RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

Size: px
Start display at page:

Download "RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008 TO THE REPUBLIC OF INDONESIA June 22, 2011 Report No:

2 ABBREVIATIONS AND ACRONYMS CO 2 DGESGWM DGMCG DGNREEC GEF MEMR WB Carbon dioxide Directorate for Geothermal Enterprise Supervision and Groundwater Management Directorate General for Mineral, Coal and Geothermal Directorate General for New and Renewable Energy and Energy Conservation Global Environment Facility Ministry of Energy and Mineral Resources World Bank Regional Vice President: Country Director: Sector Manager / Director: Task Team Leader: James W. Adams Stefan G. Koeberle Franz R. Drees-Gross Migara Jayawardena 2

3 INDONESIA GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT P CONTENTS Page A. SUMMARY... 4 B. PROJECT STATUS... 4 C. PROPOSED CHANGES... 6 ANNEX 3: EXTENSION OF CLOSING DATE

4 INDONESIA GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT SUMMARY RESTRUCTURING PAPER 1. This restructuring paper is in response to a request by the Government of the Republic of Indonesia (GoI) made through a letter dated June 14, 2011, from the Ministry of Finance. The letter and the associated detailed Action Plan, request the extension of closing date of the GEF Grant from June 30, 2011 to June 30, 2013 for the Geothermal Power Generation Development Project. 2. Approval for the proposed extension of closing date is sought from the Regional Vice President since, although it is the first extension of the project, it covers a period of two years. 3. Details of the proposed extension are discussed in Annex 1. PROJECT STATUS 4. Background. The project, approved by the World Bank s Board of Executive Directors on May 29, 2008, was designed to support the policy and institutional reforms in order to promote the expansion of economic and environmentally friendly geothermal power generation in Indonesia and reduce CO 2 emissions from the power system. Following the realization of effectiveness conditions, the Project was declared effective on October 16, The project comprises the following components. (a) Component 1: Policy Framework for Scaling-up the Development of Geothermal Power (b) Component 2: Transactions Management for Mobilizing Investments in Geothermal Power Generation (c) Component 3: Geothermal Sector Technical Capacity Building (d) Component 4: Project Management Assistance Summary of Implementation Progress. Due to initial delays and management challenges faced by the project, the project implementation rating is marginally unsatisfactory. However, given the progress made in terms of sector development and the scale-up in project activities in support of the reforms, project can achieve its objectives with the extension proposed through this restructuring paper, 6. As of April 30, 2011, the Grant had disbursed US$ 0.55 million (15 percent of the total Grant amount) and commitments had reached US$ 1.6 million (40 percent of the total Grant amount). 4

5 7. At project outset, delays were experienced with respect to the completion of internal government procedures for activation of the Special Account, and the procurement process for the selection of consultants for key activities, particularly to develop a pricing policy to address incremental costs (pricing consultants) and to design and prepare for geothermal investment transactions (transaction consultants). 8. In order to compensate for these delays in completion of the required processes, the World Bank task team became actively involved in supporting the Ministry of Energy and Mineral Resources (MEMR) and organized workshops and seminars to make progress with capacity building activities on pricing, incentive mechanisms and transaction. In order to be able to respond to the government s priority needs, the Bank mobilized funding resources outside the project to carry out a study 1 focusing on geothermal resource risks in Indonesia. This analysis will inform further project activities related to geothermal resource risks. 9. Project activities have picked up considerably over the past year. MEMR mobilized consultants under the project to carry out two key activities focusing on the removal of major barriers related to pricing and transactions involving geothermal power development in Indonesia. Since project inception, existing geothermal developers have added 220 MW of geothermal capacity. Furthermore, with the assistance of the project and the World Bank, six power purchase agreements were signed between PLN, the national power company, and state-owned geothermal developer, Pertamina Geothermal Energy (PGE). Since the consultants were mobilized under the project, they have played an important role in undertaking the urgent tasks of reviewing the existing policies and embarked upon an intensive work plan as envisaged by the GEF Project design. This has included advisory support to the GoI in general, and MEMR in particular, for mobilizing investments in the sector. The consultants have delivered draft reports to MEMR, and consultation workshops to obtain feedback on the reports were organized. Their recommendations are currently under review by MEMR, and it has become evident that additional time is required to implement GOI decisions. 10. The scopes of some studies under the project were also slightly modified during supervision as a result of findings of scoping studies and in order to reflect evolving priorities in the sector due to ongoing developments on the ground. For example, as a means of resource risk mitigation, MEMR recently decided to upgrade data quality and provide independent validation of resource information for a selected field proposed for competitive tendering under the project. 11. As a part of the effort to mainstream renewable energy, including geothermal, the GoI has established a dedicated Directorate General for New and Renewable Energy and Energy Conservation (DGNREEC) in MEMR. In line with this new institutional arrangement, the Directorate for Geothermal Enterprise Supervision and Groundwater Management (DGESGWM), which was the designated implementing department for the project, has been renamed as the Directorate for Geothermal and relocated under DGNREEC. The Project Implementation Unit (PIU) is under the Directorate of Geothermal. 1 An Assessment of Geothermal Resource Risks in Indonesia, Private Participation in Infrastructure Advisory Facility (PPIAF), The World Bank,

6 12. MEMR has faced some challenges in managing the project due to a lack of familiarity with World Bank procedures, changes in personnel, and the recent institutional restructuring at MEMR. As a result, there is room for improvement with regards to procurement and financial management. The financial management of the grant is rated moderately unsatisfactory in the latest supervision mainly due to non submission of interim financial reports (IFRs), lack of withdrawal applications submitted for disbursement, delays in budget availability and weaknesses identified in transaction review. However, following Bank provided training, the IFRs have now been submitted. A withdrawal application for disbursement has also been submitted to MOF, and the audit by BPKP has been carried out. The budget issues are being dealt with and the task team is working with MEMR to address the documentation issues identified in the transaction review. The task team has agreed with MEMR on remedial actions and training opportunities to address these project management shortcomings in order to improve implementation going forward. 13. Despite the challenges faced by the project, MEMR has reaffirmed that the project in general, and the activities focusing on pricing and transactions for geothermal power generation in particular, continue to make a critical contribution to the government s effort to remove the major barriers facing geothermal energy scale-up in Indonesia. Furthermore, the project remains relevant to the achievement of the country s development goals, particularly in light of the significance of geothermal energy in the country s power generation expansion program. 14. Action Plan for Project Implementation. Despite progress made by MEMR thus far, the major barriers related to pricing and transactions still exist. Therefore, an assessment undertaken by MEMR confirmed that the project continues to contribute to realizing the government s objectives for geothermal energy. As part of this effort, the MEMR prepared an Action Plan in consultation with the Bank, which forms the basis for the proposed extension of grant closing date. 15. The Action Plan, which is available in project files, envisages adjustments to implementation of individual activities, and proposes revisions to the scope of a select set of activities within existing project components, which are necessary to reflect the current development status in the sector and ensure continued alignment with the government s priorities. 16. According to the action plan, a total of US$ 654,850 in GEF funds will be freed up due to cost savings resulting from actual contract values under some activities being lower than originally envisaged, and revision of scope of some studies in order to better align with current priorities, or whose objectives have been met under other activities. MEMR will allocate the funds freed up towards other priority activities that reflect the recent progress in the geothermal energy sector in Indonesia. Specifically, MEMR intends to use US$ 600,000 of the remaining available funds for a study to upgrade and validate data for geothermal fields proposed for model project tendering under Component 2. Furthermore, the remaining US$ 54,850 will be directed towards strengthening the capacity of the project management unit in order to improve overall project implementation. 6

7 17. The reallocation of funds among individual activities within the project does not affect the allocation of Grant proceeds presented in Section IV, Part A, Paragraph 2 of the GEF Grant Agreement. 18. None of the changes in activity details or implementation arrangements impact the Project Development Objectives, or the expected outcomes of the individual activities. On the contrary, the Action Plan helps ensure that the project continues to meet the government s objectives. 19. The Action Plan also includes a revised implementation and disbursement schedule, which is presented in Paragraph 20 of this Paper. Accordingly, the procurement plan will be updated by MEMR and submitted to the Bank for review. PROPOSED CHANGE 20. Extension of closing date. The Government of Indonesia requests the extension of the project closing date, by two years, to June 30, This extension is necessary in order to compensate for initial delays and allow time for the completion of the critical activities under the project. Further details are available in Annex Implementation schedule. Consistent with the proposed extension of project closing date by two years, the following revised implementation schedule is envisaged for each component. 7

8 8

9 ANNEX 1: Extension of Closing Date INDONESIA GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF92324 P Restructuring Paper 1. The closing date for the Indonesia Geothermal Power Generation Development Project [GEF TF92324 P099757], will be extended from June 30, 2011 until June 30, As described in Section B of the main text of the Restructuring Paper, the project implementation progress is rated moderately satisfactory and with the proposed changes the project objectives continue to be achievable. 3. The proposed extension is necessary to compensate for initial delays in project implementation, and allow time for the completion of high priority activities under the following components: (i) Component 1: Policy Framework for Scaling up the Development of geothermal Power (ii) Component 2:Transaction Management for mobilizing Investments in Geothermal Power Generation 4. The Recipient has put in place a realistic Action Plan to ensure completion of the project by the revised closing date. The World Bank task team has reviewed the proposed action plan and has found it to be satisfactory. The action plan and implementation timeline are available in project files. 5. This will be the first extension of the project.

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 30244 Public Disclosure Authorized PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) ON A LOAN/GEF GRANT Public Disclosure

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

DIRECTIVE ON OPERATIONS PROCUREMENT A. OVERRIDING OBJECTIVE B. DEFINITIONS

DIRECTIVE ON OPERATIONS PROCUREMENT A. OVERRIDING OBJECTIVE B. DEFINITIONS DIRECTIVE ON OPERATIONS PROCUREMENT August 18, 2017 A. OVERRIDING OBJECTIVE 1. Purpose. The purpose of this Directive on Operations Procurement (Directive) is to enable the Bank s staff to implement the

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNANCE TECHNICAL ASSISTANCE PROJECT. Loan No. IDA 37570, P071063

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNANCE TECHNICAL ASSISTANCE PROJECT. Loan No. IDA 37570, P071063 Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 74602 - KG Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 59553-KH PROPOSED PROJECT

More information

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR)

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR) BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Federative Republic of Brazil Reporting Period: From 10/01/2015 to 09/30/2016 Report Date: 10/04/2016

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY

More information

The World Bank Kabeli-A Hydro Electric Project (P122406)

The World Bank Kabeli-A Hydro Electric Project (P122406) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF GRANT NUMBER TF092100 Public Disclosure Authorized Global Environment Facility Grant Agreement (Agricultural Development Program Support Project) Public

More information

The World Bank NEITI Reporting Compliance (P162344)

The World Bank NEITI Reporting Compliance (P162344) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice Public Disclosure Authorized 1. Project Data Report Number : ICRR0021284 Public Disclosure Authorized Public Disclosure Authorized Project ID P111577 Project Name ID-Local Government and Decentralization

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN WATER SUPPLY AND SANITATION PROJECT IBRD LOAN NO.

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN WATER SUPPLY AND SANITATION PROJECT IBRD LOAN NO. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FO OFFICIAL USE ONLY ESTUCTUING PAPE ON A POPOSED POJECT ESTUCTUING

More information

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMBODIA EDUCATION SECTOR SUPPORT SCALE UP ACTION PROGRAMME (TF092097)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMBODIA EDUCATION SECTOR SUPPORT SCALE UP ACTION PROGRAMME (TF092097) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020839 Public Disclosure Authorized Public Disclosure Authorized Project ID P108080 Project Name XK

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Benin 27 August 2015

Benin 27 August 2015 Benin 27 August 2015 PAGE 1 OF 6 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Benin Submission Date 27/08/2015 NDA or Focal Point Directorate

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

THE REPUBLIC OF UGANDA

THE REPUBLIC OF UGANDA THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE KAMPALA INSTITUTIONAL AND INFRASTRACTURE DEVELOPMENT PROJECT (KIIDP 2) IDA CREDIT NO. 53840 UG FOR THE FOURTEEN (14)

More information

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN UNITED NATIONS DEVELOPMENT PROGRAMME DESK REVIEW OF UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN Report No. 1310 Issue Date: 9 October 2014 Table of

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

1. Paragraph (D) of the Preamble to the GEF Grant Agreement is deleted and the succeeding paragraph re-numbered accordingly.

1. Paragraph (D) of the Preamble to the GEF Grant Agreement is deleted and the succeeding paragraph re-numbered accordingly. Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL DEVELOPMENT

More information

Clean Technology Fund Loan Agreement

Clean Technology Fund Loan Agreement Public Disclosure Authorized DOCNENUS CTF LOAN NUMBER TW0407-ID Public Disclosure Authorized Clean Technology Fund Loan Agreement (Geothermal Clean Energy Investment Project - Total Project Development

More information

Ministry of Finance Republic of the Marshall Islands. Consultant Recruitment Announcement SEDeP Project Manager

Ministry of Finance Republic of the Marshall Islands. Consultant Recruitment Announcement SEDeP Project Manager Ministry of Finance Republic of the Marshall Islands Consultant Recruitment Announcement SEDeP Project Manager Summary The RMI Ministry of Finance is inviting interested individuals for the SEDeP Project

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31013 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy EAST ASIA AND PACIFIC China Energy & Extractives Global Practice IBRD/IDA Financial Intermediary Loan FY 2008 Seq No: 11 ARCHIVED on 16-Dec-2015 ISR21909

More information

Investment criteria indicators

Investment criteria indicators Meeting of the Board 1 4 July 2018 Songdo, Incheon, Republic of Korea Provisional agenda item 14 GCF/B.20/Inf.14 8 June 2018 Investment criteria indicators Summary This document outlines the proposal by

More information

Central Finance and Contracting Unit Ministry of Finance of Albania. Capacity Building Support to Implement the Integrated Planning System (IPS)

Central Finance and Contracting Unit Ministry of Finance of Albania. Capacity Building Support to Implement the Integrated Planning System (IPS) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Central Finance and Contracting Unit Ministry of Finance of Albania Capacity Building Support to Implement the Integrated

More information

Competitive process for the selection of the Permanent Trustee

Competitive process for the selection of the Permanent Trustee Meeting of the Board 13 15 December 2016 Apia, Samoa Provisional agenda item 17 GCF/B.15/15/Rev.01 11 December 2016 Competitive process for the selection of the Permanent Trustee Summary This document

More information

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT PROPOSAL PAGE 1 OF 10 Country

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

PEOPLE S REPUBLIC OF CHINA

PEOPLE S REPUBLIC OF CHINA Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7529-CN Public Disclosure Authorized Loan Agreement (Energy Efficiency Financing Project) Public Disclosure Authorized between PEOPLE S REPUBLIC

More information

UNICEF Moldova. Terms of Reference

UNICEF Moldova. Terms of Reference UNICEF Moldova Terms of Reference Individual Consultancy on Public Finance for Development of the National Action Plan for Gradual Implementation of the Sanitary and Hygiene Norms for Preschools Duration

More information

CLIMATE INVESTMENT FUNDS

CLIMATE INVESTMENT FUNDS CLIMATE INVESTMENT FUNDS CTF/TFC.1/4 November 03, 2008 First Meeting of the CTF Trust Fund Committee Washington, D.C. November 17-18, 2008 CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT LOAN (ADDITIONAL FINANCING)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT LOAN (ADDITIONAL FINANCING) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF 052141 HR RELATED TO LOAN NUMBER 7198 HR Public Disclosure Authorized Global Environment Facility Trust Fund Grant Agreement (Energy

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18411 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

AD HOC WORKING GROUP ON LONG-TERM COOPERATIVE ACTION UNDER THE CONVENTION Resumed seventh session Barcelona, 2 6 November 2009

AD HOC WORKING GROUP ON LONG-TERM COOPERATIVE ACTION UNDER THE CONVENTION Resumed seventh session Barcelona, 2 6 November 2009 AD HOC WORKING GROUP ON LONG-TERM COOPERATIVE ACTION UNDER THE CONVENTION Non-paper No. 42 1 06/11/09 @ 17:15 CONTACT GROUP ON MITIGATION Subgroup on paragraph 1(v) of the Bali Action Plan Various approaches

More information

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government

More information

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Technical Assistance Loan FY 2013 Seq No: 4 ARCHIVED on 28-Dec-2015 ISR21722

More information

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS INTRODUCTION 1. Among the functions of the Clean Technology Fund

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL) Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDEX-BASED LIVESTOCK INSURANCE PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDEX-BASED LIVESTOCK INSURANCE PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

Green Bond Second Opinion

Green Bond Second Opinion Green Bond Second Opinion Based on the International Capital Markets Association s The Green Bond Principles, Voluntary Process Guidelines for Issuing Green Bonds, 2017 February 2018 Prepared for: Star

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567) EUROPE AND CENTRAL ASIA Albania Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 17-Oct-2017 ISR29727 Implementing Agencies: Key Dates

More information

Country Practice Area(Lead) Additional Financing China Energy & Extractives P123239

Country Practice Area(Lead) Additional Financing China Energy & Extractives P123239 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020838 Public Disclosure Authorized Public Disclosure Authorized Project ID P084874 Project Name CN-

More information

ANNEX. Objectives, Terms, and Conditions of the Grant

ANNEX. Objectives, Terms, and Conditions of the Grant Public Disclosure Authorized August 30, 2001 His Excellency DR. Boediono Minister of Finance Ministry of Finance Jakarta, Indonesia Dear Mr. Minister: Public Disclosure Authorized Public Disclosure Authorized

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES

More information

IDA CR. NO.4554-UG AND GEF TRUST FUND GRANT AGREEMENT NO. TF:

IDA CR. NO.4554-UG AND GEF TRUST FUND GRANT AGREEMENT NO. TF: THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF UGANDA ENERGY CREDIT CAPITALISATION COMPANY ENERGY FOR RURAL TRANSFORMATION PROJECT II (ERT II) IDA CR. NO.4554-UG AND

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/65/24 17 October 2011 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2014-2021 Adopted by the EEA Financial Mechanism Committee pursuant to Article 10.5 of Protocol 38c to the EEA Agreement on 8 September 2016 and confirmed

More information

Independent Electricity System Operator Licence EI

Independent Electricity System Operator Licence EI Licence Valid Until September 25, 2033 Original signed by Peter Fraser Vice President, Industry Operations & Performance Ontario Energy Board Date of Issuance: September 26, 2013 Date of Amendment: July

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H666-NP Public Disclosure Authorized Financing Agreement (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between Public

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

Module 7 Mainstreaming climate change in the budgetary process

Module 7 Mainstreaming climate change in the budgetary process Global Climate Change Alliance Support Facility Module 7 Mainstreaming climate change in the budgetary process Training workshops on mainstreaming climate change Key topics covered by this module Introduction:

More information

Agenda item 18: Policies on the formal replenishment process

Agenda item 18: Policies on the formal replenishment process Page 10 Also requests the Secretariat to take into account in developing the terms of reference of the procedure: (i) (ii) The need for the assets of the GCF to be covered by the appropriate privileges

More information

Letter No. SK-519/PSF/XII/2010 December 6, 2010

Letter No. SK-519/PSF/XII/2010 December 6, 2010 Public Disclosure Authorized Address: INTBAFRAD CONFORMED COPYO NAL DEVELOPMENT ASSOCIATION U.S.A. Cable Address: INDEVAS Stefan G. Koeberle Country Director, Indonesia Letter No. SK-519/PSF/XII/2010 December

More information

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H732 -AF Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Financial Sector Rapid Response Project) between ISLAMIC

More information

THE DEVELOPMENT OF CHINA S ESCO INDUSTRY,

THE DEVELOPMENT OF CHINA S ESCO INDUSTRY, THE DEVELOPMENT OF CHINA S ESCO INDUSTRY, 2004-2007 July 28, 2008 THE DEVELOPMENT OF CHINA S ESCO INDUSTRY, 2004-2007 July 28, 2008 China s ESCO 1 industry has grown at an astonishingly fast pace during

More information

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

The World Bank Malawi Strategic Program for Climate Resilience (P163245) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MALAWI STRATEGIC PROGRAM FOR CLIMATE RESILIENCE APPROVED ON NOVEMBER

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 4299 - AZ Public Disclosure Authorized Public Disclosure Authorized PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING

More information

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT OFFICIAL DMIUMTS LOAN NUMBER 8131-CN Loan Agreement (Zhanghu Railway Project) between PEOPLE'S REPUBLIC OF CHINA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated 8,2012 LOAN AGREEMENT AGREEMENT

More information

Forest Carbon Partnership Facility (FCPF) Readiness Fund

Forest Carbon Partnership Facility (FCPF) Readiness Fund Forest Carbon Partnership Facility (FCPF) Readiness Fund FY19 Proposed Budget for the FCPF Readiness Fund March 2018 This note is designed to present the proposed budget for FY19 of the Readiness Fund

More information

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information