Hydro Power Development in Andhra Pradesh (Installed Capacity-above 25 MW)

Size: px
Start display at page:

Download "Hydro Power Development in Andhra Pradesh (Installed Capacity-above 25 MW)"

Transcription

1 Hydro Power Development in Andhra Pradesh (Installed Capacity-above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. I. C. Identified Capacity H.E. Projects in Operation : Sl.No. Name of Project Agency I. C. Year of Commissioning 1 Upper Sileru I APGENCO Upper Sileru St.II APGENCO Srisailam APGENCO Lower Sileru APGENCO N.J. Sagar RBC APGENCO N.J. Sagar RBC Ext. APGENCO N.J. Sagar TPD APGENCO Total H.E. Schemes under Construction: Sl. No. Name of Project Agency I. C. Likely Issues / Constraints Commissioning 1 Indirasagar APGENCO Slow pace of works (Polavaram) due to fund constraints. Further, Public hearing for construction of protective embankment to be

2 held in Oddisha and Chhattisgarh as desired by MOEF at later stage. Total H.E. schemes held up due to Inter-State aspects: Sl. No. Name of Scheme/ I.C. Total I.C. ( MW) Location (State) States Involved Status 2. Inchampalli MPP (13x75= 975MW) 975 A.P. A.P./M.P./ Chhatisgarh/ Maharashtra DPR with estimated cost of Rs.1110 crores ( PL) returned in 05/1989. Requires Resolution of interstate aspects and submergence with MP, Chhatisgarh and Maharashtra.

3 Hydro Power Development in Arunachal Pradesh (Schemes having capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Identified Capacity 87 50, H.E. Projects in Operation : Sl.No. Name of Project I.C. Year of Commissioning 1 Ranganadi(NEEPCO) Total H.E. Schemes Under Construction: Sl. No. Name of Project Agency I. C. Likely Commissioning 1 Subansiri Lower NHPC * 2 Pare HPPCL Kameng NEEPCO Gongri Diran Energy * Total 2854 * subject to re-start of works. 4. H.E. Projects Cleared/Appraised by CEA : Sl No. Name of Project Agency I.C. Date of CEA Concurrence Status 1 Dibbin KSKDHPL EC accorded on FC-I accorded on & FC-II awaited. 2 Lower Siang JAVL EC & FC awaited. 3 Nafra SNEL EC accorded on FC-I accorded on

4 and FC-II accorded in Financial closure cancelled. Project held up for want of final orders on diversion of forest land. 4 Nyamjang Chhu BEL EC accorded on FC-I accorded on & FC-II awaited. 5 Tawang St-I NHPC EC accorded on FC proposal forwarded by State Govt. to MOEF on FC-I & II awaited.. 6 Tato-II THPPL EC accorded on FC is linked to Cumulative Impact Assessment Study of Siang Basin which has been carried out and accepted by MoEF. 7 Tawang St-II NHPC EC accorded on FC-I accorded on FC-II awaited 8 Demwe Lower ADPL EC accorded on FC accorded on Financial closure yet to be obtained. Petition filed in NGT against the project. 9 Hirong JAPL EC & FC awaited. 10 Talonga Londa GMR EC & FC awaited. FC is linked to Cumulative Impact Assessment Study of Siang Basin which has been carried out and accepted by MoEF 11 Etalin EHEPCL EC & FC awaited. 12 Naying HEP NDSCPL EC & FC awaited 13 Siyom SHPPL EC accorded FC awaited. Forest clearance is linked to Cumulative Impact Assessment Study

5 of Siang Basin which has been carried out and accepted by MoEF. 14 Kalai II HEP Kalai PPL EC accorded FC awaited 15 Heo HHPPL EC accorded on Letter is yet to be issued. FC-I accorded FC-II awaited 16 Tato-I SHPPL EC accorded on FC-I accorded FC-II awaited 17 Tagurshit L&T * EC & FC awaited. Total Note:- DPR of Dibang H.E.Project (2880 MW) likely to be submitted by Dec *Concurrence meeting date 4a. H.E. Projects Cleared/Appraised by State Govt. : Sl. No Name of Project Agency (Pvt.) 1 Khuitam Adishankar Power Pvt. Ltd. 2 Tirap (Tipang) IL&FS Renewable Energy Ltd. River I.C. Date of Approval Status Bicho EC accorded on m In principle Forest clearance granted on St.II Forest clearance awaited. Tirap Land acquisition awaited. Envt. Clearance awaited. No forest land involved. 3 Saskarong Patel Energy Ltd. Timko ng Rong Proposal for forest clearance submitted to State Govt. in June, Envt. Clearance accorded on

6 4 Papu Valley Vensar Const. Co. Ltd. 5 Simang-I Adishankar Power Pvt. Ltd. 6 Simang-II Adishankar Power Pvt. Ltd. 7 Lachung Coastal Projects ltd. Kamen g 48 - DPR review completed by State Govt. TEC letter yet to be issued. In Principle FC obtained on Forest proposal submitted to State Govt. in April 2011 & clearance awaited. EC accorded on Siang EC accorded in Aug FC-I accorded in May,2015. FC-II awaited. Siang Kamen g Total 378 EC & FC awaited TEC letter yet to be issued 5. Hydro Schemes Under Examination/Scrutiny in CEA : Sl. No. Name of Project Agency I.C. Month of receipt 1 Subansiri Middle (Kamla) KHEPCL 1800 Oct-13 2 Attunli Jindal Power 680 Oct-14 3 Magochu SMCPCL 96 March 16 4 Dibang NHPC 2880 Nov. 16 Total a. Hydro Schemes Under Examination/Scrutiny by State Govt.: Sl. No. Name of Project Agency River I.C. Month of receipt 1 Tawang Warang India bull Real Estate Ltd. kameng Jarong CESC Ltd. Siang 90-3 Phanchung CESC Ltd.(SPV-panchi Hydro Power Projects Ltd.) Kameng 56 DPR submitted to IIT Roorkee in Nov.,2013

7 4 Sipit Upper Srikar Energy, Hyderabad Siang 45-5 Pakke Bung-I Energy Development co. Ltd. Kameng 40 June Pachuk-I Energy Development co. Ltd. Kameng 84 June Par KVK Energy & Infrastructure Dikrong 52 July 2014 Ltd.(M/s Mytrah Energy(India) Ltd.) 8 Turu KVK Energy & Infrastructure Dikrong 90 June 2015 Ltd.(M/s Mytrah Energy(India) Ltd.) Total Hydro Schemes Returned to Project Authorities for re-submission after compliance observations : Sl. No. Name of Scheme Agency I.C. Reason of Return 1 Ranganadi St-II NEEPCO 130 NEEPCO has been asked to review the scheme and resubmit DPR after cost and tariff are brought down. MOU with State Govt. yet to be signed. 2 Yamne St-II SSYEVPL 84 DPR returned due to inadequate geological investigations at dam site, diversion tunnel, surge shaft & power house etc. 3 Hutong II MEIPL 1200 Presentation was held on and DPR taken under examination. The DPR was returned on as the scheme is now to be developed as storage scheme. Hydrology & PPS cleared on & Kalai-I MFIPL 1352 STC decided that M/S MFIPL should carry out the detailed investigation for the revised DPR as per CEA s letter dt Pemashelphu HEP 90 Due to non replying of the comments and likely change in location of Dams benefits from the project, DPR of project has been returned. 6 Sissiri HEP 100 PPS & Hydrology cleared. Project was under consideration of STC due to conversion of storage Scheme to ROR Scheme. STC Cleared the Scheme as ROR scheme vide letter dated presentation meeting held on DPR could not be accepted to detailed examination as representation of State Govt. pointed out that irrigation and drinking water component should be internal part of two project and cost of same

8 should be included in cost of project. DPR returned to developer for sort out the issue with State Govt. 7 Gimiliang 80 DPR returned during presentation meeting held on due to inadequate geological investigation. Developer was told to submit revised DPR after carrying out necessary investigation and IC got fixed by CEA. 8 Raigam 141 DPR returned during presentation meeting held on due to inadequate geological investigation. Developer was told to submit revised DPR after carrying out necessary investigation and IC got fixed by CEA. 9 Kangtangshiri KHPPL 80 Returned on due to inadequate investigation and in proper layout etc. 10 Demwe Upper LUPL 1080 Developer informed that due to lack of confidence in constructability of Dam considering its deep foundation, they are not in a position to finalize the type of dam and are still in consultation with the contractors in this regard. Hence the project was returned vide secretary CEA ltr. Dtd.26/03/ Nyukcharong Chu SNCPCL 96 Returned due to non submission of investigation suggested by GSI. Total Hydro Schemes Under Survey & Investigation : Sl. No. Name of Scheme Basin/River Agency for DPR 1 Oju Subansiri Navayuga Engg. Co. Ltd. 2 Pauk Siang Velcan Energy Pvt Ltd Original I.C. Date of MOA 1800 June'2010 for Oju-I & Oju-II, Revised MoU for Single Scheme is yet to be signed (rev MOA ) Target date of Preparation of DPR 12/17 09/17 3 Chomi Subansiri Adveta Power /18

9 4 Chela Subansiri Adveta Power /18 5 Badao Kameng Coastal Projects Pvt. Ltd. 6 Para Kameng Coastal Projects Pvt. Ltd. 7 Pachuk-II Kameng Energy development Co. Ltd 9 Tsa Chu - I Lower Tawang Energy development Co. Ltd 8 Tsa Chu - II Tawang Energy development Co. Ltd 9 Pachuk-II Lower Kameng Energy development Co. Ltd / / / / / /16 10 Marijingla Kameng Energy development Co. Ltd (Amended on ) 12/16 11 Marijingla Lower Kameng Energy development Co. Ltd 14 Rego Siang Greenko Energies Ltd. 15 Rapum Siang Greenko Energies Ltd. 16 Jameri Kameng KSK Energy Ventures Ltd 17 Pango Siang Meenakshi Power Ltd / / / / /17

10 18 Sippi Siang Meenakshi Power Ltd. 19 Jidu (Yangsang) Siang Meenakshi Power Ltd. 20 Digin Kameng Patel Hydro Power Pvt.Ltd. 21 Meyong Kameng Patel Hydro Power Pvt.Ltd. 22 Panyor Dikrong Rajratna Energy Holding Pvt. Ltd / / / / /17 23 Doimukh Dikrong SJVN Ltd /16 24 Tidding-I Lohit Sai Krishnodaya Ind. (P) Ltd. 25 Tidding-II Lohit Sai Krishnodaya Ind. (P) Ltd / /17 26 New Melling Tawang SEW Energy /16 27 Lower Yamne-II Siang Yamne Power Pvt. Ltd. 28 Lower Yamne -I Siang Yamne Power Pvt. Ltd / /17 29 Kurung Subansiri/ NEEPCO /18 Kurung Total H.E. schemes allotted for development on which Survey & Investigation is held up/ yet to be taken up:

11 Sl. No. Name of Scheme 1 Bhareli-II (Kameng-II) I.C. Agency 600 Mountain Falls Ltd. Date of Status Allotment/ MoA S&I held up due to project lie in Pakke Wild life Santuary. 2 Papu 90 CESC Ltd S&I held up. Project may be droped due to vicinity of Pakke Tiger Reserve. 3 Kameng Dam 600 KSK Energy Ventures Ltd. 4 Emra-I 275 Athena Energy Ventures Pvt. Ltd. 5 Amulin 420 Reliance Power Ltd. 6 Emini 500 Reliance Power Ltd. 7 Mihumdon 400 Reliance Power Ltd. 8 Nalo 635 Indus Hydro Power S&I held up. The project may be dropped due to vicinity of wild life santuary S&I not taken up due to inaccessibility of the site S&I held up due to Basin studies recommendations and road/infrastructure issues S&I held up due to Basin studies recommendations and road/infrastructure issues S&I held up due to Basin studies recommendations and road/infrastructure issues Transfer from Coastal Infrastrctructre to Indus Hydro Power awaited. 9 Rho 93 SEW Energy S&I held up due to the inability shown by the Developer to carry out investigations suggested by GSI 10 Dardu 60 KVK Energy & Infrastructure Ltd. 11 Naba 1000 Abir Infrastructure Pvt. Ltd S&I held up due to non resolution of Highway issue S&I held up due to unapproachable area/difficult & inhospitable terrain & local law & order problem.reduction of

12 12 Dengser 552 Coastal Infrastructre Pvt. Ltd. 13 Niare 800 Coastal Infrastructre Pvt. Ltd. 14 Anjaw 270 Athena Energy Ventures Ltd. 15 Emra-II 390 Athena Energy Ventures Ltd. 16 Yamne-I 111 S.S. Yamne Power Pvt Ltd 17 Dinchang 252 KSK Energy Ventures Ltd FRL due to basin study recommendation S&I held up due to unapproachable area/difficult & inhospitable terrain & local law & order problem in which dropping of project recommended. Awaiting approval of subansiri basin study S&I held up due to unapproachable area/difficult & inhospitable terrain & local law & order problem.awaiting approval of Subansiri Basin study in which dropping of project recommended First consultaion meeting held on Geological investigation associated with the outcome of the Lohit Basin Study S&I held up. No road connectivity to project site. Local issues, communication problem First consultation meeting held on S&I held up. Local Problems in Siang Valley. Problems of law and order S&I works to be taken up after finalization of JV.TOR extended upto Ithun-I 84 JVKIL Consortium Non-operationalization of Hunli- Desali road 19 Ithun-II 48 JVKIL Consortium Non-operationalization of Hunli- Desali road 20 Subansiri Upper 2000 KSK Energy Ventures Ltd Due to lack of clarity on funding of flood moderation cost which is about Rs. 14,000 Crs. Total 9180

13

14 Sl. No Name of Project Agency (Pvt.) 1 Lethang KHC Lethang HPP Ltd. 2 Sada Mangder Gati Infrastruct ure Ltd. 3 Ting Ting TT Energy Pvt. Ltd. River I.C. Date of Approval Status Rangit 96 Jun 2010 Public hearing held. Clearance not granted by NBWL. Case for forest clearance by State Govt. Rangit 71 - EC obtained. Rangit 99 April Forest clearance in principle accorded by MoEF in April Environment clearance accorded by MoEF in Jul Held up due to reiegious apprehensions.

15 Hydro Power Development in Assam (Schemes having capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Identified Capacity H.E. Projects in Operation: Sl.No. Name of Project I. C Year of Commissioning 1 Karbi Langpi (L. Borpani) Kopili Khandong Kopili Extn Total H.E. Projects Cleared/Appraised by CEA : Sl No. Name of Project Agency I.C. Date of CEA Concurrence 1 Lower Kopli APGCL Total H.E.Projects Returned to Project Authorities for re-submission after compliance of observations : Sl. Name of Scheme No. 1 Karbi langpi(u.borpani) I.C. Agency Reason of Return ASEB 60 Returned due to involvement of interstate aspects with Meghalaya, updated hydrology not been utilized for carrying out power potential study, cost estimates not framed at current PL and inadequate geological investigations etc.

16 5. H.E. schemes involving Inter-State aspects: Sl. No. Name of Scheme/ I.C. 1. Karbi Langpi (Upper Borpani) (2x30 = 60 MW) Total I.C. ( MW) Location (State) States Involved 60 Assam Meghalaya /Assam Status DPR with estimated cost of Rs crores (1984 PL) returned in 04/1988 DPR resubmitted in Nov., 08 and returned in Dec., 2008 due to involvement of interstate aspects still remaining un-resolved with Meghalaya and inadequate geological investigations etc.

17 HYDRO POWER DEVELOPMENT IN BIHAR 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Percentage (%) Identified Capacity Hydroelectric Schemes under operation in Bihar (above 25 MW): At present, no hydroelectric scheme (above 25 MW) is under operation in Bihar. Four H.E. Schemes having installed capacity of 44.9MW, consisting of Kosi (20MW), Sone Western Canal (6.6MW), Sone Eastern Canal (3.3MW) and Eastern Gandak (15MW), are in operation in Bihar which are all below 25MW capacity each. 3. Schemes under Construction: At present no hydro scheme is under construction in Bihar. 4. Schemes under Examination in CEA: Sl. No. Scheme/ State/ Agency/ MW 1 Dagmara /Bihar/ BSHPCL/(17x7.6 5 MW) Month of Receipt I. C. Est. Cost (Rs. Crs.) Price Level 04/ (without IDC) (03/2011) Status Concurrence meeting held on Concurrence was not accepted by the Authority due to high Project cost & tariff. Developer submitted reduced cost of the project which was on higher side and to comply with the observations of CEA, CWC & GSI which are awaited. Complete information regarding reduction / review of cost is still awaited.

18 5. H.E. schemes involving Inter-State aspects: Sl. No. Name of Scheme/ I.C. Total I.C. ( MW) Location (State) States Involved Status 1. Sindol (5x20+5x20+6x20 =320 MW) 320 Orissa MP/ Chhatisgarh/ Bihar/ Jharkhand/ Orissa / Maharashtra DPR with estimated cost of Rs crores (1994 PL) returned in 07/96 due to nonresolution of interstate aspect. The consent of the upstream States viz. Jharkhand, Bihar, M.P, Chhatisgarh and Maharashtra is not available. DPR is being revised by reducing Installed Capacity. Revised DPR yet to be submitted to CEA. Revised hydrology of Sindol-I for 100 MW has been submitted to CWC for clearance.

19 Hydro Power Development in Chhattisgarh (Installed capacity-above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Identified Capacity H.E. Projects in Operation: Sl.No. Name of Project Agency I. C. Likely Commissioning 1 Hasdeo Bango CSPGCL , 95 Total H.E. Projects Cleared/Appraised by CEA: Sl No Name of Project Agency I.C. Date of CEA Status Concurrence 1 Matnar HEP CSPCP Yet to be cleared by MOEF. Total H.E. schemes held up due to Inter-State aspects: Sl. No. Name of Scheme/ I.C. Total I.C. Location (State) States Involved Status ( MW) 1. Matnar (3x20 =60 MW) 60 Chattisgarh Chhatisgarh/ Andhra Pradesh/ Cleared by CEA on at an estimated cost of Rs crores (3/2004 PL). Indravati is one of the tributary of Godavari and flows through Orissa, Chattisgarh and Andhra Pradesh. It is an inter State river

20 Orissa between Chattisgarh and Orissa. Chattisgarh (erstwhile Madhya Pradesh) and Orissa entered into an inter-state agreement for sharing of Indravati river water on 11 th July, Chhatisgarh State Power Generation Company Ltd. (CSPGCL) has informed in April, 2009 that the concerned neighboring State will not have any problem as Matnar HEP is a Run-of-river scheme and would not affect the existing pattern of river flow. CSPGCL has also informed that distribution pattern of agreed water quantity to be made available by Govt. of India in Indravati river and the matter has been taken up at highest level by the Water Resource Department of the two States. Project involves 92 ha of forest land. Case of diversion of forest land was submitted to forest Dept. of Govt. of Chhattisgarh in March Case is under consideration of State Forest Dept. and yet to be forwarded by State Forest Dept to MOEF. Issue of identifying degraded catchment area and submission of CAT plan is required for final clearance.

21 Hydro Power Development in Goa (Installed capacity-above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Identified Capacity Nos. Capacity H.E. schemes held up due to Inter-State aspects. : Sl. No. Name of Scheme/ ( I. C. ) 1. Dudhsagar (2x15 =30 MW) Total I.C. Location (State) States Involved 30 Goa Goa/ Karnataka Status DPR with project estimated cost of Rs crores (1971 PL) was returned. Involves submergence in Karnataka.

22 Hydro Power Development in Gujarat (Installed capacity-above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Identified Capacity #Two schemes namely Ukai Dam and Sardar Sarovar were identified for an I.C of 590 MW. However as per actual, the I.C. is 550 MW 2 (a). H.E. Projects in Operation : Sl. No. Name of Project I. C. Year of Commissioning 1. Ukai Sardar Sarovar-CPH , Total 550 (b). Pumped Storage H.E. Projects in operation : Sl. No. Name of Project I. C. Year of Commissioning 1. Kadana St. I&II Sardar Sarovar Total 1440

23 Hydro Power Development in Haryana (Installed Capacity above 25 MW) 1. Identified Capacity # 1 64 #Western Yamuna Canal project (64 MW) has been developed in 4 stages each having Installed Capacity below 25 MW. 2. H.E. schemes involving Inter-State aspects: Sl. No. Name of Scheme/ I.C. Total I.C. ( MW) Location (State) States Involved Status 1 SYL (2x18+2x7=50MW) 50 Punjab Punjab/ Haryana/ Rajasthan. Cleared by CEA in 12/1987 at an estimated cost of Rs crores (5/1985 PL). Work on the canal on which project is located is held up. Haryana and Rajasthan have raised question regarding their shares of power as it envisages utilizing common facilities and water belonging to all three states, viz. Haryana, Punjab & Rajasthan.

24 Hydro Power Development in Himachal Pradesh (Installed Capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Identified Capacity H.E. Projects in Operation : Sl.No. Name of Project I.C. Year of Commissioning Satluj Basin 1 i) Bhakra (L) , 61 2 ii) Bhakra (R) , 68 3 Dehar Pong Rampur Kol dam (NTPC) Karcham Wangtoo Kashang-I (Satluj Basin) Kashang-II & III(Satluj Basin) Nathpa Jhakari Baspa-II , Sanjay Shanan & Extn Ravi Basin Sub Total Baira Siul , 81 2 Chamera St.I Chamera St.II Chamera St-III Budhil Sub Total 1321 Beas Basin 1 Parbati St.III Bassi Malana-II Larji Malana

25 6 Allain Duhangan Sub Total 1090 Yamuna Basin 1 Giri Bata Sub Total 60 Total Hydel Generation Performance : Year Target (MU) Actual Generation (MU) % of Actual Generation Vs Target * * Tentative generation upto 24 th Aug., H.E. Schemes Under Construction : Sl. No. Name of Project Agency I.C. Likely Commissioning Beas Basin 1 Parbati St--II NHPC Sainj HPPCL Uhl- III Beas Valley Power Corp. Ltd. (BVPC) Sub Total 1000 Satluj Basin 1 Sorang Himachal Sorang Power 2 Tidong-I M/s NSL Tidong Shontong Karcham HPPCL Kashang-II&III HPPCL Sub Total 715 Yamuna Basin 1 Sawara Kuddu HPPCL

26 2 Tangu Romai Tangu Romai Power Generation Sub Total 155 Ravi Basin 1 Bajoli Holi () GMR Bajoli Holi Hydro Power Pvt. Ltd. 2 Chanju-I(Ravi) IA Energy Sub Total 216 Total H.E. Projects Cleared/Appraised by CEA : Sl. No. Name of Project Agency Chenab Basin I.C. Date of CEA Concurrence Status 1 Chhatru(Private) DSC EC & FC awaited. 2 Miyar(Private) MHPCL Environment cleared on Forest Clearance is awaited. 3 Dugar DHPL * EC & FC awaited. Satluj Basin 1 Chango Yangthang Sub Total 695 MPCL EC & FC awaited. Sub Total 180 Ravi Basin 1 Kutehr JSWEPL EC accorded on FC-I accorded and FC-II accorded on Validity of earlier bids has expired due to delay in obtaining FC-II and acquisition of Pvt. Land. Fresh bidding is being invited. Indus Basin 1 Seli SHPCL * EC and FC awaited 2 Sanch Khas L&T HHPL * EC and FC awaited

27 *Concurrence meeting date Sub Total 667 Total H.E. Returned to Project Authorities for re-submission after compliance of observations: Sl. No. Name of Scheme Agency Ravi Basin I.C. Reason of Return 1 Bara Banghal MPCL 200 DPR returned due to inadequate geological investigations, environmental & wild life issues, review of I.C. & Cost. Total H.E. Schemes Under Survey & Investigation: Sl. No. Name of Scheme Beas Basin 1 Thana Plaun 2 Nakhtan (Parbati-I) Basin/River Agency for DPR Original I.C. Date of MOA Target date of Preparation of DPR Beas HPPPCL /16 Beas HPPPCL /17 Sub Total 661 Chenab Basin 1 Reoli Dugli Chenab L&T Power /16 Ltd. Sub Total 420 Satluj Basin 1. Tidong-II Sutlej Tidong Hydro Power Ltd /16 2. Sunni Dam Sutlej HPPCL Sub Total 588 Yamuna Basin

28 1 Chirgaon Majhgaon HPPCL /17 Sub Total 60 Indus Basin 1 Luhri SJVNL Ltd /16 Sub Total 219 Total H.E. schemes allotted for development on which Survey & Investigation is held up/ yet to be taken up : Sl. No. Scheme I.C. Satluj Basin Agency Date of Allotment/ MoA Status 1 Khab 636 HPPCL S&I held up due to local agitation 2 Sumte Kothang 130 Reliance Power Ltd S&I held up due to opposition from locals and NGOs 3 Lara Sumta 104 Reliance Power Ltd. Sub Total S&I held up due to opposition from locals and NGOs Chenab Basin 1 Gyspa Dam 300 HPPCL S&I held up due to local agitation Sub Total 300 Total 1170

29 Hydro Power Development in Jammu and Kashmir (Schemes having capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. I.C. Identified Capacity 54 13, H.E. Projects in Operation : Sl.No. Name of Project I.C. Year of Commissioning 1 Salal-I Salal-II Uri Dulhasti Sewa-II Chutak Uri-II (NHPC) Nimoo Bazgo Lower Jhelum Upper Sindh st-ii& Extn , Baglihar-I Baglihar-II Total H.E. Schemes Under Construction : Sl. No. Name of Project Agency I. C. Likely Commissioning 1 Kishan Ganga (NHPC) Ratle (RHPPL) Parnai JKSPDC

30 4 Lower Kalnai JKSPDC H.E. Projects Cleared/Appraised : Total Sl No. Name of Project 1 New Ganderwal Agency I.C. Date of CEA Concurrence Status JKSPDCL EC obtained on and Forest clearance awaited. 2 Pakal Dul CVPP EC accorded on and FC-I accorded on & FC-II on Decision on finalization of bidding is under approval of Board of Directors. 3 Kiru CVPPL EC & FC awaited 4 Kwar CVPP * EC & FC awaited 5 Kirthai-II JKPDC * EC & FC awaited 6 Sawalkote JKPDC * EC & FC awaited Total 5043 * Concurrence meeting date 6. Hydro Schemes Returned to Project Authorities for re-submission after compliance of observations: Sl. Name of Scheme Agency I.C. Remarks No. 1 Kirthai-I JKPDC 390 Returned due to non submission of investigation suggested by GSI. Total Hydro Schemes under Survey & Investigation: Sl.No. Name of Scheme Basin/River Agency for DPR Original I.C. Date of MOA Target date of Preparation of

31 DPR 1 Bursar Chenab NHPC /16 2 Sonmarg (Shitkari Kulan) Sindh Shapoorji 84 10/ /17 Pallonji (SP Group) HPPCL Total H.E. schemes allotted for development on which Survey & Investigation is held up/ yet to be taken up: Sl. No. Scheme I. C. Agency Date of Allotment/ MoA Status 1 Shamnot 370 NHPC S&I held up as the project will submerge National Highway. Total 370

32 Hydro Power Development in Jharkhand (Installed capacity-above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Identified Capacity a). H.E. Projects in Operation: Sl. No. Name of Project River I.C. Year of Commissioning 1. Subernrekha I&II Sharda ,80 2. Panchet Dhauliganga & 90 Total 170 2b). Pumped storage H.E. Projects in Operation: Sl. No. Name of Project I. C. Remarks 1. Panchet Hill-DVC 40 Pumping Mode- Not Working Tail Pool dam not constructed. Total H.E. schemes involving Inter-State aspects: Sl. No. Name of Scheme/ I.C. Total I.C. ( MW) Location (State) States Involved Status 1. Sindol (5x20+5x20+6x20 =320 MW) 320 Orissa MP/ Chhatisgarh/ Bihar/ Jharkhand/ Orissa / DPR with estimated cost of Rs crores (1994 PL) returned in 07/96 due to nonresolution of interstate aspect. The consent of the upstream States viz. Jharkhand, Bihar, M.P,

33 Maharashtra Chhatisgarh and Maharashtra is not available. DPR is being revised by reducing Installed Capacity. Revised DPR yet to be submitted to CEA. Revised hydrology of Sindol-I for 100 MW has been submitted to CWC for clearance.

34 Hydro Power Development in Karnataka (Installed capacity-above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study: Nos. Capacity Identified Capacity H.E. Projects in Operation: Sl.No. Name of Project Agency I. C. Year of Commissioning 1 Sharavathy KPCL Lingnamakki KPCL Bhadra (L) ( R ) (RBC) KPCL Kalinadi KPCL Kalinadi-I (Supa DPH) KPCL Varahi KPCL , 90 7 Ghatprabha KPCL Kalinadi st II (Kadra) KPCL , 99 9 Kalinadi st II (Kodasil) KPCL , Sharavathy TR KPCL Almatti dam KPCL , Varahi Extn KPCL Jog KPCL Sivasamudram KPCL , Munirabad KPCL

35 16 T.B.Dam APGENCO Hampi APGENCO Total Hydro Schemes Returned to Project Authorities for re-submission after compliance of observations: Sl. No. Name of Scheme Agency I.C. Reason of Return 1 Sivasamudram KPCL 345 Presentation meeting held on as it involves interstate issues; DPR could not be processed and returned the same for resubmission after resolution of interstate aspects. 2 Mahadayi KPCL 320 Returned due to non-tie up of inputs/clearances, the project involves interstate aspects. Total H.E. schemes held up due to Inter-State aspects: Sl. No. Name of Scheme/ I.C. Total I.C. Location (State) States Involved Status ( MW) 1 Brindavan (2x6=12 MW) 12 Karnataka TN/ Karnataka. Sanctioned by Planning Commission in 4/1990 at an estimated cost of Rs crores (3/1989 PL). On the objections of GOTN regarding clearance of the project, CEA indicated that the consumptive water use normally takes place in

36 2 Cauvery Power Projects- Mekadatu (400 MW) 400 Karnatak a Kerala/ TN/ Karnataka irrigation, drinking water etc and Brindavan HEP has no consumptive use implications. Preliminary report of Stage-I was returned in 10/1996. Sharing of Cauvery water awarded by CWDT. With the consent of GOTN and GOK, NHPC took up S&I and preparation of DPR. In the Core Group Meeting taken by secretary (Power) on , it was agreed by GOK and GOTN that Shivasamudram (Karnataka) and Hogenekkal (T.N.) should be taken up simultaneously in the first phase and remaining two projects viz. Mekadatu and Rasimanal in the next phase. In the Core Group Meeting taken by Secretary (Power) on , it was agreed that execution of these four projects through NHPC would be most viable proposition. It was decided that representatives of both the Govts. would take up the matter with their respective Govts. and seek their approval and thereafter necessary agreement will be signed between NHPC and the two State Govts. Consent by both the State Govts. was to be communicated to MOP by The State of Karnataka in June, 2007

37 informed that Shivasamudram and Mekadatu will be executed by them in State sector. KPCL informed in April, 2009 that the tribunal award is with Supreme Court. Subsequently, a meting was held on under the chairmanship of Secretary (Power) to discuss the pending issue of development of Hydroelectric Projects in Cauvery Basin. Secretary (Power) expressed that Shivasamudram being a Run of River Project with in the territory of Karnataka, Tamil Nadu should not have any objection to the development of the Project by the State Government. He further opined that there should not be any problem in taking up Shivasamudram Project by the State of Karnataka provided there is joint mechanism for monitoring the water level/releases of water to Tamil Nadu. He suggested that the CWC could act as an observer in this regard and directed that the GOK would provide/share all the technical details of the Project to/with Tamil Nadu. Both the States Government were advised to consult CEA and CWC before finalization of designing of the Project. As regards other projects located in Tamil Nadu but

38 3 Cauvery Power Projects- Sivasamudram Seasonal (2x135= 270 MW) 270 Karnataka Kerala/ TN/ Karnataka whose submergence area partly falls in Karnataka, it was suggested the two Governments need to arrive at an arrangement for power sharing. Sharing of Cauvery water awarded by CWDT. With the consent of GOTN and GOK, NHPC took up S&I and preparation of DPR. In the Core Group Meeting taken by secretary (Power) on , it was agreed by GOK and GOTN that Shivasamudram (Karnataka) and Hogenekkal (TN) should be taken up simultaneously in the first phase and remaining two projects viz. Mekadatu (Karnataka) and Rasimanal (T.N.) in the next phase. In the Core Group Meeting taken by Secretary (Power) on , it was agreed that execution of these four projects through NHPC would be most viable proposition. It was decided that representatives of both the Govts. would take up the matter with their respective Govts. and seek their approval and thereafter necessary agreement will be signed between NHPC and the two State Govts. Consent by both the State Govts. was to be communicated to MOP by The State of Karnataka in June, 2007 informed that

39 Shivasamudram and Mekadatu will be executed by them in State sector. Subsequently, a meting was held on under the chairmanship of Secretary (Power) to discuss the pending issue of development of Hydroelectric Projects in Cauvery Basin. Secretary (Power) expressed that Shivasamudaram being a Run of River Project with in the territory of Karnataka, Tamil Nadu should not have any objection to the development of the Project by the State Government. He further opined that there should not be any problem in taking up Shivasamudram Project by the State of Karnataka provided there is joint mechanism for monitoring the water level/ releases of water to Tamil Nadu. He suggested that the CWC could act as an observer in this regard and directed that the GOK would provide/share all the technical details of the Project to/with Tamil Nadu Both the States Government were advised to consult CEA and CWC before finalization of designing of the Project. As regards other projects located in TN but whose submergence area partly falls in Karnataka, it was suggested the two Governments need to arrive at an arrangement for power sharing.

40 4. Katla & Palna Diversion (Augmentation) 5. Mahadayi (2x10+ 2x150 = 320 MW) Augmentation Karna- taka 320 Karna- taka Goa/ Karnataka Goa/ Karnataka KPCL submitted revised DPR of Shivasamudram Run of River Power Project(3x100+3x15=345 MW) in Cauvery Basin to CEA vide their letter dated In the presentation meeting held in CEA on , it was decided in the meeting that due to non-resolution of Inter-State issues the DPR can not be examined and the same is returned. DPR with estimated cost of Rs 8.13 crores (1979 PL) returned in 10/1987. These two schemes are on tributaries to Mahadayi river. Unless inter-state dispute is resolved, this project cannot be taken up. DPR with estimated cost of Rs crores returned in 08/2002. Involves trans - basin diversion of waters of Mahadayi river to Malaprabha river (Krishna basin). State Govt. has constituted a Committee to prepare Master Plan for utilization of water available as Karnataka share. Total 1002 Power project will be reviewed based on the revised allotment of water for power.

41

42 Status of Hydro Electric Power Development in Kerala (Schemes having capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study: Identified Capacity Nos. Capacity Hydro Electric Projects in Operation : Sl.No. Name of Project I.C. Year of Commissioning 1 Idukki & Sabaragiri Kuttiadi Sholoyar Sengulam , 55 6 Nariamanglam & Extn Pallivasal Poringalkuttu Panniar Idamalayar Lower Periyar Kakkad Kuttiyadi Extn Kuttiyadi Addln Extn Total Kerala H.E. Schemes under Construction: Sl. No. Name of Project Agency I.C. Likely Commissioning 1 Pallivasal KSEB

43 2 Thottiyar KSEB Total H.E. Projects Cleared/Appraised by CEA and yet to be taken up for construction: Sl. Name of Project Agency I.C. Date of CEA Status No. Concurrence 1 Athirappilly KSEB EC & FC awaited. Total H.E. schemes held up due to Inter-State aspects: Sl. No. Name of Scheme/ Installed Capacity I.C. MW Location (State) States Involved Status 1* Kerala Bhavani (MPP) (3x50= 150 MW) 150 Kerala Kerala/ T.N./ Karnataka DPR with estimated cost of Rs crores ( PL) returned in 01/1992. Final award of CWDT stated that the scheme involves trans- basin diversion of water of Bhavani, therefore it is not possible to allocate water for this project. Since the tribunal has ruled out trans-basin transfer (from inter state rivers), this project remains a non-starter. The final award of CWDT has been challenged by Kerela State before the Hon ble Supreme Court of India. 2.* Mananthvady MPP (5x45 =225MW) 225 Kerala Kerala/ Earlier DPR with estimated cost of Rs crores (1980 PL) returned in 07/1980.

44 3. Pandiar Punnapuzha Tail Race (105 MW) 4.* Pambar (40 MW) (*) Projects located in Cauvery basin. T.N./ 105 Kerala TN/ Karnataka Kerala 40 Kerala T.N./ Kerala/ Karnataka Final award of CWDT stated that the scheme involves trans- basin diversion of water of Kabini, therefore it is not possible to allocate water for this project. Since the tribunal has ruled out transbasin transfer (from inter state rivers), this project remains as a non-starter. The final award of CWDT has been challenged by Kerela State before the Honourable Supreme Court of India. Earlier DPR with estimated cost of Rs crores (12/1972 PL) returned in 07/82 Pproject envisages utilisation of tailrace waters of the proposed Pandiar Punnapuzha HEP of Tamil Nadu. The project would be taken up if GOTN and Kerala come to a mutual agreement. Inter-state issue is not resolved. Earlier DPR for 30 MW with estimated cost of Rs crores (1989 PL) returned in 03/1990. The project is also entangled with Cauvery Waters Disputes Tribunal (CWDT). KSEB revised the scheme from earlier proposal of storage scheme to run-of-river scheme. Non-Consumptive use of 5.6 TMC was proposed for power generation, which has been allowed by Tribunal subject to agreement with Tamil Nadu for schedule of water release. DPR is yet to be finalized.

45 6. Pumped Storage Schemes Planned on Existing Hydro Projects: Sl.N. Name of Scheme State IC Agency 1 Kakkayam Kerala 110 KSEB 2 Kakki Kerala 480 KSEB 3 Sholayar I Kerala 810 KSEB 4 Sholayar II Kerala 390 KSEB 5 Sholayar III Kerala 105 KSEB 6 Idamalayar-I Kerala 180 KSEB 7 Idamalayar-II Kerala 180 KSEB 8 Poringal Kuthu Kerala 80 KSEB Status Existing Kuttiyadi Reservoir. Yet to be taken up under S&I. Existing Kakki reservoir. Yet to be taken up under S&I. Existing Sholayar reservoir. Yet to be taken up under S&I. Existing Sholayar reservoir. Yet to be taken up under S&I. Existing Sholayar reservoir. Yet to be taken up under S&I. Existing IHEP reservoir. Yet to be taken up under S&I. Existing IHEP reservoir. Yet to be taken up under S&I. Existing Poringalkuthu reservoir. Yet to be taken up under S&I. 7. Pumped Storage Projects identified as Doable : Sl.N. Name of Scheme State IC Agency 1 Idukki Kerala 300 KSEB 2 Pallivasal Kerala 600 KSEB Status Existing Idukki Reservoir. Yet to be taken up under S&I. Involves less forest land and DPR can be prepared within 2-3 years. Existing Pallivasal reservoir. Yet to be taken up under S&I. Involves less forest land and DPR can be prepared within 2-3 years

46 Hydro Power Development in Madhya Pradesh (Installed capacity-above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. I. C. Identified Capacity H.E. Projects in Operation: Sl. No. Name of Project Agency I.C Year of Commissioning 1. Indira Sagar (NHDC) NHDC , Omkareshwar (NHPC) NHDC Gandhi Sagar MPPGCL Bargi MPPGCL Ban Sagar Tons-I MPPGCL , Rajghat MPPGCL Bansagar Tons PH-III MPPGCL Bansagar Tons PH-II MPPGCL Madhikhera MPPGCL Total Hydel Generation performance: Year Target (MU) Actual Generation (MU) % of Actual Generation Vs Target * * Tentative generation upto 31 st August, H.E. Schemes Under Construction :

47 Sl. No. Name of Project I. C. Agency Likely Commissioning 1. Maheshwar (pvt)* 400 SMHPCL Total 400 *- Works suspended since Nov-11 due to cash flow problem with developer - A high level committee under the chairmanship of Additional Chief Secretary (Finance) GoMP, was formed on 16 th Oct, 2014 to find ways to complete the project. The committee has submitted its report on The committee has recommended three scenarios for commissioning the Maheshwar Project. Under the first scenario, another attempt to complete the project with the present private developer has been envisaged. Timeline for first scenario has elapsed (2 nd August, 2015) without the promoter complying with its requirements. Currently, the process for revival of project under second scenario is underway which envisages government companies to take over the project company with the private developer being kept as a minority shareholder. Accordingly, lenders being Govt. companies are planning to acquire the majority equity by way of conversion of sub-debt into equity and invocation of pledge share. - Likely commissioning after 1-½ year of restart of works. 5. Hydro Schemes Returned to Project Authorities for re-submission after compliance of observations: Sl. No. Name of Scheme Sector I.C. Month of Return 1. Sone State 100 Apr-03 Total H.E. schemes held up due to Inter-State aspects : Sl. No. Name of Scheme/ Installed Capacity Total I.C. MW Location (State) States Involved Status 3. Orcha MPP (2x30+2x15 = 90 MW) 90 M.P. U.P./M.P. DPR with estimated cost of Rs crores (3/1980 PL) returned in 07/1985. Inter-state aspects mainly relate to submergence under the

48 reservoir as well as sharing of 4. Ken (2x15+2x10 = 50 MW) water below Orcha. 50 M.P. U.P./M.P. DPR with estimated cost of Rs crores returned in 2/1987. The yield at the project site and sharing of water u/s & d/s of the project has been agreed between U.P. & M.P. Both the States have also agreed for preparation of DPR for the Ken MPP and NWDA proposal for transfer of surplus water of Ken to Betwa u/s of Rajghat Dam. DPR for Ken-Betwa River Linking Project has been prepared by NWDA in Dec., 2008, copies of which were forwarded by them to Govt. of M.P. and Govt. of U.P. The status of the project was discussed by the respective Govts./NWDA/ MOWR in the meeting taken by Secretary (WR) on and it was decided that S&I works will be taken up by NWDA on priority.

49 Hydro Power Development in Manipur (Installed capacity-above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study Schemes : Nos. I. C. Identified Capacity H.E. Projects in Operation: Sl.No. Name of Project Agency I. C. Year of Commissioning 1 Loktak NHPC Total H.E. Projects cleared by CEA : Sl No Name of Project Agency I.C. Date of concurrence 1 Loktak D/S LDHCL (concurrence meeting date) Status Tendering work to be done. Total 66

50 Hydro Power Development in Maharashtra (Installed Capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. I. C. Identified Capacity a. H.E. Projects in Operation: Sl.No. Name of Scheme Agency I.C. 1 Koyna I & II MAHAGENCO Koyna III MAHAGENCO Koyna DPH MAHAGENCO 36 4 Vaitarna MAHAGENCO 60 5 Bhira Tail Race MAHAGENCO 80 6 Tillari MAHAGENCO 60 7 Koyna St-IV MAHAGENCO Bandhardhara-II DLHP(Private) 34 9 Bhira Tata (Private) Bhivpuri Tata (Private) Khopoli Tata (Private) Pench MPPGCL 160 Total b. Pumped storage H.E in operation : Sl. No. Name of Project I. C. Remarks 1. Bhira 1x150=150 Pumping Mode- Working 2. Ghatgar 2x125=250 Pumping Mode- Working Total 400

51 3. Pumped storage H.E. Projects under Construction : Sl. No. Name of Project I. C. Remarks 1. Koyna Left Bank 2x40=80 Likely commissioning by Total H.E. schemes held up due to Inter-State aspects: Sl. No. Name of Scheme/ I.C. Total I.C. ( MW) Location (State) States Involved Status 1 Bhivpuri (Private) (1x90=90 MW) 90 Maharashtra Maha/ Karnataka/ AP Cleared by CEA in 5/1991 at an estimated cost of Rs crores (11/1989 PL). Involves interstate aspect with A P & Karnataka regarding Westward Diversion of Krishna Waters.

52 Hydro Power Development in Meghalaya (Schemes having capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study: Nos. Capacity Identified Capacity H.E. Projects in Operation : Sl.No. Name of Project I. C. Year of Commissioning 1 Kyrdemkulai Umiam St.I Umiam-Umtru St.IV Myntdu Total H.E. Schemes Under Construction : Name of Project Agency I.C. Likely Commissioning 1 New Umtru MePGCL Total H.E. Projects Cleared/Appraised by CEA: Sl No. Name of Project Agency I.C. Date of CEA Status Concurrence 1 Kynshi-I AKPPL EC & FC awaited Total 270

53 5. Hydro Schemes Under Examination/Scrutiny in CEA: Sl. No. Name of Project Agency I.C. Month of receipt 1 Umangot HEP MCPGCL 210 Mar-13 Total Hydro Schemes Under Survey & Investigation: Sl. No. Name of Scheme Basin/River Agency Original I.C. 1 Umiew (Mawphu St.-II) Umiew Date of MOA Target date of Preparation of DPR NEEPCO /17 2 Umduna Barak ETA Star Infrastructure Ltd 90 Dec. 2007/ Rev. Nov /16 3 Umjaut Umiew ETA Star Infrastructure Ltd 69 Dec. 2007/ Rev. Nov /16 4 Myntdu Leshka st-ii Muntdu MePGCL Total H.E. schemes allotted for development on which Survey & Investigation is held up/ yet to be taken up: Sl. No. Name of Scheme I. C. Agency 1 Kynshi-II 450 GoMe & Jaiprakash Power Date of Status Allotment/ MoA S&I held up on account of non-finalisation of dam location/height

54 Venture Ltd. (JV) due to deposit of Uranium. 2 Selim 170 ASEB First Consultation meeting held on STC has given clearance for conversion from Storage to Run-of-River Scheme in its 10th meeting held on Total H.E. schemes involving Inter-State aspects: Sl. No. Name of Scheme/ I.C. 1. Karbi Langpi (Upper Borpani) (2x30 = 60 MW) Total I.C. ( MW) Location (State) States Involved 60 Assam Meghalaya /Assam Status DPR with estimated cost of Rs crores (1984 PL) returned in 04/1988 DPR resubmitted in Nov., 08 and returned in Dec., 2008 due to involvement of interstate aspects still remaining un-resolved with Meghalaya and inadequate geological investigations etc.

55 Hydro Power Development in Mizoram (Schemes having capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Identified Capacity H.E. Schemes Under Construction: Sl. No. Name of Project Agency I. C. Likely Commissioning 1 Tuirial NEEPCO Total 60

56 Hydro Power Development in Nagaland (Schemes having capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study : Nos. Capacity Identified Capacity H.E. Projects in Operation : Sl.No. Name of Project I. C. Year of Commissioning 1 Doyang (NEEPCO) Total H.E. Projects Cleared/Appraised by CEA : Sl No. Name of Project Agency I.C. 1 Dikhu HEP NMPPL 186 Date of CEA Status Concurrence EC & FC awaited Total 186

57 Hydro Power Development in Odisha (Installed Capacity above 25 MW) 1. Identified Hydro Power Potential as per reassessment Study: Nos. Capacity Identified Capacity H.E. Projects in Operation: Sl.No. Name of Project I.C. Year of Commissioning 1 Hirakud I (Burla) , 90 2 Hirakud II (Chiplima) Balimela Rengali Upper Kolab Upper Indravati , Balimela Extn Machkund Total HP H.E. schemes involving Inter-State aspects: Sl. No. Name of Scheme/ I.C. Total I.C. ( MW) Location (State) States Involved Status 1 Sindol (5x20+5x20+6x20 =320 MW) 320 Orissa MP/ Chhatisgarh/ Bihar/ DPR with estimated cost of Rs crores (1994 PL) returned in 07/96 due to non-

58 2 Matnar (3x20 =60 MW) 60 Chattisgar h Jharkhand/ Orissa / Maharashtra Chhatis-garh/ Andhra Pradesh/ Orissa resolution of interstate aspect. The consent of the upstream States viz. Jharkhand, Bihar, M.P, Chhatisgarh and Maharashtra is not available. DPR is being revised by reducing Installed Capacity. Revised DPR yet to be submitted to CEA. Revised hydrology of Sindol-I for 100 MW has been submitted to CWC for clearance. Cleared by CEA on at an estimated cost of Rs crores (3/2004 PL). Indravati is one of the tributary of Godavari and flows through Orissa, Chattisgarh and Andhra Pradesh. It is an inter State river between Chattisgarh and Orissa. Chattisgarh (erstwhile Madhya Pradesh) and Orissa entered into an inter-state agreement for sharing of Indravati river water on 11 th July, Chhatisgarh State Power Generation Company Ltd. (CSPGCL) has informed in April, 2009 that the concerned neighboring State will not have any problem as Matnar HEP is a Run-of-river scheme and would not affect the existing pattern of river flow. CSPGCL has also informed that distribution pattern of agreed water quantity to be made available by Govt. of India in Indravati river and the matter has been taken up at highest level by the Water Resource Department of the two States. Project involves 92 ha of forest land. Case of diversion of forest land was submitted to forest Dept. of Govt. of Chhattisgarh in March Case is under consideration of State Forest Dept. and yet to be

Hydro Power Development in Himachal Pradesh

Hydro Power Development in Himachal Pradesh Hydro Power Development in Himachal Pradesh Identified Hydro Power Potential and its status of Development: Identified Hydro Power Potential as per reassessment Study from Major/Medium Schemes (Schemes

More information

INVESTOR PRESENTATION FINANCIAL YEAR : JUNE Salal Power Station, J&K

INVESTOR PRESENTATION FINANCIAL YEAR : JUNE Salal Power Station, J&K Clean Power For Every Home INVESTOR PRESENTATION FINANCIAL YEAR 18-19 : JUNE 2018 Salal Power Station, J&K Presentation Outline 2 NHPC Today Financial Highlights Financial Ratios Other Business Initiatives

More information

GOVERNMENT OF INDIA MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION LOK SABHA STARRED QUESTION NO. *187 ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION LOK SABHA STARRED QUESTION NO. *187 ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION LOK SABHA STARRED QUESTION NO. *187 ANSWERED ON 10.03.2016 *187. SHRI A.P. JITHENDER REDDY SHRI ABHIJIT MUKHERJEE

More information

Mending Power Sector Finances PPP as the Way Forward. Energy Market Forum

Mending Power Sector Finances PPP as the Way Forward. Energy Market Forum Mending Power Sector Finances PPP as the Way Forward Energy Market Forum AF Mercados EMI 11 th February 2011 Structure of the Presentation Current Status of Power Sector Generation Transmission Distribution

More information

MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER, GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED PART-I

MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER, GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED PART-I MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER, GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED 2009-2010 PART-I MISSION AND OBJECTIVES OF NORTH EASTERN ELECTRIC POWER CORPORATION

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member No. L-1/44/2010-CERC Date of Order: 29.6.2013 In the matter of: Determination of Point

More information

OUTSTANDING GOVERNMENT DEBT

OUTSTANDING GOVERNMENT DEBT ISIN Security OUTSTANDING GOVERNMENT DEBT TABLE 3: OUTSTANDING GOVERNMENT DEBT (Previous Month) Mod V+ (for V- (for Modified for 100bps for 100 bps Expected price for a 100bps rise in yield due to and

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.55 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL IN THE MATTER OF Provisional approval of Generation tariff of M.P. s 57% share of power in Sardar Sarovar Project (6x200+5x50

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.231 ANSWERED ON PARIVARTAN SCHEME

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.231 ANSWERED ON PARIVARTAN SCHEME GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.231 ANSWERED ON 02.08.2018 PARIVARTAN SCHEME *231. SHRI B. VINOD KUMAR: Will the Minister of POWER be pleased to state: (a) whether the

More information

OUTSTANDING GOVERNMENT DEBT

OUTSTANDING GOVERNMENT DEBT 48 CCIL ISIN Monthly Newsletter d OUTSTANDING GOVERNMENT DEBT TABLE 3: OUTSTANDING GOVERNMENT DEBT Yield Yield (Previous Month) Mod V+ ( V- ( Modified 100bps 100bps Expected price a 100bps rise in yield

More information

POPULATION PROJECTIONS Figures Maps Tables/Statements Notes

POPULATION PROJECTIONS Figures Maps Tables/Statements Notes 8 POPULATION PROJECTIONS Figures Maps Tables/Statements 8 Population projections It is of interest to examine the variation of the Provisional Population Totals of Census 2011 with the figures projected

More information

The following Agenda items were taken-up in that order for discussions:

The following Agenda items were taken-up in that order for discussions: Minutes of the 93rd Meeting of the Expert Appraisal Committee (EAC) for River Valley and Hydroelectric Projects held on 2 nd May, 2016 at Indus Meeting Hall, Ground Floor, Jal Wing, Indira Paryavaran Bhawan,

More information

DAM SAFETY AND DRIP ACTIVTIES IN TAMIL NADU

DAM SAFETY AND DRIP ACTIVTIES IN TAMIL NADU DAM SAFETY AND DRIP ACTIVTIES IN TAMIL NADU Presented by V.D.SURESH PROJECT DIRECTOR, TNSPMU 1 TAMIL NADU PROFILE Area : 1,30,058 sq.km (4% of the Country Area 32,87,590 sq km) Population : 7.21 crore

More information

REPORT ON THE WORKING OF THE MATERNITY BENEFIT ACT, 1961 FOR THE YEAR 2010

REPORT ON THE WORKING OF THE MATERNITY BENEFIT ACT, 1961 FOR THE YEAR 2010 REPORT ON THE WORKING OF THE MATERNITY BENEFIT ACT, 1961 FOR THE YEAR 2010 1. Scope and Objective 1.1 The Maternity Benefit Act, 1961 extends to the whole of the Indian Union and applies to every factory,

More information

06-Oct R E Division, Ministry of Power

06-Oct R E Division, Ministry of Power 06Oct2005 R E Division, Ministry of Power RURAL ELECTRIFICATION WING Arvind Jadhav Joint Secretary Rajeev Sharma Executive Director Vandana Jain Under Secretary Kiran Misra Section Officer 06Oct2005 R.E

More information

1Pl r ~1~r11rtr. ~~ ~.nz. I. ~ fcr'lljll ' '-'1\:\:1 ' ~' ~ 18 ~ 2011

1Pl r ~1~r11rtr. ~~ ~.nz. I. ~ fcr'lljll ' '-'1\:\:1 ' ~' ~ 18 ~ 2011 ~ ~ www.govtpressmp.nic.in fr tjt ~ ~ fcj:;7;rr ~ ~ %. 1Pl r ~1~r11rtr (~) ~~ ~.nz. I ~264] ~' ~'t"fc!r, ~ 18 ~ 2011-~ 28, Wcfi 1933 ~ fcr'lljll rr.::n= = cq 'l.fc:r' ~ ' '-'1\:\:1 ' ~' ~ 18 ~ 2011 1.

More information

1,14,915 cr GoI allocations for Ministry of Rural Development (MoRD) in FY

1,14,915 cr GoI allocations for Ministry of Rural Development (MoRD) in FY BUDGET BRIEFS Vol 1/ Issue 9 Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), GoI, 218-19 HIGHLIGHTS Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) is a flagship

More information

14 th Finance Commission: Review and Outcomes. Economics. February 25, 2015

14 th Finance Commission: Review and Outcomes. Economics. February 25, 2015 February 25, 2015 Economics 14 th Finance Commission: Review and Outcomes The 14th Finance Commission (FFC) was constituted on 2nd January, 2013 and submitted its report on 15 th December, 2014. The recommendations

More information

State Government Borrowing: April September 2015

State Government Borrowing: April September 2015 November 5, 2015 Economics State Government Borrowing: April September 2015 State Development Loans (SDL) are debt issued by state governments to fund their fiscal deficit. States in India like the centre,

More information

MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED PART - I

MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED PART - I MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED 00809 PART I MISSION AND OBJECTIVES OF Shri. Barkakati, CMD, NEEPCO signing

More information

LEVY OF TAX ON ENTRY OF GOODS BY THE STATE GOVERNMENTS

LEVY OF TAX ON ENTRY OF GOODS BY THE STATE GOVERNMENTS LEVY OF TAX ON ENTRY OF GOODS BY THE STATE GOVERNMENTS - A PAN-INDIA OVERVIEW (I) Legislative Background of the Levy Under Article 246 (3) of the Constitution of India, the State Government has exclusive

More information

Note on ICP-CPI Synergies: an Indian Perspective and Experience

Note on ICP-CPI Synergies: an Indian Perspective and Experience 2 nd Meeting of the Country Operational Guidelines Task Force March 12, 2018 World Bank, Washington, DC Note on ICP-CPI Synergies: an Indian Perspective and Experience 1. Meaning and Scope 1.1 International

More information

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION Vidyut Aayog Bhawan, Block No, 37, SDA Complex, Kasumpti, Shimla , Himachal Pradesh

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION Vidyut Aayog Bhawan, Block No, 37, SDA Complex, Kasumpti, Shimla , Himachal Pradesh HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION Vidyut Aayog Bhawan, Block No, 37, SDA Complex, Kasumpti, Shimla-171009, Himachal Pradesh In the matter of: Fixing the rate of sale of Free Power by the

More information

1,07,758 cr GoI allocations for Ministry of Rural Development (MoRD) in FY

1,07,758 cr GoI allocations for Ministry of Rural Development (MoRD) in FY BUDGET BRIEFS Vol 10/ Issue 9 Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), GoI, 2017-18 HIGHLIGHTS Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) is a flagship

More information

Post and Telecommunications

Post and Telecommunications Post and Telecommunications This section presents operating and financial data relating to the different branches of the Department of Posts including the Post Office Savings Banks. It comprises statistics

More information

Dependence of States on Central Transfers: State-wise Analysis

Dependence of States on Central Transfers: State-wise Analysis Dependence of States on Central : State-wise Analysis C. Bhujanga Rao and D. K. Srivastava Working Paper No. 2014-137 May 2014 National Institute of Public Finance and Policy New Delhi http://www.nipfp.org.in

More information

Year Ended March 31, 2011

Year Ended March 31, 2011 FORM NL-1-B-RA Name of the Insurer: TATA AIG GENERAL INSURANCE COMPANY LIMITED IRDA Registration No. 108, dated January 22, 2001 REVENUE ACCOUNT FOR THE YEAR ENDED MARCH 31, 2011 Particulars Schedule Year

More information

Eligible students have to contact our branches where they have availed/availing loans.

Eligible students have to contact our branches where they have availed/availing loans. Eligible students have to contact our branches where they have availed/availing loans. The last date for Banks to submit subsidy claims to Nodal Bank is 31.08.2014. Hence, we advise the students to submit

More information

JOINT STOCK COMPANIES

JOINT STOCK COMPANIES This section contains statistics relating to joint stock companies which are based on returns received from Registrars of Joint Stock Companies. Tables 25.1 (A) (B) to 25.4 These tables present data regarding

More information

No.6/1/2016-DCH/P&S GOVERNMENT OF INDIA MINISTRY OF TEXTILES OFFICE OF THE DEVELOPMENT COMMISSIONER FOR HANDLOOMS ***

No.6/1/2016-DCH/P&S GOVERNMENT OF INDIA MINISTRY OF TEXTILES OFFICE OF THE DEVELOPMENT COMMISSIONER FOR HANDLOOMS *** No.6/1/2016-DCH/P&S GOVERNMENT OF INDIA MINISTRY OF TEXTILES OFFICE OF THE DEVELOPMENT COMMISSIONER FOR HANDLOOMS *** Invitation for Expression of Interest (EOI) for Evaluation study of the implementation

More information

4.4 Building Name 4.5 Block/Sector. 4.8 City 4.9 State Code (Refer to State Code in instructions)

4.4 Building Name 4.5 Block/Sector. 4.8 City 4.9 State Code (Refer to State Code in instructions) FORM No. 61A [See rule 114E] Annual Information Return under section 285BA of the Income -tax Act, 1961 (PART-A) Please see the instructions and fill up relevant columns 1. Name of the person (in block

More information

GST Update M.S. CHHAJED & CO. GST UPDATE 2/

GST Update M.S. CHHAJED & CO. GST UPDATE 2/ GST Update 02 2018-19 01st June 2018 FOR PRIVATE CIRCULATION ONLY M.S. CHHAJED & CO. GST UPDATE 2/18-19 1 E-way Bill Now E-way Bill shall be required to be generated for intra-state movement of goods in

More information

Ujwal Discom Assurance Yojana

Ujwal Discom Assurance Yojana Ujwal Discom Assurance Yojana 9 th December, 2017 DFID s Technical Assistance Programme Supporting structural reforms in the Indian Power Sector The UK s Department for International Development (DFID)

More information

FOREWORD. Shri A.B. Chakraborty, Officer-in-charge, and Dr.Goutam Chatterjee, Adviser, provided guidance in bringing out the publication.

FOREWORD. Shri A.B. Chakraborty, Officer-in-charge, and Dr.Goutam Chatterjee, Adviser, provided guidance in bringing out the publication. FOREWORD The publication, Basic Statistical Returns of Scheduled Commercial Banks in India, provides granular data on a number of key parameters of banks. The information is collected from bank branches

More information

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12 TABLE OF CONTENTS S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY 2013-14 3-8 II PRAYER 09 III AFFIDAVIT 10-11 IV AUTHORIZATION 12 V SUB INDEX OF TRUE UP TARIFF PROPOSAL 1 CAPACITY 13-16 2

More information

MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE. No.04/RN/Ref./January/2017

MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE. No.04/RN/Ref./January/2017 MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE No.04/RN/Ref./January/2017 For the use of Members of Parliament NOT FOR PUBLICATION 1 INDUS WATERS TREATY 1960 Prepared

More information

EXPORT OF GOODS AND SOFTWARE REALISATION AND REPATRIATION OF EXPORT PROCEEDS LIBERALISATION

EXPORT OF GOODS AND SOFTWARE REALISATION AND REPATRIATION OF EXPORT PROCEEDS LIBERALISATION Corporate Law Alert J. Sagar Associates advocates and solicitors Vol.16 April 30, 2011 RBI EXPORT OF GOODS AND SOFTWARE REALISATION AND REPATRIATION OF EXPORT PROCEEDS LIBERALISATION The Reserve Bank of

More information

IRDA PUBLIC DISCLOSURES FOR THE QUARTER ENDED JUNE 30, 2014

IRDA PUBLIC DISCLOSURES FOR THE QUARTER ENDED JUNE 30, 2014 IRDA PUBLIC DISCLOSURES FOR THE QUARTER ENDED JUNE 30, 2014 Name of the Insurer: HDFC Standard Life Insurance Company Limited Registration Number and Date of Registration with the IRDA : 101 dated 23rd

More information

Financial Results Q3/FY February 2019

Financial Results Q3/FY February 2019 Financial Results Q3/FY18-19 08 February 2019 HIGHLIGHTS - DEC 2018 Total Business Total Deposit Gross Advance Operating Profit (Q-3) Rs. 291519 Crore Rs. 177906 Crore Rs.113610 Crore Rs. 381 Crore Basel

More information

ROLE OF PRIVATE SECTOR BANKS FOR FINANCIAL INCLUSION

ROLE OF PRIVATE SECTOR BANKS FOR FINANCIAL INCLUSION 270 ROLE OF PRIVATE SECTOR BANKS FOR FINANCIAL INCLUSION ABSTRACT DR. BIMAL ANJUM*; RAJESHTIWARI** *Professor and Head, Department of Business Administration, RIMT-IET, Mandi Gobindgarh, Punjab. **Assistant

More information

Power Procurement Strategy

Power Procurement Strategy Power Procurement Strategy 01.03.16 IIT-Kanpur For Public Use POWER SECTOR OVERVIEW Source: Executive Summary of October 2015, CEA *including renewable generation Installed Capacity (All) Category Installed

More information

Q4 FY 13. Investor Information

Q4 FY 13. Investor Information Q4 FY 13 Investor Information Key Messages : FY 13 Retail Advance grew by 25.47% (12.58%) SME Advance grew by 22.44% (9.49%) Retail & SME Customer base increased by 79.8% in 12 months (32.90%) Other Income

More information

Investor Presentation March-2014

Investor Presentation March-2014 Investor Presentation March-2014 1 IMPORTANT NOTICE No representation or warranty, express or implied is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness

More information

Fire Marine Miscellaneous Total Fire Marine Miscellaneous Total 3,37,441 23,19,275 2,14,17,685 2,40,74,401 2,67,675 22,58,259 1,81,45,741 2,06,71,675

Fire Marine Miscellaneous Total Fire Marine Miscellaneous Total 3,37,441 23,19,275 2,14,17,685 2,40,74,401 2,67,675 22,58,259 1,81,45,741 2,06,71,675 FORM NL-1-B-RA Name of the Insurer: TATA AIG GENERAL INSURANCE COMPANY IRDA Registration No. 108, dated January 22, 2001 REVENUE ACCOUNT FOR THE YEAR ENDED Particulars Schedule For the YEAR ENDED For the

More information

ADB INDIA PORTFOLIO,

ADB INDIA PORTFOLIO, CAPE India, Supplementary Linked Document 1 ADB INDIA PORTFOLIO, 2007 2015 Table 1: Sovereign Loans Loan No. Project Name Amount ($ million) PCR (PVR) Agriculture, Natural Resources, and Rural Development

More information

SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS

SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SYSTEM SCHEME

More information

POWER GENERATION. Public Enterprises Survey : Vol-II 295

POWER GENERATION. Public Enterprises Survey : Vol-II 295 POWER GENERATION Public Enterprises Survey 2015-2016 : Vol-II 295 14. As on 31.03.2016, there were 11 Central Public Sector Enterprises in the group. The names of these enterprises along with their year

More information

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun BEFORE IN THE MATTER OF: AND IN THE MATTER OF: THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.443/2007 Approval of tariff for supply of electricity from 400 MW Vishnu Prayag Hydroelectric

More information

Insolvency Professionals to act as Interim Resolution Professionals or Liquidators (Recommendation) Guidelines, 2018

Insolvency Professionals to act as Interim Resolution Professionals or Liquidators (Recommendation) Guidelines, 2018 Insolvency Professionals to act as Interim Resolution Professionals or Liquidators (Recommendation) Guidelines, 2018 Provisions in the Insolvency and Bankruptcy Code, 2016 31 st May, 2018 1. Section 16(3)(a)

More information

Subject: Allocation of foodgrains under Welfare Institutions and Hostels Scheme

Subject: Allocation of foodgrains under Welfare Institutions and Hostels Scheme No.9-5/2014-BP-1I Government of India Ministry of Consumer Affairs, Food & Public Distribution Department of Food & Public Distribution Krishi Bhawan, Rafi Marg, New Delhi -110 001 Dated - September 1,

More information

STATE DOMESTIC PRODUCT

STATE DOMESTIC PRODUCT CHAPTER 4 STATE DOMESTIC PRODUCT The State Domestic Product (SDP) commonly known as State Income is one of the important indicators to measure the economic development of the State. In the context of planned

More information

CENTRAL WAREHOUSING CORPORATION (A GOVT. OF INDIA UNDERTAKING)

CENTRAL WAREHOUSING CORPORATION (A GOVT. OF INDIA UNDERTAKING) CENTRAL WAREHOUSING CORPORATION (A GOVT. OF INDIA UNDERTAKING) No. CWC/FD- Taxation/GST/2017-18 Dated: 30.01.2018 GST FAQs-5 1. All the Regional Managers of CWC 2. All the Executive Engineers in -charge

More information

SJVN Limited Q2 & H1 FY-19 Results Conference Call

SJVN Limited Q2 & H1 FY-19 Results Conference Call SJVN Limited Q2 & H1 FY-19 Results Conference Call November 12, 2018 Management: Analyst: Mr. N. L. Sharma Chairman & Managing Director Mr. A. S. Bindra Director (Finance) Mr. Harshit Kapadia Elara Securities

More information

FORM L-1-A : Revenue Account. FORM L-1-A : Revenue Account UP TO THE QUARTER ENDED ON JUNE Non Participating (Linked) Total

FORM L-1-A : Revenue Account. FORM L-1-A : Revenue Account UP TO THE QUARTER ENDED ON JUNE Non Participating (Linked) Total Insurer : DHFL Pramerica Insurance Company Limited Registration No. 140 ; Date of Registration with the IRDAI: June 27, 2008 Revenue Account For the quarter Ended June 30, 2017 FORM L-1-A : Revenue Account

More information

Inclusive Development in Bihar: The Role of Fiscal Policy. M. Govinda Rao

Inclusive Development in Bihar: The Role of Fiscal Policy. M. Govinda Rao Inclusive Development in Bihar: The Role of Fiscal Policy M. Govinda Rao Introduction Fiscal policy is a means to achieving inclusive growth. Despite impressive growth performance, uneven regional spread.

More information

INDICATORS DATA SOURCE REMARKS Demographics. Population Census, Registrar General & Census Commissioner, India

INDICATORS DATA SOURCE REMARKS Demographics. Population Census, Registrar General & Census Commissioner, India Public Disclosure Authorized Technical Demographics Public Disclosure Authorized Population Urban Share Child Sex Ratio Adults Population Census, Registrar General & Census Commissioner, India Population

More information

Analyzing Data of Pradhan Mantri Jan Dhan Yojana

Analyzing Data of Pradhan Mantri Jan Dhan Yojana Technical Report 217 Analyzing Data of Pradhan Mantri Jan Dhan Yojana Tulika Dutta and Ashish Das Department of Mathematics Indian Institute of Technology Bombay Mumbai-476, India May 217 Indian Institute

More information

PERIODIC DISCLOSURES FORM NL-1-A-REVENUE ACCOUNT TATA AIG GENERAL INSURANCE COMPANY LIMITED IRDAI Registration No. 108, dated January 22, 2001

PERIODIC DISCLOSURES FORM NL-1-A-REVENUE ACCOUNT TATA AIG GENERAL INSURANCE COMPANY LIMITED IRDAI Registration No. 108, dated January 22, 2001 FORM NL-1-A-REVENUE ACCOUNT IRDAI Registration No. 18, dated January 22, 21 1 Premium earned (Net) NL-4- Premium Schedule 2 Profit/ Loss on sale/redemption of Investments Schedule REVENUE ACCOUNT FOR THE

More information

Disclosures - LIFE INSURANCE COMPANIES- WEBSITE

Disclosures - LIFE INSURANCE COMPANIES- WEBSITE Disclosures - LIFE INSURANCE COMPANIES- WEBSITE Form NO. L-1-A-RA L-2-A-PL L-3-A-BS L-4-PREMIUM SCHEDULE L-5-COMMISSION SCHEDULE L-6-OPERATING EXPENSES SCHEDULE L-7-BENEFITS PAID SCHEDULE L-8-SHARE CAPITAL

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865

More information

IJPSS Volume 2, Issue 9 ISSN:

IJPSS Volume 2, Issue 9 ISSN: REGIONAL DISPARITY IN THE DISTRIBUTION OF AGRICULTURAL CREDIT DR.S.GANDHIMATHI* DR.P.AMBIGADEVI** V.SHOBANA*** _ ABSTRACT The Eleventh Five year plan makes specific focus on the inclusive growth of the

More information

PETITION NO. 54 /2012

PETITION NO. 54 /2012 PUNJAB STATE ELECTRICITY REGULATORY COMMISSION PETITION NO. 54 /2012 Vetting of Capital Cost & Various Components of Tariff Calculations Submitted by Final Review Report (July 2013) Lahmeyer International

More information

2011: Annexure I. Guidelines/Norms for Utilization of Funds for conducting Soeio-Economic and Caste Census

2011: Annexure I. Guidelines/Norms for Utilization of Funds for conducting Soeio-Economic and Caste Census Annexure I I. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Guidelines/Norms for Utilization of Funds for conducting Soeio-Economic and Caste Census 2011: State wise Number of s may be taken as per population

More information

FORM L-1-A : Revenue Account. FORM L-1-A : Revenue Account UP TO THE QUARTER ENDED ON JUNE Non Participating. (Linked) Individual

FORM L-1-A : Revenue Account. FORM L-1-A : Revenue Account UP TO THE QUARTER ENDED ON JUNE Non Participating. (Linked) Individual Insurer : DHFL Pramerica Insurance Company Limited Registration No. 140 ; Date of Registration with the IRDAI: June 27, 2008 Revenue Account For the quarter Ended March 31, 2018 FORM L-1-A : Revenue Account

More information

Analysis of State Budgets :

Analysis of State Budgets : Analysis of State Budgets 2017-18: Emerging Issues policy brief on state finances 2017 Pinaki Chakraborty Manish Gupta Lekha Chakraborty Amandeep Kaur 1 Introduction While the Union Government finances

More information

Irrigation Projects The Double Edged Sword for EPC players of Andhra Pradesh/Telangana States

Irrigation Projects The Double Edged Sword for EPC players of Andhra Pradesh/Telangana States Ke Irrigation Projects The Double Edged Sword for EPC players of Andhra Pradesh/Telangana States Ratings July, 2016 Background India, being an agrarian economy, agriculture plays a vital role in the overall

More information

JSW Energy Track Record

JSW Energy Track Record Name of the JSW Energy Limited 1 Type of Issue IPO 2 Issue Size (Rs. Cr) 2,700 3 Grade of issue alongwith name of the rating agency Name Credit Analysis & Research Limited Grade IPO Grade 4 4 Subscription

More information

REGARDING : Hydro Electric project Starred A.Q. No: 62 : Mr. G.M.Saroori:Will the Government please state :-

REGARDING : Hydro Electric project Starred A.Q. No: 62 : Mr. G.M.Saroori:Will the Government please state :- REGARDING : Hydro Electric project Starred A.Q. No: 62 : Mr. G.M.Saroori:Will the Government please state :- Question Reply a) the status of RGGVKY (Phase-II) and DDUGJY together with the funds released

More information

Issues in Health Care Financing and Provision in India. Peter Berman The World Bank New Delhi

Issues in Health Care Financing and Provision in India. Peter Berman The World Bank New Delhi Issues in Health Care Financing and Provision in India Peter Berman The World Bank New Delhi Financing and Provision of Health Care: Some Introductory Concepts Consider whole system Government and non-government,

More information

GST Concept and Design

GST Concept and Design GST Concept and Design GST Understanding from the First discussion paper released by the Empowered Committee of State Finance Ministers on November 10, 2009 1 Understanding GST Brief History Need for GST

More information

Shri C. L. Thangliana Chief Engineer (P&E) Mizoram

Shri C. L. Thangliana Chief Engineer (P&E) Mizoram Shri M. R. Ghosh Chairman & Managing Director and Director (Finance) Shri J. Barkakati Director (Technical) Shri I. P. Barooah Director (Personnel) Shri Gurdial Singh Member (Hydro), CEA Shri Sanjay Chadha

More information

GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE

GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE 425 SHRI VENKATESH BABU T.G.: SHRI KESHAV PRASAD MAURYA: DR. A. SAMPATH: ADV.

More information

... (Please leave one blank box between two words) 2. Permanent Account Number (PAN) of the person (see instructions)

... (Please leave one blank box between two words) 2. Permanent Account Number (PAN) of the person (see instructions) FORM NO. 66 [See rule 114E of income-tax rules, 1962] Annual Information Return under section 285BA of the Income-tax Act, 1961 (PART-A) Please see the instructions and fill up relevant columns Name of

More information

Investor Presentation

Investor Presentation FINANCIAL RESULTS FOR THE QUARTER & NINE-MONTH ENDED DEC 2013 Investor Presentation UCO BANK 1 BANKS OPERATING ENVIRONMENT Positives in Q3: Improving liquidity situation Ebbing stress on cost of funds

More information

International Journal for Research in Applied Science & Engineering Technology (IJRASET) Status of Urban Co-Operative Banks in India

International Journal for Research in Applied Science & Engineering Technology (IJRASET) Status of Urban Co-Operative Banks in India Status of Urban Co-Operative Banks in India Siddhartha S Vishwam 1, Dr. B. S. Chandrashekar 2 1 Research Scholar, DOS in Economics and Co-operation, University of Mysore, Manasagangothri, Mysore 2 Assistant

More information

Investor Presentation Q3 FY 12

Investor Presentation Q3 FY 12 Investor Presentation Q3 FY 12 Performance Highlights Profitability Measure ROA 1.30 1.44 1.41 11.37 14.29 14.56 Shareholder Value Measure ROE 37.30 38.91 37.13 Efficiency Measure COST-INCOME 0.81 0.58

More information

9M FY16 Results. Leading Diversified Renewable Energy Generation Company

9M FY16 Results. Leading Diversified Renewable Energy Generation Company 9M FY16 Results Leading Diversified Renewable Energy Generation Company Disclaimer Certain statements in this presentation concerning our future growth prospects are forward looking statements, which involve

More information

Investor Presentation June-2014

Investor Presentation June-2014 Investor Presentation June-2014 1 IMPORTANT NOTICE No representation or warranty, express or implied is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : /

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : / CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi 110 001 : 011-23353503/23752958 Public Notice No. : L-1/94/CERC/2011 Dated: 26 th June, 2015

More information

Measuring Outreach of Microfinance in India Towards A Comprehensive Index

Measuring Outreach of Microfinance in India Towards A Comprehensive Index From the SelectedWorks of Dr. Arindam Laha January, 2012 Measuring Outreach of Microfinance in India Towards A Comprehensive Index Dr. Arindam Laha Prof. Pravat Kumar Kuri Available at: https://works.bepress.com/arindam_laha/8/

More information

Indian Regional Rural Banks Growth and Performance

Indian Regional Rural Banks Growth and Performance Indian Regional Rural Banks Growth and Performance Syed Mahammad Ghouse ghouse.marium@gmail.com Narayana Reddy tnreddy.jntua@gmail JNTU College of Engineering Regional rural Banks play a vital role for

More information

BUDGET BRIEFS Vol 9/Issue 3 Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) GOI, ,07,758 cr

BUDGET BRIEFS Vol 9/Issue 3 Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) GOI, ,07,758 cr BUDGET BRIEFS Vol 9/Issue 3 Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) GOI, 2017- HIGHLIGHTS 1,07,758 cr Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) is

More information

National Rural Employment Guarantee Act (NREGA 2005) Santosh Mehrotra Senior Adviser (Rural Development) Planning Commission Government of India

National Rural Employment Guarantee Act (NREGA 2005) Santosh Mehrotra Senior Adviser (Rural Development) Planning Commission Government of India National Rural Employment Guarantee Act (NREGA 2005) Santosh Mehrotra Senior Adviser (Rural Development) Planning Commission Government of India 1 30 yr history of WEPs but Problems Low programme coverage

More information

Banking Sector Liberalization in India: Some Disturbing Trends

Banking Sector Liberalization in India: Some Disturbing Trends SPECIAL REPORT Banking Sector Liberalization in India: Some Disturbing Trends Kavaljit Singh In the first week of August 2005, Reserve Bank of India (RBI), country s central bank, issued a list of 391

More information

A. Background of evaluation of Crop Insurance in India.

A. Background of evaluation of Crop Insurance in India. A. Background of evaluation of Crop Insurance in India. 1. Comprehensive Crop Insurance Scheme (CCIS) To provide financial support to the farmers in the event of failure of crops as a result of natural

More information

Q2 FY15 & H1 FY15 NHPC Results Conference Call. October 31, 2014

Q2 FY15 & H1 FY15 NHPC Results Conference Call. October 31, 2014 Q2 FY15 & H1 FY15 NHPC Results Conference Call MANAGEMENT: MR. R. S. T. SAI CHAIRMAN AND MANAGING DIRECTOR, NHPC MR. RADHESHYAM MINA DIRECTOR, FINANCE AND PERSONNEL, NHPC MODERATOR: MR. DEEPAK AGRAWALA

More information

The National Rural Employment Guarantee Act 2005 (NREGA) Annual Report. April 2008-March 2009

The National Rural Employment Guarantee Act 2005 (NREGA) Annual Report. April 2008-March 2009 The National Rural Employment Guarantee Act 2005 (NREGA) Annual Report April 2008-March 2009 Ministry of Rural Development Department of Rural Development Government of India New Delhi The National Rural

More information

GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2557

GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2557 GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2557 TO BE ANSWERED ON THE 01 ST AUGUST, 2017 / SHRAVANA 10, 1939 (SAKA) PENSION TO FREEDOM FIGHTERS 2557. SHRI TAMRADHWAJ

More information

GOVERNMENT OF INDIA MINISTRY OF SOCIAL JUSTICE AND EMPOWERMENT LOK SABHA UNSTARRED QUESTION NO TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF SOCIAL JUSTICE AND EMPOWERMENT LOK SABHA UNSTARRED QUESTION NO TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF SOCIAL JUSTICE AND EMPOWERMENT LOK SABHA UNSTARRED QUESTION NO. 3334 TO BE ANSWERED ON 06.12.2016 OLD AGE HOMES 3334. SHRI RAJESH KUMAR DIWAKER: SHRI SUKHBIR SINGH JAUNAPURIA:

More information

In the estimation of the State level subsidies, the interest rates that have been

In the estimation of the State level subsidies, the interest rates that have been Subsidies of the State Governments s ubsidies provided by the State governments have been estimated for 15 major States for 1993-94. As explained earlier, the major data source is the Finance Accounts

More information

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES ANNEXURE - I Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited, Indore INDEX OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES Financial Formats 1 Sheet S1 Profit

More information

Microfinance Industry Penetration in India: A State - wise Analysis in Context of Micro Credit

Microfinance Industry Penetration in India: A State - wise Analysis in Context of Micro Credit 24 Microfinance Industry Penetration in India: A State - wise Analysis in Context of Micro Credit Laxmi Devi, Assistant Professor, Gargi College, University of Delhi Umed Yadav, Student, Dept. of Commerce,

More information

Investor Presentation

Investor Presentation Investor Presentation December 2014 1 Overview of Jaypee Group 2 Corporate Structure Jaiprakash Associates Limited (JAL) E&C Cement 19.45 MTPA Real Estate & Hospitality Listed company BOO Power 60.72%

More information

Schemes->Margin Money Scheme of Khadi & Village Industries Commission (KVIC) MARGIN MONEY SCHEME OF KHADI & VILLAGE INDUSTRIES COMMISSION (KVIC)

Schemes->Margin Money Scheme of Khadi & Village Industries Commission (KVIC) MARGIN MONEY SCHEME OF KHADI & VILLAGE INDUSTRIES COMMISSION (KVIC) Schemes->Margin Money Scheme of Khadi & Village Industries Commission (KVIC) MARGIN MONEY SCHEME OF KHADI & VILLAGE INDUSTRIES COMMISSION (KVIC) Implementing Agency Official(s) to be contacted Khadi &

More information

A Class 2 Digital Signature Certificate is available for download after verification based on a trusted and pre-verified database.

A Class 2 Digital Signature Certificate is available for download after verification based on a trusted and pre-verified database. S No. 1 2 3 4 5 New Description of Services DSC Class-2/2 Years/Signature DSC Class-2/ 2 Years/ Combo DSC Class-3/2 Years/Signature DSC Class-3/ 1 Year/ Combo DSC Class-3/ 2 Year/ Combo 6 DSC Token Legends

More information

Q2 FY 12 INVESTOR PRESENTATION

Q2 FY 12 INVESTOR PRESENTATION Q2 FY 12 INVESTOR PRESENTATION PERFORMANCE HIGHLIGHTS Profitability Measure ROA 1.34 1.15 1.44 11.48% 11.28% 14.29% Shareholder Value Measure ROE 38.60% 38.91% Efficiency Measure COST-INCOME 33.90% 0.68

More information

ARVG & ASSOCIATES CHARTERED ACCOUNTANTS

ARVG & ASSOCIATES CHARTERED ACCOUNTANTS LEVY OF TAX ON ENTRY OF GOODS BY THE STATE GOVERNMENTS - A PAN-INDIA OVERVIEW (I) Legislative Background of the Levy Under Article 246 (3) of the Constitution of India, the State Government has exclusive

More information

UDAY Scheme: Perspective and Progress

UDAY Scheme: Perspective and Progress UDAY Scheme: Perspective and Progress Contact: Madan Sabnavis Chief Economist 91-022-67543489 Darshini Kansara Research Associate Darshini.Kansara@careratings.com 91-022-67543679 Mradul Mishra (Media Contact)

More information

FORM L-1-A : Revenue Account FORM L-1-A : Revenue Account. Non Participating (Non-Linked) Non Participating (Linked) Participating (Non-Linked) Total

FORM L-1-A : Revenue Account FORM L-1-A : Revenue Account. Non Participating (Non-Linked) Non Participating (Linked) Participating (Non-Linked) Total Insurer : DHFL Pramerica Insurance Company Limited Registration No. 140 ; Date of Registration with the IRDAI: June 27, 2008 Revenue Account For the quarter Ended March 31,2018 FORM L-1-A : Revenue Account

More information