1 MRTU CRR Settlements CRR Educational Class #10

2 Contents Why is CRR Settlements process important to understand Definition of LMP and CRR Types of CRRs: Obligation vs Option Point to Point and Multi Point CRRs Inter-SC Trades CRR settlements under different scenarios CRR Balancing Account Monthly Clearing Yearly Clearing M. Shafa 12/6/2005 to 12/8/2005 2

3 CRR Settlements Why is CRR Settlements process important to understand? The Settlements process calculates the CRR revenue to CRR holders and takes into account the cleared CRRs. A CRR balancing account will be created to reduce or eliminate the CRR holders revenue shortfall. M. Shafa 12/6/2005 to 12/8/2005 3

4 LMP and CRR LMP is the cost of supplying the next MW of load at a bus considering marginal cost of generation, congestion and losses. λ i = λ ref + λ cong i + λ loss i Factors that impact LMP are: Demand Available Generation Transmission Constraints Economic Dispatch CRRs provide a hedge against marginal congestion components of LMP (λ cong ) between sink and source in the Day Ahead market. Sink: Load, Export, Trading Hub Source: Generator, Import, Trading Hub CRRs will not hedge against marginal losses. M. Shafa 12/6/2005 to 12/8/2005 4

5 CRR Settlements: Obligation vs Option If the congestion component of LMP (λ cong ) at the sink is greater than at the source, then the CRR owner is entitled to receive a portion of congestion revenues. If the congestion component at sink is less than at the source, then: Obligation type CRR owner will be charged. Option type CRR owner will not be charged. CRR Entitlement (Obligation) = - [CRR (MW) * (DA λ cong sink DA λ cong source)] If DA λ cong sink > DA λ cong source: CRR Entitlement (Option) = - [CRR (MW) * (DA λ cong sink DA λ cong source)] If DA λ cong sink < DA λ cong source: CRR Entitlement (Option) = 0 M. Shafa 12/6/2005 to 12/8/2005 5

6 Point to Point CRR Example A B λ A = $10 (Reference Bus) λ B = (λ ref = $10) + ( λ cong = $5 ) + (λ loss = $1) = $16 Schedule & CRR Consistent & In the Direction of Congestion A SC owns 100 MW of CRRs from A-B and schedules 100 MW from A-B. CRR Revenue Entitlement (Obligation Type) = -100 (5) = CRR Revenue Entitlement (Option Type) = Charge to SC = 100 (16) (10) = 600 Schedule & CRR Consistent & In Opposite Direction of Congestion A SC owns 100 MW of CRRs from B-A and schedules 100 MW from B-A. CRR Revenue Entitlement (Obligation Type) = -100 (0 5) = 500 Charge to SC = 100 (10) (16) = (Payment to SC) M. Shafa 12/6/2005 to 12/8/2005 6

7 Multi-Point CRR Example λ cong A = $10 20 MW Injection at A 60 MW Withdrawal at D λ cong D = $25 λ cong B = $5 10 MW Injection at B 20 MW Withdrawal at E λ cong E= $20 λ cong C = $15 50 MW Injection at C CRR Entitlement = - [ (CRR MW at each Sink * DA corresponding Sink λ cong ) - (CRR MW at each Source) * DA corresponding Source λ cong ) ] CRR Entitlement = - [ (60 * 25) + (20 * 20) ] [ (20 * 10) + (10 * 5) + (50 *15) ] = M. Shafa 12/6/2005 to 12/8/2005 7

8 Generation & Load Aggregation Trading Hubs are used for inter-sc trades and include all the generators within the existing zones NP15, ZP26, SP15 Load Zones will include all the loads within the load aggregation area with exceptions (e.g., ETC load, pump load) Load zone schedules and bids will be distributed to the nodal level by LDFs There are a number of LDFs referred to in Load Zone aggregation: IFM preliminary LDFs based on preferred load schedules, i.e, load not curtailed: Not used in Settlements IFM final LDFs determined from final load schedules Used in IFM Energy Market Settlement CRR Settlements (Release 1) Static LDFs used during the CRR allocation/auction Used in CRR Settlements (Release 2) M. Shafa 12/6/2005 to 12/8/2005 8

9 Load Aggregation Load Aggregated Price = Σ (λ i * LDF i ) LDF = Load schedule at the node / Σ Load schedules within the Load Aggregation Depending on which set of LDFs are used for the load zone, there are 2 options to settle with the CRR holders. Option 1: Settle with the CRR Holders based on the LMP that is derived from LDFs used during the CRR allocation/auction. (Release 2) Option 2: Settle with CRR holders based on the same LMP that is derived from hourly load schedules in the Day Ahead market. (Release 1) M. Shafa 12/6/2005 to 12/8/2005 9

10 DA Inter-SC Energy Trade Example Node A Trading Hub B Load Zone C Inter-SC Trade SC 2 S 2 =100 MW S 1 =100 MW SC 1 Q=100MW G1 G2 G3 Q=100MW L1 L2 Assumptions: SC1 schedules 100 MW generation at node A and trades with SC2 at Trading Hub B. SC2 s load of 100 MW is at standard Load Aggregation C. SC1 has 100 MW CRR from A-B. SC2 has 100 MW CRR from B-C. Trading Hub B consists of G1, G2, G3 nodes. Load Zone C is comprised of nodes L1, L2. No Losses DA Market Solution (IFM): Creates LMP at each node. Model generation with bid at node A. Trading Hubs are not explicitly modeled in DA market run. Used only in scheduling and Settlements. Model load with bid at C using DA LDF to allocate final load schedule to individual nodes within Load Zone. M. Shafa 12/6/2005 to 12/8/

11 DA Inter-SC Energy Trade Example Node A Trading Hub B Load Zone C Inter-SC Trade SC 2 S 2 =100 MW S 1 =100 MW SC 1 Q=100MW G1 G2 G3 Q=100MW L1 L2 For Trading Hub B, same weights are used for settlement of both energy and CRRs. For Load Zone C, 2 sets of LDFs could be used for settling CRRs: 1) same set of LDFs determined in CRR release (Option 1) 2) LDFs based on final hourly load schedule (Option 2) B (Trading Hub) G1 0.4 G2 0.5 G3 0.1 Trading Hub Weights Load Zone C LDFs from CRR release Load Zone C LDF from hourly load sch. Let s explore 2 cases when the IFM LDFs are different from LDFs derived during the CRR release. C (Load Zone) L1 0.3 Case a: 0.4 Case b: 0.2 L M. Shafa 12/6/2005 to 12/8/

12 DA Inter-SC Energy Trade Example S 1 =100 MW SC 1 Node A Trading Hub B Load Zone C Q=100MW Inter-SC Trade G1 Q=100MW S 2 =100 MW λ A =$9 λ B =$12.7 λ C* =$17.4 λ C =$17.2 (case a) or $17.6 (case b) Assuming λ A = $9, λ G1 = $10, λ G2 = $15, λ G3 = $12, λ L1 = $16, λ L2 = $18, the weighted average LMPs are: G2 G3 SC 2 L1 L2 Trading Hub Weights Load Zone C LDFs used in CRR auction Hourly Final Load Zone C LDF λ i B (Trading Hub) G G G C (Load Zone) L1 0.3 Case a: 0.4 Case b: L λ B : Trading Hub B LMP = Σ (λ i * LDF i ) = (0.4 * 10) + (0.5 * 15) + (0.1 * 12) = $ 12.7 λ C* (derived LMP based on LDFs from CRR release) = (0.3 * 16) + (0.7 * 18) = $ 17.4 λ C (derived LMP based on hourly LDFs-published): Case a = (0.4 * 16) + (0.6 * 18) = $ 17.2 Case b = (0.2 * 16) + (0.8 * 18) = $ 17.6 M. Shafa 12/6/2005 to 12/8/

13 DA Inter-SC Energy Trade Example Node A Trading Hub B Load Zone C Inter-SC Trade SC 2 S 2 =100 MW S 1 =100 MW SC 1 Q=100MW G1 G2 G3 Q=100MW L1 L2 λ A =$9 λ B =$12.7 λ C* =$17.4 λ C =$17.2 (case a) or $17.6 (case b) From A-B: Energy Market Settlement Energy Market Settlement for SC1: Source at node A gets paid -100 * (λ A = 9) = - $900 From B-C: Sink at node B gets charged 100 * (λ B = $12.7) = $ 1270 Net Energy Market settlement charges: = $370 Energy Market Settlement for SC2: Source at node B gets paid -100 * (λ B = 12.7) = - $1270 Case a: Sink at C gets charged 100 * (λ C = $17.2) = $ 1720 Net Energy Market settlement charges: = $450 Case b: Sink at C gets charged 100 * (λ C = $17.6) = $ 1760 Net Energy Market settlement charges: = $490 M. Shafa 12/6/2005 to 12/8/

14 DA Inter-SC Energy Trade Example S 1 =100 MW SC 1 Node A Trading Hub B Load Zone C Q=100MW Inter-SC Trade G1 G2 G3 Q=100MW SC 2 S 2 =100 MW λ A =$9 λ B =$12.7 λ C* =$17.4 λ C =$17.2 (case a) or $17.6 (case b) L1 L2 CRR Settlement From A-B: SC1 with 100 MW CRR from A-B gets paid: - (100) * (12.7-9) = -$370 From B-C: There are 2 options to settle with SC2 that has 100 MW CRR from B-C: Option 1: Use λ C* as the sink LMP: CRR Entitlement: * [(λ C* = $17.4) (λ B = $12.7) ] = -$470 Option 2: Use λ C as the sink LMP : Case a: CRR Entitlement from B-C for SC2 : * [(λ C = $17.2) (λ B = $12.7) = -$450 Case b: CRR Entitlement from B-C for SC2 : * [(λ C = $17.6) (λ B = $12.7) = -$490 M. Shafa 12/6/2005 to 12/8/

15 DA Inter-SC Energy Trade Example S 1 =100 MW SC 1 Node A Trading Hub B Load Zone C Q=100MW Inter-SC Trade Q=100MW Results S 2 =100 MW λ A =$9 λ B =$12.7 λ C* =$17.4 λ C =$17.2 (case a) or $17.6 (case b) From A-B: SC1 is charged $370 for Energy Market Settlement and is paid $370 for CRR Settlement From B-C: SC2 gets charged $450 (case a) or $490 (case b) for Energy Market Settlement CRR Settlement: Under Option 1, SC2 gets paid $470. Under Option 2, SC2 gets paid $450 (case a) or $490 (case b) G1 G2 G3 If CRRs are consistent with schedules: Under Option 1, the CRR holder is settled based on a LMP at C which could be different from the LMP used in IFM for energy settlement (could get paid more or less than their energy market settlement). Under Option 2, the CRR holder is settled based on the same LMP that is used in IFM for energy settlement (entitled to get paid the same amount as their energy market settlement). SC 2 L1 L2 M. Shafa 12/6/2005 to 12/8/

16 CRR Settlement Scenarios The following CRR Settlements scenarios are covered: Unconstrained network Constrained network Constrained network with transmission derate M. Shafa 12/6/2005 to 12/8/

17 Assumptions for the Settlement Scenarios GA Bid = $10/MWh 0<= GA <= 200 A B GB Bid = $20/MWh 0<= GB <= 200 C GC Bid = $40/MWh 0<= GC <= 200 Load = 180 MW 3 Bus looped system with equal reactances (XAB = XBC = XAC) There are no losses. Nodes A, B, C each have a generator rated 200 MW. Their bids are $10, $20, $40 respectively. Load is at node C and does not submit a bid. (If C is a load zone, its LDFs are the same under Options 1 and 2). M. Shafa 12/6/2005 to 12/8/

18 Power Transfer Distribution Factors 1 MW 1/3 MW 1/3 MW A B A B 1 MW 2/3 MW 1/3 MW 1/3 MW 2/3 MW C C 1 MW 1 MW M. Shafa 12/6/2005 to 12/8/

19 Scenario 1: Unconstrained Network GA Bid = $10/MWh 0<= GA <= 200 GA = 180 MW λ A = $10 λ B = $10 60 MW A B GB Bid = $20/MWh 0<= GB <= 200 GB = 0 MW 120 MW Line Limit = 200 MW GC Bid = $40/MWh 0<= GC <= 200 GC = 0 MW C λ C = $10 60 MW Load = 180 MW Dispatch: G A = 180 MW G B = 0 MW G C =0 MW Flow on AC = 120 MW λ A = λ B = λ C = $10 M. Shafa 12/6/2005 to 12/8/

20 Scenario 2: Constrained Network GA Bid = $10/MWh 0<= GA <= 200 GA = 120 λ A = $10 λ B = $20 A 20 MW B λ cong B = $10 (Congestion component of LMP) GB Bid = $20/MWh 0<= GB <= 200 GB = 60 Optimal Dispatch: G A = 120 MW G B = 60 MW G C =0 MW λ A = $10 λ B = $20 λ C = -1 (10) + 2(20) = $30 Observations: 100 MW A-C Limit =100 MW GC Bid = $40/MWh 0<= GC <= 200 GC = 0 Load = 180 MW Load has no bid (price taker) and is not curtailed. G C is not dispatched and has no impact on λ C. λ C is greater than G A and G B bids. C Dec GA by 1 $10/MWh λ C = $30 λ cong C = $20 Inc GB by 2 $20/MWh 80 MW M. Shafa 12/6/2005 to 12/8/

21 Scenario 2a: Constrained Network λ A = $10 λ B = $20 GA =120 A 20 MW B λ cong B = $10 GB = 60 A-C Limit =100 MW 100 MW 80 MW GC = 0 Load = 180 MW Assumption: Owner of G A buys 120 MW CRR from A-C and owner of G B purchases 60 MW from B-C: Resource Energy Settlement CRR Entitlement CRR Revenue Allocation GA -120 * 10 = * (20 0) = * (3000 / 3000) = GB -60 * 20 = * (20 10) = * (3000 / 3000) = Load 180 * 30 = 5400 Total $3000 -$3000 -$3000 CRR Revenue Shortfall = CRR Entitlement CRR Revenue Allocation = 0 C λ C = $30 λ cong C = $20 M. Shafa 12/6/2005 to 12/8/

22 Scenario 2b: Constrained Network λ A = $10 λ B = $20 GA =120 A 20 MW B λ cong B = $10 GB = 60 A-C Limit =100 MW 100 MW 80 MW GC = 0 Load = 180 MW Assumption: CRR Holder 1 (owner of G A )buys 120 MW CRR from A-C CRR Holder 2 (owner of G B ) buys 120 MW CRR from B-C: CRR Holder 3 buys 60 MW CRR from C-B: C λ C = $30 λ cong C = $20 Resource Energy Settlement CRR Entitlement CRR Revenue Allocation GA -120 * 10 = CRR1: -120 * (20 0) = * (3000 / 3000) = GB -60 * 20 = CRR2: -120 * (20 10) = * (3000 / 3000) = Load 180 * 30 = 5400 CRR3: 60 * (20 10) = * (3000 / 3000) = 600 Total $3000 -$3000 -$3000 CRR Revenue Shortfall = CRR Entitlement CRR Revenue Allocation = 0 M. Shafa 12/6/2005 to 12/8/

23 Scenario 3: same as Scenario 2a, except G B is out of service GA Bid = $10/MWh 0<= GA <= 200 GA = 150 λ A = $10 λ B = $ MW A-C Limit =100 MW A 50 MW B 50 MW λ cong B = $15 GC Bid = $40/MWh 0<= GC <= 200 GC = 30 C Load = 180 MW λ C = $40 λ cong C = $30 Optimal Dispatch: G A = 150 MW G c = 30 MW λ A = $10 λ B = 0.5 (10) (40) = $25 λ C = $40 Inc GA by 1/2 $10/MWh Inc GC by 1/2 $40/MWh M. Shafa 12/6/2005 to 12/8/

24 Scenario 3: Continued λ A = $10 λ B = $25 GA = 150 A 50 MW B λ cong B = $15 A-C Limit =100 MW 50 MW Assumption: Owner of G A GA buys 120 MW CRR from A-C and owner of G B purchases 60 MW from B-C: Resource Energy Settlement CRR Entitlement CRR Revenue Allocation GA -150 * 10 = * (30 0) = * (4500 / 4500) = GB - 60 * (30 15) = * (4500 / 4500) = GC -30 * 40 = Load 180 * 40 = 7200 Total $ $ $4500 CRR Revenue Shortfall = 0 GC = 30 Load = 180 MW C λ C = $40 λ cong C = $30 M. Shafa 12/6/2005 to 12/8/

25 Scenario 4: Capacity Reduction on Congested Path A B Interface X AC1 X AC2 C Assumptions: X AC = X AB = X BC X AC consists of X AC1, X AC2 and X AC1 = X AC2 Y AC = 1 / X AC = 1 / X AC1 + 1 / X AC2 = 2 / X AC1 X AC = ½ X AC1 If X AC2 is out, flow limit from A-C and shift factors change: X: Reactance Y: Admittance M. Shafa 12/6/2005 to 12/8/

26 Scenario 4: Power Transfer Distribution Factors 1 MW 1/2 MW 1/4 MW A B A B 1 MW 1/2 MW 1/2 MW 1/4 MW 3/4 MW C C 1 MW 1 MW M. Shafa 12/6/2005 to 12/8/

27 Scenario 4: Capacity Reduction on Congested Path λ A = $10 A 0 MW B λ B = $20 λ cong B = $10 GA Bid = $10/MWh 0<= GA <= 200 GA = 60 GB Bid = $20/MWh 0<= GB <= 200 GB = 120 A-C Limit = 60 MW 120 MW GC = 0 C Load = 180 MW λ C = $30 λ cong C = $20 Optimal Dispatch: G A = 60 MW G B = 120 MW G C = 0 λ A = $10, λ B = $20, λ C = 2(20) 1 (10) = $30 Inc GB by 2 $20/MWh Dec GA by 1 $10/MWh M. Shafa 12/6/2005 to 12/8/

28 Scenario 4: Power Flow Distribution 30 MW 60 MW A 30 MW B 120 MW 30 MW 30 MW 30 MW 90 MW C 60 MW 120 MW M. Shafa 12/6/2005 to 12/8/

29 Scenario 4a: Continued λ A 0 MW A = $10 B λ B = $20 λ cong B = $10 GA = 60 GB = 120 A-C Limit = 60 MW 120 MW GC = 0 Load = 180 MW C λ C = $30 λ cong C = $20 Assumption: Owner of G A buys 120 MW CRR from A-C and owner of G B purchases 60 MW from B-C: Resource Energy Settlement CRR Entitlement CRR Revenue Allocation GA -60 * 10 = * (20 0) = * (2400 / 3000) = GB -120 * 20 = * (20 10) = * (2400 / 3000) = Load 180 * 30 = 5400 Total $2400 -$3000 -$2400 CRR Revenue Shortfall = CRR Entitlement CRR Revenue Allocation = $600 G A Revenue Shortfall = = $ 480 Shortfall tracked in CRR Balancing Account G B Revenue Shortfall = = $ 120 M. Shafa 12/6/2005 to 12/8/

30 Scenario 4b: Continued λ A 0 MW λ A = $10 B B = $20 λ cong B = $10 GA = 60 A-C Limit = 60 MW GC = 0 Load = 180 MW Assumption: CRR 1 owns 120 MW CRR from A-C. CRR 2 owns 120 MW CRR from B-C. CRR 3 owns 60 MW counterflow CRR from C-B: Resource Energy Settlement CRR Entitlement CRR Revenue Allocation GA -60 * 10 = * (20 0) = * (2400 / 3000) = GB -120 * 20 = * (20 10) = * (2400 / 3000) = Load 180 * 30 = * (20 10) = * (2400 / 3000) = 480 Total $2400 -$3000 -$2400 CRR Revenue Shortfall = CRR Entitlement CRR Revenue Allocation = $600 CRR 1 Revenue Shortfall = = $ 480 CRR 2 Revenue Shortfall = = $ 240 CRR 3 Undercharge = = $ 120 C 120 MW λ C = $30 λ cong C = $20 GB = 120 Shortfall tracked in CRR Balancing Account M. Shafa 12/6/2005 to 12/8/

31 CRR Balancing Account A single Balancing Account for all PTOs will be established to reduce CRR owners revenue shortfall. Funds in the Balancing Account are derived from the following sources: Hourly DA Congestion Revenues (excluding ETC/TOR/Converted Rights balanced schedules) Hourly DA Congestion Revenues from AS imports on Congested interties CRR Auction Revenues (allocated monthly) M. Shafa 12/6/2005 to 12/8/

32 Congestion Revenues from Interties If there is congestion on an intertie over which AS is imported, a congestion charge will be assessed based on the AS capacity awarded and the transmission shadow price of the intertie. Ex: A 100 MW AS import at COI is awarded to SC1. Assuming the shadow price at COI is $20, SC1 will be charged 100 * $20 = $2000. M. Shafa 12/6/2005 to 12/8/

33 Annual CRR Auctions Once a year the ISO will conduct peak and off peak CRR auctions for each season. ISO will collect the auction revenues for each season and will divide it by the number of months within each season ISO will have auction revenues for each month of the trade year derived from the annual CRR auction. M. Shafa 12/6/2005 to 12/8/

34 Ex:Annual CRR Auction Revenues Season 1: Month 1,2,3 Season 2: Month 4,5 Season 3: Month 6,7,8,9 Season 4: Month 10,11,12 Auction Revenues = $1.2M Auction Revenues = $0.6M Auction Revenues = $1.0M Auction Revenues = $1.8M Month 1,2,3 Auction Revenues = $400,000 Month 4,5 Auction Revenues = $300,000 Month 6,7,8,9 Auction Revenues = $250,000 Month 10,11,12 Auction Revenues = $600,000 M. Shafa 12/6/2005 to 12/8/

35 Total CRR Auction Revenues for each Trade Month ISO will also collect revenues from monthly CRR auctions Month n Total Auction Revenues = (Month n Auction Revenues derived from Annual CRR Auctions + Month n Auction revenues from monthly CRR auctions) Ex: Month 1 s Annual Auction Revenues = $400,000 Month 1 s Monthly Auction Revenues = $100,000 Month 1 s Total Auction Revenues = $400,000 + $100,000= $500,000 The Total Auction Revenue for each trade month is applied to the CRR Balancing Account for the corresponding month. M. Shafa 12/6/2005 to 12/8/

36 CRR Balancing Account Clearing At the end of each month, funds from the Balancing Account will be allocated to CRR owners in proportion to their gross monthly shortfall. At the end of the year, any surplus funds are allocated to CRR owners in proportion to their gross un-recovered yearly shortfall. Any remaining surplus at the end of the year will be paid to PTOs in proportion to their Transmission Revenue Requirement. M. Shafa 12/6/2005 to 12/8/

37 Hourly CRR Settlements EX: Hour 1: Congestion revenues from SCs = $1000 Net payable to CRR Holders = $1200 as follows: CRR 1 Entitlement = $800 CRR 2 Entitlement = $600 CRR 3 Counterflow charges = $200 Prorate both charges and payments for the hour using the following hourly ratio: Net congestion revenues for the hour / Net CRR Entitlement for the hour Hourly ratio = $1000 / $1200 = 83.3% CRR 1 is paid = $800 * 83.3% = -$667 CRR1 Payment shortfall for the hour = $133 CRR 2 is paid = $600 * 83.3% = -$500 CRR2 Payment shortfall for the hour = $100 CRR 3 Counterflow charges = $200 * 83.3% = $167 CRR3 undercharge = $33 Total net payment = $1000 Total net shortfall (net of underpayment and undercharges) = = $200 M. Shafa 12/6/2005 to 12/8/

38 Monthly Clearing of CRR Balancing Account Monthly shortfall is the sum of hourly shortfalls. Add all the payment shortfalls and undercharges for the all the hours in the month: Ex: CRR1 Payment Shortfall for the month = $1000 CRR2 Payment Shortfall for the month = $1500 CRR3 undercharges for the month = $600 The total shortfall in the month is the net of underpayment and undercharges for all the hours within the month = = $1900 If at the end of the month: a) Funds in the CRR balancing account >= Total monthly shortfall Pay CRR Holders payment shortfall in full and charge the counterflow CRR holders in full for the month Ex: Balance in CRR Balancing Account for the trade month = $2000 Total monthly shortfall = $1900 CRR1 Payment Shortfall for the month = $1000. Pay CRR1 $1000 Payment Shortfall = 0 CRR2 Payment Shortfall for the month = $1500. Pay CRR2 $1500 Payment Shortfall = 0 CRR3 undercharges for the month = $600. Charge CRR3 for $600 Undercharge = 0 Keep the additional $100 for yearly clearing. M. Shafa 12/6/2005 to 12/8/

39 Monthly Clearing of Balancing Account b) 0 < Funds in the CRR Balancing Acct. < Total monthly shortfall Pay CRR payment shortfall and charge counterflow CRRs prorata based on the Month s True Up Ratio = Funds in Balancing Acct. for month / Total monthly shortfall Ex: Balance in CRR Balancing Account = $1520 Total monthly shortfall = $1900 True up ratio for the month = $1520/ $1900 = 80% CRR1 Payment Shortfall for the month = $1000. Pay CRR1 80% ($1000) =$800 CRR1 s un-recovered shortfall for the month = $200 CRR2 Payment Shortfall for the month = $1500. Pay CRR2 80% ($1500) =$1200 CRR2 s un-recovered shortfall for the month = =$300 CRR3 undercharges for the month = $600. Charge CRR3 for 80% ($600) = $480 CRR3 adjusted undercharge amount for the month =$120 c) Funds in the CRR balancing account < 0 No adjustments until yearly clearing M. Shafa 12/6/2005 to 12/8/

40 Yearly Clearing of CRR Balancing Account If there is un-recovered revenue shortfall during the year: Month CRR Holder Un-recovered Shortfall ($)/ Undercharge 1 CRR CRR CRR (undercharge) 12 CRR CRR CRR Yearly shortfall is the sum of monthly shortfalls. Add up all the payment shortfalls and undercharges for the all the months in the year: CRR 1 s shortfall for the year = $800 + $300 = $1100 CRR 2 s shortfall for the year = $600 + $400 = $1000 CRR 3 s undercharge for the year = -$200 + $100 = -$100 The total shortfall in the year is the net of underpayment and undercharges for all the months within the year = = $2000 M. Shafa 12/6/2005 to 12/8/

41 Yearly Clearing of Balancing Account If at the end of the year: a) Funds in the CRR balancing account >= Total un-recovered yearly shortfall Pay CRR Holders payment shortfall in full and charge the counterflow CRR holders in full for the year. Pay any surplus to PTOs in proportion to their TRR. Ex: Balance in CRR Balancing Account at year end = $2200 The net yearly shortfall = $2000 CRR1 Payment Shortfall for the year = $1100. Pay CRR1 $1100 CRR1 adjusted Yearly Payment Shortfall = 0 CRR Holders receive full hedge. CRR2 Payment Shortfall for the year = $1000. Pay CRR2 $1000 CRR2 adjusted Yearly Payment Shortfall = 0 CRR Holders receive full hedge. CRR3 undercharges for the year = $100. Charge CRR3 for $100 CRR2 s adjusted undercharge for the year = 0 CRR Holders are fully charged Pay the surplus of $200 to PTOs. M. Shafa 12/6/2005 to 12/8/

42 Yearly Clearing of CRR Balancing Account b) 0 < funds in the CRR balancing account < Total un-recovered yearly shortfall Pay CRR payment shortfall and charge the counterflow CRRs prorata based on the Year s True Up Ratio = Funds in Balancing Acct. at year end / Total yearly shortfall Ex: Balance in CRR Balancing Account at year end = $1400 The net yearly shortfall = $2000 True up ratio for year = $1400/ $2000 = 70% CRR1 Payment Shortfall for the year = $1100. Pay CRR1 70% ($1100) =$770 CRR1 s un-recovered shortfall = $330 CRR Holders receive partial hedge. CRR2 Payment Shortfall for the year = $1000. Pay CRR2 70% ($1000) =$700 CRR2 s un-recovered shortfall= $300 CRR Holders receive partial hedge. CRR3 undercharges for the year = $100. Charge CRR3 for 70% ($100) = $70 CRR3 adjusted undercharge =$30 CRR Holders are partially charged No revenues will be available for PTOs. c) Funds in the CRR balancing account < = 0 No adjustments made CRR owners receive partial hedge. No revenues will be available for PTOs. M. Shafa 12/6/2005 to 12/8/

43 Settlement Flow From Hourly to Monthly For A Given Month Per Time-Of-Use Day-Ahead Congestion Revenues from A/S Import Day-Ahead Congestion Revenues (excluding TOR/ETC/CVR for Perfect Hedge exemption) Total Month s Auction Revenues Balancing Account (BA) CRR Obligation Charges Hourly CRR Settlement Process Hourly Surplus into BA Monthly Accumulated Surplus See previous examples Hourly Net Payable to CRR Holders (Full or Partial) Hourly Shortfall into BA Monthly Accumulated Shortfall Monthly Clearing at the End of the Month M. Shafa 12/6/2005 to 12/8/

44 Settlement Flow Monthly Clearing Of Balancing Account See previous examples There are two possibilities: If BA funds for the trade month Monthly Accumulated Shortfall If BA funds for the trade month < Monthly Accumulated Shortfall Partial true-up (partial payment and partial charge) to CRR Holders Remaining Shortfall tracked for yearly clearing of BA CRR Balancing Account Annual Accumulated Surplus Annual Accumulated Shortfall Full true-up (full payment and full charge) to CRR holders Remaining Surplus tracked for yearly clearing of BA Annual Clearing at the End of the Year M. Shafa 12/6/2005 to 12/8/

45 Settlement Flow Yearly Clearing of Balancing Account See previous examples There are two possibilities: If BA funds for the trade year Trade year Accumulated Shortfall If BA funds for the trade year < Trade Year Accumulated Shortfall Partial true-up (partial payment and partial charge) to CRR Holders Full true-up to CRR holders and full payment from CRR holders Remaining Shortfall is NOT covered by PTO or any other settlements mechanism Remaining Surplus paid to PTOs M. Shafa 12/6/2005 to 12/8/

Market Settlements - Advanced

Market Settlements - Advanced Market Settlements - Advanced FTR/ARR Module PJM State & Member Training Dept. PJM 2017 Agenda FTR/ARR Hedging Congestion FTR and ARR Billing Examples PJM 2017 2 Hedging Transmission Congestion PJM 2017

More information

Congestion Revenue Rights Auction Efficiency Track 1B Draft Tariff Language

Congestion Revenue Rights Auction Efficiency Track 1B Draft Tariff Language 6.5.1.3 Public Market Information 6.5.1.3.1 Annually, the CAISO shall publish the following information including, but not limited to: (a) Market Clearing Prices for all Aggregated PNodes used in the CRR

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix C... 2 Locational Marginal Price... 2 A. LMP Composition in the Day-Ahead Market... 2 C. The System Marginal Energy Cost Component of LMP... 3 D. Marginal Congestion Component

More information

CAISO. Settlements & Billing. CRR Hourly Settlement CC 6700

CAISO. Settlements & Billing. CRR Hourly Settlement CC 6700 CAISO Settlements & Billing CRR Hourly Settlement CC 6700 Table of Contents 1. Purpose of Document 3 2. Introduction 3 2.1 Background 3 2.2 Description 4 3. Charge Code Requirements 4 3.1 Business Rules

More information

Price Inconsistency Market Enhancements. Revised Straw Proposal

Price Inconsistency Market Enhancements. Revised Straw Proposal Price Inconsistency Market Enhancements Revised Straw Proposal August 2, 2012 Price Inconsistency Market Enhancements Table of Contents 1 Introduction... 3 2 Plan for Stakeholder Engagement... 3 3 Background...

More information

Financial Transmission Rights (FTRs), Auction Revenue Rights (ARRs) & Qualified Upgrade Awards (QUAs)

Financial Transmission Rights (FTRs), Auction Revenue Rights (ARRs) & Qualified Upgrade Awards (QUAs) Financial Transmission Rights (FTRs), Auction Revenue Rights (ARRs) & Qualified Upgrade Awards (QUAs) John Lally, Senior Engineer Market Administration Agenda FTR Basics FTR Auction FTR Settlement ARRs

More information

CAISO. Settlements & Billing CRR Auction Transaction Settlement CC 6798

CAISO. Settlements & Billing CRR Auction Transaction Settlement CC 6798 CAISO Settlements & Billing CRR Auction Transaction Settlement CC 6798 Table of Contents 1. Purpose of Document 3 2. Introduction 3 2.1 Background 3 2.2 Description 4 3. Charge Code Requirements 4 3.1

More information

CRR Prices and Pay Outs: Are CRR Auctions Valuing CRRs as Hedges or as Risky Financial instruments?

CRR Prices and Pay Outs: Are CRR Auctions Valuing CRRs as Hedges or as Risky Financial instruments? CRR Prices and Pay Outs: Are CRR Auctions Valuing CRRs as Hedges or as Risky Financial instruments? Scott Harvey Member: California ISO Market Surveillance Committee Market Surveillance Committee Meeting

More information

Convergence bidding. Congestion revenue rights (CRR) settlement rule ISO PUBLIC 2015 CAISO

Convergence bidding. Congestion revenue rights (CRR) settlement rule ISO PUBLIC 2015 CAISO Convergence bidding Congestion revenue rights (CRR) settlement rule Module objective By the end of this module, student will be able to describe how the use of congestion revenue rights may be impacted

More information

Congestion Revenue Rights Settlement Rule

Congestion Revenue Rights Settlement Rule California Independent System Operator Corporation Congestion Revenue Rights Settlement Rule Department of Market Monitoring August 18, 2009 I. Background Under nodal convergence bidding, the California

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification CRR Auction Efficiency 1B Date Created: 8/3/2018 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 27 Disclaimer All information contained in this draft Business Requirements Specification

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 28. Inter-SC Trades... 2 28.1 Inter-SC Trades Of Energy... 2 28.1.1 Purpose... 2 28.1.2 Availability Of Inter-SC Trades Of Energy... 2 28.1.3 Submission Of Inter-SC Trades Of Energy...

More information

CRR Auction Analysis Report

CRR Auction Analysis Report Report November 21, 2017 Prepared by: MQRI California Independent System Operator The following ISO staff contributed to this report: Danielle Tavel Abhishek Hundiwale Jie Duan Nongchao Guo Jim McClain

More information

Congestion Revenue Rights (CRR) Clawback Modification. Draft Final Proposal

Congestion Revenue Rights (CRR) Clawback Modification. Draft Final Proposal Congestion Revenue Rights (CRR) Clawback Modification Draft Final Proposal May 16, 2016 CRR Clawback Modification Draft Final Proposal Table of Contents 1 Introduction... 3 2 Stakeholder process and timeline...

More information

Market Surveillance Committee Activities September By Frank Wolak Chairman of the ISO Market Surveillance Committee

Market Surveillance Committee Activities September By Frank Wolak Chairman of the ISO Market Surveillance Committee Market Surveillance Committee Activities September 2004 By Frank Wolak Chairman of the ISO Market Surveillance Committee Four Opinions in Progress Trading Hubs Solution to the Seller s Choice Contracts

More information

Technical Bulletin Disconnected Pricing Node Process. Market Issue

Technical Bulletin Disconnected Pricing Node Process. Market Issue Technical Bulletin 2010-09-02 Disconnected Pricing Node Process Market Issue September 20, 2010 Introduction Technical Bulletin 2010-09-02 Disconnected Pricing Node Process As of the August 1, 2009 trading

More information

California ISO. Allocating CRR Revenue Inadequacy by Constraint to CRR Holders. October 6, Prepared by: Department of Market Monitoring

California ISO. Allocating CRR Revenue Inadequacy by Constraint to CRR Holders. October 6, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Allocating CRR Revenue Inadequacy by Constraint to CRR Holders October 6, 2014 Prepared by: Department of Market Monitoring TABLE OF CONTENTS

More information

Contingency Modeling Enhancements

Contingency Modeling Enhancements Contingency Modeling Enhancements Third Revised Straw Proposal Discussion December 10, 2015 Perry Servedio Senior Market Design & Regulatory Policy Developer Agenda Time Topic Presenter 10:00 10:05 Introduction

More information

Both the ISO-NE and NYISO allow bids in whole MWh increments only.

Both the ISO-NE and NYISO allow bids in whole MWh increments only. Attachment D Benchmarking against NYISO, PJM, and ISO-NE As the CAISO and stakeholders consider various design elements of convergence bidding that may pose market manipulation concerns, it is useful to

More information

ISO Tariff Original Sheet No. 637 ISO TARIFF APPENDIX L. Rate Schedules

ISO Tariff Original Sheet No. 637 ISO TARIFF APPENDIX L. Rate Schedules Original Sheet No. 637 ISO TARIFF APPENDIX L Rate Schedules Original Sheet No. 638 Schedule 1 Grid Management Charge The Grid Management Charge (ISO Tariff Section 8.0) is a formula rate designed to recover

More information

Convergence Bidding Overview. Jenny Pedersen Julianne Riessen Client Training Team

Convergence Bidding Overview. Jenny Pedersen Julianne Riessen Client Training Team Convergence Bidding Overview Jenny Pedersen Julianne Riessen Client Training Team Agenda Introductions Defining Convergence Bidding Project Participating in the Markets Registration and Affiliations Eligible

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 36. Congestion Revenue Rights... 3 36.1 Overview Of CRRs And Procurement Of CRRs... 3 36.2 Types Of CRR Instruments... 3 36.2.1 CRR Obligations... 3 36.2.2 CRR Options... 3 36.2.3 Point-To-Point

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 33 Hour-Ahead Scheduling Process (HASP)... 2 33.1 Submission Of Bids For The HASP And RTM... 2 33.2 The HASP Optimization... 3 33.3 Treatment Of Self-Schedules In HASP... 3 33.4 MPM For

More information

Pricing Transmission

Pricing Transmission 1 / 47 Pricing Transmission Quantitative Energy Economics Anthony Papavasiliou 2 / 47 Pricing Transmission 1 Locational Marginal Pricing 2 Congestion Rent and Congestion Cost 3 Competitive Market Model

More information

Congestion Revenue Rights Auction Efficiency Track 1B Draft Final Proposal

Congestion Revenue Rights Auction Efficiency Track 1B Draft Final Proposal Congestion Revenue Rights Auction Efficiency May 11, 2018 Prepared by: M&IP California Independent System Operator Table of Contents 1 Executive Summary... 3 2 Changes to this proposal... 5 3 Scope of

More information

Order Minute Settlements

Order Minute Settlements Order 825 5 Minute Settlements Ray Fernandez Manager, Market Settlements Development Market Implementation Committee December 14, 2016 PJM Open Access Transmission Tariff 2 Tariff Changes PJM conducting

More information

Suggested Change in Real-time LAP Pricing

Suggested Change in Real-time LAP Pricing Suggested Change in Real-time LAP Pricing Farrokh Rahimi Principal Market Engineer Market Surveillance Committee Meeting November 13, 2006 MRTU LAP Pricing and Settlement as Filed RT components: : Computed

More information

Price Effects of Real-Time Market Pricing Run Parameters

Price Effects of Real-Time Market Pricing Run Parameters Price Effects of Real-Time Market Pricing Run Parameters Edward Lo Lead Engineering Specialist, Market & Product Development MSC/Stakeholder Meeting on Parameter Maintenance September 25, 2008 Topics of

More information

Transmission Congestion Contacts

Transmission Congestion Contacts Transmission Congestion Contacts Horace Horton Senior Market Trainer, Market Training, NYISO New York Market Orientation Course (NYMOC) March 20-23, 2018 Rensselaer, NY 12144 1 Transmission Congestion

More information

WHITE PAPER. Financial Transmission Rights (FTR)/ Congestion Revenue Rights (CRR) Analysis Get ahead with ABB Ability PROMOD

WHITE PAPER. Financial Transmission Rights (FTR)/ Congestion Revenue Rights (CRR) Analysis Get ahead with ABB Ability PROMOD WHITE PAPER Financial Transmission Rights (FTR)/ Congestion Revenue Rights (CRR) Analysis Get ahead with ABB Ability PROMOD 2 W H I T E PA P E R F T R / C R R A N A LY S I S Market participants and system

More information

Five-Minute Settlements Education

Five-Minute Settlements Education Five-Minute Settlements Education Disclaimer PJM has made all efforts possible to accurately document all information in this presentation. The information seen here does not supersede the PJM Operating

More information

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts 1. Commission Directives to Submit a Market Redesign Plan The direct origin of the requirement that the CAISO

More information

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright c 2016 Ross Baldick www.ece.utexas.edu/ baldick/classes/394v/ee394v.html Title Page 1 of 33

More information

Congestion revenue rights auction efficiency

Congestion revenue rights auction efficiency Congestion revenue rights auction efficiency Track 1 draft final proposal Perry Servedio Sr. Market Design Policy Developer February 13, 2018 Three tracks for addressing auction efficiency Track 0: Process

More information

(Blackline) VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL

(Blackline) VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL VOLUME NO. III Page No. 879 SCHEDULING PROTOCOL Table of Contents SP 1 SP 1.1 OBJECTIVES, DEFINITIONS AND SCOPE Objectives SP 1.2 Definitions SP 1.2.1 Master

More information

ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS

ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS presentation by George Gross Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign University

More information

Market Performance Metric Catalog

Market Performance Metric Catalog Market Performance Metric Catalog Version 1.35 March, 217 Market Performance Report, Meta Document Page 1 of 136 ISO Market Services VERSION HISTORY Date Version Description Author 5/28/29 1. Creation

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Locational Marginal Price... 2 A. LMP Composition in the Day-Ahead Market... 2 B. LMP Composition in the Real-Time Market... 2 C. The System Marginal Energy Cost Component of LMP (Day-Ahead

More information

Settlements and Billing. Configuration Guide: Day Ahead Congestion - AS Regulation Up Import Settlement CC Version 5.01

Settlements and Billing. Configuration Guide: Day Ahead Congestion - AS Regulation Up Import Settlement CC Version 5.01 Settlements and Billing Configuration Guide: Day Ahead Congestion - AS Regulation Up Import Settlement CC 6750 Version 5.01 Table of Contents 1. Purpose of Document 3 2. Introduction 3 2.1 Background 3

More information

ARRs and FTRs MISO Training

ARRs and FTRs MISO Training MISO Training Level 200 Auction Revenue Rights and Financial Transmission Rights Last material update: 07/09/2015 Course Content and Disclaimer 2 Course Description 1 2 3 4 This is a Level 200 overview

More information

April 11, Tariff Amendments to Increase Efficiency of Congestion Revenue Rights Auctions

April 11, Tariff Amendments to Increase Efficiency of Congestion Revenue Rights Auctions California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 April 11, 2018 Re: California

More information

Scheduling and Pricing of Integrated Balancing Authority Areas (IBAAs)

Scheduling and Pricing of Integrated Balancing Authority Areas (IBAAs) Scheduling and Pricing of Integrated Balancing Authority Areas (IBAAs) J. Buglino, Senior Client Trainer February 24, 2009 Agenda What is an Integrated Balancing Authority Area? IBAA Scheduling and Pricing

More information

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study California ISO Report Regional Surplus Allocation Impact Study October 6, 2010 Regional Surplus Allocation Impact Study Table of Contents Executive Summary... 3 1 Issue and Background... 3 2 Study Framework...

More information

Standard Market Design: FERC Process and Issues

Standard Market Design: FERC Process and Issues Standard Market Design: FERC Process and Issues Richard O Neill and Udi Helman Division of the Chief Economic Advisor, Office of Markets, Tariffs and Rates Federal Energy Regulatory Commission IEEE PES

More information

FERC Order Minute Settlements Manual Revisions

FERC Order Minute Settlements Manual Revisions FERC Order 825 5 Minute Settlements Manual Revisions Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee October 30, 2017 Impacted Settlement Manuals M-27 Open Access

More information

A Tutorial on the Flowgates versus Nodal Pricing Debate. Fernando L. Alvarado Shmuel S. Oren PSERC IAB Meeting Tutorial November 30, 2000

A Tutorial on the Flowgates versus Nodal Pricing Debate. Fernando L. Alvarado Shmuel S. Oren PSERC IAB Meeting Tutorial November 30, 2000 A Tutorial on the Flowgates versus Nodal Pricing Debate Fernando L. Alvarado Shmuel S. Oren PSERC IAB Meeting Tutorial November 30, 2000 PSERC IAB Meeting, November 2000 Objectives 1. Understand the relationship

More information

Business Practice Manual for Congestion Revenue Rights. Version 2019

Business Practice Manual for Congestion Revenue Rights. Version 2019 Business Practice Manual for Congestion Revenue Rights Version 2019 Last Revised: August 254, 2016 Approval History Approval Date: 06-07-2007 Effective Date: 06-07-2007 BPM Owner: Benik Der-Gevorgian BPM

More information

Congestion Revenue Rights (CRR) Auction Efficiency Track 1B

Congestion Revenue Rights (CRR) Auction Efficiency Track 1B Congestion Revenue Rights (CRR) Auction Efficiency Track 1B Pre-Market Simulation Webinar October 31, 2018 Radha Madrigal External Training and Readiness The information contained in these materials is

More information

Standard Market Design

Standard Market Design Standard Market Design Dynegy s Perspective Characteristics of the Standard Market Design - SMD RTO provides all transmission service and takes on many if not all control area functions. RTO operates an

More information

Convergence bidding. IFM tier 1 uplift obligation ISO PUBLIC 2015 CAISO

Convergence bidding. IFM tier 1 uplift obligation ISO PUBLIC 2015 CAISO Convergence bidding IFM tier 1 uplift obligation Module Objectives Evaluate what triggers the IFM Tier 1 Uplift Obligation when participating in Convergence Bidding Identify key components to validate

More information

Southern California Edison Stakeholder Comments. Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013

Southern California Edison Stakeholder Comments. Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013 Southern California Edison Stakeholder Comments Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013 Submitted by Company Date Submitted Paul Nelson (626) 302-4814 Jeff Nelson (626)

More information

Opinion on Congestion Revenue Rights Auction Efficiency, Track 1B. by James Bushnell, Member Scott M. Harvey, Member Benjamin F.

Opinion on Congestion Revenue Rights Auction Efficiency, Track 1B. by James Bushnell, Member Scott M. Harvey, Member Benjamin F. Opinion on Congestion Revenue Rights Auction Efficiency, Track 1B by James Bushnell, Member Scott M. Harvey, Member Benjamin F. Hobbs, Chair Members of the Market Surveillance Committee of the California

More information

Market Performance Metric Catalog

Market Performance Metric Catalog Market Performance Metric Catalog Version 1.36 October 218 Market Performance Report, Meta Document Page 1 of 14 ISO Market Services VERSION HISTORY Date Version Description Author 5/28/29 1. Creation

More information

5.2 Transmission Congestion Credit Calculation Eligibility.

5.2 Transmission Congestion Credit Calculation Eligibility. 5.2 Transmission Congestion culation. 5.2.1 Eligibility. (a) Except as provided in Section 5.2.1(b), each FTR Holder shall receive as a Transmission Congestion Credit a proportional share of the total

More information

Posting Date: 08/01/2015 Gentry Crowson, Market Forensics

Posting Date: 08/01/2015 Gentry Crowson, Market Forensics VRL Analysis Posting Date: 08/01/2015 Gentry Crowson, Market Forensics 2 Contents Executive Summary... 3 Background... 6 Analysis of OC Breach Characteristics in the Marketplace... 8 VRL Yearly Analysis

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: June 14, 2018 Re: Decision on congestion

More information

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing I. Day Ahead and Real Time Energy and Ancillary Services Pricing Prices that Accurately Reflect the Marginal Cost of

More information

5 Minute Settlements. Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee November 10,

5 Minute Settlements. Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee November 10, 5 Minute Settlements Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee November 10, 2016 5 minute Real-Time Net Interchange On a 5 minute basis, an imbalance is inherently

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

LSE Perspective on FTR and ARR Surplus Funds. Jeff Whitehead Direct Energy

LSE Perspective on FTR and ARR Surplus Funds. Jeff Whitehead Direct Energy LSE Perspective on FTR and ARR Surplus Funds Jeff Whitehead Direct Energy Congestion Revenue Entitlement Transmission Customers paid and continue to pay the embedded cost of the transmission system Transmission

More information

2003 Annual Report on Market Issues and Performance

2003 Annual Report on Market Issues and Performance 2003 Annual Report on Market Issues and Performance Board of Governors Meeting April 22, 2004 Greg Cook Manager of Market Monitoring Issues in 2003-04 CALIFORNIA ISO and FERC: Continue to work through

More information

ARR/FTR Market Update: ATC Customer Meeting. August 20, 2009

ARR/FTR Market Update: ATC Customer Meeting. August 20, 2009 ARR/FTR Market Update: ATC Customer Meeting August 20, 2009 Agenda ARR Allocation FTR Annual/Monthly Auction Challenge 2 Allocation Overview 101 Market Participants took part in the 2009-2010 Annual ARR

More information

Local Market Power Mitigation Enhancements. Conference Call March 25, 2011

Local Market Power Mitigation Enhancements. Conference Call March 25, 2011 Local Market Power Mitigation Enhancements Conference Call March 25, 2011 ISO Stakeholder Initiative Process We Are Here Page 2 Agenda for today s meeting Estimated Topic Presenter Time 10:00 10:10 Introduction

More information

The Future of Nodal Trading.

The Future of Nodal Trading. The Future of Nodal Trading. Moderator: Jim Krajecki, Director with Customized Solutions Panel: - Noha Sidhom, General Counsel for Inertia Power LP. - Shawn Sheehan, Principal with XO - Wes Allen, CEO

More information

Uplift Charges, FTR Underfunding and Overallocation

Uplift Charges, FTR Underfunding and Overallocation Uplift Charges, FTR Underfunding and Overallocation Solutions in PJM Getting to Yes on Uplift Allocation Fixing FTR Funding Abram W. Klein 9 October 2014 Platts Nodal Trader Conference New York City Discussion

More information

Configuration Guide: Day Ahead Congestion - AS Regulation Down Import Settlement

Configuration Guide: Day Ahead Congestion - AS Regulation Down Import Settlement Settlements and Billing Configuration Guide: Day Ahead Congestion - AS Regulation Down Import Settlement CC 6760 Version 5.10 Table of Contents 1. Purpose of Document 3 2. Introduction 3 2.1 Background

More information

Integrated Marketplace: TCR Bid Activity

Integrated Marketplace: TCR Bid Activity The information, practices, processes and procedures outlined and contained in this publication are the intellectual property of Southwest Power Pool, Inc. ( SPP ) and are protected by law. SPP provides

More information

Two-Tier Real-Time Bid Cost Recovery. Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008

Two-Tier Real-Time Bid Cost Recovery. Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008 Two-Tier Real-Time Bid Cost Recovery Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008 The CAISO has posted an Issue Paper exploring the redesign

More information

Energy Imbalance Market Neutrality Technical Workshop. Conference Call: September 3, 2013 Updated: September 5, 2013

Energy Imbalance Market Neutrality Technical Workshop. Conference Call: September 3, 2013 Updated: September 5, 2013 Energy Imbalance Market Neutrality Technical Workshop Conference Call: September 3, 2013 Updated: September 5, 2013 Neutrality accounts needed since not all energy is settled through real-time market An

More information

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Submitted by Company Date Submitted Will Dong Paul Gribik (415) 973-9267 (415) 973-6274 PG&E December 5, 2013 Pacific

More information

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission 1 Introduction This paper provides a draft proposal as well as a list of underlying principles for allocating Congestion

More information

CHAPTER 3: Point to Point and Flow-based Financial Transmission Rights: Revenue Adequacy and Performance Incentives

CHAPTER 3: Point to Point and Flow-based Financial Transmission Rights: Revenue Adequacy and Performance Incentives CHAPTER 3: Point to Point and Flow-based Financial Transmission Rights: Revenue Adequacy and Performance Incentives Shmuel S. Oren 1 Abstract We provide an introduction to financial transmission rights

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

EIM Market Monitoring and Market Power Mitigation

EIM Market Monitoring and Market Power Mitigation EIM Market Monitoring and Market Power Mitigation Eric Hildebrandt, Ph.D. Director, Market Monitoring EIM Technical Workshop September 16, 2013 Outline Market monitoring overview Key EIM market design

More information

D. RSCP SUPPLIER PAYMENTS AND CUSTOMER RATES

D. RSCP SUPPLIER PAYMENTS AND CUSTOMER RATES 32 RSCP SUPPLIER PAYMENTS AND CUSTOMER RATES D. RSCP SUPPLIER PAYMENTS AND CUSTOMER RATES This summary is provided for bidder convenience only. Any statements herein describing BGS- RSCP rates or supplier

More information

This report summarizes key market conditions, developments, and trends for November 2001.

This report summarizes key market conditions, developments, and trends for November 2001. California Independent System Operator Memorandum To: ISO Board of Governors From: Anjali Sheffrin, Director of Market Analysis CC: ISO Officers, ISO Board Assistants Date: February 1, 22 Re: Market Analysis

More information

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist Wholesale Energy Markets Overview Jeff Klarer Market Strategist Wisconsin Electric Utility Fuel Rules (PSC-116) Fuel Cost Components Fuel for generation (coal, natural gas, uranium, etc.) Energy market

More information

Opinion on Congestion Revenue Rights Auction Efficiency. by James Bushnell, Member Scott M. Harvey, Member Benjamin F.

Opinion on Congestion Revenue Rights Auction Efficiency. by James Bushnell, Member Scott M. Harvey, Member Benjamin F. Opinion on Congestion Revenue Rights Auction Efficiency by James Bushnell, Member Scott M. Harvey, Member Benjamin F. Hobbs, Chair Members of the Market Surveillance Committee of the California ISO Draft

More information

FTR Forfeiture Implementation

FTR Forfeiture Implementation FTR Forfeiture Implementation MIC March 6, 2013 Joe Bowring Seth Hayik Objective If a holder of an FTR has an inc or a dec with delivery or receipt points at or near delivery or receipt points of the FTR

More information

This memo provides highlights of market performance in October and November.

This memo provides highlights of market performance in October and November. California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Eric Hildebrandt, Executive Director, Market Monitoring Date: December 5, 2018 Re: Department of Market Monitoring

More information

ATC Customer Benefit Metric

ATC Customer Benefit Metric ATC Customer Benefit Metric Marty Smith ATC Economic Planning April 5, 2012 Helping to keep the lights on, businesses running and communities strong Background ATC has used the Customer Benefit (CB) Metric

More information

5.2 Transmission Congestion Credit Calculation Eligibility.

5.2 Transmission Congestion Credit Calculation Eligibility. 5.2 Transmission Congestion Credit Calculation. 5.2.1 Eligibility. (a) Except as provided in Section 5.2.1(b), each FTR Holder shall receive as a Transmission Congestion Credit a proportional share of

More information

Comments in FERC Docket No. RM The FGR vs. FTR debate: Facts and Misconceptions

Comments in FERC Docket No. RM The FGR vs. FTR debate: Facts and Misconceptions Comments in FERC Docket No. RM01-12-000 The FGR vs. FTR debate: Facts and Misconceptions Shmuel S. Oren University of California at Berkeley 4119 Etcheverry Hall, Berkeley, CA 94720 oren@ieor.berkeley.edu

More information

PJM FTR Center Users Guide

PJM FTR Center Users Guide PJM 2016 FTR Center Users Guide Disclaimer The PJM FTR Center Users Guide is intended to provide Market Participants and other interested parties with introductory information about the bidding and administrative

More information

Marginal Loss Surplus Allocation Study (Progress Report)

Marginal Loss Surplus Allocation Study (Progress Report) Marginal Loss Surplus Allocation Study (Progress Report) Farrokh Rahimi Principal Market Engineer Stakeholder Meeting, August 17, 2006 Overview Market Initiatives Stakeholder Meeting of July 18-19: Agreed

More information

Optimal Bidding Strategies in Electricity Markets*

Optimal Bidding Strategies in Electricity Markets* Optimal Bidding Strategies in Electricity Markets* R. Rajaraman December 14, 2004 (*) New PSERC report co-authored with Prof. Fernando Alvarado slated for release in early 2005 PSERC December 2004 1 Opening

More information

Comments of PacifiCorp on the Consolidated EIM Initiatives

Comments of PacifiCorp on the Consolidated EIM Initiatives Comments of PacifiCorp on the Consolidated EIM Initiatives Submitted by Company Date Submitted Christine Kirsten christine.kirsten@pacificorp.com 916-207-4693 PacifiCorp June 30, 2017 Introduction PacifiCorp

More information

Contingent Transmission Rights in the Standard Market Design

Contingent Transmission Rights in the Standard Market Design 1 Contingent Transmission Rights in the Standard Market Design Richard O'Neill, Udi Helman, Ross Baldick, William Stewart, Michael Rothkopf Abstract We define transmission rights that are compatible with

More information

Intertie Deviation Settlement: Draft Final Proposal

Intertie Deviation Settlement: Draft Final Proposal Intertie Deviation Settlement: Draft Final Proposal Megan Poage & Danielle Tavel Market Design Policy Stakeholder Call December 19, 2018 IDS Draft Final Proposal, Stakeholder Call December 19, 2018 9:00

More information

Hedging Risk. Quantitative Energy Economics. Anthony Papavasiliou 1 / 47

Hedging Risk. Quantitative Energy Economics. Anthony Papavasiliou 1 / 47 1 / 47 Hedging Risk Quantitative Energy Economics Anthony Papavasiliou 2 / 47 Contents 1 Forward Contracts The Price of Forward Contracts The Virtues of Forward Contracts Contracts for Differences 2 Financial

More information

Consolidated EIM Initiatives Straw Proposal

Consolidated EIM Initiatives Straw Proposal Consolidated EIM Initiatives Straw Proposal Stakeholder Meeting August 7, 2017 Megan Poage & Don Tretheway Market Design & Policy Agenda Time Topic Presenter 10:00 10:15 Introduction and Purpose Kristina

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

Financial Transmission Rights Markets: An Overview

Financial Transmission Rights Markets: An Overview Financial Transmission Rights Markets: An Overview Golbon Zakeri A. Downward Department of Engineering Science, University of Auckland October 26, 2010 Outline Introduce financial transmission rights (FTRs).

More information

CRR Conference Call Meeting Minutes June 20, 2018

CRR Conference Call Meeting Minutes June 20, 2018 CRR Conference Call Meeting Minutes June 20, 2018 The California Independent System Operator hosts a bi-weekly Congestion Revenue Rights (CRR) conference call on Wednesdays at 11AM. This is an opportunity

More information

Market Rule Amendment Proposal

Market Rule Amendment Proposal Market Rule Amendment Proposal PART 1 MARKET RULE INFORMATION Identification No.: Subject: Title: Day Ahead Market DAM Financial Transmission Rights Nature of Proposal: X Alteration Deletion Addition Chapter:

More information

Design of a Transmission Rights Exchange

Design of a Transmission Rights Exchange Design of a Transmission Rights Exchange, Frontier Economics Inc. * Introduction It has long been recognized that the loop flow effects of power on an interconnected network may pose special problems for

More information

Real Time Scheduling. Reserve Settlements

Real Time Scheduling. Reserve Settlements Real Time Scheduling Reserve Settlements General Settlement Rules There will be a full two settlement. Reserve services will be scheduled and settled nominally on a 5-min. basis. Units are not required

More information

Analysis of Trading and Scheduling Strategies Described in Enron Memos

Analysis of Trading and Scheduling Strategies Described in Enron Memos Analysis of Trading and Scheduling Strategies Described in Enron Memos Report Department of Market Analysis October 4, 2002 CAISO/DMA/ewh 1 Introduction This report summarizes additional analysis that

More information

Congestion revenue rights auction efficiency Track 1B straw proposal stakeholder meeting April 23, 2018

Congestion revenue rights auction efficiency Track 1B straw proposal stakeholder meeting April 23, 2018 Congestion revenue rights auction efficiency Track 1B straw proposal stakeholder meeting April 23, 2018 Perry Servedio Sr. Market Design Policy Developer CAISO policy initiative stakeholder process POLICY

More information