PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS

Size: px
Start display at page:

Download "PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS"

Transcription

1 Filed: September, 00 EB-00-0 Schedule Page of PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS This set of exhibits describes the costs of the proposed facilities and the economics of the project including the economic feasibility, rate impacts, and benefits to Ontario electricity consumers. Other public interest considerations are also discussed. 0 Under the Ontario Energy Board Act,, public interest, as defined by Ontario regulation /000, means the interest of consumers with respect to the pricing, availability, reliability and quality of electricity service. Consumers are defined as those who use electricity that was not self-generated for their own consumption.

2 Filed: September, 00 EB-00-0 Schedule Page of 0 PROJECT COSTS The total estimated capital cost for the proposed facilities including overheads and an allowance for funds used during construction ("AFUDC"), is summarized in the tables below. Table Total Project Costs (Lines & Stations) Estimated Cost ($000's) Preliminary Engineering & Studies $ 00 Station and Telecommunications Facilities (Table below),000 Transmission Line (Table below) 0,00 Total $,000 0 Table Cost of Station Work Estimated cost ($000 s) Material $,00 Construction,00 Engineering,00 Commissioning,00 Contingencies,00 Cost before Overheads and AFUDC,000 Overheads,00 AFUDC,00 Total station work $,000

3 Filed: September, 00 EB-00-0 Schedule Page of Table Cost of Line Work 0 Estimated Cost (000 s as spent) Material $,0 Construction,0 Engineering 0 Contingencies,00 Cost before Overhead and AFUDC,0 Overhead,00 AFDUC 0 Total Lines work $ 0,00 Risks and Contingencies 0 As with most projects, there is some risk associated with estimating costs. Hydro One has recognized these risks in the project cost estimates. The estimates include an allowance for contingencies, based on past experience. As a result, Hydro One expects that the actual costs will not exceed the estimated costs. In the work estimates, allowance for contingencies has been included to cover a number of risks, including: Any variance between estimated costs and the actual tendered amount; Cost changes due to volatility of material prices (i.e. copper, major equipment) and the market in general; Unexpected soil conditions at the station site; and The availability of line outages in the construction phase.

4 Filed: September, 00 EB-00-0 Schedule Page of PROJECT ECONOMICS Economic Feasibility 0 The proposed Hurontario SS and line reinforcement facilities will be included in the Network pool for rate-making purposes with no capital contribution required from potential beneficiaries, consistent with the provisions of Section.. of the Transmission System Code. Since the proposed facilities are designed to maintain network reliability rather than to generate significant additional revenues, a detailed discounted cash flow analysis and capital contribution calculation based on incremental transmission costs and revenues is not a key determinate for this project. Nonetheless, a -year discounted cash flow analysis is provided in Table of this exhibit. The results indicate that the reinforcement project will have a net present value based on incremental cash flows that is close to zero (negative $.M), which will cause a very minor increase in the Network pool rate over the first few years of the project s in-service life, relative to the current rate level. The project s year-by-year rate impacts are assessed in the following section. Rate Impact Assessment 0 The analysis of the Network pool rate impact has been carried out on the basis of Hydro One s transmission revenue requirement for the year 000, and the most recently approved Ontario Transmission Rate Schedules. The Line Connection pool and Transformation Connection pool revenue requirements would be unaffected by the new reinforcement, based on the criteria used to allocate transmission costs to the three pools as approved by the Board in its RP--00 decision.

5 Filed: September, 00 EB-00-0 Schedule Page of 0 Based on the proposed reinforcement s incremental cash flows, a net increase in the Network pool revenue requirement will be required once this project is included in the transmission rate base in May of 00. The maximum revenue deficiency related to the proposed facilities will be $. million in the year 0, with a corresponding Network pool rate impact of 0.%. All else being equal, the provincial Network pool rate will increase by cents per MW from the current level of $. per month to $. per month, and will remain at that level until the following year (0). Thereafter the rate will rapidly decline in line with the depreciating assets and load growth such that by 0 the rate will have returned to its initial level of $.. Beyond that point the rate will decline below the initial level. The above analysis includes incremental load that will place the facilities above the thermal overload level discussed in, Tab, Schedule and shown in Figure therein. The detailed analysis illustrating the calculation of the incremental revenue deficiency and rate impact is provided in Table in this exhibit and the derivation of incremental load attributable to the project is shown in Table in this exhibit. 0 In order to assess the impact of the proposed facilities on end-use residential consumers of electricity in Ontario, the transmission component of a typical residential customer bill has been approximated. For a typical residential customer in Ontario, the transmission component of the delivered cost of electricity is approximately % of the total energy bill and the network portion is about % of the total transmission bill. Accordingly, as shown in the table below, the impact of the proposed facilities on the delivered cost of electricity for the typical Ontario residential customer consuming 000 kwh per month would be approximately 0.0% or cents a year.

6 Filed: September, 00 EB-00-0 Schedule Page of Impact on Typical Residential Customer A. Typical monthly bill ( per kwh x,000 kwh per month) $0 per month B. Transmission component of monthly bill (A x %) $.0 per month C. Network Pool share of Transmission component (B x %) $.0 per month D. Impact on Network Pool Provincial Uniform Rate (as per,, Schedule ) E. Increase in Network Pool share of Transmission component (C x D) 0.% $0.0 per month or $0. per year F. Net increase on typical residential customer bill (E / A) 0.0% Reduced Losses In, Tab, Schedule in its System Impact Assessment, the IESO states, Ontario system losses are being reduced by MW with the addition of the proposed facilities.

7 Filed: September, 00 EB-00-0 Schedule Page of Table - Revenue Requirement and Network Pool Rate Impact, page

8 Filed: September, 00 EB-00-0 Schedule Page of Table - Revenue Requirement and Network Pool Rate Impact, page

9 Filed: September, 00 EB-00-0 Schedule Page of Table Incremental Peak Load Forecast, p. 0 Source:, Tab, Schedule, The Joint Utility Planning Study, excerpt from Table A: Coincident load forecast in MVA. Loads from 0 to 0 are based on forecast loads provided by the LDCs. Hydro One used the years 00-0 for the technical analysis as shown in Table,, Tab, Schedule and used the forecast loads for a full 0 year outlook for the economic analysis.

10 Filed: September, 00 EB-00-0 Schedule Page of Table Incremental Peak Load Forecast, p. 0 Source:, Tab, Schedule, The Joint Utility Planning Study, excerpt from Table A: Coincident load forecast in MVA. Loads from 0 to 0 are based on forecast loads provided by the LDCs. Hydro One used the years 00-0 for the technical analysis as shown in Table,, Tab, Schedule and used the forecast loads for a full 0 year outlook for the economic analysis.

11 Filed: September, 00 EB-00-0 Schedule Page of Table DCF Analysis, Network Pool

12 Filed: September, 00 EB-00-0 Schedule Page of Table cont d DCF Analysis, Network Pool

13 Filed: September, 00 EB-00-0 Schedule Page of OTHER PUBLIC INTEREST CONSIDERATIONS Availability, Reliability, and Quality Impacts The proposed facilities will improve the reliability and quality of electricity service to consumers in the GTA West, including the Western Brampton and Northern Mississauga Areas as well as to Toronto and points beyond by providing relief to the network transmission lines connecting Trafalgar TS to Richview TS. 0 In the case of a -circuit fault at any point on the line RT/RT, the proposed facilities will limit the load loss to 00 MW thus enhancing availability of electricity service to consumers in the Western Brampton and Northern Mississauga Areas. As confirmed by IESO s System Impact Assessment (SIA) filed as, Tab, Schedule and the Joint Study filed as, Tab, Schedule, the facilities will improve the availability, reliability, and quality of electric service to consumers and will not adversely impact on the system or other transmission customers.

SUMMARY OF APPLICATION

SUMMARY OF APPLICATION Filed: September, 00 EB-00-00 Schedule Page of SUMMARY OF APPLICATION Hydro One Networks ( Hydro One or Hydro One Transmission ) is applying for an Order approving the revenue requirement, cost allocation

More information

LOCAL PLANNING REPORT ERINDALE TS T1/T2 DESN CAPACITY RELIEF GTA WEST SOUTHERN SUBREGION. Revision: 0 Date: July 9, 2015.

LOCAL PLANNING REPORT ERINDALE TS T1/T2 DESN CAPACITY RELIEF GTA WEST SOUTHERN SUBREGION. Revision: 0 Date: July 9, 2015. Hydro One Networks Inc. 483 Bay Street Toronto, Ontario M5G 2P5 LOCAL PLANNING REPORT ERINDALE TS T1/T2 DESN CAPACITY RELIEF GTA WEST SOUTHERN SUBREGION Revision: 0 Date: July 9, 2015 Prepared by: Hydro

More information

SUMMARY OF CAPITAL EXPENDITURES

SUMMARY OF CAPITAL EXPENDITURES Filed: May, 00 EB-00-000 Exhibit D Tab Schedule Page of SUMMARY OF CAPITAL EXPENDITURES.0 SUMMARY OF CAPITAL BUDGET The proposed capital expenditures result from a rigorous business planning and work prioritization

More information

Ontario Energy Board (Board Staff) INTERROGATORY #16 List 1

Ontario Energy Board (Board Staff) INTERROGATORY #16 List 1 Filed: October,, 0 Schedule.0 Staff Page of 0 0 Ontario Energy Board (Board Staff) INTERROGATORY # List Issue Is Hydro One's proposal with respect to the capital contribution Ref: Exhibit B/Tab/Sch/page

More information

Canadian Manufacturers & Exporters (CME) INTERROGATORY #1 List 1

Canadian Manufacturers & Exporters (CME) INTERROGATORY #1 List 1 Filed: December, 00 Schedule Page of 0 0 0 0 Canadian Manufacturers & Exporters (CME) INTERROGATORY # List General Issues. Ref: Exhibit A, Tab, Schedule, paragraph Exhibit A, Tab, Schedule, page Exhibit

More information

EXECUTIVE SUMMARY OF APPLICATION

EXECUTIVE SUMMARY OF APPLICATION Updated: 0-0-0 EB-0-00 Page of EXECUTIVE SUMMARY OF APPLICATION. SCOPE OF APPLICATION Hydro One Networks Inc. ( Hydro One ) is applying for an Order approving the revenue requirement, cost allocation and

More information

Electricity Power System Planning

Electricity Power System Planning Chapter 3 Section 3.02 Ministry of Energy Electricity Power System Planning Standing Committee on Public Accounts Follow-Up on Section 3.05, 2015 Annual Report The Committee held a public hearing in November

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, Schedule B to the Energy Competition Act, 1998, S.O. 1998, c.15;

IN THE MATTER OF the Ontario Energy Board Act, 1998, Schedule B to the Energy Competition Act, 1998, S.O. 1998, c.15; EB-00-00 Exhibit A Tab Schedule Filed: 00 Aug Page of 0 IN THE MATTER OF the Ontario Energy Board Act,, Schedule B to the Energy Competition Act,, S.O., c.; AND IN THE MATTER OF an Application by Toronto

More information

DECISION AND ORDER ON PHASE 1

DECISION AND ORDER ON PHASE 1 Commission de l énergie de l Ontario DECISION AND ORDER ON PHASE 1 HYDRO ONE NETWORKS INC. Leave to construct a new transmission line and facilities in the Windsor-Essex Region, Ontario. Before: Ken Quesnelle

More information

RP EB IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B

RP EB IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B RP-00-000 EB-00-0 IN THE MATTER OF the Ontario Energy Board Act,, S.O., c., Schedule B AND IN THE MATTER OF an Application by Welland Hydro- Electric System Corp. for an Order or Orders granting final

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15;

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15; Ontario Energy Board Commission de l énergie de l Ontario EB-2014-0005 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15; AND IN THE MATTER OF a determination by the Ontario Energy Board

More information

Regional Planning and Cost Allocation Review EB Working Group meeting #1 - Webinar

Regional Planning and Cost Allocation Review EB Working Group meeting #1 - Webinar Regional Planning and Cost Allocation Review EB-2016-0003 Working Group meeting #1 - Webinar Tuesday July 12, 2016 1 Agenda 1) Introduction OEB 2) Presentation IESO 3) Presentation Hydro One 4) Discussion

More information

REGULATORY ACCOUNTS. The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts.

REGULATORY ACCOUNTS. The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts. Updated: 000 Tab Page of REGULATORY ACCOUNTS. INTRODUCTION The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts. 0 All of the regulatory accounts reported

More information

REGULATORY ACCOUNTS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts.

REGULATORY ACCOUNTS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts. Exhibit F Schedule Page of REGULATORY ACCOUNTS. INTRODUCTION The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts. 0 All of the Regulatory Accounts reported

More information

Fair Hydro Plan. An Assessment of the Fiscal Impact of the Province s Fair Hydro Plan

Fair Hydro Plan. An Assessment of the Fiscal Impact of the Province s Fair Hydro Plan Fair Hydro Plan An Assessment of the Fiscal Impact of the Province s Fair Hydro Plan Spring 2017 About this Document Established by the Financial Accountability Officer Act, 2013, the Financial Accountability

More information

Transmission Connection Procedures EB

Transmission Connection Procedures EB Transmission Connection Procedures Transmission Connection Procedures Table of Contents 1.0 INTRODUCTION...1 2.0 HYDRO ONE CONNECTION PROCEDURES...4 2.1 TOTAL NORMAL SUPPLY CAPACITY PROCEDURE...5 2.2 AVAILABLE

More information

ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ

ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ EB-2017-0024 Alectra Utilities Corporation 2018 EDR Application Exhibit 3 Tab 1 Schedule 1 Filed: July 7, 2017 ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ Summary of Fixed Variable

More information

PowerStream Inc. (Licence Name PowerStream Inc. ED ) 2010 Electricity Distribution Rate Adjustment Application EB

PowerStream Inc. (Licence Name PowerStream Inc. ED ) 2010 Electricity Distribution Rate Adjustment Application EB Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street 26th Floor, Box 2319 Toronto, ON M4P 1E4 October 21, 2009 Dear Ms. Walli Re:. (Licence Name. ED20040420) 2010 Electricity Distribution

More information

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective January 1, 2017 Board File No.: EB

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective January 1, 2017 Board File No.: EB August 15, 2016 BY RESS & OVERNIGHT COURIER Ms. Kirsten Walli Board Secretary Ontario Energy Board P.O. Box 2319 2300 Yonge Street, Suite 2700 Toronto, Ontario M4P 1E4 Dear Ms. Walli: Re: Enersource Hydro

More information

CALCULATION OF INCREMENTAL CAPITAL MODULE REVENUE REQUIREMENT

CALCULATION OF INCREMENTAL CAPITAL MODULE REVENUE REQUIREMENT Updated: August 9, 0 Page of 6 CALCULATION OF INCREMENTAL CAPITAL MODULE REVENUE REQUIREMENT.0 OVERVIEW 6 7 8 9 0 In calculating the revenue requirement for the proposed ICM introduced in,, Schedule, the

More information

SUMMARY OF REVISIONS PROPOSED / NOT PROPOSED

SUMMARY OF REVISIONS PROPOSED / NOT PROPOSED Attachment E to Notice of Revised Proposed Amendments to the System Code and the Distribution System Code August 23, 2018 EB-2016-0003 SUMMARY OF REVISIONS PROPOSED / NOT PROPOSED Below is a high level

More information

Ontario Energy Board Commission de l énergie de l Ontario

Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER HYDRO ONE NETWORKS INC. Application for electricity distribution rates and other charges beginning January 1, 2017 BEFORE:

More information

HYDRO ONE. Updated Financial Analysis of the Partial Sale of Hydro One

HYDRO ONE. Updated Financial Analysis of the Partial Sale of Hydro One HYDRO ONE Updated Financial Analysis of the Partial Sale of Hydro One Winter 2018 About this Document Established by the Financial Accountability Officer Act, 2013, the Financial Accountability Office

More information

EXHIBIT LIST. Administration. Summary of Board Directives and Undertakings from Previous Proceedings A 5 1 Corporate Organization Charts

EXHIBIT LIST. Administration. Summary of Board Directives and Undertakings from Previous Proceedings A 5 1 Corporate Organization Charts Page 1 of 9 1 EXHIBIT LIST A Administration A 1 1 Exhibit List A 2 1 Application A 2 1 1 Certification of Evidence A 3 1 Executive Summary A 4 1 Compliance with OEB Filing Requirements for Electricity

More information

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1.

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1. Updated: 0-0-0 EB-0-0 Exhibit G Schedule Page of RATE DESIGN.0 INTRODUCTION The purpose of this evidence is to present the proposed rates designed to collect the revenue requirement as determined by the

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); Ontario Energy Board Commission de l Énergie de l Ontario RP-2005-0020 EB-2005-0371 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); AND IN THE MATTER OF an Application

More information

The Filing includes the Application; the Manager s Summary; and live versions of the following models:

The Filing includes the Application; the Manager s Summary; and live versions of the following models: August th, 206 Via RESS and Courier Ms. Kirsten Walli, Board Secretary Ontario Energy Board 2300 Yonge Street, 27th Floor Toronto, Ontario M4P E4 Dear Ms. Walli, Re: Electricity Distribution Licence ED-2006-003

More information

2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2

2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2 Waterloo North Hydro Inc. Exhibit 8 Page 1 of 19 Filed: May 1, 2015 TABLE OF CONTENTS 2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2 2.11.1 Fixed/Variable Proportion... 3 Current Fixed / Variable Proportion...

More information

RATES FOR EXPORT TRANSMISSION SERVICE

RATES FOR EXPORT TRANSMISSION SERVICE Page of RATES FOR EXPORT TRANSMISSION.0 INTRODUCTION The OEB has directed Hydro One Transmission to monitor and report to the Board, at the next rate case, on the functioning of the Export Transmission

More information

Energy Probe (EP) INTERROGATORY #50 List 1

Energy Probe (EP) INTERROGATORY #50 List 1 Exhibit I Tab 8 Schedule 3.01 EP 50 Page 1 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Energy Probe (EP) INTERROGATORY #50 List 1 Issue

More information

Doug Curtiss, CEO, GPI Shafee Bacchus, Chair, NWTC Encls. *Mark Rodger Professional Corporation TOR01: : v1

Doug Curtiss, CEO, GPI Shafee Bacchus, Chair, NWTC Encls. *Mark Rodger Professional Corporation TOR01: : v1 J. Mark Rodger T 416.367.6190 F 416.361.7088 mrodger@blg.com Borden Ladner Gervais LLP Scotia Plaza, 40 King Street W Toronto, ON, Canada M5H 3Y4 T 416.367.6000 F 416.367.6749 blg.com November 6, 2014

More information

REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets.

REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets. Filed: May, 0 EB-0-000 Page of REGULATORY ASSETS.0 INTRODUCTION The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets. All of the Regulatory Assets reported

More information

CONSOLIDATED FINANCIAL STATEMENTS MARCH 31, 2013

CONSOLIDATED FINANCIAL STATEMENTS MARCH 31, 2013 Toronto Hydro Corporation First Quarter of 2009 - Report to the Shareholder For the Three Months Ended March 31, 2009 CONSOLIDATED FINANCIAL STATEMENTS MARCH 31, 2013 INTERIM CONSOLIDATED BALANCE SHEETS

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for 138 kv and 240 kv Transmission System Development in the Red Deer Region And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1,

More information

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION Filed: 0-- EB-0-0 Exhibit G Tab Schedule Page of COST ALLOCATION.0 INTRODUCTION 0 Hydro One Networks Inc s total revenue requirement for each of the five years of the Custom Cost of Service (COS) period,

More information

EB Hydro One Networks Inc. s 2017 and 2018 Transmission Cost-of-Service Application Updated Evidence Filing

EB Hydro One Networks Inc. s 2017 and 2018 Transmission Cost-of-Service Application Updated Evidence Filing Hydro One Networks Inc. 7 th Floor, South Tower 483 Bay Street Toronto, Ontario M5G 2P5 www.hydroone.com Tel: (46) 345-5240 Cell: (46) 903-5240 Oded.Hubert@HydroOne.com Oded Hubert Vice President Regulatory

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB VERIDIAN CONNECTIONS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB VERIDIAN CONNECTIONS INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER VERIDIAN CONNECTIONS INC. Application for rates and other charges to be effective May 1, 2018 By Delegation, Before: Jane

More information

COMMON ASSET ALLOCATION

COMMON ASSET ALLOCATION Filed: September 30, 2008 EB-2008-0272 Exhibit C1 Tab 5 Schedule 3 Page 1 of 3 1 COMMON ASSET ALLOCATION 2 3 1.0 INTRODUCTION 4 5 6 7 This evidence will discuss the nature of Common Fixed Assets ("Shared

More information

TORONTO HYDRO CORPORATION MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS FOR THE YEAR ENDED DECEMBER 31, 2005

TORONTO HYDRO CORPORATION MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS FOR THE YEAR ENDED DECEMBER 31, 2005 TORONTO HYDRO CORPORATION MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS FOR THE YEAR ENDED DECEMBER 31, 2005 The following discussion and analysis should be read

More information

Greater Toronto Area (GTA) Pooling

Greater Toronto Area (GTA) Pooling Greater Toronto Area (GTA) Pooling 2002 Current Budget GREATER TORONTO AREA POOLING TABLE OF CONTENTS A. Business Plan 1. a) Provincial Vision Statement for GTA Equalization (Pooling).................

More information

SUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS

SUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS Filed: September, 006 EB-00-00 Page of 7 SUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS 6 7 8 9 0 This exhibit identifies chronologically, in Tables through below, Board directives

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB KENORA HYDRO ELECTRIC CORPORATION LTD.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB KENORA HYDRO ELECTRIC CORPORATION LTD. Commission de l énergie de l Ontario DECISION AND RATE ORDER KENORA HYDRO ELECTRIC CORPORATION LTD. Application for an order approving just and reasonable rates and other charges for electricity distribution

More information

HYDRO ONE LIMITED MANAGEMENT S DISCUSSION AND ANALYSIS For the three and nine months ended September 30, 2016 and 2015

HYDRO ONE LIMITED MANAGEMENT S DISCUSSION AND ANALYSIS For the three and nine months ended September 30, 2016 and 2015 MANAGEMENT S DISCUSSION AND ANALYSIS The following Management s Discussion and Analysis (MD&A) of the financial condition and results of operations should be read together with the condensed interim unaudited

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); Ontario Energy Board Commission de l Énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); AND IN THE MATTER OF an Application by Peterborough Distribution

More information

REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS

REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS EB-0-0 Exhibit J Tab Page of REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS This evidence provides a summary of THESL s regulatory assets, variance and deferral accounts. The account balances, when

More information

NPCC MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY

NPCC MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY NPCC MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY December Executive Summary This is the Maritimes Area Interim Review of its Triennial Review of Resource Adequacy. This review covers the years 2006

More information

Global Adjustment. Overview. Christine Woon, P. Eng. Key Account Specialist Customer Care

Global Adjustment. Overview. Christine Woon, P. Eng. Key Account Specialist Customer Care Global Adjustment Overview Christine Woon, P. Eng. Key Account Specialist Customer Care Understanding Global Adjustment (GA) The GA was established by the Provincial Government in 2005 to cover the cost

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC. Commission de l énergie de l Ontario DECISION AND RATE ORDER ALGOMA POWER INC. Application for rates and other charges to be effective January 1, 2019 By Delegation, Before: Jane Scott 1 INTRODUCTION AND

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for the Jenner Wind Energy Connection And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1, the Alberta Utilities Commission Act,

More information

TRANSMISSION LOAD CONNECTIONS

TRANSMISSION LOAD CONNECTIONS TRANSMISSION LOAD CONNECTIONS HYDRO ONE NETWORKS INC. SEPTEMBER 2014 BACKGROUND Important Information for Transmission Load Customers This package was published for s Tx Load Customers as a supplement

More information

AIRD BERLIS. October 16, 2017 VIA COURIER, AND RESS

AIRD BERLIS. October 16, 2017 VIA COURIER,  AND RESS AIRD BERLIS Scott Stoll Direct: 416.865.4703 E-mail:sstoll@airdberlis.com VIA COURIER, EMAIL AND RESS Ms. Kirsten Walli Board Secretary Ontario Energy Board P.O. Box 2319, 27th Floor 2300 Yonge Street

More information

SUMMARY OF APPLICATION

SUMMARY OF APPLICATION Page of 0 0 SUMMARY OF APPLICATION OVERVIEW AND CONTEXT This is an application for an order or orders of the Ontario Energy Board ( OEB ) approving payment amounts for OPG s prescribed hydroelectric and

More information

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective May 1, 2012 Board File No. EB Evidence Update

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective May 1, 2012 Board File No. EB Evidence Update 3240 Mavis Road Mississauga, Ontario L5C 3K1 Tel: (905) 273-4098 Fax (905) 566-2737 November 25, 2011 VIA RESS and Overnight Courier Ms. Kirsten Walli Board Secretary Ontario Energy Board P. O. Box 2319

More information

Ontario s Renewable Energy Standard Offer Program - LDC Information Package

Ontario s Renewable Energy Standard Offer Program - LDC Information Package Ontario s Renewable Energy Standard Offer Program - LDC Information Package Prepared with input and assistance of members of the OPA s Electricity Distributors Working Group Last updated April 03, 2007

More information

Connection and Cost Recovery Agreement. between. (Customer Legal Name) and. Hydro One Networks Inc. for. (Project Description)

Connection and Cost Recovery Agreement. between. (Customer Legal Name) and. Hydro One Networks Inc. for. (Project Description) Connection and Cost Recovery Agreement between (Customer Legal Name) and Hydro One Networks Inc. for (Project Description) (Customer s Full Legal Name) (the Customer ) has requested and Hydro One Networks

More information

ECONOMIC INDICATORS. 2.1 Distribution Cost Escalation for Construction, Operations and Maintenance

ECONOMIC INDICATORS. 2.1 Distribution Cost Escalation for Construction, Operations and Maintenance EB-00-0 Tab Schedule Page of.0 INTRODUCTION ECONOMIC INDICATORS Appendix A of, Tab, Schedule provides the costing assumptions underlying the 00 Business Plans. This exhibit provides additional background

More information

SECOND QUARTER REPORT JUNE 30, 2015

SECOND QUARTER REPORT JUNE 30, 2015 SECOND QUARTER REPORT JUNE 30, 2015 TORONTO HYDRO CORPORATION TABLE OF CONTENTS Glossary 3 Management s Discussion and Analysis 4 Executive Summary 5 Introduction 5 Business of Toronto Hydro Corporation

More information

Year Assessment Preliminary Study Design

Year Assessment Preliminary Study Design 2015 10-Year Assessment Preliminary Study Design October 15, 2014 Stakeholder and Customer Webcast atcllc.com Purpose Solicit pre-study Comments 2015 Assessment Process 2015 Assessment Assumptions Public

More information

Financial Statements of FESTIVAL HYDRO INC. Year ended December 31, 2014

Financial Statements of FESTIVAL HYDRO INC. Year ended December 31, 2014 Financial Statements of FESTIVAL HYDRO INC. KPMG LLP 140 Fullarton Street Suite 1400 London ON N6A 5P2 Canada Telephone (519) 672-4880 Fax (519)672-5684 Internet w ww.kpmg.ca INDEPENDENT AUDITORS' REPORT

More information

Essex Powerlines Corporation 2730 Highway #3, Oldcastle, ON, N0R 1L0 Telephone: (519) Fax: (519)

Essex Powerlines Corporation 2730 Highway #3, Oldcastle, ON, N0R 1L0 Telephone: (519) Fax: (519) Kirstin Walli Board Secretary Ontario Energy Board 27 th Floor 2300 Yonge Street Toronto, ON M4P 1E4 September 27, 2013 RE: ESSEX POWERLINES CORPORATION 2014 IRM 3 Electricity Distribution Rates Application

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER TILLSONBURG HYDRO INC. Application for an order approving just and reasonable rates and other charges for electricity distribution

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); EB20170266 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); AND IN THE MATTER OF an application by Peterborough Distribution Inc. for an order approving just and reasonable

More information

NEWMARKET - TAY POWER DISTRIBUTION LTD.

NEWMARKET - TAY POWER DISTRIBUTION LTD. Commission de l énergie de l Ontario DECISION AND RATE ORDER NEWMARKET - TAY POWER DISTRIBUTION LTD. Application for an order approving just and reasonable rates and other charges for electricity distribution

More information

Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER EB HYDRO ONE NETWORKS INC.

Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER EB HYDRO ONE NETWORKS INC. Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER HYDRO ONE NETWORKS INC. Application for electricity distribution rates and other charges beginning January 1, 2016 BEFORE: Allison Duff

More information

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES Filed: May, 0 EB-0-00 Tab Page of PAYMENTS IN LIEU OF CORPORATE INCOME TAXES.0 INTRODUCTION Under the Electricity Act,, Hydro One Networks Inc. ( Networks ) is required to make payments in lieu of corporate

More information

STANDING COMMITTEE ON PUBLIC ACCOUNTS

STANDING COMMITTEE ON PUBLIC ACCOUNTS STANDING COMMITTEE ON PUBLIC ACCOUNTS ELECTRICITY POWER SYSTEM PLANNING (Section 3.05, 2015 Annual Report of the Office of the Auditor General of Ontario) 2 nd Session, 41 st Parliament 66 Elizabeth II

More information

CHAPLEAU PUBLIC UTILITIES CORPORATION ED IRM APPLICATION EB

CHAPLEAU PUBLIC UTILITIES CORPORATION ED IRM APPLICATION EB CHAPLEAU PUBLIC UTILITIES CORPORATION ED-2002-0528 2018 IRM APPLICATION EB-2017-0337 Rates Effective: May 1, 2018 Submitted on: February 9, 2018 Chapleau Public Utilities Corporation 110 Lorne St. S Chapleau,

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Erie Thames Powerlines

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB NIAGARA PENINSULA ENERGY INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB NIAGARA PENINSULA ENERGY INC. Commission de l énergie de l Ontario DECISION AND RATE ORDER NIAGARA PENINSULA ENERGY INC. Application for an order approving just and reasonable rates and other charges for electricity distribution to

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC. Commission de l énergie de l Ontario DECISION AND RATE ORDER GUELPH HYDRO ELECTRIC SYSTEMS INC. Application for rates and other charges to be effective January 1, 2018 By Delegation, Before: Theodore Antonopoulos

More information

Veridian Connections Inc., 2019 Electricity Distribution IRM Rate Application Board File No.: EB

Veridian Connections Inc., 2019 Electricity Distribution IRM Rate Application Board File No.: EB 55 Taunton Road East Ajax, ON L1T 3V3 September 24, 2018 Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700, P.O. Box 2319 Toronto, ON M4P 1E4 TEL (905) 4279870 TEL 18884452881

More information

CENTRALLY HELD COSTS

CENTRALLY HELD COSTS Filed: 00-0- EB-00-000 Exhibit F Tab Schedule Page of 0 0 0 CENTRALLY HELD COSTS.0 PURPOSE This evidence presents OPG s centrally held costs. Centrally held costs primarily consist of: Certain pension

More information

Horizon Holdings Inc. Auditors Report to the Shareholders and Consolidated Financial Statements Year Ended December 31, 2016 and December 31, 2015

Horizon Holdings Inc. Auditors Report to the Shareholders and Consolidated Financial Statements Year Ended December 31, 2016 and December 31, 2015 Auditors Report to the Shareholders and Consolidated Financial Statements Year Ended December 31, 2016 and December 31, 2015 KPMG LLP Commerce Place 21 King Street West, Suite 700 Hamilton Ontario L8P

More information

DEFERRAL AND VARIANCE ACCOUNTS

DEFERRAL AND VARIANCE ACCOUNTS Toronto Hydro-Electric System Limited EB-2014-0116 Tab 1 Schedule 1 ORIGINAL Page 1 of 30 1 DEFERRAL AND VARIANCE ACCOUNTS 2 3 4 5 This evidence provides a summary of Toronto Hydro s deferral and variance

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ORANGEVILLE HYDRO LIMITED

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ORANGEVILLE HYDRO LIMITED Commission de l énergie de l Ontario DECISION AND RATE ORDER ORANGEVILLE HYDRO LIMITED Application for an order approving just and reasonable rates and other charges for electricity distribution to be

More information

NERC TPL Standard Overview

NERC TPL Standard Overview NERC TPL-001-4 Standard Overview Attachment K Quarter 3 Stakeholder s Meeting September 29, 2016 1 Background New NERC TPL Standard 2016 TPL Plan and Status Update 2015 Planning Assessment Results Compliance

More information

REFURBISHMENT AND NEW GENERATION NUCLEAR

REFURBISHMENT AND NEW GENERATION NUCLEAR Filed: 00--0 EB-00-00 Exhibit D Tab Page of 0 0 0 REFURBISHMENT AND NEW GENERATION NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear plant refurbishment

More information

SPP REPORT ON TLR EVENTS FROM FEBRUARY 13 MARCH 4, 2002

SPP REPORT ON TLR EVENTS FROM FEBRUARY 13 MARCH 4, 2002 SPP REPORT ON TLR EVENTS FROM FEBRUARY 13 MARCH 4, 2002 On seven occasions between February 13 and March 4, 2002, SPP initiated a TLR on the MorStiSooNor flow gate, #5067, that included firm service curtailments.

More information

TABLE OF CONTENTS. C. Business Planning and Budgeting Process and Economic Assumptions

TABLE OF CONTENTS. C. Business Planning and Budgeting Process and Economic Assumptions TABLE OF CONTENTS Table of Contents Page of A. Rate Plan. Rate Plan. Specific Proposals B. Bill Impacts and Proposed Rates. Rate Impact Summary C. Business Planning and Budgeting Process and Economic Assumptions

More information

DECISION AND RATE ORDER

DECISION AND RATE ORDER DECISION AND RATE ORDER WELLINGTON NORTH POWER INC. Application for rates and other charges to be effective May 1, 2019 By Delegation, Before: Pascale Duguay March 28, 2019 Ontario Energy Board 1 INTRODUCTION

More information

CUSTOMER FOCUSED ANNUAL REPORT 2014

CUSTOMER FOCUSED ANNUAL REPORT 2014 CUSTOMER FOCUSED ANNUAL REPORT 2014 We are customer focused, from the inside out. In our delivery of safe, reliable and responsible power, we know that we must look to our customers needs in everything

More information

PROPERTY TAXES. A summary of taxes other than income and capital taxes is presented below: Table 1 ($ Millions)

PROPERTY TAXES. A summary of taxes other than income and capital taxes is presented below: Table 1 ($ Millions) Updated: February, 00 EB-00-0 Exhibit C Tab Schedule Page of PROPERTY TAXES A summary of taxes other than income and capital taxes is presented below: Description Property Tax Indemnity Payment Rights

More information

DEFERRAL AND VARIANCE ACCOUNTS

DEFERRAL AND VARIANCE ACCOUNTS Toronto Hydro-Electric System Limited EB-2014-0116 Tab 1 Schedule 1 ORIGINAL Page 1 of 30 1 DEFERRAL AND VARIANCE ACCOUNTS 2 3 4 5 This evidence provides a summary of Toronto Hydro s deferral and variance

More information

Balsam Lake Coalition Interrogatory # 8

Balsam Lake Coalition Interrogatory # 8 Tab Schedule BLC- Page of 0 0 0 Balsam Lake Coalition Interrogatory # Issue : Are the proposed amounts, disposition and continuance of Hydro One s existing deferral and variance accounts appropriate? Ontario

More information

Supplement to the 2019/20 Electric Rate Application Index February 14, 2019 MANITOBA HYDRO 2019/20 ELECTRIC RATE APPLICATION. 1.0 Overview...

Supplement to the 2019/20 Electric Rate Application Index February 14, 2019 MANITOBA HYDRO 2019/20 ELECTRIC RATE APPLICATION. 1.0 Overview... 0 0 Supplement to the 0/0 Electric Rate Application Index February, 0 MANITOBA HYDRO 0/0 ELECTRIC RATE APPLICATION SUPPLEMENT TO THE APPLICATION INDEX.0 Overview....0 Reasons for the Rate Increase....0

More information

Living, Thriving, Leading. Peel s Economic Overview Presentation

Living, Thriving, Leading. Peel s Economic Overview Presentation Living, Thriving, Leading Peel s Economic Overview Presentation Regional Council November 2, 2017 1 Uncertain and Rapidly Changing Environment 2 The Global Economic Environment Change in output Annual

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB-2017-0050 HYDRO ONE NETWORKS INC. Application for rates and other charges to be effective May 1, 2018 for the former

More information

Orangeville Hydro Limited 2019 IRM APPLICATION EB Submitted on: September 24, 2018

Orangeville Hydro Limited 2019 IRM APPLICATION EB Submitted on: September 24, 2018 0 IRM APPLICATION Submitted on: September, 0 Orangeville Hydro Limited 00 Line C Orangeville, ON LW Z Page of 0 TABLE OF CONTENTS Table of Contents... Introduction... Distributor s Profile... Publication

More information

OSHAWA PUC NETWORKS CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW

OSHAWA PUC NETWORKS CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW Page 1 of 27 OSHAWA PUC NETWORKS 2015-2019 CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW Introduction 1. Oshawa PUC Networks Inc. (OPUCN) owns and operates an electricity

More information

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing Hydro One Networks Inc. th Floor, South Tower Bay Street Toronto, Ontario MG P www.hydroone.com Tel: () -0 Cell: () - Frank.Dandrea@HydroOne.com Frank D Andrea Vice President, Chief Regulatory Officer,

More information

CENTRA GAS MANITOBA INC. 2013/14 GENERAL RATE APPLICATION VOLUME I INTEGRATED FINANCIAL FORECAST & ECONOMIC OUTLOOK. 4.0 Overview of Tab 4...

CENTRA GAS MANITOBA INC. 2013/14 GENERAL RATE APPLICATION VOLUME I INTEGRATED FINANCIAL FORECAST & ECONOMIC OUTLOOK. 4.0 Overview of Tab 4... Tab Index January, 0 CENTRA GAS MANITOBA INC. 0/ GENERAL RATE APPLICATION VOLUME I INTEGRATED FINANCIAL FORECAST & ECONOMIC OUTLOOK INDEX.0 Overview of Tab.... Economic Outlook.... Integrated Financial

More information

Toronto Hydro Electricity Distribution Rate Application - Ontario Energy Board City Intervention

Toronto Hydro Electricity Distribution Rate Application - Ontario Energy Board City Intervention STAFF REPORT ACTION REQUIRED Toronto Hydro 2012-2014 Electricity Distribution Rate Application - Ontario Energy Board City Intervention Date: September 27, 2011 To: From: Wards: Reference Number: Government

More information

BDR. Submitted to Toronto Hydro-Electric System Limited February 18, 2011

BDR. Submitted to Toronto Hydro-Electric System Limited February 18, 2011 COST OF SERVICE STUDY FOR INDIVIDUALLY METERED SUITES IN MULTI-UNIT RESIDENTIAL BUILDINGS Alternative Scenario Ordered by the Ontario Energy Board Submitted to Toronto Hydro-Electric System Limited 34

More information

FEED-IN TARIFF CONTRACT (FIT CONTRACT)

FEED-IN TARIFF CONTRACT (FIT CONTRACT) FEED-IN TARIFF CONTRACT (FIT CONTRACT) Version 2.1.1 March 22, 2013 SUPPLIER INFORMATION & ADDRESS 1. 2. SUPPLIER S ADDRESS COMPANY REPRESENTATIVE Fax: Phone: E-mail: 3. SUPPLIER INFORMATION Not a Non-Resident

More information

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES Filed: September 0, 00 EB-00-0 Tab Page of PAYMENTS IN LIEU OF CORPORATE INCOME TAXES.0 INTRODUCTION Under the Electricity Act,, Hydro One Networks Inc. ( Networks ) is required to make payments in lieu

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Hydro Ottawa Limited

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER TILLSONBURG HYDRO INC. Application for an order approving just and reasonable rates and other charges for electricity distribution

More information

COMPENSATION, WAGES, BENEFITS

COMPENSATION, WAGES, BENEFITS Filed: 0-- EB-0-0 Exhibit C Tab Page of COMPENSATION, WAGES, BENEFITS.0 INTRODUCTION 0 In previous Board decisions, the Board has expressed concerns with rising compensation levels at Hydro One. In a 00

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER WEST COAST HURON ENERGY INC. Application for an order approving just and reasonable rates and other charges for electricity

More information

HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December 31, 2010 and 2011 ($ Millions)

HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December 31, 2010 and 2011 ($ Millions) HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December, 0 and 0 ($ Millions) Updated: September, 00 Schedule Attachment Page of Line No. Particulars 0 0 Revenue requirement

More information