On the Development of Power Transformer Failure Models: an Australian Case Study

Size: px
Start display at page:

Download "On the Development of Power Transformer Failure Models: an Australian Case Study"

Transcription

1 Number operating (n) Cumulative distribution (n) On the Development of Power Transformer Failure Models: an Australian Case Study D. Martin, J. Marks, T. Saha, O. Krause Power and Energy Systems The University of Queensland St. Lucia, Australia G. Russell, A. Alibegovic-Memisevic Powerlink Queensland Virginia, Australia Abstract Power transformers are expected to operate reliably for decades. Loading guides and models exist to estimate the functional life remaining of transformer cellulosic insulation. However, failure is essentially probabilistic and dependent on many factors, and so statistical models to ascertain the expected number of failures for a power transformer fleet are highly desirable when planning future investment. Given their low failure rate, approximately 1% per transformer year, a fleet size much larger than an individual Utility owns is required for statistically significant results. Therefore, a large study was performed on the Utilities in Australia who together operate around 6, power transformers. For this, data on 626 failures and retirements, over a fifteen year period, were collected. The Weibull distribution was used to determine failure rate for age, voltage class of transformer, and failure mode. Finally, the development of a tool to model future replacements is discussed. Index Terms-- Failure analysis, fault location, power system reliability, power transformers, reliability. I. INTRODUCTION As part of the Australian regulatory framework, the Utilities are obligated to provide an investment plan every five years, which includes forthcoming asset replacement [1]. In this plan, the Utilities identify the power transformers that they believe represent increased risk. This risk calculation is based on the probability of transformer failure for various failure modes and on future loading forecasts. This forms a list of power transformers which are recommended to be replaced, along with justification and cost. Statistical models are beneficial if the Utility can optimize the estimation of the likely number of failures on their network, into the near future, using different investment strategies. Data on the power transformer age distribution for 215/16 was collected from the Australian Utilities [2], and is presented in Figure 1. The criteria of a power transformer was one stepping the voltage down to either subtransmission or distribution medium voltage, and having a power rating 1 MVA. In general, the investigated transformers had a primary voltage ranging between 22 kv and 5 kv. Generator step-up power transformers were not included because these are normally owned by the power station, and not by a Utility. Similarly to other developed countries, a significant proportion of assets were installed in the 196s. Given that the working life of a power transformer is often assumed to be 4 to 5 years (based on n-1 planning criteria and loading guide), there are many units which have exceeded this age yet the Utility will keep them in service unless there is sufficient business reason to replace them. The aim of this research project was to develop a tool the Utilities can use to evaluate the effect of replacement strategy on the reliability of their system. Previous studies have indicated that the failure rate of a power transformer is approximately 1% per transformer year [3], [4]. Given that a Utility typically operates several hundred power transformers, only a few failures can be expected per year, and so there can be relatively few failures to analyze. Consequently, a statistical survey was performed to cover as much of the power transformer fleet, operated by the Utilities in Australia, as possible. Firstly, this study involved determining failure rates of power transformers. Then secondly, developing a tool to model how the number of failures would change into the future using different scenarios of replacement Number operating Cumulative distribution This work was funded by Australian Research Council, Ausgrid, Ergon Energy, Powerlink Queensland, TransGrid and Wilson Transformer Company Figure /16 asset age profile of Australian power transformer fleet.

2 Number The industry commonly takes into account the remaining life of the paper insulation of a transformer when determining replacement [5], [6], based on the tensile strength of the paper. Previous surveys have indicated many failures occurring due to the on-load tap changer (OLTC) and bushings, which are obviously independent of the winding paper condition. Thus, an algorithm to help the Utilities determine when to replace a transformer based upon its reliability is highly desirable. Several surveys have been performed. The reliability of the Australian and New Zealand (ANZ) power transformer fleet was investigated in the mid 9s, finding a low failure rate of 1% [3]. However, twenty years have passed and so improvements in technology and management may have changed the failure rate. A CIGRE study, published in 215, reviewed international failure rates for power transformers [7]. However, only data for power transformers with a primary voltage of 69 kv or above were collected. In Australia a significant proportion of power transformers operate with a line voltage of 22, 33 or 66 kv. Different regulatory environments across countries may also affect the life expectancy of a transformer. Consequently, a new review was planned. Since a Utility may withdraw a transformer due to poor condition, before failure actually occurs, information on retirements was also collected and analyzed. II. DATA COLLECTION AND PROCESSING Previous studies had used the definition of a failure being one when the transformer either tripped due to the protection, or was removed from service within 3 minutes of an alarm sounding [3]. Another definition was costly failure, where the failure had caused the Utility to incur an expense of at least 2% of the value of the transformer [3]. A Utility may then have an option to repair the transformer rather than replace it. Given that the Utilities have different cost structures, and may in the same circumstance come to a different decision on whether to repair or replace, failure was defined for this study as when the transformer had to be permanently removed from service (non-repairable). Of the twenty Utilities operating in Australia, nineteen were contacted and asked for information on power transformer failure and retirement. The twentieth Utility did not appear to own power transformers because it supplied off-grid communities in Western Australia. Data was sourced from seventeen of these Utilities, composing 97% of the Australian power transformer fleet. The Utilities were asked for the age of the transformer on failure or retirement, and the cause of the event. The Weibull distribution was applied to model the failure rate, as a function of age, using the method given in Standard BS61649:28 [8]. The probability density function (PDF) is shown in (1), where β and η are two coefficients which represent the shape and scale of the distribution, t is age. f(t) = β tβ 1 e (t η β η )β (1) According to BS61649 the data is classed as either complete or non-complete, with the distinction being whether or not all units have failed by the end of the test. Three types of data are used, censored (units are still functioning by end of test), suspended (unit was retired before failure) and failed. Thus, in addition to data on withdrawn units, information was also collected on those which were still functional. The collected data was truncated to a 15 year window (2 215), because most of the Utilities were unable to provide data prior to 2. The failure rate for a given age of transformer can be expressed as (2), where n failures and n survivors represent the numbers of transformers failing and surviving age i. F Rate = n failures (i) n survivors (i) +n failures (i) (2) The reason for failure or retirement was noted where possible and was sorted into bushings, OLTCs, windings, insulation, other and unknown failure modes (as these had been identified in previous surveys as the main modes causing failure). For retirements, the reasons were not always recorded, and so either poor condition overall or network augmentation was used. It was noted that the Utilities did not often retire (suspended by our definition) a transformer based on one problem. Usually, the unit had a number of issues making it either uneconomic to repair or of unacceptable reliability Figure 2. Age distribution of failed power transformers. The distribution of failed transformers is shown in Figure 2. Some transformers can be seen to fail early. Therefore, to model the data more than one Weibull distribution might be required, with the first representing infant mortality [11] failures and the second representing age-related problems. The number of retired units is shown in Figure 3. The number of transformers which had survived by the end of the monitoring period (215/16) is shown in Figure 4. The number of transformers surviving each year of operation was calculated keeping the 15 year observation window in mind. For instance, as long as the reporting was accurate, for a transformer installed in 2 the survey would have 15 years of operational data available. Therefore, a failure rate could be calculated for the number of units failing up to, and including, the 15 th year of operation. For the transformers surviving age 16 and older, it can obviously be stated that they had survived their first year of operation. But, it could not be determined how many of their initial population had failed before 2, and so the pre-2 survival data was omitted. For instance, for the transformers reaching 16 years in 215, only failure rate for ages 2 to 16 was calculated, and the failure rate for the

3 Number ln(ln(1/(1-median Rank))) Number Instantaneous failure rate Number first year of operation was omitted. The number of survivors as a function of age, omitting pre-2 data, is given in Figure 5. Using (2) the failure rate, shown in Figure 6 was calculated (omitting retirements). The instantaneous failure rate (IFR) calculated using the Weibull distribution is also shown for comparison, along with its ± 95% confidence interval (CI), which will be discussed in the next paragraphs implying distinctly separate infant mortality and aging related failure modes. The change in mode occurred at approximately 2 years. The ± 95% confidence intervals for the β and η coefficients were calculated using the technique given in BS61649, based on work published by Bain and Engelhardt [9] and [1]. The β and η coefficients determined using the line characteristics, shown in Figure 7, and their ± 95% confidence intervals, were then used to calculate the instantaneous failure rate λ (3) shown in Figure 6. As can be seen, there is good agreement between the two methods to calculate the failure rate, although the ± 95% confidence interval should be used to capture the peaks in failure rate. λ(t) = β tβ 1 η β (3) Figure Age distribution of retired power transformers. 3.% 2.5% 2.% 1.5% 1.%.5% Non-parametric Weibull IFR Weibull IFR + 95% CI Figure 5. Figure 4. Age distribution of censored transformers. Number of transformers in population surviving each year of age, omitting pre-2 data. The coefficients required for use by the Weibull distribution were determined graphically. As discussed in BS61649 [8], plotting ln (ln(1 (1 Median rank))) against ln (age) will give a straight line if the data follows a Weibull distribution. The coefficients of this line are then used to determine the β and η values, where β is the gradient of the line, and η = e (yintercept β). When the median ranks of the failure data were plotted, shown in Figure 7, it was evident that two distributions were present,.% Figure Instantaneous failure rate of investigated power transformers. y =.4939x R² =.9199 y = 3.354x Figure 7. III. Finding coefficients ln(age) Determining coefficients for Weibull distributions. MODELLING FAILURE MODES AND DIFFERENT VOLTAGE CLASSES Since previous research has indicated the failure mode differs depending on the voltage class of the transformer [3], the data was split into three voltage bins, 66 kv, 66 < kv 275 and > 275 kv. These bins were chosen for the following reasons. Firstly, there had to be a sufficiently large number of failures in each bin not to reduce the confidence interval; at least 2 failures is suggested by BS61649 [8]. Secondly, the Utilities had to report the number of transformers in operation to the industry Regulator in prescribed voltage levels. It was

4 not possible to distinguish between certain voltage levels. Data on transformers operating at either 22 or 275 kv were combined with 11 and 132 kv units, rather than higher voltage classes, because the failure mode appeared more consistent with the lower voltage units. Weibull distributions for 66 kv, 66 < kv 275 and >275 kv are shown in Figures 8 to 1. For the 66 and 66 < kv 275 populations both the probability of retirement and failure is given. There has been only a small number of > 275 kv transformers retired since 2, and so there was insufficient data on which to fit a distribution. Only one distribution was used to model this voltage class because, otherwise, the confidence interval would become very large from there being only two small sets of data. The 66 kv and 66 < kv 275 populations are similar because agerelated failures seem to begin at around 2 years old, similar failure modes may be responsible. The probability of a unit failing is higher than the probability of it being retired over the first few decades of operation (approximately 4 years for 66 kv and 6 years for 66 < kv 275). This implies that failure can catch the industry unaware. Once the transformer reaches its later years the industry may be more likely to retire it based on poor condition, rather than retiring due to the manifestation of a specific fault which was thought to be leading to failure. If fewer transformers are replaced, more resource may be required by the industry to manage the aging units. Figure 9. Weibull distributions for failure and retirement for 66 < kv 275 transformers. Figure 1. Weibull distribution for failure of > 275 kv transformers. Figure 8. Weibull distributions for failure and retirement for 66 kv transformers. The failure mode for these transformers was also investigated, shown in Figures 11 and 12. Winding related problems were the predominant mode of failure for transformers 275kV, while higher voltage transformers had a more mixed-mode of failure. Winding-related faults are often by lightning or downstream surges [7], where the resultant mechanical force distorts the conductors forming a winding. Figure 11. Weibull distributions for failure and retirement for 66 kv transformers.

5 Number (n) lightning or simply due to the inherent mechanical weakness tested by number of close through faults. Using a Weibull distribution to model failure was similar to when a non-parametric distribution was used. Consequently, basing an algorithm to predict the likely number of failures into the future on the Weibull distribution is suitable. As evident from the Weibull distribution, a change in failure mode appears to occur around twenty years. Using one Weibull distribution to model early failures, and another to model age-related ones, appears effective. Figure 12. Weibull distributions for failure and retirement for 66 < kv 275 kv transformers. IV. TOOL DEVELOPMENT Based on these failure rates, an algorithm is being developed to help the industry to better predict the number of failures and retirements of power transformers into the near future. This will be beneficial because the Utilities have to justify their investment plans to the Australian Energy Regulator every five years. The failure rates determined from this study are being used to estimate the number of failures and retirements expected to occur in Australia over the next ten years (Figure 13). The assumptions considered valid for this modelling are that a withdrawn unit is replaced with a new one (it is recognized that a Utility may choose not to replace), and that the criteria to retire a unit does not change. The dashed lines indicate the number of events calculated using ±95% confidence intervals. The upward trend in the traces is a result of the fleet becoming older. This algorithm is being evaluated and will be reported on in due course, for instance the effect of maintenance is being studied. Future work for this algorithm includes: (a) investigating using condition of transformer rather than solely age, (b) using spares as replacement rather than new units, and (c) using network topology to relate failures to frequency and duration of customer outages. Asset condition has not been investigated so far because the Utilities have different methods to test and process data. Whereas some Utilities have used a health index, there is still no consensus on which method is optimal. Thus, health index scores across different Utilities cannot be easily compared. V. CONCLUSIONS Nearly half of all power transformer failures over the past fifteen years were caused by winding problems, likely to have been initiated by surges from downstream faults or by Replacements Failures Retirements Replacement & CI Failure & CI Retirements & CI Year Figure 13. Estimation of future failures and retirements, for Australian power transformers, along with their confidence intervals (CI). In the first few decades, a transformer is more likely to fail than be retired. After either 4 years, for 66 kv units, or 6 years for 66 < kv 275 ones, a transformer is more likely to be retired than to fail. Also, if design related issues / weaknesses exist, they will usually become evident earlier in the transformer s life. REFERENCES [1] Australian Energy Regulator, Electricity Network Service Providers Replacement Model Handbook, Australia, December 211. [2] J. Marks, D. Martin, T. Saha, O. Krause, A. Alibegovic-Memisevic, G. Russell, G. Buckley, S. Chinnarajan, M. Gibson, T. MacArthur, An Analysis of Australian Power Transformer Failure Modes, and Comparison with International Surveys, IEEE AUPEC, Australia, Sep [3] Australian / New Zealand transformer reliability survey, Western Power, Australia, [4] A. Petersen and P. L. Austin, Impact of Recent Transformer Failures and Fires Australian and New Zealand Experiences, CIGRE, 22. [5] IEC 676-7, Power transformers - Part 7: Loading guide for oil immersed power transformers, IEC Standard, Switzerland, 25. [6] IEEE Guide for Loading Mineral-Oil-Immersed Transformers and STP-Voltage Regulators, IEEE Standard C , 212. [7] Working group A2.37, Transformer Reliability Survey, Cigre brochure 642, France, 215. [8] BS EN 61649:28, Weibull analysis, BSI, UK, 28. [9] L. J. Bain and M. Engelhardt, Simple Approximate Distributional Results for Confidence and Tolerance Limits for the Weibull Distribution Based on Maximum Likelihood Estimators, Technometrics, vol. 23, no. 1, pp. 15-2, [1] L. J. Bain and M. Engelhardt, Approximate Distributional Results Based on the Maximum Likelihood Estimators for the Weibull Distribution, Journal of Quality Technology, vol. 18, no. 3, pp , [11] J. Moubray, Reliability-Centered Maintenance, Industrial Press, New York, NY, 1997.

FLEXIBILITIES IN GRID PLANNING: CASE STUDIES ON THE FRENCH DISTRIBUTION SYSTEM

FLEXIBILITIES IN GRID PLANNING: CASE STUDIES ON THE FRENCH DISTRIBUTION SYSTEM FLEXIBILITIES IN GRID PLANNING: CASE STUDIES ON THE FRENCH DISTRIBUTION SYSTEM Jérémy BOUBERT Aländji BOUORAKIMA Yoann DESGRANGE Enedis France Enedis France Enedis France jeremy.boubert@enedis.fr alandji.bouorakima@enedis.fr

More information

Contents Introduction Chapter 1 - Security Policy... 6

Contents Introduction Chapter 1 - Security Policy... 6 Policy statement Contents Introduction... 5 PURPOSE... 5 SYSTEM OPERATOR POLICIES TO ACHIEVE THE PPOS and dispatch objective... 5 Avoid Cascade Failure... 5 Frequency... 6 Other Standards... 6 Restoration...

More information

Modelling component reliability using warranty data

Modelling component reliability using warranty data ANZIAM J. 53 (EMAC2011) pp.c437 C450, 2012 C437 Modelling component reliability using warranty data Raymond Summit 1 (Received 10 January 2012; revised 10 July 2012) Abstract Accelerated testing is often

More information

MANAGING THE RISKS ON TRANSFORMER ASSETS

MANAGING THE RISKS ON TRANSFORMER ASSETS MANAGING THE RISKS ON TRANSFORMER ASSETS by ARUN D YARGOLE & TONY McGRAIL DOBLE ENGINEERING COMPANY ayargole@doble.com What is an Asset? In commercial terms- It is an Entity that gives the owner the revenue

More information

PASS Sample Size Software

PASS Sample Size Software Chapter 850 Introduction Cox proportional hazards regression models the relationship between the hazard function λ( t X ) time and k covariates using the following formula λ log λ ( t X ) ( t) 0 = β1 X1

More information

ASSET RISK MANAGEMENT Asset Health Framework

ASSET RISK MANAGEMENT Asset Health Framework ASSET RISK MANAGEMENT Asset Health Framework 15 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D Preface This document has been prepared to

More information

Independent Review of Aurora Network summary of findings. Michael Van Doornik, Manager Advisory (VIC) 31 October 2018

Independent Review of Aurora Network summary of findings. Michael Van Doornik, Manager Advisory (VIC) 31 October 2018 Independent Review of Aurora Network summary of findings Michael Van Doornik, Manager Advisory (VIC) 31 October 2018 Agenda 1. Terms of reference 2. Limitations of the review 3. Our approach to undertaking

More information

Postprint. This is the accepted version of a paper presented at PMAPS Conference 2018.

Postprint.   This is the accepted version of a paper presented at PMAPS Conference 2018. http://www.diva-portal.org Postprint This is the accepted version of a paper presented at PMAPS Conference 8. Citation for the original published paper: Vieira Turnell, A., Linnet, A., Tamadon, N., Morozovska,

More information

Project Assessment Conclusions Report

Project Assessment Conclusions Report Powerlink Queensland Project Assessment Conclusions Report 27 August 2018 Addressing the secondary systems condition Disclaimer While care was taken in preparation of the information in this document,

More information

Using Sector Information with Linear Genetic Programming for Intraday Equity Price Trend Analysis

Using Sector Information with Linear Genetic Programming for Intraday Equity Price Trend Analysis WCCI 202 IEEE World Congress on Computational Intelligence June, 0-5, 202 - Brisbane, Australia IEEE CEC Using Sector Information with Linear Genetic Programming for Intraday Equity Price Trend Analysis

More information

Confidence Intervals for an Exponential Lifetime Percentile

Confidence Intervals for an Exponential Lifetime Percentile Chapter 407 Confidence Intervals for an Exponential Lifetime Percentile Introduction This routine calculates the number of events needed to obtain a specified width of a confidence interval for a percentile

More information

BAYESIAN NONPARAMETRIC ANALYSIS OF SINGLE ITEM PREVENTIVE MAINTENANCE STRATEGIES

BAYESIAN NONPARAMETRIC ANALYSIS OF SINGLE ITEM PREVENTIVE MAINTENANCE STRATEGIES Proceedings of 17th International Conference on Nuclear Engineering ICONE17 July 1-16, 9, Brussels, Belgium ICONE17-765 BAYESIAN NONPARAMETRIC ANALYSIS OF SINGLE ITEM PREVENTIVE MAINTENANCE STRATEGIES

More information

Gamma Distribution Fitting

Gamma Distribution Fitting Chapter 552 Gamma Distribution Fitting Introduction This module fits the gamma probability distributions to a complete or censored set of individual or grouped data values. It outputs various statistics

More information

Equity, Vacancy, and Time to Sale in Real Estate.

Equity, Vacancy, and Time to Sale in Real Estate. Title: Author: Address: E-Mail: Equity, Vacancy, and Time to Sale in Real Estate. Thomas W. Zuehlke Department of Economics Florida State University Tallahassee, Florida 32306 U.S.A. tzuehlke@mailer.fsu.edu

More information

The Locomotive. Transformer Asset Management

The Locomotive. Transformer Asset Management Transformer Asset Management By William H. Bartley, P.E., The Hartford Steam Boiler Inspection and Insurance Company Introduction The deregulation of wholesale electricity supply has led to a number of

More information

Mortality of Beneficiaries of Charitable Gift Annuities 1 Donald F. Behan and Bryan K. Clontz

Mortality of Beneficiaries of Charitable Gift Annuities 1 Donald F. Behan and Bryan K. Clontz Mortality of Beneficiaries of Charitable Gift Annuities 1 Donald F. Behan and Bryan K. Clontz Abstract: This paper is an analysis of the mortality rates of beneficiaries of charitable gift annuities. Observed

More information

TRIP OF MULTIPLE TRANSMISSION ELEMENTS IN THE SOUTHERN NSW AREA, 11 FEBRUARY 2017

TRIP OF MULTIPLE TRANSMISSION ELEMENTS IN THE SOUTHERN NSW AREA, 11 FEBRUARY 2017 TRIP OF MULTIPLE TRANSMISSION ELEMENTS IN THE SOUTHERN NSW AREA, 11 FEBRUARY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: 15 September 2017 INCIDENT CLASSIFICATIONS

More information

Survival Analysis Employed in Predicting Corporate Failure: A Forecasting Model Proposal

Survival Analysis Employed in Predicting Corporate Failure: A Forecasting Model Proposal International Business Research; Vol. 7, No. 5; 2014 ISSN 1913-9004 E-ISSN 1913-9012 Published by Canadian Center of Science and Education Survival Analysis Employed in Predicting Corporate Failure: A

More information

Generating Asset Health Indices which are both Useful and Auditable

Generating Asset Health Indices which are both Useful and Auditable MIPSYCON 2016 Generating Asset Health Indices which are both Useful and Auditable Tony McGrail, Jay Garnett Doble Engineering tmcgrail@doble.com jgarnett@doble.com Summary: Asset Health Index (AHI) AHI

More information

S atisfactory reliability and cost performance

S atisfactory reliability and cost performance Grid Reliability Spare Transformers and More Frequent Replacement Increase Reliability, Decrease Cost Charles D. Feinstein and Peter A. Morris S atisfactory reliability and cost performance of transmission

More information

RISK MANAGEMENT: COST MINIMIZATION USING CONDITION-BASED MAINTENANCE. S Fretheim

RISK MANAGEMENT: COST MINIMIZATION USING CONDITION-BASED MAINTENANCE. S Fretheim RISK MANAGEMENT: COST MINIMIZATION USING CONDITION-BASED MAINTENANCE E Solvang, L Lundgaard, B Gustavsen, A O Eggen S Fretheim SINTEF Energy Research, Norway EBL Norwegian Electricity Association, Norway

More information

[D7] PROBABILITY DISTRIBUTION OF OUTSTANDING LIABILITY FROM INDIVIDUAL PAYMENTS DATA Contributed by T S Wright

[D7] PROBABILITY DISTRIBUTION OF OUTSTANDING LIABILITY FROM INDIVIDUAL PAYMENTS DATA Contributed by T S Wright Faculty and Institute of Actuaries Claims Reserving Manual v.2 (09/1997) Section D7 [D7] PROBABILITY DISTRIBUTION OF OUTSTANDING LIABILITY FROM INDIVIDUAL PAYMENTS DATA Contributed by T S Wright 1. Introduction

More information

Stochastic model of flow duration curves for selected rivers in Bangladesh

Stochastic model of flow duration curves for selected rivers in Bangladesh Climate Variability and Change Hydrological Impacts (Proceedings of the Fifth FRIEND World Conference held at Havana, Cuba, November 2006), IAHS Publ. 308, 2006. 99 Stochastic model of flow duration curves

More information

TRANSGRID PRICING METHODOLOGY 2015/ /18. Contents

TRANSGRID PRICING METHODOLOGY 2015/ /18. Contents Pricing Methodology TRANSGRID PRICING METHODOLOGY 2015/16 2017/18 Contents Pricing Methodology 1 Introduction 3 2 Duration 3 3 Which services are subject to this pricing methodology? 4 4 Overview of the

More information

TRIP OF VALES POINT 330 KV MAIN BUSBAR ON 27 JULY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES

TRIP OF VALES POINT 330 KV MAIN BUSBAR ON 27 JULY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES TRIP OF VALES POINT 330 KV MAIN BUSBAR ON 27 JULY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: 26 September 2017 INCIDENT CLASSIFICATIONS Classification Detail

More information

A New Resource Adequacy Standard for the Pacific Northwest. Background Paper

A New Resource Adequacy Standard for the Pacific Northwest. Background Paper A New Resource Adequacy Standard for the Pacific Northwest Background Paper 12/6/2011 A New Resource Adequacy Standard for the Pacific Northwest Background Paper CONTENTS Abstract... 3 Summary... 3 Background...

More information

UK Power Networks. Overall Cost Benefit Analysis

UK Power Networks. Overall Cost Benefit Analysis UK Power Networks Overall Cost Benefit Analysis Contents 1 Executive Summary 3 1.1 Analysis Conclusions 3 1.2 Summary Table 4 2 Introduction 5 2.1 Scope 5 2.2 Input Parameters 6 2.3 Asset Replacement/Refurbishment

More information

A Skewed Truncated Cauchy Logistic. Distribution and its Moments

A Skewed Truncated Cauchy Logistic. Distribution and its Moments International Mathematical Forum, Vol. 11, 2016, no. 20, 975-988 HIKARI Ltd, www.m-hikari.com http://dx.doi.org/10.12988/imf.2016.6791 A Skewed Truncated Cauchy Logistic Distribution and its Moments Zahra

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.16-09- Exhibit No.: SCE-0, Vol. 08 Witnesses: J. R. Goizueta M. Flores A (U 338-E) 018 General Rate Case Transmission & Distribution (T&D) Volume 8 - Infrastructure Replacement Before

More information

The Effects of Increasing the Early Retirement Age on Social Security Claims and Job Exits

The Effects of Increasing the Early Retirement Age on Social Security Claims and Job Exits The Effects of Increasing the Early Retirement Age on Social Security Claims and Job Exits Day Manoli UCLA Andrea Weber University of Mannheim February 29, 2012 Abstract This paper presents empirical evidence

More information

FINAL Framework and Approach for Powerlink

FINAL Framework and Approach for Powerlink FINAL Framework and Approach for Powerlink For the regulatory control period commencing 2017 June 2015 Powerlink 2017 22 Framework and approach 1 Powerlink 2017 22 Framework and approach 2 Powerlink 2017

More information

IN D EC. consulting. A Review of the Regulatory Framework for Development of Costing Principles for Rail Access in WA

IN D EC. consulting. A Review of the Regulatory Framework for Development of Costing Principles for Rail Access in WA Discussion Paper A Review of the Regulatory Framework for Development of Costing Principles for Rail Access in WA IN D EC consulting Prepared for: Mr Jock Irvine Alcoa World Alumina Australia Booragoon

More information

UNDERSTANDING RISK TOLERANCE CRITERIA. Paul Baybutt. Primatech Inc., Columbus, Ohio, USA.

UNDERSTANDING RISK TOLERANCE CRITERIA. Paul Baybutt. Primatech Inc., Columbus, Ohio, USA. UNDERSTANDING RISK TOLERANCE CRITERIA by Paul Baybutt Primatech Inc., Columbus, Ohio, USA www.primatech.com Introduction Various definitions of risk are used by risk analysts [1]. In process safety, risk

More information

The South African Grid Code. Transmission Tariff Code. Version 9.0

The South African Grid Code. Transmission Tariff Code. Version 9.0 The South African Grid Code Transmission Tariff Code Version 9.0 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr. Bernard

More information

Preventive Maintenance For Substation With Aging Equipment Using Weibull Distribution

Preventive Maintenance For Substation With Aging Equipment Using Weibull Distribution American Journal of Engineering Research (AJER) 218 American Journal of Engineering Research (AJER) e-issn: 232-847 p-issn : 232-936 Volume-7, Issue-4, pp-16-112 www.ajer.org Research Paper Open Access

More information

Risk Assessment Of Aging Power Transformers In The Transmission Network. C. NEUMANN TU Darmstadt Germany

Risk Assessment Of Aging Power Transformers In The Transmission Network. C. NEUMANN TU Darmstadt Germany 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Risk Assessment Of Aging Power Transformers In The Transmission Network M. FLECKENSTEIN

More information

Analysis of Transformer Failures

Analysis of Transformer Failures IMIA WGP 33 (03) Analysis of Transformer Failures by William H. Bartley P.E. The Hartford Steam Boiler Inspection & Insurance Co. presented at International Association of Engineering Insurers 36 th Annual

More information

Maximum Likelihood Estimates for Alpha and Beta With Zero SAIDI Days

Maximum Likelihood Estimates for Alpha and Beta With Zero SAIDI Days Maximum Likelihood Estimates for Alpha and Beta With Zero SAIDI Days 1. Introduction Richard D. Christie Department of Electrical Engineering Box 35500 University of Washington Seattle, WA 98195-500 christie@ee.washington.edu

More information

Chapter 2 ( ) Fall 2012

Chapter 2 ( ) Fall 2012 Bios 323: Applied Survival Analysis Qingxia (Cindy) Chen Chapter 2 (2.1-2.6) Fall 2012 Definitions and Notation There are several equivalent ways to characterize the probability distribution of a survival

More information

Submitted by Western Power

Submitted by Western Power Final Determination on the New Facilities Investment Test for a 66/11 kv Medical Centre Zone Substation Expansion and Voltage Conversion of the Distribution Network Submitted by Western Power 19 February

More information

Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream

Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream Title Authors Topics Case Study: Risk based approach for the design of a transport infrastructure Edmund Ang, Imperial College

More information

OPERATIONAL INVESTMENTS

OPERATIONAL INVESTMENTS EB-0-0 Tab Schedule Page of OPERATIONAL INVESTMENTS REACTIVE CAPITAL Reactive capital investment includes funds for the replacement of failed distribution components and the restoration of system reliability.

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation)

More information

Endeavour Energy Regulatory proposal Submission to the AER Issues Paper August 2018

Endeavour Energy Regulatory proposal Submission to the AER Issues Paper August 2018 This work by Energy Consumers Australia is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/. Where

More information

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS Ancillary services to be delivered in Denmark. Tender conditions 1/49 Energinet.dk Tonne Kjærsvej 65 DK-7000 Fredericia +45 70 10 22 44 info@energinet.dk VAT no. 28 98 06 71 Date: 30. august 2017 Author:

More information

STATISTICAL DISTRIBUTIONS AND THE CALCULATOR

STATISTICAL DISTRIBUTIONS AND THE CALCULATOR STATISTICAL DISTRIBUTIONS AND THE CALCULATOR 1. Basic data sets a. Measures of Center - Mean ( ): average of all values. Characteristic: non-resistant is affected by skew and outliers. - Median: Either

More information

Properly Assessing Diagnostic Credit in Safety Instrumented Functions Operating in High Demand Mode

Properly Assessing Diagnostic Credit in Safety Instrumented Functions Operating in High Demand Mode Properly Assessing Diagnostic Credit in Safety Instrumented Functions Operating in High Demand Mode Julia V. Bukowski, PhD Department of Electrical & Computer Engineering Villanova University julia.bukowski@villanova.edu

More information

INDIAN INSTITUTE OF SCIENCE STOCHASTIC HYDROLOGY. Lecture -26 Course Instructor : Prof. P. P. MUJUMDAR Department of Civil Engg., IISc.

INDIAN INSTITUTE OF SCIENCE STOCHASTIC HYDROLOGY. Lecture -26 Course Instructor : Prof. P. P. MUJUMDAR Department of Civil Engg., IISc. INDIAN INSTITUTE OF SCIENCE STOCHASTIC HYDROLOGY Lecture -26 Course Instructor : Prof. P. P. MUJUMDAR Department of Civil Engg., IISc. Summary of the previous lecture Hydrologic data series for frequency

More information

PARAMETRIC AND NON-PARAMETRIC BOOTSTRAP: A SIMULATION STUDY FOR A LINEAR REGRESSION WITH RESIDUALS FROM A MIXTURE OF LAPLACE DISTRIBUTIONS

PARAMETRIC AND NON-PARAMETRIC BOOTSTRAP: A SIMULATION STUDY FOR A LINEAR REGRESSION WITH RESIDUALS FROM A MIXTURE OF LAPLACE DISTRIBUTIONS PARAMETRIC AND NON-PARAMETRIC BOOTSTRAP: A SIMULATION STUDY FOR A LINEAR REGRESSION WITH RESIDUALS FROM A MIXTURE OF LAPLACE DISTRIBUTIONS Melfi Alrasheedi School of Business, King Faisal University, Saudi

More information

Potential Upgrade of Queensland/New South Wales Interconnector (QNI) Assessment of Optimal Timing and Net Market Benefits

Potential Upgrade of Queensland/New South Wales Interconnector (QNI) Assessment of Optimal Timing and Net Market Benefits FINAL REPORT F 13 October 2008 Potential Upgrade of Queensland/New South Wales Interconnector (QNI) Assessment of Optimal Timing and Net Market Benefits Disclaimer While care was taken in preparation of

More information

Monitoring Processes with Highly Censored Data

Monitoring Processes with Highly Censored Data Monitoring Processes with Highly Censored Data Stefan H. Steiner and R. Jock MacKay Dept. of Statistics and Actuarial Sciences University of Waterloo Waterloo, N2L 3G1 Canada The need for process monitoring

More information

ASSESSMENT TECHNICAL LOSSES IN DISTRIBUTION SYSTEM

ASSESSMENT TECHNICAL LOSSES IN DISTRIBUTION SYSTEM ASSESSMENT TECHNICAL LOSSES IN DISTRIBUTION SYSTEM AHMED HAMZAH KADHIM Electrical Power Engineering, Universiti Tenaga Nasional (UNITEN), Selangor, Malaysia Email: Ahmed_hamza546@yahoo.com ABSTRACT This

More information

Process capability estimation for non normal quality characteristics: A comparison of Clements, Burr and Box Cox Methods

Process capability estimation for non normal quality characteristics: A comparison of Clements, Burr and Box Cox Methods ANZIAM J. 49 (EMAC2007) pp.c642 C665, 2008 C642 Process capability estimation for non normal quality characteristics: A comparison of Clements, Burr and Box Cox Methods S. Ahmad 1 M. Abdollahian 2 P. Zeephongsekul

More information

Using survival models for profit and loss estimation. Dr Tony Bellotti Lecturer in Statistics Department of Mathematics Imperial College London

Using survival models for profit and loss estimation. Dr Tony Bellotti Lecturer in Statistics Department of Mathematics Imperial College London Using survival models for profit and loss estimation Dr Tony Bellotti Lecturer in Statistics Department of Mathematics Imperial College London Credit Scoring and Credit Control XIII conference August 28-30,

More information

Smooth estimation of yield curves by Laguerre functions

Smooth estimation of yield curves by Laguerre functions Smooth estimation of yield curves by Laguerre functions A.S. Hurn 1, K.A. Lindsay 2 and V. Pavlov 1 1 School of Economics and Finance, Queensland University of Technology 2 Department of Mathematics, University

More information

Heuristics in Rostering for Call Centres

Heuristics in Rostering for Call Centres Heuristics in Rostering for Call Centres Shane G. Henderson, Andrew J. Mason Department of Engineering Science University of Auckland Auckland, New Zealand sg.henderson@auckland.ac.nz, a.mason@auckland.ac.nz

More information

Statistical Modeling Techniques for Reserve Ranges: A Simulation Approach

Statistical Modeling Techniques for Reserve Ranges: A Simulation Approach Statistical Modeling Techniques for Reserve Ranges: A Simulation Approach by Chandu C. Patel, FCAS, MAAA KPMG Peat Marwick LLP Alfred Raws III, ACAS, FSA, MAAA KPMG Peat Marwick LLP STATISTICAL MODELING

More information

FAILURE RATE TRENDS IN AN AGING POPULATION MONTE CARLO APPROACH

FAILURE RATE TRENDS IN AN AGING POPULATION MONTE CARLO APPROACH FAILURE RATE TRENDS IN AN AGING POPULATION MONTE CARLO APPROACH Niklas EKSTEDT Sajeesh BABU Patrik HILBER KTH Sweden KTH Sweden KTH Sweden niklas.ekstedt@ee.kth.se sbabu@kth.se hilber@kth.se ABSTRACT This

More information

Probabilistic Safety Analysis (PSA): Applications. Guideline for Swiss Nuclear Installations ENSI-A06

Probabilistic Safety Analysis (PSA): Applications. Guideline for Swiss Nuclear Installations ENSI-A06 Guideline for Swiss Nuclear Installations ENSI-A06 Edition November 2015 Edition November 2015 Guideline for Swiss Nuclear Installations ENSI-A06/e Contents Guideline for Swiss Nuclear Installations

More information

STOCHASTIC COST ESTIMATION AND RISK ANALYSIS IN MANAGING SOFTWARE PROJECTS

STOCHASTIC COST ESTIMATION AND RISK ANALYSIS IN MANAGING SOFTWARE PROJECTS STOCHASTIC COST ESTIMATION AND RISK ANALYSIS IN MANAGING SOFTWARE PROJECTS Dr A.M. Connor Software Engineering Research Lab Auckland University of Technology Auckland, New Zealand andrew.connor@aut.ac.nz

More information

Expenditure Forecast Methodology

Expenditure Forecast Methodology Forecast Methodology Regulatory Control Period 2018-19 to 2022-23 Version 1.0 Security Classification: Public ElectraNet Corporate Headquarters 52-55 East Terrace, Adelaide, South Australia 5000 PO Box

More information

Statistical Analysis of Life Insurance Policy Termination and Survivorship

Statistical Analysis of Life Insurance Policy Termination and Survivorship Statistical Analysis of Life Insurance Policy Termination and Survivorship Emiliano A. Valdez, PhD, FSA Michigan State University joint work with J. Vadiveloo and U. Dias Sunway University, Malaysia Kuala

More information

Chapter 4: Commonly Used Distributions. Statistics for Engineers and Scientists Fourth Edition William Navidi

Chapter 4: Commonly Used Distributions. Statistics for Engineers and Scientists Fourth Edition William Navidi Chapter 4: Commonly Used Distributions Statistics for Engineers and Scientists Fourth Edition William Navidi 2014 by Education. This is proprietary material solely for authorized instructor use. Not authorized

More information

Duration Models: Parametric Models

Duration Models: Parametric Models Duration Models: Parametric Models Brad 1 1 Department of Political Science University of California, Davis January 28, 2011 Parametric Models Some Motivation for Parametrics Consider the hazard rate:

More information

Commonly Used Distributions

Commonly Used Distributions Chapter 4: Commonly Used Distributions 1 Introduction Statistical inference involves drawing a sample from a population and analyzing the sample data to learn about the population. We often have some knowledge

More information

On the comparison of the Fisher information of the log-normal and generalized Rayleigh distributions

On the comparison of the Fisher information of the log-normal and generalized Rayleigh distributions On the comparison of the Fisher information of the log-normal and generalized Rayleigh distributions Fawziah S. Alshunnar 1, Mohammad Z. Raqab 1 and Debasis Kundu 2 Abstract Surles and Padgett (2001) recently

More information

New York State Public Service Commission

New York State Public Service Commission PSC NO. 220 ELECTRICITY ADDENDUM TYPES: SIR NIAGARA MOHAWK POWER CORPORATION ADDENDUM NO. 7 INITIAL EFFECTIVE DATE: AUGUST 16, 2017 STAMPS: ISSUED IN COMPLIANCE WITH ORDER IN CASE 16-E-0560 Issued August

More information

ANOTHER LOOK AT RISK AND STRUCTURAL RELIABILITY CRITERIA

ANOTHER LOOK AT RISK AND STRUCTURAL RELIABILITY CRITERIA ANOTHER LOOK AT RISK AND STRUCTURAL RELIABILITY CRITERIA V.M. Trbojevic, Risk Support Ltd., UK Abstract The paper presents a comparison of societal risk criteria and the several structural reliability

More information

Chapter 7.2: Large-Sample Confidence Intervals for a Population Mean and Proportion. Instructor: Elvan Ceyhan

Chapter 7.2: Large-Sample Confidence Intervals for a Population Mean and Proportion. Instructor: Elvan Ceyhan 1 Chapter 7.2: Large-Sample Confidence Intervals for a Population Mean and Proportion Instructor: Elvan Ceyhan Outline of this chapter: Large-Sample Interval for µ Confidence Intervals for Population Proportion

More information

Statistics I Final Exam, 24 June Degrees in ADE, DER-ADE, ADE-INF, FICO, ECO, ECO-DER.

Statistics I Final Exam, 24 June Degrees in ADE, DER-ADE, ADE-INF, FICO, ECO, ECO-DER. Statistics I Final Exam, June. Degrees in ADE, DER-ADE, ADE-INF, FICO, ECO, ECO-DER. EXAM RULES: Use separate booklets for each problem. Perform the calculations with at least two significant decimal places.

More information

APPENDIX A - GLOSSARY

APPENDIX A - GLOSSARY APPENDIX A - GLOSSARY 1. Photovoltaic (PV) or Solar (interchangeable): These are devices that generate electricity directly from sunlight via an electronic process that occurs naturally in certain types

More information

Basic notions of probability theory: continuous probability distributions. Piero Baraldi

Basic notions of probability theory: continuous probability distributions. Piero Baraldi Basic notions of probability theory: continuous probability distributions Piero Baraldi Probability distributions for reliability, safety and risk analysis: discrete probability distributions continuous

More information

Price Impact and Optimal Execution Strategy

Price Impact and Optimal Execution Strategy OXFORD MAN INSTITUE, UNIVERSITY OF OXFORD SUMMER RESEARCH PROJECT Price Impact and Optimal Execution Strategy Bingqing Liu Supervised by Stephen Roberts and Dieter Hendricks Abstract Price impact refers

More information

MAKING RISK BASED EARTHING DESIGN ACCESSIBLE AND EFFECTIVE

MAKING RISK BASED EARTHING DESIGN ACCESSIBLE AND EFFECTIVE MAKING RISK BASED EARTHING DESIGN ACCESSIBLE AND EFFECTIVE William CARMAN Bill Carman Consulting Australia billcarman2@gmail.com ABSTRACT Earthing design requires the synthesis of a number of highly variable

More information

STOCHASTIC COST ESTIMATION AND RISK ANALYSIS IN MANAGING SOFTWARE PROJECTS

STOCHASTIC COST ESTIMATION AND RISK ANALYSIS IN MANAGING SOFTWARE PROJECTS Full citation: Connor, A.M., & MacDonell, S.G. (25) Stochastic cost estimation and risk analysis in managing software projects, in Proceedings of the ISCA 14th International Conference on Intelligent and

More information

ESTIMATING THE DISTRIBUTION OF DEMAND USING BOUNDED SALES DATA

ESTIMATING THE DISTRIBUTION OF DEMAND USING BOUNDED SALES DATA ESTIMATING THE DISTRIBUTION OF DEMAND USING BOUNDED SALES DATA Michael R. Middleton, McLaren School of Business, University of San Francisco 0 Fulton Street, San Francisco, CA -00 -- middleton@usfca.edu

More information

Reliable and Energy-Efficient Resource Provisioning and Allocation in Cloud Computing

Reliable and Energy-Efficient Resource Provisioning and Allocation in Cloud Computing Reliable and Energy-Efficient Resource Provisioning and Allocation in Cloud Computing Yogesh Sharma, Bahman Javadi, Weisheng Si School of Computing, Engineering and Mathematics Western Sydney University,

More information

Impact of Weekdays on the Return Rate of Stock Price Index: Evidence from the Stock Exchange of Thailand

Impact of Weekdays on the Return Rate of Stock Price Index: Evidence from the Stock Exchange of Thailand Journal of Finance and Accounting 2018; 6(1): 35-41 http://www.sciencepublishinggroup.com/j/jfa doi: 10.11648/j.jfa.20180601.15 ISSN: 2330-7331 (Print); ISSN: 2330-7323 (Online) Impact of Weekdays on the

More information

ENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK

ENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK ANNEXURE A ENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK CONTENTS 1. Enterprise Risk Management Policy Commitment 3 2. Introduction 4 3. Reporting requirements 5 3.1 Internal reporting processes for risk

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Attachment 7-11 - Independent analysis of replacement expenditure Public 30 April 2015 AER repex

More information

Artificially Intelligent Forecasting of Stock Market Indexes

Artificially Intelligent Forecasting of Stock Market Indexes Artificially Intelligent Forecasting of Stock Market Indexes Loyola Marymount University Math 560 Final Paper 05-01 - 2018 Daniel McGrath Advisor: Dr. Benjamin Fitzpatrick Contents I. Introduction II.

More information

US Household Ownership of Mutual Funds in Most Mutual Fund Owners Are Educated and in Their Prime Earning Years

US Household Ownership of Mutual Funds in Most Mutual Fund Owners Are Educated and in Their Prime Earning Years ICI RESEARCH PERSPECTIVE 1401 H STREET, NW, SUITE 1200 WASHINGTON, DC 20005 202-326-5800 WWW.ICI.ORG OCTOBER 2016 VOL. 22, NO. 7 WHAT S INSIDE 2 US Household Ownership of Mutual Funds in 2016 2 Most Mutual

More information

UNBIASED INVESTMENT RISK ASSESSMENT FOR ENERGY GENERATING COMPANIES: RATING APPROACH

UNBIASED INVESTMENT RISK ASSESSMENT FOR ENERGY GENERATING COMPANIES: RATING APPROACH A. Domnikov, et al., Int. J. Sus. Dev. Plann. Vol. 12, No. 7 (2017) 1168 1177 UNBIASED INVESTMENT RISK ASSESSMENT FOR ENERGY GENERATING COMPANIES: RATING APPROACH A. DOMNIKOV, G. CHEBOTAREVA & M. KHODOROVSKY

More information

Is GPK Right for U.S. Companies? Possibility of Its Application in Bangladesh

Is GPK Right for U.S. Companies? Possibility of Its Application in Bangladesh ASA University Review, Vol. 4 No. 2, July December, 2010 Is GPK Right for U.S. Companies? Possibility of Its Application in Bangladesh Rosanne Weaver * Robert W. Rutledge ** Khondkar E. Karim *** Abstract

More information

AbleMarkets 20-minute Aggressive HFT Index Helped Beat VWAP by 8% Across Russell 3000 Stocks in 2015

AbleMarkets 20-minute Aggressive HFT Index Helped Beat VWAP by 8% Across Russell 3000 Stocks in 2015 AbleMarkets 20-minute Aggressive HFT Index Helped Beat by 8% Across Russell 3000 Stocks in 2015 Live out-of-sample demo of the 20-minute aggressive HFT index performance in execution on Canadian dollar

More information

Probabilistic models for risk assessment of disasters

Probabilistic models for risk assessment of disasters Safety and Security Engineering IV 83 Probabilistic models for risk assessment of disasters A. Lepikhin & I. Lepikhina Department of Safety Engineering Systems, SKTB Nauka KSC SB RAS, Russia Abstract This

More information

Optimal Withdrawal Strategy for Retirement Income Portfolios

Optimal Withdrawal Strategy for Retirement Income Portfolios Optimal Withdrawal Strategy for Retirement Income Portfolios David Blanchett, CFA Head of Retirement Research Maciej Kowara, Ph.D., CFA Senior Research Consultant Peng Chen, Ph.D., CFA President September

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.1-0- Exhibit No.: SCE-0, Vol. 1 (Appendix) Witnesses: R. Woods (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume 1 Appendix to Operational Overview and Risk-Informed

More information

ENTSO-E Network Code on Electricity Balancing

ENTSO-E Network Code on Electricity Balancing Annex II to Recommendation of the Agency for the Cooperation of Energy Regulators No 03/2015 of 20 July 2015 on the Network Code on Electricity Balancing Proposed amendments to the Network Code ENTSO-E

More information

POWER SYSTEM NOT IN A SECURE OPERATING STATE IN VICTORIA ON 15 JUNE 2016 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES

POWER SYSTEM NOT IN A SECURE OPERATING STATE IN VICTORIA ON 15 JUNE 2016 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES POWER SYSTEM NOT IN A SECURE OPERATING STATE IN VICTORIA ON 15 JUNE 2016 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: November 2016 INCIDENT CLASSIFICATIONS Classification

More information

Loss Evaluation Considerations for Utility Synchronous Condenser Applications. P.E. MARKEN, A.C. DEPOIAN GE Grid Solutions USA

Loss Evaluation Considerations for Utility Synchronous Condenser Applications. P.E. MARKEN, A.C. DEPOIAN GE Grid Solutions USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Loss Evaluation Considerations for Utility Synchronous Condenser Applications P.E. MARKEN,

More information

September 30th, 2013 Dave and TFSS, Please find attached final responses to the clarification requests on the NPCC Regional Standard for Automatic UFLS PRC -006-NPCC-1 as reviewed and approved during the

More information

A Scenario-Based Method (SBM) for Cost Risk Analysis

A Scenario-Based Method (SBM) for Cost Risk Analysis A Scenario-Based Method (SBM) for Cost Risk Analysis Cost Risk Analysis Without Statistics!! September 2008 Paul R Garvey Chief Scientist, Center for Acquisition and Systems Analysis 2008 The MITRE Corporation

More information

HORIZON ENERGY DISTRIBUTION LIMITED

HORIZON ENERGY DISTRIBUTION LIMITED HORIZON ENERGY DISTRIBUTION LIMITED THRESHOLD COMPLIANCE STATEMENT FOR THE ASSESSMENT DATE, 31 MARCH 2010 Pursuant to the Commerce Act (Electricity Distribution Thresholds) Notice 2004 and Amendment Notice

More information

SIL and Functional Safety some lessons we still have to learn.

SIL and Functional Safety some lessons we still have to learn. SIL and Functional Safety some lessons we still have to learn. David Craig, Amec This paper reflects AMEC s recent experience in undertaking functional safety assessments (FSA) (audits against IEC 61511)

More information

ICI RESEARCH PERSPECTIVE

ICI RESEARCH PERSPECTIVE ICI RESEARCH PERSPECTIVE 1401 H STREET, NW, SUITE 1200 WASHINGTON, DC 20005 202-326-5800 WWW.ICI.ORG OCTOBER 2017 VOL. 23, NO. 8 WHAT S INSIDE 2 US Household Ownership of Mutual Funds in 2017 2 Most Mutual

More information

Fundamentals of Statistics

Fundamentals of Statistics CHAPTER 4 Fundamentals of Statistics Expected Outcomes Know the difference between a variable and an attribute. Perform mathematical calculations to the correct number of significant figures. Construct

More information

Window Width Selection for L 2 Adjusted Quantile Regression

Window Width Selection for L 2 Adjusted Quantile Regression Window Width Selection for L 2 Adjusted Quantile Regression Yoonsuh Jung, The Ohio State University Steven N. MacEachern, The Ohio State University Yoonkyung Lee, The Ohio State University Technical Report

More information

A LEVEL MATHEMATICS ANSWERS AND MARKSCHEMES SUMMARY STATISTICS AND DIAGRAMS. 1. a) 45 B1 [1] b) 7 th value 37 M1 A1 [2]

A LEVEL MATHEMATICS ANSWERS AND MARKSCHEMES SUMMARY STATISTICS AND DIAGRAMS. 1. a) 45 B1 [1] b) 7 th value 37 M1 A1 [2] 1. a) 45 [1] b) 7 th value 37 [] n c) LQ : 4 = 3.5 4 th value so LQ = 5 3 n UQ : 4 = 9.75 10 th value so UQ = 45 IQR = 0 f.t. d) Median is closer to upper quartile Hence negative skew [] Page 1 . a) Orders

More information

EBA FINAL draft Regulatory Technical Standards

EBA FINAL draft Regulatory Technical Standards EBA/RTS/2014/10 4 July 2014 EBA FINAL draft Regulatory Technical Standards on the conditions for assessing the materiality of extensions and changes of internal approaches when calculating own funds requirements

More information