FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT

Size: px
Start display at page:

Download "FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT GRANT H HT November 3, 2008 TO THE REPUBLIC OF HAITI May 30, 2013 SUSTAINABLE DEVELOPMENT DEPARTMENT HAITI COUNTRY MANAGEMENT UNIT LATIN AMERICA AND THE CARIBBEAN REGION Report No: v1 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. 1

2 ABBREVIATIONS AND ACRONYMS BMPAD CIAT CRV DPC DRM GoH IDA IP ISR MICT MPCE MTPTEC NDRMS NGO PCU PDO PPR PROReV UCE Bureau of Monetization of Development Aid Programs (Bureau de Monétisations et Programmes d Aide au Développement) Inter-Ministerial Committee for Territorial Development (Comité Interministériel d Aménagement du Territoire) Vulnerability Reduction Unit (Cellule de Réduction de la Vulnérabilité) Directorate of Civil Protection (Direction de la Protection Civile) Disaster Risk Management (Gestion des Risques de Désastres) Government of Haiti International Development Association Implementation Progress Implementation Status and Results Report Ministry of the Interior and Collective Territories (Ministère de L Intérieur et des Collectivités Territoriales) Ministry of Planning and External Cooperation (Ministère de Planification et Cooperation Externe) Ministry of Public Works, Transportation, Energy and Communication (Ministère de Travaux Publics, Transport, Énergie et Communications) National Disaster Risk Management System (Système National de Gestion des Risques et des Désastres) Non-Governmental Organization Project Coordination Unit (Unité de Coordination de Projet) Project Development Objective Risk Management Plans (Plans de Prévention des Risques) Emergency Bridge Reconstruction and Vulnerability Reduction Project (Projet de Reconstruction D Urgence Des Ouvrages D Art et de Réduction de la Vulnérabilité) Central Execution Unit (Unité Central d Exécution) (PCU of MTPTC) Regional Vice President: Special Envoy: Sector Manager: Task Team Leader: Co-Task Team Leader: Hasan A. Tuluy Alexandre V. Abrantes Aurelio Menendez Pierre Xavier Bonneau Michel Matera 2

3 HAITI HT EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT CONTENTS Page A. SUMMARY... 4 B. PROJECT STATUS... 4 C. PROPOSED CHANGES... 5 ANNEX 1: RESULTS FRAMEWORK AND MONITORING... 9 ANNEX 2: REVISED PROCUREMENT PLAN

4 EMERGENCY BRIDGE RECONSTRUCTION AND VULNERABILITY REDUCTION PROJECT A. SUMMARY RESTRUCTING PAPER 1. This Restructuring Paper seeks the approval of the Special Envoy to Haiti to restructure the Emergency Bridge Reconstruction and Vulnerability Reduction Project (PROReV P114292). The proposed Restructuring is in response to a request from the Ministry of Finance of the Government of the Republic of Haiti (GoH) received October 5, The proposed Level Two Restructuring would involve several changes, including: (i) extension of the closing date by 21 months, from June 30, 2013 to March 31, 2015, to allow for completion of the construction of the bridge Le Theme in Mirebalais under Component 1; (ii) changes to outputs associated with Component 1 and Component 2, as a result of compounded urgent and emergency response activities following adverse natural events; (iii) a reallocation of funds from Category 2 and Category 3 to Category 1; (iv) changes to the Technical Assistance (TA) activities under Component 4 to reflect the changes in the institutional framework for vulnerability reduction in Haiti; and (v) slight modifications to the PDO Level Results Indicators to monitor the results expected from the modified activities. 3. There would be no change in the Project Development Objective (PDO), nor any impact on the safeguard category or policies triggered under the Project. The implementation arrangements would remain unchanged. B. PROJECT STATUS 4. PROReV, financed by a US$20 million Grant (H432-0-HT) and processed as an Emergency Recovery Grant, was approved by the Executive Board of Directors on November 18, 2008, and the accompanying Financing Agreement was signed on February 12, The Project became effective on March 31, The Project has complied with all environmental, social and fiduciary safeguard requirements, and both financial management and procurement has been carried out in accordance with the Bank s Financial Management and Procurement Guidelines. 5. Following the January 12, 2010 Earthquake, the GoH requested a level two restructuring to: (i) reallocate unallocated funds from Category 6 to Category 2 to cover cost overruns in Component 2; and (ii) change outputs associated with Component 4, specifically renaming and expanding the role of the Vulnerability Reduction Unit, and introducing changes to the Technical Assistance activities. The Restructuring was approved by the Country Director on March 21, The Project is currently rated Moderately Satisfactory both for achievement of Development Objective and for Overall Implementation Progress, mainly due to delayed procurement processes and changes in the disaster risk management institutional 4

5 framework for the country, specifically challenges associated with the Vulnerability Reduction Unit in the Ministry of Planning and External Cooperation (MPCE), which was discontinued as of November The Project has disbursed a total of US$ million (equivalent to 60 percent) as of May 21, C. PROPOSED CHANGES Closing Date 7. The proposed Restructuring would extend the Grant closing date of the Project by 21 months from June 30, 2013 to March 31, 2015, to accommodate the completion of the construction of the La Theme bridge in Mirebalais under Component 1 Implementing a Program of Bridge Reconstruction. Project Components 8. Component 1 Implementing a Program of Bridge Reconstruction: As a result of cost overruns for several activities under Component 1 due to compounded emergency response activities following the Earthquake (2010), Hurricane Tomas (2010), and Hurricane Sandy (2012), several activities would be dropped from. These activities include: (i) construction of Chalon Bridge; (ii) repairs of Estimé Dumarsais Bridge; and (iii) rehabilitation of the Roseaux and Voldrogue Bridges. 9. Component 2 Improving the Resilience of Transport Infrastructure: The proposed restructuring would involve slight changes to activities under Component 2. Activities under Sub-Component 2.2 Community Based Routine Maintenance Activities, would be dropped from the project to cover cost overruns under Component Component 3 Strengthening Transport System Asset Management: The proposed Restructuring would involve a reallocation of funds from Category 3 to Category 1 to utilize financing released under Component 3, and cover cost overruns under Component 1. Component 3 would now also finance technical assistance for the establishment and training of a GIS unit within the MTPTEC. 11. Component 4 Strengthening of NDRMS: The proposed restructuring would involve changes to outputs associated with Component 4, and would include the following changes: 12. Component 4.1 Provision of Technical Advisory Services to NDRMS: Activities under this sub-component have been reprioritized to focus on: (i) Technical Assistance (consultants and workshops) to assess the current status of risk assessment in the country, to develop a methodology for the preparation of Plans de Prévention des Risques (PPR Risk Management Plans) and to support the development of an appropriate institutional and regulatory framework for the integration of disaster risk management into territorial planning; (ii) Technical Assistance (consultants) for the preparation and validation of two risk assessment studies and associated PPRs for the cities of Cap-Haitien and Les Cayes; and (iii) Technical Assistance (consultants) for the finalization and dissemination of a National Multi-hazard Atlas. These activities would be implemented under the 5

6 leadership of the Inter-Ministerial Committee for Land Use Planning (CIAT Comité Interministériels d Aménagement du Territoire) in close consultation with other stakeholders of the NDRMS. Financing for the Vulnerability Reduction Unit (CRV - Cellule de Réduction de la Vulnérabilité) was discontinued as of November 2011 due to changes in the national institutional framework for vulnerability reduction. 13. Component 4.2 Technical Assistance to Inter-Ministerial Committee for Land- Use Planning (CIAT): Support to CIAT would be extended throughout the project extension period and would target key functions/thematic working groups of CIAT: Land-use planning, Water and Risk Management, Habitat and Urban Development, and Mapping/ IT. 14. The Operational Manual would be updated to reflect the above changes. Table 1: Project Component and Detailed IDA Allocation Revisions Components/Activities Project Costs (US$m.) Original Original Current Proposed Component 1: Implementing a Program of Bridge 7,165,000 7,165,000 7,900,597 Reconstruction Component 2: Improving the Resilience of Transport Infrastructure 4,950,000 5,350,000 4,643,139 Sub-component 2.1: Vulnerability reduction and repair works 4,450,000 4,850,000 4,643,139 Sub-component 2.2: Community-based routine maintenance activities 500, ,000 0 Component 3: Strengthening Transport System 2,585,000 2,585,000 2,556,264 Asset Management Component 4: Strengthening of NDRMS 4,900,000 4,900,000 4,900,000 Sub-component 4.1: Provision of Technical Advisory Services to NDRMS 3,400,000 2,990,000 3,017,000 Sub-component 4.2: Technical Assistance to Inter-Ministerial Committee for Land-Use Planning 1,500,000 1,910,000 1,910,000 Total 20,000,000 20,000,000 20,000,000 Results Framework 15. The Results Framework would be adjusted to reflect the change and impact of project activities under Component 1 and Component 4. A new core indicator would be added for Component 1 Roads Rehabilitated, Non-Rural Roads (number of kilometers). See Annex 1 for details. Institutional Arrangements, Fiduciary and Safeguards 16. Implementation arrangements for the project would remain unchanged. The Project has complied with all social, environmental and fiduciary safeguard requirements. No additional Safeguard policies would be triggered. Both financial management and procurement has been carried out in accordance with the Bank s Financial Management 6

7 and Procurement Guidelines, and there would be no changes to either Financial Management or Procurement arrangements of the Project. 17. An audit for PROReV would be conducted annually. Each audit of the Financial Statements for the Project shall cover the period of one fiscal year of the Recipient. The last audit shall cover a period of ten months ending July 31, 2015, including the graceperiod. The report for the audit for each such period would be submitted to the Bank no later than four months after the end of such period. 18. There are no overdue audit reports for the Project. 19. All procurement for the activities remaining under the Project would be carried out in accordance with World Bank Guidelines: Procurement of goods, works and nonconsulting services under IBRD Loans and IDA Credits and Grants, January 2011; and Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank Borrowers, dated January Reallocation of Grant Proceeds 20. The proposed Restructuring would involve a reallocation of funds from Category 2 and Category 3 to Category 1. The proposed reallocation is necessary to finance costoverruns under Component 1. The accompanying revised Procurement Plan can be found in Annex 2. 7

8 Table 2: Allocation of Proceeds (SDR) Category of Expenditure Allocation (US$ equivalent) % of Financing Original/Current Revised Original Current Revised Original Current Revised (1) Goods, works, nonconsulting N/A 3,220,000 3,220,000 5,056, % 100% 100% services, Consultant s Services, Training and Operating costs for Part 1 of the Project (2) Goods, works, nonconsulting N/A 3,160,000 3,450,000 2,971, % 100% 100% services, consultants services, Training and Operating Costs for: (a) Part 2.1 of the Project (b) Part 2.2 of the Project 2,840, ,000 3,130, ,000 2,971,609 0 (3) Goods, Non-consultant N/A 750, ,000 1,636, % 100% 100% services, consultants services, Training and Operating Costs for Part 3 of the Project (4) Goods, Nonconsultant N/A 2,300,000 2,300,000 3,136, % 100% 100% services, and consultants Services and Operating Costs for Part 4 of the Project (5) Refund of Preparation Advance N/A 3,080,000 3,080,000 0 (6) Unallocated N/A 290, Amount payable pursuant to Section 2.07 of the General Conditions 12,800,000 12,800,000 12,800,000 8

9 Revisions to the Results Framework ANNEX 1: Results Framework and Monitoring HAITI: Emergency Bridge Reconstruction and Vulnerability Reduction Project Results Framework PDO Original (PAD) Changes with Restructuring 2011 Current The project s development objective is to i) restore access on selected critical points of the Haitian transport system, and ii) support vulnerability reduction by strengthening the Haitian National Disaster Risk Management System. PDO indicators Original (PAD) Disaster Risk Management Units within key ministries are operational and sustainable, with adequate resources and staffing MTPTC bridge management unit is operational and sustainable, with adequate resources and staffing MPCE vulnerability reduction unit is operational and sustainable Proposed Changes No change. No change. No change. Comments/ Rationale for Change Proposed Changes Disaster Risk Management Units within Disaster Risk Management Units Change to reflect the project extension key ministries are operational and within key ministries are operational and the development of specific DRM sustainable, with adequate resources and and sustainable, with adequate instruments. staffing before the end of 2013 instruments/tools and staffing before the end of the project. No change. No change. No change. No change. Dropped. As indicated in the restructuring paper, the Vulnerability Reduction Unit (CRV - Cellule de Réduction de la Vulnérabilité) in the MPCE was discontinued as of November 2011 due to changes in the national institutional framework. Some of its responsibilities related to the integration of DRM in territorial 9

10 Revisions to the Results Framework Permanent Secretariat of Disaster Risk Management (SPGRD) unit is reinforced, operational and sustainable National Disaster Risk Management System Policy and framework assessed and strengthened before the end of Dropped. Comments/ Rationale for Change planning were transferred to CIAT. The impact of the 2010 earthquake has not created a conducive environment for a policy reform on DRM. Roads rehabilitated (km), Non-Rural roads N/A New. Including new Core Indicator to monitor progress. Intermediate Results indicators Original (PAD) Proposed Changes Component 1: Implementing a Program of Bridge Reconstruction Number of emergency fords and overpasses No change. No change. No change. built in the two months following Number of bridges rebuilt with satisfactory No change. No change. No change. technical standards 10 emergency bridges purchased No change. No change. No change. Component 2: Improving the resilience of transport infrastructure Number of bridges and road sections that No change. No change. No change. have been repaired or consolidated with satisfactory technical standards Number of community-based initiatives performing routine maintenance with satisfactory technical standards No change. Dropped. Sub-component linked to this indicator has been dropped. Component 3: Strengthening Transport System Asset Management Bridge inventory completed and up to date No change. No change. No change. Constitution of an effective crisis No change. No change. No change. management and vulnerability reduction unit in MTPTC Constitution of a bridge management unit in No change. No change. No change. MTPTC Component 4: Strengthening of NDRMS Establishment of Disaster Recovery and Reconstruction Planning Unit within MPCE Vulnerability Reduction Unit established within MPCE and a National Framework for Vulnerability Reduction created, in place before the end of 2012 and Dropped. Dropped. 10

11 Revisions to the Results Framework Presentation of Disaster Recovery and Reconstruction Program Number of Crisis Management and Vulnerability Reduction Units created within line ministries and within their departmental directorates (where applicable) Transversal development strategies developed by CIAT (i.e.: watershed management, urban planning, territorial development and land tenure). Disaster risk reduction principles integrated into these transversal strategies: integrated into sectoral policies and programs before the end of Timely presentation of Disaster Recovery and Reconstruction Program(s) are submitted and coordinated every semester and yearly by all stakeholders from second semester of Number of Emergency Management and Vulnerability Reduction Units (EM- VRU) created/reinforced and operational within line ministries and within their departmental directorates (where applicable) before the end of Transversal development strategies developed by CIAT and VRU (ie: watershed management, urban planning, territorial development and land tenure) established and in place before the end of Disaster Risk management principals integrated and assessed into these transversal strategies before the end of No change. Number of Emergency Management and Vulnerability Reduction Units (EM-VRU) created/reinforced and operational within line ministries and within their departmental directorates (where applicable) before the end of the project. Transversal development strategies and instruments developed by CIAT (ie: watershed management, urban planning, territorial development and land tenure) established and in place before the end of the project. Dropped. No change. Comments/ Rationale for Change Change to reflect project extension Change to reflect project extension and discontinuation of VRU. Instruments to integrate DRM in territorial planning will be developed as part of the previous indicator. 11

12 REVISED PROJECT RESULTS FRAMEWORK Project Development Objective (PDO): The project s development objective is to i) restore access on selected critical points of the Haitian transport system, and ii) support vulnerability reduction by strengthening the Haitian National Disaster Risk Management System. D=Dropped Cumulative Target Values** C=Continue Responsibility PDO Level Results N= New Unit of Data Source/ Baseline Frequency for Data Indicators* R=Revised Measure YR 2 YR 3 YR 4 YR5 YR6 Methodology Collection Indicator One: Disaster Risk Management Units within key ministries are operational and sustainable, with adequate instruments/tools and staffing before the end of the project. Indicator Two: MTPTC bridge management unit is operational and sustainable, with adequate resources and staffing Indicator Three: MPCE vulnerability reduction unit is operational and sustainable Indicator Four: National Disaster Risk Management System Policy and framework assessed and strengthened before the end of Indicator Five: Roads Rehabilitated (km), Non-Rural Roads Core C Number Annual SNGRD SNGRD C NO NO NO NO YES YES Annual MTPTEC MTPTEC D D N Number Annual MTPTEC MTPTEC INTERMEDIATE RESULTS Intermediate Result (Component One): Implementing a Program of Bridge Reconstruction 12

13 C Annual MTPTEC MTPEC One: Number of emergency fords and overpasses built in the two months following disasters Two: Number of bridges rebuilt with satisfactory technical standards C Annual Technical audit MTPEC Three: 10 emergency bridges purchased C NO NO NO NO YES YES Annual MTPTEC MTPTEC Intermediate Result (Component Two): Improving the Resilience of Transport Infrastructure C Number Annual MTPTEC MTPTEC One: Number of bridges and road sections that have been repaired or consolidated with satisfactory technical standards Two: Number of community-based initiatives performing routine maintenance with satisfactory technical standards D Intermediate Result (Component Three): Strengthening Transport System Asset Management One: Bridge inventory completed and up to date Two: Constitution of an effective crisis management and vulnerability reduction unit in MTPTC C Inventory 0 NO NO NO YES YES Annual MTPTEC WB team C Unit 0 NO NO NO YES YES Annual MTPTEC WB team 13

14 Three: Constitution of a bridge management unit in MTPTC C Unit 0 NO YES NO YES YES Annual MTPTEC WB team Intermediate Result (Component Four): Strengthening of NDRMS D One: Vulnerability Reduction Unit established within MPCE and a National Framework for Vulnerability Reduction created, in place before the end of 2012 and integrated into sectoral policies and programs before the end of Two: Timely presentation of Disaster Recovery and Reconstruction Program(s) are submitted and coordinated every semester and yearly by all stakeholders from second semester of C 0 NO YES YES YES YES Annual PM s Office BMPAD Three: Number of Emergency Management and Vulnerability Reduction Units (EM- VRU) created/reinforced and operational within line ministries and within their departmental directorates (where applicable) before the end of the project. R Number Annual SNGRD SNGRD 14

15 Four: 4.1 Number of Transversal development strategies developed by CIAT (ie: watershed management, urban planning, territorial development and land tenure, Risk Prevention Plans) established and in place before the end of the project. R Number Annual CIAT CIAT *Please indicate whether the indicator is a Core Sector Indicator (see further **Target values should be entered for the years data will be available, not necessarily annually. 15

16 ANNEX 2: Revised Procurement Plan HAITI: Emergency Bridge Reconstruction and Vulnerability Reduction Project Contract (Description) Estimated Cost/Real Cost (US$) Procurement / Selection Method Bank Review (Prior/Post) Planned Contract signature date /real date Planned Completion Date Component 1 Implementing a Program of Bridge Reconstruction Design & works Mirebalais 3,500,000 ICB Prior Jan 2013 Feb 2015 Signed bridge Hydraulic anti erosion protection of Mirabalais Bridge 150,000 Shopping Prior August 2013 August 2014 Component 3 Strengthening Transport System Asset Management Establishment of and Technical Assistance to the GIS Unit MTPTC Technical assistance, software servers and Training services, bridge asset management unit in MTPTC Young engineers program for bridge management Technical assistance FOR Crisis management unit in MTPTC National environmental consultant National crisis management consultant Comments 500,000 UN agency Prior May Draft contract ready 300,000 QCBS Prior Sept ,000 3CVs/contrac t extensions Prior Aug contract extension for consultant already hired with satisfactory evaluation 100,000 QCBS Prior Oct CVs Prior July CVs Prior July Vehicles 90,000 Shopping Prior Aug 2013 Dec 2013 IT and office equipment 50,000 Shopping Prior August 2013 Oct 2013 Project Audits 50,000 Direct contracting Component 4 Strengthening of NDRMS Technical Assistance PPR 150,000 QCBS Prior August 2013 December Risk Management Plans 2013 Technical Assistance for the 700,000 QCBS Prior January 2014 February preparation and validation of 2015 two risk assessment studies and associated PPRs for the cities of Cap-Haitien and Les Cayes Technical Assistance National Multi-hazard Atlas Prior July Extension of ongoing contract 150,000 QCBS Prior August 2013 August

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4320) ON A GRANT IN THE AMOUNT OF SDR 12.8 MILLION (US$20.0 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4320) ON A GRANT IN THE AMOUNT OF SDR 12.8 MILLION (US$20.0 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Document of The World Bank Report No: ICR00002483 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4320) ON A GRANT

More information

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Department Southeast Asia Country Management Unit East Asia and

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Implementation Status & Results Report Niger Disaster Risk Management and Urban Development Project (P145268)

Implementation Status & Results Report Niger Disaster Risk Management and Urban Development Project (P145268) Public Disclosure Authorized AFRICA Niger Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 04-Apr-2018 ISR30085 Implementing

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623)

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Operation Name:

More information

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 7 ARCHIVED on 28-Jun-2017 ISR27403 Implementing Agencies:

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SAFE AND SUSTAINABLE TRANSPORT PROJECT LOAN December 10, 2009 IN THE INITIAL AMOUNT OF (US$ {150}

More information

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864) Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018

More information

FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A PROPOSED ADDITIONAL GRANT AND RESTRUCTURING

FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A PROPOSED ADDITIONAL GRANT AND RESTRUCTURING Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: PAD2348 Public Disclosure Authorized Public Disclosure Authorized INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351) LATIN AMERICA AND CARIBBEAN Dominican Republic Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2018 Seq No: 1 ARCHIVED on 26-Jan-2018 ISR31220

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES12428 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT

More information

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy. Overall Ratings

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy. Overall Ratings Implementation Status & Results Burkina Faso Local Government Support Project (P120517) Operation Name: Local Government Support Project (P120517) Project Stage: Implementation Seq.No: 5 Status: ARCHIVED

More information

The World Bank Integrated Disaster Risk Management and Resilience Program (P144539)

The World Bank Integrated Disaster Risk Management and Resilience Program (P144539) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 3 ARCHIVED on 08-Aug-2017

More information

Financing Agreement OFFICIAL DOCUMENS GRANT NUMBER H806-0-HT. (Rebuilding Energy Infrastructure and Access Project) between REPUBLIC OF HAITI.

Financing Agreement OFFICIAL DOCUMENS GRANT NUMBER H806-0-HT. (Rebuilding Energy Infrastructure and Access Project) between REPUBLIC OF HAITI. Public Disclosure Authorized OFFICIAL DOCUMENS GRANT NUMBER H806-0-HT Public Disclosure Authorized Financing Agreement (Rebuilding Energy Infrastructure and Access Project) between REPUBLIC OF HAITI Public

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized DOCUMENT OF THE WORLD BANK REPORT NO.: RES30282 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized MEXICO

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BOR REGIONAL DEVELOPMENT PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BOR REGIONAL DEVELOPMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SUSTAINABLE DEVELOPMENT UNIT EUROPE AND CENTRAL ASIA Document of The World Bank FOR OFFICIAL

More information

Document of The World Bank FOR OFFICIAL USE ONLY

Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EXPANDING ACCESS TO REDUCE HEALTH INEQUITIES PROJECT (APL III)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EXPANDING ACCESS TO REDUCE HEALTH INEQUITIES PROJECT (APL III) Public Disclosure Authorized Document of The World Bank Report No: 73337-BO Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EXPAING ACCESS TO REDUCE HEALTH INEQUITIES

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2007 Seq No: 24 ARCHIVED on 29-Aug-2018 ISR33744 Implementing Agencies: ROAD FUND (Fundo de Estradas),

More information

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 29-Jun-2018 ISR32902 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy LATIN AMERICA AND CARIBBEAN Honduras Energy & Extractives Global Practice Recipient Executed Activities Technical Assistance Loan FY 2014 Seq No: 1 ARCHIVED on 16-Oct-2015 ISR20092 Implementing Agencies:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679)

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679) Operation

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL) Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663)

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663) Operation Name: Sao Paulo Feeder Roads Project (P106663) Project

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272)

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272) Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Emergency Recovery Loan FY 2009 Seq No: 14 ARCHIVED on 31-Dec-2015 ISR21491

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2770, IDA-H6880, IDA-49520) A GRANT IN THE AMOUNT OF SDR 10 MILLION (US$15.00 MILLION EQUIVALENT),

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2770, IDA-H6880, IDA-49520) A GRANT IN THE AMOUNT OF SDR 10 MILLION (US$15.00 MILLION EQUIVALENT), Public Disclosure Authorized Document of The World Bank Report No: ICR00003583 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2770, IDA-H6880, IDA-49520) ON A GRANT IN

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION

More information

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Costa Rica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2009 Seq No: 13 ARCHIVED on

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30500 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SENEGAL: TRANSPORT &

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 22 APPROVED ISR29261 Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:23-May-2007

More information

Improving Maternal and Child Health through Integrated Social Services (P123706)

Improving Maternal and Child Health through Integrated Social Services (P123706) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 31-Dec-2018 ISR35476 Implementing

More information

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lao People's Democratic Republic Lao PDR - Mainstreaming

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY

More information

E x t e r n a l E v a l u a t i o n o f t h e H a i t i R e c o n s t r u c t i o n F u n d F i n a l R e p o r t A p r i l

E x t e r n a l E v a l u a t i o n o f t h e H a i t i R e c o n s t r u c t i o n F u n d F i n a l R e p o r t A p r i l rôme E x t e r n a l E v a l u a t i o n o f t h e H a i t i R e c o n s t r u c t i o n F u n d F i n a l R e p o r t A p r i l 2015 U n i v e r s a l i a 2 4 5 a v e n u e V i c t o r i a, S u i t e

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 12 ARCHIVED on 08-Dec-2017

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE

More information

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Liberia Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 11 ARCHIVED on 10-Nov-2016 ISR24991 Implementing Agencies: Infrastructure Implementation

More information

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Costa Rica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2009 Seq No: 15 ARCHIVED on

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 8 ARCHIVED on 14-Dec-2015

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008 Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT

More information

West Bengal Institutional Strengthening of Gram Panchayats Program II (P159427)

West Bengal Institutional Strengthening of Gram Panchayats Program II (P159427) Public Disclosure Authorized SOUTH ASIA India Social, Urban, Rural and Resilience Global Practice Global Practice Requesting Unit: SACIN Responsible Unit: GSU12 IBRD/IDA Program-for-Results FY 2017 Team

More information

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDIA: BIHAR INTEGRATED SOCIAL PROTECTION STRENGTHENING PROJECT APPROVED

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC

More information

WORLD FORUM OF CATASTROPHE PROGRAMMES 2011

WORLD FORUM OF CATASTROPHE PROGRAMMES 2011 WORLD FORUM OF CATASTROPHE PROGRAMMES 2011 THE CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY (CCRIF) Natural Catastrophes 2010 2011, Recovery Efforts, Lessons Learned 1 2 0 1 0 EART H Q UA K E I N H A

More information

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

More information

Project Name. Region Sector

Project Name. Region Sector Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report

More information

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545) Public Disclosure Authorized AFRICA Kenya Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 17 ARCHIVED on 21-Jun-2017 ISR28380 Implementing Agencies: Ministry

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

FSDRP I PROCUREMENT PLAN 2013/2014 October 2, 2013

FSDRP I PROCUREMENT PLAN 2013/2014 October 2, 2013 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. GENERAL 1. PROJECT INFORMATION: FSDRP I PROCUREMENT PLAN 2013/2014 October 2, 2013

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Urban Development Global Practice IBRD/IDA Development Policy Lending FY 2013 Seq No: 4 ARCHIVED on 27-Apr-2015 ISR18749 Implementing Agencies:

More information

Actual Project Name : Emergency Recovery And Disaster Management (US$M US$M): Project Costs (US$M

Actual Project Name : Emergency Recovery And Disaster Management (US$M US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14044 1. Project Data: Date Posted : 01/13/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Operation Name:

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Colombia Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 30-Jun-2017 ISR27693 Implementing Agencies: Corporacion

More information

Document of. The World Bank INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of. The World Bank INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: PAD1478 INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized PROJECT

More information

State Owned Financial Institutions Reform Project (P156837)

State Owned Financial Institutions Reform Project (P156837) EUROPE AND CENTRAL ASIA Serbia Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 2 ARCHIVED on 12-Dec-2018 ISR34752 Implementing Agencies: Republic

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Georgia Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 11-Sep-2017 ISR28869 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank DTF: MA-Local Government Support Program (P144438)

The World Bank DTF: MA-Local Government Support Program (P144438) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2014

More information

The World Bank Recife Swap Education and Public Management (P126372)

The World Bank Recife Swap Education and Public Management (P126372) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Education Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 5 ARCHIVED on 19-Dec-2014 ISR17241 Implementing Agencies: Public

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT

More information

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313)

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Operation Name: SAMOA HEALTH

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF054531 SE Public Disclosure Authorized Public Disclosure Authorized Global Environment Facility Trust Fund Grant Agreement (Integrated

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized AFRICA Africa Environment & Natural Resources Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 13 ARCHIVED on 29-Dec-2016 ISR26629 Implementing Agencies: Ministry

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information