State of Minnesota Before the Minnesota Public Utilities Commission I. INTRODUCTION

Size: px
Start display at page:

Download "State of Minnesota Before the Minnesota Public Utilities Commission I. INTRODUCTION"

Transcription

1 State of Minnesota Before the Minnesota Public Utilities Commission Beverly Jones Heydinger Phyllis Reha David Boyd J. Dennis O Brien Betsy Wergin Chair Vice Chair Commissioner Commissioner Commissioner IN THE MATTER OF THE APPLICATION FOR A CERTIFICATE OF NEED FOR THE LINE 67 STATION UPGRADE PROJECT IN THE COUNTIES OF MARSHALL, CLEARWATER, AND ITASCA, MINNESOTA DOCKET No. PL9/CN REPLY COMMENTS AND REVISED NOTICE PLAN PROPOSAL I. INTRODUCTION Enbridge Energy, Limited Partnership, a Delaware limited liability partnership ( Enbridge ), submits this Revised Notice Plan as its reply comments in the abovecaptioned docket pursuant to Minnesota Rule This revised plan responds to and incorporates the comments of the Division of Energy Resources ( DER ), submitted on July 3, Enbridge s Line 67 Station Upgrade Project ( Project ) will provide the additional pipeline capacity necessary for Enbridge to meet its shippers transportation requirements in serving secure and reliable crude oil supplies to refineries and numerous marketing hubs throughout the Midwest and beyond. The Project will allow Enbridge to increase Line 67 s annual average capacity from 450,000 barrels per day ( bpd ) to 570,000 bpd, which is a 26.67% increase in capacity. No new land acquisition or pipeline construction will be required for the Project. The Project requires a certificate of need under Minn. R because it will expand the capacity of a large petroleum pipeline in excess of 20 percent of its rated capacity. A pipeline routing permit is not required because the Project only requires installation of additional pumping units and other modifications at the Viking, Clearbrook and Deer River Station sites in Marshall, Clearwater and Itasca Counties, respectively. This equipment is considered to be associated facilities under Minn. R , Subp. 7, so the Project is exempt from the pipeline routing permit requirement under Minn. R , Subp. 1.G. 1

2 II. REVISED NOTICE PLAN Enclosed as Attachment 1a is a revised overview map which shows general location of the existing Viking, Clearbrook and Deer River Station sites in Marshall, Clearwater and Itasca Counties, Minnesota. This revised map, as requested by the DER, also shows the eastern portion of Enbridge Pipeline (North Dakota) LLC s 1 North Dakota Mainline System as it extends from North Dakota to terminate at the Enbridge Clearbrook Station and Terminal Facility in Clearwater, Minnesota. No new land acquisition will be required and no landowners will be directly affected by the Line 67 Station Upgrade Project because all work activities will be performed at the existing station sites on land owned in fee by Enbridge. The proposed notice area is defined as the abutting properties located immediately adjacent to the three station sites where all Project work activities will be performed. That is the area reasonably likely to be affected by the Project. All three of the station sites are located in rural areas, and the abutting properties are shown on the related aerial maps listed on the table below. Name of Station Location County Map No. Viking Pump Station Section 28, T-155-N, Marshall Attachment 1b R-45-W Clearbrook Pump Station Sections 28, 29 & 33, Clearwater Attachment 1c and Terminal Facility T-149-N, R-37-W Deer River Pump Station Section 22, T-58N, R- 27-W Itasca Attachment 1d Enbridge submits this Revised Notice Plan to ensure that the notices are provided to interested parties. The components of the plan are: Revised Attachment 2 Direct mail notices to abutting residents with mailing addresses in the notice area. Revised Attachment 3 Direct mail notices to local, state and federal government officials Revised Attachment 4 General notice for publication in local and state-wide newspapers Revisions to the attachments are shown in underlined text. A. Direct Mail to Landowners Minnesota Rule , Subpart 3(A) requires Enbridge to provide direct mail notice to all landowners likely to be affected by the Project. As previously stated, the Project will be performed on land owned in fee by Enbridge. In addition, no new land acquisition or pipeline construction is required for the Project. No landowners will be directly impacted. Direct mail notice is therefore only required for those abutting property owners located immediately adjacent to the pump stations included in the Project. 1 Enbridge Pipelines (North Dakota) LLC is a wholly owned subsidiary of Enbridge Energy, Limited Partnership. 2

3 The direct mail letter has been revised, as requested by the DER, to include a statement clarifying that registering to receive documents or notifications does not equate to being a full party in the certificate of need proceeding. B. Direct Mail to Mailing Address Minnesota Rule , Subpart 3(B) requires an applicant for a Certificate of Need under Chapter 7853 to provide direct mail notice (see Attachment 2) to all mailing addresses likely to be affected by the Project. Enbridge will rely on its immediate contacts with abutting property owners, county tax records or mailing lists available from the United States Post Office to create a list of mailing addresses for the defined Notice Area at the applicable station sites. The letter has also been revised to include a statement clarifying that registering to receive documents or notifications does not equate to being a full party in the certificate of need proceeding. C. Direct Mail to Local Governments. Minnesota Rule , Subpart 3(C) requires an applicant for a Certificate of Need under Chapter 7853 to provide direct mail notice to tribal governments and to the governments of towns, statutory cities, home rule charter cities, and counties whose jurisdictions are reasonably likely to be affected by the Project. The Project will not impact any tribal properties or areas of interest, thus no direct mail notice will be required for tribal governments. Direct mail notice (see Attachment 3) will be provided to the mayor, city council or town board chair, the clerks of Viking, Clearbrook, and Deer River, Minnesota, and Viking Township, Leon Township and Wildwood Township, Minnesota, county commissioners and auditors of Marshall, Clearwater, and Itasca Counties, state Senators and state Representatives and U.S. Senators and U.S. Representatives representing constituents in the public notice area as summarized in Attachment 3a. The letter has been revised to include the same clarifying statement as the direct mail letters to be sent to landowners. The DER requested that Enbridge clarify the state legislators that represent the area where the Deer River station is located. The notice plan included the correct recipients since the station is on the border between two legislative districts. The station, located just east of the City of Deer River, is within Minnesota Senate District 3 and Minnesota House District 3B. The City of Deer River, however, is located in Minnesota Senate District 4 and Minnesota House District 4A. Enbridge believes this is a source of confusion, and has added elected officials from Districts 4 and 4a to the list of recipients included with Attachment 3. The DER also recommended that Enbridge include the governmental entities listed in Minn. R , subp. 6, which governs distribution of pipeline routing permit applications. While that rule does not apply to the Project because a pipeline routing permit is not required, Enbridge does not object to providing additional notice to development 3

4 agencies or watershed districts applicable to the three pump station locations. These entities have been added to the list of recipients. D. Published Notice Minnesota Rule , Subpart 3(D) requires an applicant for a Certificate of Need under Chapter 7853 to provide a published newspaper notice to members of the public in areas reasonably likely to be affected by the Project. The notice provided in Attachment 4, along with a black-and-white version of the Project map, will be published in the newspapers identified in Attachment 4a. The revised notice includes a statement clarifying that registering to receive documents or notifications does not equate to being a full party in the certificate of need proceeding. Enbridge will also publish the notice in the Duluth News Tribune, the Cass Lake Times (Cass Lake, MN), and the Pilot Independent (Walker, MN), as recommended by the DER. E. Content of Notice Enbridge does not propose any revisions to the content of the notice beyond those noted above. F. Notice Timing Minnesota Rule , Subpart 6, requires an applicant for a Certificate of Need to implement the Notice Plan within 30 days of its approval by the Commission. Enbridge still intends to implement the Notice Plan according to the timing contemplated by the rule. III. CONCLUSION Enbridge respectfully requests that the Commission approve its Notice Plan with the revisions discussed above. Dated July 20, 2012 Respectfully Submitted: Fryberger, Buchanan, Smith & Frederick, P.A. By: /s/ John R. Gasele Kevin T. Walli, # John R. Gasele, # Minnesota Street, Suite W1260 St. Paul, MN (651) Attorneys for Enbridge Energy, Limited Partnership, a Delaware limited liability company 4

5 Project Maps enclosed with Notice Letters to Abutting Residents & Government and Local Officials Attachment 1a Attachment 1b Attachment 1c Attachment 1d Revised Project Overview Map Aerial Map of Viking Pump Station Aerial Map of Clearbrook Pump Station and Terminal Facility Aerial Map of Deer River Pump Station

6 Attachment 1a Line 67 Station Upgrade Project - Overview Map

7 Attachment 1b: Viking Pump Station in Section 28, T-155-N, R-45-W, Marshall County

8 Attachment 1c: Clearbrook Station in Section 28, 29 and 33, T-149-N, R-37-W, Clearwater County

9 Attachment 1d: Deer River Station in Section 22, T-58N, R-27-W, Itasca County

10 Attachment 2: Notice Letter to Abutting Residents Enbridge Energy, Limited Partnership Douglas B. Aller 1409 Hammond Avenue Manager, U.S. Lands & Right- of- Way Superior, WI Major Projects Month xx, 2012 RE: Notice of Certificate of Need Application for Line 67 Station Upgrade Project No New Right-of-Way or Pipeline Construction Required MN-PUC Docket No. PL9/CN Dear Resident: Enbridge Energy, Limited Partnership ( Enbridge ) is proposing to expand the capacity of its Line 67 Pipeline as part of its ongoing efforts to meet North America s needs for reliable and secure transportation of petroleum energy supplies. The project, known as the Line 67 Station Upgrade Project ( Project ), will increase the annual average capacity of Line 67 from 450,000 barrels per day ( bpd ) to 570,000 bpd, providing Enbridge with the ability to deliver an incremental 120,000 barrels per day of secure and reliable crude oil supplies to refineries and numerous marketing hubs throughout the Midwest and beyond. Those refineries, in turn, supply the transportation fuels, heating oil, asphalt, jet fuel, petrochemicals and petrochemical feed stocks needed for our homes, industry, and transportation. The Project involves the installation of new pumping units, including all valves and appurtenances, and other minor station modification work at Enbridge s Viking, Clearbrook and Deer River Pump Station sites, which are located in Marshall, Clearwater and Itasca Counties, Minnesota. The Project will not require the acquisition of new land or require pipeline construction outside the pump stations. All work will be performed within the footprint of Enbridge s pump stations. A Project Overview Map is provided as Attachment 1a. Pending regulatory approval by the Minnesota Public Utilities Commission ( MPUC ), the Project would be in service by July 1, The additional capacity will help relieve capacity constraints on Enbridge s Mainline System and provide refineries access to secure and reliable crude oil supplies from western Canada, Montana and North Dakota, as supplies from these prolific production areas are continuing to rise.

11 Line 67 Station Upgrade Project Page 2 You are receiving this letter because you own property located immediately adjacent to one of the pump stations where the Project work will be performed and are therefore in the notice area. The following attached aerial maps show your property in relation to the pump stations involved in this Project. Name of Station Location County Map No. Viking Pump Station Section 28, T-155-N, Marshall Attachment 1b R-45-W Clearbrook Pump Station Sections 28, 29 & 33, Clearwater Attachment 1c and Terminal Facility T-149-N, R-37-W Deer River Pump Station Section 22, T-58N, R- 27-W Itasca Attachment 1d The purpose of this letter is to notify you of Enbridge s project plans and provide details on how you can participate in the MPUC s regulatory review process. A similar notice is being mailed to elected officials and community leaders within the project area. Enbridge has filed a certificate of need application with the MPUC for review and approval. To view a copy of the application, visit the MPUC s website at choose the Search E-Dockets link, select 12 from the first Docket Number dropdown box and enter 590 in the second box. The MPUC must certify that the Project is needed before Enbridge can construct the Line 67 Station Upgrade Project. The application process is governed by Minnesota Law, including Chapter 7853 of the Minnesota Rules and Chapter 216 of the Minnesota Statutes. To receive information from the MPUC regarding the Certificate of Need proceedings for the proposed Line 67 Station Upgrade Project, you may: Request to have your name added to the Line 67 Station Upgrade Project Certificate of Need mailing list to receive official mailings related to this Certificate of Need filing. Please send your request by mail, fax or to the attention of [insert Staff name] at the Minnesota Public Utilities Commission, th Place E., Suite 350, St. Paul, MN 55101, Fax: or [insert Staff ]. Register to receive notifications each time new information is filed within a corresponding docket by subscribing via the Commission s edocketing system. To subscribe, visit the MPUC s website at and click on the Subscribe to a Docket button, enter your address and select Docket Number from the Type of Subscription: drop-down box. Then select 12 from the first Docket Number dropdown box and enter 590 in the second box before clicking on the Add to List button. You must then click the Save button at the bottom of the page to confirm your subscription to the Line 67 Station Upgrade Project Docket.

12 Line 67 Station Upgrade Project Page 3 Requesting to have your name added to the Line 67 Station Upgrade Project Certificate of Need mailing list or registering to receive notifications will not make you a party to the certificate of need proceeding. For more information, you may also:contact MPUC staff directly using the information below. Minnesota Public Utilities Commission th Place E., Suite 350 St. Paul, Minnesota Contact Enbridge for more information about our proposed Line 67 Station Upgrade Project, please visit our project website at or call us toll free at , or us at Line67UpgradeProject@enbridge.com We value our relationship with you, and we look forward to addressing any questions you may have about our Project plans. Sincerely, Douglas B. Aller Manager, U.S. Lands & Right-of-Way Major Projects

13 Attachment 3: Notice Letter to Local & State Government Officials Enbridge Energy, Limited Partnership Lorraine Little 1409 Hammond Avenue Sr. Manager, U.S. Public Affairs Superior, WI Liquid Operations & Projects Month xx, 2012 RE: Notice of Certificate of Need Application for Line 67 Station Upgrade Project No New Right-of-Way or Pipeline Construction Required MN-PUC Docket No. PL9/CN Dear Elected Official/Community Leader: Enbridge Energy, Limited Partnership ( Enbridge ) is proposing to expand the capacity of its Line 67 Pipeline as part of its ongoing efforts to meet North America s needs for reliable and secure transportation of petroleum energy supplies. The project, known as the Line 67 Station Upgrade Project ( Project ), would increase the annual average capacity of Line 67 from 450,000 barrels per day ( bpd ) to 570,000 bpd, providing Enbridge with the ability to deliver an incremental 120,000 barrels per day of secure and reliable crude oil supplies to refineries and numerous marketing hubs throughout the Midwest and beyond. Those refineries, in turn, supply transportation fuels, heating oil, asphalt, jet fuel, petrochemicals and petrochemical feed stocks needed in our homes, industry, and transportation. The Project involves the installation of new pumping units, including all valves and appurtenances, and other minor station modification work at Enbridge s Viking, Clearbrook and Deer River Pump Station sites, which are located in Marshall, Clearwater and Itasca Counties, Minnesota. The Project will not require the acquisition of new land or require pipeline construction outside the pump stations. All work will be performed within the footprint of Enbridge s pump stations. A Project Overview Map is provided as Attachment 1a. Pending regulatory approval by the Minnesota Public Utilities Commission ( MPUC ), the Project would be in-service by the July 1, The additional capacity will help relieve capacity constraints on Enbridge s Mainline System and provide refineries access to crude oil supplies from western Canada, Montana and North Dakota, as supplies from these prolific production areas are continuing to rise.

14 Line 67 Station Upgrade Project Page 2 You are receiving this letter because you are an elected official, government agency representative, or community leader who has jurisdiction within the notice area. The notice area is defined as abutting property which is located immediately adjacent to Enbridge s pumping station sites where Project work will be performed. Please see the following attached aerial map which depicts abutting properties in your local area. Name of Station Location County Map No. Viking Pump Station Section 28, T-155-N, Marshall Attachment 1b R-45-W Clearbrook Pump Station Sections 28, 29 & 33, Clearwater Attachment 1c and Terminal Facility T-149-N, R-37-W Deer River Pump Station Section 22, T-58N, R- 27-W Itasca Attachment 1d The purpose of this letter is to notify you of Enbridge s Project plans and provide details on how you can participate in the MPUC s regulatory review process. A similar notice is being mailed to residents and abutting property owners who own land located immediately adjacent to Enbridge s pumping stations area where Project work will be performed. Enbridge has filed a certificate of need application with the MPUC for review and approval. To view a copy of the application, visit the MPUC s website at choose the Search E-Dockets link, select 12 from the first Docket Number dropdown box and enter 590 in the second box. The MPUC must certify that the Project is needed before Enbridge can construct the Project. The application process is governed by Minnesota Law, including Chapter 7853 of the Minnesota Rules and Chapter 216B of the Minnesota Statutes. To receive information from the MPUC regarding the Certificate of Need proceedings for the proposed Line 67 Station Upgrade Project, you may: Request to have your name added to the Line 67 Station Upgrade Project Certificate of Need mailing list to receive official mailings related to this Certificate of Need filing. Please send your request by mail, fax or to the attention of [insert name] at the Minnesota Public Utilities Commission, th Place E., Suite 350, St. Paul, MN 55101, Fax: or [insert mail]. Register to receive notifications each time new information is filed within a corresponding docket by subscribing via the Commission s edocketing system. To subscribe, visit the MPUC s website at and click on Subscribe to a Docket button, enter your address and select Docket Number from the Type of Subscription drop-down box. Then select 12 from the first Docket Number dropdown box and enter 590 in the second box before clicking on the Add to List button. You must then click the Save button at the bottom of the page to confirm your subscription to the Line 67 Station Upgrade Project Docket.

15 Line 67 Station Upgrade Project Page 3 Requesting to have your name added to the Line 67 Station Upgrade Project Certificate of Need mailing list or registering to receive notifications will not make you a party to the certificate of need proceeding. For more information, you may also: Contact MPUC staff directly using the information below. Minnesota Public Utilities Commission th Place E., Suite 350 St. Paul, Minnesota Contact Enbridge for more information about our proposed Line 67 Station Upgrade Project, please visit our project website at or call us toll free at or us at Line67UpgradeProject@enbridge.com. We value our relationship with you, and we look forward to addressing any questions you may have about our Project plans. Sincerely, Lorraine Little Senior Manager, U.S. Public Affairs, Liquids Operations & Projects

16 Attachment 3a: List of local government officials Cities City Clerk Mayor and City Council Chair Viking Laurie Ranum Michael Hestkeind Clearbrook Pamela Bodensteiner Mike Gibeau Deer River Victor R. William John O Brien Townships Township Clerk Township Board Chair Viking Township Suzan Larson Ken Krohn (Marshall) Leon Township (Clearwater) Lori Larson James Aakre Wildwood Township Darlene Vobejda Linda Winkler (Itasca) Counties County Commissioners County Auditor Marshall LeRoy Vonasek (Chair) Curtis Carlson Kenneth Borowicz Sharon Bring Gary Kiesow Scott Peters Clearwater Itasca John Nelson (Chair) Duane Hayes John Chevalier Dean Newland Daniel Stenseng Catherine McLynn (Chair) Davin Tinquist Leo Trunt Rusty Eichorn Mark Mandich Allen Paulson Jeff Walker State State Senators State Representatives Minnesota LeRoy Stumpf (Marshall) Rod Skoe (Clearwater) Tom Saxhaug (Itasca, 3) John Carlson (Itasca, 4) Debra Kiel (Marshall) David Hancock (Clearwater) Carolyn McElfatrick (Itasca, 3B) John Persell (Itasca, 4A) Federal U.S. Senators U.S.Representatives United States Sen. Amy Klobuchar Rep. Collin Peterson Sen. Al Franken Rep. Chip Cravaack

17 Notification to Agencies Name of Agency Address Contact Name Federal U.S. Army Corps of Engineers US Fish and Wildlife Service Twin Cities Field Office East Gull Lake Drive NW Brainerd, MN American Boulevard East Bloomington, MN Craig Jarnot Nick Rowse, Biologist State State Historic Preservation Office Minnesota Historical Society Minnesota Pollution Control Agency Endangered Species Review Coordinator Division of Ecological and Water Resources, Minnesota DNR Northwest Regional Development Commission Headwaters Regional Development Commission Arrowhead Regional Development Commission Middle-Snake-Tamarac Rivers Watershed District Red Lake Watershed District Marshall County Soil and Water Conservation District Clearwater County Soil and Water Conservation District Itasca County Soil and Water Conservation District 345 Kellogg Blvd. W. St. Paul, MN Lafayette Road St. Paul, MN Lafayette Road, Box 25 St Paul, MN South Main Avenue Warren, MN th St NW # 310 Bemidji, MN West First Street Duluth, MN N McKinley St PO Box 154 Warren, MN Pennington Avenue South in Thief River Falls, Minnesota, PO Box 74, Warren, MN Main Ave N Ste 3, Bagley, MN E Hwy 2, Grand Rapids, MN Barbara Mitchell Howard, Deputy State Historic Preservation Officer Lawrence Zdon; Kevin Molloy; & Deborah Idzorek Lisa Joyal Leon Heath Cliff Tweedale Pat Henderson Nick Drees Myron Jesme Danny Thorstad Kathy Rasch Jim Gustafson

18 Attachment 4 NOTICE Certificate of Need Application for the Line 67 Station Upgrade Project in Marshall, Clearwater and Itasca Counties, Minnesota NO NEW LAND ACQUISITION OR PIPELINE CONSTRUCTION REQUIRED Enbridge Energy, Limited Partnership ( Enbridge ), a Delaware limited liability partnership and wholly owned subsidiary of Enbridge Energy Partners, L.P., is proposing to make certain upgrades and station modifications at existing pumping station sites, in order to expand the capacity of its Line 67 Pipeline by the anticipated in-service date of July 1, Under the scope of the project, known as the Line 67 Station Upgrade Project ( Project ), Enbridge plans to install new pumping units, including all valves and appurtenances, and make certain station modifications at its Viking, Clearbrook and Deer River Station sites, which are located in Marshall, Clearwater and Itasca Counties, Minnesota. Those upgrades allow Enbridge to increase Line 67 s annual average capacity from 450,000 barrels per day ( bpd ) to 570,000 bpd. This notice is intended to provide notice of the Line 67 Station Upgrade Project details and information on how you can participate in the Minnesota regulatory process. All of the station facilities associated with this Project will be installed within the existing station sites on land for which Enbridge owns in fee. No new land acquisition or pipeline construction will be required for the planned Project. The Line 67 Station Upgrade Project will provide the additional pipeline transportation capacity needed by shippers to deliver secure and reliable crude oil supplies to refineries and numerous marketing hubs throughout the Midwest and beyond. Those refineries, in turn, supply the transportation fuels, heating oil, asphalt, jet fuel, petrochemicals and petrochemical feed stocks needed for our homes, industry, and transportation. The Project is part of Enbridge s ongoing efforts to meet North America s needs for reliable and secure transportation of petroleum energy supplies, and is in the public interest. The Project will require a Certificate of Need from the Minnesota Public Utilities Commission ( Commission ). The certification process is governed by Minnesota Law, including Section 216B.243 of Minnesota Statutes and Chapter 7853 of Minnesota Rules. In the Certificate of Need proceeding, the Commission will analyze whether Enbridge has proposed the most appropriate size, type, and timing for the Line 67 Station Upgrade Project. A copy of the Certificate of Need application can be obtained by visiting the Commission s website at choosing the Search E-Dockets link, selecting 12 from the first Docket Number dropdown box and entering 590 in the second box. To subscribe to the Line 67 Station Upgrade Project Docket and receive notifications when information is filed that is related to the Certificate of Need for the Line 67 Station Upgrade Project, please visit and click on the Subscribe to a Docket button. Next, enter your address and select Docket Number from the Type of Subscription dropdown box, then select 12 from the first Docket Number dropdown box and enter 590 in the second box before clicking on the Add to List button. You must then click the Save button at the bottom of the page to confirm your subscription to the Line 67 Station Upgrade Project Docket.

19 Please visit for more information on the Line 67 Station Upgrade Project. If you have any questions about the process, you may contact the Minnesota regulatory staff listed below: Minnesota Public Utilities Commission th Place East, Suite 350 St. Paul, Minnesota If you would like to have your name added to the Line 67 Station Upgrade Project Certificate of Need mailing list (MPUC Docket PL9/CN ), mail, fax, or [insert Staff name] at Minnesota Public Utilities Commission, th Place East, suite 350, St. Paul MN , Fax: or [insert Staff address]. Requesting to have your name added to the Line 67 Station Upgrade Project Certificate of Need mailing list or registering to receive notifications will not make you a party to the certificate of need proceeding. Questions you may have for Enbridge may also be directed to: Lorraine Little Sr. Manager, U.S. Public Affairs, Liquids Operations & Projects 1409 Hammond Avenue Superior, WI

20 Attachment 4a: List of local and state-wide newspapers Local Newspapers Marshall County Itasca County Clearwater County Stephen Messenger* Warren Sheaf Western Itasca-Review Grand Rapids Herald Review* Farmer s Independent* Leader-Record Cass County Regional Newspapers Minnesota Cass Lake Times (Cass Lake, MN) Pilot Independent (Walker, MN)* Grand Forks Herald Bemidji Pioneer Duluth News Tribune State-Wide Newspapers Minnesota Star Tribune Pioneer Press *Denotes county newspaper of record M:\DOCS\12554\000374\PLD\SH7069.DOCX

January 9, Dear Judge Lipman:

January 9, Dear Judge Lipman: January 9, 2014 The Honorable Eric L. Lipman Administrative Law Judge Office of Administrative Hearings 600 North Robert Street Minnesota 55101 Re: Petition to Intervene In the Matter of the Application

More information

FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION 121 Seventh Place East, Suite 350 St Paul, MN

FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION 121 Seventh Place East, Suite 350 St Paul, MN FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION 121 Seventh Place East, Suite 350 St Paul, MN 55101-2147 Nancy Lange Dan Lipschultz Matt Schuerger John Tuma Katie Sieben Chair In the Matter of the Application

More information

Application for a Certificate of Need for a Crude Oil Pipeline

Application for a Certificate of Need for a Crude Oil Pipeline Before the Minnesota Public Utilities Commission Docket No. PL-9/CN-13-153 Application for a Certificate of Need for a Crude Oil Pipeline Docket No. PL-9/CN-13-153 BEFORE THE MINNESOTA PUBLIC UTILITIES

More information

The Commission met on Thursday, April 25, 2013, with Chair Heydinger and Commissioners Boyd, Lange, O Brien, and Wergin present.

The Commission met on Thursday, April 25, 2013, with Chair Heydinger and Commissioners Boyd, Lange, O Brien, and Wergin present. The Commission met on Thursday, April 25, 2013, with Chair Heydinger and Commissioners Boyd, Lange, O Brien, and Wergin present. The following matters were taken up by the Commission: ENERGY AGENDA E-015/S-13-126

More information

September 1, 2016 VIA ELECTRONIC FILING

September 1, 2016 VIA ELECTRONIC FILING September 1, 2016 VIA ELECTRONIC FILING Mr. Daniel P. Wolf Executive Secretary Minnesota Public Utilities Commission 121 Seventh Place East, Suite 350 Saint Paul, MN 55101-2147 Honorable James LaFave Office

More information

Application for a Certificate of Need for a Crude Oil Pipeline

Application for a Certificate of Need for a Crude Oil Pipeline Before the Minnesota Public Utilities Commission Docket No. PL-9/CN-12-590 Application for a Certificate of Need for a Crude Oil Pipeline Docket No. PL-9/CN-12-590 BEFORE THE MINNESOTA PUBLIC UTILITIES

More information

This filing contains the rebuttal testimonies of Michael Palmer and Art Haskins.

This filing contains the rebuttal testimonies of Michael Palmer and Art Haskins. Document ID: 20151-105922 This is the rebuttal testimony of John Glanzer and Robert Steede. The purpose of Mr. Glanzer s testimony is to: 1) provide NDPC s analysis regarding the additional costs, facilities,

More information

NORTH DAKOTA PIPELINE COMPANY LLC

NORTH DAKOTA PIPELINE COMPANY LLC NDPSC No. 37 Cancels NDPSC No. 36 Cancels FERC No. 3.25. FERC ICA Oil Tariff NORTH DAKOTA PIPELINE COMPANY LLC LOCAL PROPORTIONAL TARIFF S APPLYING ON THE TRANSPORTATION OF CRUDE PETROLEUM POINTS IN MONTANA

More information

Enbridge Energy, Limited Partnership and Enbridge Pipelines (Southern Lights) L.L.C. Routing Permit for a Crude Oil Pipeline. Alberta Clipper Project

Enbridge Energy, Limited Partnership and Enbridge Pipelines (Southern Lights) L.L.C. Routing Permit for a Crude Oil Pipeline. Alberta Clipper Project Routing Permit for a Crude Oil Pipeline Alberta Clipper Project MPUC Docket No. PL9/PPL-07-361 November 18, 2009 Docket No. PL9/PPL-07-361 November 18, 2009 REVISED Mile Post 893 Deviation Request Enbridge

More information

NORTH DAKOTA PIPELINE COMPANY LLC

NORTH DAKOTA PIPELINE COMPANY LLC NDPSC No. 3 Cancels NDPSC No. 30 Cancels FERC No. 3.20.0 FERC ICA Oil Tariff NORTH DAKOTA PIPELINE COMPANY LLC LOCAL PROPORTIONAL TARIFF S APPLYING ON THE TRANSPORTATION OF CRUDE PETROLEUM POINTS IN MONTANA

More information

RE: APPROVAL OF COOPERATIVE AGREEMENT WITH ITASCA WATER LEGACY PARTNERSHIP, INC.

RE: APPROVAL OF COOPERATIVE AGREEMENT WITH ITASCA WATER LEGACY PARTNERSHIP, INC. RE: APPROVAL OF COOPERATIVE AGREEMENT WITH ITASCA WATER LEGACY PARTNERSHIP, INC. WHEREAS, Itasca County is currently estimated to receive $256,336.00 for the current year 2014 and $569,636.00 for the year

More information

Tar Sands US Infrastructure Development

Tar Sands US Infrastructure Development Plains Justice Environmental Justice for the Great Plains Tar Sands US Infrastructure Development Paul Blackburn, J.D. Staff Attorney, Plains Justice 100 First Street Southwest Cedar Rapids, IA 52404 Tel.

More information

Dr. Burl W. Haar Minnesota Public Utilities Commission 121 East Seventh Place, Suite 350 St. Paul, MN

Dr. Burl W. Haar Minnesota Public Utilities Commission 121 East Seventh Place, Suite 350 St. Paul, MN 150 SOUTH FIFTH STREET SUITE 2300 MINNEAPOLIS, MINNESOTA 55402 612-335-1500 MAIN 612-335-1657 FAX 612-335-7116 (DIRECT) MATTHEW.SELTZER@LEONARD.COM Dr. Burl W. Haar Minnesota Public Utilities Commission

More information

NORTH DAKOTA PIPELINE COMPANY LLC

NORTH DAKOTA PIPELINE COMPANY LLC NDPSC No. 25 Cancels NDPSC No. 22 Cancels FERC No. 3.5. FERC ICA Oil Tariff Notice of [N] Extension of Temporary Embargo NORTH DAKOTA PIPELINE COMPANY LLC LOCAL PROPORTIONAL TARIFF S APPLYING ON THE TRANSPORTATION

More information

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION Beverly Jones Heydinger Nancy Lange Dan Lipschultz John A. Tuma Betsy Wergin Chair Commissioner Commissioner Commissioner Commissioner In the Matter of

More information

The Commission met on Thursday, December 9, 2010, with Commissioners Boyd, O Brien, Pugh, Reha, and Wergin present. TELECOMMUNICATIONS AGENDA

The Commission met on Thursday, December 9, 2010, with Commissioners Boyd, O Brien, Pugh, Reha, and Wergin present. TELECOMMUNICATIONS AGENDA The Commission met on Thursday, December 9, 2010, with Commissioners Boyd, O Brien, Pugh, Reha, and Wergin present. The following matters were taken up by the Commission: TELECOMMUNICATIONS AGENDA P-442/M-10-1071

More information

APPROVAL OF CUSTOMER NOTICE Issued: September 20, 2017

APPROVAL OF CUSTOMER NOTICE Issued: September 20, 2017 Daniel P. Wolf, Executive Secretary APPROVAL OF CUSTOMER NOTICE Issued: September 20, 2017 In the Matter of Application by CenterPoint Energy Resources Corporation, d/b/a CenterPoint Energy Minnesota Gas

More information

Minnesota Wetland Conservation Act Notice of Decision

Minnesota Wetland Conservation Act Notice of Decision Minnesota Wetland Conservation Act Notice of Decision Local Government Unit (LGU) Bassett Creek Watershed Management Commission (BCWMC) Address 7800 Golden Valley Road Golden Valley, MN 55427 Applicant

More information

VIA E-MACS FILING. December 19, 2018

VIA E-MACS FILING. December 19, 2018 VIA E-MACS FILING December 19, 2018 Ms. AnnMarie O'Neill Clerk of Appellate Courts 305 Minnesota Judicial Center 25 Rev. Dr. Martin Luther King, Jr. Blvd. St. Paul, MN 55155 Re: Red Lake Band of Chippewa

More information

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul MN 55101

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul MN 55101 BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 00 North Robert Street St. Paul MN 1 FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION th Place East, Suite 0 St Paul MN 1-1 IN THE MATTER OF THE APPLICATION

More information

Minnesota Wetland Conservation Act Notice of Application

Minnesota Wetland Conservation Act Notice of Application Minnesota Wetland Conservation Act Notice of Application Local Government Unit (LGU) City of Eagan Address 3501 Coachman Pt Eagan, MN 55122 1. PROJECT INFORMATION Applicant Name Project Name Union Pacific

More information

Greater Minnesota Housing Fund & Minnesota Equity Fund Annual Report

Greater Minnesota Housing Fund & Minnesota Equity Fund Annual Report Greater Minnesota Housing Fund & Minnesota Equity Fund 2012 Annual Report Letter to the Community Dear Friends, The Greater Minnesota Housing Fund worked hard in 2012 to put our mission into action, with

More information

**COMMENTS RECEIVED AFTER DEADLINE**

**COMMENTS RECEIVED AFTER DEADLINE** .,.- STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION Date: December 21,2009 Public Comments Received by the Public Utilities Commission for week ending: 12-18-09 Docket Number: 09-178 **COMMENTS RECEIVED

More information

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION Beverly Jones Heydinger Dr. David C. Boyd Nancy Lange Dan Lipschultz Betsy Wergin Chair Commissioner Commissioner Commissioner Commissioner In the Matter

More information

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan US Army Corps of Engineers Detroit District Public Notice Applicant: Enbridge Pipelines (Lakehead), LLC In Reply Refer To: Corps File No. LRE-2010-00463-56-N18 Date: January 29, 2019 Expires: February

More information

The Section 10/404 permit application contains additional project details and a list of attachments that include:

The Section 10/404 permit application contains additional project details and a list of attachments that include: Public Notice APPLICANT: Enbridge Energy, Limited Partnership ISSUED: 20 DEC 2018 EXPIRES: 21 JAN 2019 REFER TO: 2014-01071-TJH SECTION: 404 - Clean Water Act SECTION: 10 - Rivers and Harbors Act SECTION:

More information

Thank you for your attention to this filing. Please do not hesitate to contact me with any questions or concerns.

Thank you for your attention to this filing. Please do not hesitate to contact me with any questions or concerns. Brian M. Meloy 612.335.1451 DIRECT brian.meloy@stinson.com January 23, 2018 Via Electronic Filing The Honorable Ann C. O Reilly Minnesota Office of Administrative Hearings 600 North Robert Street P.O.

More information

REIMBURSEMENT OF EXPENSES

REIMBURSEMENT OF EXPENSES Reimbursement of Expenses Itasca County recognizes that in the course of conducting business, there are associated business expenses. Employees and elected officials are expected to be cost conscious and

More information

Minnesota Wetland Conservation Act Notice of Decision

Minnesota Wetland Conservation Act Notice of Decision Local Government Unit (LGU) City of Crystal Minnesota Wetland Conservation Act Notice of Decision Address 4141 Douglas Drive N Crystal, MN 55422 Applicant Name Paulita LaPlante, PAC Properties, LLC Attach

More information

PERA phrase. The. Contribution Rate Increases On PERA's Legislative Agenda. 1st Quarter 2005 Published February 2005.

PERA phrase. The. Contribution Rate Increases On PERA's Legislative Agenda. 1st Quarter 2005 Published February 2005. The PERA phrase The employer newsletter of the Minnesota Public Employees Retirement Association 1st Quarter 2005 Published February 2005 In this issue: 1 Legislative Agenda 2 Finding ERIS Functions 3

More information

If you have any questions regarding this report, please contact Emily Engel, DNR Budget Director, at

If you have any questions regarding this report, please contact Emily Engel, DNR Budget Director, at This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp August 15, 2017 The

More information

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Ellen Anderson. J. Dennis O Brien Commissioner

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Ellen Anderson. J. Dennis O Brien Commissioner STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION Ellen Anderson Chair David Boyd Commissioner J. Dennis O Brien Commissioner Phyllis Reha Commissioner Betsy Wergin Commissioner Review

More information

STATE OF MINNESOTA Office of the State Auditor

STATE OF MINNESOTA Office of the State Auditor STATE OF MINNESOTA Office of the State Auditor Patricia Anderson State Auditor NORTHERN COUNTIES LAND USE COORDINATING BOARD DULUTH, MINNESOTA YEARS ENDED DECEMBER 31, 2003 AND 2004 Description of the

More information

Northwest Minnesota Economic and Business Conditions Report First Quarter 2016

Northwest Minnesota Economic and Business Conditions Report First Quarter 2016 Northwest Minnesota Economic and Business Conditions Report First Quarter This issue is part of a series for the six planning areas of Minnesota The Northwest Minnesota Planning Area consists of 26 counties:

More information

The Bison Pipeline Project. Public Disclosure Document

The Bison Pipeline Project. Public Disclosure Document The Bison Pipeline Project Public Disclosure Document Who is involved with the Bison project? Bison Pipeline Ltd. (Bison Pipeline), a wholly owned subsidiary of BC Gas Inc., has released a public disclosure

More information

Protecting the Common Waters of the Great Lakes Basin Through Public Trust Solutions

Protecting the Common Waters of the Great Lakes Basin Through Public Trust Solutions Protecting the Common Waters of the Great Lakes Basin Through Public Trust Solutions December 3, 2018 Mr. Scott Rasmusson Michigan Department of Environmental Quality Water Resources Division Gaylord Field

More information

141 FERC 61,056 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

141 FERC 61,056 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 141 FERC 61,056 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony T. Clark. Kinder

More information

May 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C May 8, 2017 Great Lakes Gas Transmission Company 700 Louisiana Street Houston, TX 77002-2700 John A. Roscher Director, Rates & Regulatory Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

All rates in Item 200 have been increased by the F.E.R.C. Annual Index of %.

All rates in Item 200 have been increased by the F.E.R.C. Annual Index of %. May 25, 2017 Transmittal Letter No. 34 Kim Christiansen, Executive Director Kansas Corporation Commission 1500 S.W. Arrowhead Road Topeka, KS 66604-4027 Dear Ms. Christiansen, Magellan Pipeline Company,

More information

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION Beverly Jones Heydinger Nancy Lange Dan Lipschultz John A. Tuma Betsy Wergin Chair Commissioner Commissioner Commissioner Commissioner In the Matter of

More information

DEPARTMENT OF STATE RECORD OF DECISION AND NATIONAL INTEREST DETERMINATION

DEPARTMENT OF STATE RECORD OF DECISION AND NATIONAL INTEREST DETERMINATION DEPARTMENT OF STATE RECORD OF DECISION AND NATIONAL INTEREST DETERMINATION Enbridge Energy, Limited Partnership - Alberta Clipper Pipeline Application for Presidential Permit Contents 1.0 Summary 2.0 Introduction

More information

George Casey U.S. Army Corps of Engineers, New York District 26 Federal Plaza New York, New York June 2017

George Casey U.S. Army Corps of Engineers, New York District 26 Federal Plaza New York, New York June 2017 The Wetland Trust, 4729 State Route 414, Burdett, NY 14818 607-765-4780 www.thewetlandtrust.org Peter J. Krakowiak U.S. Army Corps of Engineers, Buffalo District Biologist, Regulatory Branch 1776 Niagara

More information

Local Sales and Use Taxes 164

Local Sales and Use Taxes 164 Local es 164 Sales Tax Fact Sheet 164 Fact Sheet What s New in 2017 Starting January 1, 2018: East Grand Forks will have a 1.0 percent Fergus Falls will have a 0.5 percent Garrison, Kathio, West Mille

More information

Inver Grove Heights. Watershed Management Organization 2015 Annual Activity Report

Inver Grove Heights. Watershed Management Organization 2015 Annual Activity Report Eagan Inver Grove Heights Watershed Management Organization Annual Activity Report This annual activity report by the Eagan Inver Grove Heights Watershed Management Organization (E-IGHWMO) is for activities

More information

Minnesota Section 404 Assumption Feasibility Study

Minnesota Section 404 Assumption Feasibility Study Minnesota Section 404 Assumption Feasibility Study Prepared by: Minnesota Department of Natural Resources and the Minnesota Board of Water and Soil Resources January 17, 2017 Complete report available

More information

STATE OF NORTH DAKOTA PUBLIC SERVICE COMMISSION

STATE OF NORTH DAKOTA PUBLIC SERVICE COMMISSION STATE OF NORTH DAKOTA PUBLIC SERVICE COMMISSION Great Plains Natural Gas Co. Merge w/montana-dakota Utilities Co. Application FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER April 26, 2000 Appearances Commissioners

More information

Clean Water Fund Expenditures. Internal Controls and Compliance Audit. July 2011 through March 2014

Clean Water Fund Expenditures. Internal Controls and Compliance Audit. July 2011 through March 2014 O L A OFFICE OF THE LEGISLATIVE AUDITOR STATE OF MINNESOTA FINANCIAL AUDIT DIVISION REPORT Board of Water and Soil Resources and the Pollution Control Agency Clean Water Fund Expenditures Internal Controls

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of March 14, 2012 Committee Report Item: 2012-60 VISORY INFORMATION Subject: West St. Paul 2011 System Statement Comprehensive Plan

More information

Northwest Minnesota Economic and Business Conditions Report - Third Quarter 2016

Northwest Minnesota Economic and Business Conditions Report - Third Quarter 2016 St. Cloud State University therepository at St. Cloud State Northwest Minnesota Economic and Business Conditions Report Minnesota Regional Economic and Business Conditions Report 12-20- Northwest Minnesota

More information

MEMORANDUM April 10, 2018

MEMORANDUM April 10, 2018 1333 H Street, NW, 10th Floor Washington, DC 20005 Tel: 202 682.1611 Fax: 202 682.1867 www.americanprogressaction.org MEMORANDUM April 10, 2018 To: Interested Parties From: Center for American Progress

More information

ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: August 29, 2007

ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: August 29, 2007 Publication Date: July 30, 2007 Next Publication: August 13, 2007 Vol. 31, No. 16 Submittal Deadline: August 6, 2007 Project Title: ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: August 29,

More information

Hillsborough County City-County Planning Commission

Hillsborough County City-County Planning Commission Hillsborough County City-County Planning Commission 601 E Kennedy Blvd., 18 th floor, Tampa, Florida 33601 813-272-5940 theplanningcommission.org EXECUTIVE SUMMARY Meeting Date: December 14, 2015 - Briefing

More information

Mississippi Headwaters Board Meeting Agenda Cass County Courthouse Walker, MN October 26, :00 am

Mississippi Headwaters Board Meeting Agenda Cass County Courthouse Walker, MN October 26, :00 am Mississippi Headwaters Board Meeting Agenda Cass County Courthouse Walker, MN October 26, 2018 10:00 am Call to Order/Pledge of Allegiance 10:00 AM Approve/Amend Agenda Consent Agenda September 18 Minutes

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: October 8, 2009... *Agenda Item # _6 Company: Docket No. Issue: Greater Minnesota Gas, Inc., a wholly owned subsidiary of Greater

More information

Liquids Pipelines. Excellent Foundation for Continued Growth. ~25% of all crude oil produced in N. America. ~2/3 rds of Canadian crude exports

Liquids Pipelines. Excellent Foundation for Continued Growth. ~25% of all crude oil produced in N. America. ~2/3 rds of Canadian crude exports Liquids Pipelines Guy Jarvis President & EVP, Liquids Pipelines Excellent Foundation for Continued Growth Transports ~2/3 rds of Canadian crude exports Transports ~25% of all crude oil produced in N. America

More information

FERC ICA Oil Tariff FERC No Cancels FERC No ENBRIDGE PIPELINES (FSP) L.L.C. (FLANAGAN SOUTH PIPELINE SYSTEM)

FERC ICA Oil Tariff FERC No Cancels FERC No ENBRIDGE PIPELINES (FSP) L.L.C. (FLANAGAN SOUTH PIPELINE SYSTEM) FERC ICA Oil Tariff FERC No. 4.6.0 Cancels FERC No. 4.5.0 ENBRIDGE PIPELINES (FSP) L.L.C. (FLANAGAN SOUTH PIPELINE SYSTEM) IN CONNECTION WITH ENBRIDGE ENERGY, LIMITED PARTNERSHIP JOINT RATE TARIFF FROM

More information

RE: CenterPoint Energy s Evaluation of its Gas Affordability Program Docket G-008/GR

RE: CenterPoint Energy s Evaluation of its Gas Affordability Program Docket G-008/GR 800 LaSalle Avenue PO Box 59038 Minneapolis, MN 55459-0038 August 13, 2010 Dr. Burl Haar, Executive Secretary Minnesota Public Utilities Commission Suite 350 121 7th Place East St. Paul, MN 55101-2147

More information

STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR

STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR REBECCA OTTO STATE AUDITOR STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR SUITE 500 525 PARK STREET SAINT PAUL, MN 55103-2139 (651) 296-2551 (Voice) (651) 296-4755 (Fax) state.auditor@state.mn.us (E-mail)

More information

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Complainants, MPUC Docket No. PL95/PPL

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Complainants, MPUC Docket No. PL95/PPL BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION Donovan D. Dyrdal and Anna M. Dyrdal, v. Complainants, MPUC Docket No. PL95/PPL- 07-361 Enbridge Energy Company, Inc., (f/k/a Lakehead Pipeline Co., Inc.),

More information

Northwest Minnesota Economic and Business Conditions Report - Fourth Quarter 2014

Northwest Minnesota Economic and Business Conditions Report - Fourth Quarter 2014 St. Cloud State University therepository at St. Cloud State Northwest Minnesota Economic and Business Conditions Report Minnesota Regional Economic and Business Conditions Report 6-2015 Northwest Minnesota

More information

US Army Corps of Engineers Attn: Brett Coleman 180 5 th St. East, Suite 700 (PM-B) St. Paul, MN 55101 Mr. Coleman: The Corps has been hired by Fargo to protect Fargo, a hired gun. Get whoever you need

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of February 27, 2008 Committee Report Item: 2008-41 ADVISORY INFORMATION Date Prepared: February 20, 2008 Subject: City of Minnetonka

More information

2008 Minnesota Statutes

2008 Minnesota Statutes 162.081, 2008 Minnesota Statutes https://www.revisor.leg.state.mn.us/statutes/?id=162.081 Page 1 of 1 5/4/2009 2008 Minnesota Statutes 162.081 TOWN ROAD ACCOUNT. Subdivision 1. Account created. A town

More information

Case KRH Doc 129 Filed 08/05/15 Entered 08/05/15 18:37:24 Desc Main Document Page 1 of 44

Case KRH Doc 129 Filed 08/05/15 Entered 08/05/15 18:37:24 Desc Main Document Page 1 of 44 Document Page 1 of 44 JONES DAY North Point 901 Lakeside Avenue Cleveland, Ohio 44114 Telephone: (216) 586-3939 Facsimile: (216) 579-0212 David G. Heiman (admitted pro hac vice) Carl E. Black (admitted

More information

PIPELINES 101 BASIC PRINCIPLES OF ONSHORE PIPELINES

PIPELINES 101 BASIC PRINCIPLES OF ONSHORE PIPELINES COURSE PIPELINES 101 BASIC PRINCIPLES OF ONSHORE PIPELINES Houston Marriott West Loop by The Galleria is authorized by IACET to offer 1.0 CEUs for the course. 1 OVERVIEW This is an introductory course

More information

STATE OF MINNESOTA IN COURT OF APPEALS

STATE OF MINNESOTA IN COURT OF APPEALS STATE OF MINNESOTA IN COURT OF APPEALS In the Matter of the Application of Enbridge Energy, Limited Partnership for a Certificate of Need for the Proposed Line 3 Replacement Project in Minnesota for the

More information

NAPTP 2013 MLP Investor Conference Stamford, Connecticut. May 22 May 23, 2013

NAPTP 2013 MLP Investor Conference Stamford, Connecticut. May 22 May 23, 2013 NAPTP 2013 MLP Investor Conference Stamford, Connecticut May 22 May 23, 2013 Legal Disclaimer This presentation relates to meetings among members of management of Energy Transfer Partners, L.P. (ETP),

More information

Internal Controls Over Statewide Financial Reporting

Internal Controls Over Statewide Financial Reporting Internal Controls Over Statewide Financial Reporting Year Ended June 30, 2016 February 16, 2017 REPORT 17-05 Financial Audit Division Office of the Legislative Auditor State of Minnesota Office of the

More information

LETTER DECISION Kinder Morgan Cochin ULC (KM Cochin) Application pursuant to section 58 and Part IV (Application) of the National Energy Board Act

LETTER DECISION Kinder Morgan Cochin ULC (KM Cochin) Application pursuant to section 58 and Part IV (Application) of the National Energy Board Act File OF-Fac-Oil-K077-2012-01 01 13 June 2013 LETTER DECISION Mr. Peter J. Forrester Assistant General Counsel Kinder Morgan Group of Companies Kinder Morgan Canada Inc. Suite 2700, 300-5 th Avenue S.W.

More information

Case KRH Doc 1494 Filed 02/11/16 Entered 02/11/16 15:57:47 Desc Main Document Page 1 of 6

Case KRH Doc 1494 Filed 02/11/16 Entered 02/11/16 15:57:47 Desc Main Document Page 1 of 6 Document Page 1 of 6 JONES DAY North Point 901 Lakeside Avenue Cleveland, Ohio 44114 Telephone: (216) 586-3939 Facsimile: (216) 579-0212 David G. Heiman (admitted pro hac vice) Carl E. Black (admitted

More information

CASE 0:14-cv Document 1 Filed 11/11/14 Page 1 of 26 UNITED STATES DISTRICT COURT DISTRICT OF MINNESOTA. vs. INTRODUCTION

CASE 0:14-cv Document 1 Filed 11/11/14 Page 1 of 26 UNITED STATES DISTRICT COURT DISTRICT OF MINNESOTA. vs. INTRODUCTION CASE 0:14-cv-04726 Document 1 Filed 11/11/14 Page 1 of 26 Marc D. Fink (MN Bar No. 0343407) Center for Biological Diversity 209 East 7 th St. Duluth, MN 55805 Tel: 218-464-0539 mfink@biologicaldiversity.org

More information

Regular Meeting Agenda October 15, :00 PM Type of Meeting: Regular Monthly Meeting

Regular Meeting Agenda October 15, :00 PM Type of Meeting: Regular Monthly Meeting Regular Meeting Agenda October 15, 2018 5:00 PM Type of Meeting: Regular Monthly Meeting I.Call to order II. Consent Agenda a) Approval of prior meeting minutes from September 17, 2018 b) Approval of financial

More information

Remuneration - Members of Council and Local Boards

Remuneration - Members of Council and Local Boards Report No. 3 of the Commissioner of Finance was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on March 26, 2015. Remuneration - Members of Council

More information

Winter Reliability Assessment En Banc Hearing Docket No. M

Winter Reliability Assessment En Banc Hearing Docket No. M 225 North Shore Drive Pittsburgh, PA 15212-5861 www.eqt.com TEL 412.395.3205 FAX 412.395.3155 November 4, 2005 James J. McNulty Secretary Pennsylvania Public Utility Commission Commonwealth Keystone Building

More information

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. LeRoy Koppendrayer

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. LeRoy Koppendrayer STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION LeRoy Koppendrayer Ellen Gavin Marshall Johnson Phyllis Reha Gregory Scott Chair Commissioner Commissioner Commissioner Commissioner

More information

City of Aurora. Special Assessment Hearing. For the 2015 Street Improvement Project May 5, 2015

City of Aurora. Special Assessment Hearing. For the 2015 Street Improvement Project May 5, 2015 City of Aurora Special Assessment Hearing For the 2015 Street Improvement Project May 5, 2015 APPEALS DISCLAIMER No appeal may be taken as to the amount of an assessment unless a written objection signed

More information

Social License for Energy Projects

Social License for Energy Projects Social License for Energy Projects Keystone Oil Pipeline an unfinished Case Study Remarks of William C. (Bill) Taylor CCRE Energy Roundtable Forward-Looking Information This presentation contains certain

More information

Liquids Pipeline Expansion Projects Presentation May 17, EEP Slides posted at

Liquids Pipeline Expansion Projects Presentation May 17, EEP Slides posted at Liquids Pipeline Expansion Projects Presentation May 17, 2012 EEP Slides posted at www.enbridgepartners.com/q Legal Notice This presentation includes certain forward looking information ( FLI ) to provide

More information

2006 Annual Review. Enbridge Energy Management, L.L.C. Enbridge Energy Partners, L.P Annual Report

2006 Annual Review. Enbridge Energy Management, L.L.C. Enbridge Energy Partners, L.P Annual Report Enbridge Energy Partners 2006 Annual Report 2006 Annual Review Enbridge Energy Partners, L.P. Enbridge Energy Management, L.L.C. Adjusted Earnings * Annual Distributions 2.83 3.60 3.70 3.70 3.70 3.70 1.76

More information

White Cliffs Pipeline. David Minielly VP Operations

White Cliffs Pipeline. David Minielly VP Operations White Cliffs Pipeline David Minielly VP Operations 1 Forward-looking Information Certain matters contained in this presentation include forward-looking statements within the meaning of Section 27A of the

More information

Attached are the Comments of the Energy Division of the Minnesota Department of Commerce (Department) in the following matter:

Attached are the Comments of the Energy Division of the Minnesota Department of Commerce (Department) in the following matter: 85 7 th Place East, Suite 500 St. Paul, Minnesota 55101-2198 651.296.4026 FAX 651.297.1959 TTY 651.297.3067 December 18, 2006 Burl W. Haar Executive Secretary Minnesota Public Utilities Commission 121

More information

August 31, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

August 31, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C August 31, 2011 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: NERC Administrative Citation Notice of Penalty FERC Docket No. NP11-

More information

NEB No. 441 FERC No Cancels NEB No. 436 Cancels FERC No ENBRIDGE PIPELINES INC. ENBRIDGE ENERGY, LIMITED PARTNERSHIP

NEB No. 441 FERC No Cancels NEB No. 436 Cancels FERC No ENBRIDGE PIPELINES INC. ENBRIDGE ENERGY, LIMITED PARTNERSHIP Cancels NEB No. 436 Cancels FERC No. 45.15.1 ENBRIDGE PIPELINES INC. IN CONNECTION WITH ENBRIDGE ENERGY, LIMITED PARTNERSHIP INTERNATIONAL JOINT RATE TARIFF APPLYING ON CRUDE PETROLEUM, CONDENSATES AND

More information

Consortium of MnPALS Libraries FY 2017 PALS User Fees

Consortium of MnPALS Libraries FY 2017 PALS User Fees FY 2017 PALS User Fees Institutions Member ship Memb Tier Bibs Patrons Member Cost Bib Cost Patron Cost Min. patron FY17 FY16 FY16-17 $ 2,610 $ 2,114 $ 0.074920 $ 3.3151 25.00% 25.00% 50.00% 50% User Fees

More information

Creating Superior Value Go for Extraordinary

Creating Superior Value Go for Extraordinary Creating Superior Value Go for Extraordinary Mizuho Energy Summit April 9-10, 2018 Forward Looking Statements This presentation (and oral statements made regarding the subjects of this presentation) includes

More information

Northwest Minnesota Economic and Business Conditions Report First Quarter 2015

Northwest Minnesota Economic and Business Conditions Report First Quarter 2015 Northwest Minnesota Economic and Business Conditions Report First Quarter TABLE OF CONTENTS Executive Summary...1 Northwest Minnesota Leading Economic Indicators Index...2 Northwest Minnesota Business

More information

December 31, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

December 31, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. December 31, 2012 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: NERC Spreadsheet Notice of Penalty FERC Docket No. NP13- -000 Dear

More information

Enbridge Pipelines Inc. Infrastructure Solutions for the Bakken and Three Forks

Enbridge Pipelines Inc. Infrastructure Solutions for the Bakken and Three Forks Enbridge Pipelines Inc. Infrastructure Solutions for the Bakken and Three Forks Guy Jarvis Sr. Vice President, Business Development Williston Basin Petroleum Conference and Expo Bismarck, North Dakota

More information

Line 3 Replacement. ALJ Report Review. April 30, 2018

Line 3 Replacement. ALJ Report Review. April 30, 2018 Line 3 Replacement ALJ Report Review April 30, 2018 Enbridge s Line 3 Replacement Project In the ALJ Report, the Judge reaffirmed that the Line 3 pipeline is important today, will continue to be long into

More information

General Obligation Bond Expenditures. Internal Control and Compliance Audit

General Obligation Bond Expenditures. Internal Control and Compliance Audit O L A OFFICE OF THE LEGISLATIVE AUDITOR STATE OF MINNESOTA FINANCIAL AUDIT DIVISION REPORT General Obligation Bond Expenditures Internal Control and Compliance Audit December 5, 2008 Report 08-34 FINANCIAL

More information

NEB No. 423 FERC No Cancels NEB No. 414 Cancels FERC No ENBRIDGE PIPELINES INC. ENBRIDGE ENERGY, LIMITED PARTNERSHIP

NEB No. 423 FERC No Cancels NEB No. 414 Cancels FERC No ENBRIDGE PIPELINES INC. ENBRIDGE ENERGY, LIMITED PARTNERSHIP Cancels NEB No. 414 Cancels FERC No. 45.13.0 ENBRIDGE PIPELINES INC. IN CONNECTION WITH ENBRIDGE ENERGY, LIMITED PARTNERSHIP INTERNATIONAL JOINT RATE TARIFF APPLYING ON CRUDE PETROLEUM, CONDENSATES AND

More information

September 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

September 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 September 6, 2016 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1431

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1431 BEFORE THE PUBLIC UTILITY COMMISSION OF UM 1431 In the Matter of Verizon Communications, Inc., and Frontier Communications Corporation Joint Application for an Order Declining to Assert Jurisdiction, or,

More information

STATE OF MINNESOTA Office of the State Auditor

STATE OF MINNESOTA Office of the State Auditor STATE OF MINNESOTA Office of the State Auditor Rebecca Otto State Auditor PIKE LAKE AREA WASTEWATER COLLECTION SYSTEM TWIG, MINNESOTA FOR THE YEARS ENDED DECEMBER 31, 2007 AND 2008 Description of the Office

More information

Motions are tagged in bold. Meetings are recorded to facilitate preparation of minutes.

Motions are tagged in bold. Meetings are recorded to facilitate preparation of minutes. October 8, 2018 PERCH LAKE TOWNSHIP MINUTES OF THE REGULAR MONTHLY MEETING Motions are tagged in bold. Meetings are recorded to facilitate preparation of minutes. 1. CALL TO ORDER, ROLL CALL AND PLEDGE.

More information

Voluntary Petition for Non-Individuals Filing for Bankruptcy 04/16

Voluntary Petition for Non-Individuals Filing for Bankruptcy 04/16 Fill in this information to identify the case: Case 16-11627-BLS Doc 1 Filed 07/08/16 Page 1 of 14 United States Bankruptcy Court for the: District of Delaware (State) Case number (If known): Chapter 11

More information

Northwest Minnesota Economic and Business Conditions Report First Quarter 2014

Northwest Minnesota Economic and Business Conditions Report First Quarter 2014 Northwest Minnesota Economic and Business Conditions Report First Quarter TABLE OF CONTENTS Executive Summary...1 Northwest Minnesota Leading Economic Indicators Index...2 Northwest Minnesota Business

More information

Local Sales and Use Taxes 164

Local Sales and Use Taxes 164 Local es 164 Sales Tax Fact Sheet 164 Fact Sheet What s New in 2017 Starting October 1, 2017: Anoka County will have a 0.25 percent Transit Carver County will have a 0.5 percent Transit Clay County will

More information

Northwest Minnesota Economic and Business Conditions Report Third Quarter 2014

Northwest Minnesota Economic and Business Conditions Report Third Quarter 2014 Northwest Minnesota Economic and Business Conditions Report Third Quarter TABLE OF CONTENTS Executive Summary...1 Northwest Minnesota Leading Economic Indicators Index...2 Northwest Minnesota Business

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of March 14, 2012 Committee Report Item: 2012-63 ADVISORY INFORMATION Subject: Stillwater Township 2011 System Statement Comprehensive

More information