Stormwater Utilities 101: Getting Started on Financing your Stormwater Management Plan

Size: px
Start display at page:

Download "Stormwater Utilities 101: Getting Started on Financing your Stormwater Management Plan"

Transcription

1 Stormwater Utilities 101: Getting Started on Financing your Stormwater Management Plan Joanne Throwe Environmental Finance Center University of Maryland Martinsburg, WV July 17, 2013

2 The Environmental Finance Center: Who are we? One of 10 University-based centers across the country Provide innovative solutions to managing the costs of environmental protection and improvement by assisting communities: Address internal capacity Develop organizational capacity Assess, recommend, and implement watershed protection financing programs Identify funding and financing opportunities Address the issue of how to pay by working across sectors

3 Elements of a Comprehensive Stormwater Program 1. Administration 2. Billing and Finance 3. Public Education and Involvement 4. Technical Support 5. Engineering and Planning 6. Operation and Maintenance 7. Capital Improvements 8. Regulation and Enforcement

4 Stormwater Today: The Impact on WV Municipalities Many new MS4 Phase II More attention to Phase II communities than ever before Additional responsibility to meet TMDL All this at a time when too few resources and limited capacity available to properly manage stormwater 7/21/13 4

5 You are Not Alone: Stormwater Financing Around the Country Stormwater Utilities 2012 Source: Western Kentucky University Stormwater Utility Survey 2012; report surveys 1,314 stormwater utilities across 39 states and DC

6 Where Does It All Begin? It starts with a comprehensive strategy Estimate annually but plan for the long term Make program transparent and cost effective Get to know your system above and below the ground Engage public early and often

7 No Time like the Present to get Started Know what you are responsible for Get more familiar with your permit Develop a strategy short and long term Better organize your stormwater department Build a communication strategy Write, record, and document EVERYTHING! Create your Stormwater Champion(s) locally 7/21/13 7

8 Minimum Control Measures 1. Public Education and Outreach: Written plan, list of targeted audiences 2. Public Involvement and Participation: Promoting, tracking and soliciting feedback 3. IDD&E: Tracking inspections/complaints 4. Construction Site SW Runoff Control: Track progress 5. Post Construction SW Management: Procedures, written O&M schedule 6. Good Housekeeping/Pollution Prevention: Cleaning schedule, training 8

9 Technical Steps to Take Now Step 1: Conduct assessment of current stormwater program through data gathering Step 2: Evaluate existing program structure; evaluate current capacity; identify trends in funding Step 3: Identify gaps in existing program and evaluate future needs Step 4: Determine where current program fits into LOS; evaluate exact costs Step 5: Develop and finalize proposed stormwater program budget for year 1; project out budget

10 Funding Options for Stormwater Funding Mechanisms What Costs they Cover Funding Source Capital O&M Grants Yes No Loan Programs Yes No Bond Financing Yes Yes General Fund Yes Yes Permit Review Fees No Yes Inspection Fees No Yes Utility Rates Yes Yes

11 Case Study #1: Berlin, MD Relevant Findings Current level of funding dedicated to stormwater management in Berlin is drastically under budgeted compared to the demonstrated need 10-year revenue stream totaling ~$8.3 million, broken down into three categories: personnel costs, capital improvement costs, and operations & maintenance costs

12 Proposed Stormwater Budget, Years 1-10 $3,400,000 $3,200,000 $3,000,000 $2,800,000 $2,600,000 $2,400,000 $2,200,000 $2,000,000 $1,800,000 $1,600,000 $1,400,000 $1,200,000 $1,000,000 $800,000 $600,000 $400,000 $200,000 $- Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Personnel Costs Capital Improvement Costs O&M Costs Total Costs

13 Personnel Costs Year 1 Personnel Costs Description Cost Comments Cleaning (inlets, ditches, drains) staff $90,000 2 $30,000 plus $15,000 fringe benefits Comprehensive trash No staff needed, will utilize volunteers and $0 collection staff electric company Green infrastructure plan staff $0 No staff needed IDD&E staff $0 No staff needed Public outreach & education staff $0 No staff needed, will utilize NGOs and volunteer groups GIS management intern $0 Will utilize current staff and 1 intern Personnel Costs, Years 1-10 Year 1: $90,000 Year 6: $101,827 Year 2: $92,250 Year 7: $104,372 Year 3: $94,556 Year 8: $106,982 Year 4: $96,920 Year 9: $109,656 Year 5: $99,343 Year 10: $112,398

14 Capital Improvement Costs Year 1 Capital Improvement Costs Description Cost Comments Engineering study indicates that Area 2 and 3 should be completed first; will take 12 Area 2 & 3 Upgrades months to design Area 2 and 18 months for $1,414,199 Area 3; both are estimated to take 3 months of construction work; cost includes design and planning and 30% contingency WWTP Truck $30,000 Funds will be set aside each year towards the purchase of a new truck at the end of a 10 year period; calculated at 10% of $300,000 truck purchase price Capital Improvement Costs, Years 1-10 Year 1: $1,444,199 Year 6: $33,942 Year 2: $3,058,857 Year 7: $34,791 Year 3: $714,019 Year 8: $35,661 Year 4: $32,307 Year 9: $36,552 Year 5: $33,114 Year 10: $37,466

15 Identifying Highest Priority Projects Report prepared by town engineer to identify highest priority stormwater management projects Analyzed feedback from public outreach and the US Army Corps of Engineers stormwater improvement study Identified top 6 projects to mitigate flooding and improve water quality and quantity issues

16 Years 1-3 Priority Stormwater Projects Project Year to Start Location Driver Total Cost to Implement Area 2 - Cedar, Pine, Maple, Franklin, Grice, and Nelson 1 District 1 Frequency & water quantity concerns from flooding $1,018,582 Area 3 Williams Street near Electrical Plant Area 5 Henry s Green/ Henry s Mill Area 1 West Street near Abbey Lane 1 District 2 Flooding concerns $395,617 2 District 2 Flooding concerns $1,114,293 2 District 2 Flooding concerns $1,913,814 Area 6 Hudson Branch at Flower Street and Showell Street 3 Districts 3 & 4 Flooding concerns $570,000 Area 16 Decatur Farms Development 3 District 4 Flooding concerns $112,500

17 Operations & Maintenance Costs Year 1 Operations & Maintenance Costs Description Cost Comments Cleaning (inlets, ditches, drains) $5,000 Gas, insurance, routine maintenance of existing WWTP truck Comprehensive trash collection $500 Promotional materials for waste collection events Green infrastructure plan BMP erosion control measures (includes design $100,000 services) IDD&E $3,000 Equipment and analysis expenses General Fund budgets $10,000 for environmental Public outreach & education $10,000 projects. These funds will be put toward outreach and education as needed. Redevelopment projects $45,000 Annual operating expenses Operations & Maintenance Costs, Years 1-10 Year 1: $163,500 Year 6: $184,985 Year 2: $167,588 Year 7: $189,610 Year 3: $171,777 Year 8: $195,350 Year 4: $176,072 Year 9: $199,209 Year 5: $180,473 Year 10: $204,189

18 Utility Billing Recommendation Billing options Advantages Disadvantages 1. Separate line on tax bill 2. Line item on water & sewer bill Less likely to be contested Extra processing - $ goes to County first Easier for Berlin to collect Much more visible to community, greater chance to be contested Recommendation: The town apply the stormwater utility fee billing to the water and sewer bill as a separate line on the bill that would indicate exactly how much is being applied towards stormwater.

19 Recommended Rate Structure for Residential Properties Flat Rate Stormwater Utility Fees Pros ü Requires less internal capacity ü Reduces administrative burden ü Much less risk of billing errors Cons Does not account for variance in property size Recommendation: A flat rate fee structure should be adopted for townhome properties and single family residences (residential properties) since there is not a large enough spread among the sizes of residential units to justify a parcel-specific fee structure.

20 Residential Flat Rate Fee Structure Residential properties yield $70,000 per year Based on fixed yearly rate of $50 for 1,400 properties Monthly rate = $4.17; quarterly rate = $12.50 Residential fee based on the average impervious surface of a single family home = 2,100 square feet (1 ERU)

21 Recommended Rate Structure for Non- Residential Properties ERU-based Stormwater Utility Fees Pros ü Accounts for variance in size and nature of properties ü Fairest method ü Feasible ü Practical ü Appropriate Cons Greatest administrative burden Requires GIS capacity Recommendation: Since the size and nature of units vary widely, an ERU-based fee structure should be adopted for multi-family, commercial, and industrial properties (non-residential properties) which will base the fee on a property s actual impervious surface.

22 Additional Recommendation: Invest in GIS Recommendation: Berlin should invest in GIS software and training prior to issuing its first utility bill. Although the size of many properties may be significant, the total number of properties being assessed would not prove difficult for town staff compared to that of assessing residential properties.

23 Site-specific Examples of Non-Residential Utility Fee Property name Total lot size (acres) Impervious Cover (ft 2 ) Impervious area (as % of total area) Annual stormwater utility fee (impervious cover/2,100ft 2 x $45) Atlantic General Hospital , $9, Stephen Decatur High School , $11, Stephen Decatur Middle School , $4, Buckingham Elementary School , $4, Berlin Intermediate School , $5, Worcester Preparatory School , $6, St. Paul s Episcopal Church , $ St. Paul s Methodist Church , $ Rite Aid , $1, Sav-A Lot Shopping Center , $7,364.74

24 Non-Residential Utility Fee: Atlantic General Hospital 23.9 acres, 40.4% impervious area 421,225 sq. ft. impervious cover Calculate the fee 421,225 sq. ft./2,100 sq. ft. = ERUs ERUs x $45 = $9,026 yearly fee ($2, quarterly fee; $ monthly fee)

25 Non-Residential Utility Fee: St. Paul s Episcopal Church 2.74 acres, 22.2% impervious area 26,571 sq. ft. impervious cover Calculate the fee 26,571 sq. ft./2,100 sq. ft. = ERUs ERUs x $45 = $ yearly fee ($ quarterly fee; $47.45 monthly fee)

26 Case Study #2: Salisbury, Maryland

27 Who is included in the MS4 Permit? Source: A User s Guide to Watershed Planning in Maryland, December 2005, Prepared by Center for Watershed Protection for the Maryland Department of Natural Resources

28 Goal of the Salisbury Stormwater Program Chesapeake Bay communities are facing: More stringent MS4 permits Significant nutrient reduction expectations from TMDL and WIP activities EFC s Goal Enhance Salisbury s existing program, raising the level of service in a way that enables the City to meet permit requirements more thoroughly, address community water quality priorities, and prepare for future nutrient reduction expectations.

29 Salisbury Stormwater Program Funding Needs Relevant Findings Budgeting practices currently significantly underfund the stormwater program in order to meet the City s MS4 Permit 10-year revenue stream totaling ~$23.2 million is needed to fully support required MS4 Permit activities A comprehensive program will include additional costs associated with the City s WIP activities

30 Designing a Level of Service OPERATIONS AND MAINTENANCE Maintain, inspect, and evaluate the effectiveness of BMPs owned or maintained by the City, as well as those which are privately owned. (General Permit) Level of Service Options Program Gap Additional Staff Additional Operating Costs Yearly/One Time Expense Capital Cost Minimal Continue to perform maintenance on BMPs as resources become available. Medium Systematically address backlog of City s BMP s maintenance by adding additional crew. 1 FTE to inspect a minimum of 1/3 of all facilities annually $30,000 - $35,000 salary with and additional $4,500 - $5,250 in benefits; yearly Cell phone, camera, laptop; $40,000 for truck $5,000 annually for vehicle maintenance High Address all backlogs and add new BMPs around city.

31 Proposed Stormwater Budget, Years 1-10 $3,750,000 $3,500,000 $3,250,000 $3,000,000 $2,750,000 $2,500,000 $2,250,000 $2,000,000 $1,750,000 $1,500,000 $1,250,000 $1,000,000 $750,000 $500,000 $250,000 $0 FY 2013 (Year 1) FY 2014 (Year 2) FY 2015 (Year 3) FY 2016 (Year 4) FY 2017 (Year 5) FY 2018 (Year 6) FY 2019 (Year 7) FY 2020 (Year 8) FY 2021 (Year 9) FY 2022 (Year 10) Personnel Costs Capital Improvement Costs Operations & Maintenance Costs Total Costs

32 Residential Flat Rate Fee Structure Not a large spread among sizes of residential units Based on fixed yearly rate for 7,995 properties Residential fee based on the average impervious surface of residential properties Year Flat Rate Fee Yearly Revenue Generated Years 1-4 $40 Years 5-7 $45 Years 8-10 $50 $40 x 7,995 = $319,960 $45 x 7,995 = $359,955 $50 x 7,995 = $399,950

33 Non-Residential ERU-Based Rate Fee Structure Based on ERU-based rate calculated for 2,464 properties Utilize a tiered rate structure in years 1-2 Begin to utilize parcel data beginning in year 3 Year ERU-based Rate Yearly Revenue Generated Years 1-2 $40 $1,742,280 Years 3-4 $40 $1,982,173 Years 5-7 $45 $2,229,945 Years 8-10 $50 $2,477,716

34 Non-Residential Tiered Rate Fee Structure, Years 1-2 Non-residential properties yield $1,742,280 per year Based on lot area and national impervious surface estimates Non-residential Property Tiered Rate Structure, Years 1 & 2 Lot Area (ft 2 ) Annual Fee Lot Area (ft 2 ) Annual Fee <20,000 $200 <280,000 $2,840 <40,000 $400 <300,000 $3,040 <60,000 $600 <320,000 $3,240 <80,000 $800 <340,000 $3,440 <100,00 $1,000 <360,000 $3,680 <120,000 $1,240 <380,000 $3,880 <140,000 $1,440 <400,000 $4,080 <160,000 $1,640 <420,000 $4,280 <180,000 $1,840 <440,000 $4,480 <200,000 $2,040 <460,000 $4,680 <220,000 $2,240 <480,000 $4,880 <240,000 $2,440 <500,000 $5,080 <260,000 $2,640 >500,000 $5,280

35 Proposed Stormwater Budget vs. Total Revenue $3,500,000 begin impervious-based fee ($40/ERU) increase to $45/ERU increase to $50/ERU $3,000,000 $2,500,000 tiered system $2,000,000 $1,500,000 $1,000,000 $500,000 $- FY 2013 (Year 1) FY 2014 (Year 2) FY 2015 (Year 3) FY 2016 (Year 4) FY 2017 (Year 5) FY 2018 (Year 6) FY 2019 (Year 7) FY 2020 (Year 8) FY 2021 (Year 9) FY 2022 (Year 10) Proposed Stormwater Program Budget Total Revenue

36 Getting at True Costs is Important Current Operating Expenditures $376,600 Current Capital Expenditures $186,250 Sub- Total Capital Expen True Costs for what is needed in 1 year is: Current* (2013) $1,638,945 Year 1 (2014) Year 2 (2015) Year 3 (2016) Year 4 (2017) Year 5 (2018) $186,250 $736,250 $302,250 $352,250 $579,750 $202,250 $186,250 $766,250 $317,250 $352,250 $579,750 $202,250 Total Expend $562,850 $1,638,945 $1,211,762 $1,269,125 $1,519,547 $1,165,542 36

37 Document, Track, and Record! 7/21/13 37

38 Have a Staffing Plan 38

39 Output Flows into Budget 39

40 Project Approach: Technical Process Ø Conduct an assessment of current stormwater management program through data gathering Ø Evaluate existing stormwater management program Ø Identify gaps in program and evaluate future needs Ø Develop proposed stormwater program budget Ø Estimate revenue needs for short and long term Ø Recommendations on supporting a sustainable stormwater program find ways to pay for it!

41 Project Approach: Outreach Process One of the most important ways to achieve a high degree of accuracy in our recommendations is to engage local businesses and residents throughout the process Leveraged community partnerships Created an outreach and marketing plan Conducted outreach activities Collect and share information about stormwater with the community as a whole

42 Local Examples of Outreach for Stormwater 42

43 Storm Drain Graffiti

44 Highlighting Stormwater at Local Events

45 Stormwater Education Made Fun

46 Engaging the Public Gives Them a Voice

47 Public Engagement is Essential 7/21/13 47

48 Thank you! Questions and Comments? Joanne Throwe University of Maryland Environmental Finance Center

APWA 2016 PWX 8/18/2016. A How to Guide to Funding Stormwater Projects for Small Cities/Rural Communities PWX Minneapolis August 29, 2016

APWA 2016 PWX 8/18/2016. A How to Guide to Funding Stormwater Projects for Small Cities/Rural Communities PWX Minneapolis August 29, 2016 A How to Guide to Funding Stormwater Projects for Small Cities/Rural Communities. 2016 PWX Minneapolis August 29, 2016 PART 1 WHAT IS A STORM WATER UTILTY? 1 OVERVIEW Stormwater Utility Definition Authority

More information

Stormwater Financing Feasibility Study for. Wrightsville Borough, Pennsylvania

Stormwater Financing Feasibility Study for. Wrightsville Borough, Pennsylvania 2015 Stormwater Financing Feasibility Study for Wrightsville Borough, Pennsylvania Prepared for Wrightsville Borough, Pennsylvania Prepared by University of Maryland Environmental Finance Center for the

More information

2013 Financing Feasibility Study for Stormwater Management in Salisbury, Maryland

2013 Financing Feasibility Study for Stormwater Management in Salisbury, Maryland 2013 Financing Feasibility Study for Stormwater Management in Salisbury, Maryland Prepared for the City of Salisbury, Maryland Prepared by the Environmental Finance Center (EFC) for the Maryland Department

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009 Proposed FY2009 10 Storm Drainage Management Fund Budget Presented to the Dallas City Council August 19, 2009 Purpose Storm Drainage Management (SDM) Fund background Current rate structure Proposed rates

More information

Lancaster Stormwater Financing Workshop: A peer-to-peer approach to advancing your stormwater program

Lancaster Stormwater Financing Workshop: A peer-to-peer approach to advancing your stormwater program Lancaster Stormwater Financing Workshop: A peer-to-peer approach to advancing your stormwater program Manheim Township Public Library February 4 th, 2014 Workshop Agenda 8:40 to 8:55 AM Stormwater 201:

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m.

STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m. County of Asotin Regional Stormwater Program P.O. Box 160 135 2 nd Street Asotin, WA 99402 509-243-2071 Fax 509-243-2003 STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office

More information

STORMWATER UTILITY FEE CREDIT MANUAL

STORMWATER UTILITY FEE CREDIT MANUAL Single-Family Residential Properties STORMWATER UTILITY FEE CREDIT MANUAL Department of Public Works Stormwater Management Program 941 Fir Street Waynesboro, Virginia 22980 (540) 942-6624 waynesboro.va.us/291/stormwateradministration

More information

Stormwater Management Fee Policy Options and Recommendations

Stormwater Management Fee Policy Options and Recommendations Green Infrastructure Advisory Committee Report Stormwater Management Fee Policy Options and Recommendations Prepared for City of Lancaster, PA March 17, 2014 1717 Arch Street Suite 4400 Philadelphia, PA

More information

Stormwater Management Program

Stormwater Management Program Derry Township Municipal Authority Stormwater Management Program Stormwater Stakeholder Advisory Committee Meeting #6 July 27, 2016 Agenda 1. Where did we leave off? 2. What progress have we made? 3. What

More information

STORMWATER DISTRICT UTILITY FEASIBILITY STUDY York County, South Carolina

STORMWATER DISTRICT UTILITY FEASIBILITY STUDY York County, South Carolina STORMWATER DISTRICT UTILITY FEASIBILITY STUDY, South Carolina February 18, 2018 Table of Contents 1 Introduction... 2 2 Program Overview... 3 2.1 Current Program... 5 2.1.1 Regulatory Compliance... 5 2.1.2

More information

Sewer Rate Study July 2016

Sewer Rate Study July 2016 July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1

More information

Bowie MEMORANDUM. lir. Update on Watershed Implementation Plan II Milestones

Bowie MEMORANDUM. lir. Update on Watershed Implementation Plan II Milestones of 1; 7 15901 Excalibur Road eftmar4v Bowie, Maryland 20716 Bowie MEMORANDUM TO: City Council e, `_ ṛ Iv FROM: Alfred D. Lott, City M. -: er lir SUBJECT: Update on 2016-2017 Watershed Implementation Plan

More information

A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative

A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative June 3, 2015 Ellie Baker Horsley Witten Group, Inc. What will we cover today? Introduction

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

NPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form

NPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form NPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form City of Middletown Updated Management Plan - 2011 City of Middletown Updated Management Plan Ohio EPA Facility Permit Number: 1GQ00055*AG

More information

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3

More information

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm

More information

Stormwater Utility Report #2 April 5, 2016

Stormwater Utility Report #2 April 5, 2016 Stormwater Utility Report #2 April 5, 2016 Introduction In 2015, the Village Council identified Consider Changes to the Stormwater Utility as a Top Priority Action Item. While the fundamental policy question

More information

Accounting for Growth Concepts & Priorities for Maryland s Phase III WIP

Accounting for Growth Concepts & Priorities for Maryland s Phase III WIP Accounting for Growth Concepts & Priorities for Maryland s Phase III WIP Policy development Role of AfG Objectives Understanding reallocation Understanding Policy options Next steps Background Bay TMDL:

More information

Water Resources Engineering Division Public Works City of Colorado Springs

Water Resources Engineering Division Public Works City of Colorado Springs Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460

More information

Deerfield Regional Storm Water District. Meeting Milestones/Logistics

Deerfield Regional Storm Water District. Meeting Milestones/Logistics Deerfield Regional Storm Water District SWAC Meeting No. 3 Storm Water Financing and Level of Service Selection September 22, 2005 Meeting Milestones/Logistics July 27, 2005 1 st Meeting Project Introduction

More information

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810 REVENUE AND EXPENDITURE SUMMARY ITEM Revenues, Other Sources, and Fund Balance Sales/Charges for Services $ 2,773,135 $ 3,077,010 $ 3,191,580 $ 3,288,810 Miscellaneous Income 9,538 8,000 8,416 8,000 Investment

More information

Stormwater Management Program

Stormwater Management Program Derry Township Municipal Authority Stormwater Management Program Stormwater Stakeholder Advisory Committee Meeting #3 February 24, 2016 Agenda 1. News & Updates 2. Recap Average/Expanded Level of Service

More information

BEFORE THE RATE COMMISSION OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT THIRD DISCOVERY REQUEST STORMWATER RATE CHANGE PROCEEDING

BEFORE THE RATE COMMISSION OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT THIRD DISCOVERY REQUEST STORMWATER RATE CHANGE PROCEEDING BEFORE THE RATE COMMISSION OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT THIRD DISCOVERY REQUEST ISSUE: WITNESS: SPONSORING PARTY: STORMWATER RATE CHANGE PROCEEDING METROPOLITAN ST. LOUIS SEWER DISTRICT

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY16 Strategic Business and Operating Plan and Preliminary Budget Review April 8, 2015 Finance Committee Meeting FY16 Strategic Business Operating Plan and Preliminary Budget

More information

Audit of Selected Stormwater Activity

Audit of Selected Stormwater Activity Audit of Selected Stormwater Activity Report #1302 December 12, 2012 Copies of this audit report #1302 may be obtained from the City Auditor s web site (http://www.talgov.com/auditing/auditreports.cfm),

More information

Funding Methods and Revenue Generating Capacity

Funding Methods and Revenue Generating Capacity TOWNSHIP OF FERGUSON Funding Methods and Revenue Generating Capacity Executive Summary The purpose of this paper is to examine the funding mechanisms available to the Township to support a stormwater management

More information

MDE FINANCIAL ASSISTANCE FOR SEPTIC TO SEWER CONNECTION CAPITAL PROJECTS

MDE FINANCIAL ASSISTANCE FOR SEPTIC TO SEWER CONNECTION CAPITAL PROJECTS MDE FINANCIAL ASSISTANCE FOR SEPTIC TO SEWER CONNECTION CAPITAL PROJECTS Jag Khuman, Director Maryland Water Quality Financing Administration December 14, 2016 MDE Key Water Quality Financing Programs

More information

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors June 23, 1998 Revised April 5, 2016

More information

City of Duluth Stormwater Utility

City of Duluth Stormwater Utility City of Duluth Stormwater Utility Stormwater Utility User Fee Credit Manual JUNE 13, 2011 TABLE OF CONTENTS SECTION 1 GENERAL INFORMATION... 1 DEFINITIONS... 1 SUMMARY OF STORMWATER USER FEE CREDITS...

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

FY 2019 Approved Budget Approved by the Board of Directors on March 1, 2018

FY 2019 Approved Budget Approved by the Board of Directors on March 1, 2018 FY 2019 Approved Budget Approved by the Board of Directors on March 1, 2018 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Enhanced Clarification Facility Lucy Tunnel Boring Machine First Street Tunnel

More information

Lake County Stormwater Utility Fee

Lake County Stormwater Utility Fee County of Lake Stormwater Management Department 550 Blackbrook Road Painesville, OH 44077 Phone: (440) 350-2770 Fax: (440) 352-8133 www.lakecountyohio.org/smd Lake County Stormwater Utility Fee Credit

More information

Total Budget - All Funds (millions)

Total Budget - All Funds (millions) Total Budget - All Funds (millions) 2006 2007 Increase/ (Decrease) Increase/ (Decrease) Operating $96.9 $100.8 $3.9 4% Capital 9.5 4.7 (4.8) (51%) Debt Service 8.5 8.0 (0.5) (6%) Enterprise Funds 7.5 7.4

More information

Urban Flooding in Illinois The Changing Face of Floods

Urban Flooding in Illinois The Changing Face of Floods Urban Flooding in Illinois The Changing Face of Floods Chicago Albany Park Neighborhood June 2008 National Academies of Science Chicago, IL September 19, 2017 Welcome to Illinois Floods? Really? Illinois

More information

MDE FINANCIAL ASSISTANCE FOR CHASEPEAKE BAY WATERSHED IMPLEMENTATION PLAN CAPITAL PROJECTS

MDE FINANCIAL ASSISTANCE FOR CHASEPEAKE BAY WATERSHED IMPLEMENTATION PLAN CAPITAL PROJECTS MDE FINANCIAL ASSISTANCE FOR CHASEPEAKE BAY WATERSHED IMPLEMENTATION PLAN CAPITAL PROJECTS Jag Khuman, Director Maryland Water Quality Financing Administration MDE Key Water Quality Financing Programs

More information

FY 2016 Proposed Budget Work Session

FY 2016 Proposed Budget Work Session Department of Environmental Services FY 2016 Proposed Budget Work Session Tuesday, March 24, 2:30 5:00 Agenda Tuesday, March 24, 2015 2:30 5:00 PM Related FAAC Report: DES Department / Topic Book pgs Web

More information

CITY OF NORTH RIDGEVILLE STORMWATER UTILITY

CITY OF NORTH RIDGEVILLE STORMWATER UTILITY CITY OF NORTH RIDGEVILLE STORMWATER UTILITY NON-RESIDENTIAL CREDIT MANUAL January 2019 City of North Ridgeville, 7307 Avon Belden Road, North Ridgeville, Ohio 44039 www.nridgeville.org, 440-353-0819 (office),

More information

Stormwater System Development Charges

Stormwater System Development Charges Methodology Report Stormwater System Development Charges Prepared For City of Springfield April 20, 2009 GALARDI CONSULTING, LLC PAGE 1 OF 9 SECTION 1 Introduction Oregon legislation establishes guidelines

More information

STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL

STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL Adopted by the Board of Mayor and Aldermen of the City of Spring Hill on December 21, 2009 TABLE OF CONTENTS STORM WATER UTILITY CREDIT AND ADJUSTMENT

More information

Stormwater Management Utility Fee Reduction Credit Application

Stormwater Management Utility Fee Reduction Credit Application Stormwater Management Utility City of Dubuque, IA Winter 2003 Stormwater Management Utility Stormwater Management Utility Introduction The City of Dubuque established a Stormwater Management Utility on

More information

Issue. Background. Options and Recommendation

Issue. Background. Options and Recommendation Date: March 3, 2016 To: Public Works Commission Members From: Heather Buchanan, Support Systems Sr. Manager Subject: FY2017 O&M Budget Issue Public Works is proposing its FY 2017 operations and maintenance

More information

City of Kinston. Stormwater Utility Credit Manual

City of Kinston. Stormwater Utility Credit Manual City of Kinston Stormwater Utility Credit Manual Effective Date: July 1, 2008 Table of Contents 1.0 INTRODUCTION...3 2.0 DEFINITIONS...4 3.0 GENERAL CREDIT POLICIES...4 4.0 STORMWATER BMP CREDIT POLICY.......................

More information

REQUEST FOR PROPOSALS. Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor

REQUEST FOR PROPOSALS. Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor REQUEST FOR PROPOSALS Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor Southern Tier Central Regional Planning and Development Board (STC) is seeking

More information

Cutting Costs through Regional

Cutting Costs through Regional Cutting Costs through Regional Stormwater Management Presented by: Jim Tomaine, P.E. Executive Director, Wyoming Valley Sanitary Authority Adrienne Vicari, P.E. Financial Services Practice Area Leader

More information

Public Meeting 28 November Presented by: Deepa Srinivasan, Vision Planning and Consulting, LLC Dr. Michael Scott, ESRGC, Salisbury University

Public Meeting 28 November Presented by: Deepa Srinivasan, Vision Planning and Consulting, LLC Dr. Michael Scott, ESRGC, Salisbury University Public Meeting 28 November 2016 Presented by: Deepa Srinivasan, Vision Planning and Consulting, LLC Dr. Michael Scott, ESRGC, Salisbury University To update the all-hazards mitigation plan and flood mitigation

More information

Establishing Scenario Years for Planning Targets and Phase III WIPs

Establishing Scenario Years for Planning Targets and Phase III WIPs Establishing Scenario Years for Planning Targets and Phase III WIPs Presentation for Water Quality GIT September 11, 2017 Matt Johnston University of Maryland - CBPO Summary of WQGIT Decisions October

More information

STORMWATER ANNUAL REPORT MS4s (Municipal Separate Storm Sewer Systems) (Form revised 12/03)

STORMWATER ANNUAL REPORT MS4s (Municipal Separate Storm Sewer Systems) (Form revised 12/03) (Municipal Separate Storm Sewer Systems) (Form revised 12/03) COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT Water Quality Control Division WQCD-P-B2 4300 Cherry Creek Drive South Denver, Colorado 80246-1530

More information

Surface Water Utility Rate Study -Update-

Surface Water Utility Rate Study -Update- Surface Water Utility Rate Study -Update- City Council Study Session July 18, 2017 Steve Leniszewski, PE Public Works Director Cheryl Paston, PE Deputy Public Works Director John Ghilarducci, FCS Group

More information

West Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report

West Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report West Virginia Department of Environmental Protection MS4 Phase II Srm Water Program Srm Water Management Annual Report City of Vienna, West Virginia May 23, 2009 1.0 INTRODUCTION The City of Vienna was

More information

Update on Municipal Asset Management Planning

Update on Municipal Asset Management Planning Update on Municipal Asset Management Planning Municipal Finance Officers Association Conference Ontario Ministry of Infrastructure September 20, 2017 Overview Municipal asset management planning in Ontario

More information

Tookany Creek Watershed Flood Damage Reduction Feasibility Study Data Collection Checklist General Information Requirements

Tookany Creek Watershed Flood Damage Reduction Feasibility Study Data Collection Checklist General Information Requirements Tookany Creek Watershed Flood Damage Reduction Feasibility Study Data Collection Checklist General Information Requirements Date of Flooding Incident Time of Flood Peak (highest water point) Height of

More information

AUDIT OF Department of Public Utilities STORMWATER DIVISION

AUDIT OF Department of Public Utilities STORMWATER DIVISION Report Issue Date: June 9, 2015 Report Number: 2015-10 AUDIT OF Department of Public Utilities STORMWATER DIVISION Richmond City Council Office of the City Auditor Richmond City Hall 900 E. Broad Street,

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday November

More information

Modernization, FEMA is Recognizing the connection between damage reduction and

Modernization, FEMA is Recognizing the connection between damage reduction and EXECUTIVE SUMMARY Every year, devastating floods impact the Nation by taking lives and damaging homes, businesses, public infrastructure, and other property. This damage could be reduced significantly

More information

As outlined in Memo #2, a number of alternatives are being considered for the development of the stormwater credit program and are listed below.

As outlined in Memo #2, a number of alternatives are being considered for the development of the stormwater credit program and are listed below. MEMORANDUM City of Kitchener City Hall, 200 King St. West P.O. Box 1118 Kitchener, ON N2G 4G7 Date: September 20, 2011 To: From: cc: Steering Committee Members Nick Gollan and Nancy Corbett Project Team

More information

Stormwater Utility Fees: Implementation Considerations

Stormwater Utility Fees: Implementation Considerations Stormwater Utility Fees: Implementation Considerations Glenn Barnes Environmental Finance Center 919-962-2789 glennbarnes@sog.unc.edu www.efc.unc.edu www.efc.unc.edu By the end of this session, participants

More information

ORDINANCE # NOW THEREFORE, The City Council of the City of Ferndale do ordain as follows:

ORDINANCE # NOW THEREFORE, The City Council of the City of Ferndale do ordain as follows: ORDINANCE # AN ORDINANCE OF THE CITY OF FERNDALE WASHINGTON, SETTING RATES AND FREQUENCY OF BILLINGS FOR WATER AND SEWER SERVICE AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH. WHEREAS, it is

More information

Progressive Planning for Financially Robust Water Systems

Progressive Planning for Financially Robust Water Systems Canadian Water Network: Blue Cities 2017 Progressive Planning for Financially Robust Water Systems May 17, 2017 CITY OF ATLANTA Kasim Reed, Mayor Kishia L. Powell, Commissioner 5/25/2017 1 Discussion I.

More information

How To Score, Rank & Prioritize. Improving Regional Water Quality Utah Cultural Celebration Center November 21, 2014

How To Score, Rank & Prioritize. Improving Regional Water Quality Utah Cultural Celebration Center November 21, 2014 How To Score, Rank & Prioritize Improving Regional Water Quality Utah Cultural Celebration Center November 21, 2014 Why score & prioritize? You can t implement ALL your ideas! (at least not all at once)

More information

Karen Leatherwood, Chair Brenda Dinne, Staff Liaison/Secretary

Karen Leatherwood, Chair Brenda Dinne, Staff Liaison/Secretary Karen Leatherwood, Chair eac@ccg.carr.org Brenda Dinne, Staff Liaison/Secretary Created under Chapter 31 of the Carroll County Code of Public Local Laws, the Environmental Advisory Council (EAC) is dedicated

More information

Coral Springs Improvement District. Agenda. July 23, 2018

Coral Springs Improvement District. Agenda. July 23, 2018 Coral Springs Improvement District Agenda July 23, 2018 July 16, 2018 Coral Springs Improvement District Board of Supervisors Coral Springs Improvement District Dear Board Members: The public hearing of

More information

City of Manassas, Virginia City Council Meeting AGENDA. City Council Special Meeting

City of Manassas, Virginia City Council Meeting AGENDA. City Council Special Meeting City of Manassas, Virginia City Council Meeting AGENDA City Council Special Meeting Second Floor Conference Room 9027 Center Street Manassas, VA 20110 Monday, May 15, 2017 Call to Order Roll Call 1. Fiscal

More information

PARKS and RECREATION FY2011 Budget Presentation

PARKS and RECREATION FY2011 Budget Presentation PARKS and RECREATION FY2011 Budget Presentation 1 THE BENEFITS ARE ENDLESS! INDIVIDUAL COMMUNITY ENVIRONMENTAL ECONOMIC Current Parks and Recreation Staffing 2 Director 1 FTE 17.12 FTE s Admin Assistant

More information

Green Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM

Green Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM Green Stormwater Infrastructure for Flood Risk Reduction June 2016 Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM Topics 1. Proposed ASFPM Policy Paper 2. Background Why is

More information

Phase II WIP Informational Meetings February 7,

Phase II WIP Informational Meetings February 7, Phase II WIP Informational Meetings February 7, 2012 1 Acknowledgments The Bay Cabinet expresses its appreciation to the Town Creek Foundation for providing funding to the Harry R. Hughes Center for Agro-

More information

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal (CI) Goal Based on the premise that existing taxpayers should not have to bear the financial burden of growth-related infrastructure needs, Ensure the orderly and efficient provision of infrastructure

More information

PUBLIC WORKS 94 COMMUNITY DEVELOPMENT. Mission Statement. Mandates. Expenditure Budget: $85,838, % of Community Development

PUBLIC WORKS 94 COMMUNITY DEVELOPMENT. Mission Statement. Mandates. Expenditure Budget: $85,838, % of Community Development PUBLIC WORKS Mission Statement The Prince William County Department of Public Works does the right thing for the community by creating and sustaining the best environment in which to live, work and play.

More information

FY Budget Update

FY Budget Update FY 2017-18 Budget Update City Council Briefing June 21, 2017 Elizabeth Reich, Chief Financial Officer City of Dallas Jack Ireland, Director Office of Financial Services City of Dallas Presentation Overview

More information

East Hartford. Challenges

East Hartford. Challenges East Hartford The Town of East Hartford is a suburban community of approximately 52,212 located east of the City of Hartford and west of the Town of Manchester. The Town covers slightly more than 18 square

More information

Case Study Rural and Small Town Stormwater Program Development and Funding

Case Study Rural and Small Town Stormwater Program Development and Funding Case Study Rural and Small Town Stormwater Program Development and Funding K e i t h R e a d l i n g, P E R a f t e l i s F i n a n c i a l C o n s u l t a n t s k r e a d l i n g @ r a f t e l i s. c

More information

*** DRAFT - NOT YET FILED ***

*** DRAFT - NOT YET FILED *** 3745-39-03 Ohio EPA NPDES requirements for small MS4s. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules and federal

More information

The series 2008 Water & Sewer Revenue Bonds Feasibility Report recommended the City perform and implement a rate study for the following reasons:

The series 2008 Water & Sewer Revenue Bonds Feasibility Report recommended the City perform and implement a rate study for the following reasons: Additional Background Information Water and Wastewater The City of Fort Lauderdale supplies water and sewer services on a regional basis to over 250,000 residents of central Broward County. The areas serviced

More information

Phase 3 WIP Development Guide

Phase 3 WIP Development Guide Goal Phase 3 WIP Development Guide The development of a final plan that: 1. Is implementable to achieve the Total Maximum Daily Load (TMDL) nutrient and sediment load reduction allocations for Pennsylvania.

More information

FY OPERATING BUDGET AND SIX-YEAR CAPITAL IMPROVEMENT PROGRAM

FY OPERATING BUDGET AND SIX-YEAR CAPITAL IMPROVEMENT PROGRAM FY 2013-14 OPERATING BUDGET AND SIX-YEAR CAPITAL IMPROVEMENT PROGRAM March 26, 2013 2040 VISION AND THE BUDGET Safe Community Family and Youth Quality Education Economic Vitality Cultural and Recreational

More information

DRAFT MS4 Annual Report Cover Page

DRAFT MS4 Annual Report Cover Page 3258632975 MS4 Annual Report Cover Page MCC form for period ending March 9, 2 1 8 This cover page must be completed by the report preparer. Joint reports require only one cover page. Choose one: 2 This

More information

CAPITAL IMPROVEMENTS ELEMENT

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Goal 1.0.0. To annually adopt and utilize a 5-Year Capital Improvements Program and Annual Capital Budget to coordinate the timing and to prioritize the construction and

More information

MUNICIPAL SERVICE REVIEW FINAL

MUNICIPAL SERVICE REVIEW FINAL FIVE CANYONS COUNTY SERVICE AREA MUNICIPAL SERVICE REVIEW FINAL November 29, 2012 Prepared for the Local Agency Formation Commission of Alameda County by Baracco and Associates, Policy Consulting Associates,

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED RECOMM. General Fund: Revenue Administration 494,646 501,667 501,035 508,551 Municipal Trash Collection 101,185 60,358 60,358 60,962 Total Revenues

More information

Simsbury. Challenges Capitol Region Natural Hazards Mitigation Plan Update - Page 356

Simsbury. Challenges Capitol Region Natural Hazards Mitigation Plan Update - Page 356 Simsbury Simsbury is a suburban community of about 23,600 located in the western portion of the Capitol Region. Its land area encompasses 33.9 square miles. Elevation in town generally ranges from about

More information

HANOVER COUNTY LEGISLATIVE AGENDA 2018 General Assembly Session. November 8, 2017

HANOVER COUNTY LEGISLATIVE AGENDA 2018 General Assembly Session. November 8, 2017 HANOVER COUNTY LEGISLATIVE AGENDA 2018 General Assembly Session November 8, 2017 2018 Legislative Agenda Action Items Request that the General Assembly take the actions necessary to restore funding for

More information

City of Galesburg Stormwater Utility Credits and Incentives Policy

City of Galesburg Stormwater Utility Credits and Incentives Policy Stormwater Utility Credits and Incentives Policy December, 2014 Table of Contents 1 Background... 2 2 Applicability of Incentives and Credits... 2 3 Incentives... 3 3.1.1 Rain Barrels... 3 3.1.2 Other

More information

Fiscal Impact Analysis

Fiscal Impact Analysis Fiscal Impact Analysis Waterfront West Newburyport, MA March 22, 2017 Prepared By Fougere Planning & Development, Inc. Prepared For Newburyport Manager, LLC FOUGERE PLANNING & DEVELOPMENT, Inc. Mark J.

More information

2015 ANNUAL BUDGET. DRAFT as of 10/31/2014. Leading the nation with clean water solutions

2015 ANNUAL BUDGET. DRAFT as of 10/31/2014. Leading the nation with clean water solutions 2015 ANNUAL BUDGET DRAFT as of 10/31/2014 Leading the nation with clean water solutions Budget Narrative 1.0 Introduction to the 2015 Budget The Center for Watershed Protection s 2015 Budget is prepared

More information

Flood Risk Reduction Program

Flood Risk Reduction Program Village of Glenview July 2012 Update Flood Risk Reduction Program Executive Summary The Flood Risk Reduction Program is a comprehensive approach to solving the flooding and drainage problems that the Village

More information

PLANNING DEPARTMENT. Town Goals. Goal: Ensure that infrastructure exists for current and future needs identified in the comprehensive plan.

PLANNING DEPARTMENT. Town Goals. Goal: Ensure that infrastructure exists for current and future needs identified in the comprehensive plan. PLANNING DEPARTMENT Additional information about the Planning Department may be obtained by calling Jeff Ulma, Planning Director, at (919) 319-4580, through email at jeff.ulma@townofcary.org or by visiting

More information

Operating Budget Overview 2019

Operating Budget Overview 2019 OPERATING BUDGET Operating Overview 2019 Introduction In planning for a vibrant, healthy and sustainable community, the Town of Halton Hills is committed to providing community leadership on issues of

More information

COUNTY OF GREENVILLE PROPRIETARY FUNDS

COUNTY OF GREENVILLE PROPRIETARY FUNDS Fiscal Years 2012 and 169 COUNTY OF GREENVILLE PROPRIETARY FUNDS Proprietary funds are used to account for activities, which are similar to those found in the private sector. The County s proprietary fund

More information

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction Upper Joachim Creek Public Survey on Potential Flood Risk Reduction This survey is intended to help the interagency planning committee to receive public feedback on specific flood risk reduction techniques,

More information

Attachment A DEPARTMENT OF ENVIRONMENTAL PROTECTION FINAL RECOMMENDATIONS OF THE LONG TERM OPERATION, MAINTENANCE AND REPLACEMENT WORKGROUP

Attachment A DEPARTMENT OF ENVIRONMENTAL PROTECTION FINAL RECOMMENDATIONS OF THE LONG TERM OPERATION, MAINTENANCE AND REPLACEMENT WORKGROUP Attachment A DEPARTMENT OF ENVIRONMENTAL PROTECTION FINAL RECOMMENDATIONS OF THE LONG TERM OPERATION, MAINTENANCE AND REPLACEMENT WORKGROUP November 15, 2001 An increasing number of watershed groups, as

More information

Stormwater Needs Assessment

Stormwater Needs Assessment Stormwater Needs Assessment www.sunrail.com City Council Workshop Presentation Wednesday, April 19, 2017 at 6:00 p.m. PRESENTATION OUTLINE Background Discussion Current Stormwater Assessment Rates Stormwater

More information

Town of Little Elm, Texas

Town of Little Elm, Texas , Texas Storm Water Program Evaluation and Funding Report December 7, 2011 1701 N. Market St. #500 Dallas, Texas 75202 214.217.2200 LTE10296 TABLE OF CONTENTS 1. INTRODUCTION... 1-1 1.1. DESCRIPTION OF

More information

Stormwater Runoff Controls

Stormwater Runoff Controls Project Title Page Chg Agst Closed Stormwater Pro 196 Harmans Road Culvert Rehab 193 New Cut Rd Cul Rep 194 Storm Drainage/SWM Infrastr 195 Stormwater Runoff Controls This page intentionally blank Anne

More information

Sugar Hill Stormwater Utility Credit Technical Manual

Sugar Hill Stormwater Utility Credit Technical Manual CITY OF SUGAR HILL. Sugar Hill Stormwater Utility Credit Technical Manual.......... Amended January 14, 2010 Table of Contents City of Sugar Hill Stormwater Utility Credit Technical Manual DEFINITIONS...

More information

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration 494,751 453,181 494,253 501,667 Municipal Trash Collection 59,158 59,760 59,760 60,358 Total Revenues

More information

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015 Stormwater Utility & Water Utility Charges & Rates October 20, 2015 1 Agenda Fiscal Policies/Goals System Development Charge Stormwater Utility Charges & Rates Water Utility Charges & Rates 2 Fiscal Policies/Goals

More information

1/12/2017. The Road to RAPs. Annette Higby. . Attorney at Law Randolph, VT

1/12/2017. The Road to RAPs. Annette Higby. . Attorney at Law Randolph, VT The Road to RAPs Annette Higby. Attorney at Law Randolph, VT. 1 The Road to RAPs 1972 Federal Clean Water Act Point Sources Permits and technological controls Non point sources left to the states. The

More information