1 BUSA presentation to NERSA on Eskom s RCA Application Multi Year Price Determination (MYPD3) Year 1 (2013/2014) 5 February 2016 Martin Kingston Chair: BUSA Standing Committee on Economic & Trade Policy

2 BUSA submission BUSA would like to thank NERSA for this opportunity to present its views. BUSA has made a detailed submission to NERSA containing our views and recommendations. This presentation is a brief summary of our submission, in consideration of NERSA s timetable. The provision of more detailed information in the Eskom application would have enabled BUSA to present a more comprehensive submission. 2

3 BUSA BUSA is a confederation of business organisations including chambers of commerce and industry, professional associations, corporate associations and unisectorals. BUSA represents the views of its members in a number of national structures and bodies, both statutory and non-statutory. BUSA has encouraged its members to make their own specific submissions. The BUSA submission constitutes an overall business position. 3

4 Introduction BUSA has previously commented (November 2012) on the original MYPD3 application and raised the significant negative impacts on the economy of that application were it to be granted. BUSA has also undertaken further impact assessments as part of its review of the proposed Carbon Tax. The absence of a formally issued and up to date IRP is a fundamental challenge to an objective analysis of the energy needs of the country and associated pricing. Eskom s financial sustainability is inextricably linked to the financial well being of its customers, who require affordable electricity to remain viable. Eskom s customer base will be compromised if their viability is undermined by electricity which is not reliable, predictable and competitive. 4

5 Introduction (2) Approval of the MYPD3 RCA Application for 2013/2014 would result in a tariff significantly beyond that contemplated in the original application. Furthermore, it would render many businesses uncompetitive due to its unaffordability. BUSA is also concerned that the application was received so long after FY 2013/2014. BUSA recommends a shorter timeframe being imposed by NERSA for future applications. We have proceeded on the basis that where we have been unable to confirm the proposition from Eskom, because it has been inadequately substantiated, it should be disallowed. The remainder of this presentation will be in two parts: Part 1 deals with the methodology and underlying assumptions of the application. Part 2 deals with its potential economic impact. 5

6 Methodology and Assumptions (1): Price stability Eskom s rationale that a five-year decision on tariffs would lead to a smoother and predictable price path has not been achieved. This application would bring annual increases well above the original MYPD3 decision. No long term price certainty is being achieved. A review of the MYPD3 methodology should be considered to achieve that objective, as price certainty is a key requirement for business. 6

7 Methodology and Assumptions (2): Revenue variance The majority of the shortfall results from revenue variance, i.e. a material reduction from forecast. Much of this is due to economic growth being significantly less than was anticipated. There is no expectation that economic growth will pick up during the remainder of MYPD3. Electricity demand has regressed to 2007/8 levels, reflecting fewer business consumers. Consequently, customers will pay higher unit costs for electricity, leading to pressures on business and the prospect of further reduction in demand. This constitutes a vicious cycle that needs to be urgently arrested. Weak demand is likely to persist until 2018/19, resulting in similar variances in revenue and, therefore, the potential for ever increasing tariffs with this methodology. 7

8 Methodology and Assumptions (2): Revenue variance (continued) Revenue variance which is beyond Eskom s control should be allowed in respect of standard tariff customer sales. The revenue shortfall in respect of negotiated pricing agreement (NPA) sales is not sufficiently substantiated. The split between standard tariff, NPA and export customers needs to be reviewed to determine whether the below cost tariff of NPA customers should be permitted. The permitted variance may therefore require adjustment. Revenue losses due to load shedding should reflect that load shedding takes place during peak periods, and the calculations should reflect that accordingly. 8

9 Methodology and Assumptions (3): Primary Energy OCGT Fuel: Allowance for this in MYPD3 was premised on new generating capacity being in place. Greater use of OCGTs therefore resulted from operational inefficiencies and (as per MYPD2 RCA) this variance should not be allowed. Coal: Variances resulting from more expensive coal and coal handling as well as construction delays should not be considered prudent expenditure and should be disallowed accordingly. Oil & Gas: Costs attributable to construction delays and poor maintenance are not prudent expenditure, and should be excluded from RCA. Water treatment costs are not substantiated and should be excluded. 9

10 Methodology and Assumptions (4): Environmental Levy The adjustment in the application for the over-recovery of the levy is welcomed. However, this should not be included in allowable revenue. Inclusion of the levy in Eskom s published tariffs ignores the fact that this is a tax on customers that should be reflected separately. BUSA calls on NERSA to address this through: Adjudicating and publishing electricity prices without the levy; Ensuring adequate annual accounting of the funds collected with appropriate reconciliation of projected generation from non-renewable technology against actual on an annual basis; Requiring licensees to reflect the levy separately on customer invoices; and Ensuring separation between allowable revenue for the generation, transmission and distribution of electricity on the one hand and tax collection for the fiscus on the other. 10

11 Methodology and Assumptions (5): Expenditure MYPD3 requires expenditure to be incurred prudently. However, the application reveals that many of the costs claimed were incurred as a result of policy direction from the shareholder. The methodology makes no distinction between Eskom s operational decisions and those arising from interventions by the shareholder. The impact of such interventions should not be borne directly by the customer. 11

12 Methodology and Assumptions (6): Renewable Energy The premium paid for renewable energy is currently passed on to customers as Eskom has no control over pricing. The integration of the cost of the contracts into the tariff requires revisiting given the impact on customers. The annual update of the Integrated Resource Plan (IRP) has not taken place. Consequently, additional sources of supply are pursued without considering the ongoing reduction in demand or the most effective manner of implementation and associated pricing implications. 12

13 Methodology and Assumptions (7): Reduction in demand There are several reasons for the reduction in electricity demand, including the steep rises in the electricity price, compounded by lack of reliability and predictability. There are significant structural changes taking place in the economy with a shift from energy intensive primary and secondary sectors to the tertiary sector. There is also significantly improved energy efficiency by intensive users. 13

14 Figure 1: Trends in energy intensity and electricity sent out (EIUG, 2013) Improvements in energy intensity are leading to reduced energy demand per unit of economic output. 14

15 Methodology and Assumptions (8): Prudent Expenditure New plant delays and other factors under Eskom s control have resulted in certain of the revenue impairments. Cost recovery is critical to Eskom s financial viability, and we acknowledge the need to demonstrate that Eskom has a robust financial outlook. However, not all expenditure can be considered to have been incurred prudently. For any variance to be considered, let alone approved, NERSA needs to be provided with unambiguous motivation. An RCA application is not the appropriate context within which to determine Eskom s viability against the benchmarks in the original MYPD3 decision. If a revision is needed, this should not be done as part of the RCA application. 15

16 Part 2: Economic Impact (1) Average electricity tariffs have increased by a cumulative 70.18% between 2010/11 and 2014/15. MYPD2 & MYPD3 decisions were to increase the annual tariff by 11.51% p.a. between 2010/11 and 2017/18, and 8% p.a. for the MYPD3 period (65.51 c/kwh to c/kwh). In the period from FY 2010/11 to 2017/18, the cumulative increase is already % (41.57 c/kwh to c/kwh). In the 10 year period between 2007/8 2017/18, the electricity price is set to increase by 16.18% p.a. or a cumulative 348% 16

17 Economic Impact (2) The current re-opener application would impact severely on the viability of businesses and result in SA having one of the highest rates globally removing SA s historical competitive advantage of low electricity prices. According to the South African Reserve Bank (SARB), commenting prior to this application, the direct and indirect effects of such an increase could increase average inflation by around 0.5 percentage points over a year. This is in a context of increasing interest rates, thereby further impacting on businesses sustainability. Businesses have, with great difficulty, accommodated large tariff increases in the past. They simply cannot plan their investment, operations and long term strategy without adequate warning of tariffs increases. The magnitude of such an increase amplifies business uncertainty. 17

18 Economic Impact (3) The electricity price increases are not the only constraint on SA business. The current adverse global economic conditions significantly impact on business in SA, exacerbated by electricity price increases. The proposed increase does not take into account further increases arising from any additional taxes and levies on electricity sales by municipalities. Tariffs are not the only instrument to address Eskom s financial constraints and may divert attention from the need for a comprehensive debate on Eskom s long term structure and associated sustainability. 18

19 Conclusion We reiterate the need for a formally issued and up to date IRP, as its absence constitutes a fundamental challenge to an objective analysis of the country s energy needs and associated pricing. BUSA recognises that those elements of this application that comply with the methodology rules should be favourably considered. However there are, in a number of cases, insufficient motivation to justify the increase or the element is not included in the methodology and should therefore not be considered. The concept of prudent appears to be much more widely interpreted than BUSA believes should be the case and a clear view as to what constitutes prudent should be set out in the decision. 19

20 Conclusion (2) BUSA acknowledges the need for a sustainable financial trajectory for Eskom. However, this cannot be pursued without considering the consequences of approving this increase on the already fragile economy and the financial burdens faced by business at large. BUSA believes that precedent should be set where appropriate motivation is made in strict compliance with methodology. 20

21 Thank you

Eskom 2018/19 Revenue Application

Eskom 2018/19 Revenue Application Eskom 2018/19 Revenue Application Nersa Public Hearings Klerksdorp 13 November 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained

More information

ESKOM RCA APPLICATION TO NERSA: MINING SECTOR RESPONSE

ESKOM RCA APPLICATION TO NERSA: MINING SECTOR RESPONSE ESKOM RCA APPLICATION TO NERSA: MINING SECTOR RESPONSE Henk Langenhoven Chief Economist: Chamber of Mines Midrand 14 May 2018 PAGE CONTENTS Mining Sector CONTRIBUTION, and Conclusions re 20% Tariff Application

More information

SALGA Position on Eskom Revenue Proposal 2018/19 Cllr M. Mfikoe Nhlanhla L Ngidi Lonwabo Magida 16 November 2017

SALGA Position on Eskom Revenue Proposal 2018/19 Cllr M. Mfikoe Nhlanhla L Ngidi Lonwabo Magida 16 November 2017 SALGA Position on Eskom Revenue Proposal 2018/19 Cllr M. Mfikoe Nhlanhla L Ngidi Lonwabo Magida 16 November 2017 www.salga.org.za Content Introduction Cllr Matshidiso Mfikoe SALGA Summary of Observations

More information

Eskom Regulatory Clearing Account (RCA) year 5 of MYPD 3. Public Hearings- Port Elizabeth Date: 16 January 2019

Eskom Regulatory Clearing Account (RCA) year 5 of MYPD 3. Public Hearings- Port Elizabeth Date: 16 January 2019 Eskom Regulatory Clearing Account (RCA) year 5 of MYPD 3 Public Hearings- Port Elizabeth Date: 16 January 2019 RCA (Yr 5, MYPD3) Timeline RCAs require 3 decisions: 1 Balance decision 2 Liquidation decision

More information

NERSA Submissions ESKOM RCA

NERSA Submissions ESKOM RCA NERSA Submissions ESKOM RCA 4 February 2016 Presented by: Stefan Pieterse Armand Greyling Content 1. Who is AfriBusiness 2. RCA Methodology 3. Municipal Budget Process 4. Eskom Revenue Variance 5. OCGT

More information

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA November 2015 MYPD3 2013/14 RCA Submission to NERSA November 2015 Page 2 of 205 TABLE OF CONTENTS 1 PREFACE... 15 1.1 The basis of

More information

Eskom 2018/19 Revenue Application

Eskom 2018/19 Revenue Application Eskom 2018/19 Revenue Application Nersa Public Hearings 30 October 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained its revenue

More information

Eskom Revenue Application. Multi-Year Price Determination (MYPD 4) FY2019/ /22

Eskom Revenue Application. Multi-Year Price Determination (MYPD 4) FY2019/ /22 Eskom Revenue Application Multi-Year Price Determination (MYPD 4) FY2019/20-2021/22 September 2018 Content Content Preface... 7 Executive Summary... 10 1.1 Key elements of allowed revenue for the 2019/20-2021/22

More information

SOLUTION. [?]Adoption by all stakeholders of a vision document for the ESI

SOLUTION. [?]Adoption by all stakeholders of a vision document for the ESI 18 June 2014 Ms Trudi Mcloughlin, BUSA By email Dear Ms Mcloughlin ENERGY SECURITY WORKSHOP 5 JUNE 2014 Please find below our response to your recent survey request. KEY CHALLENGES IN THE POWER / ELECTRICITY

More information

NATIONAL ENERGY REGULATOR. Eskom MYPD2 Regulatory Clearing Account (RCA) and RCA Balance THE DECISION

NATIONAL ENERGY REGULATOR. Eskom MYPD2 Regulatory Clearing Account (RCA) and RCA Balance THE DECISION Eskom Holdings Limited: Regulatory Clearing Account Application - Multi Year Price Determination 2010/11 to 2012/13 (MYPD2). NATIONAL ENERGY REGULATOR In the matter regarding Eskom MYPD2 Regulatory Clearing

More information

Eskom 2018/19 Revenue Application

Eskom 2018/19 Revenue Application Eskom 2018/19 Revenue Application Nersa Public Hearings Bloemfontein 15 November 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained

More information

MYPD3 Application January 2013

MYPD3 Application January 2013 MYPD3 Application 2014-2018 January 2013 Disclaimer This presentation does not constitute or form part of and should not be construed as, an offer to sell, or the solicitation or invitation of any offer

More information

MYPD Methodology Eskom Response to Consultation Paper

MYPD Methodology Eskom Response to Consultation Paper MYPD Methodology Eskom Response to Consultation Paper 2 June 2016 Introduction Eskom is pleased to provide comments Eskom has provided detailed responses to the consultation paper on the review of the

More information

ESKOM RCA Applications 2015/ / /18

ESKOM RCA Applications 2015/ / /18 ESKOM RCA Applications 2015/16 2016/17 2017/18 NERSA 16 April 2018 Nelson Mandela Bay Business Chamber Inputs and Recommendations Overview The Nelson Mandela Bay Business Chamber The Applications What

More information

EIUG Comment on Eskom s RCA Applications 2014/15, 2015/16, 2016/17

EIUG Comment on Eskom s RCA Applications 2014/15, 2015/16, 2016/17 2018 EIUG Comment on Eskom s RCA s 2014/15, 2015/16, 2016/17 CONTENTS THE EIUG WHO WE ARE KEY MESSAGES PURPOSE SUMMARY OF THE RCA ANALYSIS REVENUE ANALYSIS COST OF COAL ANALYSIS LOCAL IPPs AND COGENERATION

More information

FY2017/18, Year 5 of MYPD 3 Period

FY2017/18, Year 5 of MYPD 3 Period MYPD 3: Regulatory Clearing Account Submission to NERSA FY2017/18, Year 5 of MYPD 3 Period September 2018 Contents Contents Contents... 2 Preface... 8 1.1 The basis of submissions...8 1.2 The structure

More information

Submission to SALGA and National Treasury

Submission to SALGA and National Treasury MYPD 3 Re-opener for selective items (2015/16~2017/18) o OCGTs and o STPPP Including the Submission to SALGA and National Treasury In terms of the Municipal Finance Management Act (MFMA) 16 March 2015

More information

Eskom RCA: Revenue Application NERSA Public Hearing. City Power Presentation Frank Hinda 11 May 2018

Eskom RCA: Revenue Application NERSA Public Hearing. City Power Presentation Frank Hinda 11 May 2018 Eskom RCA: Revenue Application NERSA Public Hearing City Power Presentation Frank Hinda 11 May 2018 Table of contents 1 Background to City Power Operations 2 Sales Forecasting & Rebasing of Sales Volumes

More information

NATIONAL ENERGY REGULATOR. Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14)

NATIONAL ENERGY REGULATOR. Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14) NATIONAL ENERGY REGULATOR In the matter regarding Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14) By ESKOM HOLDINGS SOC LIMITED ( ESKOM

More information

Energy and Climate Change Programme P O Box 106 Office Tel: (+27) (0) Fax:

Energy and Climate Change Programme P O Box 106 Office Tel: (+27) (0) Fax: SAFCEI is a company not for profit Reg No 2006/014388/08 NPO 053498 PBO 930024255 Faith communities committed to cherishing living earth. www.safcei.org.za Energy and Climate Change Programme P O Box 106

More information

Eskom Revenue Application. Multi Year Price Determination. 2010/11 to 2012/13 (MYPD 2)

Eskom Revenue Application. Multi Year Price Determination. 2010/11 to 2012/13 (MYPD 2) Issues Paper Eskom Revenue Application Multi Year Price Determination 2010/11 to 2012/13 (MYPD 2) Published on 30 October 2009 1 TABLE OF CONTENTS Abbreviations... 3 Definitions... 4 1. Introduction...6

More information

ESKOM TARIFF APPLICATION TO NERSA: MINING SECTOR RESPONSE

ESKOM TARIFF APPLICATION TO NERSA: MINING SECTOR RESPONSE ESKOM TARIFF APPLICATION TO NERSA: MINING SECTOR RESPONSE Henk Langenhoven Chief Economist: Chamber of Mines Midrand 17 November 2017 PAGE Content The electricity scenario for the mining sector The CLIFF,

More information

MYPD3 Application Gauteng January 2013

MYPD3 Application Gauteng January 2013 MYPD3 Application 2014-2018 Gauteng January 2013 Disclaimer This presentation does not constitute or form part of and should not be construed as, an offer to sell, or the solicitation or invitation of

More information

Draft Eskom 2018/19 Revenue Application

Draft Eskom 2018/19 Revenue Application Draft Eskom 2018/19 Revenue Application Nersa Public Hearings Durban 2 November 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained

More information

A Rational Price Path for South Africa

A Rational Price Path for South Africa A Rational Price Path for South Africa Finding the Balance Nersa s task in MYPD3 Serious Imbalance Not in Balance Balanced c. Contain taxes and levies A Balanced Solution Set Business, Eskom, NERSA and

More information

ESKOM s applications for MYPD4 and MYPD3 RCA 2017/18

ESKOM s applications for MYPD4 and MYPD3 RCA 2017/18 ESKOM s applications for MYPD4 and MYPD3 RCA 2017/18 NERSA 15 January 2019 Nelson Mandela Bay Business Chamber Comments and Recommendations Overview The Nelson Mandela Bay Business Chamber What the applications

More information

The South African Grid Code. Transmission Tariff Code. Version 9.0

The South African Grid Code. Transmission Tariff Code. Version 9.0 The South African Grid Code Transmission Tariff Code Version 9.0 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr. Bernard

More information

RCAs submitted for FY2014/15, FY 2015/16 and FY 2016/17. NERSA Public Hearings 17 April 2018

RCAs submitted for FY2014/15, FY 2015/16 and FY 2016/17. NERSA Public Hearings 17 April 2018 RCAs submitted for FY2014/15, FY 2015/16 and FY 2016/17 NERSA Public Hearings 17 April 2018 Regulator members requests Eskom has taken note of all requests made by Regulator members of the panel for :

More information

PRESENTATION AT NERSA PUBLIC HEARINGS FOR ESKOM S MYPD3 RCA FOR YEAR 5 RONALD CHAUKE 14 JANUARY 2019

PRESENTATION AT NERSA PUBLIC HEARINGS FOR ESKOM S MYPD3 RCA FOR YEAR 5 RONALD CHAUKE 14 JANUARY 2019 PRESENTATION AT NERSA PUBLIC HEARINGS FOR ESKOM S MYPD3 RCA FOR YEAR 5 RONALD CHAUKE 14 JANUARY 2019 1 CONTENT Introduction Context Operating Costs Reporting Best Practice Primary Energy World Bank Report

More information

COSATU CONGRESS OF SOUTH AFRICAN TRADE UNIONS COSATU COMMENT ON ESKOM S MYPD3 FOR THE YEAR 2, 3, 4

COSATU CONGRESS OF SOUTH AFRICAN TRADE UNIONS COSATU COMMENT ON ESKOM S MYPD3 FOR THE YEAR 2, 3, 4 COSATU CONGRESS OF SOUTH AFRICAN TRADE UNIONS Head Office 110 Jorissen Street Braamfontein 2017 JOHANNESBURG P O Box 1019 JOHANNESBURG 2000 Tel: + 27 11 339 4911 Fax: + 27 11 339 5080 Internet: http://www.cosatu.org.

More information

Eskom Presentation Standing Committee on Appropriations

Eskom Presentation Standing Committee on Appropriations Eskom Presentation Standing Committee on Appropriations 12 June 2015 Contents Content 1. Introduction 2. Financial situation 3. Eliminating Load shedding 2 Executive summary (1 of 2) Eskom is a fully integrated

More information

GUIDELINE DOCUMENT TO MUNICIPALITIES ON THE DESIGN OF A DOMESTIC INCLINING BLOCK RATE TARIFF

GUIDELINE DOCUMENT TO MUNICIPALITIES ON THE DESIGN OF A DOMESTIC INCLINING BLOCK RATE TARIFF GUIDELINE DOCUMENT TO MUNICIPALITIES ON THE DESIGN OF A DOMESTIC INCLINING BLOCK RATE TARIFF 1. BACKGROUND AND APPROACH 1.1. During the National Energy Regulator of South Africa (NERSA) stakeholder consultation

More information

Demystifying Tariff Setting The tariff conundrum Lower rates now, blackouts later?

Demystifying Tariff Setting The tariff conundrum Lower rates now, blackouts later? Demystifying Tariff Setting The tariff conundrum Lower rates now, blackouts later? Does South Africa need a cost reflective tariff? For years, low electricity costs have been a driver behind South Africa

More information

NERSA CONSULTATION PAPER: ESKOM MULTI-YEAR PRICE DETERMINATION METHODOLOGY

NERSA CONSULTATION PAPER: ESKOM MULTI-YEAR PRICE DETERMINATION METHODOLOGY NERSA CONSULTATION PAPER: ESKOM MULTI-YEAR PRICE DETERMINATION METHODOLOGY Published on: 14 October 2011 TABLE OF CONTENTS Page Abbreviations and Acronyms... 3 1 The Consultation Process... 5 2 Introduction...

More information

POST-CABINET MEDIA BRIEFING

POST-CABINET MEDIA BRIEFING POST-CABINET MEDIA BRIEFING By Phindile Nzimande CEO Holdings (Pty) Ltd 31 October 2006 Summary of Who We Are EDI HOLDINGS is a 100% state owned company We were established in 2003 to restructure the electricity

More information

NELSON MANDELA BAY BUSINESS CHAMBER

NELSON MANDELA BAY BUSINESS CHAMBER THE SUPREME COURT OF APPEAL OF SOUTH AFRICA JUDGMENT In the matter between: THE NATIONAL ENERGY REGULATOR OF SOUTH AFRICA ESKOM HOLDINGS SOC LIMITED Case No: 1288/2016 1309/2016 Reportable FIRST APPELLANT

More information

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017 OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017 1 TABLE OF CONTENTS Introduction Our Requests Our Concerns Declining Corporate Governance Lack of Transparency Regulatory Decision Making

More information

THE SOUTH AFRICAN ASSOCIATION OF FREIGHT FORWARDERS. Submission to the National Ports Regulator

THE SOUTH AFRICAN ASSOCIATION OF FREIGHT FORWARDERS. Submission to the National Ports Regulator THE SOUTH AFRICAN ASSOCIATION OF FREIGHT FORWARDERS 12 Skeen Boulevard Bedfordview P O Box 2510 Bedfordview 2008 Republic of South Africa Tel: (011) 455 1726/1707 Fax: (011) 455 1709 Republic of South

More information

MYPD 3 (Year 2014/15) Regulatory Clearing Account Submission to NERSA

MYPD 3 (Year 2014/15) Regulatory Clearing Account Submission to NERSA MYPD 3 (Year 2014/15) Regulatory Clearing Account Submission to NERSA 13 May 2016 MYPD3 2014/15 RCA Submission to NERSA 10 May 2016 Page 2 of 147 TABLE OF CONTENTS 1 PREFACE... 12 1.1 The basis of submissions...

More information

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA In the matter regarding NATIONAL ENERGY REGULATOR OF SOUTH AFRICA DETERMINATION OF THE MUNICIPAL TARIFF GUIDELINE FOR THE FINANCIAL YEAR 2013/14 AND THE REVISION OF MUNICIPAL TARIFF BENCHMARKS DECISION

More information

SUBSTITUTE FOR SENATE BILL NO. 437

SUBSTITUTE FOR SENATE BILL NO. 437 SUBSTITUTE FOR SENATE BILL NO. A bill to amend PA, entitled "An act to provide for the regulation and control of public and certain private utilities and other services affected with a public interest

More information

SOUTH AUSTRALIA VICTORIA (HEYWOOD) INTERCONNECTOR UPGRADE

SOUTH AUSTRALIA VICTORIA (HEYWOOD) INTERCONNECTOR UPGRADE 26 October 2012 Hugo Klingenberg Senior Manager Network Development Electranet Pty Ltd consultation@electranet.com.au Ashley Lloyd Senior Manager Victorian Planning Australian Energy Market Operator planning@aemo.com.au

More information

Establishing the right price for electricity in South Africa. Brian Kantor with assistance from Andrew Kenny and Graham Barr

Establishing the right price for electricity in South Africa. Brian Kantor with assistance from Andrew Kenny and Graham Barr Establishing the right price for electricity in South Africa Brian Kantor with assistance from Andrew Kenny and Graham Barr This exercise is designed to answer the essential question of relevance for consumers

More information

Irish Water 2019 Revenue Control

Irish Water 2019 Revenue Control An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Irish Water 2019 Revenue Control Information Paper Reference: CRU/17/332 Date Published: 07/12/2017 www.cru.ie Executive Summary The

More information

THE 2010/11 TARIFF ADJUSTMENT. Standard schedule of Tariffs

THE 2010/11 TARIFF ADJUSTMENT. Standard schedule of Tariffs THE TARIFF ADJUSTMENT Standard schedule of Tariffs Scenario Modelling Tool (SMT) Tariff options Only change is to the residential Standard ' options - Urban Rural Residential Megaflex Ruraflex Inclining

More information

Challenges to the South African mining industry in the wake of Marikana and Mangaung

Challenges to the South African mining industry in the wake of Marikana and Mangaung Challenges to the South African mining industry in the wake of Marikana and Mangaung Comments by Peter Leon to the Cape Town Press Club, Kelvin Grove Club, Newlands 8 February 2013 1. Statistics: the South

More information

Registration application fee to be paid by Small-Scale Embedded Generator Applicants

Registration application fee to be paid by Small-Scale Embedded Generator Applicants Consultation Paper: Registration application fee to be paid by Small-Scale Embedded Generator Applicants Published 16 December 2018 Version 1 December 2018 Issued by The National Energy Regulator of South

More information

Eskom s Draft Application to NERSA for Price. Increase in 2008/9

Eskom s Draft Application to NERSA for Price. Increase in 2008/9 Eskom s Draft Application to NERSA for Price Increase in 2008/9 Submitted to NERSA on 17 March 2008 Table of Contents Executive Summary... 4 1 Background and Introduction... 12 2 Primary Energy... 20 3

More information

YPD 3: Regulatory Clearing Account Submission to NERSA

YPD 3: Regulatory Clearing Account Submission to NERSA MYPD 3: Regulatory Clearing Account Submission to NERSA FY2016/17 July 2017 List of Tables Eskom Holdings RCA Submission FY 2016/17 Page: 2 Contents List of Tables... 6 List of Figures... 8 Preface...

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 7.1.2004 COM(2003) 830 final COMMUNICATION FROM THE COMMISSION on guidance to assist Member States in the implementation of the criteria listed in Annex

More information

Department of Energy South Africa

Department of Energy South Africa Department of Energy South Africa Policy to support the Energy Efficiency and Demand Side Management Program for the Electricity Sector through the Standard Offer Incentive Scheme Draft: March 2010 1 TABLE

More information

CHAMBER OF MINES PRESENTATION ON THE DRAFT CARBON TAX BILL

CHAMBER OF MINES PRESENTATION ON THE DRAFT CARBON TAX BILL CHAMBER OF MINES PRESENTATION ON THE DRAFT CARBON TAX BILL Presentation on the draft Carbon Tax Bill to the Standing Committee on Finance Parliament, Cape Town 14 March 2018 Presentation outline Introduction

More information

ANNEXURE 1. Consultation Paper

ANNEXURE 1. Consultation Paper ANNEXURE 1 MUNICIPAL TARIFF GUIDELINE INCREASE, BENCHMARKS AND PROPOSED TIMELINES FOR MUNICIPAL TARIFF APPROVAL PROCESS FOR THE 2018/19 FINANCIAL YEAR Consultation Paper Published on 28 February 2018 Table

More information

Comprehensive Review of BC Hydro: Phase 1 Final Report

Comprehensive Review of BC Hydro: Phase 1 Final Report Comprehensive Review of BC Hydro: Phase 1 Final Report ii Table of Contents 1. Executive Summary 1 1.1 Enhancing Regulatory Oversight of BC Hydro 1 1.2 New Rates Forecast 3 1.3 Next Steps 5 2. Strategic

More information

Investor Presentation. Cover slide (same as IR cover)

Investor Presentation. Cover slide (same as IR cover) Investor Presentation Cover slide (same as IR cover) Contents Eskom at a glance Financial review Operational review Design-to-Cost RCA High Court Decision Funding overview Progress on the new build programme

More information

Eskom 2018/19 Revenue Application. Closing remarks

Eskom 2018/19 Revenue Application. Closing remarks Eskom 2018/19 Revenue Application Closing remarks Nersa Public Hearing Midrand 20 November 2017 Content 1 System Performance and capacity 2 Adjustments being made in terms of MYPD methodology 3 Clarification

More information

Manitoba Hydro 2015 General Rate Application

Manitoba Hydro 2015 General Rate Application Manitoba Hydro 2015 General Rate Application OVERVIEW & REASONS FOR THE APPLICATION Darren Rainkie Vice-President, Finance & Regulatory Manitoba Hydro Why Rate Increases are Needed 2 Manitoba Hydro is

More information

ESKOM FINANCIALS SUMMARY REPORT

ESKOM FINANCIALS SUMMARY REPORT ESKOM FINANCIALS SUMMARY REPORT Analyst & Author Nicholas Saunders Editor Jarredine Morris 14 September 2017 Email: contact@eton.io Office: +27 (0)11 214 5960 www.eton.io www.eton.io contact@eton.io Table

More information

EXECUTIVE SUMMARY America s Three Deficits

EXECUTIVE SUMMARY America s Three Deficits EXECUTIVE SUMMARY Most policymakers in the budget debate are ignoring the trade and investment deficits, and as a result risk making all three deficits worse. Federal policymakers are consumed by a debate

More information

CANADIAN MANUFACTURERS & EXPORTERS 2015 ONTARIO PRE-BUDGET SUBMISSION

CANADIAN MANUFACTURERS & EXPORTERS 2015 ONTARIO PRE-BUDGET SUBMISSION CANADIAN MANUFACTURERS & EXPORTERS 2015 ONTARIO PRE-BUDGET SUBMISSION Date: January 29, 2015 Submitted To: Ontario Standing Committee on Finance and Economic Affairs 2 Canadian Manufacturers & Exporters

More information

Residential tariff increases and restructuring for MYPD3 explained. Brochure

Residential tariff increases and restructuring for MYPD3 explained. Brochure Residential tariff increases and restructuring for MYPD3 explained Brochure November 2012 Residential brochure for MYPD3 changes Page 1 PART 1: ESKOM REVENUE REQUIREMENT Introduction Eskom applies for

More information

ESKOM One Year Application 2018/19

ESKOM One Year Application 2018/19 ESKOM One Year Application 2018/19 NERSA 1 November 2017 Nelson Mandela Bay Business Chamber Comments and Recommendations Overview The Nelson Mandela Bay Business Chamber What the application means for

More information

Credit Opinion: Eskom Holdings SOC Limited

Credit Opinion: Eskom Holdings SOC Limited ESKOM HOLDINGS SOC Ltd 11 September 2014 MEDIA STATEMENT SUJECT: MOODY S INVESTOR SERVICES CREDIT OPINION UPDATE ESKOM HOLDINGS SOC LIMITED NOTED MOODY S SERVICES CREDIT OPINION UPDATE. KINDLY REFER TO

More information

executive summary ExEcuTivE SuMMAry

executive summary ExEcuTivE SuMMAry executive summary 1 British Energy was privatised in 1996. In 2002, the price of electricity fell and on 5 September 2002, the Company applied to the Department of Trade and Industry (the Department) for

More information

Welfare Reform & Work Bill Parliamentary Briefing

Welfare Reform & Work Bill Parliamentary Briefing Welfare Reform & Work Bill Parliamentary Briefing July 2015 Shelter helps millions of people every year struggling with bad housing or homelessness and we campaign to prevent it in the first place. We

More information

Eskom MYPD4 Revenue Application

Eskom MYPD4 Revenue Application Eskom MYPD4 Revenue Application Focus on Coal and Independent Power Producer Costs Nersa Public Hearings Durban 17 January 219 The MYPD methodology through the allowable revenue formula was applied AR=

More information

MPC update: The SARB cuts interest rates by 25bp as risks to inflation outlook seen to be reduced as SA avoids a Moody's rating downgrade

MPC update: The SARB cuts interest rates by 25bp as risks to inflation outlook seen to be reduced as SA avoids a Moody's rating downgrade Figure 1: SA Consumer Inflation: history and forecasts 14 12 % change y/y 10 8 6 4 2 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 MPC target period Actual Investec CPI

More information

Portfolio Committee on Energy

Portfolio Committee on Energy Portfolio Committee on Energy Briefing Integrated National Electrification Programme (INEP) 26 August 2014 Context & Purpose Previous briefings to PC on INEP DoE in September 2013 Salga and DoE in February

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) California Independent System ) Docket No. ER99-3339-000 Operator Corporation ) ) REQUEST FOR REHEARING OF THE CALIFORNIA INDEPENDENT

More information

SANCO FREE STATE PROVINCE

SANCO FREE STATE PROVINCE Cnr Charles & Fichardt Streets P.O. Box 4447 Kaizer Sebothelo Building Bloemfontein 9300 Date: 21 January 2013 SANCO FREE STATE PROVINCE PRESENTATION ON ESKOM PROPOSED TARIFFS INCREASE VENUE: MANGAUNG

More information

National Energy Guarantee Draft Detailed Design Consultation Paper

National Energy Guarantee Draft Detailed Design Consultation Paper National Energy Guarantee Draft Detailed Design Consultation Paper July 2018 Business Council of Australia July 2018 1 CONTENTS About this submission 2 Key recommendations 3 Commonwealth Government elements

More information

NERSA to consider public opinion on the ESKOM proposed revenue application multi-year price determination 2013/14 to 2017/18 (MYPD 3)

NERSA to consider public opinion on the ESKOM proposed revenue application multi-year price determination 2013/14 to 2017/18 (MYPD 3) NERSA to consider public opinion on the ESKOM proposed revenue application multi-year price determination 2013/14 to 2017/18 (MYPD 3) MMC presentation to NERSA on 25 January 2013 to illustrate what the

More information

Care Quality Commission consultation on regulatory fees from April 2018: NHS Providers response

Care Quality Commission consultation on regulatory fees from April 2018: NHS Providers response 17 January 2018 Care Quality Commission consultation on regulatory fees from April 2018: NHS Providers response About NHS Providers NHS Providers is the membership organisation and trade association for

More information

ESKOM S FINANCIAL CRISES AND CONTINUING TARIFF INCREASES

ESKOM S FINANCIAL CRISES AND CONTINUING TARIFF INCREASES ESKOM S FINANCIAL CRISES AND CONTINUING TARIFF INCREASES Strategies for containing costs and stabilising its financial position. NERSA Public hearing on Eskom s revenue application for 2018/19 Cape Town,

More information

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017 OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017 1 TABLE OF CONTENTS q Introduction q Our Requests q Our Concerns q Declining Corporate Governance q Lack of Transparency q Regulatory

More information

The Impact of Electricity Price Increases and Eskom s Six-Year Capital Investment Programme on the South African Economy

The Impact of Electricity Price Increases and Eskom s Six-Year Capital Investment Programme on the South African Economy The Impact of Electricity Price Increases and Eskom s Six-Year Capital Investment Programme on the South African Economy Note: This report is the final research project commissioned by Eskom entitled:

More information

NEW ZEALAND LOCAL GOVERNMENT FUNDING AGENCY

NEW ZEALAND LOCAL GOVERNMENT FUNDING AGENCY NEW ZEALAND LOCAL GOVERNMENT FUNDING AGENCY KĀPITI COAST DISTRICT BEING A PRINCIPAL SHAREHOLDING LOCAL AUTHORITY IN LOCAL GOVERNMENT FUNDING AGENCY The Council has decided to become a "Principal Shareholding

More information

Generation investment in a liberalised electricity market. 28 March 2008

Generation investment in a liberalised electricity market. 28 March 2008 Generation investment in a liberalised electricity market 28 March 2008 Darryl Biggar Australian Competition and Consumer Commission Australian Energy Regulator Investment in electricity markets Demand

More information

2012 Article IV Consultation with Spain Concluding Statement of IMF Mission Madrid, June, 14, 2012

2012 Article IV Consultation with Spain Concluding Statement of IMF Mission Madrid, June, 14, 2012 2012 Article IV Consultation with Spain Concluding Statement of IMF Mission Madrid, June, 14, 2012 Many major policy actions have been taken in recent months on several fronts. But market confidence remains

More information

Regulatory Impact Statement:

Regulatory Impact Statement: Appendix Two. Regulatory Impact Statement: Quality Advice Statement: The Ministry for the Environment s Regulatory Impact Analysis Panel has reviewed the attached Regulatory Impact Statement (RIS) prepared

More information

REGULATORY ACCOUNTS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts.

REGULATORY ACCOUNTS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts. Exhibit F Schedule Page of REGULATORY ACCOUNTS. INTRODUCTION The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts. 0 All of the Regulatory Accounts reported

More information

COMPANY OVERVIEW ABOUT PEC METERING. Background

COMPANY OVERVIEW ABOUT PEC METERING. Background COMPANY OVERVIEW ABOUT PEC METERING Background PEC Metering (Pty) Ltd is a private professional company established in 1994, specialising in utility management services and energy management with operations

More information

Change Impact: Disruption and Loss of Productivity A Model for Securing Price and Schedule Adjustment

Change Impact: Disruption and Loss of Productivity A Model for Securing Price and Schedule Adjustment Change Impact: Disruption and Loss of Productivity A Model for Securing Price and Schedule Adjustment Margins, Risk and Investment EPC contractors margins in the E&C industrial plant sector are disproportional

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION REQUESTING: (1) ACKNOWLEDGEMENT OF ITS FILING OF THE 2016 ANNUAL RENEWABLE ENERGY PORTFOLIO

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework Economic growth and trade expansion in recent years have enhanced the relevance of port sector as a critical element in globalisation of the Indian economy.

More information

Total Tax Contribution 2009

Total Tax Contribution 2009 www.pwc.com/jp/tax Total Tax Contribution 2009 This survey by PwC Japan Tax looks at the actual amount of taxes and social security contributions borne and collected by large Japanese companies for FY07/08.

More information

PRESENTATION TO THE PORTFOLIO COMMITTEE ON MINERAL RESOURCES:

PRESENTATION TO THE PORTFOLIO COMMITTEE ON MINERAL RESOURCES: PRESENTATION TO THE PORTFOLIO COMMITTEE ON MINERAL RESOURCES: Promoting the South African mining industry 7 December 2016 Chamber of Mines - Who we are Voluntary employer organisation that supports and

More information

Eskom RCA applications M o r n è M o s t e r t M a y

Eskom RCA applications M o r n è M o s t e r t M a y 2018 M o r n è M o s t e r t M a y 2 0 1 8 A F R I F O R U M AfriForum NPC (a non-profit company) registered in South Africa with, among other aims, constructive participation in matters of Government,

More information

South African Reserve Bank STATEMENT OF THE MONETARY POLICY COMMITTEE. Issued by Lesetja Kganyago, Governor of the South African Reserve Bank

South African Reserve Bank STATEMENT OF THE MONETARY POLICY COMMITTEE. Issued by Lesetja Kganyago, Governor of the South African Reserve Bank South African Reserve Bank PRESS STATEMENT EMBARGO DELIVERY 18 January 2018 STATEMENT OF THE MONETARY POLICY COMMITTEE Issued by Lesetja Kganyago, Governor of the South African Reserve Bank In recent weeks,

More information

Investment Strategy Statement: September 2018

Investment Strategy Statement: September 2018 Investment Strategy Statement: September 2018 Introduction and background This is the Investment Strategy Statement ( ISS ) of the London Borough of Lewisham Pension Fund ( the Fund ), which is administered

More information

RESPONSE NERSA IN RESPECT OF ESKOM TARIFF APPLICATION

RESPONSE NERSA IN RESPECT OF ESKOM TARIFF APPLICATION T: 011 498 7100 E: info@chamberofmines.org.za 5 Hollard Street, Johannesburg 2001 PO Box 61809, Marshalltown 2107 RESPONSE TO NERSA IN RESPECT OF ESKOM TARIFF APPLICATION 13 October 2017 Compiled by Chamber

More information

Complementary modernisation: Options to address the issue of affordability in the Energy White Paper

Complementary modernisation: Options to address the issue of affordability in the Energy White Paper Complementary modernisation: Options to address the issue of affordability in the Energy White Paper 16 March 2012 Oliver Derum, Policy Officer Energy + Water Consumers Advocacy Program Level 9, 299 Elizabeth

More information

DETERMINATION OF LESOTHO ELECTRICITY COMPANY (Pty) Ltd s APPLICATION FOR A TARIFF INCREASE FOR 2012/13

DETERMINATION OF LESOTHO ELECTRICITY COMPANY (Pty) Ltd s APPLICATION FOR A TARIFF INCREASE FOR 2012/13 LESOTHO ELECTRICITY AUTHORITY In the matter regarding a DETERMINATION OF LESOTHO ELECTRICITY COMPANY (Pty) Ltd s APPLICATION FOR A TARIFF INCREASE FOR 2012/13 1. DECISION After duly considering the application,

More information

Response by Power NI Energy (PPB)

Response by Power NI Energy (PPB) Power NI Energy Limited Power Procurement Business (PPB) I-SEM Balancing Market Principles Code of Practice Consultation Paper SEM-17-026 Response by Power NI Energy (PPB) 12 May 2017. Introduction Power

More information

Back to the Future: Henry, Cash Flows and Consumption. Greg Smith 2015

Back to the Future: Henry, Cash Flows and Consumption. Greg Smith 2015 Back to the Future: Henry, Cash Flows and Consumption Greg Smith 2015 Outline questions Back to the past: What is happening to consumption taxes in Australia as we do nothing much to change them? How did

More information

Submission to the Senate Inquiry into the Major Bank Levy Bill 2017

Submission to the Senate Inquiry into the Major Bank Levy Bill 2017 Submission to the Senate Inquiry into the Major Bank Levy Bill 2017 JUNE 2017 Business Council of Australia June 2017 1 The Business Council of Australia is a forum for the chief executives of Australia

More information

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS MINISTRY OF FINANCE AND ECONOMIC AFFAIRS Contents 1. PREAMBLE 4 2. THE POLICY OBJECTIVES 5 3. DEFINITION OF PPP 5 4. BENEFITS OF PPP 6 5. KEY GUIDING PRINCIPLES 7 6. SCOPE AND APPLICATION OF PPP PROJECTS

More information

NOTTINGHAM CITY HOMES. THE BOARD REPORT OF Ian Rabett Head of Health & Safety 26 November 2015

NOTTINGHAM CITY HOMES. THE BOARD REPORT OF Ian Rabett Head of Health & Safety 26 November 2015 ITEM 9 NOTTINGHAM CITY HOMES THE BOARD REPORT OF Ian Rabett Head of Health & Safety 26 November 2015 RISK MANAGEMENT 1 SUMMARY 1.1 A review of our risk management arrangements was carried out earlier this

More information

FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS

FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS 42 FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS. FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS BACKGROUND.1 This Chapter describes the results of our government-wide

More information

Stage 2 Cost Recovery Impact Statement. Customs and Excise Bill: Customs valuation rulings: Regulations for cost recovery charge

Stage 2 Cost Recovery Impact Statement. Customs and Excise Bill: Customs valuation rulings: Regulations for cost recovery charge Stage 2 Cost Recovery Impact Statement Customs and Excise Bill: Customs valuation rulings: Regulations for cost recovery charge Agency Disclosure Statement This Cost Recovery Impact Statement (CRIS) has

More information