1 CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: W:\2012\ \CORR\ v1.doc Date: March 29, 2013

2 Table of Contents Section Page Executive Summary... 1 Reserve Study Disclosures... 2 Project Narrative... 3 Capital Reserve Methodology... 3 Capital Reserve Calculation... 4 Capital Reserve Recommendations... 6 Component Narrative... 7 i TOTAL SYSTEMS ENGINEERING SERVICE

3 Executive Summary The Hialeah Condominium development is a 24 unit residential complex consisting of one (1) multiple story building, located at 6210 Ocean Avenue in Wildwood Crest, New Jersey. The building is three (3) stories and is located over an open air private garage at grade level. The building contains condominium style living units. An exterior balcony is also provided to each of the units. Level of Service Full Service with Site Visit Fiscal Year of Study 2013 Recommended Total First Year Contribution $35,948* 5% Threshold Funding Contribution $20,721* 10% Threshold Funding Contribution $53,578* Present Reserve Fund $56,494 Required Reserve Fund $144,236 Percent Funded 39% Month Contributions Commence May 2013 * Please note that this is the contribution for the period of January 2013 through December TOTAL SYSTEMS ENGINEERING SERVICE

4 Reserve Study Disclosures General - Becht Engineering does not currently have any other active projects with this Association. We are not aware of any involvement with this Association that would lead to an actual or perceived conflict of interest. Physical Analysis - The inspections performed to determine the current physical condition of the common elements were visual in nature; no destructive testing or invasive inspections were performed. Quantities were taken from a combination of field counts/measurements and plan take-offs. Personnel Credentials - Preparation of this Reserve Study was performed by a CAI designated Reserve Specialist and licensed Building Inspector. Completeness - This Reserve Study assumes that proper preventative and corrective maintenance has been and will continue to be performed on the common elements. Failure to properly maintain the common elements may lead to premature failure. It should be noted that higher rates of inflation, lower earned interest rates or prematurely failing components can result in a negative closing cash balance. In addition, it is important to note that the capital fund contributions each year are assumed to rise at the assumed rate of inflation. Failure to raise the annual contributions with inflation will reduce the closing balance and may lead to a future shortfall. Reliance on Client Data This Reserve Study was prepared based on certain information provided by an official representative of the Association. This information includes the current asset balance of the Reserve Fund and the ages of the common elements and dates of most recent replacements. Scope This Reserve Study is a reflection of the information provided to us and assembled for the Association s use for budgeting purposes, not for the purpose of performing an audit, quality/forensic analysis or background checks of historical records. Reserve Balance The actual and projected Reserve Fund Balance is based upon information provided by the Association and was not audited. Component Quantities Where this Reserve Study is an update of a previously prepared Study, the Association is considered to have deemed previously developed component listings and quantities as accurate and reliable. Reserve Projects While the information provided in this Study is to be considered reliable, on-site inspections are not to be considered a project audit or quality inspection. 2 TOTAL SYSTEMS ENGINEERING SERVICE

5 Introduction The purpose of a Capital Reserve Study is to estimate the amount of money that must be funded to replace those common element components that will require replacement before the end of the effective life of the project. Mortgage lenders recognize the conditions of inadequate reserves. Reserves are important in preserving the qualities of a particular complex or building and therefore can affect property values. Consequently, capital reserves are directly related to the security and risk of a lender's investment and the marketability of the property. The Capital Reserve Study develops a recommended basic annual contribution based upon current replacement costs. Inflation may increase future costs, and the accumulation of interest on the reserve fund deposits increases available funds. Accurate projection of these factors is not possible. However, the effects of inflation and interest are shown via cash flow projections using assumed inflation and interest rates. Accurate reserve funding requires regular updates. The Community Associations Institute recommends yearly reviews and a formal study every three years. Project Narrative The Hialeah Condominium development is a 24 unit residential complex consisting of one (1) multiple story building, located at 6210 Ocean Avenue in Wildwood Crest, New Jersey. The building is three (3) stories and is located over an open air private garage at grade level. The building contains condominium style living units. An exterior balcony is also provided to each of the units. Horizontal vinyl siding and vinyl cedar shake panels are utilized on exterior exposures and a partial EIFS (exterior insulation finish system) band is utilized at the bottom of the first floor as a transition to the open air garage. The main low slope roof consists of a smooth, modified bituminous membrane with a reflective type coating. A mansard roof assembly is provided along most of the perimeter of the building. The mansard roof is covered with fiberglass reinforced asphalt shingles. The driveway and parking area are concrete paved. Poured concrete sidewalks are located along Ocean Avenue and Wisteria Avenue. An in ground pool is located at the west side of the property. The pool is surrounded by a concrete pool apron and lawn area. A PVC fence surrounds the pool area. Capital Reserve Methodology 3 TOTAL SYSTEMS ENGINEERING SERVICE

6 In preparing this study, we reviewed the master deed and offering statement to identify the common element components. These building and site components are owned by the Association. Only components with estimated remaining lives of 30 years or less have been included in the capital reserve fund. Components with estimated remaining lives that are greater than 30 years, such as building structures, piping and electrical wiring are usually replaced during a major renovation and financed at that time. Including these components in the reserve fund would result in an unrealistically high-recommended annual contribution to the capital reserve. The general accepted practice is to not include these items in reserve studies. Quantities of the components to be included in the reserve fund were then determined by field measurements, as well as a review of available building and site plans. Estimates of the costs to replace each component were derived from published industry standards, including the R.S. Means Company cost-estimating guides. In addition, the costs were reviewed for accuracy based on our experience of similar replacement projects. Finally, estimated remaining lives were determined for each of the included components based on the present age, available industry data related to typical useful lives and the condition of the component, as determined by our physical inspection. The capital reserve fund is not intended to cover annual maintenance. If maintenance items are included in the Capital Reserve Study, the tax status of the reserve fund can be jeopardized. However, expected lives are based on the assumption that proper annual maintenance is being performed. Therefore, this annual maintenance should be included in the Association's maintenance fee. Without proper maintenance, accelerated deterioration can be expected, with shortened lives. Please note, it is only possible to reserve for future expenditures and that a current need must be financed separately by borrowing or assessments. This Capital Reserve Study is developed as an aid in the proper financial planning of the Association. As such, the common element components included are evaluated for their physical condition and only for the purpose of estimating their remaining lives. Identification of possible deficient conditions is beyond the intent and scope of the Capital Reserve Study. Capital Reserve Calculation We have provided two Capital Reserve calculation methods. The first method provided in this reserve study is what is known as the Component Method. This is the most conservative approach to calculating the reserve requirement. The Component Method analyzes each component individually and assumes that the money collected for each item will only be used to replace that item. Our program uses assumed rates of interest and inflation in the 4 TOTAL SYSTEMS ENGINEERING SERVICE

7 calculation of the annual contribution and fully funded balance. The assumed inflation rate is 1.50% and the assumed interest rate is 2.00%. The second calculation method is known as the Threshold Funding Method. This method pools all the components and assumes that the money contributed to the fund is available for replacement of any item. The annual contribution is determined by lowering the contribution until the closing balance for any given year drops below a pre-determined threshold. This minimizes the annual contribution while maintaining a minimum closing balance. Determining the optimum minimum closing balance is a subjective task. Certainly, the lower the minimum acceptable balance is the greater the risk that the fund will experience a deficit. The Reserve Summary (A-1) outlines the categories included in the study. This sheet lists the estimated Replacement Costs for all components in each category at the time of the study. The Present Fund column is the amount presently on deposit for the replacement of the components in these categories. The Required Fund, which is the amount we have determined should be on deposit at this time, is calculated as the Present Age of the components multiplied by the Basic Annual Contribution. The Basic Annual Contribution is the amount that should be reserved each year, in current dollars, to replace the components included in these categories. The Component Schedule (A-2 through A-3) shows the amount necessary to replace individual components, which are grouped in the categories shown on the Reserve Summary. Present Age is the age of the component at the time of the study. The Estimated Remaining Life is the anticipated number of years before replacement of this component can be expected to be necessary. This is based on the normal life, the current age, and an engineering assessment that considers site specific conditions if a site visit is included in our scope of work. The Typical Life column represents the anticipated number of years that a component may be expected to provide adequate service. These figures are based on industry standards; a component may outlive, or require replacement prior to, its typical life. The Percentage of Total is the percent of total Required Fund. This shows the significance of specific components relative to the total fund. The Present Fund refers to the amount currently set aside for replacement. If present funds are not reserved for specific components but are an unallocated pool, the total present fund is allocated between the components according to a calculation that takes into account the Percentage of Total column. The Required Fund is the amount necessary for each component to be considered fully funded. The Surplus (Deficit) column is a calculation of the Present Fund minus the Required Fund. A positive number means a surplus of cash reserves have been set aside to date. A negative number indicates that there is a deficit in the Present Fund. Years to Make-Up is simply the Estimated Remaining Life or the amount of time left to fully fund a particular component before the money is anticipated to be required to replace the component. Finally, the Contribution Adjustment signifies, if a deficit exists, the increase in annual contributions above the recommended Basic Annual Contribution required to eliminate the deficit. If a surplus exists, this is the decrease in annual contributions that would offset the over-funded condition. 5 TOTAL SYSTEMS ENGINEERING SERVICE

8 The Annual Make-Up is based on the assumption the reserve for the item must be fully funded before the item must be replaced. The Disbursement Schedule (A-9 through A-10) lists the years in which each component will require replacement. In addition, this schedule shows the replacement cost in current dollars and the adjusted cost based on the assumed inflation factor. The Reserve Fund Scenario(s) (A-11 through A-13) are schedules that approximate actual cash flows. Since this is a plan of accumulating deposits to fund the cost of replacing these capital components in future years, it is necessary to consider the interest earned on the deposited money and the effect of inflation on the costs of the replacement work. A-11 shows a 30-year scenario of the component method calculation, using the assumed rates of interest and inflation. Deposits into the fund and expenditures out of the fund are shown on an annual basis. It is very important to note that these scenarios assume that the annual contributions to the capital reserve fund will be increased at the rate of inflation. A-12 through A-13 show a 30-year scenario using the same rates of interest and inflation with a minimized Annual Contribution resulting in a closing balance, which never goes below the established threshold. The Component Detail Pages (A-4 through A-8) show further details of the individual components, including the quantities. Capital Reserve Recommendations The Hialeah Condominium has a total of 35 components in the reserve fund with a current Replacement Cost of $931,446. The Association presently has a total of $56,494 in the reserve fund. Using the Component Method, we have determined that the Basic Annual Contribution to the reserve fund should be $30,716. The fully funded balance required is $144,236. This leaves a deficit of $87,742 in the reserve fund. The deficit will be offset on an annual basis, for each reserve component, based on the estimated remaining lives. The total of the next budget year contribution to the Contribution Adjustment is $5,232. This results in a Total Contribution to the reserve fund for the next budget year of $35,948. For the Threshold Funding calculations, as directed by the Association, we have used minimum closing balances of 5% and 10% of the Total Replacement Cost of all reserve components. This means that, using the given assumptions; the closing balance will never go below these minimum balances. The Threshold Funding Method results in first year Basic Annual Contributions of $20,721 and $53,578. Based on your evaluation of the preferred calculation method, we suggest that you plan your annual contributions over the next few years according to the appropriate cash flow schedule. Each year, for the next three years, you may choose to review these assumptions. At no later than three years, we suggest that you contact us for an update based on a proper engineering review of the facility and replacement costs. 6 TOTAL SYSTEMS ENGINEERING SERVICE

9 It should be noted that higher rates of inflation, lower earned interest rates or prematurely failing components can result in a negative closing cash balance. In addition, it is important to note that the capital fund contributions each year are assumed to rise at the assumed rate of inflation. Failure to raise the annual contributions with inflation will reduce the closing balance. We recommend that the Association review this Capital Reserve Study with their Certified Public Accountant to be utilized in the preparation of their annual budget. Component Narrative Architectural ALUMINUM GUTTERS Aluminum gutters are provided for the low slope roof drainage. Additional gutters are found on the cabanas. This component is 3 years old and we estimate a remaining useful life of 17 years. BALCONY/WALKWAY RAILINGS The balcony railings are PVC. We are estimating that these railings will need to be replaced in approximately 27 years. CABANA, ROOF SHINGLES The fiberglass reinforced asphalt roof shingles on the cabanas are original to the construction. This component is 3 years old and we estimate a remaining useful life of 27 years. FIBERGLASS BALCONIES/WALKWAYS The fiberglass coating on the balconies and walkways will need to be refinished in approximately 27 years. Our estimate is based on the removal of the fiberglass and sheathing and their replacement with comparable materials. FLAT ROOF- The main roof on the building consists of a single ply modified bitumen membrane with a reflective type coating. All of the penetrations through the roof were recently reflashed due to a poor original installation. We do not expect that this roof will reach its full expected life cycle. We are estimating this roof will need to be replaced in approximately 12 years. MANSARD ROOF SHINGLES Installation issues are also a factor in the reduced service life for the mansard roof shingles. We did observe areas on the roof where shingles had already blown off. This component is 3 years old and we estimate a remaining useful life of 12 years. ROOF RAILING The roof railing was recently reinstalled to make it more secure. The railing will need to be removed and reinstalled when the roof is next replaced. We are estimating a remaining useful life of 27 years for this item. 7 TOTAL SYSTEMS ENGINEERING SERVICE

10 VINYL SIDING We have included line items for the two types of vinyl siding installed on the building: horizontal lap siding and molded cedar panels. The vinyl siding should be expected to last approximately 40 years with maintenance. Over time when individual panels break or become detached, it becomes difficult to match siding products. It should be expected that the Association will need to replace the exterior siding in the future. This component is 3 years old and we estimate a remaining useful life of 37 years. Electrical BALCONY LIGHTS This line item is for the light fixtures provided at each balcony. This component is 3 years old and we estimate a remaining useful life of 17 years. ELEVATOR OVERHAUL A line item has been included for the overhaul of the hydraulic elevator. Typically, elevators don t get completely replaced but rather modernized and overhauled. This component is 3 years old and we estimate a remaining useful life of 22 years. EMERGENCY LIGHTING/EXIT There are exit and emergency light fixtures throughout the building including the stairwells. These fixtures have an expected life of 20 years. EXT.LIGHT FIXTURES,BLDG This line item is for exterior light fixtures on the building. These fixtures have an expected remaining life of 17 years. GARAGE LIGHTS, LARGE- The parking garage has light fixtures on the ceiling. This component is 3 years old and we estimate a remaining useful life of 17 years. POOL LIGHTS There are pole mounted lights located in the pool area. This component is 3 years old and we estimate a remaining useful life of 17 years. WALKWAY LIGHTS This line item is for the lights found in the common walkway areas. This component is 3 years old and we estimate a remaining useful life of 17 years. Mechanical FIRE SPRINKLER HEADS We have included a line item to replace the sprinkler heads located in the common areas of the building, including the garage and storage areas. In a salt water environment we expect these polyester coated heads will need to be replaced within the next 27 years. The heads should be replaced with a stainless steel type head. 8 TOTAL SYSTEMS ENGINEERING SERVICE

11 POOL HEATER and FILTER Line items have been provided for the filter systems and heaters for both the pool and spa. This component is 3 years old and we estimate a remaining useful life of 17 years. PTAC WALL UNIT, CABANA A PTAC air conditioning unit has been provided to one of the cabanas. This component is 3 years old and we estimate a remaining useful life of 17 years. Site CONCRETE DRIVEWAY There are two concrete driveways that lead to the parking garage. This component is 3 years old and we estimate a remaining useful life of 27 years. CONCRETE GARAGE We have included the concrete pavement found in the open air garage. As most of the concrete is not directly exposed to the elements, we have provided for a longer expected service life. This component is 3 years old and we estimate a remaining useful life of 37 years. CONCRETE SIDEWALKS There are concrete sidewalks around the building and leading into the pool area. This component is 3 years old and we estimate a remaining useful life of 27 years. POOL A line item has been included for the pool. In the future the pool may be recoated, relined or replaced. This component is 3 years old and we estimate a remaining useful life of 17 years. POOL APRON This line item is for the concrete found around the pool. This component is 3 years old and we estimate a remaining useful life of 27 years. POOL FENCE A PVC picket style fence has been installed around the pool area. This component is 3 years old and we estimate a remaining useful life of 27 years. SPA A line item has been included for the recoating of the existing spa in the pool area. STOCKADE FENCE, VINYL, 5 FT-This component is 3 years old and we estimate a remaining useful life of 27 years. Miscellaneous COMMUNITY SIGN A community identification sign is found at the front of the property. This component is 3 years old and we estimate a remaining useful life of 22 years. 9 TOTAL SYSTEMS ENGINEERING SERVICE

12 GAZEBO There are two gazebos located in the pool area. These gazebos are constructed primarily of pressure treated wood. This component is 3 years old and we estimate a remaining useful life of 17 years. POOL FURNISHINGS This line item is for the various pool furnishings found at the pool area. Timothy P. Sullivan, RS Senior Project Manager CAI Reserve Specialist #27 March 29, TOTAL SYSTEMS ENGINEERING SERVICE

13 Capital Reserve Calculations TOTAL SYSTEMS ENGINEERING SERVICE

14 Reserve Summary Project Name: Project Location: Project Number: HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Month Contributions Commence: May 2013 RESERVES CONTRIBUTION Category Replacement Present Required Surplus Basic Cost Fund Fund (Deficit) Annual Adjustment* Total Architectural $517,653 $40,857 $104,312 ($63,455) $17,482 $4,256 $21,738 Electrical $50,125 $2,415 $6,165 ($3,750) $2,041 $180 $2,221 Mechanical $40,300 $1,869 $4,773 ($2,903) $1,580 $139 $1,719 Site $309,168 $10,536 $26,899 ($16,363) $8,923 $581 $9,504 Miscellaneous $14,200 $818 $2,088 ($1,270) $690 $77 $767 TOTALS $931,446 $56,494 $144,236 ($87,742) $30,716 $5,232 $35,948 FIRST YEAR CONTRIBUTION ADJUSTMENT CAN DIFFER EACH YEAR Thursday, March 07, 2013 Page A-1

15 Component Schedule Project Name: Project Location: Project Number: HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Est. Basic Description Replacement Present Rem. Typical Annual Percent Present Required Surplus Contrib. Cost Age Life Life Contrib. Total Fund Fund (Deficit) Adjustment Architectural ALUMINUM GUTTERS $2, $ % $110 $281 ($171) $9 BALCONY RAILINGS $15, $ % $557 $1,422 ($865) $29 CABANA, ROOF SHINGLES $2, $ % $92 $234 ($142) $5 FIBERGLASS BALCONIES $69, $2, % $2,499 $6,381 ($3,882) $132 FIBERGLASS WALKWAYS $75, $2, % $2,728 $6,966 ($4,238) $144 FLAT ROOF $174, $8, % $26,063 $66,541 ($40,478) $3,212 LEADERS $1, $ % $48 $122 ($74) $3 MANSARD ROOF SHINGLES $20, $ % $4,475 $11,425 ($6,950) $551 ROOF RAILING $6, $ % $218 $557 ($339) $12 SIDING, CEDAR STYLE VINYL $75, $1, % $1,992 $5,086 ($3,094) $76 SIDING, HORIZONTAL $66, $1, % $1,771 $4,522 ($2,751) $67 WALKWAY RAILINGS $8, $ % $303 $773 ($471) $16 Electrical BALCONY LIGHTS $2, $ % $132 $338 ($205) $11 ELEVATOR OVERHAUL $30, $1, % $1,306 $3,334 ($2,028) $85 EMERGENCY LIGHTING/EXIT $9, $ % $496 $1,266 ($770) $42 EXT.LIGHT FIXTURES,BLDG $1, $ % $55 $141 ($86) $5 GARAGE LIGHTS, LARGE $1, $ % $106 $271 ($165) $9 POOL LIGHTS $1, $ % $72 $183 ($111) $6 WALKWAY LIGHTS $4, $ % $248 $633 ($385) $21 Mechanical FIRE SPRINKLER HEADS $18, $ % $657 $1,678 ($1,021) $35 POOL HEATER $7, $ % $386 $985 ($599) $33 POOL/SPA FILTER SYSTEM $5, $ % $303 $774 ($471) $26 PTAC WALL UNIT, CABANA $2, $ % $138 $352 ($214) $12 SPA HEATER $7, $ % $386 $985 ($599) $33 Thursday, March 07, 2013 Page A-2

16 Component Schedule Project Name: Project Location: Project Number: HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Est. Basic Description Replacement Present Rem. Typical Annual Percent Present Required Surplus Contrib. Cost Age Life Life Contrib. Total Fund Fund (Deficit) Adjustment Site CONCRETE DRIVEWAY $6, $ % $248 $633 ($385) $13 CONCRETE GARAGE $160, $3, % $4,263 $10,884 ($6,621) $162 CONCRETE SIDEWALKS $45, $1, % $1,637 $4,179 ($2,542) $86 POOL $44, $2, % $2,428 $6,198 ($3,771) $208 POOL APRON $24, $ % $871 $2,223 ($1,352) $46 POOL FENCE $10, $ % $362 $924 ($562) $19 SPA $4, $ % $254 $648 ($394) $22 STOCKADE FENCE, VINYL, 5 FT $13, $ % $474 $1,210 ($736) $25 Miscellaneous COMMUNITY SIGN $2, $ % $87 $222 ($135) $6 GAZEBO $9, $ % $507 $1,294 ($787) $43 POOL FURNISHINGS $3, $ % $224 $571 ($348) $28 TOTALS $931,446 $30, % $56,494 $144,236 ($87,742) $5,232 General Notes: None Thursday, March 07, 2013 Page A-3

17 Component Detail Project Name: HIALEAH CONDOMINIUM Project Location: WILDWOOD CREST, NEW JERSEY Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Architectural RESERVES CONTRIBUTION Replacement Present Required Surplus Basic Quantity Cost Fund Fund (Deficit) Annual Total ALUMINUM GUTTERS 250 LF $2,000 $110 $281 ($171) $93 $102 BALCONY RAILINGS 408 LF $15,504 $557 $1,422 ($865) $471 $501 CABANA, ROOF SHINGLES 850 SF $2,550 $92 $234 ($142) $78 $82 FIBERGLASS BALCONIES 2,784 SF $69,600 $2,499 $6,381 ($3,882) $2,117 $2,248 FIBERGLASS WALKWAYS 3,039 SF $75,975 $2,728 $6,966 ($4,238) $2,310 $2,454 FLAT ROOF 14,560 SF $174,720 $26,063 $66,541 ($40,478) $8,129 $11,340 LEADERS 110 LF $1,100 $48 $122 ($74) $40 $44 MANSARD ROOF SHINGLES 2,000 SF $20,000 $4,475 $11,425 ($6,950) $608 $1,160 ROOF RAILING 160 LF $6,080 $218 $557 ($339) $185 $196 SIDING, CEDAR STYLE VINYL 7,500 SF $75,000 $1,992 $5,086 ($3,094) $1,691 $1,766 SIDING, HORIZONTAL 10,670 SF $66,688 $1,771 $4,522 ($2,751) $1,503 $1,570 WALKWAY RAILINGS 222 LF $8,436 $303 $773 ($471) $257 $273 TOTALS $517,653 $40,857 $104,312 ($63,455) $17,482 $21,738 Thursday, March 07, 2013 Page A-4

18 Component Detail Project Name: HIALEAH CONDOMINIUM Project Location: WILDWOOD CREST, NEW JERSEY Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Electrical RESERVES CONTRIBUTION Replacement Present Required Surplus Basic Quantity Cost Fund Fund (Deficit) Annual Total BALCONY LIGHTS 24 EA $2,400 $132 $338 ($205) $112 $123 ELEVATOR OVERHAUL 1 LS $30,000 $1,306 $3,334 ($2,028) $1,104 $1,190 EMERGENCY LIGHTING/EXIT 30 EA $9,000 $496 $1,266 ($770) $419 $461 EXT.LIGHT FIXTURES,BLDG 8 EA $1,000 $55 $141 ($86) $47 $51 GARAGE LIGHTS, LARGE 7 EA $1,925 $106 $271 ($165) $90 $99 POOL LIGHTS 2 EA $1,300 $72 $183 ($111) $60 $67 WALKWAY LIGHTS 36 EA $4,500 $248 $633 ($385) $209 $231 TOTALS $50,125 $2,415 $6,165 ($3,750) $2,041 $2,221 Thursday, March 07, 2013 Page A-5

19 Component Detail Project Name: HIALEAH CONDOMINIUM Project Location: WILDWOOD CREST, NEW JERSEY Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Mechanical RESERVES CONTRIBUTION Replacement Present Required Surplus Basic Quantity Cost Fund Fund (Deficit) Annual Total FIRE SPRINKLER HEADS 183 EA $18,300 $657 $1,678 ($1,021) $557 $591 POOL HEATER 1 EA $7,000 $386 $985 ($599) $326 $359 POOL/SPA FILTER SYSTEM 1 LS $5,500 $303 $774 ($471) $256 $282 PTAC WALL UNIT, CABANA 1 EA $2,500 $138 $352 ($214) $116 $128 SPA HEATER 1 EA $7,000 $386 $985 ($599) $326 $359 TOTALS $40,300 $1,869 $4,773 ($2,903) $1,580 $1,719 Thursday, March 07, 2013 Page A-6

20 Component Detail Project Name: HIALEAH CONDOMINIUM Project Location: WILDWOOD CREST, NEW JERSEY Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Site RESERVES CONTRIBUTION Replacement Present Required Surplus Basic Quantity Cost Fund Fund (Deficit) Annual Total CONCRETE DRIVEWAY 690 SF $6,900 $248 $633 ($385) $210 $223 CONCRETE GARAGE 16,050 SF $160,500 $4,263 $10,884 ($6,621) $3,618 $3,780 CONCRETE SIDEWALKS 5,064 SF $45,576 $1,637 $4,179 ($2,542) $1,386 $1,472 POOL 612 SF $44,064 $2,428 $6,198 ($3,771) $2,050 $2,258 POOL APRON 2,020 SF $24,240 $871 $2,223 ($1,352) $737 $783 POOL FENCE 252 LF $10,080 $362 $924 ($562) $307 $326 SPA 64 SF $4,608 $254 $648 ($394) $214 $236 STOCKADE FENCE, VINYL, 5 FT 300 LF $13,200 $474 $1,210 ($736) $401 $426 TOTALS $309,168 $10,536 $26,899 ($16,363) $8,923 $9,504 Thursday, March 07, 2013 Page A-7

21 Component Detail Project Name: HIALEAH CONDOMINIUM Project Location: WILDWOOD CREST, NEW JERSEY Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Miscellaneous RESERVES CONTRIBUTION Replacement Present Required Surplus Basic Quantity Cost Fund Fund (Deficit) Annual Total COMMUNITY SIGN 1 EA $2,000 $87 $222 ($135) $74 $79 GAZEBO 2 EA $9,200 $507 $1,294 ($787) $428 $471 POOL FURNISHINGS 1 LS $3,000 $224 $571 ($348) $189 $216 TOTALS $14,200 $818 $2,088 ($1,270) $690 $767 Thursday, March 07, 2013 Page A-8

22 Disbursement Schedule Project Name: Project Location: Project Number: HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Future Replacement Year Description Base Cost Cost FLAT ROOF $174,720 $208,898 MANSARD ROOF SHINGLES $20,000 $23,912 POOL FURNISHINGS $3,000 $3,587 $197,720 $236,398 ALUMINUM GUTTERS $2,000 $2,576 BALCONY LIGHTS $2,400 $3,091 EMERGENCY LIGHTING/EXIT $9,000 $11,592 EXT.LIGHT FIXTURES,BLDG $1,000 $1,288 GARAGE LIGHTS, LARGE $1,925 $2,479 GAZEBO $9,200 $11,850 POOL $44,064 $56,755 POOL HEATER $7,000 $9,016 POOL LIGHTS $1,300 $1,674 POOL/SPA FILTER SYSTEM $5,500 $7,084 PTAC WALL UNIT, CABANA $2,500 $3,220 SPA $4,608 $5,935 SPA HEATER $7,000 $9,016 WALKWAY LIGHTS $4,500 $5,796 $101,997 $131,374 COMMUNITY SIGN $2,000 $2,775 ELEVATOR OVERHAUL $30,000 $41,627 LEADERS $1,100 $1,526 $33,100 $45,928 BALCONY RAILINGS $15,504 $23,175 CABANA, ROOF SHINGLES $2,550 $3,812 CONCRETE DRIVEWAY $6,900 $10,314 CONCRETE SIDEWALKS $45,576 $68,127 FIBERGLASS BALCONIES $69,600 $104,038 Thursday, March 07, 2013 Page A-9

23 Disbursement Schedule Project Name: Project Location: Project Number: HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Future Replacement Year Description Base Cost Cost 2050 FIBERGLASS WALKWAYS $75,975 $113,567 FIRE SPRINKLER HEADS $18,300 $27,355 POOL APRON $24,240 $36,234 POOL FENCE $10,080 $15,068 POOL FURNISHINGS $3,000 $4,484 ROOF RAILING $6,080 $9,088 STOCKADE FENCE, VINYL, 5 FT $13,200 $19,731 WALKWAY RAILINGS $8,436 $12,610 $299,441 $447,604 CONCRETE GARAGE $160,500 $278,432 SIDING, CEDAR STYLE VINYL $75,000 $130,108 SIDING, HORIZONTAL $66,688 $115,689 $302,188 $524,229 Thursday, March 07, 2013 Page A-10

24 Reserve Fund Scenario Project Name: HIALEAH CONDOMINIUM Calculation Method: Component Project Location: Project Number: WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Month Contributions Commence: May 2013 Opening Annual Contribution Earned Closing Year Balance Contribution Adjustment Disbursements Interest Balance 2013 $56,494 $20,477 $5,232 $0 $882 $83, $83,086 $31,177 $5,311 $0 $2,058 $121, $121,632 $31,644 $5,391 $0 $2,833 $161, $161,500 $32,119 $5,471 $0 $3,637 $202, $202,727 $32,601 $5,553 $0 $4,467 $245, $245,348 $33,090 $5,637 $0 $5,326 $289, $289,401 $33,586 $5,721 $0 $6,214 $334, $334,923 $34,090 $5,807 $0 $7,131 $381, $381,951 $34,601 $5,894 $0 $8,077 $430, $430,524 $35,120 $5,983 $0 $9,055 $480, $480,682 $35,647 $6,072 $0 $10,066 $532, $532,468 $36,182 $6,164 $0 $11,108 $585, $585,921 $36,725 $1,724 $236,398 $12,136 $400, $400,107 $37,275 $1,750 $0 $8,425 $447, $447,557 $37,835 $1,776 $0 $9,378 $496, $496,546 $38,402 $1,803 $0 $10,367 $547, $547,118 $38,978 $1,830 $0 $11,386 $599, $599,312 $39,563 $1,237 $131,374 $12,430 $521, $521,168 $40,156 $1,255 $0 $10,872 $573, $573,452 $40,759 $1,274 $0 $11,924 $627, $627,409 $41,370 $1,293 $0 $13,010 $683, $683,082 $41,991 $1,313 $0 $14,134 $740, $740,519 $42,620 $1,202 $45,928 $15,285 $753, $753,698 $43,260 $1,220 $0 $15,556 $813, $813,733 $43,909 $1,238 $0 $16,763 $875, $875,643 $44,567 $1,257 $0 $18,009 $939, $939,476 $45,236 $1,275 $0 $19,293 $1,005, $1,005,280 $45,914 $455 $447,604 $20,608 $624, $624,654 $46,603 $462 $0 $13,003 $684, $684,722 $47,302 $469 $0 $14,212 $746, $746,705 $48,012 $476 $0 $15,459 $810,652 Thursday, March 07, 2013 Page A-11

25 Reserve Fund Scenario Project Name: HIALEAH CONDOMINIUM Calculation Method: 5% of Repl. Cost Project Location: WILDWOOD CREST, NEW JERSEY Minimum Balance $46,572 Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Month Contributions Commence: May 2013 Opening Annual Contribution Earned Closing Year Balance Contribution Adjustment Disbursements Interest Balance 2013 $56,494 $13,814 $0 $0 $822 $71, $71,130 $21,032 $0 $0 $1,650 $93, $93,813 $21,347 $0 $0 $2,108 $117, $117,268 $21,668 $0 $0 $2,580 $141, $141,515 $21,993 $0 $0 $3,069 $166, $166,576 $22,322 $0 $0 $3,573 $192, $192,472 $22,657 $0 $0 $4,095 $219, $219,224 $22,997 $0 $0 $4,634 $246, $246,855 $23,342 $0 $0 $5,190 $275, $275,387 $23,692 $0 $0 $5,764 $304, $304,844 $24,048 $0 $0 $6,357 $335, $335,249 $24,408 $0 $0 $6,969 $366, $366,626 $24,774 $0 $236,398 $7,601 $162, $162,604 $25,146 $0 $0 $3,524 $191, $191,275 $25,523 $0 $0 $4,102 $220, $220,900 $25,906 $0 $0 $4,699 $251, $251,505 $26,295 $0 $0 $5,315 $283, $283,114 $26,689 $0 $131,374 $5,951 $184, $184,381 $27,089 $0 $0 $3,981 $215, $215,451 $27,496 $0 $0 $4,607 $247, $247,554 $27,908 $0 $0 $5,253 $280, $280,716 $28,327 $0 $0 $5,921 $314, $314,964 $28,752 $0 $45,928 $6,611 $304, $304,398 $29,183 $0 $0 $6,404 $339, $339,985 $29,621 $0 $0 $7,121 $376, $376,726 $30,065 $0 $0 $7,860 $414, $414,652 $30,516 $0 $0 $8,624 $453, $453,791 $30,974 $0 $447,604 $9,411 $46, $46,572 $31,438 $0 $0 $1,272 $79, $79,283 $31,910 $0 $0 $1,931 $113, $113,124 $32,389 $0 $0 $2,613 $148,126 Thursday, March 07, 2013 Page A-12

26 Reserve Fund Scenario Project Name: HIALEAH CONDOMINIUM Calculation Method: 10% of Repl. Cost Project Location: WILDWOOD CREST, NEW JERSEY Minimum Balance $93,145 Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% Month Contributions Commence: May 2013 Opening Annual Contribution Earned Closing Year Balance Contribution Adjustment Disbursements Interest Balance 2013 $56,494 $35,718 $0 $0 $932 $93, $93,144 $54,381 $0 $0 $2,452 $149, $149,977 $55,197 $0 $0 $3,598 $208, $208,772 $56,025 $0 $0 $4,782 $269, $269,579 $56,865 $0 $0 $6,008 $332, $332,452 $57,718 $0 $0 $7,274 $397, $397,444 $58,584 $0 $0 $8,584 $464, $464,612 $59,463 $0 $0 $9,936 $534, $534,011 $60,355 $0 $0 $11,334 $605, $605,700 $61,260 $0 $0 $12,778 $679, $679,737 $62,179 $0 $0 $14,268 $756, $756,185 $63,112 $0 $0 $15,807 $835, $835,104 $64,058 $0 $236,398 $17,396 $680, $680,160 $65,019 $0 $0 $14,308 $759, $759,487 $65,994 $0 $0 $15,905 $841, $841,386 $66,984 $0 $0 $17,553 $925, $925,924 $67,989 $0 $0 $19,255 $1,013, $1,013,168 $69,009 $0 $131,374 $21,011 $971, $971,813 $70,044 $0 $0 $20,195 $1,062, $1,062,053 $71,095 $0 $0 $22,011 $1,155, $1,155,159 $72,161 $0 $0 $23,885 $1,251, $1,251,205 $73,244 $0 $0 $25,818 $1,350, $1,350,266 $74,342 $0 $45,928 $27,811 $1,406, $1,406,490 $75,457 $0 $0 $28,947 $1,510, $1,510,895 $76,589 $0 $0 $31,048 $1,618, $1,618,532 $77,738 $0 $0 $33,213 $1,729, $1,729,482 $78,904 $0 $0 $35,444 $1,843, $1,843,831 $80,088 $0 $447,604 $37,744 $1,514, $1,514,058 $81,289 $0 $0 $31,162 $1,626, $1,626,509 $82,508 $0 $0 $33,424 $1,742, $1,742,442 $83,746 $0 $0 $35,756 $1,861,944 Thursday, March 07, 2013 Page A-13

27 Present Fund By Category Project Name: Project Location: Project Number: HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% 18.6% 3.3% 1.4% 4.3% 72.3% Architectural Electrical Mechanical Miscellaneous Site Thursday, March 07, 2013 Page A-14

28 Current Replacement Cost by Category Project Name: Project Location: Project Number: HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% 33.2% 55.6% 1.5% 4.3% 5.4% Architectural Electrical Mechanical Miscellaneous Site Thursday, March 07, 2013 Page A-15

29 Annual Contribution by Category Project Name: Project Location: Project Number: HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% 29.1% 2.2% 5.1% 6.6% 56.9% Architectural Electrical Mechanical Miscellaneous Site Thursday, March 07, 2013 Page A-16

30 Disbursements by Year HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Name: Project Location: Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% $500,000 $450,000 $400,000 $350,000 $300,000 $250,000 $200,000 $150,000 $100,000 $50,000 $ Thursday, March 07, 2013 Page A-17

31 Reserve Fund Closing Balance Component vs. Cash Flow Project Name: HIALEAH CONDOMINIUM Project Location: WILDWOOD CREST, NEW JERSEY Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% $2,000,000 $1,800,000 $1,600,000 $1,400,000 $1,200,000 $1,000,000 $800,000 $600,000 $400,000 $200,000 $ Component Method 5% Threshold Method 10% Threshold Method Thursday, March 07, 2013 Page A-18

32 Reserve Fund Contributions Component vs. Cash Flow Project Name: HIALEAH CONDOMINIUM Project Location: WILDWOOD CREST, NEW JERSEY Project Number: Interest Rate: 2.00% Date of Study: April 2013 Inflation Rate: 1.50% $90,000 $80,000 $70,000 $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $ Component Method 5% Threshold Method 10% Threshold Method Thursday, March 07, 2013 Page A-19

33 Appendix TOTAL SYSTEMS ENGINEERING SERVICE

34 Definitions Base Cost - See definition "Current Replacement Cost Allowance". This calculation, based on current costs, is increased according to the assumed rates of inflation in the "Disbursement Schedule". Basic Annual Contribution - This is the amount that should have been contributed each year, while considering assumed rates of interest and inflation, to accumulate a reserve equal to the Current Replacement Cost Allowance at the anticipated replacement time (end-of-life). Contribution Adjustment - If the capital reserve fund for a component is not fully funded, this is the increase in annual contributions that would be required to fully fund the reserve before the estimated end-of-life. If the capital reserve fund for a component is over-funded, this is the decrease in annual contributions that would offset the over-funded condition. Contribution, Total - This is the recommended Basic Annual Contribution plus the "Annual Make-Up" (see definition) required to make up for past underfunding before replacement of the component is estimated to be required. The amount can decrease in future years because the required Annual Make-Up decreases each year in which a reserve fund for a capital component is fully funded. Current Replacement Cost - The cost to replace the component at the time of this Study. Estimated Remaining Life - The anticipated number of years before replacement of this component can be expected to be necessary. This is based on the normal life, the current age, and an engineering assessment that considers site-specific conditions. Deficit - This shows the amount that the Present Fund is undercapitalized. It is the present fund minus the Required Fund. A positive number (surplus) means excess cash reserves have been set aside to date. A negative number indicates a deficit in the Present Fund; this underfunding can be made up in one of two ways: 1) an increase in the annual fees to catch up or, 2) a special assessment between now and when the component requires replacement. This Study assumes the second method is used and recommends annual makeup on that basis. Interest - Interest accumulated on the capital reserve fund deposit based on the assumed interest rate listed at the top of the "Projected Cash Flow" pages. Inflation The increased cost of future replacement expenditures are based on an assumed rate of inflation. Opening Balance - On the "Projected Cash Flow" pages, this is the reported total reserve fund on deposit for the condominium Association. TOTAL SYSTEMS ENGINEERING SERVICE

35 Percentage Of Total - Percent of total recommended Basic Annual Contribution. This shows the significance of specific components relative to required contributions to the capital reserve fund. Present Age - Age of the component at the time of this Study. Present Fund - Present funds set aside for capital component replacement at this time. If present fund are not reserved for specific components but are an unallocated pool, the total present fund is allocated between the components according to the Percentage Of Total column. Required Fund - this amount should have been set aside for each component in the fund to be considered fully funded. Surplus - This shows the amount that the Present Fund is overcapitalized. It is the present fund minus the Required Fund. A positive number (surplus) means excess cash reserves have been set aside to date. Typical Life - The anticipated number of years that a component may be expected to provide adequate service. Please note that this is based on industry standards. A component may outlive, or require replacement prior to, its typical life. Abbreviations: EA - Each LF - Linear Foot LS - Lump Sum SF - Square Foot SY - Square Yard TOTAL SYSTEMS ENGINEERING SERVICE

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland CAPITAL RESERVE STUDY FOR THE Ellicott Meadows Condominium Association I Ellicott City, Maryland Contact Name: Victor Brzozowski Date: October 3, 2017 Table of Contents Section Name Section # Executive

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp.

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp. CAPITAL RESERVE STUDY FOR THE Providence Corner Upper Providence Twp. Management Company: The Galman Group Contact Name: Ms. Debra Lynch Date: September 28, 2016 Table of Contents Section Name Section

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM WOODBRIDGE CONDOMINIUM REPLACEMENT RESERVE REPORT FY 2015 Community Management by: CHESAPEAKE BAY MANAGEMENT Ms. Kimberly Marston 100 Volvo Parkway,

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

TIMBERLAKE COMMUNITY ASSOCIATION

TIMBERLAKE COMMUNITY ASSOCIATION TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 Community Management by: Mr. Phil Massa, AMS, PCAM 933 Windsor Oaks

More information

FIR RIDGE II CONDOMINIUM

FIR RIDGE II CONDOMINIUM FIR RIDGE II CONDOMINIUM BELLINGHAM, WASHINGTON UPDATE WITHOUT SITE VISIT FEBRUARY 2014 FOR USE WITH THE FEBRUARY 2012 RESERVE STUDY PREPARED BY: DENISE DANA, RESERVE SPECIALIST M. ARCH, REGISTERED ARCHITECT

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc.

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc. Insurance Appraisals Reserve Studies Wind Mitigation RESERVE STUDY LEVEL I - Full Reserve Study Prepared for: ABC Condominium Association, Inc. For the period of January 1, 214 - December 31, 214 71 Enterprise

More information

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions 1 Organization: Highlands Condominium Association 2 Address: Spokane, WA 3 Number of Units 46

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

RESERVE STUDY. The cost of replacement should be high enough to make it financially unsound to fund it from the operating budget.

RESERVE STUDY. The cost of replacement should be high enough to make it financially unsound to fund it from the operating budget. THE Page 2 Introduction RESERVE STUDY A Reserve Study is a report giving an estimate of the amount of money which must be put aside to replace the major items (or building components) that will wear out

More information

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL 60657 Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the.

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

CAPE GEORGE COLONY CLUB MARINA RESERVES

CAPE GEORGE COLONY CLUB MARINA RESERVES CAPE GEORGE COLONY CLUB MARINA RESERVES Port Townsend, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next

More information

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES Community Management by: ROCKTOWN REALTY Bernard Hamann 218 Market Street Harrisonburg, VA 22801 40-70-7080

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Threshold (Min Balance): $ 10,400,000 Indexed for projected

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Reserve Studies Turnover Reports Insurance Appraisals

Reserve Studies Turnover Reports Insurance Appraisals Reserve Studies Turnover Reports Insurance Appraisals Dear Board Members, Managers and Unit Owners, For twenty years we having been serving community associations throughout Florida and the Southeast United

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017 Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY Section Page RESERVE STUDY EXECUTIVE SUMMARY 1-2 ASSESSMENT AND RESERVE FUNDING 3 DISCLOSURE SUMMARY (These 3 pages should be

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Villa Marina 17104 NE 45 th Street, Redmond, WA 98053 For: Villa Marina Association of Apartment Owners c/o Sacha Copeland The Copeland Group, LLC 221 First Ave W, Suite 105

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Full Reserve Study. Sample Hawaii AOAO. Kauai, HI. Report #: HI For Period Beginning: January 1, 2007 Ending: December 31, 2007

Full Reserve Study. Sample Hawaii AOAO. Kauai, HI. Report #: HI For Period Beginning: January 1, 2007 Ending: December 31, 2007 Corporate Office P.O. Box 8637 Calabasas, CA 91372 TEL 800/733-1365 FAX 800/733-1581 www.reservestudy.com Local Offices Phoenix, AZ Huntington Beach, CA San Francisco, CA Denver, CO Honolulu, HI Las Vegas,

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND Community Management by: EVANS MILL POND, HOA Evans Mill Road McLean, Virginia 22101 Consultant: 929

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA

Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA Report #: 9999-0 DIY For Period Beginning: January 1, 2014 Ending: December 31, 2014 Date Prepared: October 22, 2013 Hello, and welcome

More information

GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION")

GARDEN ESTATES MAINTENANCE ASSOCIATION (CORPORATION) info@src-reservestudy.com 951-693-1721 GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION") Level 3 Reserve Study Update (No Site-Visit) Prepared For Fiscal Year 2016 1/26 Contents 1 Title Page 2 Table

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Sammamish Landing Condominiums 4214 West Lake Sammamish Parkway NE, Redmond, WA 98052 For: Sammamish Landing Homeowners Association c/o Scott McCue, Property Manager McCue &

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

Capital Reserve Replacement Fund Analysis for Rolling Hills Condominium Association Lafayette, New Jersey February 2016

Capital Reserve Replacement Fund Analysis for Rolling Hills Condominium Association Lafayette, New Jersey February 2016 Capital Reserve Replacement Fund Analysis for Rolling Hills Condominium Association Lafayette, New Jersey February 2016 prepared by: The Falcon Group Engineering, Architecture & Energy Consultants 682

More information

Mrs. Casey Davis Houston Community Management Services El Comino Real Houston, Texas 77058

Mrs. Casey Davis Houston Community Management Services El Comino Real Houston, Texas 77058 Mrs. Casey Davis Houston Community Management Services 7049 El Comino Real Houston, Texas 77058 Reference: Detailed Reserve Study Kipcon Dear Mrs. Davis: Attached please find Kipcon s Detailed Reserve

More information

"Full" Reserve Study. Makaha Surfside AOAO Waianae, HI

Full Reserve Study. Makaha Surfside AOAO Waianae, HI "Full" Reserve Study Makaha Surfside AOAO Waianae, HI Report #: For Period Beginning: Expires: Date Prepared: 32902-0 January 1, 2018 December 31, 2018 May 9, 2018 T W Hello, and welcome to your Reserve

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Smoky Ridge 19902 E Red Fox Ln Centennial, CO Level I Study with Site Inspection Fiscal Year End Date: 12/31/2017 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

Belle Monet. Full Reserve Study Report by HOMECERTS.COM

Belle Monet. Full Reserve Study Report by HOMECERTS.COM Belle Monet Full Reserve Study Report by HOMECERTS.COM 800.683.5528 SUPPORT@HOMECERTS.COM Belle Monet Reserve Study Report as of June 5, 2015 538 South 2200 West Pleasant Grove, UT 84062 168 Units Completed

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

UPDATE - With Site Visit

UPDATE - With Site Visit SAMPLE Reserve Study UPDATE - With Site Visit Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property.

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2014 December 31, 2014 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: January 1, 2014 Copyright

More information

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus Dashboard

More information

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File #

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # A FULL RESERVE STUDY FOR Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # 22920-04030 FOR PERIOD: January 1, 2017 December 31, 2017 PREPARED BY GAB ROBINS,

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE