Table 1: Revenue / Cost Ratios from Cost Allocation Model (%)

Size: px
Start display at page:

Download "Table 1: Revenue / Cost Ratios from Cost Allocation Model (%)"

Transcription

1 EB- Tab 1 Page 1 of 4 1 COST ALLOCATION THESL s total revenue requirement, as described in Exhibit J1, is allocated to rate classes as the basis for determining distribution rates for the Test Year. The allocation methodology employed for the Test Years is the Board s Revised Cost Allocation Model to be used for cost of service applications starting with the 2012 rate year that was provided on the Board s website on August 5, The results of the cost allocation, which shows the revenue/cost ratios prior to applying the proposed rates in each Test Year, are summarized in Table 1 below Table 1: Revenue / Cost Ratios from Cost Allocation Model (%) Rate Class Board s Guideline Ranges Residential General Service <50kW General Service kW Intermediate kW Large Use Streetlighting Unmetered Scattered Load ,, provides select inputs and outputs from the Cost Allocation model for the Test Years. The full model has also been filed electronically COST ALLOCATION MODEL The OEB s cost allocation model is designed on sound cost allocation principles. One such principle is that costs should be allocated to those customer classes causing them.

2 EB- Tab 1 Page 2 of Cost allocation generally is done in three steps: Functionalization, Categorization and Allocation. In the functionalization step, costs are aggregated into homogenous groups as defined by functions within the utility. In the case of the OEB s Cost Allocation Model, functionalization was achieved by allocating utility costs to the various USofA accounts, with further refinement in some categories for primary and secondary-related costs, and aggregation of some USofA accounts where account-by-account detail is not required for allocation. In the categorization step, each of the cost categories determined in the functionalization step is categorized as demand-related (related to the peak demands on the system), customer-related (related to the number of customers of the utility), or jointly demandand customer-related (related to both demand on the system and number of customers). Where costs are categorized as jointly demand- and customer-related, the proportions of each are determined in the Cost Allocation Model using a Minimum System approach. This approach determines the customer-related proportion by estimating the minimum system that would be needed to serve the minimum load requirements of customers. The remainder of costs are considered to be demand-related. The OEB s Cost Allocation model does not attempt to estimate the minimum system for each utility individually, but uses results of past studies to determine a generic customer/demand split based on utility densities. THESL has no information that would lead it to depart from the generic splits applied in the OEB s model, and accepts those values as reasonable. The final step is the allocation of the demand- and customer-related costs based on various allocators. THESL has adopted the allocators used in the Board s Cost Allocation model, including the use of 4 NCP for allocating primary and secondary asset costs.

3 EB- Tab 1 Page 3 of IMPLEMENTATION OF COST ALLOCATION RESULTS The OEB s Report of the Board: Review of Electricity Distribution Cost Allocation Policy (EB ) established updated target ranges for the Revenue to Cost ratios for each customer class. Table 2 below shows the Revenue to Cost ratios calculated prior to, and after, the proposed Test Year rate design in comparison to the target ranges (all ratios exclude revenues and costs related to transformer ownership allowance). 8 9 Table 2: Revenue / Cost Ratios (%) Board s Rate Class Board Guideline Model Proposed Model Proposed Model Proposed Approved Ranges Residential General Service <50kW General Service kW Intermediate kW Large Use Streetlighting Unmetered Scattered Load The proposed Revenue to Cost ratios for all THESL rate classes are within the Board s target ranges. Where the rate class Revenue to Cost ratios determined by the model fall outside of the Board s guidelines, THESL has adjusted the revenue requirement of those rate classes to meet the guidelines. The revenue adjustment was allocated to the remaining customer classes based on the class pro-rata share of revenue requirement. This is the same methodology directed by the Board in THESL s decision.

4 EB- Tab 1 Page 4 of As required by the Board s June 22, 2011 updated filing requirements,, Tab 1, Schedule 2 shows class revenues under different revenue to cost ratio assumptions (Filing Requirements Appendix 2-O).

5 Please complete the following four tables. a) Allocated Costs OEB's Appendix 2-O Cost Allocation EB- Tab 1 Schedule 2 Page 1 of 6 Classes Costs Allocated from Previous Study % Costs Allocated in Test Year Study (Column 7A) 2012 % Costs Allocated in Test Year Study (Column 7A) 2013 % Costs Allocated in Test Year Study (Column 7A) 2014 Residential $ 256,839, % $ 275,646, % $ 305,109, % $ 332,958, % GS < 50 kw $ 74,280, % $ 81,617, % $ 90,273, % $ 99,051, % GS > 50 kw to 999 kw $ 136,457, % $ 147,698, % $ 166,901, % $ 191,346, % GS > 999 to 5000 kw $ 38,493, % $ 41,716, % $ 47,793, % $ 54,526, % Large User, if applicable $ 20,035, % $ 21,819, % $ 25,168, % $ 28,943, % Street Lighting $ 17,331, % $ 17,734, % $ 19,328, % $ 21,233, % Sentinel Lighting 0.00% 0.00% 0.00% 0.00% Unmetered Scattered Load (USL) $ 4,627, % $ 3,124, % $ 3,423, % $ 3,743, % Other class, if applicable 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Embedded distributor, if applicant is a host 0.00% 0.00% 0.00% 0.00% Total $ 548,065, % $ 589,358, % $ 657,997, % $ 731,802, % Notes Customer Classification Host Distributors: Provide information on embedded distributor(s) as a separate class, even if your proposal is to bill the embedded distributor(s) as (a) General Service customer(s). If proposed rate classes differ from those in place in the previous Cost Allocation study, modify the rate classes to match the current application as closely as possible. Class Revenue Requirements If using the Board-issued model, enter data from Worksheet O-1, row 39 in the 2012 model. For the Embedded Distributor(s), the Service Revenue Requirement does not include Account Low Voltage (LV) Costs Exclude costs in deferral and variance accounts. Include Smart Meter costs only to the extent that they are being included in Rate Base and Revenue Requirement (i.e. being transferred from accounts 1555 and 1556 as a result of a prudence review). %

6 b) Revenues Classes (same as previous table) 2012 Column 7B Column 7C Column 7D Column 7E Load Forecast (LF) X current approved rates LF X current approved rates X (1 + d) LF X proposed rates Miscellaneous Revenue EB- Tab 1 Schedule 2 Page 2 of 6 Residential $ 217,119,755 $ 236,438,395 $ 238,115,903 $ 9,531,407 GS < 50 kw $ 66,034,549 $ 71,910,098 $ 72,406,796 $ 3,692,661 GS > 50 kw to 999 kw $ 158,766,598 $ 169,258,292 $ 170,157,143 $ 3,669,965 GS > 999 to 5000 kw $ 52,210,674 $ 51,159,558 $ 49,159,558 $ 653,372 Large User, if applicable $ 26,964,718 $ 25,957,906 $ 24,757,906 $ 237,517 Street Lighting $ 11,983,417 $ 13,049,664 $ 13,157,592 $ 97,332 Sentinel Lighting Unmetered Scattered Load (USL) $ 3,301,468 $ 3,595,223 $ 3,614,239 $ 106,837 Other class, if applicable $ - $ - $ - applicant is a host distributor Total $ 536,381,181 $ 571,369,136 $ 571,369,137 $ 17,989,091

7 Classes (same as previous table) 2013 Column 7B Column 7C Column 7D Column 7E Load Forecast LF X current LF X proposed Miscellaneous (LF) X current approved rates X rates Revenue approved rates (1 + d) EB- Tab 1 Schedule 2 Page 3 of 6 Residential $ 239,370,964 $ 268,089,081 $ 268,135,693 $ 9,823,816 GS < 50 kw $ 71,204,056 $ 79,746,639 $ 79,760,430 $ 3,774,771 GS > 50 kw to 999 kw $ 174,393,189 $ 191,563,589 $ 191,589,087 $ 3,801,709 GS > 999 to 5000 kw $ 53,567,271 $ 54,230,370 $ 54,237,672 $ 657,758 Large User, if applicable $ 27,212,806 $ 27,064,671 $ 27,068,516 $ 239,233 Street Lighting $ 13,169,437 $ 14,749,417 $ 14,752,370 $ 98,323 Sentinel Lighting Unmetered Scattered Load (USL) $ 3,614,532 $ 4,048,180 $ 3,948,180 $ 110,288 Other class, if applicable Embedded distributor, if applicant is a host distributor Total $ 582,532,256 $ 639,491,948 $ 639,491,948 $ 18,505,898

8 Classes (same as previous table) 2014 Column 7B Column 7C Column 7D Column 7E Load Forecast LF X current LF X proposed Miscellaneous (LF) X current approved rates X rates Revenue approved rates (1 + d) EB- Tab 1 Schedule 2 Page 4 of 6 Residential $ 269,780,773 $ 300,599,937 $ 300,618,230 $ 10,098,638 GS < 50 kw $ 78,321,333 $ 87,268,590 $ 87,274,032 $ 3,851,607 GS > 50 kw to 999 kw $ 196,352,179 $ 215,029,729 $ 215,040,241 $ 3,958,597 GS > 999 to 5000 kw $ 58,501,027 $ 59,541,347 $ 59,544,343 $ 662,347 Large User, if applicable $ 29,449,682 $ 29,498,055 $ 29,499,645 $ 241,345 Street Lighting $ 14,754,863 $ 16,440,426 $ 16,441,592 $ 99,494 Sentinel Lighting Unmetered Scattered Load (USL) $ 3,947,925 $ 4,398,927 $ 4,358,927 $ 113,491 Other class, if applicable applicant is a host distributor Total $ 651,107,781 $ 712,777,011 $ 712,777,010 $ 19,025,519 Notes: Columns 7B to 7D LF means Load Forecast of Annual Billing Quantities (i.e. customers or connections X 12, and kwh or kw, as applicable) Exclude revenue from rate adders and rate riders. For Embedded Distributor(s): exclude revenue in account Columns 7C and 7D: Column total in each column should equal the Base Revenue Requirement. For Embedded Distributor(s), Base Revenue Requirement does not include Account Low Voltage Costs Column 7C: The Board cost allocation model calculates "1+d" in worksheet O-1, cell C21. "d" is defined as Revenue Deficiency/ Revenue at Current Rates. Column 7E: If using the Board-issued Cost Allocation model, enter Miscellaneous Revenue as it appears in Worksheet O-1, row 19.

9 c) Rebalancing Revenue-to-Cost (R/C) Ratios Policy Range Class Previously Status Quo Approved Ratios Ratios Proposed Ratios Most Recent Year: (7C + 7E) / (7A) (7D + 7E) / (7A) 2011 % % % % Residential 88.72% GS < 50 kw 97.51% GS > 50 kw to 999 kw % GS > 999 to 5000 kw % EB- Tab 1 Schedule 2 Page 5 of 6 Large User, if applicable % Street Lighting 71.39% Sentinel Lighting Unmetered Scattered Load (USL) 82.53% Other class, if applicable Embedded distributor, if applicant is a host distributor Notes: Previously Approved Revenue-to-Cost Ratios For most applicants, Most Recent Year would be the third year of the IRM 3 period, e.g. if the applicant rebased in 2008 with further adjustments over 2 years, the Most recent year is For applicants that have had rates adjusted only under IRM 2, the Most Recent Year is 2006, and the applicant should enter the ratios from their Informational Filing. Status Quo Ratios The Board's updated Cost Allocation Model yields the Status Quo Ratios in Worksheet O-1. Status Quo means "No Rebalancing" or "Before Rebalancing".

10 d) Proposed Revenue-to-Cost Ratios Class Proposed Revenue-to-Cost Ratios Policy Range % % % % Residential % 93.3% GS < 50 kw % 92.0% EB- Tab 1 Schedule 2 Page 6 of 6 GS > 50 kw to 999 kw % 114.5% GS > 999 to 5000 kw % 110.4% Large User, if applicable % 102.8% Street Lighting % 77.9% Sentinel Lighting Unmetered Scattered Load (USL) % 119.5% Other class, if applicable Embedded distributor, if applicant is a host distributor The applicant should complete Table (d) if it is applying for approval of a revenue to cost ratio in 2012 that is outside the Board s policy range for any customer class. Table (d) will show the information that the distributor would likely enter in the IRM model) in In 2012 Table (d), enter the planned ratios for the classes that will be Change and No Change in 2013 (in the current Revenue Cost Ratio Adjustment Workform, Worksheet C1.1 Decision Cost Revenue Adjustment, column d), and enter TBD for class(es) that will be entered as Rebalance.

11 2012 COST ALLOCATION Sheet I6.1 Revenue Worksheet - Edit description in Sheet I2, cell C17 Page 1 of 15 Total kwhs from Load Forecast 24,728,243,609 Total kwhs from Market Particpants 264,818,673 Total kws from Load Forecast 43,124,389 Deficiency from RRWF - 46,684,782 Miscellaneous Revenue $17,989,091 ID Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load Billing Data Forecast kwh CEN 24,728,243,609 5,037,295,612 2,071,525,044 10,268,957,200 4,685,622,966 2,501,484, ,260,970 52,097,299 Forecast kw CDEM 43,124,389 26,934,430 10,637,920 5,229, ,725 Forecast kw, included in CDEM, of customers receiving line 18,566,388 5,298,207 8,303,497 4,964,684 Optional - Forecast kwh, included in CEN, from customers that - KWh excluding KWh from Wholesale Market Participants CEN EWMP 24,463,424,936 5,037,295,612 2,071,525,044 10,268,957,200 4,685,622,966 2,236,665, ,260,970 52,097,299 kwh - 30 year weather normalized amount Existing Monthly Charge $18.50 $24.64 $36.05 $ $3, $1.32 $4.91 Existing Distribution kwh Rate $ $ $ Existing Distribution kw Rate $ $ $ $ $ Existing TFOA Rate $0.63 $0.63 $0.63 $0.63 $0.63 $0.63 $0.63 Additional Charges Distribution Revenue from Rates $536,381,181 $217,119,755 $66,034,549 $158,766,598 $52,210,674 $26,964,718 $11,983,417 $3,301,468 Transformer Ownership Allowance $11,696,825 $0 $0 $3,337,870 $5,231,203 $3,127,751 $0 $0 Net Class Revenue CREV $524,684,356 $217,119,755 $66,034,549 $155,428,727 $46,979,471 $23,836,967 $11,983,417 $3,301,468 Data Mismatch Analysis Revenue with 30 year weather normalized kwh Weather Normalized Data from Hydro One Total Residential GS <50 GS - 50 to 999 GS - 1,000 to Large Use >5MW Street Light Unmetered kwh - 30 year weather normalized amount - Loss Factor

12 2012 COST ALLOCATION Sheet I6.2 Customer Data Worksheet - Edit description in Sheet I2, cell C17 Page 2 of 15 ID Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load Billing Data Bad Debt 3 Year Historical Average BDHA $7,628,705 $4,497,264 $1,942,800 $1,111,986 $76,655 $0 $0 $0 Late Payment 3 Year Historical Average LPHA $5,000,000 $2,709,349 $1,035,253 $983,705 $226,396 $45,297 $0 $0 Number of Bills CNB 4,775,070 3,798, , ,312 6, ,284 Number of Devices 163,159 12,323 Number of Connections (Unmetered) CCON 102,967 90,644 12,323 Total Number of Customers CCA 714, ,121 65,907 13, ,107 Bulk Customer Base CCB - Primary Customer Base CCP 714, ,121 65,907 13, ,107 Line Transformer Customer Base CCLT 711, ,121 65,907 11, ,107 Secondary Customer Base CCS 703, ,121 65,907 3, ,107 Weighted - Services CWCS 901, , ,814 33, ,644 12,323 Weighted Meter -Capital CWMC 178,416, ,981,826 22,433,998 26,287,600 5,633,500 1,040,000 1,040,000 - Weighted Meter Reading CWMR 971, , ,967 68,118 46,106 7, Weighted Bills CWNB 6,655,722 3,798,726 1,581,768 1,157,184 42,420 9, ,420 Bad Debt Data Historic Year: ,628,705 4,497,264 1,942,800 1,111,986 76,655 Historic Year: ,628,705 4,497,264 1,942,800 1,111,986 76,655 Historic Year: ,628,705 4,497,264 1,942,800 1,111,986 76,655 Three-year average 7,628,705 4,497,264 1,942,800 1,111,986 76,

13 2012 COST ALLOCATION Sheet I8 Demand Data Worksheet - Edit description in Sheet I2, cell C17 Page 3 of 15 CP TEST RESULTS NCP TEST RESULTS Co-incident Peak 1 CP 4 CP 12 CP 4 CP 4 NCP Indicator CP 1 CP 4 CP 12 4 NCP NCP 4 12 NCP NCP 12 Non-co-incident Peak 1 NCP 4 NCP 12 NCP Indicator NCP 1 NCP 4 NCP 12 Customer Classes Total Residential GS <50 GS - 50 to 999 GS - 1,000 to Large Use >5MW Street Light Unmetered CO-INCIDENT PEAK 1 CP Transform TCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 Bulk DeliveBCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 Total Syte DCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 4 CP Transform TCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25,998 Bulk DeliveBCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25,998 Total Syte DCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25, CP Transform TCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 Bulk DeliveBCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 Total Syte DCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 NON CO_INCIDENT PEAK 1 NCP Classificat DNCP1 5,014,960 1,236, ,059 2,049, , ,501 28,797 7,718 Primary NCPNCP1 4,875,349 1,236, ,059 1,910, , ,501 28,797 7,318 Line Tran LTNCP1 3,737,320 1,236, ,059 1,713, ,155 36,105 28,797 7,318 Secondary SNCP1 2,351,267 1,236, , ,075 16,716-28,797 7,318 4 NCP Classificat DNCP4 18,463,083 4,605,538 1,879,642 7,432,455 2,905,098 1,497, ,216 30,300 Primary NCPNCP4 17,919,247 4,605,538 1,879,642 6,888,620 2,905,098 1,497, ,216 30,300 Line Tran LTNCP4 13,584,586 4,605,538 1,879,642 6,177, , , ,216 30,300 Secondary SNCP4 8,544,838 4,605,538 1,879,642 1,853,387 63, ,216 30, NCP Classificat DNCP12 49,989,075 12,236,419 4,738,942 20,383,858 8,008,427 4,217, ,422 87,280 Primary NCPNCP12 41,919,238 12,236,419 4,738,942 12,314,021 8,008,427 4,217, ,422 87,280 Line Tran LTNCP12 30,578,349 12,236,419 4,738,942 11,043,650 1,757, , ,422 87,280 Secondary SNCP12 20,867,911 12,236,419 4,738,942 3,313, , ,422 87,280

14 2012 COST ALLOCATION Sheet O1 Revenue to Cost Summary Worksheet - Edit description in Sheet I2, cell C17 Page 4 of 15 Rate Base Assets Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load crev Distribution Revenue at Existing Rates $524,684,356 $217,119,755 $66,034,549 $155,428,727 $46,979,471 $23,836,967 $11,983,417 $3,301,468 mi Miscellaneous Revenue (mi) $17,989,091 $9,531,407 $3,692,661 $3,669,965 $653,372 $237,517 $97,332 $106,837 Miscellaneous Revenue Input equals Output Total Revenue at Existing Rates $542,673,447 $226,651,163 $69,727,210 $159,098,693 $47,632,843 $24,074,485 $12,080,749 $3,408,305 Factor required to recover deficiency (1 + D) Distribution Revenue at Status Quo Rates $571,369,137 $236,438,395 $71,910,098 $169,258,292 $51,159,558 $25,957,906 $13,049,664 $3,595,223 Miscellaneous Revenue (mi) $17,989,091 $9,531,407 $3,692,661 $3,669,965 $653,372 $237,517 $97,332 $106,837 Total Revenue at Status Quo Rates $589,358,228 $245,969,803 $75,602,759 $172,928,257 $51,812,930 $26,195,424 $13,146,996 $3,702,060 Expenses di Distribution Costs (di) $120,615,359 $48,181,182 $15,491,146 $36,205,071 $11,375,568 $5,641,770 $3,198,159 $522,463 cu Customer Related Costs (cu) $51,773,264 $31,551,241 $11,074,605 $7,515,386 $638,489 $102,675 $522,297 $368,571 ad General and Administration (ad) $89,422,210 $41,525,370 $13,430,964 $22,610,958 $6,247,470 $2,986,274 $2,152,769 $468,404 dep Depreciation and Amortization (dep) $145,414,768 $69,323,007 $18,562,812 $36,667,183 $10,213,539 $4,784,151 $5,104,616 $759,461 INPUT PILs (INPUT) $1,524,040 $723,268 $196,044 $378,164 $108,629 $51,933 $57,449 $8,552 INT Interest $77,370,498 $36,717,947 $9,952,534 $19,198,137 $5,514,758 $2,636,458 $2,916,500 $434,164 Total Expenses $486,120,138 $228,022,014 $68,708,105 $122,574,899 $34,098,455 $16,203,261 $13,951,790 $2,561,615 Direct Allocation $2,884,803 $0 $0 $222,815 $464,942 $2,197,047 $0 $0 NI Allocated Net Income (NI) $100,353,286 $47,624,957 $12,908,919 $24,900,914 $7,152,909 $3,419,613 $3,782,842 $563,132 Revenue Requirement (includes NI) $589,358,228 $275,646,971 $81,617,024 $147,698,628 $41,716,305 $21,819,921 $17,734,632 $3,124,747 Revenue Requirement Input equals Output Rate Base Calculation Net Assets dp Distribution Plant - Gross $4,322,816,988 $2,056,938,761 $559,456,134 $1,078,026,562 $297,808,978 $141,128,666 $164,874,659 $24,583,227 gp General Plant - Gross $700,543,035 $332,404,027 $90,408,775 $174,641,972 $49,269,248 $23,467,361 $26,412,241 $3,939,411 accum depaccumulated Depreciation ($2,436,796,884) ($1,162,543,981) ($315,929,844) ($606,585,165) ($165,621,762) ($78,259,103) ($93,871,686) ($13,985,344) co Capital Contribution ($288,890,109) ($136,405,721) ($38,264,602) ($75,652,137) ($17,932,115) ($8,192,762) ($10,801,960) ($1,640,812) Total Net Plant $2,297,673,029 $1,090,393,085 $295,670,463 $570,431,233 $163,524,349 $78,144,162 $86,613,254 $12,896,482 Directly Allocated Net Fixed Assets $28,644,080 $0 $0 $2,212,386 $4,616,554 $21,815,140 $0 $0 COP Cost of Power (COP) $2,170,630,600 $446,957,367 $183,805,647 $911,160,755 $415,753,584 $198,458,529 $9,872,144 $4,622,574 OM&A Expenses $261,810,833 $121,257,793 $39,996,715 $66,331,415 $18,261,528 $8,730,719 $5,873,225 $1,359,438 Directly Allocated Expenses $489,065 $0 $0 $37,775 $78,822 $372,468 $0 $0 Subtotal $2,432,930,498 $568,215,160 $223,802,362 $977,529,945 $434,093,934 $207,561,716 $15,745,370 $5,982,012 Working Capital $309,148,499 $72,202,171 $28,438,200 $124,213,131 $55,159,606 $26,374,528 $2,000,738 $760,125 Total Rate Base $2,635,465,608 $1,162,595,256 $324,108,663 $696,856,750 $223,300,509 $126,333,830 $88,613,993 $13,656,607 Rate Base Input equals Output Equity Component of Rate Base $1,054,186,243 $465,038,103 $129,643,465 $278,742,700 $89,320,204 $50,533,532 $35,445,597 $5,462,643 Net Income on Allocated Assets $100,353,286 $17,947,788 $6,894,654 $50,130,544 $17,249,534 $7,795,116 ($804,794) $1,140,444 Net Income on Direct Allocation Assets $669,402 $0 $0 $51,703 $107,887 $509,812 $0 $0 Net Income $101,022,688 $17,947,788 $6,894,654 $50,182,246 $17,357,421 $8,304,928 ($804,794) $1,140,444 RATIOS ANALYSIS REVENUE TO EXPENSES STATUS QUO% % 89.23% 92.63% % % % 74.13% % EXISTING REVENUE MINUS ALLOCATED COSTS ($46,684,781) ($48,995,809) ($11,889,813) $11,400,065 $5,916,538 $2,254,564 ($5,653,883) $283,558 Deficiency Input equals Output STATUS QUO REVENUE MINUS ALLOCATED COSTS $0 ($29,677,169) ($6,014,265) $25,229,629 $10,096,625 $4,375,503 ($4,587,636) $577,312 RETURN ON EQUITY COMPONENT OF RATE BASE 9.58% 3.86% 5.32% 18.00% 19.43% 16.43% -2.27% 20.88%

15 Output sheet showing minimum and 2012 COST ALLOCATION Page 5 of 15 Sheet O2 Monthly Fixed Charge Min. & Max. Worksheet - Edit description in Sheet I2, cell C17 GS - 1,000 to Unmetered Summary Residential GS <50 GS - 50 to 999 Large Use >5MW Street Light 4,999 Scattered Load Customer Unit Cost per month - Avoided Cost $4.85 $12.82 $46.38 $ $ $0.53 $2.36 Customer Unit Cost per month - Directly Related $7.07 $19.28 $70.04 $ $ $0.84 $3.66 Customer Unit Cost per month - Minimum System with P $20.52 $40.15 $ $ $ $16.19 $15.60 Existing Approved Fixed Charge $18.50 $24.64 $36.05 $ $3, $1.32 $4.91

16 2013 COST ALLOCATION Sheet I6.1 Revenue Worksheet - Edit description in Sheet I2, cell C17 Page 6 of 15 Total kwhs from Load Forecast 24,248,538,949 Total kwhs from Market Particpants 264,818,673 Total kws from Load Forecast 42,914,002 Deficiency from RRWF - 68,503,368 Miscellaneous Revenue $18,505,897 ID Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load Billing Data Forecast kwh CEN 24,248,538,949 4,972,246,073 2,022,696,172 10,303,528,875 4,608,287,802 2,178,788, ,893,810 52,097,299 Forecast kw CDEM 42,914,002 27,031, ,464, ,094, ,977 Forecast kw, included in CDEM, of customers receiving line 18,323,293 5,317,759 8,168,480 4,837,054 Optional - Forecast kwh, included in CEN, from customers that - KWh excluding KWh from Wholesale Market Participants CEN EWMP 23,983,720,276 4,972,246,073 2,022,696,172 10,303,528,875 4,608,287,802 1,913,970, ,893,810 52,097,299 kwh - 30 year weather normalized amount Eiti Existing Monthly Charge $ $27.02 $ $ $2, $1.45 $5.37 Existing Distribution kwh Rate $ $ $ Existing Distribution kw Rate $ $ $ $ $ Existing TFOA Rate $0.63 $0.63 $0.63 $0.63 $0.63 $0.63 $0.63 Additional Charges Distribution Revenue from Rates $582,532,256 $239,370,964 $71,204,056 $174,393,189 $53,567,271 $27,212,806 $13,169,437 $3,614,532 Transformer Ownership Allowance $11,543,675 $0 $0 $3,350, $5,146, $3,047, $0 $0 Net Class Revenue CREV $570,988,581 $239,370,964 $71,204,056 $171,043,001 $48,421,129 $24,165,462 $13,169,437 $3,614,532 Data Mismatch Analysis Revenue with 30 year weather normalized kwh Weather Normalized Data from Hydro One Total Residential GS <50 GS - 50 to 999 GS - 1,000 to Large Use >5MW Street Light Unmetered kwh - 30 year weather normalized amount - Loss Factor

17 2013 COST ALLOCATION Sheet I6.2 Customer Data Worksheet - Edit description in Sheet I2, cell C17 Page 7 of 15 ID Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load Billing Data Bad Debt 3 Year Historical Average BDHA $7,788,908 $4,591,706 $1,983,599 $1,135,338 $78,265 $0 $0 $0 Late Payment 3 Year Historical Average LPHA $5,000,000 $2,709,349 $1,035,253 $983,705 $226,396 $45,297 $0 $0 Number of Bills CNB 4,839,228 3,856, , ,200 6, ,284 Number of Devices 163,303 12,323 Number of Connections (Unmetered) CCON 103,047 90,724 12,323 Total Number of Customers CCA 724, ,696 65,892 14, ,107 Bulk Customer Base CCB - Primary Customer Base CCP 714, ,121 65,907 13, , Line Transformer Customer Base CCLT 711, ,121 65,907 11, ,107 Secondary Customer Base CCS 703, ,121 65,907 3, ,107 Weighted - Services CWCS 901, , ,814 33, ,724 12,323 Weighted Meter -Capital CWMC 183,893, ,003,076 22,909,248 27,307,600 5,633,500 1,040, Weighted Meter Reading CWMR 986, , ,117 69,339 46,582 7, Weighted Bills CWNB 6,761,028 3,856,176 1,581,408 1,205,400 42,420 9, ,420 Bad Debt Data Historic Year: ,788,908 4,591,706 1,983,599 1,135,338 78,265 Historic Year: ,788, ,591,706 1,983,599 1,135, ,265 Historic Year: ,788,908 4,591,706 1,983,599 1,135,338 78,265 Three-year average 7,788,908 4,591,706 1,983,599 1,135,338 78,

18 2013 COST ALLOCATION Sheet I8 Demand Data Worksheet - Edit description in Sheet I2, cell C17 Page 8 of 15 CP TEST RESULTS NCP TEST RESULTS Co-incident Peak 1 CP 4 CP 12 CP 4 CP 4 NCP Indicator CP 1 CP 4 CP 12 4 NCP NCP 4 12 NCP NCP 12 Non-co-incident Peak 1 NCP 4 NCP 12 NCP Indicator NCP 1 NCP 4 NCP 12 Customer Classes Total Residential GS <50 GS - 50 to 999 GS - 1,000 to Large Use >5MW Street Light Unmetered CO-INCIDENT PEAK 1 CP Transform TCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 Bulk DeliveBCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 Total Syte DCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 4 CP Transform TCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25,998 Bulk DeliveBCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25,998 Total Syte DCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25, CP Transform TCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 Bulk DeliveBCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 Total Syte DCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 NON CO_INCIDENT PEAK 1 NCP Classificat DNCP1 5,014,960 1,236, ,059 2,049, , ,501 28,797 7,718 Primary N PNCP1 4,875,349 1,236, ,059 1,910, , ,501 28,797 7,318 Line Tran LTNCP1 3,737,320 1,236, ,059 1,713, ,155 36,105 28,797 7,318 Secondary SNCP1 2,351,267 1,236, , ,075 16,716-28,797 7,318 4 NCP Classificat DNCP4 18,463,083 4,605,538 1,879,642 7,432,455 2,905,098 1,497, ,216 30,300 Primary N PNCP4 17,919,247 4,605,538 1,879,642 6,888,620 2,905,098 1,497, ,216 30,300 Line Tran LTNCP4 13,584,586 4,605,538 1,879,642 6,177, , , ,216 30,300 Secondary SNCP4 8,544,838 4,605,538 1,879,642 1,853,387 63, ,216 30, NCP Classificat DNCP12 49,989,075 12,236,419 4,738,942 20,383,858 8,008,427 4,217, ,422 87,280 Primary N PNCP12 41,919,238 12,236,419 4,738,942 12,314,021 8,008,427 4,217, ,422 87,280 Line Tran LTNCP12 30,578,349 12,236,419 4,738,942 11,043,650 1,757, , ,422 87,280 Secondary SNCP12 20,867,911 12,236,419 4,738,942 3,313, , ,422 87,280

19 2013 COST ALLOCATION Sheet O1 Revenue to Cost Summary Worksheet - Edit description in Sheet I2, cell C17 Page 9 of 15 Rate Base Assets Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load crev Distribution Revenue at Existing Rates $570,988,581 $239,370,964 $71,204,056 $171,043,001 $48,421,129 $24,165,462 $13,169,437 $3,614,532 mi Miscellaneous Revenue (mi) $18,505,898 $9,823,816 $3,774,771 $3,801,709 $657,758 $239,233 $98,323 $110,288 Miscellaneous Revenue Input equals Output Total Revenue at Existing Rates $589,494,479 $249,194,780 $74,978,827 $174,844,710 $49,078,887 $24,404,695 $13,267,760 $3,724,820 Factor required to recover deficiency (1 + D) Distribution Revenue at Status Quo Rates $639,491,948 $268,089,081 $79,746,639 $191,563,589 $54,230,370 $27,064,671 $14,749,417 $4,048,180 Miscellaneous Revenue (mi) $18,505,898 $9,823,816 $3,774,771 $3,801,709 $657,758 $239,233 $98,323 $110,288 Total Revenue at Status Quo Rates $657,997,846 $277,912,897 $83,521,410 $195,365,298 $54,888,128 $27,303,905 $14,847,740 $4,158,468 Expenses di Distribution Costs (di) $128,527,301 $51,512,846 $16,502,705 $38,400,277 $12,107,201 $6,009,054 $3,435,359 $559,859 cu Customer Related Costs (cu) $54,021,870 $33,001,126 $11,395,589 $7,954,533 $664,141 $106,706 $520,874 $378,901 ad General and Administration (ad) $97,626,310 $45,248,567 $14,568,954 $24,797,270 $6,888,038 $3,299,742 $2,317,701 $506,038 dep Depreciation and Amortization (dep) $163,217,903 $76,910,192 $20,772,576 $41,782,722 $11,827,174 $5,578,009 $5,510,349 $836,881 INPUT PILs (INPUT) $6,117,209 $2,851,206 $783,028 $1,555,506 $456,403 $219,489 $218,508 $33,069 INT Interest $88,904,698 $41,438,119 $11,380,164 $22,607,005 $6,633,150 $3,189,956 $3,175,702 $480,603 Total Expenses $538,415,291 $250,962,056 $75,403,016 $137,097,313 $38,576,106 $18,402,957 $15,178,493 $2,795,350 Direct Allocation $3,410,063 $0 $0 $263,383 $549,599 $2,597,081 $0 $0 NI Allocated Net Income (NI) $116,172,492 $54,147,527 $14,870,552 $29,540,757 $8,667,591 $4,168,341 $4,149,715 $628,008 Revenue Requirement (includes NI) $657,997,846 $305,109,583 $90,273,568 $166,901,453 $47,793,296 $25,168,379 $19,328,208 $3,423,358 Revenue Requirement Input equals Output Rate Base Calculation Net Assets dp Distribution Plant - Gross $4,771,247,689 $2,242,433,537 $615,569,780 $1,208,395,750 $338,938,595 $161,552,606 $177,590,024 $26,767,397 gp General Plant - Gross $785,423,411 $366,780,857 $100,885,197 $199,934,394 $57,679,495 $27,643,004 $28,228,163 $4,272,301 accum depaccumulated Depreciation ($2,558,360,582) ($1,209,006,256) ($331,131,745) ($644,067,216) ($177,217,400) ($84,169,739) ($98,043,438) ($14,724,790) co Capital Contribution ($304,887,704) ($144,561,309) ($40,427,918) ($79,292,026) ($18,779,445) ($8,579,612) ($11,502,258) ($1,745,137) Total Net Plant $2,693,422,814 $1,255,646,829 $344,895,314 $684,970,902 $200,621,246 $96,446,259 $96,272,491 $14,569,772 Directly Allocated Net Fixed Assets $34,154,498 $0 $0 $2,637,995 $5,504,665 $26,011,838 $0 $0 COP Cost of Power (COP) $2,279,162,129 $472,510,303 $192,215,906 $979,139,705 $437,923,513 $181,883,730 $10,538,189 $4,950,783 OM&A Expenses $280,175,481 $129,762,539 $42,467,248 $71,152,080 $19,659,380 $9,415,503 $6,273,934 $1,444,797 Directly Allocated Expenses $504,402 $0 $0 $38,958 $81,295 $384,149 $0 $0 Subtotal $2,559,842,012 $602,272,842 $234,683,154 $1,050,330,743 $457,664,188 $191,683,381 $16,812,123 $6,395,580 Working Capital $325,922,100 $76,682,088 $29,880,136 $133,729,347 $58,270,343 $24,405,354 $2,140,539 $814,293 Total Rate Base $3,053,499,412 $1,332,328,917 $374,775,450 $821,338,244 $264,396,255 $146,863,451 $98,413,031 $15,384,064 Rate Base Input equals Output Equity Component of Rate Base $1,221,399,765 $532,931,567 $149,910,180 $328,535,298 $105,758,502 $58,745,380 $39,365,212 $6,153,626 Net Income on Allocated Assets $116,172,492 $26,950,841 $8,118,394 $58,004,602 $15,762,423 $6,303,867 ($330,753) $1,363,118 Net Income on Direct Allocation Assets $837,605 $0 $0 $64,694 $134,996 $637,914 $0 $0 Net Income $117,010,097 $26,950,841 $8,118,394 $58,069,296 $15,897,419 $6,941,781 ($330,753) $1,363,118 RATIOS ANALYSIS REVENUE TO EXPENSES STATUS QUO% % 91.1% 92.52% % % % 76.82% % EXISTING REVENUE MINUS ALLOCATED COSTS ($68,503,367) ($55,914,803) ($15,294,741) $7,943,257 $1,285,591 ($763,684) ($6,060,449) $301,463 Deficiency Input equals Output STATUS QUO REVENUE MINUS ALLOCATED COSTS ($0) ($27,196,686) ($6,752,158) $28,463,845 $7,094,832 $2,135,526 ($4,480,468) $735,110 RETURN ON EQUITY COMPONENT OF RATE BASE 9.58% 5.06% 5.42% 17.68% 15.03% 11.82% -0.84% 22.15%

20 2013 COST ALLOCATION Sheet O2 Revenue to Cost Summary Worksheet - Edit description in Sheet I2, cell C17 Page 10 of 15 GS - 1,000 to Unmetered Summary Residential GS <50 GS - 50 to 999 Large Use >5MW Street Light 4,999 Scattered Load Customer Unit Cost per month - Avoided Cost $5.14 $13.46 $48.71 $ $ $0.42 $2.43 Customer Unit Cost per month - Directly Related $7.51 $20.33 $73.62 $ $ $0.70 $3.80 Customer Unit Cost per month - Minimum System wi $21.97 $42.62 $ $ $ $17.63 $16.84 Existing Approved Fixed Charge $20.29 $27.02 $43.33 $ $2, $1.45 $5.37

21 2014 COST ALLOCATION Sheet I6.1 Revenue Worksheet - Edit description in Sheet I2, cell C17 Page 11 of 15 Total kwhs from Load Forecast 24,079,240,674 Total kwhs from Market Particpants 264,818,673 Total kws from Load Forecast 42,775,807 Deficiency from RRWF - 73,077,828 Miscellaneous Revenue $19,025,518 ID Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load Billing Data Forecast kwh CEN 24,079,240,674 4,922,867,613 1,970,977,793 10,359,735,321 4,534,924,970 2,127,743, ,893,810 52,097,299 Forecast kw CDEM 42,775,807 27,179,325 10,297,773 4,975, ,229 Forecast kw, included in CDEM, of customers receiving line 18,108,892 5,346,801 8,038,392 4,723,699 Optional - Forecast kwh, included in CEN, from customers that - KWh excluding KWh from Wholesale Market Participants CEN EWMP 23,814,422,001 4,922,867,613 1,970,977,793 10,359,735,321 4,534,924,970 1,862,925, ,893,810 52,097,299 kwh - 30 year weather normalized amount Existing Monthly Charge $22.25 $30.26 $53.28 $ $2, $1.62 $5.87 Existing Distribution kwh Rate $ $ $ Existing Distribution kw Rate $ $ $ $ $ Existing TFOA Rate $0.63 $0.63 $0.63 $0.63 $0.63 $0.63 $0.63 Additional Charges Distribution Revenue from Rates $651,107,781 $269,780,773 $78,321,333 $196,352,179 $58,501,027 $29,449,682 $14,754,863 $3,947,925 Transformer Ownership Allowance $11,408,602 $0 $0 $3,368,485 $5,064,187 $2,975,931 $0 $0 Net Class Revenue CREV $639,699,179 $269,780,773 $78,321,333 $192,983,695 $53,436,840 $26,473,751 $14,754,863 $3,947,925 Data Mismatch Analysis Revenue with 30 year weather normalized kwh Weather Normalized Data from Hydro One Total Residential GS <50 GS - 50 to 999 GS - 1,000 to Large Use >5MW Street Light Unmetered kwh - 30 year weather normalized amount - Loss Factor

22 2014 COST ALLOCATION Sheet I6.2 Customer Data Worksheet - Edit description in Sheet I2, cell C17 Page 12 of 15 ID Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load Billing Data Bad Debt 3 Year Historical Average BDHA $8,452,475 $4,982,892 $2,152,589 $1,232,062 $84,932 $0 $0 $0 Late Payment 3 Year Historical Average LPHA $5,000,000 $2,709,349 $1,035,253 $983,705 $226,396 $45,297 $0 $0 Number of Bills CNB 4,905,618 3,915, , ,676 6, ,284 Number of Devices 163,399 12,323 Number of Connections (Unmetered) CCON 103,100 90,777 12,323 Total Number of Customers CCA 735, ,539 65,880 14, ,107 Bulk Customer Base CCB - Primary Customer Base CCP 714, ,121 65,907 13, ,107 Line Transformer Customer Base CCLT 711, ,121 65,907 11, ,107 Secondary Customer Base CCS 703, ,121 65,907 3, ,107 Weighted - Services CWCS 901, , ,814 33, ,777 12,323 Weighted Meter -Capital CWMC 210,264, ,639,326 23,259,498 48,692,500 5,633,500 1,040, Weighted Meter Reading CWMR 1,001, , ,341 72,207 46,582 7, Weighted Bills CWNB 6,872,130 3,915,234 1,581,120 1,257,732 42,420 9, ,420 Bad Debt Data Historic Year: ,452,475 4,982,892 2,152,589 1,232,062 84,932 Historic Year: ,452,475 4,982,892 2,152,589 1,232,062 84,932 Historic Year: ,452,475 4,982,892 2,152,589 1,232,062 84,932 Three-year average 8,452,475 4,982,892 2,152,589 1,232,062 84,

23 2014 COST ALLOCATION Sheet I8 Demand Data Worksheet - Edit description in Sheet I2, cell C17 Page 13 of 15 CP TEST RESULTS NCP TEST RESULTS Co-incident Peak 1 CP 4 CP 12 CP 4 CP 4 NCP Indicator CP 1 CP 4 CP 12 4 NCP NCP 4 12 NCP NCP 12 Non-co-incident Peak 1 NCP 4 NCP 12 NCP Indicator NCP 1 NCP 4 NCP 12 Customer Classes Total Residential GS <50 GS - 50 to 999 GS - 1,000 to Large Use >5MW Street Light Unmetered CO-INCIDENT PEAK 1 CP Transform TCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 Bulk DeliveBCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 Total Syte DCP1 4,654,856 1,078, ,540 2,031, , ,957-6,029 4 CP Transform TCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25,998 Bulk DeliveBCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25,998 Total Syte DCP4 17,153,184 4,039,891 1,856,974 7,092,595 2,703,544 1,406,121 28,063 25, CP Transform TCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 Bulk DeliveBCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 Total Syte DCP12 46,220,533 11,089,806 4,603,337 19,151,385 7,262,800 3,885, ,188 78,966 NON CO_INCIDENT PEAK 1 NCP Classificat DNCP1 5,014,960 1,236, ,059 2,049, , ,501 28,797 7,718 Primary NCPNCP1 4,875,349 1,236, ,059 1,910, , ,501 28,797 7,318 Line Tran LTNCP1 3,737,320 1,236, ,059 1,713, ,155 36,105 28,797 7,318 Secondary SNCP1 2,351,267 1,236, , ,075 16,716-28,797 7,318 4 NCP Classificat DNCP4 18,463,083 4,605,538 1,879,642 7,432,455 2,905,098 1,497, ,216 30,300 Primary NCPNCP4 17,919,247 4,605,538 1,879,642 6,888,620 2,905,098 1,497, ,216 30,300 Line Tran LTNCP4 13,584,586 4,605,538 1,879,642 6,177, , , ,216 30,300 Secondary SNCP4 8,544,838 4,605,538 1,879,642 1,853,387 63, ,216 30, NCP Classificat DNCP12 49,989,075 12,236,419 4,738,942 20,383,858 8,008,427 4,217, ,422 87,280 Primary NCPNCP12 41,919,238 12,236,419 4,738,942 12,314,021 8,008,427 4,217, ,422 87,280 Line Tran LTNCP12 30,578,349 12,236,419 4,738,942 11,043,650 1,757, , ,422 87,280 Secondary SNCP12 20,867,911 12,236,419 4,738,942 3,313, , ,422 87,280

24 2014 COST ALLOCATION Sheet O1 Revenue to Cost Summary Worksheet - Edit description in Sheet I2, cell C17 Page 14 of 15 Rate Base Assets Total Residential GS <50 GS - 50 to 999 GS - 1,000 to 4,999 Large Use >5MW Street Light Unmetered Scattered Load crev Distribution Revenue at Existing Rates $639,699,179 $269,780,773 $78,321,333 $192,983,695 $53,436,840 $26,473,751 $14,754,863 $3,947,925 mi Miscellaneous Revenue (mi) $19,025,518 $10,098,638 $3,851,607 $3,958,597 $662,347 $241,345 $99,494 $113,491 Miscellaneous Revenue Input equals Output Total Revenue at Existing Rates $658,724,697 $279,879,411 $82,172,939 $196,942,292 $54,099,187 $26,715,096 $14,854,357 $4,061,416 Factor required to recover deficiency (1 + D) Distribution Revenue at Status Quo Rates $712,777,010 $300,599,937 $87,268,590 $215,029,729 $59,541,347 $29,498,055 $16,440,426 $4,398,927 Miscellaneous Revenue (mi) $19,025,518 $10,098,638 $3,851,607 $3,958,597 $662,347 $241,345 $99,494 $113,491 Total Revenue at Status Quo Rates $731,802,527 $310,698,575 $91,120,197 $218,988,326 $60,203,694 $29,739,399 $16,539,920 $4,512,418 Expenses di Distribution Costs (di) $137,045,275 $54,936,852 $17,560,512 $40,885,446 $12,955,149 $6,436,584 $3,672,965 $597,767 cu Customer Related Costs (cu) $56,803,917 $34,317,190 $11,770,203 $9,012,060 $668,363 $106,233 $539,717 $390,152 ad General and Administration (ad) $104,306,267 $47,936,871 $15,425,504 $26,950,947 $7,428,644 $3,571,904 $2,457,944 $534,453 dep Depreciation and Amortization (dep) $185,288,222 $84,944,837 $23,301,683 $49,511,401 $13,871,279 $6,611,864 $6,113,495 $933,663 INPUT PILs (INPUT) $8,642,175 $3,918,937 $1,095,996 $2,287,253 $670,578 $325,091 $298,774 $45,545 INT Interest $102,520,411 $46,489,575 $13,001,590 $27,133,236 $7,954,931 $3,856,490 $3,544,299 $540,292 Total Expenses $594,606,267 $272,544,261 $82,155,489 $155,780,343 $43,548,944 $20,908,165 $16,627,194 $3,041,872 Direct Allocation $3,969,789 $0 $0 $306,615 $639,808 $3,023,366 $0 $0 NI Allocated Net Income (NI) $133,226,471 $60,413,745 $16,895,717 $35,259,956 $10,337,526 $5,011,553 $4,605,858 $702,116 Revenue Requirement (includes NI) $731,802,527 $332,958,005 $99,051,206 $191,346,915 $54,526,277 $28,943,085 $21,233,051 $3,743,988 Revenue Requirement Input equals Output Rate Base Calculation Net Assets dp Distribution Plant - Gross $5,303,738,463 $2,450,829,594 $679,182,963 $1,379,867,243 $386,336,091 $185,172,300 $193,129,637 $29,220,634 gp General Plant - Gross $869,796,403 $396,020,257 $110,722,539 $229,652,968 $66,371,188 $32,070,006 $30,338,110 $4,621,335 accum depaccumulated Depreciation ($2,735,847,208) ($1,280,652,183) ($351,981,387) ($701,434,732) ($191,556,198) ($91,216,450) ($103,447,103) ($15,559,155) co Capital Contribution ($317,035,815) ($150,529,584) ($42,019,655) ($82,359,632) ($19,398,849) ($8,863,282) ($12,041,176) ($1,823,638) Total Net Plant $3,120,651,842 $1,415,668,084 $395,904,460 $825,725,846 $241,752,233 $117,162,574 $107,979,469 $16,459,176 Directly Allocated Net Fixed Assets $40,094,892 $0 $0 $3,096,814 $6,462,076 $30,536,002 $0 $0 COP Cost of Power (COP) $2,393,120,235 $494,700,820 $198,064,301 $1,041,053,704 $455,716,318 $187,206,054 $11,143,761 $5,235,277 OM&A Expenses $298,155,459 $137,190,912 $44,756,219 $76,848,453 $21,052,156 $10,114,721 $6,670,625 $1,522,372 Directly Allocated Expenses $524,988 $0 $0 $40,548 $84,611 $399,829 $0 $0 Subtotal $2,691,800,682 $631,891,733 $242,820,520 $1,117,942,705 $476,853,085 $197,720,604 $17,814,386 $6,757,649 Working Capital $342,418,721 $80,381,716 $30,888,725 $142,211,314 $60,659,552 $25,151,653 $2,266,133 $859,627 Total Rate Base $3,503,165,455 $1,496,049,801 $426,793,186 $971,033,974 $308,873,861 $172,850,229 $110,245,602 $17,318,804 Rate Base Input equals Output Equity Component of Rate Base $1,401,266,182 $598,419,920 $170,717,274 $388,413,589 $123,549,544 $69,140,092 $44,098,241 $6,927,521 Net Income on Allocated Assets $133,226,471 $38,154,314 $8,964,708 $62,901,367 $16,014,943 $5,807,867 ($87,274) $1,470,546 Net Income on Direct Allocation Assets $1,014,830 $0 $0 $78,383 $163,560 $772,887 $0 $0 Net Income $134,241,300 $38,154,314 $8,964,708 $62,979,750 $16,178,502 $6,580,755 ($87,274) $1,470,546 RATIOS ANALYSIS REVENUE TO EXPENSES STATUS QUO% % 93.31% 91.99% % % % 77.90% % EXISTING REVENUE MINUS ALLOCATED COSTS ($73,077,830) ($53,078,594) ($16,878,267) $5,595,377 ($427,090) ($2,227,989) ($6,378,695) $317,428 Deficiency Input equals Output STATUS QUO REVENUE MINUS ALLOCATED COSTS $0 ($22,259,431) ($7,931,010) $27,641,411 $5,677,417 $796,314 ($4,693,132) $768,430 RETURN ON EQUITY COMPONENT OF RATE BASE 9.58% 6.38% 5.25% 16.21% 13.09% 9.52% -0.20% 21.23%

25 EB- Page 15 of COST ALLOCATION Sheet O2 Monthly Fixed Charge Min. & Max. Worksheet - Edit description in Sheet I2, cell C17 GS - 1,000 to Unmetered Summary Residential GS <50 GS - 50 to 999 Large Use >5MW Street Light 4,999 Scattered Load Customer Unit Cost per month - Avoided Cost $5.04 $13.40 $63.01 $ $ $0.44 $2.51 Customer Unit Cost per month - Directly Related $7.38 $20.33 $91.75 $ $ $0.73 $3.92 Customer Unit Cost per month - Minimum System wit $22.97 $44.44 $ $ $ $19.35 $18.15 Existing Approved Fixed Charge $22.25 $30.26 $53.28 $ $2, $1.62 $5.87

Residential General Service Less Than 50 kw General Service - 50 to 999,000 kw 1,000 to 4,999 kw Large Use Standby - General Service kw

Residential General Service Less Than 50 kw General Service - 50 to 999,000 kw 1,000 to 4,999 kw Large Use Standby - General Service kw Page 1 of 65 Residential This classification refers to an account where the electricity is used exclusively in a separately metered living accommodation. Customers shall be residing in singledwelling units

More information

COST ALLOCATION. Cost Allocation Informational Filing Guidelines for Electricity Distributors dated November 15, 2006.

COST ALLOCATION. Cost Allocation Informational Filing Guidelines for Electricity Distributors dated November 15, 2006. Filed: October 10, 2008 Schedule 1 Page 1 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 COST ALLOCATION PowerStream submitted a cost allocation informational filing with the Board

More information

BDR. Submitted to Toronto Hydro-Electric System Limited February 18, 2011

BDR. Submitted to Toronto Hydro-Electric System Limited February 18, 2011 COST OF SERVICE STUDY FOR INDIVIDUALLY METERED SUITES IN MULTI-UNIT RESIDENTIAL BUILDINGS Alternative Scenario Ordered by the Ontario Energy Board Submitted to Toronto Hydro-Electric System Limited 34

More information

2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2

2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2 Waterloo North Hydro Inc. Exhibit 8 Page 1 of 19 Filed: May 1, 2015 TABLE OF CONTENTS 2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2 2.11.1 Fixed/Variable Proportion... 3 Current Fixed / Variable Proportion...

More information

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION Filed: 0-- EB-0-0 Exhibit G Tab Schedule Page of COST ALLOCATION.0 INTRODUCTION 0 Hydro One Networks Inc s total revenue requirement for each of the five years of the Custom Cost of Service (COS) period,

More information

ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ

ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ EB-2017-0024 Alectra Utilities Corporation 2018 EDR Application Exhibit 3 Tab 1 Schedule 1 Filed: July 7, 2017 ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ Summary of Fixed Variable

More information

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1.

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1. Updated: 0-0-0 EB-0-0 Exhibit G Schedule Page of RATE DESIGN.0 INTRODUCTION The purpose of this evidence is to present the proposed rates designed to collect the revenue requirement as determined by the

More information

OSHAWA PUC NETWORKS CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW

OSHAWA PUC NETWORKS CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW Page 1 of 27 OSHAWA PUC NETWORKS 2015-2019 CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW Introduction 1. Oshawa PUC Networks Inc. (OPUCN) owns and operates an electricity

More information

CHAPLEAU PUBLIC UTILITIES CORPORATION ED IRM APPLICATION EB

CHAPLEAU PUBLIC UTILITIES CORPORATION ED IRM APPLICATION EB CHAPLEAU PUBLIC UTILITIES CORPORATION ED-2002-0528 2018 IRM APPLICATION EB-2017-0337 Rates Effective: May 1, 2018 Submitted on: February 9, 2018 Chapleau Public Utilities Corporation 110 Lorne St. S Chapleau,

More information

RATE RIDERS. Filed: EB Exhibit G1 Tab 5 Schedule 1 Page 1 of REGULATORY ASSET RATE RIDER

RATE RIDERS. Filed: EB Exhibit G1 Tab 5 Schedule 1 Page 1 of REGULATORY ASSET RATE RIDER Filed: 0--9 EB-0-06 Exhibit G Schedule Page of 6 RATE RIDERS.0 REGULATORY ASSET RATE RIDER 5 6 This section describes the used to allocate the Regulatory Asset amounts, as identified in Exhibit F, Tab,

More information

Oakville Hydro Electricity Distribution Inc Distribution Rate Adjustment Application (EB ) Effective January 1, 2018

Oakville Hydro Electricity Distribution Inc Distribution Rate Adjustment Application (EB ) Effective January 1, 2018 Oakville Hydro Electricity Distribution Inc. 2018 Distribution Rate Adjustment Application (EB-2017-0067) Effective January 1, 2018 IN THE MATTER OF the Ontario Energy Board Act, 1998, being Schedule B

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER TILLSONBURG HYDRO INC. Application for an order approving just and reasonable rates and other charges for electricity distribution

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); EB20170266 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); AND IN THE MATTER OF an application by Peterborough Distribution Inc. for an order approving just and reasonable

More information

PowerStream Inc. (Licence Name PowerStream Inc. ED ) 2010 Electricity Distribution Rate Adjustment Application EB

PowerStream Inc. (Licence Name PowerStream Inc. ED ) 2010 Electricity Distribution Rate Adjustment Application EB Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street 26th Floor, Box 2319 Toronto, ON M4P 1E4 October 21, 2009 Dear Ms. Walli Re:. (Licence Name. ED20040420) 2010 Electricity Distribution

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Erie Thames Powerlines

More information

Orangeville Hydro Limited 2019 IRM APPLICATION EB Submitted on: September 24, 2018

Orangeville Hydro Limited 2019 IRM APPLICATION EB Submitted on: September 24, 2018 0 IRM APPLICATION Submitted on: September, 0 Orangeville Hydro Limited 00 Line C Orangeville, ON LW Z Page of 0 TABLE OF CONTENTS Table of Contents... Introduction... Distributor s Profile... Publication

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario EB-2007-0761 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Lakefront

More information

AIRD BERLIS. October 16, 2017 VIA COURIER, AND RESS

AIRD BERLIS. October 16, 2017 VIA COURIER,  AND RESS AIRD BERLIS Scott Stoll Direct: 416.865.4703 E-mail:sstoll@airdberlis.com VIA COURIER, EMAIL AND RESS Ms. Kirsten Walli Board Secretary Ontario Energy Board P.O. Box 2319, 27th Floor 2300 Yonge Street

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); Ontario Energy Board Commission de l Énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); AND IN THE MATTER OF an Application by Peterborough Distribution

More information

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective January 1, 2017 Board File No.: EB

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective January 1, 2017 Board File No.: EB August 15, 2016 BY RESS & OVERNIGHT COURIER Ms. Kirsten Walli Board Secretary Ontario Energy Board P.O. Box 2319 2300 Yonge Street, Suite 2700 Toronto, Ontario M4P 1E4 Dear Ms. Walli: Re: Enersource Hydro

More information

BY COURIER. August 16, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700 P.O. Box 2319 Toronto, ON M4P 1E4

BY COURIER. August 16, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700 P.O. Box 2319 Toronto, ON M4P 1E4 BY COURIER August 16, 2013 Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700 P.O. Box 2319 Toronto, ON M4P 1E4 Dear Ms. Walli: RE: CANADIAN NIAGARA POWER INC., FORT ERIE,

More information

Essex Powerlines Corporation 2730 Highway #3, Oldcastle, ON, N0R 1L0 Telephone: (519) Fax: (519)

Essex Powerlines Corporation 2730 Highway #3, Oldcastle, ON, N0R 1L0 Telephone: (519) Fax: (519) Kirstin Walli Board Secretary Ontario Energy Board 27 th Floor 2300 Yonge Street Toronto, ON M4P 1E4 September 27, 2013 RE: ESSEX POWERLINES CORPORATION 2014 IRM 3 Electricity Distribution Rates Application

More information

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective May 1, 2012 Board File No. EB Evidence Update

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective May 1, 2012 Board File No. EB Evidence Update 3240 Mavis Road Mississauga, Ontario L5C 3K1 Tel: (905) 273-4098 Fax (905) 566-2737 November 25, 2011 VIA RESS and Overnight Courier Ms. Kirsten Walli Board Secretary Ontario Energy Board P. O. Box 2319

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB NIAGARA PENINSULA ENERGY INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB NIAGARA PENINSULA ENERGY INC. Commission de l énergie de l Ontario DECISION AND RATE ORDER NIAGARA PENINSULA ENERGY INC. Application for an order approving just and reasonable rates and other charges for electricity distribution to

More information

EXHIBIT 9 DEFERRAL AND VARIANCE ACCOUNTS

EXHIBIT 9 DEFERRAL AND VARIANCE ACCOUNTS acr EXHIBIT DEFERRAL AND VARIANCE ACCOUNTS 0 Cost of Service Chapleau Public Utilities Corporation Page of 0 0. TABLE OF CONTENTS.. TABLE OF CONTENTS. Table of Contents..... Table of Contents..... List

More information

DISPOSITION OF SMART METER DEFERRAL ACCOUNT AND STRANDED METER BALANCES

DISPOSITION OF SMART METER DEFERRAL ACCOUNT AND STRANDED METER BALANCES Toronto Hydro-Electric System Limited Filed Sep 30, 11 Page 1 of 15 1 2 DISPOSITION OF SMART METER DEFERRAL ACCOUNT AND STRANDED METER BALANCES 3 4 5 6 7 8 9 INTRODUCTION In accordance with OEB guidelines

More information

An Application. Canadian Niagara Power Inc. To Adjust. Electricity Distribution Rates. Effective January 1, 2019 EB

An Application. Canadian Niagara Power Inc. To Adjust. Electricity Distribution Rates. Effective January 1, 2019 EB An Application By To Adjust Electricity Distribution Rates Effective January 1, 2019 Submitted: August 13, 2018 Page 2 of 18 Index Application 3 Manager s Summary 6 Preamble 6 Elements of the Application

More information

TABLE OF CONTENTS. C. Business Planning and Budgeting Process and Economic Assumptions

TABLE OF CONTENTS. C. Business Planning and Budgeting Process and Economic Assumptions TABLE OF CONTENTS Table of Contents Page of A. Rate Plan. Rate Plan. Specific Proposals B. Bill Impacts and Proposed Rates. Rate Impact Summary C. Business Planning and Budgeting Process and Economic Assumptions

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Hydro Ottawa Limited

More information

DECISION AND RATE ORDER

DECISION AND RATE ORDER DECISION AND RATE ORDER WELLINGTON NORTH POWER INC. Application for rates and other charges to be effective May 1, 2019 By Delegation, Before: Pascale Duguay March 28, 2019 Ontario Energy Board 1 INTRODUCTION

More information

BUSINESS PLANNING ASSUMPTIONS

BUSINESS PLANNING ASSUMPTIONS EB-00-0 Exhibit C Tab Schedule Page of BUSINESS PLANNING ASSUMPTIONS INTRODUCTION Following is a summary of key assumptions related to THESL s financial projections included in this Application. ECONOMIC

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Hydro One Inc. for

More information

REGULATORY ACCOUNTS. The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts.

REGULATORY ACCOUNTS. The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts. Updated: 000 Tab Page of REGULATORY ACCOUNTS. INTRODUCTION The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts. 0 All of the regulatory accounts reported

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER WEST COAST HURON ENERGY INC. Application for an order approving just and reasonable rates and other charges for electricity

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB-2017-0050 HYDRO ONE NETWORKS INC. Application for rates and other charges to be effective May 1, 2018 for the former

More information

Oakville Hydro Electricity Distribution Inc Distribution Rate Adjustment Application (EB ) Effective January 1, 2017

Oakville Hydro Electricity Distribution Inc Distribution Rate Adjustment Application (EB ) Effective January 1, 2017 Oakville Hydro Electricity Distribution Inc. 2017 Distribution Rate Adjustment Application (EB20160097) Effective January 1, 2017 IN THE MATTER OF the Ontario Energy Board Act, 1998, being Schedule B to

More information

Veridian Connections Inc., 2019 Electricity Distribution IRM Rate Application Board File No.: EB

Veridian Connections Inc., 2019 Electricity Distribution IRM Rate Application Board File No.: EB 55 Taunton Road East Ajax, ON L1T 3V3 September 24, 2018 Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700, P.O. Box 2319 Toronto, ON M4P 1E4 TEL (905) 4279870 TEL 18884452881

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB KENORA HYDRO ELECTRIC CORPORATION LTD.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB KENORA HYDRO ELECTRIC CORPORATION LTD. Commission de l énergie de l Ontario DECISION AND RATE ORDER KENORA HYDRO ELECTRIC CORPORATION LTD. Application for an order approving just and reasonable rates and other charges for electricity distribution

More information

Collus PowerStream Corp. ED Incentive Regulation Mechanism Electricity Distribution Rate Application

Collus PowerStream Corp. ED Incentive Regulation Mechanism Electricity Distribution Rate Application Collus PowerStream Corp. ED20020518 2018 Incentive Regulation Mechanism Electricity Distribution Rate Application Board File Number EB20170034 For Rates Effective May 1, 2018 Collus PowerStream 43 Stewart

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); Ontario Energy Board Commission de l Énergie de l Ontario RP-2005-0020 EB-2005-0371 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); AND IN THE MATTER OF an Application

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ORANGEVILLE HYDRO LIMITED

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ORANGEVILLE HYDRO LIMITED Commission de l énergie de l Ontario DECISION AND RATE ORDER ORANGEVILLE HYDRO LIMITED Application for an order approving just and reasonable rates and other charges for electricity distribution to be

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Essex Powerlines Corporation

More information

REGULATORY ASSET RECOVERY ALLOCATION TO CUSTOMER GROUPS

REGULATORY ASSET RECOVERY ALLOCATION TO CUSTOMER GROUPS Page of REGULATORY ASSET RECOVERY ALLOCATION TO CUSTOMER GROUPS This exhibit describes Hydro One Distribution proposed methodology to allocate the costs in respect of the Regulatory Assets identified in

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB VERIDIAN CONNECTIONS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB VERIDIAN CONNECTIONS INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER VERIDIAN CONNECTIONS INC. Application for rates and other charges to be effective May 1, 2018 By Delegation, Before: Jane

More information

2019 PRICE CAP INCENTIVE REGULATION ELECTRICITY DISTRIBUTION RATE APPLICATION

2019 PRICE CAP INCENTIVE REGULATION ELECTRICITY DISTRIBUTION RATE APPLICATION 2019 PRICE CAP INCENTIVE REGULATION ELECTRICITY DISTRIBUTION RATE APPLICATION November 2, 2018 SIOUX LOOKOUT HYDRO INCORPORATED 25 FIFTH AVENUE, P.O. BOX 908 SIOUX LOOKOUT, ON P8T 1B3 Contents MANAGER

More information

List of Appendices Application Manager s Summary Proposed Adjustments... 12

List of Appendices Application Manager s Summary Proposed Adjustments... 12 Page 1 of 192 NIAGARA PENINSULA ENERGY INC. APPLICATION FOR APPROVAL OF ELECTRICITY DISTRIBUTION RATES EFFECTIVE MAY 1, 2016 Table of Contents List of Appendices... 3 Application... 5 Introduction... 5

More information

November 16, Ms. Donna Mitchell, CPA Controller/Treasurer City of Dover 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901

November 16, Ms. Donna Mitchell, CPA Controller/Treasurer City of Dover 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901 Ms. Donna Mitchell, CPA Controller/Treasurer 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901 Re: 2015 Electric Cost-of-Service and Rate Design Study Update Project Number 84122 Dear Ms.

More information

PARTIAL DECISION AND RATE ORDER

PARTIAL DECISION AND RATE ORDER Ontario Energy Board Commission de l énergie de l Ontario PARTIAL DECISION AND RATE ORDER KITCHENER-WILMOT HYDRO INC. Application for rates and other charges to be effective January 1, 2018 BEFORE: Lynne

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER TILLSONBURG HYDRO INC. Application for an order approving just and reasonable rates and other charges for electricity distribution

More information

Balsam Lake Coalition Interrogatory # 8

Balsam Lake Coalition Interrogatory # 8 Tab Schedule BLC- Page of 0 0 0 Balsam Lake Coalition Interrogatory # Issue : Are the proposed amounts, disposition and continuance of Hydro One s existing deferral and variance accounts appropriate? Ontario

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC. Commission de l énergie de l Ontario DECISION AND RATE ORDER ALGOMA POWER INC. Application for rates and other charges to be effective January 1, 2019 By Delegation, Before: Jane Scott 1 INTRODUCTION AND

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B) (the Act );

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B) (the Act ); Ontario Energy Board Commission de l énergie de l Ontario EB-2013-0196 EB-2013-0187 EB-2013-0198 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B) (the Act ); AND IN THE

More information

NEWMARKET - TAY POWER DISTRIBUTION LTD.

NEWMARKET - TAY POWER DISTRIBUTION LTD. Commission de l énergie de l Ontario DECISION AND RATE ORDER NEWMARKET - TAY POWER DISTRIBUTION LTD. Application for an order approving just and reasonable rates and other charges for electricity distribution

More information

The Filing includes the Application; the Manager s Summary; and live versions of the following models:

The Filing includes the Application; the Manager s Summary; and live versions of the following models: August th, 206 Via RESS and Courier Ms. Kirsten Walli, Board Secretary Ontario Energy Board 2300 Yonge Street, 27th Floor Toronto, Ontario M4P E4 Dear Ms. Walli, Re: Electricity Distribution Licence ED-2006-003

More information

North Bay Hydro Distribution Ltd. Application for 2018 Electricity Distribution Rates EB

North Bay Hydro Distribution Ltd. Application for 2018 Electricity Distribution Rates EB 74 Commerce Crescent Tel. (705) 4748100 P.O. Box 3240 Fax: (705) 4952756 Administration North Bay, Ontario Fax: (705) 4743138 Engineering/Purchasing P1B 8Y5 Fax: (705) 4748579 Customer Services/Accounting

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC. Commission de l énergie de l Ontario DECISION AND RATE ORDER GUELPH HYDRO ELECTRIC SYSTEMS INC. Application for rates and other charges to be effective January 1, 2018 By Delegation, Before: Theodore Antonopoulos

More information

Ontario Energy Board Commission de l énergie de l Ontario

Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER HYDRO ONE NETWORKS INC. Application for electricity distribution rates and other charges beginning January 1, 2017 BEFORE:

More information

3 RD Generation Incentive Regulation Shared Tax Savings Model for 2013 Filers

3 RD Generation Incentive Regulation Shared Tax Savings Model for 2013 Filers Version 1.0 Utility Name Essex Powerlines Corporation Assigned EB Number EEB-2012-0123 Name and Title Michelle Soucie, Operations & Regulatory Accounting Analyst Phone Number 519-737-9811 ext 112 Email

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER WEST COAST HURON ENERGY INC. Application for an order approving just and reasonable rates and other charges for electricity

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Hydro One Inc. for

More information

Halton Hills -- HYDRO--

Halton Hills -- HYDRO-- October 17,2016 Ms. Kirsten Walli Board Secretary Ontario Energy Board 27th Floor/ P.O. Box 2319 2300 Yonge St. Toronto, ON M4P 1E4 Dear Ms. Walli: ~ Halton Hills HYDRO Re: 2017 IRM Electricity Distribution

More information

BILL IMPACTS LEGACY CUSTOMERS

BILL IMPACTS LEGACY CUSTOMERS Filed: December, 00 EB-00-0 Exhibit G Tab Schedule Page of BILL IMPACTS LEGACY CUSTOMERS This exhibit presents the results of the assessment of customer total bill impacts using average levels of consumption

More information

WHITBY HYDRO ELECTRIC CORPORATION

WHITBY HYDRO ELECTRIC CORPORATION Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER WHITBY HYDRO ELECTRIC CORPORATION Applications for an order approving just and reasonable rates and other charges for electricity

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB COLLUS POWERSTREAM CORP.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB COLLUS POWERSTREAM CORP. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER COLLUS POWERSTREAM CORP. Application for an order approving just and reasonable rates and other charges for electricity

More information

REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS

REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS EB-0-0 Exhibit J Tab Page of REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS This evidence provides a summary of THESL s regulatory assets, variance and deferral accounts. The account balances, when

More information

Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER EB HYDRO ONE NETWORKS INC.

Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER EB HYDRO ONE NETWORKS INC. Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER HYDRO ONE NETWORKS INC. Application for electricity distribution rates and other charges beginning January 1, 2016 BEFORE: Allison Duff

More information

DEFERRAL AND VARIANCE ACCOUNTS

DEFERRAL AND VARIANCE ACCOUNTS Toronto Hydro-Electric System Limited EB-2014-0116 Tab 1 Schedule 1 ORIGINAL Page 1 of 30 1 DEFERRAL AND VARIANCE ACCOUNTS 2 3 4 5 This evidence provides a summary of Toronto Hydro s deferral and variance

More information

GUELPH HYDRO ELECTRIC SYSTEMS INC.

GUELPH HYDRO ELECTRIC SYSTEMS INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER GUELPH HYDRO ELECTRIC SYSTEMS INC. Application for an order approving just and reasonable rates and other charges for electricity

More information

RESIDENTIAL SERVICE CLASSIFICATION

RESIDENTIAL SERVICE CLASSIFICATION Niagara-on-the-Lake Hydro Inc. Page 1 of 10 RESIDENTIAL SERVICE CLASSIFICATION This classification applies to an account taking electricity at 750 volts or less where the electricity is used exclusively

More information

HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December 31, 2010 and 2011 ($ Millions)

HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December 31, 2010 and 2011 ($ Millions) HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December, 0 and 0 ($ Millions) Updated: September, 00 Schedule Attachment Page of Line No. Particulars 0 0 Revenue requirement

More information

EXECUTIVE SUMMARY OF APPLICATION

EXECUTIVE SUMMARY OF APPLICATION Updated: 0-0-0 EB-0-00 Page of EXECUTIVE SUMMARY OF APPLICATION. SCOPE OF APPLICATION Hydro One Networks Inc. ( Hydro One ) is applying for an Order approving the revenue requirement, cost allocation and

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Wellington North Power

More information

Ontario Energy Board

Ontario Energy Board Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Filing Requirements For Electricity Distribution Rate Applications - 2015 Edition for 2016 Rate Applications - Chapter 2 Cost

More information

DEFERRAL AND VARIANCE ACCOUNTS

DEFERRAL AND VARIANCE ACCOUNTS Toronto Hydro-Electric System Limited EB-2014-0116 Tab 1 Schedule 1 ORIGINAL Page 1 of 30 1 DEFERRAL AND VARIANCE ACCOUNTS 2 3 4 5 This evidence provides a summary of Toronto Hydro s deferral and variance

More information

August 23, via RESS signed original to follow by courier

August 23, via RESS signed original to follow by courier Andrew J. Sasso Director, Regulatory Affairs Telephone: 416.542.7834 Toronto Hydro-Electric System Limited Facsimile: 416.542.3024 14 Carlton Street regulatoryaffairs@torontohydro.com Toronto, ON M5B 1K5

More information

Canadian Manufacturers & Exporters (CME) INTERROGATORY #1 List 1

Canadian Manufacturers & Exporters (CME) INTERROGATORY #1 List 1 Filed: December, 00 Schedule Page of 0 0 0 0 Canadian Manufacturers & Exporters (CME) INTERROGATORY # List General Issues. Ref: Exhibit A, Tab, Schedule, paragraph Exhibit A, Tab, Schedule, page Exhibit

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Horizon Utilities Corporation

More information

SUMMARY OF APPLICATION

SUMMARY OF APPLICATION Filed: September, 00 EB-00-00 Schedule Page of SUMMARY OF APPLICATION Hydro One Networks ( Hydro One or Hydro One Transmission ) is applying for an Order approving the revenue requirement, cost allocation

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER GUELPH HYDRO ELECTRIC SYSTEMS INC. Application for electricity distribution rates and other charges beginning January 1,

More information

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing Hydro One Networks Inc. th Floor, South Tower Bay Street Toronto, Ontario MG P www.hydroone.com Tel: () -0 Cell: () - Frank.Dandrea@HydroOne.com Frank D Andrea Vice President, Chief Regulatory Officer,

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC. Commission de l énergie de l Ontario DECISION AND RATE ORDER ALGOMA POWER INC. Application for an order approving just and reasonable rates and other charges for electricity distribution to be effective

More information

SECOND IMPACT STATEMENT

SECOND IMPACT STATEMENT Filed: 2017-02-22 Page 1 of 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 SECOND IMPACT STATEMENT 1.0 PURPOSE The purpose of this exhibit is to show the impact of certain

More information

October 22, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700, P.O. Box 2319 Toronto, ON M4P 1E4

October 22, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700, P.O. Box 2319 Toronto, ON M4P 1E4 October 22, 2012 Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700, P.O. Box 2319 Toronto, ON M4P 1E4 Dear Ms. Walli: Re: An Application by Algoma Power Inc. to Adjust

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION PECO ENERGY COMPANY STATEMENT NO. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION DOCKET NO. R-01-0001 DIRECT TESTIMONY

More information

CALCULATION OF INCREMENTAL CAPITAL MODULE REVENUE REQUIREMENT

CALCULATION OF INCREMENTAL CAPITAL MODULE REVENUE REQUIREMENT Updated: August 9, 0 Page of 6 CALCULATION OF INCREMENTAL CAPITAL MODULE REVENUE REQUIREMENT.0 OVERVIEW 6 7 8 9 0 In calculating the revenue requirement for the proposed ICM introduced in,, Schedule, the

More information

Ontario Energy Board (Board Staff) INTERROGATORY #16 List 1

Ontario Energy Board (Board Staff) INTERROGATORY #16 List 1 Filed: October,, 0 Schedule.0 Staff Page of 0 0 Ontario Energy Board (Board Staff) INTERROGATORY # List Issue Is Hydro One's proposal with respect to the capital contribution Ref: Exhibit B/Tab/Sch/page

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Renfrew Hydro Inc.

More information

Doug Curtiss, CEO, GPI Shafee Bacchus, Chair, NWTC Encls. *Mark Rodger Professional Corporation TOR01: : v1

Doug Curtiss, CEO, GPI Shafee Bacchus, Chair, NWTC Encls. *Mark Rodger Professional Corporation TOR01: : v1 J. Mark Rodger T 416.367.6190 F 416.361.7088 mrodger@blg.com Borden Ladner Gervais LLP Scotia Plaza, 40 King Street W Toronto, ON, Canada M5H 3Y4 T 416.367.6000 F 416.367.6749 blg.com November 6, 2014

More information

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES Filed: September 0, 00 EB-00-0 Tab Page of PAYMENTS IN LIEU OF CORPORATE INCOME TAXES.0 INTRODUCTION Under the Electricity Act,, Hydro One Networks Inc. ( Networks ) is required to make payments in lieu

More information

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES Filed: May, 0 EB-0-00 Tab Page of PAYMENTS IN LIEU OF CORPORATE INCOME TAXES.0 INTRODUCTION Under the Electricity Act,, Hydro One Networks Inc. ( Networks ) is required to make payments in lieu of corporate

More information

ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M

ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M TABLE OF CONTENTS Schedule Schedule Name Page Sch 1 Summary

More information

RP EB IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B

RP EB IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B RP-00-000 EB-00-0 IN THE MATTER OF the Ontario Energy Board Act,, S.O., c., Schedule B AND IN THE MATTER OF an Application by Welland Hydro- Electric System Corp. for an Order or Orders granting final

More information

REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets.

REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets. Filed: May, 0 EB-0-000 Page of REGULATORY ASSETS.0 INTRODUCTION The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets. All of the Regulatory Assets reported

More information

Toronto Hydro-Electric System Limited EB Index - Exhibit List Filed: 2010 Aug 23 Updated: 2011 Mar 28 Page 1 of 9.

Toronto Hydro-Electric System Limited EB Index - Exhibit List Filed: 2010 Aug 23 Updated: 2011 Mar 28 Page 1 of 9. Page 1 of 9 Exhibit List A1 APPLICATION SUMMARY A1 1 1 Introduction A1 2 1 Legal Application A1 3 1 Revenue Sufficiency/Deficiency A1 4 1 Contact Information A1 5 1 Previous Directions and Undertakings

More information

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES Filed: September, 00 EB-00-00 Tab Page of PAYMENTS IN LIEU OF CORPORATE INCOME TAXES Under the Electricity Act,, Hydro One Networks Inc. ( Networks ) is required to make payments in lieu of corporate income

More information

Ontario Energy Board

Ontario Energy Board Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Filing Requirements For Electricity Transmission Applications Chapter 2 Revenue Requirement Applications February 11, 2016

More information

SECOND QUARTER REPORT JUNE 30, 2015

SECOND QUARTER REPORT JUNE 30, 2015 SECOND QUARTER REPORT JUNE 30, 2015 TORONTO HYDRO CORPORATION TABLE OF CONTENTS Glossary 3 Management s Discussion and Analysis 4 Executive Summary 5 Introduction 5 Business of Toronto Hydro Corporation

More information

PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS

PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS Filed: September, 00 EB-00-0 Schedule Page of PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS This set of exhibits describes the costs of the proposed facilities and the economics of

More information

IN THE MATTER OF subsections 78(2.1), (3.0.1), (3.0.2) and (3.0.3) of the Ontario Energy Board Act, 1998;

IN THE MATTER OF subsections 78(2.1), (3.0.1), (3.0.2) and (3.0.3) of the Ontario Energy Board Act, 1998; Ontario Energy Board Commission de l énergie de l Ontario EB-2012-0100 EB-2012-0211 IN THE MATTER OF subsections 78(2.1), (3.0.1), (3.0.2) and (3.0.3) of the Ontario Energy Board Act, 1998; AND IN THE

More information

Filed: EB Exhibit G2 Tab 1 Schedule 8 Page 1 of 6 REVENUE RECONCILIATIONS YEARS

Filed: EB Exhibit G2 Tab 1 Schedule 8 Page 1 of 6 REVENUE RECONCILIATIONS YEARS Filed: 2013-12-19 Page 1 of 6 1 2 REVENUE RECONCILIATIONS YEARS 2015-2019 3 Page 2 of 6 2015 Reconciliation / /C h h Residential Urban [UR] 209,540 2,001,279,224 - $ 20.45 $ 0.0176 $ 86,643,650 $ 86,749,139

More information