6 CIN No. U40105DL2009GOI प वर स टम ऑपर शन क रप र शन ल मट ड (प वर ड क रप र शन ऑफ इ डय ल मट ड क एक प ण व म व व ल सह यक क पन ) POWER SYSTEM OPERATION CORPORATION LIMITED (A wholly owned subsidiary of Power Grid Corporation of India Limited) ANNEXURE A (1/28) द ण य ल ड ड प च क, 29, र स क स स र ड, ब गल र SOUTHERN REGIONAL LOAD DESPATCH CENTRE, 29, RACE COURSE CROSS ROAD, BANGALORE Ref: SRLDC/MO/CCM/ The Superintending Engineer (Comml), SRPC, Bangalore Sir, Sub: Agenda for 30 th meeting of Commercial Sub-Committee of SRPC Ref: SRPC letter No.SRPC/SE-1/29 CC/2015/ dt Please find enclosed the agenda points for discussion in the forthcoming 30 th meeting of Commercial Sub-Committee of SRPC. Thanking you, Yours faithfully, Encl: As above: (V.BALAJI) Dy. GENERAL MANAGER Page 1 of 5

7 SRLDC Agenda for 30 th meeting of Commercial Sub-Committee of SRPC 1. Audit of SR DSM & Reactive Energy accounts The details of payments and disbursements of DSM and Reactive accounts from to are enclosed in Annexure-I & II in line with clause No.15 of Annexure-I (Section 6.1 (d) of CERC (IEGC) regulations, Reconciliation of DSM and Reactive charges Regional Entity-wise details of Deviation and Reactive pool payment/receipt have been sent to the pool members on a monthly basis for the period from Aug 15 to Nov 15 for reconciliation. Status of Receipt of signed reconciliation statement is enclosed in Annexure III. All other pool members who are yet to reconcile are once again requested to verify the statements compulsorily and send a signed copy to SRLDC for our records to enable us to comply with audit observations. 3. Status of outstanding charges to the pool accounts. Outstanding payments to DSM pool account. Sl. SRPC account Beneficiary Period Amount (Rs.) No. issue date 1 Kudankulam rev wk 4-21 dt. 21/09/15 21/09/15 7,65,57,153 Outstanding payments to Deviation pool account as interest due to delayed payments. Sl. No. Constituent Interest payable (Rs.) Statement issue date. 1 TN PONDY TELANGANA Non-compliance of Opening of L/C for DSM payment Sl. Week Delayed amount Constituent Period No. No. (Rs.) 1 Lanco St-III SEL AP TRANSCO NTPL 4-21 rev Page 2 of 5

8 5 TN IL&FS Pondy TELANGANA Reconciliation of Open Access disbursements The details of disbursements of STU & SLDC Open Access for the period from Aug 2015 to Nov 2015 are enclosed in Annexure-IV. The same has already been sent to all the concerned SLDCs/STUs/CTU and others on a monthly basis for reconciliation. Reconciliation of the same was done by only KPTCL. Since no comments were received from others the disbursement to be treated as reconciled. However, members may note that it is compulsory to return the signed copies of the statements. 6. Delay in SEM data transfer: Some of the entities are not sending SEM data within time in line with IEGC Clause , Statement of delay in SEM data transmission from various sites is enclosed in Annexure-V. Constituents are once again requested for compliance. The status of SEM data receipt as on 17:00 hrs of Monday and 12:00hrs of Tuesday is available in the SRLDC website under the menu Commercial>SEM data receipt status. All stations and SLDCs may monitor this information on the web and ensure the timely transmission of SEM data to SRLDC. 7. Time drift correction Though the matter was taken up in the past Commercial Sub-Committee meetings, still many stations of CTU/STUs are not adhering. The status of receipt of time drift / correction report is enclosed at Annexure-VI. 8. Non-intimation of the reasons for Under-recording In the event of under-recording of the SEMs, SRLDC has been intimating to the Regional entities. However no feed back is being received by SRLDC. All entities are requested that CT/PT inputs to the SEM are monitored and maintained. All events of under-recording shall be immediately intimated with the reasons for under recording along with the remedial actions taken 9. Low CT Ratio to be adopted for computation of Auxiliary consumption through ST/TT/SUT/Line etc drawl of start-up power through GT It is observed that some of the stations have adopted higher CT ratios for Auxiliary consumption (through ST/TT/SUT/Line) which would be normally in the range of 5-10% of the Unit capacity. Similarly, during the period of drawl of Startup power, some of the stations have been adopting high CT ratio of such as 3000/1 or 2000/1 which are Page 3 of 5

9 generally required for after commissioning of the Unit. As the quantum of power drawn during startup and Unit outage is very low, adopting lower CT ratio would result in better accuracy of recording. Regional Entities may check if the adopted CT ratios were the least available ones, if required take remedial action and intimate. Where it is not possible to do so, the Committee may look into the matter and advise. 10. Application of loss during non-availability of SEM data As of now, in the event of non-availability of SEM data or under-recording at one end of the line, other end data is being used after application of loss of 1% for 400kV lines and 2% for 220/230kV lines. It is proposed to discontinue the practice of applying loss in the energy accounting as it is the responsibility of the regional entity to maintain the SEMs and ensure timely receipt of SEM data at SRLDC Installation of Standby SEMs on LV side of GT-7 and TT-4 at Ramagundam STPS-stage III Injection of RSTPS-stage I& II is being computed by subtracting the injection of RSTPS stage-iii from the total of out going feeders. ie readings of GT-7 and TT-4 are subtracted from the outgoing feeders (total injection of the whole station). (a) Total injection of RSTPS = sum of all out going Lines and ICTs (b) Injection by RSTPS Stage -III = (GT-7) - (ST-4) (c) Injection of RSTPS (unit 1 to 6) = (a) (b) In the event of failure /under-recording of the SEMs on GT-7 and ST-4, there is no fall back arrangement. Therefore, it is proposed to arrange fall back arrangement by installing stand by SEMs on LV side of the GT-7 and ST-4. Upon approval by the Committee, necessary SEMs may be installed. 12. PoC Data for Q1 of (from April 16 to June 16) As per prevailing CERC orders PoC computations are being carried out by NLDC on quarterly basis. Data for Q1 ( ) may also be furnished by 15/01/2016 as per NLDC s letter dt. 01/01/2016 (enclosed in Annexure VII). As STOA approvals are issued three months in advance, it is essential that the computations are completed well in advance. All the DICs to furnish (1) The technical details of new transmission elements, generating units which are expected to commence commercial operation (2) Yearly Transmission charges (3) Node wise MW/MVAR Injection and Drawl and Page 4 of 5

10 (4) Forecast generation and demand data. All DICs are requested furnish the full data required for computations at least by two quarters in advance without waiting for reminders from NLDC/SRLDC. 13. PSDF Transfer The status of fund transfer from SR to PSDF as on is as below; (In Rs..Crores) UI/DSM A/c. Reactive A/c. e-bidding charges Congestion Amount Grand Total Upto Apr 15 to Aug 15 Sep' Oct' Nov Dec Total , This is for the information of the Committee. x----x----x Page 5 of 5

11 Wk No. & period Intrest for delayed payment as per SRPC letter - SRPC/SE- I/DSM/2014/ dt. 01/06/15 Regional Entity Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. PONDY ( ) KPTCL AP ( ) KSEB PG-HVDC ( ) TN TALCHER-II ( ) PONDY NLC TS-II STG-I ( ) GOA-SR NLC TS-II STG-II ( ) RSTPS STG-I&II SEL ( ) RSTPS STG-III ER ( ) SIMHADRI-II TELANGANA ( ) NLC TS-I EXP NTPL (INFIRM) ( ) VALLUR ( ) LANCO ST-II ( ) MEPL ( ) WR ( ) COASTAL ENERGEN ( ) TPCIL ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP TOTAL TOTAL ( ) AP TN ( ) KPTCL PONDY ( ) KSEB PG-HVDC ( ) RSTPS STG-I&II GOA-SR ( ) RSTPS STG-III TALCHER-II ( ) SIMHADRI-II NLC TS-II STG-I ( ) LANCO ST-II NLC TS-II STG-II ( ) SEL NLC TS-I EXP ( ) WR VALLUR ( ) COASTAL ENERGEN MEPL ( ) TPCIL ER ( ) NLC TPS-II (EXPN) TELANGANA ( ) IL&FS NTPL (INFIRM) ( ) LANCO ST-III TPCIL(INFIRM) ( ) NTPL ( ) KKNPP TOTAL TOTAL ( ) AP PONDY ( ) KPTCL PG-HVDC

12 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. 23( ) KSEB RSTPS STG-I&II ( ) TN SIMHADRI-II ( ) GOA-SR TALCHER-II ( ) RSTPS STG-III NLC TS-II STG-I ( ) VALLUR NLC TS-II STG-II ( ) LANCO ST-II NLC TS-I EXP ( ) WR SEL ( ) MEPL ( ) COASTAL ENERGEN ER ( ) TPCIL TELANGANA ( ) NLC TPS-II (EXPN) IL&FS ( ) KKNPP LANCO ST-III ( ) NTPL ( ) TPCIL(INFIRM) TOTAL TOTAL ( ) AP PONDY ( ) KPTCL PG-HVDC ( ) KSEB RSTPS STG-I&II ( ) TN RSTPS STG-III ( ) GOA-SR SIMHADRI-II ( ) NLC TS-I EXP TALCHER-II ( ) VALLUR NLC TS-II STG-I ( ) LANCO ST-II NLC TS-II STG-II ( ) SEL MEPL ( ) ER TELANGANA ( ) WR NLC TPS-II (EXPN) ( ) COASTAL ENERGEN TPCIL(INFIRM) ( ) TPCIL ( ) NTPL (INFIRM)** ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP TOTAL TOTAL rev wk 4-21 dt. 21/09/15 AP KPTCL rev wk 4-21 dt. 21/09/15 PG HVDC KSEB rev wk 4-21 dt. 21/09/15 TELANGANA TN rev wk 4-21 dt. 21/09/15 TELANGANA PUDUCHERRY rev wk 4-21 dt. 21/09/15 RSTPS STG-I&II GOA-SR rev wk 4-21 dt. 21/09/15 LANCO ST-II RSTPS STG-III rev wk 4-21 dt. 21/09/15 COASTAL ENERGEN TALCHER-II rev wk 4-21 dt. 21/09/15 SEL NLC TPS-II (Expn.)

13 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. rev wk 4-21 dt. 21/09/15 MEPL rev wk 4-21 dt. 21/09/15 ILFS (INFIRM) rev wk 4-21 dt. 21/09/15 TPCIL rev wk 4-21 dt. 21/09/15 NTPL rev wk 4-21 dt. 21/09/15 Lanco St III (Infirm)* rev wk 4-21 dt. 21/09/15 KKNPP* TOTAL TOTAL ( ) AP PG-HVDC ( ) KPTCL RSTPS STG-III ( ) KSEB SIMHADRI-II ( ) TN TALCHER-II ( ) PONDY NLC TS-II STG-I ( ) GOA-SR NLC TS-II STG-II ( ) RSTPS STG-I&II NLC TS-I EXP ( ) LANCO ST-II VALLUR ( ) WR SEL ( ) COASTAL ENERGEN MEPL ( ) TPCIL ER ( ) NLC TPS-II (EXPN) TELANGANA ( ) LANCO ST-III IL&FS ( ) NTPL TPCIL(INFIRM) ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) TOTAL TOTAL ( )-R1 AP COASTAL ( )-R1 KPTCL NTPL (INFIRM)** ( )-R1 KSEB ( )-R1 TN ( )-R1 GOA-SR ( )-R1 LANCO ST-II ( )-R1 Lanco St III ( )-R1 SEL ( )-R1 COASTAL ENERGEN (INFIRM) TOTAL TOTAL PSDF ( ) AP PG-HVDC ( ) KPTCL TALCHER-II ( ) KSEB NLC TS-II STG-II ( ) TN NLC TS-I EXP ( ) PONDY VALLUR ( ) GOA-SR MEPL

14 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. 26( ) RSTPS STG-I&II ER ( ) RSTPS STG-III TPCIL ( ) SIMHADRI-II TELANGANA ( ) NLC TS-II STG-I IL&FS (INFIRM) ( ) LANCO ST-II ( ) SEL ( ) WR ( ) COASTAL ENERGEN ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) TOTAL TOTAL Wk 25 - WRPC rev WR ( ) AP PG-HVDC ( ) KPTCL RSTPS STG-III ( ) KSEB TALCHER-II ( ) TN NLC TS-II STG-I ( ) PONDY NLC TS-II STG-II ( ) GOA-SR NLC TS-I EXP ( ) RSTPS STG-I&II VALLUR ( ) SIMHADRI-II SEL ( ) LANCO ST-II MEPL ( ) WR ER ( ) COASTAL ENERGEN TELANGANA ( ) TPCIL IL&FS (INFIRM) ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) TOTAL TOTAL ( ) AP TN ( ) KPTCL PG-HVDC ( ) KSEB TALCHER-II ( ) PONDY NLC TS-II STG-I ( ) GOA-SR NLC TS-II STG-II ( ) RSTPS STG-I&II VALLUR ( ) RSTPS STG-III SEL ( ) SIMHADRI-II ER ( ) NLC TS-I EXP TELANGANA

15 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. 28( ) LANCO ST-II ( ) MEPL ( ) WR ( ) COASTAL ENERGEN ( ) TPCIL ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) TOTAL TOTAL PSDF ( ) AP PG-HVDC ( ) KPTCL TALCHER-II ( ) KSEB NLC TS-II STG-I ( ) TN NLC TS-II STG-II ( ) PONDY NLC TS-I EXP ( ) GOA-SR VALLUR ( ) RSTPS STG-I&II ER ( ) RSTPS STG-III TELANGANA ( ) SIMHADRI-II ( ) LANCO ST-II ( ) SEL ( ) MEPL ( ) WR ( ) COASTAL ENERGEN ( ) TPCIL ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) TOTAL TOTAL ( ) AP PG-HVDC ( ) KPTCL TALCHER-II ( ) KSEB NLC TS-I EXP ( ) TN VALLUR ( ) PONDY SEL ( ) GOA-SR ER ( ) RSTPS STG-I&II WR

16 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. 30( ) RSTPS STG-III ( ) SIMHADRI-II ( ) NLC TS-II STG-I ( ) NLC TS-II STG-II ( ) LANCO ST-II ( ) MEPL ( ) COASTAL ENERGEN ( ) TPCIL ( ) TELANGANA ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) TOTAL TOTAL ( ) AP PG-HVDC ( ) KPTCL TALCHER-II ( ) KSEB NLC TS-I EXP ( ) TN ER ( ) PONDY WR ( ) GOA-SR ( ) RSTPS STG-I&II ( ) RSTPS STG-III ( ) SIMHADRI-II ( ) NLC TS-II STG-I ( ) NLC TS-II STG-II ( ) VALLUR ( ) LANCO ST-II ( ) SEL ( ) MEPL ( ) COASTAL ENERGEN ( ) TPCIL ( ) TELANGANA ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) TOTAL TOTAL ( ) AP PG-HVDC

17 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. 32( ) KPTCL TALCHER-II ( ) KSEB NLC TS-II STG-I ( ) TN NLC TS-II STG-II ( ) PONDY SEL ( ) GOA-SR ER ( ) RSTPS STG-I&II ( ) RSTPS STG-III ( ) SIMHADRI-II ( ) NLC TS-I EXP ( ) VALLUR ( ) LANCO ST-II ( ) MEPL ( ) WR ( ) COASTAL ENERGEN ( ) TPCIL ( ) TELANGANA ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) Intrest for delayed payment as per SRPC letter - SRPC/SE- I/DSM/2015/ dt. 06/11/15 TOTAL TOTAL TELANGANA MEPL NTPL GOA-SR TN PONDY TPCIL IL&FS ( ) AP PG-HVDC ( ) KPTCL TALCHER-II ( ) KSEB ER ( ) TN ( ) PONDY ( ) GOA-SR ( ) RSTPS STG-I&II ( ) RSTPS STG-III ( ) SIMHADRI-II ( ) NLC TS-II STG-I

18 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. 33( ) NLC TS-II STG-II ( ) NLC TS-I EXP ( ) VALLUR ( ) SEL ( ) MEPL ( ) WR ( ) COASTAL ENERGEN ( ) TPCIL ( ) TELANGANA ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) ( ) LKPL ST-III (INFIRM) TOTAL TOTAL Intrest for delayed payment as per SRPC letter - SRPC/SE- I/DSM/2015/ dt. 07/12/15 TELANGANA TPCIL IL&FS ( ) AP PONDY ( ) KPTCL PG-HVDC ( ) KSEB TALCHER-II ( ) TN VALLUR ( ) GOA-SR ER ( ) RSTPS STG-I&II ( ) RSTPS STG-III ( ) SIMHADRI-II ( ) NLC TS-II STG-I ( ) NLC TS-II STG-II ( ) NLC TS-I EXP ( ) SEL ( ) MEPL ( ) WR ( ) COASTAL ENERGEN ( ) TPCIL ( ) TELANGANA ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL

19 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. 34( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) ( ) LKPL ST-III (INFIRM) ( ) NTPC, KUDGI (INFIRM) TOTAL TOTAL PSDF ( ) AP PONDY ( ) KPTCL PG-HVDC ( ) KSEB TALCHER-II ( ) TN NLC TS-II STG-I ( ) GOA-SR NLC TS-II STG-II ( ) RSTPS STG-I&II MEPL ( ) RSTPS STG-III ER ( ) SIMHADRI-II WR ( ) NLC TS-I EXP ( ) VALLUR ( ) SEL ( ) COASTAL ENERGEN ( ) TPCIL ( ) TELANGANA ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) ( ) LKPL ST-III (INFIRM) ( ) NTPC, KUDGI (INFIRM) TOTAL TOTAL ( ) AP TN ( ) KPTCL PG-HVDC ( ) KSEB TALCHER-II ( ) PONDY NLC TS-I EXP ( ) GOA-SR MEPL ( ) RSTPS STG-I&II ER ( ) RSTPS STG-III TPCIL ( ) SIMHADRI-II TELANGANA ( ) NLC TS-II STG-I ( ) NLC TS-II STG-II ( ) VALLUR

20 Receipt and Disbursement details of Deviation Charges during Sep 2015 to Dec 2015 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to Deviation disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to Total amt. Date of Regional Entity Regional Entity Amount from pool / (-) into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursed (Rs.) disbursement disbursible(rs.) Excess Excess disbursed. 36( ) SEL ( ) WR ( ) COASTAL ENERGEN ( ) NLC TPS-II (EXPN) ( ) IL&FS ( ) LANCO ST-III ( ) NTPL ( ) KKNPP ( ) COASTAL ENERGEN (INFIRM) ( ) LKPL ST-III (INFIRM) ( ) NTPC, KUDGI (INFIRM) TOTAL TOTAL * Yet to pay **NTPL (Infirm) had not pad Rs as per 24( )-R0. Hence no disbursement made to NTPL (Infirm) for 24( )-R1. 10

21 Annexure-II Receipt and disbursement details of Reactive Energy charges during June 2015 to Aug 2015 Reactive charges dues as per weekly A/c. issued Details of realisation Details of Disbursement WEEK NO.AND PERIOD Payable Constituent Due date Amount due in Rs. Date of realisation Amount realised (in Rs.) Balance due, if any (in Rs.) Receivable Constituent Amount receivable as per a/c Amount receivable as per SREB decision prorata Amount disbursed Date of Disbursement Balance due, if any (in Rs.) Remarks 21( ) No regional entity payable. Hence no amount to be disbursed. 22( ) No regional entity payable. Hence no amount to be disbursed. 23( ) No regional entity payable. Hence no amount to be disbursed. 24( ) TELANGANA 2-Oct Oct AP Oct ( ) KPTCL Oct ( ) KSEB Oct ( ) TANGEDCO Oct ( ) PUDUCHERRY Oct ( ) IL& FS Oct ( ) TOTAL TOTAL No regional entity payable. Hence no amount to be disbursed. 26( ) 27( ) 28( ) 29( ) 30( ) 31( ) 32( ) No regional entity payable. Hence no amount to be disbursed. No regional entity payable. Hence no amount to be disbursed. No regional entity payable. Hence no amount to be disbursed. No regional entity payable. Hence no amount to be disbursed. No regional entity payable. Hence no amount to be disbursed. No regional entity payable. Hence no amount to be disbursed. No regional entity payable. Hence no amount to be disbursed. 33( ) TELANGANA 4-Dec Dec AP Dec ( ) KPTCL Dec ( ) KSEB Dec ( ) TANGEDCO Dec ( ) PUDUCHERRY Dec-15 0 TOTAL TOTAL ( ) AP 11-Dec Dec KPTCL Dec ( ) KSEB Dec ( ) TANGEDCO Dec-15 0

22 Annexure-II Receipt and disbursement details of Reactive Energy charges during June 2015 to Aug 2015 Reactive charges dues as per weekly A/c. issued Details of realisation Details of Disbursement WEEK NO.AND PERIOD Payable Constituent Due date Amount due in Rs. Date of realisation Amount realised (in Rs.) Balance due, if any (in Rs.) Receivable Constituent Amount receivable as per a/c Amount receivable as per SREB decision prorata Amount disbursed Date of Disbursement Balance due, if any (in Rs.) Remarks 34( ) PUDUCHERRY Dec ( ) TELANGANA Dec ( ) TOTAL TOTAL No regional entity payable. Hence no amount to be disbursed. 36 ( ) P1 AP 25-Dec Dec KPTCL Dec ( ) P1 TELANGANA 25-Dec KSEB Dec ( ) P1 TANGEDCO Dec ( ) P1 PUDUCHERRY Dec-15 0 TOTAL TOTAL ( ) P2 TELANGANA 25-Dec Dec KPTCL Dec ( ) P2 KSEB Dec ( ) P2 TANGEDCO Dec ( ) P2 PUDUCHERRY Dec-15 0 TOTAL TOTAL

23 Date Updated Status of Receipt of Signed Reconciliation Statement at SRLDC - Deviation Charges Annexure III Month Sl No: Pool Member Aug-15 Sep-15 Oct-15 1 APTRANSCO 2 KPTCL Yes 3 KSEB Yes Yes Yes 4 TANTRANSCO 5 PONDY 6 GOA Yes (m) Yes (m) Yes (m) 7 TSTRANSCO Yes Yes Yes 8 PG-HVDC Yes Yes Yes 9 RSTPS Stg 1 & 2 Yes Yes 10 RSTPS Stg 3 Yes Yes 11 Talcher Stg 2 Yes Yes 12 Simhadri 2 Yes Yes 13 NLC TS2 Stg 1 Yes Yes Yes 14 NLC TS2 Stg 2 Yes Yes Yes 15 NLC Ts 1 Expn Yes Yes 16 NLC TS 2 Expn Yes Yes 18 NTECL, Vallur Yes (m) Yes (m) Yes (m) 20 LANCO ST II Yes (m) Yes (m) 21 LANCO ST III Yes (m) Yes (m) 22 Kudankulam Yes 23 SEPL Yes Yes Yes 25 MEPL Yes Yes 26 Coastal Energen 27 TPCIL Yes Yes 28 TPCIL (Infirm) NA Yes 29 NTPL Yes 30 IL&FS 31 ERLDC Yes Yes Yes 32 WRLDC

24 Annexure III Date Updated Status of Receipt of Signed Reconciliation Statement at SRLDC - Reactive Charges Sl No: Pool Member Aug-15 Sep-15 Oct-15 1 APTRANSCO No No No 2 KPTCL Yes Yes No 3 KSEB No Yes Yes 4 TANTRANSCO No No No 5 TSTRANSCO Yes Yes No 6 PONDY No No No 7 IL&FS No No No

25 I Disbursement of PoC Charges Aug'15 to Nov'15 Sl.no. Month Injection Withdrawal MWH PoC Charges MWH PoC Charges Total PoC Charges for CTU 1 Aug ,479, ,297, ,777,684 2 Sep ,429, ,958, ,388,267 3 Oct ,636, ,887, ,524,060 4 Nov ,887, ,518, ,406,020 II Month Disbursement of STU/SLDC Charges from Aug'15 to Nov'15 STATE STU Charges SLDC Charges TOTAL A/C No. 1) STU charge: SBI, A/c. No SBIN ) SLDC charge: Corporation bank A/c No IFSC Code: CORP Aug-15 DELHI 318,490 42, ,490 Bank of India, A/c. No , RTGS GUJARAT -97 1, Code: BKID HARYANA 64,800 1,000 65,800 HPSEB 1,300 2,000 3,300 ORISSA 1,673,542 60,000 1,733,542 APTRANSCO 54,375, ,000 54,889,626 KPTCL 26,579, ,000 26,923,002 TELANGANA 122,447,835 1,099, ,546,835 State Bank of Patiala, A/c. No , RTGS Code: STBP ) STU charge: State Bank of Patiala, A/c No STBP ) SLDC charge: Punjab National Bank A/C No PUNB (1) STU Charge: S/B A/c.No UBIN (2) SLDC Charge :S/B A/c.No UBIN APTRANSCO Hyderabad, ICICI, A/c.No , IFSC Code ICIC SBM A/c. No , Madhavanagar Branch. RTGS Code: SBMY TGTRANSCO,STATE BANK OF HYDERABAD,A/c.No ,IFSC Code::SBHY TOTAL 205,460,499 2,063, ,523,499

26 1) STU charge: SBI, A/c. No SBIN ) SLDC charge: Corporation bank A/c No IFSC Code: CORP Sep-15 DELHI 539,114 17, ,114 GUJARAT 0 30,000 30,000 HARYANA 36,000 1,000 37,000 MSETCL 1,848,361 54,000 1,902,361 ORISSA 114,000 2, ,000 WBSETCL 8,000 1,000 9,000 APTRANSCO 38,483, ,000 38,860,657 KPTCL 17,020, ,000 17,254,175 TELANGANA 117,440, , ,389,616 TOTAL 175,489,924 1,665, ,154,924 Bank of India, A/c. No , RTGS Code: BKID State Bank of Patiala, A/c. No , RTGS Code: STBP (1) STU Charge: Bank of Maharashtra, A/c.No , RTGS Code: MAHB (2) SLDC Charge: Bank of Maharashtra, Airoli, A/C No IFSC Code:MAHB (1) STU Charge: S/B A/c.No UBIN (2) SLDC Charge :S/B A/c.No UBIN UCO Bank S/B A/c. No , RTGS Code UCBA APTRANSCO Hyderabad, ICICI, A/c.No , IFSC Code ICIC SBM A/c. No , Madhavanagar Branch. RTGS Code: SBMY TGTRANSCO,STATE BANK OF HYDERABAD,A/c.No ,IFSC Code::SBHY Oct-15 DELHI 371,553 4, ,553 HARYANA 108,000 1, ,000 ORISSA 1,143,125 18,000 1,161,125 WBSETCL 68,000 3,000 71,000 APTRANSCO 50,261, ,000 50,668,729 KPTCL 11,832,000 62,000 11,894,000 1) STU charge: SBI, A/c. No SBIN ) SLDC charge: Corporation bank A/c No IFSC Code: CORP State Bank of Patiala, A/c. No , RTGS Code: STBP (1) STU Charge: S/B A/c.No UBIN (2) SLDC Charge :S/B A/c.No UBIN UCO Bank S/B A/c. No , RTGS Code UCBA APTRANSCO Hyderabad, ICICI, A/c.No , IFSC Code ICIC SBM A/c. No , Madhavanagar Branch. RTGS Code: SBMY TNEB 191,133 24, ,133 TELANGANA 123,829, , ,498,253 TOTAL 187,804,792 1,188, ,992,792 TANTRANSCO, Canara Bank A/c.No , Anna Salai Branch, Chennai-2, IFSC Code:CNRB TGTRANSCO,STATE BANK OF HYDERABAD,A/c.No ,IFSC Code::SBHY

27 1) STU charge: SBI, A/c. No SBIN ) SLDC charge: Corporation bank A/c No IFSC Code: CORP Nov-15 DELHI 1,520,846 14,000 1,534,846 GUJARAT 0 30,000 30,000 ORISSA 473,895 14, ,895 APTRANSCO 41,638, ,000 42,167,855 KPTCL 67,200 10,000 77,200 Bank of India, A/c. No , RTGS Code: BKID (1) STU Charge: S/B A/c.No UBIN (2) SLDC Charge :S/B A/c.No UBIN APTRANSCO Hyderabad, ICICI, A/c.No , IFSC Code ICIC SBM A/c. No , Madhavanagar Branch. RTGS Code: SBMY TNEB 0 24,000 24,000 TELANGANA 53,215, ,000 53,852,112 TOTAL 96,915,908 1,258,000 98,173,908 TANTRANSCO, Canara Bank A/c.No , Anna Salai Branch, Chennai-2, IFSC Code:CNRB TGTRANSCO,STATE BANK OF HYDERABAD,A/c.No ,IFSC Code::SBHY

28 NON RECEIPT OF SEM DATA BY 12:00 Hrs of TUESDAY for the period from to Sep 2015 to Dec 2015 Annexure-V Week APTRANSCO TELANGANA KPTCL KSEB TANTRANSCO PONDY GOA POWERGRID NLC NTPC NPC IPP MAMIDIPALLY GUTTUR ALAMATHY NELLORE KTPS N'SAGAR TANDUR HVDC TALCHER ALAMPUR X ROADS TUTICORIN PS JURALA GUTTUR MOOLAMOTTOM NCTPS HYDERABAD N'SAGAR KODASALLY MOOZHIYAR ALAMATHY CHALAKURTHY KADRA KADALANGUDI WANAPARTHY STCMS RAMAPURAM SIRUSERI SEETHAPURAM KAYATAR WADAPALLI GUMMIDPOONDI SP KOIL VTPS DINDI GUTTUR NCTPS KADAPA GADWAL KODASALLY ALAMATHY MADHUGIRI JURALA KADRA STCMS GAJUWAKA N'SAGAR SEDAM RAICHUR 765kV CHALAKURTHY KONAJE VIJAYAWADA WANAPARTHY MALKARAM GUTTUR KAYATHAR KADAPA VTPS KODASALLY ALAMATHY MADHUGIRI KADRA RTPS WADAPALLI KODASALLY ALAMATHY PONDA NELLORE KADRA SP KOIL KAYATAR GUMMIDIPOONDI VTPS MALKARAM AMBEWADI ALAMATHY KARAIKUDI KAIGA SEL N'SAGAR RC WADAPALLI GUTTUR SP KOIL MEPL WANPARTHY NELAMANGALA ACHRAPAKAM KODASALLY KAYATAR KADRA CHITTOR MAHABOOBNAGAR AMBEWADI ALAMATHY ARASUR NLC 2 EXP JSW WARNAPARTHY YARENDAHALLI SP KOIL NELLORE GAJWEL KAYATAR 765 KURNOOL KODADA KOZHIKODE VTPS TANDUR GUTTUR EDAMAN NCTPS GAZUWAKA N' SAGAR RC SP KOIL 765kV RAICHUR KAMAVARPUKOTA KADRA SIRUSERI XELDEM WARANGAL

29 NON RECEIPT OF SEM DATA BY 12:00 Hrs of TUESDAY for the period from to Sep 2015 to Dec 2015 Annexure-V Week APTRANSCO TELANGANA KPTCL KSEB TANTRANSCO PONDY GOA POWERGRID NLC NTPC NPC IPP KODADA KODASALLI GUMMIDPOONDI GUTTUR SEDAM AMBEWADI BALLARY KAMAVARPUKOTA MAHABOOBNAGAR KADRA MOOZHIYAR GUMMIDIPOONDI XELDEM NAGAPATTINAM KUSUMANCHI KODASALLI SP KOIL SEDAM EDAMAN GUMMIDIPOONDI KADRA SP KOIL HOSUR CHALAKURTHY NELAMANGALA PARASALA GUMMIDIPOONDI PONDA NAGAPATTINAM MAHABOOBNAGAR GUTTUR XELDEM N'SAGAR AMBEWADI TTPS KODASALLI KADRA N'SAGAR AMBEWADI XELDEM RAICHUR WANAPARTHY RAGULAPADU KADRA GUMMIDIPOONDI MUNIRABAD JSW SEDAM SP KOIL KCP CEMENTS DINDI KADRA CUDDAPAH NTL GOOTY-RS KTPS RAICHUR GOOTY MAHABOOBNAGAR KODASALLI N'SAGAR GADWAL KTPP CHALAKURTHY

30 Annexure VI Sep-15 AP TG KARNATAKA KERALA TN PONDY POWERGRID POWERGRID GOA ISGS IPP Ragulapadu Ditchipally Ambewadi Achrapakkam Cuddapah Madurai Xeldem KAIGA- NPC JSW Nunna GAJWEL 400 kv Bellary(Alipur) ARNI Gazuwaka Munirabad Ponda MAPS NPC SEL Kakinada KSTPS( KOTHAGUDAM) BTPS Gummidipundi Gooty Narendra Ramagundam NPTC Kurnool KTPP( KAKATHEEYA) Guttur SP KOIL Hiriyur Nellore NTPL MEPL VTPS Srisailam LB Hoody TTPS Hyderabad Pondy BHAVINI Sulurpet Dindi S/S Kadakola SIRUSERI Kalavinthapattu Raichur 765kV Srisailam RB Wanaparthy S/S Konaje S R Pudur Somanahalli Kurnool 765kV KURNOOL (Nanoor) Gadwal S/S Nelamangala Sriperumbudur Trichy Brahmanakotkar Alampur X roads S/S Raichur Thiruvelam Vijayawada AP carbides Jurala Sedam TALCHER HVDC-AUX Warangal Chillakallu S/S Aswraopeta Kadra KCP Cements S/S Khammam S/S Kodasally Kodada S/S Yarandahalli Ramapuram S/S Seethapuram S/S Nagarjuna sagar dam S/S Chalakurthy S/S Bonakallu Oct-15 AP TG KARNATAKA KERALA TN PONDY POWERGRID POWERGRID GOA ISGS IPP Ragulapadu Ditchipally Ambewadi Achrapakkam Villianur Cuddapah Raichur 765kV Xeldem KAIGA- NPC JSW Gooty (RS-AP) GAJWEL 400 kv Bellary(Alipur) Mettur Gazuwaka Kurnool 765kV Ponda Neyveli TS-II Stg. I & II SEL Kakinada KSTPS( KOTHAGUDAM) BTPS ARNI Gooty Salem TALCHER STAGE-II NTPC MEPL Kurnool KTPP( KAKATHEEYA) Guttur Gummidipundi Hiriyur Somanahalli NTPL BHAVINI VTPS Tandur Hoody SP KOIL Hyderabad Sriperumbudur Sulurpet Srisailam LB Kadakola TTPS Kalavinthapattu Thiruvelam Srisailam RB Dindi S/S Konaje Theni Karaikudi TALCHER HVDC-AUX KURNOOL (Nanoor) Wanaparthy S/S Nelamangala Kolar DC Warangal Brahmanakotkar Gadwal S/S Raichur S R Pudur Munirabad Pondy AP carbides Alampur X roads S/S Sedam Nellore Nagarjuna sagar Right canal S/S Jurala Kadra Nunna Aswraopeta Kodasally Kamavarapu kota S/S Madira S/S Yarandahalli Kodada S/S Ramapuram S/S Seethapuram S/S Lower sileru -APGENCO Nagarjuna sagar dam S/S Chalakurthy S/S TIME DRIFT STATEMENT NOT RECEIVED

31 TIME DRIFT STATEMENT NOT RECEIVED Annexure VI Nov-15 AP TG KARNATAKA KERALA TN PONDY POWERGRID POWERGRID GOA ISGS IPP Chitthoor(220 kv) Ditchipally Ambewadi Achrapakkam Cuddapah Raichur 765kV Xeldem Neyveli TS-II Stg. I & II Chittoor 400 kv GAJWEL 400 kv Bellary(Alipur) ARNI Gazuwaka Kurnool 765kV Ponda NTPL JSW Ragulapadu KSTPS( KOTHAGUDAM) BTPS Gummidipundi Gooty Sriperumbudur SEL Gooty (RS-AP) KTPP( KAKATHEEYA) Guttur Kuzhithurai Hyderabad Thiruvelam MEPL Kakinada Malkaram Hoody SP KOIL Nellore Udumalpet BHAVINI Kurnool Srisailam LB Kadakola TTPS Munirabad TALCHER HVDC-AUX COASTAL ENERGEN VTPS Dindi S/S Konaje S R Pudur Warangal TPCIL Sulurpet Wanaparthy S/S Raichur Pondy Srisailam RB Sedam KURNOOL (Nanoor) Alampur X roads S/S Kadra Brahmanakotkar Jurala Kodasally AP carbides Aswraopeta Yarandahalli Nagarjuna sagar Right Madira S/S Nunna Khammam S/S Kodada S/S Ramapuram S/S Seethapuram S/S Lower sileru -APGENCO Nagarjuna sagar dam S/S Chalakurthy S/S Bonakallu Dec-15 AP TG KARNATAKA KERALA TN PONDY POWERGRID POWERGRID GOA ISGS IPP Chitthoor(220 kv) Ditchipally Ambewadi Achrapakkam Cuddapah Nagarjunasagar Xeldem MAPS NPC JSW Chittoor 400 kv GAJWEL 400 kv Bellary(Alipur) Alamathy Gooty Nellore Ponda Neyveli TPS-I COASTAL Expansion ENERGEN Ragulapadu KSTPS( KOTHAGUDAM) BTPS ARNI Hiriyur Pondy Neyveli TS-II Stg. I MEPL Gooty (RS-AP) KTPP( KAKATHEEYA) Guttur Gummidipundi Hosur Pugalur(Karur) Ramagundam BHAVINI Kakinada Malkaram Hoody Hosur-TNEB Karaikudi Raichur 765kV SEL Kurnool Mamidipally Kadakola Kuzhithurai Kolar AC Kurnool 765kV VTPS Mehaboobnagar Konaje SP KOIL Munirabad Sriperumbudur Sulurpet Tandur Nelamangala TTPS Trivandurm TALCHER HVDC-AUX Srisailam RB Srisailam LB Raichur SIRUSERI Tuticorin PS Trichur KURNOOL (Nanoor) Dindi S/S Sedam S R Pudur Udumalpet Warangal Brahmanakotkar Wanaparthy S/S Kadra AP carbides Gadwal S/S Kodasally Nagarjuna sagar Right Alampur X roads S/S Yarandahalli Bommuru S/S Jurala Donkarai S/S Aswraopeta Nunna Kusumanchi S/S Kodada S/S Ramapuram S/S Seethapuram S/S Lower sileru -APGENCO Nagarjuna sagar dam S/S Wadapalli S/S Chalakurthy S/S

32

33 Loc ID Sl No Location CT ratio RM-07 NP-7174-A RAMAGUNDAM ST RM-08 NP-7175-A RAMAGUNDAM ST RM-09 NP-7192-A RAMAGUNDAM ST RM-49 NP-4079-A RAMAGUNDAM ST SM-03 NP-7184-A Simhadri ST SM-15 NP-7215-A Simhadri ST TL-57 NP-4064-A Talcher ST-1 (main) 100 TL-58 NP-4065-A Talcher ST-1 (Check) 100 TL-59 NP-4066-A Talcher ST-2 (main) 100 TL-60 NP-4067-A Talcher ST-2 (Check) 100 VL-01 NP-7152-A Vallur ST VL-03 NP-7276-A Vallur ST VL-05 NP-7197-A Vallur ST KG-03 NP-4013-A Kaiga ST-1 (Main) 125 KG-04 NP-4016-A Kaiga ST-2(main) 125 KG-07 NP-7812-A Kaiga ST-3(main) 125 KG-08 NP-4059-A Kaiga ST-4(main) 125 KG-13 NP-4012-A Kaiga ST-1 (check) 125 KG-14 NP-4030-A Kaiga ST-2(check) 125 KG-17 NP-4076-A Kaiga ST-3(check) 125 KG-18 NP-4060-A Kaiga ST-4(check) 125 KD-25 NP-9601-A Kudgi ST KD-01 NP-9642-A Kudgi(PG) Line -1 at NTPC Kudgi (main) 3000 KD-02 NP-9593-A Kudgi(PG) Line -1 at NTPC Kudgi (Check) 3000

34 DETAILS OF NODAL OFFICERS FOR SEM DATA COORDINATION Sl.No Entity Name Designation Contact No. id 1 APTRANSCO D.Praveen Maurice Divisional Engineer,SLDC aptransco@gmail.com 2 KPTCL Shivaraju M.N. Asst.Executive Engineer croomldckptcl@yahoo.com 3 KSEBL Beno Paul Executive Engineer eeksebld2@gmail.com 4 TANTRANSCO P.Murugavelan Asst.Executive Engineer, SLDC murugavelan.p@yahoo.com 5 TSTRANSCO P.Chandra Shekar Divisional Engineer,SLDC cesldctelangana@gmail.com V.V.Subrahmanyyam Asst.Divisional Engr/EBC tstranscoebc@gmail.com 6 PUDUCHERRY Rammohan Asst.Engr,System Control Centre Goa (SR) Sunilkumar.A.Kamalapurkar Asst.Executive Engr(Elec.) kvged@gmail.com 8 RSTPS SSS.Srinivas AGM(EMD) ssssrinivas@ntpc.co.in 9 Talcher STPS II P.Narayan DGM(EEMG) pnarayan@ntpc.co.in 10 Simhadri STPS K.Sureshbabu DGM(EEMG) ksureshbabu@ntpc.co.in 11 NLC TPS II M.Sampath Chief Manager(Elec) , sampath.m@nlcindia.com 12 NLC TPS I Expn E.Sachindrakumar Chief Manager(Elec) sachindrakumar.e@nlcindia.com 13 NLC TPS II Expn N.Duraikannan Chief Manager(Elec) , , duraikannan.n@nlcindia.com.plan ning.ts2expn@nlcindia.com 14 MAPS J.Rooby STE(C&CS),Technical unit jrooby@npcil.com 15 KGS G.K.Sunil Senor Operation Engineer(KGS-1& , gksunil@npcil.co.in 16 KKNPP R.Ramesh Babu SOE,Operation Group rrameshbabu@kknpp.com rrajendran@ntpc.co.in,rajntecl@g 17 NTECL(Vallur) R.Rajendran Deputy Manager , mail.com 18 NTPL(Tutucorin) K.C.Ragunathan Chief Manager(Elec) , ragunathan.k.c@nlcindia.com 19 Coastalenergen A.U.Azarudeen Senior Engineer(Electrical) azarudeen.u@coastalenergen.co m 20 MEPL Seshagirirao Lead Engineer(Elec) , seshagiri.anantharapu@meenaks hienergy.com 21 SEL D.Narendra Reddy CM (Elec.) , sme@simhapurienergy.com 22 TPCIL N.R.Nayak Head Operations , nayak.nr@tpcil.com Nageshwar Rao.JVLH AGM , ose@tpcil.com 23 PGCIL-SRTS-I SDCS Rao CM(AM) , oandmsrts1@gmail.com 24 PGCIL-SRTS-II Rajeswara Rao Dpty Manager oandmsr2@yahoo.com 25 Kudgi STPP P Sunil Dpty General Manager sunilp@ntpc.co.in 25 SRLDC Ramkumar Engineer sreasem@gmail.com 26 L&T Ananda kumar Seshadri C.D. Assistant Manager cd.seshadri@lntebg.com 27 EDMI A.Nithyananth Executive Projects nithyananth@edmi.co.in 28 Secure M.Shankar Sr. Executive Mktg m.shanker@securetogether.com 29 ELSTER A.Princeton Regional Manager princeton@elster.com 30

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80 TAMIL NADU TRANSMISSION CORPORATION LIMITED (Subsidiary of TNEB Ltd) From Er. G.Venkatesan, B.E., Superintending Engineer/LD&GO, SLDC Block, Chennai To The Superintending Engineer, Southern Regional Power Committee, No.29, Race Course Cross Road, Bangalore Lr. No. SE/LD&GO/EE/G/AEE2/AE2/F. CCM /D /2015, Dt Sub: Points to be included in the Agenda of the ensuing 30 th Commercial Sub- Committee Meeting Regarding. Ref: SRPC/SE-I/30 CC/2015, dt As requested vide letter cited in the reference, the following points are furnished to include in the Agenda for the 30 th Meeting of the Commercial Sub-Committee of SRPC: 1. Transmission charges for the Long Outage Generating Unit / Not-able to maintain the approved Injection quantum by Generator for long time has to be paid by the Generators itself: As per CERC (Sharing of Transmission Charges and Losses) (Third Amendment) Regulations, 2015, the Point of Connection (PoC) injection charges have been merged into PoC withdrawal charges in respect of withdrawal Designated ISTS Consumers (DIC). In this regard the PoC slab rate for the DIC includes both withdrawal as well as injection charges. The DIC has to pay the transmission charges for the Approved withdrawal quantum specified in the RTA. The Approved withdrawal of DIC is calculated based on their ex-bus share from all the ISGS stations for the installed capacity after declaration of CoD. The above Approved withdrawal also includes the ex-bus share from the ISGS stations under AOH / Generator not generating up to the approved injection quantum for the installed capacity for the month. Hence the DIC has to pay the transmission charges for not withdrawing any quantum from the ISGS stations under AOH/Generator not generating up to the approved injection quantum for the month. In Southern Region, KKNPP Unit-1 is taken out of bar for AOH during the month end of June 2015 for a period of 60 days, but still now the unit has not turned back to its generation. Due to the above long shutdown of KKNPP Unit-1, Tamil Nadu had paid an amount of Rs.47.04

81 crores as transmission charges for withdrawal quantum of MW per month as ex-bus share from KKNPP Unit-1 from July 2015 to November But for the above five months, the Tamil Nadu had paid the transmission charges for not utilizing the energy from KKNPP instead for blocking the corridor alone. Hence the Tamil Nadu request is that the whenever a Generating unit is under long shutdown, the transmission charges for that period has to be paid by the Generators alone and it should not be passed on to the DIC/Beneficiaries bills. Likewise, the ISGS stations like NTECL, NLC TS2 Exp, NTPL has not maintaining the approved injection quantum for long time, the transmission charges for the Generating stations not maintaining the approved injection quantum for long time also has to be paid by the respective Generators alone and the same should not be passed on to the DIC/Beneficiaries bills. 2. Energy Transactions between Western Region and Southern Region: It is hereby intimated that an amount of Rs. 98,64,551/- have been received from MSEB towards amount payable by MSEB to TNEB towards the energy transaction for the period from August 1999 to December The pending net arrears between SR and WR Constituents for long period are listed below. Amount Payable by TNEB to Chattisgarh Rs. (-) 92,77,878 Amount Receivable by TNEB from MPSEB Rs. 1,17,17,268 Nett amount Receivable from Western Region (MPSEB) Rs. 24,39,390 It is requested that the above may be taken up with WRPC and its constituent MPSEB for early settlement for TN receivable amount. Yours faithfully, Sdxxx( ) Superintending Engineer/LD&GO

82

83

84

85 S R P C, S E C R E T A R I A T SCADA Vs SEM-mismatch

86 Possible Reasons For Deviations The Accuracy Class Of SCADA Is 0.5S, The Accuracy Class Of The Interface Meters Data Is 0.2s. Scan Rate of parameters SEM Higher Scan Rate

87 Errors at the source- SCADA RTU failure / database corruption in SAS / RTU PT fuse failure Faulty transducers Communication failure SEM Time drifting of Interface Meters clock PT fuse failure

88 Other Factors Difference in combination of drawal points considered. Non-availability of telemetry at all points

89 Way Forward Improving communication for reliable telemetry- achieve redundant paths with optical fiber at all data points Providing RTUs/telemetry facilities at all locations Philosophy of manual substitution in case of telemetry failure Philosophy of selection of data points for calculation of drawal Quick rectification of Interface Meter errors

90 SRLDC, Bengaluru Drawl Computation Mismatch of AP & TN

91 As per IEGC clause IEGC Reliable and efficient speech and data communication systems shall be provided to facilitate necessary communicationn and data exchange, and supervision/control of the grid by the RLDC, under normal and abnormal conditions. All users, STUs and CTU shall provide Systems to telemeter power system parameter such as flow, voltage and status of switches/ transformer taps etc. in line with interface requirements and other guideline made available by RLDC. The associated communication system to facilitate data flow up to appropriate data collection point on CTU s system, shall also be established by the concerned user or STU as specified by CTU in Connection Agreement. All users/stus in coordination with CTU shall provide the required facilities at their respective ends as specified in the Connection Agreement.

92 SRLDC AP DECEMBER Mon nth Average Week wise Mismatch Percentage W1 W2 W3 W4

93 SRLDC AP JANUARY Mon nth week wise Average Mismatc ch Percentage W1 JANUARY Month week wise Average Mism match W W2 W3 W W2 W3 W4

94 Tamilnadu January Month Week wise Average Perce entage Error W W2 W3 W4-4.00

95 SRLDC PERCENTAGE ERROR Tamilnadu December Month Week wise Average Percent tage Error W1 W2 W3 W AXIS TITLE

96 In the previous 115 th OCC meeting drawl computation mismatch issue was discussed. AP and TN Drawl Validation was completed in July AP Drawl error in the December month because of Raichur & Kurnool data problem. MEPL data problem in the January month weeks 2&3 (Mainly on 17 th )

97 Effects of Unreliablee Data Effects the real time grid security. Unreliable data misleads the system operator to take unnecessary actions. Leads to Commercial implications. Arguments in place of decisions between constituents and SRLDC.

98 Tamilnadu December Week Wise Percentage Error MON TUE WED W W W W THU FRI SAT SUN

99 Tamilandu January Week Wise Percentage Error MON TUE WED THU FRI SAT SUN W1 W2 W3 W

100 AP December Month SEM Vs SCADA Mismatch Percentage MON TUE WED THU FRI SAT SUN W1 W2 W3 W4

101 AP December Month Day wise SCADA VS SEM mismatch percentage Nov-15 2-Dec-15 7-Dec Dec Dec Dec Dec-15 1-Jan-16 6-Jan

102 SRLDC AP January Month SEM Vs SCADA Mismatch Percentage MON TUE WED THU FRI SAT SUN W1 W2 W3 W4

103 AP January Month Day wise SEM VS SCADA Mismatch Percentage th Jan Data mismatch is more because of MEPL data Sudden jump in few blocks Dec-15 1-Jan-16 6-Jan Jan Jan Jan Jan

104 SRLDC, Bengaluru Thank You

105 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 67/TT/2015 Coram: Shri Gireesh B. Pradhan, Chairperson Shri A.K. Singhal, Member Shri A.S. Bakshi, Member Dr. M.K. Iyer, Member Date of Hearing : Date of Order : In the matter of: Approval of transmission tariff of i) Asset-I (HVDC Portion) and ii) Combined Asset-II (AC Portion) from anticipated COD to under the transmission system associated with North East-Northern/Western Interconnector-I Project in North Eastern, Northern & Western Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, And in the matter of: Power Grid Corporation of India Limited "Saudamini", Plot No.2, Sector-29, Gurgaon Petitioner Vs 1. Assam Electricity Grid Corporation Limited, Bijulee Bhawan, Paltan Bazar, Guwahati Meghalaya Energy Corporation Limited, Lumjingshai, Short Round Road. Shilong-1 3. Government of Arunachal Pradesh, Department of Power, Itanagar Power & Electricity Department, Government of Mizoram, Aizwal Order in Petition No. 67/TT/2015 Page 1 of 26

106 5. Manipur State Electricity Distribution Company Limited, Keishampat, Imphal Department of Power, Government of Nagaland, Kohima Tripura State Electricity Corporation Limited, Bidyut Bhawan, North Banamaliupr, Agartala OTPC (ONGC Tripura Power company Limited), 6th Floor, A Wing, IFCI Towers, New Delhi NTPC, NTPC Bhawan, Scope Complex, Institutional Area, Lodhi Road, New Delhi Rajasthan Rajya Vidyut Prasaran Nigam Ltd., Vidyut Bhawan, VidyutMarg, Jaipur Ajmer Vidyut Vitran Nigam Ltd., 400 kv GSS Building (Ground Floor), Ajmer Road, Heerapura, Jaipur. 12. Jaipur Vidyut Vitran Nigam Ltd., 400 kv GSS Building (Ground Floor), Ajmer Road, Heerapura, Jaipur. 13. Jodhpur Vidyut Vitran Nigam Ltd., 400 kv GSS Building (Ground Floor), Ajmer Road, Heerapura, Jaipur. 14. Himachal Pradesh State Electricity Board Vidyut Bhawan, Kumar House Complex Building II Shimla Punjab State Electricity Board, The MalL, Patiala Haryana Power Purchase Centre, Shakti Bhawan, Sector-6 Panchkula (Haryana) Order in Petition No. 67/TT/2015 Page 2 of 26

107 17. Power Development Department, Govt. of Jammu and Kashmir, Mini Secretariat, Jammu. 18. Uttar Pradesh Power Corporation Ltd., Shakti Bhawan, 14, Ashok Marg, Lucknow Delhi Transco Ltd., Shakti Sadan, Kotla Road, New Delhi BSES Yamuna Power Ltd., Shakti Kiran Building, Karkardooma, Delhi BSES Rajdhani Power Ltd., BSES Bhawan, Nehru Place, New Delhi. 22. North Delhi Power Ltd., Power Trading & Load Dispatch Group, Cennet Building, Adjacent to 66/11 kv Pitampura-3, Grid Building, Near PP Jewellers, Pitampura, New Delhi Chandigarh Administration, Sector-9, Chandigarh. 24. Uttarakhand Power Corporation Ltd., Urja Bhawan, Kanwali Road, Dehradun. 25. North Central Railway, Allahabad. 26. New Delhi Municipal Council, Palika Kendra, SansadMarg, New Delhi Madhya Pradesh Power Management Company Ltd., Shakti Bhawan, Rampur Jabalpur Order in Petition No. 67/TT/2015 Page 3 of 26

108 28. Maharashtra State Electricity Distribution Company Limited, Prakashgad, 4th floor Andehri (East), Mumbai Gujarat UrjaVikas Nigam Ltd., Sardar Patel VidyutBhawan, Race Course Road, Vadodara Electricity Department, Government of Goa, Vidyut Bhawan, Panaji, Near Mandvi Hotel, Goa Electricity Department, Administration of Daman and Diu, Daman Electricity Department, Administration of Dadra Nagar Haveli, U.T. Silvassa Chhattisgarh State Electricity Board, P.O. Sunder Nagar, Dangania, Raipur Chhattisgarh Madhya Pradesh Audyogik Kendra Vikas Nigam (Indore) Ltd., 3/54, Press Complex, Agra-Bombay Road Indore Respondents For petitioner : Shri Udit Grover, Advocate for PGCIL Shri V. Srinivas, PGCIL Shri Rakesh Kumar, PGCIL Shri Bhoj Paul, PGCIL Shri UpendraPande, PGCIL Shri H.K Mallick, PGCIL Shri Y.K. Sehgal, PGCIL Shri S.S. Raju, PGCIL Shri Jasbir Singh, PGCIL Shri ShashiBhushan, PGCIL Shri J. Mazumder, PGCIL Shri R.K. Guter, PGCIL Ms. Manju Gupta, PGCIL Shri Vivek Kumar Singh, PGCIL Shri Rakesh Prasad, PGCIL Order in Petition No. 67/TT/2015 Page 4 of 26

109 Shri M.M. Mondal, PGCIL Shri S.K. Venkatesan, PGCIL For respondents : Shri S.K. Agarwal, Advocate, JVVNL Shri S.P. Das, Adocate, JVVNL Shri H.M. Sharma, APDCL Shri S.R. Narasimhan, POSOCO ORDER The petitioner, Power Grid Corporation of India Limited (PGCIL) has filed the instant petition seeking transmission tariff for (i) Asset-I (HVDC Portion) and (ii) Combined Asset-II (AC Portion) from anticipated COD, to under the transmission system associated with North East-Northern/Western Interconnector-I Project in North-Eastern, Northern & Western Regions in accordance with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 (hereinafter referred to as "the 2014 Tariff Regulations ).The petitioner has also prayed for allowing 90% of the Annual Fixed Charges claimed, in terms of proviso (i) of Regulation 7(7) of the 2014 Tariff Regulations for inclusion under PoC mechaism. 2. The petitioner initially in the petition claimed tariff for HVDC portion and AC portion separately with anticipated date of commercial operation as Subsequently, vide affidavit dated , the petitioner has submitted that HVDC portion was commissioned on and AC portion has been split into three parts. The petitioner has submitted that parts of AC system were commissioned on , and and the remaining portion of the system is anticipated to be commissioned on The details of the assets and their scheduled and Order in Petition No. 67/TT/2015 Page 5 of 26

110 actual/anticipated date of commercial operation submitted by the petitioner are as under:- Asset Name Scheduled COD Anticipated COD/Actual COD* Asset-I (HVDC ±800 kv HVDC Biswanath (actual) Portion) Chariali-Agra Pole-I (1500 MW HVDC terminals at Biswanath Chariali and Agra each along with ±800 kv Hexa Lapwing transmission line) Asset-II (AC 132 kv D/C Biswanath Chariali (actual) Portion) (PG)-Biswanath Chariali (AEGCL) T/L along with associated bays at Biswanath Chariali (AEGCL) & Biswanath Chariali Pooling Station (PGCIL) Asset-II (1.a):(AC Portion) Loop in and Loop out (LILO) of 400 kv Ranganadi-Balipara-I T/L at Biswanath Chariali PS alongwith (actual) associated bays at Biswanath Asset-II (1.b):(AC Portion) Asset-II Portion) (3):(AC Chariali PS (Asset-II (1.b)) Loop in and Loop out (LILO) of 400 kv Ranganadi-Balipara-II T/L at Biswanath Chariali PS alongwith associated bays at Biswanath Chariali PS (Asset-II (1.b)) 200 MVA, 400/132/33kV ICT-I at BiswanathChariali PS (Asset-II(3)) (actual) (revised anticipated) 3. The matter was heard on The petitioner was directed to submit the information regarding time over-run, cost over-run, CEA certificate, minutes of RPC meetings, PPAs signed by beneficiaries, BPTAs for the instant assets and status of their commissioning. The petitioner has submitted the information vide affidavits dated and The petition was again heard on No other respondent DIC except Assam appeared during the hearing. We have heard the petitioner and the respondent Order in Petition No. 67/TT/2015 Page 6 of 26

111 present during the hearing. In this order, we proceed to determine the transmission charges under proviso (i) to clause 7 of Regulation 7 of the 2014 Tariff Regulations. 5. Clause 7 alongwith proviso (i) of Regulation 7 of the 2014 Tariff Regulations provides as under:- (7) In case of new projects, the generating company or the transmission licensee, as the case may be, may be allowed tariff by the Commission based on the projected capital expenditure from the anticipated COD in accordance with Regulation 6 of these regulations: Provided that (i) the Commission may grant tariff upto 90% of the annual fixed charges claimed in respect of the transmission system or element thereof based on the management certificate regarding the capital cost for the purpose of inclusion in the POC charges in accordance with the CERC (Sharing of Inter State Transmission charges and losses), Regulation, 2010 as amended from time to time: The petitioner has made the application in accordance with Regulation 6 and Annexure-I of the 2014 Tariff Regulations for determination of tariff of the instant assets. The petitioner has also complied with the requirements of the Central Electricity Regulatory Commission (Procedure for making of application for determination of tariff, publication of the application and other related matters) Regulations, 2004, such as service of the copy of the application on the respondent DICs, publication of notice and web hosting of the application, etc. No comments have been received in response to the public notice. 6. UPPCL and APDCL have filed their replies. UPPCL in its reply vide affidavit dated has raised the issue of time over-run, over-estimation of initial spares Order in Petition No. 67/TT/2015 Page 7 of 26

112 and cost over-run. The petitioner has filed the rejoinders to the replies of UPPCL and APDCL. 7. After taking into consideration the time over-run and cost over-run in case of the instant assets, which shall be looked into in detail at the time of issue of final tariff, the Commission has decided to grant tariff of the assets covered in the petition in terms of proviso (i) of Regulation 7(7) of the 2014 Tariff Regulations. 8. The details of AFC claimed by the petitioner and tariff allowed by the Commission are as under:- A. Annual transmission charges claimed by the petitioner are as follows:- (` in lakh) Assets Asset I Asset II B. Annual transmission charges allowed are as follows:- (` in lakh) Assets Asset I Asset II The transmission charges allowed in this order shall be subject to adjustment as after determination of AFC in accordance with clause (7) of the 2014 Tariff Regulations. Order in Petition No. 67/TT/2015 Page 8 of 26

113 Sharing of Transmission Charges 10. The Commission vide RoP of the hearing held on directed the petitioner to submit information regarding the utilization of the transmission assets for which tariff has been sought in the present petition. The petitioner vide affidavit dated has submitted that the North-Eastern Region of the country has a very large hydro generation potential of the order of 50,000 MW apart from approximately 4500 MW in the State of Sikkim. In addition, about 5000 MW of hydro generation was envisaged to be developed in Bhutan and power from such generation would be consumed in India. This huge quantum of hydro potential was planned to be developed in a phased manner to meet the growing energy requirement in the country in the long run. To evacuate such a huge quantum of power, the petitioner as the Central Transmission Utility planned and executed the transmission systems associated with North East-Northern / Western Interconnector-I Project. The petitioner has submitted that the transmission lines covered under the transmission systems had to traverse through the difficult terrains of NER and ER and the limited corridor available in Chicken Neck area which is a narrow patch of land measuring 22 km in width and 18 km in length near Siliguri having borders of Nepal on one side and Bangladesh on the other side and the area is largely habitated. The petitioner has submitted that all transmission lines, railway lines, gas pipe-lines, telecommunication lines, etc., from NER to the other parts of the country have to pass through the Chicken Neck area and therefore, the petitioner keeping in view the requirement of evacuation of power over a long distance with optimal utilization of RoW available in that area and the limitation of longer AC system due to requirement of reactive compensation and other economic constraints, planned to Order in Petition No. 67/TT/2015 Page 9 of 26

114 construct 5-6 high capacity HVDC power transmission corridors connecting NER Grid with National Grid. Regarding capacity of transmission assets, the petitioner vide affidavit dated has submitted that keeping in view the phased generation addition, HVDC corridor was planned for 6000 MW while the terminal stations were planned in modules of 3000 MW. The petitioner has submitted that the sending end HVDC terminal stations of 3000 MW at Biswanath Chariali and 3,000 MW at Alipurduar (under "Transmission System for development of pooling station in Northern part of West Bengal and transfer of power from Bhutan to NR / WR") are under implementation and the receiving end HVDC terminal stations would be of ultimate capacity 6000 MW, to be installed in two stages at Agra from where power can be transferred to deficit Northern/Western Regions. 11. Regarding the basis of planning of transmission systems, the petitioner vide affidavit dated has submitted the following:- (a) Keeping in view the long term perspective it was desirable to implement the subject transmission systems as a transmission infrastructure which would facilitate the transfer of power even as the major hydel projects get completed. The Scheme was deliberated in various Standing Committee Meetings (SCMs) on Power System Planning and Regional Power Committee (RPC) Meetings in Northern Region, Eastern Region, Western Region and North-Eastern Regions and based on the deliberations and discussion in these forums, the transmission systems have been planned as a Regional System Strengthening Scheme. In the meeting taken by the Secretary (Power), Government of India on , it Order in Petition No. 67/TT/2015 Page 10 of 26

115 was decided to plan transmission corridors in the Chicken Neck Area to meet the evacuation requirement for next 10 to 15 years. (b) The NER Grid is presently connected to the rest of the National Grid through series of AC lines passing through Bongaigaon Sub-station. NER Grid has been connected with rest of the National Grid through radial AC lines and on account of transmission constraints on AC lines, such types of radial connections are not desirable from the point of view of Grid Stability and Security. Moreover, tripping of inter-connecting lines with NER also leads to grid disturbance. (c) Biswanath Chariali - Agra HVDC line will help in strengthening links of rest of the National Grid to NER Grid. The petitioner has further submitted that during monsoon, with high hydro generation in NER, North Bengal and Bhutan, loading of 400 kv Binaguri - Purnea 2 x D/C and Purnea - Muzaffarpur D/C remains high. Therefore, Biswanath Chariali - Agra HVDC line will provide a parallel path and relieve loading of these lines. (d) The Teesta-lll generating station is expected to be commissioned in , while Rangpo-Kishanganj D/C line is expected to be delayed. The HVDC line would help in evacuation of hydro power of Sikkim, even in the absence of Rangpo-Kishanganj line. 12. Further, the petitioner has submitted that the HVDC assets of the transmission systems for which tariff have been sought in the present petition are for benefit of the entire country on account of the following reasons:- Order in Petition No. 67/TT/2015 Page 11 of 26

116 (a) The HVDC lines will relieve the load in the intervening AC network. The petitioner has cited the examples of Mundra-Mohindergarh and Talcher-Kolar HVDC lines which have been modulated to control flow through AC lines. According to the petitioner, Mundra-Mohindergarh HVDC lines are relieving the load on 765 kv Gwalior-Agra lines. (b) HVDC lines will help in Voltage control, as power flow through parallel AC line can be increased/ decreased as per the requirement. (c) systems. HVDC lines will enhance the power transfer capability of the transmission (d) HVDC lines will accommodate renewable-variation and intermittency can be taken care of. 13. In response to the Commission s query through letter dated regarding the planning of the subject transmission system, CEA has submitted the following vide its letters dated and : (i) The capacity of ±800 kv HVDC bipole as agreed in the various standing committee meetings on power system planning (SCMPSP) of Northern, Western and North Eastern regions and TCC/RPC meeting of North Eastern Region is 6000 MW with 3000 MW rectifier module at Biswanath Chaiyali. (ii) As desired, copies of the minutes / extracts of the minutes of the meetings in which the above scheme was discussed and agreed are enclosed as below: a) 20 th SCMPSP of Northern region held at Nanital, Uttranchal on b) 26 th SCMPSP of Western Region held on at WRPC, Mumbai. c) 2 nd SCMPSP of North-Eastern Region held on at Guwahati. d) 25 th SCMSP of Northern region held on at NRPC, New Delhi. e) 6 th TCC & 6 th NERPC meeting held on 7 th 8 th Aug at Gurgaon. Order in Petition No. 67/TT/2015 Page 12 of 26

117 (iii) The HVDC bipole line was agreed as a part of associated transmission system/inter-regional system for Lower Subansiri (8x250 MW) and Kameng (4x150 MW) HEPs. As per the information available in CEA, the work on Lower Subansiri HEPs is held up since Dec., 2011 due to agitation by anti dam activists and the latest commissioning schedule is The Kameng project is likely to be commissioned by Until these generation projects are commissioned, HVDC module at Biswanath Chariali would remain unutilized. 14. CEA vide its letter dated has submitted the original and revised/latest schedules of commissioning of these HEPs as under:- Sl. No. HEP Original Schedule Revised/Latest Schedule 1. Kameng Lower Subansiri Work held up since December, Punatsangchhu-I Beyond Punatsangchhu-II Beyond Mangdechhu Beyond CEA vide letter dated has stated that HEPs have been considerably delayed and in the absence of these generation projects, the HVDC interconnector-i would not be utilized in the manner it was planned. CEA has submitted that the implementation of a transmission project may not be possible to be delayed beyond a certain time on account of contractual obligations of the petitioner with various EPC contractors. CEA has further stated that as recorded in the minutes of the 14th meeting of NERPC held on , the petitioner had slowed down the implementation of the transmission systems. Order in Petition No. 67/TT/2015 Page 13 of 26

118 15. The Commission vide letter dated sought the views of POSOCO with regard to the utilization of ± 800 kv Biswanath Chariali- Agra HVDC line in the backdrop of partial commissioning/non-commissioning of associated generation projects. POSOCO vide letter dated has submitted that one pole of the HVDC Biswanath Chariali-Alipurduar-Agra line was expected to be commissioned in September, 2015 would be the first Multi-terminal HVDC with terminals located at Biswanath Chariali (NER), Agra (NR) and Alipurduar (ER) and would be operating at ±800 kv. Considering the seasonality of hydro generation, it would also be the 1 st HVDC bipole having flows in either direction depending on the season and would provide the flexibility and function as a pseudo phase-shifter. A report dated 17 th September, 2015 has been prepared by POSOCO for the operational modalities of HVDC BNC-Agra which has been circulated to RLDCs/RPCs/ CTU/CEA/ POWERGRID. POSOCCO has submitted that generation and load of NER is seasonal and so is the flow on ER-NER corridor. In order to cater to the seasonal changes in the load, generation and line flows, flexible transmission in the form of HVDC is essential. Any new element added to the network is adding to the reliability of the system and is being utilised by the system operator to the maximum extent. POSOCO has emphasised that the transmission assets are normally planned for a life of 35 years and the advantages need to be assessed over the entire life cycle of the assets rather than the initial years. POSOCO has submitted that the maximum power order on this HVDC shall be initially restricted to maximum 1000 MW depending upon real time conditions till the time 400 kv Ranganadi-Balipara D/C is looped in looped out (LILO) at 400 kv BNC Sub-station. POSOCO has also submitted that low frequency oscillations have been observed few Order in Petition No. 67/TT/2015 Page 14 of 26

119 times in NER. HVDCs have controllers such as Power Oscillation Damping (POD) which could be tuned to mitigate such oscillations in inter-area mode. Similarly, the frequency controllers at BNC should also help in operation of NER system, if it were to get islanded due to any reasons. POSOCO has submitted that the area around Binaguri is prone to lightning strikes which have led to multiple outages of 400/220 kv circuits from Binaguri many times and leads to evacuation problem of hydro generation in NER during high hydro conditions and curtailment of NER drawl from the grid. With the commissioning of HVDC BNC-Agra, it is expected that the outages (planned/emergency/forced) in the underlying 400 / 220 kv network would not impact the evacuation of hydro generation or drawl of NER. 16. Assam Power Distribution Company Limited (APDCL), one of the respondents, in its reply filed vide affidavit dated has submitted that the subject HVDC network along with AC portion was conceived as the ATS of Subansiri HEP (200 MW) of NHPC and Kameng HEP (600 MW) of NEEPCO at 1 st TCC & 2 nd Power Committee Meeting of NERPC on 28/ in which it was decided that NER beneficiaries would share the transmission charges and beneficiaries outside NER and having allocation from NER projects would also share transmission charges of AC portion. APDCL has also submitted that there shall be mismatch of commissioning generation station with respective ATS and requested the Commission to look into the matter and not to burden the beneficiaries like Assam for failure on the part of generating station in commissioning the units. APDCL has further submitted that a number of hydro projects are coming up in NER and at present NER has no permanent allocation of power from Order in Petition No. 67/TT/2015 Page 15 of 26

120 sources located in other regions. During the hydro season, the region is always in surplus and the seasonal shortfall is nominal which is being maintained through existing AC network. APDCL has submitted that under the present funding system, the bidirectional flow seems to be not necessary immediately. 17. The petitioner in its rejoinder filed vide affidavit dated has submitted that the subject transmission systems were not built only for evacuation of power from Kameng HEP of NEEPCO and Subansiri HEP of NHPC. The original plan was conceived in the year In this regard, several meetings were held in the Ministry of Power, Government of India at the Secretary and Joint Secretary levels during the period In the meeting taken by the Joint Secretary, Ministry of Power in October 2003, CEA suggested that for connecting NER with rest of India, the only option would be to construct the HVDC bipole from NER to NR with the capacity of the order of 3500 to 4000 MW. Accordingly, the subject transmission system was planned as a strengthening scheme in order to provide for important transmission service connecting the NE Region to the Northern and Western Regions. Therefore, the petitioner is entitled for timely grant of tariff. The petitioner has submitted that there is no mismatch between commissioning of generating stations and the subject transmission assets as generators in NER (Lower Subansiri and Kameng) had earlier proposed their commissioning schedule as March, 2010 and December, 2010 respectively. However, the commissioning schedule has been revised by generation developers from time to time. The petitioner has submitted that after commissioning of this link, power up to 900 MW in both the directions is being transferred over this link and thus, the need for Order in Petition No. 67/TT/2015 Page 16 of 26

121 bidirectional flow of power has been proved in just few days of the operation of the link. The petitioner has further submitted that that the NER NR / WR Interconnector I, shall provide the following benefits to the DICs:- a) The link provides flexibility of power transfer in the seasonal varied hydro power generation of NER and would function as a pseudo phase-shifter. b) Surplus power to the extent of 1500 MW can be exported / imported between NER and other regions. c) Power can be imported by NER during low hydro season. d) The link would enhance the power transfer capacity between ER and NR. With the commissioning of many generation projects coming up in NER, Bhutan and Sikkim in next 2-3 years, power flow over this link shall increase. e) This link would provide stability to interconnection of NER with National Grid. f) This shall reduce maximum angle spread across the NER NR grid by degree. 18. The petitioner has submitted that the precise issue being raised by APDCL was considered in the Report of Sub-Committee of CAC on Congestion chaired by Shri R.V. Shahi, Ex-Secretary (Power) which included Members from CEA, CERC, GRIDCO, APTRANSCO, POSOCO, IIT, MERC, APP in June, The following has been recorded in the said meeting:- (xix) NER States have huge Hydro potential. It would be wrong to assume that all projects will be developed in the same time frame. It would be also be a wrong strategy to develop transmission systems adequate enough only for the projects already under implementation. Long term planning would require development of transmission systems in a manner that they are normally underutilized in the initial years but later utilized well. Order in Petition No. 67/TT/2015 Page 17 of 26

122 19. With specific reference to the submission of APDCL for sharing of transmission charges of the subject transmission systems, the petitioner has submitted that as per the decisions taken in the 1 st TCC and 2 nd Power Committee Meeting of NERPC held on and , Assam supported commissioning of strong transmission corridor from NER to other regions and agreed to share/pay the cost of transmission system as per CERC norms. Therefore, APDCL cannot renege on its commitment at this stage. The petitioner has prayed that the sharing of transmission charges shall be in accordance with the provisions of the Sharing Regulations, as amended from time to time. 20. During the hearing on , the representative of the petitioner submitted that based on various discussions and deliberations in various meetings taken in Ministry of Power (MoP) during wherein a need was felt to establish a high capacity transmission infrastructure to interconnect North Eastern Region (NER) to other regions of the country. This link is the backbone of National Grid. He submitted that based on the master plan prepared by CEA in March, 2006, a Detailed Project Report (DPR) for high capacity HVDC corridor including corridors in Chicken Neck area was submitted to Ministry of Power in He further submitted that the Planning Commission (Project Appraisal and Management Division) initiated Public Investment Board (PIB) on 7 th April, 2008; however, after the petitioner was notified as a Navratna company, PIB clearance was no longer required. He submitted that the Investment Approval was obtained from the Board of Directors of the petitioner on with an estimated cost of ` 11, crore. Further, the Board of Directors of the petitioner Order in Petition No. 67/TT/2015 Page 18 of 26

123 has vide letter dated approved Revised Cost Estimate (RCE) of ` crore including Interest During Construction (IDC) of ` crore. He submitted that the 1500 MW module of ±800 kv Biswanath Chariali-Agra HVDC system has been commissioned and power up to 900 MW in both directions has been transferred over this link. He also submitted that presently NER is connected to rest of the country vide AC system emanating from 400 kv Bongaigaon Sub-station and in case of major contingency, the NER will be cut out of the entire country. With the Commissioning of the HVDC system, NER would be able to draw reliable power from National Grid irrespective of major contingency in AC interconnections. He prayed that as per proviso (i) of Regulation 7(7) of the 2014 Tariff Regulations, the Commission may grant tariff up to 90% of the AFC of the transmission system or element thereof for the purpose of inclusion in POC charges in accordance with the Sharing Regulations. 21. During the hearing, the representative of POSOCO stated that the link was tested for 1500 MW from BNC to Agra and for 1000 MW from Agra to BNC on All the HVDCs existing in the Country prior to commissioning of this link were associated with thermal projects, but this link is associated with hydro projects. He also stated that in the absence of Binaguri Purnea D/C line since last 2 weeks, TTC /ATC of NER NR is not affected only because this link is available. Representative of Assam stated that since generation projects have not come up, beneficiaries should not be burdened with transmission charges for the link. On a query of the Commission whether the link is carrying any power, representative of petitioner replied that the link is currently carrying 900 MW from Agra to BNC. Order in Petition No. 67/TT/2015 Page 19 of 26

124 22. We have considered submissions of the petitioner and respondents. Central Electricity Regulatory Commission (Sharing of Transmission Charges) (3rd Amendment) Regulations, 2015 provides the guidelines for sharing of HVDC charges as under: Treatment of HVDC: Flow on HVDC systems is regulated by power order and remains constant for marginal change in load or generation. Hence, marginal participation (MP) of HVDC systems is zero. Since the HVDC systems were specifically set up for transfer of bulk power to specific Region, the DICs of the Region shall share the cost of HVDC systems. HVDC system also helps in controlling voltages and power flow in inter-regional lines and some benefits accrue to all DICs by virtue of HVDC system. Accordingly, 10 % of the MTC of these systems be recovered through Reliability Support Charges. The balance amount shall be payable by Withdrawal DICs of the Region in proportion to their Approved Withdrawal. In case of Injection DICs having Long Term Access to target region, it shall be payable in proportion to their Approved Injection. Where transmission charges for any HVDC system line are to be partly borne by a DIC (injecting DIC or withdrawal DIC, as the case may be) under a PPA or any other arrangement, transmission charges in proportion to the share of capacity in accordance with PPA or other arrangement shall be borne by such DIC and the charges for balance capacity shall be borne by the remaining DICs by scaling up of YTC of the AC system included in the PoC The SoR of the 3 rd Amendment to the Sharing Regulations, 2010, provides as under: For any new HVDC line, the Commission shall decide the methodology through an order. However, the above principle of sharing of transmission charges of HVDC lines may be reviewed based on the national transmission planning, if certain HVDC systems are planned to cater to multiple needs i.e. evacuation or reliability or Renewable integration or change in the benefits derived by the stakeholders. 24. Keeping in view the above provisions of Sharing Regulations, we proceed to decide the proposed methodology for sharing of transmission charges for the HVDC link (Asset-I). 25. Government of India mooted a proposal for development of hydro projects with a capacity of MW and accordingly, MW Hydro Electric Initiative was Order in Petition No. 67/TT/2015 Page 20 of 26

125 launched in May 2003 by the then Hon ble Prime Minister of India. About MW of power was planned to be evacuated from NER / Sikkim and Bhutan. The transmission system for all the generation projects was to traverse through Chicken Neck area having a length of 18 km and width of 22 km and would require about 1.5 km wide transmission corridor to evacuate the quantum of power. In a meeting taken by Jt. Secretary (Hydro), Ministry of Power on , it was decided that the hybrid system of HVDC and AC was the desirable option for evacuation of MW of power from NER by the end of 12 th plan. In the meeting taken by Secretary (Power) on , it was decided that corresponding to the ultimate capacity of hydro projects in NER, the evacuation system would require transmission corridors passing through the Chicken Neck area. During the meeting taken by Secretary (Power) on , it was decided that for security, reliability as well as for reservation of right of way, it would be desirable to go ahead with the building of transmission corridors in the Chicken Neck area. In another meeting taken by Secretary (Power) on , the phased development of NER / Sikkim and Bhutan projects was deliberated and it was decided that the transmission system should be developed for phased development of generation at the rate of 2000 MW each during , and respectively. Central Electricity Authority submitted a comprehensive note to Ministry of Power on on the transmission system for evacuation of power for major generation projects in the North Eastern Region along with power from projects coming in Sikkim and Bhutan during the 11 th plan and 12 th plan period. CEA in the said note has suggested that the option of hybrid network of HVDC and high capacity 400 kv line has been found to be most suitable from cost, corridor, operational and phased Order in Petition No. 67/TT/2015 Page 21 of 26

126 development consideration. Further, CEA has also stated that as the transmission distance from NER / WR is quite long i.e to 2500 km, the requirement of keeping the losses within reasonable and cost effective limits suggests strongly in favour of adopting as high a HVDC transmission voltage as possible. The planning of the transmission system as stated by CEA in the Note to the Ministry of Power is as under: - The first 800kV HVDC bi-pole line has been planned from a pooling substation at Bishwanath Chariyali in North-eastern Region to Agra in Northern region. This is being programmed for commissioning matching with Subansiri Lower HEP in The transmission line would be for 6000 MW capacity and HVDC terminal capacity would be 3000 MW between Bishwanath Chariyali and Agra. In the second phase, for transmission of power from hydro projects at Sikkim and Bhutan pooled at Sliguri, another 3000 MW terminal modules would be added between Siliguri and Agra. Accordingly, CEA suggested for implementation of the transmission system under a scheme titled Inter-regional transmission system for power export from NER to NR / WR. CEA further suggested to adopt national approach for development of the transmission system in which the beneficiaries outside NER would share the transmission charges of identified transmission system based on the power allocation from the NER Hydro projects. In a meeting dated taken by Secretary (Power), it was decided that the transmission system from NER to NR / WR would be required and the proposal for Public Investment Board (PIB) clearance for the project be initiated. Accordingly, a note for Public Investment Board was initiated by the Planning Commission (Project Appraisal and Management Division) on 7 th April, 2008 in which the project was found suitable and optimal considering the right of way. In the mean time, the petitioner was notified as a Navratna company and PIB clearance was no longer required. Investment approval was obtained from the Board of Directors of the Order in Petition No. 67/TT/2015 Page 22 of 26

127 petitioner. The development of subject transmission systems were also discussed in the Standing Committee Meetings on Power System Planning of Northern Region, Western Region and North-eastern Region from time to time. 26. In view of the process of planning, development and execution of the transmission system as discussed hereinabove, we are of the view that the subject transmission systems are of strategic and national importance and are in the long term interest of the economy and consumers of the country. The ±800 kv Biswanath Chariali- Agra HVDC link is the first of its kind in India and is passing through the Chicken Neck area. This HVDC asset once created will serve multiple purpose of evacuating hydro potential of North East, Sikkim and Bhutan to the rest of the country and would also carry power from Agra to Biswanath Charaiali during lean hydro season in NER, thereby serving needs of North East Region as well. In addition to this, the link is serving very important role of integrating the entire Indian Electrical Grid through a robust link. This asset is a unique asset due to its location and strategic importance. This link is a strategically important and vital connection for harnessing the present and anticipated exploitation and optimal utilization of hydro, thermal and renewable energy resources in the country. The strategic importance of the line is established by the fact that a secure and strong linkage for the North-Eastern Region and the rest of the country is now firmly established. Pertinently, the extremely narrow Chicken Neck which is 18 km X 22 km has been optimally utilized solving any future right of way issues in this critical, sensitive and vital area. Therefore, the setting up of such a powerful link is not only important but infuses a high degree of confidence, certainty and assurance for development of hydro Order in Petition No. 67/TT/2015 Page 23 of 26

128 power potential in North-East Region of the country, underlining the fact that no hydel development will have to face bottling up of power or backing down on account of transmission constraints. 27. The Commission agrees with POSOCO that the usefulness and importance of the subject transmission assets should not be seen in the narrow prism of its immediate utilization during the initial years but needs to be assessed over the entire life cycle of the assets which will carry the hydro power from the huge potential in North East for the benefit by the entire country. POSOCO has rightly pointed out that this link would provide the flexibility in power transfer, function as a pseudo phase-shifter and help in mitigating oscillations in inter-area mode and above all, the frequency controllers at BNC would help in operation of NER system, if it were to get islanded due to any reasons. Further, this bi-directional HVDC technology would enable optimal hydrothermal mix and successful integration of renewable energy resources of the country due to its connectivity with the hydro surplus North Eastern Region on one end and balance part of the country through National Grid. Strong interconnection through AC links between all the regions of National Grid would enable exchange of power between North East Region and rest of the country. Moreover, this high capacity interconnection between North East Region comprising of huge hydro potential would go a long way for integration of large renewable energy resources being developed in different parts of the country. Due to direct interconnection, hydro generation can support the variability and intermittent nature of renewable generation. Thus, this vital link is a flagship endeavor of the Indian Power Sector which will benefit the entire country. Order in Petition No. 67/TT/2015 Page 24 of 26

129 28. Since the transmission assets are of strategic and national importance whose benefits shall be derived by the entire country, we are of the view that the charges for the HVDC assets covered in the present petition should be shared by all the regions of the Country. 29. The Commission is conscious of the fact that the capital investments in the assets of the subject transmission systems are huge and the entire assets may not be utilised to their intended level on account of the delay in commissioning of planned hydro potential in NER. The Commission feels that there is a strong necessity to share the burden of capital cost of transmission scheme by way of assistance from the Power System Development Fund (PSDF) by way of one time grant. Accordingly, we direct the petitioner to take up the matter with the Monitoring Committee of the PSDF for assistance in the form of one time grant from the PSDF and with Ministry of Power for grant to reduce the burden of transmission charges on the DICs. We also request Ministry of Power, Government of India to arrange for funds from the PSDF as well as Government grant, considering the subject transmission systems as assets of strategic and national importance, keeping in view the utility of these assets in the long term perspective to the economy of the country. 30. Since, these assets are proposed to be considered as assets of national importance and all the regions are proposed to bear the transmission charges, we consider it necessary to hear the DICs of all the regions. Accordingly, we direct the petitioner to file a revised memo of parties and serve copy of the petition on the DICs Order in Petition No. 67/TT/2015 Page 25 of 26

130 (other than those on whom petition has already been served) by The hearing of the petition will take place on and all DICs are directed to participate in the hearing and share their views. 31. Recovery of the transmission charges determined through this order shall be made as per the principle/methodology to be decided by the Commission after hearing all DICs. -sd- -sd- -sd- -sd- (Dr. M.K. Iyer) (A.S. Bakshi) (A.K. Singhal) (Gireesh B. Pradhan) Member Member Member Chairperson Order in Petition No. 67/TT/2015 Page 26 of 26

131

132

133 KSfrB KERALA STATE ELECTRICITY BOARD LIMITED (lncorporated under the lndion Componies Act, 1956) Office of the Chief Engineer (Transmission System Operotion) Lood Dispotch Centre, H.M.T Colony(Po), Ko[omassery Te t : ( C E), ; F ax : B 50 E - moi I : ce so oi l. com NO. CESO/EELDII/AEELD3/ABT/ SRPC-CCM -3OI2OI 5-1 6I JqgTDL 28.0 I.2O 1 6 To. The Mernber Secletary. SRPC, Bangalore Sir. Sub: -30t1' meeling of Comr.nercial Sub Committee - lnclusion o1' additional agenda point - reg. Ref' - 30d' meeting agenda points on rvebsite Please find the enclosed agenda points to be included in the discussion iti thc lbrthcoming 30tl' rneeting of Comrnercial Sub-Comrrittec. Acc: as above 4-5,1"1 \" Copl, subrnitted to: 1.Tl.re Director (Trans & Sys. Operation),1(SEB Ltd, Vydyuthi Bhavanam, Pattoln, Thiruvanathapuram for ki nd i nformati on. Copy To: Chief Engineer' (Trans. ) 1. rhe Chief Engineer(C&T), KSEB Ltd.,VB Vydyuthi Bhavanarn. Pattom, Thiruvanathapul'am for inforn-ration. 2. The Financial Advisor', KSEB Ltd, Vydyuthi Bhavanarn, Pattorn. Thiruvanathapuram for information. I of i

134 l. Energy Account of collective Transaction at state periphery. 'fhc enelgy accor:n1 ofcollcctive transaclion at SR periphery fbr the months of November 15 & December l5 is matching nith the REA. But the same a1 state periphery is not tallying witlr our cornputation. This is clcating prob)err in computing the enelgy to thc open access consumers. -l-hc l'ollowing points are noticed in thc IEX schedules o1' Novembel and - Decernbcr The traded quar.rtitl, (euerg]' quantlrm at thc SR peripher,r ) is rralching with the REA o1'srpc. While computing thc cnergy at statc pclipher'1'. Iix' the same MW. ar.rcl same 7n loss- dill'elent values lirr thc schcdr.rles arc seen even ir.r time blocks in a single day. This results in considerable cliff'erence when tlre energl,- lrausactions arc considered in units (ku,h) at stale pcfiphery and in the consunrer' Periphery For exarrrple on 2nd Dccember The hacled quantit.v (SR pelipherl') ol' I{SEBL on 21" block is 150 MW up to2411' block. But fbr the sane MW. ancl same o% loss (Region Drawal Loss %). the quanlity in State pcripl.rery is changing liom MW to MW. Similarly I'r'om 261r' block up to 4011' blocl(. thc tladccl. quanlil_"- is 135 MW. But 1he quantity at State pcripl.rely is changing liom i31.64n1\\' to MW. On considering thc cnergl, transaction in unils (krvh) at Statc pcliphcrl and lbr Open Access consunters at ConsurleL Periphery. this lcsults in considcrable clill'erence. N4orcovcr. r,vhile courpuling thc cnclgl at slrtl' peliphcr\. approximation to tr.vo decimals arc macle in all the timc blocks lol the cnergl in VI\\i. -fhis is also lesr:lling in considcrahlc di1'1'erence whcn the energy trans.rctions arc consiclerecl in units (krvh) at state periphel'y. I)lease look into the matter ancl r'nal<c neccssarv stcps 1br rraking correct the Rcgional Energr, Account at all thc Peliphelics. The IEX schedule lbr I 5 is attached as annexure 1 Our corrlnents on the auenda itcnrs ate lurnished as lbllows: (I) Item No. 5.2 (Pendine payments bchveen Wll&SR) An ar.nount ol l- has bccn rcceived fi'om M/s. MSEDC'l- on wl,ich l.ras already been acknou'ledged rvith copy to SRPC & \\IRPC. Thc anrounl receivable fl'om othcr constitueuts alc conllmed lvith tliose already inclr.rdccl in the agenda poi:rts. Net leceivable fi'om WI{ is alrpended as annexure 2 (2) Pendins issues rvith I(PTCL Regarding the pending paymcnl issues rvith Kamalaha. it uray be notcd that in tlre meeting clt a1 Bangalorc. KPl CL had inlbrmcd that ar1 anlorrnl o1"3 Cloles is receivable to KSEtll, towat'ds settlement of principal arnount as on 3l/03/2105 and Director (Fir.ra:rce). KPTCL has bccn entrusted rvith tl.re samc lix furtlier proceedings. But KPTCL has no1 relcascd the anlount yet. 11 is l'urther intimated that I(SIIBI- would release thc cullent amounl ol'rlrl charges & 1'rlrvhecling chargcs palablc to KPTCI, rv.e.l' 01/04/201 5 irnn.rediately on receipt o1'tlre pa1'ment of 'i Cllores I}om KPTCL. 2 ol ll

135 ANNEXURE 2 Net Receivable to KSEB from Western Region for the period upto December 2002 (Principal amount) Sl.No. Particu la rs Amount (Rs) Receipt Balance Remarks 1 3 Amount receivable by KSEB from Western Region (Period prior to October 2001) Amount receivable by KSEB from Maharashtra (Period from October 200'1to December 2002) Received Rs.1,19,61,4441 on 12/ from l\4sedcl 2 Amount receivable by KSEB from Gujarat (Period from October 2001to Deceniber 2002) '19 Received Rs.3,51,4511 ('25t11t2013) Rs.5,59,9361 (23t09t2015\ d Amount receivable by KSEB from l\4adhya Pradesh (Period from October 200'1to December 2002) Amount receivable by KSEB from Chattisgarh (Period from October 2001to December 2002) Net Receivable Net amount receivable from Western Region by KSEB for the period upto December 2002 = Rs.1,33,50,5591 I of 3

136 7 I f -:;;;i. r::{''' 12/'2/2a15 i*l;'!dnr6niwl. D.hm or hbdioirj/ ;.;,.,, ;;"" i 5"

137 DATE COIVIPUTED ENERGY Time block AT Kerala periphery A I Kerala peripherv lexll\ilp % Time IEXIMP Loss block loss 1 0 2A9% A9% / % A9% % yo A9% % A9% k / / k A9% % '136.5'1 o EO 0 2A9% % k A9% % A9% h 0 ot % % % Yo % % Y" % A9% 136.5' A9% % % % S / % h Yo % % % % % % ' % V % o/o Yo / k % % aA % % % % k % ' B A9% % / % % 195.0? k % aA B k Jt) / A9% A9% / A9% C0 2.49% % % % / % /a ah A9% % tjo. c r % A9% k k h % k % Total Mu zoo % A9% /

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU AGENDA FOR THE 30 th MEETING OF COMMERCIAL SUB - COMMITTEE OF SRPC TO BE HELD AT BENGALURU ON 4 th FEBRUARY 2016 1. Confirmation of the Minutes of 29 th Commercial

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU AGENDA NOTES FOR THE 29 th MEETING OF COMMERCIAL SUB- COMMITTEE OF SRPC TO BE HELD AT BENGALURU ON 29 th SEPTEMBER 2015 1. CONFIRMATION OF THE MINUTES OF THE

More information

The DSM account for the following weeks have been revised, based on the revised data furnished by SRLDC, and attached:

The DSM account for the following weeks have been revised, based on the revised data furnished by SRLDC, and attached: त स क क न र य व द य त प र वधक ण दवक षण क ष त र य व द य त सव वत 29, स क स क र स ड ब गल :-560 009 Government of India Central Electricity Authority Southern al Power Committee 29, Race Course Cross Road

More information

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON 31.07.2013 1. INTRODUCTION 1.1 The 22 nd Meeting of the Commercial Sub-

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the 30 th Meeting of Commercial Sub Committee of SRPC held at Bengaluru on 4 th February 2016 1. Introduction The 30 th Meeting of Commercial Sub-Committee

More information

Reason(s) for revision as furnished by SRLDC

Reason(s) for revision as furnished by SRLDC भ रत सरक र क न द र य व द य त प र वधकरण दवक षण क ष त र य व द य त सवमवत 29, र स क स क र स र ड ब गल र :-560 009 Phone : 080-2228 2516 ; FAX : 080-2225 9343; Government of India Central Electricity Authority

More information

दव ण त र य व द य त सवमवत

दव ण त र य व द य त सवमवत भ रत सरक र GOVERNMENT OF INDIA व द य त म त र लय MINISTRY OF POWER क द र य व द य त प र व करण CENTRAL ELECTRICITY AUTHORITY दव ण त र य व द य त सवमवत SOUTHERN REGIONAL POWER COMMITTEE व ण ज य उप सम त क उन

More information

पत स च/ Address List

पत स च/ Address List पत स च/ Address List 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. म य अ भय त (व ण य), एप प स स, ह दर ब द Chief Engineer (Comml.), APPCC, Hyderabad. अपर नद शक (प रय जन ),प स क ल, क व र भवन,

More information

पत स च / Address List

पत स च / Address List पत स च / Address List 1. 2. 3. 4. 5. 6. 7. 8. 9. म ख य भचभयत व चज य), एप प स स, ह दर ब द Chief Engineer (Comml.), APPCC, Hyderabad. भपर चनद शक वपररय जन ),प स क ल, क र भ न, ब गल र Additional Director (Proj.),

More information

पत स च / Mailing List

पत स च / Mailing List पत स च / Mailing List 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. म ख य भ ययत व ज य), एप प स स, ह दर ब द Chief Engineer (Comml.), APPCC, Hyderabad. भपर द शक वपररय ज ),प स क ल, क र य, ब गल

More information

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 19 TH MEETING OF TECHNICAL COORDINATION COMMITTEE OF SRPC HELD AT HYDERABAD ON

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 19 TH MEETING OF TECHNICAL COORDINATION COMMITTEE OF SRPC HELD AT HYDERABAD ON SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 19 TH MEETING OF TECHNICAL COORDINATION COMMITTEE OF SRPC HELD AT HYDERABAD ON 27.09.2012 1. INTRODUCTION 1.1 The 19 th meeting of Technical Coordination

More information

(Collective Transaction) Procedure for Scheduling

(Collective Transaction) Procedure for Scheduling Annexure-II Short-Term Open Access in Inter-State Transmission (Collective Transaction) Procedure for Scheduling [As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent (Amendment) Regulations,

More information

ब क ह द म पत र च र क स व गत करत ह

ब क ह द म पत र च र क स व गत करत ह NHB (ND)/DRS/Misc. Circular No.18/2017-18 November 17, 2017 To, All Registered Housing Finance Companies Madam/Sir Notification as Financial Institution under section 2(1)(iv)(m) of the Securitization

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member No. L-1/44/2010-CERC Date of Order: 29.6.2013 In the matter of: Determination of Point

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting regarding issues pertaining to Tamil Nadu

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting regarding issues pertaining to Tamil Nadu SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Record Notes of the Meeting regarding issues pertaining to Tamil Nadu A Meeting on issues pertaining to Tamil Nadu was held on 25 th TANTRANSCO, Chennai. The

More information

TELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16

TELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16 1 TELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16 TSPCC on behalf of TSDISCOMs (TSSPDCL & TSNPDCL) intends to purchase 2000 MW power for the

More information

ग व शपय डर ल मट ड. Sub: Bi-Annual Rate contract for Empanelment Of Chemist and Druggist

ग व शपय डर ल मट ड. Sub: Bi-Annual Rate contract for Empanelment Of Chemist and Druggist फ़ क स Fax : (0832) 2516396 ईम ल Email : contactus@goashipyard.co व बस इट Website : www.goashipyard.com CIN No. : U63032GA1967GOI000077 सभ उत तर अध यक ष एव पर ब ध नद शक क स ब धत करन ह All replies to be

More information

31 NON-AVAILING OF OCC APPROVED SHUTDOWN GRID STUDY COMMITTEE (TASK- 2) AUDIT PROGRESS DETAILS STATUS OF PHASE I AND PHASE II OF

31 NON-AVAILING OF OCC APPROVED SHUTDOWN GRID STUDY COMMITTEE (TASK- 2) AUDIT PROGRESS DETAILS STATUS OF PHASE I AND PHASE II OF CONTENTS 1. INTRODUCTION... 4 2. CONFIRMATION OF THE MINUTES OF THE 29 th TCC & 30 th SRPC MEETINGS... 4 3. MEMBERSHIP TO RPC... 4 4. PREPARATION FOR MEETING REVISED ENVIRONMENT NORMS AS PER ENVIRONMENT

More information

Bhopal, Dated:

Bhopal, Dated: Bhopal, Dated: 08.12.2015 No. /MPERC /2015 - In exercise of powers conferred under sub-section zp of Section 181 of the Electricity Act, 2003 (36 of 2003), and all other powers enabling it in this behalf,

More information

CONTENTS 1.0 INTRODUCTION CONFIRMATION OF THE MINUTESOF 27 th TCC MEETING IMPLEMENTATION OF SPS FOR CONTINGENCY OF 400 kv NELLORE -

CONTENTS 1.0 INTRODUCTION CONFIRMATION OF THE MINUTESOF 27 th TCC MEETING IMPLEMENTATION OF SPS FOR CONTINGENCY OF 400 kv NELLORE - CONTENTS 1.0 INTRODUCTION... 1 2.0 CONFIRMATION OF THE MINUTESOF 27 th TCC MEETING... 5 3.0 IMPLEMENTATION OF SPS FOR CONTINGENCY OF 400 kv NELLORE - NELLORE PS LINES AND DIFFERENTIAL PROTECTION... 5 4.0

More information

Procedure for Scheduling

Procedure for Scheduling Short-Term Open Access in Inter-State Transmission (Bilateral Transaction) Procedure for Scheduling (As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent (Amendment) Regulations, 2009

More information

न वद क द त व ज TENDER DOCUMENTS

न वद क द त व ज TENDER DOCUMENTS न वद क द त व ज ई- न वद म क ३0000१०९४८ १०९४८ दन क: २६-अ ल-२0१७ म गल र रफ़ इन र ए ड प क मक स ल मट ड (ऑइल ए ड न च रल ग स क रप र शन क सह यक क पन ) TENDER DOCUMENTS E-Tender No. 3000010948 Dated: 26-April-2017

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION No. ---/---/---/GERC Dated: 13/01/2017. NOTIFICATION No. of 2017

GUJARAT ELECTRICITY REGULATORY COMMISSION No. ---/---/---/GERC Dated: 13/01/2017. NOTIFICATION No. of 2017 GUJARAT ELECTRICITY REGULATORY COMMISSION -------- No. ---/---/---/GERC Dated: 13/01/2017 NOTIFICATION No. of 2017 In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 (36

More information

No. 06/06/CEA/PFAM(Award Scheme)/2016 Dated To CMDs of Distribution Licensees

No. 06/06/CEA/PFAM(Award Scheme)/2016 Dated To CMDs of Distribution Licensees भ रत सरक र Government of India क द र य ब ध त प र बधकरण Central Electricity Authority प वर फ र आल प र धन प रभ ग Power For All Monitoring Division www.cea.nic.in स व भवन, आर क प रम, नई ब ल ल -110066 Telefax

More information

Telephone: / FAX:

Telephone: / FAX: म नव स स धन ववभ ग / HUMAN RESOURCES DEPARTMENT कममच र कल य ण प रभ ग / STAFF WELFARE DIVISION, क रप र ट क र लर, मण प ल व ग / CORPORATE OFFICE, MANIPAL WING, Telephone: 0820 2571181/ FAX: 0820 2572420 Email:

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 and all powers enabling it in this behalf, the Uttar Pradesh Electricity

More information

Sharing of ISTS Losses

Sharing of ISTS Losses Procedure for Sharing of ISTS Losses In accordance with Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 July, 2010 ational Load Despatch

More information

1.1 These regulations shall extend to whole of the State of Punjab.

1.1 These regulations shall extend to whole of the State of Punjab. THE PUNJAB STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION The, 2018 No.PSERC/Secy/Regu. - In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other

More information

एन एल स तम लन ड प वर मलम ट ड,त त क ररन NLC TAMILNADU POWER LIMITED, TUTICORIN

एन एल स तम लन ड प वर मलम ट ड,त त क ररन NLC TAMILNADU POWER LIMITED, TUTICORIN एन एल स तम लन ड प वर मलम ट ड,त त क ररन-628 001 NLC TAMILNADU POWER LIMITED, TUTICORIN-628 001 मनमवद आ त रण न रटस NOTICE INVITING TENDER इक ई Unit स ग र प रब धन पररसर NLC TAMILNADU POWER LIMITED ज च स./

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT) CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI New Delhi, the 20 th of June 2013 NOTIFICATION (DRAFT) No.L-1/132/2013/CERC.- In exercise of the powers conferred under Section 178 of the Electricity

More information

EXTENSION NOTICE (व स त र स चन )

EXTENSION NOTICE (व स त र स चन ) स न ट रल म न प ल ल म न ए न नन ट ट ट य टट ल म. क ल इ ड य ललल ट क अन ष ग क म पन त रतक त क पप रम क ष त र य र स थ न-5 र ए प आई क म ल क र र प त, ब ल रप त, (छ.ग.) Central Mine Planning & Design Institute Limited

More information

भ रत य ररज़र व ब क. RBI/ /295 DBS.CO.CFMC.BC.No.007/ / January 21, 2016

भ रत य ररज़र व ब क. RBI/ /295 DBS.CO.CFMC.BC.No.007/ / January 21, 2016 भ रत य ररज़र व ब क RESERVE BANK OF INDIA www.rbi.org.in RBI/2015-16/295 DBS.CO.CFMC.BC.No.007/23.04.001/2015-16 January 21, 2016 The Chairmen / Chief Executive Officers All Scheduled Commercial Banks (excluding

More information

Key Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava

Key Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava Key Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava www.iexindia.com Day Ahead Market-Collective Transaction Features A closed double-sided anonymous auction for each 15-min

More information

न यव ल NLC India Limited, Neyveli

न यव ल NLC India Limited, Neyveli एनएलस इ डय ल मट ड,न यव ल न यव ल -607 807 NLC India Limited, Neyveli-607 807 (formerly Neyveli Lignite Corporation Limited) न वद आम ण न टस NOTICE INVITING TENDER इक ई Unit स म ब धन प रसर Material Management

More information

RBI/ /278 RPCD.RCB.BC.No.37/ / October 29, 2014

RBI/ /278 RPCD.RCB.BC.No.37/ / October 29, 2014 RBI/14-15/278 RPCD.RCB.BC.No.37/07.51.012/14-15 October 29, 14 All State / Central Cooperative Banks (StCBs/CCBs) Madam / Dear Sir, Risk Weights for calculation of CRAR Please refer to our circular RPCD.CO.RF.BC.40/07.38.03/07-08

More information

Procedure for. Sharing of Inter-State Transmission System Losses. In compliance of

Procedure for. Sharing of Inter-State Transmission System Losses. In compliance of Procedure for Sharing of Inter-State Transmission System Losses In compliance of Central Electricity Regulatory Commission (Sharing of inter-state Transmission Charges and Losses) Regulations, 2010 June,

More information

31 NON-AVAILING OF OCC APPROVED SHUTDOWN GRID STUDY COMMITTEE (TASK- 2) AUDIT PROGRESS DETAILS STATUS OF PHASE I AND PHASE II OF

31 NON-AVAILING OF OCC APPROVED SHUTDOWN GRID STUDY COMMITTEE (TASK- 2) AUDIT PROGRESS DETAILS STATUS OF PHASE I AND PHASE II OF CONTENTS 1. INTRODUCTION... 4 2. CONFIRMATION OF THE MINUTES OF THE 30 th SRPC MEETING... 7 3. MEMBERSHIP TO RPC... 7 4. PREPARATION FOR MEETING REVISED ENVIRONMENT NORMS AS PER ENVIRONMENT (PROTECTION)

More information

न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उप म) च म ह ऊस स - म जयप र फ न / फ

न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उप म) च म ह ऊस स - म जयप र फ न / फ न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उप म) च म ह ऊस स - म जयप र 302 001 फ न - 0141-2376760 / 2365947 फ - 2363910 1(20)/म. स./ र.ब. न.-जय/17-18 दन क: 30-01-2018 **ई- न वद -स चन ** य क य लय, र य ब

More information

Procedure for Scheduling

Procedure for Scheduling Short-Term Open Access in Inter-State Transmission (Collective Transaction) Procedure for Scheduling (As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent(amendment) Regulations, 2009

More information

स श /चन एव ग ह ))र ब न ल -प ण / दन क : चन एव ग ह क डड फ ल ल ट / अ डरस इज़ / ल ड क न त रण ह त न वद आम ण स चन

स श /चन एव ग ह ))र ब न ल -प ण / दन क : चन एव ग ह क डड फ ल ल ट / अ डरस इज़ / ल ड क न त रण ह त न वद आम ण स चन द रभ ष स य : 020-24264587 फ स : 020-24272584 स श /चन एव ग ह ))र ब न ल -प ण /2016-17 दन क : 07.11.2017 चन एव ग ह क डड फ ल ल ट / अ डरस इज़ / ल ड क न त रण ह त न वद आम ण स चन र य ब ज नगम ल मट ड, प ण क अ तगत

More information

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION No. / /2017/MPERC.- In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other powers enabling

More information

ग व शपय डर ल मट ड. Sub : Bi-Annual Rate contract Empanelment of Pathology Lab and Sample Collection Centre

ग व शपय डर ल मट ड. Sub : Bi-Annual Rate contract Empanelment of Pathology Lab and Sample Collection Centre फ़ क स Fax : (0832) 2516396 ईम ल Email : contactus@goashipyard.co व बस इट Website : www.goashipyard.com CIN No. : U63032GA1967GOI000077 सभ उत तर अध यक ष एव पर ब ध नद शक क स ब धत करन ह All replies to be

More information

Power Market, Power Trading and Power Exchange

Power Market, Power Trading and Power Exchange Power Market, Power Trading and Power Exchange National Seminar Challenges & Opportunities in Power Generation, Transmission & Distribution 23-03-12 Power System Operation Corporation Ltd. Eastern Regional

More information

TENDER NOTICE FOR COURIER SERVICES

TENDER NOTICE FOR COURIER SERVICES TENDER NOTICE FOR COURIER SERVICES Sealed tenders are invited by the undersigned on behalf of Life Insurance Corporation of India, Divisional Office, Bikaner for PROVIDING COURIER SERVICE ON CONTRACT BASIS

More information

ड एन ए फ गरप र ट ग एव ननद न क द र

ड एन ए फ गरप र ट ग एव ननद न क द र ड एन ए फ गरप र ट ग एव ननद न क द र (ब य क न ल ज प वञ न न र र य य कगकम त र ल ल जय एक व व यत o व न भ रo रक र) CENTRE FOR DNA FINGERPRINTING AND DIAGNOSTICS (An Autonomous Institute of Department of Biotechnology,

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

न यव ल स म क ड NLC INDIA LIMITED, NEYVELI NOTICE INVITING TENDER. Material Management Complex ENQ/18-19/001268/MM01(03)

न यव ल स म क ड NLC INDIA LIMITED, NEYVELI NOTICE INVITING TENDER. Material Management Complex ENQ/18-19/001268/MM01(03) इक ई Unit ज च स./ Enquiry No..स स. Sl. No. स म क ड Material Code 1 461060274 न यव ल ल इट क प र शन ल मट ड,न यव ल न यव ल -607 807, NEYVELI-607 807 न वद आम ण न टस 1.0 NOTICE INVITING TENDER स म ब धन प रसर

More information

Telephone No.(0240) Fax No. (0240) न ल म स चन

Telephone No.(0240) Fax No. (0240) न ल म स चन THE COTTON CORPORATION OF INDIA LTD., ( A Govt. of India Undertaking ) Chandramouli Bldg., Plot No.27, Veer Sawarkar Chowk, Samrat Nagar, Shahnoorwadi Road, Aurangabad. CIN:U51490MH1970GOI014733 e-mail

More information

RBI/ /137 FIDD.CO.FSD.BC.No.15/ / March 7, 2019

RBI/ /137 FIDD.CO.FSD.BC.No.15/ / March 7, 2019 भ रत य रज़वर ब क RESERVE BANK OF INDIA www.rbi.org.in --------------------------------------------------------------------------------------------------------------------- RBI/2018-19/137 FIDD.CO.FSD.BC.No.15/05.02.001/2018-19

More information

KENDRIYA VIDYALAYA SANGATHAN ZONAL INSTITUTE OF EDUCATION & TRAINING, BHUBANESWAR

KENDRIYA VIDYALAYA SANGATHAN ZONAL INSTITUTE OF EDUCATION & TRAINING, BHUBANESWAR ZONAL INSTITUTE OF EDUCATION & TRAINING, BHUBANESWAR बस इट /Website : www.zietbbsr.orge-mail Address : dirzietbhubaneswar@kvsedu.org, zietbbsr@yahoo.com NOTICE FOR TENDER वर ष 2017-18 ल य ल लवद स च क ल

More information

दव ण त र य व द य त सवमवत

दव ण त र य व द य त सवमवत भ रत सरक र GOVERNMENT OF INDIA व द य त म त र लय MINISTRY OF POWER क द र य व द य त प र व करण CENTRAL ELECTRICITY AUTHORITY दव ण त र य व द य त सवमवत SOUTHERN REGIONAL POWER COMMITTEE ददन क 26 ज ल ई 2014

More information

भ रत य कप स न गम ल लमट ड

भ रत य कप स न गम ल लमट ड भ रत य कप स न गम ल लमट ड THE COTTON CORPORATION OF INDIA LIMITED (भ रत सरक र क उपक रम ) (A Government of India Undertaking) क स ट स य ब ल ड ग, त र म ल ल, 11- ड.य.एन. ब रह मच र स र ट, क लक त -700 017 Constantia

More information

DRI.F.No. A-3502/01/2017-Vehicles Dated:

DRI.F.No. A-3502/01/2017-Vehicles Dated: भ रत सरक र Government of India व म लय, र ज वभ ग / Ministry of Finance, Department of Revenue र ज आस चन नद श लय /DIRECTORATE OF REVENUE INTELLIGENCE बगल र आ च लक इक ई / Bangalore Zonal Unit स o 8 (प )2,

More information

य लयर प वर क पर शन ऑफ इ डय लमट ड NUCLEAR POWER CORPORATION OF INDIA LIMITED

य लयर प वर क पर शन ऑफ इ डय लमट ड NUCLEAR POWER CORPORATION OF INDIA LIMITED य लयर प वर क पर शन ऑफ इ डय लमट ड NUCLEAR POWER CORPORATION OF INDIA LIMITED (भ रत सरक र क उयम) (A Government of India Enterprise) स वद एव स म ब धन CONTRACTS & MATERIALS MANAGEMENT Phone No. 02626-230634/271/714

More information

Tender No Supply of MTE make Capacitor as per tender specification. TABLE OF CONTENTS

Tender No Supply of MTE make Capacitor as per tender specification. TABLE OF CONTENTS म गल र रफ़ इन र ए ड प क मक स ल मट डMangalore Refinery & Petrochemicals Limited (ऑइल ए ड न च रल ग स क रप र शन क सह यक क पन A subsidiary of Oil and Natural Gas Corporation Ltd.) प ज क त क य लय:क त र प ट,

More information

र ष ट र य जन सहय ग एव ब ल ववक स स स थ न 5 स र, इ स ट टय शनल एररय, ह ज ख स, नई द ल ल स स थ न म दकर ए क व हन (क र) ह त वनवव स चन

र ष ट र य जन सहय ग एव ब ल ववक स स स थ न 5 स र, इ स ट टय शनल एररय, ह ज ख स, नई द ल ल स स थ न म दकर ए क व हन (क र) ह त वनवव स चन National Institute of Public Cooperation and Child Development 5, Siri Institutional Area, Hauz Khas, New Delhi-110 016 Tender notice for Hiring of Vehicle (Car) Sealed tenders are invited by National

More information

VASAI-VIRAR CITY MUNICIPAL CORPORATION

VASAI-VIRAR CITY MUNICIPAL CORPORATION 1 VASAI-VIRAR CITY MUNICIPAL CORPORATION e- TENDER NOTICE NO... FOR YEAR 2016 17 NAME OF WORK: ADDITIONAL WATER SUPPLY DISTRIBUTION SYSTEM FOR VASAI VIRAR CITY MUNCIPAL CORPORATION UNDER AMRUT TENDER DOCUMENT

More information

दव ण त र य व द य त सवमवत

दव ण त र य व द य त सवमवत भ रत सरक र GOVERNMENT OF INDIA व द य त म त र लय MINISTRY OF POWER क द र य व द य त प र व करण CENTRAL ELECTRICITY AUTHORITY दव ण त र य व द य त सवमवत SOUTHERN REGIONAL POWER COMMITTEE छब ब सव ब ठक क क र यव

More information

NOTICE FOR TENDER वर ष ल य ल लवद स च क ल य लवज ञ प

NOTICE FOR TENDER वर ष ल य ल लवद स च क ल य लवज ञ प क न द र य लवद य य स गठ Zonal Institute of Education & Training, Bhubaneswar ल क ष एव प रल क षण क आ चल क स स थ, भ व श वर (म स स ल क स म र क अ, भ रत सरक र) क न द र य लवद य य क रम क पररसर 4 (Under the Ministry

More information

Please arrange to supply the following materials as per rates, terms and conditions mentioned below:-

Please arrange to supply the following materials as per rates, terms and conditions mentioned below:- ईटन क लफस ल मट ड (क ल इ डय ल मट ड क अन ष ग ) (भ रत सरक र क उप"म) अ$य%-सह-'ब धक नद शक क क य लय स म, 'ब धन -वभ ग("य क ध), स कत ड़य प0 ल य- डस रगढ़, 2ज-ब4व न, प.ब ग ल-713333 Eastern Coalfields Limited (A Subsidiary

More information

Master Circular- Housing Finance Companies Approval of Acquisition or Transfer of Control (NHB) Directions, 2016

Master Circular- Housing Finance Companies Approval of Acquisition or Transfer of Control (NHB) Directions, 2016 NHB(ND)/DRS/REG/MC-06/2017 July 1, 2017 All Housing Finance Companies Dear Sir/Madam, Master Circular- Housing Finance Companies Approval of Acquisition or Transfer of Control (NHB) Directions, 2016 In

More information

ग र घ स द स व श व द य लय, ब ल सप र (छ.ग.)

ग र घ स द स व श व द य लय, ब ल सप र (छ.ग.) ग र घ स द स व श व द य लय, ब ल सप र (छ.ग.) Guru Ghasidas Vishwavidyalaya, Koni, Bilaspur 495009 (C.G.) ( A Central University established by the Central Universities Act, 2009 No. 25 of 2009) Website: www.ggu.ac.in

More information

RBI/ /49 FIDD.CO.Plan.BC.08/ / September 21, Co-origination of loans by Banks and NBFCs for lending to priority sector

RBI/ /49 FIDD.CO.Plan.BC.08/ / September 21, Co-origination of loans by Banks and NBFCs for lending to priority sector RBI/2018-19/49 FIDD.CO.Plan.BC.08/04.09.01/2018-19 September 21, 2018 The Chairman / Managing Director/ Chief Executive Officer All Scheduled Commercial Banks (excluding RRBs & SFBs) and All NBFC-ND-SIs

More information

द रभ ष स ख य : फ क स : (एस क म हत ) क ष त र य प रबन धक. स प रश /Cond )र ब न ल -प ण / दद क :

द रभ ष स ख य : फ क स : (एस क म हत ) क ष त र य प रबन धक. स प रश /Cond )र ब न ल -प ण / दद क : द रभ ष स ख य : 020-24264587 फ क स : 020-24272584 स प रश /Cond )र ब न ल -प ण /2016-17 दद क : 01.06.2017 ग ह व अन य फसल क अब ज बबक र ह त न ववद आम त रण सच र ष ट र य ब ज न गम ल लमट ड, प ण क ष त र क अ तगगत

More information

RBI/ /631 RPCD.RCB.BC.No. 110 / / June 5, All State and Central Cooperative Banks. Dear Sir/ Madam,

RBI/ /631 RPCD.RCB.BC.No. 110 / / June 5, All State and Central Cooperative Banks. Dear Sir/ Madam, RBI/2013-14/631 RPCD.RCB.BC.No. 110 /07.51.020/2013-14 June 5, 2014 All State and Central Cooperative Banks Dear Sir/ Madam, The Banking Laws (Amendment) Act 2012 Amendments to Section 18 & 24 of Banking

More information

Contents. Minutes of the 32 nd Meeting of SRPC held on Page 1

Contents. Minutes of the 32 nd Meeting of SRPC held on Page 1 Contents 1. INTRODUCTION... 3 2. CONFIRMATION OF THE MINUTES OF 31 st MEETING OF SRPC... 5 3. OPERATION OF HYDRO POWER PROJECTS IN PEAKING MODE... 5 4. MEMBERSHIP TO RPC... 8 5. PREPARATION FOR MEETING

More information

Electricity Market. July 15.

Electricity Market.   July 15. Electricity Market Email: info@iexindia.com July 15 www.iexindia.com In this presentation Introduction to Indian Power Market Product Portfolio Trading Mechanism Market Snapshot Participation Volume Price

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005 GUJARAT ELECTRICITY REGULATORY COMMISSION OPEN ACCESS REGULATION Notification No. 13 of 2005 In exercise of the powers conferred on it by Section 181 read with Sections 39(2)(d), 40(c), 42 (2)(3)(4), 86(1)(c)

More information

1. Confirmation of the Minutes of the 29 th Protection Coordination Sub-Committee meeting held on 20 th February, 2014

1. Confirmation of the Minutes of the 29 th Protection Coordination Sub-Committee meeting held on 20 th February, 2014 SOUTHERN REGIONAL POWER COMMITTEE BANGALORE Agenda for the 30 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 20.03.2014 (Thursday) 1. Confirmation of the Minutes of the 29 th

More information

National Bank for Agriculture and Rural Development

National Bank for Agriculture and Rural Development National Bank for Agriculture and Rural Development Regional Office, Shimla Premises Section Tender for Renovation of 14 Officers Flats in Block -2, 14 & 16, Phase- III, Near BCS, New Shimla, Shimla Date

More information

एस. ज. व. एन. ल मट ड (SJVN Limited)

एस. ज. व. एन. ल मट ड (SJVN Limited) agon एस. ज. व. एन. ल मट ड (SJVN Limited) (भ रत सरक र एव हम चल द श सरक र क एक स य उप!म) एक मन र# और स %य ल- A क पन (A Mini Ratna and Schedule A Company) (6X250MW न थप झ कड़+ जलव, त -ट शन) पण एव स वद वभ ग

More information

दव ण त र य व द य त सवमवत

दव ण त र य व द य त सवमवत भ रत सरक र GOVERNMENT OF INDIA व द य त म त र लय MINISTRY OF POWER क द र य व द य त प र व करण CENTRAL ELECTRICITY AUTHORITY दव ण त र य व द य त सवमवत SOUTHERN REGIONAL POWER COMMITTEE अठ ईसव ब ठक क क र यव

More information

र ष ट र य ब ज न गम न नमट ड क ष त र य क य य : प ण अमर वत पर उप ब ध गभग 148 प ड़ क कड़ड़य एव 574 ब स क बबक र ह त न बवद

र ष ट र य ब ज न गम न नमट ड क ष त र य क य य : प ण अमर वत पर उप ब ध गभग 148 प ड़ क कड़ड़य एव 574 ब स क बबक र ह त न बवद र ष ट र य ब ज न गम न नमट ड क ष त र य क य य : प ण फ : 020-24264587, फ क स: 20-24272584 म : rm.pune@indiaseeds.com स अभ (अमर वत )/एन एस स -प ण /2017-18 द न क : 05.02.2018 अमर वत पर उप ब ध गभग 148 प ड़ क कड़ड़य

More information

Central Depository Services (India) Limited

Central Depository Services (India) Limited Central Depository Services (India) Limited Convenient Dependable Secure COMMUNIQUÉ TO DEPOSITORY PARTICIPANTS CDSL/OPS/DP/1746 October 20, 2009 UPDATION OF NEW BANK ACCOUNT NUMBERS DPs are advised to

More information

Real Effective Exchange Rate based on CPI as Price Index for India

Real Effective Exchange Rate based on CPI as Price Index for India प र स प रक शन PRESS RELEASE स च र व भ ग, क द र य क य लय, एस.ब.एस.म र, म बई-400001 DEPARTMENT OF COMMUNICATION, Central Office, S.B.S.Marg, Mumbai-400001 फ न/Phone: 91 22 2266 0502 फ क स/Fax: 91 22 22660358

More information

Claim Process for Personal Accidental Insurance State Bank Gold/Platinum Debit Card (Visa/MasterCard)

Claim Process for Personal Accidental Insurance State Bank Gold/Platinum Debit Card (Visa/MasterCard) Claim Process for Personal Accidental Insurance State Bank Gold/Platinum Debit Card (Visa/MasterCard) 1. Policy No: 240700421710000023 (Please note: Policy number has to be mentioned on every communication

More information

व श व श वरय य र ष ट र य प र द य व क स स थ न, न प र (भ रत) - ४४००१०

व श व श वरय य र ष ट र य प र द य व क स स थ न, न प र (भ रत) - ४४००१० व श व श वरय य र ष ट र य प र द य व क स स थ न, न प र (भ रत) - ४४००१० VISVESVARAYA NATIONAL INSTITUTE OF TECHNOLOGY, NAGPUR 440 011 (INDIA) Phone: 091-0712-2222828, 2223710, 2226750, 2236330, 2236331, 2236332,

More information

. HUMAN RESOURCES MANAGEMENT DIVISION, HOSPITALISATION CELL (PHONE HEAD OFFICE: NEW DELHI

. HUMAN RESOURCES MANAGEMENT DIVISION, HOSPITALISATION CELL (PHONE HEAD OFFICE: NEW DELHI . HUMAN RESOURCES MANAGEMENT DIVISION, HOSPITALISATION CELL (PHONE 011-28075345-emailid-hrdhospitalisation@pnb.co.in) HEAD OFFICE: NEW DELHI July 19, 2018 स व नव त कम च रय ह त य जन ए /SCHEMES FOR RETIRED

More information

Rajasthan Electricity Regulatory Commission

Rajasthan Electricity Regulatory Commission Rajasthan Electricity Regulatory Commission Vidyut Viniyamak Bhawan, Near State Motor Garage, Sahkar Marg, JAIPUR -302001 Phone: EPBX 0141-2741299, Fax: 0141-2741018 Website: www.rerc.rajasthan.gov.in

More information

न गम त स व ए ववभ ग. ENQUIRY.No.BOM/CSD/STN/ 05 / NOTICE INVITING TENDER (NIT)

न गम त स व ए ववभ ग. ENQUIRY.No.BOM/CSD/STN/ 05 / NOTICE INVITING TENDER (NIT) न गम त स व ए ववभ ग Corporate Services Department प रध न क र लर : ल क गल, 1501, म व ज गर, प ण -5 Head Office: LOKMANGAL,1501,SHIVAJINAGAR,PUNE-5 ट ल फ /TELE :020-25614331 फ क स/FAX :020-25512351 ई- ल/e-mail

More information

RBI/ /14 Ashadha 23, 1938 DCBR.BPD.BC.No. 01/ / July 14, 2016

RBI/ /14 Ashadha 23, 1938 DCBR.BPD.BC.No. 01/ / July 14, 2016 RBI/2016-17/14 Ashadha 23, 1938 DCBR.BPD.BC.No. 01/19.51.026/2016-17 July 14, 2016 All State / Central Co-operative Banks Dear Sir / Madam, Investments in Non-SLR instruments by State / Central Co-operative

More information

न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उप म) च म ह ऊस स - म जयप र फ न / फ

न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उप म) च म ह ऊस स - म जयप र फ न / फ न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उपम) च म ह ऊस स - म जयप र 302 001 फ न - 0141-2376760 / 2365947 फ - 2363910 1(20)/म. स./ र.ब. न.-जय/18-19 दन क: 04.01.2019 **ई- न वद -स चन ** य क य लय, र य ब ज

More information

आक स अन स ध न क$ (भ रत य क )ष अन स ध न प,रषद) प.य/ग ,8स.कम, भ रत

आक स अन स ध न क$ (भ रत य क )ष अन स ध न प,रषद) प.य/ग ,8स.कम, भ रत र य आक स अन स ध न क$ (भ रत य क )ष अन स ध न प,रषद) प.य/ग- 737106,8स.कम, भ रत द रभ स न बर : 91-03592-257703(AF&AO) ट ल1फ़ स न बर : 03592-257289 व बस इट : http://www.nrcorchids.nic.inईम ल न बर nrcorchids@rediffmail.com

More information

VASAI-VIRAR CITY MUNICIPAL CORPORATION

VASAI-VIRAR CITY MUNICIPAL CORPORATION 1 VASAI-VIRAR CITY MUNICIPAL CORPORATION e- TENDER NOTICE NO... FOR YEAR 2016 17 NAME OF WORK: ADDITIONAL WATER SUPPLY DISTRIBUTION SYSTEM FOR VASAI VIRAR CITY MUNCIPAL CORPORATION UNDER AMRUT TENDER DOCUMENT

More information

RESERVE BANK OF INDIA

RESERVE BANK OF INDIA भ रत य ररजर व ब क RESERVE BANK OF INDIA www.rbi.org.in RBI/2015-16/18 DNBR (PD) CC. No. 046 / 03.10.119 / 2015-16 July 01, 2015 To All NBFCs, Dear Sir/Madam, Master Circular "Infrastructure Debt Fund-Non-Banking

More information

स फ टव यर ट क न ल ज प र कसस ऑफ़ इ ड य

स फ टव यर ट क न ल ज प र कसस ऑफ़ इ ड य स फ टव यर ट क न ल ज प र कसस ऑफ़ इ ड य (इल र कर ड र कस एव स च प र द य ड क म त र लय, भ रत सरक र) Webel STP II Building, 2 nd Floor, DN - 53, Sector- V, Salt Lake, Kolkata-700091. www.kol.stpi.in एसट प आई-क

More information

PUNJAB & SIND BANK.

PUNJAB & SIND BANK. प ज ब ए ड स ध ब क PUNJAB & SIND BANK (भ रत सरक र क उप म/A GOVERNMENT OF INDIA UNDERTAKING) प चव तल, 21 र ज ल स, नई द ल -110008 H.O. HRD Department, 5 th Floor, Bank House, 21 Rajendra Place, New Delhi-

More information

स य ब न क ग र डड फ ल ल ट क बबक र ह त ननव द आम त रण स चन

स य ब न क ग र डड फ ल ल ट क बबक र ह त ननव द आम त रण स चन द रभ ष स ख य : 020-24264587 फ क स : 020-24272584 स प रश /Cond )र ब न ल -प ण /2016-17 दद क : 27.09.2017 स य ब न क ग र डड फ ल ल ट क बबक र ह त ननव द आम त रण स चन र ष ट र य ब ज न गम ल लमट ड, प ण क ष त र क

More information

न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उप म) च म ह ऊस स - म जयप र फ न / फ

न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उप म) च म ह ऊस स - म जयप र फ न / फ न शनल स ड स क रप र शन ल मट ड (भ रत सरक र क उप म) च म ह ऊस स - म जयप र 302 001 फ न - 0141-2376760 / 2365947 फ - 2363910 1(30-B)/उ दन/ र.ब. न.-जय/18-19 दन क: 11.09.2018 ** न वद -स चन ** य क य लय, र य ब ज

More information

भ रत य रज़वर ब क. RBI/ /52 DCBR.CO.LS.PCB. Cir.No.5/ / September 27, 2018

भ रत य रज़वर ब क. RBI/ /52 DCBR.CO.LS.PCB. Cir.No.5/ / September 27, 2018 भ रत य रज़वर ब क RESERVE BANK OF INDIA www.rbi.org.in RBI/2018-19/52 DCBR.CO.LS.PCB. Cir.No.5/07.01.000/2018-19 September 27, 2018 Chief Executive Officers of all Primary (Urban) Co-operative Banks Dear

More information

स प रश /(चन स ल)र ब नन लल -प ण / ददन क :

स प रश /(चन स ल)र ब नन लल -प ण / ददन क : द रभ ष स ख य : 020-24264587 फ क स : 020-24272584 स प रश /(चन स ल)र ब नन लल -प ण /201 7-1 8 ददन क : 30.01.201 8 चन (Gram) ब ज क अब ज क र प म बबक र ह त ननव द आम त रण स चन र ष ट र य ब ज ननगम लललमट ड, प ण

More information

F (2)/01/2018-KVS (Kol)/ Date: Sub.: Inviting Bid for outsourcing of Security, Conservancy and Gardening Services.

F (2)/01/2018-KVS (Kol)/ Date: Sub.: Inviting Bid for outsourcing of Security, Conservancy and Gardening Services. E-mail : kvskolkata@yahoo.co.in (033) 2337 6998 /2321 9490 /2359 6099 / 2337 9335 क न द र य व द य लय स गठन (म न स स धन व क स म त र लय, भ रत सरक र) KENDRIYA VIDYALAYA SANGATHAN (Under Ministry of HRD, Govt.

More information

Trading at Power Exchange - IEX

Trading at Power Exchange - IEX Trading at Power Exchange - IEX February 2016 Prasanna Rao Market Operations In this presentation Product Portfolio Trading Mechanism & Process Flow- Day-Ahead Market Trading Mechanism-Term-Ahead Market

More information

भ रत य कप स न गम ल 0

भ रत य कप स न गम ल 0 भ रत य कप स न गम ल 0 THE COTTON CORPORATION OF INDIA LTD. (A Government of India Undertaking) (Website : texmin.nic.in) 161-162, ºÉäEäòhb ò±ééä ú, EäòªÉ ú VÉÉäxÉ {±ÉÉVÉÉ ÉäxÉ ºÉäC]õ ú, ÉɺjÉÒxÉMÉ ú, ÉÒ±É

More information

RBI/ /366 FIDD.CO.Plan.BC.23/ / April 7, 2016

RBI/ /366 FIDD.CO.Plan.BC.23/ / April 7, 2016 भ रत य ररज र व ब क ----------------------RESERVE BANK OF INDIA----------------- www.rbi.org.in RBI/2015-16/366 FIDD.CO.Plan.BC.23/ 04.09.01/2015-16 April 7, 2016 The Chairman/ Managing Director/ Chief

More information

Auction of Government Securities: Non-Competitive Bidding Facility to retail investors

Auction of Government Securities: Non-Competitive Bidding Facility to retail investors RBI/2017-18/99 IDMD.1080/08.01.001/2017-18 November 23, 2017 All Scheduled Commercial Banks All State Co-operative Banks / All Scheduled Primary (Urban) Co-operative Banks / All Financial Institutions

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 94/2010 Coram: Dr. Pramod Deo, Chairperson Shri S.Jayaraman, Member Shri V.S.Verma, Member Shri M.Deena Dayalan, Member Date of Hearing:

More information

य लयर प वर क पर शन ऑफ इ डय लमट ड NUCLEAR POWER CORPORATION OF INDIA LIMITED

य लयर प वर क पर शन ऑफ इ डय लमट ड NUCLEAR POWER CORPORATION OF INDIA LIMITED य लयर प वर क पर शन ऑफ इ डय लमट ड NUCLEAR POWER CORPORATION OF INDIA LIMITED (भ रत सरक र क उयम) (A Government of India Enterprise) स वद एव स म ब धन CONTRACTS & MATERIALS MANAGEMENT Phone No. 02626-230634/271/714

More information

Submitted to. Maharashtra Electricity Regulatory Commission. Mumbai

Submitted to. Maharashtra Electricity Regulatory Commission. Mumbai MSLDC Mid-Term Review Petition For Truing up of Budget Cost of Operation for FY 2015-16 & 2016-17, Provisional truing-up for FY 2017-18 and ARR forecast and determination of Fees and Charges For FY 2018-19

More information

TENDER NOTICE FOR JOB/LABOUR WORK AT GODOWNS

TENDER NOTICE FOR JOB/LABOUR WORK AT GODOWNS भ रत य कप स नगम ल मट ड The Cotton Corporation of India Limited (भ रत सरक र क उप म / A Govt. of India Undertaking ) ल ट न बर 27,च म ल ब ड ग, व र स वरकर च क, स ट नगर, श हन रव ड र ड, Plot No. 27, ChandramauliBuilding,VeerSawarkarChowk,

More information