1 Cost situation of land-based wind energy Results with respect to the financing costs and possible developments in the tendering system

2 Agenda Cost situation in the two-stage reference yield model cost categories LCOE Sensitivities Changes by the EEG 2017 Estimation of cost situation in the tender system Changes due to the tendering system as in EEG 2017

3 Cost situation in the twostage reference yield model EEG 2014 Transitional arrangements EEG 2017

4 Specific turbine costs [ /kw] Main CapEx NH 100 m 100 m < NH 120 m 120 m < NH 140 m 140 m < NH N=46 2 MW < P 3 MW 3 MW < P 4 MW The average standard deviation is 88 /kw. P = Nameplate capacity NH = Hub Height 3

5 Specific main CapEx (real) [2015 /kw] Specific main CapEx (real) [2015 /kw] Historical development of the specific main CapEx Average cost reduction per kw since 2012: 7% Average cost reduction per square meter of swept rotor area since 2012: 16%. P = Nameplate capacity NH = Hub Height 4

6 Additional CapEx (real) [2015 /kw] Additional CapEx [Rehfeldt, Wallasch et al. 2013] 2010 [Rehfeldt, Wallasch et al. 2011] 2008 [Rehfeldt et al. 2008] 2001 [Ender et al. 2002] 1998 [Rehfeldt et al. 1999] Mittlere Hauptinvestitionskosten Investitionsnebenkosten 25% 75% 0 Foundation Grid connection 26% 17% Infrastucture Planning 20% Other Cost 26% 11% Assumption: no change in real costs - price increase in line with inflation 5

7 OpEx (real) [2015 /kw] 17% Operational Expenditure First decade 8% 4% 5% Second decade 13% 5% 5% 3% 19% 22% 44% 55% [Rehfeldt, Wallasch et al. 2013] 2010 [Rehfeldt, Wallasch et al. 2011] 2008 [Rehfeldt et al. 2008] 2001 [Ender et al. 2002] 1998 [Rehfeldt et al. 1999] Wartung Maintenance & Reparatur & Repairs Pachtzahlungen Lease payments Kaufm. Technical und & commercial techn. BF management Versicherungskosten Insurance costs Rücklagen Reserves Sonstige Others Betriebskosten Assumption: slight real cost reduction compensation of inflation 6

8 Interest rate Financing structures Equity share: 15% Interest of equity: 8% at each site quality, Interest of debt: 2.5% in the first decade, 5% in follow-up 5,5% financing 5,0% Repayment period: 10 to 17 years 4,5% 4,0% 3,5% 3,0% 2,5% 2,0% 1,5% 1,0% 0,5% 0,0% KfW refinancing rate (10 year fixed interest rate) KfW refinancing rate (20 years fixed interest rate) ECB rate 7

9 Choice of turbine configuration Windzone Windzone 1 Windzone 2 Windzone 3/4 Average nameplate capacity kw kw kw Average hub height 139 m 125 m 100 m Average rotor diameter 110 m 102 m 102 m Average specific power 280 W/m² 324 W/m² 354 W/m² These averages are based on a distribution of different turbine types, that are installed in the specific area. 8

10 LCOE [ct/kwh] Levelized cost of energy Reduction of the nominal LCOE since 2012/13 by 12 % on average , ,6 9,9 8,6 9,0 7,8 8,2 7,2 7,7 6,7 7,3 7,0 6,7 6,5 6,3 6,3 6,1 5,8 5,5 5, LCOE 2016/17 in ct/kwh LCOE 2012/13 in ct/kwh [DWG 2013] 60% 70% 80% 90% 100% 110% 120% 130% 140% 150% Site quality 9

11 LCOE [ct/kwh] Change of LCOE [%] LCOE [ct/kwh] Change of LCOE [%] Sensitivity analysis Equity share Impact of reduction / increase of the equity share Interest of dept Impact of reduction / increase of the interest of dept LCOE base case Increase of equity interest by 10% points Reduction of equity share by 5% points 50% 40% LCOE base case Increase of interest of debt by 1% point Reductionof interest of debt by 0.5% points 50% 40% 8 30% 8 30% 6 20% 6 20% 4 10% 4 10% 2 0% 2 0% 0-10% 0-10% Site quality Site quality 10

12 Change of cost and framework with EEG 2017 Tender System EEG 2017

13 Estimation of cost situation in the tender system Considering the new reference yield model Reevaluation of variable and fixed components of OpEx Adapting the technology selection and the corresponding CapEx Assumption of an increase of CapEx Assumption of an increase of interests of debt and equity and the equity share Analysis on behalf of BWE Incentive for high wind locations as in BWE position paper 12

14 Proprortion / corretion factor Proportion factors considering technology depending on IEC classes and BWE incentive 1,60 1,50 1,40 1,30 1,20 1,10 1,00 0,90 0,80 0,70 0,60 IEC- class total height III Ø 199 m II Ø 188 m Verhältnisfaktoren: Proportion factors: Technologieauswahl technology choice depending nach IEC on Klassen, IEC classes Wechsel (II von to III IEC at II 100%) zu IEC and III bei BWE 100%, incentive Anreiz nach BWE-Stellungnahme Korrekturfaktoren Correction factors EEG EEG % 70% 80% 90% 100% 110% 120% 130% 140% 150% Site quality Site quality 60% 70% 80% 90% 100% 110% 120% 130% 140% 150% Average o range of proportion factors 1,34 1,34 1,18 1,06 1,00 0,96 0,89 0,83 0,83 0,83 Correction factors EEG ,29 1,29 1,16 1,07 1,00 0,94 0,89 0,85 0,81 0,79 13

15 Changes due to the tendering system as in EEG 2017 Reference site and site quality New definition of the reference site New calculation of site quality Single-stage model and proportion factors Abolition of the two-stage reference yield model Introduction of tenders Restriction of development by tendered capacity Creating competition between projects 14

16 Wind speed at the reference location [m/s] Change by redefining the reference site 8,0 7,5 7,0 6,5 6,0 Reference location as in EEG ,5 Reference location as in EEG , Hub height [m[ Effect on the reference yield by redefining At low hub heights < as after definition EEG 2014 For large hub heights > as after definition EEG 2014 Site quality = energy yield at the location / reference yield => Redefining the reference site creates an incentive to larger hub heights compared to EEG

17 Calculation and verification of site quality The assumed site quality of the first 5 years is based on an assessment before commissioning Site yield = expected gross yield less Shading effects Lack of technical availability (max. 2%) Electrical efficiency losses Permit constraints (for example by noise emissions, shadows, nature protection or safety of flight operations) Assessment 5, 10 and 15 years of service to prove the site quality Site yield = fed in electricity plus the fictional amount of electricity By technical unavailability > 2% By Curtailment by grid operator By other shutdown or throttling 16

18 Remuneration [ct/kwh] Remuneration by site quality depending on the accapeted bid ,03 Site quality 70% 80% 90% 100% 110% 120% 130% 140% 150% Correction factor 1,29 1,16 1,07 1 0,94 0,89 0,85 0,81 0,79 8,12 7,49 Accepted bid= remuneration at a 100% Location 7, ,58 6,96 6,23 5,95 6 6,42 5,67 5,53 6 5,64 5 5,34 5,1 4,86 Remuneration Vergütung bei with Zuschlagswert accepted bid at von 7 ct/kwh 7 ct/kwh 4,74 4 Remuneration Vergütung bei with Zuschlagswert accepted bid at von 6,5 6,5 ct/kwh ct/kwh Remuneration Vergütung bei with Zuschlagswert accepted bid at von 6 ct/kwh 6 ct/kwh 3 60% 70% 80% 90% 100% 110% 120% 130% 140% 150% Site quality 17

19 Thank you for your attention Silke Lüers

Wind policy in Germany removing the bottlenecks for a continuing success story. Dania Röpke, Policy Advisor German Wind Energy Association

Wind policy in Germany removing the bottlenecks for a continuing success story. Dania Röpke, Policy Advisor German Wind Energy Association Wind policy in Germany removing the bottlenecks for a continuing success story Dania Röpke, Policy Advisor German Wind Energy Association 2011 03 16 Agenda The target: contrasting the government s and

More information

Auction s Definition Citizen s Project Curse or Blessing for Community Wind Entities?

Auction s Definition Citizen s Project Curse or Blessing for Community Wind Entities? Auction s Definition Citizen s Project Curse or Blessing for Community Wind Entities? Fabian Tenk Community Wind Officer WWEA Fabian Tenk Coimbatore, 14.06.2017 21 June 2015 Content Objective and scope

More information

GOVERNMENT OF PUERTO RICO STATE OFFICE OF ENERGY POLICY. GREEN ENERGY FUND Tier 2 Reference Guide (Revised on September 24, 2014)

GOVERNMENT OF PUERTO RICO STATE OFFICE OF ENERGY POLICY. GREEN ENERGY FUND Tier 2 Reference Guide (Revised on September 24, 2014) GOVERNMENT OF PUERTO RICO STATE OFFICE OF ENERGY POLICY GREEN ENERGY FUND Tier 2 Reference Guide (Revised on September 24, 2014) TABLE OF CONTENTS CHAPTER ONE GENERAL... 1 I. Title and Introduction...

More information

THE FINANCIAL IMPACT OF WIND PLANT UNCERTAINTY

THE FINANCIAL IMPACT OF WIND PLANT UNCERTAINTY ALBANY BARCELONA BANGALORE NAWEA Symposium Aug 6, 2013 Boulder, CO THE FINANCIAL IMPACT OF WIND PLANT UNCERTAINTY BRUCE H. BAILEY, PH.D., CCM PRESIDENT/CEO AWS TRUEPOWER, LLC 463 NEW KARNER ROAD ALBANY,

More information

STATE ENERGY PROGRAM GOVERNMENT OF PUERTO RICO

STATE ENERGY PROGRAM GOVERNMENT OF PUERTO RICO COMMONWEALTH OF PUERTO RICO STATE OFFICE OF ENERGY POLICY GREEN ENERGY FUND Tier 1 Reference Guide (Revised on August 17, 2017) STATE ENERGY PROGRAM GOVERNMENT OF PUERTO RICO TABLE OF CONTENTS CHAPTER

More information

Gabriel Zeitouni, COWI A/S

Gabriel Zeitouni, COWI A/S Incentives for renewable energy investments through PPA contracts in Panama Introduction to PPA Assessment Tool Gabriel Zeitouni, COWI A/S 1 Who am I? Gabriel Zeitouni M.Sc. Sustainable Energy Wind Power

More information

Minimising Risk Maximising Return. Chanda Kapande Business Development Manager Wind Prospect

Minimising Risk Maximising Return. Chanda Kapande Business Development Manager Wind Prospect Minimising Risk Maximising Return Chanda Kapande Business Development Manager Wind Prospect Agenda Wind Prospect Wind energy in East Africa Sample Project & Financial model RIsks Wind Conclusions Performance

More information

Industrialisierung von Offshore-Windenergie im internationalen Kontext

Industrialisierung von Offshore-Windenergie im internationalen Kontext Industrialisierung von Offshore-Windenergie im internationalen Kontext Markus Rieck Geschäftsführer Alstom Renewable Germany GmbH Hannover 08/04/2014 Agenda 01 02 Alstom Overview Offshore Wind Industrial

More information

GOVERNMENT OF PUERTO RICO STATE OFFICE OF ENERGY POLICY. GREEN ENERGY FUND Tier 1 Reference Guide (Revised on October 10, 2014)

GOVERNMENT OF PUERTO RICO STATE OFFICE OF ENERGY POLICY. GREEN ENERGY FUND Tier 1 Reference Guide (Revised on October 10, 2014) GOVERNMENT OF PUERTO RICO STATE OFFICE OF ENERGY POLICY GREEN ENERGY FUND Tier 1 Reference Guide (Revised on October 10, 2014) TABLE OF CONTENTS CHAPTER ONE GENERAL... 2 I. Title and Introduction... 2

More information

Quality of Wind BMU PNs pp11_47

Quality of Wind BMU PNs pp11_47 Quality of Wind BMU PNs pp11_47 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. by Erol Chartan

More information

Legislative support of RES in the Russian Federation. Russian Association of Wind Power Industry, RAWI

Legislative support of RES in the Russian Federation. Russian Association of Wind Power Industry, RAWI Legislative support of RES in the Russian Federation Russian Association of Wind Power Industry, RAWI RES support legislation principles The plan of capacity commissioning ( quotas for tender for LTCA

More information

GREEK RENEWABLES SUPPORT SCHEME PROPOSALS

GREEK RENEWABLES SUPPORT SCHEME PROPOSALS BRIEFING GREEK RENEWABLES SUPPORT SCHEME PROPOSALS MARCH 2016 BRIEF OUTLINE OF THE SCHEME PHOTOVOLTAIC PROJECTS TRANSITIONAL PROVISIONS NON-INTERCONNECTED ISLANDS COMPETITIVE BIDDING PROCESS FROM 2017

More information

Offshore Wind Energy in Germany and Europe: Status Quo and Market Outlook. Andreas Wagner, Managing Director German Offshore Wind Energy Foundation

Offshore Wind Energy in Germany and Europe: Status Quo and Market Outlook. Andreas Wagner, Managing Director German Offshore Wind Energy Foundation Offshore Wind Energy in Germany and Europe: Status Quo and Market Outlook Andreas Wagner, Managing Director German Offshore Wind Energy Foundation Agenda 1. German Offshore Wind Energy Foundation - Who

More information

Das Ausschreibungsdesign für Onshore - Windenergieprojekte im EEG 2017

Das Ausschreibungsdesign für Onshore - Windenergieprojekte im EEG 2017 Das Ausschreibungsdesign für Onshore - Windenergieprojekte im EEG 2017 Malte Luks, Referat für Erneuerbare Energien, Bundesnetzagentur Konferenz zur Finanzierung von Windenergieprojekten im Kontext neuer

More information

CORRWIND: A LIFE CYCLE COST COMPARATIVE FOR THE WIND ENERGY INDUSTRY USERS MANUAL BY INTERNATIONAL ZINC ASSOCIATION

CORRWIND: A LIFE CYCLE COST COMPARATIVE FOR THE WIND ENERGY INDUSTRY USERS MANUAL BY INTERNATIONAL ZINC ASSOCIATION CORRWIND: A LIFE CYCLE COST COMPARATIVE FOR THE WIND ENERGY INDUSTRY USERS MANUAL BY INTERNATIONAL ZINC ASSOCIATION IZA has developed the cost model CorrWind to calculate life cycle costs for different

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Generating Unit Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Generating Unit Operating Requirements Applicability 1 Section 502.6 applies to: (a) the operator of a generating unit that is: (i) synchronized to the interconnected electrical system; and (ii) directly connected to the transmission system

More information

Feed-in tariff determination Best practice and cross-country coordination

Feed-in tariff determination Best practice and cross-country coordination Feed-in tariff determination Best practice and cross-country coordination Dr. Corinna Klessmann, Ecofys 26 January 2012 9 th Workshop of the International Feed-in Cooperation (IFIC) Content I. Best practice

More information

New Brunswick Community Wind Projects Getting to the Tipping Point New Brunswick Department of Energy Generic Business Plan

New Brunswick Community Wind Projects Getting to the Tipping Point New Brunswick Department of Energy Generic Business Plan August 2010 New Brunswick Community Wind Projects Getting to the Tipping Point New Brunswick Department of Energy Generic Business Plan Table of Contents 1 Executive Summary 1 2 Introduction 2 2.1 Municipalia,

More information

Building Your Proforma

Building Your Proforma Building Your Proforma A Million Little Pieces Community Wind Energy 2006 Expanding The Know-how - Expanding The Market Iowa Events Center, Des Moines, Iowa March 7-8, 2006 Thomas A. Wind, PE Wind Utility

More information

German Wind and Solar from FiT to tender.

German Wind and Solar from FiT to tender. German Wind and Solar from FiT to tender. Contents Roadmap to EEG 2016 EEG 2014 vs. Draft EEG 2016 General principles Direct marketing How does it work? FiT or tenders applicable? Framework for specific

More information

Renewing Ireland's Energy European Investment Bank

Renewing Ireland's Energy European Investment Bank Renewing Ireland's Energy European Investment Bank IWEA Autumn Conference 2013 Galway Thursday 3 rd October 08/10/2013 1 The European Investment Bank (EIB) Long-term finance promoting European objectives

More information

COMPAÑÍA MINERA CERRO BAYO HYBRID POWER GENERATION SYSTEM MAY 2015 TSX // MND

COMPAÑÍA MINERA CERRO BAYO HYBRID POWER GENERATION SYSTEM MAY 2015 TSX // MND COMPAÑÍA MINERA CERRO BAYO HYBRID POWER GENERATION SYSTEM MAY 2015 TSX // MND Forward looking statement disclaimer This presentation contains "forward-looking statements" within the meaning of applicable

More information

Suzlon Energy Limited H1 FY November 2017

Suzlon Energy Limited H1 FY November 2017 Suzlon Energy Limited H1 FY18 10 November 2017 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Suzlon Energy Limited (the Company ), have been

More information

CapEx, OpEx, Feasibility. Houston Workshop Nov. 29, 2007 Uwe Roeper, President, ORTECH

CapEx, OpEx, Feasibility. Houston Workshop Nov. 29, 2007 Uwe Roeper, President, ORTECH CapEx, OpEx, Feasibility Houston Workshop Nov. 29, 2007 Uwe Roeper, President, ORTECH ORTECH Power Wind Consulting: Technical & Financial Advisors Affiliated with DEWI German Wind Energy Institute Wind

More information

E E G A M E N D M E N T

E E G A M E N D M E N T E N E R G Y B R I E F I N G E E G A M E N D M E N T 2 0 1 7 J U L Y 2 0 1 6 AUCTION SYSTEM TO BE INTRODUCED FIRST AUCTION ONSHORE WIND 01/05/2017 FIXED CAPACITY FOR ONSHORE WIND EXPANSION RESTRICTIONS

More information

Suzlon Energy Limited Q1 FY August 2017

Suzlon Energy Limited Q1 FY August 2017 Suzlon Energy Limited Q1 FY18 11 August 2017 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Suzlon Energy Limited (the Company ), have been prepared

More information

Result Presentation Q1 FY11 13th August 2010

Result Presentation Q1 FY11 13th August 2010 Suzlon Energy Limited Result Presentation Q1 FY11 13th August 2010 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Suzlon Energy Limited (the Company

More information

26 th Revision of Sheet No. 91 Canceling 25 th Revision WN U-60 of Sheet No. 91

26 th Revision of Sheet No. 91 Canceling 25 th Revision WN U-60 of Sheet No. 91 26 th Revision of Sheet No. 91 Canceling 25 th Revision WN U-60 of Sheet No. 91 COGENERATON AND SMALL POWER PRODUCTON (T) AVALABLTY: 1. This schedule applies to any person or entity, hereinafter referred

More information

Sustainable Energy Handbook

Sustainable Energy Handbook Sustainable Energy Handbook Module 6.1 Simplified Financial Models Published in February 2016 1 Introduction to simplified financial models The simplified financial model is a tool that enables to understand

More information

Interconnected Offshore Grid: Barriers & Solutions

Interconnected Offshore Grid: Barriers & Solutions Interconnected Offshore Grid: Barriers & Solutions Minutes of the Stakeholder Workshop Date: 20.06.2014 Authors: Leif Rehfeldt, Anna-Kathrin Wallasch Reviewed by: Paul Kreutzkamp and Fabio Genoese Status

More information

Energix Renewable Energies LTD אנרג'יקס אנרגיות מתחדשות בע"מ דוח תקופתי לשנת 4102

Energix Renewable Energies LTD אנרג'יקס אנרגיות מתחדשות בעמ דוח תקופתי לשנת 4102 Energix Renewable Energies LTD אנרג'יקס אנרגיות מתחדשות בע"מ 2014 2014 Financial Financial Statements Report דוח תקופתי לשנת 4102 (Convenience Translation of report originally issued in Hebrew) Chapter

More information

The 2030 Energy & Climate Package for the EU: the challenges that lie ahead The utilities view

The 2030 Energy & Climate Package for the EU: the challenges that lie ahead The utilities view The 2030 Energy & Climate Package for the EU: the challenges that lie ahead The utilities view Dr. Hans Bünting CEO, RWE Innogy GmbH Brussels, 3 rd December 2014 RWE Innogy 04/12/2014 PAGE 1 New targets:

More information

Investment Opportunities in the German Solar Industry

Investment Opportunities in the German Solar Industry Telephone Briefing Investment Opportunities in the German Solar Industry 29 March 2012 Dr. Ulrike Binder Dr. Marius Boewe Thomas Schubert, LLM Partner Partner Associate Tel. +49 69 7941 1377 Tel. +49 211

More information

Q4 and FY 2017 results. 15 March 2018

Q4 and FY 2017 results. 15 March 2018 Q4 and FY 2017 results 15 March 2018 Business environment has further improved for offshore wind Offshore Wind Grid connected capacity addition offshore 2017-2026 for top 20 markets1 40 73 GW IN TOTAL

More information

Feed-in Tariff Review workshop. BIS Conference Centre, London, 5 October 2015

Feed-in Tariff Review workshop. BIS Conference Centre, London, 5 October 2015 Feed-in Tariff Review workshop BIS Conference Centre, London, 5 October 2015 Agenda 10.00 10.15 Presentation on FIT Review consultation Gareth Redmond, Head of Renewables Programme Team, DECC Sarah Lowe,

More information

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form Revised Cal. P.U.C. Sheet No. 42643-E* Cancelling Revised Cal. P.U.C. Sheet No. 32498-E U 39 San Francisco, California ELECTRIC SAMPLE FORM NO. 79-1080 Sheet 1 BASE INTERRUPTIBLE PROGRAM Please Refer to

More information

We believe our human capital is the key factor to success, as well as the reason r upholding a leading position on the Bulgarian financial market.

We believe our human capital is the key factor to success, as well as the reason r upholding a leading position on the Bulgarian financial market. ELANA is a Bulgarian financial non-banking institution with over 16 years history in setting the novelties on the local financial market in transition n relying on being stable traditional partner for

More information

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016 The Economics and Financing of Distributed Generation Investment Budapest, Hungary November 17, 2016 Topics to Cover How to Finance Distributed Generation Investments 1 Importance of financial aspects

More information

Suzlon Energy Limited Q1 FY August 2018

Suzlon Energy Limited Q1 FY August 2018 Suzlon Energy Limited Q1 FY19 04 August 2018 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Suzlon Energy Limited (the Company ), have been prepared

More information

Providing the competitiveness of nuclear energy in the implementation of. PRORYV project

Providing the competitiveness of nuclear energy in the implementation of. PRORYV project 1 98 Providing the competitiveness of nuclear energy in the implementation of PRORYV project D. Tolstoukhov 1 1 ITCP «PRORYV», Moscow, Russian Federation E-mail contact: tda@proryv2020.ru Abstract. In

More information

Lessons from the Past

Lessons from the Past Lessons from the Past Country Specific Issues in Investment Arbitrations Tim Rauschning Vienna, 17 November 2017 Legal and Tax Advice www.luther-lawfirm.com Outline Background International Legal Framework

More information

MONITORING & REVIEW of IMPLEMENTATION PROGRESS. Definition and Quantification of the KPIs for the SET-Plan EIIs

MONITORING & REVIEW of IMPLEMENTATION PROGRESS. Definition and Quantification of the KPIs for the SET-Plan EIIs 1 MONITORING & REVIEW of IMPLEMENTATION PROGRESS Definition and Quantification of the KPIs for the SET-Plan EIIs Monitoring & Review - A reminder - SG Meeting _240511 2 2 Council Conclusions (12 (12 March

More information

Review of Support Mechanisms and Policy Options for Offshore Wind. Prepared by the Center for Wind Energy at James Madison University.

Review of Support Mechanisms and Policy Options for Offshore Wind. Prepared by the Center for Wind Energy at James Madison University. Review of Support Mechanisms and Policy Options for Offshore Wind Prepared by the Center for Wind Energy at James Madison University August 2012 Denmark Denmark s long-term target is to achieve complete

More information

The development of offshore wind - The case of Denmark

The development of offshore wind - The case of Denmark 9 February 2017 The development of offshore wind - The case of Denmark Camilla Holbech, Deputy Manager Danish Wind Industry Association Zooming in on the Danish wind industry More than 30,000 employees

More information

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS This Agreement made this day of, by and between Wisconsin Electric Power

More information

Energiewende. Drivers and Enablers for German Offshore Wind. Dr. Martin Schöpe

Energiewende. Drivers and Enablers for German Offshore Wind. Dr. Martin Schöpe Energiewende Drivers and Enablers for German Offshore Wind Dr. Martin Schöpe BMWi Head of Unit IIA1 International Cooperation on Energy Hamburg, 25 September 2018 18-09-24 Referent 1 Source: Ecofys 2018

More information

Risks and prospects for renewable investments in Greece. Panagiotis Papastamatiou

Risks and prospects for renewable investments in Greece. Panagiotis Papastamatiou Risks and prospects for renewable investments in Greece Panagiotis Papastamatiou RES investments in Greece, within the period of crisis Apart from the crisis, two main events were the main drivers for

More information

RAINMAKER ENERGY. Comments to 2011 NERSA REFIT Review Tariffs

RAINMAKER ENERGY. Comments to 2011 NERSA REFIT Review Tariffs RAINMAKER ENERGY Comments to 2011 NERSA REFIT Review Tariffs 1 About Rainmaker Rainmaker Energy is developing Wind projects within South Africa Two flagship projects are in final stage of development,

More information

9M QUARTERLY STATEMENT Financial Year

9M QUARTERLY STATEMENT Financial Year 9M QUARTERLY STATEMENT 2017 Financial Year Key Figures of the MVV Energie Group 1 Euro million Sales and earnings 1 Oct 2016 to 30 Jun 2017 1 Oct 2015 to 30 Jun 2016 % change Sales excluding energy taxes

More information

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR NON-RESIDENTIAL CUSTOMERS

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR NON-RESIDENTIAL CUSTOMERS Sheet 1 1. Introduction This tariff ( Tariff ) describes the terms and conditions under which an Applicant for an eligible distributed generation project ( DG Project ) will receive funding pursuant to

More information

Perspective on Financing Wind Energy Projects. June 16, 2016

Perspective on Financing Wind Energy Projects. June 16, 2016 Perspective on Financing Wind Energy Projects June 16, 2016 Agenda 2 1 Risk Matrix 3 Context Setting Way Forward KEY SEGMENTS IN THIS PRESENTATION 3 Indian Energy Sector Landscape Bank Lending Sector wise

More information

Manual 05. NYISO Day-Ahead Demand Response Program Manual

Manual 05. NYISO Day-Ahead Demand Response Program Manual Manual 05 NYISO Day-Ahead Demand Response Program Manual Issued: December, 2018 Version: 4.0 Effective Date: 12/03/2018 Committee Acceptance: 11/14/2018 BIC Prepared by: NYISO Distributed Resources Operations

More information

UNDA RENEWABLE ENERGY ESCWA PIPELINE PROJECTS

UNDA RENEWABLE ENERGY ESCWA PIPELINE PROJECTS UNDA PROJECT ON PROMOTING RENEWABLE ENERGY INVESTMENTS FOR CLIMATE CHANGE MITIGATION AND SUSTAINABLE DEVELOPMENT UNDA PROJECT CLOSING WORKSHOP: Renewable Energy UNDA project conclusions and way forward

More information

Implementation of Auctions for Renewable Energy Support in the Netherlands and Denmark: A cooperation case study Report D7.1-NL/DK, March 2016

Implementation of Auctions for Renewable Energy Support in the Netherlands and Denmark: A cooperation case study Report D7.1-NL/DK, March 2016 Downloaded from orbit.dtu.dk on: Oct 08, 2018 Implementation of Auctions for Renewable Energy Support in the Netherlands and Denmark: A cooperation case study Report D7.1-NL/DK, March 2016 Gephart, Malte;

More information

Senvion S.A., Luxembourg Interim Report as of March 31, January 1, 2018 March 31, 2018

Senvion S.A., Luxembourg Interim Report as of March 31, January 1, 2018 March 31, 2018 + Senvion S.A., Luxembourg Interim Report as of March 31, 2018 January 1, 2018 March 31, 2018 Senvion S.A., Interim Report March 31, 2018 2 Key Financials First time adoption of new accounting standards

More information

Fourth quarter Oslo, 25 January 2019

Fourth quarter Oslo, 25 January 2019 Fourth quarter 2018 Oslo, 25 January 2019 Disclaimer The following presentation is being made only to, and is only directed at, persons to whom such presentation may lawfully be communicated ( relevant

More information

Senvion SA Annual Results Presentation 2017 March 15, 2018

Senvion SA Annual Results Presentation 2017 March 15, 2018 Senvion SA Annual Results Presentation 2017 March 15, 2018 Disclaimer This presentation (the Presentation ) has been prepared by Senvion S.A. ( Senvion and together with its subsidiaries, we, us or the

More information

Centrifugal pumps. Medium flow rates PERFORMANCE RANGE INSTALLATION AND USE APPLICATION LIMITS OPTIONALS AVAILABLE ON REQUEST

Centrifugal pumps. Medium flow rates PERFORMANCE RANGE INSTALLATION AND USE APPLICATION LIMITS OPTIONALS AVAILABLE ON REQUEST HF Centrifugal pumps Medium flow rates PERFORMANCE RANGE Flow rate up to 600 l/min (36 m³/h) Head up to 39 m APPLICATION LIMITS Manometric suction lift up to 7 m Liquid temperature between -10 C and +90

More information

Umdenken lohnt sich. Three-Month Report 2001

Umdenken lohnt sich. Three-Month Report 2001 Umdenken lohnt sich Three-Month Report 2001 Introduction 1 Status Report 2-6 Notes on the Interim Balance 2 Market Trend 3 Group Indicators as of 31.03.2001 4 Course of Business 4 Performance of Shares

More information

No. 45. An act relating to renewable energy and energy efficiency. (H.446) It is hereby enacted by the General Assembly of the State of Vermont:

No. 45. An act relating to renewable energy and energy efficiency. (H.446) It is hereby enacted by the General Assembly of the State of Vermont: No. 45. An act relating to renewable energy and energy efficiency. (H.446) It is hereby enacted by the General Assembly of the State of Vermont: Sec. 1. DESIGNATION OF ACT This act shall be referred to

More information

IMIA NEWS SHEET. The International Association of Engineering Insurers TM. June Welcome to the 9 th edition of the IMIA News Sheet.

IMIA NEWS SHEET. The International Association of Engineering Insurers TM. June Welcome to the 9 th edition of the IMIA News Sheet. IMIA The International Association of Engineering Insurers TM NEWS SHEET June 2008 Welcome to the 9 th edition of the IMIA News Sheet. 1 News from the Secretariat Preparation of the next Annual Conference

More information

Introduction to EMR Arrangements. Thursday 18 May 2017

Introduction to EMR Arrangements. Thursday 18 May 2017 Introduction to EMR Arrangements Thursday 18 May 2017 Welcome Health & Safety Agenda Item Time Lead Registration 09.30 EMRS Welcome 10.00 EMRS Overview of Electricity Market Reform 10.05 LCCC Forecasting

More information

EL PASO ELECTRIC COMPANY SCHEDULE NO. 33 ECONOMIC DEVELOPMENT RATE RIDER

EL PASO ELECTRIC COMPANY SCHEDULE NO. 33 ECONOMIC DEVELOPMENT RATE RIDER APPLICABILITY This rate schedule is available for the additional maximum demand of an existing Customer or for the total maximum demand of a new Customer. The minimum monthly billing demand for any Customer

More information

5th Annual Renwable Energy Finance in Practice 21 October Support Tendering - François van Leeuw CEO of Parkwind

5th Annual Renwable Energy Finance in Practice 21 October Support Tendering - François van Leeuw CEO of Parkwind 5th Annual Renwable Energy Finance in Practice 21 October 2016 - Support Tendering - François van Leeuw CEO of Parkwind AGENDA 1. Introduction to Parkwind 1. Corporate Overview 2. Shareholders structure

More information

Inter-Annual Variability and Uncertainty in Wind Farm Annual Energy Production Estimates

Inter-Annual Variability and Uncertainty in Wind Farm Annual Energy Production Estimates Inter-Annual Variability and Uncertainty in Wind Farm Annual Energy Production Estimates Peter Taylor 1,2, Jim Salmon 2, 1 York University, 2 Zephyr North Canada Contact: pat@yorku.ca ICEM, Toulouse, June

More information

RENEWABLE ENERGY PROJECT FINANCING

RENEWABLE ENERGY PROJECT FINANCING RENEWABLE ENERGY PROJECT FINANCING Yiannis Saratsis Head of Project Finance MAY 2018 I. Eurobank & RES financing Eurobank & RES Eurobank remains committed in the financing of Renewable Energy Projects

More information

Real Options for Real Communities: Incorporating Uncertainty into Small- Scale Energy Planning

Real Options for Real Communities: Incorporating Uncertainty into Small- Scale Energy Planning Real Options for Real Communities: Incorporating Uncertainty into Small- Scale Energy Planning A Presentation for: ZEW Conference, 10/28/2008 Real Options in Energy Economics Katherine Dykes, PhD Candidate,

More information

D2.6 Business Model Report

D2.6 Business Model Report D2.6 Business Model Report Germany This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No 646554 Index Introduction... 4 1.

More information

Endesa FY 2017 Results 28/02/2018

Endesa FY 2017 Results 28/02/2018 Endesa FY 2017 Results 28/02/2018 1. Highlights and key financial figures 2. Endesa s performance in 2017 market context 3. Financial results 4. Final remarks 2 1. Highlights and key financial figures

More information

Prospects for Wind Farm Installation in Wapakoneta, Ohio: An Initial Study on Economic Feasibility

Prospects for Wind Farm Installation in Wapakoneta, Ohio: An Initial Study on Economic Feasibility Prospects for Wind Farm Installation in Wapakoneta, Ohio: An Initial Study on Economic Feasibility Prepared by Katherine Dykes 12/04/2007 ESD 71 Prof. de Neufville Bowling Green, Ohio Wind Farm Content

More information

18 November 2016 Energiekontor AG. FIRST BERLIN Equity Research

18 November 2016 Energiekontor AG. FIRST BERLIN Equity Research FIRST BERLIN Equity Research Energiekontor AG RATING Germany / Cleantech Frankfurt Stock Exchange 9M report PRICE TARGET 19.70 Bloomberg: EKT GR Return Potential 31.3% ISIN: DE0005313506 Risk Rating High

More information

Vestforsyning Erhverv A/S Gedmosen

Vestforsyning Erhverv A/S Gedmosen APPENDICES TO EXHIBIT 1 MAIN TERMS WIND TURBINE SUPPLY AGREEMENT (WTSA) Vestforsyning Erhverv A/S Gedmosen Page 1 LIST OF APPENDICES Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Appendix 6 Appendix

More information

An Independent Power Producer with 33 MWs of Awarded ComFIT Projects in Nova Scotia at $0.131/kW

An Independent Power Producer with 33 MWs of Awarded ComFIT Projects in Nova Scotia at $0.131/kW An Independent Power Producer with 33 MWs of Awarded ComFIT Projects in Nova Scotia at $0.131/kW 1 DISCLAIMER Watts Wind Energy Inc. Important Notice: This document has been prepared by Watts Wind Energy

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-74/2015 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS Section 86(1) (e) of the Electricity Act 2003 mandates

More information

Generation Production Costs, Scheduling & Operating Rate

Generation Production Costs, Scheduling & Operating Rate Disclaimer This training presentation is provided as a reference for preparing for the PJM Certification Exam. Note that the following information may not reflect current PJM rules and operating procedures.

More information

Capital Markets Day. Strategic Plan Francesco Starace CEO & General Manager

Capital Markets Day. Strategic Plan Francesco Starace CEO & General Manager Capital Markets Day Strategic Plan 2019-21 Francesco Starace CEO & General Manager Agenda Francesco Starace (CEO & General Manager) Enel Today 2015-2018 Our Delivery 2019-2021 Our Vision & Positioning

More information

Cost Reduction Monitoring Framework

Cost Reduction Monitoring Framework Cost Reduction Monitoring Framework Quantitative Assessment Report 19 December 2016 Glossary CAPEX Capital expenditure CfD Contract for Difference CPI Consumer Price Inflation CRMF Cost Reduction Monitoring

More information

Status TF isr. Users Group 20/03/ Auteur changer dans le masque de titre

Status TF isr. Users Group 20/03/ Auteur changer dans le masque de titre Status TF isr Users Group 20/03/2014 24.03.2014 Auteur changer dans le masque de titre Contracting calendar: Agreed with CREG and Administration 3/24/2014 Final GO Volume Minister 13/4 Call for Candidates

More information

Methodology and criteria for evaluating investments in electricity and gas infrastructure projects (Article 13(6) Infrastructure Regulation 1 )

Methodology and criteria for evaluating investments in electricity and gas infrastructure projects (Article 13(6) Infrastructure Regulation 1 ) Methodology and criteria for evaluating investments in electricity and gas infrastructure projects (Article 13(6) Infrastructure Regulation 1 ) 1 Regulation (EU) No 347/2013 on guidelines for trans-european

More information

Call for Tenders Document A/O

Call for Tenders Document A/O Call for Tenders A/O 2013-01 ELECTRICITY SUPPLY FOR QUÉBEC NEEDS Call for Tenders Document A/O 2013-01 [Consolidated document integrating Addendum 1 issued on July 7, 2014, Addendum 2 issued on August

More information

In relation to Tenderers questions regarding Terms of Reference and its annexes, please find below quoted questions and Buyer s responses.

In relation to Tenderers questions regarding Terms of Reference and its annexes, please find below quoted questions and Buyer s responses. Warsaw, 10 th July 2013 r. Regarding: Unlimited tender for supply, installation, take over and service of Wind turbines within investment project Budowa farmy wiatrowej Ostaszewo o łącznej mocy 40 MW.

More information

Challenges & opportunities in the Nordics Experience from recent transactions

Challenges & opportunities in the Nordics Experience from recent transactions Challenges & opportunities in the Nordics Experience from recent transactions SEB Nordic Infrastructure and Renewable Energy Day, Oslo, June 8 th, 2017 Agenda 1 Aquila Group 2 Track Record in the Nordics

More information

The Future of Offshore Wind Energy

The Future of Offshore Wind Energy The Future of Offshore Wind Energy The National Academies Roundtable on Science and Technology for Sustainability June 27, 2012 Washington, DC Doug Pfeister, Senior Vice President Offshore Wind Development

More information

Chapter 5: Trading. Industry Guide to the I-SEM

Chapter 5: Trading. Industry Guide to the I-SEM Chapter 5: Trading Industry Guide to the I-SEM 1 5.1 Submission timelines Each market operates over different timelines, as described in Chapter 4. By way of an example, the combined submission timelines

More information

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fifth Revised Sheet No. 26 Canceling P.S.C. MO. No. 7 Fourth Revised Sheet No.

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fifth Revised Sheet No. 26 Canceling P.S.C. MO. No. 7 Fourth Revised Sheet No. P.S.C. MO. No. 7 Fifth Revised Sheet No. 26 Canceling P.S.C. MO. No. 7 Fourth Revised Sheet No. 26 PURPOSE: The Market Based Demand Response Program (MBDR) offers qualified business demand response (BDR)

More information

Independent Power Producer with 33.2 MWs of Awarded ComFIT Projects in NS

Independent Power Producer with 33.2 MWs of Awarded ComFIT Projects in NS Irish Mountain 6.0 MW 2014 project Watts Section 1.5 MW In-service: 2011 Wedgeport 1.6 MW 2014 project Shag Harbour 3.2 MW 2014 project Watts Wind Current and Phase One Projects Independent Power Producer

More information

PRE-BID CONFERENCE Wind-generated electricity

PRE-BID CONFERENCE Wind-generated electricity PRE-BID CONFERENCE Wind-generated electricity Block of 450 MW Call for tenders A/O 2013-01 PRE-BID CONFERENCE AGENDA Introduction (15 minutes) ; Presentation (60 minutes) ; Pause (15 minutes) ; Question

More information

TENDER DOCUMENT FOR SUPPLY INSTALLATION AND COMMISSIONING OF WIND- SOLAR HYBRID SYSTEMS IN THE STATE OF ODISHA

TENDER DOCUMENT FOR SUPPLY INSTALLATION AND COMMISSIONING OF WIND- SOLAR HYBRID SYSTEMS IN THE STATE OF ODISHA TENDER DOCUMENT FOR SUPPLY INSTALLATION AND COMMISSIONING OF WIND- SOLAR HYBRID SYSTEMS IN THE STATE OF ODISHA ODISHA RENEWABLE ENERGY DEVELOPMENT AGENCY Under the Department of Science & Technology Government

More information

POLICY NO I. INTRODUCTION

POLICY NO I. INTRODUCTION POLICY NO. 300.11 SUBJECT: Distributed Generation Policy I. INTRODUCTION A. This policy shall apply to the interconnection and extended parallel operation of all qualifying distributed generation installations

More information

Authority 1: EAC (Electricity Authority of Cyprus) as acting DSO, Technical Instruction KE1/33/2005

Authority 1: EAC (Electricity Authority of Cyprus) as acting DSO, Technical Instruction KE1/33/2005 A. INTERCONNECTION RULES Country: CYPRUS Eligible renewable /other technologies: PV Applicable sectors: All sectors Breakpoint for Small System (Simplified Rules): 20 kw Rules for net metering systems:

More information

Interim Results for the 6 months ending 30 September October 2018

Interim Results for the 6 months ending 30 September October 2018 Interim Results for the 6 months ending 30 September 2018 30 October 2018 Highlights for first half FY19 Operating portfolio has capitalised on strong wind conditions. Delivery of 54MW Salt Creek Wind

More information

Energix Renewable Energies LTD Annual Report 2015

Energix Renewable Energies LTD Annual Report 2015 Energix Renewable Energies LTD Annual Report 2015 This Translations of the reports is for convenience purposes only. For the avoidance of doubt, the company shall only be bound by the Original reports

More information

Energix Renewable Energies LTD אנרג'יקס אנרגיות מתחדשות בע"מ דוח תקופתי לשנת 4102

Energix Renewable Energies LTD אנרג'יקס אנרגיות מתחדשות בעמ דוח תקופתי לשנת 4102 Energix Renewable Energies LTD אנרג'יקס אנרגיות מתחדשות בע"מ 2013 2014 2013 Financial Statements Report דוח תקופתי לשנת 4102 Chapter A Convenience Translation of report originally issued in Hebrew Chapter

More information

Suzlon Energy Limited

Suzlon Energy Limited Suzlon Energy Limited FY12 Earnings Presentation 25 th May, 2012 REpower offshore project : Beatrice 1 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared

More information

The switch to variable rate tenders in the main refinancing operations

The switch to variable rate tenders in the main refinancing operations The switch to variable rate tenders in the main refinancing operations At its meeting on 8 June 2 the Governing Council of the ECB decided that, starting from the operation to be settled on 28 June 2,

More information

Kent Breeze Corporation and MacLeod Windmill Project Inc. c/o Suncor Energy Services Inc North Sheridan Way Mississauga, Ontario L5K 1A8

Kent Breeze Corporation and MacLeod Windmill Project Inc. c/o Suncor Energy Services Inc North Sheridan Way Mississauga, Ontario L5K 1A8 Ministry of the Environment Ministère de l Environnement RENEWABLE ENERGY APPROVAL NUMBER 7988-8AVKM5 Issue Date: November 10, 2010 Kent Breeze Corporation and MacLeod Windmill Project Inc. c/o Suncor

More information

Available online at ScienceDirect. Energy Procedia 69 (2015 )

Available online at   ScienceDirect. Energy Procedia 69 (2015 ) Available online at www.sciencedirect.com ScienceDirect Energy Procedia 69 (2015 ) 1704 1710 International Conference on Concentrating Solar Power and Chemical Energy Systems, SolarPACES 2014 Feasibility

More information

Islamic Republic of Pakistan

Islamic Republic of Pakistan nein Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

TWB II Municipal offshore wind financing. May 2017

TWB II Municipal offshore wind financing. May 2017 TWB II Municipal offshore wind financing May 2017 TWB II Municipal offshore wind financing Table of contents 1. Who we are 2. Project overview 3. Equity story 4. Debt raising 5. Timeline 6. Take-aways

More information

MONTHLY REPORT JANUARY 2016

MONTHLY REPORT JANUARY 2016 MONTHLY REPORT JANUARY 2016 INDEX S. Nos. Description Page No. 1 Executive Summary 1 2 Operation 2 KPI 2 No. of Starts 2 Gas Loss 3 3 Production Activities 4 Operating Results: 4 - Total Power Generation

More information