Transmission Formula Rate Annual Customer Meeting. June 2017

Size: px
Start display at page:

Download "Transmission Formula Rate Annual Customer Meeting. June 2017"

Transcription

1 American Electric Power Transmission Formula Rate Annual Customer Meeting Public Service Company of Oklahoma Southwestern Electric Power Company June 2017

2 2017 Annual Update Internet Posting nduct/oasis/tarifffilings/ AEP-SPP Docket No. ER , OATT Formula Rate Annual Update 2017 Notice of Annual Filing (PDF) AEP-SPP Transmission Formula Rate Annual Update for Rates eff 7/01/2017 (XLS) Supplemental Worksheets F & G (Part IV) -- PSO BPU Project Tables (XLS) Supplemental Worksheets F & G (Part IV) -- SWE BPU Project Tables (XLS) CY 2016 NITS True-Up (XLS) Annual Formula Rate Update Meeting Notice (Word) 2

3 2017 Annual Update Projected Rates Projection based on 2016 year-end rate base balances plus projected 2017 plant balances, plus 2016 O&M and Depreciation expenses. To be billed for the period July 1, 2017 through June 30, 2018 and trued up in 2018 True-up of 2016 Calendar Year Rates effective July 1, 2015 (billed January June 2016) were $1,566.72/MW Month Rates effective July 1, 2016 (billed July December 2016) were $1,623.70/MW Month True-up to 2016 Cost Data with Average Rate Base Balances (B/E Yr 2016) -- $1,652.23/MW Month True-Up of $5.6M to be charged to all AEP Zone network customers 3

4 Summary of Projected Rates (PSO/SWEPCO) July 1, 2016 July 1, 2017 Charge 2015 FERC Form 1 (projected plant 2016) 2016 FERC Form 1 (projected plant 2017) % Change NITS & PTP Rate $/MW Month (Sch. 7, 8 & 9) Base Plan (Sch. 11) $1, $1, % $70,531,855 $90,656,981 29% Load Dispatch and Scheduling Service (Sch. 1) AEP West Zone SPP Average 12-Mo. Coincident Peak Demand $0.0825/MWh $0.0776/MWh (6%) 8,211 MW 8,167 MW (1%) 4

5 Primary Drivers - NITS Rate (PSO / SWEPCO) Increased Net Plant in Service resulted in higher Depreciation, Income Taxes, and Taxes other than Income Taxes 1% Decrease (44 MW) in AEP Zone Coincident Peak Demands (denominator in the rate) 5

6 Base Plan Upgrades (Schedule 11) PSO 21 BP Projects. $53 million invested by end of 2017 Added 3 new projects in 2016 with $1 million investment SWEPCO 63 BP projects. $666 million invested by end of 2017 Added 8 new projects in 2016 with $43.3 million investment 6

7 Summary Comparison 2016 Projected 2016 True-Up REVENUE REQUIREMENT PSO SWEPCO TOTAL REVENUE REQUIREMENT (w/o incentives) 2016 Projected 91,596, ,087, ,683, True-Up 91,918, ,847, ,765,271 Inc/(Dec) 322, ,941 1,081,950 Percentage Inc/(Dec) 0.35% 0.49% 0.44% REVENUE CREDITS 2016 Projected 6,818,274 9,347,015 16,165, True-Up 5,668,002 7,268,807 12,936,809 Inc/(Dec) (1,150,273) (2,078,208) (3,228,480) Percentage Inc/(Dec) % % % REVENUE REQUIREMENT For All Company Facilities 2016 Projected 84,777, ,740, ,518, True-Up 86,250, ,578, ,828,463 Inc/(Dec) 1,472,282 2,838,148 4,310,430 Percentage Inc/(Dec) 1.74% 1.95% 1.87% REVENUE REQUIREMENT For SPP Schedule 11 Facilities (w/o collection & interest adj) 2016 Projected 6,774,890 63,756,965 70,531, True-Up 6,843,152 66,059,700 72,902,852 Inc/(Dec) 68,262 2,302,735 2,370,997 Percentage Inc/(Dec) 1.01% 3.61% 3.36% EXISTING ZONAL ATRR FOR SPP OATT ATTACHMENT H, Sec. 1, Col. 3 (Schedule 9) 2016 Projected 78,003,006 81,983, ,986, True-Up 79,407,026 82,518, ,925,611 Inc/(Dec) 1,404, ,413 1,939,433 Percentage Inc/(Dec) 1.80% 0.65% 1.21% 7

8 Summary Comparison 2016 Projected 2016 True-Up PSO SWEPCO TOTAL RATE BASE CALCULATION TOTAL GROSS PLANT 2016 Projected 811,597,999 1,444,039,554 2,255,637, True-Up 788,947,539 1,436,511,513 2,225,459,052 Inc/(Dec) (22,650,460) (7,528,040) (30,178,500) Percentage Inc/(Dec) -2.79% -0.52% -1.34% TOTAL NET PLANT IN SERVICE 2016 Projected 597,940, ,196,754 1,569,136, True-Up 595,773, ,959,694 1,579,733,237 Inc/(Dec) (2,166,552) 12,762,940 10,596,388 Percentage Inc/(Dec) -0.36% 1.31% 0.68% TOTAL ADIT ADJUSTMENTS 2016 Projected (168,360,594) (202,161,943) (370,522,537) 2016 True-Up (170,786,141) (216,110,008) (386,896,149) Inc/(Dec) (2,425,548) (13,948,065) (16,373,612) Percentage Inc/(Dec) 1.44% 6.90% 4.42% TOTAL WORKING CAPITAL 2016 Projected 13,665,039 11,928,814 25,593, True-Up 12,348,834 11,040,770 23,389,604 Inc/(Dec) (1,316,205) (888,043) (2,204,249) Percentage Inc/(Dec) -9.63% -7.44% -8.61% RATE BASE 2016 Projected 442,223, ,624,004 1,176,847, True-Up 436,300, ,034,670 1,179,335,525 Inc/(Dec) (5,922,990) 8,410,666 2,487,676 Percentage Inc/(Dec) -1.34% 1.14% 0.21% 8

9 Summary Comparison 2016 Projected 2016 True-Up EXPENSE, TAXES, RETURN & REVENUE REQUIREMENTS CALCULATION PSO SWEPCO TOTAL TOTAL O&M EXPENSE 2016 Projected 21,632,441 25,160,083 46,792, True-Up 20,415,108 26,265,765 46,680,873 Inc/(Dec) (1,217,333) 1,105,682 (111,651) Percentage Inc/(Dec) -5.63% 4.39% -0.24% TOTAL DEPRECIATION AND AMORTIZATI0N 2016 Projected 16,036,344 32,389,503 48,425, True-Up 17,866,563 33,898,055 51,764,618 Inc/(Dec) 1,830,219 1,508,552 3,338,771 Percentage Inc/(Dec) 11.41% 4.66% 6.89% TOTAL OTHER TAXES 2016 Projected 5,896,392 10,492,874 16,389, True-Up 5,587,676 11,013,526 16,601,203 Inc/(Dec) (308,716) 520, ,936 Percentage Inc/(Dec) -5.24% 4.96% 1.29% TOTAL INCOME TAXES 2016 Projected 13,813,583 24,395,738 38,209, True-Up 13,996,627 24,574,666 38,571,293 Inc/(Dec) 183, , ,972 Percentage Inc/(Dec) 1.33% 0.73% 0.95% RETURN ON RATE BASE (Rate Base*WACC) 2016 Projected 34,184,900 60,587,755 94,772, True-Up 34,022,836 58,814,138 92,836,974 Inc/(Dec) (162,065) (1,773,616) (1,935,681) Percentage Inc/(Dec) -0.47% -2.93% -2.04% TOTAL REVENUE REQUIREMENT (incl IPP Interest) 2016 Projected 91,596, ,087, ,683, True-Up 91,918, ,847, ,765,271 Inc/(Dec) 322, ,941 1,081,950 Percentage Inc/(Dec) 0.35% 0.49% 0.44% 9

10 Summary Comparison 2016 Projected 2016 True-Up WEIGHTED AVERAGE COST OF CAPITAL (WACC) PSO SWEPCO TOTAL LONG TERM DEBT INTEREST 2016 Projected 61,279, ,777, ,056, True-Up 61,279, ,509, ,789,052 Inc/(Dec) , ,067 Percentage Inc/(Dec) 0.00% 0.62% 0.41% COMMON EQUITY 2016 Projected 1,115,802,854 2,150,942,582 3,266,745, True-Up 1,163,310,681 2,169,740,454 3,333,051,135 Inc/(Dec) 47,507,827 18,797,872 66,305,699 Percentage Inc/(Dec) 4.26% 0.87% 2.03% TOTAL WACC 2016 Projected 7.73% 8.25% 2016 True-Up 7.80% 7.92% Inc/(Dec) 0.07% -0.33% 10

11 Questions? 11

12 American Electric Power Oklahoma Transmission Co. Southwestern Transmission Co. 12

13 2017 Annual Update Internet Posting Annual Update AEPTCo SPP nduct/oasis/tarifffilings/ AEP-SPP Docket No. ER , OATT Formula Rate Notice of Annual Filing ATRR Summary SPP Formula Rate OKTCo Supplemental Worksheet F&G SWTCo Supplemental Worksheet F&G OKTCo 2016 NITS True-Up SWTCo 2016 NITS True-Up Exclusion of State Formation Costs (per FERC Settlement) Annual Formula Rate Update Meeting Notice 13

14 2017 Annual Update (OKTCo / SWTCo) Projected Rates Projection based on 2016 year-end balances plus projected 2017 plant balances Rate Year begins July 1, 2017 through June 30, 2018 True-up (CY2016) Rates effective July 1, 2015 (billed January June 2016) -- $ (OKTCo) & 1.44 (SWTCo)/MW Month Rates effective July 1, 2016 (billed July December 2016) -- $ (OKTCo) & 1.33 (SWTCo)/MW Month True-up to 2016 Cost Data with Average Ratebase Balances (B/E Yr 2016) -- $477.31/MW Month (OKTCo) & $1.34 (SWTCo) True-Up of $4.4M to be charged to all AEP Zone network customers 14

15 Summary of Projected Rates (OKTCo / SWTCo) Charge July 1, FERC Form 1 (projected plant 2016) July 1, FERC Form 1 (projected plant 2017) NITS & PTP Rate $/MW Month (Sch. 7, 8 & 9) Base Plan (Sch. 11) OKTCo - $ SWTCo - $ 1.33 OKTCo - $13,475,209 SWTCo - $ 0 OKTCo - $ SWTCo - $ 1.27 OKTCo - $27,948,610 SWTCo - $ 0 AEP West Zone SPP Average 12-Mo. Coincident Peak Demand 8,211 MW 8,167 MW 15 - TCO

16 Drivers Affecting NITS Rate Increased capital investment in OKTCo results in higher O&M Expense and Depreciation Expense 16

17 Base Plan Upgrades (Schedule 11) OKTCo Added 3 new Base Plan projects $102.3 million investment SWTCo No Base Plan projects until final regulatory approval is obtained from all state commissions 17 - TCO

18 Summary Comparison - Transcos 2016 Projected 2016 True-Up REVENUE REQUIREMENT OKTCo SWTCo REVENUE REQUIREMENT (w/o incentives) 2016 Projected 65,470, , True-Up 66,232, ,248 Inc/(Dec) 762,539 1,793 Percentage Inc/(Dec) 1.16% 1.31% REVENUE CREDITS 2016 Projected 1,793,628 5, True-Up 2,431,724 6,951 Inc/(Dec) 638,096 1,269 Percentage Inc/(Dec) 35.58% 22.33% REVENUE REQUIREMENT For All Company Facilities 2016 Projected 63,676, , True-Up 63,800, ,297 Inc/(Dec) 124, Percentage Inc/(Dec) 0.20% 0.40% REVENUE REQUIREMENT For SPP Schedule 11 Facilities (w/o collection & interest adj) 2016 Projected 13,475, True-Up 17,022,290 0 Inc/(Dec) 3,547,081 0 Percentage Inc/(Dec) 26.32% 0.00% EXISTING ZONAL ATRR FOR SPP OATT ATTACHMENT H, Sec. 1, Col. 3 (Schedule 9) 2016 Projected 50,201, , True-Up 46,778, ,297 Inc/(Dec) (3,422,638) 524 Percentage Inc/(Dec) -6.82% 0.40% 18

19 Summary Comparison - Transcos 2016 Projected 2016 True-Up RATE BASE CALCULATION OKTCo SWTCo TOTAL GROSS PLANT 2016 Projected 555,772, True-Up 548,105,957 0 Inc/(Dec) (7,666,738) 0 Percentage Inc/(Dec) -1.38% 0.00% TOTAL NET PLANT IN SERVICE 2016 Projected 528,672, True-Up 524,417,251 0 Inc/(Dec) (4,255,311) 0 Percentage Inc/(Dec) -0.80% 0.00% TOTAL ADIT ADJUSTMENTS 2016 Projected (95,600,964) 5, True-Up (117,163,397) 4,636 Inc/(Dec) (21,562,433) (1,122) Percentage Inc/(Dec) 22.55% % TOTAL WORKING CAPITAL 2016 Projected 388, True-Up 510, Inc/(Dec) 122, Percentage Inc/(Dec) 31.41% #DIV/0! RATE BASE 2016 Projected 433,460,289 5, True-Up 407,764,636 5,423 Inc/(Dec) (25,695,653) (335) Percentage Inc/(Dec) -5.93% -5.81% 19

20 Summary Comparison - Transcos 2016 Projected 2016 True-Up EXPENSE, TAXES, RETURN & REVENUE REQUIREMENTS CALCULATION OKTCo SWTCo TOTAL O&M EXPENSE 2016 Projected 4,223, , True-Up 5,853, ,565 Inc/(Dec) 1,629,960 1,795 Percentage Inc/(Dec) 38.59% 1.32% TOTAL DEPRECIATION AND AMORTIZATI0N 2016 Projected 8,972, True-Up 11,122,384 0 Inc/(Dec) 2,150,021 0 Percentage Inc/(Dec) 23.96% TOTAL OTHER TAXES 2016 Projected 4,162, True-Up 4,736, Inc/(Dec) 574, Percentage Inc/(Dec) 13.79% TOTAL INCOME TAXES 2016 Projected 15,310, True-Up 14,403, Inc/(Dec) (907,640) (20) Percentage Inc/(Dec) -5.93% -9.41% RETURN ON RATE BASE (Rate Base*WACC) 2016 Projected 32,800, True-Up 30,117, Inc/(Dec) (2,683,835) (46) Percentage Inc/(Dec) -8.18% -9.60% TOTAL REVENUE REQUIREMENT (incl IPP Interest) 2016 Projected 65,470, , True-Up 66,232, ,248 Inc/(Dec) 762,540 1,793 Percentage Inc/(Dec) 1.16% 1.31% 20

21 Summary Comparison - Transcos 2016 Projected 2016 True-Up WEIGHTED AVERAGE COST OF CAPITAL (WACC) OKTCo SWTCo LONG TERM DEBT INTEREST 2016 Projected 8,069, True-Up 8,825,886 0 Inc/(Dec) 756,346 0 Percentage Inc/(Dec) 9.37% 0.00% COMMON EQUITY 2016 Projected 213,669,471 (831,371) 2016 True-Up 251,688,904 (914,915) Inc/(Dec) 38,019,433 (83,544) Percentage Inc/(Dec) 17.79% 10.05% TOTAL WACC 2016 Projected 7.57% 8.25% 2016 True-Up 7.39% 7.92% Inc/(Dec) -0.18% -0.33% 21

22 Questions? 22

23 American Electric Power Schedule 9 True-Up Results 23

24 Network Transmission Service Annual True-up Schedule 9, Network Integration Transmission Service (NITS), charges are trued up annually on an individual customer basis. True-up amounts will be credited or charged, with interest, with the July service month billings. 24

25 Network Customer True-Up <<PSO/SWEPCO>> (A) (B) (C) (D) = (B) - (C) (E) (F) = (D) + (E) Customer Actual Charge (2016 True-Up) Invoiced for CY2016 Transmission Service True-Up (w/o Interest) Interest Total True-Up Surcharge / (Refund) AECC $ 13,611,071 $ 13,161,055 $ 450,016 $ 16,222 $ 466,238 Bentonville, AR $ 2,326,340 $ 2,250,044 $ 76,296 $ 2,714 $ 79,010 Coffeyville, KS $ 1,777,799 $ 1,717,415 $ 60,385 $ 2,211 $ 62,596 ETEC $ 3,884,393 $ 3,791,108 $ 93,285 $ 2,626 $ 95,911 Greenbelt $ 143,744 $ 139,325 $ 4,419 $ 156 $ 4,575 Hope, AR $ 941,771 $ 910,580 $ 31,191 $ 1,116 $ 32,307 Lighthouse $ 28,088 $ 27,204 $ 884 $ 31 $ 915 Minden, LA $ 527,061 $ 509,641 $ 17,420 $ 620 $ 18,040 NTEC $ 9,627,544 $ 9,265,403 $ 362,142 $ 14,021 $ 376,163 OG&E $ 317,228 $ 306,052 $ 11,176 $ 396 $ 11,572 OMPA $ 2,131,377 $ 2,062,721 $ 68,656 $ 2,405 $ 71,061 Prescott, AR $ 247,835 $ 239,566 $ 8,268 $ 300 $ 8,568 TEXLA $ 1,574,575 $ 1,516,560 $ 58,015 $ 2,219 $ 60,234 WFEC $ 662,544 $ 639,936 $ 22,609 $ 827 $ 23,435 Non-Affiliate $ 37,801,370 $ 36,536,610 $ 1,264,760 $ 45,864 $ 1,310,624 Subtotals PSO $ 62,322,116 $ 60,281,976 $ 2,040,139 $ 72,364 $ 2,112,503 SWEPCO $ 59,296,882 $ 57,313,141 $ 1,983,741 $ 71,565 $ 2,055,306 SWEPCO-Valley $ 2,506,433 $ 2,420,418 $ 86,015 $ 3,170 $ 89,185 Affiliate $ 124,125,431 $ 120,015,535 $ 4,109,896 $ 147,099 $ 4,256,995 Subtotals TOTALS $ 161,926,801 $ 156,552,146 $ 5,374,656 $ 192,963 $ 5,567,619 25

26 Network Customer True-Up <<Oklahoma Transmission Company>> (A) (B) (C) (D) = (B) - (C) (E) (F) = (D) + (E) Customer Actual Charge (2016 True-Up) Invoiced for CY2016 Transmission Service True-Up (w/o Interest) Interest Total True-Up Surcharge / (Refund) AECC $ 3,932,080 $ 3,580,293 $ 351,787 $ 16,910 $ 368,696 Bentonville, AR $ 672,052 $ 613,703 $ 58,350 $ 2,765 $ 61,115 Coffeyville, KS $ 513,586 $ 463,028 $ 50,558 $ 2,427 $ 52,985 ETEC $ 1,122,156 $ 1,122,601 $ (445) $ 1,388 $ 943 Greenbelt $ 41,526 $ 38,767 $ 2,759 $ 139 $ 2,899 Hope, AR $ 272,067 $ 247,572 $ 24,494 $ 1,160 $ 25,654 Lighthouse $ 8,114 $ 7,517 $ 597 $ 29 $ 626 Minden, LA $ 152,262 $ 138,656 $ 13,606 $ 635 $ 14,240 NTEC $ 2,781,285 $ 2,406,685 $ 374,600 $ 16,725 $ 391,325 OG&E $ 91,644 $ 81,472 $ 10,171 $ 452 $ 10,623 OMPA $ 615,730 $ 565,846 $ 49,884 $ 2,350 $ 52,235 Prescott, AR $ 71,597 $ 64,979 $ 6,618 $ 318 $ 6,936 TEXLA $ 454,876 $ 397,090 $ 57,786 $ 2,579 $ 60,365 WFEC $ 191,401 $ 172,259 $ 19,142 $ 905 $ 20,046 Non-Affiliate Subtotals $ 10,920,375 $ 9,900,468 $ 1,019,907 $ 48,781 $ 1,068,688 PSO $ 18,004,133 $ 16,451,870 $ 1,552,263 $ 73,466 $ 1,625,730 SWEPCO $ 17,130,179 $ 15,530,929 $ 1,599,249 $ 75,705 $ 1,674,955 SWEPCO-Valley $ 724,079 $ 650,271 $ 73,808 $ 3,508 $ 77,316 Affiliate $ 35,858,391 $ 32,633,070 $ 3,225,321 $ 152,680 $ 3,378,001 Subtotals TOTALS $ 46,778,767 $ 42,533,538 $ 4,245,228 $ 201,461 $ 4,446,689 26

27 Network Customer True-Up <<Southwestern Transmission Company>> (A) (B) (C) (D) = (B) - (C) (E) (F) = (D) + (E) Customer Actual Charge (2016 True-Up) Invoiced for CY2016 Transmission Service True-Up (w/o Interest) Interest Total True-Up Surcharge / (Refund) AECC $ 11,039 $ 11,372 $ (333) $ (14) $ (347) Bentonville, AR $ 1,887 $ 1,942 $ (56) $ (2) $ (58) Coffeyville, KS $ 1,442 $ 1,488 $ (47) $ (2) $ (49) ETEC $ 3,150 $ 3,177 $ (27) $ (2) $ (29) Greenbelt $ 117 $ 119 $ (3) $ (0) $ (3) Hope, AR $ 764 $ 787 $ (23) $ (1) $ (24) Lighthouse $ 23 $ 23 $ (1) $ (0) $ (1) Minden, LA $ 427 $ 440 $ (13) $ (1) $ (13) NTEC $ 7,808 $ 8,128 $ (320) $ (14) $ (334) OG&E $ 257 $ 266 $ (9) $ (0) $ (9) OMPA $ 1,729 $ 1,777 $ (49) $ (2) $ (51) Prescott, AR $ 201 $ 207 $ (6) $ (0) $ (6) TEXLA $ 1,277 $ 1,327 $ (50) $ (2) $ (52) WFEC $ 537 $ 555 $ (18) $ (1) $ (18) Non-Affiliate Subtotals $ 30,658 $ 31,611 $ (953) $ (41) $ (994) PSO $ 50,545 $ 52,029 $ (1,484) $ (63) $ (1,547) SWEPCO $ 48,091 $ 49,585 $ (1,494) $ (64) $ (1,558) SWEPCO-Valley $ 2,033 $ 2,100 $ (67) $ (3) $ (70) Affiliate Subtotals $ 100,669 $ 103,714 $ (3,045) $ (130) $ (3,175) TOTALS $ 131,327 $ 135,325 $ (3,998) $ (172) $ (4,169) 27

28 Network Customer True-Up <<AEP WEST --- NET NITS TRUE-UP>> (A) (B) (C) (D) = (B) - (C) (E) (F) = (D) + (E) Customer Actual Charge (2016 True-Up) Invoiced for CY2016 Transmission Service True-Up (w/o Interest) Interest Total True-Up Surcharge / (Refund) AECC $ 17,554,189 $ 16,752,720 $ 801,470 $ 33,117 $ 834,587 Bentonville, AR $ 3,000,279 $ 2,865,690 $ 134,589 $ 5,477 $ 140,066 Coffeyville, KS $ 2,292,827 $ 2,181,931 $ 110,896 $ 4,636 $ 115,532 ETEC $ 5,009,699 $ 4,916,886 $ 92,813 $ 4,012 $ 96,825 Greenbelt $ 185,387 $ 178,211 $ 7,176 $ 295 $ 7,471 Hope, AR $ 1,214,602 $ 1,158,939 $ 55,662 $ 2,275 $ 57,937 Lighthouse $ 36,225 $ 34,744 $ 1,481 $ 60 $ 1,540 Minden, LA $ 679,751 $ 648,738 $ 31,013 $ 1,254 $ 32,267 NTEC $ 12,416,638 $ 11,680,216 $ 736,422 $ 30,733 $ 767,154 OG&E $ 409,129 $ 387,791 $ 21,338 $ 848 $ 22,186 OMPA $ 2,748,835 $ 2,630,344 $ 118,491 $ 4,754 $ 123,245 Prescott, AR $ 319,632 $ 304,752 $ 14,880 $ 617 $ 15,497 TEXLA $ 2,030,729 $ 1,914,977 $ 115,751 $ 4,796 $ 120,547 WFEC $ 854,483 $ 812,750 $ 41,733 $ 1,731 $ 43,464 Non-Affiliate $ 48,752,404 $ 46,468,689 $ 2,283,715 $ 94,604 $ 2,378,318 Subtotals PSO $ 80,376,794 $ 76,785,875 $ 3,590,919 $ 145,768 $ 3,736,686 SWEPCO $ 76,475,152 $ 72,893,656 $ 3,581,497 $ 147,206 $ 3,728,703 SWEPCO-Valley $ 3,232,545 $ 3,072,789 $ 159,756 $ 6,675 $ 166,431 Affiliate $ 160,084,491 $ 152,752,320 $ 7,332,171 $ 299,649 $ 7,631,820 Subtotals TOTALS $ 208,836,894 $ 199,221,009 $ 9,615,886 $ 394,252 $ 10,010,138 28

29 American Electric Power Schedule 11 True-Up 29

30 Base Plan Upgrades Annual True-up Schedule 11, Base Plan Upgrades (BPU), charges are trued up annually, with interest. The true-up adjustment will be rolled together with the Projected BPU revenue requirement and collected or refunded over the ensuing rate year. 30

31 Schedule 11 True Up Results Company Projected 2017 Base ATRR 2016 True-Up Adjustment Interest Adjusted ATRR Effective 7/1/17 PSO 6,729,904 (287,901) (15,353) 6,426,650 SWEPCO 83,927, ,313 (148,212) 84,452,178 OKTCO 27,948,610 4,589, ,416 32,834,196 31

32 Questions? 32

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69 AEPTCo SPP Formula Rate Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2015 SPP Zone 1 Projected AEP Revenue Requirements

More information

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69 Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data For rates effective July 1, 2016 SPP Zone 1 Projected AEP Revenue Requirements OKTCo Annual SWTCo Annual

More information

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 68

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 68 Projected NITS Rates Page: 1 of 68 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2013 SPP Zone 1 Projected AEP Revenue Requirements AEP Annual PSO Annual

More information

ATTACHMENT A clean copy of the revised tariff sheets (Exhibit No. AEP102A) Exhibit No. AEP 102A Page 1 of 44 Southwest Power Pool pro forma Third Revised Sheet No. 94 FERC Electric Tariff Superseding Second

More information

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69 Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2014 SPP Zone 1 Projected AEP Revenue Requirements AEP Annual PSO Annual

More information

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69 Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2015 SPP Zone 1 Projected AEP Revenue Requirements AEP Annual PSO Annual

More information

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2015 AEP SPP Formula Rate Projected NITS Rates Page: 1 of 69 SPP Zone 1 Projected AEP Revenue Requirements

More information

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 AEPTCo subsidiaries in PJM Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Projected TCOS Page 1 of 75 AEP OHIO TRANSMISSION COMPANY Line Transmission

More information

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Projected TCOS Page 1 of 37 Line Transmission No. Amount 1 REVENUE REQUIREMENT (w/o incentives)

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 I & M Projected TCOS Page 1 of 48 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

Southwestern Public Service Company. Transmission. Formula Rate Template. and Supporting Worksheets. Schedule 1 Annual Revenue Requirement

Southwestern Public Service Company. Transmission. Formula Rate Template. and Supporting Worksheets. Schedule 1 Annual Revenue Requirement Transmission Formula Rate Template and Supporting Worksheets Schedule 1 Annual Revenue Requirement For the 2014 TrueUp For the Period January 1, 2014 through December 31, 2014 Rate Formula Template Table

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 KPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 KPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 KGPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2012 and Projected Net Plant at Year-End 2013

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2012 and Projected Net Plant at Year-End 2013 Transmission Cost of Service Utilizing Historic Cost Data for 2012 and Projected Net Plant at YearEnd 2013 APCo Projected TCOS Page 1 of 36 Line Transmission No. Amount 1 REVENUE REQUIREMENT (w/o incentives)

More information

RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting

RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting September 2, 2014 TO: All Interested Parties RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting In accordance with Section 1.3(a) of the Oklahoma Gas and Electric Company ( OG&E

More information

Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green

Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green Topics Introductions Annual Update Overview FERC Form No. 1 page 106b Known errors 2017

More information

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589 Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line No. Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR

More information

RR16 - Page 1 of

RR16 - Page 1 of DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of ARTHUR P. FREITAS on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618 Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618

More information

July 15, 2015 VIA ELECTRONIC FILING

July 15, 2015 VIA ELECTRONIC FILING July 15, 2015 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket No.

More information

Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011. Oklahoma Gas and Electric Company. Index of Worksheets

Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011. Oklahoma Gas and Electric Company. Index of Worksheets Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011 (Enter whether "Projected Data" or "Actual Data") Projected Data Attachment H Addendum 2A Oklahoma Gas and Electric Company

More information

SPP Staff Proposal on TO Zonal Placement. April 20, 2017

SPP Staff Proposal on TO Zonal Placement. April 20, 2017 SPP Staff Proposal on TO Zonal Placement April 20, 2017 Outline I. II. III. IV. V. VI. Background of the Staff s Proposal Paul Suskie Examples of New TO additions Carl Monroe SPC Motion & Updated Staff

More information

Transmission Formula Rate 2017 Annual Update. June 23, 2017

Transmission Formula Rate 2017 Annual Update. June 23, 2017 Transmission Formula Rate 2017 Annual Update June 23, 2017 1 Topics Introductions Annual Update Overview 2017 Projection and 2016 True-Up Schedule 1 Additional Information Questions and Discussion 2 OASIS

More information

July 21, Southwest Power Pool, Inc., Docket No. ER Submission of Response to Request for Additional Information

July 21, Southwest Power Pool, Inc., Docket No. ER Submission of Response to Request for Additional Information July 21, 2016 VIA ELECTRONIC FILING Penny Murrell Director, Division of Electric Power Regulation-Central Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest

More information

Midwest Energy, Inc. Transmission Formula Rate Protocols

Midwest Energy, Inc. Transmission Formula Rate Protocols Section 1 Annual Updates A. Definitions Annual Publication and Filing Date shall mean the date on which the last of the events listed in Section 1. C. occurs for each year. Annual Review Procedures shall

More information

PacifiCorp Transmission Rate Case

PacifiCorp Transmission Rate Case PacifiCorp Transmission Rate Case Customer & Stakeholder Meetings Portland, March 10, 2011 & Salt Lake City, March 16, 2011 2000 PACIFICORP PAGE 2 Agenda Welcome and Introduction Purpose of Meeting and

More information

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS TRANSMISSION OWNER ZONAL PLACEMENT PROCESS Published July 2017 CONTENTS Section 1: Introduction, Scope & Steps... 1 Subsection A: Introduction To Zonal Placement... 1 Subsection B: Scope... 1 Subsection

More information

Southwestern Public Service Company Attachment O SPS Transmission Formula 2017 Projection Material Accounting Changes since January 1, 2016

Southwestern Public Service Company Attachment O SPS Transmission Formula 2017 Projection Material Accounting Changes since January 1, 2016 1 The Company has listed below any material changes that have taken effect since January 1, 2016. For additional information, please refer to the Southwestern Public Service Company FERC Form 1 for Q4

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

In addition to this transmittal letter and associated records for the etariff database, this filing includes:

In addition to this transmittal letter and associated records for the etariff database, this filing includes: 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 Phone (202) 338-2416 Fax SUBMITTED VIA E-TARIFF FILING January 4, 2017 Kimberly D. Bose Secretary Federal Energy Regulatory

More information

American Electric Power Service Corporation Docket No. ER10- -

American Electric Power Service Corporation Docket No. ER10- - American Electric Power 801 Pennsylvania Avenue N.W. Suite 320 Washington, DC 20004 AEP.com May 3, 2010 Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E.

More information

April 29, 2016 VIA ELECTRONIC FILING

April 29, 2016 VIA ELECTRONIC FILING April 29, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc., Docket No.

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

FORMULA RATE TASK FORCE CONFERENCE CALL TO DISCUSS GOLDEN SPREAD RECOMMENDATIONS

FORMULA RATE TASK FORCE CONFERENCE CALL TO DISCUSS GOLDEN SPREAD RECOMMENDATIONS FORMULA RATE TASK FORCE 12-15-05 CONFERENCE CALL TO DISCUSS GOLDEN SPREAD RECOMMENDATIONS PARTICIPATION: (v) Jay Toungate AEP (v) Bob Oakes Westar Alan Hientz SPP Formula Rate Consultant (v) Dave Grover

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Northern Indiana Public Service Company LLC Line Allocated No.

More information

Stakeholder Meeting for GridLiance High Plains LLC 2019 Transmission Formula Rate Projection. October 31, :30 am CST

Stakeholder Meeting for GridLiance High Plains LLC 2019 Transmission Formula Rate Projection. October 31, :30 am CST Stakeholder Meeting for GridLiance High Plains LLC 2019 Transmission Formula Rate Projection October 31, 2018 9:30 am CST Agenda Introduction GridLiance High Plains LLC (GridLiance HP) Background Transmission

More information

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER Hesser G. McBride, Jr. Associate General Regulatory Counsel Law Department 80 Park Plaza, T5G, Newark, NJ 07102-4194 tel: 973.430.5333 fax: 973.430.5983 email: Hesser.McBride@pseg.com June 13, 2016 VIA

More information

January 25, By Electronic Filing

January 25, By Electronic Filing Gary J. Newell P 202.370.0137 F 202.370.0143 gnewell@jsslaw.com Jennings, Strouss & Salmon, P.L.C. 1350 I Street, NW Suite 810 Washington, D.C. 200053305 jsslaw.com January 25, 2019 By Electronic Filing

More information

Stakeholder Meeting for GridLiance West LLC 2019 Annual Formula Rate Projection. November 7, :00pm CST

Stakeholder Meeting for GridLiance West LLC 2019 Annual Formula Rate Projection. November 7, :00pm CST Stakeholder Meeting for GridLiance West LLC 2019 Annual Formula Rate Projection November 7, 2018 2:00pm CST Agenda Introduction GridLiance West LLC (GridLiance) Background Transmission Formula Rate Template

More information

Regulatory Status Report

Regulatory Status Report FERC or State Jurisdiction: FERC AD10-12 AD12-12 Increasing Market and Planning Efficiency through Improved Software A technical conference was held on June 24-26, 2013 to discuss opportunities for increasing

More information

boardman (1 Richard A. Heinemann August 27, 2015

boardman (1 Richard A. Heinemann August 27, 2015 boardman & ci a r k up L A W F I R M Richard A. Heinemann, Attorney 1 SOUTH PINCKNEY STREET, STE. 410, P.O. BOX 927, MADISON, WI 53701-0927 Telephone 608-283-1706 Facsimile 608-283-1709 rheinemann@boardmanclark.com

More information

September Investor Meetings aep.com. 3rd Quarter 2018 EARNINGS RELEASE PRESENTATION October 25, 2018

September Investor Meetings aep.com. 3rd Quarter 2018 EARNINGS RELEASE PRESENTATION October 25, 2018 September Investor Meetings aep.com 3rd Quarter 2018 EARNINGS RELEASE PRESENTATION October 25, 2018 1 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation

More information

Southwestern Public Service Company Attachment O SPS Transmission Formula Annual True-up for 2016 Material Accounting Changes since January 1, 2016

Southwestern Public Service Company Attachment O SPS Transmission Formula Annual True-up for 2016 Material Accounting Changes since January 1, 2016 1 The Company has listed below any material changes that have taken effect since January 1, 2016. For additional information, please refer to the Southwestern Public Service Company FERC Form 1 for Q4

More information

AEP Zone Network Integration Transmission Service Customers

AEP Zone Network Integration Transmission Service Customers Appalachian Power Company American Electric Power Company Transmission Customers FERC Filing - : Calendar Year 2007 Statement BA Page 1 of 1 AEP Zone Network Integration Transmission Service Customers

More information

Appendix 1 Duquesne Light Company Attachment H -17A Page 1 of 25 Formula Rate - Appendix A True-Up Notes FERC Form 1 Page # or Instruction 2017 Shaded cells are input cells Allocators 1 Transmission Wages

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

Tab Schedule/Worksheet Designation Description Date to be Posted

Tab Schedule/Worksheet Designation Description Date to be Posted Westar Energy Inc. (Westar) Rate Formula Template Table of Contents Overview The formula is calculated in two steps. The first step is to fill out Tabs A1 thru A12, and the Actual Gross Rev. Req. tab with

More information

Annual Transmission Revenue Requirement &

Annual Transmission Revenue Requirement & Annual Transmission Revenue Requirement & Transmission Facilities Charge LES Administrative Board November 16, 2018 Emily N. Koenig Director of Finance & Rates LES.com 1 What is the Annual Transmission

More information

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C McGuireWoods LLP 2001 K Street N.W. Suite 400 Washington, DC 20006-1040 Phone: 202.857.1700 Fax: 202.857.1737 www.mcguirewoods.com Julia Dryden English Direct: 202.857.1706 jenglish@mcguirewoods.com Fax:

More information

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1.

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1. The following questions pertain to the spreadsheet file 07-2015---Attachment_O- 2014_SPS_Transmission_Formula_Rate_True-Up_rv1 : GSEC 1-1. Refer to SPS s 2014 FERC Form 1 page 207, line 48 Account 350

More information

American Electric Power Service Corporation ER Etariff Compliance Filing

American Electric Power Service Corporation ER Etariff Compliance Filing American Electric Power 801 Pennsylvania Avenue N.W. Suite 320 Washington, DC 20004 AEP.com March 9, 2011 Monique Rowtham- Kennedy Senior Counsel Regulatory Services (202) 383-3436 (202) 383-3459 (F) Honorable

More information

1 st Quarter 2018 Earnings Release Presentation

1 st Quarter 2018 Earnings Release Presentation 1 st Quarter 2018 Earnings Release Presentation April 26, 2018 1 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within

More information

Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators

Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators Page 1 of 25 Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators 1 Transmission Wages Expense p354.21.b 5,926,573 2 Total Wages Expense

More information

October 29, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

October 29, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C., 46 October 9, 5 Re: Southwest Power Pool, Inc., Docket No. ER6- - Submission of Tariff

More information

N. Am. Elec. Reliability Corp., 119 FERC 61,060, order on reh g, 120 FERC 61,260 (2007).

N. Am. Elec. Reliability Corp., 119 FERC 61,060, order on reh g, 120 FERC 61,260 (2007). The Honorable Kimberly D. Bose Secretary November 7, 2008 Page 2 Arkansas. SPP currently has 50 Members, serving more than 4 million customers in a 255,000 square-mile area covering all or part of eight

More information

September Investor Meetings aep.com. 4th Quarter 2018 EARNINGS RELEASE PRESENTATION January 24, 2019

September Investor Meetings aep.com. 4th Quarter 2018 EARNINGS RELEASE PRESENTATION January 24, 2019 September Investor Meetings aep.com 4th Quarter 2018 EARNINGS RELEASE PRESENTATION January 24, 2019 1 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation

More information

PPL Electric Utilities Corporation

PPL Electric Utilities Corporation Page 1 of 22 ATTACHMENT H8G PPL Electric Utilities Corporation Formula Rate Appendix A Notes FERC Form 1 Page # or Instruction 2014 Data Shaded cells are input cells Allocators Wages & Salary Allocation

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF ) OKLAHOMA GAS AND ELECTRIC COMPANY ) FOR APPROVAL OF A GENERAL CHANGE IN ) DOCKET NO. 0-0-U RATES AND TARIFFS ) Direct

More information

Rate Formula Template (A) (B) (C) (D) (E) (F)

Rate Formula Template (A) (B) (C) (D) (E) (F) Page 1 of 4 Rate Formula Template (A) (B) (C) (D) (E) (F) Line Allocated No. Reference Worksheet/Note Amount A. NETWORK SERVICE 1 GROSS REVENUE REQUIREMENT Page 2, line 26, col. (F) $ 116,851,990 REVENUE

More information

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER Gary A. Morgans 202 429 6234 gmorgans@steptoe.com 1330 Connecticut Avenue, NW Washington, DC 20036-1795 202 429 3000 main www.steptoe.com The Hon. Kimberly D. Bose Secretary Federal Energy Regulatory Commission

More information

AGENDA. 1. Call to Order and Administrative Items... Mike Wise. 2. Review of SPC s Policy Decision (4-Step Process)... Paul Suskie

AGENDA. 1. Call to Order and Administrative Items... Mike Wise. 2. Review of SPC s Policy Decision (4-Step Process)... Paul Suskie Southwest Power Pool, Inc. STRATEGIC PLANNING COMMITTEE MEETING Friday, June 2, 2017 9:00 AM 3 PM AEP Office, 8 th Floor Renaissance Tower, Dallas, Texas AGENDA 1. Call to Order and Administrative Items...

More information

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696 Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/14 Utilizing FERC Form 1 Data Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line

More information

September 30, 2016 VIA ELECTRONIC FILING

September 30, 2016 VIA ELECTRONIC FILING September 30, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket

More information

ATTACHMENT NO POPULATED FORMULA RATE

ATTACHMENT NO POPULATED FORMULA RATE ATTACHMENT NO. 1 2008 POPULATED FORMULA RATE Attachment No. 1 Page 1 of 27 ATTACHMENT H13A Commonwealth Edison Company Formula Rate Appendix A Notes FERC Form 1 Page # or Instruction Shaded cells are input

More information

Office Fax delmarva.com

Office Fax delmarva.com Amy L. Blauman Assistant General Counsel EP1132 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 delmarva.com alblauman@pepcoholdings.com May 16, 2016 Ms. Kimberly D.

More information

Tab Schedule/Worksheet Designation Description Date to be Posted

Tab Schedule/Worksheet Designation Description Date to be Posted Westar Energy Inc. (Westar) Rate Formula Template Table of Contents Overview The formula is calculated in two steps. The first step is to fill out Tabs A1 thru A12, and the Actual Gross Rev. Req. tab with

More information

4 th Quarter 2017 Earnings Release Presentation

4 th Quarter 2017 Earnings Release Presentation 4 th Quarter 2017 Earnings Release Presentation January 25, 2018 1 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements

More information

Tab Schedule/Worksheet Designation Description Date to be Posted

Tab Schedule/Worksheet Designation Description Date to be Posted Westar Energy Inc. (Westar) Rate Formula Template Table of Contents Overview The formula is calculated in two steps. The first step is to fill out Tabs A1 thru A12, and the Actual Gross Rev. Req. tab with

More information

post such Annual Update on PJM s Internet website via link to the Transmission Services page or a similar successor page; and

post such Annual Update on PJM s Internet website via link to the Transmission Services page or a similar successor page; and 701 Ninth Street, NW Suite 1100 Washington, DC 20068 Amy L. Blauman Associate General Counsel 202-872-2122 202-331-6767 Fax alblauman@pepcoholdings.com May 14, 2012 Ms. Kimberly D. Bose Secretary Federal

More information

April 28, Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template

April 28, Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 Re: Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template Honorable Secretary Bose: Pursuant

More information

PROTOCOLS AS INCORPORATED INTO WESTAR S OATT

PROTOCOLS AS INCORPORATED INTO WESTAR S OATT PROTOCOLS AS INCORPORATED INTO WESTAR S OATT FERC Electric Tariff ORIGINAL Sheet No. 228 ATTACHMENT H-2 Formula Rate Implementation Protocols I. Annual Update 1. The rate formula template in Attachment

More information

2018 Annual Projected Rate Meeting for South Central MCN LLC. October 18, :00pm 4:00pm CST

2018 Annual Projected Rate Meeting for South Central MCN LLC. October 18, :00pm 4:00pm CST 2018 Annual Projected Rate Meeting for South Central MCN LLC October 18, 2017 3:00pm 4:00pm CST Agenda Introduction South Central MCN LLC ( SCMCN ) Background 2018 Projected Formula Rate Q&A Closing Remarks

More information

December 29, American Electric Power Service Corporation Docket No. ER

December 29, American Electric Power Service Corporation Docket No. ER American Electric Power 1 Riverside Plaza Columbus, OH 43215 AEP.com Honorable Kimberly D Bose Secretary Federal Energy Regulatory Commission 888 First St., N.E. Washington D.C. 20426 December 29, 2015

More information

ATTACHMENTS ATTACHMENT GG NETWORK UPGRADE CHARGE

ATTACHMENTS ATTACHMENT GG NETWORK UPGRADE CHARGE ATTACHMENT GG Network Upgrade Charge ATTACHMENTS 32.0.0 ATTACHMENT GG NETWORK UPGRADE CHARGE 1. Network Upgrade Cost Allocation: This Attachment GG sets forth the method for calculating and collecting

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

Cost Allocation for Transmission Infrastructure

Cost Allocation for Transmission Infrastructure USAID/NARUC East Africa Regional Regulatory Partnership Exchange: Cost Allocation for Transmission Infrastructure Andrew Greene Massachusetts Dept. of Public Utilities Energy Facilities Siting Board Dar

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S INTERIM REPORT ON ITS PARTICIPATION IN THE SOUTHWEST POWER POOL REGIONAL TRANSMISSION ORGANIZATION,

More information

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Transmission System Expansion Cost Allocation Alternatives for Renewable Resources Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Page 1 Why Page 2 Page 1 of 11 Basic Principles Wind generation

More information

Office Fax pepco.com

Office Fax pepco.com Amy L. Blauman Assistant General Counsel EP1132 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 pepco.com alblauman@pepcoholdings.com May 16, 2016 Ms. Kimberly D. Bose

More information

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company The Dayton Power and Light Company 1065 Woodman Drive, Dayton Ohio 45458 May 8, 2018 Via etariff Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

RSC Workshop on the Integration of WAPA, Basin, Heartland. April 4, 2014

RSC Workshop on the Integration of WAPA, Basin, Heartland. April 4, 2014 RSC Workshop on the Integration of WAPA, Basin, Heartland April 4, 2014 AGENDA I. Impact of IS Joining SPP II. Cost Allocation III. Potential Clarification to RSC Bylaws IV. SPP Bylaw and Membership Agreement

More information

PJM Interconnection, L.L.C., Dkt. No. ER (Related to Docket Nos. ER , -1997, -2034)

PJM Interconnection, L.L.C., Dkt. No. ER (Related to Docket Nos. ER , -1997, -2034) American Electric Power 801 Pennsylvania Avenue N.W. Suite 320 Washington, DC 20004 AEP.com November 24, 2010 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room

More information

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2015 Transmission Revenue Requirement

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2015 Transmission Revenue Requirement Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Tel. 202.739.3000 Fax: 202.739.3001 www.morganlewis.com John D. McGrane Partner 202.739.5621 jmcgrane@morganlewis.com May 15,

More information

SPP PLANNING AND COST ALLOCATION OVERVIEW

SPP PLANNING AND COST ALLOCATION OVERVIEW Benefit/Cost Ratio Primer 101 for the Regional Allocation Review Task Force August 4, 2011 1 SPP PLANNING AND COST ALLOCATION OVERVIEW 2 1 Transmission = 10% Retail Electricity Rates Transmission enables

More information

ATLANTIC CITY ELECTRIC COMPANY BPU NJ

ATLANTIC CITY ELECTRIC COMPANY BPU NJ Attachment 1 Attachment 1 Page 1 of 3 ATLANTIC CITY ELECTRIC COMPANY BPU NJ No. 11 Electric Service - Section IV Revised Sheet Replaces Revised Sheet No. 60 RIDER (BGS) Basic Generation Service (BGS) Basic

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwest Power Pool, Inc. ) Docket No. ER16- -000 PETITION OF SOUTHWEST POWER POOL, INC. FOR TARIFF WAIVER Pursuant to Rule 207(a)(5)

More information

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2016 Transmission Revenue Requirement

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2016 Transmission Revenue Requirement Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Tel. 202.739.3000 Fax: 202.739.3001 www.morganlewis.com John D. McGrane Partner 202.739.5621 jmcgrane@morganlewis.com May 16,

More information

Costs and Revenue Offsets Item # Description

Costs and Revenue Offsets Item # Description Item # CUS-13 Costs and Description Total Cost Allocation - Total cost (PV of 40-year ATRR's ) are listed as $7,382M on ESWG slide 3. Could we get a breakdown (listing) of how this total was determined.

More information

First Revised Sheet No. 2758L. Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data VECTREN

First Revised Sheet No. 2758L. Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data VECTREN Midwest ISO FERC Electric Tariff, Fourth Revised Volume No. 1 First Revised Sheet No. 2758L Superseding Original Sheet No. 2758L Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended

More information

UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwestern Public Service Company, ) v. ) Docket No. EL13-15-000 Southwest Power Pool, Inc. ) ) Southwestern Public Service Company,

More information

Energy Bar Association

Energy Bar Association Energy Bar Association EBA Energizer: Section 205/206 Fundamentals and Insights November 17, 2016 David DesLauriers, Director Black & Veatch Management Consulting, LLC Jason T. Gray Esq., Shareholder Duncan,

More information

Regulatory Status Report

Regulatory Status Report FERC or State Jurisdiction: FERC EL13-88 EL16-91 Northern Indiana Public Service Company's ("NIPSCO") Complaint Against the Midcontinent Independent System Operator, Inc. ("MISO") and PJM Interconnection,

More information

Q Earnings Review August 9, 2016

Q Earnings Review August 9, 2016 Q2 2016 Earnings Review August 9, 2016 Safe Harbor Statement Statements made in this presentation that relate to future events or PNM Resources, Inc. s ( PNMR ), Public Service Company of New Mexico s

More information

Potomac Electric Power Company ( Pepco ), Docket No. ER Informational Filing of 2017 Formula Rate Annual Update; Notice of Annual Meeting

Potomac Electric Power Company ( Pepco ), Docket No. ER Informational Filing of 2017 Formula Rate Annual Update; Notice of Annual Meeting Amy L. Blauman Assistant General Counsel Edison Place 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 pepco.com alblauman@pepcoholdings.com May 12, 2017 Ms. Kimberly

More information

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015 2014 Attachment O True-Up Presentation Presenter: David Grover Manager, Transmission Pricing July 8, 2015 Presentation Purpose Discuss the 2014 Annual True-Up posting Walk through the timeline and mechanics

More information

Public Service Company of New Mexico Attachment H 1 Current Year Formula Rate

Public Service Company of New Mexico Attachment H 1 Current Year Formula Rate Attachment H 1 Formula Rate Allocators 1 Wages and Salary Allocation Factor 2 Transmission Wages Expense page 354, line 21, column b 5,229,728 3 4 Total Wages Expense page 354, line 28, column b 118,475,166

More information

FIRST QUARTERLY PROJECT TRACKING REPORT 2018 January 2018

FIRST QUARTERLY PROJECT TRACKING REPORT 2018 January 2018 FIRST QUARTERLY PROJECT TRACKING REPORT 2018 January 2018 CONTENTS Executive Summary... 3 NTC Project Summary... 5 NTC Issuance... 7 NTC Withdraw... 7 Completed Projects... 8 Project status summary...

More information

American Electric Power Service Corporation Docket No. ER

American Electric Power Service Corporation Docket No. ER American Electric Power 801 Pennsylvania Ave NW, Suite 320 Washington, DC 200042615 AEP.com August 22, 2018 Honorable Kimberly D Bose Secretary Federal Energy Regulatory Commission 888 First St., N.E.

More information