1

2 The Honorable Kimberly D. Bose Secretary November 7, 2008 Page 2 Arkansas. SPP currently has 50 Members, serving more than 4 million customers in a 255,000 square-mile area covering all or part of eight states. SPP s members include 12 investor-owned utilities, 8 municipal systems, 11 generation and transmission cooperatives, 2 state authorities, 4 independent power producers, 11 power marketers, and 2 independent transmission companies. As an RTO, SPP is a transmission provider administering transmission service over portions of Arkansas, Kansas, Louisiana, Missouri, New Mexico, Oklahoma, and Texas. In addition to providing tariff services as an RTO, SPP serves as a Regional Entity for the North American Electric Reliability Corporation. 1 As an RTO, SPP administers provision of open access transmission service on a regional basis across the facilities that the SPP transmission owners have dedicated to the SPP Tariff. 2 The rates for transmission service under the SPP Tariff are zonal rates. SPP s zonal rates benefit all market participants by allowing customers to transmit power across the SPP region while paying only one, rather than multiple, transmission charges. For service to load located within the SPP region, the transmission rates are based on the revenue requirements for the host zone within which the load is located. 3 For service to load located outside of the SPP region, the transmission charge is based on the lowest cost zone interconnected with the control area external to the SPP Region that is the designated point of delivery, i.e., the interface between SPP and the receiving system. 4 The revenue requirement for each pricing zone is set out in Attachment H of the SPP Tariff, either in the form of a fixed revenue requirement or a formula rate. The loss factor for each pricing zone host is set forth in Attachment M, and the agreements that have been classified as Grandfathered Agreements ( GFAs ) are listed in Attachment W. On December 17, 1999, the Commission approved the use of zonal rates, subject to modifications to the revenue requirement and through-and-out transmission rates of one pricing zone host N. Am. Elec. Reliability Corp., 119 FERC 61,060, order on reh g, 120 FERC 61,260 (2007). See Sw. Power Pool, Inc., 89 FERC 61,084 (1999); Sw. Power Pool, Inc., 86 FERC 61,090 (1998); Sw. Power Pool, Inc., 82 FERC 61,267 (1998). See SPP Tariff at Schedules 7-9. See SPP Tariff at Schedule 7, Section 1; Schedule 8, Section 1; Schedule 9, Section 1; see also Sw. Power Pool, Inc., 89 FERC 61,284, at 61,889 (1999) ( December 17 Order ). See December 17 Order at 61,

3 The Honorable Kimberly D. Bose Secretary November 7, 2008 Page 3 B. Description of LES & Standard of Review LES is a municipal electric utility formed in 1966 that now serves approximately 108,000 residential customers and 15,000 commercial and industrial customers located in Lancaster County, Nebraska, including the cities of Lincoln, Prairie Home, Waverly, Walton, Cheney, and Emerald. LES is a non-profit, customer-owned utility governed by a semi-autonomous administrative board of local citizens. As a political subdivision of the state of Nebraska, LES is not a public utility within the meaning of section 201 of the FPA 6 and is not subject to the Commission s jurisdiction under sections 205 and of the FPA. However, the Commission does have jurisdiction under sections 205 and 206 of the FPA over the rates for transmission service provided by SPP, an RTO that is a public utility. In this respect, the courts have made clear that when a non-jurisdictional transmission owner voluntarily joins an RTO, the Commission can ensure by examining [the non-jurisdictional utility s revenue requirement] that the [RTO s] rates will ultimately be just and reasonable. 8 However, the Commission has declined to establish a formal standard of review to be applied to all non-jurisdictional revenue requirement cases. 9 C. Filing in Docket No. ER On September 30, 2008, SPP filed proposed revisions to its Bylaws, Tariff and Membership Agreements in order to facilitate LES, along with the Nebraska Public Power District ( NPPD ) and Omaha Public Power District ( OPPD ) (collectively Nebraska Entities ), becoming members of SPP. 10 The modifications proposed in the September 30 Filing were designed to accommodate the unique state and local law requirements imposed on NPPD and OPPD as state public power agencies and LES as a municipal electric utility. The September 30 Filing proposed an effective date of December 1, 2008 for the revisions, with the intention that the Nebraska Entities would become members of SPP on December 1, 2008 and transfer control of their transmission U.S.C. 824(e). 16 U.S.C. 824e. Pac. Gas & Elec. Co. v. FERC, 306 F.3d 1112, 1117 (D.C. Cir. 2002). City of Vernon, Cal., 111 FERC 61,092, at P 36, reh g granted in part and denied in part, 112 FERC 61,207 (2005), reh g denied, 115 FERC 61,297 (2006). Revisions to Bylaws, Tariff and Membership Agreement of Southwest Power Pool, Inc., Docket No. ER (Sept. 30, 2008) ( September 30 Filing ).

4 The Honorable Kimberly D. Bose Secretary November 7, 2008 Page 4 systems to SPP and begin participating in SPP s Energy Imbalance Service Market on April 1, The instant filing is one of several companion filings to integrate each of the Nebraska Entities into SPP as a separate rate zone. 11 II. DESCRIPTION OF THE FILING The instant filing contains LES s proposed formula rate template to be utilized to calculate LES s Annual Transmission Revenue Requirement ( ATRR ) and transmission rates. LES proposes to utilize a formula rate to calculate its ATRR and underlying rates for Network Service and Scheduling and Dispatch Service provided under Schedule 1 of the SPP Tariff. In addition, the formula rate template provides the formula for calculating LES s ATRR for Base Plan Upgrades and other Network Upgrades (Sponsored Upgrades, Service Upgrades and Generation Upgrades) under Attachment J of SPP s Tariff. LES provides both a blank revenue requirement formula rate template and a completed template reflecting data from LES s 2007 Energy Information Administration ( EIA ) Form 412. Although the EIA no longer requires this form to be filed, LES continues to complete the Form 412 annually. The formula rate template proposed by LES is based on a rate template approved for use by non-jurisdictional utilities in the Midwest ISO. The blank and completed formula rate templates are included in Exhibit No. LES-1. The protocol for updating the values in the LES formula rate template, ATRR and underlying transmission rates is included in Exhibit No. LES-2. The formula rate template calculates ATRR by summing transmission Operation and Maintenance ( O&M ) expenses for the transmission facilities being placed under SPP functional control with the transmission allocation of Administrative and General ( A&G ) costs, debt service, taxes and debt coverage (margin). Allocation factors are based on the transmission portion of gross plant or wages and salaries, as appropriate. Adjustments are made to reduce the transmission allocations for transmission facilities not within the SPP footprint. A deduction for Base Plant Funding is included for possible future use. The ATRR is divided by the average annual system demand plus transmission reservations. All values are historic and no true-up will be done. 11 Contemporaneously with this filing, SPP is making three additional filings: (1) an omnibus filing to reflect the necessary tariff revisions to integrate each of the Nebraska Entities as a separate rate zone ( SPP Companion Filing ); (2) a filing on behalf of NPPD to implement its ATRR formula rate template and other documents related to the provision of transmission service in the NPPD Zone; and (3) a filing on behalf of OPPD to implement its ATRR formula rate template and other documents related to the provision of transmission service in the OPPD Zone.

5 The Honorable Kimberly D. Bose Secretary November 7, 2008 Page 5 The instant filing also includes a rate sheet for Firm and Non-Firm Point-To-Point transmission service within the LES transmission pricing zone in Exhibit No. LES-3. These rates are also included in the SPP Companion Filing as a revision to Attachment T to the SPP Tariff. In addition, the instant filing includes a request for Commission acceptance of LES s transmission loss factor. As indicated in Exhibit No. LES-4, LES s average transmission loss factor is 1.07%. This loss factor is also reflected in the SPP Companion Filing to revise Schedule 1 of Attachment M of its Tariff. Additionally, Exhibit No. LES-5 contains a list of contracts for which LES seeks grandfathered treatment under the SPP Tariff. These contracts have been included in the SPP Companion Filing s revisions to Attachment W of the SPP Tariff. Finally, included in Exhibit No. LES-6 is a list of transmission facilities LES proposes to transfer to SPP s operational control on April 1, The facilities identified in Exhibit No. LES-6 will form the LES transmission pricing zone in SPP (Zone 16) and are listed in the SPP Companion Filing. LES asserts that all of the facilities identified in Exhibit No. LES-6 comply with the definition of Transmission Facilities set forth in Attachment AI of the SPP Tariff. III. ADDITIONAL INFORMATION A. Waiver and Request for Commission Action On behalf of LES, SPP respectfully requests waiver of the Commission s prior notice requirement, 18 C.F.R. 35.3(a), requiring rates for electric service to be filed no more than 120 days before the rates are scheduled to go into effect. SPP has made the instant filing more than 120 days in advance in order to provide LES with certainty that it will be able to recover its revenue requirements and comply with applicable state laws upon transferring control of its transmission facilities to SPP. The rates proposed herein are scheduled to go into effect on April 1, Additionally, SPP respectfully requests that the Commission act on the instant filing within 60 days of the date of this filing, in order to ensure that customers have notice of the rates and can make reservations 60 days before the April 1, 2009 effective date and to provide LES with certainty that SPP s transmission service rates will enable it to recover its revenue requirements before it transfers control of its transmission facilities to SPP.

6 The Honorable Kimberly D. Bose Secretary November 7, 2008 Page 6 B. Information Required by the Commission s Regulations (1) Documents submitted with this filing: In addition to this transmittal letter, the following LES exhibits are included in this filing: Exhibit No. LES-1 Exhibit No. LES-2 Exhibit No. LES-3 Exhibit No. LES-4 Exhibit No. LES-5 Exhibit No. LES-6 LES Revenue Requirement Formula Rate Template Attachment H: Rate Protocol Rate Sheets for Point-to-Point Transmission Service in LES Zone 16 LES Loss Factor List of LES Grandfathered Agreements List of LES Transmission Facilities Comprising Zone 16 (2) Effective date: As discussed above, SPP requests an effective date of April 1, 2009 for the changes proposed in this filing. The requested effective date is intended to coincide with the effective date of the transfer to SPP of functional control over LES s transmission facilities and the addition of the LES Zone to the SPP Tariff. The Tariff revisions for the LES Zone are being submitted separately and contemporaneously with this filing. The addition of the LES Zone to SPP s Tariff is consistent with Commission precedent and in the public interest, and thus warrants the Commission s approval. (3) Service: A copy of this transmittal letter has been served on all SPP members and customers. In addition, a complete copy of this filing has been served on all state commissions within SPP s service region. Finally, a copy of the revised Tariff will be posted on the SPP web page (

7 The Honorable Kimberly D. Bose Secretary November 7, 2008 Page 7 (4) Requisite agreements: LES has executed a SPP Membership Agreement, which was included as part of SPP s September 30 Filing in Docket No. ER (5) Estimate of transactions and revenues: It is not presently possible to make a reasonable prediction of the transactions and revenues resulting from this filing. (6) Basis of rates: The basis for the proposed rates is explained above and in the attached exhibits of LES. (7) Comparison to rates for similar services: The rates proposed herein are for services provided in Zone 16 under the SPP Tariff. Such rates can be compared to the rates for similar services to other zones under the SPP Tariff. (8) Specifically assignable facilities installed or modified: There are none. C. Communications SPP requests that all correspondence and communications with respect to this filing be sent to, and SPP requests that the Secretary include on the official service list, the following: L. Patrick Bourne Director Regulatory Policy Southwest Power Pool, Inc. 415 North McKinley, #140 Plaza West Little Rock, AR Telephone: (501) Fax: (501) pbourne@spp.org Barry S. Spector Wendy N. Reed Matthew J. Binette WRIGHT & TALISMAN, P.C G Street, N.W., Suite 600 Washington, DC Telephone: (202) Fax: (202) spector@wrightlaw.com reed@wrightlaw.com binette@wrightlaw.com

8

9 Exhibit No. LES-1

10 Based on the Midwest ISO rate template Formula Rate - Cash Flow Rate Formula Template For the 12 months ending 12/31/07 Utilizing EIA Form 412 Data LINCOLN ELECTRIC SYSTEM Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 2, line 23, col. 5) $ - REVENUE CREDITS (Note Q) Total Allocator 2 Account No. 454 (page 3, line 34) 0 TP Account No. 456 (page 3, line 37) 0 TP Revenues from Grandfathered Interzonal Transactions TP Revenues from service provided by the ISO at a discount TP TOTAL REVENUE CREDITS (sum lines 2-5) 0 7 NET REVENUE REQUIREMENT for all facilities (line 1 minus line 6) $ - 8 Revenue Requirements for Base Plan Funded Projects 0 9 NET REVENUE REQUIREMENT less base plan funded projects (line 7 minus line 8) $ - DIVISOR 10 Average of 12 coincident system peaks for requirements (RQ) service (Note A) 11 Plus 12 CP of firm bundled sales over one year not in line 10 (Note B) 12 Plus 12 CP of Network Load not in line 10 (Note C) 13 Less 12 CP of firm P-T-P over one year (enter negative) (Note D) 14 Plus Contract Demand of firm P-T-P over one year 15 Less Contract Demand from Grandfathered Interzonal transactions over one year (enter negative) (Note P) 16 Less 12 CP or Contract Demands from service over one year provided by ISO at a discount (enter negative) 17 Divisor (sum lines 10-16) 0 kw 18 Annual Cost ($/kw/yr) (line 9/ line 17) $ Network & P-to-P Rate ($/kw/mo) (line 18/ 12) $0.000 Peak Rate Off-Peak Rate 20 Point-To-Point Rate ($/kw/wk) (line 18 / 52; line 18/ 52) $0.000 $ Point-To-Point Rate ($/kw/day) (line 20/ 5; line 20/ 7) $0.000 Capped at weekly rate $ Point-To-Point Rate ($/MWh) (line 21/ 16; line 21/ 24 $0.000 Capped at weekly $0.000 times 1,000) and daily rates 23 FERC Annual Charge($/MWh) (Note E) $0.000 Short Term $0.000 Short Term 24 $0.000 Long Term $0.000 Long Term 11/6/2008 2:14 PM K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Blank Formula Rate Template -- USE THIS VERSION.XLS

11 Based on the Midwest ISO rate template Formula Rate - Cash Flow Rate Formula Template For the 12 months ending 12/31/07 Utilizing EIA Form 412 Data LINCOLN ELECTRIC SYSTEM (1) (2) (3) (4) (5) Line EIA 412 Transmission No. Reference Company Total Allocator (Col 3 times Col 4) O&M 1 Transmission VII.8.d TE Less Account A&G VII.13.d W/S Less FERC Annual Fees W/S Less EPRI & Reg. Comm. Exp. & Non-safety Ad (Note F) W/S a Plus Transmission Related Reg. Comm. Exp. (Note F) TE Common CE Transmission Lease Payments TOTAL O&M (sum lines 1, 3, 5a, 6, 7 less 2, 4, 5) 0 0 DEBT SERVICE 9 Debt Service GP Amortization of premium or discount GP TOTAL DEBT SERVICE (Sum lines 9-10) 0 0 TAXES OTHER THAN INCOME TAXES (Note G) LABOR RELATED 13 Payroll W/S Highway and vehicle W/S PLANT RELATED 16 Property GP Gross Receipts zero 0 18 Other GP Payments in lieu of taxes GP TOTAL OTHER TAXES (sum lines 13-19) SUBTOTAL (sum lines 8, 12, 20) (O&M + DS + Taxes) MARGIN REQUIREMENT (Note H) GP REV. REQUIREMENT (sum lines 21, 23) /6/2008 2:14 PM K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Blank Formula Rate Template -- USE THIS VERSION.XLS

12 Based on the Midwest ISO rate template Formula Rate - Cash Flow Rate Formula Template For the 12 months ending 12/31/07 Utilizing EIA Form 412 Data LINCOLN ELECTRIC SYSTEM Line No. SUPPORTING CALCULATIONS AND NOTES EIA 412 GROSS PLANT IN SERVICE Reference Company Total Allocator Transmission 1 Production IV.6.g NA 2 Transmission IV.7.g TP Distribution IV.8.g NA 4 General & Intangible IV.9.g + IV.1.g W/S Common CE TOTAL GROSS PLANT (sum lines 1-5) 0 GP= 0.000% 0 TRANSMISSION PLANT INCLUDED IN ISO RATES 7 Total transmission plant (line 2) 0 8 Less transmission plant excluded from ISO rates (Note J) 9 Less transmission plant included in OATT Ancillary Services (Note K ) 10 Transmission plant included in ISO rates (line 7 less lines 8 & 9) 0 11 Percentage of transmission plant included in ISO Rates (line 10 divided by line 7) TP= TRANSMISSION EXPENSES Schedule 1 Recoverable Expenses 12 Total transmission expenses (page 2, line 1, column 3) 0 13 Less transmission expenses included in OATT Ancillary Services (Note I) 0 Acct 561 included in Line 13? 14 Included transmission expenses (line 12 less line 13) 0 Revenue Credits for Sched 1/Acct 561 transactions <1 yr 15 Percentage of transmission expenses after adjustment (line 14 divided by line 12) non-firm 16 Percentage of transmission plant included in ISO Rates (line 11) TP transactions w/ load not in divisor 17 Percentage of transmission expenses included in ISO Rates (line 15 times line 16) TE= $0 total Revenue Credits $0 Net Schedule 1 Expenses (Acct 561 minus Credits) WAGES & SALARY ALLOCATOR (W&S) (Note L) $ Allocation 18 Production Transmission Distribution W&S Allocator 21 Other ($ / Allocation) 22 Total (sum lines 18-21) 0 0 = COMMON PLANT ALLOCATOR (CE) (Note M) $ % Electric Labor Ratio 23 Electric (line 23 / line 26) (line 22) CE 24 Gas * = Water 26 Total (sum lines 23-25) 0 FINANCING DATA $ 27 Long Term Debt II.33.b +II.34.b 28 Debt Service 29 Interest on Long Term Debt III.16.b + III.17.b Note R 30 Bond Principal Amortization (line 28 less line 29) 0 REVENUE CREDITS Load ACCOUNT 447 (SALES FOR RESALE) 31 a. Bundled Non-RQ Sales for Resale (Note N) 32 b. Bundled Sales for Resale included in Divisor on page 1 33 Total of (a)-(b) 0 34 ACCOUNT 454 (RENT FROM ELECTRIC PROPERTY) (Note O) ACCOUNT 456 (OTHER ELECTRIC REVENUES) 35 a. Transmission charges for all transmission transactions 36 b. Transmission charges for all transmission transactions included in Divisor on page 1 37 Total of (a)-(b) $0 11/6/2008 2:14 PM K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Blank Formula Rate Template -- USE THIS VERSION.XLS

13 Based on the Midwest ISO rate template Formula Rate - Cash Flow Rate Formula Template For the 12 months ending 12/31/07 Utilizing EIA Form 412 Data LINCOLN ELECTRIC SYSTEM General Note: References to pages in this formulary rate are indicated as: (page#, line#, col.#) References to data from EIA Form 412 are indicated as: x.y.z (section, line, column) To the extent the page references to EIA Form 412 are missing, the entity will include a "Notes" section in Note the EIA Form 412 to provide this data. Letter A The utility's maximum monthly megawatt load (60-minute integration) for RQ service at time of ISO coincident monthly peaks. RQ service is service which the supplier plans to provide on an on-going basis (i.e., the supplier includes projected load for this service in its system resource planning). B Includes LF, IF, LU, IU service. LF means "firm service" (cannot be interrupted for economic reasons and is intended to remain reliable even under adverse conditions), and long-term (duration of at least five years); does not meet definition of RQ service. IF is "firm service" for a term longer than one but less than five years. LU is service from a designated generating unit, of a term no less than five years. LI is service from a designated generating unit for a term between one and five years. Measured at time of ISO coincident monthly peaks. C LF as defined above at time of ISO coincident monthly peaks. D LF as defined above at time of ISO coincident monthly peaks. E The FERC's annual charges for the year assessed the Transmission Owner for service under this tariff, if any F Line 5 - EPRI Annual Membership Dues, all Regulatory Commission Expenses, and non-safety related advertising. Line 5a - Regulatory Commission Expenses directly related to transmission service, ISO filings, or transmission siting. G Includes only FICA, unemployment, highway, property, gross receipts, and other assessments charged in the current year. Taxes related to income are excluded. Gross receipts taxes are not included in transmission revenue requirement in the Rate Formula Template, since they are recovered elsewhere. H The Margin Requirement is the margin the utility uses in calculating rates applicable to its native load sales. The Margin Requirement as a percent of interest expense yields a TIER (times interest earned ratio), and the Margin Requirement as a percent of debt service is the DSR (debt service ratio), either of which may be referred to as a Margin Ratio (MR). Some utilities have MRs required by bond covenants and/or MRs that include expenses additional to interest or debt service (for example, an MR equal to a percentage of the sum of DS+O&M). The ISO will review such party's filings to assure that the MRs are consistent with those applicable to native load or required by bond covenants and utility must provide workpapers showing derivation of margin. I Removes dollar amount of transmission expenses included in the OATT ancillary services rates, including all of Account No J Removes transmission plant determined by Commission order to be state-jurisdictional according to the seven-factor test (until RUS 12 balances are adjusted to reflect application of seven-factor test). K Removes dollar amount of transmission plant included in the development of OATT ancillary services rates and generation step-up facilities, which are deemed to included in OATT ancillary services. For these purposes, generation step-up facilities are those facilities at a generator substation on which there is no through-flow when the generator is shut down. L If the utility has more employees assigned to A&G than to the sum of production, transmission, and distribution, set the W&S allocator at page 3, line 22 equal to the gross plant allocator (GP) at page 3, line 6. M Enter dollar amounts. N Line 33 must equal zero since all short-term power sales must be unbundled and the transmission component reflected in Account No. 456 and all other uses are to be included in the divisor. O Includes income related only to transmission facilities, such as pole attachments, rentals and special use. P Grandfathered agreements whose rates have been changed to eliminate or mitigate pancaking - the revenues are included in line 4 page 1 and the loads are included in line 13, page 1. Grandfathered agreements whose rates have not been changed to eliminate or mitigate pancaking - the revenues are not included in line 4, page 1 nor are the loads included in line 13, page 1. Q The revenues credited on page 1 lines 2-5 shall include only the amounts received directly (in the case of grandfathered agreements) or from the ISO (for service under this tariff) reflecting the Transmission Owner's integrated transmission facilities. They do not include revenues associated with FERC annual charges, gross receipts taxes, ancillary services, facilities not included in this template (e.g., direct assignment facilities and GSUs) which are not recovered under this Rate Formula Template. R From Reference II.17.b include only the amount from Account /6/2008 2:14 PM K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Blank Formula Rate Template -- USE THIS VERSION.XLS

14 Based on the Midwest ISO rate template Formula Rate - Cash Flow Rate Formula Template For the 12 months ending 12/31/07 Utilizing EIA Form 412 Data LINCOLN ELECTRIC SYSTEM Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 2, line 23, col. 5) $ 12,472,696 REVENUE CREDITS (Note Q) Total Allocator 2 Account No. 454 (page 3, line 34) 246,705 TP ,601 3 Account No. 456 (page 3, line 37) 324,947 TP ,439 4 Revenues from Grandfathered Interzonal Transactions 0 TP Revenues from service provided by the ISO at a discount 0 TP TOTAL REVENUE CREDITS (sum lines 2-5) 386,040 7 NET REVENUE REQUIREMENT for all facilities (line 1 minus line 6) $ 12,086,655 8 Revenue Requirements for Base Plan Funded Projects 0 9 NET REVENUE REQUIREMENT less base plan funded projects (line 7 minus line 8) $ 12,086,655 DIVISOR 10 Average of 12 coincident system peaks for requirements (RQ) service (Note A) 584,000 kw 11 Plus 12 CP of firm bundled sales over one year not in line 10 (Note B) 0 kw 12 Plus 12 CP of Network Load not in line 10 (Note C) 0 kw 13 Less 12 CP of firm P-T-P over one year (enter negative) (Note D) 0 kw 14 Plus Contract Demand of firm P-T-P over one year 70,000 kw 15 Less Contract Demand from Grandfathered Interzonal transactions over one year (enter negative) (Note P) 0 kw 16 Less 12 CP or Contract Demands from service over one year provided by ISO at a discount (enter negative) 0 kw 17 Divisor (sum lines 10-16) 654,000 kw 18 Annual Cost ($/kw/yr) (line 9/ line 17) $ Network & P-to-P Rate ($/kw/mo) (line 18/ 12) $1.540 Peak Rate Off-Peak Rate 20 Point-To-Point Rate ($/kw/wk) (line 18 / 52; line 18/ 52) $0.355 $ Point-To-Point Rate ($/kw/day) (line 20/ 5; line 20/ 7) $0.071 Capped at weekly rate $ Point-To-Point Rate ($/MWh) (line 21/ 16; line 21/ 24 $4.443 Capped at weekly $2.116 times 1,000) and daily rates 23 FERC Annual Charge($/MWh) (Note E) $0.000 Short Term $0.000 Short Term 24 $0.000 Long Term $0.000 Long Term 11/6/2008 2:15 PM K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Formula With 2007 Data -- USE THIS VERSION.XLS

15 Based on the Midwest ISO rate template Formula Rate - Cash Flow Rate Formula Template For the 12 months ending 12/31/07 Utilizing EIA Form 412 Data LINCOLN ELECTRIC SYSTEM (1) (2) (3) (4) (5) Line EIA 412 Transmission No. Reference Company Total Allocator (Col 3 times Col 4) O&M 1 Transmission VII.8.d 4,093,662 TE ,633,563 2 Less Account A&G VII.13.d 14,434,055 W/S ,011 4 Less FERC Annual Fees 0 W/S Less EPRI & Reg. Comm. Exp. & Non-safety Ad (Note F) 419,521 W/S ,735 5a Plus Transmission Related Reg. Comm. Exp. (Note F) 0 TE Common 0 CE Transmission Lease Payments TOTAL O&M (sum lines 1, 3, 5a, 6, 7 less 2, 4, 5) 18,108,196 3,292,838 DEBT SERVICE 9 Debt Service 42,629,372 GP ,455, Amortization of premium or discount -495,722 GP , TOTAL DEBT SERVICE (Sum lines 9-10) 42,133,650 4,403,908 TAXES OTHER THAN INCOME TAXES (Note G) LABOR RELATED 13 Payroll 2,269,566 W/S , Highway and vehicle 11,965 W/S PLANT RELATED 16 Property 418,947 GP , Gross Receipts 0 zero 0 18 Other 0 GP Payments in lieu of taxes 9,756,156 GP ,019, TOTAL OTHER TAXES (sum lines 13-19) 12,456,634 1,170, SUBTOTAL (sum lines 8, 12, 20) (O&M + DS + Taxes) 72,698,480 8,867, MARGIN REQUIREMENT (Note H) 34,491,137 GP ,605,095 Note this is the "Available for Debt Service" and Debt Service from F&A. Avail. For D.S. $77,120, REV. REQUIREMENT (sum lines 21, 23) 107,189,617 12,472,696 minus D.S. $42,629,372 $34,491,137 11/6/2008 2:15 PM K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Formula With 2007 Data -- USE THIS VERSION.XLS

16 Based on the Midwest ISO rate template Formula Rate - Cash Flow Rate Formula Template For the 12 months ending 12/31/07 Utilizing EIA Form 412 Data LINCOLN ELECTRIC SYSTEM Line No. SUPPORTING CALCULATIONS AND NOTES EIA 412 GROSS PLANT IN SERVICE Reference Company Total Allocator Transmission 1 Production IV.6.g 559,590,364 NA 2 Transmission IV.7.g 166,374,648 TP ,353,907 3 Distribution IV.8.g 320,716,017 NA 4 General & Intangible IV.9.g + IV.1.g 51,362,873 W/S ,416,226 5 Common 0 CE TOTAL GROSS PLANT (sum lines 1-5) 1,098,043,902 GP= % 114,770,133 TRANSMISSION PLANT INCLUDED IN ISO RATES Note: Various Gross Plant Transmission Lines that are excluded from ISO. Walter Scott #4 23,844,092 7 Total transmission plant (line 2) 166,374,648 LRS 24,334,550 8 Less transmission plant excluded from ISO rates (Note J) 54,020,741 LRS - Ault Sub 535,213 9 Less transmission plant included in OATT Ancillary Services (Note K ) 0 LRS West 1,694, Transmission plant included in ISO rates (line 7 less lines 8 & 9) 112,353,907 Radial Lines 1,967,454 20th & Pioneer to 29th & Leighton 1,644,708 14th & Alvo to NW 12th & Arbor Rd. 11 Percentage of transmission plant included in ISO Rates (line 10 divided by line 7) TP= ,020,741 TRANSMISSION EXPENSES Schedule 1 Recoverable Expenses 12 Total transmission expenses (page 2, line 1, column 3) 4,093, Less transmission expenses included in OATT Ancillary Services (Note I) 193, ,859 Acct 561 included in Line 13? 14 Included transmission expenses (line 12 less line 13) 3,899,803 Revenue Credits for Sched 1/Acct 561 transactions <1 yr 15 Percentage of transmission expenses after adjustment (line 14 divided by line 12) non-firm 16 Percentage of transmission plant included in ISO Rates (line 11) TP transactions w/ load not in divisor 17 Percentage of transmission expenses included in ISO Rates (line 15 times line 16) TE= $0 total Revenue Credits $193,859 Net Schedule 1 Expenses (Acct 561 minus Credits) WAGES & SALARY ALLOCATOR (W&S) (Note L) $ Allocation 18 Production 3,014, Transmission 1,633, ,103, Distribution 7,313, W&S Allocator 21 Other 11,487, ($ / Allocation) 22 Total (sum lines 18-21) 23,449,811 1,103,132 = COMMON PLANT ALLOCATOR (CE) (Note M) $ % Electric Labor Ratio 23 Electric 1,098,043,902 (line 23 / line 26) (line 22) CE 24 Gas * = Water 0 26 Total (sum lines 23-25) 1,098,043,902 FINANCING DATA $ 27 Long Term Debt II.33.b +II.34.b $691,050, Debt Service 42,629, Interest on Long Term Debt III.16.b + III.17.b Note R 31,867, Bond Principal Amortization (line 28 less line 29) 10,762,159 REVENUE CREDITS Load ACCOUNT 447 (SALES FOR RESALE) 31 a. Bundled Non-RQ Sales for Resale (Note N) 0 32 b. Bundled Sales for Resale included in Divisor on page Total of (a)-(b) 0 Cell Tower Fees $240, Wagener Land Rent $3, ACCOUNT 454 (RENT FROM ELECTRIC PROPERTY) (Note O) $246, Transmission Pole Attachments $3, $246, ACCOUNT 456 (OTHER ELECTRIC REVENUES) 35 a. Transmission charges for all transmission transactions $720, b. Transmission charges for all transmission transactions included in Divisor on page 1 $395, Total of (a)-(b) $324,947 11/6/2008 2:15 PM K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Formula With 2007 Data -- USE THIS VERSION.XLS

17 Based on the Midwest ISO rate template Formula Rate - Cash Flow Rate Formula Template For the 12 months ending 12/31/07 Utilizing EIA Form 412 Data LINCOLN ELECTRIC SYSTEM General Note: References to pages in this formulary rate are indicated as: (page#, line#, col.#) References to data from EIA Form 412 are indicated as: x.y.z (section, line, column) To the extent the page references to EIA Form 412 are missing, the entity will include a "Notes" section in Note the EIA Form 412 to provide this data. Letter A The utility's maximum monthly megawatt load (60-minute integration) for RQ service at time of ISO coincident monthly peaks. RQ service is service which the supplier plans to provide on an on-going basis (i.e., the supplier includes projected load for this service in its system resource planning). B Includes LF, IF, LU, IU service. LF means "firm service" (cannot be interrupted for economic reasons and is intended to remain reliable even under adverse conditions), and long-term (duration of at least five years); does not meet definition of RQ service. IF is "firm service" for a term longer than one but less than five years. LU is service from a designated generating unit, of a term no less than five years. LI is service from a designated generating unit for a term between one and five years. Measured at time of ISO coincident monthly peaks. C LF as defined above at time of ISO coincident monthly peaks. D LF as defined above at time of ISO coincident monthly peaks. E The FERC's annual charges for the year assessed the Transmission Owner for service under this tariff, if any F Line 5 - EPRI Annual Membership Dues, all Regulatory Commission Expenses, and non-safety related advertising. Line 5a - Regulatory Commission Expenses directly related to transmission service, ISO filings, or transmission siting. G Includes only FICA, unemployment, highway, property, gross receipts, and other assessments charged in the current year. Taxes related to income are excluded. Gross receipts taxes are not included in transmission revenue requirement in the Rate Formula Template, since they are recovered elsewhere. H The Margin Requirement is the margin the utility uses in calculating rates applicable to its native load sales. The Margin Requirement as a percent of interest expense yields a TIER (times interest earned ratio), and the Margin Requirement as a percent of debt service is the DSR (debt service ratio), either of which may be referred to as a Margin Ratio (MR). Some utilities have MRs required by bond covenants and/or MRs that include expenses additional to interest or debt service (for example, an MR equal to a percentage of the sum of DS+O&M). The ISO will review such party's filings to assure that the MRs are consistent with those applicable to native load or required by bond covenants and utility must provide workpapers showing derivation of margin. I Removes dollar amount of transmission expenses included in the OATT ancillary services rates, including all of Account No J Removes transmission plant determined by Commission order to be state-jurisdictional according to the seven-factor test (until RUS 12 balances are adjusted to reflect application of seven-factor test). K Removes dollar amount of transmission plant included in the development of OATT ancillary services rates and generation step-up facilities, which are deemed to included in OATT ancillary services. For these purposes, generation step-up facilities are those facilities at a generator substation on which there is no through-flow when the generator is shut down. L If the utility has more employees assigned to A&G than to the sum of production, transmission, and distribution, set the W&S allocator at page 3, line 22 equal to the gross plant allocator (GP) at page 3, line 6. M Enter dollar amounts. N Line 33 must equal zero since all short-term power sales must be unbundled and the transmission component reflected in Account No. 456 and all other uses are to be included in the divisor. O Includes income related only to transmission facilities, such as pole attachments, rentals and special use. P Grandfathered agreements whose rates have been changed to eliminate or mitigate pancaking - the revenues are included in line 4 page 1 and the loads are included in line 13, page 1. Grandfathered agreements whose rates have not been changed to eliminate or mitigate pancaking - the revenues are not included in line 4, page 1 nor are the loads included in line 13, page 1. Q The revenues credited on page 1 lines 2-5 shall include only the amounts received directly (in the case of grandfathered agreements) or from the ISO (for service under this tariff) reflecting the Transmission Owner's integrated transmission facilities. They do not include revenues associated with FERC annual charges, gross receipts taxes, ancillary services, facilities not included in this template (e.g., direct assignment facilities and GSUs) which are not recovered under this Rate Formula Template. R From Reference II.17.b include only the amount from Account /6/2008 2:15 PM K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Formula With 2007 Data -- USE THIS VERSION.XLS

18 12/31/2007 Scheduling, System Control and Dispatch Service FERC Form 561 $193,859 (Load Dispatch) FERC Form 556 $1,634,466 (System Control & Load Dispatch; SEM) Revenue Requirement $1,828,325 "Divisor" from page 1 Dollars per MW - annually Dollars per MW - monthly 654,000 kw $ per MW-Annually $24.70 per MW-Monthly K:\SPP\Nebraska Joining\Rates\LES FILING\Attachment H Formula With 2007 Data -- USE THIS VERSION.XLS 11/6/2008

19 Exhibit No. LES-2

20 Lincoln Electric System Attachment H For the Lincoln Electric System (LES), the annual transmission revenue requirement for purposes of Network Integration Transmission Service, Base Plan Upgrades, Scheduling, System Control and Dispatch Service, and for the determination of Point-to-Point rates shall be calculated using the Formula Rate Template set forth in Attachment H Addendum 6 of this Tariff. The annual transmission revenue requirement and rates calculated pursuant to the formula rate template shall be revised annually. The results of such annual calculations shall be posted on LES OASIS website and in a publicly accessible location on the Transmission Provider s website by May 15 of each calendar year. Written comments will be accepted until June 15 and the annual revenue requirement and rates shall become effective from August 1 of such year through July 31 of the following year. Supporting data for completion of the formula rate template will be available from LES upon request. Initially, the rates calculated pursuant to the formula-based rate template and incorporated into this SPP OATT will be in place through July 31, LES Attachment H.doc

21 Exhibit No. LES-3

22 Lincoln Electric System Rate Sheet For Point-to-Point Transmission Service Firm Point-To-Point Transmission Service The Transmission Customer shall compensate the Transmission Provider each month for Firm Point-To-Point Transmission Service up to the sum of the applicable charges set forth below: 1. Yearly delivery: one-twelfth of the demand charge of $18.481/kW of Reserved Capacity per year. 2. Monthly delivery: $1.540/kW of Reserved Capacity per month. 3. Weekly delivery: $0.355/kW of Reserved Capacity per week. 4. Daily delivery: On-Peak: $0.071/kW of Reserved Capacity per day. Off-Peak: $0.051/kW of Reserved Capacity per day. On-Peak is all hours between HE 0700 and HE 2200, inclusive, Central Time Zone, excluding Sundays and holidays. Holidays shall be as defined by NERC, currently New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Off-Peak is all hours not designated as On-Peak. The total demand charged in any week, pursuant to a reservation for Daily delivery, shall not exceed the rate specified in section (3) above times the highest amount in kilowatts of Reserved Capacity in any day during such week.

23 Non-Firm Point-To-Point Transmission Service The Transmission Customer shall compensate the Transmission Provider each month for Non-Firm Point-To-Point Transmission Service up to the sum of the applicable charges set forth below: 1. Monthly delivery: $1.540/kW of Reserved Capacity per month. 2. Weekly delivery: $0.355/kW of Reserved Capacity per week. 3. Daily delivery: On-Peak: $0.071/kW of Reserved Capacity per day. Off-Peak: $0.051/kW of Reserved Capacity per day. 4. Hourly delivery: On-Peak: $4.443/MWh of Reserved Capacity per hour. Off-Peak: $2.116/MWh of Reserved Capacity per week. On-Peak is all hours between HE 0700 and HE 2200, inclusive, Central Time Zone excluding Sundays and holidays. Holidays shall be as defined by NERC, currently New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Off-Peak is all hours not designated as On-Peak. The total demand charge in any day, pursuant to a reservation for Hourly delivery, shall not exceed the rate specified in section (3) above times the highest amount in kilowatts of Reserved Capacity in any hour during such day. In addition, the total demand charge in any week, pursuant to a reservation for Hourly or Daily delivery, shall not exceed the rate specified in section (2) above times the highest amount in kilowatts of Reserved Capacity in any hour during such week.

24 Exhibit No. LES-4

25 LES Transmission System Losses 9/22/2008 LES TRANSMISSION LOSSES FOR 2009 Prepared by Resource & Transmission Planning Department Lincoln Electric System September

26 LES Transmission System Losses 9/22/2008 Table of Contents 1.0 Executive Summary Introduction General Information Scope Study Procedure Computer Programs Model Development Methodology Tabulation of Transmission Losses Conclusion and Recommendation

27 LES Transmission System Losses 9/22/ Executive Summary In order to give a Balancing Area (BA) Transmission system loss factor to SPP, it was determined that LES needed to update our loss analysis to compute this correctly. The LES transmission system is a relatively compact system, meaning shorter lines and probably lower losses than our neighbors. It is made up of 345kV, 161kV and 115kV facilities. All of LES base load resources (511MW) are external to LES BA but there is over 450MW of internal generation. LES 2009 inlet load forecast is 774MW. This study looked at 2009 and 2010 and determined transmission system losses for multiple load points throughout the two years and losses with and without internal generation. After completing the analysis documented in this report it is recommended that LES utilize a 1.07% loss factor for Since this study did show a significant drop in losses for 2010 it is also recommended that LES repeat a loss analysis for 2010 in the last quarter of

28 LES Transmission System Losses 9/22/ Introduction 2.1 General Information The Lincoln Electric System (LES) transmission system is fairly compact serving primarily the City of Lincoln Nebraska but does serve some small communities in the immediate area. All load is considered to be load of LES and as such LES has not historically metered data coming off of the transmission system separately. The transmission system consists of a combination of 345, 161 and 115kV facilties. LES major inlets are at 345kV although there is one 161kv inlet and four 115kV inlets. Beginning in 2009 LES will have a 345kV loop around the service territory. Off of this loop there are two interconnections to OPPD and two to NPPD. During 2009, so that by 2010, there will be a new 345kV interconnection to NPPD that will be completed. There are three LES 345/115kV transformers and one 161/115kv transformer owned by LES. The LES transmission system is connected to the LES distribution system primarily by 115/12.5kV transformers although there is some 115/34.5kV transformers as well. LES base load resources are external to LES service territory and balancing area. Internal to LES service territory LES owns the following natural gas fired (or oil fired backup) resources: Peak Capacity Unit Rating Rokeby #1 74 Rokeby #2 88 Rokeby #3 94 Rokeby BS 3.2 J Street 30 SVGS # on 1 CC Operation SVGS #2 46 SVGS #3 46 SVGS #4 46 SVGS BS All of these units except J Street are stepped up to 115kV. These units would be used when the LES load exceeds our base load capability of 511MW (effective 2009). The Black Start (BS) units are not generally used to serve load and are only oil fired. The LES Summer peak load is forecast to be 774MW in 2009 and 789 in (This is defined as the net interchange plus LES internal generation). 4

29 LES Transmission System Losses 9/22/ Scope There are several reasons for LES to review our transmission loss calculations: Many changes to 345kv system Moving to SPP requires that we have a Transmission system loss number A transmission loss number alone did not mean much to LES when all load in LES is defined as LES load. Since LES does not have metering to determine losses directly from the transmission system the losses will have to be calculated based on a power flow analysis of the system. To determine the appropriate loss figure two years (2009 and 2010) will be looked at due to the addition of the NPPD 345kV interconnection prior to 2010 and incorporated in the 2010 MRO transmission system models. Multiple load levels will be investigated to represent 4 seasons in each of the years. Finally the impact of LES internal generation on our losses will also be investigated. After this analysis the most appropriate loss value will be identified for the LES transmission system Study Procedure 3.1 Computer Programs The PSS/E Power System Simulator, Version 30.3 was used to calculate the transmission losses for this report. 3.2 Model Development The preliminary MRO 2008 Series models (Pass 5) were used to calculate the transmission losses used in this study and report. The only changes made to these models are described in the following section on the study methodology. 3.3 Methodology The system load forecast for the years 2009 and 2010 that was used to calculate the LES transmission losses are included in the following two tables (note the hours are based on 52 week year so there 8,736 hours in 52 weeks): 5

30 LES Transmission System Losses 9/22/2008 Table I: Year = 2009 Month Peak Energy Hours % weight (MW) (MWH) Jan-Mar ,454 2, % Apr-May ,681 1, % Jun-Sep 774 1,346,329 2, % Oct-Dec ,958 2, % Annual 774 3,579,422 8, % Table II: Year = 2010 Month Peak Energy Hours % weight (MW) (MWH) Jan-Mar ,865 2, % Apr-May ,209 1, % Jun-Sep 789 1,384,263 2, % Oct-Dec ,757 2, % Annual 789 3,671,094 8, % The 2009 power flow models were mapped to the load forecast as shown below. The 2010 power flow models used the same mapping Spring Peak Use Apr-Mar load level 2009 Summer Peak Use Jun-Sep load level 2009 Fall Peak Use Oct-Dec load level 2009 Winter Peak Use Jan-Mar load level The following steps were used to calculate the transmission losses: Step 1 Set the local gas-fired generation to the desired real and reactive power output, and let the shift in generation be off-set against the system swing bus generation. Step 2 Scale the load so the sum of load plus losses match the forecasted load highlighted in Tables I and II. Step 3 The transmission losses were determined by adding power flows at the system inlet points to the net local generation (inside BA), and then summing and subtracting the power flowing into the high voltage side of the 115/35kV and 6

31 LES Transmission System Losses 9/22/ /12kV transformers. The remainder is the transmission losses. See Tables V and VI for the detailed results. 4.0 Tabulation of Transmission Losses Tables III and IV summarize the transmission losses. Tables V and VI show results from the eight power flow cases (Spring, Summer, Fall, and Winter) for the combined years 2009 and Table III takes the data from Table V and shows two different loss calculations depending on how the local system generation is handled. It boils down to what is used for the denominator for the transmission system load. So the loss percentages are calculating using two different definitions for transmission system load. For the column title Load as the basis for the loss percentage, the denominator is Forecast load (or inlet load) minus losses. For the column titles Net Load as the basis for the loss percentage, the denominator is the Forecast Load minus internal generation or Net load minus losses. Table III - Local Gas-Fired Generation on line Loss Percentage based on Loss Percentage based on Season Forecast load Net Load Losses Load Net load Forecast load Net Load Losses Load Net load Spring % 0.97% % 0.93% Summer % 1.35% % 1.23% Fall % 1.01% % 0.86% Winter % 0.97% % 1.12% weighted annual 0.89% 1.10% 0.84% 1.06% The two different calculations are presented because technically neither is quite correct. When local gas-fired generation is brought on line for LES that generation is an input onto the 115kV system, which effectively unloads the 345kV. However it does not unload the 115kV system. So the losses are probably somewhere between the two numbers calculated for each year. 7

32 LES Transmission System Losses 9/22/2008 Table IV takes the data from Table VI and calculates the loss percentage based on serving the LES entire load thru our transmission system (i.e. no internal generation on to meet the same inlet load requirement, or Load forecast). Table IV Local Gas-Fired Generation OFF line Season Forecast load Losses Loss Percentage Forecast load Losses Loss Percentage Spring % % Summer % % Fall % % Winter % % weighted annual 1.07% 0.97% This is a method where we know that the denominator is correct because all load is delivered thru the transmission system in this case. The results from these cases do indeed give results between the two calculations utilized in Table III. So while this method is utilized for it s mathematical simplicity and correctness and may not represent how internal generation is handled to generally serve load it is believed to be the calculation that yields the best Loss percentage calculation. Table V calculates transmission losses for the conditions with local gas-fired generation on line to serve load, and Table VI for the conditions with local gas-fired generation off line. For example, the Spring case in Table V resulted in a power flow at the system meters totaling 479 MW, net generation of 98 MW, when combined together yielded a 577 inlet load and a total transmission system load of MW. The calculated transmission losses were 4.6 MW. 8

First Revised Sheet No. 2758L. Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data VECTREN

First Revised Sheet No. 2758L. Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data VECTREN Midwest ISO FERC Electric Tariff, Fourth Revised Volume No. 1 First Revised Sheet No. 2758L Superseding Original Sheet No. 2758L Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2018 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2018 Utilizing FERC Form 1 Data page 1 of 5 Thirteen Monthly Balances Composite Depreciation Rates Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 31) $ 601,791,927 REVENUE CREDITS (Note T) Total Allocator 2 Account

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2015 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2015 Utilizing FERC Form 1 Data page 1 of 5 Thirteen Monthly Balances Composite Depreciation Rates Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 31) $ 565,724,391 REVENUE CREDITS (Note T) Total Allocator 2 Account

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data page 1 of 5 Thirteen Monthly Balances Composite Depreciation Rates Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 31) $ 575,738,213 REVENUE CREDITS (Note T) Total Allocator 2 Account

More information

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696 Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/14 Utilizing FERC Form 1 Data Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data Midwest ISO First Revised Sheet No. 2647 FERC Electric Tariff, Fourth Revised Volume No. 1 Superseding Original Sheet No. 2647 page 1 of 5 Thirteen Monthly Balances Composite Depreciation Rates Line Allocated

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

Total Network Revenue Requirement per Attachment O $ 463,230,109. Network Billings $ (462,862,216) True-up to be collected in 2011 $ 367,893

Total Network Revenue Requirement per Attachment O $ 463,230,109. Network Billings $ (462,862,216) True-up to be collected in 2011 $ 367,893 Estimated Network Revenue Requirement True-up For the Year Ended December 31, 2009 Total Network Revenue Requirement per $ 463,230,109 Network Billings $ (462,862,216) True-up to be collected in 2011 $

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER Gary A. Morgans 202 429 6234 gmorgans@steptoe.com 1330 Connecticut Avenue, NW Washington, DC 20036-1795 202 429 3000 main www.steptoe.com The Hon. Kimberly D. Bose Secretary Federal Energy Regulatory Commission

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Northern Indiana Public Service Company LLC Line Allocated No.

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C McGuireWoods LLP 2001 K Street N.W. Suite 400 Washington, DC 20006-1040 Phone: 202.857.1700 Fax: 202.857.1737 www.mcguirewoods.com Julia Dryden English Direct: 202.857.1706 jenglish@mcguirewoods.com Fax:

More information

April 28, Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template

April 28, Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 Re: Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template Honorable Secretary Bose: Pursuant

More information

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589 Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line No. Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR

More information

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618 Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618

More information

July 15, 2015 VIA ELECTRONIC FILING

July 15, 2015 VIA ELECTRONIC FILING July 15, 2015 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket No.

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

October 29, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

October 29, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C., 46 October 9, 5 Re: Southwest Power Pool, Inc., Docket No. ER6- - Submission of Tariff

More information

Formula Rate - Non-Levelized For the 12 months ended 12/31/2015 Rate Formula Template Utilizing EKPC 2015 Form FF1 Data (ver.

Formula Rate - Non-Levelized For the 12 months ended 12/31/2015 Rate Formula Template Utilizing EKPC 2015 Form FF1 Data (ver. page 1 of 5 Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 29) 72,070,265 REVENUE CREDITS Note A Total Allocator 2 Account No. 454 (page 4, line 34) 152,462 TP 1.00000 152,462 3 Account

More information

Entergy Services, Inc., Docket No. ER Informational Filing of Annual Transmission Formula Rate Update

Entergy Services, Inc., Docket No. ER Informational Filing of Annual Transmission Formula Rate Update Entergy Services, Inc. 101 Constitution Ave., N.W. Suite 200 East Washington, DC 20001 Tel: 202 530 7323 Fax: 202 530 7350 E-mail: mgriffe@entergy.com Michael C. Griffen Assistant General Counsel Federal

More information

Southwestern Public Service Company. Transmission. Formula Rate Template. and Supporting Worksheets. Schedule 1 Annual Revenue Requirement

Southwestern Public Service Company. Transmission. Formula Rate Template. and Supporting Worksheets. Schedule 1 Annual Revenue Requirement Transmission Formula Rate Template and Supporting Worksheets Schedule 1 Annual Revenue Requirement For the 2014 TrueUp For the Period January 1, 2014 through December 31, 2014 Rate Formula Template Table

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404 202-239-3300 Fax: 202-239-3333 www.alston.com September 1, 2016 To: Re: Parties to FERC Docket No. ER08-386-000 Potomac-Appalachian

More information

September 30, 2016 VIA ELECTRONIC FILING

September 30, 2016 VIA ELECTRONIC FILING September 30, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

January 25, By Electronic Filing

January 25, By Electronic Filing Gary J. Newell P 202.370.0137 F 202.370.0143 gnewell@jsslaw.com Jennings, Strouss & Salmon, P.L.C. 1350 I Street, NW Suite 810 Washington, D.C. 200053305 jsslaw.com January 25, 2019 By Electronic Filing

More information

RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting

RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting September 2, 2014 TO: All Interested Parties RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting In accordance with Section 1.3(a) of the Oklahoma Gas and Electric Company ( OG&E

More information

Rate Formula Template (A) (B) (C) (D) (E) (F)

Rate Formula Template (A) (B) (C) (D) (E) (F) Page 1 of 4 Rate Formula Template (A) (B) (C) (D) (E) (F) Line Allocated No. Reference Worksheet/Note Amount A. NETWORK SERVICE 1 GROSS REVENUE REQUIREMENT Page 2, line 26, col. (F) $ 116,851,990 REVENUE

More information

July 21, Southwest Power Pool, Inc., Docket No. ER Submission of Response to Request for Additional Information

July 21, Southwest Power Pool, Inc., Docket No. ER Submission of Response to Request for Additional Information July 21, 2016 VIA ELECTRONIC FILING Penny Murrell Director, Division of Electric Power Regulation-Central Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest

More information

UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwestern Public Service Company, ) v. ) Docket No. EL13-15-000 Southwest Power Pool, Inc. ) ) Southwestern Public Service Company,

More information

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER Hesser G. McBride, Jr. Associate General Regulatory Counsel Law Department 80 Park Plaza, T5G, Newark, NJ 07102-4194 tel: 973.430.5333 fax: 973.430.5983 email: Hesser.McBride@pseg.com June 13, 2016 VIA

More information

In addition to this transmittal letter and associated records for the etariff database, this filing includes:

In addition to this transmittal letter and associated records for the etariff database, this filing includes: 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 Phone (202) 338-2416 Fax SUBMITTED VIA E-TARIFF FILING January 4, 2017 Kimberly D. Bose Secretary Federal Energy Regulatory

More information

Energy Bar Association

Energy Bar Association Energy Bar Association EBA Energizer: Section 205/206 Fundamentals and Insights November 17, 2016 David DesLauriers, Director Black & Veatch Management Consulting, LLC Jason T. Gray Esq., Shareholder Duncan,

More information

Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011. Oklahoma Gas and Electric Company. Index of Worksheets

Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011. Oklahoma Gas and Electric Company. Index of Worksheets Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011 (Enter whether "Projected Data" or "Actual Data") Projected Data Attachment H Addendum 2A Oklahoma Gas and Electric Company

More information

(1) (2) (3) (4) (5) 1 GROSS REVENUE REQUIREMENT (page 3, line 47) $

(1) (2) (3) (4) (5) 1 GROSS REVENUE REQUIREMENT (page 3, line 47) $ page 1 of 5 Attachment H Formula Rate NonLevelized Rate Formula Template For the 12 months ended 12/31/2018 Utilizing FERC Form 1 Data (1) (2) (3) (4) (5) Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwest Power Pool, Inc. ) Docket No. ER16- -000 PETITION OF SOUTHWEST POWER POOL, INC. FOR TARIFF WAIVER Pursuant to Rule 207(a)(5)

More information

PPL Electric Utilities Corporation

PPL Electric Utilities Corporation Page 1 of 22 ATTACHMENT H8G PPL Electric Utilities Corporation Formula Rate Appendix A Notes FERC Form 1 Page # or Instruction 2014 Data Shaded cells are input cells Allocators Wages & Salary Allocation

More information

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69 AEPTCo SPP Formula Rate Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2015 SPP Zone 1 Projected AEP Revenue Requirements

More information

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company The Dayton Power and Light Company 1065 Woodman Drive, Dayton Ohio 45458 May 8, 2018 Via etariff Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

American Electric Power Service Corporation Docket No. ER10- -

American Electric Power Service Corporation Docket No. ER10- - American Electric Power 801 Pennsylvania Avenue N.W. Suite 320 Washington, DC 20004 AEP.com May 3, 2010 Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E.

More information

GridLiance West Transco LLC (GWT) Formula Rate Index

GridLiance West Transco LLC (GWT) Formula Rate Index (GWT) Formula Rate Index Appendix III Main Body of the Formula Attachment 1 Revenue Credit Worksheet Attachment 2 Cost Support Attachment 2a Cost Support Attachment 2b Cost Support Attachment 3 Incentives

More information

May 18, Black Hills Power, Inc. Docket Nos. ER and EL Compliance Filing Revising Attachment H Formula Rate Protocols

May 18, Black Hills Power, Inc. Docket Nos. ER and EL Compliance Filing Revising Attachment H Formula Rate Protocols Texas New York Washington, DC Connecticut Seattle Dubai London Blake R. Urban Attorney 202.828.5868 Office 800.404.3970 Fax Blake.Urban@bgllp.com Bracewell & Giuliani LLP 2000 K Street NW Suite 500 Washington,

More information

April 29, 2016 VIA ELECTRONIC FILING

April 29, 2016 VIA ELECTRONIC FILING April 29, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc., Docket No.

More information

GridLiance West Transco LLC (GWT) Formula Rate Index

GridLiance West Transco LLC (GWT) Formula Rate Index (GWT) Formula Rate Index Appendix III Main Body of the Formula Attachment 1 Revenue Credit Worksheet Attachment 2 Cost Support Attachment 2a Cost Support Attachment 2b Cost Support Attachment 3 Incentives

More information

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69 Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data For rates effective July 1, 2016 SPP Zone 1 Projected AEP Revenue Requirements OKTCo Annual SWTCo Annual

More information

Re: Rockland Electric Company, Docket No. EL18-111

Re: Rockland Electric Company, Docket No. EL18-111 Margaret Comes Associate Counsel Rockland Electric Company 4 Irving Place, Room 1815-S, New York, NY 10003 Tel.: 212-460-3013 Email: comesm@coned.com May 14, 2018 Hon. Kimberly D. Bose Secretary Federal

More information

ATTACHMENT A clean copy of the revised tariff sheets (Exhibit No. AEP102A) Exhibit No. AEP 102A Page 1 of 44 Southwest Power Pool pro forma Third Revised Sheet No. 94 FERC Electric Tariff Superseding Second

More information

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS TRANSMISSION OWNER ZONAL PLACEMENT PROCESS Published July 2017 CONTENTS Section 1: Introduction, Scope & Steps... 1 Subsection A: Introduction To Zonal Placement... 1 Subsection B: Scope... 1 Subsection

More information

July 30, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

July 30, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Regulation James A. Cuillier Director FERC Rates & Regulation July 30, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose:

More information

January 22, Compliance Filing of Virginia Electric and Power Company Docket No. EL

January 22, Compliance Filing of Virginia Electric and Power Company Docket No. EL Troutman Sanders LLP 401 9th Street, N. W., Suite 1000 Washington, D.C. 200042134 troutman.com Anne K. Dailey anne.dailey@troutman.com January 22, 2019 The Honorable Kimberly D. Bose, Secretary Federal

More information

Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators

Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators Page 1 of 25 Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators 1 Transmission Wages Expense p354.21.b 5,926,573 2 Total Wages Expense

More information

Appendix 1 Duquesne Light Company Attachment H -17A Page 1 of 25 Formula Rate - Appendix A True-Up Notes FERC Form 1 Page # or Instruction 2017 Shaded cells are input cells Allocators 1 Transmission Wages

More information

RR16 - Page 1 of

RR16 - Page 1 of DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of ARTHUR P. FREITAS on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

Index. Rate Formula Template. For the 12 months ended 12/31/ New York Transco LLC

Index. Rate Formula Template. For the 12 months ended 12/31/ New York Transco LLC Index Rate Formula Template Utilizing FERC Form 1 Data New York Transco LLC Projected Annual Transmission Revenue Requirement For the 12 months ended 12/31/ Appendix A Main body of the Formula Rate Attachment

More information

Informational Filing of Midwest Independent Transmission System Operator, Inc. s Independent Market Monitor

Informational Filing of Midwest Independent Transmission System Operator, Inc. s Independent Market Monitor Potomac Economics, Ltd. 9990 Fairfax Boulevard, Suite 560 Telephone: 703-383-0720 Fairfax, Virginia 22030 Facsimile: 703-383-0796 Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

March 15, Informational Filing UNS Electric, Inc., Formula Transmission Service Rates Docket No. ER17-

March 15, Informational Filing UNS Electric, Inc., Formula Transmission Service Rates Docket No. ER17- 88 E. Broadway Boulevard, Tucson, Arizona 85701 P.O. Box 711, Tucson, Arizona 85702 Amy Welander, Assistant General Counsel Telephone: 520-884-3655 Legal Department, HQE910 Fax: 520-884-3601 awelander@tep.com

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 61411-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53858-E Schedule TOU-BIP Sheet 1 APPLICABILITY This Schedule is optional

More information

May 11, Re: PPL Electric Utilities Corporation Docket No. ER Informational Filing of 2012 Formula Rate Annual Update

May 11, Re: PPL Electric Utilities Corporation Docket No. ER Informational Filing of 2012 Formula Rate Annual Update Donald A. Kaplan D 202.661.6266 F 202.778.9100 don.kaplan@klgates.com May 11, 2012 VIA ELECTRONIC FILING Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2016 Transmission Revenue Requirement

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2016 Transmission Revenue Requirement Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Tel. 202.739.3000 Fax: 202.739.3001 www.morganlewis.com John D. McGrane Partner 202.739.5621 jmcgrane@morganlewis.com May 16,

More information

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2015 Transmission Revenue Requirement

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2015 Transmission Revenue Requirement Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Tel. 202.739.3000 Fax: 202.739.3001 www.morganlewis.com John D. McGrane Partner 202.739.5621 jmcgrane@morganlewis.com May 15,

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S INTERIM REPORT ON ITS PARTICIPATION IN THE SOUTHWEST POWER POOL REGIONAL TRANSMISSION ORGANIZATION,

More information

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. ANDREW W. TUNNELL t: (205) 226-3439 f: (205) 488-5858 e: atunnell@balch.com BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

October 8, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

October 8, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. October 8, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Duke Energy Carolinas, LLC; Carolina Power & Light Company;

More information

SPP New Member Communication and Integration Process. Mountain West Transmission Group. Background Information October 2017

SPP New Member Communication and Integration Process. Mountain West Transmission Group. Background Information October 2017 1 SPP New Member Communication and Integration Process Mountain West Transmission Group Background Information October 2017 Contents Introduction... 2 1. Westside Tariff Design... 2 2. Operational Provisions...

More information

April 16, Commonwealth Edison Ministerial Revisions to Formula Transmission Rate; Docket No. ER14-

April 16, Commonwealth Edison Ministerial Revisions to Formula Transmission Rate; Docket No. ER14- SIDLEY AUSTIN LLP 1501 K STREET, N.W. WASHINGTON, D.C. 20005 (202) 736 8000 (202) 736 8711 FAX BEIJING BRUSSELS CHICAGO DALLAS FRANKFURT GENEVA HONG KONG LONDON LOS ANGELES NEW YORK SAN FRANCISCO SHANGHAI

More information

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Projected TCOS Page 1 of 37 Line Transmission No. Amount 1 REVENUE REQUIREMENT (w/o incentives)

More information

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 AEPTCo subsidiaries in PJM Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Projected TCOS Page 1 of 75 AEP OHIO TRANSMISSION COMPANY Line Transmission

More information

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW

More information

boardman (1 Richard A. Heinemann August 27, 2015

boardman (1 Richard A. Heinemann August 27, 2015 boardman & ci a r k up L A W F I R M Richard A. Heinemann, Attorney 1 SOUTH PINCKNEY STREET, STE. 410, P.O. BOX 927, MADISON, WI 53701-0927 Telephone 608-283-1706 Facsimile 608-283-1709 rheinemann@boardmanclark.com

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 I & M Projected TCOS Page 1 of 48 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 KPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 KPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2012 and Projected Net Plant at Year-End 2013

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2012 and Projected Net Plant at Year-End 2013 Transmission Cost of Service Utilizing Historic Cost Data for 2012 and Projected Net Plant at YearEnd 2013 APCo Projected TCOS Page 1 of 36 Line Transmission No. Amount 1 REVENUE REQUIREMENT (w/o incentives)

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 KGPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

ATTACHMENTS ATTACHMENT GG NETWORK UPGRADE CHARGE

ATTACHMENTS ATTACHMENT GG NETWORK UPGRADE CHARGE ATTACHMENT GG Network Upgrade Charge ATTACHMENTS 32.0.0 ATTACHMENT GG NETWORK UPGRADE CHARGE 1. Network Upgrade Cost Allocation: This Attachment GG sets forth the method for calculating and collecting

More information

153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER REJECTING TARIFF REVISIONS. (Issued November 30, 2015)

153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER REJECTING TARIFF REVISIONS. (Issued November 30, 2015) 153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Southwest Power Pool,

More information

Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green

Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green Topics Introductions Annual Update Overview FERC Form No. 1 page 106b Known errors 2017

More information

transmission system. This project is referred to in the Transition Agreement as the Transmission Interconnection.

transmission system. This project is referred to in the Transition Agreement as the Transmission Interconnection. 2 Application of Valley Electric Association, Inc. to the California Independent System Operator Corporation to Become a Participating Transmission Owner June 21, 2012 Valley Electric Association, Inc.

More information

Rate Schedules and Seams Agreements Tariff

Rate Schedules and Seams Agreements Tariff Rate Schedules and Seams Agreements Tariff Southwest Power Pool Rate Schedules and Seams Agreements Tariff Document Generated On: 8/20/2015 Southwest Power Pool - Rate Schedules and Seams Agreements Tariff

More information

Public Service Company of New Mexico Attachment H 1 Current Year Formula Rate

Public Service Company of New Mexico Attachment H 1 Current Year Formula Rate Attachment H 1 Formula Rate Allocators 1 Wages and Salary Allocation Factor 2 Transmission Wages Expense page 354, line 21, column b 5,229,728 3 4 Total Wages Expense page 354, line 28, column b 118,475,166

More information

Office Fax pepco.com

Office Fax pepco.com Amy L. Blauman Assistant General Counsel EP1132 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 pepco.com alblauman@pepcoholdings.com May 16, 2016 Ms. Kimberly D. Bose

More information

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Transmission System Expansion Cost Allocation Alternatives for Renewable Resources Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Page 1 Why Page 2 Page 1 of 11 Basic Principles Wind generation

More information

Office Fax delmarva.com

Office Fax delmarva.com Amy L. Blauman Assistant General Counsel EP1132 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 delmarva.com alblauman@pepcoholdings.com May 16, 2016 Ms. Kimberly D.

More information

SOUTHERN CALIFORNIA EDISON COMPANY TRANSMISSION OWNER TARIFF

SOUTHERN CALIFORNIA EDISON COMPANY TRANSMISSION OWNER TARIFF Southern California Edison Company FERC Electric Tariff, Second Revised Volume No. 6 Title Page SOUTHERN CALIFORNIA EDISON COMPANY TRANSMISSION OWNER TARIFF Issued on: December 23, 2002 Effective: January

More information

Wages & Salary Allocation Factor 1 Transmission Wages Expense p b 18,901,839

Wages & Salary Allocation Factor 1 Transmission Wages Expense p b 18,901,839 Page 1 of 29 Arizona Public Service Company Formula Rate Appendix A Notes Instruction 2014 Shaded cells are input cells Allocators Wages & Salary Allocation Factor 1 Transmission Wages Expense p354.21.b

More information

Index. Rate Formula Template. For the 12 months ended 12/31/18. New York Transco LLC

Index. Rate Formula Template. For the 12 months ended 12/31/18. New York Transco LLC Index Rate Formula Template Utilizing FERC Form 1 Data New York Transco LLC Projected Annual Transmission Revenue Requirement For the 12 months ended 12/31/18 Appendix A Main body of the Formula Rate Attachment

More information

Transmission Formula Rate 2017 Annual Update. June 23, 2017

Transmission Formula Rate 2017 Annual Update. June 23, 2017 Transmission Formula Rate 2017 Annual Update June 23, 2017 1 Topics Introductions Annual Update Overview 2017 Projection and 2016 True-Up Schedule 1 Additional Information Questions and Discussion 2 OASIS

More information

Potomac Electric Power Company ( Pepco ), Docket No. ER Informational Filing of 2017 Formula Rate Annual Update; Notice of Annual Meeting

Potomac Electric Power Company ( Pepco ), Docket No. ER Informational Filing of 2017 Formula Rate Annual Update; Notice of Annual Meeting Amy L. Blauman Assistant General Counsel Edison Place 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 pepco.com alblauman@pepcoholdings.com May 12, 2017 Ms. Kimberly

More information

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g 2012 SERTP Welcome SERTP 2012 First RPSG Meeting & Interactive Training Session 1 2012 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission provider for

More information

post such Annual Update on PJM s Internet website via link to the Transmission Services page or a similar successor page; and

post such Annual Update on PJM s Internet website via link to the Transmission Services page or a similar successor page; and 701 Ninth Street, NW Suite 1100 Washington, DC 20068 Amy L. Blauman Associate General Counsel 202-872-2122 202-331-6767 Fax alblauman@pepcoholdings.com May 14, 2012 Ms. Kimberly D. Bose Secretary Federal

More information

Small General Service Demand Time-of-Use

Small General Service Demand Time-of-Use First Revised Sheet No.: 204 Superseding Original Sheet No.: 204 Small General Service Demand Time-of-Use AVAILABILITY Available throughout the Company s entire electric service area where the facilities

More information

Twelfth Revised Sheet No FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No INDEX OF CONTRACTS AND AGREEMENTS

Twelfth Revised Sheet No FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No INDEX OF CONTRACTS AND AGREEMENTS Twelfth Revised Sheet No. 10.001 FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No. 10.001 INDEX OF CONTRACTS AND AGREEMENTS Sheet No. Contract Provisions - Various 10.010 Distribution Substation

More information

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015 2014 Attachment O True-Up Presentation Presenter: David Grover Manager, Transmission Pricing July 8, 2015 Presentation Purpose Discuss the 2014 Annual True-Up posting Walk through the timeline and mechanics

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF ) OKLAHOMA GAS AND ELECTRIC COMPANY ) FOR APPROVAL OF A GENERAL CHANGE IN ) DOCKET NO. 0-0-U RATES AND TARIFFS ) Direct

More information

ATLANTIC CITY ELECTRIC COMPANY BPU NJ

ATLANTIC CITY ELECTRIC COMPANY BPU NJ Attachment 1 Attachment 1 Page 1 of 3 ATLANTIC CITY ELECTRIC COMPANY BPU NJ No. 11 Electric Service - Section IV Revised Sheet Replaces Revised Sheet No. 60 RIDER (BGS) Basic Generation Service (BGS) Basic

More information

Tab Schedule/Worksheet Designation Description Date to be Posted

Tab Schedule/Worksheet Designation Description Date to be Posted Westar Energy Inc. (Westar) Rate Formula Template Table of Contents Overview The formula is calculated in two steps. The first step is to fill out Tabs A1 thru A12, and the Actual Gross Rev. Req. tab with

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY WILLIAM A. GRANT. on behalf of

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY WILLIAM A. GRANT. on behalf of BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION FOR REVISION OF ITS RETAIL RATES UNDER ADVICE NOTICE NO., SOUTHWESTERN PUBLIC SERVICE

More information

SUBMITTED VIA E-TARIFF FILING. July 2, Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

SUBMITTED VIA E-TARIFF FILING. July 2, Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 Phone (202) 338-2416 Fax Gary D. Bachman 202-298-1880 gdb@vnf.com SUBMITTED VIA E-TARIFF FILING July 2, 2015 Kimberly

More information

December 7, Compliance with Order No. 844 Response to Deficiency Letter

December 7, Compliance with Order No. 844 Response to Deficiency Letter California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System

More information