Market Highlights 1 (November 1 November 14)

Size: px
Start display at page:

Download "Market Highlights 1 (November 1 November 14)"

Transcription

1 Market Highlights 1 (November 1 November 14) The average DLAP price in the integrated forward market was $ The maximum and minimum DLAP prices were $16.9 and $16.49, respectively. The maximum and minimum PNode prices in the integrated forward market were $ and -$23.79 respectively. The top two interties congested in the integrated forward market were PALOVRDE_ITC and MALIN5. Congestion rents in these two weeks totaled $2,383,86.3. The average day-ahead ancillary service prices were between $. and $ Approximately percent of the RUC requirements were met from RA units. The average real-time FMM DLAP price was $46.22, with a maximum price of $1,24.8 and a minimum price of -$ The maximum and minimum PNode prices in the FMM were $1,294.5 and -$152.46, respectively. Out of the total 1,344 FMM intervals, 15 intervals saw DLAP prices above $25, and 1 intervals saw DLAP prices below -$15. Out of the total 1,344 FMM intervals, 53 intervals saw ELAP prices above $25 and 1 intervals saw ELAP prices below -$15. The average real-time FMM ELAP price was $3.87, with a maximum price of $ and a minimum price of -$ The average real-time RTD DLAP price was $36.37, with a maximum price of $1, and a minimum price of -$ The maximum and minimum PNode prices in the RTD were $3, and -$292.94, respectively. Out of the total 4,32 RTD intervals, 38 intervals saw DLAP prices above $25 and interval saw DLAP prices below -$15. Out of the total 4,32 RTD intervals, 55 intervals saw ELAP prices above $25 and 15 intervals saw ELAP prices below -$15. The average real-time RTD ELAP price was $27.45, with a maximum price of $1,9.2 and a minimum price of -$ Root cause for daily high price events are noted in Tables 1 and 2. Trade Date FMM Nov 6 HE 17 FMM Nov 6 HE 18 FMM Nov 7 HE 14 Table 1 FMM Intervals Root Cause Load changes, re-dispatch of resources, and reduction of net imports Load changes, renewable deviation and re-dispatch of resources. Congestion on 24138_SERRANO _5_24137_SERRANO _23_XF_1 _P. 1 A description of the metrics presented in this report is available at Market Quality and Renewable Integration/L.Hernandez 1

2 GW Trade Date FMM Nov 7 HE 17 FMM Nov 7 HE 18,19 Table 1 FMM Intervals Root Cause Load changes, generator outage, renewable deviation, and re-dispatch of resources. Load changes, generator outage, reduction of net imports, re-dispatch of resources. Trade Date RTD Nov 1 HE 8, 9; Nov 4 HE 18 RTD Nov 3 HE 9; Nov 7 HE 8,14 RTD Nov 3 HE 17,19 RTD Nov 4 HE 16 RTD Nov 6 HE 15,16 RTD Nov 7 HE 15 RTD Nov 7 HE 17,18 RTD Nov 9 HE 2 RTD Nov 1 HE 7 RTD Nov 12 HE 8 Table 2 RTD Intervals Root Cause Load changes. Load changes and renewable deviation. Re-dispatch of resources. Load changes and reduction of net imports. Load changes, renewable deviation, and reduction of net imports. Load changes and re-dispatch of resources. Load changes, renewable deviation, and reduction of net imports. Congestion on OMS ELD_MKP_SCIT_NG. Re-dispatch of resources. Congestion on 782_TL 23S_OVERLOAD_NG. Figure 1: Day-Ahead (IFM) LAP LMP and Cleared Bid-In Demand PGAE SCE SDGE VEA Cleared Bid-In Demand (GW) Figure 2: Day-Ahead Congestion Rents Market Quality and Renewable Integration/L.Hernandez 2

3 Congestion Rents (in Millions) $7. $6. $5. $4. $3. $2. $1. $. Flow-Gates PALOVRDE_ITC MALIN5 Figure 3: Day-Ahead Congestion Rents for Flow-Based Constraints Congestion Transmission Constraint Rent OMS ELD_MKP_SCIT_NG $ 6,468, _SERRANO _5_24137_SERRANO _23_XF_1 _P $ 5,74, _DOUBLTTP_138_223_FRIARS _138_BR_1 _1 $ 2,431, _TL 23S_OVERLOAD_NG $ 223, _TRIMBLE _115_35616_SNJOSEB _115_BR_1 _1 $ 115, _LOCKEFRD_6._33736_LODI JCT_6._BR_1 _1 $ 75, _ESCNDIDO_23_22844_TALEGA _23_BR_1 _1 $ 53, _LASAGUIL_23_379_PANOCHE _23_BR_2 _1 $ 51, _HYMPOMJT_6._31553_BIG BAR _6._BR_1 _1 $ 49, _ENCINATP_23_22716_SANLUSRY_23_BR_2 _1 $ 22,129.3 OMS _OP-661 $ 17, _POWAY _69._22664_POMERADO_69._BR_1 _1 $ 16, _CORTINA _6._3451_CRTNA M_ 1._XF_1 $ 12, _HPLND JT_6._3137_CLVRDLJT_6._BR_1 _1 $ 9, _MSS TAP2_6._31553_BIG BAR _6._BR_1 _1 $ 9, _HGHLNDJ2_115_3195_CORTINA _115_BR_1 _1 $ 8, _BIG BEN2_115_31516_WYANDJT2_115_BR_1 _2 $ 7, _CARLOTTA_6._3115_RIODLLTP_6._BR_1 _1 $ 4, _SWNS FLT_6._3111_BRDGVLLE_6._BR_1 _1 $ 4, Market Quality and Renewable Integration/L.Hernandez 3

4 Figure 3: Day-Ahead Congestion Rents for Flow-Based Constraints (cont) Congestion Transmission Constraint Rent HUMBOLDT_IMP_NG $ 3, _HMBLT BY_6._311_EEL RIVR_6._BR_1 _1 $ 2, _HPLND JT_6._3126_HPLND JT_115_XF_2 $ 1, _COTWDPGE_115_315_COTTNWD _23_XF_1 $ _E.NICOLS_115_32214_RIO OSO _115_BR_1 _1 $ _MOSSLD _23_3797_LASAGUIL_23_BR_1 _1 $ Total $ 28,368, Figure 4: Day-Ahead (IFM) Average A/S Price Non Spin Spin Reg Up Reg Dn Mile Up Mile Dn Figure 5: Day-Ahead Average RUC Price Market Quality and Renewable Integration/L.Hernandez 4

5 Figure 6: Real-Time FMM Average A/S Price Non Spin Spin Reg Up Reg Dn Mile Up Mile Dn Market Quality and Renewable Integration/L.Hernandez 5

6 Figure 7: Real-Time FMM DLAP LMP PGAE SCE SDGE VEA Figure 8: Real-Time RTD DLAP LMP PGAE SCE SDGE VEA Market Quality and Renewable Integration/L.Hernandez 6

7 Figure 9: Real-Time FMM ELAP LMP PGE PACW PACE NEVP AZPS -4 PSEI Figure 1: Real-Time RTD ELAP LMP AZPS NEVP PACE Market Quality and Renewable Integration/L.Hernandez PACW -8 PGE PSEI 7

Market Highlights 1 (November 16 November 29)

Market Highlights 1 (November 16 November 29) Market Highlights 1 (November 16 November 29) The average DLAP price in the integrated forward market was $28.69. The maximum and minimum DLAP prices were $8.18 and -$.8, respectively. The maximum and

More information

Market Highlights 1 (February 7 February 20)

Market Highlights 1 (February 7 February 20) Market Highlights 1 (February 7 February 2) The average DLAP price in the integrated forward market was $33.28. The maximum and minimum DLAP prices were $117.69 and -$.53, respectively. The maximum and

More information

Market Highlights 1 (January 9 January 22)

Market Highlights 1 (January 9 January 22) Market Highlights 1 (January 9 January 22) The average DLAP price in the integrated forward market was $4.98. The maximum and minimum DLAP prices were $76.25 and $5.9, respectively. The maximum and minimum

More information

Market Highlights 1 (November 28 December 11)

Market Highlights 1 (November 28 December 11) Market Highlights 1 (November 28 December 11) The average DLAP price in the integrated forward market was $7.41. The maximum and minimum DLAP prices were $23.34 and $23.3, respectively. The maximum and

More information

Market Highlights 1 (December 26 January 8)

Market Highlights 1 (December 26 January 8) Market Highlights 1 (December 26 January 8) The average DLAP price in the integrated forward market was $42.52. The maximum and minimum DLAP prices were $89.58 and $1., respectively. The maximum and minimum

More information

Market Highlights 1 (October 17 October 30)

Market Highlights 1 (October 17 October 30) Market Highlights 1 (October 17 October 3) The average DLAP price in the integrated forward market was $43.78. The maximum and minimum DLAP prices were $11.74 and $9.62, respectively. The maximum and minimum

More information

Market Highlights 1 (July 11 July 24)

Market Highlights 1 (July 11 July 24) Market Highlights 1 (July 11 July 24) The average DLAP price in the integrated forward market was $79.8. The maximum and minimum DLAP prices were $1,7.51 and $23.98, respectively. The maximum and minimum

More information

Market Performance Report January 2018

Market Performance Report January 2018 Market Performance Report January 218 March 19, 218 ISO Market Quality and Renewable Integration CAISO 25 Outcropping Way Folsom, California 9563 (916) 351-44 Executive Summary 1 The market performance

More information

Market Performance Report December 2018

Market Performance Report December 2018 Market Performance Report December 2018 March 4, 2019 ISO Market Quality and Renewable Integration CAISO 250 Outcropping Way Folsom, California 95630 (916) 351-4400 Executive Summary 1 The market performance

More information

Market Performance Metric Catalog

Market Performance Metric Catalog Market Performance Metric Catalog Version 1.35 March, 217 Market Performance Report, Meta Document Page 1 of 136 ISO Market Services VERSION HISTORY Date Version Description Author 5/28/29 1. Creation

More information

Market Performance Metric Catalog

Market Performance Metric Catalog Market Performance Metric Catalog Version 1.36 October 218 Market Performance Report, Meta Document Page 1 of 14 ISO Market Services VERSION HISTORY Date Version Description Author 5/28/29 1. Creation

More information

California ISO. Q Report on Market Issues and Performance. February 14, Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. February 14, Department of Market Monitoring California Independent System Operator Corporation California ISO Q4 2017 Report on Market Issues and Performance February 14, 2018 Department of Market Monitoring TABLE OF CONTENTS Executive summary...

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 33 Hour-Ahead Scheduling Process (HASP)... 2 33.1 Submission Of Bids For The HASP And RTM... 2 33.2 The HASP Optimization... 3 33.3 Treatment Of Self-Schedules In HASP... 3 33.4 MPM For

More information

Consolidated EIM Initiatives Straw Proposal

Consolidated EIM Initiatives Straw Proposal Consolidated EIM Initiatives Straw Proposal Stakeholder Meeting August 7, 2017 Megan Poage & Don Tretheway Market Design & Policy Agenda Time Topic Presenter 10:00 10:15 Introduction and Purpose Kristina

More information

California ISO. Q Report on Market Issues and Performance. August 22, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. August 22, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q2 2016 Report on Market Issues and Performance August 22, 2016 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive

More information

CRR Auction Analysis Report

CRR Auction Analysis Report Report November 21, 2017 Prepared by: MQRI California Independent System Operator The following ISO staff contributed to this report: Danielle Tavel Abhishek Hundiwale Jie Duan Nongchao Guo Jim McClain

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 28. Inter-SC Trades... 2 28.1 Inter-SC Trades Of Energy... 2 28.1.1 Purpose... 2 28.1.2 Availability Of Inter-SC Trades Of Energy... 2 28.1.3 Submission Of Inter-SC Trades Of Energy...

More information

Congestion Revenue Rights (CRR) Clawback Modification. Draft Final Proposal

Congestion Revenue Rights (CRR) Clawback Modification. Draft Final Proposal Congestion Revenue Rights (CRR) Clawback Modification Draft Final Proposal May 16, 2016 CRR Clawback Modification Draft Final Proposal Table of Contents 1 Introduction... 3 2 Stakeholder process and timeline...

More information

Appendix A. - Transmission Constraints. Physical and operational limitations on the transfer of electric power through transmission facilities, which

Appendix A. - Transmission Constraints. Physical and operational limitations on the transfer of electric power through transmission facilities, which Appendix A - Transmission Constraints Physical and operational limitations on the transfer of electric power through transmission facilities, which include Contingencies and Nomograms. - Contingency A

More information

How to find PSEI EIM prices on CAISO s Public Websites

How to find PSEI EIM prices on CAISO s Public Websites How to find PSEI EIM prices on CAISO s Public Websites EIM Locational Marginal Prices are publically available on CAISO websites. PSEI EIM settlements are based on 3 price types: Intertie Nodes, Generator

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix C... 2 Locational Marginal Price... 2 A. LMP Composition in the Day-Ahead Market... 2 C. The System Marginal Energy Cost Component of LMP... 3 D. Marginal Congestion Component

More information

Convergence Bidding Overview. Jenny Pedersen Julianne Riessen Client Training Team

Convergence Bidding Overview. Jenny Pedersen Julianne Riessen Client Training Team Convergence Bidding Overview Jenny Pedersen Julianne Riessen Client Training Team Agenda Introductions Defining Convergence Bidding Project Participating in the Markets Registration and Affiliations Eligible

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Locational Marginal Price... 2 A. LMP Composition in the Day-Ahead Market... 2 B. LMP Composition in the Real-Time Market... 2 C. The System Marginal Energy Cost Component of LMP (Day-Ahead

More information

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Submitted by Company Date Submitted Will Dong Paul Gribik (415) 973-9267 (415) 973-6274 PG&E December 5, 2013 Pacific

More information

Appendix A. - Transmission Constraints. Physical and operational limitations on the transfer of electric power through transmission facilities, which

Appendix A. - Transmission Constraints. Physical and operational limitations on the transfer of electric power through transmission facilities, which Appendix A - Transmission Constraints Physical and operational limitations on the transfer of electric power through transmission facilities, which include Contingencies and Nomograms. - Contingency A

More information

Day Ahead Market Enhancements: Updates to Revised Straw Proposal. Workshop June 19, 2018

Day Ahead Market Enhancements: Updates to Revised Straw Proposal. Workshop June 19, 2018 Day Ahead Market Enhancements: Updates to Revised Straw Proposal Workshop June 19, 2018 Agenda Time Topic Presenter 10:00 10:15 Welcome and Introductions Kristina Osborne 10:15 10:30 Overview Megan Poage

More information

Congestion revenue rights auction efficiency

Congestion revenue rights auction efficiency Congestion revenue rights auction efficiency Track 1 draft final proposal Perry Servedio Sr. Market Design Policy Developer February 13, 2018 Three tracks for addressing auction efficiency Track 0: Process

More information

Price Effects of Real-Time Market Pricing Run Parameters

Price Effects of Real-Time Market Pricing Run Parameters Price Effects of Real-Time Market Pricing Run Parameters Edward Lo Lead Engineering Specialist, Market & Product Development MSC/Stakeholder Meeting on Parameter Maintenance September 25, 2008 Topics of

More information

Congestion Revenue Rights Auction Efficiency Track 1B Draft Tariff Language

Congestion Revenue Rights Auction Efficiency Track 1B Draft Tariff Language 6.5.1.3 Public Market Information 6.5.1.3.1 Annually, the CAISO shall publish the following information including, but not limited to: (a) Market Clearing Prices for all Aggregated PNodes used in the CRR

More information

Price Inconsistency Market Enhancements. Revised Straw Proposal

Price Inconsistency Market Enhancements. Revised Straw Proposal Price Inconsistency Market Enhancements Revised Straw Proposal August 2, 2012 Price Inconsistency Market Enhancements Table of Contents 1 Introduction... 3 2 Plan for Stakeholder Engagement... 3 3 Background...

More information

Stakeholder Process: Congestion Revenue Rights Auction Efficiency. Summary of Submitted Comments

Stakeholder Process: Congestion Revenue Rights Auction Efficiency. Summary of Submitted Comments Stakeholder Process: Congestion Revenue Rights Auction Efficiency Attachment A Summary of Submitted Comments Stakeholders submitted four rounds of written comments to the ISO under the congestion revenue

More information

Convergence bidding. IFM tier 1 uplift obligation ISO PUBLIC 2015 CAISO

Convergence bidding. IFM tier 1 uplift obligation ISO PUBLIC 2015 CAISO Convergence bidding IFM tier 1 uplift obligation Module Objectives Evaluate what triggers the IFM Tier 1 Uplift Obligation when participating in Convergence Bidding Identify key components to validate

More information

CRR Conference Call Meeting Minutes June 20, 2018

CRR Conference Call Meeting Minutes June 20, 2018 CRR Conference Call Meeting Minutes June 20, 2018 The California Independent System Operator hosts a bi-weekly Congestion Revenue Rights (CRR) conference call on Wednesdays at 11AM. This is an opportunity

More information

Intertie Deviation Settlement: Draft Final Proposal

Intertie Deviation Settlement: Draft Final Proposal Intertie Deviation Settlement: Draft Final Proposal Megan Poage & Danielle Tavel Market Design Policy Stakeholder Call December 19, 2018 IDS Draft Final Proposal, Stakeholder Call December 19, 2018 9:00

More information

Convergence bidding. Participating in the markets Credit policy implications ISO PUBLIC 2015 CAISO

Convergence bidding. Participating in the markets Credit policy implications ISO PUBLIC 2015 CAISO Convergence bidding Participating in the markets Credit policy implications Module objectives By the end of this section, you will be able to: Describe how the last-in / first-out methodology applies to

More information

Two-Tier Allocation of Bid Cost Recovery

Two-Tier Allocation of Bid Cost Recovery Two-Tier Allocation of Bid Cost Recovery Jordan Curry Market Design & Regulatory Policy Developer December 21, 2015 Agenda Time Topic Presenter 1:00 1:05 Introduction Kim Perez 1:05 2:00 Purpose and Background

More information

California ISO October 1, 2002 Market Design Elements

California ISO October 1, 2002 Market Design Elements California October 1, 2002 Market Design Elements California Board of Governors Meeting April 25, 2002 Presented by Keith Casey Manager of Market Analysis and Mitigation Department of Market Analysis 1

More information

Two-Tier Real-Time Bid Cost Recovery. Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008

Two-Tier Real-Time Bid Cost Recovery. Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008 Two-Tier Real-Time Bid Cost Recovery Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008 The CAISO has posted an Issue Paper exploring the redesign

More information

EIM market monitoring and market issues/performance

EIM market monitoring and market issues/performance EIM market monitoring and market issues/performance Energy Imbalance Market Regional Issues Forum April 6, 2016 Eric Hildebrandt, Director Department of Market Monitoring EIM Market Monitoring Page 2 Mission

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions for the Imposition of Mitigation Measures... 2 39.2.1

More information

Opinion on Intertie Deviation Settlements. James Bushnell, Member Scott M. Harvey, Member Benjamin F. Hobbs, Chair

Opinion on Intertie Deviation Settlements. James Bushnell, Member Scott M. Harvey, Member Benjamin F. Hobbs, Chair Opinion on Intertie Deviation Settlements by James Bushnell, Member Scott M. Harvey, Member Benjamin F. Hobbs, Chair Members of the Market Surveillance Committee of the California ISO January 16, 2019

More information

Technical Bulletin Disconnected Pricing Node Process. Market Issue

Technical Bulletin Disconnected Pricing Node Process. Market Issue Technical Bulletin 2010-09-02 Disconnected Pricing Node Process Market Issue September 20, 2010 Introduction Technical Bulletin 2010-09-02 Disconnected Pricing Node Process As of the August 1, 2009 trading

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Resource Modeling & EIM Enhancements 2017 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 108 Disclaimer All information contained in this draft Business Requirements Specification

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification CRR Auction Efficiency 1B Date Created: 8/3/2018 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 27 Disclaimer All information contained in this draft Business Requirements Specification

More information

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright c 2016 Ross Baldick www.ece.utexas.edu/ baldick/classes/394v/ee394v.html Title Page 1 of 33

More information

Opinion on Congestion Revenue Rights Auction Efficiency. by James Bushnell, Member Scott M. Harvey, Member Benjamin F.

Opinion on Congestion Revenue Rights Auction Efficiency. by James Bushnell, Member Scott M. Harvey, Member Benjamin F. Opinion on Congestion Revenue Rights Auction Efficiency by James Bushnell, Member Scott M. Harvey, Member Benjamin F. Hobbs, Chair Members of the Market Surveillance Committee of the California ISO Draft

More information

Market Surveillance Committee Activities September By Frank Wolak Chairman of the ISO Market Surveillance Committee

Market Surveillance Committee Activities September By Frank Wolak Chairman of the ISO Market Surveillance Committee Market Surveillance Committee Activities September 2004 By Frank Wolak Chairman of the ISO Market Surveillance Committee Four Opinions in Progress Trading Hubs Solution to the Seller s Choice Contracts

More information

Local market power mitigation enhancements discussion

Local market power mitigation enhancements discussion Local market power mitigation enhancements discussion Gabe Murtaugh Sr. Infrastructure and Regulatory Policy Developer Elliott Nethercutt Sr. Market Design Policy Developer Market Surveillance Committee

More information

FERC Order Minute Settlements Manual Revisions

FERC Order Minute Settlements Manual Revisions FERC Order 825 5 Minute Settlements Manual Revisions Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee October 30, 2017 Impacted Settlement Manuals M-27 Open Access

More information

Real Time Scheduling. Reserve Settlements

Real Time Scheduling. Reserve Settlements Real Time Scheduling Reserve Settlements General Settlement Rules There will be a full two settlement. Reserve services will be scheduled and settled nominally on a 5-min. basis. Units are not required

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent Of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions For The Imposition Of Mitigation Measures... 2 39.2.1

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent Of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions For The Imposition Of Mitigation Measures... 2 39.2.1

More information

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts 1. Commission Directives to Submit a Market Redesign Plan The direct origin of the requirement that the CAISO

More information

Local Market Power Mitigation Enhancements. Conference Call March 25, 2011

Local Market Power Mitigation Enhancements. Conference Call March 25, 2011 Local Market Power Mitigation Enhancements Conference Call March 25, 2011 ISO Stakeholder Initiative Process We Are Here Page 2 Agenda for today s meeting Estimated Topic Presenter Time 10:00 10:10 Introduction

More information

Business Practice Manual For The Energy Imbalance Market. Version 1213

Business Practice Manual For The Energy Imbalance Market. Version 1213 Business Practice Manual For The Energy Imbalance Market Version 1213 Revision Date: October 25 November 29, 2018 Approval History Approval Date: October 2, 2014 Effective Date: October 2, 2014 BPM Owners:

More information

Business Practice Manual For The Energy Imbalance Market. Version 78

Business Practice Manual For The Energy Imbalance Market. Version 78 Business Practice Manual For The Energy Imbalance Market Version 78 Revision Date: March 31May 31, 2017 Approval History Approval Date: October 2, 2014 Effective Date: October 2, 2014 BPM Owners: Mike

More information

2003 Annual Report on Market Issues and Performance

2003 Annual Report on Market Issues and Performance 2003 Annual Report on Market Issues and Performance Board of Governors Meeting April 22, 2004 Greg Cook Manager of Market Monitoring Issues in 2003-04 CALIFORNIA ISO and FERC: Continue to work through

More information

Scheduling and Pricing of Integrated Balancing Authority Areas (IBAAs)

Scheduling and Pricing of Integrated Balancing Authority Areas (IBAAs) Scheduling and Pricing of Integrated Balancing Authority Areas (IBAAs) J. Buglino, Senior Client Trainer February 24, 2009 Agenda What is an Integrated Balancing Authority Area? IBAA Scheduling and Pricing

More information

Contingency Modeling Enhancements

Contingency Modeling Enhancements Contingency Modeling Enhancements Third Revised Straw Proposal Discussion December 10, 2015 Perry Servedio Senior Market Design & Regulatory Policy Developer Agenda Time Topic Presenter 10:00 10:05 Introduction

More information

Business Practice Manual For The Energy Imbalance Market. Version 89

Business Practice Manual For The Energy Imbalance Market. Version 89 Business Practice Manual For The Energy Imbalance Market Version 89 Revision Date: Jan 02, 2018May 31, 2017 Approval History Approval Date: October 2, 2014 Effective Date: October 2, 2014 BPM Owners: Mike

More information

Southern California Edison Stakeholder Comments. Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013

Southern California Edison Stakeholder Comments. Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013 Southern California Edison Stakeholder Comments Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013 Submitted by Company Date Submitted Paul Nelson (626) 302-4814 Jeff Nelson (626)

More information

2011 Budget Initial Stakeholder Call

2011 Budget Initial Stakeholder Call 2011 Budget Initial Stakeholder Call Michael Epstein Director of Financial Planning June 23, 2010 Agenda TOPIC PRESENTER Introduction Steve Berberich Budget principles & strategic initiatives Steve Berberich

More information

Posting Date: 08/01/2015 Gentry Crowson, Market Forensics

Posting Date: 08/01/2015 Gentry Crowson, Market Forensics VRL Analysis Posting Date: 08/01/2015 Gentry Crowson, Market Forensics 2 Contents Executive Summary... 3 Background... 6 Analysis of OC Breach Characteristics in the Marketplace... 8 VRL Yearly Analysis

More information

Charge Type Overview. April 2015

Charge Type Overview. April 2015 Charge Type Overview April 2015 Contents Energy Charge Types Operating Reserves Charge Types Over-Collected Losses (OCL) Charge Types Make Whole Payment Charge Types Demand Response Charge Types Other

More information

CAISO CRR Auction Efficiency Initiative. Congestion Revenue Rights Auction Efficiency Working Group 12/19/2017

CAISO CRR Auction Efficiency Initiative. Congestion Revenue Rights Auction Efficiency Working Group 12/19/2017 CAISO CRR Auction Efficiency Initiative Congestion Revenue Rights Auction Efficiency Working Group 12/19/2017 Overview 1. Comments on CAISO analysis 2. Issues with current CRR Auction design 3. Proposed

More information

Local Market Power Mitigation Enhancements

Local Market Power Mitigation Enhancements Local Market Power Mitigation Enhancements Revised Straw Proposal Stakeholder Web Conference November 28, 2018 10:00 am - 1:00 pm Market Design Policy Agenda Time Topic Presenter 10:00 10:05 Welcome and

More information

MRTU. CRR Settlements. CRR Educational Class #10

MRTU. CRR Settlements. CRR Educational Class #10 MRTU CRR Settlements CRR Educational Class #10 Contents Why is CRR Settlements process important to understand Definition of LMP and CRR Types of CRRs: Obligation vs Option Point to Point and Multi Point

More information

Design Standard and Convention

Design Standard and Convention Settlements and Billing Design Standard and Convention Version 5.7 CAISO, 20142/20/2014 Page 1 of 70 Table of Contents 1. Purpose of Document 5 1.1 Revision History 5 2. Introduction 6 2.1 Scope 6 2.2

More information

Flexible Ramping Constraint Penalty Price In the Fifteen Minute Market

Flexible Ramping Constraint Penalty Price In the Fifteen Minute Market Flexible Ramping Constraint Penalty Price In the Fifteen Minute Market April 14, 2014 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 Revision History Date Version Description Author 2014-04-08

More information

WHITE PAPER. Financial Transmission Rights (FTR)/ Congestion Revenue Rights (CRR) Analysis Get ahead with ABB Ability PROMOD

WHITE PAPER. Financial Transmission Rights (FTR)/ Congestion Revenue Rights (CRR) Analysis Get ahead with ABB Ability PROMOD WHITE PAPER Financial Transmission Rights (FTR)/ Congestion Revenue Rights (CRR) Analysis Get ahead with ABB Ability PROMOD 2 W H I T E PA P E R F T R / C R R A N A LY S I S Market participants and system

More information

Settlements and Billing. Configuration Guide: Day Ahead Congestion - AS Regulation Up Import Settlement CC Version 5.01

Settlements and Billing. Configuration Guide: Day Ahead Congestion - AS Regulation Up Import Settlement CC Version 5.01 Settlements and Billing Configuration Guide: Day Ahead Congestion - AS Regulation Up Import Settlement CC 6750 Version 5.01 Table of Contents 1. Purpose of Document 3 2. Introduction 3 2.1 Background 3

More information

This report summarizes key market conditions, developments, and trends for November 2001.

This report summarizes key market conditions, developments, and trends for November 2001. California Independent System Operator Memorandum To: ISO Board of Governors From: Anjali Sheffrin, Director of Market Analysis CC: ISO Officers, ISO Board Assistants Date: February 1, 22 Re: Market Analysis

More information

Commitment Cost Enhancements Phase 3 Opportunity Cost Methodology. Technical Appendix

Commitment Cost Enhancements Phase 3 Opportunity Cost Methodology. Technical Appendix Commitment Cost Enhancements Phase 3 Opportunity Cost Methodology Technical Appendix April 22, 2016 Table of Contents 1. Introduction... 3 2. Overview of opportunity cost... 3 3. Opportunity cost model

More information

Alberta Capacity Market

Alberta Capacity Market Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 8: Supply Obligations and Performance Assessments Prepared by: Alberta Electric System Operator Date: January

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 54897-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53225-E Schedule CBP Sheet 1 APPLICABILITY The Capacity Bidding Program

More information

December 7, Compliance with Order No. 844 Response to Deficiency Letter

December 7, Compliance with Order No. 844 Response to Deficiency Letter California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System

More information

The Future of Nodal Trading.

The Future of Nodal Trading. The Future of Nodal Trading. Moderator: Jim Krajecki, Director with Customized Solutions Panel: - Noha Sidhom, General Counsel for Inertia Power LP. - Shawn Sheehan, Principal with XO - Wes Allen, CEO

More information

Uplift Charges, FTR Underfunding and Overallocation

Uplift Charges, FTR Underfunding and Overallocation Uplift Charges, FTR Underfunding and Overallocation Solutions in PJM Getting to Yes on Uplift Allocation Fixing FTR Funding Abram W. Klein 9 October 2014 Platts Nodal Trader Conference New York City Discussion

More information

May 30, Advice Letter 3444-E

May 30, Advice Letter 3444-E STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 May 30, 2017 Advice Letter 3444-E Russell G. Worden Director, State Regulatory

More information

Standard Market Design

Standard Market Design Standard Market Design Dynegy s Perspective Characteristics of the Standard Market Design - SMD RTO provides all transmission service and takes on many if not all control area functions. RTO operates an

More information

Market Settlements - Advanced

Market Settlements - Advanced Market Settlements - Advanced FTR/ARR Module PJM State & Member Training Dept. PJM 2017 Agenda FTR/ARR Hedging Congestion FTR and ARR Billing Examples PJM 2017 2 Hedging Transmission Congestion PJM 2017

More information

Chapter 7 DESIGN FLAWS AND A WORSENING CRISIS. Sequential Markets and Strategic Bidding

Chapter 7 DESIGN FLAWS AND A WORSENING CRISIS. Sequential Markets and Strategic Bidding Chapter 7 DESIGN FLAWS AND A WORSENING CRISIS During the first two successful years of restructuring in California, prices declined. This initial success meant that the restructured market s design flaws

More information

Both the ISO-NE and NYISO allow bids in whole MWh increments only.

Both the ISO-NE and NYISO allow bids in whole MWh increments only. Attachment D Benchmarking against NYISO, PJM, and ISO-NE As the CAISO and stakeholders consider various design elements of convergence bidding that may pose market manipulation concerns, it is useful to

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 36. Congestion Revenue Rights... 3 36.1 Overview Of CRRs And Procurement Of CRRs... 3 36.2 Types Of CRR Instruments... 3 36.2.1 CRR Obligations... 3 36.2.2 CRR Options... 3 36.2.3 Point-To-Point

More information

Congestion revenue rights auction efficiency Track 1B straw proposal stakeholder meeting April 23, 2018

Congestion revenue rights auction efficiency Track 1B straw proposal stakeholder meeting April 23, 2018 Congestion revenue rights auction efficiency Track 1B straw proposal stakeholder meeting April 23, 2018 Perry Servedio Sr. Market Design Policy Developer CAISO policy initiative stakeholder process POLICY

More information

Suggested Change in Real-time LAP Pricing

Suggested Change in Real-time LAP Pricing Suggested Change in Real-time LAP Pricing Farrokh Rahimi Principal Market Engineer Market Surveillance Committee Meeting November 13, 2006 MRTU LAP Pricing and Settlement as Filed RT components: : Computed

More information

Convergence bidding. Congestion revenue rights (CRR) settlement rule ISO PUBLIC 2015 CAISO

Convergence bidding. Congestion revenue rights (CRR) settlement rule ISO PUBLIC 2015 CAISO Convergence bidding Congestion revenue rights (CRR) settlement rule Module objective By the end of this module, student will be able to describe how the use of congestion revenue rights may be impacted

More information

Power Supplier Energy Settlements

Power Supplier Energy Settlements Power Supplier Energy Settlements Gina E. Craan Manager, Market Training New York Independent System Operator Accounting & Billing Workshop October 18 20, 2016 Latham, New York 2016 New York Independent

More information

Configuration Guide: Day Ahead Congestion - AS Regulation Down Import Settlement

Configuration Guide: Day Ahead Congestion - AS Regulation Down Import Settlement Settlements and Billing Configuration Guide: Day Ahead Congestion - AS Regulation Down Import Settlement CC 6760 Version 5.10 Table of Contents 1. Purpose of Document 3 2. Introduction 3 2.1 Background

More information

This memo provides highlights of market performance in October and November.

This memo provides highlights of market performance in October and November. California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Eric Hildebrandt, Executive Director, Market Monitoring Date: December 5, 2018 Re: Department of Market Monitoring

More information

Memorandum. This memorandum does not require Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum does not require Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Eric Hildebrandt, Executive Director, Market Monitoring Date: November 7, 2018 Re: Department of Market Monitoring

More information

Local Market Power Mitigation Enhancements discussion

Local Market Power Mitigation Enhancements discussion Local Market Power Mitigation Enhancements discussion Donald Tretheway Sr. Advisor- Market Design Policy Market Surveillance Committee General Session September 28, 2018 Work accomplished prior to issue/straw

More information

EIM Market Monitoring and Market Power Mitigation

EIM Market Monitoring and Market Power Mitigation EIM Market Monitoring and Market Power Mitigation Eric Hildebrandt, Ph.D. Director, Market Monitoring EIM Technical Workshop September 16, 2013 Outline Market monitoring overview Key EIM market design

More information

Order Minute Settlements

Order Minute Settlements Order 825 5 Minute Settlements Ray Fernandez Manager, Market Settlements Development Market Implementation Committee December 14, 2016 PJM Open Access Transmission Tariff 2 Tariff Changes PJM conducting

More information

Flexible Ramping Product. Draft Final Technical Appendix

Flexible Ramping Product. Draft Final Technical Appendix Flexible Ramping Product Draft Final Technical Appendix January 25, 2016 Table of Contents 1. Introduction... 3 2. Generalized flexible ramping capacity model... 3 3. Flexible ramping product summary...

More information

Standard Market Design: FERC Process and Issues

Standard Market Design: FERC Process and Issues Standard Market Design: FERC Process and Issues Richard O Neill and Udi Helman Division of the Chief Economic Advisor, Office of Markets, Tariffs and Rates Federal Energy Regulatory Commission IEEE PES

More information

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist Wholesale Energy Markets Overview Jeff Klarer Market Strategist Wisconsin Electric Utility Fuel Rules (PSC-116) Fuel Cost Components Fuel for generation (coal, natural gas, uranium, etc.) Energy market

More information

ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS

ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS presentation by George Gross Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign University

More information

Docket No. ER July 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity

Docket No. ER July 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity California Independent System Operator Corporation September 14, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Market Rule Amendment Proposal

Market Rule Amendment Proposal Market Rule Amendment Proposal PART 1 MARKET RULE INFORMATION Identification No.: Subject: Title: Day Ahead Market DAM Financial Transmission Rights Nature of Proposal: X Alteration Deletion Addition Chapter:

More information