1 Eskom 2018/19 Revenue Application Closing remarks Nersa Public Hearing Midrand 20 November 2017

2 Content 1 System Performance and capacity 2 Adjustments being made in terms of MYPD methodology 3 Clarification of issues raised during public hearings 4 Analysis by external parties 5 Financial position, debt and rating agencies 6 Conclusion 1

3 System Operator's Day-Ahead Generation Scheduling Process Renewable Forecast Demand forecast Network constraints Cost of generation Day ahead contract Unconstrained schedule (Cheapest mix) Constrained schedule Operating reserve requirement

4 Nominal Capacity versus Peak demand Available Capacity Operating Reserves PCLF UCLF Peak Demand Installed Capacity MW Breakdowns (UCLF) 6500 MW Average Planned Maintenance (PCLF) 6800 MW Operating Reserve 2000MW Peak Demand Available Capacity Nov Dec Jan Feb Mar Production plan is optimised to ensure that required maintenance is executed and demand is met. Excess generation will then be placed into Cold Reserve 3

5 Maintenance is on track in line with 80:10:10 strategy Generation planned maintenance performance 1 FY2014 to FY2018 Percentage (%) 10,50 9,91 12,99 12,14 8,37 10,00 PCLF Target 10% Key Insights Current projections indicate a PCLF of 10% by year end PCLF is higher in FY2016 and FY2017 as Eskom conducted more maintenance to address to catch up with maintenance FY2014 FY2015 FY2016 FY2017 FY2018 YTD FY2018 Projection Source: Eskom Generation 4

6 Percentage of breakdowns after Outages is very low UCLF, % Key Insights 7,30 0,34 9,44 0,68 10,49 0,88 7,54 0,64 Post outage UCLF UCLF 8,86 0,55 11,68 11,88 0,44 0,64 9,60 0,60 The UCLF for FY2018 YTD (31 October 2017) is 8.27% Post Outage UCLF contributed only 0.6% to total UCLF 6,96 8,76 9,61 6,90 8,31 11,24 11,24 9,00 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Average SOURCE: GPSS

7 Threshold for operating stations is a function of economics The age based life expectancy used for long term planning (first & last units) Camden : 2020 & 2023 Hendrina : 2020 & 2027 Komati : 2024 & 2029 Grootvlei : 2025 & 2028 However, life of a station can be extended beyond this age based life expectancy if it is economically viable to do that Eskom has determined that it is not economically viable to extend the life of Hendrina, Komati Camden and Grootvlei beyond their age based life expectancy These plants are of an old design with a lower thermodynamic efficiency which will not improve above that of newer design even if the station is refurbished (these stations do not have reheaters whereas newer designs have reheaters) Moreover in FY2020, Hendrina, Komati & Grootvlei are not required to meet production and will not be dispatched (even before most units reach age based life expectancy) due to the fact that they have higher projected scheduling costs amongst stations that do not affect voltage stability of KZN Source: Eskom Generation 6

8 Extended cold reserve can be ringfenced One of the key inputs to conclusion on economic viability and Production Commercial Operation of new build (Medupi, Kusile, REIPP s) which lead to conclusion of excess capacity It is therefore advisable to put the plant in extended cold reserve as a risk mitigation against any future uncertainties cold reserve will result in massive savings in Opex and Capex because it is not operational e.g. Eskom stopped the replacement of Turbines at Hendrina at contract stage However, some preservation expenditure will be required for the stations in cold reserve Eskom will provide written feedback to NERSA on the costs of preservation as well as savings due to cold reserve per station Source: Eskom Generation 7

9 South Africa vs Australia Eskom + IPP 4,300 kilometres. Integrated report 31 March 2017 * Including imports % 0.01 % *4.7 % 5 % Capacity (GW) Energy (TWh) % 9 % 7% 5 % NEM Total electricity generating capacity April 2017 NEM Fact Sheet National Electricity Market (NEM) & (SWIS) (94% of Demand) Both Operates on one of the World s Longest interconnected power systems around Coal 32,220 km of transmission lines and cables. No Market Electricity, Limited Gas & Coal Market s Gas Coal 5,000 kilometres. 40,000 km of transmission lines and cables. High developed Market s Electricity, Coal & Gas Gas NUCLEAR 1% 1 % 6 % 0% Although similar electrical Capacity & Energy Mix Australia Market driven with mature Electricity/Coal/Gas markets 8

10 Household Energy Price & Comparative price in other open markets Australian Chief Economist & ACCC has reported significant increases in Household energy price over the past 10 year in the Australia Electricity Market compared with the increase in wages and CPI ACCC Australia Competition & Consumer Commission South Africa Aus ($) 1 = R R/kWh = 24 Australian cents Australia residential electricity prices (May 2017 prices Australia, 2015 prices European Countries) Australian Household Energy Price high compared with Competitive markets in European Countries AEMO Australia Energy Market Operator Competitive market high renewable penetration 9 South Africa Household tariff remain lower than the Australian Household

11 Concerns about aging power plant Closed Coal Fired Power Plan and aging generation fleet in Australian is placing pressure on the stability of the grid. Conventional Capacity Closed Capacity (GW) Energy (TWh) Grid stability Conventional Plant provides multiple services Aging profile Conventional Capacity Replacing with Renewable generation provides dominantly energy Capacity (GW) OCGT, CCGT, Pump storage, batteries,, New Technologies, etc Energy (TWh) Renewables Grid stability Batteries, Flywheels, New Technologies, Smart Grid etc New energy from renewable source do not provide adequate capacity and system stability services. Acquire 2017/11/20 these service maybe required Additional 10 Markets which may increasing price pressures.

12 The New Build Programme is at an advanced stage In the event that part of or all of the works are suspended at Medupi & Kusile there would be significant contractual and commercial implications Although expenditure would be temporarily deferred, the net result would be that the projects would incur significant additional costs when it came to restarting and completing the remaining construction and commissioning Works. Most contract packages are placed and committed for Medupi and Kusile. Medupi Considering construction progress, it will not be feasible to suspend all or part of the works at Medupi. Kusile In the case of Kusile, based on the assumption that the suspension would be implemented with immediate effect it would result in significant additional cost. In addition the decision to cease construction would have a tremendous social and economic impact on in excess of 22,000 people currently directly employed on the Project Site and a further undetermined number of people and business s indirectly employed in the surrounding communities providing support and services to the Project.

13 Eskom has made significant progress in implementing Medupi new build project 84.70% overall project completion Unit 6: 99.72% Unit 5: 99.67% Unit 4: 88.43% Unit 3: 87.95% Unit 2: 68.71% Unit 1: 63.67%

14 Eskom has made significant progress in implementing Kusile new build project 82.60% overall project completion Unit 1: 99.02% Unit 2: 93.12% Unit 3: 75.27% Unit 4: 61.83% Unit 5: 53% Unit 6: 46%

15 Kusile Unit 5: Progress in Pictures CRT Tank Assembly and Installation Unit 5 Overall Progress: 53% (A) vs. 48% (P) Unit Transformer Foundation Construction

16 Kusile Unit 5: Progress in Pictures Installation of Burners Refractory Rings FGD Pump House ACC Top Steam Header Installation Progress on Aux Bay Rooms (Brick works and Fire proofing)

17 Kusile Unit 5: Progress in Pictures FGD Absorber Tank ACC Main Exhaust Ducts Unit 5 Turbine Hall ID Fans Installation

18 Kusile Unit 6: Progress in Pictures Generator Rotor Installation Unit 6 Overall Progress: 46% (A) vs. 41% (P) Turbine Piping Installation

19 Kusile Unit 6: Progress in Pictures ACC Top steam headers installed 2 Bunkers Delivered to Site Welding Connecting Tubes to Headers Turbine Piping Installation

20 Kusile Unit 6: Progress in Pictures Unit 6 Turbine Hall Primary Air Ducts PJFF Support Structure Installation Units Over view

21 Adjustments being made to Eskom s application in accordance with MYPD methodology Sales Changes in sales volume projections (GWh) for 2018/19 year, with a reduction in standard tariffs sales volumes of 4 871GWh Standard Tariff Sales NPA Sales Export Sales Total Sales ,305 IPPs 13,634 Drop in GWh of energy to be secured from IPPs Drop in R7 080m for costs of IPPs 4,871 Coal Costs Coal costs increase to address drop in energy that was to be secured from IPPs Net increase in coal costs following drop in sales volumes and reduced IPPs of R450m 20

22 Update of Revenue Requirement and Price increase after reducing IPPs by R7bn and accounting for the latest sales forecasts with reflects a 5TWh decline Allowable Revenue (AR) Regulated Asset Base WACC (%) Returns Expenditure Primary energy IPPs (local) International purchases Depreciation IDM Research & development Levies and taxes RCA Total Allowable Revenue RAB ROA E PE PE PE D I R&D L&T RCA Recovered from non standard tariff customers Standard tariff customers Standard tariff sales volumes Standard tariff price Standard tariff price adjustments R m GWh c/kwh % Fx Application FY2018/19 (R m) % % Adjustments to Application 2.97% Revised Application FY2018/19 (R m) % % Revenue requirement drops by R6630m with 18.9% average price increase & 26.9% for Munics from 1 July 2018

23 In order to achieve a CPI price increase in 2018/19 will require a revenue reduction of R22 billion Scenario Allowable Revenue (AR) Regulated Asset Base WACC (%) Returns Expenditure Primary energy IPPs (local) International purchases Depreciation IDM Research & development Levies and taxes RCA Total Allowable Revenue RAB ROA E PE PE PE D I R&D L&T RCA Recovered from non standard tariff customers Standard tariff customers Standard tariff sales volumes Standard tariff price Standard tariff price adjustments R m GWh c/kwh % Fx Application FY2018/19 (R m) % % Adjustments to Application 2.97% Revised Application FY2018/19 (R m) % % Revenue requirement drops to R191bn which is R14bn lower than R205 billion allowed in 2017/18

24 Specific reasons for drop in sales in industrial sector provided by Eskom customers Customers having improved co-gen capacity Mines affected by worked out resources, uneconomical existing shafts, safety incidents and high running costs Ageing plant, decline in world commodities (post commodities boom) and importing of cheaper products Customer exposed to depleting feedstock Customers having liquidated or applied for business rescue due to financial vulnerability and low competitiveness Struggling to compete with international sister plants due to production costs, with production allocated to most cost effective plants by the parent company Shutting down operations and relocated to Asia due to incentives offered Voluntary contribution to the Energy Conservation Scheme Decline in world commodities, reduced competitiveness Opting to export un-beneficiated ore The price of electricity alone is unlikely to reverse the deterioration in the economy; it would require a holistic approach 23

25 It is common practice in most countries to provide incentives for certain sectors of economy (1) Nearly all countries have policies to protect certain sectors of the economy and society. The State is significantly involved in determining sectors and type of support that is needed with short and long term incentives including tax breaks In South Africa the following is done to support the different sectors: Residential Sector Facilitation of access to electricity through government national electrification program. Social grants provided directly to customers through Free Basic Electricity of 50 kwh per household per month by national government to the indigent through the Equitable Share Fund. Eskom provides FBE to customers in their area of supply as an agent for the municipalities For the MYPD3 period the increase on the Homelight 20A customers (lifeline tariff) was lower than the average increase. Subsidised by direct Eskom large urban customers (affordability subsidy) Agricultural Sector A challenge is the cost of the large networks to be built to provide supply to farmers causing high fixed network costs Agricultural customers are subsidized by large high voltage urban customers around 32% through a Low Voltage Subsidy 24

26 Minimal impact to Eskom poor residential customers Of the approximately 6 million Eskom customers the majority are on Eskom Homelight 20A tariff For 350kWh monthly electricity consumption, on the Homelight 20A tariff, customers would pay an additional R57 per month The average usage for Homelight 20A customers is around 100 kwh/customer/month The majority of Eskom residential customers will pay around R16 per month more for electricity Rand Increase 2017/18 tariff 1, , kWH 150kWH 350kWh 700kWh 1400kWh Consumption per month 25

27 It is common practice in most countries to provide incentives for certain sectors of economy (2) Short Term Special Incentive Products to increase current sales Industrial Sector Government is in process of developing framework Short Term Pricing Incentive Framework to retain customers and sales DOE is developing a Short-term Electricity Incentive Programme to provide opportunities to retain existing businesses that have closed down or are at serious risk of failure owing to their inability to compete in markets Purpose is to provide incentives to encourage large consumers to increase their offtake of electrical energy to fully utilise existing production capacity to support sustained and increasing economic activity Proposed tariffs for electricity-intensive industry consumers To stabilise and increase sales to electricity intensive industrial consumers with very high load factors It is critical that National Government plays a significant role in - determining which sectors of society and the economy require support, - ensuring there is a level playing field between customers of Eskom and municipalities; - ensuring that incentives are provided to contribute to economy 26

28 Eskom response to Governance challenges and Corruption Eskom is mindful that actions in dealing with governance issues, are a test and a determiner of future success. The following has already been implemented Strengthening general internal ethics and fraud framework Implementing independent audits on leadership Terminating all irregular supplier contracts and work: McKinsey contract was terminated in July Contract with Impulse International has been suspended, pending outcome of forensic investigation There are no dealings with Trillian contractually or otherwise Independent audits on Tegeta contracts have been clarified as being within range of other similar contracts and all control gaps have since been tightened Enhancing the internal commercial governance process Instituting disciplinary charges and taking legal action when required Suspended eight members of leadership who have allegedly been involved in governance irregularities. Four of whom are from Executive team Have instituted criminal charges against certain Eskom management in this regard 27

29 Clarifications of certain points raised during public hearing The NERSA decision for the last year of the MYPD 3 period (2017/18) was a nominal increase of 2.2% from the previous year s tariff. This is experienced as an effective decrease in real terms by consumers Difference in accounting and regulatory rules for capacity charges for DOE Peakers results in difference in IPP costs reflected in Eskom s Annual Financial statements and Eskom s revenue application Avon and Dedisa are two contracts that are classified as finance lease according to IFRIC 4 for Financial Accounting purposes. MYPD methodology: Purchases or procurement of energy and capacity from IPPs, including capacity payments, energy payments and any other payments as set out in the PPA, will be allowed as a full pass-through cost. Eskom is required to undertake Generation build projects when determined by the Minister of Energy in accordance with the IRP and the ERA The IRP 2010 included Sere, Ingula, Medupi and Kusile Eskom is not in a position to undertake further renewable build projects unless determined by the Minister of Energy

30 Staff complement has escalated over last 10 years with a reduction reflected in over the next few years Distribution headcount growth of 4300 over the 10 year period due to: Increase in electrification numbers 1.75million more end customers Increase of 54 Customer Network Centers to improve response time and to reduce outages 900 Temporary Employment Agency workers absorbed due to change in legislation Significant focus to restore and improve network performance and manage customer risk on service delivery. Generation headcount growth of 2482 over the 10 year period due to: Majuba P/S that moved away from two shifting to running base load RTS (Camden, Grootvlei, Komati ) plus Medupi and Kusile Peaking resource capacitation for Ankerlig, Gourikwa & Ingula Nuclear New build preparation additional Learners of 4308 and bursar intake of 1058 over 10 year period (some of these are included in the Generation and Distribution staff complements) Eskom s application reflects drop of 4454 from (2015/16) to (2018/19) 29

31 What has Eskom done to contribute to easing burden on the consumer and fiscus Eskom has reduced its costs by R47bn for the first four years of the MYPD 3 period The total target for the 5 year MYPD 3 period is R60bn this is by March 2018 The application made for the 2018/19 year has already taken these into account The areas where these savings against budget were realised include Employee benefit costs Primary energy costs Reprioritising of capital expenditure to the extent possible within the legislative requirements Eskom has significantly rephased recovery of allowed ROA Processes to recover debt from Municipalities and Soweto customers Municipality debt recovery is complex due to Municipalities not being able to recover from their own customers is a challenge that COGTA, NT and SALGA are also addressing Eskom has submitted rationalisation of Municipal tariffs to NERSA Eskom is making every effort to manage the Soweto challenge installing split metering Have increased cut-off level with increased cut-off this financial year majority of which were not reconnected 30

32 How has Eskom s costs moved from FY2017 to FY2019 Coal burn costs have increased by 10,2% over a 2 year period, averaging 5.1% Staff costs have increased by 1,6% over a 2 year period, averaging 0.8% Other Operating costs have decreased by -11,9% over a 2 year period, averaging -6% Maintenance costs have increased by 25.4% over a 2 year period, averaging 12.7% Generation own PE costs (excl Coal usage and Coal provision) have increased by 23.3% over 2 year period, averaging 11.62% IPP costs have increased by 25% (after reducing R7bn) over 2 year period, averaging 12.5% Capital expenditure have increased by 30.5% over 2 year period, averaging 15.2% Item 2016/ / /19 % growth FY19 FY17 source Coal usage costs % Table 23 IPPs = % Table 23 Generation own PE (excl coal usage and coal provision costs) % Table 23 Staff costs % Table 30 Other Opex costs % Table 30 Maintenance costs % Table 30 Capital Expenditure % Table 22 31

33 The utility financial death spiral for Eskom should not be artificially created through subsidies or through price premiums (costs reflected for illustrative purposes only) c/kwh True gap to the potential start of utility financial death spiral Eskom cost Self generation cost Eskom cost Off grid/own generation Munic cost and surcharges Transmission and Distribution cost Self grid storage, back-up etc For illustrative purposes only 187 Average selling price of Munic Gap as perceived by many municipal customers, to start of financial death spiral. Financial death spiral is actually another term for demand reaching a relatively price elastic zone. It could potentially commence when the substitutes and alternatives become economically viable, compared to grid electricity. Subsidies to reduce the perceived cost of such substitutes and alternatives, or premiums to the cost of grid electricity, could artificially narrow the gap. Indications are that Eskom s current average price, and also the price reflective of prudent and efficient cost is well below the cost of substitutes and alternatives. This might not be the case with many municipalities due to surcharges, cross-subsidies, etc. Inappropriate decisions around the pricing of electricity could potentially have significant consequences: - 42% of Eskom volumes are sold to municipalities. If this volume is reduced due to artificial mechanisms it could create stranded assets and unrecovered sunk costs, for Eskom as well as municipalities. - Customers more able to afford own generation could defect off-grid faster. Even if due to artificial price signals, once off-grid it is likely to remain offgrid. - Policy decisions needed on subsidies and surcharges

34 Illustration of financial effects of price reduction and volume increase Various studies of price elasticity of demand for electricity have estimated electricity demand as relative inelastic e.g. textiles and clothing -0.23, manufacturing -0.3, metals -0.31, ferro-alloys commodities Thus, at -0.3 a real increase in price of 10% would cause a volume reduction of 3% This dynamic would however mostly be observed once electricity prices reach a level that is close to the cost of viable alternatives The simple calculation shows however that a 10% general price reduction would require a 16.9% volume increase merely to break-even financially (and assuming that primary energy increases at the average cost of Primary Energy per kwh) 33

35 What BUSA and EIUG saw as a balanced price for 2017/18 year EIUG analysis indicates that tariff increases in the range of 10% to 13% are sufficient to support Eskom s viability and fundability over the MYPD3 period. Corresponds to 97.69c to c by 2017/18 BUSA in MYPD 3 decision would be 101.7c/kWh by the 2017/18 year Entity Year Proposal for price (KWh) EIUG during MYPD 3 hearings 2017/18 Range of 98 to 112c BUSA during MYPD 3 hearings 2017/18 102c 34

36 35 World bank Report 2016 summary of inefficient (hidden) costs The World bank study defined certain parameters that reflect efficient operations. Any deviation from these norms are seen to be inefficient and defined as hidden costs The norms are - Transmission & distribution losses (both technical and commercial) should be <10% of dispatched electricity - 100% bill collection - Same staffing level as in well-performing, comparable utilities in Latin America The graph below illustrates the factors that contribute to hidden costs Breakdown of hidden costs in Africa Under-pricing is the main contributor of Eskom s hidden costs This is different from other African countries Eskom losses are not reflected in the graph as they are within the norm

37 Government debt to GDP (%) Chamber of Mines agree that country should guard against the impact on Government debt Macroeconomic impacts of alternative scenarios to meet Eskom s five-year revenue requirement The impact of the 5 scenarios on Government Debt were modelled and the outcomes are illustrated below 120% 104% 100% 100% 88% 80% 68% 60% 67% 55% 1A: 13%, debt 40% 1B: 19%, tariff BAU2: 8%, downgrade 20% 3A: 8%, VAT BAU1: 8%, debt 0% The price increase cannot be seen in isolation If Eskom does not receive the required revenue through the tariff it impacts the fiscus and taxpayer someone needs to pay thus the VAT, debt and downgrade impact Significant changes are seen in Government debt to GDP levels Concerns on impact of price increases were also raised Addressing generating capacity was raised This is being done will be after this revenue cycle. 36

38 Financial Implications : Cash from operations over MYPD3 covered debt service commitments but did not allow for a build up of cash reserves in the balance sheet 50,000 40,000 30,000 Cash from operations (CFO) 20,000 10,000 0 (10,000) CFO after Interest repayments (20,000) CFO after debt repayments (30,000) FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 Note: In FY2016 and FY2017 the MYPD 2 and FY2014 RCA s were liquidated which improved the cash from operations 37

39 Full cost recovery would have required ave price of 120c/kWh in 2019, on reduced DRC asset values as per application (and 129c/kWh on historical asset values thus even higher) c/kwh Gap represents R59bn revenue p.a. Revised revenue application for R213bn / 101c/kWh Gap represents R42bn revenue p.a. Applied-for price in 2018/19 not yet cost-reflective Gap in 2018/19 approx. 20c/kWh Revenue shortfall approx. R42bn in 2018/19 This shortfall cannot be closed with efficiencies / cost-cutting as it would imply eliminating 66% of total O&M Eskom has been raising debt to fund the cash gap caused by revenue shortfall This has been the situation since 2008 and is not sustainable (for Revenue Application FY the revenue and price on DHC is higher than on DRC due to low RAB value on DRC) 38

40 Eskom has sacrificed Returns in an effort to reduce impact on consumer Eskom has reduced the ROA % from 4.7% (2017/18) to 2.97% (2018/19) Returns of R million does not cover interest costs Net interest costs paid in 2016/17 was R million Thus the equity returns in the application is negative Price increase is minimal and remains in base electricity price until full RCA is recovered over longer period Item 2018/19 Returns on Asset Net Interest costs R22 690m R36 200m Return on Equity (R13 510m) Eskom cannot be financially sustainable if it must borrow to pay for interest In this application the depreciation component contributes towards covering interest 39

41 Regulatory Clearing Accounts (RCAs) BUSA, EIUG and other stakeholders have called for a waiver of the outstanding RCAs Eskom rejects this proposal on the following basis: Contravenes the Electricity Regulation Act, MYPD Methodology utility must be allowed to recover efficient costs and earn fair return SALGA have confirmed that RCAs will allow Eskom to earned the Revenue which was awarded Outstanding RCAs (Year2, 3 and 4) total R66billion with revenue variance contributing R45 billion Eskom expects the trend of approximately R20bn for RCA 2017/18 (year5) to continue During selective reopener stakeholders criticised Eskom for not complying with MYPD Methodology, while now they expect Eskom and NERSA to contravene MYPD Methodology Eskom does acknowledge the impact that RCAs will have on the electricity and affordability 40

42 Recommendation on outstanding RCAs Eskom s cost base grows by inflation between FY2017 to FY2019 RCAs will be processed together with MYPD4 decision RCAs will be liquidated from April 2019 on phased in basis Example Assume that of the R66bn NERSA decides that R42bn is allowed to be recovered over a period Price increase is minimal and remains in base electricity price until full RCA is recovered over longer period Item Revenue allowed R200bn RCA Price adjustment 1.0% 1.0% 1.0% 0% 0% RCA Revenue impact R2bn R4bn R6bn R6bn R6bn Benefits : Allows Eskom to address the affordability of consumers Use the RCA decision to refinance debt and raise loans (confidence to investors & rating agencies) Provide auditors with further certainty around revenue generation to address going concern 41

43 Fitch Ratings puts Eskom on Rating Watch Negative extract from 17 Nov

44 In conclusion Eskom appreciates the robust Nersa process and comments and criticism received during the last 3 weeks endeavor to address issues in the future As a SOE Eskom business model is determined by policy We don t have the latitude to pursue only profitable customers or stop supplying non-paying customers The impact of the reduced IPP costs plus the updated lower sales forecasts makes a minimal impact on the price increase Fitch Ratings have indicated the importance of this price decision and certainty around the outstanding RCAs Eskom s cost base has escalated by inflationary levels from FY2017 have sacrificed returns to reduce impact on customers However debt service commitments are escalating by more than inflation Eskom is not financially sustainable with a CPI price increase as this would imply an average price increase of 4% (2.2% in 2017/18 + 6% in 2018/19) over the 2 years 43

Eskom 2018/19 Revenue Application

Eskom 2018/19 Revenue Application Eskom 2018/19 Revenue Application Nersa Public Hearings Bloemfontein 15 November 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained

More information

Eskom Regulatory Clearing Account (RCA) year 5 of MYPD 3. Public Hearings- Port Elizabeth Date: 16 January 2019

Eskom Regulatory Clearing Account (RCA) year 5 of MYPD 3. Public Hearings- Port Elizabeth Date: 16 January 2019 Eskom Regulatory Clearing Account (RCA) year 5 of MYPD 3 Public Hearings- Port Elizabeth Date: 16 January 2019 RCA (Yr 5, MYPD3) Timeline RCAs require 3 decisions: 1 Balance decision 2 Liquidation decision

More information

Eskom 2018/19 Revenue Application

Eskom 2018/19 Revenue Application Eskom 2018/19 Revenue Application Nersa Public Hearings Klerksdorp 13 November 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained

More information

Eskom 2018/19 Revenue Application

Eskom 2018/19 Revenue Application Eskom 2018/19 Revenue Application Nersa Public Hearings 30 October 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained its revenue

More information

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA November 2015 MYPD3 2013/14 RCA Submission to NERSA November 2015 Page 2 of 205 TABLE OF CONTENTS 1 PREFACE... 15 1.1 The basis of

More information

Investor Presentation. Cover slide (same as IR cover)

Investor Presentation. Cover slide (same as IR cover) Investor Presentation Cover slide (same as IR cover) Contents Eskom at a glance Financial review Operational review Design-to-Cost RCA High Court Decision Funding overview Progress on the new build programme

More information

Eskom Presentation Standing Committee on Appropriations

Eskom Presentation Standing Committee on Appropriations Eskom Presentation Standing Committee on Appropriations 12 June 2015 Contents Content 1. Introduction 2. Financial situation 3. Eliminating Load shedding 2 Executive summary (1 of 2) Eskom is a fully integrated

More information

Draft Eskom 2018/19 Revenue Application

Draft Eskom 2018/19 Revenue Application Draft Eskom 2018/19 Revenue Application Nersa Public Hearings Durban 2 November 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained

More information

Eskom MYPD4 Revenue Application

Eskom MYPD4 Revenue Application Eskom MYPD4 Revenue Application Focus on Coal and Independent Power Producer Costs Nersa Public Hearings Durban 17 January 219 The MYPD methodology through the allowable revenue formula was applied AR=

More information

PRESENTATION AT NERSA PUBLIC HEARINGS FOR ESKOM S MYPD3 RCA FOR YEAR 5 RONALD CHAUKE 14 JANUARY 2019

PRESENTATION AT NERSA PUBLIC HEARINGS FOR ESKOM S MYPD3 RCA FOR YEAR 5 RONALD CHAUKE 14 JANUARY 2019 PRESENTATION AT NERSA PUBLIC HEARINGS FOR ESKOM S MYPD3 RCA FOR YEAR 5 RONALD CHAUKE 14 JANUARY 2019 1 CONTENT Introduction Context Operating Costs Reporting Best Practice Primary Energy World Bank Report

More information

Eskom Revenue Application. Multi-Year Price Determination (MYPD 4) FY2019/ /22

Eskom Revenue Application. Multi-Year Price Determination (MYPD 4) FY2019/ /22 Eskom Revenue Application Multi-Year Price Determination (MYPD 4) FY2019/20-2021/22 September 2018 Content Content Preface... 7 Executive Summary... 10 1.1 Key elements of allowed revenue for the 2019/20-2021/22

More information

Eskom Revenue Application. Multi Year Price Determination. 2010/11 to 2012/13 (MYPD 2)

Eskom Revenue Application. Multi Year Price Determination. 2010/11 to 2012/13 (MYPD 2) Issues Paper Eskom Revenue Application Multi Year Price Determination 2010/11 to 2012/13 (MYPD 2) Published on 30 October 2009 1 TABLE OF CONTENTS Abbreviations... 3 Definitions... 4 1. Introduction...6

More information

MYPD3 Application January 2013

MYPD3 Application January 2013 MYPD3 Application 2014-2018 January 2013 Disclaimer This presentation does not constitute or form part of and should not be construed as, an offer to sell, or the solicitation or invitation of any offer

More information

FY2017/18, Year 5 of MYPD 3 Period

FY2017/18, Year 5 of MYPD 3 Period MYPD 3: Regulatory Clearing Account Submission to NERSA FY2017/18, Year 5 of MYPD 3 Period September 2018 Contents Contents Contents... 2 Preface... 8 1.1 The basis of submissions...8 1.2 The structure

More information

SALGA Position on Eskom Revenue Proposal 2018/19 Cllr M. Mfikoe Nhlanhla L Ngidi Lonwabo Magida 16 November 2017

SALGA Position on Eskom Revenue Proposal 2018/19 Cllr M. Mfikoe Nhlanhla L Ngidi Lonwabo Magida 16 November 2017 SALGA Position on Eskom Revenue Proposal 2018/19 Cllr M. Mfikoe Nhlanhla L Ngidi Lonwabo Magida 16 November 2017 www.salga.org.za Content Introduction Cllr Matshidiso Mfikoe SALGA Summary of Observations

More information

Group Interim results for the six months ended 30 September Cover slide (same as IR cover)

Group Interim results for the six months ended 30 September Cover slide (same as IR cover) Group Interim results for the six months ended 30 September 2015 Cover slide (same as IR cover) 24 November 2015 Contents Overview of the period Financial review Operating performance Conclusion 1 Sustainable

More information

Submission to SALGA and National Treasury

Submission to SALGA and National Treasury MYPD 3 Re-opener for selective items (2015/16~2017/18) o OCGTs and o STPPP Including the Submission to SALGA and National Treasury In terms of the Municipal Finance Management Act (MFMA) 16 March 2015

More information

Cover slide (same as IR cover)

Cover slide (same as IR cover) Integrated results for the year ended 31 March 2016 Cover slide (same as IR cover) 5 July 2016 This presentation is available at www.eskom.co.za/ir2016 Contents Overview of the year Financial review Operating

More information

Demystifying Tariff Setting The tariff conundrum Lower rates now, blackouts later?

Demystifying Tariff Setting The tariff conundrum Lower rates now, blackouts later? Demystifying Tariff Setting The tariff conundrum Lower rates now, blackouts later? Does South Africa need a cost reflective tariff? For years, low electricity costs have been a driver behind South Africa

More information

MYPD 3 (Year 2014/15) Regulatory Clearing Account Submission to NERSA

MYPD 3 (Year 2014/15) Regulatory Clearing Account Submission to NERSA MYPD 3 (Year 2014/15) Regulatory Clearing Account Submission to NERSA 13 May 2016 MYPD3 2014/15 RCA Submission to NERSA 10 May 2016 Page 2 of 147 TABLE OF CONTENTS 1 PREFACE... 12 1.1 The basis of submissions...

More information

NATIONAL ENERGY REGULATOR. Eskom MYPD2 Regulatory Clearing Account (RCA) and RCA Balance THE DECISION

NATIONAL ENERGY REGULATOR. Eskom MYPD2 Regulatory Clearing Account (RCA) and RCA Balance THE DECISION Eskom Holdings Limited: Regulatory Clearing Account Application - Multi Year Price Determination 2010/11 to 2012/13 (MYPD2). NATIONAL ENERGY REGULATOR In the matter regarding Eskom MYPD2 Regulatory Clearing

More information

ESKOM s applications for MYPD4 and MYPD3 RCA 2017/18

ESKOM s applications for MYPD4 and MYPD3 RCA 2017/18 ESKOM s applications for MYPD4 and MYPD3 RCA 2017/18 NERSA 15 January 2019 Nelson Mandela Bay Business Chamber Comments and Recommendations Overview The Nelson Mandela Bay Business Chamber What the applications

More information

Eskom RCA: Revenue Application NERSA Public Hearing. City Power Presentation Frank Hinda 11 May 2018

Eskom RCA: Revenue Application NERSA Public Hearing. City Power Presentation Frank Hinda 11 May 2018 Eskom RCA: Revenue Application NERSA Public Hearing City Power Presentation Frank Hinda 11 May 2018 Table of contents 1 Background to City Power Operations 2 Sales Forecasting & Rebasing of Sales Volumes

More information

ESKOM S FINANCIAL CRISES AND CONTINUING TARIFF INCREASES

ESKOM S FINANCIAL CRISES AND CONTINUING TARIFF INCREASES ESKOM S FINANCIAL CRISES AND CONTINUING TARIFF INCREASES Strategies for containing costs and stabilising its financial position. NERSA Public hearing on Eskom s revenue application for 2018/19 Cape Town,

More information

RCAs submitted for FY2014/15, FY 2015/16 and FY 2016/17. NERSA Public Hearings 17 April 2018

RCAs submitted for FY2014/15, FY 2015/16 and FY 2016/17. NERSA Public Hearings 17 April 2018 RCAs submitted for FY2014/15, FY 2015/16 and FY 2016/17 NERSA Public Hearings 17 April 2018 Regulator members requests Eskom has taken note of all requests made by Regulator members of the panel for :

More information

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA 22 October 2018 PRESENTATION TO THE ABSA POWER, UTILITIES AND INFRASTRUCTURE INSIGHT SERIES Dr Grové Steyn 1 THE ORIGINAL RATIONALE FOR

More information

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017 OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017 1 TABLE OF CONTENTS Introduction Our Requests Our Concerns Declining Corporate Governance Lack of Transparency Regulatory Decision Making

More information

Eskom s Draft Application to NERSA for Price. Increase in 2008/9

Eskom s Draft Application to NERSA for Price. Increase in 2008/9 Eskom s Draft Application to NERSA for Price Increase in 2008/9 Submitted to NERSA on 17 March 2008 Table of Contents Executive Summary... 4 1 Background and Introduction... 12 2 Primary Energy... 20 3

More information

Residential tariff increases and restructuring for MYPD3 explained. Brochure

Residential tariff increases and restructuring for MYPD3 explained. Brochure Residential tariff increases and restructuring for MYPD3 explained Brochure November 2012 Residential brochure for MYPD3 changes Page 1 PART 1: ESKOM REVENUE REQUIREMENT Introduction Eskom applies for

More information

ESKOM One Year Application 2018/19

ESKOM One Year Application 2018/19 ESKOM One Year Application 2018/19 NERSA 1 November 2017 Nelson Mandela Bay Business Chamber Comments and Recommendations Overview The Nelson Mandela Bay Business Chamber What the application means for

More information

MYPD3 Application Gauteng January 2013

MYPD3 Application Gauteng January 2013 MYPD3 Application 2014-2018 Gauteng January 2013 Disclaimer This presentation does not constitute or form part of and should not be construed as, an offer to sell, or the solicitation or invitation of

More information

Cover slide (same as IR cover)

Cover slide (same as IR cover) Integrated results for the year ended 31 March 2015 Cover slide (same as IR cover) 11 August 2015 This presentation is available at www.eskom.co.za/ir2015 Contents Overview of the year Financial review

More information

MYPD Methodology Eskom Response to Consultation Paper

MYPD Methodology Eskom Response to Consultation Paper MYPD Methodology Eskom Response to Consultation Paper 2 June 2016 Introduction Eskom is pleased to provide comments Eskom has provided detailed responses to the consultation paper on the review of the

More information

YPD 3: Regulatory Clearing Account Submission to NERSA

YPD 3: Regulatory Clearing Account Submission to NERSA MYPD 3: Regulatory Clearing Account Submission to NERSA FY2016/17 July 2017 List of Tables Eskom Holdings RCA Submission FY 2016/17 Page: 2 Contents List of Tables... 6 List of Figures... 8 Preface...

More information

BUSA presentation to NERSA on Eskom s RCA Application Multi Year Price Determination (MYPD3) Year 1 (2013/2014) 5 February 2016

BUSA presentation to NERSA on Eskom s RCA Application Multi Year Price Determination (MYPD3) Year 1 (2013/2014) 5 February 2016 BUSA presentation to NERSA on Eskom s RCA Application Multi Year Price Determination (MYPD3) Year 1 (2013/2014) 5 February 2016 Martin Kingston Chair: BUSA Standing Committee on Economic & Trade Policy

More information

NATIONAL ENERGY REGULATOR. Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14)

NATIONAL ENERGY REGULATOR. Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14) NATIONAL ENERGY REGULATOR In the matter regarding Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14) By ESKOM HOLDINGS SOC LIMITED ( ESKOM

More information

Eskom group interim results for the six months ended 30 September 2017

Eskom group interim results for the six months ended 30 September 2017 Eskom group interim results for the six months ended 30 September 2017 30 January 2018 This presentation is available at www.eskom.co.za/ir2017/interim Contents Overview of key challenges Leadership and

More information

Eskom group annual results for the year ended 31 March 2018

Eskom group annual results for the year ended 31 March 2018 Eskom group annual results for the year ended 31 March 2018 23 July 2018 This presentation is available at www.eskom.co.za/ir2018 Contents From business as usual to transition towards sustainability Key

More information

Integrated Results Presentation for the year ended 31 March 2013

Integrated Results Presentation for the year ended 31 March 2013 Integrated Results Presentation for the year ended ch 2013 10 July 2013 Disclaimer This presentation does not constitute or form part of and should not be construed as, an offer to sell, or the solicitation

More information

Integrated Results Presentation for the six months ended 30 September 2013

Integrated Results Presentation for the six months ended 30 September 2013 Integrated Results Presentation for the six months ended 30 September 5 December Disclaimer This presentation does not constitute or form part of and should not be construed as, an offer to sell, or the

More information

Eskom RCA applications M o r n è M o s t e r t M a y

Eskom RCA applications M o r n è M o s t e r t M a y 2018 M o r n è M o s t e r t M a y 2 0 1 8 A F R I F O R U M AfriForum NPC (a non-profit company) registered in South Africa with, among other aims, constructive participation in matters of Government,

More information

AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie

AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie Utility Sustainability- Business Essentials AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie BUSINESS IS LIKE THE WEATHER- EVERYONE TALKS ABOUT IT, BUT FEW UNDERSTAND WHERE IT COMES FROM PRF 2

More information

Interim integrated results for the six months ended 30 September 2014

Interim integrated results for the six months ended 30 September 2014 Interim integrated results for the six months ended 30 September 2014 25 November 2014 This presentation is available at www.eskom.co.za/ir2014/interim Disclaimer This presentation does not constitute

More information

A Rational Price Path for South Africa

A Rational Price Path for South Africa A Rational Price Path for South Africa Finding the Balance Nersa s task in MYPD3 Serious Imbalance Not in Balance Balanced c. Contain taxes and levies A Balanced Solution Set Business, Eskom, NERSA and

More information

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017 OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017 1 TABLE OF CONTENTS q Introduction q Our Requests q Our Concerns q Declining Corporate Governance q Lack of Transparency q Regulatory

More information

Eskom Audited Annual Results Presentation for the year ended 31 March 2011

Eskom Audited Annual Results Presentation for the year ended 31 March 2011 Eskom Audited Annual Results Presentation for the year ended 31 March 2011 October 2011 Eskom, Megawatt Park Disclaimer This presentation does not constitute or form part of and should not be construed

More information

ESKOM RCA APPLICATION TO NERSA: MINING SECTOR RESPONSE

ESKOM RCA APPLICATION TO NERSA: MINING SECTOR RESPONSE ESKOM RCA APPLICATION TO NERSA: MINING SECTOR RESPONSE Henk Langenhoven Chief Economist: Chamber of Mines Midrand 14 May 2018 PAGE CONTENTS Mining Sector CONTRIBUTION, and Conclusions re 20% Tariff Application

More information

EIUG Comment on Eskom s RCA Applications 2014/15, 2015/16, 2016/17

EIUG Comment on Eskom s RCA Applications 2014/15, 2015/16, 2016/17 2018 EIUG Comment on Eskom s RCA s 2014/15, 2015/16, 2016/17 CONTENTS THE EIUG WHO WE ARE KEY MESSAGES PURPOSE SUMMARY OF THE RCA ANALYSIS REVENUE ANALYSIS COST OF COAL ANALYSIS LOCAL IPPs AND COGENERATION

More information

THE 2010/11 TARIFF ADJUSTMENT. Standard schedule of Tariffs

THE 2010/11 TARIFF ADJUSTMENT. Standard schedule of Tariffs THE TARIFF ADJUSTMENT Standard schedule of Tariffs Scenario Modelling Tool (SMT) Tariff options Only change is to the residential Standard ' options - Urban Rural Residential Megaflex Ruraflex Inclining

More information

SOLUTION. [?]Adoption by all stakeholders of a vision document for the ESI

SOLUTION. [?]Adoption by all stakeholders of a vision document for the ESI 18 June 2014 Ms Trudi Mcloughlin, BUSA By email Dear Ms Mcloughlin ENERGY SECURITY WORKSHOP 5 JUNE 2014 Please find below our response to your recent survey request. KEY CHALLENGES IN THE POWER / ELECTRICITY

More information

NERSA COMMENTS ON ESKOM S REVENUE APPLICATIONFOR 2018/19 FINANCIAL YEAR

NERSA COMMENTS ON ESKOM S REVENUE APPLICATIONFOR 2018/19 FINANCIAL YEAR NERSA COMMENTS ON ESKOM S REVENUE APPLICATIONFOR 2018/19 FINANCIAL YEAR TO NERSA 16 NOVEMBER 2017 by Nico Bruwer (Member of the public) CONTENTS Introduction Strategic considerations Important and strange

More information

Electricity blackouts in South Africa: proximate and ultimate causes & recommendations for the future

Electricity blackouts in South Africa: proximate and ultimate causes & recommendations for the future Electricity blackouts in South Africa: proximate and ultimate causes & recommendations for the future Presentation to Parliamentary Portfolio Committee on Public Enterprises 14 February 2007 Prof Anton

More information

ESKOM TARIFF APPLICATION TO NERSA: MINING SECTOR RESPONSE

ESKOM TARIFF APPLICATION TO NERSA: MINING SECTOR RESPONSE ESKOM TARIFF APPLICATION TO NERSA: MINING SECTOR RESPONSE Henk Langenhoven Chief Economist: Chamber of Mines Midrand 17 November 2017 PAGE Content The electricity scenario for the mining sector The CLIFF,

More information

Eskom Holdings SOC Limited: Eskom s revenue application for 2018/19

Eskom Holdings SOC Limited: Eskom s revenue application for 2018/19 NATIONAL ENERGY REGULATOR OF SOUTH AFRICA Decision and Reasons for Decision Eskom Holdings SOC Limited: Eskom s revenue application for 2018/19 NATIONAL ENERGY REGULATOR OF SOUTH AFRICA (NERSA) In the

More information

SWARTLAND MUNICIPALITY

SWARTLAND MUNICIPALITY SWARTLAND MUNICIPALITY PRESENTATION AT NERSA PUBLIC HEARING 3 JUNE 2010 2010/11 ELECTRICITY TARIFF APPLICATION R DU TOIT Pr Eng 1 2 ACKNOWLEDGEMENTS Extracts and copies from public documents included in

More information

NERSA CONSULTATION PAPER: ESKOM MULTI-YEAR PRICE DETERMINATION METHODOLOGY

NERSA CONSULTATION PAPER: ESKOM MULTI-YEAR PRICE DETERMINATION METHODOLOGY NERSA CONSULTATION PAPER: ESKOM MULTI-YEAR PRICE DETERMINATION METHODOLOGY Published on: 14 October 2011 TABLE OF CONTENTS Page Abbreviations and Acronyms... 3 1 The Consultation Process... 5 2 Introduction...

More information

The South African Grid Code. Transmission Tariff Code. Version 9.0

The South African Grid Code. Transmission Tariff Code. Version 9.0 The South African Grid Code Transmission Tariff Code Version 9.0 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr. Bernard

More information

ESKOM RCA Applications 2015/ / /18

ESKOM RCA Applications 2015/ / /18 ESKOM RCA Applications 2015/16 2016/17 2017/18 NERSA 16 April 2018 Nelson Mandela Bay Business Chamber Inputs and Recommendations Overview The Nelson Mandela Bay Business Chamber The Applications What

More information

Results Presentation Six month period ended 31 December 2010

Results Presentation Six month period ended 31 December 2010 Results Presentation Six month period ended 31 December 2010 22 February 2011 Disclaimer This presentation may contain projections or forward looking statements regarding a variety of items. Such forward-looking

More information

SECOND QUARTER 2017 RESULTS. August 3, 2017

SECOND QUARTER 2017 RESULTS. August 3, 2017 SECOND QUARTER 2017 RESULTS August 3, 2017 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations, including statements

More information

Credit Opinion: Eskom Holdings SOC Limited

Credit Opinion: Eskom Holdings SOC Limited ESKOM HOLDINGS SOC Ltd 11 September 2014 MEDIA STATEMENT SUJECT: MOODY S INVESTOR SERVICES CREDIT OPINION UPDATE ESKOM HOLDINGS SOC LIMITED NOTED MOODY S SERVICES CREDIT OPINION UPDATE. KINDLY REFER TO

More information

Origin Energy. Macquarie Australia Conference. Frank Calabria, CEO 1 May 2018

Origin Energy. Macquarie Australia Conference. Frank Calabria, CEO 1 May 2018 Origin Energy Macquarie Australia Conference Frank Calabria, CEO 1 May 2018 Important Notice Forward looking statements This presentation contains forward looking statements, including statements of current

More information

NERSA Submissions ESKOM RCA

NERSA Submissions ESKOM RCA NERSA Submissions ESKOM RCA 4 February 2016 Presented by: Stefan Pieterse Armand Greyling Content 1. Who is AfriBusiness 2. RCA Methodology 3. Municipal Budget Process 4. Eskom Revenue Variance 5. OCGT

More information

Dr Willem J. De Beer, Chief Operations Officer, EDI Holdings (Pty) Ltd, South Africa 23November 2010

Dr Willem J. De Beer, Chief Operations Officer, EDI Holdings (Pty) Ltd, South Africa 23November 2010 Dr Willem J. De Beer, Chief Operations Officer, EDI Holdings (Pty) Ltd, South Africa 23November 2010 The process of dealing with the EDI maintenance backlog: Can we catch up? Electricity Supply Chain GENERATION

More information

Large Commercial Rate Simplification

Large Commercial Rate Simplification Large Commercial Rate Simplification Presented to: Key Account Luncheon Red Lion Hotel Presented by: Mark Haddad Assistant Director/CFO October 19, 2017 Most Important Information First There is no rate

More information

POST-CABINET MEDIA BRIEFING

POST-CABINET MEDIA BRIEFING POST-CABINET MEDIA BRIEFING By Phindile Nzimande CEO Holdings (Pty) Ltd 31 October 2006 Summary of Who We Are EDI HOLDINGS is a 100% state owned company We were established in 2003 to restructure the electricity

More information

Annual financial statements. 31 March 2016

Annual financial statements. 31 March 2016 Annual financial statements 31 March 2016 Contents Statement of directors responsibilities and approval 2 Report of the audit and risk committee 3 Statement by company secretary 4 Directors report 5 Independent

More information

GUIDELINE DOCUMENT TO MUNICIPALITIES ON THE DESIGN OF A DOMESTIC INCLINING BLOCK RATE TARIFF

GUIDELINE DOCUMENT TO MUNICIPALITIES ON THE DESIGN OF A DOMESTIC INCLINING BLOCK RATE TARIFF GUIDELINE DOCUMENT TO MUNICIPALITIES ON THE DESIGN OF A DOMESTIC INCLINING BLOCK RATE TARIFF 1. BACKGROUND AND APPROACH 1.1. During the National Energy Regulator of South Africa (NERSA) stakeholder consultation

More information

Establishing the right price for electricity in South Africa. Brian Kantor with assistance from Andrew Kenny and Graham Barr

Establishing the right price for electricity in South Africa. Brian Kantor with assistance from Andrew Kenny and Graham Barr Establishing the right price for electricity in South Africa Brian Kantor with assistance from Andrew Kenny and Graham Barr This exercise is designed to answer the essential question of relevance for consumers

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

Finance and Group Capital division continued PIC TO COME

Finance and Group Capital division continued PIC TO COME Finance and Group Capital division continued PIC TO COME 68 PIC TO COME 69 Finance and Group Capital Paul O Flaherty Finance Director and Divisional Executive: Group Capital Finance mandate Provides financial

More information

Integrated Results for the year ended 31 March 2014

Integrated Results for the year ended 31 March 2014 Integrated Results for the year ended ch 2014 11 July 2014 Disclaimer This presentation does not constitute or form part of and should not be construed as, an offer to sell, or the solicitation or invitation

More information

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA NATIONAL ENERGY REGULATOR OF SOUTH AFRICA In the matter regarding DETERMINATION OF THE MUNICIPAL TARIFF GUIDELINE AND THE REVISION OF MUNICIPAL TARIFF BENCHMARKS FOR THE FINANCIAL YEAR 2011/12 DECISION

More information

Title of presentation

Title of presentation Tariffs versus Return on Investment Title of presentation Cornelis van der Waal Industry Manager Africa Energy and Power Systems Power Indaba 2008, Cape Town, South Africa TOC Current State of the Electricity

More information

Portfolio Committee on Energy

Portfolio Committee on Energy Portfolio Committee on Energy Briefing Integrated National Electrification Programme (INEP) 26 August 2014 Context & Purpose Previous briefings to PC on INEP DoE in September 2013 Salga and DoE in February

More information

Issues Paper on Proposed Revisions to the Western Power Network Access Arrangement (2017/18 to 2021/22 - AA4)

Issues Paper on Proposed Revisions to the Western Power Network Access Arrangement (2017/18 to 2021/22 - AA4) Issues Paper on Proposed Revisions to the Western Power Network Access Arrangement (2017/18 to 2021/22 - AA4) 31 October 2017 (amended 14 November 2017) (2017/18 to 2021/22 AA4) Economic Regulation Authority

More information

RESPONSE NERSA IN RESPECT OF ESKOM TARIFF APPLICATION

RESPONSE NERSA IN RESPECT OF ESKOM TARIFF APPLICATION T: 011 498 7100 E: info@chamberofmines.org.za 5 Hollard Street, Johannesburg 2001 PO Box 61809, Marshalltown 2107 RESPONSE TO NERSA IN RESPECT OF ESKOM TARIFF APPLICATION 13 October 2017 Compiled by Chamber

More information

Credit Suisse First Boston Asian Investment Conference

Credit Suisse First Boston Asian Investment Conference Credit Suisse First Boston Asian Investment Conference Philip Chronican Chief Financial Officer Westpac Banking Corporation 25 March 2004 Westpac at a glance Established 1817 Top 100 bank globally 1 Core

More information

FIRST QUARTER 2014 RESULTS. May 2, 2014

FIRST QUARTER 2014 RESULTS. May 2, 2014 FIRST QUARTER 2014 RESULTS May 2, 2014 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations, including statements

More information

The Australian national electricity market

The Australian national electricity market The Australian national electricity market Are you managing your risks? AusIMM Technical presentation John Bartlett and Patrick Booth 26 April 2017 john.bartlett@energetics.com.au and patrick.booth@energetics.com.au

More information

AMEU CONVENTION 2010 MUNICIPAL TARIFF CHALLENGES

AMEU CONVENTION 2010 MUNICIPAL TARIFF CHALLENGES AMEU CONVENTION 2010 MUNICIPAL TARIFF CHALLENGES Ir Leon Kritzinger 28 September 2010 What lies behind us and what lies before us are tiny matters compared to what lies within us. Walt Emerson Challenges

More information

FOURTH QUARTER AND FULL-YEAR 2016 RESULTS. February 24, 2017

FOURTH QUARTER AND FULL-YEAR 2016 RESULTS. February 24, 2017 FOURTH QUARTER AND FULL-YEAR 2016 RESULTS February 24, 2017 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations,

More information

Energy and Climate Change Programme P O Box 106 Office Tel: (+27) (0) Fax:

Energy and Climate Change Programme P O Box 106 Office Tel: (+27) (0) Fax: SAFCEI is a company not for profit Reg No 2006/014388/08 NPO 053498 PBO 930024255 Faith communities committed to cherishing living earth. www.safcei.org.za Energy and Climate Change Programme P O Box 106

More information

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA In the matter regarding NATIONAL ENERGY REGULATOR OF SOUTH AFRICA DETERMINATION OF THE MUNICIPAL TARIFF GUIDELINE FOR THE FINANCIAL YEAR 2013/14 AND THE REVISION OF MUNICIPAL TARIFF BENCHMARKS DECISION

More information

Electric Price Outlook for Indiana High Load Factor (HLF) customers September 2015

Electric Price Outlook for Indiana High Load Factor (HLF) customers September 2015 Electric Price Outlook for Indiana High Load Factor (HLF) customers September 2015 Price projection Duke Energy Indiana s prices continue to drop for the fourth quarter of 2015. Depending on your total

More information

Sabancı Holding Q Earnings Presentation

Sabancı Holding Q Earnings Presentation Sabancı Holding Q4 2017 Earnings Presentation Disclaimer 2 The information and opinions contained in this document have been compiled by Hacı Ömer Sabancı Holding A.Ş. ( Holding ) from sources believed

More information

THE TRADE-OFFS BETWEEN PRO-POOR AND COST- REFLECTIVE TARIFFS IN SOUTH AFRICA: A REGULATORY PERSPECTIVE

THE TRADE-OFFS BETWEEN PRO-POOR AND COST- REFLECTIVE TARIFFS IN SOUTH AFRICA: A REGULATORY PERSPECTIVE THE TRADE-OFFS BETWEEN PRO-POOR AND COST- REFLECTIVE TARIFFS IN SOUTH AFRICA: A REGULATORY PERSPECTIVE Michael Maphosa Michael.maphosa@nersa.org.za +27 401 4699 National Energy Regulator of South Africa

More information

RC_2017_06 REDUCTION OF THE PRUDENTIAL EXPOSURE IN THE RESERVE CAPACITY MECHANISM OUTSTANDING AMOUNT CALCULATION

RC_2017_06 REDUCTION OF THE PRUDENTIAL EXPOSURE IN THE RESERVE CAPACITY MECHANISM OUTSTANDING AMOUNT CALCULATION RC_2017_06 REDUCTION OF THE PRUDENTIAL EXPOSURE IN THE RESERVE CAPACITY MECHANISM OUTSTANDING AMOUNT CALCULATION 26 October 2017 PRESENTED BY STUART MACDOUGALL & MARK KATSIKANDARAKIS SLIDE 1 AGENDA 1.

More information

Supply Chain. An Insurer Perspective. Willis Energy Summit 21 January 2016 Jamie Summons, Head of Weather Solutions, Asia Pacific

Supply Chain. An Insurer Perspective. Willis Energy Summit 21 January 2016 Jamie Summons, Head of Weather Solutions, Asia Pacific Supply Chain An Insurer Perspective Willis Energy Summit 21 January 2016 Jamie Summons, Head of Weather Solutions, Asia Pacific The Supply Chain: Current approach to risk transfer Contingent Business Interruption:

More information

NUMSA Submission on the 2018/19 Eskoms Application for Electricity Tariffs to NERSA 20 TH November Prepared by Sharon Modiba 1

NUMSA Submission on the 2018/19 Eskoms Application for Electricity Tariffs to NERSA 20 TH November Prepared by Sharon Modiba 1 NUMSA Submission on the 2018/19 Eskoms Application for Electricity Tariffs to NERSA 20 TH November 2017 Prepared by Sharon Modiba 1 Landlords, like all other men, love to reap where they never sowed. (KARL

More information

A study into approaches to minimise the impact of electricity price increases on the poor

A study into approaches to minimise the impact of electricity price increases on the poor TRADE AND INDUSTRY CHAMBER FUND FOR RESEARCH INTO INDUSTRIAL DEVELOPMENT, GROWTH AND EQUITY (FRIDGE) A study into approaches to minimise the impact of electricity price increases on the poor Final Report

More information

SUBMISSION DOCUMENT EXECUTIVE SUMMARY

SUBMISSION DOCUMENT EXECUTIVE SUMMARY Unique Identifier 221-222 SUBMISSION DOCUMENT Document Type CCGTE Revision 1 Effective Date June 2011 Regulation & Governance SUBMISSION TO ICAS on 28 June 2011 EXECUTIVE SUMMARY 1. TITLE OF THE SUBMISSION

More information

Statkraft Investor Update. March 2014

Statkraft Investor Update. March 2014 Statkraft Investor Update March 2014 Disclaimer This presentation has been prepared by, and the information contained herein (unless otherwise indicated) has been provided by Statkraft AS (the "Company").

More information

Update on the Energy Conservation Scheme (ECS) proposed by the DME and Eskom. by Chris Yelland CEng Managing editor EE Publishers

Update on the Energy Conservation Scheme (ECS) proposed by the DME and Eskom. by Chris Yelland CEng Managing editor EE Publishers Update on the Energy Conservation Scheme (ECS) proposed by the DME and Eskom by Chris Yelland CEng Managing editor EE Publishers Background to the ECS The ECS is a component of the Power Conservation Programme

More information

ESKOM S CONNECTION CHARGES METHODOLOGY

ESKOM S CONNECTION CHARGES METHODOLOGY ESKOM S CONNECTION CHARGES METHODOLOGY 13 November 2007 This document may be updated from time to time. Please refer to www.eskom.co.za/tariffs for the latest version. Eskom s Connection Charges Methodology

More information

FOURTH QUARTER AND FULL-YEAR 2017 RESULTS. February 23, 2018

FOURTH QUARTER AND FULL-YEAR 2017 RESULTS. February 23, 2018 FOURTH QUARTER AND FULL-YEAR 2017 RESULTS February 23, 2018 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations,

More information

Global Resilience Risk

Global Resilience Risk Global Resilience Risk An Insurers Perspective WEC Energy Summit 16 March 2016 Jamie Summons, Head of Weather Solutions, Asia Pacific Swiss Re Weather Market Capability Global presence, market leadership

More information

Enabling Renewable Energy in South Africa Assessing the Renewable Energy IPP Procurement Programme

Enabling Renewable Energy in South Africa Assessing the Renewable Energy IPP Procurement Programme Enabling Renewable Energy in South Africa Assessing the Renewable Energy IPP Procurement Programme WWF RE Finance Report Launch IDC Offices, Sandton 29 August 2014 Disclaimer and confidentiality This document

More information

Electric Price Outlook for Indiana High Load Factor (HLF) customers December 2016

Electric Price Outlook for Indiana High Load Factor (HLF) customers December 2016 Electric Price Outlook for Indiana High Load Factor (HLF) customers December 2016 Price projection We project our prices for High Load Factor customers to increase 4 to 6 percent in 2017 compared to 2016.

More information

ANNEXURE 1. Consultation Paper

ANNEXURE 1. Consultation Paper ANNEXURE 1 MUNICIPAL TARIFF GUIDELINE INCREASE, BENCHMARKS AND PROPOSED TIMELINES FOR MUNICIPAL TARIFF APPROVAL PROCESS FOR THE 2018/19 FINANCIAL YEAR Consultation Paper Published on 28 February 2018 Table