MATARAWA FLOOD CONTROL SCHEME EXTENSION (PRD 5 20)

Size: px
Start display at page:

Download "MATARAWA FLOOD CONTROL SCHEME EXTENSION (PRD 5 20)"

Transcription

1 Report No Decision Required MATARAWA FLOOD CONTROL SCHEME EXTENSION (PRD 5 20) 1. PURPOSE 1.1. The purpose of this item is to seek the approval of the Committee (and ultimately Council) to include in the Draft Annual Plan (DAP) a proposal to amend the scope / extent of the Matarawa Scheme to address issues highlighted by the June 2015 flood event. 2. RECOMMENDATION That the Committee recommends that Council: a. receives the information contained in Report No and Annex; b. instructs the Group Manager River Management to include for consultation in Council s DAP the following detail: i. adding the Matarawa Stream through the urban part of Whanganui to the inspection and maintenance schedule for the Matarawa Scheme; ii. undertaking a two year programme of deferred maintenance work that would commence in the financial year; iii. funding that work programme by way of a loan; and iv. repaying that loan and covering ongoing operating costs primarily by extending the targeted rate classification for the scheme to encompass the primary benefit area within the urban part of Whanganui (defined as Option B in Annex A). 3. FINANCIAL IMPACT 3.1. If adopted as proposed, the work programme would require additional expenditure estimated at $338,000 over two years commencing in the financial year. It is intended to loan-fund this expenditure and provide for the repayment cost (and the additional ongoing inspection and maintenance expenditure) by increasing overall Matarawa Flood Control Scheme rate income. The amount required is $40,250 for the first year and $51,200 per year for the next nine years. This would be mainly sourced by extending targeted rate income to encompass the added benefit area; in accordance with Council s funding policy the increased targeted rate income would attract an additional general rate contribution to the scheme of approximately $90,000 over 10 years. 4. COMMUNITY ENGAGEMENT 4.1. Initial community engagement in relation to this matter took place in the form of public meetings arranged by the Whanganui District Council (WDC) following the extensive flooding in Whanganui East in June Consultation around the changes proposed for inclusion in the DAP is intended to have two main components to it; writing to every new ratepayer in the urban area outlining the rationale to the proposal, followed by a public meeting in Whanganui East. This meeting would form part of the Catchment Community meeting for the Matarawa Scheme and is scheduled to take place early in the period that the DAP is open for submissions. Matarawa Flood Control Scheme Extension (PRD 5 20) Page 1

2 5. SIGNIFICANT BUSINESS RISK IMPACT 5.1. As previously advised, the primary risk identified with this proposal is that it could trigger an amended Long Term Plan process. If this risk were realised the primary impact for Council would be one of cost. This risk could be avoided by proceeding with the work but not amending the rating classification but it would introduce other risks (committing to expenditure outside the present defined extents of the scheme without a funding mechanism in place) The work could also be deferred but that has its own risks (further deterioration in the condition of the channel with the low probability over that period of another weather event severe enough to result in flooding) The staff view is that the risk that the changes proposed to the scheme are sufficient to be construed as meeting the wider definition of significant is low. The treatment strategy as outlined in Section 4 is to engage with all of those proposed to be included as new Matarawa Scheme ratepayers and to time a public meeting to coincide with the DAP submission period. That is, place particular emphasis on informing those ratepayers around the changes and encouraging Annual Plan submissions. 6. BACKGROUND 6.1. The Matarawa Flood Control Scheme was established in 1981 to provide a level of control of flooding in the Matarawa, Kaukatea, Mangaone, and Mangamoku (Longacre) Valleys. Flood control was to be achieved through the construction of five detention dams, extensive channel clearance works and some minor stopbanking The scheme area was defined by catchment boundaries and by the then Whanganui County / Whanganui City boundary in the lower reaches of the Matarawa Stream. The WDC declined to participate in the new scheme, preferring to manage the section of Matarawa Stream within Whanganui East either itself or through enforcing landowner responsibilities, which in most cases extend to the centre of the stream The severe storm that struck much of the Region in June 2015 resulted in extensive flooding adjacent to the lower reaches of the Matarawa Stream. An original component of scheme construction, the Mateongaonga Diversion, lessened that impact by diverting the upper catchment flow away from the lower reaches but the intensity of the lower catchment rainfall was still sufficient for extensive flooding to occur A number of affected property owners who attended the public meetings that followed the June 2015 event were of the view that the congested state of the stream channel had contributed significantly to the flooding. There was a very clear desire for the channel to be cleared and regularly maintained and an expectation that such work would be undertaken by either the District Council or Regional Council. Reinforcing that sentiment, the WDC submitted on Horizons draft Annual Plan, requesting (among other things), that Horizons look to urgently add this reach of the Matarawa Stream to the operational responsibilities encompassed by the Matarawa Scheme. 7. DISCUSSION 7.1. A detailed survey of the lower reach of the Matarawa Stream was undertaken by River Management staff in January Observations matched the feedback provided by residents following the June 2015 event, with the channel highly congested / overgrown. Matarawa Flood Control Scheme Extension (PRD 5 20) Page 2

3 Figure1: Matarawa Scheme Study Reach 7.2. In determining the work required to address those issues and the consequent cost to the scheme, a number of factors need to be taken into account. The number of residential properties involved (115 in total) adds considerable complexity to the work; in many instances houses are close to the stream limiting site access. This will limit the ability to use large mechanical equipment in many locations, and as a result removal of vegetation for disposal will be particularly difficult. Those complexities are reflected in both the relatively high physical works cost estimate and the staff time cost associated with managing the works The inspection also confirmed the view of staff (and feedback from residents) that maintenance of the channel is beyond the resources of the majority of residential property owners. Those few owners who might be capable will receive little benefit from their efforts if adjoining sections of channel are left unattended to. The reality is, irrespective of any legal requirement, that such a major watercourse will not be properly maintained by adjoining owners and without intervention its condition will continue to deteriorate Given that there is an established scheme in the Matarawa catchment, the levels of service for which include maintenance of stream and diversion channels immediately upstream of the urban area, it is logical that the urban section of channel also be maintained by the scheme. While the initial channel clearance works will create some significant demands on staff and funding resources, the ongoing maintenance work should be reasonably easily accommodated within the wider scheme management programme. 8. PROPOSED WORKS 8.1. It is proposed to undertake the initial clearance works over a two year period, commencing in In order to avoid localised exacerbation of flood hazard while work is underway it would commence at the downstream (Anzac Parade) end of the Matarawa Stream. Matarawa Flood Control Scheme Extension (PRD 5 20) Page 3

4 8.2. Note that the level of service commitment to the community would mirror that adopted in other parts of the scheme. That is, it would relate to flood flow conveyance (general channel management) but would not extend to erosion control / bank protection. This may pose some difficulties for Council in two ways the initial clearance programme could well involve making rather vexed decisions in regard to disturbance of existing bank protection works and the potential that a more open, free-flowing channel might (at least initially) give rise to claims around creating bank erosion issues (or exacerbating existing issues). These are not new operating risks the treatment strategies will centre on using senior staff to coordinate and manage the work, developing a comprehensive communication strategy with those property owners and ensuring a complete before and after photographic record of the work It should also be noted that the clearance work will not address all the factors that influence flood hazard in that reach of the Matarawa Stream; the four Whanganui District Council culvert / bridge crossings are likely to limit (to varying degrees) high flow. A freer-flowing channel will however to some extent aid the scouring of sediment in the stream bed which at present is reducing the capacity of those culverts. It will also greatly reduce the risk of debris blockage during high flows The estimated cost of the work is $344,000 including staff time costs. It is proposed that the work be loan funded with a 10-year loan term; a longer term is not desirable given the nature of the work (essentially deferred maintenance). Regular inspection and maintenance of that reach of stream channel would commence from The cost of that work can be expected to vary from year to year, depending on the incidence and magnitude of higher flow events. Average annual expenditure for that work is estimated at $10, FUNDING Year Additional Funding Required Regional Contribution Rate Targeted Contribution $50, $10, $40, each year each year onwards Table1: Funding Model $64,000 $12,800 $51,200 $10,000 $2,000 $8,000 Rate 9.1. It is proposed that the funding model required to both repay the loan and cover ongoing operating costs follow Council s funding policy. That is, 80% of the income required is sourced from additional targeted rate revenue with 20% coming from general rates. The targeted rate classification for the Matarawa Scheme was last reviewed in 2006 and comprises a contributor category, an indirect benefit category and a direct benefit category, proportioned 20:20:60 respectively. As this reach of the Matarawa lies outside the current classification extents a new direct benefit category needs to be established The total impact of the proposed works on all rating categories, including the proposed new urban direct benefit category, is shown in the table below. The figures are relative to that collected in the current financial year and include GST. Matarawa Flood Control Scheme Extension (PRD 5 20) Page 4

5 Year Additional Targeted Rate Required Additional Rate per Category L1 - L3, M1, M3, M4 MW (WDC contribution) $40,250 Nil +4,709 (21%) $51,200 Nil +$5,990 (27%) UC IN (rural indirect benefit) +$24,150 +3,340 (64%) +$30,720 +$4,249 (82%) CN (contributor) +$8,050 (64%) +$10,240 (82%) onwards $8,000 Nil +$937 (4%) Table2: Funding Impact of Proposed Works +$4,800 +$664 (13%) +$1,600 (13%) 9.3. Note that a substantial portion of the land adjoining the lower reach of the Matarawa Stream is owned by either the Crown or the WDC, with that land managed by the WDC as reserve land. The targeted rate scenarios presented above do allow for an increased WDC scheme contribution as part of an adjustment pro rata of existing indirect benefit income; it does not allow for recognition through direct benefit income, reflecting Horizons limited ability to compel the WDC to contribute to scheme operating costs beyond that already agreed Should the WDC choose to acknowledge that situation, the direct benefit income required from private property would reduce by $6,230 in and $7,925 annually beyond that out to It is intended that this matter be included as part of Horizons submission on the WDC s draft Annual Plan Three options have been looked at for defining direct benefits extents, presented in Annex A. Inputs to those options include the extent of flooding recorded for the June 2015 event, the nature of the topography for this part of Whanganui East and the nature of the WDC stormwater network. Those scenarios also include a qualitative assessment of a conceivable worst case; the effect of a channel with essentially no conveyance in combination with an extreme weather event Option A could be regarded as an absolute minimum, high-benefit area. Option C arguably reflects the opposite end of the spectrum and starts to reflect indirect benefits which are already accounted for. Option B is considered to most fairly define the area of direct benefit. It is proposed that the direct benefit be reflected by a single differential (UC = Urban Channel) applied to all those properties that fall within the Option B area. The rate would be based on capital value. 10. CONSULTATION Subject to adoption of the recommendations contained in this item, the proposal will be included in the DAP. The changes proposed would be identified in the Annual Plan Summary document and included in the Whanganui edition of the Across the Region publication that will focus on the DAP However, the consultation focus will centre on writing to all new ratepayers advising of the proposal and how it would affect them. That would be followed by a public meeting timed to coincide with the DAP consultation period. 11. SIGNIFICANCE This is not a significant decision according to the Council s Policy on Significance and Engagement. Matarawa Flood Control Scheme Extension (PRD 5 20) Page 5

6 Allan Cook PROJECT ENGINEER Ramon Strong GROUP MANAGER RIVER MANAGEMENT ANNEXES A Three Rating Options Matarawa Flood Control Scheme Extension (PRD 5 20) Page 6

EXPLAINED. Your Rates

EXPLAINED. Your Rates Your Rates EXPLAINED 2018-2019 The Horizons Region extends over 22,200km2 - from Ruapehu in the north and Horowhenua in the south, to Whanganui in the west and Tararua in the east, and has a population

More information

The approach to managing natural hazards in this Plan is to: set out a clear regional framework for natural hazard management

The approach to managing natural hazards in this Plan is to: set out a clear regional framework for natural hazard management 10 Natural Hazards 10.1 Scope and Background This chapter establishes an overall framework for natural hazard management under the Resource Management Act 1991 (RMA). It also sets out the division of responsibilities

More information

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back Alyth (Potentially Vulnerable Area 08/04) Local Plan District Tay Local authority Perth and Kinross Council Main catchment Alyth Burn (River Tay) Summary of flooding impacts 50 residential properties 20

More information

Flood Risk Assessment for Planning

Flood Risk Assessment for Planning Flood Risk Assessment for Planning Report on: Sample Property, Sample Town, Sample Postcode Report prepared for: Report Reference: Report Date: Sample AEL-XXXX-FRA-XXXX 28 th October 2016 Client Reference:

More information

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA McLuckie D. For the National Flood Risk Advisory Group duncan.mcluckie@environment.nsw.gov.au Introduction Flooding is a natural phenomenon

More information

Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Do

Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Do Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Don Summary of flooding impacts 230 residential properties

More information

Options to fund River Scheme flood damage

Options to fund River Scheme flood damage File Reference: 1.00030 Significance of Decision: Receives Only - No Decisions Report To: Operations, Monitoring and Regulation Committee Meeting Date: 3 May 2011 Report From: Ken Tarboton, Group Manager

More information

Strategic Flood Risk Assessment for SDCC Development Plan

Strategic Flood Risk Assessment for SDCC Development Plan Strategic Flood Risk Assessment for SDCC Development Plan Detailed Report on Flood Risk in the Baldonnell Area 8 th May 2015 rpsgroup.com/ireland Strategic Flood Risk Assessment for SDCC Development Plan

More information

Upper Tukituki Flood Control Scheme. Asset Management Plan. October 2017 HBRC Plan Number 4559 HBRC Report Number AM 15-04

Upper Tukituki Flood Control Scheme. Asset Management Plan. October 2017 HBRC Plan Number 4559 HBRC Report Number AM 15-04 Upper Tukituki Flood Control Scheme Asset Management Plan October 2017 HBRC Plan Number 4559 HBRC Report Number AM 15-04 Asset Management Group Technical Report ISSN 1174 3085 Engineering Section Upper

More information

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013 APPENDIX II TO THE SEA ENVIRONMENTAL REPORT STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED AMENDMENT TO THE GAELTACHT LOCAL AREA PLAN 2008-2014 for: Galway County Council County Buildings Prospect

More information

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanarkshire Council, South Lanarkshire Council Main catchment

More information

Revenue and Financing Policy 2018

Revenue and Financing Policy 2018 Revenue and Financing Policy 2018 Greater Wellington Regional Council Contents Core provisions... 2 1. Introduction... 2 2. Considerations for this policy... 2 3. Valuation system... 2 Equalised capital

More information

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Tay Local authority Perth and Kinross Council Main catchment River Tay Summary of flooding impacts

More information

Nairn East and Auldearn (Potentially Vulnerable Area 05/08) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Hi

Nairn East and Auldearn (Potentially Vulnerable Area 05/08) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Hi Nairn East and Auldearn (Potentially Vulnerable Area 05/08) Findhorn, Nairn and Speyside Local authority The Highland Council Main catchment River Nairn Summary of flooding impacts Summary of flooding

More information

Fort William (Potentially Vulnerable Area 01/25) Local authority Main catchment The Highland Council Appin coastal Background This Potentially Vulnera

Fort William (Potentially Vulnerable Area 01/25) Local authority Main catchment The Highland Council Appin coastal Background This Potentially Vulnera Fort William (Potentially Vulnerable Area 01/25) Local authority The Highland Council Main catchment Appin coastal Summary of flooding impacts 100 residential properties 80 non-residential properties 520,000

More information

Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Local authority Main catchment Tay Perth and Kinross Council River Tay

Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Local authority Main catchment Tay Perth and Kinross Council River Tay Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Tay Local authority Perth and Kinross Council Main catchment River Tay Summary of flooding impacts 240 residential properties

More information

Elgin (Potentially Vulnerable Area 05/05) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council River

Elgin (Potentially Vulnerable Area 05/05) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council River Elgin (Potentially Vulnerable Area 05/05) Findhorn, Nairn and Speyside Local authority The Moray Council Main catchment River Lossie Summary of flooding impacts Summary of flooding impacts At risk of flooding

More information

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coastal Summary of flooding impacts 110 residential 40

More information

A REALITY CHECK ON FLOOD RISK

A REALITY CHECK ON FLOOD RISK A REALITY CHECK ON FLOOD RISK Barry Carter, Nick Brown, Neil Blazey. Auckland Council, Auckland, New Zealand. ABSTRACT Traditional approaches to flood risk assessments involve modelling catchment systems

More information

Managing the Risk and Impact of Regional Flooding

Managing the Risk and Impact of Regional Flooding Managing the Risk and Impact of Regional Flooding Ben Lukey FCRM Manager Strategy & Investment Environment Agency Wednesday 8 June 2016 Environment Agency - Who are we? Our role in Flood Risk Management

More information

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner Nairn Central (Potentially Vulnerable Area 01/18) Local authority The Highland Council Main catchment Moray coastal Summary of flooding impacts At risk of flooding 350 residential 30 non-residential 340,000

More information

THAMES-COROMANDEL DISTRICT COUNCIL COASTAL HAZARDS POLICY

THAMES-COROMANDEL DISTRICT COUNCIL COASTAL HAZARDS POLICY THAMES-COROMANDEL DISTRICT COUNCIL COASTAL HAZARDS POLICY 1. OBJECTIVES a) To sustainably manage the effects of coastal hazards on the District s coastal foreshore land by ensuring risk to life and property

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

Dunblane and Bridge of Allan (Potentially Vulnerable Area 09/03) Local Plan District Local authority Main catchment Forth Stirling Council Allan Water

Dunblane and Bridge of Allan (Potentially Vulnerable Area 09/03) Local Plan District Local authority Main catchment Forth Stirling Council Allan Water Dunblane and Bridge of Allan (Potentially Vulnerable Area 09/03) Local Plan District Forth Local authority Stirling Council Main catchment Allan Water Summary of flooding impacts At risk of flooding 370

More information

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page Mike Page Lowestoft FLOOD RISK MANAGEMENT Strategy Summary 2016 Introduction This Strategy Summary Document is a brief overview of the Strategy for managing the risk of flooding to Lowestoft from the sea,

More information

Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Local authority Main catchment Forth Stirling Council Stirlin

Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Local authority Main catchment Forth Stirling Council Stirlin Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Forth Local authority Stirling Council Main catchment Stirling coastal Summary of flooding impacts At risk of flooding

More information

Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling C

Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling C Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catchment River Forth Summary of flooding

More information

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee Flood Risk Management Strategy Solway Local Plan District Section 1: Flood Risk Management in Scotland 1.1 What is a Flood Risk Management Strategy?... 1 1.2 How to read this Strategy... 1 1.3 Managing

More information

THE PEOPLE OF THE STATE OF MICHIGAN ENACT:

THE PEOPLE OF THE STATE OF MICHIGAN ENACT: DRAFT A bill to authorize local units of government to create storm water utilities; to permit the establishment and collection of storm water utility fees; to provide for the allocation of the costs of

More information

Appendix F: Ozark special Road District Addendum

Appendix F: Ozark special Road District Addendum Appendix F: Ozark special Road District Addendum F-1: Introduction and Planning Process F-1.1 Purpose The Christian County 2016 Multi-Jurisdictional Natural Hazards Mitigation Plan is an updated version

More information

Flood Risk Management Planning in Scotland: Arrangements for February 2012

Flood Risk Management Planning in Scotland: Arrangements for February 2012 Flood Risk Management Planning in Scotland: Arrangements for 2012 2016 February 2012 Flood Risk Management (Scotland) Act 2009 1 Contents Forewords 1. Introduction to this document... 5 2. Sustainable

More information

DRAFT Rates Remission and Postponement Policies

DRAFT Rates Remission and Postponement Policies DRAFT Rates Remission and Postponement Policies June 2018 Doc # 10264888 Page i Table of contents 1 Remission of rates for sporting and recreational organisations... 1 1.1 Objectives 1 1.2 Criteria and

More information

Stormwater Management Utility Fee Reduction Credit Application

Stormwater Management Utility Fee Reduction Credit Application Stormwater Management Utility City of Dubuque, IA Winter 2003 Stormwater Management Utility Stormwater Management Utility Introduction The City of Dubuque established a Stormwater Management Utility on

More information

Flood Investigation Report

Flood Investigation Report Flood Investigation Report Bar Hill 1.1 Background As the Lead Local Flood Authority (LLFA) for Cambridgeshire, it is Cambridgeshire County Council s duty to investigate flood incidents as detailed within

More information

Flood risk management plans the interlink between Floods Directive and Water Framework Directive a creative approach to authorities work

Flood risk management plans the interlink between Floods Directive and Water Framework Directive a creative approach to authorities work Flood risk management plans the interlink between Floods Directive and Water Framework Directive a creative approach to authorities work Gimo, 11.06.2014 Iveta Teibe, iveta.teibe@varam.gov.lv What s explicitly

More information

P art B 4 NATURAL HAZARDS. Natural Hazards ISSUE 1. River Flooding

P art B 4 NATURAL HAZARDS. Natural Hazards ISSUE 1. River Flooding 4 NATURAL HAZARDS ISSUE 1 River Flooding A large part of the plains within the Timaru District is subject to some degree of flooding risk. At least part of all of the main settlements in the District and

More information

Dornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta

Dornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta Dornoch (Potentially Vulnerable Area 01/07) Local authority The Highland Council Main catchment Dornoch coastal Summary of flooding impacts

More information

Revenue and Financing Policy 2017

Revenue and Financing Policy 2017 Revenue and Financing Policy 2017 Foreword Andrew Duncan Manager Financial Policy, Auckland Council Adopted by the Governing Body on 29 June 2017 Resolution number: GB/2017/65 4 Auckland Council Revenue

More information

Appendix 4 Candidate Projects for Local Choices

Appendix 4 Candidate Projects for Local Choices Appendix 4 Candidate Projects for Local Choices MTP 2012/13 MODERATION EVIDENCE EA Unique Project Reference: SNC001F/000A/001A Project Name: Mushroom Green Dam RFCC: Severn EA Region: Midlands Operating

More information

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN Comprehensive General Plan/Administration and Implementation CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN CHAPTER II ADMINISTRATION AND IMPLEMENTATION This Chapter of the General Plan addresses the administration

More information

Financial information

Financial information Financial information 135 Significant forecasting assumptions and risks Greater Wellington Draft Long-Term Plan 2012-22 These prospective financial statements were authorised for issue by the Council on

More information

Funding Fire and Emergency Services for all New Zealanders PUBLIC CONSULTATION

Funding Fire and Emergency Services for all New Zealanders PUBLIC CONSULTATION Funding Fire and Emergency Services for all New Zealanders PUBLIC CONSULTATION A public consultation paper on the setting of the rates of levy on contracts of fire insurance for the 2017/18 financial year

More information

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010.

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010. STATUTORY INSTRUMENTS. S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010. (Prn. A10/0432) 2 [122] S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT

More information

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catchment River Devon Summary of flooding impacts Summary

More information

This survey is expected to take approximately 20 minutes and must be completed in one session.

This survey is expected to take approximately 20 minutes and must be completed in one session. Introduction Thank you for your willingness to participate in this online survey as part of the State Flood Assessment effort. This first step toward developing comprehensive flood planning for Texas does

More information

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council Main catchment River Clyde Summary of flooding impacts At risk of

More information

Implementing risk-based asset management strategies

Implementing risk-based asset management strategies Implementing risk-based asset management strategies 2018. 04. 17 Disaster Resilience by Design The challenge for local governments The Challenge for Local Governments Landslides Debris Flows Wildfire Wind

More information

Strategic Flood Risk Assessment. SFRA Report

Strategic Flood Risk Assessment. SFRA Report Strategic Flood Risk Assessment SFRA Report on Strandhill Mini-Plan Variation No.1 of the Sligo County Development Plan 2011-2017 Prepared by Contents 1. The context for the Flood Risk Assessment 1 2.

More information

FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES IN URBAN ENVIRONMENT

FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES IN URBAN ENVIRONMENT Proceedings of the 14 th International Conference on Environmental Science and Technology Rhodes, Greece, 3-5 September 2015 FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES

More information

Turriff (Potentially Vulnerable Area 06/07) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Deveron Backgrou

Turriff (Potentially Vulnerable Area 06/07) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Deveron Backgrou Turriff (Potentially Vulnerable Area 06/07) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Deveron Summary of flooding impacts At risk of flooding

More information

DO WE NEED TO CONSIDER FLOODS RARER THAN 1% AEP?

DO WE NEED TO CONSIDER FLOODS RARER THAN 1% AEP? DO WE NEED TO CONSIDER FLOODS RARER THAN 1% AEP? Drew Bewsher and John Maddocks Bewsher Consulting Pty Ltd Abstract Everyone is aware that floods rarer than the 1% AEP event occur. Australia-wide, over

More information

Flood Risk Management Strategy. Shetland

Flood Risk Management Strategy. Shetland Flood Risk Management Strategy Shetland Publication date: 14 December 2015 Terms and conditions Ownership: All intellectual property rights for Flood Risk Management Strategies are owned by SEPA or its

More information

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Impacts from the July 8, 2013 Storm Event on the City of Toronto STAFF REPORT ACTION REQUIRED Impacts from the July 8, 2013 Storm Event on the City of Toronto Date: September 10, 2013 To: From: Wards: Executive Committee City Manager All Reference Number: SUMMARY The

More information

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Tay Estuary and Montrose Basin Local authority Angus Council Main catchment Brothock Water Summary of flooding impacts 250 residential properties

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED VARIATION NO. 1 (CORE STRATEGY) TO THE LONGFORD TOWN DEVELOPMENT PLAN 2009-2015 for: Longford Local Authorities Great Water Street, Longford, Co. Longford by:

More information

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Orkney Local authority Orkney Islands Council Main catchment Orkney coastal Summary of flooding impacts 490 residential properties 460 non-residential

More information

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED We are the Environment Agency. We protect and improve the environment and make

More information

DEFINING BEST PRACTICE IN FLOODPLAIN MANAGEMENT

DEFINING BEST PRACTICE IN FLOODPLAIN MANAGEMENT DEFINING BEST PRACTICE IN FLOODPLAIN MANAGEMENT M Babister 1 M Retallick 1 1 WMAwater, Level 2,160 Clarence Street Sydney Abstract With the upcoming release of the national best practice manual, Managing

More information

Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Local authority Main catchment

Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Local authority Main catchment Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Tweed Local authority Scottish Borders Council Main catchment River Tweed Summary

More information

Development Contributions Policy 2018: Springvale Urban Expansion Area and Otamatea West

Development Contributions Policy 2018: Springvale Urban Expansion Area and Otamatea West Development Contributions Policy 2018: Urban Expansion Area and West 1 P a g e Development Contributions Policy 2018: Urban Expansion Area and West Originator: Damien Wood, Development Engineer Contact

More information

Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority Main catchment The Highland Council River Conon Background This Poten

Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority Main catchment The Highland Council River Conon Background This Poten Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority The Highland Council Main catchment River Conon Summary of flooding impacts Summary of flooding impacts At risk of flooding

More information

Chapter 6 - Floodplains

Chapter 6 - Floodplains Chapter 6 - Floodplains 6.1 Overview The goal of floodplain management is to reduce the potential risks to both existing and future developments, and infrastructure, in the 100-year floodplain. Over the

More information

Flood Risk Management in England

Flood Risk Management in England REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1521 SESSION 2010 2012 28 OCTOBER 2011 Department for Environment, Food and Rural Affairs and Environment Agency Flood Risk Management in England Flood

More information

DRAFT Revised Guide to the National CDEM Plan 2015 July 2015

DRAFT Revised Guide to the National CDEM Plan 2015 July 2015 2. Hazards and risks Summary The National CDEM Plan 2015 identifies core functions for national management of the consequences of emergencies. It may also address the management of consequences of other

More information

Acknowledgements. Legal Disclaimer. Copyright

Acknowledgements. Legal Disclaimer. Copyright SUMMARY REPORT 2018 Acknowledgements The Office of Public Works (OPW) gratefully acknowledges the assistance, input and provision of data by a large number of organisations towards the implementation

More information

This survey is expected to take approximately 20 minutes and must be completed in one session.

This survey is expected to take approximately 20 minutes and must be completed in one session. State Flood Assessment Survey 1 Introduction Thank you for your willingness to participate in this online survey as part of the State Flood Assessment effort. This first step toward developing comprehensive

More information

SUSTAINABLE LAND USE INITIATIVE (SLUI)

SUSTAINABLE LAND USE INITIATIVE (SLUI) Report No. 15-131 Information Only - No Decision Required SUSTAINABLE LAND USE INITIATIVE (SLUI) 1. PURPOSE 1.1. This report is to update Members about progress on Council s Sustainable Land Use Initiative

More information

Section 5 Dollars and Cents

Section 5 Dollars and Cents Section 5 Dollars and Cents section Revenue and financing policy 5a Financial statements 5b Funding impact statement rating implications 5c Rating changes 5d Balanced budget statement 5e Financial reporting

More information

Flood Risk Management (Scotland) Act 2009: DRAFT Local Flood Risk Management Plan Ayrshire Local Plan District

Flood Risk Management (Scotland) Act 2009: DRAFT Local Flood Risk Management Plan Ayrshire Local Plan District Appendix 1 Flood Risk Management (Scotland) Act 2009: DRAFT Local Flood Risk Management Plan Ayrshire Local Plan District Published by: North Ayrshire Council No 12 Local FRM Plan March 2016 Delivering

More information

2. Hazards and risks. 2 HAZARDS AND RISKS p1

2. Hazards and risks. 2 HAZARDS AND RISKS p1 2. Hazards and risks Summary The National CDEM Plan 2015 identifies core functions for national management of the consequences of emergencies. It may also address the management of consequences of other

More information

Justification for Floodplain Regulatory Standards in Illinois

Justification for Floodplain Regulatory Standards in Illinois Justification for Floodplain Regulatory Standards in Illinois Office of Water Resources Issue Paper April, 2015 Proactive Illinois floodplain and floodway regulatory standards have prevented billions of

More information

GENERAL PLAN AMENDMENT # FLOOD HAZARDS

GENERAL PLAN AMENDMENT # FLOOD HAZARDS GENERAL PLAN AMENDMENT #2011-03 FLOOD HAZARDS The following text that appears on pages HS 3-4 of the Health and Safety Element in the Yolo 2030 Countywide General Plan has been amended. New language is

More information

Greater Wellington Regional Council Revenue and Financing Policy Statement of Proposal 1

Greater Wellington Regional Council Revenue and Financing Policy Statement of Proposal 1 Revenue and Financing Policy Statement of Proposal 1 (Greater Wellington) proposes to change our Revenue and Financing Policy. The purpose of the changes is to make the funding policies more transparent,

More information

Stage 2 Cost Recovery Impact Statement

Stage 2 Cost Recovery Impact Statement Stage 2 Cost Recovery Impact Statement Fire levy rates for 2017/18 Agency disclosure statement This cost recovery impact statement (CRIS) has been prepared by the Department of Internal Affairs. It provides

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (A) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 BEARNA PLAN for: Galway County Council Áras an Chontae

More information

Devon Local Flood Risk Management Strategy Update

Devon Local Flood Risk Management Strategy Update Devon Local Flood Risk Management Strategy Update April 2015 Newsletter Devon s Local Flood Risk Management Strategy was published in June 2014, alongside Devon s Action Plan, prioritising investigation

More information

Natural Hazards Mitigation Plan. Executive Summary

Natural Hazards Mitigation Plan. Executive Summary Natural Hazards Mitigation Plan Executive Summary 1. Introduction Kane County Illinois, is subject to natural hazards that threaten life and health and have caused extensive property damage. Floods struck

More information

Chapter Flood Consequences

Chapter Flood Consequences Chapter 2.16. Flood Consequences 438 16. Flood Consequences 16.1. Introduction and Scope of Topic 16.1.1. This chapter identifies and describes the existing flood risk features along the route of the Scheme

More information

POPULATION GROWTH. Steady and moderate growth of 1.7% a year to 2018, slowing to 0.6% a year out to 2048 MITGATING FACTORS (IF APPLICABLE)

POPULATION GROWTH. Steady and moderate growth of 1.7% a year to 2018, slowing to 0.6% a year out to 2048 MITGATING FACTORS (IF APPLICABLE) POPULATION GROWTH Steady and moderate growth of 1.7% a year to 2018, slowing to 0.6% a year out to 2048 ALTERNATIVES IMPACT LIKELIHOOD OVERALL RISK REASONS AND FINANCIAL EFFECT That the population growth

More information

Flood Risk Management

Flood Risk Management Flood Risk Management COUNTY SUMMARY COUNTY: MONAGHAN (Information correct as of 31/12/2017) CONTENTS: 1. OPW Capital Investment to 31 December 2017 a. Major Flood Relief Schemes 1995 2017 b. Minor Flood

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 DRAFT FOR CONSULTATION OCTOBER 7, 2014 Information Note 1: Environmental and Social Risk Classification The Board has requested the release of this document for consultation purposes to seek feedback on

More information

Hawke s Bay Regional Council s Long Term Plan Part 3 30 Year Infrastructure Strategy

Hawke s Bay Regional Council s Long Term Plan Part 3 30 Year Infrastructure Strategy Hawke s Bay Regional Council s Long Term Plan 2015-25 Part 3 30 Year Infrastructure Strategy HBRC s 30 Year Infrastructure Strategy Contents Section 1 - Introduction... 1 Section 2 Significant Infrastructure...

More information

Modernization, FEMA is Recognizing the connection between damage reduction and

Modernization, FEMA is Recognizing the connection between damage reduction and EXECUTIVE SUMMARY Every year, devastating floods impact the Nation by taking lives and damaging homes, businesses, public infrastructure, and other property. This damage could be reduced significantly

More information

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004 ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE 12 January 2004 1.0 INTRODUCTION This is an update to the existing policy statement which was prepared by Arun District Council to provide

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Official Journal of the European Union

Official Journal of the European Union L 63/22 28.2.2004 COMMISSION REGULATION (EC) No 364/2004 of 25 February 2004 amending Regulation (EC) No 70/2001 as regards the extension of its scope to include aid for research and development THE COMMISSION

More information

CRISP COUNTY, GEORGIA AND INCORPORATED AREAS

CRISP COUNTY, GEORGIA AND INCORPORATED AREAS CRISP COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number ARABI, CITY OF 130514 CORDELE, CITY OF 130214 CRISP COUNTY (UNINCORPORATED AREAS) 130504 Crisp County EFFECTIVE: SEPTEMBER 25,

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (B) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 GAELTACHT PLAN (INCLUDING SETTLEMENTS OF AN CHEATHRÚ

More information

Unique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review

Unique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review Location:, Co. Clare Unique ID: 250412 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 164500 Northing: 168500 River / Catchment / Sub-catchment Black River / Shannon Type

More information

Sioux County, Iowa. Mitigation Plan

Sioux County, Iowa. Mitigation Plan Sioux County, Iowa Part B of the Comprehensive County-Wide Emergency Operations Plan Prepared by: Mark Dunlop, Coordinator Sioux County Emergency Management Agency Orange City, Iowa 51041 February, 2003

More information

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter Agenda Date: 6/7/2016 Agenda Placement: 8A Set Time: 1:30 PM PUBLIC HEARING Estimated Report Time: 20 Minutes NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter TO: FROM: Board

More information

KITTITAS COUNTY CONSERVATION DISTRICT KITTITAS COUNTY, WASHINGTON RESOLUTION NO

KITTITAS COUNTY CONSERVATION DISTRICT KITTITAS COUNTY, WASHINGTON RESOLUTION NO KITTITAS COUNTY CONSERVATION DISTRICT KITTITAS COUNTY, WASHINGTON RESOLUTION NO. 2016-002 Kittitas County Conservation District A RESOLUTION of the Board of Supervisors of Kittitas County Conservation

More information

Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Local authority Main catchment Brodick to Kilmory Ayrshire North Ayrshire Counci

Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Local authority Main catchment Brodick to Kilmory Ayrshire North Ayrshire Counci Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Ayrshire Local authority North Ayrshire Council Main catchment Brodick to Kilmory Arran coastal Summary of flooding impacts At risk

More information

Planning and Flood Risk

Planning and Flood Risk Planning and Flood Risk Patricia Calleary BE MEngSc MSc CEng MIEI After the Beast from the East Patricia Calleary Flood Risk and Planning Flooding in Ireland» Floods are a natural and inevitable part of

More information

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England 25 January 2017 We are the Environment Agency. We protect and improve the

More information

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Council, Renfrewshire Council Main catchment Firth of Clyde

More information

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014 Shropshire Local Flood Risk Management Strategy Summary for Consultation July 2014 SHROPSHIRE LOCAL FLOOD RISK MANAGEMENT STRATEGY 1 Introduction This Strategy is about managing flooding in Shropshire.

More information

The following pages present the financial projections of the council for 2018/19 to 2027/28. In particular the following information is presented.

The following pages present the financial projections of the council for 2018/19 to 2027/28. In particular the following information is presented. NOTES TO THE FINANCIAL STATEMENTS The following pages present the financial projections of the council for 2018/19 to 2027/28. In particular the following information is presented. The sources of income

More information

City of St. Augustine. Floodplain Management Higher Standards Information

City of St. Augustine. Floodplain Management Higher Standards Information City of St. Augustine Floodplain Management Higher Standards Information There are different regulations that communities can use to help protect existing and future development and natural floodplain

More information

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment River Cree Summary of flooding impacts 210 residential properties

More information