Agenda 8 th User Group at Brussels Airport* 17/04/ :30-12:30 CET

Size: px
Start display at page:

Download "Agenda 8 th User Group at Brussels Airport* 17/04/ :30-12:30 CET"

Transcription

1 Agenda 8 th User Group at Brussels Airport* 17/04/ :30-12:30 CET TIME AGENDA ITEM PRESENTER 09:30 09:40 1. Welcome, agenda Mark Pickles 09:40 10:15 2. Project status update incl. matters related to EFET and eurelectric letters 10:15 10:45 3. Extended trial period a) Feedback market parties b) NEMO s view (implicit trading) c) RTE s/amprion s view (explicit trading) Mark Pickles Vladimir Satek 10:45-11:15 4. Preparations 2 nd trial period Vladimir Satek 11:15 12:15 5. Go-live preparations and process a) Go-live readiness and road-map b) Overview products and GOT&GCT c) Cross-border trading possibilities for D-1 delivery Vladimir Satek Pietro Rabassi Viviane Illegems 12:15-12:30 6. Wrap up Mark Pickles * Exact address: Sheraton Brussels Airport Hotel Brussels National Airport 1930 Zaventem, Belgium 1

2 Agenda 1. Welcome, agenda 2. Project status update 3. Extended trial period 4. Preparations 2 nd trial period 5. Go-live preparations and process 6. Wrap up 2

3 2. Project Timeline High Level Delivery Plan until Go-Live (updated) Dec 14 Apr 15 Mar 16 Oct 16 Nov 17 May 18 LIP Testing Preparations LIP Testing Execution Transitional Period XBID Core Development DBAG SM* Specification SM* Development XBID Test (FAT-IAT) SM Test XBID Test (UAT) Go-Live Preparation Go-Live Window Completed In progress Planned LIP scope *SM Shipping Module XBID DBAG Functional Specification Release 1.0 UAT 1 (Functional) Release 1.2 Testing May-Aug UAT 3 (Integration) UAT 5 (Fallback) UAT Preparations UAT 2 (Performance) Timeline updated to reflect additional testing required for fixes of latent faults identified by DBAG/Release UAT 4 (Simulation) UAT 1 (new functionalities.), UAT 3 (reduced) & regression tests Release 1.3 & 1.4 Testing Sept 17 April 18 Security tests First LIPs Target Go-Live 12 th /13 th June 2018 UAT 1, 2 & 3 UAT 5 UAT 4

4 2. Project Progress Achievements (1/2) Technical Release 1.4. scope and approach agreed for testing the latent faults identified by DBAG. Tests have been undertaken. Bugs have largely been rectified by DBAG, and testing/verification of the fixes is in progress. End to End System Integration Testing is underway (all Project Parties and all systems). This testing is due to complete on 27/04. Five clear days testing without issues is required to demonstrate stability of the system. Certification activities for the central system are being delivered according to plan High level functional concept for Losses on DC cables has been agreed Discussions continue with DBAG about XBID Release 2.0 which will deliver improvements to the Shipping Module as well as Enhanced Shipper Part II Operational readiness All products (15 minutes, 30 minutes, User Defined Blocks etc.) are confirmed as being available on specified borders for go-live Extended Trial Period underway. Second Trial Period scheduled from 14/05-18/05. Good progress achieved with Operational Training Go-live activities are agreed Plans are in place to establish OPSCOM from go-live. PMO has been appointed. Incident Committees will also be held as needed. 4

5 2. Project Progress Achievements (2/2) Contractual The IDOA has been finalised and issued to project parties for submission to NRAs as required Significant progress has been made in resolving outstanding cost sharing and splitting clarifications Project Parties have been asked to confirm their willingness to sign the IDOA (by 13/04) Signature process due to commence 23/04 TCID (TSO cooperation agreement) and ANIDOA (NEMO cooperation agreement) are finalised Accession Stream Accession Stream Management Events continue to be held to ensure continual collaboration and interface with the central project Lessons learnt workshop will be held with Accession Parties after 1 st go-live 2 nd wave go-live plan is in place and tracked Lock In A Lock-in was held on 16 th April with Dr Borchardt to tackle all outstanding blockers for golive. The outcomes are detailed on the next four slides. 5

6 2. Potential blockers for go-live Outcome of Lock In (1/4) 1. ECC/NP Cross Clearing Agreement Based on NRAs information, the participants agreed that NEMOs/CCPs/SAs should not charge each other crossclearing fees for the single intraday market. Each NEMOs/CCPs/SAs should bear its own clearing and settlement costs related to the single intraday market and seek cost recovery from the respective NRAs. Based on Article 3 of CACM, the Commission agreed to monitor the implementation of NRAs decisions on the recovery of NEMOs clearing and settlement costs. In this context, the Commission highlighted that the clearing and settlement costs related to activities performed by NEMOs on behalf of TSOs should be recovered via the TSOs tariffs. Based on this monitoring, the Commission will take the appropriate measures, including the initiative for CACM amendments. In this context, the Commission will write a report as soon as possible and no later than one year after XBID go-live. 6

7 2. Potential blockers for go-live Outcome of Lock In (2/4) 2. Local Order Book/Parallel Trading The Commission highlighted that all information describing the interaction between XBID and local order books should be made publicly available as soon as possible. Therefore, the NEMOs agreed to publish all relevant information on their websites, including EPEX paper sent to the Commission on 14 th of March updated with the Exchange Council approval on 20 th March. All participants confirm that products offered on XBID will not be offered in parallel in the local trading systems during cross-border allocation. Pre-defined blocks as described by EPEX in the rulebook will not be available on XBID at go-live. Such products are defined as hourly block orders covering multiple hours that are pre-defined in the trading system by EPEX. If it is demonstrated that those predefined blocks are needed for the single intraday market, a roadmap should be agreed in the NEMO committee in order to move them to XBID as soon as possible. Two examples: block baseload covering hours 1 to 24 and block peak load hours 9 to 20. 7

8 2. Potential blockers for go-live Outcome of Lock In (3/4) 3. Tick Size The Commission stressed the importance of not delaying the go-live of XBID further. Therefore, the participants agreed as follows: XBID will go-live with a tick size of XBID will undertake an interim assessment by mid-august to see if there are any significant detrimental impacts of the tick size on the single intraday market. In this case, the concerned NEMOs will take the necessary operational measures to mitigate those negative impacts. XBID will request DBAG to perform a sensitivity analysis on the effect of the tick size on the single intraday market, especially on the visibility of the order book, by mid- October Depending on the results, a change of the tick size on XBID should be implemented by all NEMOs as soon as possible and no later than end November The following question shall be asked to DBAG: what is the effect of the tick size change with particular regard to the market order book visibility? 8

9 2. Potential blockers for go-live Outcome of Lock In (4/4) 4. Cost sharing clarifications These are now all complete 5. Parties willingness to sign IDOA/cost socialisation Nearly all parties have confirmed their willingness to sign the IDOA (3 parties are due to confirm during this week). This minimises the impact of cost pre-financing by those parties who do sign 9

10 2. Feedback MPs on sustainable order book depth Background The order book depth applicable at the go live is set to 31 (for details on the meaning of the order book depth and implication on the block orders see the updated Q&A) The project parties are taking necessary steps to explore options for extension of the order book depth while reflecting required performance and system boundaries DBAG have provided the European Commission with slides which detail the rationale of the visible Order Book Depth limitation EFET have provided feedback to the EC Changes to Order Book Depth are not possible before go-live 10

11 Agenda 1. Welcome, agenda 2. Project status update 3. Extended trial period 4. Preparations 2 nd trial period 5. Go-live preparations and process 6. Wrap up 11

12 3. Trial Period extended opportunity for the Market Participants Background: In order to ensure a smooth transition to the XBID Solution 2 Trial Periods were offered to Market Participants. The results of the 1 st Trial Period has shown that not all Market Participants were able to finalize their internal process which limited Market Participants in the 1 st Trial Period. Project parties consider that readiness of the Market Participants for the go-live is important for the overall success. Therefore project parties have agreed to offer an extended opportunity for the Market Participants on the NEMO individual basis (2 nd Trial Period is not impacted by the extended opportunity) Extended opportunity: Based on individual offering and coordination of each NEMO and TSOs which are responsible for borders with explicit allocations. Technical details of the period and other specifics were provided by the individual NEMOs upon request of the Market Participants. The days for the provision of the capacity are foreseen for the delivery day of Tuesdays and Wednesdays (local offering may deviate from this principle). 12

13 3. Trial Period extended opportunity for the Market Participants a) Feedback market parties b) NEMO s view (implicit trading) c) RTE s/amprion s view (explicit trading) 13

14 Agenda 1. Welcome, agenda 2. Project status update 3. Extended trial period 4. Preparations 2 nd trial period 5. Go-live preparations and process 6. Wrap up 14

15 2 nd Trial Period - 1/3 The 2 nd Trial Period is a final stage of the XBID Project before the launch process is started. Therefore the focus is made to create an environment reflecting production like situation (to the extent feasible) 2 nd Trial Period is based on the final status of all project components as they will be used at the go live. All test activities for the Go Live XBID Solution are completed (Functional Tests, End to End tests, ) and XBID Solution deployed on the Trial Period environment. Final configuration of all XBID Solution components is applied (e.g. Product, Areas, Borders, ) Lessons learnt from the 1 st Trial Period and extended opportunity for Market Participants is applied (including applicable procedures) Local Solutions fully reflect status which will be used at go live Liquidity: 1 st Trial Period showed that liquidity of the market was limited due to limited participation (which is expected to be mitigated by extended trial period) and unfocused utilization of the XBID Solution. The principal assumption is that Market Participants shall not be limited in any way or forced to follow trading patterns predefined by the Project Parties during the Trial Period. Still it may be of Market Participants interest to understand utilization of the XBID Solution during the 1 st Trial Period (see the next slide). Note: In order to address Market Participants concern on the liquidity the NEMOs may generate liquidity during the 2 nd Trial Period 15

16 2 nd Trial Period - 2/3 The figures above represents daily distribution of orders and trades for all days of the 1 st Trial Period Trade distribution reflect in principle an order distribution Majority of the Market Participant activities are executed during the office hours (9:00-14:00 CET). No activity during the night. Note that XBID Solution is available 24 hours a day reflecting LTS limitations if any, however, operator s support is provided as indicated in the next slide 16

17 2 nd Trial Period - 3/3 Day Special scenarios Comments 1 Mo 14/05 None Regular trading day 2 Tu 15/05 None Regular trading day Part 2 3 We 16/05 Trade recall and trade cancellation of the implicit trades Closing of market(s) 4 Th 17/05 Trade recall and trade cancellation Closing of several borders including French-German border 5 Fr 18/05 XBID not available (between 14:00 15:00) There are new rules for this process and for some MPs the system is working differently from what they are used to. Still to be decided which market(s) will be closed (simulate situation of partial decoupling) See 16/05 No trading and capacity allocation in XBID possible. LTSs services may be still available. During the trial period, the daily schedule is as follows: 09:00 17:00 CET: Regular trading 09:30 11:00 CET: Special scenarios 13:00 16:00 CET: Special scenarios 17

18 Agenda 1. Welcome, agenda 2. Project status update 3. Extended trial period 4. Preparations 2 nd trial period 5. Go-live preparations and process 6. Wrap up 18

19 5.a) Go-live readiness and road-map 1/3 Go live represent a final step in the complex coordination process consisting of two principal areas: Preconditions* for activation of the launch process consisting of but not limited to: Contractual arrangements on global, regional and local levels, Technical readiness of XBID Solution and all Local Solutions, Operational readiness focused on organization, procedures, staffing,, Preparation, validation and execution of launch related activities and deliverables: Launch Approach - defines strategic principles as coordinated launch of all LIPs which are ready big bang, principles for activation of the rollback etc. Launch Matrix & Launch Plan lists detailed activities and organization of the launch process. Launch Execution Plan timetable of the particular steps and deliverables to be executed during the launch process (what, when, by whom) * Around 30 groups of deliverables are monitored for the purpose of go live readiness 19

20 5.a) Go-live readiness and road-map - 2/3 Go live readiness Status of major activities non legal activities as of 16/04/ /7/17 22/9/17 22/01/18 30/04/18 27/04/18 LIP testing Release 1.4 including E2E IT & Testing activities Env. Of Central system ready Additional 22/9/17 security test 05/12/17 Finalization of the XBID configuration 26/2-2/3/ /5/18 Release Testing TP Preparation TP 1st run TP 2nd run Certification of the central system 01/12/17 5/18 First delivery day of XBID = 13/06/ /02/18 30/03/18 Operational activities & General support Completed In progress Planned Launch Approach, Matrix, Plan, Execution Plan Operational Training - Planning Validation Go Live check lists and scripts, Roll-back & Roll forward procedures Operational Training - Execution First LIPs Go-Live Q /01/18 23/2/18 30/04/18 20

21 5.a) Go-live readiness and road-map - 3/3 Road-map Launch Execution Plan (categories) Market Participants involved 30/05 04/06 11/06 12/06 13/06 Explicit Participants connectivity (API, GUI)** Explicit Allocation* Final validation of the XBID Solution configuration Activation of operational services Communication & data transfer validation Trading* 700+ number of steps/checks to be executed during launch process (each check is clearly assigned to the actor with a clear deadline for completion) * Different needs of the regional and local markets are reflected (individual schedule per NEMO/TSO) => Opening of Trading by NEMOs and availability of capacities per brother can differ (first data submission expected by 2 pm) ** Connectivity window for Explicit Market Participants closes by 08/06 17:00, new one opens after successful completion of go live 21

22 5.b) Overview of established Market Areas as part of the 1 st go-live Delivery Areas to be launched at first go-live 50Hertz Transmission GmbH Amprion Austria Denmark West Denmark East Estonia Elia System Operator Finland Finland-Russia Exchange Area Lithuania Latvia Morocco Delivery Area Netherlands Norway 1-5 Portugal Delivery Area France Sweden 1-4 Spain Delivery Area TransnetBW GmbH TenneT TSO GmbH NRAs have confirmed that explicit access is only on the DE/FR border 22

23 5.b) Products offered in the XBID solution A. Overview XBID system supports the following products: 15-minutes 30-minutes 60-minutes Hourly User Defined Blocks Products are configured to the XBID solution per market area For specific product availability in different market areas see next slide 23

24 5.b) Products offered in the XBID solution B. Details Size Price Tick Price Range Products Notes German TSO areas Austria France NL & Belgium Nordics & Baltics Min vol. Increment 0.1 MW EUR 0.01** per MWh /MWh to /MWh 15-min X X 30-min X X Iberia Hourly X X X X X X User Defined Blocks* X X X X X * Hourly blocks (not 15 or 30 min blocks) ** Confirmed 16/04 24

25 5.b) Products offered in the XBID solution C. Order types Order type Regular predefined Regular userdefined block Execution Restrictions NON (None) IOC (Immediate-or- Cancel) FOK (Fill-or-Kill) AON (All-or-Nothing) Validity Restrictions GTD (Good Till Date) GFS (Good For Session) GTD (Good Till Date) GFS (Good For Session) Iceberg NON (None) GTD (Good Till Date) GFS (Good For Session) Basket Orders None (1) Valid (2) Linked (3) 25 Predefined User- Defined Yes No Yes No Yes No -- Yes No (1) Orders are processed as if they would have been submitted separately (2) All orders in the basket are accepted or rejected (3) All orders in the basket must be executed immediately with their entire quantity, all orders inside basket have the execution restriction "FOK"

26 5.b) Products offered in the XBID solution D. Capacity requests types for CMM Capacity requests can be sent to the CMM for one or more Hours of delivery and/or one or more Half-Hours of delivery 3 types of request Immediate Or Cancel: request can be partially accepted All Or Nothing: request cannot be accepted partially All Contracts Equal (for multiple contracts only): minimum capacity value available across all the contracts is allocated to all 26

27 5.b) Opening and closing times Intra-MA Opening times All products 15-min German TSO areas Austria France NL & Belgium Nordics & Baltics Iberia 18:00 15:00 15:00 14:00 14:00 14:00 Delivery (D)-30 min D-30 min Closing times 30-min D-30 min D-30 min Hourly D-30 min D-30 min D-30 min D-5 min D-60min* D-60 min User Defined Blocks D-30 min D-30 min D-30 min D-5 min D-60 min* Notes * Finland and Estonia at D-30 min 27

28 5.b) Opening and closing times Cross-MA Opening times^ Closing times Notes German TSO areas Austria France NL & Belgium Nordics Baltics Iberia^^ 22:00** 18:00 22:00 22:00 14:00** 18:00*** 22:00 D-60 min* *Estlink Closing time D-30 min; for FR-DE, same GCT applies to both half hours of a given hour **DE-AT, DE-DK2 (Kontek) and DE-DK1 opening at 18:00 ***Pending as part of overall decision by ACER - move it to 15:00 ^Pending IDCZGT overall regulatory decision by ACER by end of April 2018 ^^The capacity will be released in several batches during the day Ramping constraint on (DK1-NO2, DK1-SE3, DK1-DK2) Cross-border contract resolutions: - DE-AT border: 15 min - FR-DE border: 30 min - All other borders: 60 min 28

29 5.c) Cross-border trading possibilities for D-1 delivery (tentative)* 1/3 *Exact timing/sequence shall be properly confirmed shortly before the go-live through the usual market communication. D-2: Pre-launch D-1: Launch D: Delivery of energy traded in XBID 11 June 12 June 13 June 14 June LIP 1 Nordic borders No ATCs released for trading day D-1 11 June 12 June 13 June LIP 2 DK internal & Kontek No ATCs released for trading day D-1 11 June 12 June 13 June LIP 3 DE-DK1, DE-NL ATC released for trading day D-1 Trading for delivery day D-1 No trading for delivery D-1 18:00 11 June 18:00 12 June 13 June 29 Exception: The No trading for delivery D-1 period will not be applied to the interconnector AMP-NL Regular gate closures will be applied,

30 5.c) Cross-border trading possibilities for D-1 delivery (tentative)* 2/3 *Exact timing/sequence shall be properly confirmed shortly before the go-live through the usual market communication. D-2: Pre-launch D-1: Launch D: Delivery of energy traded in XBID 11 June 12 June 13 June 14 June LIP 4 NO2-NL No ATC released for trading day D-1 11 June 12 June 13 June LIP 5 FR-DE ATC released for trading day D-1 11 June 21:05 12 June 16:00 13 June LIP 6 BE-NL ATC released for trading day D-1 Trading for delivery day D-1 No trading for delivery D-1 21:00 16:00 11 June 12 June 13 June 30

31 5.c) Cross-border trading possibilities for D-1 delivery (tentative)* 3/3 *Exact timing/sequence shall be properly confirmed shortly before the go-live through the usual market communication. D-2: Pre-launch D-1: Launch D: Delivery of energy traded in XBID 11 June 12 June 13 June 14 June LIP 8 BE-FR ATC released for trading day D-1 11 June 21:05 12 June 16:00 13 June LIP 9&12 FR-ES LIP 13 Baltic (only for Baltic AC internal interconnectors, for the DC interconnectors with Nordic, the Nordic LIP 1 approach applies) ATC released for trading day D-1 17:00 12:00 17:00 11 June Explicit auction 12 June 13 June ATC released for trading day D-1 for D-1 No Auctions 14:00 14:00 11 June 12 June 13 June Trading for delivery day D-1 No trading for delivery D-1 31

32 Agenda 1. Welcome, agenda 2. Project status update 3. Extended trial period 4. Preparations 2 nd trial period 5. Go-live preparations and process 6. Wrap up 32

XBID Information Package Published February 2018 Updated December 2018

XBID Information Package Published February 2018 Updated December 2018 XBID Information Package Published February 2018 Updated December 2018 1. Purpose of this document This document centralises, consolidates and comprehensively describes the necessary information which

More information

Cross-Border Intraday: Questions & Answers

Cross-Border Intraday: Questions & Answers Last update: 04/12/2018 Cross-Border Intraday: Questions & Answers 1. What is the Cross-Border Intraday initiative? The Cross-Border Intraday initiative (XBID Project) started as a joint initiative by

More information

Nord Pool. XBID webinar, May 2018

Nord Pool. XBID webinar, May 2018 Nord Pool XBID webinar, May 2018 Timeline 2 nd May: Member test starting 14 th to 18 th May: XBID common trial period 12 th JUNE XBID Go-live 2 Nord Pool intraday market areas Nord Pool markets, part of

More information

HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations

HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations Friday July 20th ΟΤΕAcademy, Athens HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations Dr. Nikolaos P. Ziogos Introduction CACM XBID Participation in ID Market LIDAs GRIDAs XBID Results

More information

Info Session NWE Day-Ahead

Info Session NWE Day-Ahead Elia s European Market Design Work Group & Belpex Users Group Info Session NWE Day-Ahead Operational & contractual changes for Belgian wholesale market organization General overview NWE DAY-AHEAD PRICE

More information

NWE Info Session. Operational & contractual changes for Dutch wholesale market organization

NWE Info Session. Operational & contractual changes for Dutch wholesale market organization NWE Info Session Operational & contractual changes for Dutch wholesale market organization General principles OPERATIONAL PRINCIPLES & POSSIBLE SCENARIOS Price Coupling Process General term for ATC and/or

More information

Intraday Implicit Cross- Border allocation on BE-FR border. Description of the allocation mechanism

Intraday Implicit Cross- Border allocation on BE-FR border. Description of the allocation mechanism Intraday Implicit Cross- Border allocation on BE-FR border Description of the allocation mechanism Version Date 11 July 2016 Contents 1 Introduction...3 2 General Context and rationale of the project...3

More information

Intraday Implicit CrossBorder allocation on BE-NL. and borders (Interim Implicit Cross Border Intraday BE-NL. Description of the allocation mechanism

Intraday Implicit CrossBorder allocation on BE-NL. and borders (Interim Implicit Cross Border Intraday BE-NL. Description of the allocation mechanism Intraday Implicit CrossBorder allocation on BE-NL and borders (Interim Implicit Cross Border Intraday BE-NL Description of the allocation mechanism version 2.0) Description of the allocation mechanism

More information

Cross-Border Intraday: Questions & Answers

Cross-Border Intraday: Questions & Answers Cross-Border Intraday: Questions & Answers 1. What is the Cross-Border Intraday initiative? The Cross-Border Intraday initiative (XBID Project) is a joint initiative by the Power Exchanges (PXs): APX/Belpex,

More information

EUROPEAN POWER EXCHANGE

EUROPEAN POWER EXCHANGE 2016 EUROPEAN POWER EXCHANGE ABOUT EPEX SPOT EEX GROUP EEX / POWERNEXT 51% HGRT AMPRION / APG / ELIA / RTE / SWISSGRID / TENNET 49% SHAREHOLDER STRUCTURE SINCE NOVEMBER 2015 100% APX INCLUDING BELPEX 100%

More information

Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Functioning of the European Power Exchange

Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Functioning of the European Power Exchange Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Functioning of the European Power Exchange Patrick Adigbli, Head of Public & Regulatory Affairs, EPEX SPOT 1

More information

Intraday Cross Border The Netherlands-Belgium

Intraday Cross Border The Netherlands-Belgium Intraday Cross Border The Netherlands-Belgium Content 1. Overall design 1. Process description 2. Capacity calculation 3. Elbas trading platform 4. Tradable products 5. Timeline & Nominations 2. Contractual

More information

Agenda 9 th User Group meeting in Brussels* 21/11/ :30 16:00 CET

Agenda 9 th User Group meeting in Brussels* 21/11/ :30 16:00 CET Agenda 9 th User Group meeting in Brussels* 21/11/2018 12:30 16:00 CET TIME AGENDA ITEM PRESENTER 12:30 13:15 Lunch 13:15 13:25 1. Welcome, agenda Mark Pickles 13:25 13:50 2. Feedback Market Parties on

More information

Intraday Cross Border The Netherlands-Belgium

Intraday Cross Border The Netherlands-Belgium Intraday Cross Border The Netherlands-Belgium Content 1. Overall design 1. 2. 3. 4. 5. Process description Capacity calculation Elbas trading platform Tradable products Timeline & Nominations 2. Contractual

More information

Minutes of Workgroup European Market Design 29/09/2015

Minutes of Workgroup European Market Design 29/09/2015 Minutes of Workgroup European Market Design 29/09/2015 Present: B. De Wispelaere (FEBEG) J. Mortier (FEBEG) M. Van Bossuyt (FEBELIEC) A. Gillieaux (EFET) S. Harlem (FEBEG) N. Pierreux (BELPEX) S. Gabriels

More information

NWE Info Session. Operational & contractual changes for Dutch wholesale market organization

NWE Info Session. Operational & contractual changes for Dutch wholesale market organization NWE Info Session Operational & contractual changes for Dutch wholesale market organization Agenda Introduction Matthijs Nijpels General overview of NWE Price Coupling Thomas Donders Operational principles

More information

Info Session NWE Day-Ahead

Info Session NWE Day-Ahead Elia s European Market Design Work Group & Belpex Users Group Info Session NWE Day-Ahead Operational & contractual changes for Belgian wholesale market organization Agenda Introduction Pascale Fonck &

More information

Participants Forum 2014

Participants Forum 2014 Participants Forum 2014 Programme of the day 13.15 hrs Introduction 13.30 hrs Intraday 14.15 hrs Survey Results 14.30 hrs BritNed Operational Updates 15.00 hrs Tea / Coffee break 15.15 hrs New code 15.45

More information

Present: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners.

Present: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners. Deliberation Deliberation of the French Energy Regulatory Commission (CRE) dated 2 October 2013 approving the implicit Day-Ahead allocation method for interconnection capacity within the North- West Europe

More information

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: Launch of Elbas4 1(6)

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: Launch of Elbas4 1(6) Trading Appendix 3 Product Specifications Physical Markets Issued by Nord Pool Spot AS Effective from: Launch of Elbas4 1(6) PRODUCT SPECIFICATIONS - PHYSICAL MARKET 1 INTRODUCTION 1.1 General The following

More information

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018 Consultation document PC_2018_E_01 9 January 2018 Trg republike 3 1000 Ljubljana Slovenia T: +386 (0)8 2053 400 info@acer.europa.eu www.acer.europa.eu This consultation document is issued to invite comments

More information

APX Power NL Market Instrument Specifications

APX Power NL Market Instrument Specifications APX Power NL Market Instrument Specifications APX Power B.V. Atlas Arena Amsterdam Australia Building, 3 rd floor Hoogoorddreef 7 1101 BA Amsterdam The Netherlands T +31 (0)20 305 4000 F +31 (0)20 305

More information

Participation Agreement. between

Participation Agreement. between Participation Agreement between Joint Allocation Office S.A., with its registered office at 2, rue de Bitbourg, L-1273 Luxembourg, Grand Duchy of Luxembourg, registered with the Luxembourg Trade and Companies

More information

The market setup in the Baltics explanation with examples

The market setup in the Baltics explanation with examples The market setup in the Baltics explanation with examples Table of Contents The market setup in the Nordic-... 3 Baltic exchange area... 3 Daily routines at Nord Pool... 4 Price calculation principles...

More information

Object: Technical and market design improvements urgently required for XBID go-live

Object: Technical and market design improvements urgently required for XBID go-live To: Klaus-Dieter Borchardt Director for the Internal Energy Market, European Commission, DG Energy Cc: Alberto Pototschnig Director, ACER Cosimo Campidoglio Director for Market Monitoring, Analysis and

More information

Market integration: the Dutch- Belgian French market and beyond

Market integration: the Dutch- Belgian French market and beyond Market integration: the Dutch- Belgian French market and beyond 7th Cambridge MIT electricity policy conference London, 28 September 2007 Bert den Ouden, CEO, APX Group b.denouden@apxgroup.com Agenda Introduction

More information

Present: Olivier CHALLAN BELVAL, Jean-Pierre SOTURA, and Michel THIOLLIERE, Commissioners.

Present: Olivier CHALLAN BELVAL, Jean-Pierre SOTURA, and Michel THIOLLIERE, Commissioners. Deliberation Deliberation of the French Energy Regulatory Commission dated 12 March 2014 approving amendments to capacity allocation rules for the France - Spain interconnection Present: Olivier CHALLAN

More information

Regulatory framework for crossborder redispatching and countertrading

Regulatory framework for crossborder redispatching and countertrading Regulatory framework for crossborder redispatching and countertrading Joint Task Force ACER ENTSO-E 1 OUTLINE The need for an efficient and coordinated redispatch measures framework Current situation:

More information

Status quo: Network Codes and Guidelines from NRAs perspective. Dace Bite Public Utilities Commission of Latvia Deputy Director of Energy Department

Status quo: Network Codes and Guidelines from NRAs perspective. Dace Bite Public Utilities Commission of Latvia Deputy Director of Energy Department Status quo: Network Codes and Guidelines from NRAs perspective Dace Bite Public Utilities Commission of Latvia Deputy Director of Energy Department 25 th Baltic Electricity Market Forum Tartu 18 April

More information

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E TSOs perspective of the CACM requirements Athanasios Troupakis Market Advisor ENTSO-E Energy Community Secretariat Energy Community Secretariat Table of contents 1. Introductory remarks 2. Elements of

More information

February February 2017 Page 1 of 12

February February 2017 Page 1 of 12 Italian Borders TSOs/NEMOs Complementary Regional Auctions in accordance with Article 63 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and

More information

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries Among: AS Augstsprieguma tīkls Elering AS LITGRID

More information

Prague, 25/09/ M Market Coupling

Prague, 25/09/ M Market Coupling Prague, 25/09/2014 4M Market Coupling Agenda I. Czech-Slovak-Hungarian-Romanian Common Parts 1. Market Coupling Theory and Practice 2. Where do we come from 3. Operational overview 4. Detailed Procedures

More information

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for a common set of requirements, in accordance with Article

More information

I-SEM Business Liaison Group NEMO. 26 January 2018

I-SEM Business Liaison Group NEMO. 26 January 2018 I-SEM Business Liaison Group NEMO 26 January 2018 1 Agenda SEMOpx Implementation Update Block Orders for the Intraday Continuous Market Foreign Exchange Rate SEMOpx Statement of Charges SEMOpx Interim

More information

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: 1 July (5)

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: 1 July (5) Trading Appendix 3 Product Specifications Physical Markets Issued by Nord Pool Spot AS Effective from: 1 July 2014 1(5) PRODUCT SPECIFICATIONS - PHYSICAL MARKET 1 INTRODUCTION 1.1 General The following

More information

Continuous Trading Matching Algorithm Public Description

Continuous Trading Matching Algorithm Public Description Continuous Trading Matching Algorithm Public Description Table of contents 1. Introduction... 3 1.1. Continues trading matching algorithm... 3 1.2. Single intra-day coupling algorithm... 3 1.2.1. SOB...

More information

The Road to the I-SEM

The Road to the I-SEM The Road to the I-SEM 1 Agenda Development of power markets in Ireland and Northern Ireland Development of power markets across Europe Market coupling explained The road to the I-SEM The elements of the

More information

I-SEM NEMO BLG. 4 th April 2016

I-SEM NEMO BLG. 4 th April 2016 I-SEM NEMO BLG 4 th April 2016 1 Agenda & Terms of Reference NEMO BLG Terms of Reference CACM Obligations NEMO Solution Overview Day-Ahead Solution Overview PCR/MRC Workstream Euphemia Trial Overview Lunch

More information

Public consultation. 6 October 2015

Public consultation. 6 October 2015 Public consultation 6 October 2015 Public consultation by the French Energy Regulatory Commission of 6 October 2015 on the introduction of 30-minute power trading products in the organised market and at

More information

Project Document. November 2010

Project Document. November 2010 Project Document A report for the regulators of the Central West European (CWE) region and other stakeholders on the final design of the market coupling solution in the region by the CWE MC Project November

More information

13 th February th February 2017 Page 1 of 7

13 th February th February 2017 Page 1 of 7 Intraday Coupling Model proposal for Italian Borders in accordance with Article 63 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion

More information

SEMO PX MARKET DESIGN

SEMO PX MARKET DESIGN SEMO PX MARKET DESIGN November 2017 EirGrid 2017. Commercial In Confidence. Table of Contents 1. Background... 4 2. High Level Processes for Ex-Ante Markets... 6 2.1 Day-ahead MRC and Intraday Coupled

More information

INTRODUCTION TO HUPX GROUP. Minta szöveg minta Minta

INTRODUCTION TO HUPX GROUP. Minta szöveg minta Minta INTRODUCTION TO HUPX GROUP Minta szöveg minta Minta MILESTONES HUDEX CEEGEX WD HUPX DAM 2010 Jul HUPX PHF 2011 Jul CZ-SK-HU MC Go- live 2012 Sep CEEGEX 2013 Jan 4M MC Go- live 2014 Nov HUPX IDM 2016 March

More information

Intraday CWE. Bernard Malfliet Convenor CWE-TSO-work group

Intraday CWE. Bernard Malfliet Convenor CWE-TSO-work group Intraday CWE Bernard Malfliet Convenor CWE-TSO-work group 1 Main criteria for the Target Model choice (European and CWE Model) Ease of use of the solution Accessibility for all market parties Visibility

More information

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times Background information In December 2016, all TSOs submitted to all NRAs the all TSOs proposal for the

More information

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES ACER DECISION OF THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 04/2018 of24 April 2012 ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL

More information

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT DK1-DE Countertrade models Collected Impact Assessment 1/46 FINAL REPORT DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT Date: 1. 29th november of November 2017 2017 Author: Contents 1. Executive summary...

More information

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12 All TSOs proposal for common settlement rules applicable to all intended exchanges of energy as a result of the reserve replacement process, frequency restoration process with manual and automatic activation

More information

ENERGY COMMODITIES C O N F E R E N C E

ENERGY COMMODITIES C O N F E R E N C E ENERGY COMMODITIES C O N F E R E N C E 2 0 1 8 Thursday May10th gazarte Live, Athens Greek Electricity Market : Current status and transition to the EU Target Model Dr. Christoforos Zoumas Director, Electricity

More information

OPERATING PROPOSAL FOR THE INTRADAY MARKET IN MIBEL

OPERATING PROPOSAL FOR THE INTRADAY MARKET IN MIBEL OPERATING PROPOSAL FOR THE INTRADAY MARKET IN MIBEL Introduction Since 2007, the Iberian Electricity Market (MIBEL) has held an intraday market based on six auction sessions that uses the market coupling

More information

The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling. Michael Schaefer Project Manager, Amprion System Operation

The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling. Michael Schaefer Project Manager, Amprion System Operation The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling Michael Schaefer Project Manager, Amprion System Operation Diploma in Information Science & Advanced Postgraduate

More information

BritNed Participants Forum. 12 October 2017 London

BritNed Participants Forum. 12 October 2017 London BritNed Participants Forum 12 ober 2017 London Programme 10:30 12:00 Introduction Commercial Update Operational Update Brexit 12:00 12:45 Lunch 12:45 14:00 Implementation of the Internal Energy Market

More information

Current State of Intraday Markets in Europe May 2007

Current State of Intraday Markets in Europe May 2007 Current State of Intraday Markets in Europe May 2007 ETSO Report: Current State of Intraday Markets in Europe Page 1 of 18 Contents 1. Introduction... 3 1.1 Objective and scope of this report... 3 2. Intraday

More information

COMMISSION REGULATION (EU) NO. 543/2013. Article 17.1.a: Rules on Balancing

COMMISSION REGULATION (EU) NO. 543/2013. Article 17.1.a: Rules on Balancing COMMISSION REGULATION (EU) NO. 543/2013 Article 17.1.a: Rules on Balancing Tender Rules Frequency Containment Reserves Required Amount ±64 MW (2018) FCR Austria Tenders Tendering Period Weekly (Friday

More information

Session 3 Wednesday 29 November 2017, 10:00-10:30. State of affairs on TSA compilation in Europe

Session 3 Wednesday 29 November 2017, 10:00-10:30. State of affairs on TSA compilation in Europe DG GROW / UNWTO Workshop Measuring the economic impact of tourism in Europe: the Tourism Satellite Account (TSA) BREY Building, Brussels, Belgium, 29-30 November 2017 Session 3 Wednesday 29 November 2017,

More information

Congestion Management Guidelines. Compliance report

Congestion Management Guidelines. Compliance report Congestion Management Guidelines Compliance report Report 8/2007 Congestion Management Guidelines Compliance report Report 8/2007 NordREG c/o Danish Energy Regulatory Authority Nyropsgade 30 DK- 1780

More information

Report from the Board

Report from the Board Report from the Board Bente Hagem, Chair of the Board ENTSO-E Annual Assembly Meeting Bergen, 8 June 08 Topics Roadmap 08-0 Implementation Targets Clean Energy Package Governance of the Balancing Implementation

More information

IBEX PRESENTATION AND ROLE ON THE POWER MARKET Четири години успешна работа с институции и пазарни участници.

IBEX PRESENTATION AND ROLE ON THE POWER MARKET Четири години успешна работа с институции и пазарни участници. СЪДЪРЖАНИЕ IBEX PRESENTATION AND ROLE ON THE POWER MARKET Четири години успешна работа с институции и пазарни участници. THE POSITION OF THE NEW MAKRET SEGMENT - IDM Completion of the IBEX portfolio with

More information

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity Response to ENTSOE public consultation On Network Code on Capacity Allocation and Congestion Management for Electricity 23 May 2012 EUROPEX Rue Montoyer 31 Bte 9 BE-1000 Brussels T. : +32 2 512 34 10 E.:

More information

Allocation on the France-Belgium interconnection. Intra-day allocation mechanism

Allocation on the France-Belgium interconnection. Intra-day allocation mechanism Allocation on the France-Belgium interconnection Intra-day allocation mechanism Information note Table of contents 1. Introduction... 2 2. Product characteristics... 2 2.1. Basis principles... 2 2.2. The

More information

MARKET SEGMENT PROCEDURE

MARKET SEGMENT PROCEDURE MARKET SEGMENT PROCEDURE Purpose of the Market Segment Procedure The Market Segment Procedure is a Market Procedure, Appendix to the (Indirect) Participation Agreement that contains a detailed description

More information

MARI. Project in a Nutshell and Accession Conditions. Manually Activated Reserves Initiative. BSG Meeting 07/06/2017

MARI. Project in a Nutshell and Accession Conditions. Manually Activated Reserves Initiative. BSG Meeting 07/06/2017 Manually Activated Reserves nitiative Project in a Nutshell and Accession Conditions BSG Meeting 07/06/2017 Project Description 19 TSOs founded an mfrr cooperation to design, implement and operate a platform

More information

European Update. 1 st October 2015

European Update. 1 st October 2015 European Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 1 st October 2015 1. General

More information

CHAPTER 1. General Provisions

CHAPTER 1. General Provisions IFA Interconnector s Border Specific Annex to the Harmonised Allocation Rules for long-term transmission rights in accordance with Article 52 of Commission Regulation (EU) 2016/1719 of 26 September 2016

More information

EU JOINT TRANSFER PRICING FORUM

EU JOINT TRANSFER PRICING FORUM EUROPEAN COMMISSION DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Analyses and tax policies Analysis and coordination of tax policies Brussels, 30 May 2005 Taxud/E1/WB DOC: JTPF/019/REV5/2004/EN EU JOINT

More information

Viviane Illegems European Market Integration

Viviane Illegems European Market Integration Introduction of the allocation of Financial Transmission Rights (FTRs) Options instead of Physical Transmission Rights with UIOSI (Use It or Sell It) for long term transmission rights on Belgian Borders

More information

Public data underlying the figures of Annual Report on the Results of Monitoring the Internal Electricity and Natural Gas Markets in 2013

Public data underlying the figures of Annual Report on the Results of Monitoring the Internal Electricity and Natural Gas Markets in 2013 Public data underlying the figures of Annual Report on the Results of Monitoring the Internal Electricity and Natural Gas Markets in 2013 October 2014 Legal notice This document is a joint publication

More information

Roadmap to the French Balancing Target System

Roadmap to the French Balancing Target System Roadmap to the French Balancing Target System Vincent de Laharpe 1 Agenda 1 2 3 Regulatory context Roadmap to the target Information provided to the market 2 Regulatory context 3 Timeline for European

More information

Capacity Allocation and Congestion Management (CACM) Code Overview

Capacity Allocation and Congestion Management (CACM) Code Overview Capacity Allocation and Congestion Management (CACM) Code Overview Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size

More information

NordREG Activities 2008

NordREG Activities 2008 NordREG Activities 2008 NordREG Activities 2008 NordREG c/o Norwegian Water Resources and Energy Directorate P.O. Box 5091, Majorstua N-0301 Oslo Norway Telephone: +47 22 95 95 95 Telefax: +47 22 95 90

More information

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance with Article 57 of the Commission Regulation (EU) 2015/1222

More information

Workshop Session 1: Theoretical understanding of flow-based method, intuitiveness, hybrid-coupling

Workshop Session 1: Theoretical understanding of flow-based method, intuitiveness, hybrid-coupling Workshop Session 1: Theoretical understanding of flow-based method, intuitiveness, hybrid-coupling by Joel HOEKSEMA (APX), Adrien ATAYI (RTE) and Pieter SCHAVEMAKER (e-bridge) 1 Workshop 1 Agenda I. Flow-based

More information

The Concept of Baltic CoBA

The Concept of Baltic CoBA The Concept of Baltic CoBA Explanatory document Supporting public consultation material 27 th June, 2016 Elering, Augstsprieguma tīkls, LITGRID 1 1. Introduction According to draft guideline on Electricity

More information

IGCC Participation Elia

IGCC Participation Elia IGCC Participation Elia What is IGCC (International Grid Control Cooperation) On 01/10/2012 Elia started with IGCC for a trial period of 1 year. Presently: Energinet (DK-W), TenneT TSO (NL), SwissGrid

More information

OST and Nord Pool. Status of the Albanian power exchange , En.Trading Seminar Tirana

OST and Nord Pool. Status of the Albanian power exchange , En.Trading Seminar Tirana OST and Nord Pool Status of the Albanian power exchange 14.09.2017, En.Trading Seminar Tirana Matias Peltoniemi Elton B. Radheshi Nord Pool Consulting OST sh.a. European target model the same basic solution

More information

Status CWE Flow-Based Project. European Market Design Working Group May 31 st 2013

Status CWE Flow-Based Project. European Market Design Working Group May 31 st 2013 Status CWE Flow-Based Project European Market Design Working Group May 31 st 2013 Agenda Status of FB Project FB Project Planning External Parallel Run - Results Next Steps 2 Status of FB Project Launch

More information

European transmission tariff structures Cambridge Economic Policy Associates

European transmission tariff structures Cambridge Economic Policy Associates European transmission tariff structures Cambridge Economic Policy Associates 24 March 2015 Cambridge Economic Policy Associates (CEPA) We are an economic and financial policy consulting business Our energy

More information

Publishing date: 01/04/2012 Document title: We appreciate your feedback. Share this document

Publishing date: 01/04/2012 Document title: We appreciate your feedback. Share this document Publishing date: 01/04/2012 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Share this document ACER Coordination

More information

Electricity markets, cross-border capacity allocation and the role of RTE

Electricity markets, cross-border capacity allocation and the role of RTE Electricity markets, cross-border capacity allocation and the role of RTE Paris 18th July 2014 Galileo BARBIERI galileo.barbieri@rte-france.com 1 What are the processes for scheduling for OTC, DAM and

More information

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12 All TSOs proposal for common settlement rules applicable to all intended exchanges of energy as a result of the reserve replacement process, frequency restoration process with manual and automatic activation

More information

The role of the spot market in successful demand side management. James Matthys-Donnadieu Brussels,

The role of the spot market in successful demand side management. James Matthys-Donnadieu Brussels, The role of the spot market in successful demand side management James Matthys-Donnadieu Brussels, 10-06-2013 APX Group today 3 power spot markets operated in the Netherlands, UK and Belgium 86 TWh traded

More information

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal Explanatory Document to all TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

More information

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

More information

SHADOW ALLOCATION RULES

SHADOW ALLOCATION RULES SHADOW ALLOCATION RULES Version 1.3 01 August 2016 0 CONTENTS CHAPTER 1 GENERAL PROVISIONS... 4 Article 1 Subject-matter and scope... 4 Article 2 Definitions and interpretation... 4 Article 3 Allocation

More information

Anders Plejdrup Houmøller 10 May Wholesale market models and the role of exchanges and traders. Prepared by Anders Plejdrup Houmøller

Anders Plejdrup Houmøller 10 May Wholesale market models and the role of exchanges and traders. Prepared by Anders Plejdrup Houmøller Wholesale market models and the role of exchanges and traders Prepared by Anders Plejdrup Houmøller www. erranet.org Agenda The trading system. The spot market. Transparency. Surveillance of the market.

More information

Item 6.1 Corporate Actions Subgroup Status Report

Item 6.1 Corporate Actions Subgroup Status Report Item 6.1 Corporate Actions Subgroup Status Report Advisory Group meeting 28 November 2012 T2S CASG T2S Programme Office European Central Bank Item 6.1 09.04.01/2012/0010080 1 2 Table of contents 1 2012

More information

DAY-AHEAD AND INTRADAY ELECTRICITY MARKET OPERATING RULES. Madrid, May 11, Non-binding Translation of the Market Operating Rules

DAY-AHEAD AND INTRADAY ELECTRICITY MARKET OPERATING RULES. Madrid, May 11, Non-binding Translation of the Market Operating Rules DAY-AHEAD AND INTRADAY ELECTRICITY MARKET OPERATING RULES Madrid, May 11, 2018 Non-binding Translation of the Market Operating Rules This translation has been carried out for the sole and exclusive purpose

More information

18 April 2016 Draft for consultation

18 April 2016 Draft for consultation All TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity

More information

Introduction to Power Exchanges

Introduction to Power Exchanges For Public Use Introduction to Power Exchanges Presented by: Mr. S.K. Ray on behalf of IEX In this presentation Introduction to Indian Power Markets Power Exchange functioning and Market Snapshot International

More information

System Operating Policies on Compensation between Elia and Nemo Link

System Operating Policies on Compensation between Elia and Nemo Link System Operating Policies on Compensation between Elia and Nemo Link 1 WHEREAS Elia and Nemo Link have entered into the Joint Operation Agreement ( JOA ) on the 25 th of February 2015 for the purpose of

More information

Brexit and electricity interconnectors. Jason Mann

Brexit and electricity interconnectors. Jason Mann Brexit and electricity interconnectors Jason Mann 12 May 2018 Expansion of UK interconnection capacity driven by strong fundamentals and benign policies - but complicated by Brexit Mounting political pressures

More information

Market Integration of Renewable Energies A European Perspective

Market Integration of Renewable Energies A European Perspective Market Integration of Renewable Energies A European Perspective British- German Workshop Renewable Energies and Electricity Market Design Squaring the Circle? 13.06.2013 Dr. Corinna Klessmann Diversity

More information

Technical Conference. August 3, 2009

Technical Conference. August 3, 2009 Technical Conference August 3, 2009 1 2 Agenda Welcome Background and Overview Considerations for Participation by Third- Party Sellers Survey Results Next Steps 3 Background and Overview 4 Background

More information

ETS SUPPORT FACILITY COSTS BREAKDOWN

ETS SUPPORT FACILITY COSTS BREAKDOWN ETS SUPPORT FACILITY COSTS BREAKDOWN 1. INTRODUCTION 1.1. The EUROCONTROL Agency has recently submitted information papers to EUROCONTROL s Air Navigation Services Board and to the European Commission

More information

Nordic bidding zones. Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers.

Nordic bidding zones. Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers. Public ISBN-number: 978-82-93150-43-5 Nordic bidding zones Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers October 2013 Thema Report 2013-27

More information

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline

More information

Balancing Arrangements Review of Platform Options

Balancing Arrangements Review of Platform Options Balancing Arrangements Review of Platform Options Regulation EU 312/2014 Balancing Network Code Compliance 25 August 2016 Issued for Industry Consultation CONSULTATION DETAILS Consultation Closes: 15 September

More information

Wholesale power market challenges:

Wholesale power market challenges: EU Electricity Market Reform Seminar Dublin 13 March 2013 Wholesale power market challenges: from simplicity and efficiency to complexity and regulation Peter Styles European Federation of Energy Traders

More information

Product Specifications

Product Specifications Product Specifications German Market Area Nord Pool AS CONTENTS 1. INTRODUCTION 3 1.1 Scope 3 1.2 Time References 3 1.3 Cash Settlement 3 2. INTRADAY MARKET 3 2.1 General 3 2.2 Available Products in 4

More information