) AGREEMENT (STATE FORM SC-8.0) DEPARTMENT ID: CONTRACT ID #: PROJECT #: PROJECT NAME: VENDOR NAME: SC-8.0

More information

RECOMMENDATION. c. Approve a total project cost of $3,300,000

RECOMMENDATION. c. Approve a total project cost of $3,300,000 1. U. T. Arlington - Intramural and Recreation Complex - Phase I: Request for Approval to Amend the FY 2002-2007 Capital Improvement Program and the FY 2002-2003 Capital Budget to Include Project; Authorization

More information

PQS P3 Mixed Use Building Development APPLIED RESEARCH CENTER ADDENDUM #1

PQS P3 Mixed Use Building Development APPLIED RESEARCH CENTER ADDENDUM #1 PQS 18-004 P3 Mixed Use Building Development APPLIED RESEARCH CENTER ADDENDUM #1 ISSUE DATE: THURSDAY, March 29, 2018 Procurement Department W: 863-874-8428 4700 Research Way Lakeland, FL 33805-8531 dobrien@floridapoly.edu

More information

PUBLIC-PRIVATE PARTNERSHIP GUIDELINES

PUBLIC-PRIVATE PARTNERSHIP GUIDELINES PUBLIC-PRIVATE PARTNERSHIP GUIDELINES Table of Contents I. PURPOSE OF GUIDELINES... 3 II. DEFINITIONS... 3 III. USE OF QUALIFIED PROFESSIONALS... 5 IV. PROCUREMENT PROCEDURES... 5 V. PROJECT FEASIBILITY

More information

CHAPTER 3: PROJECT PRIORITIES AND SELECTION

CHAPTER 3: PROJECT PRIORITIES AND SELECTION CHAPTER 3: PROJECT PRIORITIES AND SELECTION 3.1 Overview 3.2 Steps in the Capital Outlay Process 3.3 State Funding Configurations 3.4 Priority Criteria for Capital Outlay 3.5 Types of Projects 3.6 Community

More information

UW-Platteville Pioneer Budget Model

UW-Platteville Pioneer Budget Model UW-Platteville Pioneer Budget Model This document is intended to provide a comprehensive overview of the UW-Platteville s budget model. Specifically, this document will cover the following topics: Model

More information

KimberlyK. Hagara, CPA, CIA, CISA, C _Q'}) _ Associate Vice President, Audit Services U'"'Q

KimberlyK. Hagara, CPA, CIA, CISA, C _Q'}) _ Associate Vice President, Audit Services U''Q . Health MEMORANDUM TO: FROM: DATE: Michael R. Shriner Vice President, Business Operations & Facilities KimberlyK. Hagara, CPA, CIA, CISA, C _Q'}) _ Associate Vice President, U'"'Q September 8, 2015 SUBJECT:

More information

I. PROJECT DESCRIPTION

I. PROJECT DESCRIPTION REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms

More information

Guidelines for Space Needs Studies

Guidelines for Space Needs Studies Guidelines for Space Needs Studies Approved by the Capital Funding & Priorities Committee; 9/26/11 INTENT Develop a standard process, including standardized documentation, to assess existing space utilization

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS 702 KAR 4:160 KENTUCKY DEPARTMENT OF EDUCATION REQUEST FOR PROPOSALS for CONSTRUCTION MANAGEMENT SERVICES School District: Project: Boyle County Boyle County Middle School RFP Date: June 20 30, 2016 CONTENTS

More information

RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-XX-P-15-XXX CASCADE, SNELL, KERR RENOVATION DESIGN

RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-XX-P-15-XXX CASCADE, SNELL, KERR RENOVATION DESIGN RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-XX-P-15-XXX CASCADE, SNELL, KERR RENOVATION DESIGN This Retainer Contract Supplement dated (the Supplement

More information

Fiscal Year (FY13) Operating Budget and Capital Budget Overview

Fiscal Year (FY13) Operating Budget and Capital Budget Overview Approved by President Rush Fiscal Year 2012-2013 (FY13) Operating Budget and Capital Budget Overview Background A university budget represents the complex interchange between revenue streams that support

More information

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES SECTION: Facilities Number: 09.04.01 AREA: Facilities Renewal SUBJECT: Capital Facilities Life Cycle Renewal I. PURPOSE The purpose

More information

Campus Budget Submissions Due: August 19, 2008

Campus Budget Submissions Due: August 19, 2008 System Budget Office 401 Golden Shore, 5 th Floor Long Beach, CA 90802-4210 562-951-4560 Fax 562-951-4971 www.calstate.edu/budget FINAL-Budget Act of 2008 was chaptered on 9/23/08, AB 1781, Chapter 268

More information

Request For Qualifications Center Theatre Redevelopment City of Monroe, NC

Request For Qualifications Center Theatre Redevelopment City of Monroe, NC Request For Qualifications Center Theatre Redevelopment City of Monroe, NC The City of Monroe seeks to hire a Professional/Consultant Design Team for Architectural/Engineering/Design Services (full architectural,

More information

Exhibit M BALTIMORE COUNTY PUBLIC SCHOOLS

Exhibit M BALTIMORE COUNTY PUBLIC SCHOOLS Exhibit M BALTIMORE COUNTY PUBLIC SCHOOLS DATE: May 8, 2007 TO: FROM: SUBJECT: ORIGINATOR: RESOURCE PERSON(S): BOARD OF EDUCATION Dr. Joe A. Hairston, Superintendent FY 2007 EDUCATIONAL FACILITIES MASTER

More information

Integrated Capital Planning Manual

Integrated Capital Planning Manual 0 Integrated Capital Planning Manual August 2017 0 Contents Introduction... 1 Annual Integrated Capital Planning Cycle... 3 Integrated Capital Plan Submission... 8 Business Case Guide and Template... 11

More information

State Capital Outlay Program Overview

State Capital Outlay Program Overview State Capital Outlay Program Overview CCC Chancellor s Office ACBO Institute, February 2017 Fred Harris Carlos Montoya Agenda Chancellor s Office Role CCC Facilities Overview Capital Outlay Planning Capital

More information

Today I will go over space modeling and its uses as well as present the conceptual differences between the space model we currently use and the space

Today I will go over space modeling and its uses as well as present the conceptual differences between the space model we currently use and the space Today I will go over space modeling and its uses as well as present the conceptual differences between the space model we currently use and the space planning guidelines as outlined by the CEFPI organization.

More information

CAPITAL PLANNING, DESIGN AND CONSTRUCTION SECTION IV FISCAL RESOURCES FOR CAMPUS DEVELOPMENT SECTIONS Table of Contents

CAPITAL PLANNING, DESIGN AND CONSTRUCTION SECTION IV FISCAL RESOURCES FOR CAMPUS DEVELOPMENT SECTIONS Table of Contents SECTIONS 9025 9041 Table of Contents SECTION PAGE Fiscal Resources for Campus Development 9025 1 State Capital Outlay Appropriations to CSU 9026 1 Procedures for Securing Funding for Proposed Capital Outlay

More information

UC MERCED CAPITAL PLANNING PROCESS CAPITAL PROJECT DEVELOPMENT Issued: February 2005 TABLE OF CONTENTS. Table of Contents...1

UC MERCED CAPITAL PLANNING PROCESS CAPITAL PROJECT DEVELOPMENT Issued: February 2005 TABLE OF CONTENTS. Table of Contents...1 UC MERCED CAPITAL PLANNING PROCESS CAPITAL PROJECT DEVELOPMENT Issued: February 2005 TABLE OF CONTENTS Table of Contents...1 I. Executive Summary...2 II. III. Overview of the UC Merced Capital Planning

More information

ANNUAL FINANCIAL REPORT For the Fiscal Year Ended June 30, 2011

ANNUAL FINANCIAL REPORT For the Fiscal Year Ended June 30, 2011 Hutchinson and Willmar, MN ANNUAL FINANCIAL REPORT For the Fiscal Creating Opportunities, Changing Lives. ANNUAL FINANCIAL REPORT For the year ended June 30, 2011 TABLE OF CONTENTS Page College Administration

More information

SOUTH SEATTLE COMMUNITY COLLEGE COUNCIL BYLAWS (Approved June 1998) PHILOSOPHY

SOUTH SEATTLE COMMUNITY COLLEGE COUNCIL BYLAWS (Approved June 1998) PHILOSOPHY SOUTH SEATTLE COMMUNITY COLLEGE COUNCIL BYLAWS (Approved June 1998) PHILOSOPHY The participatory governance model for South Seattle Community College is established to provide opportunity and encouragement

More information

Statement of Qualifications and Proposal

Statement of Qualifications and Proposal Statement of Qualifications and Proposal Date: February 24, 2016 Re: Solano Community College District Pavement Assessment Project (Fairfield Campus) 4000 Suisun Valley Road, Fairfield, CA Package includes

More information

System Office Request for Qualifications for Facilities Professional/Technical Consultant Master Contract

System Office Request for Qualifications for Facilities Professional/Technical Consultant Master Contract Minnesota State Colleges and Universities System Office Request for Qualifications for Facilities Professional/Technical Consultant Master Contract Date: 01/23/2019 ADDENDUM #1 1. Refer to the Request

More information

THE RETRIEVER ATHLETICS CENTER (RAC) RENEWAL PROJECT RFP NO: BC C

THE RETRIEVER ATHLETICS CENTER (RAC) RENEWAL PROJECT RFP NO: BC C SOLICITATION FOR ARCHITECTURAL AND ENGINEERING PROFESSIONAL SERVICES FOR THE RETRIEVER ATHLETICS CENTER (RAC) RENEWAL PROJECT ISSUED: 03/22/2018 PROCUREMENT/ISSUING OFFICE UMBC Department of Procurement

More information

REQUEST FOR QUALIFICATIONS For Architectural Services Office Tenant Improvements

REQUEST FOR QUALIFICATIONS For Architectural Services Office Tenant Improvements REQUEST FOR QUALIFICATIONS For Architectural Services Office Tenant Improvements University of California Office of the President (UCOP) requests that interested firms submit written proposals to provide

More information

Definitions. For this Regents Rule, the terms listed below have the following meaning:

Definitions. For this Regents Rule, the terms listed below have the following meaning: The University of North Texas System Rules Chapter 11 Facilities and Regents Real Estate 11.200 Construction Projects 11.201 Definitions. For this Regents Rule, the terms listed below have the following

More information

R E Q U E S T F O R P R O P O S A L O N Q U A L I F I C A T I O N S F O R A C A M P U S W I D E E N E R G Y S E R V I C E S P R O G R A M

R E Q U E S T F O R P R O P O S A L O N Q U A L I F I C A T I O N S F O R A C A M P U S W I D E E N E R G Y S E R V I C E S P R O G R A M U N I V E R S I T Y O F N O R T H A L A B A M A R E Q U E S T F O R P R O P O S A L O N Q U A L I F I C A T I O N S F O R A C A M P U S W I D E E N E R G Y S E R V I C E S P R O G R A M R F P 2 0 1 7-23

More information

GENERAL INSTRUCTIONS COVER SHEET AND CERTIFICATION C-1

GENERAL INSTRUCTIONS COVER SHEET AND CERTIFICATION C-1 INDEX GENERAL INSTRUCTIONS (i) COVER SHEET AND CERTIFICATION C-1 Part I General Information I-1 Part II Direct Costs II-1 Part III Indirect Costs III-1 Part IV Depreciation and Use Allowances IV-1 Part

More information

PENNSYLVANIA 529 GUARANTEED SAVINGS PLAN

PENNSYLVANIA 529 GUARANTEED SAVINGS PLAN PENNSYLVANIA 529 GUARANTEED SAVINGS PLAN Annual Actuarial Report on the Pennsylvania 529 Guaranteed Savings Plan Fund June 30, 2017 Prepared by John T. Condo, FSA, MAAA, Ph.D. Atlanta Birmingham Kansas

More information

2020 Annual Amendment to the Comprehensive Plan and Land Use Regulatory Code. Monday, April 1, 2019, at 5:00 p.m.

2020 Annual Amendment to the Comprehensive Plan and Land Use Regulatory Code. Monday, April 1, 2019, at 5:00 p.m. APPLICATION PACKET 2020 Annual Amendment to the Comprehensive Plan and Land Use Regulatory Code Application Deadline: Monday, April 1, 2019, at 5:00 p.m. Application Fee: $1,400 Submittal Requirements:

More information

SPACE ALLOCATION AND MANAGEMENT PROCEDURE

SPACE ALLOCATION AND MANAGEMENT PROCEDURE Procedure # Related Policy Name & # Approved by: Approval Date: Replaces Procedure Dated: Policy Holder: Admin. Contact(s): Review Date: TBD Space Allocation and Management Policy Rani Dhaliwal TBD n/a

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT BUDGET SERVICES AUDIT PROGRAM

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT BUDGET SERVICES AUDIT PROGRAM GENERAL: Budget preparation and administration are important aspects of overall district operations. The budgeting process allows the district the opportunity allocate resources, to improve it's operations,

More information

Architecture, Engineering and Construction (AEC) User s Guide to Construction Projects

Architecture, Engineering and Construction (AEC) User s Guide to Construction Projects Architecture, Engineering and Construction (AEC) User s Guide to Construction Projects 1 Table of Contents Executive Summary... 4 Capital Project Stakeholders...6 Capital Project Approval... 10 Design

More information

AGREEMENT FOR PROFESSIONAL SERVICES (COMPANY NAME)

AGREEMENT FOR PROFESSIONAL SERVICES (COMPANY NAME) AGREEMENT FOR PROFESSIONAL SERVICES WITH (COMPANY NAME) (DATE) This Agreement authorizes the Professional to provide services as described herein. TABLE OF CONTENTS PART I: PROJECT AGREEMENT FOR PROFESSIONAL

More information

Finance, Capital, and Resources Committee September 13, 2018 Item # EXECUTIVE SUMMARY Page 1 of 7

Finance, Capital, and Resources Committee September 13, 2018 Item # EXECUTIVE SUMMARY Page 1 of 7 EXECUTIVE SUMMARY Page 1 of 7 Item Name: Capital Development Plan (NAU) Action Item Committee Recommendation to Full Board First Read of Proposed Policy Change Information or Discussion Item Issue: Northern

More information

Developer Project Guidelines

Developer Project Guidelines Developer Project Guidelines The Texas A&M University System Office of Facilities Planning and Construction November 04, 2015 Introduction The purpose of these guidelines is to explain the Office of Facilities

More information

PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION

PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION 2013-14 PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION I. Division Purpose Plan, construct and maintain a safe, functional, clean and attractive physical environment for the users of El Camino

More information

Sacramento City College Strategic Planning System

Sacramento City College Strategic Planning System Sacramento City College Strategic Planning System Title: Plan Type: OPR: Collaborative Groups: Resource Management and Capital Outlay Master Plan 2018 Institutional VPA Resource Allocation Groups: Budget

More information

RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-xxx-P-15-xx CAMPUS ROOF REPLACEMENT DESIGN 2016

RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-xxx-P-15-xx CAMPUS ROOF REPLACEMENT DESIGN 2016 RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-xxx-P-15-xx CAMPUS ROOF REPLACEMENT DESIGN 2016 This Retainer Contract Supplement dated (the Supplement

More information

AGENDA COMMITTEE ON FINANCE

AGENDA COMMITTEE ON FINANCE AGENDA COMMITTEE ON FINANCE Meeting: 1:00 p.m., Tuesday, September 11, 2018 Glenn S. Dumke Auditorium John Nilon, Chair Peter J. Taylor, Vice Chair Jane W. Carney Douglas Faigin Emily Hinton Jack McGrory

More information

A "bottom-line" constraint, which in itself becomes a financial performance target

A bottom-line constraint, which in itself becomes a financial performance target IV:09:01 BUDGET I. Definition of Budgeting According to the National Association of College and University Business Officers' Financial Accounting and Reporting Manual, the budget is the financial expression

More information

Erica Bowers, Ed.D. Chair, Planning, Resource, and Budget Committee (PRBC)

Erica Bowers, Ed.D. Chair, Planning, Resource, and Budget Committee (PRBC) MEMORANDUM Date: May 5, 2016 To: From: Mildred García, Ed.D. University President Erica Bowers, Ed.D. Chair, Planning, Resource, and Budget Committee (PRBC) Subject: PRBC Recommendations for FY 2016-17

More information

Grossmont-Cuyamaca Community College District Project Labor Agreement Evaluation Plan

Grossmont-Cuyamaca Community College District Project Labor Agreement Evaluation Plan March 16, 2017 PROCEDURE MANUAL TABLE OF CONTENTS PLA EVALUATION PLAN PROCESS A. OVERVIEW... 2 Projects... 2 Controlling Laws and Regulations... 2 Roles and Responsibilities... 2 B. KEY PERFORMANCE INDICATORS

More information

HOLYOKE COMMUNITY COLLEGE FINANCIAL OUTLOOK FY 2016 FY 2020 DRAFT 11/12/14. Introduction

HOLYOKE COMMUNITY COLLEGE FINANCIAL OUTLOOK FY 2016 FY 2020 DRAFT 11/12/14. Introduction HOLYOKE COMMUNITY COLLEGE FINANCIAL OUTLOOK FY 2016 FY 2020 DRAFT 11/12/14 Introduction Holyoke Community College s traditional mission to provide high quality, affordable educational opportunities to

More information

Roger Williams University. Business Plan for Expansion or Initiation of an Academic or Support Program

Roger Williams University. Business Plan for Expansion or Initiation of an Academic or Support Program Program title: Please check one: [ ] Academic program [ ] Support program Please check one: [ ] Expansion of an existing program [ ] Initiation of a new program Department: Prepared by: Program proposer

More information

CONSULTANT S AGREEMENT

CONSULTANT S AGREEMENT CONSULTANT S AGREEMENT Project No.: This Agreement made as of XXXXX by and between the State University Construction Fund, having its principal office and place of business at The State University Plaza,

More information

CPM Manual Revision NoticeD

CPM Manual Revision NoticeD Effective: 3/1/2007 CPM Manual Revision NoticeD Policy Summary of Change CPM 002 Definitions Revised to delete the definitions for Architectural/Engineering Production Services, FP and SM, and Records

More information

North Orange County Community College District Integrated. Planning Manual March 2014 Update

North Orange County Community College District Integrated. Planning Manual March 2014 Update 2013 Integrated Planning Manual March 2014 Update 2013 Integrated Planning Manual NOCCCD Mission Statement The mission of the is to serve and enrich our diverse communities by providing a comprehensive

More information

Solano Community College District REQUEST FOR QUALIFICATIONS (RFQ #14-008) CIVIL ENGINEERING SERVICES CAPITAL IMPROVEMENT PROGRAM

Solano Community College District REQUEST FOR QUALIFICATIONS (RFQ #14-008) CIVIL ENGINEERING SERVICES CAPITAL IMPROVEMENT PROGRAM REQUEST FOR QUALIFICATIONS (RFQ #14-008) CIVIL ENGINEERING SERVICES CAPITAL IMPROVEMENT PROGRAM In November of 2002 and November 2012 the residents of the Solano Community College District ( District ),

More information

REQUEST FOR PROPOSALS WAYNE STATE UNIVERSITY STUDENT HOUSING DEVELOPMENT PROJECT. Issued: February 1, 2016 Detroit, Michigan

REQUEST FOR PROPOSALS WAYNE STATE UNIVERSITY STUDENT HOUSING DEVELOPMENT PROJECT. Issued: February 1, 2016 Detroit, Michigan REQUEST FOR PROPOSALS WAYNE STATE UNIVERSITY STUDENT HOUSING DEVELOPMENT PROJECT Issued: February 1, 2016 Detroit, Michigan Pre-proposal Meeting: February 9, 2016, 11:00 A.M. EST Submittals Due: March

More information

Effectiveness and Efficiency Accountability Report of the University of Missouri System. Fiscal Year 2011

Effectiveness and Efficiency Accountability Report of the University of Missouri System. Fiscal Year 2011 Effectiveness and Efficiency Accountability Report of the University of Missouri System Fiscal Year 2011 January 25, 2012 Efficiencies and Effectiveness Report Fiscal Year 2011 UM Since 1998, the University

More information

Revenue Fund Annual Financial Report For the years ended June 30, 2016 and 2015

Revenue Fund Annual Financial Report For the years ended June 30, 2016 and 2015 Revenue Fund Annual Financial Report For the years ended June 30, 2016 and 2015 Minnesota State is an affirmative action, equal opportunity employer and educator. REVENUE FUND MINNESOTA STATE COLLEGES

More information

Temporary Use of University Space Policy Number: Office of the Vice-President, Finance and Administration

Temporary Use of University Space Policy Number: Office of the Vice-President, Finance and Administration Name: Temporary Use of University Space Policy Number: 5-1009 Origin: Office of the Vice-President, Finance and Administration Approved: 2018-JUN-01 Issuing Authority: Vice-President, Finance and Administration

More information

INSTITUTIONAL EFFECTIVENESS POLICY AND PROCEDURE

INSTITUTIONAL EFFECTIVENESS POLICY AND PROCEDURE Responsible Official: President Responsible Office: Office of the President Next Review Date: July 2019 Website Address: https://mymoc.moc.edu/services/ir/policies/public%20pol ices/institutionaleffectiveness.pdf

More information

Revenue Fund Annual Financial Report For the years ended June 30, 2017 and 2016

Revenue Fund Annual Financial Report For the years ended June 30, 2017 and 2016 Revenue Fund Annual Financial Report For the years ended June 30, 2017 and 2016 Minnesota State is an affirmative action, equal opportunity employer and educator. REVENUE FUND MINNESOTA STATE COLLEGES

More information

Revenue Fund Annual Financial Report For the years ended June 30, 2018 and 2017

Revenue Fund Annual Financial Report For the years ended June 30, 2018 and 2017 Revenue Fund Annual Financial Report For the years ended June 30, 2018 and 2017 Minnesota State is an affirmative action, equal opportunity employer and educator. REVENUE FUND MINNESOTA STATE COLLEGES

More information

Minnesota State Colleges & Universities

Minnesota State Colleges & Universities This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota State Colleges

More information

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES SECTION: Facilities Number: 09.04.04 AREA: Facilities Management and Maintenance Information SUBJECT: Maintenance Project Evaluation

More information

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT ATTACHMENT A AIA DOCUMENT B141 1987 EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT Winston-Salem/Forsyth County Board of Education June 15-2015 Revised Edition for Project: Architect: Amendments,

More information

CAPITAL IMPROVEMENT BUDGET FY

CAPITAL IMPROVEMENT BUDGET FY CAPITAL IMPROVEMENT BUDGET FY 2008-09 Capital projects such as land acquisitions, new construction, rehabilitation of existing facilities, and repairs and renovations are requested as part of the six-year

More information

FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING

FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Page 1 of 11 FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Project Budget: $52,234,000 $8,308,000 $67,358,000 State Match: $36,564,000 ($36,564,000) - Basic Aid Allocation:

More information

FINANCE AND FACILITIES COMMITTEE JANUARY 18, :30 a.m.

FINANCE AND FACILITIES COMMITTEE JANUARY 18, :30 a.m. FINANCE AND FACILITIES COMMITTEE JANUARY 18, 2011 8:30 a.m. BOARD ROOM WELLS FARGO PLACE 30 7TH STREET EAST SAINT PAUL, MN Please note: Committee/Board meeting times are tentative. Committee/Board meetings

More information

Request for Qualifications Facilities Condition Assessment and Development Consulting Services City of Mobile Mobile, Alabama PL

Request for Qualifications Facilities Condition Assessment and Development Consulting Services City of Mobile Mobile, Alabama PL Request for Qualifications Facilities Condition Assessment and Development Consulting Services City of Mobile Mobile, Alabama PL-220-16 1.0 INTRODUCTION The City of Mobile is inviting qualified consultants

More information

CAPITAL PROJECT MANAGEMENT

CAPITAL PROJECT MANAGEMENT ASSETWORKS, INC. CAPITAL PLANNING & PROJECT MANAGEMENT TRAINING GUIDE STATE CAPITAL PROJECT MANAGEMENT REV MARCH 17 STATE CAPITAL PROJECT STANDARD OPERATING PROCEDURE PROJECT INITIATION... 3 PHASE 1...

More information

Request for Applications

Request for Applications Chancellor s Office, California Community Colleges Division of Workforce and Economic Development Request for Applications RFA Instructions, RFA Specification, and Terms & Conditions Program CTE Data Unlocked

More information

SIRF: Sustainability Initiatives Revolving Fund

SIRF: Sustainability Initiatives Revolving Fund SIRF: Sustainability Initiatives Revolving Fund FY 2012 Annual Report SIRF provides energy savings opportunities, makes good business sense February 1, 2013 We are pleased to present you with Arizona State

More information

CITY OF GRAND RAPIDS

CITY OF GRAND RAPIDS OFFICE OF CITY ENGINEER CITY OF GRAND RAPIDS March 1, 2017 To: Prospective Professional Firms From: Office of the City Engineer City of Grand Rapids, Michigan RE: Request for Statement of Qualifications:

More information

What Is Budgeting? Making Decisions that Distribute Resources to Enable Actions. Dr. Richard L. Brown, Jr. Executive Vice Chancellor

What Is Budgeting? Making Decisions that Distribute Resources to Enable Actions. Dr. Richard L. Brown, Jr. Executive Vice Chancellor What Is Budgeting? Making Decisions that Distribute Resources to Enable Actions Dr. Richard L. Brown, Jr. Executive Vice Chancellor The Budget The budget is the device by which an organization: Carries

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER SERVICES DICKINSON PUBLIC SCHOOL DISTRICT NO. 1 DICKINSON, NORTH DAKOTA

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER SERVICES DICKINSON PUBLIC SCHOOL DISTRICT NO. 1 DICKINSON, NORTH DAKOTA REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER SERVICES NEW MIDDLE SCHOOL 212,000 SQUARE FEET DICKINSON PUBLIC SCHOOL DISTRICT NO. 1 DICKINSON, NORTH DAKOTA November 25, 2014 1. INTRODUCTION: Dickinson

More information

ITEM FOR ACTION AUTHORIZATION TO ESTABLISH INDENTURE FOR GENERAL REVENUE BONDS TO FINANCE AND REFINANCE DEBT FOR UC PROJECTS

ITEM FOR ACTION AUTHORIZATION TO ESTABLISH INDENTURE FOR GENERAL REVENUE BONDS TO FINANCE AND REFINANCE DEBT FOR UC PROJECTS Office of the President July 3, 2003 504 TO MEMBERS OF THE COMMITTEE ON FINANCE: For Meeting of ITEM FOR ACTION AUTHORIZATION TO ESTABLISH INDENTURE FOR GENERAL REVENUE BONDS TO FINANCE AND REFINANCE DEBT

More information

Making the Case for Funding Deferred Maintenance Before it s Too Late

Making the Case for Funding Deferred Maintenance Before it s Too Late Making the Case for Funding Deferred Maintenance Before it s Too Late Jim Kadamus Vice President Sightlines Cuba Plain Assistant Vice President for Budget Planning and Development University of Missouri

More information

University of Virginia Status Report on the Plan to Address Deferred Maintenance

University of Virginia Status Report on the Plan to Address Deferred Maintenance Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 540 buildings and related infrastructure, encompassing

More information

Capital Project Funding Guidelines

Capital Project Funding Guidelines In order to maintain the university s fiscal integrity, the university has developed the following capital project funding guidelines. This document will be reviewed and adjusted annually, with adjustments

More information

Arkansas State University. Tax Exempt Bond Post-Issuance Compliance Manual

Arkansas State University. Tax Exempt Bond Post-Issuance Compliance Manual Arkansas State University Tax Exempt Bond Post-Issuance Compliance Manual Effective Date: January 1, 2012 Arkansas State University System Post-Issuance Compliance Policy Manual Section 1. Introduction

More information

Agenda Item No. 3.2 AGENDA ITEM BRIEFING

Agenda Item No. 3.2 AGENDA ITEM BRIEFING Agenda Item No. 3.2 AGENDA ITEM BRIEFING Submitted by: Billy Hamilton, Executive Vice Chancellor and Chief Financial Officer The Texas A&M University System Subject: Approval of the Revised Project Scope

More information

Health and Human Services. Contract instruction manual. Contract Management Services. 300 South Sixth Street, MC: 165. Minneapolis, Minnesota 55487

Health and Human Services. Contract instruction manual. Contract Management Services. 300 South Sixth Street, MC: 165. Minneapolis, Minnesota 55487 Health and Human Services Contract instruction manual Contract Management Services 300 South Sixth Street, MC: 165 Minneapolis, Minnesota 55487 Contract instruction manual Revised July 2018 Table of contents

More information

University of Colorado Denver

University of Colorado Denver University of Colorado Denver Fiscal Policy Title: Source: Prepared by: Approved by: Budgeting Budget Office Budget Office Associate Vice Chancellor for Budget and Operations Effective Date: July 1, 2010

More information

Faculty Senate Fiscal Committee February 24, 2015

Faculty Senate Fiscal Committee February 24, 2015 Faculty Senate Fiscal Committee February 24, 2015 TOPIC: Overhead Rates for FY 2016 CONTEXT: This is the annual calculation of overhead rates charged by the University to non-general Fund (earnings) units

More information