Michael Faller. October 19, Destiny Industries, LLC 250 RW Bryant Rd Moultrie, GA RE: MFT2437-MD NTA JOB NUMBER: DES

Size: px
Start display at page:

Download "Michael Faller. October 19, Destiny Industries, LLC 250 RW Bryant Rd Moultrie, GA RE: MFT2437-MD NTA JOB NUMBER: DES"

Transcription

1 October 19, 2016 Destiny Industries, LLC 250 RW Bryant Rd Moultrie, GA RE: MFT2437-MD NTA JOB NUMBER: DES Dear John Olmstead: The referenced manufactured building has been reviewed and approved. NTA, Inc. certifies this plan is in compliance with 2014 Florida Codes with 2016 Supplements as referenced in the approved drawings. This approval covers the factory build structure only. Any alterations to the factory built structure, on site, voids the approval. This plan is subject to the following limitations: 1. This plan is NOT approved for High Velocity Hurricane Zone (i.e. Broward and Dade Counties). 2. Signed and sealed plans are on file with NTA, Inc. 3. The Chapter 633 Plan Review and Inspection shall be conducted by the local fire safety inspector. 4. Items installed on site are subject to review and approval by the local authority having jurisdiction. Please reference the list of site installed items on the approved plans. 5. This review included products for compliance with or FAC Chapter 61G20-3. If you have any additional questions or comments regarding this matter please contact me at your convenience at (574) Respectfully, Michael Faller Michael Faller Account Manager NTA, Inc. Florida Plan Approval Letter Page 1 of 1

2 . Oct 18, 2016

3 . Oct 18, 2016

4 . Oct 18, 2016

5 . Oct 18, 2016

6 . Oct 18, 2016

7 . Oct 18, 2016

8 . Oct 18, 2016

9 . Oct 18, 2016

10 . Oct 18, 2016

11 . Oct 18, 2016

12 . Oct 18, 2016

13 . Oct 18, 2016

14 . Oct 18, 2016

15 . Oct 18, 2016

16 . Oct 18, 2016 * 1119 lbs

17 Job: MD Load Short Form Date: 8/19/16 By: AMS of Indiana, Inc. Entire House AMS of Indiana, Inc E. Jackson Blvd., Elkhart, IN Phone: (574) Fax: (574) For: DESTINY HOMES MD Project Information Design Information Outside db ( F) Inside db ( F) Design TD ( F) Daily range Inside humidity (%) Moisture difference (gr/lb) Htg Clg L Method Construction quality Fireplaces Infiltration Simplified Average 0 HEATING EQUIPMENT COOLING EQUIPMENT Make Generic Make Generic Trade Trade Model AFUE 100 Cond SEER 13.0 AHRI ref Coil AHRI ref Efficiency 100 AFUE Efficiency 11.6 EER, 13 SEER Heating input 3.1 kw Sensible cooling Btuh Heating output Btuh Latent cooling 7905 Btuh Temperature rise 12 F Total cooling Btuh Actual air flow 810 cfm Actual air flow 810 cfm Air flow factor cfm/btuh Air flow factor cfm/btuh Static pressure 0.30 in H2O Static pressure 0.30 in H2O Space thermostat Load sensible heat ratio 0.72 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft²) (Btuh) (Btuh) (cfm) (cfm) M BED WIC BA UTILITY KIT\DIN\LIV C GC FURN BED BED M BA C HALL Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Right-Suite Universal RSU02009 F:\DS\Destiny Homes\MD rup Calc = MJ8 Front Door faces: SW 2016-Aug-19 14:49:39 Page 1

18 Entire House Other equip loads RSM Latent cooling 7453 TOTALS Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Right-Suite Universal RSU02009 F:\DS\Destiny Homes\MD rup Calc = MJ8 Front Door faces: SW 2016-Aug-19 14:49:39 Page 2

19 Job: MD Project Summary Date: 8/19/16 By: AMS of Indiana, Inc. Entire House AMS of Indiana, Inc E. Jackson Blvd., Elkhart, IN Phone: (574) Fax: (574) Project Information For: DESTINY HOMES MD Notes: Design Information Weather: Key West Intl AP, FL, US Winter Design Conditions Summer Design Conditions Outside db 50 F Outside db 92 F Inside db 70 F Inside db 75 F Design TD 20 F Design TD 17 F Daily range L Relative humidity 50 % Moisture difference 75 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 6696 Btuh Structure Btuh Ducts 2763 Btuh Ducts 3417 Btuh Central vent (58 cfm) 1265 Btuh Central vent (58 cfm) 1081 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load Btuh Use manufacturer's data n Rate/swing multiplier 0.97 Infiltration Equipment sensible load Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 3159 Btuh Ducts 1370 Btuh Heating Cooling Central vent (58 cfm) 2924 Btuh Area (ft²) Equipment latent load 7453 Btuh Volume (ft³) Air changes/hour Equipment total load Btuh Equiv. AVF (cfm) Req. total capacity at 0.70 SHR 2.2 ton Heating Equipment Summary Cooling Equipment Summary Make Generic Make Generic Trade Trade Model AFUE 100 Cond SEER 13.0 AHRI ref Coil AHRI ref Efficiency 100 AFUE Efficiency 11.6 EER, 13 SEER Heating input 3.1 kw Sensible cooling Btuh Heating output Btuh Latent cooling 7905 Btuh Temperature rise 12 F Total cooling Btuh Actual air flow 810 cfm Actual air flow 810 cfm Air flow factor cfm/btuh Air flow factor cfm/btuh Static pressure 0.30 in H2O Static pressure 0.30 in H2O Space thermostat Load sensible heat ratio 0.72 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Right-Suite Universal RSU02009 F:\DS\Destiny Homes\MD rup Calc = MJ8 Front Door faces: SW 2016-Aug-19 14:49:39 Page 1

20 N 1ST FLOOR WIC BA UTILITY M BED 84 cfm 6 " 84 cfm 6 " 21 cfm 28 cfm 30 cfm 5 " 5 " 5 " 8 " HALL 6 " 12 " 810 cfm 14 " 6 " 99 cfm 99 cfm 6 " KIT\DIN\LIV FURN M BA 84 cfm 6 " BED 3 6 " 79 cfm 8 " BED 2 6 " GC 90 cfm 6 " 6 " 99 cfm 99 cfm C3 C2 Job #: MD Performed by AMS of Indiana, Inc. for: DESTINY HOMES MD AMS of Indiana, Inc E. Jackson Blvd. Elkhart, IN Phone: (574) Fax: (574) eng-ams@comcast.net Scale: 1 : 83 Page 1 Right-Suite Universal RSU Aug-19 14:49:41...\Destiny Homes\MD rup

21 Job: MD Duct System Summary Date: 8/19/16 By: AMS of Indiana, Inc. Entire House AMS of Indiana, Inc E. Jackson Blvd., Elkhart, IN Phone: (574) Fax: (574) For: DESTINY HOMES MD Project Information Heating Cooling External static pressure 0.30 in H2O 0.30 in H2O Pressure losses 0.04 in H2O 0.04 in H2O Available static pressure 0.26 in H2O 0.26 in H2O Supply / return available pressure / in H2O / in H2O Lowest friction rate in/100ft in/100ft Actual air flow 810 cfm 810 cfm Total effective length (TEL) 230 ft Supply Branch Detail Table Design Htg Clg Design Diam H x W Duct Actual Ftg.Eqv Name (Btuh) (cfm) (cfm) FR (in) (in) Matl Ln (ft) Ln (ft) Trunk BA BED 2 BED 3 KIT\DIN\LIV KIT\DIN\LIV-A KIT\DIN\LIV-B KIT\DIN\LIV-C M BA M BED M BED-A UTILITY WIC h h c c c c c h c c h h x 0 0x 0 0x 0 0x 0 0x 0 0x 0 0x 0 0x 0 0x 0 0x 0 0x 0 0x 0 VlFx VlFx VlFx VlFx VlFx VlFx VlFx VlFx VlFx VlFx VlFx VlFx st4 st2 st1 st1 st2 st3 st3 st4 st4 Supply Trunk Detail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk st2 Peak AVF x 0 VinlFlx st3 Peak AVF x 0 VinlFlx st1 st4 Peak AVF x 0 VinlFlx st1 st1 Peak AVF x 0 VinlFlx Right-Suite Universal RSU02009 F:\DS\Destiny Homes\MD rup Calc = MJ8 Front Door faces: SW 2016-Aug-19 14:49:39 Page 1

22 Return Branch Detail Table Grill Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Matl Trunk rb1 0x x 0 VlFx Right-Suite Universal RSU02009 F:\DS\Destiny Homes\MD rup Calc = MJ8 Front Door faces: SW 2016-Aug-19 14:49:39 Page 2

23

24

25 Erik Myers PE, PLLC 10/18/2016 Destiny Industries, LLC MD Page Design Criteria & Load Cases 1 2 MWFRS Design 3 4 Uplift Connections 5 6 Headers / Studs / Connections 7 18 Endwall Rim Joists Overhang Oct 18, 2016

26 Design Criteria ASCE 7 10 Erik Myers PE, PLLC 8/31/2016 Total Width = ft Stories = 1 Module Width = ft Wall Height = 9 ft Length = 50 ft Sidewall Eave Height = 10 ft Roof Slope = 2.28 /12 Foundation Height = 9 ft Roof Angle = ⁰ Roof Projection = 3.00 ft Sidewall OH = 12 in Mean Roof Height = ft Endwall OH = 12 in Min. Mean Roof Height = 21 ft Wind Loads Components and Cladding Wind Speed = 180 mph + Exposure = D Zone psf Wind Pressure qh = 46.0 psf Zone psf Zone 2 OH Design Loads Zone psf Floor Live = 40 psf Zone 3 OH Floor Dead = 10 psf Zone psf Wall Dead = 45 plf Zone psf Roof Dead = 14 psf Main Wind Force Resisting System Roof Loads Trans Long Roof Live = 20 psf Wall psf EZ Min. Roof Live = 20 psf Roof psf Ground Snow = 0 psf Wall psf IZ Flat Roof Snow = 0.0 psf Roof psf Sloped Roof Snow = 0.0 psf Max Unbalanced = 0.0 psf Soffit Loading for Overhang Positive = 57.0 psf Negative = 69.1 psf 1

27 Erik Myers PE, PLLC 8/31/2016 Design Criteria Building Dimensions Wind Speed: 180 mph Length: 50 ft Wind Exposure: D Width: ft Mean Roof Height: ft Module Width: ft Roof Live Load: 20 psf Wall Height: 9 ft Roof Dead Load: 14 psf Roof Pitch: 2.28 /12 Wall Dead Load: 45 plf Truss Spacing: 16 in Floor Live Load: 40 psf Heel Height: 4.75 in Floor Dead Load: 10 psf Attic Live Load: 40 psf Truss Reactions Sidewall Matewall Uplift 453 lbs 496 lbs Gravity 304 lbs 304 lbs Vertical Load Cases Roof Level D 94 plf 94 plf L 0 plf 0 plf Lr 134 plf 134 plf W 660 plf 714 plf.75(l+lr) 101 plf 101 plf D+L 94 plf 94 plf D+Lr 228 plf 228 plf D+.75(L+Lr) 194 plf 194 plf.6d+.6w 340 plf 372 plf Floor Level D 206 plf 206 plf L 267 plf 267 plf Lr 134 plf 134 plf W 660 plf 714 plf.75(l+lr) 301 plf 301 plf D+L 472 plf 472 plf D+Lr 340 plf 340 plf D+.75(L+Lr) 506 plf 506 plf.6d+.6w 273 plf 305 plf 2

28 Erik Myers PE, PLLC 8/31/2016 Wind Design ASCE 7 10 MWFRS Horizontal Loads Wind Speed: 180 mph Trans Long Wind Exposure: D EZ Wall psf Mean Roof Height: ft Roof psf Length: 50 ft IZ Wall psf Width: ft Roof psf Module Width: ft EZ 2a = 6 ft Wall Height: 9 ft Wall Sheathing Suction W = 109 lbs Roof Pitch: 2.28 /12 Stud Spacing = 16 in Truss Spacing: 16 in Edge Field Roof Projection: 3.00 ft Zone psf 6 12 in o.c. Zone psf 6 12 in o.c. Wind Load at Roof Level Perpendicular to Ridge: 4358 lbs Parallel to Ridge: 2833 lbs Wind Load at Floor Level Perpendicular to Ridge: Parallel to Ridge: 9684 lbs 5428 lbs Shearwalls Transverse FHS Unit Shear Overturning Moment Shearwall ft 177 plf 1590 lbs Shearwall ft 192 plf 1730 lbs Longitudinal Shearwall ft 85 plf 769 lbs Co = plf 931 lbs Shearwall ft 110 plf 993 lbs Co = plf 1119 lbs 7/16" Sheathing 6" o.c. 4" o.c. 3" o.c 2" o.c..113"x2.38" nails 252 plf 378 plf 504 plf 644 plf.131" nails 365 plf 530 plf 685 plf 895 plf Bottom Plate to Floor w/ 16d nails Z = 246 lbs Out of Plane F = 164 plf 3 nails / bay = 369 plf Allowable In Plane shear = plf Sliding Force Perpendicular to Ridge: 9684 lbs Unit Shear: 363 plf Parallel to Ridge: 5428 lbs Unit Shear: 123 plf.162 " toe nail Z = 204 lbs 6" o.c. = 408 plf OSB w/.131" Z = 108 lbs 3" o.c. = 432 plf 3

29 Roof Diaphragm Erik Myers PE, PLLC 8/31/2016 Roof Diaphragm V = 4358 lbs 7/16" sheathing w/.113" nails: 250 plf Unit shear = 152 plf 6" o.c. edge, 12" o.c. field Floor Diaphragm V = 5326 lbs 19/32" sheathing w/.099" nails: 210 plf Unit shear = 200 plf 6" o.c. edge, 6" o.c. field Components and Cladding Loading Wind Speed: 180 mph Wall Framing Spacing: 16 in Exposure: D Roof Framing Spacing: 16 in C+C (psf) + Zone psf Zone psf Zone 2 OH psf Zone psf Zone 3 OH psf Zone psf Zone psf Suction Fastening Requirements (spacing limited to diaphragm spacing requirements) Fastener =.113"x2.38" nail W = 109 lbs Edge Field Zone in o.c. Zone in o.c. Zone 2 OH in o.c. Zone in o.c. Zone 3 OH in o.c. Zone in o.c. 4

30 Uplift Connections Erik Myers PE, PLLC 8/31/2016 Truss Reactions Sidewall Matewall Horiz. = 219 lbs Gravity = 304 lbs Uplift = 453 lbs Uplift = 496 lbs Simpson H2.5A 600 lbs OK for Uplift Use Simpson H2.5A strap each truss OSB Overlap at Top Plate F = 340 plf Minimum 7/16" sheathing with.113 nails Z = 94 lbs Nail Spacing = 3 inches o.c. Rows = One Row Lap Sheathing Over Top Plate and Fasten with One Row of.113 nails at 3 inches o.c. Horizontal Connection #8 Toe Screw 134 lbs F = 219 lbs 2 fasteners required Use (2) #8 Toe Screws each truss Girder Connection Over Openings Truss to Girder.131"x3" nail F = 496 lbs Uplift Controls Qty Required = 6 Use (6).131"x3" nails each truss Uplift Strap Connection at Matewall F = 496 lbs OK for Uplift LSTA9 740 lbs Use LSTA9 strap 16 inches o.c., rail to stud Spacing = 24 inches o.c. 5

31 Uplift Connection at Floor Erik Myers PE, PLLC 8/31/2016 Sidewall F = 464 plf Option 1 w/ Straps LSTA9 740 lbs Strap Spacing = 19 inches o.c. Use LSTA9 strap 16 inches o.c., w/ (5).131"nails Option 2 w/ OSB Overlap F = 464 plf Minimum 7/16" sheathing with.113 nails Z = 94 lbs Nail Spacing = 2 inches o.c. Rows = One Row Lap Sheathing Over Band and Fasten with One Row of.113 nails at 2 inches o.c. Matewall F = LSTA9 372 plf 740 lbs Option 1 Straps with Full Nail Quota Ok for Uplift Use LSTA9 strap 16 inches o.c., rail to stud 6

32 Erik Myers PE, PLLC 8/31/2016 Matewall Header Species = Murphy W = -372 plf Ld = 1.6 Grade = LVL LL = 134 plf Ld = 1 b = 1.5 in DL = 94 plf d = 16 in LL = L/ 240 A = in^2 TL = L/ 180 S = in^3 W = L/ 240 I = in^4 Qty = 1 Span = 214 in Fb = 3100 psi Fv = 290 psi L+D W E = psi F'b = psi F'b = psi Lr = 1 F'v = 290 psi F'v = 464 psi Cfb = 1 L+D W Mu = in-lbs Mu = in-lbs Mn = in-lbs OK Mn = in-lbs OK L+D W Vu = 2033 lbs Vu = lbs Vn = 4640 lbs OK Vn = 7424 lbs OK LL = 0.30 in Allowable LL = 0.89 in OK TL = 0.40 in Allowable TL = 1.19 in OK W = 0.83 in Allowable TL = 0.89 in OK Reaction Uplift Reaction F = 2033 lbs F = lbs Use (1) 1.5 x 16 LVL for 17' 10" span 7

33 Erik Myers PE, PLLC 8/31/2016 Matewall Header Species = SYP W = -372 plf Ld = 1.6 Grade = #2 LL = 134 plf Ld = 1 b = 1.5 in DL = 94 plf d = 5.5 in LL = L/ 240 A = 8.25 in^2 TL = L/ 180 S = 7.56 in^3 W = L/ 240 I = in^4 Qty = 1 Span = 34 in Fb = 1000 psi Fv = 175 psi L+D W E = psi F'b = psi F'b = psi Lr = 1 F'v = 175 psi F'v = 280 psi Cfb = 1 L+D W Mu = in-lbs Mu = in-lbs Mn = in-lbs OK Mn = in-lbs OK L+D W Vu = 323 lbs Vu = lbs Vn = lbs OK Vn = 1540 lbs OK LL = 0.01 in Allowable LL = 0.14 in OK TL = 0.01 in Allowable TL = 0.19 in OK W = 0.02 in Allowable TL = 0.14 in OK Reaction Uplift Reaction F = 323 lbs F = -527 lbs Use (1) 2 x 6 #2 SYP for 2' 10" span 8

34 Matewall Stud W = -372 plf L = 108 in Ke = 1 DL = 94 plf d = 3.5 in le = 108 in LL = 134 plf t = 1.5 in le/d = < 50 OK span = 214 in Cd = 1 Spacing = 16 in Cf(Fc) = 1 Cf(Fb) = 1 Fb psi Ft psi Fv psi Fc psi Fc psi E psi Emin psi #3 SYP Qty A (in^2) S (in^3) I (in^4) F'b psi F'c psi Axial Compression Qty FcE psi αc Cp F'c psi fc psi fc/f'c Capacity NG 1863 lbs OK 3726 lbs OK 5589 lbs Lateral Bending W = 5 psf Qty M (in-lbs) F'c psi fb psi fb/f'c OK OK OK Combined Stresses Qty Axial Lateral Combined Max Axial Combined NG OK 3600 lbs OK 5946 lbs Reaction Uplift Reaction F = 2185 lbs F = lbs Use (2) 2 x 4 #3 SYP for 17' 10" span Erik Myers PE, PLLC 8/31/2016 9

35 Matewall Stud W = -372 plf L = 108 in Ke = 1 DL = 94 plf d = 3.5 in le = 108 in LL = 134 plf t = 1.5 in le/d = < 50 OK span = 34 in Cd = 1 Spacing = 16 in Cf(Fc) = 1 Cf(Fb) = 1 Fb psi Ft psi Fv psi Fc psi Fc psi E psi Emin psi #3 SYP Qty A (in^2) S (in^3) I (in^4) F'b psi F'c psi Axial Compression Qty FcE psi αc Cp F'c psi fc psi fc/f'c Capacity OK 1863 lbs OK 3726 lbs OK 5589 lbs Lateral Bending W = 5 psf Qty M (in-lbs) F'c psi fb psi fb/f'c OK OK OK Combined Stresses Qty Axial Lateral Combined Max Axial Combined OK 1666 lbs OK 3820 lbs OK 6011 lbs Reaction Uplift Reaction F = 475 lbs F = -775 lbs Use (1) 2 x 4 #3 SYP for 2' 10" span Erik Myers PE, PLLC 8/31/

36 Floor Rim Band Spans LLΔ = L/ 360 TLΔ = L/ 240 Sidewall Loading Matewall Loading Floor Load Only LL = 301 plf LL = 301 plf LL = 267 plf DL = 206 plf DL = 206 plf DL = 66.7 plf Erik Myers PE, PLLC 8/31/2016 Sidewall Loading Qty b d Spc Grade Fb Fb' Fv E SP # SP # SP # SP # A S I M V LL TL Max Span in in in in Matewall Loading Qty b d Spc Grade Fb Fb' Fv E SP # SP # SP # SP # A S I M V LL TL Max Span in in in in Floor Loading Qty b d Spc Grade Fb Fb' Fv E SP # SP # SP # SP # Summary (2) #2 SP 2x12 (3) #2 SP 2x12 (2) #2 SP 2x10 A S I M V LL TL Max Span in in in in Sidewall - no Max Spans splice 1 splice 2 Matewall 1 Floor Only 1 Sidewall w/ 1 7' 11" 5' 8" 7' 11" 9' 9" 10' 5" 7' 11" 10' 4" 12' 10" 6' 9" 4' 9" 6' 9" 8' 4" (3) #2 SP 2x10 8' 10" 6' 9" 8' 10" 10' 11" Notes: 1. Rim joist splices at support locations. 2. One rim spliced between support locations. 11

37 Sidewall Stud W = -340 plf L = in Ke = 1 DL = 94 plf d = 5.5 in le = in LL = 134 plf t = 1.5 in le/d = < 50 OK span = 38 in Cd = 1 Spacing = 16 in Cf(Fc) = 1 Cf(Fb) = 1 Fb psi Ft psi Fv psi Fc psi Fc psi E psi Emin psi #2 SYP Qty A (in^2) S (in^3) I (in^4) F'b psi F'c psi Axial Compression Qty FcE psi αc Cp F'c psi fc psi fc/f'c Capacity OK 7281 lbs OK lbs OK lbs Lateral Bending W = 72.7 psf Qty M (in-lbs) F'c psi fb psi fb/f'c OK OK OK Combined Stresses Qty Axial Lateral Combined Max Axial Combined OK 2744 lbs OK lbs OK lbs Reaction Uplift Reaction F = 513 lbs F = -764 lbs Use (1) 2 x 6 #2 SYP for 3' 2" span (1) Jack / (1) Jamb Erik Myers PE, PLLC 8/31/

38 Sidewall Stud W = -340 plf L = in Ke = 1 DL = 94 plf d = 5.5 in le = in LL = 134 plf t = 1.5 in le/d = < 50 OK span = 74 in Cd = 1 Spacing = 16 in Cf(Fc) = 1 Cf(Fb) = 1 Fb psi Ft psi Fv psi Fc psi Fc psi E psi Emin psi #2 SYP Qty A (in^2) S (in^3) I (in^4) F'b psi F'c psi Axial Compression Qty FcE psi αc Cp F'c psi fc psi fc/f'c Capacity OK 7281 lbs OK lbs OK lbs Lateral Bending W = 72.7 psf Qty M (in-lbs) F'c psi fb psi fb/f'c OK OK OK Combined Stresses Qty Axial Lateral Combined Max Axial Combined OK 2681 lbs OK lbs OK lbs Reaction Uplift Reaction F = 855 lbs F = lbs Use (1) 2 x 6 #2 SYP for 6' 2" span (1) Jack / (1) Jamb Erik Myers PE, PLLC 8/31/

39 Erik Myers PE, PLLC 8/31/2016 Sidewall Header Species = SYP W = -340 plf Ld = 1.6 Grade = #2 LL = 134 plf Ld = 1 b = 1.5 in DL = 94 plf d = 5.5 in LL = L/ 240 A = in^2 TL = L/ 180 S = in^3 W = L/ 240 I = in^4 Qty = 3 Span = 38 in Fb = 1000 psi Fv = 175 psi L+D W E = psi F'b = psi F'b = psi Lr = 1.15 F'v = 175 psi F'v = 280 psi Cfb = 1 L+D W Mu = in-lbs Mu = in-lbs Mn = in-lbs OK Mn = in-lbs OK L+D W Vu = 361 lbs Vu = lbs Vn = lbs OK Vn = 4620 lbs OK LL = 0.00 in Allowable LL = 0.16 in OK TL = 0.00 in Allowable TL = 0.21 in OK W = 0.01 in Allowable TL = 0.16 in OK Reaction Uplift Reaction F = 361 lbs F = -538 lbs Use (3) 2 x 6 #2 SYP for 3' 2" span 14

40 Erik Myers PE, PLLC 8/31/2016 Sidewall Header Species = SYP W = -340 plf Ld = 1.6 Grade = #2 LL = 134 plf Ld = 1 b = 1.5 in DL = 94 plf d = 5.5 in LL = L/ 240 A = in^2 TL = L/ 180 S = in^3 W = L/ 240 I = in^4 Qty = 3 Span = 74 in Fb = 1000 psi Fv = 175 psi L+D W E = psi F'b = psi F'b = psi Lr = 1.15 F'v = 175 psi F'v = 280 psi Cfb = 1 L+D W Mu = in-lbs Mu = in-lbs Mn = in-lbs OK Mn = in-lbs OK L+D W Vu = 703 lbs Vu = lbs Vn = lbs OK Vn = 4620 lbs OK LL = 0.05 in Allowable LL = 0.31 in OK TL = 0.07 in Allowable TL = 0.41 in OK W = 0.13 in Allowable TL = 0.31 in OK Reaction Uplift Reaction F = 703 lbs F = lbs Use (3) 2 x 6 #2 SYP for 6' 2" span 15

41 Erik Myers PE, PLLC 8/31/2016 Sidewall Header at Porch Species = SYP W = -537 plf Ld = 1.6 Grade = #2 LL = 134 plf Ld = 1 b = 1.5 in DL = 94 plf d = 7.25 in LL = L/ 240 A = in^2 TL = L/ 180 S = in^3 W = L/ 180 I = in^4 Qty = 3 Span = 108 in Fb = 925 psi Fv = 175 psi L+D W E = psi F'b = psi F'b = psi Lr = 1.15 F'v = 175 psi F'v = 280 psi Cfb = 1 L+D W Mu = in-lbs Mu = in-lbs Mn = in-lbs OK Mn = in-lbs OK L+D W Vu = 1026 lbs Vu = lbs Vn = lbs OK Vn = 6090 lbs OK LL = 0.10 in Allowable LL = 0.45 in OK TL = 0.13 in Allowable TL = 0.60 in OK W = 0.40 in Allowable TL = 0.60 in OK Reaction Uplift Reaction F = 1026 lbs F = lbs Use (3) 2 x 8 #2 SYP for 9' 0" span 16

42 Header Connections Zone = 5 Zone H = 80 in Zone W = 38 in Wall H = 108 in Stud = 16 in o.c. C+C = 72.7 psf C +C = 327 plf Uplift = 340 plf Erik Myers PE, PLLC 8/31/2016 Fr = F = 472 plf 747 lbs.131" Z = 114 lbs Header to King Stud F = 747 lbs 7 nails Stud to Plate W1 = 48 plf a = 68 in W2 = 164 plf c = 40 in R top = 842 lbs R bot = Max = 725 lbs 842 lbs 8 nails Uplift Truss = F = LSTA15 16 in o.c. 764 lbs 1110 lbs 1 straps 17

43 Header Connections Zone = 5 Zone H = 80 in Zone W = 74 in Wall H = 108 in Stud = 16 in o.c. C+C = 72.7 psf C +C = 327 plf Uplift = 340 plf Erik Myers PE, PLLC 8/31/2016 Fr = F = 472 plf 1454 lbs.131" Z = 114 lbs Header to King Stud F = 1454 lbs 13 nails Stud to Plate W1 = 48 plf a = 68 in W2 = 273 plf c = 40 in R top = 1434 lbs R bot = Max = 1204 lbs 1434 lbs 13 nails Uplift Truss = F = LSTA15 16 in o.c lbs 1110 lbs 2 straps 18

44 COMPANY Erik Myers PE PLLC th St Parkersburg, WV (304) Aug. 31, :40 PROJECT SW1a.wwb Design Check Calculation Sheet WoodWorks Sizer 10.2 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End Load1 Dead Full Area (16.0)* psf Load2 Live Full Area (16.0)* psf Load3 Dead Full UDL 60.0 plf Load4 Wind Point lbs Load5 Wind Point lbs Load6 Wind Point lbs Load7 Wind Point lbs Self-weight Dead Full UDL 7.2 plf *Tributary Width (in) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 13'-4" 0' 13'-3.1" Unfactored: Dead Live Wind Factored: Uplift 1010 Total Bearing: Capacity Joist Supports Anal/Des Joist Support Load comb #2 #5 Length Min req'd Cb Cb min Cb support Fcp sup Lumber n-ply, S. Pine, No.2, 2x10, 2-ply (3"x9-1/4") Supports: All - Timber-soft Beam, D.Fir-L No.2 Floor joist spaced at 16.0" c/c; Total length: 13'-4.0"; Lateral support: top= full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); 19

45 WoodWorks Sizer SOFTWARE FOR WOOD DESIGN SW1a.wwb WoodWorks Sizer 10.2 Page 2 Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Criterion Analysis Value Design Value Analysis/Design Shear fv = 82 Fv' = 280 fv/fv' = 0.29 Bending(+) fb = 825 Fb' = 920 fb/fb' = 0.90 Live Defl'n 0.15 = <L/ = L/ Total Defl'n 0.45 = L/ = L/ Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' Fb' Fcp' E' 1.4 million Emin' 0.51 million CRITICAL LOAD COMBINATIONS: Shear : LC #5 = D+.6W, V = 1514, V design = 1514 lbs Bending(+): LC #2 = D+L, M = 2943 lbs-ft Deflection: LC #3 = D+.75(L+.6W) (live) LC #3 = D+.75(L+.6W) (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2012 CALCULATIONS: Deflection: EI = 139e06 lb-in2/ply "Live" deflection = Deflection from all non-dead loads (live, wind, snow ) Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2012), the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause FIRE RATING: Joists, wall studs, and multi-ply members are not rated for fire endurance. 20

46 COMPANY Erik Myers PE PLLC th St Parkersburg, WV (304) Aug. 31, :41 PROJECT SW1b.wwb Design Check Calculation Sheet WoodWorks Sizer 10.2 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End Load1 Dead Full Area (16.0)* psf Load2 Live Full Area (16.0)* psf Load3 Dead Full UDL 60.0 plf Load4 Wind Point lbs Load5 Wind Point lbs Load6 Wind Point lbs Load7 Wind Point lbs Self-weight Dead Full UDL 7.2 plf *Tributary Width (in) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 13'-4" 0' 13'-3.1" Unfactored: Dead Live Wind Factored: Uplift 1010 Total Bearing: Capacity Joist Supports Anal/Des Joist Support Load comb #5 #2 Length Min req'd Cb Cb min Cb support Fcp sup Lumber n-ply, S. Pine, No.2, 2x10, 2-ply (3"x9-1/4") Supports: All - Timber-soft Beam, D.Fir-L No.2 Floor joist spaced at 16.0" c/c; Total length: 13'-4.0"; Lateral support: top= full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); 21

47 WoodWorks Sizer SOFTWARE FOR WOOD DESIGN SW1b.wwb WoodWorks Sizer 10.2 Page 2 Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Criterion Analysis Value Design Value Analysis/Design Shear fv = 73 Fv' = 280 fv/fv' = 0.26 Bending(+) fb = 825 Fb' = 920 fb/fb' = 0.90 Live Defl'n 0.13 = <L/ = L/ Total Defl'n 0.44 = L/ = L/ Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' Fb' Fcp' E' 1.4 million Emin' 0.51 million CRITICAL LOAD COMBINATIONS: Shear : LC #4 =.6D+.6W, V = 1351, V design = 1351 lbs Bending(+): LC #2 = D+L, M = 2943 lbs-ft Deflection: LC #2 = D+L (live) LC #2 = D+L (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2012 CALCULATIONS: Deflection: EI = 139e06 lb-in2/ply "Live" deflection = Deflection from all non-dead loads (live, wind, snow ) Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2012), the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause FIRE RATING: Joists, wall studs, and multi-ply members are not rated for fire endurance. 22

48 COMPANY Erik Myers PE PLLC th St Parkersburg, WV (304) Aug. 31, :45 PROJECT SW3a.wwb Design Check Calculation Sheet WoodWorks Sizer 10.2 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End Load1 Dead Full Area (1.33)* psf Load2 Live Full Area (1.33)* psf Load3 Dead Full UDL 60.0 plf Load4 Wind Point lbs Load5 Wind Point lbs Self-weight Dead Full UDL 10.8 plf *Tributary Width (ft) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 13'-4" 0' 13'-3.2" Unfactored: Dead Live Wind Factored: Uplift 850 Total Bearing: Capacity Beam Supports Anal/Des Beam Support Load comb #5 #2 Length Min req'd Cb Cb min Cb support Fcp sup Lumber n-ply, S. Pine, No.2, 2x10, 3-ply (4-1/2"x9-1/4") Supports: All - Timber-soft Beam, D.Fir-L No.2 Total length: 13'-4.0"; Service: wet; Lateral support: top= at supports, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); 23

49 WoodWorks Sizer SOFTWARE FOR WOOD DESIGN SW3a.wwb WoodWorks Sizer 10.2 Page 2 Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Criterion Analysis Value Design Value Analysis/Design Shear fv = 61 Fv' = 272 fv/fv' = 0.23 Bending(+) fb = 1188 Fb' = 1434 fb/fb' = 0.83 Live Defl'n 0.31 = L/ = L/ Total Defl'n 0.62 = L/ = L/ Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' Fb' Fcp' E' 1.4 million Emin' 0.51 million CRITICAL LOAD COMBINATIONS: Shear : LC #5 = D+.6W, V = 1772, V design = 1704 lbs Bending(+): LC #5 = D+.6W, M = 6353 lbs-ft Deflection: LC #4 =.6D+.6W (live) LC #5 = D+.6W (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2012 CALCULATIONS: Deflection: EI = 139e06 lb-in2/ply "Live" deflection = Deflection from all non-dead loads (live, wind, snow ) Total Deflection = 2.00(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2012), the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause BUILT-UP BEAMS: it is assumed that each ply is a single continuous member (that is, no butt joints are present) fastened together securely at intervals not exceeding 4 times the depth and that each ply is equally top-loaded. Where beams are side-loaded, special fastening details may be required. 5. FIRE RATING: Joists, wall studs, and multi-ply members are not rated for fire endurance. 24

50 COMPANY Erik Myers PE PLLC th St Parkersburg, WV (304) Aug. 31, :45 PROJECT SW3b.wwb Design Check Calculation Sheet WoodWorks Sizer 10.2 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End Load1 Dead Full Area (1.33)* psf Load2 Live Full Area (1.33)* psf Load3 Dead Full UDL 60.0 plf Load4 Wind Point lbs Load5 Wind Point lbs Self-weight Dead Full UDL 10.8 plf *Tributary Width (ft) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 13'-4" 0' 13'-3.2" Unfactored: Dead Live Wind Factored: Uplift 847 Total Bearing: Capacity Beam Supports Anal/Des Beam Support Load comb #2 #5 Length Min req'd Cb Cb min Cb support Fcp sup Lumber n-ply, S. Pine, No.2, 2x10, 3-ply (4-1/2"x9-1/4") Supports: All - Timber-soft Beam, D.Fir-L No.2 Total length: 13'-4.0"; Service: wet; Lateral support: top= at supports, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); 25

51 WoodWorks Sizer SOFTWARE FOR WOOD DESIGN SW3b.wwb WoodWorks Sizer 10.2 Page 2 Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Criterion Analysis Value Design Value Analysis/Design Shear fv = 29 Fv' = 170 fv/fv' = 0.17 Bending(+) fb = 565 Fb' = 907 fb/fb' = 0.62 Bending(-) fb = 712 Fb' = 1434 fb/fb' = 0.50 Live Defl'n = L/ = L/ Total Defl'n = L/ = L/ Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' Fb' Fb' Fcp' E' 1.4 million Emin' 0.51 million CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+L, V = 912, V design = 802 lbs Bending(+): LC #2 = D+L, M = 3023 lbs-ft Bending(-): LC #4 =.6D+.6W, M = 3807 lbs-ft Deflection: LC #4 =.6D+.6W (live) LC #2 = D+L (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2012 CALCULATIONS: Deflection: EI = 139e06 lb-in2/ply "Live" deflection = Deflection from all non-dead loads (live, wind, snow ) Total Deflection = 2.00(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2012), the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause BUILT-UP BEAMS: it is assumed that each ply is a single continuous member (that is, no butt joints are present) fastened together securely at intervals not exceeding 4 times the depth and that each ply is equally top-loaded. Where beams are side-loaded, special fastening details may be required. 5. FIRE RATING: Joists, wall studs, and multi-ply members are not rated for fire endurance. 26

52 Erik Myers PE, PLLC 8/31/2016 Overhang Calculation (Cantilever Under Top Chord) Loading Conditions: Loading Conditions: 1 C D : 1 1 LL: 20 psf 2 C D : LL: psf LL L/ 180 DL: 7 psf TL L/ 180 Loading Conditions: Width Depth Species Grade Fb Fv E C F SP # Spacing Qty A in 2 S in 3 I in 4 Cr F'b F'v E' 1a b a b Design Limits Bending Shear Max Span LL TL 1a in OK OK 1b in OK OK 2a in OK OK 2b in OK OK Connections: Overhang L: 6 in Truss Spacing = 16 in Load at Truss Load at Gable 1a 9-1b 9-2a b Worst Case Reactions Normalized to Ld = 1.0 Load at Truss Load at Gable 10 lbs 169 lbs Notes: 1a Overhang loaded only 1b Truss bay loaded only 2a Overhang loaded only 2b Overhang and truss bay loaded Overhang equal to Truss Spacing.131" x 3" nail (Ld=1.0) W = 31 lbs (3) nails per truss = 93 lbs > 10 OK Load at Gable = 169 lbs Bearing on Gable Endwall OK 27

53

54 Job Truss M Truss Type MONO TRUSS Qty 1 Ply 1 Destiny 316 GA 156 BOX Ref. # Universal Forest Products Inc., Grand Rapids, MI 49525, Weston Gorby e May MiTek Industries, Inc. Fri Sep 05 10:56: Page 1 of 1 Copyright C 2014 Universal Forest Products, Inc. All Rights Reserved - This replaces the drawing issued on 9/2/ Increased overall length/lowered pitch x x4 4 1x3 3 T1 W Brg x3 3x3 HW1 3x3 2 W3 W2 W1 B x3 1x3 3x **High Wind Speed Truss** Exercise caution to ensure all field connections and reaction supports are properly specified by a design professional to transmit the required forces Plate Offsets (X,Y)-- [1:0-5-3,0-1-8], [4:0-2-0,0-1-0], [6:0-2-4,0-1-4] LOADING (psf) TCLL 20.0 TCDL 7.0 BCLL 0.0 * BCDL 7.0 SPACING Plates Increase 1.25 Lumber Increase 1.25 Rep Stress Incr YES Code FBC2010/TPI2007 CSI. TC 0.81 BC 0.70 WB 0.25 (Matrix) DEFL. Vert(LL) Vert(TL) Horz(TL) in (loc) l/defl >278 >334 n/a L/d n/a PLATES MT20 GRIP 244/190 Weight: 57 lb FT = 0% REACTIONS. (lb/size) 1=304/0-3-8 (min ), 6=304/0-3-8 (min ) Max Horz 1=219(LC 5) Max Uplift 1=-453(LC 5), 6=-496(LC 5) LUMBER- TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.2 SLIDER Left 2x3 SP No BRACING- TOP CHORD BOT CHORD Structural wood sheathing directly applied or oc purlins, except end verticals. Rigid ceiling directly applied or oc bracing. FORCES. (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-666/1086, 2-3=-641/1087, 3-4=-641/1135, 4-5=-52/17, 5-6=-31/104 BOT CHORD 1-8=-1255/630, 7-8=-1255/630, 6-7=-1255/630 WEBS 3-8=-61/233, 4-6=-708/1410, 4-7=-191/176 Signature is invalid NOTES- 1) This truss has been checked for uniform roof live load only, except as noted. Consult UFP Engineering 2) Wind: ASCE 7-10; Vult=180mph (3-second gust) Vasd=139mph; TCDL=4.2psf; BCDL=4.2psf; h=30ft; Cat. II; Exp D; Encl., GCpi=0.18; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left exposed ;C-C for for original document. members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle tall by wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 453 lb uplift at joint 1 and 496 lb uplift at joint 6. 6) Based on: M ) Revision: Decreased overall length from The professional engineering seal indicates that a licensed professional has reviewed the design under the standards referenced within this document, not necessarily the current state building code. The engineering seal is not an approval to use in a specific state. The final determination on whether a truss design is acceptable under the locally adopted building code rest with the building official or designated appointee. 9/5/2014 Universal Forest Products, Inc EAST BELTLINE RD, NE WARNING - Verify design parameters and READ NOTES PHONE (616) FAX (616) GRAND RAPIDS, MI Truss shall not be cut or modified without approval of the truss design engineer. This component has only been designed for the loads noted on this drawing. Construction and lifting forces have not been considered. The builder is responsible for lifting methods and system design. Builder responsibilities are defined under TPI1. This design is based only upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component is responsibility of building designer - not truss designer. Bracing shown is for lateral support of individual web members only. Additional temporary bracing to insure stability during construction is the responsibility of the erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication, quality control, storage, delivery, erection and bracing, consult BCSI 1-06 from the Wood Truss Council of America and Truss Plate Institute Recommendation available from WTCA, 6300 Enterprise LN, Madison, WI J:\support\MitekSupp\templates\ufp.tpe

55 Job Truss M Truss Type MONO TRUSS Universal Forest Products Inc., Grand Rapids, MI 49525, Michael Adams C Copyright 2014 Universal Forest Products, Inc. All Rights Reserved Qty 1 Ply 1 Destiny 316 GA 156 porch Job Reference e May MiTek Industries, Inc. Mon Sep 08 09:07: Page 1 of x x5 4 brg x5 4x5 2.5x6 2 HW1 T1 1x3 3 W3 W2 W1 8 B x4 1x4 5x5 W **High Wind Speed Truss** Exercise caution to ensure all field connections and reaction supports are properly specified by a design professional to transmit the required forces Plate Offsets (X,Y)-- [1:0-4-3,0-2-0], [4:0-2-4,0-1-4] LOADING (psf) TCLL 20.0 TCDL 7.0 BCLL 0.0 * BCDL 7.0 SPACING Plates Increase 1.25 Lumber Increase 1.25 Rep Stress Incr YES Code FBC2010/TPI2007 CSI. TC 0.86 BC 0.95 WB 0.53 (Matrix) DEFL. Vert(LL) Vert(TL) Horz(TL) in (loc) l/defl >257 >280 n/a L/d n/a PLATES MT20 GRIP 244/190 Weight: 67 lb FT = 0% LUMBER- TOP CHORD 2x4 SP No.1 BOT CHORD 2x6 SP No.2 WEBS 2x4 SP No.2 SLIDER Left 2x3 SP No BRACING- TOP CHORD BOT CHORD Structural wood sheathing directly applied or oc purlins, except end verticals. Rigid ceiling directly applied or oc bracing. [P] REACTIONS. (lb/size) 6=304/0-3-8 (min ), 1=304/0-3-8 (min ) Max Horz 1=213(LC 7) Max Uplift 6=-757(LC 5), 1=-716(LC 5) FORCES. (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-661/2594, 2-3=-642/2596, 3-4=-650/2648, 4-5=-34/8, 5-6=-46/110 BOT CHORD 1-8=-2741/633, 7-8=-2741/633, 6-7=-2741/633 WEBS 3-8=-122/295, 4-6=-696/3029, 4-7=-1143/215 NOTES- (6-7) 1) This truss has been checked for uniform roof live load only, except as noted. 2) Wind: ASCE 7-10; Vult=180mph (3-second gust) Vasd=139mph; TCDL=4.2psf; BCDL=4.2psf; h=30ft; Cat. II; Exp D; Encl., GCpi=0.18; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; porch left and right exposed;c-c for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. Signature is invalid 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle tall by wide Consult UFP Engineering will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 757 lb uplift at joint 6 and 716 lb uplift for original document. at joint 1. 6) Based on: M ) Revision: Exposed BC to wind for porch The professional engineering seal indicates that a licensed professional has reviewed the design under the standards referenced within this document, not necessarily the current state building code. The engineering seal is not an approval to use in a specific state. The final determination on whether a truss design is acceptable under the locally adopted building code rest with the building official or designated appointee. 9/8/2014 Universal Forest Products, Inc EAST BELTLINE RD, NE WARNING - Verify design parameters and READ NOTES PHONE (616) FAX (616) GRAND RAPIDS, MI Truss shall not be cut or modified without approval of the truss design engineer. This component has only been designed for the loads noted on this drawing. Construction and lifting forces have not been considered. The builder is responsible for lifting methods and system design. Builder responsibilities are defined under TPI1. This design is based only upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component is responsibility of building designer - not truss designer. Bracing shown is for lateral support of individual web members only. Additional temporary bracing to insure stability during construction is the responsibility of the erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication, quality control, storage, delivery, erection and bracing, consult BCSI 1-06 from the Wood Truss Council of America and Truss Plate Institute Recommendation available from WTCA, 6300 Enterprise LN, Madison, WI J:\support\MitekSupp\templates\ufp.tpe

56

57

MODEL: MFT2437-ME PRODUCT APPROVAL SPECIFICATION SHEET DESTINY INDUSTRIES

MODEL: MFT2437-ME PRODUCT APPROVAL SPECIFICATION SHEET DESTINY INDUSTRIES DESTINY INDUSTRIES MODEL: MFT2437-ME563-620-108 PRODUCT APPROVAL SPECIFICATION SHEET As required by Florida Statute 553.842 and Florida Administration Code 61G20-3.006, please provide the information and

More information

. Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug 11, 2016 . Aug

More information

High Load Diaphragm Design for Panelized Roofs. Copyright Materials. A Cost Effective Solution for Large Low Slope Roofs. Learning Objectives

High Load Diaphragm Design for Panelized Roofs. Copyright Materials. A Cost Effective Solution for Large Low Slope Roofs. Learning Objectives The Wood Products Council is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES

More information

Connecting Garage Door Jambs to Building Framing

Connecting Garage Door Jambs to Building Framing Connecting Garage Door Jambs to Building Framing Introduction The members of DASMA recognize that connecting garage doors to building framing is as important as the design of garage doors themselves. The

More information

Shear Wall Design with Examples DES 413-1

Shear Wall Design with Examples DES 413-1 Shear Wall Design with Examples DES 413-1 John Buddy Showalter, PE Vice President, Tech. Transfer American Wood Council Michelle Kam-Biron, PE,SE, SECB Director of Education Copyright Materials This presentation

More information

Structural Calculations

Structural Calculations Structural Calculations Whole House Green Remodel 921 Valley View Lane Mill Valley, CA Prepared for: Beth Schriock 921 Valley View Lane Mill Valley, CA 94941 Prepared by: 1314 Fountain Street Alameda,

More information

Part 2-Offset Shear Walls

Part 2-Offset Shear Walls Presentation Based On: Part 2-Offset Shear Walls Presentation updated to 2012 IB, ASE 7-10 2008 SDPWS opyright McGraw-Hill, I Presented by: By: R. Terry Malone, PE, SE Senior Technical Director Architectural

More information

#161. Connecting Garage Door Jambs to Building Framing. Introduction

#161. Connecting Garage Door Jambs to Building Framing. Introduction Connecting Garage Door Jambs to Building Framing Introduction The members of DASMA are equally as concerned about connecting garage doors to building framing as they are about the design of garage doors

More information

Offset Diaphragms. Presentation Based On: By: R. Terry Malone, PE, SE.

Offset Diaphragms. Presentation Based On: By: R. Terry Malone, PE, SE. Presentation Based On: Offset Diaphragms Presentation updated to 2012 IB, ASE 7-10 2008 SDPWS opyright McGraw-Hill, I Presented by: By: R. Terry Malone, PE, SE Senior Technical Director Architectural &

More information

City of Saratoga Springs

City of Saratoga Springs City of Saratoga Springs BUILDING DEPARTMENT CITY HALL - 474 BROADWAY - SARATOGA SPRINGS, NY 12866 PHONE 518-587-3550 FAX 518-580-9480 APPLICATION FOR DETACHED GARAGE 1. APPLICATION MUST BE FILLED OUT

More information

The Analysis of Offset Diaphragms and Shear Walls

The Analysis of Offset Diaphragms and Shear Walls Presentation based on: Webinar Presentation, June 5, 2014: The nalysis of Offset Diaphragms and Shear Walls Presentation updated to 2012 I, SE 7-10 opyright McGraw-Hill, I and the Wood Products ouncil

More information

IRC Bracing Methods, Relevant Test Data, and Recommended Design Values for Wind Bracing Analysis of Conventional Wood-Frame Homes

IRC Bracing Methods, Relevant Test Data, and Recommended Design Values for Wind Bracing Analysis of Conventional Wood-Frame Homes IRC Bracing Methods, Relevant Test Data, and Recommended Design Values for Wind Bracing Analysis of Conventional Wood-Frame Homes Prepared by Jay H. Crandell, P.E. Prepared for ICC Ad Hoc Committee on

More information

Installation Analysis

Installation Analysis PROJECT NO.: G8908.01-122-34 CKD: JCW SHEET: 1 OF 17 Installation Analysis Alumaboard Cladding Clip Analysis Report G8908.01-122-34 Rendered to: ROLLFAB METAL PRODUCTS, LLC 2529 West Jackson Street Phoenix,

More information

DISCLAIMER By using the LOGIX Design Manual, in part or in whole, the user accepts the following terms and conditions.

DISCLAIMER By using the LOGIX Design Manual, in part or in whole, the user accepts the following terms and conditions. DISCLAIMER By using the LOGIX Design Manual, in part or in whole, the user accepts the following terms and conditions. The LOGIX Design Manual shall be used for the sole purpose of estimating, design or

More information

STRUCTURAL PERFORMANCE TEST REPORT

STRUCTURAL PERFORMANCE TEST REPORT STRUCTURAL PERFORMANCE TEST REPORT Client: Gallina USA, LLC. 245 E Madison Avenue Milton, WI 53563 Report No.: NCTL-210-3193-2 Test Date: 10/12/05 Report Date: 10/26/05 Test Specimen: 0.280 (7mm) Corrugated

More information

Citizens Opening Protection Requirements for Homes in the Wind-Borne Debris Region (WBDR)

Citizens Opening Protection Requirements for Homes in the Wind-Borne Debris Region (WBDR) 1. What is all of this about? The Florida Legislature passed a law about the types of policies Citizens may insure. This law goes into effect in 2009, and affects policies that cover homes with a replacement

More information

Alan's Factory Outlet Carport Prices in Colorado, New Mexico, Nebraska & Nevada NOTE: FRAME WORK LENGTH 20, 25, 30, 35, 40, 45, 50.

Alan's Factory Outlet Carport Prices in Colorado, New Mexico, Nebraska & Nevada NOTE: FRAME WORK LENGTH 20, 25, 30, 35, 40, 45, 50. Alan's Factory Outlet Carport Prices in Colorado, New Mexico, Nebraska & Nevada $595 STANDARD 14 GAUGE, 5 HEIGHT STANDARD FEATURES: PRICES ARE FOR TOP WITH OPEN SIDES ONLY. 12 GAUGE 14 GAUGE 12W x 21L

More information

FE ASIB ILIT Y S TUDY O F PA RTIA LLY RE STRA INED CON NECT IONS

FE ASIB ILIT Y S TUDY O F PA RTIA LLY RE STRA INED CON NECT IONS FE ASIB ILIT Y S TUDY O F PA RTIA LLY RE STRA INED CON NECT IONS by Joseph P. Migliozzi This thesis submitted to the faculty of the Virginia Polytechnic Institute and State University in partial fulfillment

More information

Diaphragm And Shear Walls With Offsets and Openings

Diaphragm And Shear Walls With Offsets and Openings Presentation ased On: Diaphragm nd Shear Walls With Offsets and Openings Presentation updated to 2015 I, SE 7-10 2015 SDPWS opyright McGraw-Hill, I y: R. Terry Malone, PE, SE Presented by: Senior Technical

More information

SAMPLE PROJECT IN LONDON DOCUMENT NO. STR-CALC UNITISED CURTAIN WALL 65 ENGINEER PROJECT. Pages REVISION TITLE

SAMPLE PROJECT IN LONDON DOCUMENT NO. STR-CALC UNITISED CURTAIN WALL 65 ENGINEER PROJECT. Pages REVISION TITLE PROJECT ENGINEER DOCUMENT NO. STR-CALC-253 0 REVISION TITLE Pages UNITISED CURTAIN WALL 65 UNITISED CURTAIN WALL 2 of 65 Contents 1 Basic Data... 3 1.1 References... 3 1.2 Materials... 3 1.3 Loads... 4

More information

Wind Loss Mitigation Implementation Issues and Recommendations

Wind Loss Mitigation Implementation Issues and Recommendations FCHLPM F M Windstorm W n m Mitigation g t Committee i tee September 2009 Wind Loss Mitigation Implementation Issues and Recommendations Building Codes Insurance Now Future Loss Mitigation L. A. Twisdale,

More information

LIST OF APPROVED COMPONENTS AND SYSTEMS Issue Date: April 9, 2018

LIST OF APPROVED COMPONENTS AND SYSTEMS Issue Date: April 9, 2018 LIST O PPROVE COMPONENTS N SYSTEMS Issue ate: pril 9, 2018 Title 10 Texas dministrative Code Chapter 80 (10 TC 80), Section 80.26(j) states, ll department letters issued prior to the effective date of

More information

REQUEST FOR BID POLE BUILDING CONSTRUCTION

REQUEST FOR BID POLE BUILDING CONSTRUCTION IONIA COUNTY BUILDINGS AND GROUNDS 100 Library Street, Ionia, Michigan 48846 Joe Cusack, Physical Plant Director Office: 616-527-5345 REQUEST FOR BID POLE BUILDING CONSTRUCTION The County of Ionia is accepting

More information

Investor Presentation March 2018

Investor Presentation March 2018 Investor Presentation March 2018 Forward-Looking Statements Non-GAAP Financial Measures Forward-Looking Statements During the course of this presentation, we may make forward-looking statements or provide

More information

Program Update Home Efficiency Program, Income Qualified

Program Update Home Efficiency Program, Income Qualified Program Update Home Efficiency Program, Income Qualified Brian Stewart Account Manager January 24, 2017 Agenda Review of HEPIQ Program Ally Guide to Paperwork HVAC initiative Financing process Roll-out

More information

MASSACHUSETTS PROPERTY INSURANCE UNDERWRITING ASSOCIATION

MASSACHUSETTS PROPERTY INSURANCE UNDERWRITING ASSOCIATION MASSACHUSETTS PROPERTY INSURANCE UNDERWRITING ASSOCIATION (MPIUA) HOMEOWNERS 2000 PROGRAM MANUAL PAGES MPIUA MASSACHUSETTS STATE PAGES EFFECTIVE AS OF 09-01 - 2018 PAGE CHECKLIST FOR MASSACHUSETTS STATE

More information

MASSACHUSETTS PROPERTY INSURANCE UNDERWRITING ASSOCIATION (MPIUA)

MASSACHUSETTS PROPERTY INSURANCE UNDERWRITING ASSOCIATION (MPIUA) MASSACHUSETTS PROPERTY INSURANCE UNDERWRITING ASSOCIATION (MPIUA) DWELLING POLICY PROGRAM (2002 EDITION) MANUAL PAGES EFFECTIVE 09 01 18 PAGE CHECKLIST FOR MASSACHUSETTS STATE PAGES TO BE USED IN CONJUNCTION

More information

EXTERIOR VENEERS/SIDING ON SFD & TOWNHOUSE Please submit/upload plans in PDF format

EXTERIOR VENEERS/SIDING ON SFD & TOWNHOUSE Please submit/upload plans in PDF format EXTERIOR VENEERS/SIDING ON SFD & TOWNHOUSE Please submit/upload plans in PDF format Applicant must provide the following items: Please indicate items submitted with a checkmark ( ) Create on line as Permit

More information

PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA. Underwriting Rules Stand-Alone Earthquake

PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA. Underwriting Rules Stand-Alone Earthquake PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA Underwriting Rules Stand-Alone Earthquake Comprehensive and Comprehensive Plus Protection Policy Edition 3 Table of Contents 1. POLICY FORMS AND

More information

Building Permit Application

Building Permit Application Building Permit Application Inyo County 377 West Line Street, Bishop, California 93514 760-873-7857 ctruelsen@inyocounty.us www.inyocounty.us Project Address: APN: Contractor: Owner: Address : Address:

More information

BUSINESSOWNERS ISO RULES. ISO Properties, Inc

BUSINESSOWNERS ISO RULES. ISO Properties, Inc BUSINESSOWNERS ISO RULES ISO Properties, Inc MANUAL RULES CROSS REFERENCE GUIDE This manual rules cross reference guide is provided to assist manualholders in locating the rules applicable to specific

More information

Garrett W. Walton, CEO (c)

Garrett W. Walton, CEO (c) To: Cindy Walden Subject: RE: OIR Form 1802 From: Garrett Walton [mailto:gwalton@rebuildnwf.org] Sent: Friday, September 30, 2011 4:04 PM To: Michael Milnes Cc: Steve Fredrickson; Cindy Walden; Garrett

More information

A.) STANDARD Freestanding Unit Specifications: Intended purpose : roundpen cover only

A.) STANDARD Freestanding Unit Specifications: Intended purpose : roundpen cover only ROUNDPEN COVER CONTRACT CCB#EQUINECL943QL 3/29/17 last updated A.) STANDARD Freestanding Unit Specifications: Intended purpose : roundpen cover only o Standard rafters, 2x3 galvanized GatorShield steel

More information

Oak Island 1999 Hurricane Floyd

Oak Island 1999 Hurricane Floyd Oak Island 1999 Hurricane Floyd Topics to be Discussed What is a flood zone Flood zones in Oak Island Special Flood Hazard Areas (SFHA) Flood insurance Base Flood Elevations (BFEs) Building in flood zones

More information

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918)

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918) CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box 2007 211 N. Elm Jenks, OK 74037(918) 299-5883 CERTIFICATE OF OCCUPANCY: DATE RECEIVED: BUILDING ADDRESS: LOT: BLOCK: ADDITION: SECTION: TOWNSHIP: RANGE:

More information

Structural Failure(s) MET Wind Flowing Around a House. Shutters. Breaching the Building Envelope Adds Internal Pressure to External Suction

Structural Failure(s) MET Wind Flowing Around a House. Shutters. Breaching the Building Envelope Adds Internal Pressure to External Suction MET 4532 Wind Engineering & Insurance Lecture 35 1-4 December 2017 How Do Buildings Fail in a Hurricane? Wind Flowing Around a House Pressure on windward walls Suction on roof & lee walls Breaching the

More information

California Stand Alone Earthquake Program

California Stand Alone Earthquake Program California Stand Alone Earthquake Program AEGIS SECURITY INSURANCE COMPANY 2407 Park Drive, Harrisburg, PA 17105 3153 California Stand Alone Earthquake Program Contents 1. POLICY FORMS AND DWELLING LIMITS...

More information

RULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER NEW MANUFACTURED HOMES AND RECREATIONAL VEHICLES

RULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER NEW MANUFACTURED HOMES AND RECREATIONAL VEHICLES RULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER 0780-2-4 NEW MANUFACTURED HOMES AND RECREATIONAL VEHICLES TABLE OF CONTENTS 0780-2-4-.01 Definitions 0780-2-4-.08

More information

Building Division Fees 2018

Building Division Fees 2018 Building Division Fees 2018 Permit Administration A permit administration fee of $45.00 shall be assessed for each permit. Staff Consultation Fee $75.00 Administration Determination $90.00 / hour; $23.00

More information

QUICK GUIDE. An Introduction to COPE Data. Copyright 2017 AssetWorks Inc. All Rights Reserved. For more information visit,

QUICK GUIDE. An Introduction to COPE Data. Copyright 2017 AssetWorks Inc. All Rights Reserved. For more information visit, QUICK GUIDE An Introduction to COPE Data An Introduction to COPE Data The collection of COPE data is important for organizations. It s four data categories construction, occupancy, protection, and exposure

More information

THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER

THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER I, of UNIT # request approval by the Architectural Review Committee for the

More information

Advanced Diaphragm Analysis-Workshop

Advanced Diaphragm Analysis-Workshop Presentation ased On: dvanced Diaphragm nalysis-workshop Presentation updated to 2015 I, SE 7-10 2015 SDPWS opyright McGraw-Hill, I Presented by: y: R. Terry Malone, PE, SE Senior Technical Director rchitectural

More information

HAZUS-MH Hurricane Model Methodology. II: Damage and Loss Estimation

HAZUS-MH Hurricane Model Methodology. II: Damage and Loss Estimation HAZUS-MH Hurricane Model Methodology. II: Damage and Loss Estimation Peter J. Vickery 1 ; Peter F. Skerlj 2 ; Jason Lin 3 ; Lawrence A. Twisdale Jr. 4 ; Michael A. Young 5 ; and Francis M. Lavelle 6 Abstract:

More information

Hurricane Deductible

Hurricane Deductible NEW JERSEY MANUFACTURERS INSURANCE COMPANY Hurricane Deductible What You Need to Know This booklet contains only general information and is not a legal document. Save this booklet. TABLE OF CONTENTS About

More information

RFP # for Addition to Parks Recreation 190 Facility

RFP # for Addition to Parks Recreation 190 Facility City Of Hammond Purchasing Department RFP # 16-22 for Addition to Parks Recreation Building @ 190 Facility Proposals shall be faxed/emailed/hand delivered to the City Of Hammond, Purchasing Department

More information

Home Performance with Energy Star Loan Policy

Home Performance with Energy Star Loan Policy Home Performance with Energy Star Loan Policy The Home Performance with Energy Star Loan will help residential electric customers finance energy efficiency improvements that might be suggested for customers

More information

SYLLABUS FOR BAR BENDING & STEEL FIXING TRADE

SYLLABUS FOR BAR BENDING & STEEL FIXING TRADE SYLLABUS FOR BAR BENDING & STEEL FIXING TRADE Duration at Skills Training Institute (Spread in three months) : 600 Hrs 1. Introduction to ITI : 3 Hrs 2. Introduction to the Trade : 3 Hrs 3. Introduction

More information

Norseman Structures LIMITED WARRANTY

Norseman Structures LIMITED WARRANTY Norseman Structures LIMITED WARRANTY Effective Date October 15, 2015 W-NSLW Version 1 NORSEMAN STRUCTURES * LIMITED WARRANTY What is Covered Components of Structures manufactured by Norseman are warranted

More information

ATTIC FAN - DECEMBER 1995

ATTIC FAN - DECEMBER 1995 400 Ashley Court Glen Mills, PA 19342 Phone: 610-459-0510 Fax: 610-459-5317 ATTIC FAN - DECEMBER 1995 WHEREAS, the Declaration of Condominium for Darlington Woods Condominium restricts alterations of any

More information

Presenters. Bracken Engineering. Structures Disasters Forensics

Presenters. Bracken Engineering. Structures Disasters Forensics Presenters Bill Bracken, PE John Minor, CGC Bracken Engineering Structures Disasters Forensics Hurricane Ike Pre & Post FIRM Ike Pre Firm Post Firm FEMA Background The NFIP requires the mortgage loans

More information

Residential Energy Improvement Program Project Completion Form

Residential Energy Improvement Program Project Completion Form Residential Energy Improvement Program Instructions To receive rebates, participating contractors should complete the attached Project Completion Form and submit it with required documentation to: E-mail:

More information

Floodplain Design, Construction, and Impacts On Flood Insurance

Floodplain Design, Construction, and Impacts On Flood Insurance Floodplain Design, Construction, and Impacts On Flood Insurance AIA/CES Registration Architectural Record is a registered provider with The American Institute of Architects Continuing Education Systems.

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

APPRAISAL_PLUS_CRAW_ PDF. Date 2/21/2017 INSURED

APPRAISAL_PLUS_CRAW_ PDF. Date 2/21/2017 INSURED 1 APPRAISAL_PLUS_CRAW_022117092958.PDF Appraisal Plus Report PACIFIC SPECIALTY menlo park, CA 94025 ATTN: Brenda Riley Date 2/21/2017 FILE I.D. Client File 3110027 Loss 2/7/2017 Our File 6557-2979109 Assigned

More information

Light Bulb Removal Suction Cup (1) #8 x 1/2 (8) Wire Caps (3) Duct pieces 3-1/ 4 x 10 Rect., straight 6 Round, straight 7-10 Round, straight 3-1/ 4 x 10 Rect.90 0 elbow 3-1/ 4 x 10 Rect.45 0 elbow 3-1/

More information

IID APPLICATION INSTRUCTIONS ENERGY REWARDS PROGRAM FOR RESIDENTIAL CUSTOMERS

IID APPLICATION INSTRUCTIONS ENERGY REWARDS PROGRAM FOR RESIDENTIAL CUSTOMERS ENERGY REWARDS PROGRAM FOR RESIDENTIAL CUSTOMERS APPLICATION INSTRUCTIONS How to Apply 1. Before applying for a rebate through IID s Energy Rewards Program, please be sure to read the Energy Rewards Guidelines

More information

LCC Methodology. Håkan Sundquist Structural Design and Bridges KTH. ETSI Methodology 1

LCC Methodology. Håkan Sundquist Structural Design and Bridges KTH. ETSI Methodology 1 LCC Methodology Håkan Sundquist Structural Design and Bridges KTH 1 There are many requirements on a bridge 2 The classic task 3 The classic bridge design task 4 LCC optimization 5 LCC/Construction cost

More information

KENTUCKY FAIR PLAN APPLICATION FOR HOMEOWNERS COVERAGE FORM HO-8

KENTUCKY FAIR PLAN APPLICATION FOR HOMEOWNERS COVERAGE FORM HO-8 KENTUCKY FAIR PLAN APPLICATION FOR HOMEOWNERS COVERAGE FORM HO-8 PRODUCER INSTRUCTIONS INCOMPLETE APPLICATIONS WILL BE DELAYED AND/OR RETURNED BY THE FAIR PLAN IMPORTANT Returned applications create an

More information

OVERALL DIA. RIM WIDTH OVERALL WIDTH

OVERALL DIA. RIM WIDTH OVERALL WIDTH AG TRACTOR TIRE SIZE MATERIAL NUMBER PLY RATING LOAD INDEX RIM WIDTH OVERALL WIDTH TIRE DIMENSIONS (IN.) OVERALL DIA. STATIC LOADED RADIUS ROLLING CIRCUM. BAR HEIGHT 32NDS BAR HEIGHT INCHES CONTACT AREA

More information

Request for Proposal Fabric Membrane Salt Storage Structure RFP

Request for Proposal Fabric Membrane Salt Storage Structure RFP Request for Proposal Fabric Membrane Salt Storage Structure RFP Date Issued: April 27, 2015 Issued By: City of Fargo Public Works Department 402 23 rd Street N. Fargo, ND 58102 (701) 241-1453 (Phone) (701)

More information

A ROUGH INSPECTION for all DUCTWORK must be completed PRIOR to a BUILDING FRAME INSPECTION

A ROUGH INSPECTION for all DUCTWORK must be completed PRIOR to a BUILDING FRAME INSPECTION TOWN OF MIDDLETON 2012 MECHANICAL/SHEET METAL PERMIT CHECKLIST Residential 1 & 2 Family Only FEE = $125/System PROJECT ADDRESS: BUILDING PERMIT #: A ROUGH INSPECTION for all DUCTWORK must be completed

More information

The Best Products The Best Price The Best Service...We Guarantee It!

The Best Products The Best Price The Best Service...We Guarantee It! The Best Products The Best Price The Best Service...We Guarantee It! Prepared For: ABC Company 125 Maple St Rockford, MI 49341 Phone: 555.223.1245 Fax: 555.555.1234 Billing Address Phone: 545.456.5663

More information

Bordeaux Village One Condominium

Bordeaux Village One Condominium Bordeaux Village One Condominium LOCATION: 2431-2497 HERON TERRACE CLEARWATER, FLORIDA 33762 IP Risk Services, Inc. 9721 TIFFANY OAKS LANE, SUITE 200 TAMPA, FL 33612-7510 Email: IPRiskServices@aol.com

More information

2010 Florida Building Code Update December 8, 2011

2010 Florida Building Code Update December 8, 2011 Current Status and Expected Changes: Wind and Flood Code Upgrades Outline Code Basics Chapter 16 Wind& Flood Case Study Code Basics The Florida Building Code FBC Preface: The Florida Building Code is a

More information

May 3, Dear Ms. Bordelon:

May 3, Dear Ms. Bordelon: Entergy Services, Inc. 639 Loyola Avenue (70113) P.O. Box 61000 New Orleans, LA 70161-1000 Tel 504 576 4122 Fax 504 576 5579 Michael J. Plaisance Senior Counsel Legal Services - Regulatory May 3, 2018

More information

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014 2014 RESERVE FUND STUDY Hill & Associates Ltd. Member APEGNB July 2014 Reserve Fund Study Prepared for Bobak Place Townhome Condominiums Prepared by Hill & Associates Ltd. Consulting Professional Engineers

More information

INVITATION FOR BID. TITLE: Maintenance Storage Building #2

INVITATION FOR BID. TITLE: Maintenance Storage Building #2 INVITATION FOR BID ISSUE DATE: April 10, 2018 IFB #: S-LB-18626 TITLE: Maintenance Storage Building #2 Sealed Bids will be received until May 1, 2018 at 2:00 p.m. for furnishing items and/or services described

More information

ANNUAL LETTER. Visit our Highway Department Website!

ANNUAL LETTER. Visit our Highway Department Website! ANNUAL LETTER From: James Griesbach, Highway Commissioner Date: March 15, 2018 Visit our Highway Department Website! Marathon County Highway Department s Web Site includes information on the following

More information

PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA. Underwriting Guidelines Embedded Stand-Alone (Mini) Earthquake

PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA. Underwriting Guidelines Embedded Stand-Alone (Mini) Earthquake PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA Underwriting Guidelines Embedded Stand-Alone (Mini) Earthquake Standard Protection Policy Edition 1 Table of Contents 1. POLICY FORMS AND DWELLING

More information

COMPREHENSIVE COVERAGE

COMPREHENSIVE COVERAGE COMPREHENSIVE COVERAGE IN YOUR POCKET NEW CONSTRUCTION STRUCTURAL WARRANTY Comprehensive Coverage Explained: A Pocket Guide to Understanding the Difference Between Homeowners Insurance, Home Warranty Service

More information

Windstorm Insurance in Florida Protect Our Economy

Windstorm Insurance in Florida Protect Our Economy Windstorm Insurance in Florida Protect Our Economy Table of Contents The Problem...slide 3 The Solution slide 5 Improve Risk Methodology.........slide 6 Wind versus Water.slide 9 Collier County....slide

More information

Coverage during the Total Protection Period

Coverage during the Total Protection Period Extended Warranty WHAT DOES THE EXTENDED LIMITED WARRANTY COVER? Building Products of Canada Corp. ( BP ) warrants to the owner(s) of the property on which a BP Weather-Tite TM ( WT ) Roofing System is

More information

BOAT DOCK INFORMATION DPW- ENGINEERING DIVISION (650)

BOAT DOCK INFORMATION DPW- ENGINEERING DIVISION (650) BOAT DOCK INFORMATION DPW- ENGINEERING DIVISION (650) 522-7320 CDD - BUILDING DIVISION (650) 522-7172 330 W. 20 th Ave. San Mateo, CA 94403-1388 The Marina Lagoon is used as a dual function facility: (1)

More information

Mechanical Design of Process Equipments

Mechanical Design of Process Equipments CH2357 Process Equipment Design I Mechanical Design of Process Equipments Dr. M. Subramanian Associate Professor Department of Chemical Engineering Sri Sivasubramaniya Nadar College of Engineering Kalavakkam

More information

FEMA Elevation Certificates and Hydrostatic Venting Requirements

FEMA Elevation Certificates and Hydrostatic Venting Requirements FEMA Elevation Certificates and Hydrostatic Venting Requirements Tennessee Association of Floodplain Managers Conference Gatlinburg, TN July 30 August 2, 2013 1 What is the National Flood Insurance Program

More information

Prescriptive HVAC Application

Prescriptive HVAC Application Thank you for participating in Indianapolis Power & Light Company s (IPL) Business Energy Program. Refer to the information below to ensure you are eligible for program rebates and your application is

More information

Floodplain Management 101: UNIT II. Maps & Flood Insurance Studies

Floodplain Management 101: UNIT II. Maps & Flood Insurance Studies Floodplain Management 101: UNIT II Maps & Flood Insurance Studies Who is ASFPM? ASFPM stands for the Association of State Floodplain Managers A national organization of floodplain management professionals

More information

MECHANICS OF MATERIALS

MECHANICS OF MATERIALS CHAPTER 7 Transformations MECHANICS OF MATERIALS Ferdinand P. Beer E. Russell Johnston, Jr. John T. DeWolf Lecture Notes: J. Walt Oler Texas Tech Universit of Stress and Strain 006 The McGraw-Hill Companies,

More information

UNC Imaging Research Building Chapel Hill, NC

UNC Imaging Research Building Chapel Hill, NC UNC Imaging Research Building Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Thomas Boothby Existing Building Information Outline Existing Building

More information

Be wattsmart and earn cash back.

Be wattsmart and earn cash back. Be wattsmart and earn cash back. Heat ump Incentives Washington Residents For work completed on or after January 1, 2018 Heat ump Incentives Your trade ally or store associate can help you find eligible

More information

City Of Hammond Purchasing Department. Request for Pricing: RFP For Construction of Metal Building at 190 Maintenance Yard

City Of Hammond Purchasing Department. Request for Pricing: RFP For Construction of Metal Building at 190 Maintenance Yard 1 City Of Hammond Purchasing Department Request for Pricing: RFP 15-42 For Construction of Metal Building at 190 Maintenance Yard Proposals shall be faxed/emailed/hand delivered to the City Of Hammond,

More information

Math 115 Sample Final. 5) 1 5 y y y

Math 115 Sample Final. 5) 1 5 y y y Math 11 Sample Final Name MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. Factor completel. If the polnomial is prime, state this. 1) 3 + 82-20 A)

More information

Policy E-06: Added (c) to reflect policy (no change). April 1, 2013 Policy E-09: Added more information to reflect changes in QFR process.

Policy E-06: Added (c) to reflect policy (no change). April 1, 2013 Policy E-09: Added more information to reflect changes in QFR process. Alberta Health Alberta Aids to Daily Living Stationary Commodes, Mattress Overlays, Transfer Pole-Aids and Transfer Bed Rails Benefits Policy & Procedures Manual July 1, 2013 Transfer Bed Rails Benefits,

More information

Warmer homes for everyone

Warmer homes for everyone Warmer homes for everyone If you have a low income and high heating bills, you could save money through funding available from our Warm Home Assistance scheme. You can use this funding for a new gas supply

More information

Oyster River Cooperative School District Business Administrator s Office

Oyster River Cooperative School District Business Administrator s Office Oyster River Cooperative School District Business Administrator s Office November 3, 2016 Subject: Enclosures: Request for Lease proposal 77-Passenger School Bus Lease Request for Lease proposal General

More information

Flood Resistant Provisions of Connecticut s Newest Building Codes. Laura E. Ghorbi, PE, CFM Risk Management & Resilience

Flood Resistant Provisions of Connecticut s Newest Building Codes. Laura E. Ghorbi, PE, CFM Risk Management & Resilience Flood Resistant Provisions of Connecticut s Newest Building Codes Laura E. Ghorbi, PE, CFM Risk Management & Resilience October 25, 2017 Overview 2018 Connecticut State Building Code Adoption National

More information

PROPOSAL FOR 2018 HIGH-CUBE VAN BODY

PROPOSAL FOR 2018 HIGH-CUBE VAN BODY 840 S. Telegraph Road Monroe, Michigan 48161 Phone: (734) 240-5102 Fax: (734) 240-5101 PROPOSAL FOR 2018 HIGH-CUBE VAN BODY BID OPENING: Wednesday, April 4, 2018 at 10:00 a.m. BOARD OF COUNTY ROAD COMMISSIONERS

More information

State of Stress in Three Dimensions

State of Stress in Three Dimensions State of Stress in Three Dimensions Theories of failure Introduction: Due to large numbers of examples of compound stresses met with in engineering practice, the cause of failure or permanent set under

More information

The Florida Public Hurricane Loss Model Selected Results

The Florida Public Hurricane Loss Model Selected Results The Florida Public Hurricane Loss Model Selected Results Shahid S. Hamid, Ph.D., CFA PI, Hurricane Loss Projection Model Professor of Finance, College of Business, and Director, Laboratory for Insurance,

More information

This notice is referenced in an endnote at the Bradford Tax Institute. CLICK HERE to go to the home page. Q&A on Tax Credits for Sections 25C and 25D

This notice is referenced in an endnote at the Bradford Tax Institute. CLICK HERE to go to the home page. Q&A on Tax Credits for Sections 25C and 25D This notice is referenced in an endnote at the Bradford Tax Institute. CLICK HERE to go to the home page. Q&A on Tax Credits for Sections 25C and 25D Notice 2013-70 SECTION 1. PURPOSE This notice provides

More information

Courts of Country Lakes Condominium Association, Inc.

Courts of Country Lakes Condominium Association, Inc. 1 Courts of Country Lakes Condominium Association, Inc. N-SITE RESERVE STUDY Presented by: 2 Courts of Country Lakes Condominium Association, Inc. EXECUTIVE SUMMARY At the direction of the Board of Directors

More information

Lesson 2: The Homeowners Policy

Lesson 2: The Homeowners Policy Lesson 2: The Homeowners Policy Homeowners Insurance: ISO Policy Forms Covered Property to Identify and Address Residential Property and Liability Loss Exposures Four Methods for Managing Personal Residential

More information

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561) OFFICE USE ONLY: TOWN OF JUNO BEACH 340 Ocean Drive Phone: (561) 656-0302 Fax: (561) 775-0812 Date: Permit #: Tracking #: Application for Building Permit & Certificate of Occupancy Job Address: Property

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

Determination 2008/104

Determination 2008/104 Determination 2008/104 26 November 2008 Determination regarding the weathertightness of remedial work after storm damage to a 24- year-old house at 16A Lyall Parade, Lyall Bay, Wellington 1. The matter

More information

2016 Residential HVAC Rebate Application

2016 Residential HVAC Rebate Application Instructions for Use STEP1 Determine Eligibility Verify the utility company listed on the rebate application is your electric utility. Applications for other participating utility service providers can

More information

PART #2 IDENTIFY WHO WILL PERFORM THE WORK (Complete either 2a or 2b)

PART #2 IDENTIFY WHO WILL PERFORM THE WORK (Complete either 2a or 2b) COUNTY OF SHASTA APPLICATION FOR PERMIT DEPARTMENT OF RESOURCE MANAGEMENT OFFICE: (530) 225-5761 BUILDING DIVISION FAX: (530) 245-6468 1855 PLACER STREET, SUITE 102, REDDING, CA 96001 WEB SITE: www.co.shasta.ca.us

More information

ASTRO 2 CIRCULATORS. ASTRO 2 3-Speed Circulators (except Astro 286):

ASTRO 2 CIRCULATORS. ASTRO 2 3-Speed Circulators (except Astro 286): ASTRO 2 CIRCULATORS ASTRO 2 3-Speed Circulators (except Astro 286): IRON BODY CONSTRUCTION (Includes Check Valve) Model No. Part No. Connection List Price Wt.ea.lbs. Astro 210CI 110223-326 Flanged $ 307.00

More information

CONTRACTORS SUPPLEMENTAL APPLICATION

CONTRACTORS SUPPLEMENTAL APPLICATION Note: This application must be completed in addition to the ACORD Applicant Information Section and the Commercial General Liability Application. The signature of an owner, partner or officer is required

More information

Uniform Construction Code Permit Package For. Zerbe Township

Uniform Construction Code Permit Package For. Zerbe Township LIGHT-HEIGEL & ASSOCIATES, INC. A full service provider of PA Uniform Construction Code (UCC) services. Uniform Construction Code Permit Package For Zerbe Township Local Office contact Information: 142

More information