Update on the Roadmap for Nigerian Power Sector Reform

Size: px
Start display at page:

Download "Update on the Roadmap for Nigerian Power Sector Reform"

Transcription

1 Update on the Roadmap for Nigerian Power Sector Reform Uzoma D. Achinanya Senior Special Assistant to the President of Nigeria on Electricity Distribution and Market Operations

2 Outline Overview of the Nigerian Electricity Industry The Nigerian Power Sector Reform Roadmap Tracking the Roadmap Summary

3 Overview of the Nigerian Electricity Technical Generation: Industry About 5,000MW capacity from 15 grid connected generating plants. The mix is twelve (12) thermal and three (3) hydros Ten (10) state owned and five (5) IPPs Hydro:thermal capacity ratio is 25:75 Generation ratio of the IPPs to State owned plants is 36:64

4 Overview (cont d) Technical Transmission Transmit at 330KV and 132kv Transformation capacity = 6,000MW at 330KV and 7,500MW at 132KV About 5,000Km of 330KV lines and 7,000Km of 132KV lines Average transmission loss factor = 9% Distribution Transformation capacity = 16,000MW Average distribution loss factor = 13% Access to supply = 45% Commercial No. of connections = 4.5million Average end-user tariff = N12.0/KWh ($cent 8/KWh) Average tariff paid by consumers = N8.5/KWh ($cent 5.7/KWh) Average subsidy provided by Govt. = N3.5/KWh ($cent2.3/kwh) Average monthly revenue collection = 11.5bn NGN ($77m)

5 Overview (cont d) Reform Key early reform milestones already achieved Passage of the Reform Act Establishment of the Regulatory Commission Creation of PHCN from NEPA, and unbundling of the industry into 18 Successor Companies Approval of the Market Rules Reform activities slowed down in 2007 Outstanding milestones Corporatization of the Successor Companies Commercialization of the Successor Companies Development of competitive electricity market Privatization of the Successor Companies

6 Overview (cont d) Investment of about $10.0bn required in the sector annually for the next ten years to take the country to the 2020 target of 40,000MW The private sector to be incentivized to make the investment in partnership with the Govt. There is, therefore the need to pursue and conclude the fundamental changes to the ownership, control and regulation of the power sector as outlined in the NEPP(2001) and EPSR Act 2005 However, improvement in the sector cannot wait until the industry is privatized, some sort of short to medium term improvements are necessary

7 The Roadmap for the Nigerian Power Sector Reform The FG, in response to the people s demand for real and immediate improvement in supply set up the Presidential Action Committee on Power (PACP), chaired by the President, and with most decision makers in the economy as members Simultaneously, a Presidential Task Force on Power (PTFP), was set up to carry out the day to day responsibilities of the PACP. TheTask Force is made up of technocrats and Industry Experts The PTFP developed a Roadmap (launched in August 2010) which outlines the plans to Fast track the power sector reform programme Improve service delivery in the short run Set medium to long term supply targets for the country

8 The Roadmap:-Fast tracking the reform programme Removing obstacles to private sector investments (major reform objective) Establishment of an appropriate pricing regime that supports financial viability of the sector Establishment of a Bulk Trader, adequately resourced to sign PPAs with IPPs, and sell power to the Discos. Credit enhancement to be provided to the BT in order to accelerate private sector investment in generation Operationalization of NELMCO as a Special Purpose Vehicle to assume and manage stranded assets and liabilities Addressing the concerns of the workforce which will be displaced by privatization

9 The Roadmap:-Fast tracking the reform programme (cont d) Divesting of the PHCN Successor Companies (strategies and timelines) The Generating Companies Hydro plants: strategy adopted is to grant concession for the operation of the 3 FGN hydro plants, through open tender. This strategy is predicated on the magnitude of the capital requirements and the water right issuesassociated with these plants. Thermal plants: these will be privatized via a sale of minimum of 51% equity to core investors that clearly demonstrate the technical and financial ability to operate and expand the plants All activities, including handing over of assets to be concluded during 2011 Transmission Company of Nigeria (TCN) The transmission grid is a natural monopoly, and is of critical importance to the country s security. It cannot therefore be readily opened up for competition. The strategy is to hand over TCN to a credible private sector company under a five year management contract Management contractor to be in place before end of 2011

10 The Roadmap:-Fast tracking the reform programme (cont d) Divesting of the PHCN Successor Companies (strategies and timelines) The Distribution Companies The eleven distribution companies are to be privatized, based on a core investor sale of a minimum of 51% of the government s equity in the companies. The preferred sale methodology is the Aggregate Technical, commercial and collection (ATC&C) loss reduction model. Bidders will be required to submit investment proposals and work plans for meeting the efficiency targets Target date for complete privatisation of the distribution assets is Dec. 2011

11 The Roadmap: Improving service delivery in the short run Establishing the supply gaps Setting up the targets short, medium and long term, for closing the gaps Identifying projects to facilitate gap closure

12 Establishing the Gaps Joint operation by Distribution and Transmission teams pressure tested the medium voltage networks for feeder capabilities and rejected loads Desired generation was determined from the estimated peak demand on the distribution network Desired Transmission and Distribution capabilities referenced to the desired generation, with reasonable redundancies

13 Desired Scenario Establishing the Gaps (the power cone) Generation 10,000MW Existing Scenario Transmission 12,000MW < < Distribution 15,000MW Generation =4,600MW Transmission = 5,200MW Distribution = 5,800MW

14 Roadmap short-to-medium term targets Fuel to power capacity (MWE) Generation capacity (MW) Transmissio n capability (MW) Distribution capability (MW) July 2010 Dec April 2011 Dec Dec Dec ,558 5,627 7,711 9,184 11,701 11,780 4,612 5,379 7,033 9,767 11,879 14,218 5,155 5,515 5,995 6,555 7,866 8,653 5,758 6,334 6,900 7,485 8,061 9,057

15 Immediate Actions/Targets Keep the lights on, and sustain improvements in generation capacity A summit of all key operators in the power industry was convened to discuss the Immediate Targets

16 Objectives of the Power Summit To determine the realistic position of power situation in the country To agree on the bottom lines for power generation and supply To agree on the strategies for building on the bottom lines, including revenue collection To agree on the optimization of the use of the available generation by way of Demand Side Management

17 Agreed Strategies for immediate improvement in service delivery Load Rotation Divide the country into three and supply 2/3 at a time on an 8hrs rolling blackout. This way consumers have 16hrs supply daily A sensible method of power rationing Consumers will have opportunity to predict their supply and plan in advance Improvements in generation will easily reflect in the hrs of supply to consumers Service Level Agreements (SLA) with the CEOs of the Successor Companies, based on nominations and commitments To ensure service delivery is carried out in a well-mannered and monitored manner, for which output is properly evaluated To ensure service delivery for which those directly responsible can be held truly accountable To ensure improvement in performance efficiency Energy Efficiency and Demand Side Management To release some capacity and complement power generation towards achieving the Nations peak demand

18 Tracking the Roadmap Reform On-going review of the Multi-year Tariff Order, to achieve a costreflective end-user tariff. New tariffs to be in place during 2011 Bulk Trader has been registered and licensed, credit enhancements being put in place to enable BT take off NELMCO already in place, currently being resourced for operations Investors retreat organized in Oct. 2010, bringing investors from all over the world to update them on the reform progress so far Serious engagement with the labor to discuss it s concerns, payment of some workers dues and provision of funds for payment of severance package Transaction advisers engaged by the Privatisation Agency Requests for EOIs on the Successor Companies expected to be advertised before end of Dec. 2010

19 Tracking the Roadmap (cont d) Short term improvement in supply Generation Work is progressing well on five NIPP projects expected to be commissioned by the 1 st quarter of 2011, to add 1,250MW generation capacity. Rehab of some existing plants also on-going Total addition expected by end of the short term period is about 1,500MW Transmission A major 330KV line to the Northern part of the country has just been completed, about to be commissioned. This will improve the quality of power in the NE part of the country Total of 600MVA and 360MVA transformation capacities have been added at the 330KV and 132KV levels respectively A number of projects will be completed before end of April 2011

20 Tracking the Roadmap (cont d) Short term improvement in supply Distribution A total of additional 500MW distribution capability would have been commissioned by end of Dec Work is progressing to add another MW by end of April 2011 Sum of N5.6bn has been released to execute the projects Commercial Revenue collection has improved from an average of N10bn to an average of N11.5bn Sum of N3bn has been released by the FG to the Discos for pre-payment metering and revenue enhancement programmes

21 Tracking the Roadmap (cont d) General 16hrs Load rotation program commenced nationwide on the 1 st Dec Service Level Agreements (with incentives) are currently being signed by the CEOs of the Successor Companies Performance monitoring and evaluation for the Discos started on the 1 st Dec. Those for the Gencos and TCN will commence by Jan. 2011

22 Summary Investments are urgently needed in the Country all the way alongthe electricity supply chain, viz Fuel to - power Generation Transmission Distribution The private sector is being incentivized and resourced to committhe required investments and take over the control of the electricity industry Transition to private sector owned and controlled businesses cannot happen overnight, the FG is seriously committed to improved service delivery in the short run, huge resources are being deployed for this Some of the strategies for improved service delivery include performance monitoring and evaluation, and holding people responsible for certain deliverables Government s initiatives in the sector are obviously becoming visible to the consuming public

23 Thank You Questions please!

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION By Bolanle Onagoruwa Director General, Bureau of Public Enterprises A Presentation to the West African Power Industry Convention November 2011 Outline Introduction

More information

Review of the Reform and Privatization of the Power Sector in Nigeria. Peter Kieran Dar es Salaam January 31, 2014

Review of the Reform and Privatization of the Power Sector in Nigeria. Peter Kieran Dar es Salaam January 31, 2014 Review of the Reform and Privatization of the Power Sector in Nigeria Peter Kieran Dar es Salaam January 31, 2014 Corporate Overview -history -who we are today Our History CPCS Limited Canadian Pacific

More information

The Role of the Bulk Trader in the Transitional Electricity Market and Off-take Security

The Role of the Bulk Trader in the Transitional Electricity Market and Off-take Security 1 The Role of the Bulk Trader in the Transitional Electricity Market and Off-take Security Presented by Rumundaka Wonodi Bankers Committee and BPE Technical Workshop May 25, 2011 2 Outline Background Bulk

More information

Executive Summary Federal Government Economic Recovery and Growth Plan Power Sector Reforms Power Sector Constraints and Challenges

Executive Summary Federal Government Economic Recovery and Growth Plan Power Sector Reforms Power Sector Constraints and Challenges Executive Summary Federal Government Economic Recovery and Growth Plan Given the critical role of power supply in socio-economic development and the development of all sectors of Nigeria s economy, the

More information

FEDERAL REPUBLIC OF NIGERIA POWER SECTOR RECOVERY PROGRAMME:

FEDERAL REPUBLIC OF NIGERIA POWER SECTOR RECOVERY PROGRAMME: FEDERAL REPUBLIC OF NIGERIA POWER SECTOR RECOVERY PROGRAMME: 2017 2021 JANUARY 2018 1 TABLE OF CONTENTS ABBREVIATIONS AND ACRONYMS... 4 1. EXECUTIVE SUMMARY... 6 1.1. INTRODUCTION... 6 1.3. WHAT IS THE

More information

IPP Project Development

IPP Project Development IPP Project Development AFRICA UTILITY WEEK CONFERENCE Yesufu Longe Alonge Head, Power Procurement & Power Contracts And Dr. Nnaemeka Ewelukwa General Counsel & Company Secretary May 13, 2013 1 Outline

More information

Presentation to the Ethiopia Government Delegation to Canada on PPP. Peter Kieran May 15, 2014 Ottawa, Ontario

Presentation to the Ethiopia Government Delegation to Canada on PPP. Peter Kieran May 15, 2014 Ottawa, Ontario Presentation to the Ethiopia Government Delegation to Canada on PPP Peter Kieran May 15, 2014 Ottawa, Ontario Overview Who is CPCS? Public-Private Partnerships / Transaction Advisory Services Example:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: PIDA46436 Project Name Region Country Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/Updated

More information

MULTI-YEAR TARIFF ORDER

MULTI-YEAR TARIFF ORDER MULTI-YEAR TARIFF ORDER FOR THE DETERMINATION OF THE COST OF ELECTRICITY GENERATION FOR THE PERIOD 1 JUNE 2012 TO 31 MAY 2017 Nigerian Electricity Regulatory Commission 1 ST JUNE 2012 Table of Contents

More information

ROADMAP POWER SECTOR REFORM

ROADMAP POWER SECTOR REFORM THE PRESIDENCY FEDERAL REPUBLIC OF NIGERIA ROADMAP FOR POWER SECTOR REFORM (A CUSTOMER-DRIVEN SECTOR-WIDE PLAN TO ACHIEVE STABLE POWER SUPPLY) PRESIDENTIAL ACTION COMMITTEE ON POWER (PACP) Dr. Goodluck

More information

OPPORTUNITIES IN THE ON-GRID RE SECTOR IN NIGERIA

OPPORTUNITIES IN THE ON-GRID RE SECTOR IN NIGERIA OPPORTUNITIES IN THE ON-GRID RE SECTOR IN NIGERIA by Yesufu Longe Head, Power Procurement & Power Contracts June, 2016 Outline History How NBET Works Tenders & Auctions International & Local Investment

More information

A HIGH LEVEL RED FLAG REVIEW OF THE NIGERIAN ELECTRIC SUPPLY INDUSTRY

A HIGH LEVEL RED FLAG REVIEW OF THE NIGERIAN ELECTRIC SUPPLY INDUSTRY A HIGH LEVEL RED FLAG REVIEW OF THE NIGERIAN ELECTRIC SUPPLY INDUSTRY Gbite Adeniji March 21, 2014 INTRODUCTION 25-Mar-14 2 GAS PRODUCER NBET POWER PURCHASE AGREEMENT GENCO/IPP TRANSMISSION [TCN = MO &

More information

REGULATIONS FOR INVESTMENTS IN ELECTRICITY NETWORKS IN NIGERIA 2015

REGULATIONS FOR INVESTMENTS IN ELECTRICITY NETWORKS IN NIGERIA 2015 REGULATIONS FOR INVESTMENTS IN ELECTRICITY NETWORKS IN NIGERIA 2015 REGULATION NO: NIGERIAN ELECTRICITY REGULATORY COMMISSION In exercise of its powers to make Regulations conferred by Section 96 (1) &

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6841. I. Project Context

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6841. I. Project Context Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report

More information

ELECTRICITY REGULATORY COMMISSION

ELECTRICITY REGULATORY COMMISSION NIGERIAN ELECTRICITY REGULATORY COMMISSION RULES FOR THE INTERIM PERIOD BETWEEN COMPLETION OF PRIVATISATION AND THE START OF THE TRANSITIONAL ELECTRICITY MARKET (TEM) 2013 NIGERIAN Regulation No: NERC-Ol13

More information

Nigeria Power Guide. Volume 1, 2012 Edition. Inside this Guide 1. POWER SECTOR OUTLOOK

Nigeria Power Guide. Volume 1, 2012 Edition. Inside this Guide 1. POWER SECTOR OUTLOOK Volume 1, 2012 Edition 1. POWER SECTOR OUTLOOK Inside this Guide POWER SECTOR OUTLOOK 1 REGULATORY FRAMEWORK 2 Power Sector Road Map aspiration 40,000 MW by 2020 Current Daily Peak Delivery 4300 MW ( ±

More information

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0)

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0) Ghana Power Sector Review of Reform Programme Ray Tomkins (ECA) ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0)20 7604 4545 / fax +44 (0)20 7604 4547 www.eca-uk.com

More information

AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie

AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie Utility Sustainability- Business Essentials AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie BUSINESS IS LIKE THE WEATHER- EVERYONE TALKS ABOUT IT, BUT FEW UNDERSTAND WHERE IT COMES FROM PRF 2

More information

Impact Analysis of Implementation of PSRP on 2016 Financials. 1

Impact Analysis of Implementation of PSRP on 2016 Financials.   1 Impact Analysis of Implementation of PSRP on 2016 Financials www.abujaelectricity.com 1 Introduction: Power Sector Recovery Program (PSRP) Key Thrusts of The Plan: CBN/NBET upstream payment assurance program

More information

Opportunities & Challenges by. Nadeem Babar Orient Power Company Ltd. November 2015

Opportunities & Challenges by. Nadeem Babar Orient Power Company Ltd. November 2015 Opportunities & Challenges by Nadeem Babar Orient Power Company Ltd November 2015 1 The Opportunity Market offers long term opportunities of growth for those who understand the risks Half of Power produced

More information

POWER SECTOR RECOVERY PROGRAM

POWER SECTOR RECOVERY PROGRAM POWER SECTOR RECOVERY PROGRAM FEDERAL GOVERNMENT OF NIGERIA MARCH 2017 DRAFT FINAL TABLE OF CONTENTS 1 Executive Summary 2 Introduction 3 The Challenge 4 The Plan 5 World Bank Group 6 Action Plan 7 Appendix

More information

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT Energy Department Government of Bihar 2012 ( 1 ) Table of Content 1. Objective 2. Title and Enforcement 3. Scope and Coverage 4. Nodal Agency 5. Classification

More information

Investment Opportunities in the Nigerian Public Enterprise Reform & Privatisation Programme APRIL 17-20

Investment Opportunities in the Nigerian Public Enterprise Reform & Privatisation Programme APRIL 17-20 Profile Alex Okoh Director General/CEO of the Bureau of Public Enterprises (BPE). Prior to his appointment, he was Managing Partner, Ashford & McGuire Consulting Limited. 32 years experience in the banking

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC Power Sector Recovery Performance Based Loan

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC Power Sector Recovery Performance Based Loan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC0122348

More information

Eskom 2018/19 Revenue Application

Eskom 2018/19 Revenue Application Eskom 2018/19 Revenue Application Nersa Public Hearings Klerksdorp 13 November 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained

More information

The South African Grid Code. Transmission Tariff Code. Version 9.0

The South African Grid Code. Transmission Tariff Code. Version 9.0 The South African Grid Code Transmission Tariff Code Version 9.0 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr. Bernard

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED SERIES OF PARTIAL RISK GUARANTEES

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED SERIES OF PARTIAL RISK GUARANTEES Public Disclosure Authorized Document of The World Bank Report No: 82664-NG Public Disclosure Authorized Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL

More information

TOWARDS A COMPETITIVE ELECTRICITY MARKET: THE BERTHING OF ELIGIBLE CUSTOMERS

TOWARDS A COMPETITIVE ELECTRICITY MARKET: THE BERTHING OF ELIGIBLE CUSTOMERS TOWARDS A COMPETITIVE ELECTRICITY MARKET: THE BERTHING OF ELIGIBLE CUSTOMERS www.templars-law.com TOWARDS A COMPETITIVE ELECTRICITY MARKET: THE BERTHING OF ELIGIBLE CUSTOMERS One overarching objective

More information

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution IFC Transaction Advisory Services Creating opportunity where it s needed most From Concept Design to Project Execution ECREEE Abidjan, March 2014 Introduction and agenda Introduction and agenda Introduction:

More information

Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region

Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region Harish Saran Executive Director PTC India Ltd. harishsaran@ptcindia.com Existing Regional Cooperation in

More information

Global Project Finance Alert

Global Project Finance Alert Global Project Finance Alert March 20, 2018 Project Finance: Structuring for Success Mini-Summary This Practice Note considers the meaning of the term structure in a project finance transaction and identifies

More information

Analysis: The Nigeria Energy Sector 2018

Analysis: The Nigeria Energy Sector 2018 Analysis: The Nigeria Energy Sector 2018 Synterra Energy (Nig) Ltd Femi Ogunkolati CEO Synterra Energy Page 1 of 21 INTRODUCTION Synterra Energy has undertaken an analysis of the Nigerian power sector

More information

TECHNICAL REVIEW OF NIGERIA S 2016 MINI GRID REGULATION

TECHNICAL REVIEW OF NIGERIA S 2016 MINI GRID REGULATION TECHNICAL REVIEW OF NIGERIA S 2016 MINI GRID REGULATION Emeka Okpukpara and Taiwo Ibiyemi October 30, 2016 Project Team Emeka Okpukpara, Partner Taiwo Ibiyemi, Analyst This report sets forth the information

More information

Power Sector Reform India The Long Road Ahead

Power Sector Reform India The Long Road Ahead Power Sector Reform India The Long Road Ahead Rahul Tongia Department of Engineering & Public Policy/ School of Computer Science University February 19, 2003 2 Outline Overview of the Indian power sector

More information

Meeting Africa s Power Challenges

Meeting Africa s Power Challenges Meeting Africa s Power Challenges @AntonEberhard Prof Anton Eberhard Management Program in Infrastructure Reform and Regulation University of Cape Town Outline 1. Africa s power challenges 2. The response:

More information

Tgenerating station in the country was built in Lagos.

Tgenerating station in the country was built in Lagos. HISTORY OF THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY (NESI): he evolution of the Nigerian Electricity Supply Industry (NESI) can be traced to 1896 when the first power Tgenerating station in the country

More information

Market structure in Saudi Arabia

Market structure in Saudi Arabia Market structure in Saudi Arabia ERRA Tariff / Pricing Committee meeting 19 October 2016, Bratislava, Slovakia Engr. Zaid Rajeh Al-Zaid Economic & Tariff Affairs, ECRA 1 Outline Introduction 2015 Facts

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

Title of presentation

Title of presentation Tariffs versus Return on Investment Title of presentation Cornelis van der Waal Industry Manager Africa Energy and Power Systems Power Indaba 2008, Cape Town, South Africa TOC Current State of the Electricity

More information

Power Sector Reform and Investment Comparing Uganda with Kenya and Tanzania

Power Sector Reform and Investment Comparing Uganda with Kenya and Tanzania Power Sector Reform and Investment Comparing Uganda with Kenya and Tanzania Prof Anton Eberhard Management Program in Infrastructure Reform and Regulation University of Cape Town Drivers for utility reform

More information

ANNUAL ANALYST S PRESENTATION

ANNUAL ANALYST S PRESENTATION ANNUAL ANALYST S PRESENTATION Transforming the Enterprise Athens, May 3 2006 Public Power Corporation S.A. 1 AGENDA What is PPC attractive assets in advantaged market 2005 results year of transition Looking

More information

Introduction to Presentation &

Introduction to Presentation & Introduction to Presentation & Brief Discussion of Haiti Paper Silvia Alvarado de Cordoba Director, Energy Intelligence Consulting Juan A. B. Belt Senior Associate (non-resident), Center for Strategic

More information

Peter Wright. Renewable Energy Projects in Africa Comparing Procurement Models for Renewable Generation Capacity. Simmons & Simmons March 2015

Peter Wright. Renewable Energy Projects in Africa Comparing Procurement Models for Renewable Generation Capacity. Simmons & Simmons March 2015 Renewable Energy Projects in Africa Comparing Procurement Models for Renewable Generation Capacity Peter Wright Simmons & Simmons March 2015 Meeting the cost of Green Energy When renewables first emerged

More information

Obstacles to Trade and Compatibility of Market Rules in Southeast Europe

Obstacles to Trade and Compatibility of Market Rules in Southeast Europe Obstacles to Trade and Compatibility of Market Rules in Southeast Europe Findings/ Recommendations of SEETEC Final Draft Report Athens Forum June 22st, 2006 REM-1202-47RP-I-0006 National wholesale markets

More information

AJUMOGOBIA & OKEKE. Nigerian Energy Sector: Legal & Regulatory Overview (2015) Nigerian Energy Sector_155x235.indd 1 02/07/ :18:33

AJUMOGOBIA & OKEKE. Nigerian Energy Sector: Legal & Regulatory Overview (2015) Nigerian Energy Sector_155x235.indd 1 02/07/ :18:33 AJUMOGOBIA & OKEKE Nigerian Energy Sector: Legal & Regulatory Overview (2015) Nigerian Energy Sector_155x235.indd 1 02/07/2015 17:18:33 a&o 2 Nigerian Energy Sector_155x235.indd 2 02/07/2015 17:18:34 a&o

More information

Regional Power Market Challenges and Opportunities from Nepalese perspective

Regional Power Market Challenges and Opportunities from Nepalese perspective Regional Power Market Challenges and Opportunities from Nepalese perspective Hitendra Dev Shakya Director, Power Trade Department, Nepal Electricity Authority Outline of the Presentation 1. Energy sector

More information

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1.

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1. Updated: 0-0-0 EB-0-0 Exhibit G Schedule Page of RATE DESIGN.0 INTRODUCTION The purpose of this evidence is to present the proposed rates designed to collect the revenue requirement as determined by the

More information

PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS

PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS Filed: September, 00 EB-00-0 Schedule Page of PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS This set of exhibits describes the costs of the proposed facilities and the economics of

More information

Power Sector Development in Haryana: Progress and Challenges

Power Sector Development in Haryana: Progress and Challenges Page10 Power Sector Development in Haryana: Progress and Challenges Manju* *Assistant Professor, CRSU Jind Energy plays a vital role in the sustainable development an economy. Electricity is considered

More information

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46)) GOVERNMENT NOTICE NO. 77 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 18(5), 45 and 46)) THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2018 1. Citation

More information

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner Contents 1. The restriction of subsidies and policy priorities. 2.

More information

ROADMAP POWER SECTOR REFORM

ROADMAP POWER SECTOR REFORM THE PRESIDENCY FEDERAL REPUBLIC OF NIGERIA ROADMAP FOR POWER SECTOR REFORM (A CUSTOMER-DRIVEN SECTOR-WIDE PLAN TO ACHIEVE STABLE POWER SUPPLY) PRESIDENTIAL ACTION COMMITTEE ON POWER (PACP) Dr. Goodluck

More information

Dr Willem J. De Beer, Chief Operations Officer, EDI Holdings (Pty) Ltd, South Africa 23November 2010

Dr Willem J. De Beer, Chief Operations Officer, EDI Holdings (Pty) Ltd, South Africa 23November 2010 Dr Willem J. De Beer, Chief Operations Officer, EDI Holdings (Pty) Ltd, South Africa 23November 2010 The process of dealing with the EDI maintenance backlog: Can we catch up? Electricity Supply Chain GENERATION

More information

Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective?

Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective? Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective? 1 Which federal policy would be the most cost-effective? India aims to double existing renewable energy

More information

Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003

Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003 Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003 David G. Victor Program on Energy and Sustainable Development Stanford

More information

All Source Request for Proposal Bid Conference. October 22, 2008

All Source Request for Proposal Bid Conference. October 22, 2008 All Source Request for Proposal Bid Conference October 22, 2008 Agenda Overview of All Source Request for Proposal Schedule and timeline Resource Alternatives Delivery Points Bid Fee (s) Fixed and Index

More information

Domestic Use Tariffs. Codes 05, 06, 07 and 08

Domestic Use Tariffs. Codes 05, 06, 07 and 08 Domestic Use Tariffs Codes 05, 06, 07 and 08 Tariffs for Domestic Use Tariffs for Domestic Use are applicable where the electricity is solely used for domestic purposes to private dwellings. They are not

More information

Connection and Use of System Charge Methodology Statement ("Condition 25 Statement")

Connection and Use of System Charge Methodology Statement (Condition 25 Statement) Connection and Use of System Charge Methodology Statement ("Condition 25 Statement") Revised Effective Date: 1 st January 2016 Approved by the Authority for Electricity Regulation, Oman Connection and

More information

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia By Mollalign Abebe Ethiopian Electricity Agency November 27, 2006 1 Four parts of the Presentation: Policy,

More information

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA 22 October 2018 PRESENTATION TO THE ABSA POWER, UTILITIES AND INFRASTRUCTURE INSIGHT SERIES Dr Grové Steyn 1 THE ORIGINAL RATIONALE FOR

More information

TARIFF AND GOVERNANCE ASSESSMENT

TARIFF AND GOVERNANCE ASSESSMENT Assam Power Sector Investment Program (RRP IND 47101) TARIFF AND GOVERNANCE ASSESSMENT A. Tariff Analysis Assam Power Generating Corporation 1. In its (Terms and Conditions for Determination of Tariff)

More information

LIGHT INSIDE THE EXPERIENCE OF INDEPENDENT POWER PRODUCERS IN NIGERIA

LIGHT INSIDE THE EXPERIENCE OF INDEPENDENT POWER PRODUCERS IN NIGERIA LIGHT INSIDE THE EXPERIENCE OF INDEPENDENT POWER PRODUCERS IN NIGERIA LIGHT INSIDE: THE EXPERIENCE OF INDEPENDENT POWER PRODUCERS IN NIGERIA ANTON EBERHARD KATHARINE NAWAAL GRATWICK January 2012 INFRASTRUCTURE

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for 138 kv and 240 kv Transmission System Development in the Red Deer Region And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1,

More information

Global Resilience Risk

Global Resilience Risk Global Resilience Risk An Insurers Perspective WEC Energy Summit 16 March 2016 Jamie Summons, Head of Weather Solutions, Asia Pacific Swiss Re Weather Market Capability Global presence, market leadership

More information

regulation Policy Brief 26 November 2014

regulation Policy Brief 26 November 2014 Fostering Electricity transmission investments to achieve Europe s energy goals: Towards a future-looking regulation Policy Brief 26 November 2014 Executive Summary A strong and secure transmission network

More information

Nigerian Power Sector Is there light at the end of the tunnel?

Nigerian Power Sector Is there light at the end of the tunnel? 1 Executive Summary In this report, we initiate a coverage of the Nigerian power sector with reviews and insights into developments in the post-privatization era. In 2013, Nigeria commenced a comprehensive

More information

83C Questions and Answers

83C Questions and Answers 83C Questions and Answers (2) Section 1.7.4.1 Can the Evaluation Team provide guidance on the scope and amount of information that could be requested from ISO-NE, and the expected magnitude of any associated

More information

Oando Plc H Performance Review

Oando Plc H Performance Review Oando Plc H1 2012 Performance Review www.oandoplc.com 1 Disclaimer This presentation does not constitute an invitation to underwrite, subscribe for, or otherwise acquire or dispose of any Oando Plc (the

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public

More information

Cover slide (same as IR cover)

Cover slide (same as IR cover) Integrated results for the year ended 31 March 2016 Cover slide (same as IR cover) 5 July 2016 This presentation is available at www.eskom.co.za/ir2016 Contents Overview of the year Financial review Operating

More information

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS ON GENERAL PRINCIPLES FOR REGULATING ELECTRICITY TARIFFS IN THE KINGDOM OF CAMBODIA Under Electricity Law of The Kingdom

More information

Information Document FAC-008-AB-3 Facility Ratings ID # RS

Information Document FAC-008-AB-3 Facility Ratings ID # RS Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

Morocco s experience in financing solar projects

Morocco s experience in financing solar projects Morocco s experience in financing solar projects February 5, 2019 1 Morocco s Energy Strategy 2 RENEWABLE ENERGIES, AT THE HEART OF MOROCCO S ENERGY STRATEGY Strong will of increasing renewable energy

More information

MMC Norilsk Nickel: OGK-3 3 Acquisition Building the Leading Russian Power Company. Investor Presentation. Moscow, Russia.

MMC Norilsk Nickel: OGK-3 3 Acquisition Building the Leading Russian Power Company. Investor Presentation. Moscow, Russia. MMC Norilsk Nickel: OGK-3 3 Acquisition Building the Leading Russian Power Company Investor Presentation Moscow, Russia 26 March 2007 Disclaimer The information contained herein has been prepared using

More information

The Role of Risk Allocation in Transaction Design: The Case of Power Distribution

The Role of Risk Allocation in Transaction Design: The Case of Power Distribution The Role of Risk Allocation in Transaction Design: The Case of Power Distribution Allen Eisendrath & Fraser Morrison Deloitte Emerging Markets February 26, 2003 Agenda Investors View of Electricity Distribution

More information

Feed-in Tariff Review workshop. BIS Conference Centre, London, 5 October 2015

Feed-in Tariff Review workshop. BIS Conference Centre, London, 5 October 2015 Feed-in Tariff Review workshop BIS Conference Centre, London, 5 October 2015 Agenda 10.00 10.15 Presentation on FIT Review consultation Gareth Redmond, Head of Renewables Programme Team, DECC Sarah Lowe,

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 15-Oct-2014

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION, ITS COMPLIANCE AND IMPLEMENTATION OF RENEWABLE ENERGY CERTIFICATE FRAMEWORK)

More information

MISO Planning Process. May 31, 2013

MISO Planning Process. May 31, 2013 MISO Planning Process May 31, 2013 MISO Planning Objectives Fundamental Goal The development of a comprehensive expansion plan that meets reliability needs, policy needs, and economic needs MISO Board

More information

2014 Fixed Income Investor Update

2014 Fixed Income Investor Update 2014 Fixed Income Investor Update Toronto April 23, 2014 Montreal April 24, 2014 Winnipeg April 28, 2014 Disclaimer Certain information included in this presentation or incorporated by reference herein

More information

Oando Plc. YTD September 2011 Conference Call October, YTD Sept 2011 Conference Call 1

Oando Plc. YTD September 2011 Conference Call October, YTD Sept 2011 Conference Call 1 Oando Plc ember 2011 Conference Call October, 2011 2011 Conference Call 1 Cautionary Statement ne The information presented herein is based on sources which Oando Plc ( Oando ) regards dependable. This

More information

Ontario s Renewable Energy Standard Offer Program - LDC Information Package

Ontario s Renewable Energy Standard Offer Program - LDC Information Package Ontario s Renewable Energy Standard Offer Program - LDC Information Package Prepared with input and assistance of members of the OPA s Electricity Distributors Working Group Last updated April 03, 2007

More information

REQUEST FOR FINANCING PROPOSALTO ACT AS LETTER OF CREDIT (L/C) ISSUING BANK SUPPORTED BY A PARTIAL RISK GUARANTEE (PRG) FROM THE AFRICAN DEVELOPMENT

REQUEST FOR FINANCING PROPOSALTO ACT AS LETTER OF CREDIT (L/C) ISSUING BANK SUPPORTED BY A PARTIAL RISK GUARANTEE (PRG) FROM THE AFRICAN DEVELOPMENT REQUEST FOR FINANCING PROPOSALTO ACT AS LETTER OF CREDIT (L/C) ISSUING BANK SUPPORTED BY A PARTIAL RISK GUARANTEE (PRG) FROM THE AFRICAN DEVELOPMENT FUND (ADF) IN SUPPORT OF THE 105MW MENENGAI GEOTHERMAL

More information

Outline: Skye Bank Overview. Business Environment. Financial Highlights. Risk Management. Strategic Outlook

Outline: Skye Bank Overview. Business Environment. Financial Highlights. Risk Management. Strategic Outlook = Disclaimer This presentation may contain certain forward-looking statements, estimates and targets with respect to the operating results, financial condition and business of Skye Bank. Such statements

More information

I N F O R M A T I O N

I N F O R M A T I O N Ec I N F O R M A T I O N D O C U M E N T Augu REVIEW OF THE STATE OF THE TRINIDAD & TOBAGO ELECTRICITY COMMISSION 1995-2003 Classification: Information Document Distribution: Stakeholders / Public Reference

More information

PIESA CONFERENCE PRESENTATION

PIESA CONFERENCE PRESENTATION PIESA CONFERENCE PRESENTATION ESCOM S ASPIRATIONS TO REDUCE NON TECHNICAL LOSSES Lytton Moyo Nkopola Lodge,Mangochi, Malawi 24 th February 2015 PRESENTATION OUTLINE 1 Introduction 2 Challenges faced by

More information

1200kV AC Sub-station at Bina. Delivering Smart Grid/ Distribution Solutions `

1200kV AC Sub-station at Bina. Delivering Smart Grid/ Distribution Solutions ` 1200kV AC Sub-station at Bina Delivering Smart Grid/ Distribution Solutions ` Press Meet 12 th February, 2013 Disclaimer By attending the meeting where this presentation is made, or by reading the presentation

More information

REFURBISHMENT AND NEW GENERATION NUCLEAR

REFURBISHMENT AND NEW GENERATION NUCLEAR Filed: 00--0 EB-00-00 Exhibit D Tab Page of 0 0 0 REFURBISHMENT AND NEW GENERATION NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear plant refurbishment

More information

Armstrong South East Asia Clean Energy Fund LP

Armstrong South East Asia Clean Energy Fund LP Armstrong South East Asia Clean Energy Fund LP Solar Energy South East Asia Financing Small Power Projects 26 th November 2014 Fund Executive Summary Sector focus Fund premise & rationale Growing energy

More information

Status of the Liberian Power Sector & Future Plans. EG Team/Liberia December 15, 2008

Status of the Liberian Power Sector & Future Plans. EG Team/Liberia December 15, 2008 Status of the Liberian Power Sector & Future Plans EG Team/Liberia December 15, 2008 1 Liberia: Key Statistics Capital: Monrovia Area: 111,369 sq. km. Population: 3.5 million GDP: $631 million Real GDP

More information

Schedule NEM-V Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES

Schedule NEM-V Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES Southern California Edison Revised Cal. PUC Sheet No. 55676-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 54511-E* APPLICABILITY Schedule NEM-V Sheet 1 Applicable to Qualified

More information

Comparison Case Study: Two Neighbors in Contrast: The Restructuring of the Power Sectors of Argentina and Brazil

Comparison Case Study: Two Neighbors in Contrast: The Restructuring of the Power Sectors of Argentina and Brazil Session 22 Comparison Case Study: Two Neighbors in Contrast: The Restructuring of the Power Sectors of Argentina and Brazil PURC/ARSESP Training Sao Paulo, S.P., Brazil October 22-26, 2012 Ashley Brown

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 22-Apr-2015 Report No.: ISDSC8904 Date ISDS Approved/Disclosed: 27-Apr-2015 Public Disclosure Authorized

More information

Central Asia South Asia Electricity Transmission and Trade Project

Central Asia South Asia Electricity Transmission and Trade Project Central Asia South Asia Electricity Transmission and Trade Project Update on Progress and Recent Developments November 6, 2014 1 The CASA-1000 project is the most advanced initiative on regional cooperation

More information

Domestic Use Tariffs. Codes 05, 06, 07 and 08

Domestic Use Tariffs. Codes 05, 06, 07 and 08 Domestic Use Tariffs Codes 05, 06, 07 and 08 Tariffs for Domestic Use Tariffs for Domestic Use are applicable where the electricity is solely used for domestic purposes to private dwellings. They are not

More information

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE Sheet 1 AVAILABILITY Electric delivery service shall be taken under this rate for all purposes by any customer who is placed on the rate by the Company in accordance with this paragraph. The Company shall

More information

FY 2016 RESULTS. March 2 nd, 2017

FY 2016 RESULTS. March 2 nd, 2017 FY 2016 RESULTS March 2 nd, 2017 AGENDA Key messages & strategy execution Financial update 2017 outlook & conclusion FY2016 RESULTS 2 KEY MESSAGES & STRATEGY EXECUTION KEY MESSAGES 2016 results in line

More information

Georgian National Electricity Regulatory Commission

Georgian National Electricity Regulatory Commission Georgian National Electricity Regulatory Commission Resolution # 3 1 July, 1998 Tbilisi On Approval of the Electricity Tariff Methodology, Setting Rules and Procedures. On the recent stage of the reform

More information

CUSC - SECTION 14 CHARGING METHODOLOGIES CONTENTS

CUSC - SECTION 14 CHARGING METHODOLOGIES CONTENTS CUSC - SECTION 14 CHARGING METHODOLOGIES CONTENTS 14.1 Introduction Part I -The Statement of the Connection Charging Methodology 14.2 Principles 14.3 The Calculation of the Basic Annual Connection Charge

More information