AN EVALUATION STUDY ON VIKAS MEIN JAN SAHYOG PROGRAMME IN HIMACHAL PRADESH
|
|
- Cody Barrett
- 5 years ago
- Views:
Transcription
1 AN EVALUATION STUDY ON VIKAS MEIN JAN SAHYOG PROGRAMME IN HIMACHAL PRADESH ISSUED BY : Planning Department Himachal Pradesh
2 PREFACE The programme Gaon Bhi Apna, Kam Bhi Apna was introduced in 99-9 to elicit effective people s participation through decentralized planning. In 994 the programme was restructured and renamed as Vikas Main Jan Sahyog. Under this participatory programme people come forward for meeting their most intensively felt needs with a public participation supplemented with Government budgetary support. After the feed back from the public, different slabs have been introduced for the public and Government participation of the programme. The public and government contribution ratio for Tribal Areas, Backward Declared Areas of the pradesh and villages having 50% and more than 50% population of SC/ST/OBC (or all the three categories) is 5:85. This contribution ratio for other rural areas and urban areas is 5:75 and 50:50 respectively. But the contribution ratio in urban areas for the construction of government Educational, Health, Veterinary institution buildings, Water Supply & Sewerage and Hand Pumps is 5:75. The contribution ratio for the to be constructed in the memory of some one is 50:50 in both the rural as well as urban areas. The State Government has decided to make a comprehensive review of this programme by conducting an evaluation study to assess the efficacy of this scheme. Accordingly, present study was conducted to assess the various aspects such as people s participation, utilization of funds for infrastructural development, completion and maintenance of assets, utility of assets created for the people and employment generation under this programme. The scope of the study was whole of Himachal Pradesh. A detailed schedule was designed to collect wide range of information on all aspects of the scheme covered under Vikas Main Jan Sahyog Programme. Out of total 667, 66 covering Community Assets, Drinking Water, Irrigation, Roads and Schools were selected for the study. The main findings of the study are : i) Out of 66, the estimated cost of 96% of the were below Rs. 5 lakh. % each of the were between Rs. 5 to 0 lakh and above Rs. 0 lakh. Concluding thereby that people prefer smaller. ii) Out of 66, sharing pattern of 47% was 5:85, 5% 5:75 and % were in the sharing pattern of 50:50 which depicts that this scheme is more popular in the rural areas. This fact is also substantiated with the finding that in sharing pattern of 50:50 category only % of the total sample fall. iii) Out of 66 works of 60 i.e. 97.5% were completed. iv) Out of total investment of lakh the public contributin was Rs lakh and rest was Govt. share.
3 v) The study has revealed that 99% of the were functional due to the people s participation input in the programme. vi) 99% of labour force were employed for construction of works under VMJS from with in the village resulting in a very high employment generation of this programme in rural economy. The study has come out with the findings indicating the successful implementation of the programme. This study shows that any programme having public participation not only lead to the additional mobilisation of resources but also create sense of belongingness among the public which ensures the sustainability of the programme. I hope that the planners, policy formulator and the researcher will find this publication very useful. Dated : (Arvind Mehta) I.A.S. Secretary (Planning) to the Govt. of H.P., Shimla-
4 EXECUTIVE SUMMARY The State Government decided to undertake a comprehensive review of VMJS programme and accordingly, this study was conducted to assess the various aspects of the scheme such as people's participation, utilization of funds for infrastructural development, completion and maintenance of assets, utility of assets created for the rural population, social acceptability of programme, employment generation under this programme and to know the quality of work. The study has been conducted in all the districts of the State. The systematic stratified random sampling with multi-stage sampling technique for the selection of sample was adopted. 0% sample was drawn from each strata after stratifying the works on the basis of activity and estimated cost within the district. Out of 667 total number of, a sample size of 644 was selected for this study. But the analysis of the report is based on 66 as were not reported and 6 schedules were rejected during scrutiny. The completed.from the year to were covered under this study. The results of the present study show that this programme is usefu to a greater extent for creation of assets in the rural areas as well as in the urban areas on a need felt basis. In 97.5yo cases, the works taken under this programme were completed in a stipulated period. The average Government and public participation ratio in financial terms was 80:0. About 99% of the completed were functional. However, on the maintenance part, results of the study indicate that only in % cases the maintenance funds were utilized. In 73% cases Development Committees have been constituted to oversee the work under VMJS programme. This programme has also helped in employment generation at the local level as 99% of the labour force employed was from within the village. The detailed findings of the study are as under : Under VMJS Programme, first preference of the people is to build road (3%) followed by Community Assets(6%), Schools (4%) Irrigation % and Drinking Water(8%). Out of 66, estimated cost of 96% of the total was below Rs. 5 lakh and % each of the between Rs 5 to 0 lakh and above 0 lakh. In 99.6% cases the estimated cost of the was equal to actual amount sanctioned and there was no cost escalation observed under this scheme. In terms of investment 5% of the total amount was invested in the below Rs 5 lakh and 48% investment was utilized in the of Rs 5 to 0 lakh and above Rs 0 lakh. In terms of investment 48% of the share of investment goes to Schools followed by Community Assets (9%), Roads (5%), Irrigation (6%) and Drinking Water (%). 3
5 Out of 66, sharing pattern of 47% of the was 5:85, 5% 5:75 and % scheme was in the sharing pattern of 50:50. The scheme is more popular in rural areas. Only % cases of the bearing the name of the particular person fall in the category of sharing pattern of 50:50 and in 99% cases community are preferred. In total investment of Rs lakh, Rs lakh i.e. 80% comprises Govt. share and Rs lakh i.e. 0% is public share under the sample. Out of 66, 60 i.e. 97.5% were completed. Out of total completed, 73% of the were completed within one year, 9% took years for completion and 8% took more than years 99% of the were found functional Only 3% UCs/CCs were submitted In % cases beneficiaries have utilized the maintenance fund. In case of 79% of the need for the use of maintenance fund was not felt and 8% were not aware of the maintenance fund. In 73% of the cases Development Committees have been constituted. 99% of the labour force employed under this programme was from within the village. Out of total investment,.5% was observed as labour cost. The average wage paid to the labour was Rs 56/- per day. 4
6 CONTENTS CHAPTERS Chapter Subject Page I II III IV V VI VII VIII Introduction Objectives of the study Methodology and sampling Design Overall results and discussions District-wise results and discussions Summary of findings Recommendation Schedules TABLES Table Title Page Composition of assets created Category and size-wise surveyed Amount sanctioned Asset-wise investment Activity-wise sharing pattern Activity-wise Govt. and Public share Status of surveyed Time taken for completion of scheme Completed and functional Activity-wise submission of UCs/CCs Maintenance Fund Agency maintaining the created assets Status of utilization of maintenance fund Constitution of Development Committees Status of the and families benefited Activity-wise labour force used Activity-wise mandays generated District-wise tables : Table- to Table-4 Table- to Table
7 DIAGRAMS Figure Title Page Composition of selected under sample frame Size of investment-wise percentage of Schemes and investment pattern Asset-wise investment percentage Sharing pattern of Sharing pattern and activity-wise percentage of Govt. and Public share Completed Agencies maintaining created assets Families benefited DISTRICT-WISE DIAGRAMS District-wise percentage of District-wise investment percentage of Estimated Cost - wise of scheme Average size of as per estimated cost
8 I. INTRODUCTION CHAPTER- I.. The State Government has started a programme named "Gaon Bhi Apna or Kam Bhi Apna" in the year 99-9 as a step in the area of decentralised planning and Public participation. A detailed review of this scheme was carried out after two years of its implementation which led to the restructuring and renaming of the Programme as "Vikas Main Jan Sahyog". Over the years certain changes/amendments have been carried out in its implementation but by and large basic frame work and objectives of the scheme remained the same as was envisaged at the very outset of the Programme. Basic approach behind this programme was to ensure people's participation at the grass root level with an objective of supplementing the Government efforts in the area of infrastructural development and ensure the sustainability of assets in future... There is people's participation from the stage of identification of the scheme based on local priorities up to the level of its execution as is clear from the very nomenclature of the Scheme. According to the guidelines of the scheme a community or an individual can approach the DC/ADC/ADM/SDM/DPO/BDO for taking up a particular work under this scheme and thereafter the community or an individual can submit the approved plan alongwith the requisite contribution and other necessary documents required as per the guidelines of the scheme. People's contribution varies according to the nature/type of scheme and location of the scheme i.e. whether in the urban area, rural area, backward area, or SCI ST population predominant area...3 VMJS Programme is in operation in the entire State both tribal areas as well as non-tribal areas. As per the norms, funds are apportioned among the districts, 60% on the basis of population and 40% on the basis of area. Schemes sanctioned above Rs. five lakh are over and above the normal financial allocations made to the Districts...4 The designated sanctioning authorities of according to their financial powers are as under: Initial Revised. Dy Commissioner Rs..00 lakh Rs lakh. Pr. Adviser (Planning) Rs lakh Rs lakh 3. Pr. Secretary (Planning) Rs lakh Rs lakh 4. Finance Department Above Rs lakh..5 The sharing pattern for urban area is 50:50 except Government Educational, Health, and Veterinary institution buildings, Water Supply, Sewerage and Hand Pumps where public and government contribution is 5 :75 in urban areas also, for the rural areas 5:75 and for SCs / STs populated area and backward area it is 5:85. An amount i.e. 0% of public and Government share is kept for maintenance of asset created. The public share is collected in advance by the D.C. and the funds are released keeping in view the availability of budget under VMJS programme. 7
9 ..6 Under this programme Government share is not provided to such works where the financial assistance is already provided by Central Government, State Government or any other source. In addition, such cases are not considered where there is already a budget provision in the State Budget. The financial support for the religious institutions is provided only for the community assets...7 The priority of works given under this programme is as under:. C/O school buildings. C/O multipurpose community assets 3. C/O motorable roads and rope-ways 4. C/O Irrigation /drinking water /installation of hand pumps 5. C/O buildings for public health services 6. Provision of important missing links such as three phase transmission lines, transformers, X-Rays plant and Ambulance etc...8 In addition, thee is provision up to Rs. 0 lakh investment by the Government for providing special facilities on pilot basis at places of tourist interest under Vikas Main Jan Shayog, on matching share basis by local communities or Hotel Association...9 The local committee of the public sharers is given first priority for the execution of work. If the sanctioned work is to be executed by the private agencies /Committees including PT As, such agencies should be registered. The sanctioned work is required to be completed within a period of one year form the date of sanction...0 There is very strong in built mechanism for monitoring of works in progress. For this purpose, local committees based on the size of the have been constituted For up to Rs. fifty Thousand, members of the committee comprise Chairman of Panchayat Samitti, Block Development Officer and Junior Engineer. For works up to one lakh, Members of the Zila Parishad of the concerned Division and Sub- Oivisional Officer are additional members and for works above Rs. One lakh, Chairman of Zila Parishad, Deputy Commissioner, XEN, Chairman of concerned Panchayat Samitti and BOO are the members of the monitoring committee. About 68% of the sanctioned are monitored by the various designated authorities.. Need of the Study.. In a State Level Technical Advisory Committee meeting held on 30th act. 00, it was decided that to conduct evaluation studies including the VMJS. In this meeting it was also decided that evaluation study on VMJS Programme may be conducted by the Planning Department. The field work of the study was done by the District Planning Cells. 8
10 ... Since the VMJS Programme has been under implementation since 99 and significant amount of Plan funds have been invested on this programme, it was decided to take stock of the extent of usefulness and social acceptability of this programme in various districts including tribal districts. 3. Scope of the Study.3. This study has been conducted in districts of the State. Under this study the following have been selected:. Community Assets. Drinking Water Supply 3. Irrigation 4. Roads 5. Schools 4. Time period of study.4. The completed from to were covered under this evaluation study. 9
11 CHAPTER-II OBJECTIVE OF THE STUDY.. The main objectives of the study are : i) To assess level of public participation / contribution made and funds utilised for the in fulfilling local developmental needs in terms of infrastructural development at the Panchayat / Village level. ii) iii) iv) To study the time taken for the sanction of completed and maintenance of. To evaluate the importance / utility of the assets created for the benefit of the local people. To study the views of the local representatives regarding the social acceptability of the programme. v) To estimate the direct employment generation in rural areas under this programme. vi) To evaluate the Quality of the work undertaken under this programme and the extent of usefulness of the prioritised by the people in rural areas. 0
12 CHAPTER-III METHODOLOGY AND SAMPLING DESIGN: 3.. It was decided to adopt stratified random sampling with multi-stage sampling technique for the selection of sample under the study. While selecting from the districts, the entire universe was divided into two stratums. i) Strata-I Tribal Areas ii) Strata-II Non-Tribal Areas. 3.. It was further decided that proportion of sample from Non- Tribal and Tribal districts would be in the ratio of 90%: 0%.. Sampling Size 3.. In this study, systematic stratified sampling design was adopted to workout the 0% sample and the following sample was selected:- Name of Category No of Schemes Sample size i) Community Assets ii) Drinking Water iii) Irrigation iv) Roads v) Schools The sample was further stratified into the following three categories based on the estimated cost. i) Estimated cost < than as five lakh. ii) iii) Estimated cost Rs. five lakh one to Rs. ten lakhs. Estimated cost Rs. ten lakh one and above After stratifying the works on the basis of activity and estimated cost within the district, 0% sample was drawn from each strata.out of the total sample of 644, 65 fall in the range of the estimated cost of less than Rs. 5 lakh, 4 were in the range of Rs to 0.00 lakh and the rest 5 were above 0 lakh.
13 : Following table gives the activity-wise/ cost-wise breakup of the sampled Category Less than Rs. Five Lakh Rs. Five lakh to Rs. Ten lakh Above Rs. Ten lakh Community Assets Drinking Water Irrigation Roads Schools : District-wise details of the selected are as under: Sr. Districts No of Comm unity Assets Drinking Water Activity-wise detail Irrigation Roads School s Bilaspur Chamba Hamirpur Kangra Kinnaur Kullu L & S Mandi Shimla Sirmour Solan Una The analysis of the report is based on 66 as out of the sample of 644 were non reported cases and 6 schedules were rejected during survey The coverage of this study was from the year to
14 CHAPTER-IV OVERALL RESULTS AND DISCUSSIONS 4.. A sample of 644 was drawn out of total 667 consisting of various categories of assets created under Vikas Main Jan Sahyog Programme. The results of the study are based on 66 as were non reported and 6 schedules were rejected. The assets created have been classified under five broad activities i.e. Community Assets (include Crematoria, Sarai, Community centre, Rain shelter, Mela Ground, Mahila Mandal Bhawan, Janj Ghar, etc.); Drinking Water (Baulies, Water Supply Schemes, Hand Pumps, Drinking Water Tanks, etc.); Irrigation (Irrigation tanks, Irrigation Schemes, Irrigation Wells, Kuhals and Field Channels); Roads ( Paths, Foot paths, link roads, Mule roads, Street pavements, culverts, pully, Bridges and Tractor roads) and Schools (Additional rooms, Toilets, Boundary wall, retaining wall, play ground and Stadium). A table showing the details of total of under sample frame, number of sampled and actual number of on which analysis is based are given below: TABLE- COMPOSITION OF ASSETS CREATED Sr. Schemes of Sample %age of Schemes composition Community Assets Drinking Water Irrigation Roads Schools From the table above it is seen that under Vikas Main Jan Sahyog Programme, first preference of the people is to build Roads (3% ) followed by Community Assets (6%), Schools (4%), Irrigation (%) and Drinking Water (8%). 3
15 4..3 The graphic representation of the above table is given in Figure-I: COMPOSITION OF SELECTED SCHEMES UNDER SAMPLE FRAME Schools-50 (4%) Community Assets-6 (6%) Drinking Water-5 (8%) Roads-9 (3%) Irrigation-7 (%) FIGURE-l 4..4 Out of total 66. the estimated cost of 603 was below Rs lakh and of was Rs to 0.00 lakh and for the estimated cost was above Rs lakh. Under Vikas Main Jan Sahyog Programme, the highest priority has been given by the people to the costing below Rs lakh as 96% of the total fall in this category and % each fall in the category of Rs to 0.00 lakh a~d above Rs lakh Activity-wise details of sample, with percentage, are given in the following table -. : Sr. TABLE- CATEGORY AND SIZE OF INVESTMENT WISE SURVEYED SCHEMES Category of scheme of Schemes Below Rs Lakh Rs-5.00 Rs 0.00 Lakh Above Rs Lakh Community Assets Drinking Water Irrigation Roads Schools (00%) 603 (96%) (%) (%) 4
16 4..6. Graphic presentation of table- is given in Figure- SIZE OF INVESTMENT-WISE PERCENTAGE OF SCHEMES 96% % % Below Rs. 5 lakh Rs. 5 to 0 Lakh SIZE FIGURE- Above Rs. 0 lakh The information on estimated cost and actual amount sanctioned was also collected. It is found that out of lakh of estimated cost Rs lakh was sanctioned i.e.99.6%. Therefore, it is concluded that proposals submitted by the public were mostly in order The aggregate sanctioned amount of the sampled is Rs lakh including Govt. and private share. The analysis is based on the 9.38% of the total and the time period covered under the study is five years. The average annual investment under the programme in respect of sampled comes to Rs lakh. The average annual releases by the Government under these during the period under study are Rs lakh. For further analysis sanctioned amount has been taken as investment.. Investment Pattern: Table 3 below gives the comparative position of of and percentage viz a viz their share in total investment. TABLE-3 AMOUNT SANCTIONED (Rs. in Lakh) Sr. Category of scheme of Schemes (%age) Amount sanctioned / Investment (%age) Below Rs Lakh 603 (96) (5) Lakh () (7) 3. Above 0.00 Lakh () (3) 66 (00) (00) Note : Amount sanctioned has been taken as investment 5
17 SCHEMES AND INVESTMENT PATTERN 96% 5% % 7% % 3% %age of Schemes %age Investment FIGURE Out of total investment 5 percent are invested in the costing below Rs. 5 lakhs, 7 percent in the costing Rs. 5 to 0 lakh and 3% in the costing above Rs. 0 lakh While analyzing the investment pattern in the different assets created, it is seen that 48% of the share of total investment goes to schools followed by Community Assets (9%), Roads (5%), Irrigation (6%) and Drinking Water (% ). Table 4 given below shows the share of investment in different assets created. Sr. Category of scheme TABLE-4 ASSET-WISE INVESTMENT of sample Schemes Amount sanctioned /investment (Rs. in lakh) % age sanctioned amount Community Assets Drinking Water Irrigation Roads Schools
18 4..3. The following diagram depicts the activity-wise details of investment: ASSET -WISE INVESTMENT PERCENTAGE 48% 9% 5% 6% % Schools Community Roads Irrigation Drinking Assets ACTIVITIES Water 3. Sharing Pattern: FIGURE As per the guidelines of VMJS Programme, sharing pattern for the urban areas is 50:50 except Government Educational, Health, Veterinary institution buildings, Water Supply, Sewerage and Hand Pumps whefe public and government contribution is 5:75 in urban areas also, for Rural area 5:75 and for the SCs/STs populated area and Backward area 5: The analysis of the results shows that out of 66 47% falls under 5:85 sharing category, 5% under 5:75 and % under 50:50 sharing pattern. It is revealed from this analysis that higher the Govt. contribution higher is the public demand for the scheme under the VMJS as 99% are falling in the Govt. contribution of 85% and 75%. It is also revealed that this scheme is benefiting the rural areas. It is also concluded that the scheme is more popular in rural areas. The only % were sanctioned in the sharing pattern of 50:50. Among different activities sharing pattern has no specific trend. Table 5 depicts the sharing pattern among different activities. TABLE-5 ACTIVITY-WISE SHARING PATTERN Sr Activity No Sharing Pattern-wise No of of sample 5:85 5:75 50: Community Assets 6 (00) 6 (39) 97 (59) 3 (). Drinking Water (00) (59) (4) 3. Irrigation (00) (38) (6) 4. Roads 9 (00) 3 (57) 68 (4) () 5. Schools 50 (00) 5 (45) 94 (53) 4 () %age to total 66 (00) 93 (47) 35 (5) 8 () 7
19 Following graphs show the of under different proportion of sharing and sharing trend among different categories. SHARING PATTERN OF SCHEMES 66 (00) & %age of Schemes 93 (47.0) 35 (5.0) 8 (.0) 5: 85 5:75 50:50 SHARING PATTERN FIGURE-5 SHARING PATTERN AND ACTIVITY -WISE %AGE OF SCHEMES 50:50 % % 59% 57% 5:85 5:75 6% 59% 53% 45% 39% 38% % 4% 4% Community Assets Schools Roads Drinking Water Roads Schools Community Assets Irrigation Irrigation Community Assets Schools Roads Drinking Water FIGURE In total investment of Rs lakh under the sample, Rs lakh is public share and Rs lakh is Government share. This includes provision for repair and maintenance. Taking into account all the categories of the, the average sharing pattern of Government and Public is 80:0. Activity-wise difference in the percentage of Government and public share is due to the of different sharing pattern falling in similar activity. The schematic detail is given in the following table: 8
20 Sr Activity TABLE-6 ACTIVITY-WISE GOVT. AND PUBLIC SHARE of sample Amount of Government and Public share (Rs. In Lakh) Govt. Public Share Share Community Assets 6 (00) (78) 5.68 ( ) 40.6 (00). Drinking Water 5 (00) 3.7 (79) 3.39 () 6.56 (00) 3. Irrigation 7 (00) 4.04 (78).58 () 53.6 (00) 4. Roads 9 (00) (80) 4.7 (0) 3.64 (00) 5. Schools 50 (00) (8) 73.7 (8) (00) %age to 66 (00) (80) (0) (00) Graphic representation of the Govt. and public share is given in figure-7: GOVT. AND PUBLIC SHARE % Amount (Rs. In lakh) & %age % % % Schools Community Assets 5.68 % % Roads SCHEMES 4.7 0% % Irrigation.58 % Drinking Water % % 3.39 % Public Share Govt. Share FIGURE-7 9
21 4. Status of the Scheme: 4.4. The works of 60 i.e. 97.5% were complete; six were in progress and the five,were incomplete out of the total 66. However, the works of two were cancelled and status of 3 was not recorded. The percentage of completed is quite encouraging which can be seen from the following table: TABLE-7 Sr No. Activity STATUS OF THE SAMPLED SCHEMES No of Work Cancelled 0 Status of the Work In progress Schemes Incomplet e No Record Complete d Community Assets Drinking Water Irrigation Roads Schools % age to total Schemes 66 (00) 5. Time Taken for Completion of Scheme: (0.3) 6 (0.9) 5 (0.8) 3 (0.5) 60 (97.5) 4.5. Out of 60, 55 (4%) were completed within 6 months, 3% within the period of 6 to months, 0% between to 8 months, 9% took 8 to 4 months and 8% took above two years for completion. Concluding thereby that out of total completed, 73% were completed within the period of one year, 9% within the period of years and 8% took more than years. The following table depicts the scheme-wise time taken for completion of the : TABLE-8 Sr No Activity TIME TAKEN FOR COMPLETION OF SCHEMES Schemes completed No of No of comple-ted Within 6 months 6- months -8 months 8-4 months Above years Community Assets 6 5 (00) 45 (30) 45 (30) 0 (3) 3 (5) 9 (). Drinking Water 5 50 (00) 8 (56) 5 (30) (4) 3. Irrigation 7 7 (00) 3 (44) () 7 (0) 7 (9) 4 (5) 4. Roads 9 9 (00) 0 (58) 46 (4) 8 (9) 8 (4) 9 (5) 5. Schools (00) 40 (8) 60 (4) 6 () 5 (0) 4 (0) % age to total 66 (00) 60 (00) 55 (4) 88 (3) 6 (0) 53 (9) 53 (8)
22 4.5. Graphic representation of above table is in Figure below: COMPLETED SCHEMES 60 (00% ) 443 (73%) 4 (9%) 53 (8%) and %age Within Within Above year years years FIGURE Out of total 60 completed, 60 were found functional which constitutes about 99% of the completed. The detailed position of completed and functional is depicted in the table below : Sr Activity TABLE-9 COMPLETED AND FUNCTIONAL SCHEMES No of No of completed Functional Nonfunctional Community Assets Drinking Water Irrigation Roads Schools % age to total (00) 60 (99%) 8 (%) 6. Submission of Utilisation Certificate/Completion Certificates: 4.6. The analysis of the results shows that the implementing agencies are not serious about the submission of UCs/CCs. The UCs/CCs of only 96 (3%) were submitted by the beneficiaries out of 60 completed. There are clear instruction in the sanction letter about the submission of Ucs / CCs after completion of the. The detail of submission of UCs/CCs is shown in the following table :
23 Sr Activity TABLE-0 ACTIVITY-WISE SUBMISSION OF UCs/CCs of No of completed UCs/CCs received UCs/CCs Not sent Community Assets Drinking Water Irrigation Roads Schools % age to total Schemes (00%) 96 (3%) 44 (68) 7. MAINTENANCE : i) Maintenance Fund 4.7. As per the guideline of Vikas Main Jan Sahyog programme, maintenance funds equivalent to the 0% of the total cost of the are mandatory. The analysis of the data reveals that the 8.5% of the total cost of the is kept as maintenance fund The Position of sanctioned amount and the maintenance fund is depicted in the following table : TABLE- Sr. Activity of Schemes MAINTENANCE FUND Sanctioned amount/inve stment (Rs.in lakh) Amount kept for %age maintenance Community Assets. Drinking Water Irrigation Roads Schools %age to 66 (00%)
24 ii) Maintenance of Assets: 4.7. Table depicts that different agencies are maintaining the assets created under VMJS. These agencies are Constituted Committees, Mahila Mandals, NGOs, BDO /SDM, School/PTA, Panchayats and Villagers/eneficiaries. Out of 60 functional, status of maintenance was reported in respect of 98%. Maximum number of assets (50%) are being maintained by the constituted committees. The detailed position is depicted in table. Sr TABLE- AGENCIES MAINTAINING THE CREATED ASSETS Activity Maintenance of Assets by : No of functional Constituted Committee Mahila mandal N.G.O BDO/SDM School/PTA Panchayats Villagers / beneficiaries Not Reported Community 49 0 Assets Drinking 49 0 Water Irrigation Roads Schools Percentage (00) (50.3) (4.0) (0.) (.0) (3.9) (7.8) (0.8) (.0) The graphic representation of the above table is given in figure-9 AGENCIES MAINTAINING CREATED ASSETS Constituted Committee Panchayat 07 (7.8%) School/PTA 84 (3.9) Villagers/Beneficiarie 65 (0.8%) Mahila Mandal 4 (4.0%) Not Reported (.0%) BDO/SDM 6 (.0%) NGO (0.%) 303 (50.3%) 60 (00) FIGURE-9 3
25 iii) Utilisation of Maintenance of Fund: The information on Maintenance Fund was also collected During the survey. It has been revealed after the analysis of data that the Maintenance Funds has been utilized in respect of % only. There was no immediate requirement of Maintenance Fund in case of 79% and 8% could not utilized due to lack of awareness. The following table gives the overall complete position of the utilisation of Maintenance Fund : TABLE-3 STATUS OF UTILISATION OF MAINTENANCE FUND Sr Activity Requirement of Maintenance fund of Schemes No of completed Schemes Received Not Released by the agency No requireme nt received Lack of awareness Community Assets Drinking Water Irrigation Roads Schools % age to total (00) 3 () 6 () 473 (79) 0 (8) As per guidelines, Maintenance Fund is to be provided after years from the completion of the scheme. On the basis of the analysis, it is observed that the utilization of Maintenance Fund is very low i.e. % only. It is suggested that an awareness campaign is required to educate the public for the utilization of Maintenance Fund. 8. Constitution of Development Committee for the execution of works : 4.8. Out of total 60 completed under VMJS, the Development Committees of 73% were found constituted. The average number of the members in the committee comes to seven. The detail of the constitution of Development Committee is shown in the following table : Sr Activity TABLE-4 CONSTITUTION OF DEVELOPMENT COMMITTEES of Schemes No of completed Schemes of Development Committee constituted Members in the Committee Community Assets Drinking Water Irrigation Roads Schools % age to total (00) 448 ( Average Member of Committee 7 4
26 9. Families Benefitted : 4.9. On the basis of the analysis, out of the total 60 functional maximum of families benefitted from construction of school buildings followed by Community Assets, Roads, Irrigation and Drinking Water. On an average, 07 families have been benefitted per scheme. The number of families benefitted under different are depicted in table 5. Sr TABLE-5 STATUS OF THE SCHEMES AND FAMILIES BENEFITTED Activity of Schemes No of Completed Schemes No of Functional No of families benefited Community Assets Drinking Water Irrigation Roads Schools Average families benefitted per scheme (00%) FAMILIES BENEFITTED No of families benefitted (in 000) 33.5 (5%) 6.3 (5%).5 (9%). (%) (%) 0. Employment Generation: Schools Community Roads Irrigation Drinking Assets Water SCHEMES FIGURE On the basis of the analysis, it is found that 99% of the labour force was employed from within the village in respect of sampled and only % was from outside the village. This programme has helped in the employment generation at the village level and uplifting the economic condition of the local people. In further analysis, 5
27 it is seen that maximum of employment was generated by activities of roads being the labour intensive activity. The table below depicts the activity wise labour force used under the VMJS programme Sr Activity TABLE-6 ACTIVITY-WISE LABOUR FORCE USED of Labour farce used of completed Within the Out side Schemes Village the village Community Assets (98) 5 () 30 (00). Drinking Water (00) 0 40 (00) 3. Irrigation (98) () 538 (00) 4. Roads (99) 6 () 6830 (00) 5. Schools (98) 3 ( ) 63 (00) % age to total (99) 0 () 4 (00) The labour component in the total cost is Rs lakh which is % of the total cost of the completed. Capital cost is 79%. The highest labour component is in roads (50%) followed by Drinking water (33.9%) and Irrigation (5.9 %). The maximum of mandays have been generated in roads (35%) followed by schools (9%), Community assets (6%), Irrigation (7%) and drinking water (3%). Table 7 depicts the detailed position of labour cost component and man days generated. Sr Activity TABLE-7 ACTIVITY-WISE MANDAYS GENERATED of Cost Mandays of completed (Rs.in lakh) generated Schemes Amount Paid to the labour % age of labour cost Community Assets (6) (5). Drinking Water (3) (30 3. Irrigation (7) (8) 4. Roads (35) (34) 5. Schools (9) (30) % age to total (00) (00) (00) Average wage per labour 56 6
28 CHAPTER-V DISTRICT-WISE RESULTS AND DISCUSSIONS 5.. While drawing sample, identity of the Districts was also maintained so as to see the District-wise priorities in various activities and investment pattern alongwith the other parameters like sharing pattern of the scheme, status of the, their maintenance, employment pattern, etc. 5.. In all, 66 were surveyed. Tables and give the District-wise and activity-wise distribution of in all the districts of the Pradesh. These Tables have been arranged in the descending order so as to have clear view of the district-wise priorities of the people for the sanctioned under VMJS. District Mandi is leading in terms of total of scheme followed by Hamirpur, Kangra, Kullu and Chamba. Whereas in terms of investment, District Shimla has got the Ist place followed by Solan, Una, Kullu, Mandi and Hamirpur. Graphic representations of Table-I and II give the clear view of the situation Table- and also depict the inter district and intra activity position in terms of of and investment. The roads are at Ist place in term of the maximum number of sanctioned/completed followed by Community Assets, Schools, Irrigation and Drinking Water (Table 6 at page ). District-wise preference of the people for the creation of assets varies from district to district. The table- shows the share of each of district in percentage term as well as in absolute Nos for total no. of as well as each activity separately. This table has been arranged in a descending order to have an instant view of the factual position Table- shows the position of the inter district and intra activity wise investment of the entire twelve districts. The Community Assets, Drinking Water, Roads and School Buildings are at number one place in term of investment in district Sirmour, Mandi, Kullu, and Shimla respectively. As already stated above, Shimla district is at the st place in term of the total investment in all activities. 7
29 TABLE- ACTIVITY-WISE AND DISTRICT-WISE SCHEMES SURVEYED Sr. Districts No of Schemes District Comm. Assets District Drinking Water Districts Irrigation Districts Roads Districts Schools Mandi (9.49) Mandi 4 (4.9) Chamba 5 (9.4) Kullu 6 (.) Mandi 54 (8.3) Hamirpur 44 (9.33) Hamirpur 84 (3.4) Hamirpur 3 (4.9) Mandi 3 (5.49) Shimla 4 (9.44) Kullu 33 (7.9) Kangra 3 (5.33) 3 Kangra 76 (.4) Kangra (3.66) Hamirpur 6 (.76) Solan (6.67) Chamba 30 (5.63) Mandi (4.67) 4 Kullu 70 (.8) Solan 9 (.80) Kangra 4 (7.84) Mandi 9 (.50) Kangra 4 (.50) Una (4.00) 5 Chamba 6 (9.74) Una 7 (0.56) Una 4 (7.84) Hamirpur 4 (5.56) Shimla 4 (7.9) Solan (7.33) 6 Solan 54 (8.63) Kullu 4 (8.70) Shimla 4 (7.84) Sirmour 4 (5.56) Solan 9 (4.69) Kullu 7 (4.67) 7 Una 49 (7.83) Kinnaur 9 (5.59) Solan 3 (5.88) Bilaspur 3 (4.7) Bilaspur 8 (4.7) Shimla 6 (4.00) 8 Shimla 46 (7.35) Chamba 9 (5.59) Bilaspur (3.9) Chamba 3 (4.7) Hamirpur 7 (3.65) Chamba 4 (.67) 9 Bilaspur (3.5) Shimla 8 (4.97) Kullu 0 Kangra 3 (4.7) Una 6 (3.3) Bilaspur 4 (.67) 0 Sirmour 7 (.7) Sirmour 6 (3.73) Sirmour 0 Lahaul & Spiti (.78) Sirmour 4 (.08) Sirmour 3 (.00) Kinnaur 5 (.40) Bilaspur 5 (3.) Kinnaur 0 Una (.39) Kinnaur (.04) Kinnaur 3 (.00) Lahaul & Spiti 0 (.60) Lahaul & Spiti 5 (3.) Lahaul & Spiti 0 Kinnaur (.39) Lahaul & Spiti (0.5) Lahaul & Spiti (.33) %age to (00) (5.7) (8.) (.5) (30.7) (4.0) 8
30 TABLE- DISTRICT-WISE & ACTIVITY-WISE INVESTMENT (Rs. In lakh) Sr. Districts Comm. Assets District Drinking Water Districts Irrigation Districts Roads Districts Schools Districts Investment Sirmour (8.8) Mandi 4.4 (5.0) Kullu.58 (40.3) Mandi 4.69 (0.0) Shimla 0.36 (30.) Shimla (9.0) Una 8.4 (.7) Kangra 3. (8.8) Shimla 7.37 (3.8) Kullu 0.9 (6.3) Solan (6.8) Solan 7.9 (4.) 3 Solan 4.58 (0.) Shimla.9 (7.5) Solan 5.9 (.0) Solan 9.35 (5.7) Una (4.5) Una 89.8 (0.6) 4 Lahaul & Spiti 4.0 (0.0) Chamba.5 (3.0) Mandi 3.53 (6.6) Shimla 4.66 (.9) Hamirpur (.4) Kullu (9.7) 5 Mandi 3.06 (9.6) Hamirpur.5 (3.0) Lahaul & Spiti 3.4 (6.) Kangra.69 (0.3) Kangra 3.40 (5.9) Mandi (9.4) 6 Hamirpur.37 (9.3) Solan 0.74 (4.5) Kangra 3.7 (5.9) Chamba 0.57 (8.6) Mandi 3.03 (5.8) Hamirpur (9.) 7 Kullu 9.68 (8.) Una 0.7 (4.3) Bilaspur.8 (4.) Lahaul & Spiti 6.35 (5.) Lahaul & Spiti 0.3 (5.) Kangra (7.) 8 Kangra 7.56 (7.3) Bilaspur 0.65 (3.9) Hamirpur.7 (4.0) Bilaspur 4.79 (3.9) Kullu 9.38 (4.8) Lahaul & Spiti 53.9 (6.5) 9 Kinnaur 6.6 (6.7) Kullu 0 Sirmour.6 (3.0) Hamirpur 4.3 (3.5) Kinnaur 3.77 (3.4) Sirmour 5.40 (6.3) 0 Shimla 3.9 (5.5) Sirmour 0 Chamba.04 (.9) Kinnaur.8 (.8) Sirmour 3.44 (0.8) Kinnaur 33.4 (4.0) Bilaspur 3.5 (.5) Kinnaur 0 Kinnaur 0.93 (.7) Sirmour.8 (.7) Chamba.76 (0.7) Chamba 9.34 (.3) Chamba.8 (.) Lahaul & Spiti 0 Una 0.88 (.6) Una.48 (.) Bilaspur.8 (0.7) Bilaspur 3.95 (.7) %age to (8.8) (.0) (6.4) (4.8) (48.0) (00) 9
31 DISTRICT-WISE %AGE OF SCHEMES 9.49 DISTRICT-WISE INVESTMENT %AGE OF SCHEMES 9 %age of Investment %age of Mandi Hamirpur Kangra Kullu Chamba Solan Una Shimla Bikaspur Sirmour Kinnaur L & S Shimla Solan Una Kullu Mandi Hamirpur Kangra.3.7 L & S Sirmour Kinnaur Chamba Bikaspur FIGURE- FIGURE- 30
32 An attempt has also been made to see the composition of scheme according to their size in various Districts. Table-3 below gives the district-wise position of the scheme classified on the basis of estimated cost. It is seen that District Mandi, Kangra, Bilaspur, Chamba and Sirmour have no scheme in the category of Rs. 5 to 0 lakh and above 0 lakh.. Sr. Activity TABLE-3 ESTIMATED COST-WISE DETAIL OF SCHEMES No of of Scheme having estimated cost (Rs.in lakh) Below Rs lakh Rs to Rs lakh Above Rs 0.00 lakh Mandi 0 0 (8.) Hamirpur (3.9) (8.3) (9.) 3 Kangra (.6) 4 Kullu (.) (5.0) 5 Solan 54 5 (8.5) (8.3) (8.) 6 Una (7.6) (8.3) (8.) 7 Shimla 46 4 (6.7) 3 (5.0) (8.) 8 Bilaspur 0 0 (3.6) 9 Chamba (0.) 0 Sirmour 7 6 (.6) 0 (9.) Kinnaur 5 3 (.) (8.3) (9.) Lahaul & Spiti 0 6 (.0) (6.8) (8.) %age to total ( 00) (00) (00) 3
33 ESTIMATED COST-WISE NO OF SCHEMES Mandi Hamirpur Kangra Kullu Solan Una 46 5 of Schemes Shimla Bilaspur Chamba Sirmour 0 6 Kinnaur L & S 6 3 Above 0 lakh 5 to 0 Lakh Below Rs 5 lakh FIGURE-3 3
34 In table-4 and Graph at Fig-4, District-wise average size of the scheme has been given. It is seen that District Lahaul and Spiti has the highest average size of the scheme in terms of Rupees based on estimated cost followed by Shimla, Sirmour, Kinnaur, Solan and Una. Sr. Districts TABLE-4 AMOUNT SANCTIONED AND AVERAGE SIZE of Scheme Sanctioned amount %age No of Schemes (Rs. In Lakh) Average size of Mandi (9.4) Hamirpur (9.) 3 Kangra (7.) 4 Kullu (9.7) 5 Chamba (.3) 6 Solan (4.) 7 Una (0.6) 8 Shimla (9.0) 9 Bilaspur (.7) 0 Sirmour (6.3) Kinnaur (4.0) Lahaul & Spiti (6.5) %age to (00) 33
35 AVERAGE SIZE OF SCHEMES AS PER ESTIMATED COST 5.39 Avg. Size (Rs.in lakh) L & S Shimla Sirmour Kinnaur Solan Una Kullu Hamirpur Kangra Mandi Bilaspur Chamba DISTRICTS FIGURE-4 Other parameters relating to sharing pattern of the scheme, status of the, maintenance of assets, families benefited and employment generation are given in the subsequent tables. TABLE- SCHEMES SURVEYED AND % THEREOF Sr. Districts of % among districts surveyed Schemes Mandi 9 Hamirpur Kangra 76 4 Kullu 70 5 Chamba Solan Una Shimla Bilaspur 4 0 Sirmour 7 3 Kinnaur 5 Lahaul & Spiti %age to 34
36 TABLE- ACTIVITY-WISE AND DISTRICT-WISE SCHEMES SURVEYED Sr. Districts Activity-wise detail No of Comm. Drinking Irrigation Roads Schools Assets Water Mandi (9.49) Hamirpur 84 (3.4) 3 Kangra 76 (.4) 4 Kullu 70 (.8) 5 Chamba 6 (9.74) 6 Solan 54 (8.63) 7 Una 49 (7.83) 8 Shimla 46 (7.35) 9 Bilaspur (3.5) 0 Sirmour 7 (.7) Kinnaur 5 Lahaul & Spiti %age to (.40) 0 (.60) 66 (00) (4.9) 3 (4.9) (3.66) 4 (8.70) 9 (5.59) 9 (.80) 7 (0.56) 8 (4.97) 5 (3.) 6 (3.73) 9 (5.59) 5 (3.) 6 (00) (5.49) 6 (.76) 4 (7.84) (.50) 4 (5.56) 3 (4.7) (9.4) 3 (5.88) 4 (7.84) 4 (7.84) (3.9) (.) 3 (4.7) (6.67) (.39) 4 (9.44) 3 (4.7) 0 4 (5.56) 0 (.39) 0 5 (00) (.78) 7 (00) (8.3) 7 (3.65) 4 (.50) 33 (7.9) 30 (5.63) 9 (4.69) 6 (3.3) 4 (7.9) 8 (4.7) 4 (.08) (.04) (0.5) 9 (00) (4.67) 44 (9.33) 3 (5.33) 7 (4.67) 4 (.67) (7.33) (4.00) 6 (4.00) 4 (.67) 3 (.00) 3 (.00) (.33) 50 (00) 35
37 Sr. Activity TABLE-3 ESTIMATED COST -WISE SCHEMES SURVEYED No of of Scheme having estimated cost Below Rs. 5.00lakh Rs to Rs lakh (Rs.in lakh) Above Rs 0.00 lakh Mandi (8.) Hamirpur (3.9) 3 Kangra (.6) 4 Kullu (.) 5 Solan 54 5 (8.5) 6 Una (7.6) 7 Shimla 46 4 (6.7) 8 Bilaspur (3.6) 9 Chamba 6 6 (0.) 0 Sirmour 7 6 (.6) Kinnaur 5 3 (.) Lahaul & Spiti 0 6 %age to total (.0) ( 00) 0 0 (8.3) (9.) (5.0) (8.3) (8.3) 3 (5.0) 0 (8.) (8.) (8.) (8.3) (6.8) (00) (9.) (9.) (8.) (00) 36
38 TABLE-4 AMOUNT SANCTIONED (Rs. In Lakh) Sr. Districts of Scheme Sanctioned amount Mandi (9.4) Hamirpur (9.) 3 Kangra (7.) 4 Kullu (9.7) 5 Chamba (.3) 6 Solan (4.) 7 Una (0.6) 8 Shimla (9.0) 9 Bilaspur 3.95 (.7) 0 Sirmour (6.3) Kinnaur (4.0) Lahaul & Spiti (6.5) (00) %age to TABLE-5 DISTRICT-WISE & ACTIVITY-WISE INVESTMENT (Rs. In Lakh) Sr. Districts Activity-wise detail Comm. Assets Drinking Water Irrigation Roads Schools Mandi 3.06 (9.6) 4.4 (5.0) 3.53 (6.6) 4.69 (0.0) 3.03 (5.8) (9.4) Hamirpur.37 (9.3).5 (3.0).7 (4.0) 4.3 (3.5) (.4) (9.) 3 Kangra 7.56 (7.3) 3. (8.8) 3.7 (5.9).69 (0.3) 3.40 (5.9) (7.) 4 Kullu 9.68 (8.) 0.58 (40.3) 0.9 (6.3) 9.38 (4.8) (9.7) 5 Chamba.8 (.).5 (3.0).04 (.9) 0.57 (8.6).76 (0.7) 9.34 (.3) 6 Solan 4.58 (0.) 0.74 (4.5) 5.9 (.0) 9.35 (5.7) (6.8) 7.9 (4.) 7 Una 8.4 (.7) 0.7 (4.3) 0.88 (.6).48 (.) (4.5) 89.7 (0.6) 8 Shimla 3.9 (5.5).9 (7.5) 7.37 (3.8) 4.66 (.9) 0.36 (30.) (9.0) 9 Bilaspur 3.5 (.5) 0.65 (3.9).8 (4.) 4.79 (3.9).8 (0.7) 3.95 (.7) 0 Sirmour (8.8) 0.6 (3.0).8 (.7) 3.44 (0.8) 5.40 (6.3) Kinnaur 6.6 (6.7) (.7).8 (.8) 3.77 (3.4) 33.4 (4.0) Lahaul & Spiti 4.0 (0.0) (6.) 6.35 (5.) 0.3 (5.) 53.9 (6.5) %age to (00.00) (00.00) (00.00) (00.00) (00.00) (00.00) 37
39 Sr. Districts TABLE-6 SHARING PATTERNOF THE SCHEMES of Scheme Sharing Pattern 5:85 5:75 50: Mandi 8 (8.0) Hamirpur 84 (0.3) 3 Kangra 76 4 (4.0) 4 Kullu 70 (7.) 5 Chamba 6 6 (0.8) 6 Solan 54 (3.8) 7 Una 49 4 (4.8) 8 Shimla 46 3 (7.8) 9 Bilaspur 0 (3.4) 0 Sirmour 7 4 (.4) Kinnaur 5 5 (5.) Lahaul & Spiti 0 0 (3.4) %age to (00) 39 (.0) (.5) 8 (4.8) (5.0) 35 0 (0.8) 49 0 (5.) (.6) (5.0) 35 0 (0.8) 3 0 (7.) 0 (3.7) 0 3 (3. ) (37.5) (00) 8 (00) TABLE-7 GOVT. AND PUBLIC SHARE Sr. District No of Govt. and Public share No Govt. Share Public Share Mandi 630 (80.6) 5.5 (9.4) (00.00) Hamirpur (74.7) 9.36 (5.3) (00.00) 3 Kangra (8.0).4 (9.0) (00.00) 4 Kullu (78.0) 7.79 (.0) (00.00) 5 Chamba (84.9).9 (5.) 9.34 (00.00) 6 Solan (8.).7 (9.9) 7.9 (00.00) 7 Una ( 79.9) 7.96 (.) 89.6 (00.00) 8 Shimla ( 8.4) 9.57 (8..6) (00.00) 9 Bilaspur.33 ( 8.).6 (8.8) 3.95 (00.00) 0 Sirmour (74.4) 3.43 (5.6) 5.40 (00.00) Kinnaur (85.0) 4.97 (5.0) 33.4 (00.00) Lahaul & Spiti ( 85.0) 8.09 (5.0) 53.9 (00.00) %age to total (00.00) (00.00) (00.00) 38
40 TABLE-8 STATUS OF SURVEYED SCHEMES Sr. District No of Status of No Work Cancelled Work in Progress incomplete Schemes No Record Completed Mandi 0 (50.0) (9.7) Hamirpur 84 (50.0) (50.0) 79 (.9) 3 Kangra (.4) 4 Kullu (.3) 5 Chamba (0.0) 6 Solan (8.9) 7 Una 49 (50.0) (50.0) 0 46 (7.5) 8 Shimla (7.5) 9 Bilaspur (3.6) 0 Sirmour (.6) Kinnaur 5 0 (50.0) (.3) Lahaul & Spiti (.3) %age to total (00.00) (00.00) (00.00) (00.00) (00.00) Sr. No District TABLE-9 TIME TAKEN FOR COMPLETION OF SCHEMES No No of Time taken for completion of of Comple-ted Within months months months months Above years Mandi 0 (9.7) 43 (6.9) 4 (.3) (8.0) 3 (4.5) (0.7) Hamirpur (.9) 3 (.) 3 (7.) 8 (3.) 5 (9.4) 3 (5.7) 3 Kangra (.4) 30 (.8) 33 (7.5) 7 (.5) 4 (7.5) (.9) 4 Kullu (.3) 40 (5.7) 7 (9.0) 6 (9.8) (3.4) 4 (7.5) 5 Chamba 6 6 (0.0) 5 (0.0) 6 (3.) (3.3) (.9) (.9) 6 Solan (8.9) (4.7) 8 (4.) (8.0) 5 (8.3) 8 (5.) 7 Una (7.5) 0 (3.9) (.) 6 (9.9) 3 (5.7) 6 (.3) 8 Shimla (7.5) 5 (5.9) 8 (4.) 6 (9.9) 4 (7.5) 3 (4.5) 9 Bilaspur (3.6) 7 (.7) (6.4) (.6) (.9) (.9) 0 Sirmour 7 6 (.6) (4.3) 3 (.6) (.6) 0 (.9) Kinnaur 5 4 (.3) 3 (.) 5 (.7) 0 3 (5.7) 3 (5.7) Lahaul & Spiti 0 8 (.3) (0.8) (0.5) (3.3) (3.4) (.9) %age to total 00 (00 ) (00) (00) (00) (00 ) 39
41 Sr. No District TABLE-0 COMPLETED AND FUNCTIONAL SCHEMES No of No of Functional Completed Schemes Non functional Mandi 0 (00) Hamirpur (00) 3 Kangra (00) 4 Kullu (00) 5 Chamba 6 6 (00) 6 Solan (00) 7 Una (00) 8 Shimla (00) 9 Bilaspur (00) 0 Sirmour 7 6 (00) Kinnaur 5 4 (00) Lahaul & Spiti 0 8 %age to total (00) (00) 0 (00) 76 (96) 75 (00) 67 (97) 59 (97) 53 (98) 46 (00) 46 (00) (00) 6 (00) 4 (00) 8 (00) 60 (99 ) 0 3 (4) 0 (3) (3) () ( ) 40
42 Sr. Districts TABLE- SUBMISSION OF UCs/CCs Sr. Districts No of No of completed UCs/CCs received UCs/CCs not received Mandi 0 (00) 0 (8) 0 (9) Hamirpur (00) 6 (77) 8 (3) 3 Kangra (00) 0 75 (00) 4 Kullu (00) 5 (7) 64 (93) 5 Chamba (00) (00) 6 Solan (00) () 53 (98) 7 Una (00) 36 (78) 0 () 8 Shimla (00) 0 46 (00) 9 Bilaspur -- (00) (00) 0 Sirmour 7 6 (00) 0 6 (00) Kinnaur 5 4 (00) 0 4 (00) Lahaul & Spiti 0 8 (00) 0 8 (00) %age to total ( 00) 96 (3%) 44 (68%) TABLE- MAINTENANCE FUND No of Sanctioned amount Amount kept for maintenance %age to sanctioned amount Mandi Hamirpur Kangra Kullu Chamba Solan Una Shimla Bilaspur Sirmour Kinnaur Lahaul & Spiti
H.P. GOVERNMENT EMPLOYEES AS ON
H.P. GOVERNMENT EMPLOYEES AS ON 3.3.3. GENERAL The data regarding the State Government employees is collected every year by the Department of Economics and Statistics, Himachal Pradesh with an object to
More information2. The Joint Labour Commissioner and Deputy Labour Commissioner, Himachal Pradesh as Inspector for the whole State.
PROGRESS REPORT REGARDING WORKING AND IMPLEMENTATION OF VARIOUS WELFARE SCHEMES BY HIMACHAL PRADESH BUILDING AND OTHER CONSTRUCTION WORKERS WELFARE BOARD In order to regulate and implementation of the
More information2 The Joint Labour Commissioner and Deputy Labour Commissioner, Himachal Pradesh as Inspector for the whole State.
PROGRESS REPORT REGARDING WORKING AND IMPLEMENTATION OF VARIOUS WELFARE SCHEMES BY HIMACHAL PRADESH BUILDING AND OTHER CONSTRUCTION WORKERS WELFARE BOARD In order to regulate and implement the service
More informationA BRIEF NOTE ON THE IMPLEMENTATION OF NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME IN HIMACHAL PRADESH
A BRIEF NOTE ON THE IMPLEMENTATION OF NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME IN HIMACHAL PRADESH NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME The National Rural Employment Guarantee Act was notified
More informationPending Audit Para s in respect of Directorate SC,OBC s & Minority Affairs. Sr.No Period Para.No Particulars Status
Pending Audit Para s in respect of Directorate SC,OBC s & Minority Affairs Sr.No Period Para.No Particulars Status 1. 11/77to3/79 (B) Shortage worth store articles Rs.20167/- 2. 4/86to3/87 Para 3(a) Misutilisation
More informationDepartment of Agriculture, Himachal Pradesh.
Department of Agriculture, Himachal Pradesh. (TENDER DOCUMENT) Invitation of bids for selection of Insurance Companies as Implementing Agencies (IA) for Pradhan Mantri Fasal Bima Yojna (PMFBY) for Himachal
More informationDepartment of Agriculture, Himachal Pradesh
TENDER DOCUMENT No.1: Department of Agriculture, Himachal Pradesh Invitation of bids for selection of Insurance Companies as Implementing Agencies (IAs) for Pradhan Mantri Fasal Bima Yojna (PMFBY) in Himachal
More informationRequest for Proposal (RFP) for. Corporate Agency Arrangement for Life Insurance Business
Request for Proposal (RFP) for Corporate Agency Arrangement for Life Insurance Business Date of RFP: March 16, 2016 Last Date & Time for Seeking Clarifications to RFP: March 21, 2016 till 16:00 Hrs Last
More informationComparative Performance Evaluation Of Himachal Pradesh Co- Operative Bank And Kangra Central Co-Operative Bank
International Journal of scientific research and management (IJSRM) Volume 3 Issue 7 Pages 331-3323 2015 \ Website: www.ijsrm.in ISSN (e): 2321-3418 Comparative Performance Evaluation Of Himachal Pradesh
More informationImpact of Multi Sector Development Plan on Muslims: A Case Study of Moradabad District
Impact of Multi Sector Development Plan on Muslims: A Case Study of Moradabad District B. K. Bajpai Introduction At the national level, 90 Minority Concentrated districts were identified as backward ones
More information1 - Organisation, functions and duties
1 - Organisation, functions and duties Introduction The Department of Economics and Statistics in Himachal Pradesh is functioning since the year 1955-56. The Directorate of Economics & Statistics came
More informationFunctions and Activities of the Department of Rural Development, Nagaland
Functions and Activities of the Department of Rural Development, Nagaland INTRODUCTION: The Department of Rural Development has been involved in the developmental activities of the rural areas of Nagaland
More informationPlanPlus ( A tool for Decentralized and Integrated District Planning
PlanPlus (http://planningonline.gov.in) A tool for Decentralized and Integrated District Planning 1 TFC BRGF Planning currently done in silos (scheme-based) Funding NREGS Gram Panchayat Own Funds May not
More informationCHAPTER 1 TERMS OF REFERENCE, CONSTITUTION, APPROACH AND METHODOLOGY
CHAPTER 1 TERMS OF REFERENCE, CONSTITUTION, APPROACH AND METHODOLOGY A. TERMS OF REFERENCE 1.1 Towards evolving and ensuring active participation of the grass-root level local government bodies in the
More informationA Study on Co-operative Banks with special reference to Himachal Pradesh Co-operative Bank
IOSR Journal Of Humanities And Social Science (IOSR-JHSS) Volume 22, Issue 12, Ver. 7 (December. 2017) PP 67-73 e-issn: 2279-0837, p-issn: 2279-0845. www.iosrjournals.org A Study on Co-operative Banks
More informationFUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF )
FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF ) Planning Commission was set up in March, 1950. A copy of the Resolution of Government of India has been given in Unit I of this document.
More informationStudy on Employment Assurance Scheme (EAS)
Study on Employment Assurance Scheme (EAS) Employment Assurance Scheme The Scheme The Employment Assurance Scheme was launched on 2 nd October, 1993 in 1778 identified backward blocks situated in drought
More informationChapter V Financial Resource Mobilization of PRIs in Karnataka
Chapter V Financial Resource Mobilization of PRIs in Karnataka CHAPTER-5 FINANCIAL RESOURCE MOBILIZATION OF PRIs IN KARNATAKA 5.1 Introduction The Panchayat Raj Institutions are granted adequate political
More informationA Study on Cooperative Banks in Himachal Pradesh with Special References to Lending Practices
A Study on Cooperative Banks in Himachal Pradesh with Special References to Lending Practices Mukesh Kumar (Assistant Professor) E.mail : mukesh2_jawali@yahoo.co.in Dronacharya PG College of Education,
More informationI. Geographical Features. (i) Location. (ii) Climate. (iii) Forests
1.1 After India became free in 1947, there was a demand in some quarters for the merger of Hill States with the east Punjab but it met with vehement opposition from the rulers and people. In what is Himachal
More informationHP BUILDING AND OTHER CONSTRUCTION WORKERS WELFARE BOARD. ANNUAL REPORT (4 th ) THAKUR VATIKA, KHALINI SHIMLA
HP BUILDING AND OTHER CONSTRUCTION WORKERS WELFARE BOARD ANNUAL REPORT (4 th ) 2012-2013 THAKUR VATIKA, KHALINI SHIMLA-171002. Ph.: 0177-2629807, 2620256, 2620210, 2625084 H.P.BUILDING AND OTHER CONSTRUCTION
More informationHIM GRAMIN PARIVAHAN SWAROJGAR YOJNA (GPSY)
HIM GRAMIN PARIVAHAN SWAROJGAR YOJNA (GPSY) REASONS AND OBJECTIVE Himachal Pradesh is a hilly State, and its topography is quite different from other States of the country. The predominant way to traverse
More informationDFID. Sustainable Community Management of a Multi-village Water Supply Scheme in Kolhapur, Maharashtra, India. SPI Series:2.
Field Note Water and Sanitation Program An international partnership to help the poor gain sustained access to improved water supply and sanitation services Sustainable Community Management of a Multi-village
More informationPOS No.1 Fund released under 12 th & 13 th Finance Commission Observations.
POS No.1 Fund released under 12 th & 13 th Finance Commission Observations. 1 It may please be stated the criteria for Finance Department allocated Rs.157.80 allocation of fund under 12 th Finance crore
More informationGOVERNMENT OF MADHYA PRADESH APPROPRIATION ACCOUNTS
1 GOVERNMENT OF MADHYA PRADESH APPROPRIATION ACCOUNTS 2004-2005 2 APPROPRIATION ACCOUNTS 2004-2005 GOVERNMENT OF MADHYA PRADESH TABLE OF CONTENTS Pages Introductory vii Summary of Appropriation Accounts
More informationPROFORMA FOR RELEASE OF 2 ND INSTALMENT PROPOSAL UNDER INDIRA AWAAS YOJANA DURING THE YEAR NAME OF THE DISTRICT NAME OF THE STATE
PROFORMA FOR RELEASE OF 2 ND INSTALMENT PROPOSAL UNDER INDIRA AWAAS YOJANA DURING THE YEAR 2012-2013 NAME OF THE DISTRICT NAME OF THE STATE DOCUMENTS ATTACHED WITH THE PROPOSAL:- Sl. Documents/clarifications
More informationDivisional level meeting Shimla Division
Divisional level meeting Shimla Division Panchayati Raj Department 1. Preparation of GPDP:- Rs in Crore No. Name Distt. of Name of Block Number of Gram Panchayats in the Block Total fund released to all
More informationDISASTER MANAGEMENT PLAN
DISASTER MANAGEMENT PLAN PANCHAYATI RAJ DEPARTMENT Government of Himachal Pradesh 1 P a g e TABLE OF CONTENTS 1 ABOUT THE DEPARTMENT... 3 1.1 ORGANIZATIONAL STRUCTURE... 3 1.2 PURPOSE OF THE PLAN... 5
More informationIMPACT OF NREGA ON AGRICULTURAL LABOUR FORCE IN THOOTHUKUDI DISTRICT INTERVIEW SCHEDULE. 1. Name of Beneficiary: Contact: 2. Village Name Village Code
IMPACT OF NREGA ON AGRICULTURAL LABOUR FORCE IN THOOTHUKUDI DISTRICT INTERVIEW SCHEDULE A. Primary Information 1. Name of Beneficiary: Contact: 2. Village Name Village Code 3. Ward Name Ward Code 4. Block
More informationCHAPTER-II HISTORICAL PERSPECTIVE
CHAPTER-II HISTORICAL PERSPECTIVE 2.1 The practice of providing Central Assistance to the States to finance development schemes had been in vogue even before the advent of Five Year Plans. On the termination
More informationSurvey on MGNREGA. (July 2009 June 2011) Report 2. (Preliminary Report based on Visits 1, 2 and 3)
Survey on MGNREGA (July 2009 June 2011) Report 2 (Preliminary Report based on Visits 1, 2 and 3) National Sample Survey Office Ministry Statistics & Programme Implementation Government India March 2012
More informationImpact of SHGs on the Upliftment of Rural Women: An Economic Analysis
EUROPEAN ACADEMIC RESEARCH Vol. II, Issue 9/ December 2014 ISSN 2286-4822 www.euacademic.org Impact Factor: 3.1 (UIF) DRJI Value: 5.9 (B+) Impact of SHGs on the Upliftment of Rural Women: An Dr. RAJANI
More informationThe Role Of Micro Finance In Women s Empowerment (An Empirical Study In Chittoor Rural Shg s) In A.P.
The Role Of Micro Finance In Women s Empowerment (An Empirical Study In Chittoor Rural Shg s) In A.P. Dr. S. Sugunamma Lecturer in Economics, P.V.K.N. Govt College, Chittoor Abstract: The SHG method is
More informationPEO Study No.120 EVALUATION REPORT ON THE INTEGRATED CHILD DEVELOPMENT SERVICES PROJECT ( ) The Study
PEO Study No.120 EVALUATION REPORT ON THE INTEGRATED CHILD DEVELOPMENT SERVICES PROJECT (1976-78) - 1982 1. The Study The Ministry of Social Welfare, Government of India, launched in October, 1975 a total
More informationChapter 3. Implementation Mechanism of MGNREGA
Chapter 3 Implementation Mechanism of MGNREGA MGNREGA, the largest poverty alleviation programme initiated by the Government of India in the year 2005 had the sole objective to offer a legal guarantee
More informationPerformance of Mahatma Gandhi National Rural Employment Guarantee Act in Karnataka, India
International Research Journal of Social Sciences ISSN 2319 3565 Performance of Mahatma Gandhi National Rural Employment Guarantee Act in Karnataka, India Gangadhara Reddy Y 1* and Aswath G.R. 2 1 Political
More informationANSWER KEY C F.Y.B. Com. (FINANCIAL MANAGEMENT) (CHOICE BASE) SEMESTER - I / C Indian Financial System
ANSWER KEY-00135 C0921 - F.Y.B. Com. (FINANCIAL MANAGEMENT) (CHOICE BASE) SEMESTER - I / C0584 - Indian Financial System Q1) a) Answer whether the below statements are True or False: (Attempt any 8) (8
More informationUNIT 11 PERFORMANCE BUDGETING
UNIT 11 PERFORMANCE BUDGETING Structure Objectives Introduction Performance Budgeting : Concept and Objectives Steps in Performance Budgeting Performance Budgeting System in India Performance Budgeting
More informationPratidhwani the Echo ISSN: (Online) (Print) Impact Factor: 6.28
Pratidhwani the Echo A Peer-Reviewed International Journal of Humanities & Social Science ISSN: 2278-5264 (Online) 2321-9319 (Print) Impact Factor: 6.28 (Index Copernicus International) Volume-IV, Issue-I,
More informationGOVERNMENT OF TRIPURA
GOVERNMENT OF TRIPURA ACCOUNTS AT A GLANCE SENIOR DEPUTY ACCOUNTANT GENERAL (ACCOUNTS AND ENTITLEMENT) TRIPURA, AGARTALA GOVERNMENT OF TRIPURA ACCOUNTS AT A GLANCE SENIOR DEPUTY ACCOUNTANT GENERAL (ACCOUNTS
More informationDevelopment Credit Agreement. (Andhra Pradesh District Poverty Initiatives Project) between INDIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3332 IN Public Disclosure Authorized Development Credit Agreement (Andhra Pradesh District Poverty Initiatives Project) between INDIA Public Disclosure
More informationRBI/ /357 RPCD.CO.MFFI. BC.No. 85/ / January 22, 2009
RBI/2008-09/357 RPCD.CO.MFFI. BC.No. 85/ 12.01.015/ 2008-09 January 22, 2009 The Chairman/ Managing Director/ Chief Executive Officer All Scheduled Commercial Banks (Including RRBs) Dear Sir/ Madam, 100
More informationNature and Extent of Rural Unemployment in the Low Hill Zone Agrarian Economy of Himachal Pradesh: A Multi-dimensional Approach
Nature and Extent of Rural Unemployment in the Low Hill Zone Agrarian Economy of Himachal Pradesh: A Multi-dimensional Approach Sikander Kumar *1 Rakesh Singh ** INTRODUCTION There has been a general notion
More informationCORPORATE SOCIAL RESPONSIBILITY & SUSTAINABILITY POLICY
CORPORATE SOCIAL RESPONSIBILITY & SUSTAINABILITY POLICY (w.e.f. 01.04.2014) MMTC Limited - Corporate Social Responsibility & Sustainability Policy 1. Short Title and Applicability This Policy shall be
More informationWelcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh. May 11, 2012
Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh May 11, 2012 1 ACHIEVEMENTS OF ELEVENTH PLAN (ECONOMY) Targets and Achievement Sector Target for Growth Expected
More informationDate of Approval by GoI. Project Component Housing Municipality
S. No ANNEXURE I : PROJECT INFORMATION (FINANCIAL) State /UT Code 19 State/UT Name West Bengal SLNA KMDA City Implementing Agency Code Title Bank Account No. Component Date of Approval by GoI Cost (Rs.
More informationSTATE FINANCES for the year ended 31 March 2015
Report of the Comptroller and Auditor General of India On STATE FINANCES for the year ended 31 March 2015 GOVERNMENT OF UTTAR PRADESH TABLE OF CONTENTS Preface Particulars Reference to Paragraph Page
More informationStrategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals
Strategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals Demographic Indicators Indicator Himachal Pradesh (Census 2011) All India Population (million) 6.8 1210 Decennial Growth
More informationCentrally Sponsored Schemes
LOK SABHA SECRETARIAT PARLIAMENT LIBRARY AND REFERENCE, RESEARCH, DOCUMENTATION AND INFORMATION SERVICE (LARRDIS) MEMBERS REFERENCE SERVICE REFERENCE NOTE. No. 31 /RN/Ref./December /2013 For the use of
More informationExecutive summary Siddharth Nagar
Executive summary Siddharth Nagar 1.1. Introduction: A Survey conducted by Centre Government highlighted the fact that as many as 90 districts, having minority concentration, are backward and of these
More informationCO:RURAL BANKING DEPARTMENT. Revised Kisan Credit Card (KCC) Scheme
a MAIN : ADV - 29/2012-13 DT. 14-05-2012 SUB : Rural Lending - 04 CO:RURAL BANKING DEPARTMENT FILE M-2 S-201 Revised Kisan Credit Card (KCC) Scheme Our Bank issued Master circular on Indian Bank Kisan
More informationPreamble. Objective. Target Beneficiaries
Preamble Khadi, the fabric of freedom, has been a source of livelihood to a large number of spinners, weavers and other artisans spread across the country living in the rural as well as urban areas. Though
More informationTHE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA. NOTIFICATION Shimla, the 22 nd November, 2018
THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA NOTIFICATION Shimla, the 22 nd November, 2018 No. HPERC-F(1)-1/2018- Whereas section 61 of the Electricity Act, 2003 (36 of 2003), provides
More informationHIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )
HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF:- (Date of Order: 25.07.2018) Petition No.: 26/2018(Suo-Moto) CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member
More informationDiscussion paper on National Gramin Awaas Mission (GRAM)
Discussion paper on National Gramin Awaas Mission (GRAM) Indira Awaas Yojana was launched in June, 1985 as a sub-scheme of Rural Landless Employment Guarantee Programme and later became a component of
More informationHimachal Pradesh Budget Analysis
-4.9% -3.2% 3.9% 9. 10.4% 7.2% 10.2% 10. 10.8% 7.5% 9.1% 6.9% Himachal Pradesh Budget Analysis The Finance Minister of Himachal Pradesh, Mr. Jai Ram Thakur, presented the Budget for financial year on March
More informationBhopal: Dated 5 th May 2006
Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh
More informationDECENTRALISATION OF GOVERNANCE IN KERALA AN OVERVIEW. Prof. T.Raghavan. Kerala Institute of Local Administration
DECENTRALISATION OF GOVERNANCE IN KERALA AN OVERVIEW Prof. T.Raghavan. Kerala Institute of Local Administration Kerala at a glance Area 38863 sq.km Population 3.33 Crores (33387677) Urban 1.59 crores
More informationA CASE STUDY ON THE DEVELOPMENT OF SCHEDULDED CAST IN ANDHRA PRADESH NEAR GUNTUR REGION
A CASE STUDY ON THE DEVELOPMENT OF SCHEDULDED CAST IN ANDHRA PRADESH NEAR GUNTUR REGION Y. RAVI CHANDRASEKHAR BABU 1* 1. SKBR GOVERNMENT DEGREE COLLEGE MACHERLA. GUNTUR DIST. ANDHRA PRADESH, INDIA Abstract
More informationTelangana Budget Analysis
The Finance Minister of Telangana, Mr. Eatala Rajender, presented the Budget for Telangana for financial year on March 14, 2016. Budget Highlights The Gross State Domestic Product of Telangana for is estimated
More informationSTRUCTURE AND FUNCTIONING OF SELF HELP GROUPS IN PUNJAB
Indian J. Agric. Res., 41 (3) : 157-163, 2007 STRUCTURE AND FUNCTIONING OF SELF HELP GROUPS IN PUNJAB V. Randhawa and Sukhdeep Kaur Mann Department of Extension Education, Punjab Agricultural University,
More informationCHAPTER VIII INSTITUTIONAL, INFRASTRUCTURE AND DEVELOPMENT PROFILE OF THE HILL SUB-SAMPLE
CHAPTER VIII INSTITUTIONAL, INFRASTRUCTURE AND DEVELOPMENT PROFILE OF THE HILL SUB-SAMPLE VIII.1 Having discussed the institutional strength, status of rural development and rural infrastructure in the
More informationA Multi Sectoral Approach To Health (UNDP Aided) Project Management Unit (SWAJAL) Deptt. Of Rural Development, Govt.
A Multi Sectoral Approach To Health (UNDP Aided) Project Management Unit (SWAJAL) Deptt. Of Rural Development, Govt. Of Uttar Pradesh 2 Structure Background Study and findings Action Plan 3 Background
More informationSale period of bidding document. to AM to 4.00PM
SATLUJ JAL VIDYUT NIGAM LIMITED (A joint venture of Govt. of India and Govt. of HP) Dhaula-Sidh Hydro Electric Project H.No.-113, Ward No.-1, Krishna Nagar, Hamirpur, Distt. Hamirpur (HP), Ph. No: 01972-223236
More informationGovernment s Agricultural economic initiatives and challenges ahead
Government s Agricultural economic initiatives and challenges ahead Author: Prof. Pravin B. Rayate* Dr. Suhas. B. Dhande** Prof. Manoj R. Mahanubhav** Abstract: Indian economy is highly dependent on agriculture
More informationPERFORMANCE EVALUATION OF DCCBs IN INDIA - A STUDY
169 PERFORMANCE EVALUATION OF DCCBs IN INDIA - A STUDY ABSTRACT THIRUPATHI KANCHU* *Faculty Member, University College, Department of Commerce and Business Management, Satavahana University, Karimnagar,
More informationNo.32/ 76 / /PVSE Government of India Ministry of New and Renewable Energy ***
No.32/ 76 / 2009-10/PVSE Government of India Ministry of New and Renewable Energy *** To The Pay & Accounts Officer, Ministry of New and Renewable Energy, New Delhi-11003. Block No. 14, C.G.O. Complex,
More informationSTATUS OF PANCHAYATI RAJ STATE PROFILE CHHATTISGARH STATE
STATUS OF PANCHAYATI RAJ STATE PROFILE CHHATTISGARH STATE 1. Introduction: The State of Chhattisgarh came into being on 1 November 2000, when it was carved out of Madhya Pradesh. According to the 2001
More information1,07,758 cr GoI allocations for Ministry of Rural Development (MoRD) in FY
BUDGET BRIEFS Vol 10/ Issue 8 Pradhan Mantri Awaas Yojana Gramin (PMAY G) GoI, 2017-18 Pradhan Mantri Awaas Yojana - Gramin (PMAY - G) ) is Government of India s (GoI) flagship Housing for All scheme.
More informationMadhya Pradesh Best practices in Governance
Madhya Pradesh Best practices in Governance The Growth Story (XI Plan Period 2007-08 to 2011-12) Particulars MP Rank All India GSDP 10.20 2 nd 7.67 Primary 8.45 1 st 2.51 Secondary 9.82 2 nd 6.83 Tertiary
More informationCHAPTER-IV REFORMS IN THE CSS
CHAPTER-IV REFORMS IN THE CSS 6. The analysis of the CSS in the previous Chapter has indicated the need for reforms. Suggestions on this are being mentioned in the following paragraphs: 6.1 6.1.1 It has
More informationCHAPTER-8 SUMMARY, FINDINGS & SUGGESTIONS
CHAPTER-8 SUMMARY, FINDINGS & SUGGESTIONS SR. NO. PARTICULAR P. NO 8.1 INTRODUCTION 166 8.2 METHODOLOGY 166 8.3 ANALYSIS OF LIQUIDITY 167 8.4 ANALYSIS OF PROFITABILITY 168 8.5 ANALYSIS OF FINANCIAL STRUCTURE
More informationIndian Surveys on Organised and Unorganised
Indian Surveys on Organised and Unorganised Sectors Measuring Entrepreneurship from a Gender Perspective H. Borah Deputy Director General Central Statistics Office Ministry of Statistics and Programme
More informationANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT
Financial Management Manual for Department of RWSS May 2008 ANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT
More informationPRADHAN MANTRI ADARSH GRAM YOJANA (PMAGY) MINISTRY OF SOCIAL JUSTICE AND EMPOWERMENT
Centrally-sponsored Pilot Scheme of PRADHAN MANTRI ADARSH GRAM YOJANA (PMAGY) MINISTRY OF SOCIAL JUSTICE AND EMPOWERMENT Government of India Pradhan Mantri Adarsh Gram Yojana (PMAGY) A new scheme called
More information2. Role of Banks 2.1 Bank staff may help the poor borrowers in filling up the forms and completing other formalities so that they are able to get cred
Master Circular--Credit Facilities to Scheduled Castes (SCs) & Scheduled Tribes (STs) Banks should take the following measures to step up their advances to SCs / STs: 1. Planning Process 1.1 The District
More informationOdisha Budget Analysis
-6.7% -0.4% 4.4% 1.3% 3.1% 1.8% 4.7% 5.4% 7.8% 7.8% 8.1% 9.3% 11. 10.7% 12.4% 8.2% 10.4% 7.1% 15. 15.1% Budget Analysis The Finance Minister of, Mr. Sashibhusan Behera, presented the Budget for financial
More informationOFFICE MEMORANDUM. Subject:- Administrative Approval of Central Sector Scheme "National Dairy Plan Phase-1 (NDP-1)"
F. No.22-23l2011-DP Government of lrdia Ministry of ft{jrirulture Department of Animal Husbandry, Dairying & Fisheries Krishi Bhawan, New Delhi-11 0001 Dated the 16th March, 2012 OFFICE MEMORANDUM Subject:-
More informationGOVERNMENT OF MADHYA PRADESH
GOVERNMENT OF MADHYA PRADESH ACCOUNTANT GENERAL (ACCOUNTS AND ENTITLEMENTS) MADHYA PRADESH, GWALIOR 2 Preface The Annual Accounts of the State Government are prepared and examined under the directions
More informationPerformance of MGNREGA in Mysore District, Karnataka
International Journal of Research in Humanities and Social Studies Volume 3, Issue 6, June 2016, PP 1-7 ISSN 2394-6288 (Print) & ISSN 2394-6296 (Online) Performance of MGNREGA in Mysore District, Karnataka
More informationDr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010
Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri
More informationEvaluation of SHG-Bank Linkage: A Case Study of Rural Andhra Pradesh Women
EUROPEAN ACADEMIC RESEARCH Vol. II, Issue 8/ November 2014 ISSN 2286-4822 www.euacademic.org Impact Factor: 3.1 (UIF) DRJI Value: 5.9 (B+) Evaluation of SHG-Bank Linkage: A Case Study of Rural Andhra Pradesh
More informationRURAL LOCAL BODY FINANCES AND SOCIO- ECONOMIC DEVELOPMENT OF RAIGAD DISTRICT
379 Chapter V RURAL LOCAL BODY FINANCES AND SOCIO- ECONOMIC DEVELOPMENT OF RAIGAD DISTRICT 5.1 Introduction In India and Maharashtra too, have a large number of villages and large number of population
More information% 2161} Sf p , CIRCULAR. Subject: Implementation of NHB Schemes - Revised Operational Guidelines.
National Horticulture Board Ministry of Agriculture, Government of India, Plot NO.85,Sector 18, Institutional Area, Gurgaon - 122 015 (Haryana) Ph. 0124-2342992, Fax: 2342991, 2341225 Website: www.nhb.gov.in
More informationStrengthening National Comprehensive Agricultural Public Expenditure. in Sub-Saharan Africa. Public Expenditure Tracking Survey
Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Public Expenditure Tracking Survey Template Terms of Reference web page: www.worldbank.org/afr/agperprogram email
More informationBUDGET: TABLE 1: BUDGET AT A GLANCE (Actuals) A. Revenue Receipts
BUDGET: 2018-19 TABLE 1: BUDGET AT A GLANCE (Rs. in crore) Items 2016-17 (Actuals) (RE) 2018-19 A. Revenue Receipts 41978 58168 55307 64269 B. Revenue Expenditure 39812 48819 43882 51185 Revenue Surplus
More informationF.No.6/41/2012-FI( Vol.III) Government of India Ministry of Finance Department of Financial Services
To: 1. Shri Ajit Seth, Cabinet Secretary, Rashtrapati Bhawan, New Delhi. 2. Shri Pulok Chatterji, Pr. Secretary to PM, South Block, New Delhi. 3. Shri R.S. Gujral, Secretary, D/o Expenditure, North Block,
More informationCHAPTER 2 ORGANIZATIONAL STRUCTURE OF LIC
CHAPTER 2 ORGANIZATIONAL STRUCTURE OF LIC ORGANIZATION STRUCTURE To perform the functions of the Life Insurance Corporation of India, a committee consisting of 15 members is appointed by the Central Government.
More information4. Taking all these resources into account, the Annual Plan size for Punjab for Annual Plan has been fixed at Rs 16,125 crore.
PUNJAB No.4/20/2012-FR Planning Commission (Financial Resources Division) New Delhi, May, 2013 Subject: Annual Plan, 2013-14 PUNJAB Deputy Chairman Chief Minister Meeting to finalize Plan size held on
More informationTotal Sanitation Campaign GOI,
Total Sanitation Campaign GOI, 2012-13 Launched in 1999, the Total Sanitation Campaign (TSC) is the Government of India's (GOI) flagship programme for providing universal access to sanitation facilities.
More informationCORPORATE SOCIAL RESPONSIBILITY POLICY
CORPORATE SOCIAL RESPONSIBILITY POLICY (CSR POLICY) USHAKIRON MOVIES LIMITED CIN: U92111TG1987PLC007757 Regd. Office: Ramoji Film City R.R. Dist -501 512. Telangana. India Tel: 08415-246555 Fax:08415-246401
More informationIMPACT ASSESSMENT STUDY OF SOCIO-ECONOMIC DEVELOPMENT PROGRAMMES
IMPACT ASSESSMENT STUDY OF SOCIO-ECONOMIC DEVELOPMENT PROGRAMMES A CASE STUDY OF HIMACHAL PRADESH Sponsored by Planning Commission, Government of India, New Delhi Conducted by Asia Pacific Socio Economic
More informationCHAPTER III CONCEPTUAL FRAME WORK
CHAPTER III CONCEPTUAL FRAME WORK This chapter is intended primarily to provide a conceptual frame work of the study. Moreover, the important terms and concepts used in the thesis have also been explained
More informationMLA S AREA DEVELOPMENT SCHEME, ASSAM (REVISED GUIDELINES)
1. Background: MLA S AREA DEVELOPMENT SCHEME, ASSAM (REVISED GUIDELINES) 1.1 Assam is an Agrarian State. As per 2001 census there are 266.38 lakh population,out of which more than 88 percent are living
More informationNote on ICP-CPI Synergies: an Indian Perspective and Experience
2 nd Meeting of the Country Operational Guidelines Task Force March 12, 2018 World Bank, Washington, DC Note on ICP-CPI Synergies: an Indian Perspective and Experience 1. Meaning and Scope 1.1 International
More information13 Audit of Co-operative Societies
13 Audit of Co-operative Societies Question 1 An auditor of a Co-operative Society governed by Cooperative Societies Act, 1912 is required to attach schedules giving certain information. Please list the
More informationRETAIL SUPPLY SCHEME-DOMESTIC
1. Objective of the Support Scheme 2. Strategy and Schemes RETAIL SUPPLY SCHEME-DOMESTIC : To meet increasing demand for jute shopping bags and other JDPs arising mainly due to ban or restrictions on the
More informationSchemes->Margin Money Scheme of Khadi & Village Industries Commission (KVIC) MARGIN MONEY SCHEME OF KHADI & VILLAGE INDUSTRIES COMMISSION (KVIC)
Schemes->Margin Money Scheme of Khadi & Village Industries Commission (KVIC) MARGIN MONEY SCHEME OF KHADI & VILLAGE INDUSTRIES COMMISSION (KVIC) Implementing Agency Official(s) to be contacted Khadi &
More informationGram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj
Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj 1 Panchayat Statistics Avg. population per GP National Average population per GP: 3,416 No. of PRIs in the country : 2,56,103 No. of Gram
More informationCONCLUSIONS AND SUGGESTIONS
CHAPTER - VIII CONCLUSIONS AND SUGGESTIONS The main function of IDBI, as its name suggests, is to finance industrial enterprises such as manufacturing, mining, processing, shipping and other transport
More information