1 Reserve Study Transmittal Letter Date: February 1, 215 To: Sonja Bachus, Management Alternative, The From: Browning Reserve Group (BRG) Re: ; Update w/o Site Visit Review Attached, please find the reserve study for. To assist in your understanding of the study, and to highlight key information you may need quickly, we have listed below some of the important information contained in the study. At BRG our goal is to bring clarity from complexity, so should you have any questions, please do not hesitate to contact us anytime. 1. Where do I find the recommended reserve contribution for next year's budget? This is found in Section III, 3 Year Reserve Funding Plan, Cash Flow Method. $168,34 is the annual amount. Directly under the annual amount is the amount per ownership interest, per month, or other period, as applicable. $ For any other funding related issues, if any, see Section III, 3 Year Reserve Funding Plan, Cash Flow Method. 2. Where do I find the status of the reserve fund, based on the Percent Funded calculation? This is found for the 3-year term of the study in Section IV, 3 Year Reserve Funding Plan, Including Fully Funded Balance and % Funded. For the year for which the study was prepared, 215/216, the Association is 46.1% funded. Based on the 3 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 3 years. California statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded. This study's balances do not include the USDA required loan reserve which is held in a separate account. The new water system project components have not been visually observed by the reserve provider. A reserve site visit and updated reserve study may be required once the project is complete. 6uwov4.5.7 P. O. Box 6125 / Sacramento, CA 9586 Office (916) Fax (916) Bob@BrowningRG.com /

2 February 1, Reserve Study Page Two 3. Where do I find the assumptions for interest and inflation factors? While this information is in various places in the study, it can always be found in Section III, 3 Year Reserve Funding Plan, Cash Flow Method. For this study the assumption is 2.5% for the interest rate and 2.5% for the inflation factor. Please be advised these rates estimate the values that will stand the test of time over the 3-year term of the study, not simply only next year. 6uwov4.5.7

3 February 1, Reserve Study Page Three 4. What pages from the reserve study get mailed to the members (homeowners)? Please see the last section of the reserve study, "Member Distribution Materials." These are the last six pages (or more) of the study which can be removed, and copied, for distribution to the membership with the budget packet. This packet includes all state mandated disclosures related to the reserves and the reserve study. This section of the study is a stand-alone packet with it's own cover and table of contents. 5. What are the next steps? This study meets the CA Civil Code Requirements for a review of the study each year and the preparation of the California Assessment and Reserve Funding Disclosure, which under law, must be presented to the association members each year. The next site visit study will be due three years from the date of the last site visit study. BRG proposes doing an Update Without Site Visit Study during the intervening two years at a nominal cost which includes the preparation of a reserve study and above required disclosures. Please read the two helpful sections entitled Glossary and Notes to the Auditor. The glossary explains common reserve study terms as well as BRG specific terminology. The Notes to the Auditor while intended to assist the auditor, has useful information for the casual reader on how year zero, (214/215) the current fiscal year is dealt with in the study. Thank you for the opportunity to work with the on this study. 6uwov4.5.7

4 RESERVE STUDY Update w/o Site Visit Review Sky High Ranch of Calaveras Water System Published - February 1, 215 Browning Reserve Group P. O. Box 6125 / Sacramento, CA 9586 Office (916) Fax (916) Bob@BrowningRG.com / Browning Reserve Group /1/215 6uwov :m Version 2/1/215 3:42:1 PM

5 Sky High Ranch of Calaveras Water System Table of Contents Section Report Page Section I: of Association Reserves 1 Section II: 3 Year Expense Forecast Detailed 5 Section III: 3 Year Reserve Funding Plan Cash Flow Method {c} 9 Section III-a: 3 Year Reserve Funding Plan Cash Flow Method - Ending Balances Chart 1 Section III-b: 3 Year Reserve Funding Plan Special Assessments / Other Contributions 11 Details Section IV: 3 Year Reserve Funding Plan Fully Funded Balance and % Funded 13 Section IV-a: 3 Year Reserve Funding Plan Cash Flow Method - Percent Funded Chart 14 Section V: Reserve Fund Balance Forecast Component Method 15 Section VI: Component Listing Included Components 17 Section VI-b: Component Listing Excluded Components 24 Section VII: Tabular Component Listing Included Components 27 Section VII-a: Expenditures by Year - Next 3 Years 3 Section X: Auditor Notes 32 Section X-a: Supplementary Information for Auditor Component Method Section XI: Glossary Reserve Study Terms Addendum: Member Distribution Materials See Page ii for Details /1/215 6uwov :m Version 2/1/215 3:42:1 PM Browning Reserve Group 215 TOC - i

6 Sky High Ranch of Calaveras Water System Member Distribution Materials The following Reserve Study sections, located at the end of the report, should be provided to each member. Section Report California: Member Assessment and Reserve Funding Disclosure Section III: 3 Year Reserve Funding Plan Section III-b: 3 Year Reserve Funding Plan [Civil Code 557] Cash Flow Method {c} Special Assessments / Other Contributions Details /1/215 6uwov :m Version 2/1/215 3:42:1 PM Browning Reserve Group 215 TOC - ii

7 Section I Update w/o Site Visit Review Sky High Ranch of Calaveras Water System Published - February 1, 215 Reserve Study A Reserve Study was conducted of (the "Association"). An Update Without Site-Visit Review is an update with no on-site visual observation upon where the following tasks are performed: life and valuation estimates; fund status; and a funding plan. is a Planned Development with a total of 245 Lots. of Reserves For the first year of the Reserve Study, the reserve contribution is based upon the existing budget unless otherwise noted in Section III, Reserve Funding Plan. In addition BRG relied on the Association to provide an accurate Beginning Reserve Balance. The status of the Association's reserves, as reflected in the following Reserve Study, is as follows: 1. The Expenditure Forecast of the following Reserve Study identifies the major components which the Association is obligated to repair, replace, restore or maintain, as determined in accordance with the criteria specified above, and specifies for each such component: a. Its current estimated replacement cost; b. Its estimated useful life; and c. Its estimated remaining useful life. 2. It is estimated that the total cash reserves necessary to repair, replace, restore or maintain such major components (in the aggregate) during and at the end of their first remaining useful life is $231,22. [For purposes of this calculation, necessary is defined as the Fully Funded Balance (FFB) (Component Current Cost X Effective Age / Useful Life, including a provision for interest and inflation in future years.)] 3. The current amount of accumulated cash reserves actually set aside to repair, replace, restore, or maintain such major components as of the fiscal year ending June 3, 216 is estimated to be $16,612, constituting 46.1% of the total expenditures anticipated for all such major components through their first end of useful life replacement /1/215 6uwov :m Version 2/1/215 3:42:1 PM Browning Reserve Group 215 P. O. Box 6125 / Sacramento, CA 9586 Office (916) Fax (916) Bob@BrowningRG.com /

8 Reserve Study - Update w/o Site Visit Review 2 4. Based upon the schedule of annual reserve contributions necessary to defray the cost of repairing, replacing, restoring or maintaining such major components in the years such expenditures are estimated to be required, it is estimated that annual reserve contributions in the initial amount of $168,34 [$ per Lot per year (average)] for the fiscal year ending June 3, 216 (the first full fiscal year following first distribution of this report) will be necessary in order to meet all such reserve expenditures when they are projected to come due. Funding Assessment Based on the 3 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 3 years. California statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded. This study's balances do not include the USDA required loan reserve which is held in a separate account. The new water system project components have not been visually observed by the reserve provider. A reserve site visit and updated reserve study may be required once the project is complete. Percent Funded Status Based on paragraphs 1-3 above, the Association is 46.1% funded. The following scale can be used as a measure to determine the Association s financial picture whereas the lower the percentage, the higher the likelihood of the Association requiring a special assessment, or other large increases to the reserve contribution in the future. Percent Funded Poor % Fair % Strong % Methodology The above recommended reserve contribution for the next fiscal year (and future fiscal years as outlined in Section III, Reserve Fund Balance Forecast) was developed using the cash flow method. This is a method of developing a reserve funding plan where the contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved. Funding Goals The funding goal employed for is Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than Fully Funding.

9 Reserve Study - Update w/o Site Visit Review 3 Limitations The intention of the Reserve Study is to forecast the Association's ability to repair or replace major components as they wear out in future years. The Reserve Study is not an engineering report, and no destructive testing was performed. The costs outlined in the study are for budgetary and planning purposes only, and actual bid costs would depend upon the defined scope of work at the time repairs are made. Also, any latent defects are excluded from this report. Statutory Disclosures Compliance The Reserve Study was conducted pursuant to Sections 53 and 555 of the California Civil Code. Open Meeting California Civil Code Section 556 says (in part): The (Reserve Funding) plan shall be adopted by the board of directors at an open meeting before the membership of the association as described in Article 2 (commencing with Section 49) of Chapter 6. If the board of directors determines that an assessment increase is necessary to fund the reserve funding plan, any increase shall be approved in a separate action of the board that is consistent with the procedure described in Section 565. General: Supplemental Disclosures BRG has no other involvement(s) with the Association which could result in actual or perceived conflicts of interest. Personnel Credentials: BRG is a licensed general building contractor in California, #768851, and the owner, Robert W. Browning, holds the Reserve Specialist designation, #46 from the Community Associations Institute. Completeness: BRG has found no material issues which, if not disclosed, would cause a distortion of the Association's situation. Reliance on Client Data: Information provided by the official representative of the Association regarding financial, physical, quantity, or historical issues will be deemed reliable by BRG. Scope: This Reserve Study is a reflection of information provided to BRG and assembled for the Association's use, not for the purpose of performing an audit, quality/forensic analysis, health and safety inspection, or background checks of historical records.

10 Reserve Study - Update w/o Site Visit Review 4 Reserve Balance: The actual beginning reserve fund balance in this Reserve Study is based upon information provided and was not audited. Reserve Projects: Information provided about reserve projects will be considered reliable. Any on-site inspection should not be considered a project audit, quality inspection, or health and safety review. Component Quantities: The Association warrants the previously developed component quantities are accurate and reliable. Browning Reserve Group

11 See Section VI-b for Excluded Components Section II 3 Year Expense Forecast - Detailed Current Replacement Life Useful / Reserve Component Cost Remaining 214/15 215/16 216/17 217/18 218/19 219/2 22/21 221/22 222/23 223/24 224/25 225/26 226/27 227/28 228/ Existing Components 4 - Structural Repairs 93 - Building Maintenance 2 Skyline Drive Pump Houses Total 4 - Structural Repairs 16, Water System 15 - Pressure Relief Valves 4 Distribution Line PRV's 16 - Pressure Relief Valves 3 PRV Maintenance 21 - Well Meadow Well 25 - Pump- Replace 15 HP- Replace Pump- Re-build 15 HP- Rebuild 26 - Pump- Replace 3/4 HP- Replace Flow Meter Meadow Well Electrical Panel Meadow Well 3 - Water Storage Tank 22,3 Gal. Middle Tank 31 - Water Storage Tank 65,9 Gal. Upper Tank 9 - Miscellaneous Accumulator 91 - Miscellaneous Hi-Lo Switches, Panels, Sheds, Etc 92 - Miscellaneous Transmitters 93 - Miscellaneous Testing & Cleaning Sediment Total 28 - Water System 38, Undesignated 1 - Miscellaneous Reserve Items Total 32 - Undesignated 3,9 16, ,338 22,194 29, ,338 22,194 1, ,76 1,218 1, , , ,673 4,543 8, ,452 1, ,468 1, ,25 6, ,352 53, ,267 96, ,612 2, ,537 3,247 1, ,266 1,432 1,62 6, ,329 8,12 3, ,126 4,2 46,7 12,11 11,25 58,893 27,879 3, ,998 4,412 4,871 5,376 3,998 4,412 4,871 5,376 Total [Existing Components] Expenditures 2.5% 5,5 17,338 4,412 12,11 11,25 4,871 58, , /215 Replacement Project 28 - Water System Version 2/1/215 3:42:1 PM Browning Reserve Group /15 to 228/29 5

12 Current Replacement Life Useful / See Section VI-b for Excluded Components 3 Year Expense Forecast - Detailed Reserve Component Cost Remaining 214/15 215/16 216/17 217/18 218/19 219/2 22/21 221/22 222/23 223/24 224/25 225/26 226/27 227/28 228/ Distribution Line Repl. 2,963 Lin. Ft. Line Replace (135%)[nr:1] 27 - Service Lines 2,655 Lin. Ft. Dedicated Pump/Tank Line (135%)[nr:1] Service Lines Pump 2 Bypass Line (135%)[nr:1] Miscellaneous 5 Pressure Reducing Stations (135%)[nr:1] Valves 46 6" Gate Valves (135%)[nr:1] Miscellaneous 7 Blow-Off Assemblies (135%)[nr:1] Miscellaneous 1 ARVs (135%)[nr:1] Miscellaneous 248 Reconnect Services (135%)[nr:1] Pump- Replace Well Pump Well & Pump New Well & Pump (135%)[nr:1] Flow Meter Booster Pump 1 (135%)[nr:1] Water Storage Tank 125, Gal. Bolted Steel (135%)[nr:1] Total 28 - Water System 3,818,944 2,264,4 5 2,264,4 286, ,74 2,25 5 2,25 236, ,25 124, ,2 14, ,175 2,25 5 2,25 52,2 5 52,2 1, , 5 162, 1, , , ,75 3,88,944 Total [214/215 Replacement Project] Expenditures 2.5% Total Expenditures 2.5% 3,88,944 3,88,944 5,5 17,338 4,412 12,11 11,25 4,871 58, ,45 Total Current Replacement Cost 4,219,74 Version 2/1/215 3:42:1 PM Browning Reserve Group /15 to 228/29 6

13 See Section VI-b for Excluded Components 3 Year Expense Forecast - Detailed Reserve Component 229/3 23/31 231/32 232/33 233/34 234/35 235/36 236/37 237/38 238/39 239/4 24/41 241/42 242/43 243/ Existing Components 4 - Structural Repairs 93 - Building Maintenance 2 Skyline Drive Pump Houses Total 4 - Structural Repairs 28,41 28, Water System 15 - Pressure Relief Valves 4 Distribution Line PRV's 16 - Pressure Relief Valves 3 PRV Maintenance 21 - Well Meadow Well 25 - Pump- Replace 15 HP- Replace Pump- Re-build 15 HP- Rebuild 26 - Pump- Replace 3/4 HP- Replace Flow Meter Meadow Well Electrical Panel Meadow Well 3 - Water Storage Tank 22,3 Gal. Middle Tank 31 - Water Storage Tank 65,9 Gal. Upper Tank 9 - Miscellaneous Accumulator 91 - Miscellaneous Hi-Lo Switches, Panels, Sheds, Etc 92 - Miscellaneous Transmitters 93 - Miscellaneous Testing & Cleaning Sediment Total 28 - Water System 32 - Undesignated 1 - Miscellaneous Reserve Items Total 32 - Undesignated Total [Existing Components] Expenditures 2.5% 1,559 1,764 1, ,325 51,899 12,99 15,487 1,879 2,46 2,823 3,613 9,411 12,47 4,157 1,833 2,74 2,347 1,371 5,123 15,491 14,113 75,388 19,83 18,66 283,325 5,934 6,55 7,23 7,981 5,934 6,55 7,23 7,981 15,491 2,47 81,938 28,41 7,23 19,83 18,66 291, /215 Replacement Project 28 - Water System 21 - Distribution Line Repl. 2,963 Lin. Ft. Line Replace (135%)[nr:1] 27 - Service Lines 2,655 Lin. Ft. Dedicated Pump/Tank Line (135%)[nr:1] Service Lines Pump 2 Bypass Line (135%)[nr:1] Version 2/1/215 3:42:1 PM Browning Reserve Group /3 to 243/44 7

14 See Section VI-b for Excluded Components 3 Year Expense Forecast - Detailed Reserve Component 229/3 23/31 231/32 232/33 233/34 234/35 235/36 236/37 237/38 238/39 239/4 24/41 241/42 242/43 243/ Miscellaneous 5 Pressure Reducing Stations (135%)[nr:1] Valves 46 6" Gate Valves (135%)[nr:1] Miscellaneous 7 Blow-Off Assemblies (135%)[nr:1] Miscellaneous 1 ARVs (135%)[nr:1] Miscellaneous 248 Reconnect Services (135%)[nr:1] Pump- Replace Well Pump Well & Pump New Well & Pump (135%)[nr:1] Flow Meter Booster Pump 1 (135%)[nr:1] Water Storage Tank 125, Gal. Bolted Steel (135%)[nr:1] Total 28 - Water System 14,483 14,483 Total [214/215 Replacement Project] Expenditures 2.5% Total Expenditures 2.5% 14,483 14,483 15,491 2,47 81,938 28,41 7,23 19,83 18,66 291,36 Version 2/1/215 3:42:1 PM Browning Reserve Group /3 to 243/44 8

15 Section III 3 Year Reserve Funding Plan Cash Flow Method Beginning Balance Inflated 2.5% Reserve Contribution 245 Percentage Increase 214/15 215/16 216/17 217/18 218/19 219/2 22/21 221/22 222/23 223/24 137,694 16, ,88 132, , , , ,657 25,472 3,88,944 5,5 17,338 4,412 12,11 11,25 4,871 71,18 168,34 169, , ,44 175, , ,658 18, , % 1.% 1.% 1.% 1.% 1.% 1.% 1.% 1.% Special Assessments / Other 1 3,873, , , , , , , , , ,397 Interest After 2.5% Ending Balance 1) 1,7 3,16 2,885 3,22 3,569 4,15 4,637 5,99 5,767 8, ,694 16, ,88 132, , , , ,657 25, ,933 See Section III-b for important USDA loan repayment, water system project contribution and existing water system funding details. Additionally required USDA loan reserve funds are not included within this study's balances and are held within a separate account. Beginning Balance Inflated 2.5% Reserve Contribution 245 Percentage Increase Special Assessments / Other Interest After 2.5% Ending Balance 224/25 225/26 226/27 227/28 228/29 229/3 23/31 231/32 232/33 233/34 283, ,11 33, ,28 145, ,247 23, , ,37 28,158 58, ,45 14,483 15,491 2,47 184,71 184,71 184,71 184,71 184,71 184,71 184,71 184,71 184,71 184, %.%.%.%.%.%.%.%.%.% -152, , , , , , , , , ,397 7,494 7,737 7,986 6,35 4,34 4,746 5,282 5,762 6,447 7,4 323,11 33, ,28 145, ,247 23, , ,37 28, ,232 Beginning Balance Inflated 2.5% Reserve Contribution 245 Percentage Increase Special Assessments / Other Interest After 2.5% Ending Balance 234/35 235/36 236/37 237/38 238/39 239/4 24/41 241/42 242/43 243/44 319, , , , ,616 41, , ,89 494, ,3 81,938 28,41 7,23 19,83 18,66 291,36 184,71 184,71 184,71 184,71 184,71 184,71 184,71 184,71 184,71 184, %.%.%.%.%.%.%.%.%.% -152, , , , , , , , , ,397 8,377 8,354 8,33 8,975 9,636 1,579 11,297 11,897 12,761 1,23 359, , , ,616 41, , ,89 494, ,3 289,628 Version 2/1/215 3:42:1 PM Browning Reserve Group 215 9

16 Fund Balance Section III-a 3 Year Reserve Funding Plan Cash Flow Method - Ending Balances $6, $5, $4, $3, $2, $1, $ 214/15 215/16 216/17 217/18 218/19 219/2 22/21 221/22 222/23 223/24 224/25 225/26 226/27 227/28 228/29 229/3 23/31 231/32 232/33 233/34 234/35 235/36 236/37 237/38 238/39 239/4 24/41 241/42 242/43 243/44 Years Version 2/1/215 3:42:1 PM Browning Reserve Group 215 1

17 Section III-b 3 Year Reserve Funding Plan Special Assessments / Other Contributions Detail Funding Source 214/15 215/16 216/17 217/18 218/19 219/2 22/21 221/22 222/23 223/24 224/25 225/26 226/27 227/28 228/29 Existing Water System Accumulated Reserve Funds INFLOW USDA Loan INFLOW OUTFLOW Lump Sum Inflow: fp1 Lump Sum Inflow: fp1 3 Outflows: fp2 64,814 3,48,944 Funds transferred from the general reserve account for existing water system reserve obligations. -152, , , , , , , , , , , , , ,397 $3,48,944 loan with P&I repayment at $152,397/year for 4 years based on 3.25% interest per Water System Project report dated 1/1/215. Loan payback period 215/216 through 254/255. Water System Project Contribution INFLOW Lump Sum Inflow: fp1 4, Funds transferred from the general reserve account for the water project contribution. Net Total Other Contributions 3,873, , , , , , , , , , , , , , , Version 2/1/215 3:42:1 PM Browning Reserve Group /15 to 228/29

18 Funding PlanSpecial Assessments / Other Contributions Detail Funding Source 229/3 23/31 231/32 232/33 233/34 234/35 235/36 236/37 237/38 238/39 239/4 24/41 241/42 242/43 243/44 Existing Water System Accumulated Reserve Funds INFLOW USDA Loan INFLOW OUTFLOW Lump Sum Inflow: fp1 Lump Sum Inflow: fp1 3 Outflows: fp2-152,397 Funds transferred from the general reserve account for existing water system reserve obligations. -152, , , , , , , , , , , , , ,397 $3,48,944 loan with P&I repayment at $152,397/year for 4 years based on 3.25% interest per Water System Project report dated 1/1/215. Loan payback period 215/216 through 254/255. Water System Project Contribution INFLOW Lump Sum Inflow: fp1 Funds transferred from the general reserve account for the water project contribution. Net Total Other Contributions -152, , , , , , , , , , , , , , , Version 2/1/215 3:42:1 PM Browning Reserve Group /3 to 243/44

19 Section IV 3 Year Reserve Funding Plan Including Fully Funded Balance and % Funded Year Beginning Balance Fully Funded Balance Percent Funded Inflated 2.5% Reserve Contribution Special Assessments & Other Contributions 214/15 4,17,43 3.4% 3,88,944 71,18 3,873,758 1,7 137, /16 137, , % 5,5 168,34-152,397 3,16 16, /17 16,612 23, % 169, ,397 2, ,88 217/18 127,88 227,93 58.% 17, , ,397 3,22 132, /19 132, , % 173,44-152,397 3, , /2 156,817 26, % 4, , ,397 4,15 179,295 22/21 179, , % 12,11 176, ,397 4, , /22 196, , % 11,25 178, ,397 5,99 216, /23 216, , % 18, ,397 5,767 25, /24 25, ,65 82.% 4, , ,397 8, , /25 283, , % 184,71-152,397 7, ,11 225/26 323,11 44, % 58, ,71-152,397 7,737 33, /27 33, , % 184,71-152,397 7, ,28 227/28 343,28 411, % 235,45 184,71-152,397 6,35 145, /29 145,539 25, % 184,71-152,397 4,34 181, /3 181, , % 14, ,71-152,397 4,746 23,184 23/31 23, , % 15, ,71-152,397 5, , /32 224, , % 2,47 184,71-152,397 5, ,37 232/33 242,37 283, % 184,71-152,397 6,447 28, /34 28, ,48 1.3% 184,71-152,397 7,4 319, /35 319, , % 184,71-152,397 8, , /36 359, ,42 8.7% 81, ,71-152,397 8, , /37 317, , % 184,71-152,397 8,33 357, /38 357, ,86 95.% 28,41 184,71-152,397 8, , /39 369,616 41, % 184,71-152,397 9,636 41, /4 41, , % 7,23 184,71-152,397 1, ,948 24/41 445,948 48, % 19,83 184,71-152,397 11, ,89 241/42 469,89 56, % 18,66 184,71-152,397 11, , /43 494, , % 184,71-152,397 12, ,3 243/44 539,3 585, % 291,36 184,71-152,397 1,23 289,628 Interest Ending Balance Version 2/1/215 3:42:1 PM Browning Reserve Group

20 Percent Funded Section IV-a 3 Year Reserve Funding Plan Cash Flow Method - Percent Funded /15 215/16 216/17 217/18 218/19 219/2 22/21 221/22 222/23 223/24 224/25 225/26 226/27 227/28 228/29 229/3 23/31 231/32 232/33 233/34 234/35 235/36 236/37 237/38 238/39 239/4 24/41 241/42 242/43 243/44 Years /1/215 6uwov :m Version 2/1/215 3:42:1 PM Browning Reserve Group

21 Section V Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 214/215 Fully Funded Balance 215/216 Fully Funded Balance % Per Year Straight Line 215/216 Line Item Contribution based on Cash Flow Method 3 - Existing Components 4 - Structural Repairs 93 - Building Maintenance 2 Skyline Drive Pump Houses 28 - Water System 15 - Pressure Relief Valves 4 Distribution Line PRV's 16 - Pressure Relief Valves 3 PRV Maintenance 21 - Well Meadow Well 25 - Pump- Replace 15 HP- Replace Pump- Re-build 15 HP- Rebuild 26 - Pump- Replace 3/4 HP- Replace Flow Meter Meadow Well Electrical Panel Meadow Well 3 - Water Storage Tank 22,3 Gal. Middle Tank 31 - Water Storage Tank 65,9 Gal. Upper Tank 9 - Miscellaneous Accumulator 91 - Miscellaneous Hi-Lo Switches, Panels, Sheds, Etc 92 - Miscellaneous Transmitters 93 - Miscellaneous Testing & Cleaning Sediment 16, ,338 1,734 11,27 13,22 7.6% 12,798 29, ,592 8,38.% 1, , ,76.94% 1, , ,325 7,83 38,74 42, % 52,283 3, ,673 3,167 27,81 31, % 23,379 8, , ,26 4, % 6,977 1, , % 1,84 1, , % 1,628 6, , ,856 2, % 5,427 53, ,267 1,857 36,366 38, % 13,75 96, ,612 3,34 65,424 69, % 24,656 2, , ,228 2, % 1,873 1, , , % 1,869 6, , ,558 6, % 4,672 3, , ,745 3, % 2,38 Sub-total [28 - Water System] 38,76 557,688 19, , , % 141,448 Version 2/1/215 3:42:1 PM Browning Reserve Group

22 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 214/215 Fully Funded Balance 215/216 Fully Funded Balance % Per Year Straight Line 215/216 Line Item Contribution based on Cash Flow Method 3 - Existing Components 32 - Undesignated 1 - Miscellaneous Reserve Items 3, , ,925 3, % 7,377 Sub-total Existing Components 4,76 579,24 21,896 27,861 23, % 161, /215 Replacement Project 28 - Water System 21 - Distribution Line Repl. 2,963 Lin. Ft. Line Replace (135%)[nr:1] 27 - Service Lines 2,655 Lin. Ft. Dedicated Pump/Tank Line (135%)[nr:1] Service Lines Pump 2 Bypass Line (135%)[nr:1] Miscellaneous 5 Pressure Reducing Stations (135%)[nr:1] Valves 46 6" Gate Valves (135%)[nr:1] Miscellaneous 7 Blow-Off Assemblies (135%)[nr:1] Miscellaneous 1 ARVs (135%)[nr:1] Miscellaneous 248 Reconnect Services (135%)[nr:1] Pump- Replace Well Pump Well & Pump New Well & Pump (135%)[nr:1] Flow Meter Booster Pump 1 (135%)[nr:1] Water Storage Tank 125, Gal. Bolted Steel (135%)[nr:1] 2,264,4 5 2,264,4.% 286, ,74.% 2,25 5 2,25.% 236, ,25.% 124, ,2.% 14, ,175.% 2,25 5 2,25.% 52,2 5 52,2.% 1, , % 6, , 5 162,.% 1, ,125.% 168, ,75.% Sub-total [28 - Water System] 3,818,944 14, ,89, % 6,682 Sub-total 214/215 Replacement Project 3,818,944 14, ,89, % 6,682 Totals 4,219,74 593,57 22,81 4,17,43 231,22 1.% 168,34 [A] [EndBal] [A] [B] [EndBal] [B] Percent Funded 3.43% 46.15% Version 2/1/215 3:42:1 PM Browning Reserve Group

23 Section VI Component Listing Included Components Existing Components Structural Repairs 93 - Building Maintenance Useful Life 1 2 Skyline Drive Pump Houses Quantity 2 Unit of Measure Building Cost /Bldg $8,5 This is to repair and maintain the middle and upper pump houses. 1.% Total Cost/Study $16,1 Replacement Year 217/218 Future Cost $17, Water System 15 - Pressure Relief Valves Useful Life 5 4 Distribution Line PRV's Quantity 4 Unit of Measure Items Cost /Itm $7,3 This is to install new pressure relief valves along distribution lines % Total Cost/Study $29,2 Replacement Year 251/252 Future Cost $72, Pressure Relief Valves Useful Life 5 3 PRV Maintenance Quantity 3 Unit of Measure Items Cost /Itm $35 1.% Total Cost/Study $1,5 Replacement Year 215/216 Future Cost $1,76 This is for regular ongoing pressure relief valve inspections and maintenance Well Useful Life 4 Meadow Well Quantity 1 Unit of Measure Items This is to replace the 78' well. Cost /Itm $138,45 22/23- This work completed including electrical components % Total Cost/Study $138,45 Replacement Year 243/244 Future Cost $283, Pump- Replace Useful Life 1 15 HP- Replace Quantity 1 Unit of Measure Lump Sum Cost /LS $3,9 1.% Total Cost/Study $3,9 Replacement Year 215/216 Future Cost $31,672 This is to replace the 15 HP pump motor. Pump rebuild is provided for within another component. 1 Version 2/1/215 3:42:1 PM Browning Reserve Group

24 Component Listing Included Components Existing Components Water System Pump- Re-build Useful Life 1 15 HP- Rebuild Quantity 1 Unit of Measure Lump Sum Cost /LS $8,15 1.% Total Cost/Study $8,15 Replacement Year 22/221 Future Cost $9,452 This is to rebuild the pump. Pump replacement is provided for within another component. 29/21- Cost estimate increased per client to add electrical work at pump Pump- Replace Useful Life 1 3/4 HP- Replace Quantity 1 Unit of Measure Lump Sum This is to replace the 3/4 HP pump motor (pony). Cost /LS $1,235 1.% Total Cost/Study $1,235 Replacement Year 221/222 Future Cost $1, /213- Per client, this has been replaced so the remaining life is reset to full Flow Meter Useful Life 1 Meadow Well Quantity 1 Unit of Measure Items This is to replace the well flow meter. Cost /Itm $1,855 1.% Total Cost/Study $1,855 Replacement Year 221/222 Future Cost $2,25 212/213- Per client, this has been replaced so the remaining life is reset to full Electrical Panel Useful Life 1 Meadow Well Quantity 1 Unit of Measure Lump Sum Cost /LS $6,185 This is to maintain, repair and replace the well electrical panel. 1.% Total Cost/Study $6,185 Replacement Year 221/222 Future Cost $7, Per client, this has been replaced so the remaining life is reset to full Water Storage Tank Useful Life 4 22,3 Gal. Middle Tank Quantity 22,3 Unit of Measure Gallon Cost /Gal $ % Total Cost/Study $53,875 Replacement Year 227/228 Future Cost $74,267 This is to maintain and replace the 22,3 gallon water tank, perform complete water testing, drain and re-coat the tank Tank placed in service. Version 2/1/215 3:42:1 PM Browning Reserve Group

25 Component Listing Included Components Existing Components Water System 31 - Water Storage Tank Useful Life 4 65,9 Gal. Upper Tank Quantity 65,9 Unit of Measure Gallon Cost /Gal $ % Total Cost/Study $96,925 Replacement Year 227/228 Future Cost $133,612 This is to maintain and replace the 65,9 gallon water tank, perform complete water testing, drain and re-coat the tank Tank placed in service. 9 - Miscellaneous Useful Life 1 Accumulator Quantity 1 Unit of Measure Lump Sum Cost /LS $2,475 1.% Total Cost/Study $2,475 Replacement Year 215/216 Future Cost $2,537 This is to replace the accumulator with the pumps motor. May not be needed with new system. 212/213- Per client, this can be extended from 213/214 to 214/ Miscellaneous Useful Life 5 Hi-Lo Switches, Panels, Sheds, Etc Quantity 1 Unit of Measure Lump Sum Cost /LS $1,235 This is to maintain the high-low switches, electrical panels, sheds, etc. 1.% Total Cost/Study $1,235 Replacement Year 215/216 Future Cost $1, Miscellaneous Useful Life 1 Transmitters Quantity 1 Unit of Measure Lump Sum This is to maintain the radio transmitters. Cost /LS $6,175 1.% Total Cost/Study $6,175 Replacement Year 215/216 Future Cost $6, Miscellaneous Useful Life 1 Testing & Cleaning Sediment Quantity 1 Unit of Measure Lump Sum Cost /LS $3,5 1.% Total Cost/Study $3,5 Replacement Year 215/216 Future Cost $3,126 This is to inspect, clean and test the water tanks and measure accumulation levels. 1 Version 2/1/215 3:42:1 PM Browning Reserve Group

26 Component Listing Included Components Existing Components Undesignated 1 - Miscellaneous Useful Life 4 Reserve Items Quantity 1 Unit of Measure Lump Sum Cost /LS $3,9 This is for major unanticipated reserve component repairs. 1.% Total Cost/Study $3,9 Replacement Year 215/216 Future Cost $3, /215 Replacement Project Water System 21 - Distribution Line Repl. Useful Life 5 2,963 Lin. Ft. Line Replace (135%) Quantity 2,963 Unit of Measure Linear Feet Cost /l.f. $8. Qty * $/l.f. $1,677,4 135.% Treatment [nr:1] Total Cost/Study $2,264,4 Replacement Year 214/215 Future Cost $2,264,4 This is to replace existing line with 6" line including construction contingency, engineering & administration and construction management overheads. 214/215- $1,677,4 cost, 2,963 lf quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/ Service Lines 2,655 Lin. Ft. Dedicated Pump/Tank Line (135%) Useful Life 5 Quantity 2,655 Unit of Measure Linear Feet Cost /l.f. $8. Qty * $/l.f. $212,4 135.% Treatment [nr:1] Total Cost/Study $286,74 Replacement Year 214/215 Future Cost $286,74 This is for dedicated pump/tank 6" line including construction contingency, engineering & administration and construction management overheads. 214/215- $212,4 cost, 2,655 lf quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/ Service Lines Useful Life 5 Pump 2 Bypass Line (135%) Quantity 1 Unit of Measure Lump Sum Cost /LS $15, Qty * $/LS $15, 135.% Treatment [nr:1] Total Cost/Study $2,25 Replacement Year 214/215 Future Cost $2,25 This is for 6" pump 2 bypass line including construction contingency, engineering & administration and construction management overheads. 214/215- $15, cost and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/215. Version 2/1/215 3:42:1 PM Browning Reserve Group 215 2

27 Component Listing Included Components /215 Replacement Project Water System Miscellaneous Useful Life 5 5 Pressure Reducing Stations (135%) Quantity 5 Unit of Measure Items Cost /Itm $35, Qty * $/Itm $175, 135.% Treatment [nr:1] Total Cost/Study $236,25 Replacement Year 214/215 Future Cost $236,25 This is for the pressure reducing stations including construction contingency, engineering & administration and construction management overheads. 214/215- $175, cost, 5 item quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/ Valves Useful Life " Gate Valves (135%) Quantity 46 Unit of Measure Items Cost /Itm $2, Qty * $/Itm $92, 135.% Treatment [nr:1] Total Cost/Study $124,2 Replacement Year 214/215 Future Cost $124,2 This is for the 6" gate valves including construction contingency, engineering & administration and construction management overheads. 214/215- $92, cost, 46 item quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/ Miscellaneous Useful Life 5 7 Blow-Off Assemblies (135%) Quantity 7 Unit of Measure Items Cost /Itm $1,5 Qty * $/Itm $1,5 135.% Treatment [nr:1] Total Cost/Study $14,175 Replacement Year 214/215 Future Cost $14,175 This is for the blow-off assemblies including construction contingency, engineering & administration and construction management overheads. 214/215- $1,5 cost, 7 item quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/ Miscellaneous Useful Life 5 1 ARVs (135%) Quantity 1 Unit of Measure Items Cost /Itm $1,5 Qty * $/Itm $15, 135.% Treatment [nr:1] Total Cost/Study $2,25 Replacement Year 214/215 Future Cost $2,25 This is for the ARVs including construction contingency, engineering & administration and construction management overheads. 214/215- $15, cost, 1 item quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/215. Version 2/1/215 3:42:1 PM Browning Reserve Group

28 Component Listing Included Components /215 Replacement Project Water System Miscellaneous Useful Life Reconnect Services (135%) Quantity 248 Unit of Measure Items Cost /Itm $1,5 Qty * $/Itm $372, 135.% Treatment [nr:1] Total Cost/Study $52,2 Replacement Year 214/215 Future Cost $52,2 This is for reconnect services including construction contingency, engineering & administration and construction management overheads. 214/215- $372, cost, 248 item quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/ Pump- Replace Useful Life 15 Well Pump Quantity 1 Unit of Measure Items This is to repair and replace the well pump. Cost /Itm $1, 15 1.% Total Cost/Study $1, Replacement Year 229/23 Future Cost $14, /215- $1, cost and 15 year life estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/ Well & Pump Useful Life 5 New Well & Pump (135%) Quantity 1 Unit of Measure Lump Sum Cost /LS $12, Qty * $/LS $12, 135.% Treatment [nr:1] Total Cost/Study $162, Replacement Year 214/215 Future Cost $162, This is for a new well and pump including construction contingency, engineering & administration and construction management overheads. 214/215- $12, cost, single item quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/ Flow Meter Useful Life 5 Booster Pump 1 (135%) Quantity 1 Unit of Measure Items Cost /Itm $7,5 Qty * $/Itm $7,5 135.% Treatment [nr:1] Total Cost/Study $1,125 Replacement Year 214/215 Future Cost $1,125 This is for the booster pump #1 flow meter including construction contingency, engineering & administration and construction management overheads. 214/215- $7,5 cost, single item quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/215. Version 2/1/215 3:42:1 PM Browning Reserve Group

29 Component Listing Included Components /215 Replacement Project Water System Water Storage Tank Useful Life 5 125, Gal. Bolted Steel (135%) Quantity 125, Unit of Measure Gallon Cost /Gal $1. Qty * $/Gal $125, 135.% Treatment [nr:1] Total Cost/Study $168,75 Replacement Year 214/215 Future Cost $168,75 This is for the bolted steel storage tank including construction contingency, engineering & administration and construction management overheads. 214/215- $125, cost, 125, gallon capacity, single item quantity and 35% overhead estimates per Weber, Ghio & Associations, Inc Water System Replacement Project report dated 1/15/215. Version 2/1/215 3:42:1 PM Browning Reserve Group

30 Section VI-b Component Listing Excluded Components /215 Replacement Project Water System 4 - Distribution Line Repl. Useful Life 8 Phase 1- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $512,5 Replacement Year N/A 1.% Total Cost/Study $512,5 1 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase one cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report. 213/214- $1,5 expended to revise water system proposal in Sept 213. Client advised that Phase 1 project will begin in June 214 with an estimated expense of $5,. Client to provide payment schedule as project progresses. BRG moved project to the 214/215 fiscal year due to June start date. 212/213- The board has resolved to do this project phase in 213/214 to see what the impact is on the community and the reserve fund Distribution Line Repl. Useful Life 8 Phase 2- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 1.% Total Cost/Study $525,3 6 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase two cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report Distribution Line Repl. Useful Life 8 Phase 3- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 13 1.% Total Cost/Study $525,3 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase three cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report. Version 2/1/215 3:42:1 PM Browning Reserve Group

31 /215 Replacement Project Water System Distribution Line Repl. Useful Life 8 Component Listing Excluded Components Phase 4- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 2 1.% Total Cost/Study $525,3 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase four cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report Distribution Line Repl. Useful Life 8 Phase 5- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 27 1.% Total Cost/Study $525,3 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase five cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report Distribution Line Repl. Useful Life 8 Phase 6- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 34 1.% Total Cost/Study $525,3 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase six cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report Distribution Line Repl. Useful Life 8 Phase 7- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 41 1.% Total Cost/Study $525,3 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase seven cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report. Version 2/1/215 3:42:1 PM Browning Reserve Group

32 /215 Replacement Project Water System Distribution Line Repl. Useful Life 8 Component Listing Excluded Components Phase 8- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 48 1.% Total Cost/Study $525,3 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase eight cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report Distribution Line Repl. Useful Life 8 Phase 9- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 55 1.% Total Cost/Study $525,3 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase nine cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report Distribution Line Repl. Useful Life 8 Phase 1- Multiyear Project Quantity 1 Unit of Measure Lump Sum Cost /LS $525,3 Replacement Year N/A 62 1.% Total Cost/Study $525,3 Future Cost N/A This is to replace the distribution piping with 4" line. This is the estimated project phase ten cost. The actual project costs may vary as the work is put out to bid. Water service connection fees estimated at $25, are not included at this time. Administrative costs are in a separate line item. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report Water Storage Tank Useful Life 3 2 New 6k Gal Storage Near Tank 2 Quantity 2 Unit of Measure Items Cost /Itm $71,963 Replacement Year N/A 13 1.% Total Cost/Study $143,925 Future Cost N/A This is to install approximately 6, gallons of new storage near tank 2 and perform complete water testing. This is recommended in the engineering report based on build-out of lots. The consultant may be recommending that a pair of 27,+/- gallon tanks be installed instead. This work is to coincide with phase 3 of the water project. 214/215- Excluded this component based on 1/15/215 Water System Replacement Preliminary Engineering Report. Version 2/1/215 3:42:1 PM Browning Reserve Group

33 Section VII Component Tabular Listing Included Components Component Current Replacement Cost Useful Life Remaining Life Quantity Cost/ U of M Treatment Location Existing Components Structural Repairs 93 - Building Maintenance $16, $8,5/Bldg Skyline Drive Pump Houses 28 - Water System 15 - Pressure Relief Valves $29, $7,3/Itm Distribution Line PRV's 16 - Pressure Relief Valves $1, $35/Itm PRV Maintenance 21 - Well $138, $138,45/Itm Meadow Well 25 - Pump- Replace $3, $3,9/LS 15 HP- Replace Pump- Re-build $8, $8,15/LS 15 HP- Rebuild 26 - Pump- Replace $1, $1,235/LS 3/4 HP- Replace Flow Meter $1, $1,855/Itm Meadow Well Electrical Panel $6, $6,185/LS Meadow Well 3 - Water Storage Tank $53, ,3 $2.42/Gal Middle Tank 31 - Water Storage Tank $96, ,9 $1.47/Gal Upper Tank 9 - Miscellaneous $2, $2,475/LS Accumulator 91 - Miscellaneous $1, $1,235/LS Hi-Lo Switches, Panels, Sheds, Etc 92 - Miscellaneous $6, $6,175/LS Transmitters 93 - Miscellaneous $3, $3,5/LS Testing & Cleaning Sediment 32 - Undesignated 1 - Miscellaneous $3, $3,9/LS Reserve Items /215 Replacement Project Water System 21 - Distribution Line Repl. $2,264,4 5 2,963 $8./l.f. (135%) [nr:1] Line Replace 27 - Service Lines $286,74 5 2,655 $8./l.f. (135%) [nr:1] Dedicated Pump/Tank Line Service Lines $2, $15,/LS (135%) [nr:1] Pump 2 Bypass Line Miscellaneous $236, $35,/Itm (135%) [nr:1] Pressure Reducing Stations Valves $124, $2,/Itm (135%) [nr:1] 6" Gate Valves Miscellaneous $14, $1,5/Itm (135%) [nr:1] Blow-Off Assemblies Miscellaneous $2, $1,5/Itm (135%) [nr:1] ARVs Version 2/1/215 3:42:1 PM Browning Reserve Group

34 Component Tabular Listing Component Current Replacement Cost Useful Life Remaining Life Quantity Cost/ U of M Treatment Location Included Components /215 Replacement Project Water System Miscellaneous $52, $1,5/Itm (135%) [nr:1] Reconnect Services Pump- Replace $1, $1,/Itm Well Pump Well & Pump $162, 5 1 $12,/LS (135%) [nr:1] New Well & Pump Flow Meter $1, $7,5/Itm (135%) [nr:1] Booster Pump Water Storage Tank $168, , $1./Gal (135%) [nr:1] Bolted Steel Version 2/1/215 3:42:1 PM Browning Reserve Group

35 Component Tabular Listing Component Current Replacement Cost Useful Life Remaining Life Quantity Cost/ U of M Treatment Location Excluded Components /215 Replacement Project Water System 4 - Distribution Line Repl. $512, $512,5/LS Phase 1- Multiyear Project 44 - Distribution Line Repl. $525, $525,3/LS Phase 2- Multiyear Project 48 - Distribution Line Repl. $525, $525,3/LS Phase 3- Multiyear Project Distribution Line Repl. $525, $525,3/LS Phase 4- Multiyear Project Distribution Line Repl. $525, $525,3/LS Phase 5- Multiyear Project 42 - Distribution Line Repl. $525, $525,3/LS Phase 6- Multiyear Project Distribution Line Repl. $525, $525,3/LS Phase 7- Multiyear Project Distribution Line Repl. $525, $525,3/LS Phase 8- Multiyear Project Distribution Line Repl. $525, $525,3/LS Phase 9- Multiyear Project Distribution Line Repl. $525, $525,3/LS Phase 1- Multiyear Project 48 - Water Storage Tank $143, $71,963/Itm New 6k Gal Storage Near Tank 2 Version 2/1/215 3:42:1 PM Browning Reserve Group

36 Section VII-a Expenditures by Year - Next 3 Years Reserve Component Life Useful Current Replacement Cost Forecast Inflated 2.5% 214/ /215 Replacement Project Water System 21 - Distribution Line Repl. 2,963 Lin. Ft. Line Replace (135%)[nr:1] 5 2,264, Service Lines 2,655 Lin. Ft. Dedicated Pump/Tank Line (135%)[nr:1] 5 286, Service Lines Pump 2 Bypass Line (135%)[nr:1] 5 2, Miscellaneous 5 Pressure Reducing Stations (135%)[nr:1] 5 236, Valves 46 6" Gate Valves (135%)[nr:1] 5 124, Miscellaneous 7 Blow-Off Assemblies (135%)[nr:1] 5 14, Miscellaneous 1 ARVs (135%)[nr:1] 5 2, Miscellaneous 248 Reconnect Services (135%)[nr:1] 5 52, Well & Pump New Well & Pump (135%)[nr:1] 5 162, Flow Meter Booster Pump 1 (135%)[nr:1] 5 1, Water Storage Tank 125, Gal. Bolted Steel (135%)[nr:1] 5 168,75 Total 214/15: 3,88, / Non Replacement Project Components 28 - Water System 16 - Pressure Relief Valves 3 PRV Maintenance 25 - Pump- Replace 15 HP- Replace 9 - Miscellaneous Accumulator 91 - Miscellaneous Hi-Lo Switches, Panels, Sheds, Etc 92 - Miscellaneous Transmitters 93 - Miscellaneous Testing & Cleaning Sediment 32 - Undesignated 1 - Miscellaneous Reserve Items Total 28 - Water System: 44, ,5 1,76 1 3,9 31, ,475 2, ,235 1, ,175 6, ,5 3,126 46,6 4 3,9 3, /1/215 6uwov :mm.* Version 2/1/215 3:42:1 PM Browning Reserve Group 215 3

37 Reserve Component 215/16 Life Useful Expenditures by Year- Next 3 Years Current Replacement Cost Forecast Inflated 2.5% Total 215/16: 48,785 5, /1/215 6uwov :mm.* Version 2/1/215 3:42:1 PM Browning Reserve Group

38 Section X Notes to the Auditor This report is intended to assist the auditor while preparing the audit, review or compilation of s (the "Association") financial documents. Browning Reserve Group ("BRG") prepared a reserve study for the Association during the 214/215 fiscal year. This was done to help determine the Association's reserve contribution for the next fiscal year (215/216) and future fiscal years. In addition, BRG prepared the proper statutory disclosures for distribution to the Association members. This reserve study is an Update w/o Site Visit Review. An Update Without Site-Visit Review is an update with no on-site visual observation upon where the following tasks are performed: life and valuation estimates; fund status; and a funding plan. Please note, as this study update did not require a site visit, and relied completely on the information provided, it is possible BRG has never visited Sky High Ranch of Calaveras Water System. For BRG reserve studies, the year in which the study is being conducted, is the first year of the study. For example, this study is being prepared during 214/215 and is the Association s first year in the study. This enables BRG to use a starting point which ties to the last audited financial statement, June 3, 214. You will notice in Section III, Reserve Fund Balance Forecast, a Beginning Reserve Balance of $ is being used which ties to the last completed audit or review of the Association s financial statements. BRG then re-builds the first year of the study, in this case 214/215, and estimates an ending reserve fund balance. Again, see Section III and the 214/215 ending reserve balance estimate of $137,694. Re-building the first year of the study as mentioned above simply means using the 214/215 adopted budget for the 214/215 reserve contribution. Finally, the 214/215 reserve expenses both actual and projected are estimated. We find by using the above method a more accurate reserve study is possible because the beginning reserve fund balance ties directly to the Association s audited financial statement or, in the absence of an audit or review, the year end balance sheet. There is no need to rely on others for determining mid year reserve balances or estimating current year ending reserve balances. This approach forces all involved, to look at the current year s reserve fund activities so a more accurate ending reserve fund balance can be estimated. Version 2/1/215 3:42:1 PM Browning Reserve Group

39 Notes to the Auditor With respect to the reserve component Percent Funded values on the next page(s), here are the calculations: FFB = Year Cost X Year Effective Age / Useful Life % Funded = Year Estimated Ending Reserve Balance / Year FFB Please see Section V - Reserve Fund Balance Forecast. Browning Reserve Group Version 2/1/215 3:42:1 PM Browning Reserve Group

40 Schedule of Supplementary Information for Auditor Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life 214/215 Fully Funded Balance 215/216 Fully Funded Balance 215/216 Line Item Contribution based on Cash Flow Method 3 - Existing Components 4 - Structural Repairs 93 - Building Maintenance 2 Skyline Drive Pump Houses 28 - Water System 15 - Pressure Relief Valves 4 Distribution Line PRV's 16 - Pressure Relief Valves 3 PRV Maintenance 21 - Well Meadow Well 25 - Pump- Replace 15 HP- Replace Pump- Re-build 15 HP- Rebuild 26 - Pump- Replace 3/4 HP- Replace Flow Meter Meadow Well Electrical Panel Meadow Well 3 - Water Storage Tank 22,3 Gal. Middle Tank 31 - Water Storage Tank 65,9 Gal. Upper Tank 9 - Miscellaneous Accumulator 91 - Miscellaneous Hi-Lo Switches, Panels, Sheds, Etc 92 - Miscellaneous Transmitters 93 - Miscellaneous Testing & Cleaning Sediment 32 - Undesignated 1 - Miscellaneous Reserve Items 16, ,27 13,22 12,798 29, ,592 8,38 1, ,76 1, , ,74 42,573 52,283 3, ,81 31,673 23,379 8, ,26 4,177 6,977 1, ,84 1, ,628 6, ,856 2,536 5,427 53, ,366 38,655 13,75 96, ,424 69,544 24,656 2, ,228 2,537 1,873 1, ,266 1,869 6, ,558 6,329 4,672 3, ,745 3,126 2,38 3, ,925 3,998 7,377 Sub-total Existing Components 4,76 27,861 23, , /215 Replacement Project 28 - Water System 21 - Distribution Line Repl. 2,963 Lin. Ft. Line Replace (135%)[nr:1] 27 - Service Lines 2,655 Lin. Ft. Dedicated Pump/Tank Line (135%)[nr:1] Service Lines Pump 2 Bypass Line (135%)[nr:1] Miscellaneous 5 Pressure Reducing Stations (135%)[nr:1] Valves 46 6" Gate Valves (135%)[nr:1] Miscellaneous 7 Blow-Off Assemblies (135%)[nr:1] Miscellaneous 1 ARVs (135%)[nr:1] 2,264,4 5 2,264,4 286, ,74 2,25 5 2,25 236, ,25 124, ,2 14, ,175 2,25 5 2, /1/215 June 3 Version 2/1/215 3:42:1 PM Browning Reserve Group

41 Schedule of Supplementary Information for AuditorComponent Method Reserve Component Current Repl. Cost Useful Life Remaining Life 214/215 Fully Funded Balance 215/216 Fully Funded Balance 215/216 Line Item Contribution based on Cash Flow Method 6-214/215 Replacement Project 28 - Water System Miscellaneous 248 Reconnect Services (135%)[nr:1] Pump- Replace Well Pump Well & Pump New Well & Pump (135%)[nr:1] Flow Meter Booster Pump 1 (135%)[nr:1] Water Storage Tank 125, Gal. Bolted Steel (135%)[nr:1] 52,2 5 52,2 1, , , 5 162, 1, , , ,75 Sub-total 214/215 Replacement Project 3,818,944 3,89, ,682 Totals 4,219,74 4,17,43 231,22 168,34 [A] [B] Percent Funded [EndBal] [A] 3.43% [EndBal] [B] 46.15% /1/215 June 3 Version 2/1/215 3:42:1 PM Browning Reserve Group

42 Section XI Glossary of Reserve Study Terms Terms & Definitions CAI CASH FLOW METHOD: A method of developing a Reserve Funding Plan where contributions to the Reserve fund are designed to offset the variable annual expenditures from the Reserve fund. Different Reserve Funding Plans are tested against the anticipated schedule of Reserve expenses until the desired Funding Goal is achieved. COMPONENT INVENTORY: The task of selecting and quantifying Reserve Components. This task can be accomplished through on-site visual observations, review of association design and organizational documents, a review of established association precedents, and discussion with appropriate representative(s) of the association or cooperative. COMPONENT METHOD: A method of developing a Reserve Funding Plan where the total contribution is based on the sum of contributions for individual components. See Cash Flow Method. COMPONENT: The individual line items in the Reserve Study, developed or updated in the Physical Analysis. These elements form the building blocks for the Reserve Study. Components typically are: 1) Association responsibility, 2) with limited Useful Life expectancies, 3) predictable Remaining Useful Life expectancies, 4) above a minimum threshold cost, and 5) as required by local codes. CONDITION ASSESSMENT: The task of evaluating the current condition of the component based on observed or reported characteristics. CURRENT REPLACEMENT COST: See Replacement Cost." DEFICIT: An actual (or projected) Reserve Balance less than the Fully Funded Balance. The opposite would be a Surplus. EFFECTIVE AGE: The difference between Useful Life and Remaining Useful Life. Not always equivalent to chronological age, since some components age irregularly. Used primarily in computations. FINANCIAL ANALYSIS: The portion of a Reserve Study where current status of the Reserves (measured as cash or Percent Funded) and a recommended Reserve contribution rate (Reserve Funding Plan) are derived, and the projected Reserve income and expense over time is presented. The Financial Analysis is one of the two parts of a Reserve Study. Version 2/1/215 3:42:1 PM Browning Reserve Group

43 Glossaryof Reserve Study Terms FULLY FUNDED BALANCE (FFB): Total Accrued Depreciation. An indicator against which Actual (or projected) Reserve balance can be compared. The Reserve balance that is in direct proportion to the fraction of life used up of the current Repair or Replacement cost. This number is calculated for each component, then summed together for an association total. Two formulae can be utilized, depending on the provider s sensitivity to interest and inflation effects. Note: Both yield identical results when interest and inflation are equivalent. FFB = Current Cost X Effective Age / Useful Life or FFB = (Current Cost X Effective Age / Useful Life) + [(Current Cost X Effective Age / Useful Life) / (1 + Interest Rate) ^ ] - [(Current Cost X Effective Age / Useful Life) / (1 + Inflation Rate) ^ ] FULLY FUNDED: 1% Funded. When the actual (or projected) Reserve balance is equal to the Fully Funded Balance. FUND STATUS: The status of the reserve fund as compared to an established benchmark such as percent funding. FUNDING GOALS: Independent of methodology utilized, the following represent the basic categories of Funding Plan goals: Baseline Funding: Full Funding: Statutory Funding: Establishing a Reserve funding goal of keeping the Reserve cash balance above zero. Setting a Reserve funding goal of attaining and maintaining Reserves at or near 1% funded. Establishing a Reserve funding goal of setting aside the specific minimum amount of Reserves required by local statues. Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than Fully Funding." FUNDING PLAN: An association s plan to provide income to a Reserve fund to offset anticipated expenditures from that fund. FUNDING PRINCIPLES: Sufficient Funds When Required Stable Contribution Rate over the Years Evenly Distributed Contributions over the Years Fiscally Responsible LIFE AND VALUATION ESTIMATES: The task of estimating Useful Life, Remaining Useful Life, and Repair or Replacement Costs for the Reserve components. PERCENT FUNDED: The ratio, at a particular point of time (typically the beginning of the Fiscal Year), of the actual (or projected) Reserve Balance to the Fully Funded Balance, expressed as a percentage. PHYSICAL ANALYSIS: The portion of the Reserve Study where the Component Inventory, Condition Assessment, and Life and Valuation Estimate tasks are performed. This represents one of the two parts of the Reserve Study. Version 2/1/215 3:42:1 PM Browning Reserve Group

44 Glossaryof Reserve Study Terms REMAINING USEFUL LIFE (RUL): Also referred to as (RL). The estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the initial year have zero Remaining Useful Life. REPLACEMENT COST: The cost of replacing, repairing, or restoring a Reserve Component to its original functional condition. The Current Replacement Cost would be the cost to replace, repair, or restore the component during that particular year. RESERVE BALANCE: Actual or projected funds as of a particular point in time that the association has identified for use to defray the future repair or replacement of those major components which the association is obligated to maintain. Also known as Reserves, Reserve Accounts and Cash Reserves. Based upon information provided and not audited. RESERVE PROVIDER: An individual that prepares Reserve Studies. RESERVE STUDY: A budget planning tool which identifies the current status of the Reserve fund and a stable and equitable Funding Plan to offset the anticipated future major common area expenditures. The Reserve Study consists of two parts: the Physical Analysis and the Financial Analysis. RESPONSIBLE CHARGE: A reserve specialist in responsible charge of a reserve study shall render regular and effective supervision to those individuals performing services which directly and materially affect the quality and competence rendered by the reserve specialist. A reserve specialist shall maintain such records as are reasonably necessary to establish that the reserve specialist exercised regular and effective supervision of a reserve study of which he was in responsible charge. A reserve specialist engaged in any of the following acts or practices shall be deemed not to have rendered the regular and effective supervision required herein: 1. The regular and continuous absence from principal office premises from which professional services are rendered; except for performance of field work or presence in a field office maintained exclusively for a specific project; 2. The failure to personally inspect or review the work of subordinates where necessary and appropriate; 3. The rendering of a limited, cursory or perfunctory review of plans or projects in lieu of an appropriate detailed review; 4. The failure to personally be available on a reasonable basis or with adequate advance notice for consultation and inspection where circumstances require personal availability. SPECIAL ASSESSMENT: An assessment levied on the members of an association in addition to regular assessments. Special Assessments are often regulated by governing documents or local statutes. SURPLUS: An actual (or projected) Reserve Balance greater than the Fully Funded Balance. See Deficit. USEFUL LIFE (UL): Total Useful Life or Depreciable Life. The estimated time, in years, that a reserve component can be expected to serve its intended function if properly constructed in its present application or installation. The above terms and definitions are from the Community Associations Institute (CAI) national standards. Version 2/1/215 3:42:1 PM Browning Reserve Group

45 Glossaryof Reserve Study Terms Terms & Definitions BRG Browning Reserve Group reserve studies use several terms that are unique to our reports. Our specialized systems have been developed to offer flexibility in many areas of our reporting. Please see below for definitions of abbreviations and symbols used in many of our reserve studies. NR-1 (LIMITED RECURRENCE, 1 TIME): This signifies a major reserve component recurs for only a fixed number of cycles. Most often used to display a cost in a specific year only, NR-1 signifies the component only occurs one time. An NR-2 means the component will display for two cycles and so on. This makes it easy to enter one-time costs that pop up from time to time, or to display a cost that may be unique at one replacement date only. SE-2 (SPREAD EVENLY OVER 2 YEARS): This signifies the major component, when replaced is spread evenly over 2 or more years. For example if a component will be replaced in year 8 of the study, and there is a SE-2, then the component will be replaced over 2 years, year 8 and year 9. Although the component is split over 2 or more years, each subsequent year will increase by the study s inflation factor. An SE-3 signifies the component is split over three years and so on. NSE-2 (SPREAD NON-EVENLY OVER 2 YEARS): Similar to above, but the spread is not equal in each year. The spread is entered at a different amount for each year in the spread. The total of the spread will always equal 1% of the total replacement cost, excluding inflation. % (PERCENT TO INCLUDE): This signifies that the component is being replaced at less than 1 percent of its replacement cost or quantity. Perhaps a component is replaced partially at each replacement year. Another example would be to do a small portion of the work at each replacement year. Oftentimes wood fencing is replaced over several cycles, and the study will display a percentage of the fence at each replacement cycle. DELAYED START (REMAINING LIFE GREATER THAN USEFUL): In many instances a component's replacement cycle may not begin immediately, so the replacement cycle start is delayed. Delay is accomplished by setting the remaining life greater than the useful life. ZERO REMAINING LIFE: Zero remaining life signifies that the component is replaced in the year which the study is prepared. All replacements are reflected in their replacement year, and the year in which the study is prepared is no different than any other year. Version 2/1/215 3:42:1 PM Browning Reserve Group

46 RESERVE STUDY Member Distribution Materials Sky High Ranch of Calaveras Water System Update w/o Site Visit Review Published - February 1, 215 Section Report Page California: Member 1 Assessment and Reserve Funding Disclosure [Civil Code 557] Section III: 3 Year Reserve Funding Plan Cash Flow Method {c} 5 Section III-b: 3 Year Reserve Funding Plan Special Assessments / Other Contributions 6 Details 3 Professionally managed by Management Alternative, The (29) Browning Reserve Group /1/215 6uwov :m Version 2/1/215 3:42:1 PM Browning Reserve Group 215

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

R E S E R V E S T U D Y

R E S E R V E S T U D Y SAGUARO CANYON SUBDIVISION HOMEOWNERS ASSOCIATION R E S E R V E S T U D Y Full Study Published - May 27, 2010 B R O W N I N G R E S E R V E G R O U P ~ Emmett, ID 83617 ~ Office (208) 365-0977 Fax (208)

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT LAKE OF THE WOODS COMMUNITY CLUB LEVEL I RESERVE STUDY WITH SITE VISIT Gig Harbor, WA 98329 Report #302105122 FINANCIAL YEAR 01.2014 12.2014 701 Fifth Ave, Suite 4200, Seattle

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: November 13, 2013 To: Rob Ross, Gateview From: Richard Avelar & Associates (RA&A) Re: Gateview; Update w/ Site Visit Review Attached, please find the reserve study

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

National Reserve Study Standards

National Reserve Study Standards RS National Reserve Study Standards General Information about Reserve Studies One of the primary responsibilities of the board of directors of a community association is to protect, maintain, and enhance

More information

Reserve Specialist (RS ) Designation

Reserve Specialist (RS ) Designation Reserve Specialist (RS ) Designation NATIONAL RESERVE STUDY STANDARDS General Information About Reserve Studies One of the primary responsibilities of the board of directors of a community association

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums. 1825 W. Ray Road, #1135, Chandler, AZ 85244 support@azreservestudy.com Tel: (480) 620-4757 Fax: (888) 842-9319 April 4, 2013 Summit Park Condominiums HOA Regarding: 2012 - Level I Capital Replacement Reserve

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at Fairway Drive Boynton Beach, Florida 33437

Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at Fairway Drive Boynton Beach, Florida 33437 Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at 12241 Fairway Drive Boynton Beach, Florida 33437 Prepared by Sadat Engineering, Inc. Boynton Beach, Florida

More information

LAKE DON PEDRO COMMUNITY SERVICES DISTRICT Policy and Procedures Manual

LAKE DON PEDRO COMMUNITY SERVICES DISTRICT Policy and Procedures Manual EXHIBIT A LAKE DON PEDRO COMMUNITY SERVICES DISTRICT Policy and Procedures Manual POLICY TITLE: Reserve Policy POLICY NUMBER: (to be established) ADOPTED: July 18, 2016 AMENDED: This statement is intended

More information

Full Reserve Study. Kings Row HOA. Carbondale, CO. Report #: For Period Beginning: January 1, 2015 Expires: December 31, 2015

Full Reserve Study. Kings Row HOA. Carbondale, CO. Report #: For Period Beginning: January 1, 2015 Expires: December 31, 2015 Full Reserve Study Kings Row HOA Carbondale, CO Report #: 16151-1 For Period Beginning: January 1, 2015 Expires: December 31, 2015 Date Revised: December 8, 2014 Hello, and welcome to your Reserve Study!

More information

SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016

SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016 SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016 www.schwindtco.com 503.227.1165 PAGE 1 of 57 SURFSIDE HOMEOWNERS ASSOCIATION Executive Summary Year of

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION")

GARDEN ESTATES MAINTENANCE ASSOCIATION (CORPORATION) info@src-reservestudy.com 951-693-1721 GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION") Level 3 Reserve Study Update (No Site-Visit) Prepared For Fiscal Year 2016 1/26 Contents 1 Title Page 2 Table

More information

F U L L R E S E RV E S T U DY R E P O RT

F U L L R E S E RV E S T U DY R E P O RT Office: (888) 927-7865 Fax: (813) 200-8448 Contact@customreserves.com 5470 E Busch Blvd., Unit 171 Tampa, FL 33617 Hawks Point Community Development District F U L L R E S E RV E S T U DY R E P O RT For

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA PHONE: (352) * FAX:

VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA PHONE: (352) * FAX: VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA 32162 PHONE: (352) 751-6700 * FAX: (352) 751-6715 E-mail: melissa.schaar@districtgov.org

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

SPECIAL ENGINEERING COMMITTEE MEETING May 27, :00 p.m. PPHCSD Office 4176 Warbler Road, Phelan, CA AGENDA

SPECIAL ENGINEERING COMMITTEE MEETING May 27, :00 p.m. PPHCSD Office 4176 Warbler Road, Phelan, CA AGENDA 4176 Warbler Road P. O. Box 294049 Phelan, CA 92329-4049 (760) 868-1212 Fax (760) 868-2323 1. Call to Order Pledge of Allegiance 2. Roll Call 3. Approval of Agenda SPECIAL ENGINEERING COMMITTEE MEETING

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Smoky Ridge 19902 E Red Fox Ln Centennial, CO Level I Study with Site Inspection Fiscal Year End Date: 12/31/2017 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com November 23, 2017 Job 2006-127-12 L3 Sunshine Villas Homeowners

More information

Floriston Property HOA

Floriston Property HOA Full Reserve Study Floriston Property HOA Floriston, CA Report #: 26862-0 For Period Beginning: April 1, 2014 Expires: March 31, 2015 Date Prepared: June 30, 2014 Hello, and welcome to your Reserve Study!

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Nevada Texas Utah New Mexico CAPITAL RESERVE STUDY prepared for: Midvale Park HOA Date of report: 2/23/2017 www.azreserveanalysts.com BRINGING THE FUTURE INTO THE PRESENT FOREWARD 2/23/2017 Midvale

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

EAST NILES COMMUNITY SERVICES DISTRICT

EAST NILES COMMUNITY SERVICES DISTRICT EAST NILES COMMUNITY SERVICES DISTRICT FISCAL YEAR EDISON- ASSESSMENT DISTRICT A/D # 3 KERRNITA PARK-ASSESSMENT DISTRICT A/D # 7 WEEDPATCH HWY WATER SYSTEM-ASSESSMENT DISTRICT A/D# 8 BOARD OF DIRECTORS

More information

Do-It-Yourself Reserve Study Kit

Do-It-Yourself Reserve Study Kit Do-It-Yourself Reserve Study Kit Kawela Plantation Kaunakakai, HI 96748 Report #: 12293-7 For Period Beginning: January 1, 2012 Expires: December 31, 2012 Date Prepared: August 20, 2011 Hello, and welcome

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

Bridgewood Manor HOA

Bridgewood Manor HOA Bridgewood Manor HOA Level 1 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 18076 Property Type Condominium Number of Units 40 Fiscal Year End 12/31 Date of Property Inspection

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland CAPITAL RESERVE STUDY FOR THE Ellicott Meadows Condominium Association I Ellicott City, Maryland Contact Name: Victor Brzozowski Date: October 3, 2017 Table of Contents Section Name Section # Executive

More information

ENGINEERING AND OPERATIONS COMMITTEE. November 27, :30 PM Greenspot Road, Highland CA AGENDA

ENGINEERING AND OPERATIONS COMMITTEE. November 27, :30 PM Greenspot Road, Highland CA AGENDA ENGINEERING AND OPERATIONS COMMITTEE November 27, 2017-2:30 PM 31111 Greenspot Road, Highland CA 92346 CALL TO ORDER PLEDGE OF ALLEGIANCE PUBLIC COMMENTS NEW BUSINESS AGENDA 1. Approve the September 25,

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

Draft Post Oak Savannah Groundwater Conservation District Groundwater Well Assistance Program (GWAP)

Draft Post Oak Savannah Groundwater Conservation District Groundwater Well Assistance Program (GWAP) Draft Post Oak Savannah Groundwater Conservation District Groundwater Well Assistance Program (GWAP) Post Oak Savannah Groundwater Conservation District 310 East Avenue C Milano, TX 76556 512.455.9900

More information

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp.

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp. CAPITAL RESERVE STUDY FOR THE Providence Corner Upper Providence Twp. Management Company: The Galman Group Contact Name: Ms. Debra Lynch Date: September 28, 2016 Table of Contents Section Name Section

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Mountain Oaks Townhomes Flagstaff, Arizona Version 002 February 4, 2019 Advanced Reserve Solutions, Inc. 2761 E. Bridgeport Parkway - Gilbert, Arizona 85295 kthompson@arsinc.com

More information

RESERVE DATA ANALYSIS, INTL.

RESERVE DATA ANALYSIS, INTL. RESERVE DATA ANALYSIS, INTL. September 30, 2014 mail@reservedataanalysis.com 15502 NE 86 th Street Vancouver, WA 98682 Fax (800) 579-5015 Office (800) 359-5015 Mr. Art Burke, Manager Cape George Colony

More information

Report Dated November 17, Updates November 26, 2012 Reserve Study for Fiscal Year Prepared By WALLA SERVICES

Report Dated November 17, Updates November 26, 2012 Reserve Study for Fiscal Year Prepared By WALLA SERVICES RESERVE STUDY ANALYSIS COMPONENT CALCULATION UPDATE Bakersfield, California A Planned Master Association Report Dated November 17, 2014 Updates November 26, 2012 Reserve Study for Fiscal Year 2015 Prepared

More information

CAPE GEORGE COLONY CLUB MARINA RESERVES

CAPE GEORGE COLONY CLUB MARINA RESERVES CAPE GEORGE COLONY CLUB MARINA RESERVES Port Townsend, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next

More information

For the Years Ended December 31, 2015 and EGAN & EGAN Certified Public Accountants

For the Years Ended December 31, 2015 and EGAN & EGAN Certified Public Accountants FINANCIAL STATEMENTS AND INDEPENDENT AUDITORS REPORT For the Years Ended December 31, 2015 and 2014 EGAN & EGAN Certified Public Accountants FINANCIAL STATEMENTS FOR THE YEARS ENDED AND INDEPENDENT AUDITORS

More information

REQUEST FOR PROPOSAL (RFP) FOR: RFP # LEACHATE HAULING MAR-OCO LANDFILL POSTING DATE: OCTOBER 17, 2018

REQUEST FOR PROPOSAL (RFP) FOR: RFP # LEACHATE HAULING MAR-OCO LANDFILL POSTING DATE: OCTOBER 17, 2018 REQUEST FOR PROPOSAL (RFP) FOR: RFP # 18-040-57 LEACHATE HAULING MAR-OCO LANDFILL POSTING DATE: OCTOBER 17, 2018 RESPONSE DEADLINE: DECEMBER 4, 2018 4:00 P.M. CENTRAL STANDARD TIME (CST) TO: PAUL KLOSE

More information

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2 2013 Reserve Study Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida 32118 Report No: 2713 Version 2 For the Period From: January 1, 2013 To: December 31, 2013

More information

Water Rate Study FINAL January 31, 2018

Water Rate Study FINAL January 31, 2018 Water Rate Study FINAL January 31, 2018 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com January 31, 2018 Joshua Basin Water District P.O. Box 675 / 61750 Chollita Road Joshua

More information

CITY OF. Dixon. Water Enterprise Financial Plan Overview. City Council Meeting - March 27, 2018

CITY OF. Dixon. Water Enterprise Financial Plan Overview. City Council Meeting - March 27, 2018 t CITY OF Dixon Water Enterprise Financial Plan Overview City Council Meeting - March 27, 2018 1 STEPS IN CONDUCTING A RATE STUDY Financial Plan Evaluation of CIP and financing options Cash flow analysis

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY Replacement Reserve Analysis - Page A1 EXECUTIVE SUMMARY The Ford Plantation - POA Replacement Reserve Inventory identifies 77 Projected Replacements for funding from Replacement Reserves, with an estimated

More information

Culinary and Pressure Irrigation Water System. Capital Facilities Plan

Culinary and Pressure Irrigation Water System. Capital Facilities Plan Culinary and Pressure Irrigation Water System Capital Facilities Plan September 2009 Prepared By: J-U-B ENGINEERS, Inc. 240 West Center St., Ste. 200 Orem, Utah 84057 (801) 226-0393 SANTAQUIN CITY CULINARY

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

Utilities - Water and Sewer Funds

Utilities - Water and Sewer Funds Utilities - Water and Sewer Funds Summary of Expenditures by Fund: Water Funds: Actual Adopted Amended Adopted Amended Estimated Proposed Water Administration $ 158,511 $ 199,100 $ 199,100 $ 198,400 (0.4)

More information

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08 The Ranches HOA Level II Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10329 Property Type..... Single Family Homes Number of Units.......... 1,750 Fiscal Year End......... December

More information

SACRAMENTO AREA FLOOD CONTROL AGENCY. For the Fiscal Year Ended June 30, 2015

SACRAMENTO AREA FLOOD CONTROL AGENCY. For the Fiscal Year Ended June 30, 2015 Independent Auditors Reports, Management's Discussion and Analysis, Basic Financial Statements, Required Supplementary Information and Other Reports For the Fiscal Year Ended June 30, 2015 For the Fiscal

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

ALVA FIRE CONTROL AND RESCUE SERVICE DISTRICT BASIC FINANCIAL STATEMENTS TOGETHER WITH ADDITIONAL REPORTS YEAR ENDED SEPTEMBER 30, 2017

ALVA FIRE CONTROL AND RESCUE SERVICE DISTRICT BASIC FINANCIAL STATEMENTS TOGETHER WITH ADDITIONAL REPORTS YEAR ENDED SEPTEMBER 30, 2017 ALVA FIRE CONTROL AND RESCUE SERVICE DISTRICT BASIC FINANCIAL STATEMENTS TOGETHER WITH ADDITIONAL REPORTS YEAR ENDED SEPTEMBER 30, 2017 TABLE OF CONTENTS Page(s) INDEPENDENT AUDITOR'S REPORT......... 1-4

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

I. INTRODUCTORY SECTION

I. INTRODUCTORY SECTION Spartanburg Water System Spartanburg, South Carolina Comprehensive Annual Financial Report For the Year Ending June 30, 2017 I. INTRODUCTORY SECTION SPARTANBURG WATER SYSTEM SPARTANBURG, SOUTH CAROLINA

More information

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services

More information

This page intentionally left blank.

This page intentionally left blank. References American Water Works Association. Buried No Longer: Confronting America s Water Infrastructure Challenge. 2012. Brown and Caldwell et al. City of Davis Water Distribution System Optimization

More information

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Squaw Valley PSD Water & Sewer Rate and Connection Fee Study February 15, 2017 Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Purpose of the District s Study Provide sufficient

More information

Kayscreek Estates HOA

Kayscreek Estates HOA Kayscreek Estates HOA Level I Reserve Study Report Period 1/01/09 12/31/09 Client Reference Number.... 11004 Property Type........ Single Family Homes Number of Units............. 276 Fiscal Year End.........

More information

OPTIONS FOR FUTURE WATER SERVICE IN LOMPICO May 22, :30 p.m. Preview

OPTIONS FOR FUTURE WATER SERVICE IN LOMPICO May 22, :30 p.m. Preview OPTIONS FOR FUTURE WATER SERVICE IN LOMPICO May 22, 2014 7:30 p.m. Senior Center, Highlands Park, 8500 Highway 9, Ben Lomond Preview 1 WORKING GROUP Susan Mauriello, County Administrative Officer Christina

More information

INDIAN WELLS VALLEY WATER DISTRICT REQUEST FOR PROPOSAL WATER RATE STUDY

INDIAN WELLS VALLEY WATER DISTRICT REQUEST FOR PROPOSAL WATER RATE STUDY I. PURPOSE INDIAN WELLS VALLEY WATER DISTRICT REQUEST FOR PROPOSAL WATER RATE STUDY The Indian Wells Valley Water District ( District ) is accepting Competitive Sealed Proposals for a cost of service and

More information

Country Club Townhomes

Country Club Townhomes Full Reserve Study Country Club Townhomes Dewey, Arizona Report #: 9621-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: March 4, 2016 Hello, and welcome to your Reserve

More information

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE I. INTRODUCTION City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE The City of Arroyo Grande, California (the City ) was incorporated as a general

More information

PELICAN MARSH COMMUNITY DEVELOPMENT DISTRICT FINANCIAL STATEMENTS

PELICAN MARSH COMMUNITY DEVELOPMENT DISTRICT FINANCIAL STATEMENTS FINANCIAL STATEMENTS TABLE OF CONTENTS PAGE PART I. FINANCIAL SECTION Independent Auditor s Report 1-2 Management s Discussion and Analysis (MD&A) 3 Basic Financial Statements: Government-wide Financial

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PHEASANTS HOLLOW HOMEOWNERS LEVEL I RESERVE STUDY FULL STUDY WITH SITE VISIT Kent, WA 98031 Report #306115924 FINANCIAL YEAR 01.2015 12.2015 701 Fifth Ave, Suite 4200, Seattle

More information

Fountain Valley Authority (A Component Unit of the City of Colorado Springs, Colorado)

Fountain Valley Authority (A Component Unit of the City of Colorado Springs, Colorado) (A Component Unit of the City of Colorado Springs, Colorado) Financial Statements and Report of Independent Certified Public Accountants (A Component Unit of the City of Colorado Springs, Colorado) Financial

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

For the Years Ended December 31, 2016 and EGAN & EGAN Certified Public Accountants

For the Years Ended December 31, 2016 and EGAN & EGAN Certified Public Accountants FINANCIAL STATEMENTS AND INDEPENDENT AUDITORS REPORT For the Years Ended December 31, 2016 and 2015 EGAN & EGAN Certified Public Accountants FINANCIAL STATEMENTS FOR THE YEARS ENDED AND INDEPENDENT AUDITORS

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Marin Municipal Water District

Marin Municipal Water District Marin Municipal Water District Corte Madera, California Basic Financial Statements And Independent Auditors Report For the years ended June 30, 2012 and 2011 Basic Financial Statements Table of Contents

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014

CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014 CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014 CONTENTS Independent Auditors Report 2-3 Management s Discussion and Analysis 4-7 BASIC FINANCIAL STATEMENTS Statements of

More information

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

ASSOCIATION OF APARTMENT OWNERS OF HALE KAMAOLE

ASSOCIATION OF APARTMENT OWNERS OF HALE KAMAOLE ASSOCIATION OF APARTMENT OWNERS OF HALE KAMAOLE FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2016 and 2015 TABLE OF CONTENTS INDEPENDENT AUDITOR S REPORT... 1 FINANCIAL STATEMENTS: BALANCE SHEET...

More information

I. INTRODUCTORY SECTION

I. INTRODUCTORY SECTION Spartanburg Water System Spartanburg, South Carolina Comprehensive Annual Financial Report For the Years Ended June 30, 2018 and 2017 I. INTRODUCTORY SECTION SPARTANBURG WATER SYSTEM SPARTANBURG, SOUTH

More information

Riverwood CDD Water, Sewer, and Irrigation

Riverwood CDD Water, Sewer, and Irrigation Florida Reserve Study and Appraisal, Inc. 12407 N. Florida Avenue Tampa, FL 33612 Phone: 813.932.1588 Fax: 813.388.4189 www.reservestudyfl.com Funding Reserve Analysis for Riverwood CDD Water,, and Irrigation

More information

Marina Coast Water District Marina, California

Marina Coast Water District Marina, California Marina Coast Water District Marina, California Comprehensive Annual Financial Report For The Fiscal Years Ended June 30, 2014 and 2013 11 Reservation Road, Marina California 93933 Marina Coast Water District

More information

CITY OF STURGIS INTEGRATING 20 YEARS OF MAINTENANCE HISTORY INTO AN AMP

CITY OF STURGIS INTEGRATING 20 YEARS OF MAINTENANCE HISTORY INTO AN AMP CITY OF STURGIS INTEGRATING 20 YEARS OF MAINTENANCE HISTORY INTO AN AMP ASSET MANAGEMENT FROM PLAN TO PROGRAM - JANUARY 25, 2017 Tom Sikorski WWTP Superintendent Allen Gelderloos, PE AMP Project Manager

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

Richard Pearson, Community Development Director Tim Tucker, City Engineer

Richard Pearson, Community Development Director Tim Tucker, City Engineer CITY OF MARTINEZ CITY COUNCIL AGENDA February 21, 2007 TO: FROM: PREPARED BY: SUBJECT: Mayor and City Council Don Blubaugh, City Manager Richard Pearson, Community Development Director Tim Tucker, City

More information

SACRAMENTO AREA FLOOD CONTROL AGENCY. For the Fiscal Year Ended June 30, 2013

SACRAMENTO AREA FLOOD CONTROL AGENCY. For the Fiscal Year Ended June 30, 2013 Independent Auditors Reports, Management's Discussion and Analysis, Basic Financial Statements, Required Supplementary Information, Supplemental Information and Other Reports For the Fiscal Year Ended

More information

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017 Full Reserve Study Nelson Farms HOA Fort Collins, CO Report #: 19185-0 For Period Beginning: May 1, 2016 Expires: April 30, 2017 Date Revised: January 13, 2016 Hello, and welcome to your Reserve Study!

More information

TOWN OF PLAINFIELD, CONNECTICUT

TOWN OF PLAINFIELD, CONNECTICUT FINANCIAL REPORT JUNE 30, 2009 McGladrey & Pullen, LLP is a member firm of RSM International, an affiliation of separate and independent legal entities. COMPREHENSIVE ANNUAL FINANCIAL REPORT TABLE OF

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Level 3 Reserve Analysis Reserve Study without Property Inspection Report Period 01/01/11 12/31/011 Date of Property Inspection Inspector Report

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com March 24, 2015 Job 2000-003-10 L3 St. Tropez Villas I, Incorporated

More information

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016 WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results January 5, 2016. Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants Utility

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information