1 Project Concept Note I. Project Details Project Name Sector Project type Countries, in which the Project is to be implemented Nurek HPP Rehabilitation (Phase 1). Component: Rehabilitation of three generating units, key infrastructure components of the plant, and replacement of six autotransformers. Subcomponent: Replacement of six autotransformers. Power sector (hydropower) Financing the purchase, supply, installation, and commissioning of six singlephase 500 kv / 220 kv autotransformers to replace the autotransformers installed at the HPP transformer substation that have reached the end of their service life and are in an unsatisfactory technical condition. Republic of Tajikistan Investment Project location Republic of Tajikistan, Khatlon oblast, 70 km to the South-East of the city of and place of registration Dushanbe, close to the town of Nurek, on the Vakhsh River. Project summary description Project objectives Project implementation outcomes Nurek HPP is the largest hydroelectric power plant in the Republic of Tajikistan and in Central Asia, which supplies more than 70 % of all the electricity generated in the country and makes part of the Vakhsh HPP Cascade. The HPP installed capacity is 3,000 MW (8 hydroelectric units 335 MW each and 1 hydroelectric unit of 320 MW). The HPP was put into operation in 1972, the last unit was put into operation in At present, the HPP can potentially generate only 77 % of its design capacity due to its equipment obsolescence and lack of necessary maintenance. The capacity of its reservoir is 10.5 km 3 (the working storage is 4.5 km 3 ), its surface area is 98 km 2, its length is about 70 km. The height of the dam is 300 m (until 2013, it used to be the highest dam in the world). The average annual power generation was over 10,223 million kwh per annum in The Nurek HPP Rehabilitation is conditionally divided into 2 phases: Phase 1 includes 3 components (350 million): Component 1: Rehabilitation of three generating units, key infrastructure components of the plant, and replacement of six autotransformers. Component 2: Enhancement of dam safety. Component 3: Technical assistance from the IDA and the AIIB. Phase 2 (350 million) covers the finalisation of the Nurek HPP rehabilitation and involves the purchase of plant equipment to replace 6 hydropower units and rehabilitate 5 transformers (300 million), as well as the payment of project management fees and the costs of engaging an expert group, the development of an environmental management plan (EMP), technical assistance and contingencies (50 million). The detailed structure of Phase 2 will be developed in Phase 1 is to be financed by the International Development Association (IDA, World Bank Group), the Asian Infrastructure Investment Bank (AIIB), and the EFSD. The HPP rehabilitation through replacement of its physically and morally obsolete equipment. Improved HPP reliability and safety and, thus, uninterrupted power supply to domestic consumers, especially in winter, and to external markets (in summer); Lower operation and repair costs; and 1

2 Degree of Project preparation HPP capacity recovery. The World Bank, in cooperation with Tractebel Engineering, an independent consultancy firm, reviewed the Project feasibility study and prepared a report (August 2016). It also made studies, held public hearings, and prepared the final Environmental and Social Impact Assessment Report (January 2017) and the Sedimentation Study Report (February 2016). At the stage of the Project preparation, the Asian Infrastructure Investment Bank was mobilised to co-finance the project. Barki Tojik OJSHC hosts the Project Implementation Unit. The Resolution of the Government On Approving the Conceptual Framework of the New Electricity Tariff Policies in the Republic of Tajikistan (Instruction of the RT President No. RP-594 of 6 October 2015) has been drafted and is currently routed for approval. An Action Plan of the End Recipient Financial Rehabilitation has been drafted and sent for approval. Project financing structure The total cost of the Nurek HPP Rehabilitation is estimated at 700 million, of which 350 million is the co-financing of Phase 1, where: Component 1 is 210 million (sources of financing: IDA, EDB); Component 2 is 30 million (sources of financing: IDA, AIIB); and Component 3 is 10 million (sources of financing: IDA, AIIB). Requested EFSD financing limit: 40 million; Currency of financing: ; Type of financing: an investment loan; Objective of EFSD financing: to replace six single-phase 500 kv / 220 kv autotransformers; Total investment loan maturity, including the grace period: 20 years; Grace period for principal repayment: 8 years; The principal debt will be repaid in line with a schedule to be developed if the Project is approved. The investment loan Recipient will ensure the EFSD Project co-financing of at least 10 million or less than 20 % of the Project cost, which makes 50 million. The Recipient will provide the cofinancing in the form of exemptions from taxes, duties, and other mandatory payments under contracts financed with the proceeds of the EFSD investment loan. The project implementation arrangement is presented in Annex No. 2 to this Concept Note State support of the Project The National Development Strategy of the Republic of Tajikistan for envisages the development of the energy sector as a priority strategic objective. Based on its Resolution No. 417 of 10 January 2016, the Government of the Republic of Tajikistan raised the electricity tariffs starting from 11 January Based on its Resolution No. 42 of 25 January 2017, the Government of the Republic of Tajikistan reduced the debt of Barki Tojik OJSHC to Sangtudin HPP-1 OJSC by TJS 12.5 million by transferring this amount to the authorised fund of Barki Tojik OJSHC as a founder. Therefore, the balance as at the beginning of 2017 amounted to TJS million, with TJS million billed, and TJS million paid, and the stock outstanding as at 1 April 2017 was TJS million (in Q1 2017, it increased by TJS million). Estimated financial and economic indicators of the Project The estimated indicators are to be updated after the terms of the loan are defined. 2

3 Project environment impact In accordance with the findings of the final Environmental and Social Impact Assessment Report (August 2016), prepared by Tractebel Engineering, the Nurek HPP Rehabilitation Project will have no impact on the environment, the local communities, or the riparian states (Afghanistan, Uzbekistan, and Turkmenistan) as the Project does not entail significant changes in the mode of operation of the existing HPP and is associated exclusively with the rehabilitation (reconstruction) and modernisation of the existing HPP equipment and infrastructure. The World Bank disseminated official letters to notify the riparian states of the Project implementation. No objections have been received. Sources of debt repayment Proceeds from electricity sales. Expected security The loan is provided to the Government of the Republic of Tajikistan under an international agreement. The Republic of Tajikistan has got no arrears associated with its external public debt repayment and service. Project Company Open joint-stock holding company Barki Tojik (Barki Tojik OJSHC). Supplier selection plans At Project implementation. Sales plans II. Project Company Details Project Company Project contacts Electricity generation and sales in the domestic and external markets. Open joint-stock holding company Barki Tojik, established and operating under the legislation of the Republic of Tajikistan. Barki Tojik OJSHC was established through reregistration of Barki Tojik SJSHC under Resolution of the RT Government No. 492 of 3 November Reregistration of the legal entity registered with the Ministry of Justice of the Republic of Tajikistan on 27 November 2008 under No (reregistered with the tax authorities on 19 April 2010). Registered office: 64 Ismoili Somoni Str., city of Dushanbe, , Republic of Tajikistan. The Government of the Republic of Tajikistan is the only shareholder of the company (100 % stake). Additional details on the Project Company are presented in Annex No. 1 to this Concept Note. Akhliddin Nuriddinzoda, Head of the Public Debt and Public Investment Mobilisation General Directorate, Ministry of Finance of the Republic of Tajikistan; Mirzo Ibrokhim Ismoilzoda, Chairman, Barki Tojik OJSHC; Ubaidullo Nazarovich Habibov, Head, Project Implementation Unit Reduction of Energy Losses, Barki Tojik OJSHC. Minister of Finance of the Republic of Tajikistan Abdusalom Karim Qurboniyon The document asserting the authority: Decree of the President of the Republic of Tajikistan No. 86 of 29 November

4 Annex No. 1 to the Concept Note of the Nurek HPP Rehabilitation Project (Phase 1). Component: Rehabilitation of three generating units, key infrastructure components of the plant, and replacement of six autotransformers. Subcomponent: Replacement of six autotransformers Overview of Project Company Open joint-stock holding company Barki Tojik (Barki Tojik OJSHC, the Project Company) is the successor of sate company Tajikenergo, which was founded in Barki Tojik OJSHC was established through reregistration of Barki Tojik SJSHC under Resolution of the Government of the Republic of Tajikistan No. 492 of 3 November 2001 (registered with the Ministry of Justice of the Republic of Tajikistan on 27 November 2008 under No , reregistered with the tax authorities on 19 April 2010). Barki Tojik OJSHC performs the following activities: production, transportation, transmission, distribution, transformation, and sale of electricity and thermal energy to enterprises, organisations, and private individuals located (residing) on the territory of the country, in accordance with the terms of licenses obtained following the procedure established by the legislation of the Republic of Tajikistan; electricity exports; buying electricity from foreign energy producers; implementation of intergovernmental agreements on the use of water and energy resources of transboundary rivers; ensuring reliable and safe operation of power facilities and grids in accordance with the established standards and rules; and mitigating environmental and social impacts associated with the construction, rehabilitation, operation, and repair of Barki Tojik OJSHC facilities. The key consumers of the company s services include Tajik Aluminium Company SUE (TALCO), Tojikcement OJSC, Tojikkhimprom OJSC, Afganistan Breshna Sherkat LLC, and households. 100 % of shares of the Project Company are held by the Government of the Republic of Tajikistan. The company s equity is TJS million. Under Resolution of the Government of the Republic of Tajikistan No. 637 of 3 October 2008, enterprises and organisations operating in the power sector were put under the management of Barki Tojik OJSHC. The holding company includes 12 branches, 14 open joint-stock companies, a representative office in the Russian Federation, a subsidiary responsible for inventory and logistics management Tajikenergosnab SILM, and Bark-Service LLC (as at December 2016). The company employs 10,917 people. The total installed capacity of the country s power plants is 5,400 MW, HPPs account for 95 % of that capacity. Nurek HPP, with its seasonal regulation reservoir, is the largest power plant with installed capacity of 3,000 MW, generating over 70 % of the country s total annual electricity output and ensuring pump irrigation of over 70,000 ha of farming land. Barki Tojik OJSHC manages 9 HPPs and 3 CHPs: 4

5 Number of No. Name Set voltage Capacity (MW) Year units commissioned (kv) (pcs) IC 1 TIC 2 OC 3 1. Vakhsh HPP Cascade , Nurek HPP , Baipazin HPP Golovnaya HPP Perepadnaya HPP Central HPP Qairokkum HPP Varzob HPP Cascade -Varzob HPP Varzob HPP Varzob HPP Combined heat and power plants (CHPs) Dushanbe CHP Dushanbe CHP Yavan CHP The fixed assets of Barki Tojik OJSHC include buildings and structures, machinery and equipment, construction in progress, and equipment for installation, and other fixed assets. The kv thermal and electric networks, hydroelectric power plants and combined heat and power plants form the electric power system of the Republic of Tajikistan. The power system of the Republic of Tajikistan is able not only to produce, transport, and distribute electricity in the domestic market, but also to export (in spring and summer), import (in the autumn and winter periods), and deal with cross-flows to neighbouring states. The main risks of the production activities of Barki Tojik OJSHC are associated with the water regime of the Syr Darya, Vakhsh and Varzob rivers and the fil rate of the HPP-operated reservoirs, timely and complete supply of fuel for the CHPs (natural gas and low-sulphur fuel oil), as well as lack of financing to support restructuring and rehabilitation and modernization programmes of the companies within the holding. The Project Company operates in accordance with the current legislation and international requirements, environmental protection and social impact mitigation standards, and agreements on the joint use and redistribution of water resources (related to the Nurek HPP Rehabilitation Project), the main of which are: domestic regulations: The Water Code that aims at regulating the water relations to ensure sustainable use of water for the needs of households, sectors of the economy, and the environment, to protect water resources from pollution, damage and depletion, to prevent and eliminate negative impacts of water, to improve the condition 1 Installed capacity of the hydroelectric units 2 Total installed capacity of the power plant 3 Operated capacity 4 Non-operational 5

6 of water bodies and protect them, to strengthen the rule of law and protect the rights of private individuals and legal entities in the field of water relations; The Forest Code that regulates relations in the field of forest management and aims at ensuring sustainable use of forest resources, protection and preservation of the natural environment, and encouragement of timber and agricultural production; The Law On Environmental Protection that establishes the legal framework for the government environmental policies and aims at sustainable development, maintaining a healthy and supportive environment, preventing negative environmental impacts, ensuring environmental safety and sustainable use of natural resources; The Law On Special Protected Areas that establishes the legal, organizational, and economic framework for protected areas, their tasks, operating procedures, and zoning; The Law On Industrial and Household Waste that regulates the relations arising in the context of waste generation, collection, storage, use, transportation, recycling, and disposal and is aimed at preventing its negative impact on the environment; The Law On Environmental Monitoring that defines the organizational, legal, economic, and social frameworks for environmental monitoring; The Law On Environmental Audit that establishes the principles and conditions for conducting environmental audits and aims at preventing negative environmental impacts of planned economic activities; The Law On Environmental Expert Review that regulates the overall procedure of organizing and performing environmental expert reviews and establishes the rights and obligations of the parties involved in the environmental expert reviews, citizens' rights to access information on environmental hazards associated with facilities at their design, construction, and commissioning, the conditions for appeal, settlement and resolution of disputes, and also establishes the liability for violation of the legislation in the field of environmental expert reviews; The Laws On Wildlife and On Flora Protection and Use that establish the principles of government policies in the field of protection and sustainable use of flora and fauna, determine the legal, economic, and social frameworks in these areas, and aim at preserving and reproducing their resources; The Law On Safety of Hydraulic Structures that regulates the relations arising in the context of activities aimed at ensuring safety at the stage of design, construction, major repair, commissioning, operation, reconstruction, rehabilitation, conservation, and liquidation of hydraulic structures and establishes the responsibilities of government bodies, owners of hydraulic structures, and their users to ensure safety of their hydraulic structures; and The Law On Special Natural Areas and Sites. key international agreements and protocols: Protocol No. 566 of 10 September 1987 on the resources of the Amu Darya River basin, signed by Kyrgyzstan, Tajikistan, Turkmenistan, and Uzbekistan with a view to limiting the use of water in the basin and regulating additional tributaries to the Aral Sea, as well as Resolution of the Council of Ministers of the USSR No adopted in accordance therewith on 19 September 1988 On Measures for Radical Improvement of Ecological and Sanitary Situation in the Region of the Aral Sea. Enhancing the Efficiency and Use to Strengthen the Protection of the Water and Land Resources in its Basin, which set the annual volume of minimum permissible environmental releases to the former Aral Sea and is accepted by these states to date; The Declaration of 12 October 1991 dealing with the observance and continuity in the distribution of water by the States of the Aral Sea basin (Kazakhstan, Kyrgyzstan, Tajikistan, Turkmenistan, and Uzbekistan), the Almaty Agreement of 18 February 1992 On Cooperation in the Field of Joint Management, Use, and Protection of Transboundary Water Sources, and the Nukus Declaration of 20 September 1995 reiterating the agreement on the joint use of the water resources in the Aral Sea basin; The UNECE Aarhus Convention (Denmark, 1998) on Access to Information, Public Participation in Decision-Making, and Access to Justice in Environmental Matters; The Ramsar Convention on Wetlands of International Importance (Iran, 1971) that aims at conservation and sustainable use of all wetlands through actions at the local and national levels and international cooperation, as a contribution to achieving worldwide sustainable development; and 6

7 The Espoo Convention on Environmental Impact Assessment in a Transboundary Context (Finland, 1991) that sets out the obligations of the parties to perform EIAs for certain activities at an early stage of planning, and the general obligations of states to notify and consult each other on all major projects that can have a significant negative environmental impact in a transboundary context. No radical changes have recently occurred in the production and technological process of electricity and heat generation. The main suppliers of electromechanical and thermal equipment are foreign companies (China, France, Russia). Operating Activities and Financial Analysis Financial metrics of Barki Tojik OJSHC: 000 TJS Item as at 31 December December December 2013 CONSOLIDATED STATEMENT OF FINANCIAL POSITION (BALANCE SHEET) ASSETS 11,555,285 10,519,833 11,144,020 Long-term (non-current) assets 10,484,943 9,209,365 9,606,701 Fixed assets 9,351,334 8,892,058 9,319,152 Intangible assets Long-term advances provided 950, , ,919 Long-term investments 182, , ,399 Other long-term assets Short-term (current) assets 1,070,342 1,310,468 1,537,319 Inventories 578, ,518 1,000,072 Trade credit and other receivables 410, , ,451 Short-term advances provided 17,794 33,892 83,499 Prepaid taxes 1,129 4,052 6,296 Cash and cash equivalents 61,661 11,007 3,001 LIABILITIES 11,555,285 10,519,833 11,144,020 Capital (62,236) 2,754,285 4,491,019 Equity 410, , ,836 Surplus reserve 24,302 24,302 24,302 Fixed asset revaluation reserve 4,803,071 5,051,949 5,781,686 Accumulated loss (5,299,629) (2,705,733) (1,698,796) Exchange rate differences (81) (69) (9) Long-term liabilities 6,171,457 3,278,884 2,693,741 Long-term loans 5,781,251 2,985, ,405 Deferred earnings long-term part 390, ,108 1,815,336 Current liabilities 5,446,064 4,486,664 3,959,260 Short-term loans 2,762,497 2,238,886 1,743,079 Deferred earnings short-term part 2,508 2,032 1,443 Trade credit and other payables 1,227,369 1,335,216 1,115,582 Advances received 75,202 56,601 35,956 Taxes payable 171, , ,099 Other 1,207, , ,101 CONSOLIDATED PROFIT AND LOSS ACCOUNT Incomes 1,548,665 1,306,015 1,251,881 Cost of production (907,143) (1,065,132) (599,635) Gross profit (loss) 641, , ,246 Cost of sales (637,184) (819,793) (621,123) General and administrative costs (119,869) (127,601) (161,329) Net loss from operations with foreign (1,991,678) (314,958) (24,132) exchange Financial income 42,

8 Financial costs (684,116) (476,669) (596,443) Other net non-operating costs (73,072) (222,813) (1,630,039) Profit (loss) before profit tax (2,821,685) (1,720,951) (2,380,820) Profit tax recovery (profit tax payment) (21,089) (15,723) 48,366 Net profit (loss) (2,842,774) (1,736,674) (2,332,454) Other total income (costs) (12) (60) 5,781,686 TOTAL NET PROFIT (LOSS) (2,842,786) (1,736,734) 3,449,232 CONSOLIDATED CASH FLOW STATEMENT OPERATING ACTIVITIES Net cash inflow (outflow) (89,064) 91,611 (100,816) Income from sales 1,563,324 1,070, ,045 Other income 14,681 26,937 22,167 Cost of sales (823,107) (309,350) (349,643) Inventory acquisition (548,152) (97,570) - Electricity acquisition (274,955) (211,780) - Salaries and wages, and social tax (248,593) (257,939) (206,168) Services (38,933) (21,106) (64,799) Interest (237,518) (116,915) (144,564) Profit tax (14,065) (20,170) (41,103) Other taxes (284,100) (253,669) (188,792) Other charges (20,753) (26,874) (55,959) INVESTMENT ACTIVITIES Net cash inflow (outflow) (83,809) (86,494) (147,153) Fixed asset acquisition (83,618) (86,367) (147,153) Intangible asset acquisition (191) (127) - FINANCIAL OPERATIONS Net cash inflow (outflow) 213,955 2, ,075 Loans 1,140, , ,314 Grants 5, Loan repayments (925,655) (275,013) (314,239) Commission fees under loans received (6,222) - - NET INCREASE (DECLINE) IN CASH 41,082 7,634 (7,894) Cash and cash equivalents as at year start 11,007 3,001 9,412 Exchange rate differences 9, ,483 Cash and cash equivalents as at year end 61,661 11,007 3,001 In 2015, the equity of the holding company increased by TJS million in line with Resolution of the RT Government of 28 November That increase was a result of a mutual offset of liabilities of Barki Tojik OJSHC to Sangtudin HPP-1 OJSC for electricity and tax liabilities of the HPP to the national budget. The long-term investments include those in construction of Sangtudin HPP-2 (40 million) and Rogun HPP (TJS 31.6 million). Trade credit and other receivables include those for heat and electricity, goods and services. As at 31 December 2015, the largest debtors were: TALCO million TJS; Agency for Land Reclamation and Irrigation (ALRI) TJS million; Afganistan Breshna Sherkat LLC TJS million; Tojikkhimprom OJSC TJS million; and Rogun HPP OJSC TJS 7.99 million. As at 31 December 2015, the loans received by the Project Company included the following: Long-term: о loan of the RT Ministry of Finance TJS 4, million; 8

9 о loan of OrienBank OJSC TJS 1, million; and о EBRD loan TJS million. Short-term: о loan of the RT Ministry of Finance TJS 1, million; о loan of OrienBank OJSC TJS million; and о EBRD loan TJS 5.79 million. A detailed presentation of the outstanding (as at 31 December 2015) debt of Barki Tojik OJSHC under the loans received from key International Financial Organisations (IFOs) is shown below: Creditor (IFO) Project Year of repayment Construction of North-South 500 kv Electricity Transmission Line 2026 million Construction of CHP-2 (Phase 2) 2039 million CNY Construction of 220 kv Lolazor-Khatlon 2026 million Power Transmission Line Agreement Current Currency Amount debt, million TJS , Construction of North-South, Lolazor million EXIMBANK Khatlon 500/220 kv High-Voltage Electricity Transmission Line Construction of 220 kv Khujand-Aini 2031 million Power Transmission Line Reconstruction of Regar Substation 2033 million Construction of Single Power Grid for the 2031 million North of Tajikistan TOTAL for EXIMBANK 4, Regional Power Transmission 2036 million Interconnection Project Nurek HPP 500 kv Switchyard 2033 million Reconstruction Power System Rehabilitation 2025 million ADR ADB Construction of Power Transmission 2031 million Interconnection ADR Baipazin Landslide Stabilisation 2033 million ADR Golovnaya 240 MW HPP Rehabilitation 2039 million Wholesale Metering and Transmission 2040 million Reinforcement TOTAL for ADB IDB Reliable Energy Supply in Rural Tajikistan 2020 million dinars Extended Tajik-Afghan Cooperation in 2031 million Energy Sector Small HPP Construction 2029 million dinars Reconstruction of Ravshan Electricity 2038 million Substation 9

10 TOTAL for IDB IDA Energy Emergency Recovery Assistance 2030 million Energy Loss Reduction 2026 million Urgent Increase of the Volume and 2028 million Reliability of the National Energy Supply, Especially in the Winter Season Energy Loss Reduction 2032 million Energy Supply in the Winter Season 2035 million TOTAL for IDA KfW Replacement of 220 kv Switchgear 2033 million Equipment at Nurek HPP EUR Construction of 220 kv Switchgear Equipment at Nurek HPP 2032 million EUR TOTAL for KfW EBRD Qairokkum HPP Rehabilitation 2029 million Sugd Energy Loss Reduction 2026 million TOTAL for EBRD TOTAL for key IFOs 6, In 2014 and 2015, the holding company acquired (and created) fixed assets using loans and grants in the amount of TJS million and TJS 1, million, respectively. As for those costs, disbursements were made directly to suppliers and contractors of Barki Tojik OJSHC, without transferring the funds to the company s accounts. The Project Company has a settlement account with the Ministry of Finance of the Republic of Tajikistan, which accumulates payments for electricity from budget organizations. These funds are used to repay the loans received from the RT Ministry of Finance. The consolidated statement of cash flows reflects transactions in this account. In 2014 and 2015, the company repaid loans from this current account for the amount of TJS million and TJS million, respectively. In accordance with the Resolution of the RT Government of 3 May 2014, Barki Tojik OJSHC performed a clearing payment of accounts receivable for electricity and tax liabilities to the state budget in the amount of TJS million. 10

11 Annex No. 2 to the Concept Note of the Nurek HPP Rehabilitation Project (Phase 1). Component: Rehabilitation of three generating units, key infrastructure components of the plant, and replacement of six autotransformers. Subcomponent: Replacement of six autotransformers Project Implementation Arrangement 11

Regional Power Transmission Interconnection Project (Afghanistan and Tajikistan)

Regional Power Transmission Interconnection Project (Afghanistan and Tajikistan) Completion Report Project Number: 40043 Loan Numbers: 2303-TAJ (SF)/8320-TAJ and 2304-AFG (SF) Grant Number: 0230-AFG June 2014 Regional Power Transmission Interconnection Project (Afghanistan and Tajikistan)

More information

OPEN JOINT STOCK HOLDING COMPANY BARQI TOJIK

OPEN JOINT STOCK HOLDING COMPANY BARQI TOJIK Public Disclosure Authorized Public Disclosure Authorized OPEN JOINT STOCK HOLDING COMPANY BARQI TOJIK Consolidated financial statements for the year ended and independent auditors report Public Disclosure

More information

OPEN JOINT STOCK HOLDING COMPANY BARQI TOJIK

OPEN JOINT STOCK HOLDING COMPANY BARQI TOJIK Public Disclosure Authorized Public Disclosure Authorized OPEN JOINT STOCK HOLDING COMPANY BARQI TOJIK Consolidated financial statements for the year ended and independent auditors report Public Disclosure

More information

Report and Recommendation of the President to the Board of Directors. Proposed Grant Republic of Tajikistan: Regional Power Transmission Project

Report and Recommendation of the President to the Board of Directors. Proposed Grant Republic of Tajikistan: Regional Power Transmission Project Report and Recommendation of the President to the Board of Directors Project Number: 43150 July 2010 Proposed Grant Republic of Tajikistan: Regional Power Transmission Project CURRENCY EQUIVALENTS (as

More information

Tajikistan: Financial Assessment of Barki Tojik

Tajikistan: Financial Assessment of Barki Tojik Public Disclosure Authorized Tajikistan: Financial Assessment of Barki Tojik Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized October 2013 Artur Kochnakyan Ani Balabanyan

More information

CASA-1000 Project List of FAQs

CASA-1000 Project List of FAQs 1. What is the objective of the project? CASA-1000 Project List of FAQs The objective of the CASA-1000 project is to provide for the export of the available summer electricity surpluses from Tajikistan

More information

Guidelines for Transboundary Environmental Impact Assessment in the Lower Mekong Basin

Guidelines for Transboundary Environmental Impact Assessment in the Lower Mekong Basin Summary note Guidelines for Transboundary Environmental Impact Assessment in the Lower Mekong Basin Final draft In an effort to communicate openly with broader stakeholders of the Mekong River Commission

More information

PROJECT PROCUREMENT RISK ASSESSMENT

PROJECT PROCUREMENT RISK ASSESSMENT PROJECT PROCUREMENT RISK ASSESSMENT Proposed Project Name: Wholesale Metering and Transmission Reinforcement Project Executing Agency: Barki Tojik (BT) Assessor: L. Mtchedlishvili, CWRD/CWEN Proposed Amount

More information

EBRD s Environmental & Social (E&S) Risk Management Procedures for Leasing Activities

EBRD s Environmental & Social (E&S) Risk Management Procedures for Leasing Activities EBRD s Environmental & Social (E&S) Risk Management Procedures for Leasing Activities Any EBRD partner Financial Intermediary (FI) must have clearly defined environmental and social management systems

More information

Afghanistan: Energy Supply Improvement Investment Program (Tranche 2)

Afghanistan: Energy Supply Improvement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 47282-004 MFF Number: 0090 November 2016 Afghanistan: Energy Supply Improvement Investment Program (Tranche 2) This document is being disclosed to the

More information

Tajikistan: Power Rehabilitation Project

Tajikistan: Power Rehabilitation Project Validation Report Reference Number: PCV: TAJ 2011-06 Project Number: 32513 Loan Number: 1817 April 2011 Tajikistan: Power Rehabilitation Project Independent Evaluation Department CURRENCY EQUIVALENTS (as

More information

OSHC "BARQI TOJIK" Preparation of Proposed Winter Energy Project Advance No. IDA Q9800-TJ

OSHC BARQI TOJIK Preparation of Proposed Winter Energy Project Advance No. IDA Q9800-TJ Public Disclosure Authorized OSHC "BARQI TOJIK" Public Disclosure Authorized Preparation of Proposed Winter Energy Project Advance No. IDA Q9800-TJ Special Purpose Project Financial Statements for the

More information

Loan Agreement. (Alma Electricity Transmission Project) between JOINT STOCK COMPANY KAZAKHSTAN ELECTRICITY GRID OPERATING COMPANY.

Loan Agreement. (Alma Electricity Transmission Project) between JOINT STOCK COMPANY KAZAKHSTAN ELECTRICITY GRID OPERATING COMPANY. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7965-KZ Public Disclosure Authorized Loan Agreement (Alma Electricity Transmission Project) Public Disclosure Authorized between JOINT STOCK COMPANY

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project Report and Recommendation of the President to the Board of Directors Project Number: 44198 May 2012 Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project CURRENCY EQUIVALENTS (as

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

LATVENERGO GROUP PRESENTATION. June, 2018

LATVENERGO GROUP PRESENTATION. June, 2018 LATVENERGO GROUP PRESENTATION June, 2018 Disclaimer This presentation and any materials distributed or made available in connection herewith (collectively, the presentation ) have been prepared by Latvenergo

More information

MUHAMMAD DAUD Ex GM Planning/Consultant Planning NTDC/ Member Pakistan Working Group for CASA For SAARC Workshop Lahore, 30th, September, 2015

MUHAMMAD DAUD Ex GM Planning/Consultant Planning NTDC/ Member Pakistan Working Group for CASA For SAARC Workshop Lahore, 30th, September, 2015 AN INTRODUCTION OF CASA- 1000 PROJECT BY MUHAMMAD DAUD Ex GM Planning/Consultant Planning NTDC/ Member Pakistan Working Group for CASA For SAARC Workshop Lahore, 30th, September, 2015 CASA-1000 PROJECT

More information

AFGHANISTAN RECONSTRUCTION TRUST FUND Naghlu Hydropower Rehabilitation Project NHRP (P132944) Project Preparation Grant (PPG) Application to ARTF Management Committee MC Meeting Date: May 7, 2013 Applicant:

More information

Latvenergo Group Unaudited Results 1H 2016

Latvenergo Group Unaudited Results 1H 2016 Investor Conference Webinar Presentation Latvenergo Group Unaudited Results 1H 216 5 September 216 Guntars Baļčūns, CFO Disclaimer This presentation and any materials distributed or made available in connection

More information

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the Tanahu Hydropower Project was carried out in accordance with Financial Management and Analysis

More information

ELECTRICITY ACT, 2005

ELECTRICITY ACT, 2005 ELECTRICITY ACT, 2005 ARRANGEMENTOF SECTIONS Section PART 1 PRELIMINARY 1. Short title 2. Interpretation 3. Objectives PART II FUNCTIONS OF THE DEPARTMENT OF STATE 4. Functions of the Department of State

More information

Form F3 Material Change Report

Form F3 Material Change Report Form 51-102F3 Material Change Report Item 1 Name and Address of Company Tethys Petroleum Limited ( Tethys or the Company ) Suite 3, Borough House Rue du Pre, Guernsey GY1 6EL Item 2 Date of Material Change

More information

Montecristo Hydroelectric Project

Montecristo Hydroelectric Project Montecristo Hydroelectric Project Answers to Clarifications Required Reference No. UNFCCC 1077 Date: August 22, 2007 2 Montecristo Hydroelectric Project Answers to Clarifications Required Reference No.

More information

LEGAL CONSULTING GROUP. Law firm

LEGAL CONSULTING GROUP. Law firm LEGAL CONSULTING GROUP Law firm The Legal Consulting Group (LCG) is a leading law firm operating in Tajikistan since 2004. LCG is the only firm in Tajikistan with experience in providing legal advice on

More information

Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No , Grant No. H679-TJ

Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No , Grant No. H679-TJ Public Disclosure Authorized Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No. 099848, Grant No. H679-TJ Financial statements Public Disclosure Authorized For the year ended 31

More information

Financing Renewable Energy Projects in Kazakhstan: Key Legal Challenges

Financing Renewable Energy Projects in Kazakhstan: Key Legal Challenges Financing Renewable Energy Projects in Kazakhstan: Key Legal Challenges Shaimerden Chikanayev (March, 2016) 25.03.2016 1 Applicable Legal Framework 1) The Law On Electric Power, No. 588-II dated 9 July

More information

Safeguards Monitoring Report

Safeguards Monitoring Report Safeguards Monitoring Report Semiannual Report Covering July-Dec 2016 period February 2017 (ESDIP) Tranche-2 Chimtala- Arghandi 220 kv DC Transmission Line Subproject (DABS - 006/ICB) Prepared by Da Afghanistan

More information

Kyrgyz Republic 2007 JOINT COUNTRY PORTFOLIO REVIEW. IDB Portfolio. Background Paper

Kyrgyz Republic 2007 JOINT COUNTRY PORTFOLIO REVIEW. IDB Portfolio. Background Paper Kyrgyz Republic 2007 JOINT COUNTRY PORTFOLIO REVIEW IDB Portfolio Background Paper Regional Office in Almaty February 2007 CONTENTS I. INTRODUCTION... 1 II. OVERALL PORTFOLIO DESCRIPTION AND PERFORMANCE...

More information

Latvenergo Group Unaudited Results 9M 2016

Latvenergo Group Unaudited Results 9M 2016 Investor Conference Webinar Presentation Latvenergo Group Unaudited Results 9M 2016 7 December 2016 Guntars Baļčūns, CFO Disclaimer This presentation and any materials distributed or made available in

More information

Latvenergo Group Unaudited Results 2016

Latvenergo Group Unaudited Results 2016 Investor Conference Webinar Presentation Latvenergo Group Unaudited Results 216 9 March 217 Guntars Baļčūns, CFO Disclaimer This presentation and any materials distributed or made available in connection

More information

LAW OF THE REPUBLIC OF TAJIKISTAN ON FREE ECONOMIC ZONES

LAW OF THE REPUBLIC OF TAJIKISTAN ON FREE ECONOMIC ZONES LAW OF THE REPUBLIC OF TAJIKISTAN ON FREE ECONOMIC ZONES The present law defines the organizational, legal, economic principles of establishment, management, operation and termination of free economic

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

Technical Cooperation s Contribution to Transition in Early Transition Countries: Evidence from Micro, Small and Medium Enterprises Lending 1

Technical Cooperation s Contribution to Transition in Early Transition Countries: Evidence from Micro, Small and Medium Enterprises Lending 1 WORKING DRAFT Technical Cooperation s Contribution to Transition in Early Transition Countries: Evidence from Micro, Small and Medium Enterprises Lending 1 Office of Chief Economist, the European Bank

More information

Unaudited Interim Condensed Consolidated Financial Statements

Unaudited Interim Condensed Consolidated Financial Statements Unaudited Interim Condensed Consolidated Financial Statements for the 9 month period ended 3 September 216 3.11.216 / RIGA Disclaimer This presentation and any materials distributed or made available in

More information

REPORT ON STATE SUPPORT TO THE KOSTOLAC THERMAL POWER PLANT AND MINING BASIN

REPORT ON STATE SUPPORT TO THE KOSTOLAC THERMAL POWER PLANT AND MINING BASIN REPORT ON STATE SUPPORT TO THE KOSTOLAC THERMAL POWER PLANT AND MINING BASIN Belgrade, June 2014 Content Context 3 Research Methodology 4 Research Findings 5 I Signing of the loan agreement (First phase

More information

First Meeting of the Regional Network of Legal and Technical Experts on Transport Facilitation Feb. 2014, Phuket, Thailand

First Meeting of the Regional Network of Legal and Technical Experts on Transport Facilitation Feb. 2014, Phuket, Thailand First Meeting of the Regional Network of Legal and Technical Experts on Transport Facilitation 10 11 Feb. 2014, Phuket, Thailand Comparative analysis of ECO Transit Transport Framework Agreement and Basic

More information

Interregional Distribution Grid (IDG) Company of North-West

Interregional Distribution Grid (IDG) Company of North-West Interregional Distribution Grid (IDG) Company of North-West Consolidated Interim Condensed Financial Statements for the nine months ended 30 September 2015 (Unaudited) Contents CONSOLIDATED CONDENSED STATEMENT

More information

Operational Programme INFRASTRUCTURE AND ENVIRONMENT The Ministry of Regional Development 20 October 2008,

Operational Programme INFRASTRUCTURE AND ENVIRONMENT The Ministry of Regional Development 20 October 2008, Operational Programme INFRASTRUCTURE AND ENVIRONMENT 2007-2013 The Ministry of Regional Development 20 October 2008, National Cohesion Strategy (NCS)/National Strategic Reference Framework (NSRF) 2007-2013

More information

Central Asia South Asia Electricity Transmission and Trade Project

Central Asia South Asia Electricity Transmission and Trade Project Central Asia South Asia Electricity Transmission and Trade Project Update on Progress and Recent Developments November 6, 2014 1 The CASA-1000 project is the most advanced initiative on regional cooperation

More information

edf financial statements Financial Statements Électricité de France at December 31, 2001

edf financial statements Financial Statements Électricité de France at December 31, 2001 edf Financial Statements Électricité de France at December 31, 2001 43 Financial Statements 43 Balance sheets assets 44 Balance sheets equity and liabilities 45 Income statements - Expenses 46 Income statements

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

Is public-private partnership a solution to the infrastructure backwardness of Tajikistan?

Is public-private partnership a solution to the infrastructure backwardness of Tajikistan? Is public-private partnership a solution to the infrastructure backwardness of Tajikistan? By Ziyodullo Parpiev, PhD Westminster International University in Tashkent ADB-ADBI-CAREC Institute Research Conference

More information

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program)

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) A. Road Sector Road Map 1. Strategic Objective 1. The strategic objective of the National Road Development

More information

Georgian National Electricity Regulatory Commission

Georgian National Electricity Regulatory Commission Georgian National Electricity Regulatory Commission Resolution # 3 1 July, 1998 Tbilisi On Approval of the Electricity Tariff Methodology, Setting Rules and Procedures. On the recent stage of the reform

More information

Tajikistan Short Form Report - May 2017

Tajikistan Short Form Report - May 2017 Sanctions FAFT AML Deficient Higher Risk Areas Medium Risk Areas None No US Dept of State Money Laundering assessment Compliance with FATF 40 + 9 Recommendations Not on EU White list equivalent jurisdictions

More information

Ekološki Sklad Republike Slovenije, Javni Sklad Environmental Fund of the Republic of Slovenia, Public Fund

Ekološki Sklad Republike Slovenije, Javni Sklad Environmental Fund of the Republic of Slovenia, Public Fund Ekološki Sklad Republike Slovenije, Javni Sklad Environmental Fund of the Republic of Slovenia, Public Fund Vesna Vidič, Assistant Director October 2007 Fund overview: The Slovenian Environmental Development

More information

Eurasian Development Bank Resources Manager of Eurasian Fund for Stabilization and Development. in the amount of US$ 25.2 million.

Eurasian Development Bank Resources Manager of Eurasian Fund for Stabilization and Development. in the amount of US$ 25.2 million. Eurasian Development Bank Resources Manager of Eurasian Fund for Stabilization and Development APPRAISAL of Preliminary Application of Republic of Armenia for Investment Loan to be provided by the Eurasian

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

RUSHYDRO GROUP. Condensed Consolidated Interim Financial Information (Unaudited) prepared in accordance with IAS 34

RUSHYDRO GROUP. Condensed Consolidated Interim Financial Information (Unaudited) prepared in accordance with IAS 34 RUSHYDRO GROUP Condensed Consolidated Interim Financial Information (Unaudited) prepared in accordance with IAS 34 As at and for the three and six months ended 2018 CONTENTS REPORT ON REVIEW Condensed

More information

Government Decree on Flood Risk Management 659/2010

Government Decree on Flood Risk Management 659/2010 Ministry of Agriculture and Forestry, Finland NB: Unofficial translation; legally binding texts are those in Finnish and Swedish. Government Decree on Flood Risk Management 659/2010 Section 1 Preliminary

More information

Water Security and Dams Rehab. Workshop

Water Security and Dams Rehab. Workshop Water Security and Dams Rehab. Workshop Dam Rehabilitation: Financial Instruments, O&M and Sustainability 19 September 2017 PRESENTATION OUTLINE The financial instruments, PPP and new instruments and approaches

More information

Latvenergo Group Unaudited Results 6 months of 2018

Latvenergo Group Unaudited Results 6 months of 2018 Latvenergo Group Unaudited Results 6 months of 2018 Investor Conference Webinar Presentation 5 September 2018 Transcript Ladies and Gentlemen, good afternoon! Welcome to Latvenergo Investor Conference

More information

Fortum Corporation Interim Report January-June 2008

Fortum Corporation Interim Report January-June 2008 Fortum Corporation Interim Report January-June 2008 Fortum Corporation Interim Report January-June 2008 17 July 2008 at 9:00 Solid first half-year results Strong performance in Power Generation Comparable

More information

Budget Performance Report

Budget Performance Report Ministry of Finance of the Republic of Tajikistan Budget Performance Report January - June 2010 Dushanbe TABLE OF CONTENTS: INTRODUCTION... 4 1 BASIC MACROECONOMIC INDICATORS... 5 2 SUMMARY OF REVENUE

More information

Tax Card 2015 with effect from 1 January 2015 Republic of Belarus KPMG LLC

Tax Card 2015 with effect from 1 January 2015 Republic of Belarus KPMG LLC Tax Card 2015 with effect from 1 January 2015 Republic of Belarus KPMG LLC BELARUSIAN STATE TAXES AND DUTIES Value Added Tax (VAT) Excise Duty Corporate Profit Tax (CPT) Withholding tax on income of foreign

More information

MINISTRY OF ENVIRONMENT LOCAL GOVERNMENT AND RURAL DEVELOPMENT

MINISTRY OF ENVIRONMENT LOCAL GOVERNMENT AND RURAL DEVELOPMENT REGISTERED No. M-302 L-7646 THE GAZETTE OF PAKISTAN EXTRAORDINARY PUBLISHED BY AUTHORITY ====================================================== ISLAMABAD, THURSDAY, JUNE 15, 2000 ======================================================

More information

ACT ON TOLL MOTORWAYS. of October 27, 1994

ACT ON TOLL MOTORWAYS. of October 27, 1994 ACT ON TOLL MOTORWAYS of October 27, 1994 General Provisions Art. 1 1. This Act defines the conditions for the preparations for the construction of toll motorways, the terms for awarding concessions and

More information

PRESENCE IN MORE THAN 250 PROFESSIONALS YEARS EXPERIENCE COUNTRIES AROUND THE WORLD CHAMBERS AND PARTNERS IFLR

PRESENCE IN MORE THAN 250 PROFESSIONALS YEARS EXPERIENCE COUNTRIES AROUND THE WORLD CHAMBERS AND PARTNERS IFLR MORE THAN 250 PROFESSIONALS PRESENCE IN 21 COUNTRIES AROUND THE WORLD CHAMBERS IFLR 1 AND PARTNERS HO S HOLEGAL 25 YEARS EXPERIENCE Our Transport team will support and guide you through rapidly changing

More information

Kazakhstan: on the wave of structural reforms. Aset Irgaliyev, PhD First Deputy Chairman Economic Research Institute

Kazakhstan: on the wave of structural reforms. Aset Irgaliyev, PhD First Deputy Chairman Economic Research Institute Kazakhstan: on the wave of structural reforms Aset Irgaliyev, PhD First Deputy Chairman Economic Research Institute September 2015 New economic reality: transformation of global economy Over the last 12

More information

Doing business in Tajikistan Commercial guide for investors

Doing business in Tajikistan Commercial guide for investors Doing business in Tajikistan 2015 Commercial guide for investors 2 3 Content Foreword 4 Country profile 6 Economic situation 10 Legal regulation of foreign investments 12 Different investment forms 17

More information

Swiss economic development cooperation with Tajikistan

Swiss economic development cooperation with Tajikistan -1- Last update: February 2005 Swiss economic development cooperation with Tajikistan 1. Transition process: an overview Tajikistan gained independence in 1991, with the breakdown of the USSR. The challenges

More information

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46)) GOVERNMENT NOTICE NO. 77 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 18(5), 45 and 46)) THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2018 1. Citation

More information

MINISTRY OF NATIONAL ECONOMY OF THE REPUBLIC OF KAZAKHSTAN INVESTMENT OPPORTUNITIES IN KAZAKHSTAN

MINISTRY OF NATIONAL ECONOMY OF THE REPUBLIC OF KAZAKHSTAN INVESTMENT OPPORTUNITIES IN KAZAKHSTAN MINISTRY OF NATIONAL ECONOMY OF THE REPUBLIC OF KAZAKHSTAN INVESTMENT OPPORTUNITIES IN KAZAKHSTAN London, 2014 Strategy Kazakhstan-2050 and Concept of entering top 30 most developed countries Kazakhstan

More information

LAW On free economic zones in the Republic of Tajikistan

LAW On free economic zones in the Republic of Tajikistan REPUBLIC OF TAJIKISTAN LAW On free economic zones in the Republic of Tajikistan Present Law determining organizational, legal and economic basis of creation and liquidation of free economic zones on the

More information

The Energy Charter Treaty and Energy Security

The Energy Charter Treaty and Energy Security The Energy Charter Treaty and Energy Security OSCE Conference Strengthening Regional Cooperation in Central Asia for Promoting Stable and Reliable Energy within Eurasia Ashgabat, 3-4 May 2010 Olga Sorokina

More information

EAP Task Force. EAP Task

EAP Task Force. EAP Task EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 15.12.2017 C(2017) 8795 final COMMISSION IMPLEMENTING DECISION of 15.12.2017 on the Annual Action Programme 2017 part II and 2018 part I in favour of Afghanistan to be financed

More information

NEWSLETTER 03/2016. NEWS OF FINANCIAL SECTOR OF TAJIKISTAN FOR THE 3 rd QUARTER OF 2016

NEWSLETTER 03/2016. NEWS OF FINANCIAL SECTOR OF TAJIKISTAN FOR THE 3 rd QUARTER OF 2016 NEWS OF FINANCIAL SECTOR OF TAJIKISTAN FOR THE 3 rd QUARTER OF 2016 ECONOMIC NEWS OF TAJIKISTAN Short macroeconomic review and banking system activity of Tajikistan for the first half of 2016 On July 25

More information

Georgian State Electrosystem JSC. Special Purpose Project Financial Statements for the year ended 31 December 2016

Georgian State Electrosystem JSC. Special Purpose Project Financial Statements for the year ended 31 December 2016 Public Disclosure Authorized Georgian State Electrosystem JSC Public Disclosure Authorized Special Purpose Project Financial Statements for the year ended 31 December 2016 Public Disclosure Authorized

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 1 of the Commission Implementing Decision on the Annual Action Programme 2015 part 2 in favour of Central Asia Action Document for the Regional coordination

More information

National Agriculture and Rural Development Plan

National Agriculture and Rural Development Plan MEASURE 2.3. DEVELOPMENT AND IMPROVEMENT OF THE RURAL INFRASTRUCTURE Rationale The development of the private economic activities and the improvement of the living conditions for the population in the

More information

Implementation Status & Results Afghanistan Technical Assistance for Water-sector Capacity Building (P112097)

Implementation Status & Results Afghanistan Technical Assistance for Water-sector Capacity Building (P112097) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Afghanistan Technical Assistance for Water-sector Capacity Building (P112097) Operation Name: Technical Assistance

More information

UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 9 MONTH PERIOD ENDING 30 SEPTEMBER 2013

UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 9 MONTH PERIOD ENDING 30 SEPTEMBER 2013 UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 9 MONTH PERIOD ENDING 30 SEPTEMBER 2013 Latvenergo Group is the most valuable company in Latvia and one among the most valuable companies

More information

Major government priority for 2008 [inflation control / stability] Government actively supporting investments into wider sectors of the economy

Major government priority for 2008 [inflation control / stability] Government actively supporting investments into wider sectors of the economy Executive summary Official KZT/USD exchange rate as at 01.02.08г. was 120.22 Economy Banking sector Major government priority for 2008 [inflation control / stability] Government actively supporting investments

More information

Tax Card January 2016 Belarus KPMG LLC. kpmg.com/by

Tax Card January 2016 Belarus KPMG LLC. kpmg.com/by Tax Card 2016 1 January 2016 Belarus KPMG LLC kpmg.com/by BELARUSIAN STATE TAXES AND DUTIES Value Added Tax (VAT) Excise Duty Corporate Profit Tax (CPT) Withholding tax on income of foreign legal entities

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Department Central Asia Country Unit Europe and Central Asia

More information

CAREC ELECTRICITY REGULATORS FORUM'S FOURTH ANNUAL MEETING September 2008 Issyk-Kul, Kyrgyz Republic PROGRAM OF ACTIVITIES

CAREC ELECTRICITY REGULATORS FORUM'S FOURTH ANNUAL MEETING September 2008 Issyk-Kul, Kyrgyz Republic PROGRAM OF ACTIVITIES CAREC ELECTRICITY REGULATORS FORUM'S FOURTH ANNUAL MEETING 15 19 September 2008 Issyk-Kul, Kyrgyz Republic PROGRAM OF ACTIVITIES Monday, 15 September 2008 (Day 1: Annual Plenary) 8:30 9:00 Registration

More information

Realizing a Central Asia-South Asia Regional Electricity Market: CASA-1000

Realizing a Central Asia-South Asia Regional Electricity Market: CASA-1000 Realizing a Central Asia-South Asia Regional Electricity Market: CASA-1000 Conference on Normalizing India-Pakistan Trade Salman Zaheer, The World Bank New Delhi, January 22, 2014 Examples of Regional

More information

Completion Report. Project Number: Loan Number: 1912 April Tajikistan: Emergency Baipaza Landslide Stabilization Project

Completion Report. Project Number: Loan Number: 1912 April Tajikistan: Emergency Baipaza Landslide Stabilization Project Completion Report Project Number: 36233 Loan Number: 1912 April 2006 Tajikistan: Emergency Baipaza Landslide Stabilization Project CURRENCY EQUIVALENTS Currency Unit somoni (TJS) At Appraisal At Project

More information

Periodic Financing Request Report. Afghanistan: Energy Supply Improvement Investment Program (Tranche 3)

Periodic Financing Request Report. Afghanistan: Energy Supply Improvement Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 47282 005 MFF Number: 0090 September 2017 Afghanistan: Energy Supply Improvement Investment Program (Tranche 3) Distribution of this document is restricted

More information

LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2787-IND LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED and ASIAN DEVELOPMENT BANK DATED 30 MARCH 2012 IND 44426 LOAN

More information

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001 Pacific Gas and Electric Company Statement of Estimated Cash Flows April 20, 2001 This document provides the latest forecast of cash flows for Pacific Gas and Electric Company (the Company ). The purpose

More information

Proposed Changes to the National Energy Board Electricity Regulations 1

Proposed Changes to the National Energy Board Electricity Regulations 1 Proposed Changes to the National Energy Board Electricity Regulations 1 SHORT TITLE 1. These Regulations may be cited as the National Energy Board Electricity Regulations. INTERPRETATION 2. In these Regulations,

More information

Investment Policy of the Kyrgyz Republic in the Framework of Integration Process

Investment Policy of the Kyrgyz Republic in the Framework of Integration Process Investment Policy of the Kyrgyz Republic in the Framework of Integration Process The Center of Economic Research The National Bank of the Kyrgyz Republic Content Macroeconomic indicators Economic achievements

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80090) ON A LOAN IN THE AMOUNT OF US$110 MILLION TO THE REPUBLIC OF UZBEKISTAN FOR THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80090) ON A LOAN IN THE AMOUNT OF US$110 MILLION TO THE REPUBLIC OF UZBEKISTAN FOR THE Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80090) ON A LOAN IN THE AMOUNT OF US$110 MILLION TO THE REPUBLIC

More information

EBRD s Environmental & Social (E&S) Risk Management Procedures for Insurance

EBRD s Environmental & Social (E&S) Risk Management Procedures for Insurance EBRD s Environmental & Social (E&S) Risk Management Procedures for Insurance Any EBRD partner Financial Intermediary (FI) must have clearly defined environmental and social management systems in place,

More information

LIETUVOS ENERGIJOS GAMYBA AB

LIETUVOS ENERGIJOS GAMYBA AB 2016 LIETUVOS ENERGIJOS GAMYBA AB COMPANY S AND FINANCIAL STATEMENS PREPARED ACCORDING TO INTERNATIONAL FINANCIAL REPORTING STANDARDS AS ADOPTED BY THE EUROPEAN UNION FOR THE YEAR 2016, PRESENTED TOGETHER

More information

Institutional reforms on improvement of investment and business climate

Institutional reforms on improvement of investment and business climate Institutional reforms on improvement of investment and business climate Chair of State Committee for Investment and State Property Management Qodir Qosim LOGO Developments goals Ensuring attractiveness

More information

1THE REPUBLIC 2 2ECONOMY 4 4INDUSTRIAL PARK 8 5THE LAND-USE MASTER PLAN 10 7BENEFITS 14 8 CONTENTS ONE-STOP OF BELARUS

1THE REPUBLIC 2 2ECONOMY 4 4INDUSTRIAL PARK 8 5THE LAND-USE MASTER PLAN 10 7BENEFITS 14 8 CONTENTS ONE-STOP OF BELARUS CONTENTS 1THE REPUBLIC 2 OF BELARUS 2ECONOMY 4 AND INDUSTRY 3 ATTRACTION 6 OF FOREIGN CAPITAL 9 ONE-STOP 10 18 STATION GUARANTEES 20 FOR INVESTORS 4INDUSTRIAL PARK 8 OVERVIEW 5THE LAND-USE MASTER PLAN

More information

PUBLIC SERVICES REGULATORY COMMISSION OF ARMENIA (PSRC)

PUBLIC SERVICES REGULATORY COMMISSION OF ARMENIA (PSRC) PUBLIC SERVICES REGULATORY COMMISSION OF ARMENIA (PSRC) THE GAS SECTOR OF ARMENIA There are two companies operating in the Armenian gas sector 1. ARMGASPROM, whose functions are importation distribution,

More information

TRANSMISSION CHARGING STATEMENT

TRANSMISSION CHARGING STATEMENT TRANSMISSION CHARGING STATEMENT 1 September 2016 1 September 2016 TABLE OF CONTENTS Page 1 Introduction... 1 2 General System Charges... 4 3 Site Specific Charges... 5 4 Connection Assets... 8 5 Least

More information

INVESTMENT OPPORTUNITIES in Central Asia Power Sector

INVESTMENT OPPORTUNITIES in Central Asia Power Sector INVESTMENT OPPORTUNITIES in Central Asia Power Sector Business Mission to Kazakhstan Almaty - Kazakhstan September 5, 2017 Pedro Robiou Senior Energy Specialist FOR DISCUSSION ONLY. The opinions expressed

More information

DOING BUSINESS IN TAJIKISTAN A GUIDE TO DOING BUSINESS IN TAJIKISTAN. September 2017 THE POWER OF BEING UNDERSTOOD AUDIT TAX CONSULTING

DOING BUSINESS IN TAJIKISTAN A GUIDE TO DOING BUSINESS IN TAJIKISTAN. September 2017 THE POWER OF BEING UNDERSTOOD AUDIT TAX CONSULTING DOING BUSINESS IN TAJIKISTAN A GUIDE TO DOING BUSINESS IN TAJIKISTAN September 2017 THE POWER OF BEING UNDERSTOOD AUDIT TAX CONSULTING FOREWORD Operating a business in another country is always a challenge.

More information

Forecast Financial Statements. New Zealand Defence Force. EXTERNAL SECTOR - INFORMATION SUPPORTING THE ESTIMATES 2013/14 B.5A Vol.

Forecast Financial Statements. New Zealand Defence Force. EXTERNAL SECTOR - INFORMATION SUPPORTING THE ESTIMATES 2013/14 B.5A Vol. Forecast Financial Statements New Zealand Defence Force EXTERNAL SECTOR - INFORMATION SUPPORTING THE ESTIMATES 2013/14 B.5A Vol.4 185 Statement of Forecast Comprehensive Income for the year ending 30 June

More information

LIETUVOS ENERGIJOS GAMYBA, AB

LIETUVOS ENERGIJOS GAMYBA, AB 2017 LIETUVOS ENERGIJOS GAMYBA, AB COMPANY'S AND CONDENSED INTERIM FINANCIAL INFORMATION FOR THE SIX-MONTH PERIOD ENDED 30 JUNE 2017 PREPARED ACCORDING TO INTERNATIONAL ACCOUNTING STANDARD 34, 'INTERIM

More information

MINISTRY OF FINANCE REPUBLIC TAJIKISTAN THE GOVENRMENT MEDIUM - TERM EXPENDITURE FRAMEWORK FOR

MINISTRY OF FINANCE REPUBLIC TAJIKISTAN THE GOVENRMENT MEDIUM - TERM EXPENDITURE FRAMEWORK FOR MINISTRY OF FINANCE REPUBLIC TAJIKISTAN THE GOVENRMENT MEDIUM - TERM EXPENDITURE FRAMEWORK FOR 2011-2013 Dushanbe - 2010 Government of the Republic of Tajikistan REGULATION Dated «30» June 2010 # 315 On

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized 69052 Tajikistan Agriculture Sector: Policy Note 3 Demand and Supply for Rural Finance Improving Access to Rural Finance The Asian Development Bank has conservatively estimated the capital investment needs

More information

AFGHANISTAN RESOURCE CORRIDOR STRATEGY AND PLAN. Executive Summary

AFGHANISTAN RESOURCE CORRIDOR STRATEGY AND PLAN. Executive Summary AFGHANISTAN RESOURCE CORRIDOR STRATEGY AND PLAN Executive Summary Afghanistan s vast endowment of natural resources remains largely undeveloped. The country s resources include copper, coal, iron ore,

More information

TNUoS Tariffs in 10 minutes March 2018

TNUoS Tariffs in 10 minutes March 2018 TNUoS s in 10 minutes March 2018 An overview of TNUoS tariffs This information paper provides an overview of National Grid s Transmission Network Use of System (TNUoS) tariffs, applicable to transmission

More information