1 CONTEMPORARY TRANSMISSION ISSUES: COST ALLOCATION SESSION 1:00 PM Wisconsin Public Utility Institute May 26, 2010 Panelist: Greg Levesque, Manager - Regional Relations & Policy, ATC, Don Neumeyer, Engineer, Wisconsin Public Service Commission Chris Plante, Wisconsin Public Service

2 AGENDA Context Principles of cost allocation What is the magnitude of this issue Report from the RECB 1 (Reliability Projects) and 2(Economic Projects) Task Forces Current MISO Process that creates a backdrop for proposed process Comparison of proposals

3 CONTEXT All-In financial costs of transmission have, historically, been comparatively small, Vintage costs of long-lived assets legacy assets; existing right-of-way; somewhat overbuilt except for selected paths.

4 CURRENT PLANS Current transmission plans call for a roughly 3- fold increase in expansion, compared to the 1990s: Ongoing needs for reliability, accommodation of expected load growth. Economy (least-cost dispatch accounting for congestion). Expanded needs for transport services (e.g., Midwest wind power).

5 ALL IN COSTS Because of significantly higher all-in costs for transmission in the future, cost allocation is a key issue.

6 PRINCIPLES FOR COST ALLOCATION Efficiency Fairness Pricing Continuity

7 EFFICIENCY Volumetric prices based on marginal costs (LMP) obtain least total costs, in the short-term. Access charges covering all-in financial costs, determined through cost allocation, affect siting locations of participants generators in particular but also industrial loads. Hence, the efficiency properties of cost allocation methods must be taken into account.

8 FAIRNESS That cost allocation method fairly apportions costs among market participants.

9 PRICING CONTINUITY Stability: Market participants need to assurances that cost allocation methods have continuity. Thus, transmission charges do not vary greatly in the future as a result of changes in cost allocation method. Practical i.e., the methodology must be technically and institutionally workable.

10 THE MAGNITUDE OF THE PROBLEM

11

12

13

14 Current MISO Cost Allocation RECB I (Reliability Projects) Qualifying projects are split 80/20 (local/regional) Projects must be $5 million and 345 kv or above ATC has had the most RECB I projects cost shared RECB II (Economic Projects) Qualifying projects are split 80/20 (local/regional) Projects must be $5 million and 100 kv or above Only one project has qualified under this approach due to high cost benefit ratio for qualification All other projects assigned directly to local pricing zone

15 MISO RECB TASK FORCE MISO Regional Expansion Criteria & Benefits Task Force Meetings during last 18 months to address various issues Phase I (Generator Interconnection) Sought to address Otter Tail Power issue (50/50 cost split between generators and host zone) MISO interim solution 345kV and above = 90/10 split Below 345kV = 100% to generators FERC issued interim order on October 23, 2009 Phase II Integrating renewables on a large scale Filing due to FERC by July 15, 2010

16 Current MISO Cost Allocation Proposal RECB I & II would be retained Both would be re-examined after July 15 th New category would be created Multi-Value Projects (MVPs) need to integrate remote and/or low carbon generation Costs socialized across MISO footprint 80 percent to load/20 percent to all generation Generator Interconnection Projects would now use higher of methodology. Imports and exports would also receive charges.

17 PROPOSED COST ALLOCATION METHODOLOGIES WITHIN MIDWEST ISO STAKEHOLDER PROCESS MISO Proposal Very complex Injection/withdrawal Applies to all new transmission Multiple layers (regional/local) Transmission usage study Multiple voltage classes Charges based on access (MW) and energy (MWHr) Charge both load and generation Gen interconnections pay higher of TO Proposal Less complex Applies to Unique Purpose Projects Single layer (regional) No transmission usage study Charges based on access (MW) Charges for UPP 100% to load Gen interconnections pay 80% - load pays 20% Maintain existing allocation for reliability and economic projects but revisit after filing OMS Hybrid Blend of MISO and TO proposals Injection/withdrawal Single layer (regional) Applies to UPP and economic projects Transmission usage study for determination of generator allocation Charges based on access (MW) and energy (MWHr) Charge both load and generation Gen interconnections pay higher of

18 Comparison of Cost Allocation Proposals M ISO Tr ansmission Ow ner s OM S CA RP C ha r ge t o Gener a t o r s 20% of Revenue Requirement for Multi-0% of Revenue Requirement for Value Projects (MVPs) Unique Purpose Projects (UPPs) 20% of Revenue Requirement for Unique Purpose Projects (UPPs) Char ge t o Load 80% of Revenue Requirement for MVPs 100% of Revenue Requirement for UPPs 80% of Revenue Requirement for UPPs Gener ation Inter connection New GIPs charged to generators via "Higher Of" methodology <345 kv = 100% direct assign to generator 345 kv = 80% direct assign to generator and 20% to load New GIPs charged to generators via "Higher Of" methodology Impact on Cur r ent RECB Methodol ogies RECB I & RECB II will remain in place. Commitment to reexamine in 2010 RECB I & RECB II will remain in place. Commitment to reexamine in 2010 RECB I will remain in place

History of Cost Allocation within MISO RECB TF. January 29, 2015

History of Cost Allocation within MISO RECB TF. January 29, 2015 History of Cost Allocation within MISO RECB TF January 29, 2015 Cost Allocation FERC Orders, Filings, and Rulings Cost allocation for MISO began with Order 2003 which instituted a pro forma Generator Interconnection

More information

Injection / Withdrawal CARP

Injection / Withdrawal CARP Injection / Withdrawal CARP Decisions Note: To inform the RECB Stakeholders at their upcoming September 30 th meeting, this version of the Decision Tree contains the decisions made by CARP (in bold/italics)

More information

MISO Planning Process. May 31, 2013

MISO Planning Process. May 31, 2013 MISO Planning Process May 31, 2013 MISO Planning Objectives Fundamental Goal The development of a comprehensive expansion plan that meets reliability needs, policy needs, and economic needs MISO Board

More information

Cost Allocation Principles for Seams Transmission Expansion Projects

Cost Allocation Principles for Seams Transmission Expansion Projects Cost Allocation Principles for Seams Transmission Expansion Projects SPP s seams agreements currently contain requirements for SPP to develop coordinated system plans with its neighbors. The extent and

More information

Cost Allocation Reform Update

Cost Allocation Reform Update Cost Allocation Reform Update Regional Expansion Criteria and Benefits Working Group May 18, 2017 Conditions Precedent for Regional Transmission Investment 1. Increased consensus regarding the issue(s)

More information

Stakeholder Survey I Cross Border Cost Allocation for Economic Transmission Projects For Discussion September 24, 2008

Stakeholder Survey I Cross Border Cost Allocation for Economic Transmission Projects For Discussion September 24, 2008 PJM and the Midwest ISO are seeking input from stakeholders on various concepts that have been discussed during the PJM/Midwest ISO Cross-Border meetings for dealing with transmission projects constructed

More information

Regional Transmission Organization Frequently Asked Questions

Regional Transmission Organization Frequently Asked Questions 1. The CRA analysis showed greater trade benefits to the Entergy region from joining SPP rather than joining MISO. Did Entergy re-do the CRA analysis? No. The CRA analysis was a key component of the Entergy

More information

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing I. Day Ahead and Real Time Energy and Ancillary Services Pricing Prices that Accurately Reflect the Marginal Cost of

More information

MISO Cost Allocation Response. RECBWG February 15, 2018

MISO Cost Allocation Response. RECBWG February 15, 2018 MISO Cost Allocation Response RECBWG February 15, 2018 MISO Cost Allocation Response: February 2018 Context The overall objective of the MISO transmission cost allocation methodology is to align who pays

More information

Renewable Generation, Transmission and the Energy Marketplace

Renewable Generation, Transmission and the Energy Marketplace Renewable Generation, Transmission and the Energy Marketplace Portfolio Development and Business Case October 25, 2012 Overview Multi Value Projects reflect the transformation of the MISO planning process

More information

Filed with the Iowa Utilities Board on May 31, 2017, E STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD

Filed with the Iowa Utilities Board on May 31, 2017, E STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD IN RE: MIDAMERICAN ENERGY IN RE: DOCKET NOS. E-22269, E-22270, AND E-22271 DOCKET NO. E-22279 (consolidated) ITC MIDWEST LLC BRIEF BY THE MIDCONTINENT

More information

ATC Customer Benefit Metric

ATC Customer Benefit Metric ATC Customer Benefit Metric Marty Smith ATC Economic Planning April 5, 2012 Helping to keep the lights on, businesses running and communities strong Background ATC has used the Customer Benefit (CB) Metric

More information

Lower Voltage Interregional Economic Projects. RECBWG April 18, 2018

Lower Voltage Interregional Economic Projects. RECBWG April 18, 2018 Lower Voltage Interregional Economic Projects RECBWG April 18, 2018 Interregional Gaps & Inconsistencies 1. No tariff defined cost allocation for sub 345 kv economic projects with PJM 2. Economic projects

More information

Seams Cost Allocation: A Flexible Framework to Support Interregional Transmission Planning (Summary of Final Report)

Seams Cost Allocation: A Flexible Framework to Support Interregional Transmission Planning (Summary of Final Report) Seams Cost Allocation: A Flexible Framework to Support Interregional Transmission Planning (Summary of Final Report) Presented at: SPP RSC Quarterly Meeting Presented by: Johannes Pfeifenberger Delphine

More information

RATES FOR EXPORT TRANSMISSION SERVICE

RATES FOR EXPORT TRANSMISSION SERVICE Page of RATES FOR EXPORT TRANSMISSION.0 INTRODUCTION The OEB has directed Hydro One Transmission to monitor and report to the Board, at the next rate case, on the functioning of the Export Transmission

More information

COM~lIS$ION. Midwest Independent Transmission System Operator, Inc. and the Midwest ISO Transmission Owners, Docket No.

COM~lIS$ION. Midwest Independent Transmission System Operator, Inc. and the Midwest ISO Transmission Owners, Docket No. MidwestIS"~fll.ie. Energizing the HeartlandSECRETARY GF"lHE COM~lIS$ION ORIGINAL Arthur W. lier, Assistant General Counsel Direct Dial: 317-249-5497 E-mail: ailer@midwestiso.org July 15, 2010 2010JUl 15

More information

PJM/MISO Cost Allocation For Economic Upgrades

PJM/MISO Cost Allocation For Economic Upgrades PJM/MISO Cost Allocation For Economic Upgrades Stakeholder Meeting Hilton Baltimore BWI, Baltimore MD May 19, 2008 1 Topics for Discussion Background FERC Order / Schedule (RTO Staffs) Review Internal

More information

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Transmission System Expansion Cost Allocation Alternatives for Renewable Resources Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Page 1 Why Page 2 Page 1 of 11 Basic Principles Wind generation

More information

2018 Budget. Stakeholder Presentation. October 10, atcllc.com

2018 Budget. Stakeholder Presentation. October 10, atcllc.com 2018 Budget Stakeholder Presentation October 10, 2017 atcllc.com Welcome & Overview Welcome Randy Karls ROE Complaints Brian Drumm Budget Overview Kevin Szalacinski ATC Network MISO Other charges Asset

More information

EIPC Roll-Up Report & Scenarios

EIPC Roll-Up Report & Scenarios EIPC Roll-Up Report & Scenarios Zach Smith Director, Transmission Planning New York Independent System Operator IPTF/EGCWG/ESPWG Meeting January 6, 2014 2013 New York Independent System Operator, Inc.

More information

Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades

Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades Presentation by Michael Proctor Chief Economist, Missouri PSC Harvard Electricity Policy Group Chicago, Illinois October 2, 2008

More information

154 FERC 61,073 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING AND CLARIFICATION AND ACCEPTING COMPLIANCE

154 FERC 61,073 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING AND CLARIFICATION AND ACCEPTING COMPLIANCE 154 FERC 61,073 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, and Colette D. Honorable. Midwest Independent Transmission

More information

Year Assessment Preliminary Study Design

Year Assessment Preliminary Study Design 2015 10-Year Assessment Preliminary Study Design October 15, 2014 Stakeholder and Customer Webcast atcllc.com Purpose Solicit pre-study Comments 2015 Assessment Process 2015 Assessment Assumptions Public

More information

ATTACHMENTS ATTACHMENT GG NETWORK UPGRADE CHARGE

ATTACHMENTS ATTACHMENT GG NETWORK UPGRADE CHARGE ATTACHMENT GG Network Upgrade Charge ATTACHMENTS 32.0.0 ATTACHMENT GG NETWORK UPGRADE CHARGE 1. Network Upgrade Cost Allocation: This Attachment GG sets forth the method for calculating and collecting

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

Implementation of BAL Dede Subakti

Implementation of BAL Dede Subakti Implementation of BAL-002-2 Dede Subakti Agenda Background information Impact assessment Issue statement Implementation options Request for comments Page 2 Background Information NERC BAL-002-2 was approved

More information

ITC Holdings Corp. Fourth Quarter & Year End 2013 Investor Call February 27, 2014

ITC Holdings Corp. Fourth Quarter & Year End 2013 Investor Call February 27, 2014 ITC Holdings Corp. Fourth Quarter & Year End 2013 Investor Call February 27, 2014 Safe Harbor Language & Legal Disclosure This presentation contains certain statements that describe our management s beliefs

More information

MVP Postage Stamp Cost Allocation and Portfolio Requirement Regional Expansion Criteria and Benefits Working Group. September 28, 2017

MVP Postage Stamp Cost Allocation and Portfolio Requirement Regional Expansion Criteria and Benefits Working Group. September 28, 2017 MVP Postage Stamp Cost Allocation and Portfolio Requirement Regional Expansion Criteria and Benefits Working Group September 28, 2017 What is a Multi Value Project? A Multi Value Project is one or more

More information

Northern Tier Transmission Group Cost Allocation Principles Work Group. Straw Proposal. May 29, 2007

Northern Tier Transmission Group Cost Allocation Principles Work Group. Straw Proposal. May 29, 2007 Northern Tier Transmission Group Cost Allocation Principles Work Group Straw Proposal May 29, 2007 NTTG Cost Allocation Principles and Process page 1 INTRODUCTION This paper makes a strawman proposal responsive

More information

Easier Said Than Done: The Continuing Saga of Transmission Cost Allocation

Easier Said Than Done: The Continuing Saga of Transmission Cost Allocation Easier Said Than Done: The Continuing Saga of Transmission Cost Allocation Presented by: Johannes Pfeifenberger Presented to: Harvard Electricity Policy Group February 24, 2011 www.brattle.com Antitrust/Competition

More information

Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14

Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14 Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14 Introduction On April 28, 2003, the Federal Energy Regulatory Commission (FERC or Commission)

More information

Southern California Edison Company s Testimony on Tehachapi Renewable Transmission Project (TRTP)

Southern California Edison Company s Testimony on Tehachapi Renewable Transmission Project (TRTP) Application Nos.: Exhibit No.: Witnesses James A. Cuillier Gary L. Allen (U -E) Southern California Edison Company s Testimony on Tehachapi Renewable Transmission Project (TRTP) Cost Recovery And Renewable

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

We Energies. Request for Proposal Renewable Energy Supply 2014

We Energies. Request for Proposal Renewable Energy Supply 2014 We Energies Request for Proposal Renewable Energy Supply 2014 Page 2 of 12 I. Introduction A. Summary of Request for Proposals Wisconsin Electric Power Company (We Energies) requests proposals (Proposals)

More information

Transmission Investment Trends and Planning Challenges

Transmission Investment Trends and Planning Challenges Transmission Investment Trends and Planning Challenges Presented at: EEI Transmission and Wholesale Markets School Presented by: Johannes Pfeifenberger Madison, WI August 8, 2012 Copyright 2012 The Brattle

More information

Consolidated EIM Initiatives Straw Proposal

Consolidated EIM Initiatives Straw Proposal Consolidated EIM Initiatives Straw Proposal Stakeholder Meeting August 7, 2017 Megan Poage & Don Tretheway Market Design & Policy Agenda Time Topic Presenter 10:00 10:15 Introduction and Purpose Kristina

More information

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist Wholesale Energy Markets Overview Jeff Klarer Market Strategist Wisconsin Electric Utility Fuel Rules (PSC-116) Fuel Cost Components Fuel for generation (coal, natural gas, uranium, etc.) Energy market

More information

Benefits Determination and Cost Allocation

Benefits Determination and Cost Allocation Benefits Determination and Cost Allocation Johannes Pfeifenberger Transmission Executive Forum West 2012 Meeting Public Policy Objectives through Transmission Investment San Diego, CA October 22, 2012

More information

MISO PJM IPSAC. August 26, PJM IPSAC Meeting, August 26,

MISO PJM IPSAC. August 26, PJM IPSAC Meeting, August 26, MISO PJM IPSAC August 26, 2016 1 Agenda 2 Targeted Market Efficiency Project (TMEP) Study TMEP Proposed JOA Language FERC EL13-88 Filings IPSAC Work Schedule 2 3 Targeted Market Efficiency Project Study

More information

ISO Tariff Original Sheet No. 637 ISO TARIFF APPENDIX L. Rate Schedules

ISO Tariff Original Sheet No. 637 ISO TARIFF APPENDIX L. Rate Schedules Original Sheet No. 637 ISO TARIFF APPENDIX L Rate Schedules Original Sheet No. 638 Schedule 1 Grid Management Charge The Grid Management Charge (ISO Tariff Section 8.0) is a formula rate designed to recover

More information

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101 BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 00 North Robert Street St. Paul, MN 1 FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION th Place East, Suite 0 St Paul MN 1-1 IN THE MATTER OF THE APPLICATION

More information

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101 BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 00 North Robert Street St. Paul, MN 1 FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION th Place East, Suite 0 St Paul MN 1-1 IN THE MATTER OF THE APPLICATION

More information

COMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS

COMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS COMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS February 8 th, 2019 NV Energy appreciates the opportunity to comment

More information

SPP PLANNING AND COST ALLOCATION OVERVIEW

SPP PLANNING AND COST ALLOCATION OVERVIEW Benefit/Cost Ratio Primer 101 for the Regional Allocation Review Task Force August 4, 2011 1 SPP PLANNING AND COST ALLOCATION OVERVIEW 2 1 Transmission = 10% Retail Electricity Rates Transmission enables

More information

ARRs and FTRs MISO Training

ARRs and FTRs MISO Training MISO Training Level 200 Auction Revenue Rights and Financial Transmission Rights Last material update: 07/09/2015 Course Content and Disclaimer 2 Course Description 1 2 3 4 This is a Level 200 overview

More information

BAML Investor Meetings February 28 and March 1, 2018

BAML Investor Meetings February 28 and March 1, 2018 Powering Beyond BAML Investor Meetings February 28 and March 1, 2018 Safe Harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations

More information

Powering Beyond. Guggenheim investor meetings June 20 21, 2018

Powering Beyond. Guggenheim investor meetings June 20 21, 2018 Powering Beyond Guggenheim investor meetings June 20 21, 2018 Safe harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations of financial

More information

Local Market Power Mitigation Enhancements. Conference Call March 25, 2011

Local Market Power Mitigation Enhancements. Conference Call March 25, 2011 Local Market Power Mitigation Enhancements Conference Call March 25, 2011 ISO Stakeholder Initiative Process We Are Here Page 2 Agenda for today s meeting Estimated Topic Presenter Time 10:00 10:10 Introduction

More information

SUMMARY OF APPLICATION

SUMMARY OF APPLICATION Filed: September, 00 EB-00-00 Schedule Page of SUMMARY OF APPLICATION Hydro One Networks ( Hydro One or Hydro One Transmission ) is applying for an Order approving the revenue requirement, cost allocation

More information

FERC Order 1000: Planning for the Right of First Refusal and Planning for Public Policy Status & Implementation in New York

FERC Order 1000: Planning for the Right of First Refusal and Planning for Public Policy Status & Implementation in New York 1 FERC Order 1000: Planning for the Right of First Refusal and Planning for Public Policy Status & Implementation in New York Henry Chao Vice President - System and Resource Planning New York Independent

More information

Powering Beyond. Wells Fargo Equity Investor Meetings April 6, 2018

Powering Beyond. Wells Fargo Equity Investor Meetings April 6, 2018 Powering Beyond Wells Fargo Equity Investor Meetings April 6, 2018 Safe Harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations

More information

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Northern Indiana Public Service Company LLC Line Allocated No.

More information

2017 OMS MISO Survey Results June 2017

2017 OMS MISO Survey Results June 2017 2017 OMS MISO Survey Results Furthering our joint commitment to regional resource assessment and transparency in the MISO region, OMS and MISO are pleased to announce the results of the 2017 OMS MISO Survey

More information

Uplift Charges, FTR Underfunding and Overallocation

Uplift Charges, FTR Underfunding and Overallocation Uplift Charges, FTR Underfunding and Overallocation Solutions in PJM Getting to Yes on Uplift Allocation Fixing FTR Funding Abram W. Klein 9 October 2014 Platts Nodal Trader Conference New York City Discussion

More information

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696 Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/14 Utilizing FERC Form 1 Data Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line

More information

Cost Allocation for Transmission Infrastructure

Cost Allocation for Transmission Infrastructure USAID/NARUC East Africa Regional Regulatory Partnership Exchange: Cost Allocation for Transmission Infrastructure Andrew Greene Massachusetts Dept. of Public Utilities Energy Facilities Siting Board Dar

More information

Transmission Cost Allocation

Transmission Cost Allocation Transmission Cost Allocation IPSAC February 2, 2010 John P. Buechler NYISO Executive Regulatory Policy Advisor Background FERC Policy has evolved Order 888 No Planning Requirement for ISOs Order 2000 Planning

More information

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * * S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * * In the matter, on the Commission s own ) Motion Establishing the Method and ) Avoided Cost Calculation for Northern

More information

PROPOSAL FOR COST ESTIMATION REVIEW PROCESS FOR SPP TRANSMISSION

PROPOSAL FOR COST ESTIMATION REVIEW PROCESS FOR SPP TRANSMISSION PROPOSAL FOR COST ESTIMATION REVIEW PROCESS FOR SPP REGIONALLY FUNDED TRANSMISSION Presented on behalf of SPP s Transmission Owners SPP Strategic Planning Committee Meeting December 3, 2010 REGIONALLY

More information

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS TRANSMISSION OWNER ZONAL PLACEMENT PROCESS Published July 2017 CONTENTS Section 1: Introduction, Scope & Steps... 1 Subsection A: Introduction To Zonal Placement... 1 Subsection B: Scope... 1 Subsection

More information

Resource Adequacy in Energy-Only ERCOT

Resource Adequacy in Energy-Only ERCOT Resource Adequacy in Energy-Only ERCOT Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) 619-3532 shams@crescentpower.net June 27, 2007 Background on ERCOT Electric Reliability Council of Texas (ERCOT) is:

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

Two-Tier Real-Time Bid Cost Recovery. Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008

Two-Tier Real-Time Bid Cost Recovery. Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008 Two-Tier Real-Time Bid Cost Recovery Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008 The CAISO has posted an Issue Paper exploring the redesign

More information

Powering Beyond. UBS investor meeting August 24, 2018

Powering Beyond. UBS investor meeting August 24, 2018 Powering Beyond UBS investor meeting August 24, 2018 Safe harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations of financial

More information

TNUoS Tariffs in 10 minutes March 2018

TNUoS Tariffs in 10 minutes March 2018 TNUoS s in 10 minutes March 2018 An overview of TNUoS tariffs This information paper provides an overview of National Grid s Transmission Network Use of System (TNUoS) tariffs, applicable to transmission

More information

PEAK RELIABILITY COORDINATOR FUNDING

PEAK RELIABILITY COORDINATOR FUNDING PEAK RELIABILITY COORDINATOR FUNDING Straw Proposal May 8, 2015 Assessment of 2 Peak Reliability Coordinator Charges Straw Proposal Table of Contents 1 Introduction... 3 2 Background... 3 3 Plan for Stakeholder

More information

FTR Credit Requirements Prevailing Flow Paths Affected by Transmission System Upgrades

FTR Credit Requirements Prevailing Flow Paths Affected by Transmission System Upgrades FTR Credit Requirements Prevailing Flow Paths Affected by Transmission System Upgrades Hal Loomis Manager, Credit Markets & Reliability Committee December 7, 2017 Credit Risk Exposure Issue Description

More information

Powering Beyond. Wells Fargo Fixed Income Investor Meetings April 5, 2018

Powering Beyond. Wells Fargo Fixed Income Investor Meetings April 5, 2018 Powering Beyond Wells Fargo Fixed Income Investor Meetings April 5, 2018 Safe Harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations

More information

MRTU. CRR Settlements. CRR Educational Class #10

MRTU. CRR Settlements. CRR Educational Class #10 MRTU CRR Settlements CRR Educational Class #10 Contents Why is CRR Settlements process important to understand Definition of LMP and CRR Types of CRRs: Obligation vs Option Point to Point and Multi Point

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

PJM & MISO Assumptions and Criteria for Testing of New Resources

PJM & MISO Assumptions and Criteria for Testing of New Resources & Assumptions and Criteria for Testing of New Resources 1 Introduction These slides provide a description and comparison of the assumptions and criteria used by and during the study of customer proposed

More information

Southwest Power Pool, Inc. Policy Recommendation for the SPP Board of Directors and Members Committee. March 6, 2018 Mountain West Transmission Group

Southwest Power Pool, Inc. Policy Recommendation for the SPP Board of Directors and Members Committee. March 6, 2018 Mountain West Transmission Group Southwest Power Pool, Inc. Policy for the SPP Board of Directors and Members Committee Policy Area #1 DC Ties March 6, 2018 Mountain West Transmission Group SPP and MWTG anticipate that incorporating the

More information

Informational Filing of Midwest Independent Transmission System Operator, Inc. s Independent Market Monitor

Informational Filing of Midwest Independent Transmission System Operator, Inc. s Independent Market Monitor Potomac Economics, Ltd. 9990 Fairfax Boulevard, Suite 560 Telephone: 703-383-0720 Fairfax, Virginia 22030 Facsimile: 703-383-0796 Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

Two-Tier Allocation of Bid Cost Recovery

Two-Tier Allocation of Bid Cost Recovery Two-Tier Allocation of Bid Cost Recovery Jordan Curry Market Design & Regulatory Policy Developer December 21, 2015 Agenda Time Topic Presenter 1:00 1:05 Introduction Kim Perez 1:05 2:00 Purpose and Background

More information

Transmission Program Impact on High Voltage TAC Estimating Model Version. Stakeholder Overview November 5, 2018

Transmission Program Impact on High Voltage TAC Estimating Model Version. Stakeholder Overview November 5, 2018 Transmission Program Impact on High Voltage TAC Estimating Model 2017-2018 Version Stakeholder Overview November 5, 2018 Background Forecasting tool developed for the 2012-2013 Transmission Plan in response

More information

2012 Budget. Customer Presentation October 10, Helping to keep the lights on, businesses running and communities strong

2012 Budget. Customer Presentation October 10, Helping to keep the lights on, businesses running and communities strong 2012 Budget Customer Presentation October 10, 2011 Helping to keep the lights on, businesses running and communities strong Welcome & Overview Welcome! Introductions Tom Finco Budget Overview Kevin Szalacinski

More information

ITP Evaluation Process Plan

ITP Evaluation Process Plan ITP Evaluation Process Plan HVDC Conversion Project The goal of the coordinated Interregional Transmission Project (ITP) evaluation process is to achieve consistent planning assumptions and technical data

More information

(Blackline) VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL

(Blackline) VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL VOLUME NO. III Page No. 879 SCHEDULING PROTOCOL Table of Contents SP 1 SP 1.1 OBJECTIVES, DEFINITIONS AND SCOPE Objectives SP 1.2 Definitions SP 1.2.1 Master

More information

Structure of Charges project WPD workshop

Structure of Charges project WPD workshop Structure of Charges project WPD workshop 1 Agenda Background to project Summary of proposed charging methodology Changes since October stakeholder meeting Scaling demand charges to required revenue Alternatives

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwest Power Pool, Inc., ) Complainant, ) ) v. ) Docket No. EL14-21-000 ) Midcontinent Independent System ) Operator, Inc. )

More information

Straw Proposal for Energy Compensation for Curtailed MWh from Sites with Wholesale DER and Load: Integrated Approach

Straw Proposal for Energy Compensation for Curtailed MWh from Sites with Wholesale DER and Load: Integrated Approach Straw Proposal for Energy Compensation for Curtailed MWh from Sites with Wholesale DER and Load: Integrated Approach Andrew Levitt, Senior Market Strategist, Emerging Markets Distributed Energy Resources

More information

MISO SCHEDULE 38 SCHEDULES SCHEDULE 38. MTEP Project Cost Recovery for DEO and DEK

MISO SCHEDULE 38 SCHEDULES SCHEDULE 38. MTEP Project Cost Recovery for DEO and DEK SCHEDULE 38 I. Definitions Any capitalized terms not defined in this Schedule 38 shall have the meaning as defined in Module A of the Tariff. Definitions for this Schedule 38 are as follows: A. ATSI American

More information

PEAK RELIABILITY COORDINATOR FUNDING. Draft Final Proposal. May 28, 2015

PEAK RELIABILITY COORDINATOR FUNDING. Draft Final Proposal. May 28, 2015 PEAK RELIABILITY COORDINATOR FUNDING Draft Final Proposal May 28, 2015 2 Assessment of Peak Reliability Coordinator Charges Draft Final Proposal Table of Contents 1 Introduction... 3 2 Background... 3

More information

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study California ISO Report Regional Surplus Allocation Impact Study October 6, 2010 Regional Surplus Allocation Impact Study Table of Contents Executive Summary... 3 1 Issue and Background... 3 2 Study Framework...

More information

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015 2014 Attachment O True-Up Presentation Presenter: David Grover Manager, Transmission Pricing July 8, 2015 Presentation Purpose Discuss the 2014 Annual True-Up posting Walk through the timeline and mechanics

More information

Kind of Service: Electric Class of Service: All Docket No.: U Order No.: 19 Part III. Rate Schedule No. 35 Effective: 3/31/16

Kind of Service: Electric Class of Service: All Docket No.: U Order No.: 19 Part III. Rate Schedule No. 35 Effective: 3/31/16 7 th Revised Sheet No. 35.1 Schedule Sheet 1 of 5 Replacing: 6 th Revised Sheet No. 35.1 35.0. LARGE COGENERATION RIDER 35.1. AVAILABILITY To any customer who takes service under the provisions of any

More information

MISO SCHEDULE 39 Multi-Value Project Financial Obligations and Cost Recovery SCHEDULES SCHEDULE 39

MISO SCHEDULE 39 Multi-Value Project Financial Obligations and Cost Recovery SCHEDULES SCHEDULE 39 SCHEDULE 39 MULTI-VALUE PROJECT FINANCIAL OBLIGATIONS AND COST RECOVERY FOR WITHDRAWING TRANSMISSION OWNERS I. Definitions Any capitalized terms not defined in this Schedule 39 shall have the meaning as

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

COMMENTS OF TROUTMAN SANDERS LLP ON THE EUROPEAN REGULATORS GROUP FOR ELECTRICITY AND GAS DRAFT PROPOSAL ON GUIDELINES ON INTER-TSO COMPENSATION

COMMENTS OF TROUTMAN SANDERS LLP ON THE EUROPEAN REGULATORS GROUP FOR ELECTRICITY AND GAS DRAFT PROPOSAL ON GUIDELINES ON INTER-TSO COMPENSATION DRAFT COMMENTS OF TROUTMAN SANDERS LLP ON THE EUROPEAN REGULATORS GROUP FOR ELECTRICITY AND GAS DRAFT PROPOSAL ON GUIDELINES ON INTER-TSO COMPENSATION In response to the ERGEG Draft Proposal on Guidelines

More information

Technical Bulletin Disconnected Pricing Node Process. Market Issue

Technical Bulletin Disconnected Pricing Node Process. Market Issue Technical Bulletin 2010-09-02 Disconnected Pricing Node Process Market Issue September 20, 2010 Introduction Technical Bulletin 2010-09-02 Disconnected Pricing Node Process As of the August 1, 2009 trading

More information

Memo No. Issue Summary No. 1 * Issue Date March 5, Meeting Date(s) EITF March 19, EITF Liaison

Memo No. Issue Summary No. 1 * Issue Date March 5, Meeting Date(s) EITF March 19, EITF Liaison Memo No. Issue Summary No. 1 * Memo Issue Date March 5, 2015 Meeting Date(s) EITF March 19, 2015 Contact(s) Mark Pollock Lead Author Ext. 476 Jennifer Hillenmeyer EITF Coordinator Ext. 282 John Althoff

More information

Long Term Access Goal Final Report Update

Long Term Access Goal Final Report Update Long Term Access Goal 2007-09 Final Report 2008-10 Update SME Version of Presentation for ATC Board of Directors Meeting December 14, 2009 2007-09 and 2008-10 Long Term Goals Access (10%) Reduce congestion

More information

Order No Transmission Planning and Cost Allocation

Order No Transmission Planning and Cost Allocation Order No. 1000 Transmission Planning and Cost Allocation Thursday, August 18, 2011, 1:00 pm Eastern Panelists: John D. McGrane, Floyd L. Norton, IV, Stephen M. Spina www.morganlewis.com Overview Order

More information

Flexible Capacity Procurement. Market and Infrastructure Policy Issue Paper

Flexible Capacity Procurement. Market and Infrastructure Policy Issue Paper Flexible Capacity Procurement Market and Infrastructure Policy Issue Paper January 27, 2012 Discussion Paper Table of Contents 1 Introduction... 3 2 Background... 4 2.1 ISO Renewable Integration Studies...

More information

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 9.1 Nature of Relationship. Each Participating TO shall enter into

More information

Transmission Transitions: Potential Cost Savings Offered by Competitive Planning

Transmission Transitions: Potential Cost Savings Offered by Competitive Planning Transmission Transitions: Potential Cost Savings Offered by Competitive Planning Discussion Paper PRESENTED AT NRRI Webinar PREPARED BY Johannes Pfeifenberger Judy Chang Akarsh Sheilendranath PREPARED

More information

MARCH A report for the. Australian Energy Market Commission

MARCH A report for the. Australian Energy Market Commission MODELS OF INTER-REGIONAL TRANSMISSION CHARGING MARCH 2008 A report for the Australian Energy Market Commission The Brattle Group rue Ducale 83 Bruxelles 1000 Belgium tel: +32.2790.3580 fax: +32.2790.3581

More information

SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects

SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects January 4, 2016 SPP Interregional Relations Table of Contents Executive Summary... 2 Introduction... 5 Stakeholder

More information

Alberta Electric System Operator 2018 ISO Tariff Application

Alberta Electric System Operator 2018 ISO Tariff Application Alberta Electric System Operator 2018 ISO Tariff Application Date: September 14, 2017 Table of Contents 1 Application... 6 1.1 Background... 6 1.2 Organization of application... 6 1.3 Relief requested...

More information