EXPANDINGING ENERGY PERFORMANCE CONTRACTING IN CHINA: POLICY SOLUTIONS AND MARKET MECHANISMS

Size: px
Start display at page:

Download "EXPANDINGING ENERGY PERFORMANCE CONTRACTING IN CHINA: POLICY SOLUTIONS AND MARKET MECHANISMS"

Transcription

1 EXPANDINGING ENERGY PERFORMANCE CONTRACTING IN CHINA: POLICY SOLUTIONS AND MARKET MECHANISMS April 2015

2 This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by its trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or The Regents of the University of California. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof, or The Regents of the University of California. Ernest Orlando Lawrence Berkeley National Laboratory is an equal opportunity employer.

3 EXPANDING ENERGY PERFORMANCE CONTRACTING IN CHINA: POLICY SOLUTIONS AND MARKET MECHANISMS BO SHEN, LYNN PRICE, XU LIU, LU MENG (LAWRENCE BERKLEY NATIONAL LABORATORY) WENJING SHI, MEREDYDD EVANS, VOLHA ROSHCHANKA, SHA YU (PACIFIC NORTHWEST NATIONAL LABORATORY) IN COLLABORATION WITH ESCO COMMITTEE OF CHINA ENERGY CONSERVATION ASSOCIATION (EMCA) April 2015

4 Executive Summary Energy performance contracting is an important market mechanism that uses energy savings to pay over time for the upfront costs of energy efficiency retrofits in buildings, industries, and other types of facilities. Through energy performance contracts (EPCs), Energy Service Companies (ESCOs) play an important role in implementing energy efficiency retrofits. Both China and the United States have large markets for EPCs and significant opportunities for growth. The Chinese government has made great efforts in promoting the country s ESCO business and expanding its EPC markets. This paper makes a series of recommendations for China to adopt more ambitious policy measures to encourage deep energy savings projects via EPCs. These recommendations are built on initial insights from a white paper developed by researchers at the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory with the assistance from the ESCO Committee of China s Energy Conservation Association (EMCA). Key recommendations are listed below. Stimulating energy savings through incentives for EPCs Allow for more diverse contracting and financing models to benefit from government incentives Encourage deeper energy savings projects through energy performance-based incentives and establishing national accreditation and credit rating systems Effective leveraging of government funding key recommendations Leverage government resources to address key barriers to market adoption in underserved sectors, including public and commercial buildings, the residential sector, and small-to-medium enterprises (SMEs) Scaling up energy performance contracting in China s public sector Develop training programs that raise awareness and build capacity of major stakeholders to implement EPCs in the public sector. Major stakeholders include government officials, financial institutions and ESCOs. Modify government budgeting rules to allow public institutions to keep their energy budgets for the duration of the EPC contract. Amend procurement rules to authorize EPCs and introduce facilitating mechanisms, such as long-term contracting and two-stage tendering in the public sector. i

5 执行摘要 合同能源管理 (EPC) 是一种利用节能收益支付建筑 工业和其他行业节能改造初始成本的重要市场机制 合同能源管理中, 能源服务公司 (ESCOs) 是实施节能改造的重要力量 中国和美国都有巨大且增长的合同能源管理市场 中国政府已在推进中国的能源服务和扩大合同能源管理市场方面做出了巨大努力 本政策建议报告提出了一系列建议, 以利中国采取更积极的政策措施, 通过合同能源管理挖掘更广阔的节能机会 这些建议是基于美国西北太平洋国家实验室 美国劳伦斯伯克利国家实验室 中国节能协会节能服务产业委员会 (EMCA) 合作撰写的中美合同能源管理白皮书对中美合同能源管理发展总结的基础上提出的 主要建议如下 通过激励政策刺激合同能源管理市场 政府激励政策应鼓励所有适合市场条件的合同能源管理的合同模式 以利扩大使用合同能源管理机会 政府激励从对节能改造项目直接补贴转向支持消除节能技术市场化及实施合同能源管理的障碍, 从而节能量不再是公共财政驱动而是来自于市场需求 有效利用政府融资 利用政府资源来解决关键市场壁垒, 包括公共和商业建筑 住宅建筑 和中小型企业建筑 推动公共部门扩大合同能源管理 制定培训项目, 提高公共部门合同能源管理主要利益相关者的认识, 对其进行能力建设 主要的利益相关者包括政府官员, 金融机构和能源服务公司 改进公共部门预算规则, 使公共机构可以在合同期限内保持其能源预算 修订公共部门采购规则 ( 如允许两段招标 ), 使公共部门使用合同能源管理更便捷, 程序更一致 鼓励创新的融资激励措施, 实施多种最佳实践, 鼓励更深层次的节能改造 ii

6 Table of Contents Executive Summary... i 执行摘要...ii Acronyms and Abbreviations...iv Introduction... 1 Stimulating Energy Savings through Incentives for EPCs Key Recommendations... 1 Allowing for More Diverse Contracting and Financing Models to Benefit from Government Incentives 2 Encouraging Deeper Energy Savings Projects through Performance-Based Incentives and Establishing Accreditation and Credit Rating Systems. 3 Effective Leveraging of Government Funding Key Recommendations... 3 Leveraging Government Resources to Address Key Barriers 3 Scaling up Energy Performance Contracting in China s Public Sector...10 The Public Sector in China 10 Current Policies on Energy Efficiency in the Public Sector 11 Institutional Arrangements 12 Capacity Building Is Vital to Scaling up EPCs in the Public sector 12 Relevant Issues: Budget Rules and Procurement Policies 14 Conclusions...16 Acknowledgements...17 References...18 Appendix A. Examples of EPC Incentives at National and City Levels...22 Appendix B. Existing Tax and Fiscal Incentives in China...23 Appendix C. Green Bonds As Financing...24 Appendix D. Types of Public Facilities in China...25 Appendix E. Current Institutional Arrangement of the Chinese Public Sector...27 Appendix F. Additional Options to Promote Deep Energy Savings in the Public Sector...29 List of Figures and Tables Figure 1 Structure of the Greening the Supply Chain financing scheme... 9 Figure 2. Number of Public Facilities in China by Type, 2010 (in Thousands).. 25 Figure 3. Public Sector EPC Projects in China by Province 26 Figure 4. EPCs Projects in China by Public Institutions Type. 26 Figure 5. Institutional Framework for EPCs in Government Buildings.. 27 Table 1. Examples of EPC Incentives in China at National and City Levels 2 Table 2. Examples of EPC Models by Target Sector, Primary Barriers Overcome and Challenges with Implementation.. 5 Table 3. Local Fiscal Incentives in Selected Locations 23 iii

7 Acronyms and Abbreviations Btu CHUEE CNY DOE EES EMC EMCA ESCO EPC ESPC FEDS FEMP FYP GDP GEF GOA HVAC IDB IFC IPMVP LBNL MNC M&V MOF MUSH NAESCO NDRC OBF PACE PNNL PPP SEF SME SPV tce USD WB British thermal unit China Utility-Based Energy Efficiency Finance Program Currency of China Yuan U.S. Department of Energy Energy Efficiency Star Energy Management Company ESCO Committee of China Energy Conservation Association Energy Service Company Energy Performance Contract Energy Savings Performance Contract Facility Energy Decision System Federal Energy Management Program Five-Year Plan (China) Gross Domestic Product Global Environmental Facility Government Offices Administration of the State Council heating, ventilation and air conditioning Inter-American Development Bank International Finance Corporation International Performance Measurement and Verification Protocol Lawrence Berkeley National Laboratory multinational corporation Measurement and Verification Ministry of Finance (China) Municipal, University, School and Hospital National Association of Energy Service Companies National Development & Reform Commission (China) on-bill financing Property Assessed Clean Energy Pacific Northwest National Laboratory public-private partnership sustainable energy financing small-and-medium sized enterprise special purpose vehicle ton of coal equivalent U.S. dollar World Bank iv

8 Introduction Energy performance contracts (EPCs) are transformative because they integrate project development, design, financing, construction, operation, and measurement and verification (M&V) in carrying out energy-savings measures. China and the United States have large markets for energy performance contracting (EPC), estimated at over $6 billion in investments in each country in 2011 (Evans et al. 2014). The two countries are collaborating to capture deep energy savings opportunities through a joint EPC initiative launched in 2014 as part of the U.S.-China Climate Change Working Group under the U.S.-China Strategic and Economic Dialogue. With the assistance from the ESCO Committee of China s Energy Conservation Association (EMCA), researchers at the U.S. Pacific Northwest National Laboratory (PNNL) and the Lawrence Berkeley National Laboratory (LBNL) developed a white paper entitled Unleashing Energy Efficiency Retrofits through Energy Performance Contracts in China and the United States as the first deliverable under this initiative. The white paper (Evans et al. 2014) examines differences in the EPC mechanisms and markets between China and the U.S. and identifies various policy, technical, financing, and market issues that confront the two countries. It points out general opportunities for expanding the EPC markets in each country. This report builds on the initial insights from the white paper and provides policy recommendations to address specific barriers. The report offers detailed insights on creating feasible solutions and effective mechanisms to address challenges in the EPC market, especially underserved segments such as public institutions, small and medium enterprises, and the buildings sector. The discussion and recommendations of this paper focus heavily on the government s role because government policy can be essential in enabling healthy EPC market expansion. Both the central government and local governments have adopted policies to promote EPCs. Cities are already investing in incentives for EPCs, and they are seeking ways to make these investments as impactful and cost-effective as possible. This report focuses on some important elements in unlocking financing and technical know-how for energy efficiency retrofits. It first describes the types of incentives that can be used to stimulate energy savings through EPCs and then discusses how government can leverage funds allocated to supporting EPCs more effectively. These recommendations are not mutually exclusive and governments can experiment with various combinations of these options. This paper also focuses in particular on the public sector and discusses ways to capture untapped EPC opportunities in this sector. Stimulating Energy Savings through Incentives for EPCs Key Recommendations Policymakers at the national, provincial and local levels in China have many options to stimulate EPCs as a way to facilitate deep energy savings projects. The most important strategies include: Allowing for more diverse contracting and financing models to benefit from government incentives Encouraging deeper energy savings projects through performance-based incentives and establishing national accreditation and credit rating systems 1

9 Allowing for More Diverse Contracting and Financing Models to Benefit from Government Incentives The Chinese government at the national and subnational level has created ESCO reward programs targeting EPCs. The national government has offered favorable tax exemptions and reductions to support the country s ESCO industry. These incentives have played a significant role in stimulating the early development of EPCs in China. However, further development of the Chinese EPC market would benefit from greater flexibility in incentives that allows for more diverse financing and contracting models. Innovations in financing and contracting can help expand the opportunities for projects in the EPC market, particularly for larger and more complex projects that require external financing. In this way, they can accelerate sector growth. Policymakers at the national, provincial and local levels in China can encourage development of such innovation by creating a level playing field for various financing and contracting models (i.e. providing similar incentives to all models). The Chinese government is currently providing incentives for the shared savings model in most cases, but it could encourage companies to experiment with other options, such as variations of the guaranteed savings model (Box 1) and other new approaches, like energy service agreements (ESA) (Box 2). Several municipal and local governments have begun experimenting with flexible incentives that allow for different types of financing and contracting mechanisms. For example, the city of Shanghai offers incentives for projects that use either a shared savings model or a guaranteed savings model, and the city of Shenzhen also provides incentives for projects that use a range of models (see Table 1). These incentives went into effect in The Beijing Municipal Commission of Development and Reform is also considering expanding existing incentives to cover outsourcing of energy management. Appendix A provides more detailed information on China s EPC incentives on both national and city levels. Table 1. Examples of EPC Incentives in China at National and City Levels National Beijing Shanghai Shenzhen Shared Shared savings savings model model Contracting Model National Requirements Incentives Shared savings model and guaranteed savings model Shared savings model and combined shared savingsguaranteed savings model ESCOs cover at least 70% of the project cost; annual energy savings of 100 to 10,000 tonnes of coal equivalent (tce) for non-industrial projects; annual energy savings of 500 and 10,000 tce for industrial projects. CNY 240/tce from Ministry of Finance (MOF) CNY 240/tce from MOF, and CNY 260/tce from Beijing Finance Bureau CNY 240/tce from MOF, and CNY 360/tce from Shanghai Finance Bureau CNY 240/tce from MOF, and CNY 300/tce from Shenzhen Finance Bureau * ESCOs registered at the national level can apply for national incentives, which are jointly funded by MOF and local MOF equivalents. National incentives are CNY 240/tce, and different cities have different levels of local incentives (no less than CNY 60/tce). Appendix A has more detail on incentives for ESCOs registered at local level. Sources: Interim Management Regulations on Financial Rewards of Energy Performance Contracting Projects Beijing Energy Performance Contracting Financial Incentives Interim; Shanghai Energy Performance Contracting Financial Incentives; Shenzhen Energy Performance Contracting Financial Incentives Interim. 2

10 Encouraging Deeper Energy Savings Projects through Performance-Based Incentives and Establishing Accreditation and Credit Rating Systems The Chinese EPC sector has opportunities to expand in terms of implementing deeper energy savings retrofits, i.e. with a greater percentage of saving per unit of energy consumed. Initially, it is common for ESCOs to test the market with small and technically simple projects. However, deeper retrofits can help access energy savings after EPC projects deploying short-term payback measures are exhausted in the market. Bundling short-term and longer-term energy saving measures make it easier to achieve deeper savings as this will build a project portfolio that has a good average rate of return, making the portfolio attractive for investment. Governments can stimulate deeper savings by providing energy performancebased incentives. For example, they can target incentives on contracting and financing models that encourage longer-term projects and/or providing progressive financial stimulus based on the energy-savings levels of varying measures rather than on a fixed incentive for per unit of energy-savings regardless of types of measures. For a program of energy performance-based incentives to succeed, it will require a more rigorous and detailed measurement and verification procedures. In particular, a more comprehensive M&V protocol could support projects with multiple energy savings measures; it could also help ESCOs and their customers accurately measure and verify the energy savings levels. Energy efficiency financing can signal the value and security of the investment opportunity to financial stakeholders, since it enhances the confidence of savings from retrofits and customer repayment. China could increase the market confidence in EPC projects through forward-leaning measures. For example, while China has made efforts to rate ESCOs based on comprehensive technology capability, it still lacks an effective ESCO accreditation system for ESCOs to demonstrate rigorous standards of technical and managerial competence to design and implement EPC projects. An accreditation system would increase customer confidence in EPC projected performed by accredited companies meeting rigorous standards set by the government and industry. Moreover, governments can facilitate the development of a reliable nationwide credit rating system that not only tracks and documents the credit history of businesses but also issues credit rating to promptly evaluate a debtor s creditworthiness, especially a business. Such a credit rating system could assist third-party financiers in effectively and objectively determining the debtor's ability to repay the debt and the likelihood of default, easing the process of financing and reducing associated transaction costs. Effective Leveraging of Government Funding Key Recommendations Leveraging government resources to address key barriers to market adoption in underserved sectors, including public and commercial buildings, the residential sector, and small-to-medium enterprises (SMEs) Leveraging Government Resources to Address Key Barriers China provides a number of fiscal incentives for EPC projects. (Appendix A provides more detailed information on the ESCO incentives and some issues that could constrain EPC market expansion in China). China s fiscal rewards and tax incentives primarily benefit shared savings projects. This discourages ESCOs from pursuing contract options other than the shared savings model that could better suit the EPC project conditions. Moreover, according to case studies described in an LBNL paper (Romankiewicz et al., 2012), China s 3

11 government financial rewards only marginally impacted payback periods of retrofit projects. This can influence whether deep energy savings measures are installed, suggesting a missed opportunity for public funding to be more impactful. International experiences outside China have shown that government incentive programs have shifted from simply subsidizing retrofits to providing value-added support to significantly address the fundamental barriers to the market adoption of energy efficient technologies in industrial facilities and buildings so that energy savings will be achieved through increasing market demand rather than by government subsidies. In fact, government financial support in other countries has targeted activities such as moving energy innovation effectively and quickly to the market place, creating the next generation of energy professionals and clean energy entrepreneurs, addressing the soft cost associated with the deployment of efficient technology, raising public awareness and facilitating behavior changes regarding energy efficiency, enhancing the credit of market participants, promoting energy efficiency through significantly improving operation and management, and supporting innovation in SMEs who play a critical role in economic growth and job creation. Direct public incentive for EPC projects may be necessary in the beginning of EPC industry development. However, to grow and optimize ESCO development and create great leverage for public funds, public funding should promote all suitable EPC models in order to maximize and diversify EPC opportunities. China could benefit from focusing its incentive policy on long-term solutions and addressing the fundamental barriers to market adoption of energy efficient measures, better attracting private capital to deep-savings projects and mitigating risks to EPC market participants. The vast majority of EPC projects in China are self-financed by ESCOs. This prevents ESCOs from maximizing their expertise and taking on more and deeper energy savings EPC projects, because their assets are tied up in their current projects. At the same time, financing by a third party incurs transaction costs. China s policymakers can use government resources to facilitate third-party financing. National, provincial and local governments can develop and implement dedicated financing programs 1 in special units or functional areas of existing Chinese financial institutions, such as China Development Bank, and other mechanisms that promote longer-term contracts, offer credit enhancement or bring down interest rates. Such leverage-focused government programs need not to be a burden to governments, and they could harness the creativity of the private sector by gathering ideas and feedback on program design that goes beyond the shared-savings model. See examples set forth below in Boxes 1 to 4 below which attempt to overcome barriers for possible adaptation in different target sectors in China, as summarized in Table 2 below. 1 In the United States, subnational entities, like the New York Green Bank, have implemented investment schemes encouraging the private sector to co-invest with the state government, while the government uses private sector fund management skills to execute deals that the private sector may be reluctant to finance alone. Private sector financing in clean energy markets is crowded in through various financing approaches, such as credit enhancements, project aggregation, asset-backed securitization and deploying long-term ( patient ) capital by extending project terms beyond what s offered by private funding (NY Green Bank, 2014). 4

12 Table 2. Examples of EPC Models by Target Sector, Primary Barriers Overcome and Challenges with Implementation Target Primary Barriers Overcome Select Challenges with Model Sector Implementation Traditional Guaranteed Savings Public buildings Short- Termed Guaranteed Savings Energy Service Agreement On-Bill Financing Supply Chain- Driven Finance Commercial and public buildings Public buildings, commercial buildings Residential, commercial buildings SME manufacturers Financing by third party that allows ESCOs to grow; Clear payment schedule, making budgeting and financing easier; Clear M&V protocols attractive to customers Self-financed by host or by third party financing. Project host withholds portion of ESCO s fee (e.g., 20% of project costs) for an agreed term until after M&V, limited to first year of ESCO s savings guarantee in effect, is complete and savings are verified Government-owned or authorized special purpose vehicle (SPV) bears loan on its balance sheet no upfront finance by ESCO or host client, relieving ESCO from financing and host credit risk and relieving host from upfront capital cost which may limit host s ability to obtain future financing for core business needs No upfront financing by customer or ESCO; Diversified types of financing as long as payment made via utility billing; Bill payment history help assess and enhance customers creditworthiness SME access to third-party financing guaranteed by multinational corporation (MNC) so no (or limited) upfront equity by SME host or ESCO; product cost-savings shared between SMEs and upstream buyer MNC Host may not want financing on its balance sheet; government budget rules must be amended to allow institutions to repay retrofits (e.g., out of retained budget due to savings) Because guarantee is shorterterm, measures with longer paybacks will not be adopted. Government-owned SPV could increase government debt; amend government budget rules to let public institutions keep savings to repay retrofits; enforcement of complex agreements and M&V; government must develop inhouse or outsource capacity to assess host credit risk and technical risk of efficiency measures Requires regulatory changes; requires utilities to modify billing system. For heating services, on-bill financing may be more feasible for buildings in Southern China where district heating is not provided, as compared with difficult application in Northern China where heating services are not metered Resistance from SMEs in sharing cost data; SMEs hosts may not want financing on balance sheet 5

13 Box 1. Short-Term Guaranteed Savings Contractual Arrangements A short-term performance guaranteed savings model used by Johnson Controls, Inc., is a modification of the traditional guaranteed savings agreement that covers a longer period of performance. It involves a contract in which the host facility client agrees to pay the ESCO for approximately 80% of total project costs upfront and to pay the remaining contract value after M&V which verifies project performance in the first 1-2 years of operation. The ESCO provides a short-term savings performance guarantee (e.g., up to 2 years). An independent, government - certified third-party conducts the M&V to assure savings performance before final payment is made to the ESCO. To mitigate the non-payment of host client, an escrow account is established. The financing may be from a third-party or the host facility client, and projects usually have payback periods of approximately 5 years. This model may be suitable for China s public sector where the host facility is unlikely to change ownership, and if used in other sectors, such as the commercial sector, a central government credit enhancement (e.g., first loss reserve to support borrower credit risk) could assist with accelerating deployment. Box 2. Energy Service Agreements Internationally, the energy or efficiency service agreement model (ESA) is receiving increasing attention. An ESA is a pay-for-service financing solution that allows host customers to benefit from comprehensive efficiency upgrades without upfront capital expenditure (DOE 2014; ACUPCC 2014). Evans et al. (2014) provides additional details on ESA. Governments can be instrumental in creating ESA type contracts, for example, by establishing a government-owned or authorized special purpose vehicle (SPV). The government-supported SPV serves as the obligor of a third-party loan, as supported by both an agreement from the host facility to pay the government-owned or authorized SPV for the energy services and an energy savings performance guarantee from the ESCO backstopping any savings shortfall. In the United States, the ESA has been used as an off-credit model (i.e., Chicago Infrastructure Trust) that does not impact the credit rating of the city or central government and its ability to raise debt financing in the future because the payments based on the client s energy savings is variable and therefore contingent. The variability of the stream of payment from the host client based on energy savings is smoothed out by the payments made by the ESCO for any savings shortfalls so the government-owned or -authorized SPV can pay the lender according to a fixed amortization schedule. China could consider promoting ESA type financing, especially with an entity at the city level serving as the government-supported SPV, perhaps backed up by a central government credit guarantee to induce third-party lending, that contracts with third-party M&V auditors. China s state-owned utility companies, such as the State Grid and China Southern Grid, have created their own ESCOs to conduct energy retrofits for meeting their mandatory energy reduction target. In view of grid company requirements to meet annual targets for investing in energy efficiency, these utility-owned ESCOs or a China policy bank could form the SPV or serve as a prime contractor working with city or industrial park governments throughout China to develop large-scale energy efficiency programs using ESA and ESCOs for the installation work. 6

14 Box 3. Diversifying Financing Options via On-Bill Financing On-bill financing (OBF) is a new tool for energy-related financing that leverages a utility s unique relationship with its customers to provide access to funding for energy efficiency retrofits and allows customer repayment through their utility billings. In the United States, where OBF has been popular in the buildings sector, at least 23 states have implemented or are ready to implement OBF (ACEEE, 2012). Depending on the retrofit type, OBF can be bill-neutral, with energy savings sufficient to cover the scheduled payments for the financing so that the total energy charge on the utility bill is less than or equal to the pre-retrofit bill. A utility can be an active player in pursuing OBF, by directly using its own ratepayer funds collected by a state regulator through an approved tariff, by a utility public benefit charge or by arranging the thirdparty financing to support customers energy retrofits. Utilities may also play a less active role serving only as a payment collector, allowing a third-party to directly offer financing to the utility customers and collect payment via the utility billing system. In return, the utility generates revenue for its payment collection service. Benefits of OBF include no upfront cost for customers retrofits, bill payment history for assessing customers creditworthiness, and flexible and diverse financing options that enable the utility to convert financing it provides to off-balance-sheet operating expenses through utility bill payment. The current utility advance payment practices in parts of China may facilitate use of OBF financing for the untapped residential sector. Under this advance payment scheme, repayment by customers of the retrofit financing may be facilitated by reprograming the calculation of customer s account balance. In cases where OBF is bill-neutral before and after the retrofit, customers will have the same or more amount left on their prepaid account over a defined time period depending on the financing repayment schedules. For OBF to be a successful financing tool, issues like split incentive and complex property ownership still need to be addressed. For heating services, OBF may be more feasible for buildings in southern China where district heating is not utilized and may be difficult to apply in Northern China where heating services are not metered. 7

15 Box 4. Innovative Financing Driven by the Supply Chain Small-and-medium sized enterprises (SMEs) represent a large untapped energy saving and pollution reduction potential in China. Unlike for large, state-owned enterprises, financing is more difficult and more costly for SMEs to access, and the EPC market for SMEs has historically faced many barriers due to small project size and the unavailability or fragmented nature of data on SMEs credit histories. Removing barriers to financing energy efficiency in SMEs requires innovative mechanisms. An MNCs-facilitated financing scheme initially proposed by LBNL and supported by companies like Ernst Young is a model that leverages Greening the Supply Chain programs of MNCs and global buyers/brands to overcome the efficiency financing barriers for SMEs. This scheme uses financing arrangements that leverage established business relations between MNCs and their long-standing SME suppliers with strong credit ratings of MNCs as risk mitigation strategies. Under this model, the MNC serves as a guarantor of the SME host supplier s loan from a third-party financier, which proceeds pay for the upfront costs of a portfolio of efficiency measures including retrofits installing the MNC s products or solutions. The MNC s loan guarantee induces the third-party financier to extend credit to the SME host supplier. The SME supplier repays the third-party financier and shares with the MNC cost savings generated from the efficiency measures through a price discount in the SME host supplier s products procured by the MNC. In entering supply agreements with SMEs, MNCs typically conduct financial due diligence on SME counterparts to assure stable supply at contracted prices. The MNC s level of transparency into the SME s financial condition from this process and investment-grade energy audit as a prerequisite for the MNC to provide a loan guarantee can form a baseline for establishing a negotiated sharing of cost savings. ESCOs design and install the efficiency measures, collect fixed fees for the services, and assume only the technical risk of a project through an energy savings performance guarantee without providing the financing for upfront costs. The MNC s credit enhancement and ESCOs performance guarantee could work together to mitigate both credit and technical risks of financing efficiency retrofits of SME suppliers, significantly lowering the transaction costs, while also relieving ESCOs from financing the upfront costs of their installations thereby enabling their continued growth. The MNC s risk of providing a guarantee under this scheme could be mitigated if the International Finance Corporation (IFC) were amenable to sharing or assuming first loss on the SME s risk under the IFC s CHUEE program. The supply chain-driven financing scheme can effectively leverage provincial government programs, such as the Energy Efficiency Star program, to create both policy push and market pull for promoting and financing energy retrofits in China s SMEs. The Energy Efficiency Star (EES) program is a one-to-five-star comprehensive labeling scheme initiated by the Suzhou city government to evaluate and rate local manufacturing enterprises based on their comprehensive performance in multiple areas, including energy management practices, savings from energy retrofits and improvements in energy efficiency or environmental quality. Programs like EES can drive SME participation by helping MNCs identify the SME suppliers to target and assist MNCs with measurement of savings improvement targets set by MNCs. 8

16 Figure 1 Structure of the Greening the Supply Chain financing scheme The above examples in Boxes 1 to 4 demonstrate that governments can play important and effective roles in working directly with the private sector to address market adoption and financing barriers to comprehensive and deeper energy savings retrofits. Now is the right time for China to explore ideas on creating an innovative and strong partnership using a panoply of business models, financing tools and approaches whereby governments can significantly leverage private resources to enable energy efficiency financing and EPC market development. Finally, tapping China s corporate or asset-backed bond markets may unleash in the long-term larger pools of capital to finance energy efficiency retrofits, as has been done through investment funds sponsored in the United States and Europe by private and public entities. China is developing its asset-backed securitization (ABS) market, with the release in November 2014 by the China Securities and Banking Regulatory Commissions (CSRC, CBRC) of new provisions relaxing approvals required to facilitate this market development. Even with these changes, the China bond market remains fragmented and illiquid, with short maturities (i.e., 3-5 years) and untested laws on special purpose vehicle trusts for ABS. Nevertheless, China may consider piloting in a select municipality an ABS model that uses monetized savings from standardized operational efficiency retrofits to repay bondholders. Box 5 below and Box 6 in Appendix C offer examples of ABS bond offerings that could be piloted by central or provincial governments. 9

17 Box 5. Sustainable Energy Financing. The Sustainability Energy Financing (SEF) is designed by the Foundation for Renewable Energy and Environment and implemented in several U.S. jurisdictions (e.g., Delaware, California, Pennsylvania, and Washington D.C.). The SEF is organized and administered by an implementing entity that is affiliated with a local authority or an independent third-party contracted by the local authority and responsible for leading state or local level implementation of energy efficiency and onsite renewable energy generation programs. Under the SEF, the implementing entity leverages private capital through issuing tax-exempt, low-interest sustainable energy bonds or tax-exempt leases using bank loans. The low-cost financing results from the higher credit rating of the implementing entity and is achieved by pooling common credits, streamlining repayment management, and using an objective, measurement-based contractual guarantee of monetized energy savings which must always be greater than the debt service payment. The financing is issued in series to meet the specific funding requirements of projects with different terms and different technologies (FREE, 2013). China s onshore bond market offers state-owned and private, well-capitalized entities lower interest rates than bank loans with the same term. The SEF concept could be piloted in select municipalities authorized to issue onshore bonds if the underlying project assets and documents can be standardized. Scaling up Energy Performance Contracting in China s Public Sector Develop training programs that raise awareness and build capacity of major stakeholders to implement EPCs in the public sector. Major stakeholders include government officials, financial institutions and ESCOs. Modify government budgeting rules to allow public institutions to keep their energy budgets for the duration of the contract. Amend procurement rules to authorize EPCs and introduce facilitating mechanisms, such as long-term contracting and two-stage tendering in the public sector. The Public Sector in China The public sector 2 in China offers many opportunities for energy efficiency improvements and for ESCO market expansion. 3 The sector consumed 6.2% of the country s total energy use in 2010 (World Bank 2012) 4 and consisted of 1.9 million public facilities that occupied about 6 billion m 2 of floor space (Yu et al. 2014). (See Appendix D for more information on public facilities in China). EPCs can help tap the large energy efficiency potential of the Chinese public sector, but it may require building capacity of major stakeholders as well as re-examining China s related institutional framework and public procurement process (Evans et al. 2014). 2 Public buildings in this report refer to buildings owned or occupied by government or government-sponsored entities. 3 In China, most ESCOs are called energy management companies. "Energy management companies" is a slightly broader category as some of these companies provide energy and energy efficiency services without getting paid based on the performance of their projects. 4 This number also includes the transportation fleet. 10

18 Current Policies on Energy Efficiency in the Public Sector Recognizing the significance of the public sector, the Chinese government has adopted a series of policies and measures to improve energy efficiency, including collecting better data on energy consumption, setting energy saving targets and expanding government financing and incentives (GOA 2008; NDRC and MOHURD 2013). The government has encouraged the use of EPCs in energy efficiency retrofits in the public sector, but to date, there have been relatively few EPC projects in the public sector. By comparison, the U.S. public sector commonly relies on EPCs for energy efficiency retrofits, and the mechanism helped improve energy intensity (energy consumption per m 2 ) in existing federal facilities by more than 30%, compared to when EPCs were first introduced in In fact, government and institutional 5 facilities currently account for up to 84% of U.S. ESCOs total revenue (Larsen et al. 2012). In China, the public sector could also offer a stream of projects for ESCOs. The EPC mechanism is already established in other sectors in China. Currently, 72% of the contracts are in the industrial sector (Evans et al. 2014). In the public sector, ESCOs have completed just 470 EPC projects to date, which cover less than 0.1% of existing public facilities (GOA 2014). As noted previously, the Chinese central government has introduced policies to encourage energy efficiency in the public sector. In 2008, GOA of China s State Council issued the Public Sector Energy Conservation Rule, which encouraged public facilities to work with ESCOs and use EPC for energy efficiency financing, retrofits and management, and also laid out a system for developing detailed goals for improving energy efficiency. Specifically, it required NDRC, GOA and MOF to develop targets for energy use per m 2 for different regions and building types. The State Council also mandated that government agencies determine allowable budgets for energy costs at public institutions (GOA 2008). Further, the directive required that public institutions procure energy efficient products in accordance with national mandatory procurement rules or from product reference lists. In 2013, the NDRC and Ministry of Housing and Urban-Rural Development (MOHURD) of China s State Council issued the Green Building Action Plan, which encouraged public buildings to use EPCs to finance retrofits. This action plan called for 60 million m 2 of retrofits in government office buildings and another 60 million m 2 of retrofits in other types of public facilities (NDRC and MOHURD 2013). Incentivizing energy efficiency improvements is an important factor in developing an EPC market in the public sector. However, experiences in the United States and other countries show that public sector EPCs require additional support, in particular through capacity building of various stakeholders, developing budgeting and financing mechanisms, and creating supportive procurement rules. At the local level, several provinces and cities have experimented with policies to encourage EPCs in the public sector. For example, Beijing introduced Interim Measures on Supporting EPC Projects in Public Institutions in 2009 and Beijing Energy Performance Contracting Financial Incentives Interim in 2010 (BMCDR and BFB 2010). Through these policies the Beijing government rewards EPC projects initiated by public institutions and large-scale public buildings and allows public facilities to retain a portion of savings as internal funds for the first three years after the end of the contract period. Scaling up such policies and implementing other best practices outlined here can help harness the energy efficiency potential of the public sector in China. 5 Institutional refers to municipal facilities, universities, schools and hospitals. 11

19 Institutional Arrangements EPCs can vary in their complexity but typically involve ESCOs, facility managers, building occupants, building owners and financial institutions. In the public sector, stakeholders can also include various government agencies, legislative authorities and taxpayers. Owners and managers of public buildings can also be local, provincial or central government institutions, and solutions to scaling up EPCs need to consider this context. In China, the GOA of the State Council guides, manages and monitors energy efficiency in central government buildings and facilities. Meanwhile, provincial GOAs or their local-level equivalents manage and monitor government facilities at their respective levels. The MOF as well as provincial and local finance departments manage energy budgets for public buildings at their respective levels. NDRC, MOHURD and MOF provide policy and financial support and guidance on energy efficiency in public institutions. The local equivalents of these national agencies manage provincial and local-level energy efficiency of public institutions, and they set local targets and policies (see Appendix E for a more detailed description). It is important to consider these various stakeholders to obtain the necessary buy-ins and approvals and secure cash flows in EPC projects. For example, if local finance bureaus sign off on a facility budget or an EPC payment, they need to understand how EPCs generate savings. Capacity Building Is Vital to Scaling up EPCs in the Public sector Capacity building is a critical first step in gaining buy-in from stakeholders on the need for new budget and procurement rules that are essential for EPCs. These rules would represent a departure from some existing budgeting practices. At the same time, strengthening capacity can help stakeholders view EPCs as more feasible. Below, we describe options for building capacity and awareness among government and public sector stakeholders, at financial institutions and in ESCOs. Raising awareness and building capacity of government officials and other stakeholders Government officials, facility managers, building occupants and other stakeholders lack awareness of EPCs and capacity to initiate projects. This section covers two distinct types of activities: (1) activities to raise the awareness of key stakeholders and create an increased understanding of the value of energy efficiency retrofits, and (2) training specifically to build capacity among government managers to initiate, design and manage EPCs. Many stakeholders have a limited understanding of the specific benefits of improving energy efficiency in buildings. Raising awareness among government officials will help ensure that public sector decision-makers have sufficient awareness and motivation to undertake EPCs. Universities, research institutes or the EMCA could raise awareness about energy efficiency and EPCs among Chinese government agency officials and other stakeholders through educational campaigns and targeted media outreach. Educational campaigns could target stakeholders related to government office buildings, hospitals, universities and schools, with a particular emphasis on key energy decision-makers in the facilities. Trained facility managers can reduce EPC negotiation time, save costs and increase the likelihood of project success. Meanwhile, it is rare for public facilities in China to have professional facility managers, with the exception of large buildings. Much of the 12

20 responsibility for implementing EPCs typically lies with staff at public facilities who have other full-time responsibilities. Thus, it is important to identify the right staff at facilities, who would benefit from training in energy and building management and the use of EPCs in retrofits. EMCA already offers fee-based, in-person EPC training, however, this training is mainly for ESCOs. Chinese universities, research institutes or EMCA could provide more training courses specifically targeting government officials and public facility managers. Examples of additional training areas that could help build the capacity of government managers include scoping EPC projects, contracting issues, financing from the perspective of a facilities manager, project implementation, and M&V. An example of such a program in the United States is the Federal Energy Management Program (FEMP). FEMP builds capacity by offering more than 600 free ondemand video courses and presentations designed for various government and institutional stakeholders. Videos cover such topics as audits, building management systems, contracting and finance, energy efficient technologies, energy management, labs and data centers, legislation, operations and maintenance, renewable energy, sustainability and institutional change, and water use reduction. China already has experience in building capacity for retrofits in other sectors by increasing the capacity of stakeholders. One example is China s large-scale efforts to retrofit multifamily housing in cold climates. The China Academy of Building Research (CABR) has provided training on energy efficient technologies, energy efficiency evaluation and labeling in both residential and public sectors. The training targeted management teams from construction departments and quality supervision stations (CABR 2014). Capacity building in the financing sector The public sector offers many opportunities for energy efficiency improvements, and third-party financing will make it easier to achieve these savings. Education and capacity building need to focus on assisting banks and insurance companies in developing and promoting financial products that are specifically tailored to energy efficiency and EPCs. Further, education and capacity building should focus on creating diversified and innovative financing mechanisms. Thus, financial institutions could benefit from several types of targeted training and capacity building. Such training could cover EPCs and evaluation of cash flow, profits and risks. It could also include sharing information on business models that might work in the public sector, such as what types of guarantees might be available, and how government funds might co-sponsor certain projects. There are several existing business models for the public sector. Examples are models where financial institutions agree to purchase future receivables from the project, =finance bond issues for projects, or provide financing to ESCOs to implement projects (Evans et al. 2014). The risks and benefits of each vary and exposure of financial institutions to these models could help stimulate the market. Some commercial banks in China, such as Bank of Beijing, Industrial Bank, Hua Xia Bank, China Merchants Bank and SPD Bank, have provided loans to ESCOs (ISC 2013). It is difficult for small-sized ESCOs with limited credit histories to obtain bank loans from large state-owned banks. However, state-owned banks could lend to public institutions to implement EPCs, which will reduce ESCOs financial pressure. More training on these alternative financing channels would be beneficial to financial institutions as well. Building capacity of ESCOs for public sector EPCs 13

21 To work efficiently with the public sector, ESCOs and service providers have much to learn, as public facilities operate within certain constraints and must follow specific rules. Training, specifically developed for ESCOs, can help further reduce the learning cost. Currently, EMCA hosts a training center for ESCOs in China, which provides courses covering a wide range of topics, such as policy, financing, technologies, EPC taxation and financial management, energy auditing, project management, and measurement and verification (EMCA 2014). The training fees range from RMB 1,000 to 10,000 per person depending on the course level. EMCA also provides free in-person training to its members and shares free training resources online. The EMCA or other training providers could include more training resources that are free and available online, such as pre-recorded webinars and training materials. In addition to EMCA s current general courses, more specific training could be beneficial. Special courses might include public sector procurement rules for ESCOs, financing public sector retrofit projects, technology choices for public sector projects and integrated, comprehensive approaches to retrofits in public buildings. For comparison, in the United States, the National Association Energy Service Companies (NAESCO) hosts an annual Federal Market Workshop, which provides ESCOs with updates, changes and processes in the vast federal energy efficiency market (NAESCO 2014). Also, the FEMP has specific training on energy efficient technologies, energy management, contracting and finance. Other examples of specific courses are case studies that offer ESCOs information on successful peer experiences. Relevant Issues: Budget Rules and Procurement Policies In China, a public institution s energy budget depends on its set energy use targets (expressed as energy use per m 2 ), in accordance with the State Council s 2008 Public Sector Energy Conservation Rules (GOA 2008). This approach encourages efficiency in theory, but in practice, after the target is set any savings result in budget cuts. This approach makes it very difficult for public institutions to pursue EPCs because they will not have the budget savings in hand to repay the ESCOs. On the other hand, allowing public facilities to retain their original energy budgets for the entire contract period would help motivate public institutions to implement EPCs; it would also ensure that public facilities could repay the ESCOs under the EPC. The United States and several other countries have re-written government budgeting rules to allow public institutions to keep their energy budgets uncut during the period of the contract to allow for repayment. Examples of such policies already exist in China at the local level. The Beijing Municipal Development and Reform Commission and Beijing Finance Bureau issued the Beijing Energy Performance Contracting Financial Incentives Interim in November 2010, which requires that budgets for energy use are allocated according to a decreased energy use within the period of EPC projects. Meanwhile, payments to ESCOs will be categorized as part of the EPC project expenditure budget, and the portion of savings retained by public institutions can be used as internal funds within the first three years after the end of the contract period. However, this provisionary legislation only applies to the shared savings contracts, which limits the flexibility to innovate in financing and contracting based on project needs. Shenzhen serves as an exemplary practitioner at the local level. The Shenzhen Government Offices Administration, Shenzhen Municipal Development and Reform Commission and Finance Commission of Shenzhen Municipality issued Shenzhen Energy Performance Contracting in Public Sector Implementation Plan in 2012, which requires that 14

22 energy performance contracting is the main approach to energy efficiency in the public sector. By June 2014, Shenzhen implemented 7 million m 2 and completed 4.2 million m 2 of EPCs projects in the public sector (Shenzhen News 2014). It is also worth noting that Shenzhen has utilized an innovative mechanism for budgeting rules. The Finance Commission of Shenzhen Municipality requires that budgets for energy use are allocated based on original budgets standards or energy intensity. At the same time, facilities are required to report energy savings to the Finance Commission of Shenzhen Municipality and make payments to ESCOs, which has resolved the contradiction between allocation of energy savings and budget rules. GOA has pointed out that EPCs in public sector should learn from Shenzhen s experience in EPCs in Public Sector Symposium in July 2014 (ECPI 2014). Public sector entities must follow public procurement rules, so the existence of supporting legislation is critical, based on experience around the world. Thus, existing public procurement rules need to be adapted to allow EPCs to flourish in the public sector. There are three main reasons for rule adaptation. First, public procurement rules are typically designed for simple purchases of goods or services; they may not have any provisions for procurements that involve performance requirements. Without such provisions, there may not be legal authority for undertaking EPCs, making it harder to obtain approval for EPCs. At the national level, the State Council s 2008 Public Sector Energy Conservation Rules indicated public institutions can use EPCs for energy efficiency retrofits and financing. At provincial and local levels, policies and guidelines support EPCs in the public sector to varying degrees. Stronger legislative and policy support of EPCs at the national level, such as amendment of government procurement rules, and required harmonization of provincial and local rules with national legislation and policies would help scale up EPCs in the public sector (GOA 2008). Second, public procurement rules may need to be adjusted to allow for selection of awards based not just on the lowest cost but on the lowest life-cycle cost. In other words, an EPC proposal with the lowest first costs may not provide the best financial value to the public institutions; procurement rules should reward lower life-cycle costs, particularly for effective EPCs. Third, EPCs are relatively complex contracts; streamlining the procurement policy will facilitate EPCs in the public sector. Streamlining can also help in meeting the specific requirements of EPCs (particularly regarding the need for high-quality investment grade audits (IGAs)). In the United States, the FEMP designed a procurement process, called a Super Energy Service Performance Contract (Super ESPC), that streamlines contracting for facilities in the public sector. Under this program, the FEMP requires ESCOs to compete for large umbrella contracts every 5 years; any federal agency can access these umbrella contracts for specific projects by issuing a task order. About 15 ESCOs receive awards, and the FEMP then rotates assignments for developing projects with federal agencies among the ESCOs (agencies may also choose to hold a limited competition among several ESCOs). This approach significantly reduces the procurement expenses, negotiation time, and risks for ESCOs and public facilities. Another flexibility built into this contract process is that ESCOs are allowed to modify initially proposed energy conservation measures post-award, based on a more in-depth audit or IGA, before guaranteeing savings. This modification process allows for a higher quality audit, which reduces risks for all involved and allows the ESCO to guarantee larger savings. The Chinese government could also experiment with a two-stage procurement process, which can be an alternative way of allowing the ESCOs to conduct IGAs. In such a procurement model, public facilities first select one or a few ESCOs based on their qualifications and (sometimes) a simple proposal. In the second stage, the winning ESCOs submit a proposal in which energy conservation measures have been examined more 15

23 thoroughly. Typically, ESCOs are unwilling to invest in an IGA unless they have a very strong chance of winning a project, but skipping the IGA typically leads to smaller, riskier projects. A two-stage procurement process allows ESCOs and facilities to take on less risk and lowers ESCOs procurement costs, as the selection at the first stage limits competition. If the results of an IGA deviate significantly from the client s expectation, the client has the right to cancel the EPC project without paying the ESCO for the prior analysis. Appendix F describes additional options to promote deep energy savings in the public sector. Conclusions EPCs are an important market mechanism in unlocking financing and technical knowhow for energy efficiency. By pursuing EPCs, ESCOs play an important role in achieving energy efficiency retrofits in buildings, industry, and other types of facilities. The Chinese government has made a great effort in promoting the country s ESCO business and expanding the EPC market. This paper makes a series of recommendations for China to adopt more ambitious policy measures in encouraging deep energy savings via EPCs. To bring optimal results, it will be valuable for China to use its public funding to support all suitable EPC models to maximize and diversify EPC opportunities. It will also be beneficial for China to start focusing its incentive policy on long-term and more costeffective solutions, making a transition from directly subsidizing EPC projects to creating market conditions necessary for deploying deep-saving solutions and financing frameworks that support demand. While policy changes at the national level are complex and timeconsuming, Chinese cities and provinces often serve as early adopters in much the same way as localities in the United States and elsewhere and experiment with innovative incentive policies, financing models, and public procurement rules, as is done in the United States and other countries. Innovation in financing could help China extend EPCs to underserved market segments such as commercial buildings, SMEs and the residential sector. At the same time, pursuing long-term and comprehensive energy efficiency solutions require more effective contracting options beyond the shared savings model. Regardless of what options are adopted, however, standardizing contractual procedures with common terms and conditions will help China smooth the contracting process and minimize transaction costs associated with financing. Such contract standardization will also better position China in the long-term to tap its capital markets and private resources for innovative financing for energy efficiency. It is equally important for China to promote EPCs in the public sector as it can unleash great energy efficiency retrofits in a sector that leads by example to demonstrate the public sector s commitment to environmental and energy sustainability while reducing operation costs. It is important for both China and the United States to seek continuing policy support and greater market flexibility in developing innovative mechanisms to attract investment at lower costs and to trigger technology integration focused on deep energy savings. It is also important for both countries to strengthen their collaboration in EPCs to share valuable insights and lessons learned in incentives, financing, contracting, technologies, project development, risk management, and M&V. Such innovation and collaboration will allow both countries to create tremendous opportunities to expand EPCs and unleash deep-savings retrofits. 16

24 Acknowledgements This report was funded by the U.S. Department of State and implemented under U.S. Department of Energy Contract No. DE-AC05-76RL01830 with the Battelle Memorial Institute and U.S. Department of Energy Contract No. DE-AC02-05CH11231 with the Regents of the University of California. The authors would like to thank stakeholders from the EPC Symposium held in connection with the 2015 EMCA Annual Meeting, including the following individuals for providing comments or answering our questions: Clay Nesler of Johnson Controls, Jennifer Layke of World Resources Institute, Ming Zhao of ESCO Committee of China Energy Conservation Association, Bo Song of China Academy of Building Research, and Haijian Li of Shenzhen Coolead Industry Co., Ltd 17

25 References ASE (Alliance to Save Energy) Brief #1: Funding Mechanisms for Energy Efficiency. ACUPCC (American College & University Presidents' Climate Commitment) Financing Sustainability Projects on Campus: Efficiency Services Agreements. ACEEE (American Council for Energy-Efficient Economy) On-Bill Financing for Energy Efficiency Improvements. Beijing Evening News Establishment of Special Funds for Energy Management Contracting. December 5, &page=2 Beijing Municipal Commission of Development and Reform, Beijing Finance Bureau Beijing Energy Performance Contracting Financial Incentives Interim. Beijing Municipal Commission of Development and Reform, Beijing Finance Bureau Suggestion on Beijing further promoting Energy Performance Contracting in developing energy efficiency service industry. BMCDR and BFB (Beijing Municipal Commission of Development and Reform and Beijing Finance Bureau) Beijing Energy Performance Contracting Financial Incentives Interim. CABR (China Academy of Building Research) Training Information. DOE (Department of Energy) Revolving Loan Funds and the State Energy Program. DOE (Department of Energy) Energy Department s Loan Portfolio Continues Strong Performance While Deploying Innovation. DOE (Department of Energy) Energy Service Agreement. ECPI (Energy Conservation for Public Institutions) Public Institutions Demonstration Projects and Energy Performance Contracting Promotion Symposium, Government Offices Administration. EMCA and IFC (Energy Management Company Association and International Finance Corporation) China Energy Service Company (ESCO) Market Study. EMCA China Energy Services Training Center. Evans, M., Yu, S., Roshchanka, V., Halverson, M., Shen, B., Price, L., Liu, M., Miao, P., Dai, F., and L. Meng (in print). Unleashing Energy Efficiency Retrofits through Energy Performance Contracts in China and the United States 18

26 Finance Commission of Shenzhen Municipality Shenzhen Energy Performance Contracting Financial Incentives. FREE (Foundation for Renewable Energy & Environment) Sustainability Energy Utility (SEU): Understanding the Basics. Frusha, M., and J. Karger Leveraging Federal Funds: Department of Energy PACE Webinar. January 15, 2011, U.S. Department of Energy Goldman C.A., Peters, J.S., Albers, N., Stuart, E., and M.C. Fuller Energy Efficiency Services Sector: Workforce Education and Training Needs. Lawrence Berkeley National Laboratory and Research Into Action, Inc. GOA (Government Offices Administration of the State Council) Public Sector Energy Conservation Rule. GOA (Government Offices Administration of the State Council) Public Institutions Energy Conservation Plan in the 12 th FYP. GOA (Government Offices Administration of the State Council) Strengthen Public Sector Energy Conservation and Promote Ecological Civilization. ISC (Institute for Sustainable Communities) Guangdong Public Building Energy Efficiency Guideline. Energy-Efficiency-Guidebook.pdf IFC (International Finance Corporation) Study on the Potential of Sustainable Energy Financing for Small and Medium Enterprises in China. October eport+for+web.pdf?mod=ajperes Kostka, G., Moslener, U., and Andreas, J Barriers to Increasing Energy Efficiency: Evidence from Small- and Medium-Sized Enterprises in China. Journal of Cleaner Production. 57 (2013): Larsen, P., C. A. Goldman and A. Satchwell Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from Lawrence Berkeley National Laboratory, 5447-E. Berkeley, CA MOF (Ministry of Finance) Notice on Interim Management Regulations on Financial Rewards of Energy Performance Contracting Projects, June 3, NAESCO (National Association of Energy Service Companies) Federal Market Workshop. NDRC (National Development and Reform Commission) Directive of Administrative Measures in DSM Implementation. NDRC and MOHURD (National Development and Reform Commission and Ministry of Housing and Urban-Rural Development) Green Building Action Plan. 19

27 NY Green Bank Investment Strategy. Strategy PNNL (Pacific Northwest National Laboratory) The Facility Energy Decision System (FEDS). Romankiewicz, J., Shen, B., Price, L., and Lu, H.Y Addressing the Effectiveness of Industrial Energy Efficiency Incentives in Overcoming Investment Barriers in China. Proceedings of the European Council for an Energy-Efficient Economy s 2012 Summer Study in Industry, pp Stockholm: ECEEE. SEIA (Solar Energy Industries Association) Loan Guarantee Program. Shanghai Municipal Commission of Economy and Informatization Shanghai Energy Performance Contracting Financial Incentives. Shenzhen GOA, Shenzhen MDRC and FC of Shenzhen (Shenzhen Government Offices Administration, Shenzhen Municipal Development and Reform Commission and Finance Commission of Shenzhen Municiplaity) Shenzhen Energy Performance Contracting in Public Sector Implementation Plan. Shenzhen News Innovative Shenzhen Model on Energy Performance Contracting in Public Sector. Wei, Y.J Introduction of Work Done by Shanghai Energy Conservation Supervision Center, Proceedings of 2010 China Industrial Energy Efficiency Workshop, August 19-20, 2010 Xi an, China World Bank China - Improving Energy Efficiency in Public Institutions. ESMAP (Energy Sector Management Assistance Program) c_institutions.pdf World Bank Scaling Up Energy Efficiency in Buildings in the Western Balkans Energy Services Market Development. Guidance Note. May Washington, DC Yu, S., M. Evans, and Q. Shi Analysis of the Chinese Market for Building Energy Efficiency. Pacific Northwest National Laboratory, PNNL College Park, MD 20

28 APPENDICES 21

29 Appendix A. Examples of EPC Incentives at National and City Levels Contracting Model Scoping National Requirements Incentives for ESCOs registered at national level Local Requirements Incentives for ESCOs registered at local levels National Beijing Shanghai Shenzhen Shared Shared savings savings model model Register at the national level Register in Beijing Shared savings model and guaranteed savings model Register and implement EPCs in Shanghai Shared savings model and sharedguaranteed savings hybrid model Register and implement EPCs in Shenzhen ESCOs cover at least 70% of the project cost; annual energy savings of 100 and 10,000 tonnes of coal equivalent (tce); industrial project s annual energy savings of 500 and 10,000 tce. CNY 240/tce from Ministry of Finance (MOF) N/A CNY 240/tce from MOF, and CNY 260/tce from Beijing Finance Bureau ESCOs cover at least 70% of the project cost; annual energy savings of at least 100 tce; industrial project s energy savings of at least 300 tce. Two types of incentives: 1. Annual energy savings: CNY450/tce; 2. Energy savings rate: 15% of investment amount (rate between 15% and 25%); or 20% of investment amount (rate at least 25%) (annual energy savings of at least 500 tce.) CNY 240/tce from MOF, and CNY 360/tce from Shanghai Finance Bureau ESCOs cover at least 50% of the project cost; annual energy savings of at least 50 tce. Three types of incentives: Shared savings: 1. Annual energy savings: CNY500/tce; 2. Energy savings rate: at least 20% of investment amount (rate between 15% and 25%); or at least 30% of investment amount (rate at least 25%). Guaranteed savings: 3. 60% of shared savings incentives standards. CNY 240/tce from MOF, and CNY 300/tce from Shenzhen Finance Bureau Annual energy savings of at least 50 tce; industrial project s energy savings of at least 200 tce. One type of incentive: 1. Annual energy savings: CNY 500/tce. * There are incentives at both national and local levels. National incentives are available for ESCOs registered at the national level, and are jointly funded by MOF and local MOF equivalents. Local incentives are available for ESCOs registered at the local level, and are funded by local MOF equivalents. Sources: Interim Management Regulations on Financial Rewards of Energy Performance Contracting Projects Beijing Energy Performance Contracting Financial Incentives Interim; Shanghai Energy Performance Contracting Financial Incentives ; Shenzhen Energy Performance Contracting Financial Incentives Interim. 22

30 Appendix B. Existing Tax and Fiscal Incentives in China The Chinese government has created ESCO reward programs targeting industrial projects with energy savings achieved between 500 and 10,000 tons of coal equivalent (tce) ( million Btu) and projects in other sectors with energy savings between 100 and 10,000 tce ( million Btu). For every tce of verified energy savings, provincial/local governments offer a minimum of CNY 60 ($0.28/thousand Btu) to match the national incentive of CNY 240 ($1.11/thousand Btu) (MOF 2010). Local governments have also provided rewards to support EPC projects. Table 1 lists fiscal rewards offered by local governments in China. Table 3. Local Fiscal Incentives in Selected Locations Location Amount of Incentives (CNY/tce Saved) Beijing Industry: 600, Non-industry: 800; chauffage option: 360 Shanghai 600 Shenzhen 540 Guangdong 500 Fujian Industry: 500, Building & Transportation: 800 Shanxi 400 Tianjin, Hainan, Chongqing 360 Xiamen 340 Xinjiang 240 Source: Evans et al China s government has also provided favorable tax exemptions and reductions to support the ESCO industry. ESCOs in China are normally subject to three types of tax: valueadded tax, business tax, and corporate income tax. The new tax policy allows qualified ESCOs to get an exemption from business and value-added taxes. In addition, ESCOs will not pay any income tax for the first three years of the associated qualifying project, and only 50% of the income tax rate for the next consecutive three years during the project. Any fixed or intangible assets are allowed to be depreciated or amortized over the shared savings contracting period. These incentives have played a significant role in stimulating the early development of EPCs in China. However, the effectiveness of this incentive policy, especially for projects targeting deep-energy savings, has not been clear. First, both existing fiscal rewards and tax incentives favor shared savings contracts which discourage ESCOs from pursuing other contract options that may better suit the EPC project conditions. Second, the prerequisite for ESCOs to cover at least 70% of the upfront costs of efficiency improvements remains a formidable obstacle for most SME ESCOs to finance EPC projects. The large amount of required self-funding discourages ESCOs from pursuing, and is a barrier to participation by SME ESCOs in, deep energy savings projects that typically require a large, upfront injection of capital. Third, despite the tax benefits, government tax policy allowing EPC project assets to be depreciated or amortized over the contracting period creates an actual effect that encourages ESCOs to enter into short-term projects as a shorter period creates higher depreciation or amortization, resulting in less tax payment. Fourth, local incentives have been linked to the registration of ESCOs with local jurisdictions. This may to a certain extent confine ESCO business within geographic boundaries, fragmenting the EPC market. Finally, case studies described in an LBNL paper (Romankiewicz et al., 2012) reveal that government financial rewards only marginally impacted payback periods of efficiency retrofit projects, indicating a missed opportunity for public funding to be more impactful. 23

31 Appendix C. Green Bonds As Financing Box 6. Green Bonds as Financing The Inter-American Development Bank (IDB) has structured a capital markets solution for energy efficiency financing in Mexico that may have applications for deploying energy efficiency retrofits in China at scale, even as China seeks to develop its bond market. The project seeks to securitize a pool of energy efficiency projects originated by ESCOs competitively selected to participate in this facility in order to obtain debt financing that offers better financial conditions and terms appropriate to the projects needs. The facility s main objective is to issue the first green bonds backed by clean energy projects in Mexico s capital market, in order to help mitigate greenhouse gas (GHG) emissions and open a new long-term financing channel to promote this type of investment among institutional and impact investors. The first stage of the proposed project consists of a senior revolving line of credit (warehouse line) for up to US$50 million for the construction of the efficiency projects. Once these projects become operational, the second stage consists of periodic green bond offerings backed by energy efficiency projects for up to Mex$2 billion (US$149 million), as supported by an IDB partial credit guarantee program for up to a total amount of Mex$750 million (US$56 million) and a second loss guarantee from the Clean Technology Fund (a funding window of the Climate Investment Funds which provides concessional financing through five partner multilateral development banks for large-scale, country-led projects in renewable energy, energy efficiency and transport) for up to a total amount of $19 million, that will refinance the construction loans and provide the long-term financing. This project also involves a competitive fund manager selection process, standardization of legal contracts, establishment of project eligibility criteria, project selection methodology, a GHG emission calculation methodology, and energy efficiency calculation methodology in order to create a homogenous class of assets that could be securitized and given a credit rating that will attract institutional investors, like pension funds and insurance companies. While still in the early warehousing phase of developing projects, this facility has not yet issued any green bonds supported by the energy savings of underlying operational projects. Nonetheless, this presents a capital markets alternative in which the central and provincial governments could play a role like IDB s in facilitating the development of such a standardized facility, and China s financing institutions, like the China Development Bank, could provide a second loss guarantee and/or partial credit guarantee for the asset-backed green bonds. 24

32 Appendix D. Types of Public Facilities in China Public facilities in China include central, provincial and local government-owned facilities with a range of functions, such as educational institutions; government offices; healthcare institutions; social, cultural and sports facilities; and science and technology centers (see Figure 2) Educational institutions Government office and research centers Healthcare institutions 281 Social, cultural and sports facilities Science and tech centers 446 Other Figure 2. Number of Public Facilities in China by Type, 2010 (in Thousands) Source: Adapted from World Bank The Government Offices Administration (GOA), the National Development and Reform Commission (NDRC) and the Ministry of Finance (MOF) have started the Conservation-Oriented Public Sector Demonstration since 2012, and EPCs have been widely used in this demonstration program. For example, 18 EPCs are completed in the central government and 292 EPCs are completed in local governments (CABR 2015). Jiangsu and Zhejiang are top two provinces that have completed more than 20 EPCs in public institutions (see Figure 3). Among the total 310 EPCs projects, 48% are implemented in government buildings, and 31% and 16% of EPCs projects are carried out in universities and hospitals respectively (see Figure 3). 25

33 Figure 3. Public Sector EPC Projects in China by Province Source: Adapted from China Academy of Building Research Figure 4. EPCs Projects in China by Public Institutions Type Source: Adapted from China Academy of Building Research

34 Appendix E. Current Institutional Arrangement of the Chinese Public Sector World Bank describes and existing framework for ownership and responsibilities for buildings in the public sector in China (World Bank 2012). As shown in Figure 2, the GOA of the State Council guides, manages and monitors energy efficiency in central government buildings and facilities. Meanwhile, provincial GOAs or their local equivalents manage and monitor government facilities at their respective levels. The MOF as well as provincial and local finance departments manage energy budgets for public buildings at their respective levels. According to known case studies, ESCOs have received payments directly from public facilities (see red arrows in Figure 2) when implementing EPCs (ISC 2013). Thus, Figure 2 illustrates an integrated potential institutional framework, with the public buildings management structure and the project payment stream from facilities to ESCOs. Also, GOA coordinates with many central government agencies at the same level regarding energy efficiency. For example, GOA coordinates with NDRC, MOHURD and MOF in setting targets, standards and financing instruments. Specifically, NDRC oversees national energy efficiency policies MOHURD manages national building energy efficiency programs MOF provides special energy conservation funds. Moreover, GOA coordinates with other central ministries, such as the Ministry of Education (MOE) and the Ministry of Health (MOH). At MOE, officials oversee universities reporting to the central government, and MOE local government affiliates oversee primary and secondary schools and some universities reporting to local governments. On the other hand, MOH and its local government affiliates own hospital buildings, but the hospital managers are in charge of facility operation and maintenance. There are also health service centers and village health stations, which report to provincial or local government health departments (World Bank 2012). Figure 5. Institutional Framework for EPCs in Government Buildings Source: World Bank 2012 and ISC

Energy Performance Contracting Recommendations for China s Public Sector

Energy Performance Contracting Recommendations for China s Public Sector PNNL-27282 Energy Performance Contracting Recommendations for China s Public Sector February 2018 Yuanrong Zhou, Artur Denysenko, Meredydd Evans, Sha Yu (Pacific Northwest National Laboratory) Mei Lu,

More information

Session 4b China Health Insurance Industry A Ever Changing Landscape. Davout Yean, FSA

Session 4b China Health Insurance Industry A Ever Changing Landscape. Davout Yean, FSA Session 4b China Health Insurance Industry A Ever Changing Landscape Davout Yean, FSA China Health Insurance Industry - A Ever Changing Landscape DAVOUT YEAN FSA AIG Business Consulting(BJ), Chief Strategy

More information

中国人民银行上海总部关于支持中国 ( 上海 ) 自由贸易试验区扩大人民币跨境使用的通知

中国人民银行上海总部关于支持中国 ( 上海 ) 自由贸易试验区扩大人民币跨境使用的通知 Unofficial Translation 中国人民银行上海总部关于支持中国 ( 上海 ) 自由贸易试验区扩大人民币跨境使用的通知 Notice of the Shanghai Head Office of the People's Bank of China to Promote Cross-border Use of Renminbi in the China (Shanghai) Pilot

More information

HOW TO DEVELOP A SUCCESSFUL JOINT-VENTURE IN CHINA. is a business unit of

HOW TO DEVELOP A SUCCESSFUL JOINT-VENTURE IN CHINA. is a business unit of HOW TO DEVELOP A SUCCESSFUL JOINT-VENTURE IN CHINA WHAT IS A JOINT-VENTURE Joint-Venture in China SIMPLY PUT, A JOINT VENTURE (JV) IS NOTHING MORE THAN AN ECONOMIC COOPERATION, OR BUSINESS COMBINATION,

More information

Account Maintenance Fee. USD 10 or equivalent per month for average account balance(s) less than USD 100,000 or equivalent. Account Maintenance Fee

Account Maintenance Fee. USD 10 or equivalent per month for average account balance(s) less than USD 100,000 or equivalent. Account Maintenance Fee Charges and Commissions (Effective from 1 st October, 2015) Account Maintenance Fee Account Maintenance Fee USD 10 or equivalent per month for average account balance(s) less than USD 100,000 or equivalent.

More information

中国东方航空股份有限公司 China Eastern Airlines Corporation Limited

中国东方航空股份有限公司 China Eastern Airlines Corporation Limited 中国东方航空股份有限公司 China Eastern Airlines Corporation Limited 股东提名董事候选人程序说明 Procedures for Shareholders to Nominate Director Candidates 第一章总则 Chapter One General Provisions 第一条根据 中华人民共和国公司法 上市公司治理准则 公司章程 关于在上市公司建立独立董事制度的指导意见

More information

NYU Shanghai CAMPUS GUIDELINES

NYU Shanghai CAMPUS GUIDELINES NYU Shanghai CAMPUS GUIDELINES 上海纽约大学校园导则 Title Guidelines on the Use of NYU Shanghai Faculty Funds 名称上海纽约大学教职经费使用导则 Effective Date: December 1, 2015 生效日期 : 2015 年 12 月 1 日 Supersedes: Guidelines on the

More information

CUSTOMER INFORMATION/CNY BASIC SETTLEMENT ACCOUNT (SOLE ACCOUNT) OPENING FORM

CUSTOMER INFORMATION/CNY BASIC SETTLEMENT ACCOUNT (SOLE ACCOUNT) OPENING FORM CUSTOMER INFORMATION/CNY BASIC SETTLEMENT ACCOUNT (SOLE ACCOUNT) OPENING FORM!"#L!"#$%&E!F!" HSBC Bank (China) Company Limited!!! Branch Date W NOTE: 1Please tick( ) where applicable and complete : this

More information

R&D tax incentives in the EU 欧盟的研发税收奖励

R&D tax incentives in the EU 欧盟的研发税收奖励 R&D tax incentives in the EU 欧盟的研发税收奖励 By Vinod Kalloe Head of international tax policy KPMG The Netherlands 荷兰毕马威会计事务所国际税收政策部负责人 IP Key-CAS IPM Conference Beijing, 4 December 2014 北京,2014 年 12 月 4 日 Content

More information

Audit Report 30 JUN W'k h4hi E Audit Service Center of China National Audit Office for. Foreign Loan and Assistance Projects

Audit Report 30 JUN W'k h4hi E Audit Service Center of China National Audit Office for. Foreign Loan and Assistance Projects Public Disclosure Authorized Public Disclosure Authorized Audit Service Center of China National Audit Office for Foreign Loan and Assistance Projects Audit Report 30 JUN 2016 1 44q3 3 Public Disclosure

More information

Media Announcement (For Immediate Release) 即时新闻发布. LionGold Corp Signs MOU with China SOE-backed Mining Contractor 瑞狮集团和中国国有企业背景的矿山工程承包商 签订合作备忘录

Media Announcement (For Immediate Release) 即时新闻发布. LionGold Corp Signs MOU with China SOE-backed Mining Contractor 瑞狮集团和中国国有企业背景的矿山工程承包商 签订合作备忘录 LionGold Corp Ltd (Incorporated in Bermuda) 59 Mohamed Sultan Road Sultan Link 02-08 Singapore 238999 Tel: (65) 6690 6860 Fax: (65) 6690 6844 info@liongoldcorp.om www.liongoldcorp.com LIONGOLD CORP Highlights

More information

Asia Practice Group 亚洲事务组

Asia Practice Group 亚洲事务组 Asia Practice Group 亚洲事务组 Introduction to the Firm is a dynamic full-service law firm headquartered in the heart of Manhattan specializing in Corporate, Capital Markets and Securities Law. Our objective

More information

2015年度审计报告及财务报表 02 03

2015年度审计报告及财务报表 02 03 2015年度审计报告及财务报表 02 03 2015 年度审计报告及财务报表 04 05 资产负债表 单位 : 中国石化财务有限责任公司 金额单位 : 元 资产行次 2015-12-31 2014-12-31 负债及所有者权益行次 2015-12-31 2014-12-31 资产 : 1 负债 : 52 现金 2 200,861.73 192,601.71 拆入资金 53 10,000,000,000.00

More information

ACCA F3/FIA FFA. Provided by Academy of Professional Accounting (APA) Financial Accounting(FA) Financial Reporting ACCA Lecturer: Tom Liu

ACCA F3/FIA FFA. Provided by Academy of Professional Accounting (APA) Financial Accounting(FA) Financial Reporting ACCA Lecturer: Tom Liu Professional Accounting Education Provided by Academy of Professional Accounting (APA) ACCA F3/FIA FFA Financial Accounting(FA) Financial Reporting ACCA Lecturer: Tom Liu ACCAspace 中国 ACCA 特许公认会计师教育平台

More information

CAR Inc Annual Results. Feb 27 th, 2018

CAR Inc Annual Results. Feb 27 th, 2018 CAR Inc. 2017 Annual Results Feb 27 th, 2018 Operational & Financial Highlights Q4 17 Highlights (RMB in millions) Car rental 1,211 684 Continue to demonstrate strong growth momentum with YOY price reduction

More information

The 12 th five year plan. The Formulation of China s Major Plans and Programs and onwards

The 12 th five year plan. The Formulation of China s Major Plans and Programs and onwards The Formulation of China s Major Plans and Programs 2008-2010 and onwards S u p p o r t i n g a h a r m o n i o u s s o c i e t y BACKGROUND China s five year plans In recent years, not only has the methodology

More information

芯系天下 ( 線上法說會 ) Q Quarterly Online Investor Conference. March 15, March 3, 2016

芯系天下 ( 線上法說會 ) Q Quarterly Online Investor Conference. March 15, March 3, 2016 環宇 芯系天下 March 3, 2016 Q4 2018 Quarterly Online Investor Conference ( 線上法說會 ) March 15, 2019 Disclaimer Statement This presentation includes forward-looking statements. All statements, other than statements

More information

NEWSLETTER TAX CHINA JUNE / JULY 2018 JUNE / JULY 2018

NEWSLETTER   TAX CHINA JUNE / JULY 2018 JUNE / JULY 2018 NEWSLETTER TAX CHINA JUNE / JULY 2018 WWW.GARRIGUES.CN JUNE / JULY 2018 LAW BRIEF NAME DATE OF EFFECTIVENESS GARRIGUES INSIGHT 国家税务总局公告 2018 年第 28 号 国家税务总局关于发布 企业所得税税前扣除凭证管理办法 的公告 / Announcement of the

More information

中国人民银行关于金融支持中国 ( 上海 ) 自由贸易试验区建设的意见

中国人民银行关于金融支持中国 ( 上海 ) 自由贸易试验区建设的意见 Unofficial Translation 中国人民银行关于金融支持中国 ( 上海 ) 自由贸易试验区建设的意见 Opinions of People's Bank of China to Support China (Shanghai) Pilot Free Trade Zone in Financial Sector 为贯彻落实党中央 国务院关于建设中国 ( 上海 ) 自由贸易试验区 ( 以下简称试验区

More information

全面进入 EMC 模式 同方泰德 (1206:HK) BUY. Technology Hardware & Equipment Company. Bringing China to the World. Unchanged

全面进入 EMC 模式 同方泰德 (1206:HK) BUY. Technology Hardware & Equipment Company. Bringing China to the World. Unchanged SWS Co. Ltd is a subsidiary of ShenwanHongyuan Securities. 99 East Nanjing Road, Shanghai +86 21 2329 7818 www.swsresearch.com Technology Hardware & Equipment Company Bringing China to the World 2 June

More information

Interest Rate Liberalization: the Soul of Financial Reform

Interest Rate Liberalization: the Soul of Financial Reform Interest Rate Liberalization: the Soul of Financial Reform Introduction Interest rate is the most important price in the financial market, with its liberalization being one of the most debated topics among

More information

Audit Report 30 JUN : Henan Provincial Audit Office of the People's Republic of China *F# (2016) 71 # HENAN AUDIT REPORT C 2016) NO.

Audit Report 30 JUN : Henan Provincial Audit Office of the People's Republic of China *F# (2016) 71 # HENAN AUDIT REPORT C 2016) NO. Public Disclosure Authorized Henan Provincial Audit Office of the People's Republic of China 30 JUN 2016 Public Disclosure Authorized Audit Report *F# (2016) 71 # HENAN AUDIT REPORT C 2016) NO.71 Public

More information

ATA Inc. Financial Results Conference Call for the Three- and Nine-Month Transition Periods Ended December 31, 2017 TRANSCRIPT

ATA Inc. Financial Results Conference Call for the Three- and Nine-Month Transition Periods Ended December 31, 2017 TRANSCRIPT ATA Inc. Financial Results Conference Call for the Three- and Nine-Month Transition Periods Ended December 31, 2017 TRANSCRIPT March 19, 2018 at 9 p.m. ET SPEAKERS Carolyne Sohn Senior Associate, The Equity

More information

加码高端物管市场维持彩生活买入评级 彩生活服务集团 (1778:HK) BUY Unchanged. Real Estate Company Research. Bringing China to the World

加码高端物管市场维持彩生活买入评级 彩生活服务集团 (1778:HK) BUY Unchanged. Real Estate Company Research. Bringing China to the World 15-08 15-09 15-10 15-11 15-12 16-01 16-02 16-03 16-04 16-05 16-06 16-07 16-08 SWS Research Co. Ltd is a subsidiary of ShenwanHongyuan Securities. 99 East Nanjing Road, Shanghai +86 21 2329 7818 www.swsresearch.com

More information

CSE: LUX XETRA: NGO Frankfurt: NGO. Environmentally Responsible Gold Recovery

CSE: LUX XETRA: NGO Frankfurt: NGO. Environmentally Responsible Gold Recovery CSE: LUX XETRA: NGO Frankfurt: NGO Environmentally Responsible Gold Recovery Cautionary Disclaimer Forward Looking Statements Certain statements contained herein regarding Newlox Gold Ventures Corp. (the

More information

5% BONUS 5% 赠金条款 ( 适用于 1 月 ) TERMS AND CONDITIONS

5% BONUS 5% 赠金条款 ( 适用于 1 月 ) TERMS AND CONDITIONS 5% BONUS 5% 赠金条款 ( 适用于 1 月 ) TERMS AND CONDITIONS 1 GENERAL 1 总则 The terms and conditions contained herein apply to the Promotional Bonus (the Promotion ) offer made available through the websites of Fair

More information

C H I N A LEGAL BRIEFING* 205

C H I N A LEGAL BRIEFING* 205 C H I N A LEGAL BRIEFING* 205 23. 29 29. NOV OV. 2009 * CHINA LEGAL BRIEFING is a weekly collection of Chinese law related news gathered from various media and news services, edited by - LAW LTD. distributed

More information

流动性补充 配股将最多为华油能源带来约 2.3 亿港币现金 (1.9 亿人民币 ), 相当于 17 年底在手现金的 1.3 倍 获得的流动性补充不仅满足了在订单量激增下日益增长的项目垫资需求, 而且在行业景气周期中为企业未来业务发展打下了坚实的资金基础, 打开了未来的增长空间

流动性补充 配股将最多为华油能源带来约 2.3 亿港币现金 (1.9 亿人民币 ), 相当于 17 年底在手现金的 1.3 倍 获得的流动性补充不仅满足了在订单量激增下日益增长的项目垫资需求, 而且在行业景气周期中为企业未来业务发展打下了坚实的资金基础, 打开了未来的增长空间 本研究报告仅通过邮件提供给国投瑞银国投瑞银基金管理有限公司 (res@ubssdic.com) 使用 1 SWS Co. Ltd is a subsidiary of Shenwan Hongyuan Securities 99 East Nanjing Road, Shanghai (8621)23297818 www.swsresearch.com Utilities Bringing China

More information

Natural Gas Sales Growth to Accelerate, Maintain Buy

Natural Gas Sales Growth to Accelerate, Maintain Buy 股票研究 Equity Research : Binhai Investment (02886 HK) Kevin Guo 郭勇公司报告 : 滨海投资 (02886 HK) +86 755 23976671 kevin.guo@gtjas.com Natural Gas Sales Growth to Accelerate, Maintain Buy 天然气销售增速将会加快, 维持 买入 评级 公司报告证券研究报告清洁能源行业

More information

环境险峻 京东集团 (JD:US) 中性维持. Bringing China to the World. Internet Software &Services Company Research

环境险峻 京东集团 (JD:US) 中性维持. Bringing China to the World. Internet Software &Services Company Research 本研究报告仅通过邮件提供给国投瑞银国投瑞银基金管理有限公司 (res@ubssdic.com) 使用 1 SWS Co. Ltd 99 East Nanjing Road, Shanghai +86 21 2329 7818 www.swsresearch.com Internet Software &Services Company Bringing China to the World 2018

More information

DEVELOPING ASIAN CAPITAL MARKETS

DEVELOPING ASIAN CAPITAL MARKETS Updated: August 2017 Pre-deal Research Addenda for the Hong Kong IPO process Prepared with the kind assistance of Herbert Smith Freehills and Norton Rose Fulbright DEVELOPING ASIAN CAPITAL MARKETS Contents

More information

China Newsletter 1 GREENBERG TRAURIG, LLP ATTORNEYS AT LAW

China Newsletter 1 GREENBERG TRAURIG, LLP ATTORNEYS AT LAW Spring 2013 / Issue No. 23 of Series ALBANY AMSTERDAM ATLANTA AUSTIN BOSTON CHICAGO DALLAS DELAWARE DENVER FORT LAUDERDALE HOUSTON LAS VEGAS LONDON* LOS ANGELES MEXICO CITY+ MIAMI NEW JERSEY NEW YORK ORANGE

More information

TRACKING THE INSTITUTIONALISATION OF AD HOC ARBITRATION IN MAINLAND CHINA

TRACKING THE INSTITUTIONALISATION OF AD HOC ARBITRATION IN MAINLAND CHINA Zeyu Huang, PhD Student in University of Macau (Private International Law & International Arbitration) TRACKING THE INSTITUTIONALISATION OF AD HOC ARBITRATION IN MAINLAND CHINA THE RELEVANCE OF UNCITRAL

More information

2nd Insurance Innovation Congress China 2017

2nd Insurance Innovation Congress China 2017 IIC 2nd Insurance Innovation Congress China 2017 2017 年第二届中国保险业创新国际峰会 March 8-10th, 2017 Shanghai, China Pre-Conference Workshop 会前研讨会 (2017-3-8,13:30-18:00) Pre-Workshop 会前研讨会 Blockchain Technology and

More information

Plan Ahead. We ve Got You Covered INTERNATIONAL EXCLUSIVE

Plan Ahead. We ve Got You Covered INTERNATIONAL EXCLUSIVE Plan Ahead We ve Got You Covered INTERNATIONAL EXCLUSIVE This product is distributed and managed by AXA Tianping Property & Casualty Insurance Company Limited. Sales and distribution agents are not responsible

More information

Nature and sustainability of the Chinese economy

Nature and sustainability of the Chinese economy Nature and sustainability of the Chinese economy Long Guoqiang Development Research Center of the State Council Prepared for the Nomura Foundation Conference Prospects for Growth in the World s Four Major

More information

Mining Could Bring Positive Surprise in 2017, Maintain Accumulate

Mining Could Bring Positive Surprise in 2017, Maintain Accumulate Infrastructure Sector Equity Research Report Company Report Equity Research 股票研究公司报告证券研究报告 Company Report: Gary Wong 黄家玮 公司报告 : 中国中铁 (39 HK) +852 259 2616 gary.wong@gtjas.com.hk Mining Could Bring Positive

More information

Green Finance: China and G20 Initiatives

Green Finance: China and G20 Initiatives Green Finance: China and G20 Initiatives MA Jun, Ph.D. Director, Center for Finance and Development, Tsinghua University Chairman, China Green Finance Committee Co-Chair, G20 Sustainable Finance Study

More information

Public Disclosure Authorized. Public Disclosure Authorized. China. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. China. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized -- China 2010 The International Bank for Reconstruction and Development / The World Bank

More information

2017 Key business drivers and opportunities in cross-border ecommerce

2017 Key business drivers and opportunities in cross-border ecommerce 2017 Key business drivers and opportunities in cross-border ecommerce Rolf Visser Chairman Co-founder, CBEC (Cross-border Ecommerce Community) Vice Chairman, WECIA (World Ecommerce Industry Alliance) Vice

More information

Ministry of Commerce (MOFCOM)

Ministry of Commerce (MOFCOM) Ministry of Commerce (MOFCOM) 商务部 Address: 2 Dong Chang an Jie, Beijing 100731 Phone: 86-10-5165-1200 Website: www.mofcom.gov.cn MOFCOM is similar to the US Department of Commerce in that it regulates

More information

2018 Market Survey Report for (Non-financial) Application of Blockchain in China

2018 Market Survey Report for (Non-financial) Application of Blockchain in China 2018 Market Survey Report for (Non-financial) Application of Blockchain in China Disclaimer The information in this report is derived from the data collected in the survey, as well as the data publicly

More information

Chinese Bankers Survey 2011

Chinese Bankers Survey 2011 www.pwchk.com Raymond Yung Financial Services Leader for China China Charles Chow Financial Services Partner China Outline Background Objectives Key findings - Economic situation - Business development

More information

ESCOs in China. Dr David Crossley, Senior Advisor

ESCOs in China. Dr David Crossley, Senior Advisor ESCOs in China ESCO Workshop Sponsored by Nexant and King Mongkut s University of Technology Thonburi Bangkok, 28 November 2014 Dr David Crossley, Senior Advisor The Regulatory Assistance Project 睿博能源智库

More information

Macroeconomics. Se Yan Guanghua School of Management Peking University Spring 2014

Macroeconomics. Se Yan Guanghua School of Management Peking University Spring 2014 Macroeconomics Se Yan Guanghua School of Management Peking University Spring 2014 1 Chapter 1 Introduction Section 1 Organization 2 Se Yan Email: seyan@gsm.pku.edu.cn Office phone: 62757764 Office: Rm

More information

业绩符合预期 交行周四公布中报业绩 期末贷款余额同比增长 7.4%, 存款余额同比增长 4.9% 净息差同比下降 30 个基点至 1.97% 净利息收入同比下降 4.1%, 非利息收入同比增速达到 8.1% 上半年净利润达到 亿元, 基本每股收益 0.

业绩符合预期 交行周四公布中报业绩 期末贷款余额同比增长 7.4%, 存款余额同比增长 4.9% 净息差同比下降 30 个基点至 1.97% 净利息收入同比下降 4.1%, 非利息收入同比增速达到 8.1% 上半年净利润达到 亿元, 基本每股收益 0. SWS Research Co. Ltd is a subsidiary of Shenwan Hongyuan Securities. 99 East Nanjing Road, Shanghai +86 21 2329 7818 www.swsresearch.com Bringing China to the World August 26, 2016 买入 维持 Market Data: Aug

More information

Frequently Asked Questions On Fast Service

Frequently Asked Questions On Fast Service 第 1 页共 8 页 Frequently Asked Questions On Fast Service 1. What is FAST? FAST (Fast And Secure Transfers) is a new electronic funds transfer service that allows a secure and almost immediate transfer of

More information

课后练习参考答案 Key to Exercises

课后练习参考答案 Key to Exercises WTO 基础知识英文选读 (Selected Readings the WTO Basics) 邱贵溪主编 上海交通大学出版社,2009 年第一版 课后练习参考答案 Key to Exercises Key to Unit One 1. Translate the following English words and phrases into Chinese. 1) 多边贸易体制 2) 关税与贸易总协定

More information

博士学位论文 对外援助, 国际收支平衡及经济增长 以赞比亚为例 FOREIGN AID, BALANCE OF PAYMENTS AND ECONOMIC GROWTH-THE CASE OF ZAMBIA. Francis Mulenga Muma 指导教师姓名 : 黄梅波教授

博士学位论文 对外援助, 国际收支平衡及经济增长 以赞比亚为例 FOREIGN AID, BALANCE OF PAYMENTS AND ECONOMIC GROWTH-THE CASE OF ZAMBIA. Francis Mulenga Muma 指导教师姓名 : 黄梅波教授 学校编码 :10384 分类号密级 学号 : 15720090153743 UDC 博士学位论文 对外援助, 国际收支平衡及经济增长 以赞比亚为例 FOREIGN AID, BALANCE OF PAYMENTS AND ECONOMIC GROWTH-THE CASE OF ZAMBIA Francis Mulenga Muma 指导教师姓名 : 黄梅波教授 专业名称 : 世界经济 论文提交日期

More information

A Feasibility Property Development and Finance Study of Building up Huaxi Photography Base

A Feasibility Property Development and Finance Study of Building up Huaxi Photography Base A Feasibility Property Development and Finance Study of Building up Huaxi Photography Base SHEN LIN (Guiyang, Guizhou, 550025) Abstract: Property development is the process by which buildings are erected

More information

NEWSLETTER TAX CHINA MARCH / MAY 2018

NEWSLETTER   TAX CHINA MARCH / MAY 2018 NEWSLETTER TAX CHINA MARCH / MAY 2018 WWW..CN JANUARY / FEBRUARY 2018 LAW BRIEF 财税 2018 年第 32 号 财政部税务总局关于调整增值税税率的通知 / I. The VAT rates of 17% and 11% are adjusted to 16% and 10% respectively ( Adjustment

More information

Literature Review on the Factors Influencing

Literature Review on the Factors Influencing Chinese Studies, 2017, 6, 24-28 http://www.scirp.org/journal/chnstd ISSN Online: 2168-541X ISSN Print: 2168-5428 A Literature Review on the Factors Influencing R & D Investment Liujun Liu Management School,

More information

New Innovations for Green Financing in Urban China. Thursday, July th Floor

New Innovations for Green Financing in Urban China. Thursday, July th Floor New Innovations for Green Financing in Urban China Thursday, July 26 2018 5 th Floor IFC GREEN Commercial bank framework July 27, 2018 IFC China climate finance Development Path Joint-stock Commercial

More information

The Yuan Exchange rate and Firms Atturo Giulia

The Yuan Exchange rate and Firms Atturo Giulia 1 The yuan exchange rate and firms How the Chinese exchange rate can influence strategic entering into the Chinese market Abstract 中国人民币汇率跟企业的关系 随着时代的进步, 国与国的距离拉近, 各国间政府, 经济, 文化等方面的常常交流, 全球化已经到了 外贸经济的地位越来越紧要,

More information

INVEST TO SUCCEED. INVEST TORONTO CCBC RECEPTION

INVEST TO SUCCEED. INVEST TORONTO CCBC RECEPTION INVEST TO SUCCEED. INVEST TORONTO CCBC RECEPTION INVEST TORONTO 多伦多投资促进局 Invest Toronto is your connection to the global business opportunities found in Toronto. We can facilitate all of the government

More information

ISO9001 有用吗? 还是它只是一个游戏

ISO9001 有用吗? 还是它只是一个游戏 ISO 9001:2015 Quality Management System Requirements Risk Management CK Cheung International Lead Evaluator for National Accreditation Body ISO9001 有用吗? 还是它只是一个游戏 视乎企业的态度 系统中所订定的目标的水平 质量管理系统的可执行性 最高层管理的承诺

More information

ACCA F8. Provided by Academy of Professional Accounting (APA) Introduction to Audit Evidence ACCA Lecturer: Tom Liu. ACCAspace 中国 ACCA 特许公认会计师教育平台

ACCA F8. Provided by Academy of Professional Accounting (APA) Introduction to Audit Evidence ACCA Lecturer: Tom Liu. ACCAspace 中国 ACCA 特许公认会计师教育平台 Professional Accounting Education Provided by Academy of Professional Accounting (APA) ACCA F8 Introduction to Audit Evidence ACCA Lecturer: Tom Liu ACCAspace 中国 ACCA 特许公认会计师教育平台 Copyright ACCAspace.com

More information

Weekly HKFRS Q&As Q&A # 7

Weekly HKFRS Q&As Q&A # 7 China National Technical Weekly HKFRS Q&As Q&A # 7 中文 March 2014 Since January 2014, we started to publish weekly HKFRS Q&As that aim to help you deal with the application issues during the busy financial

More information

Investment in Non-performing Loans in China

Investment in Non-performing Loans in China Investment in Non-performing Loans in China Stewart Wang Partner, Shanghai Office I. Overview of the legal regime applicable to China s Non-performing Loan ("NPL") China's NPL market as well as the legal

More information

Measures to Ease the Restrictions on Cross-border RMB Settlement of Goods Exports -Moves to remove the pilot enterprise system for goods exports-

Measures to Ease the Restrictions on Cross-border RMB Settlement of Goods Exports -Moves to remove the pilot enterprise system for goods exports- March 5, 2012 People s Bank of China Announcements Mizuho Bank (China), Ltd. Advisory Division Mizuho China Business Express (No. 214) Measures to Ease the Restrictions on Cross-border RMB Settlement of

More information

J M L J M L. Financial Services Regulatory Update 金融服务监管资讯. Jeffrey Mak Law Firm 麦振兴律师事务所

J M L J M L. Financial Services Regulatory Update 金融服务监管资讯. Jeffrey Mak Law Firm 麦振兴律师事务所 Jeffrey Mak Law Firm 麦振兴律师事务所 www.jmaklegal.com Financial Services Regulatory Update 金融服务监管资讯 2018.04.13 China to Further Open Financial Markets China s President Xi Jinping mentioned at the Boao Forum

More information

Management Buyout Offer at HK$6.30 Per Share, Sell

Management Buyout Offer at HK$6.30 Per Share, Sell Belle Int l (01810 HK) Equity Research Report Equity Research 股票研究 : Terry Hong 洪学宇 公司报告 : 百丽国际 (01880 HK) +86 755 23976722 hongxueyu@gtjas.com Management Buyout Offer at HK$6.30 Per Share, Sell 管理层收购要约以每股

More information

Pay your ICBC Credit Cards Bills via FAST 通过 FAST 支付工银信用卡账单

Pay your ICBC Credit Cards Bills via FAST 通过 FAST 支付工银信用卡账单 Pay your ICBC Credit Cards Bills via FAST 通过 FAST 支付工银信用卡账单 Pay your ICBC Credit Card bills immediately by simply conducting a funds transfer. 您可通过资金转账立即支付工银信用卡账单 ICBC Credit Cards can receive payments

More information

Release of Administrative Measures on Foreign-invested Securities Companies.

Release of Administrative Measures on Foreign-invested Securities Companies. Release of Administrative Measures on Foreign-invested Securities Companies www.lehmanbrown.com This article was prepared by LehmanBrown International Accountants. This article is intended for general

More information

Investing in Australian Real Property Tax structuring 投资澳洲不动产的税务考量

Investing in Australian Real Property Tax structuring 投资澳洲不动产的税务考量 Investing in Australian Real Property Tax structuring 投资澳洲不动产的税务考量 5 June 2017 Inbound investment - Key messages 境外投资者 投资澳洲地产的关键考量 相比本地投资者, 可能适用更低的税率 :Inbound investors can often access lower Australian

More information

Tax Benefits to Overseas Investors Reinvesting Distributed Profits Expanded.

Tax Benefits to Overseas Investors Reinvesting Distributed Profits Expanded. Tax Benefits to Overseas Investors Reinvesting Distributed Profits Expanded www.lehmanbrown.com This article was prepared by LehmanBrown International Accountants. This article is intended for general

More information

China s VAT Reform: The Basics.

China s VAT Reform: The Basics. China s VAT Reform: The Basics www.lehmanbrown.com This article was prepared by LehmanBrown International Accountants. This article is intended for general information purposes only and is not intended

More information

ACCA IFRS Seminar in Shenzhen 16 September 2006

ACCA IFRS Seminar in Shenzhen 16 September 2006 ACCA IFRS Seminar in Shenzhen 16 September 2006 IFRS Nelson Lam CFA FCCA FCPA(Practising) MBA MSc BBA CPA(US) ACA 2005-06 Nelson 1 Today s Agenda Introduction Presentation and Disclosure IFRS and PRC GAAP

More information

The Evolution of Trade and Supply Chain Finance: Moving towards Digitization 供应链融资演变趋势

The Evolution of Trade and Supply Chain Finance: Moving towards Digitization 供应链融资演变趋势 The Evolution of Trade and Supply Chain Finance: Moving towards Digitization 供应链融资演变趋势 Charley Zhang Head of China Trade Advisory and Shanghai Trade Sales Global Trade & Loan Products J.P. Morgan This

More information

中国中铁 -H [390.HK] 中国建筑业 收盘价 : 7.19 港元 (2018 年 11 月 30 日 ) 目标价 : 8.30 港元 (+15.4%) 股价表现 (852)

中国中铁 -H [390.HK] 中国建筑业 收盘价 : 7.19 港元 (2018 年 11 月 30 日 ) 目标价 : 8.30 港元 (+15.4%) 股价表现 (852) 中国中铁 -H [390.HK] 继续看好 2019 年盈利增长前景我们已更新了公司的 2018-2019 年盈利预测 公司 18 年首九个月的净利润同比增长 18.2%, 同期整体基础设施投资增长则基本持平 凭借中央国有企业建筑公司的地位, 公司在 18 年首九个月成功获得市场份额, 亦增加了对利润率较高的 PPP 投资业务的规模 面对经济增长下行的强大压力, 中央政府将明显依靠基础设施固定资产投资来稳定经济增长

More information

CHINA BUSINESS CLIMATE SURVEY REPORT

CHINA BUSINESS CLIMATE SURVEY REPORT CHINA BUSINESS CLIMATE SURVEY REPORT 中国商务环境调查报告 The American Chamber of Commerce in the People s Republic of China In partnership with 与贝恩公司合作编制 Table of Contents 目录 Chairman's Message 2 主席致辞 Executive

More information

CCHI Mini-Glossary Project Glossary #4 Subject: Affordable Care Act - Insurance Language: Mandarin

CCHI Mini-Glossary Project Glossary #4 Subject: Affordable Care Act - Insurance Language: Mandarin CCHI Mini-Glossary Project Glossary #4 Subject: Affordable Care Act - Insurance Language: Mandarin Note: Some terms and definitions are from the Benefits and Coverage Uniform Glossary by Centers of Medicaid

More information

C-9/NAT 年 11 月 29 日至 12 月 3 日 29 November 2004 CHINESE Original: ENGLISH 荷兰王国以欧洲联盟名义的说明 在反对扩散大规模毁灭性武器的欧盟战略框架内对禁化武组织活动给予支持的联合行动

C-9/NAT 年 11 月 29 日至 12 月 3 日 29 November 2004 CHINESE Original: ENGLISH 荷兰王国以欧洲联盟名义的说明 在反对扩散大规模毁灭性武器的欧盟战略框架内对禁化武组织活动给予支持的联合行动 禁止化学武器组织 缔约国大会 第九届会议 C-9/NAT.2 2004 年 11 月 29 日至 12 月 3 日 29 November 2004 CHINESE Original: GLISH 荷兰王国以欧洲联盟名义的说明 在反对扩散大规模毁灭性武器的欧盟战略框架内对禁化武组织活动给予支持的联合行动 1. 欧洲联盟关于反对扩散大规模毁灭性武器的战略指出, 要开展一系列具体行动, 推进并加强 化学武器公约

More information

China Infrastructure Sector

China Infrastructure Sector C H I N A S E C U R I T I ES ( I N T L ) R E S E A R C H Equity Research l China l Industrials 24 October 2017 China Infrastructure Sector Bracing for new cycle in China; Overweight Mkt cap Up/ EPS growth

More information

德瑞思国际律师事务所 油气在加拿大的机遇 多伦多 纽约 卡尔加里

德瑞思国际律师事务所 油气在加拿大的机遇 多伦多 纽约 卡尔加里 德瑞思国际律师事务所 油气在加拿大的机遇 多伦多 纽约 卡尔加里 Oil and Gas Opportunities in Canada TORONTO NEW YORK CALGARY 我们在油气方面的法律业务 毫无疑问是加拿大最好的律师事务所之一 钱伯斯全球律师指南 (Chambers Global) 德瑞思的专长体现在油气行业的各个方面 我们曾就加拿大 美国和全球范围内的各类油气项目为客户提供咨询服务,

More information

国际财务管理 第七讲全球融资管理 对外经济贸易大学国际商学院会计学系制作

国际财务管理 第七讲全球融资管理 对外经济贸易大学国际商学院会计学系制作 国际财务管理 第七讲全球融资管理 对外经济贸易大学国际商学院会计学系制作 Exhibit 1 Internal Financing of the Foreign Subsidiary Funds From Within the Multinational Enterprise (MNE) Funds from parent company Funds from sister subsidiaries

More information

28/11/2014 GST Talk Alan Yoon Associates - All Rights Reserved GST? - GST stands for Goods and Services Tax

28/11/2014 GST Talk Alan Yoon Associates - All Rights Reserved GST? - GST stands for Goods and Services Tax GST Talk 1 GST? - GST stands for Goods and Services Tax - It is a form of consumption tax charged on every business transaction stages where value adding is present - GST incurred on inputs is allowed

More information

FOREIGN INVESTMENT IN UPSTREAM OIL AND GAS IN CHINA (PART 1)

FOREIGN INVESTMENT IN UPSTREAM OIL AND GAS IN CHINA (PART 1) FOREIGN INVESTMENT IN UPSTREAM OIL AND GAS IN CHINA (PART 1) Wang Weidong I INTRODUCTION For decades, Chinese government has been continuously favouring foreign investment in the upstream oil and gas industry

More information

虹姐讲美国金融市场结构和求职技巧. For internal use only. Please do not cite or distribute without permission

虹姐讲美国金融市场结构和求职技巧. For internal use only. Please do not cite or distribute without permission 虹姐讲美国金融市场结构和求职技巧 USCareerPass.com USCareerPass.com is a career consulting, professional training and job information-sharing platform founded by elite mentors from Goldman Sachs, Morgan Stanly, JPMorgan

More information

株洲南车时代电气 ( 3898.HK ) 中报业绩显示环比改善迹象

株洲南车时代电气 ( 3898.HK ) 中报业绩显示环比改善迹象 本研究报告仅通过邮件提供给泰信基金朱志权 (zhuzhiquan@ftfund.com) 使用 1 wwwww1 SWS Research Co. Ltd 99 East Nanjing Road, Shanghai +86 21 2329 7818 www.swsresearch.com Capital Goods Company Research The Chinese View on China

More information

CAR Inc Annual Results. March 2016

CAR Inc Annual Results. March 2016 CAR Inc. 2015 Annual Results March 2016 2015 major achievements 1 Dominant market leadership 91,179 total fleet (1) 5x EBITDA compare to #2 (2) 2 Robust growth 53% rental revenue growth 68% adj. net profit

More information

Key Topics on China -Venezuela Business 中国 - 委内瑞拉投资关键考虑. Tax overview July 2011 税务概述 2011 年 7 月. Espiñeira, Sheldon y Asociados1

Key Topics on China -Venezuela Business 中国 - 委内瑞拉投资关键考虑. Tax overview July 2011 税务概述 2011 年 7 月. Espiñeira, Sheldon y Asociados1 Key Topics on China -Venezuela Business 中国 - 委内瑞拉投资关键考虑 Tax overview July 2011 税务概述 2011 年 7 月 1 Agenda 目录 Choice of entity Registrations Restrictions on cross-border cash flows Key tax issues Individual

More information

Client Alert. China - Securities Law. New SAFE Rules Clarify QFII Account Management BACKGROUND. M a r c h 2013

Client Alert. China - Securities Law. New SAFE Rules Clarify QFII Account Management BACKGROUND. M a r c h 2013 Client Alert China - Securities Law New SAFE Rules Clarify QFII Management At the end of 2012, the State Administration of Foreign Exchange ("SAFE") issued the Revised Foreign Exchange Rules for Securities

More information

Universal Social Protection

Universal Social Protection Universal Social Protection Universal s in China 200 2002 2003 2004 2005 2006 2007 2008 2009 200 20 202 203 Universal s in China Between 2009 and 203, China tripled the number of people covered by the

More information

Internationalisation of the RMB & Prospects for the UK's Finance & Professional Services Sector

Internationalisation of the RMB & Prospects for the UK's Finance & Professional Services Sector Internationalisation of the RMB & Prospects for the UK's Finance & Professional Services Sector www.lehmanbrown.com This article was prepared by LehmanBrown International Accountants. This article is intended

More information

Static on the line CHINA TELECOM (728:HK)

Static on the line CHINA TELECOM (728:HK) 17-04 17-05 17-06 17-07 17-08 17-09 17-10 17-11 17-12 18-01 18-02 18-03 18-04 本研究报告仅通过邮件提供给国投瑞银国投瑞银基金管理有限公司 (res@ubssdic.com) 使用 1 SWS Co. Ltd is a subsidiary of Shenwan Hongyuan Securities. 99 East Nanjing

More information

Chapter 12 Introduction to Asset Liability Management

Chapter 12 Introduction to Asset Liability Management Chapter 12 Introduction to Asset Liability Management 1 Introduction Bank s structural position depositors borrowers checking accounts saving accounts fixed deposits commercial loans credit-card debt car

More information

年报前瞻 中广核新能源 (1811:HK) Renewable Energy Company. Bringing China to the World

年报前瞻 中广核新能源 (1811:HK) Renewable Energy Company. Bringing China to the World 本研究报告仅通过邮件提供给方正富邦基金方正富邦基金管理有限公司 (research@founderff.com) 使用 1 SWS Co. Ltd is a subsidiary of Shenwan Hongyuan Securities. 99 East Nanjing Road, Shanghai +86 21 2329 7818 www.swsresearch.com Renewable Energy

More information

常见问题及答案 Frequently Asked Question & Answers

常见问题及答案 Frequently Asked Question & Answers 常见问题及答案 Frequently Asked Question & Answers 1. 如何能成为会员? How can an entity become a member? 申请者可直接向 CBM 或通过总商会申请成为会员 会员确认步骤将由 CBM 和总商会完成 An interested entity may apply directly to The Bureau for membership

More information

THE FUTURE OF TRADE FOR THE UK

THE FUTURE OF TRADE FOR THE UK 英国贸易的未来 企业指南 THE FUTURE OF TRADE FOR THE UK March 2017 CLIFFORD CHANCE LLP Clifford Chance is one of the world s pre-eminent law firms with significant depth and range of resources across five continents.

More information

杠杆之殇. Bringing China to the World. New Energy Company Research. 下调 GCL New Energy (451HK) Market Data: Aug 29, 2018

杠杆之殇. Bringing China to the World. New Energy Company Research. 下调 GCL New Energy (451HK) Market Data: Aug 29, 2018 SWS Co. Ltd 99 East Nanjing Road, Shanghai +86 21 2329 7818 www.swsresearch.com Bringing China to the World New Energy Company 30 Aug 2018 中性 杠杆之殇 下调 GCL New Energy (451HK) Market Data: Aug 29, 2018 Financial

More information

LECTURE 2 RISKS, ORGANIZATION AND STRUCTURE OF BANKING INDUSTRY IN CHINA. 9/27/2017 ACEM, SJTU, Nan Li

LECTURE 2 RISKS, ORGANIZATION AND STRUCTURE OF BANKING INDUSTRY IN CHINA. 9/27/2017 ACEM, SJTU, Nan Li LECTURE 2 RISKS, ORGANIZATION AND STRUCTURE OF BANKING INDUSTRY IN CHINA 1 Example of Simple Bank Balance Sheet Assets Cash 5 Marketable Securities 10 Loans 80 Fixed Assets 5 Total 100 Liabilities Deposits

More information

Why do projects go wrong? 为什么项目会出错呢?

Why do projects go wrong? 为什么项目会出错呢? Why do projects go wrong? 为什么项目会出错呢? 项目 实际资本 100 万美元 实际完工时间成本超支进度超支取得成效 W Mackenzie & N Cusworth, 2016 2 China Mining 2018 Why did it go wrong? 为什么会出错? Project 项目 Category 类别 3 phase study process 3 阶段

More information

Improving fundamentals LEE & MAN PAPER MANUFACTURING (2314:HK) Financial summary and valuation

Improving fundamentals LEE & MAN PAPER MANUFACTURING (2314:HK) Financial summary and valuation 本研究报告仅通过邮件提供给国投瑞银国投瑞银基金管理有限公司 (res@ubssdic.com) 使用 1 SWS Co. Ltd is a subsidiary of Shenwan Hongyuan Securities. 99 East Nanjing Road, Shanghai +86 21 2329 7818 www.swsresearch.com Materials Company 1

More information

2018 Interim Results Beat Expectations, Maintain "Buy"

2018 Interim Results Beat Expectations, Maintain Buy - Clean Energy Sector-Natural Gas Equity Research 股票研究 Company Report: 公司报告 : 北京控股 (392 HK) Kevin Guo 郭勇 (86755) 2397 6671 kevin.guo@gtjas.com 218 Interim Results Beat Expectations, Maintain "Buy" 218

More information

Six Don ts for Turnarounds in Asia.

Six Don ts for Turnarounds in Asia. Six Don ts for Turnarounds in Asia www.lehmanbrown.com This article was prepared by LehmanBrown International Accountants. This article is intended for general information purposes only and is not intended

More information

STAYING ON THE RIGHT PATH GROWING THROUGH ACQUISITION

STAYING ON THE RIGHT PATH GROWING THROUGH ACQUISITION Changjiang Fertilizer holdings limited STAYING ON THE RIGHT PATH GROWING THROUGH ACQUISITION 按部就班 收购成长 ANNUAL REPORT 2010 Contents 02 06 07 08 10 12 17 27 31 32 34 72 74 81 A message from Chairman 执行主席致词

More information

B&R Cases TM TM 一带一路案例

B&R Cases TM TM 一带一路案例 B&R Cases TM TM 一带一路案例 Siemens International Trading (Shanghai) Co., Ltd. and Shanghai Golden Landmark Company Limited, A Case of an Application for the Recognition and Enforcement of a Foreign Arbitral

More information

For personal use only

For personal use only U & D COAL LIMITED A.C.N. 165 894 806 Off-Market Buyback Booklet 28 November 2014 This is an important document and requires your urgent attention. If you are in any doubt as to how to deal with this Booklet,

More information

KPMG BUSINESS SCHOOL. elearning Catalogue. The Business School for the Real World. Accounting. Cyber. Financial Products

KPMG BUSINESS SCHOOL. elearning Catalogue. The Business School for the Real World. Accounting. Cyber. Financial Products KPMG BUSINESS SCHOOL The Business School for the Real World elearning Catalogue Content is accurate as of 19 September 2018 Description Accounting IAS 21 The Effects of Changes in Foreign Exchange Rates

More information