1 NWE Info Session Operational & contractual changes for Dutch wholesale market organization

2 Agenda Introduction Matthijs Nijpels General overview of NWE Price Coupling Thomas Donders Operational principles & possible scenarios Catherine Fricot Detailed operational procedures Matthijs Nijpels New Smart Order types & Automatic Order Submission Tool Rob Loos Changes to Market Rules (APX / TenneT) Rob Loos & Thomas Donders Member Testing & Planning to go-live Rob Loos Conclusion Gineke van Dijk 2

3 General overview NWE DAY-AHEAD PRICE COUPLING

4 AS IS > TO BE Two separate Market Couplings (CWE & Nordic) linked by a volume coupling (ITVC organised by EMCC) Sequential calculation approach No common algorithm applied Full coupling with GB One single price coupling based on a single calculation One single common algorithm to allow for a sound and robust price formation NWE 4

5 NWE Driving European Market Integration NWE is more than the sum of its parts It promotes liquidity and robustness of DA markets It establishes the necessary framework to enable extensions NWE DA It allows for optimal usage of cross-border capacities It encourages the harmonization of market rules 5

6 NWE Behind the scenes Parties involved 13 Transmission System Operators 4 Power Exchanges Systems & interfaces Approx. 50 systems involved Approx. 150 interfaces 40 serviced interconnectors 30 bidding zones 6

7 NWE - Interconnectors Skagerak Kontiscan FerroSkan EstLink IFA BritNed NorNed DK1-DE Baltic Kontek SwePol

8 Price Coupling Process General term for ATC and/or FB parameters used = CZCs : Cross Zonal Capacities 8

9 PCR : Price Coupling of Regions 9

10 Potential integration of losses on DC cables Activation of losses on a specific interconnector is subject to approval of relevant national NRAs Cable Loss factor foreseen 10 Comments IFA (UK-FR) yes Application to Ofgem and CRE. Foreseen for go-live Britned (UK-NL) yes Application to Ofgem and ACM. Foreseen for go-live NorNed (NO-NL) yes Application to NVE and ACM. Pending regulatory approval

11 General principles OPERATIONAL PRINCIPLES & POSSIBLE SCENARIOS

12 Price Coupling Process General term for ATC and/or FB parameters used = CZCs : Cross Zonal Capacities 12

13 NWE Business Process 10:30 CZCs and Allocation constraints submitted to PCR 12:00 Orderbooks closure Global Preliminary PX confirmation 12:55 Global final confirmation Publication 12:55 14:00 Nominations CZCs and allocation constraints submission and integration Final confirmation of the results Price coupling results and scheduled exchanges transfer Trading confirmation and scheduled exchanges notification PCR process: CZCs and allocation constraints process Orderbook processing PMB calculation Preliminary confirmation process Final confirmation process 13

14 PCR Process Timings for NWE Normal process 55 minutes 12:00 OBK GCT 12:00 12:10 Check of OBK and sending to PMB 12:10 12:27 Calculation 12:28 12:41 Preliminary PX validation 12:42 Publication of preliminary results (incl. market clearing price) to the market and in parallel sending of these preliminary results for final confirmation/approval to the TSOs 12:42 12:54 Final TSO validation 12:55 Publication of Final Results (incl. market clearing price) Start of Notification Process 14

15 Process is delayed Target Time Latest Time to Start an IC Partial Coupling/Full Decoupling Deadline TIME Normal Procedure Normal procedures can still apply after target time Backup procedure can apply before the target time Backup procedures Fallback procedures can apply before fallback time Fallback procedures Decoupling preparation decoupling 15

16 Process delayed assumptions Pre-coupling Deadline to solve incidents with Network Data (CZCs) publication is 11:45 CET Coupling Time allowance for technical problem solving up to 55 min Time allowance for special market procedures such as handling of curtailment situations or price threshold reached via a second auction used by CWE PXs or the NPS-applied regulated routines that include peak load capacity (production/load) reserves activation. Deadline for final Market Results is 13:50 CET Max. Time /Flexibility to solve technical problems 55min 2 nd Auction CWE/ GB 48 min Post-coupling Final notification deadline of 15:30 in CWE, CWE-GB and CWE-Nordic interconnectors 16

17 Second Auction 2 nd Auction CWE/ GB 48 min A Second Auction is triggered in case at least one of the CWE/GB prices reach or exceed the predefined price thresholds The routine consists in Reopening the PXs order books for 10 minutes to give the Market Participants the opportunity to modify their bids in order to improve the market situation Execution of a second calculation with the new Order Data The thresholds to trigger a 2nd auction in CWE remain the same: EUR/MWh and -150 EUR/MWh In GB thresholds will be introduced: GBP/MWh and -150 GBP/MWh In case the prices still reach the thresholds after the Second Auction calculation, no additional Second Auction will be triggered 17

18 PCR PROCESS TIMINGS for NWE * This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical problem is resolved in less than 55 min than the next processes will start earlier. ** the Second Auction in CWE / GB is a single process taking 48 minutes. *** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the full decoupling deadline when NWE is coupled. 18

19 Fallback procedures Target Time Latest Time to Start an IC Partial Coupling/Full Decoupling Deadline TIME Normal Procedure Normal procedures can still apply after target time Backup procedure can apply before the target time Backup procedures Fallback procedures can apply before fallback time Fallback procedures Decoupling preparation decoupling 19

20 Fallback procedures Target Time Latest Time to Start an IC Partial Coupling/Full Decoupling Deadline TIME Normal Procedure Normal procedures can still apply after target time Backup procedure can apply before the target time Backup procedures Fallback procedures can apply before fallback time Fallback procedures Decoupling preparation decoupling 20

21 Full Decoupling of NWE (1) Internally in CWE and for the CWE Nordic interconnectors (except Baltic Cable): Shadow auctions organized by CASC will be held and results published The 3 PXs within CWE will reopen the order books (20 min) and perform local DA spot market calculations without using cross border capacities The notification deadline of is applicable for the notification by market parties of utilization of Explicit Capacity bought in Shadow Auctions Fallback for Baltic cable : capacity goes back to the cable owner In GB Shadow auctions organized by RTE/NGIC are applicable for FR/GB border only (IFA interconnector), this consists of daily explicit auctions Capacity of virtual interconnector set to zero The 2 PXs will reopen the order books (APX UK 15 min) and perform local DA spot market calculations without using cross border capacities Fallback for BritNed : capacity goes to intraday For the Nordic Baltic area including the link with Poland Shadow auctions on 3 CWE-Nordic links Re-opening of NPS order books Price coupling will be performed by NPS utilizing the cross border capacities within this region 21

22 Shadow Auctions Bids submitted through the Shadow Auctions interface at CASC.EU are default bids : They are valid for every day of the year, for a specific border, direction and an hourly period (Volume in MW and a Price in /MWh) Participants can update their default bids at any time before the freezing of the database when Shadow Auctions are run Description in Harmonised Auction Rules for CWE, CSE and CH Possibility to register only for Shadow Auctions, with a lighter status: Participant to Shadow Auctions Only" Market Participants need to submit a nomination towards the respective TSOs by the notification deadline of

23 Full Decoupling scenario CWE : 4 local PX auctions Nordic-Baltic Market Splitting Virtual Capacity is set to Zero 2 local PX auctions Shadow Auctions Local matching process In case of full decoupling the processes are local Communication in case of fallback is organized locally (different info, different timings) 23

24 CWE TSO investigate flexibility of notification deadline The CWE TSOs and 50 Hertz have agreed upon a joint target solution for the deadlines for submitting the different schedules towards the TSOs available as of Go-Live of the Price Coupling in the NWE region Taken into account that it is important for the TSOs to receive data of good quality, the TSOs agreed to extend the deadline for submitting generation schedules in the very rare cases of specific fallback situations to a later time than 15:30 In these extraordinary situations, all CWE TSOs and 50 Hertz will extend the deadline for submitting generation schedules until at least 15:45. Some TSOs can extend this deadline even beyond 15:45 depending on local market rules This means that market participants have at least 60 minutes for the submission of generation schedules 24

25 CWE TSO investigation on flexibility of notification deadline impact on procedures Exceptional cases Notification Process 45 min 15:30 15:30 15:30 15:45 25 Crossborder Notification Process 45 min Generation Notification Process At least 60 min

26 PCR PROCESS TIMINGS for NWE 26

27 Full decoupling before OBK GCT (12:00) OBK GCT = 12:00 Case X10 Full decoupling before Case X11 X10 + delay Case X12 X10 + 2nd Auction CWE Publication of preliminary results =12:42 Full decoupling 42 min Full decoupling 42 min Full decoupling 42 min Notification Process 60 min Max. Time /Flexibility to solve technical problems 55min* 2 nd Auction CWE/ GB 28 min** Notification Process 60 min Notification Process 60 min Final Notification deadline =15:30 which applies to: Internal CWE, CWE-GB and CWE-Nordic interconnectors * This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical problem is resolved in less than 55 min than the next processes will start earlier. ** the Second Auction in CWE / GB is a single process taking 48 minutes. *** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the full decoupling deadline when NWE is coupled. 27

28 Partial (De)coupling within NWE Any scenario where one or more bidding areas and/or interconnectors are temporary not participating in NWE Market Coupling while the remaining bidding areas/interconnectors still participate in NWE Market Coupling The CZCs for the decoupled borders / interconnectors will be allocated via the fall back solution for these temporary not participating borders / interconnectors NWE parties will try to couple as many borders / interconnectors as possible Partial coupling is triggered during the pre-coupling process, at the latest at 11:45 during the coupling process, at the latest at 12:40 28

29 Partial Coupling Scenario Example : CWE+GB <> Nordic PCR coupling Nordic-Baltic: Market Splitting Shadow Auctions Local matching process PCR matching process 29

30 Partial Coupling Scenario Example : NorNed PCR coupling Shadow Auctions PCR matching process 30

31 Partial Coupling Scenario Example : EPEX OBK missing PCR coupling Shadow Auctions PCR matching process Local matching process 31

32 Partial Coupling Scenario Example: APX NL/Belpex OBK missing PCR coupling Shadow Auctions Local matching process 32

33 Partial Coupling Scenario Example : no CWE CZCs in PMB PCR coupling Shadow Auctions PCR matching process Local matching process 33

34 Decoupling scenarios Where s the problem What decouples? Resulting configuration APX/Belpex EPEX NPS (Nordic) CWE internal borders (FR-DE, FR-BE, BE-NL, NL-DE) and NorNed and BritNed and GB-GB CWE internal borders and IFA, DK-DE, DE-SE Nordic area, NorNed, DE-DK, DE-SE 34 NL, BE and APX UK markets isolated DE, FR, and BE markets isolated Nordic markets isolated (but internally coupled) N2EX GB-GB, IFA N2EX market isolated CWE TSOs CWE internal borders BE market isolated BritNed BritNed No market isolated NorNed NorNed No market isolated Any other individual interconnector PMB, or problem after 12:20 That interconnector Entire region No market isolated All markets isolated (but Nordic markets internally coupled) 34

35 Partial Coupling before OBK GCT (12:00) * This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical problem is resolved in less than 55 min than the next processes will start earlier. ** the Second Auction in CWE / GB is a single process taking 48 minutes. *** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the full decoupling deadline when NWE is coupled. 35

36 Partial Coupling before OBK GCT (12:00) Partial coupling followed by Full Decoupling + Special Routine Nordics * In case X6b, the NPS special procedure, being an iterative process, may take the same timeframe as when all markets are still coupled, but this is not relevant in a full decoupling since Nordic and Baltic TSOs do not impose a nomination deadline, but instead NPS can take as long time as needed to finish the Price Calculation and subsequent notifications can be submitted (updated) by NPS and market parties to relevant TSOs until about 1 hour before delivery hour.

37 Partial coupling after OBK GCT (12:00) Case X7 Case X8 Case X9a Case X9b Publication of preliminary results =12:42 37

38 38

39

40 Timings and messages DETAILED OPERATIONAL PROCEDURES

41 NORMAL NWE/PCR PROCESS

42 Normal NWE/PCR process Final results Normal PX GCT timing 10:30 12:00 12:42 12:55 14:00 CZC publication MP s introduce orders Preliminary result publication Coupling process Notifications to TenneT 42 * All timings are C.E.T

43 Normal process timeline CZC published at 10:30 on CASC website PX gate closure time at 12:00 Publication of preliminary market results 12:42 Publication of final market results 12:55 Notification deadline Belgium France Germany The Netherlands Cross-Border 14:30 14:30 14:30 14:00 (E-program) Local/hub Hub 1: 14:00 Hub 2: 14:30 Ex post 14:30 14:00 (E-program) Consumption 14:30 n/a 14:30 14:45 (T-program) Generation 15:00 16:30 14:30 14:45 (T-program)

44 CASE 1 PROCESS DELAYED WITH MAX TIMING

45 Case 1 Process delayed with max timing Normal timing PX GCT 10:30 12:00 12:42 12:55 13:00 13:20 Final results Exceptional timing 13:38 13:50 15:00 CZC publication MP s introduce orders Preliminary result publication Coupling process / Backup procedures Message to MP Notifications to TenneT Technical problem * All timings are C.E.T 45

46 Case 1 Process delayed with max timing CZC published at 10:30 on CASC website PX gate closure time at 12:00 Delay in Market Coupling results Timing Message Additional actions for MPs Market results Publication deadline Local hub Notification Cross border notification deadline 12:42 [ExC_02]: Delay in Market Coupling Results publication CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 14:00 14:00 13:00 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 14:30 14:30 13:20 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 15:00 15:00

47 Messages PX : [ExC_02] TSO 47

48 CASE 2A SECOND AUCTION

49 Case 2a second auction Normal timing PX GCT 10:30 12:00 12:30 Final results 14:00 Exceptional timing >12:42 >12:55 13:00 <13:50 15:00 CZC publication MP s introduce orders Preliminary result publication Coupling process Message to MP Notifications to TenneT * All timings are C.E.T

50 Case 2a second auction CZC published at 10:30 on CASC website PX gate closure time at 12:00 Threshold reached or 500 / or Second Auction triggered (re-opening of Order Books) Timing* Message Additional actions for MPs Market results Publication deadline Local hub Notification Cross border notification deadline ±12:30 [ExC_01]: Thresholds reached - Reopening of the order books PX: OBK open for 10 minutes after message 13:50 n/a n/a 13:00 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline CASC: invitation to update bids in the Shad ow Auction system before 13:40 13:50 15:00 15:00

51 Messages PX : [ExC_01] CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 13:40. 51

52 CASE 4 FULL DECOUPLING

53 Case 4 Full Decoupling Normal timing PX GCT 10:30 12:00 12:55 Shadow Auction results Final results Exceptional timing 12:42 13:05 13:00 13:20 13:50 >14:30 15:30 CZC publication MP s introduce bids Process run Full decoupling preparation* Full decoupling Exceptional procedures MP s update orders** Notifications to TenneT Message to MP Note: *Shadow auction will be triggered at CASC ** Reopening of order book for 20 min

54 Case 4 Full Decoupling CZC published at 10:30 on CASC website PX gate closure time at 12:00 Full decoupling announcement Shadow auctions Follow the local auction rules Timing* Message Additional actions for MPs 12:42 13:00 13:20 13:50 [ExC_02]: Delay in Market Coupling Results publication TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline [ExC_03b]: Risk of Full Decoupling [ExC_04b]: Full Decoupling Reopening of the order books CASC: invitation to update bids in the Shad ow Auction system before 13:40 Bids update in the Shadow Auction system OBK open for 20 minutes after message Market results Publication deadline Local hub Notification Cross border notification deadline 13:50 14:00 14:00 13:50 14:30 14:30 n/a 15:00 15:00 n/a 15:30 15:30

55 Messages PX : [ExC_02] 55

56 Messages PX : [ExC_03b] TSO CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 13:40 56

57 Messages PX : [ExC_04b] TSO 57

58 CASE 5A FULL DECOUPLING + 2ND AUCTION

59 Case 5a Full Decoupling + 2 nd Auction Normal timing PX GCT 10:30 12:00 12:55 Shadow Auction results Final**** results Exceptional timing 12:42 13:05 13:00 13:20 13:50 14:00 14:25 14:45 15:30 CZC publication MP s introduce bids Coupling process Full decoupling preparation* Full decoupling MP s update orders** Exceptional procedures MP s update orders*** Notifications to TenneT Message to MP Note: *Shadow auction will be triggered at CASC ** Reopening of order book for 20 min *** Reopening of order book second auction 10 min **** PX publish at best effort base at 14:45

60 Case 5a Full Decoupling + 2 nd Auction CZC published at 10:30 on CASC website PX gate closure time at 12:00 Timing* Message Additional actions for MPs Market results Publication deadline Local hub Notification Cross border notification deadline 12:42 [ExC_02]: Delay in Market Coupling Results publication CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 14:00 14:00 13:00 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 14:30 14:30 13:20 [ExC_03b]: Risk of Full Decoupling CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline 13:50 15:00 15:00

61 Case 5a Full Decoupling + 2 nd Auction Full decoupling announcement Shadow auctions Follow the local auction rules Timing Message Additional actions for MPs Market results Publication deadline Local hub Notification Cross border notification deadline [ExC_04b]: Full Decoupling Reopening of the order books PX: OBK open for 20 minutes after message 13:50 TSO: Extension of Notification Deadlines due to full decoupling declared/delay in local Market Results publication 15:30 15:30 [CWE_UMM_05]: Thresholds reached during local auction PX: OBK open for 10 minutes after message 14:25 TSO: Extension of Generation Notification Deadlines due to Second Auction Triggered after Full Decoupling 15:30 15:30

62 Messages PX : [ExC_02] 62

63 Messages PX : [ExC_03b] TSO CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 13:40 63

64 Messages PX : [ExC_04b] TSO 64

65 Messages PX : [UMM_05] TSO 65

66 CASE X3A PARTIAL COUPLING BEFORE OBK GCT + SECOND AUCTION

67 Case X3a partial coupling before OBK GCT + Second Auction Normal timing 10:30 Shadow Auction results 12:00 PX GCT 12:30 Final results 14:00 Exceptional timing 11:15 11:45 >12:42 >12:55 13:00 13:20 <13:50 15:30 CZC publication MP s introduce orders Partial coupling before OBK GCT Preliminary result publication Coupling process Notifications to TenneT Message to MP * All timings are C.E.T 67

68 Case X3a partial coupling before OBK GCT + Second Auction CZC published at 10:30 on CASC website PX gate closure time at 12:00 Threshold reached -150 /MWh or 500 /MWh (-150 /MWh or /MWh) Second Auction triggered (re-opening of Order Books) Publication of final market results before 13:50 Timing Message Additional actions for MPs Market results Publication deadline Local hub Notification Deadline Cross Border Notification Deadline 11:15 [UMM_02]: Risk of partial decoupling for one or more interconnectors CASC: invitation to update bids in the Shadow Auction system before 11:35 13:50 11:45 [UMM_03]: One or more interconnectors decoupled 13:50 ±12:30 [ExC_01]: Thresholds reached - Reopening of the order books PX: OBK open for 10 minutes after message 13:50 13:00 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 14:30 14:30 13:20 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline 13:50 15:00 15:00 68

69 Message PX : [UMM_02] CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 13:40 69

70 Messages PX : [ExC_01] 70

71 CASE X7 PARTIAL COUPLING AFTER GCT

72 Case X7 partial coupling after GCT Normal timing PX GCT 10:30 12:00 Shadow Auction results Final results Exceptional timing 12:20 12:30 12:40 13:00 13:20 13:38 13:50 15:00 CZC publication MP s introduce orders Preliminary result publication Partial coupling preparation* Partial coupling MP s update orders** Coupling process / backup procedures Message to MP Notifications to TenneT Note: *Shadow auction will be triggered at CASC ** Reopening of order book for 10 min

73 Case X7 partial coupling after GCT CZC published at 10:30 on CASC website PX gate closure time at 12:00 Publication of preliminary market results at the latest 13:38 Publication of final market results at the latest 13:50 Timing* Message Additional actions for MPs Market results Publication deadline Local hub Notification Cross border notification deadline 12:20 [ExC_03a]: Risk of Partial Decoupling CASC: invitation to update bids in the Shadow Auction system before 12:30 n/a n/a n/a 12:40 [ExC_04a]: Partial Decoupling Reopening of the PX order books PX: OBK open for 10 minutes after message 13:50 14:00 14:00 13:00 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 14:30 14:30 13:20 TSO: Delay in Market Coupling Results/ local Market Results publication and extension of Hub Notification deadline CASC: invitation to update bids in the Shadow Auction system before 13:40 13:50 15:00 15:00

74 Messages PX : [ExC_03a] CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 12:30. 74

75 Messages PX : [ExC_04a] TSO 75

76 NWE process overview Normal timing PX GCT 10:30 12:00 12:55 Exceptional timing 11:45 12:20 12:40 13:05 13:50 15:30 CZC publication MP s introduce bids Process run Partial coupling due CZC reason Partial coupling preparation Partial coupling Full decoupling preparation Exceptional procedures Full decoupling Notifications to TenneT

77 Decoupling scenarios Where s the problem What decouples? Resulting configuration APX/Belpex EPEX NPS (Nordic) CWE internal borders (FR- DE, FR-BE, BE-NL, NL-DE) and NorNed and BritNed and GB-GB CWE internal borders and IFA, DK-DE, DE-SE Nordic area, NorNed, DE- DK, DE-SE NL, BE and APX UK markets isolated DE, FR, and BE markets isolated Nordic markets isolated (but internally coupled) N2EX GB-GB, IFA N2EX market isolated CWE TSOs CWE internal borders BE market isolated BritNed BritNed No market isolated NorNed NorNed No market isolated Any other individual interconnector That interconnector No market isolated PMB, or problem after 12:20 Entire region All markets isolated 77 (but Nordic markets internally coupled)

78 Communication to the market - summarized Time/ Deadline Communication 10:00 Risk of Partial/full Decoupling known in advance Message number [ExC_03a/b] Other messages CASC TSO Local PX X 10:30 Partial/full Decoupling known in advance [ExC_05a/b] 11:15 Risk of partial decoupling for one or more interconnectors [UMM_02] X 11:45 One or more interconnectors decoupled [UMM_03] 12:20 Risk of Partial Decoupling in certain regions [ExC_03a] X ~ 12:30 Second Auction [ExC_01] X 12:40 Partial Decoupling Reopening of order books [ExC_04a] X Regular publication time (12:42) Delay in Market Coupling Results publication [ExC_02] X NB 1. The fallback solutions and processes as well as their associated contents and timings are organized on local / regional level and not on NWE level. Timings are therefore indicative and additional messages can be sent (e.g. IFA CMS will also sent messages in case of a fall back situation) NB 2. The shift of notification deadlines only applies for CWE internally and CWE borders. 78

79 Communication to the market - summarized Time/ Deadline Communication 13:00 Delay in Market Coupling Results publication -> Extension of notification deadlines Message number Other messages CASC TSO Local PX X 13:20 Risk of Full Decoupling Delay in Market Coupling Results publication -> Extension of notification deadlines [EXC_03b] X 13:50 Decision of Full decoupling Extension of notification deadlines [EXC_04b] X 14:25 Thresholds reached during local auction [UMM_05] X X 79

80 80

81 New Block Order Types LINKED & EXCLUSIVE BLOCK ORDERS

82 Linked Block Orders Definition: The execution of (a set of) profile block(s) is subject to the execution of another block Other standard execution rule apply in full Use: Allows to explicitly consider technical and economical constraints For example, a first block may include the start-up costs of a production facility, and additional blocks comprising fuel costs may be linked to this block Possibility to design complex linked structures (i.e. families) Q Hour Block Order Block Order 2 Block Order 3 Q Hour Block Order Block Order 2 Block Order 3

83 Example Technical plant data Output (MW) Pmin Pmax Cost ( /MWh) Production cost 50 MW = 65 /MWh Production cost 300 MW = 60 /MWh Marginal cost to increase production from 50 MW to 300 MW = 59 /MWh Marginal cost to increase from 50 MW to 200 MW = 61 /MWh Marginal cost to increase from 200 MW to 300 MW = 56 /MWh Bidding strategies Possible bidding strategy 1: Block 1: Sell Block 2: Sell linked to Block 1 Unit is fully accepted if P>60; or 50 MW accepted if P>65 Possible bidding strategy 2: Block 1: Sell Block 2: Sell linked to Block 1 Block 3: Sell linked to Block 2 Unit is fully accepted if P>60; or 200 MW accepted if P>62; or 50 MW accepted if P>65

84 Example Technical plant data Output (MW) Pmin Pmax Cost ( /MWh) Production cost 50 MW = 65 /MWh Production cost 300 MW = 60 /MWh 65! Marginal cost to increase production from 50 MW to 300 MW = 59 /MWh Marginal cost to increase from 50 MW to 200 MW = 61 /MWh Marginal cost to increase from 200 MW to 300 MW = 56 /MWh Bidding strategies Possible bidding strategy 1: Block 1: Sell Block 2: Sell linked to Block 1 Unit is fully accepted if P>60; or 50 MW accepted if P>65 Linked Block Orders: global wellfare considered Possible bidding strategy 2: Block 1: Sell Block 2: Sell linked to Block 1 Block 3: Sell The unit will also clear if baseload price is 60 P The algorithm is not sequential, linked but to considers Block 2 the global wellfare of both blocks. Unit is fully accepted if P>60; or 200 MW accepted if P>62; or 50 MW accepted if P>65

85 Linked Block Orders use cases Optimise thermal power plants Offer plant using multiple orders, allowing it to run at different outputs, each reflected by their own cost level Run one/several hour(s) earlier or later if power prices remain interesting outside of the peak period Optimise consumption processes Only execute part B of consumption process if part A of process was started earlier Or only start A+B when combination does not exceed certain costs Optimise storage capacity Sell only during peak period if off-peak purchase order has been accepted and buy/sell combination is in the money

86 Exclusive Block Orders Definition: Within a set of profile blocks, at most one block can be accepted Other standard execution rule apply in full Use: Allows to propose for trading different production patterns For example, a specific production plant can be offered at a low price for baseload production, at a medim price for peak load production >at a high price for super peak load production but can only be executed once Low price order Medium price order High price order

87 Exclusive Block Orders Optimise thermal power plants Similar to using Linked Block Orders Optimise combined heat & power installations Heat demand with flexible timing, or some heat buffer Flexibility might allow to produce heat & power when power prices are highest, using several exclusive production profiles Optimise demand side management Case: End user can stop consumption, but only if DAM prices > 500 /MWh and for max 2 hours/day Program load shedding on the DAM on the most expensive hours (and only of threshold is reached), using a combination of exclusive blocks of 2 hours Block 1: hours 1 & 2, Block 2: hours 2 & 3,

88 Benefits of Smart Orders Smarter orders give more flexibility when introducing orders for the auction Better reflecting technical constraints of generation units E.g. no partial clearing at non-cost reflective price levels, lower PRB frequency (plant offered in smaller blocks), Easier bidding, less operational work Result: better asset optimization (generation + consumption) Better price formation More robust against uncertainties faced when making day-ahead price forecasts

89 Static Demo Linked Family

90 Linked Family - Entry Two options are available to submit a Linked family

91 Linked Family - Entry A visual representation helps the trader to identify mistakes: Red screen for Buy side (Green for Sell side)

92 Linked Family - Entry Linked family can combine Buy and Sell: the background turns blue and the columns turn red or green to represent Buy or Sell orders

93 Linked Family - Entry A Tree View shows the hierarchical relationship between orders

94 Static Demo Exclusive Group

95 Exclusive Group - Entry Two options are available to submit an Exclusive Group

96 Exclusive Group - Entry A visual representation helps the trader to identify mistakes: Green screen for Sell side (Red for Buy side)

97 Exclusive Group - Entry Linked family can combine Buy and Sell: the background turns blue and the columns turn red or green to represent Buy or Sell orders

98 Submit Orders using XML files AUTOMATIC ORDER SUBMISSION TOOL

99 Automatic Order Submission Intro New tool to facilitate submitting orders in automated way using XML files Easier workflow Eliminates operational risks involved with Paste from Excel functionality Planned to be available before launch of Smart Orders

100 Automatic Order Submission Details Software to be installed alongside EuroLight client Tool will monitor specific folder and Process all xml files contained in folder Give feedback via «acknowledgement» xml file Orders introduced via tool will be visible in EuroLight Order Book Editing via EuroLight possible

101 Automatic Order Submission XML Specifications & Testing Draft manual & specifications of xml files available on APX website Scheduled to be available on the Member Testing environment as of 23 October

102 APX Power Market Rules NL allocation rules CHANGE TO RULES 102

103 APX Power NL Market Rules Market Rules Changes with respect to countries involved in Market Coupling Execution conditions for Linked & Exclusive Block Orders Delisting Strips Market Already delisted in practice by removing all eligible instruments Various clarifications (with no impact on members) 103

104 APX Power NL Market Rules Instrument Specifications Day-Ahead Market Minimum price will become -500 /MWh Maximum price will remain /MWh Availability Linked & Exclusive Block Orders confirmed Changes to operational timings Strips Market Chapter will be removed Changes regarding rollback 104

105 Changes to NL allocation rules TenneT rules No changes Dutch grid code Fallback timings and principles (also for NorNed) brought in line with the NWE procedures Rollback possibility to change back to CWE market coupling for BE-NL and DE-NL borders and ITCV market coupling for NorNed Inclusion of the losses for the NorNed cable in the market coupling is pending regulatory approval 105

106 Capacities Flows Prices PUBLICATIONS 106

107 Publications Market prices & auction volumes & energieinfo.tennet.org NTC values, ATC values, flows ATC values, Shadow Auction results (if any) Yearly, monthly capacity auction results Daily prices, ATC values & flows 107

108 PLANNING TO GO-LIVE & MEMBER TESTING 108

109 NWE Target Go-live Date The Target Go-live date has been set at 26 November 2013 for Delivery Date 27 November 2013 Go-live date is subject to Successful completion of the Simulation Test phase; Successful completion of the Member Test phase; Signing of all contracts and agreements; Regulatory approval Final Go/No Go decision to launch will be taken early November Launch activities have been started 109

110 NWE Simulation Testing Simulation Testing phase by NWE project parties until 31/10/2013 Normal Day scenarios Backup scenarios Fallback scenarios (full decoupling and partial coupling) Complexity due to testing with 50+ systems and 150+ interfaces involved New partial coupling procedures and system functionality NWE Parties are working hard to meet the acceptance criteria for simulation testing 110

111 Joint NWE Member Tests NWE Member Test planned for 14/10 25/10 Timing delayed to afternoon, but same process time On request of members, testing of nomination process has been added to all test days Smart Orders are available in NWE Member Testing Date Simulation Settlement Process i Monday, October 14 Normal Day Yes Yes Tuesday, October 15 2nd auction triggering in CWE / GB Yes Yes Wednesday, October 16 Full decoupling of NWE Yes Yes Partial Coupling 1 (Nordic-Baltic area Thursday, October 17 will be decoupled from the CWE. CWE and GB remain coupled.) No Yes Friday, October 18 No testing N/A N/A Saturday, October 19 Sunday, October 20 Monday, October 21 Partial Coupling 2 (missing order books EPEX) Yes Yes Tuesday, October 22 Full decoupling of NWE Yes Yes Wednesday, October 23 Thursday, October 24 No test foreseen, but can still be used as backup testing day No No No test foreseen, but can still be used as backup testing day No No Friday, October 25 No testing N/A N/A Nomination Process 111

112 Local Member Tests Smart Orders Smart Orders are available on Member Test environment already Will remain available until (and after) NWE Go-live From 28 October until 15 November, test auction will be organized by APX Smart orders will be available to see how matching results are presented Details on these local tests will be communicated later 112

113 Local Member Tests Automatic Order Submission Tool Scheduled to be available on Member Testing environment as of 23 October Exact details will be communicated later Will be available on Production environment prior to the NWE go-live Please note that the Smart Orders functionality will only be available after NWE Go-live 113

114 Disclaimer: All messages and timings are subject to changes after final testing. 114

115 CONCLUSION 115

116 Annex SUMMARY 116

117 PCR PROCESS TIMINGS for NWE * This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical problem is resolved in less than 55 min than the next processes will start earlier. ** the Second Auction in CWE / GB is a single process taking 48 minutes. *** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the full decoupling deadline when NWE is coupled. 117

118 PCR PROCESS TIMINGS for NWE 118

119 Full decoupling before OBK GCT (12:00) OBK GCT = 12:00 Case X10 Full decoupling before Case X11 Idem + delay Case X12 Idem + 2 nd Auction CWE Publication of preliminary results =12:42 Full decoupling 42 min Full decoupling 42 min Full decoupling 42 min Notification Process 60 min Max. Time /Flexibility to solve technical problems 55min* 2 nd Auction CWE/ GB 28 min** Notification Process 60 min Notification Process 60 min Final Notification deadline =15:30 which applies to: Internal CWE, CWE-GB and CWE-Nordic interconnectors * This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical problem is resolved in less than 55 min than the next processes will start earlier. ** the Second Auction in CWE / GB is a single process taking 48 minutes. *** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the full decoupling deadline when NWE is coupled. 119

120 Partial Coupling before OBK GCT (12:00) Case X1 Case X2 Case X3a Case X3b Case X4a Case X4b Publication of preliminary results =12:42 120

121 Partial Coupling before OBK GCT (12:00) * In case X6b, the NPS special procedure, being an iterative process, may take the same timeframe as when all markets are still coupled, but this is not relevant in a full decoupling since Nordic and Baltic TSOs do not impose a nomination deadline, but instead NPS can take as long time as needed to finish the Price Calculation 121 and subsequent notifications can be submitted (updated) by NPS and market parties to relevant TSOs until about 1 hour before delivery hour.

122 Partial coupling after OBK GCT (12:00) Case X7 Case X8 Case X9a Case X9b * In case X9b, the NPS special procedure, being an iterative process, may take the same timeframe as when all markets are still coupled, but this is not relevant in a full decoupling since Nordic and Baltic TSOs do not impose a nomination deadline, but instead NPS can take as long time as needed to finish the Price Calculation and subsequent 122 notifications can be submitted (updated) by NPS and market parties to relevant TSOs until about 1 hour before delivery hour.

123 Communication to the market - summarized Time/ Deadline Communication 12:20 Increased risk for partial coupling in certain region TSO message to MPs: Inform Market of fall back processes (update of explicit shadow auction bids) ~ 12:35 Second Auction PCR message to PXs and subsequently MPs and TSOs: Second Auction is declared Regular publication time (12:42) PCR message that process is delayed from PXs* to TSOs and MPs (timings to be confirmed). (TSO message to MPs: Inform Market of fall back processes) Message number [EXC_03a] [EXC_01] Local PX msg NB 1. The fallback solutions and processes as well as their associated contents and timings are organized on local / regional level and not on NWE level. Timings are therefore indicative and additional messages can be sent (e.g. IFA CMS will also sent messages in case of a fall back situation) NB 2. The shift of notification deadlines only applies for CWE internally and CWE borders. 123

124 Communication to the market - summarized Time/ Deadline Communication 13:20 PCR message to PXs and subsequently MPs and TSOs: Inform Market about Incident and risk of decoupling. TSO message to MPs: Inform Market of fall back processes (update of explicit shadow auction bids) & shifting of notification deadline to 15h00 13:40 End of update shadow auction bids Start of explicit shadow auction calculation 13:50 Decision of Full decoupling PCR message to PXs and subsequently MPs and TSOs: Full decoupling is declared (TSO message to MPs: notification deadline has been extended to 15h30) 13:50-14:00 Publication of the explicit shadow auction fall back results (target is to publish immediately after and at the latest at 14:00, feasibility of these timings must still be confirmed) 13:55-14:15 Update of local auction bids according to shadow auction results [EXC_03b] - [EXC_04b] - Local PX msg

NWE Info Session. Operational & contractual changes for Dutch wholesale market organization

NWE Info Session. Operational & contractual changes for Dutch wholesale market organization NWE Info Session Operational & contractual changes for Dutch wholesale market organization General principles OPERATIONAL PRINCIPLES & POSSIBLE SCENARIOS Price Coupling Process General term for ATC and/or

More information

Info Session NWE Day-Ahead

Info Session NWE Day-Ahead Elia s European Market Design Work Group & Belpex Users Group Info Session NWE Day-Ahead Operational & contractual changes for Belgian wholesale market organization General overview NWE DAY-AHEAD PRICE

More information

Info Session NWE Day-Ahead

Info Session NWE Day-Ahead Elia s European Market Design Work Group & Belpex Users Group Info Session NWE Day-Ahead Operational & contractual changes for Belgian wholesale market organization Agenda Introduction Pascale Fonck &

More information

SEMOpx Auction Timings, Communications and Market Messages. For Day-Ahead & Intraday Auctions

SEMOpx Auction Timings, Communications and Market Messages. For Day-Ahead & Intraday Auctions SEMOpx Auction Timings, Communications and Market Messages For Day-Ahead & Intraday Auctions 1 Introduction This presentation gives a high level overview of the timings, communications and market messages

More information

Intraday Cross Border The Netherlands-Belgium

Intraday Cross Border The Netherlands-Belgium Intraday Cross Border The Netherlands-Belgium Content 1. Overall design 1. Process description 2. Capacity calculation 3. Elbas trading platform 4. Tradable products 5. Timeline & Nominations 2. Contractual

More information

Intraday Cross Border The Netherlands-Belgium

Intraday Cross Border The Netherlands-Belgium Intraday Cross Border The Netherlands-Belgium Content 1. Overall design 1. 2. 3. 4. 5. Process description Capacity calculation Elbas trading platform Tradable products Timeline & Nominations 2. Contractual

More information

XBID Information Package Published February 2018 Updated December 2018

XBID Information Package Published February 2018 Updated December 2018 XBID Information Package Published February 2018 Updated December 2018 1. Purpose of this document This document centralises, consolidates and comprehensively describes the necessary information which

More information

Project Document. November 2010

Project Document. November 2010 Project Document A report for the regulators of the Central West European (CWE) region and other stakeholders on the final design of the market coupling solution in the region by the CWE MC Project November

More information

Intraday Implicit CrossBorder allocation on BE-NL. and borders (Interim Implicit Cross Border Intraday BE-NL. Description of the allocation mechanism

Intraday Implicit CrossBorder allocation on BE-NL. and borders (Interim Implicit Cross Border Intraday BE-NL. Description of the allocation mechanism Intraday Implicit CrossBorder allocation on BE-NL and borders (Interim Implicit Cross Border Intraday BE-NL Description of the allocation mechanism version 2.0) Description of the allocation mechanism

More information

Intraday Implicit Cross- Border allocation on BE-FR border. Description of the allocation mechanism

Intraday Implicit Cross- Border allocation on BE-FR border. Description of the allocation mechanism Intraday Implicit Cross- Border allocation on BE-FR border Description of the allocation mechanism Version Date 11 July 2016 Contents 1 Introduction...3 2 General Context and rationale of the project...3

More information

Prague, 25/09/ M Market Coupling

Prague, 25/09/ M Market Coupling Prague, 25/09/2014 4M Market Coupling Agenda I. Czech-Slovak-Hungarian-Romanian Common Parts 1. Market Coupling Theory and Practice 2. Where do we come from 3. Operational overview 4. Detailed Procedures

More information

The role of the spot market in successful demand side management. James Matthys-Donnadieu Brussels,

The role of the spot market in successful demand side management. James Matthys-Donnadieu Brussels, The role of the spot market in successful demand side management James Matthys-Donnadieu Brussels, 10-06-2013 APX Group today 3 power spot markets operated in the Netherlands, UK and Belgium 86 TWh traded

More information

Agenda 8 th User Group at Brussels Airport* 17/04/ :30-12:30 CET

Agenda 8 th User Group at Brussels Airport* 17/04/ :30-12:30 CET Agenda 8 th User Group at Brussels Airport* 17/04/2018 09:30-12:30 CET TIME AGENDA ITEM PRESENTER 09:30 09:40 1. Welcome, agenda Mark Pickles 09:40 10:15 2. Project status update incl. matters related

More information

How a power exchange can help integrate RES into the wholesale power market. Belpex Elia s ad hoc platform RES Rob Loos Brussels 6 March 2012

How a power exchange can help integrate RES into the wholesale power market. Belpex Elia s ad hoc platform RES Rob Loos Brussels 6 March 2012 How a power exchange can help integrate RES into the wholesale power market Belpex Elia s ad hoc platform RES Rob Loos Brussels 6 March 2012 Agenda Belpex Belpex in a nutshell Belpex markets - Day-ahead

More information

Cross-Border Intraday: Questions & Answers

Cross-Border Intraday: Questions & Answers Last update: 04/12/2018 Cross-Border Intraday: Questions & Answers 1. What is the Cross-Border Intraday initiative? The Cross-Border Intraday initiative (XBID Project) started as a joint initiative by

More information

Present: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners.

Present: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners. Deliberation Deliberation of the French Energy Regulatory Commission (CRE) dated 2 October 2013 approving the implicit Day-Ahead allocation method for interconnection capacity within the North- West Europe

More information

Current State of Intraday Markets in Europe May 2007

Current State of Intraday Markets in Europe May 2007 Current State of Intraday Markets in Europe May 2007 ETSO Report: Current State of Intraday Markets in Europe Page 1 of 18 Contents 1. Introduction... 3 1.1 Objective and scope of this report... 3 2. Intraday

More information

Wholesale power market challenges:

Wholesale power market challenges: EU Electricity Market Reform Seminar Dublin 13 March 2013 Wholesale power market challenges: from simplicity and efficiency to complexity and regulation Peter Styles European Federation of Energy Traders

More information

Nord Pool. XBID webinar, May 2018

Nord Pool. XBID webinar, May 2018 Nord Pool XBID webinar, May 2018 Timeline 2 nd May: Member test starting 14 th to 18 th May: XBID common trial period 12 th JUNE XBID Go-live 2 Nord Pool intraday market areas Nord Pool markets, part of

More information

Minutes of Workgroup European Market Design 29/09/2015

Minutes of Workgroup European Market Design 29/09/2015 Minutes of Workgroup European Market Design 29/09/2015 Present: B. De Wispelaere (FEBEG) J. Mortier (FEBEG) M. Van Bossuyt (FEBELIEC) A. Gillieaux (EFET) S. Harlem (FEBEG) N. Pierreux (BELPEX) S. Gabriels

More information

Commission de Régulation de l Electricité et du Gaz. the CWE region. ELCom Forum Alain Marien Technical Operation of the Markets

Commission de Régulation de l Electricité et du Gaz. the CWE region. ELCom Forum Alain Marien Technical Operation of the Markets Commission de Régulation de l Electricité et du Gaz Current status of cross-border management in the CWE region ELCom Forum 2011 Alain Marien Technical Operation of the Markets 18 November 2011 1 Plan

More information

Status CWE Flow-Based Project. European Market Design Working Group May 31 st 2013

Status CWE Flow-Based Project. European Market Design Working Group May 31 st 2013 Status CWE Flow-Based Project European Market Design Working Group May 31 st 2013 Agenda Status of FB Project FB Project Planning External Parallel Run - Results Next Steps 2 Status of FB Project Launch

More information

CHAPTER 1. General Provisions

CHAPTER 1. General Provisions IFA Interconnector s Border Specific Annex to the Harmonised Allocation Rules for long-term transmission rights in accordance with Article 52 of Commission Regulation (EU) 2016/1719 of 26 September 2016

More information

Viviane Illegems European Market Integration

Viviane Illegems European Market Integration Introduction of the allocation of Financial Transmission Rights (FTRs) Options instead of Physical Transmission Rights with UIOSI (Use It or Sell It) for long term transmission rights on Belgian Borders

More information

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12 All TSOs proposal for common settlement rules applicable to all intended exchanges of energy as a result of the reserve replacement process, frequency restoration process with manual and automatic activation

More information

The Road to the I-SEM

The Road to the I-SEM The Road to the I-SEM 1 Agenda Development of power markets in Ireland and Northern Ireland Development of power markets across Europe Market coupling explained The road to the I-SEM The elements of the

More information

I-SEM Business Liaison Group NEMO. 26 January 2018

I-SEM Business Liaison Group NEMO. 26 January 2018 I-SEM Business Liaison Group NEMO 26 January 2018 1 Agenda SEMOpx Implementation Update Block Orders for the Intraday Continuous Market Foreign Exchange Rate SEMOpx Statement of Charges SEMOpx Interim

More information

ELECTRICITY BALANCING IN EUROPE

ELECTRICITY BALANCING IN EUROPE EUROPEAN ELECTRICITY BALANCING GUIDELINE NOVEMBER 2018 AN OVERVIEW OF THE EUROPEAN BALANCING MARKET AND ELECTRICITY BALANCING GUIDELINE European Network of Transmission System Operators for Electricity

More information

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: 1 July (5)

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: 1 July (5) Trading Appendix 3 Product Specifications Physical Markets Issued by Nord Pool Spot AS Effective from: 1 July 2014 1(5) PRODUCT SPECIFICATIONS - PHYSICAL MARKET 1 INTRODUCTION 1.1 General The following

More information

Day-ahead Market Regulations. Nord Pool AS

Day-ahead Market Regulations. Nord Pool AS Day-ahead Market Regulations Nord Pool AS DAY-AHEAD MARKET REGULATIONS 1. INTRODUCTION 1.1 These Day-ahead Market Regulations contain detailed provisions on Orders and the calculation of Prices in the

More information

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for a common set of requirements, in accordance with Article

More information

APX Power NL Market Instrument Specifications

APX Power NL Market Instrument Specifications APX Power NL Market Instrument Specifications APX Power B.V. Atlas Arena Amsterdam Australia Building, 3 rd floor Hoogoorddreef 7 1101 BA Amsterdam The Netherlands T +31 (0)20 305 4000 F +31 (0)20 305

More information

Czech-Slovak-Hungarian Market Coupling Project. Survey on Fallback Timing

Czech-Slovak-Hungarian Market Coupling Project. Survey on Fallback Timing Czech-Slovak-Hungarian Market Coupling Project Survey on Fallback Timing Feedbacks are welcome till 29 March 2012 via Answer Template doc to marketinfo@mavir.hu CZ-SK-HU Market Coupling Implicit allocation

More information

BritNed border specific annex to the Allocation Rules. GB NL border

BritNed border specific annex to the Allocation Rules. GB NL border BritNed border specific annex to the Allocation Rules GB NL border CHAPTER 1 General Provisions Section 1 Subject-matter and scope 1. In accordance with Article 4 (Regional specificities) of the Allocation

More information

Publishing date: 01/04/2012 Document title: We appreciate your feedback. Share this document

Publishing date: 01/04/2012 Document title: We appreciate your feedback. Share this document Publishing date: 01/04/2012 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Share this document ACER Coordination

More information

Market integration: the Dutch- Belgian French market and beyond

Market integration: the Dutch- Belgian French market and beyond Market integration: the Dutch- Belgian French market and beyond 7th Cambridge MIT electricity policy conference London, 28 September 2007 Bert den Ouden, CEO, APX Group b.denouden@apxgroup.com Agenda Introduction

More information

The market setup in the Baltics explanation with examples

The market setup in the Baltics explanation with examples The market setup in the Baltics explanation with examples Table of Contents The market setup in the Nordic-... 3 Baltic exchange area... 3 Daily routines at Nord Pool... 4 Price calculation principles...

More information

Implementation rules

Implementation rules Implementation rules PAGE 2 of 26 Contents 1. Implementation regulations for bids (pursuant to section 5.1.1.1.a1 of Grid Code) 3 1.1 Introduction 3 1.2 Procedure pursuant to section 5.1.1.1.a1 of the

More information

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12 All TSOs proposal for common settlement rules applicable to all intended exchanges of energy as a result of the reserve replacement process, frequency restoration process with manual and automatic activation

More information

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times Background information In December 2016, all TSOs submitted to all NRAs the all TSOs proposal for the

More information

MARKET SEGMENT PROCEDURE

MARKET SEGMENT PROCEDURE MARKET SEGMENT PROCEDURE Purpose of the Market Segment Procedure The Market Segment Procedure is a Market Procedure, Appendix to the (Indirect) Participation Agreement that contains a detailed description

More information

Report on Proposed principles for Common Balance Management

Report on Proposed principles for Common Balance Management Report on Proposed principles for Common Balance Management 2007-11-16 1 Contents 1. INTRODUCTION AND BACKGROUND...3 2. COMMON COST ALLOCATION...3 3. FEE STRUCTURE... 4 4. NEW MODEL FOR ENCOMPASSING TWO

More information

Electricity markets, cross-border capacity allocation and the role of RTE

Electricity markets, cross-border capacity allocation and the role of RTE Electricity markets, cross-border capacity allocation and the role of RTE Paris 18th July 2014 Galileo BARBIERI galileo.barbieri@rte-france.com 1 What are the processes for scheduling for OTC, DAM and

More information

SEMOpx. Operating Procedures: DAM, IDA, IDC. Updated Draft: 09/03/18. Draft prepared for discussion at the BLG meeting, 14 March 2018.

SEMOpx. Operating Procedures: DAM, IDA, IDC. Updated Draft: 09/03/18. Draft prepared for discussion at the BLG meeting, 14 March 2018. SEMOpx Updated Draft: 09/03/18 Operating Procedures: DAM, IDA, IDC Draft prepared for discussion at the BLG meeting, 14 March 2018. 1 CONTENTS A. Introduction 5 A.1 General provisions 5 A.1.1 Purpose and

More information

Workshop Session 1: Theoretical understanding of flow-based method, intuitiveness, hybrid-coupling

Workshop Session 1: Theoretical understanding of flow-based method, intuitiveness, hybrid-coupling Workshop Session 1: Theoretical understanding of flow-based method, intuitiveness, hybrid-coupling by Joel HOEKSEMA (APX), Adrien ATAYI (RTE) and Pieter SCHAVEMAKER (e-bridge) 1 Workshop 1 Agenda I. Flow-based

More information

SHADOW ALLOCATION RULES

SHADOW ALLOCATION RULES SHADOW ALLOCATION RULES Version 1.3 01 August 2016 0 CONTENTS CHAPTER 1 GENERAL PROVISIONS... 4 Article 1 Subject-matter and scope... 4 Article 2 Definitions and interpretation... 4 Article 3 Allocation

More information

Regulatory framework for crossborder redispatching and countertrading

Regulatory framework for crossborder redispatching and countertrading Regulatory framework for crossborder redispatching and countertrading Joint Task Force ACER ENTSO-E 1 OUTLINE The need for an efficient and coordinated redispatch measures framework Current situation:

More information

HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations

HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations Friday July 20th ΟΤΕAcademy, Athens HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations Dr. Nikolaos P. Ziogos Introduction CACM XBID Participation in ID Market LIDAs GRIDAs XBID Results

More information

Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Functioning of the European Power Exchange

Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Functioning of the European Power Exchange Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Functioning of the European Power Exchange Patrick Adigbli, Head of Public & Regulatory Affairs, EPEX SPOT 1

More information

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity Response to ENTSOE public consultation On Network Code on Capacity Allocation and Congestion Management for Electricity 23 May 2012 EUROPEX Rue Montoyer 31 Bte 9 BE-1000 Brussels T. : +32 2 512 34 10 E.:

More information

Implementation Guide JAN, 2018 SON -SY

Implementation Guide JAN, 2018 SON -SY Implementation Guide JAN, 2018 SON -SY Contents 1. Implementation regulations for bids (pursuant to section 5.1.1.1.a1 of Grid Code) 3 1.1 Introduction 3 1.2 Procedure pursuant to section 5.1.1.1.a1 of

More information

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: Launch of Elbas4 1(6)

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: Launch of Elbas4 1(6) Trading Appendix 3 Product Specifications Physical Markets Issued by Nord Pool Spot AS Effective from: Launch of Elbas4 1(6) PRODUCT SPECIFICATIONS - PHYSICAL MARKET 1 INTRODUCTION 1.1 General The following

More information

Participants Forum 2014

Participants Forum 2014 Participants Forum 2014 Programme of the day 13.15 hrs Introduction 13.30 hrs Intraday 14.15 hrs Survey Results 14.30 hrs BritNed Operational Updates 15.00 hrs Tea / Coffee break 15.15 hrs New code 15.45

More information

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES OF CCR HANSA TSO PROPOSAL FOR CCR HANSA REGIONAL REQUIREMENTS TO HARMONISED ALLOCATION RULES IN ACCORDANCE WITH ARTICLE 52 OF THE COMMISSION REGULATION (EU)

More information

Intraday CWE. Bernard Malfliet Convenor CWE-TSO-work group

Intraday CWE. Bernard Malfliet Convenor CWE-TSO-work group Intraday CWE Bernard Malfliet Convenor CWE-TSO-work group 1 Main criteria for the Target Model choice (European and CWE Model) Ease of use of the solution Accessibility for all market parties Visibility

More information

BritNed Participants Forum. 12 October 2017 London

BritNed Participants Forum. 12 October 2017 London BritNed Participants Forum 12 ober 2017 London Programme 10:30 12:00 Introduction Commercial Update Operational Update Brexit 12:00 12:45 Lunch 12:45 14:00 Implementation of the Internal Energy Market

More information

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E TSOs perspective of the CACM requirements Athanasios Troupakis Market Advisor ENTSO-E Energy Community Secretariat Energy Community Secretariat Table of contents 1. Introductory remarks 2. Elements of

More information

EUROPEAN POWER EXCHANGE

EUROPEAN POWER EXCHANGE 2016 EUROPEAN POWER EXCHANGE ABOUT EPEX SPOT EEX GROUP EEX / POWERNEXT 51% HGRT AMPRION / APG / ELIA / RTE / SWISSGRID / TENNET 49% SHAREHOLDER STRUCTURE SINCE NOVEMBER 2015 100% APX INCLUDING BELPEX 100%

More information

Allocation on the France-Belgium interconnection. Intra-day allocation mechanism

Allocation on the France-Belgium interconnection. Intra-day allocation mechanism Allocation on the France-Belgium interconnection Intra-day allocation mechanism Information note Table of contents 1. Introduction... 2 2. Product characteristics... 2 2.1. Basis principles... 2 2.2. The

More information

SEMO PX MARKET DESIGN

SEMO PX MARKET DESIGN SEMO PX MARKET DESIGN November 2017 EirGrid 2017. Commercial In Confidence. Table of Contents 1. Background... 4 2. High Level Processes for Ex-Ante Markets... 6 2.1 Day-ahead MRC and Intraday Coupled

More information

Regional Flow-based allocations. State-of-play

Regional Flow-based allocations. State-of-play Page 1 of 15 Regional Flow-based allocations State-of-play March 2007 ETSO Final paper Page 2 of 15 Contents 1. Introduction... 3 2. Flow-based allocations... 3 3. Status of flow-based allocations... 6

More information

ENTSO-E Network Code on Electricity Balancing

ENTSO-E Network Code on Electricity Balancing Annex II to Recommendation of the Agency for the Cooperation of Energy Regulators No 03/2015 of 20 July 2015 on the Network Code on Electricity Balancing Proposed amendments to the Network Code ENTSO-E

More information

BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION

BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION North Western Europe (NWE) FINLAND North Western Europe (NWE) NORWAY SWEDEN ESTONIA LATVIA RUSSIA DENMARK

More information

System Operating Policies on Compensation between Elia and Nemo Link

System Operating Policies on Compensation between Elia and Nemo Link System Operating Policies on Compensation between Elia and Nemo Link 1 WHEREAS Elia and Nemo Link have entered into the Joint Operation Agreement ( JOA ) on the 25 th of February 2015 for the purpose of

More information

ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY

ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY Stephen Woodhouse 3 November 2015 AGENDA ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY To be covered in this session: What is flexibility? Reality and misconceptions

More information

MARKET SEGMENT PROCEDURE

MARKET SEGMENT PROCEDURE MARKET SEGMENT PROCEDURE Purpose of the Market Segment Procedure The Market Segment Procedure is a Market Procedure, Appendix to the Participation Agreement that contains a detailed description of the

More information

Business Process. BP_SO_13.1 Interim Long-Term Coordinated Capacity Calculation

Business Process. BP_SO_13.1 Interim Long-Term Coordinated Capacity Calculation Business Process BP_SO_13.1 Interim Long-Term Coordinated Capacity Calculation EirGrid and SONI support the provision of information to the marketplace by publishing operational data, processes, methodologies

More information

Capacity Allocation and Congestion Management (CACM) Code Overview

Capacity Allocation and Congestion Management (CACM) Code Overview Capacity Allocation and Congestion Management (CACM) Code Overview Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size

More information

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018 Consultation document PC_2018_E_01 9 January 2018 Trg republike 3 1000 Ljubljana Slovenia T: +386 (0)8 2053 400 info@acer.europa.eu www.acer.europa.eu This consultation document is issued to invite comments

More information

European Market Desing and focus on Flow-Based Market Coupling

European Market Desing and focus on Flow-Based Market Coupling European Market Desing and focus on Flow-Based Market Coupling AGENDA 1. Introduction a. Electricity sector restructuring in Europe b. Electricity market design in Europe c. Transmission Capacity Allocation

More information

Anders Plejdrup Houmøller 10 May Wholesale market models and the role of exchanges and traders. Prepared by Anders Plejdrup Houmøller

Anders Plejdrup Houmøller 10 May Wholesale market models and the role of exchanges and traders. Prepared by Anders Plejdrup Houmøller Wholesale market models and the role of exchanges and traders Prepared by Anders Plejdrup Houmøller www. erranet.org Agenda The trading system. The spot market. Transparency. Surveillance of the market.

More information

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU)

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline

More information

20 years operation of the Nordic electricity market

20 years operation of the Nordic electricity market ENERGY 20 years operation of the Nordic electricity market ADB Regional Energy Trade Workshop September 8-9, 2014 Manila Dr. Per Christer Lund 1 SAFER, SMARTER, GREENER Electricity market world wide 2

More information

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal Explanatory Document to all TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

More information

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation Annex I Capacity Allocation and Congestion Management in accordance with Article 73 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Congestion income distribution

More information

ALL TRANSMISSION SYSTEM OPERATORS OF THE CAPACITY CALCUCULATION REGION CORE, TAKING INTO ACCOUNT THE FOLLOWING: Whereas

ALL TRANSMISSION SYSTEM OPERATORS OF THE CAPACITY CALCUCULATION REGION CORE, TAKING INTO ACCOUNT THE FOLLOWING: Whereas Regional Specific Annex for CCR Core to the Harmonised Allocation Rules for long-term transmission rights in accordance with Article 52 of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing

More information

Market coupling mechanism for integrating DAMs in South-East Europe. Dušan Vlaisavljević

Market coupling mechanism for integrating DAMs in South-East Europe. Dušan Vlaisavljević Elektroenergetski Koordinacioni Centar d.o.o. Electricity Coordinating Center Ltd. V. Stepe 412, 11040 Belgrade 33, Serbia www.ekc-ltd.com Market coupling mechanism for integrating DAMs in South-East Europe

More information

18 April 2016 Draft for consultation

18 April 2016 Draft for consultation All TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity

More information

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT DK1-DE Countertrade models Collected Impact Assessment 1/46 FINAL REPORT DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT Date: 1. 29th november of November 2017 2017 Author: Contents 1. Executive summary...

More information

Electricity Exchange set-up and Market Coupling Arrangements. Drs. B. den Ouden lecture for IEX, Amsterdam, 14 July 2014

Electricity Exchange set-up and Market Coupling Arrangements. Drs. B. den Ouden lecture for IEX, Amsterdam, 14 July 2014 Electricity Exchange set-up and Market Coupling Arrangements Drs. B. den Ouden lecture for IEX, Amsterdam, 14 July 2014 former CEO APX-ENDEX 1999-2013 Managing Director Berenschot Energy&Sustainability

More information

Public consultation. 6 October 2015

Public consultation. 6 October 2015 Public consultation 6 October 2015 Public consultation by the French Energy Regulatory Commission of 6 October 2015 on the introduction of 30-minute power trading products in the organised market and at

More information

Market Trial Participant Guide

Market Trial Participant Guide Market Trial Participant Guide I-SEM Market Trial Version 3.0 EirGrid 2017. Commercial In Confidence. EirGrid 2017. Commercial In Confidence. Page 2 Table of Contents 1. Introduction... 7 1.1 Overview

More information

COMMISSION REGULATION (EU) NO. 543/2013. Article 17.1.a: Rules on Balancing

COMMISSION REGULATION (EU) NO. 543/2013. Article 17.1.a: Rules on Balancing COMMISSION REGULATION (EU) NO. 543/2013 Article 17.1.a: Rules on Balancing Tender Rules Frequency Containment Reserves Required Amount ±64 MW (2018) FCR Austria Tenders Tendering Period Weekly (Friday

More information

Grid Code Issue Paper

Grid Code Issue Paper For presentation at the April 2016 meeting of the Grid Code Development Forum Robert Selbie on behalf of National Grid Interconnector Physical Notification submissions following XBID (Cross Border Intra

More information

Flow-Based Concept and Methodology

Flow-Based Concept and Methodology Flow-Based Concept and Methodology Dr. ir. Pieter Schavemaker E-Bridge Consulting B.V. Joint NordREG / Nordic TSO workshop on Flow-Based Capacity Calculation Clarion Hotel, rlanda, Stockholm, Sweden December

More information

Present: Olivier CHALLAN BELVAL, Jean-Pierre SOTURA, and Michel THIOLLIERE, Commissioners.

Present: Olivier CHALLAN BELVAL, Jean-Pierre SOTURA, and Michel THIOLLIERE, Commissioners. Deliberation Deliberation of the French Energy Regulatory Commission dated 12 March 2014 approving amendments to capacity allocation rules for the France - Spain interconnection Present: Olivier CHALLAN

More information

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries Among: AS Augstsprieguma tīkls Elering AS LITGRID

More information

Baltic Harmonised Imbalance Settlement Model Document

Baltic Harmonised Imbalance Settlement Model Document Baltic Harmonised Imbalance Settlement Model Document Elering AS July 12, 2017 AS Augstsprieguma tīkls Litgrid AB 1. Update on the Baltic harmonised imbalance settlement model... 3 2. Description of Baltic

More information

The new electricity market arrangements in Ukraine

The new electricity market arrangements in Ukraine The new electricity market arrangements in Ukraine A report prepared by ECS Project Office April 2016 FINAL DRAFT Revisions Table Version Date Description FINAL DRAFT 1.0 November16, 2015 Internal Draft

More information

POWER MARKETS: CRITICAL ELEMENTS FOR PROPER FUNCTIONING

POWER MARKETS: CRITICAL ELEMENTS FOR PROPER FUNCTIONING POWER MARKETS: CRITICAL ELEMENTS FOR PROPER FUNCTIONING Regional Electricity Trading Conference Tbilisi, Georgia, 19-20/Nov/2012 Plamen Popov, Statkraft 1 AGENDA 1 2 3 Market elements Standardization issue

More information

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline

More information

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority.

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority. 1 (6) Request for amendment on Nordic TSOs proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission Regulation (EU) 2015/1222 Between

More information

Regional Spot Markets and Inter-Regional Market Coupling

Regional Spot Markets and Inter-Regional Market Coupling APEx conference in Boston 11-13 October 2009 Session 1 part 2: European Market Situations Regional Spot Markets and Inter-Regional Market Coupling 1. Intro to Nord Pool Spot and the Nordic PX & Market

More information

CASC Project Information for Users

CASC Project Information for Users CASC Project Information for Users 4th November 2010 Auction Rules 2011 - first phase and second phase First Phase TSOs act as Auction Operators Minor Changes in AR 2011 for Yearly, Monthly and Daily Auctions

More information

Methodology for the Calculation of Scheduled Exchanges resulting from single day-ahead coupling Explanatory Note

Methodology for the Calculation of Scheduled Exchanges resulting from single day-ahead coupling Explanatory Note Methodology for the Calculation of Scheduled Exchanges resulting from single day-ahead coupling Explanatory Note 13 December 2016 Disclaimer This explanatory document is approved by All TSOs, but only

More information

Operational Rules for Day Ahead Market segment (DAM) INDEPENDENT BULGARIAN ENERGY EXCHANGE

Operational Rules for Day Ahead Market segment (DAM) INDEPENDENT BULGARIAN ENERGY EXCHANGE Operational Rules for Day Ahead Market segment (DAM) INDEPENDENT BULGARIAN ENERGY EXCHANGE In force from 26.02.2018 Content Trading system... 2 Trading days, hourly trading interval, trading stages...

More information

Agenda 9 th User Group meeting in Brussels* 21/11/ :30 16:00 CET

Agenda 9 th User Group meeting in Brussels* 21/11/ :30 16:00 CET Agenda 9 th User Group meeting in Brussels* 21/11/2018 12:30 16:00 CET TIME AGENDA ITEM PRESENTER 12:30 13:15 Lunch 13:15 13:25 1. Welcome, agenda Mark Pickles 13:25 13:50 2. Feedback Market Parties on

More information

29 June 2016 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the All TSOs proposal for methodology for congestion

More information

CID Methodology Explanatory note

CID Methodology Explanatory note 29 June 2016 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the All TSOs proposal for methodology for congestion

More information

Introduction of Power Exchange Market in Bulgaria. Dry-run launch of the Power Exchange market for electricity

Introduction of Power Exchange Market in Bulgaria. Dry-run launch of the Power Exchange market for electricity Introduction of Power Exchange Market in Bulgaria Dry-run launch of the Power Exchange market for electricity Panel I Panel II - Panel III - Trading principles, Power Exchange Rules and capabilities of

More information