1 A. INTERCONNECTION RULES Country: CYPRUS Eligible renewable /other technologies: PV Applicable sectors: All sectors Breakpoint for Small System (Simplified Rules): 20 kw Rules for net metering systems: yes If yes then Authority 1: EAC (Electricity Authority of Cyprus) as acting DSO, Technical Instruction KE1/33/2005 Limit on System Size/Overall Enrollment: No limit (single phase or multiple phase) Standard Interconnection Agreement: Yes Additional Insurance Requirements: Not allowed for systems eligible for net metering External Disconnect Required: Yes Rules for non net-metered DG: Not allowed for PV systems connected to the grid Date Enacted: 1/11/2005 Effective Date: 7/11/2005 Expiration Date: NA Summary: (max 1000 words) The initial application for interconnection of a PV system - integrated in an already electrified facility (house, etc)- is done by the PV producer to the EAC. The applications for PV systems have priority from the regular electricity applications and are investigated immediately. The position of the future PV metering unit is agreed at a site visit by the PV producer, the electrician and the EAC personnel. The metering unit for the PV system must be separate from the traditional metering unit for the electricity consumption of the facility. The two meters must be in the same location for ease of monitoring. The monitoring takes place every two months. After agreement on the location of the PV metering unit, EAC Commercial unit prepares the official PV system Interconnection rules which must be accepted by the PV producer in order for the process of interconnection to proceed further.

2 The Interconnection rules include the following: Description of the location size and other technical requirements that are required by the EAC for the installation of the single phase PV metering unit. All expenses for the construction and positioning of the PV metering unit are to be undertaken by the PV producer. The official EAC technical rules that apply for approval of a PV system interconnection to the distribution grid. The formal acceptance of the PV producer of the EAC rules for interconnection and the acceptance of the subsidy to be received from EAC. EAC will provide the agreed subsidy to the PV producer as long as the technical rules of interconnection are not violated. A contract will be signed for a 15 year duration that can extend to another 5 years if requested by the PV producer. The current subsidy by the EAC is set by CERA (Cyprus Energy Regulatory Authority) at 6.32c per kwh. This subsidy may be revised by CERA each year. On top of this subsidy, and as explained previously, the PV producer will be receiving subsidy by the Government payable to him by EAC (EAC will deduct this amount from its other payables to the Government). If the EAC subsidy is reduced by CERA during this 15 year period, the Government subsidy will be automatically adjusted so that the total amount of subsidy remains the same during the whole 15 year period. After agreement and signature of the Interconnection rules, a formal copy of the signed Interconnection rules is given to the PV producer so that he can include it in his application for subsidy from the Government (Ministry of Commerce, Industry and Tourism) under the Governmental schemes. Only after the initial approval for the Government subsidy, the PV producer may begin with the PV system implementation. The Ministry of Commerce, Industry and Tourism will be responsible for the supervision of the PV system implementation so that the final PV system will be in accordance to the requirements of the Governmental subsidy scheme. A license from the Department of Town Planning and Housing is also necessary for the PV system implementation unless a special waiver is provided. After the PV system is implemented, the PV produced must apply again to the EAC for the PV system final inspection for interconnection approval. In this application, the PV producer must also enclose the following documents: Initial approval by the Ministry of Commerce, Industry and Tourism for subsidy under the RES subsidy schemes License for the PV system installation by the Department of Town Planning and Housing (a license waiver can be provided in certain cases) All the technical standards for the specific PV system as published by the PV manufacturer Copy of the Declaration of Conformity of the manufacturer to the European standards for the equipment used in implementing the PV system During the inspection, EAC will ensure that all the technical rules for the Interconnection of PV system in the distribution grid apply. The PV system implementation must be in accordance to the European standards 73/23/EEC (Electrical Apparatus Low Voltage Directive), 89/336/EEC (Electromagnetic

3 compatibility) and 93/68/EEC (CE Marking) and also to be accompanied by the Declaration of Conformity by the PV manufacturer for the equipment to be used. The connection of the PV system to the distribution grid must be in accordance to the interconnection diagram (Figure 1). The technical rules are described in Section D of this questionnaire. In addition, some other technical rules are: No grounding of the inverter AC neutral while the PV system is synchronized to the grid. The area of responsibility of EAC ends just after the two metering units In the cases where the facility is not already electrified, then two separate applications to the EAC must be made. Two separate rules of Interconnection will be made one for the facility (e.g. house) and one for the PV system. The remaining procedure is then the same as explained above. Contact: Name: Ioannis Hadjipaschalis Address: 11, Amfipoleos str, 2025, Nicosia, Cyprus Phone : ioannishadjipashalis@eac.com.cy Web site: B. NET METERING RULES Country: CYPRUS Eligible renewable/other Technologies: PV Applicable Sectors: All sectors Limit on System Size: 20 kw Limit on overall Enrollment: No limit on overall enrollment Treatment of Net Excess: The amount of kwh produced and are fed to the Distribution grid are multiplied by the amount of 6.32c (see next section) which is the EAC subsidy per kwh. The same amount of kwh is also multiplied by the amount of 14.18c or 31.95c (depending on the subsidy option chosen from the schemes of the Government -Cyprus Institute of Energy CIE see Section C). The total amount (either 20.5c or 38.27c per kwh) is then sent by the EAC to the customer in the form of a checque to his name within 30 days from the date of the last monitoring of the PV meter. This checque, the customer can deposit in his banking account. EAC may also deposit the amount directly to the customer s selected banking account. EAC will deduct the amount that it paid to the PV producer on behalf of the Government from its payables to the Government each year.

4 Utilities Involved: EAC Interconnection Standards for Net Metering: Yes Authority 1: EAC as acting DSO Technical Instruction KE1/33/2005 Website: Date Enacted: 1/11/2005 Effective Date: 7/11/2005 Summary: (max 1000 words) In addition to the application and payment procedure already described in Section A above, the following rules apply to the net metering interconnection: The acting DSO (EAC) has the right to continuous and unlimited access to the metering units location within the PV producer s property. This is required in order to allow for the monitoring, repair and replacement of the metering units if necessary. The acting DSO has the right to randomly check the accuracy and the operation of the PV metering unit and also check the PV system s power factor. In case of power factor divergence from the range dictated in the technical interconnection rules, EAC will request corrective measures on behalf of the PV producer. No kwh estimations, based on previous values, are allowed to be made regarding the PV power supplied to the grid. EAC operators have to visit the metering unit once every two months and record the actual readings of the unit. However, if the metering unit stops recording, the PV power supply to the grid has to be estimated based on previous values In the case that either EAC or the PV producer have any doubts regarding the accuracy of the PV metering unit, these have to be expressed to one another in writing and the metering will be checked. In case a fault is found, each party has to pay back the amount for owed with the current daily interest rate. In case of delay of payment by the EAC to the PV producer, the payable amount will be charged with the current daily interest rate. Contact: Name: Ioannis Hadjipaschalis Address: 11, Amfipoleos str, 2025, Nicosia, Cyprus Phone: ioannishadjipashalis@eac.com.cy Web site:

5 C. FINANCIAL AND SUPPORTING SCHEMES Title: Grant Scheme for the Promotion of Renewable Energy Sources Utilization Country: CYPRUS Incentive type: Feed in Tariff/Investment subsidies Eligible renewable /other technologies: Photovoltaic, Small Wind Applicable sectors: Physical or legal entities that do not exercise economic activity Terms, budgets and requirements: see summary below System sizes: see summary below Authority: Cyprus Institute of Energy (under the Ministry of Commerce Industry and Tourism) Summary: The support Scheme for the promotion of RES for individuals and organisations to the extent that they do not exercise economic activity covers investments, regarding the electricity production, in the following main areas: Wind Energy Photovoltaic Wind energy category refers to small wind energy systems with generating capacity up to 30 kw. The subsidization for such systems reaches 55% of the eligible capital costs with a maximum grant of 51,258. Furthermore, EAC will pay 6.32 c/kwh produced and supplied into the electricity network. For small PV systems with generating capacity up to 20 kw connected to the network the total amount of subsidy will depend on the supplier s choice. He can either receive 55% subsidy on the investment cost with the maximum grant being 64,929 and a further c/kwh subsidy on the produced energy, or he can choose to receive increased subsidization on the produced energy of the order of c/kwh with no subsidy for the purchase and installation cost. EAC will contribute 6.32 c/kwh produced and supplied into the electricity network while the remaining subsidy (14.18 c/kwh in the first case and c/kwh in the second) will come from the Special RES Fund set up by the Government. Contact Name: Ioannis Hadjipaschalis Address: 11, Amfipoleos str, 2025, Nicosia, Cyprus Phone: ioannishadjipashalis@eac.com.cy Web site:

6 D. SAFETY AND POWER QUALITY REQUIREMENTS COUNTRY: (Cyprus) REQUIREMENT VALUE REFERENCE STANDARD OR GUIDE (including link) PROTECTION REQUIREMENTS Is an external accessible disconnecting switch mandatory? What is the acceptable range of AC voltage for operation of DER? YES (description: visible disconnecting switch with safety in the isolation position) 230V +-10% (after 31/12/2009) BS EN60947 EN Is monitoring of voltage of each phase required? What is the maximum allowed time for disconnection of DER in case of a voltage out of range event What is the acceptable range of frequency for operation of DER What is the maximum allowed time for disconnection of DER in a case of a frequency out of range event What is the minimum time for reconnection after a disconnection of DER Other protection requirements IMPACT ON GRID-POWER QUALITY What is the allowable variation of voltage at LV side of LV/MV transformer, due to DER connection What is the limit of harmonic current emissions of DER 230V +10%, -6% (up to 31/12/2009) No (EAC is allowed to randomly check the inverter ) 5 secs 50 Hz +-1% 5 secs 3 minutes Automatic disconnection of PV systems is mandatory +- 10% (after 31/12/ %, -6% (up to 31/12/2009) Harmonic % voltage distortion LV NA EN EN 50160

7 What is the limit of the voltage fluctuations and flicker for DER Requirements regarding power factor Other requirements for impact on grid-power quality PV SPECIFIC REQUIREMENTS Is an AC disconnecting switch mandatory for a PV plant For Wind Parks: P st =0.35 and P lt =0.35 For other DG: Frequency of flicker events: per minute, P st =0.7 and P lt =0.5 Frequency of flicker events: per minute, maximum allowed value is 3% Frequency of flicker events: <0.02 per minute, maximum allowed value is 5% The power factor of DG units connected to the distribution grid (if these DG units have inductive generators) must be 0.95 lagging to 1.00 leading. If the DG generators are synchronous then these must be operated with a power factor that is agreed with the DSO. Typically, these generators must operate with a power factor between 0.85 lagging and 0.95 leading. YES (with safety in the isolating position) IEC

8 What is the acceptable range for the settings of under-voltage disconnection What is the maximum allowed time for disconnection of a PV inverter in case of a voltage out of range event What is the acceptable range of settings for under- over frequency disconnection What is the maximum allowed time for disconnection of a PV inverter in case of a frequency out of range event What is the minimum time for reconnection after a disconnection of a PV inverter What is the limit of the total harmonic distortion of current of a PV inverter Is an isolation transformer required for a PV inverter What is the maximum allowable DC current injected to the grid Is any special protection required for transformerless inverters Is an anti-islanding protection for the PV inverter mandatory What method of anti-islanding protection is acceptable -10% (after 31/12/2009) -6% (up to 31/12/2009) 5 secs +-1% 5 secs 3 minutes No 5mA Overcurrent protection Fuses YES Under-frequency protection E. BEST PRACTICES Title: PV system at the EAC Headquarters in Nicosia, CYPRUS Project start and end: 2005 Location: Nicosia, CYPRUS Description This PV solar system of 88,6 kwp installed capacity is placed on the south side of the building and is connected to the electrical grid. Apart from the obvious use of the photovoltaic system which is of course electricity generation, the photovoltaic panels act as sunshade to the offices that are facing to the south. To maximize the power generation the photovoltaic panels are tilted downwards by 15%. The modules have been located with their longer side parallel to the building to avoid, as much as possible, the problems with partial shadows over the PV system.

9 The system includes 836 ISOFOTON photovoltaic modules I-106 made of monocrystalline silicon, of 106Wp each at 12V and 43 DC/AC transformerless inverters. 88,6kV photovoltaic system for electricity generation Photovoltaic system acting as sunshade Technical characteristics: see description above Financing: Financed by the EAC Results 1 ST year output (June 2005-June 2006): 81307kWh 2 nd year output (June 2006-June 2007): 93207kWh

10 Contacts Name: Ioannis Hadjipaschalis Address: 11, Amfipoleos str, 2025, Nicosia, Cyprus Phone: ioannishadjipashalis@eac.com.cy

11 Figure 1: Typrical circuit for the interconnection of PV system to the LV grid of the EAC

BANDERA ELECTRIC COOPERATIVE, INC. Tariff for Electric Service. Sheet No. Section III 1.0

BANDERA ELECTRIC COOPERATIVE, INC. Tariff for Electric Service. Sheet No. Section III 1.0 1.0 340. Small Power Production Sections 340-345 of this tariff apply to the interconnection and parallel operation of all small power generating installations. All installations must meet all system performance

More information

CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW

CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW DECLARATIONS ( Customer-Generator ), and the City of

More information

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Policy Bulletin No. 25 Net Metering Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Interconnection Agreement For Net Energy Metering With Customer Solar, Wind,

More information

Jefferson Energy Cooperative Policy 124 DISTRIBUTED GENERATION POLICY

Jefferson Energy Cooperative Policy 124 DISTRIBUTED GENERATION POLICY DISTRIBUTED GENERATION POLICY I. OBJECTIVE This document establishes the terms and conditions for the interconnection of distributed generation facilities and for providing net energy metering services

More information

Interconnection Application and Compliance Form For Photovoltaic Systems Up to 2 MW

Interconnection Application and Compliance Form For Photovoltaic Systems Up to 2 MW Interconnection Application and Compliance Form For Photovoltaic Systems Up to 2 MW A. APPLICANT INFORMATION *Person/Company Name: *OUC Account No.: *Mailing Address: *City, State & Zip: Street Address

More information

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS PROCEDURES: I. Members Applying for New Interconnection/Submission

More information

I. Members Applying for New Interconnection/Submission of Plans/Specifications.

I. Members Applying for New Interconnection/Submission of Plans/Specifications. PLATTE-CLAY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF RENEWABLE ENERGY SYSTEMS WITH CAPACITY OF 100 kw OR LESS PROCEDURES: I. Members Applying for New Interconnection/Submission

More information

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS This Agreement made this day of, by and between Wisconsin Electric Power

More information

NET ENERGY METERING AND INTERCONNECTION AGREEMENT

NET ENERGY METERING AND INTERCONNECTION AGREEMENT NET ENERGY METERING AND INTERCONNECTION AGREEMENT This Net Energy Metering and Interconnection Agreement (the Agreement ), dated,, (the Effective Date ), is entered into by and between the CITY OF PALO

More information

Name: City: State: Zip Code: Is the applicant the property owner at the system address? Yes No. City: State: Zip Code: City: State: Zip Code:

Name: City: State: Zip Code: Is the applicant the property owner at the system address? Yes No. City: State: Zip Code: City: State: Zip Code: Maryland Level 1 Interconnection Request Application Form and Conditional Agreement to Interconnect (Lab Certified Inverter-based Small Generator Facilities Less than 10 kw) Interconnection Applicant Contact

More information

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH INSTRUCTIONS: Enter information in the empty fields below and send this form to Entergy. This Standard Interconnection Agreement shall be completed, submitted and approved before the net metering facility

More information

Application for Interconnection and Net Metering Level 1

Application for Interconnection and Net Metering Level 1 Application for Interconnection and Net Metering Level 1 Use this Application only for: 1.) a generating facility that is inverter based and certified by a nationally recognized testing laboratory to meet

More information

Steps/Process. <COOPERATIVE NAME> 10 kw INVERTER PROCESS Page 1

Steps/Process. <COOPERATIVE NAME> 10 kw INVERTER PROCESS Page 1 10 kw INVERTER PROCESS Page 1 Application, Procedures, and Terms and Conditions for Interconnecting a Certified Inverter-Based Generation Facility No Larger than 10 kw ("10 kw Inverter Process") Steps/Process

More information

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT Net(B) Metering Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT 1. Cover Letter to Customers 2. What is Net(B)

More information

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 A. ELIGIBLE CUSTOMER-GENERATOR RULE NO. 18 Net Energy Metering Net energy metering is available

More information

Lane Electric Cooperative, Inc. Eugene, Oregon Policy 311 (Net-Metering Services)

Lane Electric Cooperative, Inc. Eugene, Oregon Policy 311 (Net-Metering Services) October 2018 Lane Electric Cooperative, Inc. Eugene, Oregon Policy 311 (Net-Metering Services) I. Objective A. This Policy is offered in compliance with ORS 757.300, as amended by House Bill 3219, dated

More information

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES INSTRUCTIONS Enter information in the empty fields below and send this form to Entergy. This Standard Interconnection Agreement shall be completed, submitted and approved before the net metering facility

More information

UNITED COOPERATIVE SERVICES. Distributed Generation Procedures & Guidelines Manual for Members

UNITED COOPERATIVE SERVICES. Distributed Generation Procedures & Guidelines Manual for Members UNITED COOPERATIVE SERVICES Distributed Generation Procedures & Guidelines Manual for Members October 2015 TABLE OF CONTENTS GENERAL... 4 I. DETERMINE THE CATEGORY OF DG FACILITY... 5 1) Connection Level

More information

Central Texas Electric Cooperative, Inc. Tariff for Electric Service

Central Texas Electric Cooperative, Inc. Tariff for Electric Service 340 Interconnection with Distributed Generation Section 340 of this tariff and all subsections thereof apply to the interconnection and parallel operation of all qualifying (QF) and non-qualifying (NQF)

More information

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS (Customer) and Roosevelt County Electric Cooperative, Inc. (Utility), referred to collectively as parties and individually

More information

SOLAR PV INSTALLATION AT USC BASEBALL STADIUM

SOLAR PV INSTALLATION AT USC BASEBALL STADIUM AMENDMENT NO. 7 TO SOLICITATION TO: ALL VENDORS FROM: Charles Johnson, Procurement Manager SUBJECT: SOLICITATION NUMBER: USC-RFP-1761-CJ SOLAR PV INSTALLATION AT USC BASEBALL STADIUM DATE: June 30, 2010

More information

MicroFIT-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw

MicroFIT-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw This application is applicable to individual or multiple generating units at the Applicant s facility with total nameplate rating of 10 kw or less. The applicant s generation facility must generate electricity

More information

Steuben Rural Electric Cooperative, Inc. Member-Owned Distributed Generation Interconnection Information Packet

Steuben Rural Electric Cooperative, Inc. Member-Owned Distributed Generation Interconnection Information Packet Steuben Rural Electric Cooperative, Inc. Member-Owned Distributed Generation Interconnection Information Packet Member-Owned Distributed Generation Application Procedures (For single-phase attachment of

More information

Interconnection Process for Customer-Owned Generation (QFs)

Interconnection Process for Customer-Owned Generation (QFs) Interconnection Process for Customer-Owned Generation (QFs) Member-consumer makes Co-op letter explaining process & providing information (including co-op Application Member reviews information Member

More information

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

Holden Municipal Light Department Interconnection Agreement for Net Metering Service This agreement dated the day of, 20, ( Agreement ) is by and between Holden Municipal Light Department ( Department ), and, ( Customer ) (Department and Customer referred to as Parties ). Whereas, Customer

More information

FIRSTENERGY INTERCONNECTION APPLICATION/AGREEMENT - PART

FIRSTENERGY INTERCONNECTION APPLICATION/AGREEMENT - PART FIRSTENERGY INTERCONNECTION APPLICATION/AGREEMENT - PART 1 With Terms and Conditions for Interconnection For a Level 1 Review (Certified Inverter-based Units of 10kW and under) (Application & Conditional

More information

Interconnection of Electric Generators

Interconnection of Electric Generators Interconnection of Electric Generators (GENERATING CAPACITY OF NOT MORE THAN 25 KILOWATTS) Public Utility #1 of Ferry County Republic Washington November 15, 2007 Table of Contents Chapter 1 Purpose and

More information

GARLAND POWER & LIGHT. GP&L s Solar Generation Installation Requirements 2018

GARLAND POWER & LIGHT. GP&L s Solar Generation Installation Requirements 2018 GARLAND POWER & LIGHT GP&L s Solar Generation Installation Requirements 2018 All GP&L Customers who plan to install Solar Photovoltaic Panels must meet minimum requirements. Please direct any questions

More information

Orange and Rockland Utilities, Inc. Issued in compliance with Order in Case 15-E-0036 dated 07/20/2015.

Orange and Rockland Utilities, Inc. Issued in compliance with Order in Case 15-E-0036 dated 07/20/2015. Orange and Rockland Utilities, Inc. Addendum - SIR-5 INITIAL EFFECTIVE DATE: July 27, 2015 To P.S.C. No. 3 - Electricity Issued in compliance with Order in Case 15-E-0036 dated 07/20/2015. New York State

More information

NET METERING CUSTOMER SITED RENEWABLE GENERATION FACILITIES POLICY

NET METERING CUSTOMER SITED RENEWABLE GENERATION FACILITIES POLICY A CUSTOMER OWNED UTILITY Serving Our Community Since 1894 NET METERING CUSTOMER SITED RENEWABLE GENERATION FACILITIES POLICY APPROVED BY THE BOARD OF ELECTRIC COMMISSIONERS: June 28 th, 2016 Previously

More information

delma,va power A PHI Company DELAWARE LEVEL 1 INTERCONNECTION APPLICATION/AGREEMENT

delma,va power A PHI Company DELAWARE LEVEL 1 INTERCONNECTION APPLICATION/AGREEMENT delma,va power A PHI Company ELAWARE LEVEL 1 INTERCONNECTION APPLICATION/AGREEMENT With Terms and Conditions for Interconnection (Lab Certified Inverter-Based Small Generator Facilities Less than or Equal

More information

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less) INSTRUCTIONS: Enter information in the empty fields below and send this form to Entergy Mississippi, Inc. ( Entergy or the Company ). This Standard Interconnection Application and Agreement shall be completed,

More information

Interconnection Process and Guide for Small Power Generation Systems

Interconnection Process and Guide for Small Power Generation Systems Interconnection Process and Guide for Small Power Generation Systems As Adopted by the Board of Directors South Central Indiana REMC July 2014 Amended 05-25-2017 South Central Indiana REMC 300 Morton Avenue

More information

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems)

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems) INSTRUCTIONS: Enter information in the empty fields below and send this form to Entergy Mississippi, Inc. ( Entergy or the Company ). This Standard Interconnection Application and Agreement shall be completed,

More information

Section 24 COGENERATION AND SMALL POWER PRODUCTION

Section 24 COGENERATION AND SMALL POWER PRODUCTION Section 24 COGENERATION AND SMALL POWER PRODUCTION Cooperative is a member of Corn Belt Power Cooperative and Northwest Iowa Power Cooperative, generation and transmission cooperatives ("G&T" or "Corn

More information

Section 25 COGENERATION AND SMALL POWER PRODUCTION Effective Date: June 15, 2016

Section 25 COGENERATION AND SMALL POWER PRODUCTION Effective Date: June 15, 2016 Section 25 COGENERATION AND SMALL POWER PRODUCTION Allamakee-Clayton Electric Cooperative is a member of Dairyland Power Cooperative, a generation and transmission cooperative ("G&T") and obtains all of

More information

New Mexico Public Regulation Commission P. O. Box Paseo de Peralta Santa Fe, New Mexico 87504

New Mexico Public Regulation Commission P. O. Box Paseo de Peralta Santa Fe, New Mexico 87504 THE NEW MEXICO INTERCONNECTION MANUAL (To be Used in Conjunction with New Mexico Public Regulation Commission Rule 17.9.568 NMAC, Interconnection of Generating Facilities with a Rated Capacity Up to and

More information

MICHIGAN ELECTRIC UTILITY

MICHIGAN ELECTRIC UTILITY MICHIGAN ELECTRIC UTILITY Generator Interconnection Requirements Projects with Aggregate Generator Output of 30 kw or More, but Less than 150 kw Effective Aug. 10, 2004 INTRODUCTION This Generator Interconnection

More information

MODEL STANDING OFFER TERMS & CONDITIONS FOR BASIC CONNECTION SERVICES FOR RETAIL CUSTOMERS WHO ARE SMALL GENERATORS 3602

MODEL STANDING OFFER TERMS & CONDITIONS FOR BASIC CONNECTION SERVICES FOR RETAIL CUSTOMERS WHO ARE SMALL GENERATORS 3602 MODEL STANDING OFFER TERMS & CONDITIONS FOR BASIC CONNECTION SERVICES FOR RETAIL CUSTOMERS WHO ARE SMALL GENERATORS 3602 SA Power Networks www.sapowernetworks.com.au 3602 - MSO T_C's for BCS for Retail

More information

New York State Public Service Commission

New York State Public Service Commission PSC NO. 220 ELECTRICITY ADDENDUM TYPES: SIR NIAGARA MOHAWK POWER CORPORATION ADDENDUM NO. 7 INITIAL EFFECTIVE DATE: AUGUST 16, 2017 STAMPS: ISSUED IN COMPLIANCE WITH ORDER IN CASE 16-E-0560 Issued August

More information

RENEWABLE ENERGY INCENTIVE PROGRAM Step 1, Section 1 Uniform Credit Purchase Program Application

RENEWABLE ENERGY INCENTIVE PROGRAM Step 1, Section 1 Uniform Credit Purchase Program Application RENEWABLE ENERGY INCENTIVE PROGRAM Step 1, Section 1 Uniform Credit Purchase Program Application For residential and commercial systems, the combined generation capacity at the location is limited to a

More information

Electric Interconnection Policy Category 1 Projects Aggregate Generator Output (20 kw and Under)

Electric Interconnection Policy Category 1 Projects Aggregate Generator Output (20 kw and Under) Marquette Board of Light and Power 2200 Wright Street Marquette, Michigan 49855 906-228-0300 Electric Interconnection Policy Category 1 Projects Aggregate Generator Output (20 kw and Under) Effective:

More information

Black Hills 2017 Community Solar Garden ( CSG ) RFP Program

Black Hills 2017 Community Solar Garden ( CSG ) RFP Program Solar Garden ID No.: BHE CSG 2017-05 Customer Generator Sys te m E- Fili ngs The Interconnection Application/Agreement is between Black Hills/Colorado Electric Utilities, LP d/b/a Black Hills Energy, hereinafter

More information

STCP19-5 Issue 002 Offshore Transmission System Compliance Process & Testing

STCP19-5 Issue 002 Offshore Transmission System Compliance Process & Testing STCP19-5 Issue 002 Offshore Transmission System Compliance Process & Testing STC Procedure Document Authorisation Company National Grid Electricity Transmission plc Name of Party Representative Signature

More information

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System CITY OF MOUNT DORA, FLORIDA FIRST REVISED SHEET NO. 15.0 CANCELS ORIGINAL SHEET NO. 15.0 Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System This Agreement is made and

More information

Renewable Generation (Category 1-20 kw and less):

Renewable Generation (Category 1-20 kw and less): Renewable Generation (Category 1-20 kw and less): Net Metering Program Interconnection Program Application Parallel Operating Agreement Net Metering Program What is net metering? Net metering is a tool

More information

REISSUED JUNE 1, 1988

REISSUED JUNE 1, 1988 REVISED SHEET NO. 29 Effective: October 28, 1966 RULE NO. 14 REISSUED JUNE 1, 1988 Service Connections and Facilities on Customer's Premises A. METER INSTALLATIONS AND MISCELLANEOUS SERVICE EQUIPMENT ON

More information

Renewable Generation (Category 1 20 kw and less):

Renewable Generation (Category 1 20 kw and less): Renewable Generation (Category 1 20 kw and less): Net Metering Program Interconnection Program Application Parallel Operating Agreement Net Metering Program What is net metering? Net metering is a tool

More information

HOLY CROSS ENERGY November 3, 2015 GENERATOR INTERCONNECT POLICY

HOLY CROSS ENERGY November 3, 2015 GENERATOR INTERCONNECT POLICY GENERATOR INTERCONNECT POLICY GENERATOR INTERCONNECT (PROCEDURE) GENERATOR INTERCONNECT (GUIDELINES) Page 1 of 50 TABLE OF CONTENTS GENERATOR INTERCONNECT (PROCEDURE)... 4 I. GENERAL OVERVIEW... 5 A. Applicability...

More information

NET-ENERGY METER AGGREGATION INTERCONNECTION AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC CUSTOMERS

NET-ENERGY METER AGGREGATION INTERCONNECTION AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC CUSTOMERS CITY OF HEALDSBURG, ELECTRIC DEPARTMENT NET-ENERGY METER AGGREGATION INTERCONNECTION AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC CUSTOMERS DECLARATIONS ( Customer ) and the City of Healdsburg ( City

More information

Consumer Requirements for Distributed Generation Installation and Interconnection

Consumer Requirements for Distributed Generation Installation and Interconnection Rio Grande Electric Cooperative, Inc. Consumer Requirements for Distributed Generation Installation and Interconnection (Click on links to be taken to the appropriate page) TABLE OF CONTENTS SECTION PAGE

More information

LEVEL 1: STANDARD APPLICATION FORM AND INTERCONNECTION AGREEMENT

LEVEL 1: STANDARD APPLICATION FORM AND INTERCONNECTION AGREEMENT LEVEL 1: STANDARD APPLICATION FORM AND INTERCONNECTION AGREEMENT Interconnection Request Application Form and Conditional Agreement to Interconnect (For Lab-Certified Inverter-Based Distributed Generation

More information

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard) 63 SOUTH CAROLINA Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard) 1. Overview: This Standard contains the requirements, in addition

More information

Town of Highlands Board Approved as of May 17, 2012

Town of Highlands Board Approved as of May 17, 2012 TOWN OF HIGHLANDS INTERCONNECTION AGREEMENT FOR SMALL PHOTOVOLTAIC GENERATION FACILITY OF 10 kw OR LESS This PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR SMALL GENERATION 10 kw or less (the Agreement ),

More information

CAPE HATTERAS ELECTRIC COOPERATIVE

CAPE HATTERAS ELECTRIC COOPERATIVE CAPE HATTERAS ELECTRIC COOPERATIVE INTERCONNECTION STANDARD STANDARD FOR INTERCONNECTING SMALL GENERATION 100 kw OR LESS 1. Definitions: 1.1 Area EPS: Area Electric Power System: The electric facilities

More information

INTERCONNECTION GENERATION AND NET METERING POLICY

INTERCONNECTION GENERATION AND NET METERING POLICY INTERCONNECTION GENERATION AND NET METERING POLICY Manual for Member Owned Interconnection Generation Facilities Equal to 100 kw or Less Revised: May 11, 2015 Approved: August 25, 2014 Effective: August

More information

INTERCONNECTION & NET ENERGY METERING AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC GENERATING FACILITIES

INTERCONNECTION & NET ENERGY METERING AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC GENERATING FACILITIES D ECLARATIONS R EV 0 7. 21.2017 P G.1 CITY OF HEALDSBURG, ELECTRIC DEPARTMENT INTERCONNECTION & NET ENERGY METERING AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC GENERATING FACILITIES DECLARATIONS

More information

7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150

7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150 7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150 TABLE OF CONTENTS Overview Sheet 150-A Availability Sheet 150-A Definitions Sheet 150-B Monthly Rates Sheet 150-D Terms And

More information

Distributed Generation Connection Standard ST B Planning Engineer. Network Planning Manager. General Manager Network

Distributed Generation Connection Standard ST B Planning Engineer. Network Planning Manager. General Manager Network Effective Date 1 May 2018 Issue Number 1.1 Page Number Page 1 of 26 Document Title Distributed Generation Connection Standard Document Number ST B1.1-001 Document Author Planning Engineer Document Reviewer

More information

South Carolina Standard for Interconnecting Small Generation 100 kw or Less With Electric Power Systems (EPS) (Interconnection Standard)

South Carolina Standard for Interconnecting Small Generation 100 kw or Less With Electric Power Systems (EPS) (Interconnection Standard) South Carolina Standard for Interconnecting Small Generation 100 kw or Less With Electric Power Systems (EPS) (Interconnection Standard) 1. Overview: This Standard contains the requirements, in addition

More information

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows: LEE COUNTY ELECTRIC COOPERATIVE STANDARD INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS GREATER THAN 10 KW AND LESS THAN OR EQUAL TO 100 KW TIER 2 This Interconnection Agreement

More information

GARKANE ENERGY COOPERATIVE, INC. ELECTRIC SERVICE SCHEDULE SC STATE OF UTAH IMPACT FEES & SERVICE CHARGES

GARKANE ENERGY COOPERATIVE, INC. ELECTRIC SERVICE SCHEDULE SC STATE OF UTAH IMPACT FEES & SERVICE CHARGES SCHEDULE SC IMPACT FEES & SERVICE CHARGES This schedule sets the amounts for impact fees, various services, and other miscellaneous charges authorized in the Rules and Regulations of either the Utah Public

More information

PUBLIC SERVICE COMPANY OF NEW MEXICO AGREEMENT NO.

PUBLIC SERVICE COMPANY OF NEW MEXICO AGREEMENT NO. PUBLIC SERVICE COMPANY OF NEW MEXICO AGREEMENT NO. STANDARD LARGE SOLAR RENEWABLE ENERGY CERTIFICATE PURCHASE AGREEMENT FOR THIRD-PARTY OWNER PARTICIPATION IN PNM S SOLAR REC INCENTIVE PROGRAM SYSTEMS

More information

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows: LEE COUNTY ELECTRIC COOPERATIVE STANDARD INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS GREATER THAN 100 KW AND LESS THAN OR EQUAL TO 1 MW TIER 3 This Interconnection Agreement

More information

Illinois Shines PV System Power Purchase Agreement Disclosure Form

Illinois Shines PV System Power Purchase Agreement Disclosure Form Illinois Shines This form gives consumers who are considering contracting for a solar photovoltaic ("PV") system clear information about the system and their transaction. Execution of this form is required

More information

Illinois Adjustable Block Program PV System Purchase Disclosure Form

Illinois Adjustable Block Program PV System Purchase Disclosure Form Illinois Adjustable Block Program PV System Purchase Disclosure Form Draft for Stakeholder Comments Released October 3, 2018 Comments Due October 26, 2018 This form gives consumers who are considering

More information

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM This Agreement is made and entered into this day of, 20, by and between, (hereinafter RGS Owner ), located at in, Florida, and Utility

More information

NHEC s 2014 Residential Solar Photovoltaic Incentive Program

NHEC s 2014 Residential Solar Photovoltaic Incentive Program NHEC s 2014 Residential Solar Photovoltaic Incentive Program Dear Member: Thank you for inquiring about your New Hampshire Electric Cooperative s (NHEC) Residential Solar Photovoltaic (PV) Incentive Program.

More information

Weatherford Municipal Utility System. Distributed Generation Procedures & Guidelines Manual for Customers

Weatherford Municipal Utility System. Distributed Generation Procedures & Guidelines Manual for Customers Weatherford Municipal Utility System Distributed Generation Procedures & Guidelines Manual for Customers June 24, 2009 Prepared by: McCord Engineering, Inc. P.O. Box 10047 College Station, Texas 77842

More information

A. CUSTOMER INFORMATION Customer. B. PROJECT INFORMATION Project. C. CONTRACTOR INFORMATION Contractor D. INCENTIVE PAYMENT RELEASE

A. CUSTOMER INFORMATION Customer. B. PROJECT INFORMATION Project. C. CONTRACTOR INFORMATION Contractor D. INCENTIVE PAYMENT RELEASE Eugene Water & Electric Board Energy Management Services 500 E 4 th Avenue / PO Box 10148 Eugene, OR 97440 541-685-7000 www.eweb.org EWEB Solar Electric Program 2018 Power Purchase Agreement ( Agreement

More information

COMPARISION OF OFFSHORE REQUIREMENTS

COMPARISION OF OFFSHORE REQUIREMENTS Key to Table COMPARISION OF OFFSHORE REQUIREMENTS (Comparison based on GB Grid Code Issue 4 Revision 13 only and ENSTO - E RFG Internal Version dated 26 June 2012) (Note Does not include other Industry

More information

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS TABLE OF CONTENTS SECTION TITLE PAGE 1. CUSTOMER-GENERATOR RENEWABLE ELECTRICAL GENERATING

More information

The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents

The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents Description Status Schedule Index All-Electric Service Active AE-17 2 Domestic Service Active D-17 3 Small Commercial

More information

WEST OREGON ELECTRIC COOPERATIVE, INC. VERNONIA, OREGON POLICY 311 NET METERING SERVICE

WEST OREGON ELECTRIC COOPERATIVE, INC. VERNONIA, OREGON POLICY 311 NET METERING SERVICE September, 2016 WEST OREGON ELECTRIC COOPERATIVE, INC. VERNONIA, OREGON POLICY 311 NET METERING SERVICE I. Objective Net-Metering service is available, on an equal basis, to members who own and operate

More information

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20,

More information

Draft Illinois Adjustable Block Program Community Solar Disclosure Form

Draft Illinois Adjustable Block Program Community Solar Disclosure Form Draft Illinois Adjustable Block Program Community Solar Disclosure Form This form gives consumers who are considering subscribing to a community solar project clear information about the transaction. Community

More information

Small Generator Interconnection Application

Small Generator Interconnection Application Small Generator Interconnection Application Eligibility: All Interconnection Customers must submit a completed copy of this application to Holy Cross Energy s Power Supply Department. HCE s review process

More information

Parkland Light & Water Company Park Ave Tacoma, WA 98444

Parkland Light & Water Company Park Ave Tacoma, WA 98444 Parkland Light & Water Company 12918 Park Ave Tacoma, WA 98444 Interconnection Requirements of Member Owned Renewable Electric Generating Facilities of 100 Kilowatts or Less (REVISED 8/29/2015) Table of

More information

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS BRIGHTRIDGE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS This Interconnection Agreement ( Agreement ) is made and entered into this day

More information

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows: LEE COUNTY ELECTRIC COOPERATIVE STANDARD INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS GREATER THAN 10 KW AC AND LESS THAN OR EQUAL TO 100 KW AC TIER 2 This Interconnection

More information

APPENDIX A - GLOSSARY

APPENDIX A - GLOSSARY APPENDIX A - GLOSSARY 1. Photovoltaic (PV) or Solar (interchangeable): These are devices that generate electricity directly from sunlight via an electronic process that occurs naturally in certain types

More information

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment B to Schedule 150, Page 1

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment B to Schedule 150, Page 1 WN U-60 Attachment B to Schedule 150, Page 1 FUEL CELL, SOLAR, WIND, BIOGAS, COMBINED HEAT AND POWER, OR HYDROPOWER ELECTRIC GENERATING FACILITIES OF 100 KILOWATTS OR LESS Application and Agreement for

More information

The Narragansett Electric Company Standards for Connecting Distributed Generation. R.I.P.U.C. No Canceling R.I.P.U.C. No.

The Narragansett Electric Company Standards for Connecting Distributed Generation. R.I.P.U.C. No Canceling R.I.P.U.C. No. Effective R.I.P.U.C. No. 2163 : S:\RADATA1\RATE ADMINISTRATION\Tariffs_Current\Narragansett Sheet 1 TABLE OF CONTENTS 1.0 Introduction...3 1.1 Applicability...3 1.2 Definitions...3 1.3 Forms and Agreements...8

More information

AN APPLICATION FEE OF $50.00 MUST BE SUBMITTED WITH THE APPLICATION. Interconnection Applicant Contact Information. Name: Address:

AN APPLICATION FEE OF $50.00 MUST BE SUBMITTED WITH THE APPLICATION. Interconnection Applicant Contact Information. Name:  Address: Illinois Standard Distributed Generation Interconnection Level 1 Interconnection Request Application Form and Conditional Agreement to Interconnect (Lab-Certified Inverter-Based Distributed Generation

More information

STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION TABLE OF CONTENTS

STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION TABLE OF CONTENTS TABLE OF CONTENTS 1.0 GENERAL... 1 1.1 Applicability... 1 1.2 Definitions... 1 1.3 Forms and Agreements... 9 2.0 BASIC UNDERSTANDINGS... 10 3.0 PROCESS OVERVIEW... 11 3.1 Simplified Process Radial Distribution

More information

Net Metering Interconnections Standards

Net Metering Interconnections Standards Net Metering Interconnections Standards FOR Interconnection of Electric Generators (GENERATING CAPACITY OF NOT MORE THAN 100 KILOWATTS) PUBLIC UTILITY DISTRICT # 1 OF SKAMANIA COUNTY My Documents / Electric

More information

Power Partner Program Agreement. Energy For Tomorrow

Power Partner Program Agreement. Energy For Tomorrow Energy For Tomorrow Power Partner Program Agreement This Energy for Tomorrow Power Partner Program Agreement (the Agreement ) is entered into as of the day of, 200, by and between Wisconsin Electric Power

More information

Distributed Generation Procedures & Guidelines Manual for Members

Distributed Generation Procedures & Guidelines Manual for Members Distributed Generation Procedures & Guidelines Manual for Members October 2016 Page 2 GENERAL In order to receive service from the Cooperative, a customer must join or become a Member of the Cooperative.

More information

Western Power Distribution (East Midlands) plc Registered in England and Wales No

Western Power Distribution (East Midlands) plc Registered in England and Wales No CONNECTION AGREEMENT THIS AGREEMENT is made the day of 2014 Between Western Power Distribution (East Midlands) plc Registered in England and Wales No. 2366923 Whose REGISTERED OFFICE is at And Avonbank

More information

Cogeneration and Small Power Production Parallel Operation, Power Sales and Interconnection Agreement

Cogeneration and Small Power Production Parallel Operation, Power Sales and Interconnection Agreement between and Lincoln Electric System This Power Sales and Interconnection, hereinafter called the, is made and entered into as of the day of, 20, by and between, hereinafter referred to as the Owner of

More information

PEPCO CUSTOMER NET ENERGY METERING CONTRACT. Qualifying facility of 1000 KW or less

PEPCO CUSTOMER NET ENERGY METERING CONTRACT. Qualifying facility of 1000 KW or less PEPCO CUSTOMER NET ENERGY METERING CONTRACT Qualifying facility of 1000 KW or less Customer Name: Customer Pepco Acct. #: Customer Address: Customer Telephone Number: Customer E-Mail Address: Generator

More information

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS This Agreement is made and entered into this day of, 20, by and between, (hereinafter called "Customer"), located at in, Florida

More information

PSE&G Solar Loan III Program General Q&A

PSE&G Solar Loan III Program General Q&A PSE&G Solar Loan III Program General Q&A Note: The following are common questions that PSE&G has received regarding the Solar Loan III Program. This document is for informational purposes only. See your

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation)

More information

REQUIREMENTS FOR OPERATION OF PARALLEL GENERATION FACILITIES (COGENERATION AND SMALL POWER PRODUCERS)

REQUIREMENTS FOR OPERATION OF PARALLEL GENERATION FACILITIES (COGENERATION AND SMALL POWER PRODUCERS) Original Sheet No. D-3.00 REQUIREMENTS FOR OPERATION OF PARALLEL GENERATION FACILITIES (COGENERATION AND SMALL POWER PRODUCERS) In order to provide for the safety of customers, utility personnel, and others,

More information

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES) Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES) 1. Overview: This Standard sets forth the requirements,

More information

Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA Distribution Systems

Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA Distribution Systems Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA Distribution Systems -1- TABLE OF CONTENTS Section I. Application Process..

More information

STANDARD INTERCONNECTION AGREEMENT FOR INTERCONNECTED CUSTOMER-OWNED BATTERY SUBSYSTEMS 1 KW OR MORE

STANDARD INTERCONNECTION AGREEMENT FOR INTERCONNECTED CUSTOMER-OWNED BATTERY SUBSYSTEMS 1 KW OR MORE STANDARD INTERCONNECTION AGREEMENT FOR INTERCONNECTED CUSTOMER-OWNED BATTERY SUBSYSTEMS 1 KW OR MORE This Agreement is made and entered into this day of, 20, by and between, (hereinafter called "Customer"),

More information

Massachusetts Electric Company. Nantucket Electric Company. d/b/a National Grid. Standards for Interconnecting Distributed Generation

Massachusetts Electric Company. Nantucket Electric Company. d/b/a National Grid. Standards for Interconnecting Distributed Generation Massachusetts Electric Company Nantucket Electric Company d/b/a National Grid Standards for Interconnecting Distributed Generation M.D.P.U. No 1219 Canceling M.D.P.U. 1176 Effective: May 1, 2013 TABLE

More information

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission This STANDARD INTERCONNECTION AGREEMENT, (the Agreement ), is entered into this day of, 20 by and between, hereinafter called Customer

More information