1 Local Market Power Mitigation Enhancements Conference Call March 25, 2011
2 ISO Stakeholder Initiative Process We Are Here Page 2
3 Agenda for today s meeting Estimated Topic Presenter Time 10:00 10:10 Introduction Chris Kirsten 10:10 10:20 Background Cynthia Hinman 10:20 10:40 Straw Proposal Cynthia Hinman 10:40 11:15 Examples Cynthia Hinman / Lin Xu 11:15 11:50 Inline Competitive Path Jeff McDonald Assessment 11:50 12:00 Next Steps Chris Kirsten Page 3
4 Goal of the LMPM straw proposal Meet the FERC requirement to use bid-in demand Incorporate design elements to reflect the implementation of: Convergence bidding Proxy demand resource Improve accuracy of mitigation in real-time market Provide the opportunity to incorporate inline competitive path designation Page 4
5 From issue paper to straw proposal Input from stakeholders MSC Meeting Stakeholder comments Other ISOs' mitigation processes The DMM approach or Option B approach Page 5
6 Straw Proposal Locational Marginal Price (LMP) Decomposition process overview 1. Perform all constraints (AC) run 2. Decompose the LMP for each location a. Energy component b. Loss component c. Congestion cost component i. Competitive constraint component ii. Non-competitive constraint component 3. If the non-competitive component of a physical supply ppy bid > 0, it potentially has market power and requires mitigation. Page 6
7 Straw Proposal LMP Decomposition process overview (continued) 4. A physical supply bid will be mitigated to the higher of: a. Its default energy bid (DEB) b. Its competitive LMP (analogous to the LMP produced in today s competitive constraints run) if that is lower than its unmitigated bid 5. Virtual supply bids are not mitigated 6. Run IFM with mitigated bids Page 7
8 Straw Proposal LMP Decomposition details For location i: LMP i = LMP i EC + LMP i LC + LMP i CC + LMP i NC Where: EC = the energy component LC = the loss component CC = the competitive constraints congestion component NC = the non-competitive constraints congestion component Page 8
9 Straw Proposal LMP Decomposition details (continued) For location i: Congestion Component LMP i = LMP i EC + LMP i LC + LMP i CC + LMP i NC Where: EC = the energy component LC = the loss component CC = the competitive constraints congestion component NC = the non-competitive constraints congestion component Page 9
10 Straw Proposal LMP Decomposition details (continued) For location i: Competitive LMP LMP i = LMP i EC + LMP i LC + LMP i CC + LMP i NC Where: EC = the energy component LC = the loss component CC = the competitive constraints congestion component NC = the non-competitive constraints congestion component Page 10
11 2 Bus Example System side Local side S 100 MW Non competitive G0: 600MW at $40/MWh G1: 100MW at $ 20/MWh G2: 200MW at $100/MWh G3: 200MW at $130/MWh G4: 100MW at $150/MWh VS1: 200MW at $110/MWh VD1: 200MW at $140/MWh PD1: 300MW at $160/MWh L Page 11
12 2 Bus Example (Continued) Page 12
13 2 Bus Example - LMPM under current approach Supply CC run (MW) AC run (MW) CC LMP AC LMP DEB LMPM Mit. Bid G $40 $40 $30 N $40 G $40 $110 $10 N $20 G $40 $110 $30 Y $40 G3 0 0 $40 $110 $60 N $130 G4 0 0 $40 $110 $70 N $150 VS $40 $110 N/A N $110 Terminology: CC run Competitive constraints run LMP Locational marginal price LMPM Local market power mitigation AC run All constraints run DEB Default energy bid Mit. Bid Mitigated bid Page 13
14 2 Bus Example - LMPM under current approach Dispatched up in AC run Supply CC run (MW) AC run (MW) CC LMP AC LMP DEB LMPM Mit. Bid G $40 $40 $30 N $40 G $40 $110 $10 N $20 G $40 $110 $30 Y $40 G3 0 0 $40 $110 $60 N $130 G4 0 0 $40 $110 $70 N $150 VS $40 $110 N/A N $110 Terminology: CC run Competitive constraints run LMP Locational marginal price LMPM Local market power mitigation AC run All constraints run DEB Default energy bid Mit. Bid Mitigated bid Page 14
15 2 Bus Example - LMPM under current approach Dispatched up in AC run Supply CC run (MW) AC run (MW) CC LMP AC LMP DEB LMPM Mit. Bid G $40 $40 $30 N $40 G $40 $110 $10 N $20 G $40 $110 $30 Y $40 G3 0 0 $40 $110 $60 N $130 G4 0 0 $40 $110 $70 N $150 VS $40 $110 N/A N $110 Terminology: CC run Competitive constraints run LMP Locational marginal price LMPM Local market power mitigation Bypasses mitigation due to VS1 crowd out AC run All constraints run DEB Default energy bid Mit. Bid Mitigated bid Page 15
16 2 Bus Example (Continued) Bypasses mitigation due to VS1 crowd out Page 16
17 2 Bus Example - LMPM straw proposal System side as reference bus Supply Sched. (MW) LMP EC CC LC NC UB DEB LMPM Mit. Bid G0 100 $40 $40 $0 $0 $0 $40 $30 N $40 G1 100 $110 $40 $0 $0 $70 $20 $10 Y $20 G2 200 $110 $40 $0 $0 $70 $100 $30 Y $40 G3 0 $110 $40 $0 $0 $70 $130 $60 Y $60 G4 0 $110 $40 $0 $0 $70 $150 $70 Y $70 VS1 100 $110 $40 $0 $0 $70 $110 N/A N $110 Terminology: Sched. Schedule CC Competitive constraint congestion Component NC Non-competitive constraint congestion component EC Energy component LC Loss component UB Unmitigated bid Page 17
18 2 Bus Example - LMPM straw proposal System side as reference bus Supply Sched. (MW) LMP EC CC LC NC UB DEB LMPM Mit. Bid G0 100 $40 $40 $0 $0 $0 $40 $30 N $40 G1 100 $110 $40 $0 $0 $70 $20 $10 Y $20 G2 200 $110 $40 $0 $0 $70 $100 $30 Y $40 G3 0 $110 $40 $0 $0 $70 $130 $60 Y $60 G4 0 $110 $40 $0 $0 $70 $150 $70 Y $70 VS1 100 $110 $40 $0 $0 $70 $110 N/A N $110 Terminology: Sched. Schedule CC Competitive constraint congestion Component NC Non-competitive constraint congestion component EC Energy component LC Loss component UB Unmitigated bid NC > 0 = potential market power Page 18
19 3 Bus Example PD1 400 MW G1 600 MW at $400 L MW G3 600MW at $50 S G4 G5 G2 600 MW at $200 L 2 Page 19
20 3 Bus Example PD1 400 MW G1 600 MW at $400 L MW G3 600MW at $50 S G4 G5 G2 600 MW at $200 L 2 System side of the constraint Page 20
21 3 Bus Example Local constrained areas PD1 400 MW G1 600 MW at $400 L MW G3 600MW at $50 S G4 G5 G2 600 MW at $200 L 2 Page 21
22 3 Bus Example - LMPM under current approach Supply CC run (MW) AC run (MW) Bid CC LMP AC LMP DEB LMPM Mit. Bid G1 0 0 $400 $50 $350 $50 N $400 G $200 $50 $200 $80 Y $80 G $50 $50 $50 $45 N $50 Terminology: CC run Competitive constraints run AC run All constraints run LMP Locational marginal price DEB Default energy bid LMPM Local market power mitigation Mit. Bid Mitigated bid Page 22
23 3 Bus Example - LMPM under current approach Supply CC run (MW) AC run (MW) Bid CC LMP AC LMP DEB LMPM Mit. Bid G1 0 0 $400 $50 $350 $50 N $400 G $200 $50 $200 $80 Y $80 G $50 $50 $50 $45 N $50 Dispatched up in AC Terminology: run $200 X 2-$50= $350 1 extra MW of load at CC run Competitive constraints run AC run All constraints run L1 will be served by LMP Locational marginal price DEB Default energy bid dispatching G2 up by LMPM Local market power mitigation Mit. Bid Mitigated bid 2 MW and G1 down by 1 MW Page 23
24 3 Bus Example - LMPM straw proposal Supply Sched (MW) LMP EC CC LC NC UB DEB LMPM Mit. Bid G1 0 $350 $50 $0 $0 $300 $400 $50 Y $50 G2 200 $200 $50 $0 $0 $150 $200 $80 Y $80 G3 200 $50 $50 $0 $0 $0 $50 $45 N $60 Terminology: Sched. Schedule CC Competitive constraint congestion Component NC Non-competitive constraint congestion component EC Energy component LC Loss component UB Unmitigated bid NC > 0 = potential market power Page 24
25 Straw Proposal RMR Condition 1 & Condition 2 Mitigation Concern - Use of bid-in demand and virtual bids could cause over or under commitment t of RMR resources Proposed solution Condition 1 units - market bids will be utilized in the AC run and RMR proxy bids will be used in place of DEBs. The same LMP decomposition will be used to determine when RMR proxy bids replace market bids. Condition 2 units ISO operators will manually dispatch these resources if needed and RMR proxy bids will be utilized in the market. For 2011, there is only 1 RMR contracted resource Page 25
26 Proposal for in-line competitive path assessment Stakeholder Call on March 25, 2011 Jeff McDonald, Ph.D. Department of Market Monitoring
27 Topics covered Proposed approach compared to current approach. In-line testing for competitiveness of constraints using the residual supply index Calculating the residual supply index for a constraint Identifying potentially binding constraints Other issues Page 27
28 Proposed approach compared to current approach Current approach Perform assessment four times a year (manual) Use range of system conditions: low, medium, and high conditions for hydro and load. Use anticipated generation and transmission availability can t account for changes / current conditions. Proposed approach Perform assessment in-line with market software daily for day ahead and every 15 min. for real time. Uses current system conditions. Uses current generation and transmission avail. Page 28
29 In-line testing for competitiveness of constraints using the residual supply index Competitiveness test is applied by the market software in a pre-market run. Use the residual supply index (RSI) to determine if there is competitive (effective) supply of counter-flow. Remove effective supply of up to three largest net suppliers for each potentially binding constraint. If RSI 1 then constraint is competitive, otherwise it is uncompetitive. Pass tested competitive / uncompetitive designations to LMPM process for potential mitigation. Default designation (if not tested) is competitive. Page 29
30 Calculating the residual supply index for a constraint The residual supply index for a constraint is the ratio of the effective supply of counter-flow without selected suppliers to the demand for counter-flow. Effective supply: Only remove effective supply of net suppliers. Accounts for current availability and dispatch level. Reflects current effectiveness from changes in network conditions. Demand for counter-flow: Measured using dispatch of effective resources from premarket run. Formulas for calculating the RSI are found on pages 3 and 4 of fthe DMM paper. Page 30
31 Identifying potentially binding constraints Local market power is created by congestion in the market run. The path competitiveness test t and the mitigation test t are applied before the actual market run can t perfectly predict congestion. Can use the critical constraint list from pre-market runs to expand list from binding to potentially binding. Trade-off: Adding non-binding constraints reduces under- identification and increases over-identification. For real time, using set of constraints with flow 97.5% or 95% of limit provides good accuracy. Note: constraint must fail test to be uncompetitive. See Table 3 from DMM paper for statistics. Page 31
32 Identifying potentially binding constraints real time market timing Currently Use congestion in HASP for mitigation in RTD. Propose Use critical constraint list from RTPD A/S run for mitigation in RTD. Page 32
33 Other issues Information identifying net suppliers and portfolio changes due to tolling agreements into market process. Default values for path designations if market software issues prevent testing. ti Method to calculate the mitigation trigger (price decomposition test) for non-competitive constraints that are not binding. Page 33
34 Next Steps April 1 Comments Due May 2 Draft Final Proposal May 9 Conference Call May 23 Comments Due June 29, 30 Board of Governors Page 34
35 Please send comments to Questions? Contact Cynthia Hinman Dynamic Competitive Path Assessment Comments to
EIM Market Monitoring and Market Power Mitigation
EIM Market Monitoring and Market Power Mitigation Eric Hildebrandt, Ph.D. Director, Market Monitoring EIM Technical Workshop September 16, 2013 Outline Market monitoring overview Key EIM market design
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 33 Hour-Ahead Scheduling Process (HASP)... 2 33.1 Submission Of Bids For The HASP And RTM... 2 33.2 The HASP Optimization... 3 33.3 Treatment Of Self-Schedules In HASP... 3 33.4 MPM For
More informationCongestion Revenue Rights (CRR) Clawback Modification. Draft Final Proposal
Congestion Revenue Rights (CRR) Clawback Modification Draft Final Proposal May 16, 2016 CRR Clawback Modification Draft Final Proposal Table of Contents 1 Introduction... 3 2 Stakeholder process and timeline...
More informationLocal Market Power Mitigation Enhancements discussion
Local Market Power Mitigation Enhancements discussion Donald Tretheway Sr. Advisor- Market Design Policy Market Surveillance Committee General Session September 28, 2018 Work accomplished prior to issue/straw
More informationConvergence bidding. IFM tier 1 uplift obligation ISO PUBLIC 2015 CAISO
Convergence bidding IFM tier 1 uplift obligation Module Objectives Evaluate what triggers the IFM Tier 1 Uplift Obligation when participating in Convergence Bidding Identify key components to validate
More informationLocal Market Power Mitigation Enhancements
Local Market Power Mitigation Enhancements Revised Straw Proposal Stakeholder Web Conference November 28, 2018 10:00 am - 1:00 pm Market Design Policy Agenda Time Topic Presenter 10:00 10:05 Welcome and
More informationIntertie Deviation Settlement: Draft Final Proposal
Intertie Deviation Settlement: Draft Final Proposal Megan Poage & Danielle Tavel Market Design Policy Stakeholder Call December 19, 2018 IDS Draft Final Proposal, Stakeholder Call December 19, 2018 9:00
More informationMarket Surveillance Committee Activities September By Frank Wolak Chairman of the ISO Market Surveillance Committee
Market Surveillance Committee Activities September 2004 By Frank Wolak Chairman of the ISO Market Surveillance Committee Four Opinions in Progress Trading Hubs Solution to the Seller s Choice Contracts
More informationTwo-Tier Real-Time Bid Cost Recovery. Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008
Two-Tier Real-Time Bid Cost Recovery Margaret Miller Senior Market and Product Economist Convergence Bidding Stakeholder Meeting October 16, 2008 The CAISO has posted an Issue Paper exploring the redesign
More informationCongestion Revenue Rights Settlement Rule
California Independent System Operator Corporation Congestion Revenue Rights Settlement Rule Department of Market Monitoring August 18, 2009 I. Background Under nodal convergence bidding, the California
More informationConsolidated EIM Initiatives Straw Proposal
Consolidated EIM Initiatives Straw Proposal Stakeholder Meeting August 7, 2017 Megan Poage & Don Tretheway Market Design & Policy Agenda Time Topic Presenter 10:00 10:15 Introduction and Purpose Kristina
More informationFlexible Ramping Constraint Penalty Price In the Fifteen Minute Market
Flexible Ramping Constraint Penalty Price In the Fifteen Minute Market April 14, 2014 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 Revision History Date Version Description Author 2014-04-08
More informationConvergence bidding. Congestion revenue rights (CRR) settlement rule ISO PUBLIC 2015 CAISO
Convergence bidding Congestion revenue rights (CRR) settlement rule Module objective By the end of this module, student will be able to describe how the use of congestion revenue rights may be impacted
More informationPrice Effects of Real-Time Market Pricing Run Parameters
Price Effects of Real-Time Market Pricing Run Parameters Edward Lo Lead Engineering Specialist, Market & Product Development MSC/Stakeholder Meeting on Parameter Maintenance September 25, 2008 Topics of
More informationConvergence Bidding Overview. Jenny Pedersen Julianne Riessen Client Training Team
Convergence Bidding Overview Jenny Pedersen Julianne Riessen Client Training Team Agenda Introductions Defining Convergence Bidding Project Participating in the Markets Registration and Affiliations Eligible
More informationTwo-Tier Allocation of Bid Cost Recovery
Two-Tier Allocation of Bid Cost Recovery Jordan Curry Market Design & Regulatory Policy Developer December 21, 2015 Agenda Time Topic Presenter 1:00 1:05 Introduction Kim Perez 1:05 2:00 Purpose and Background
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent Of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions For The Imposition Of Mitigation Measures... 2 39.2.1
More informationComments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language
Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Submitted by Company Date Submitted Will Dong Paul Gribik (415) 973-9267 (415) 973-6274 PG&E December 5, 2013 Pacific
More informationCOMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS
COMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS February 8 th, 2019 NV Energy appreciates the opportunity to comment
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent Of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions For The Imposition Of Mitigation Measures... 2 39.2.1
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions for the Imposition of Mitigation Measures... 2 39.2.1
More informationSummary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts
Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts 1. Commission Directives to Submit a Market Redesign Plan The direct origin of the requirement that the CAISO
More informationMarket Monitoring, Mitigation & Analysis
Market Monitoring, Mitigation & Analysis Ken Galarneau Supervisor, Mitigation Performance & Analysis New York Independent System Operator New York Market Orientation Course (NYMOC) October 19, 2017 Rensselaer,
More informationFTR Forfeiture FERC Order MIC Update
FTR Forfeiture FERC Order MIC Update Asanga Perera Manager, Market Simulation Market Implementation Committee February 8, 2017 Overview On June 10, 2013 PJM filed revisions to its Tariff to define UTC
More informationFERC Order Minute Settlements Manual Revisions
FERC Order 825 5 Minute Settlements Manual Revisions Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee October 30, 2017 Impacted Settlement Manuals M-27 Open Access
More information4.1 Daily & Hourly Bid Components
4.1 Daily & Hourly Bid Components This section is based on CAISO Tariff Section 30.4 Election for Start-Up and Minimum Load Costs and Section 39.6.1.6. (Start-Up and Minimum Load Costs are not applicable
More informationMRTU. CRR Settlements. CRR Educational Class #10
MRTU CRR Settlements CRR Educational Class #10 Contents Why is CRR Settlements process important to understand Definition of LMP and CRR Types of CRRs: Obligation vs Option Point to Point and Multi Point
More informationStandard Market Design
Standard Market Design Dynegy s Perspective Characteristics of the Standard Market Design - SMD RTO provides all transmission service and takes on many if not all control area functions. RTO operates an
More informationMarket Power Screens and Mitigation
Market Power Screens and Mitigation September 13, 2017 www.poweradvisoryllc.com AESO Workgroup Energy Market Prices Offer Flexibility Common Elements of Mitigation An offer cap of $1000/MWh is in place
More informationContingency Modeling Enhancements
Contingency Modeling Enhancements Third Revised Straw Proposal Discussion December 10, 2015 Perry Servedio Senior Market Design & Regulatory Policy Developer Agenda Time Topic Presenter 10:00 10:05 Introduction
More informationLocal market power mitigation enhancements discussion
Local market power mitigation enhancements discussion Gabe Murtaugh Sr. Infrastructure and Regulatory Policy Developer Elliott Nethercutt Sr. Market Design Policy Developer Market Surveillance Committee
More informationSouthern California Edison Stakeholder Comments. Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013
Southern California Edison Stakeholder Comments Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013 Submitted by Company Date Submitted Paul Nelson (626) 302-4814 Jeff Nelson (626)
More informationReal Time Scheduling. Reserve Settlements
Real Time Scheduling Reserve Settlements General Settlement Rules There will be a full two settlement. Reserve services will be scheduled and settled nominally on a 5-min. basis. Units are not required
More informationPrice Inconsistency Market Enhancements. Revised Straw Proposal
Price Inconsistency Market Enhancements Revised Straw Proposal August 2, 2012 Price Inconsistency Market Enhancements Table of Contents 1 Introduction... 3 2 Plan for Stakeholder Engagement... 3 3 Background...
More informationCongestion revenue rights auction efficiency Track 1B straw proposal stakeholder meeting April 23, 2018
Congestion revenue rights auction efficiency Track 1B straw proposal stakeholder meeting April 23, 2018 Perry Servedio Sr. Market Design Policy Developer CAISO policy initiative stakeholder process POLICY
More informationCongestion Revenue Rights (CRR) Auction Efficiency Track 1B
Congestion Revenue Rights (CRR) Auction Efficiency Track 1B Pre-Market Simulation Webinar October 31, 2018 Radha Madrigal External Training and Readiness The information contained in these materials is
More informationOverview of the Forward Capacity Market ( FCM ) ISO New England Inc.
Overview of the Forward Capacity Market ( FCM ) ISO New England Inc. Objectives of this Presentation 1. Introduce the ISO Presentation Series on the Forward Capacity Market 2. Present an OVERVIEW of the
More informationSettlements and Billing. Configuration Guide: Day Ahead Congestion - AS Regulation Up Import Settlement CC Version 5.01
Settlements and Billing Configuration Guide: Day Ahead Congestion - AS Regulation Up Import Settlement CC 6750 Version 5.01 Table of Contents 1. Purpose of Document 3 2. Introduction 3 2.1 Background 3
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: June 14, 2018 Re: Decision on congestion
More informationOrganization of MISO States Response to the Midwest ISO October Hot Topic on Pricing
Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing I. Day Ahead and Real Time Energy and Ancillary Services Pricing Prices that Accurately Reflect the Marginal Cost of
More informationBusiness Requirements Specification
Business Requirements Specification CRR Auction Efficiency 1B Date Created: 8/3/2018 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 27 Disclaimer All information contained in this draft Business Requirements Specification
More informationPower Supplier Energy Settlements
Power Supplier Energy Settlements Gina E. Craan Manager, Market Training New York Independent System Operator Accounting & Billing Workshop October 18 20, 2016 Latham, New York 2016 New York Independent
More informationCalifornia ISO October 1, 2002 Market Design Elements
California October 1, 2002 Market Design Elements California Board of Governors Meeting April 25, 2002 Presented by Keith Casey Manager of Market Analysis and Mitigation Department of Market Analysis 1
More informationEnergy Imbalance Market Neutrality Technical Workshop. Conference Call: September 3, 2013 Updated: September 5, 2013
Energy Imbalance Market Neutrality Technical Workshop Conference Call: September 3, 2013 Updated: September 5, 2013 Neutrality accounts needed since not all energy is settled through real-time market An
More informationConfiguration Guide: Day Ahead Congestion - AS Regulation Down Import Settlement
Settlements and Billing Configuration Guide: Day Ahead Congestion - AS Regulation Down Import Settlement CC 6760 Version 5.10 Table of Contents 1. Purpose of Document 3 2. Introduction 3 2.1 Background
More informationFinancial Transmission Rights (FTRs), Auction Revenue Rights (ARRs) & Qualified Upgrade Awards (QUAs)
Financial Transmission Rights (FTRs), Auction Revenue Rights (ARRs) & Qualified Upgrade Awards (QUAs) John Lally, Senior Engineer Market Administration Agenda FTR Basics FTR Auction FTR Settlement ARRs
More informationFlexible Ramping Product. Draft Final Technical Appendix
Flexible Ramping Product Draft Final Technical Appendix January 25, 2016 Table of Contents 1. Introduction... 3 2. Generalized flexible ramping capacity model... 3 3. Flexible ramping product summary...
More informationComments of PacifiCorp on the Consolidated EIM Initiatives
Comments of PacifiCorp on the Consolidated EIM Initiatives Submitted by Company Date Submitted Christine Kirsten christine.kirsten@pacificorp.com 916-207-4693 PacifiCorp June 30, 2017 Introduction PacifiCorp
More informationBoth the ISO-NE and NYISO allow bids in whole MWh increments only.
Attachment D Benchmarking against NYISO, PJM, and ISO-NE As the CAISO and stakeholders consider various design elements of convergence bidding that may pose market manipulation concerns, it is useful to
More informationResource Adequacy in Energy-Only ERCOT
Resource Adequacy in Energy-Only ERCOT Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) 619-3532 shams@crescentpower.net June 27, 2007 Background on ERCOT Electric Reliability Council of Texas (ERCOT) is:
More informationStandard Market Design: FERC Process and Issues
Standard Market Design: FERC Process and Issues Richard O Neill and Udi Helman Division of the Chief Economic Advisor, Office of Markets, Tariffs and Rates Federal Energy Regulatory Commission IEEE PES
More informationSpecial Pricing Rule Updates
Special Pricing Rule Updates Michael DeSocio Manager, Energy Market Design New York Independent System Operator Business Issues Committee September 18, 2013 NYISO KCC Conference Center 2013 New York Independent
More informationProposed Reserve Market Enhancements
Proposed Reserve Market Enhancements Energy Price Formation Senior Task Force December 14, 2018 Comprehensive Reserve Pricing Reform The PJM Board has determined that a comprehensive package inclusive
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 28. Inter-SC Trades... 2 28.1 Inter-SC Trades Of Energy... 2 28.1.1 Purpose... 2 28.1.2 Availability Of Inter-SC Trades Of Energy... 2 28.1.3 Submission Of Inter-SC Trades Of Energy...
More informationMarket Settlements - Advanced
Market Settlements - Advanced FTR/ARR Module PJM State & Member Training Dept. PJM 2017 Agenda FTR/ARR Hedging Congestion FTR and ARR Billing Examples PJM 2017 2 Hedging Transmission Congestion PJM 2017
More information2011 Budget Initial Stakeholder Call
2011 Budget Initial Stakeholder Call Michael Epstein Director of Financial Planning June 23, 2010 Agenda TOPIC PRESENTER Introduction Steve Berberich Budget principles & strategic initiatives Steve Berberich
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket No. ER18-1169-000 Operator Corporation ) MOTION TO INTERVENE AND PROTEST OF THE DEPARTMENT
More informationFive-Minute Settlements Education
Five-Minute Settlements Education Disclaimer PJM has made all efforts possible to accurately document all information in this presentation. The information seen here does not supersede the PJM Operating
More informationDecember 7, Compliance with Order No. 844 Response to Deficiency Letter
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System
More informationCRR Prices and Pay Outs: Are CRR Auctions Valuing CRRs as Hedges or as Risky Financial instruments?
CRR Prices and Pay Outs: Are CRR Auctions Valuing CRRs as Hedges or as Risky Financial instruments? Scott Harvey Member: California ISO Market Surveillance Committee Market Surveillance Committee Meeting
More informationContingency Reserve Cost Allocation. Draft Final Proposal
Contingency Reserve Cost Allocation Draft Final Proposal May 27, 2014 Contingency Reserve Cost Allocation Draft Final Proposal Table of Contents 1 Introduction... 3 2 Changes to Straw Proposal... 3 3 Plan
More informationCTS-New England Overview
CTS-New England Overview William Porter Senior Market Trainer, NYISO Cheryl Mendrala Principal Engineer, ISO-NE 2000-2015 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION
More informationApril 11, Tariff Amendments to Increase Efficiency of Congestion Revenue Rights Auctions
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 April 11, 2018 Re: California
More informationMarch 13, Provisions, Docket No. ER (filed December 13, 2013) ( FCA 9 ORTP Filing ).
VIA etariff FILING The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 March 13, 2014 Re: ISO New England Inc., Docket No. ER14-616-001;
More informationARR/FTR Market Update: ATC Customer Meeting. August 20, 2009
ARR/FTR Market Update: ATC Customer Meeting August 20, 2009 Agenda ARR Allocation FTR Annual/Monthly Auction Challenge 2 Allocation Overview 101 Market Participants took part in the 2009-2010 Annual ARR
More informationPEAK RELIABILITY COORDINATOR FUNDING
PEAK RELIABILITY COORDINATOR FUNDING Straw Proposal May 8, 2015 Assessment of 2 Peak Reliability Coordinator Charges Straw Proposal Table of Contents 1 Introduction... 3 2 Background... 3 3 Plan for Stakeholder
More information2003 Annual Report on Market Issues and Performance
2003 Annual Report on Market Issues and Performance Board of Governors Meeting April 22, 2004 Greg Cook Manager of Market Monitoring Issues in 2003-04 CALIFORNIA ISO and FERC: Continue to work through
More informationEIM market monitoring and market issues/performance
EIM market monitoring and market issues/performance Energy Imbalance Market Regional Issues Forum April 6, 2016 Eric Hildebrandt, Director Department of Market Monitoring EIM Market Monitoring Page 2 Mission
More informationStakeholder Comments Template
Stakeholder Comments Template Submitted by Company Date Submitted Xian Ming Cindy Li Patrick Cunningham Patrick.cunningham@cpuc.ca.gov 415-703-1993 Public Advocates Office California Public Utilities Commission
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: March 14, 2018 Re: Decision on congestion
More informationCapacity Procurement Mechanism Replacement. Second Revised Draft Straw Proposal
Capacity Procurement Mechanism Replacement Second Revised Draft September 25, 2014 Table of Contents 1. Document change tracking... 4 2. Executive summary... 5 3. CPUC Joint Reliability Plan Proceeding...
More informationOrder Minute Settlements
Order 825 5 Minute Settlements Ray Fernandez Manager, Market Settlements Development Market Implementation Committee December 14, 2016 PJM Open Access Transmission Tariff 2 Tariff Changes PJM conducting
More informationWHITE PAPER. Financial Transmission Rights (FTR)/ Congestion Revenue Rights (CRR) Analysis Get ahead with ABB Ability PROMOD
WHITE PAPER Financial Transmission Rights (FTR)/ Congestion Revenue Rights (CRR) Analysis Get ahead with ABB Ability PROMOD 2 W H I T E PA P E R F T R / C R R A N A LY S I S Market participants and system
More informationJ.P. Morgan Comments on CAISO Straw Proposal on Data Release & Accessibility Phase 1: Transmission Constraints
J.P. Morgan Comments on CAISO Straw Proposal on Data Release & Accessibility Phase 1: Transmission Constraints Submitted by Company Date Submitted Steve Greenleaf (916) 802-5420 J.P. Morgan December 16,
More informationCalifornia ISO CRR Market
California ISO CRR Market Presented by Kolby Kettler Vitol, Inc. April 2018 Discussion Overview Where are we? Implementation of Track 0 Track 1a at FERC Transmission Outage Process Enhancements Removal
More informationThis memo provides highlights of market performance in October and November.
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Eric Hildebrandt, Executive Director, Market Monitoring Date: December 5, 2018 Re: Department of Market Monitoring
More informationUplift Charges, FTR Underfunding and Overallocation
Uplift Charges, FTR Underfunding and Overallocation Solutions in PJM Getting to Yes on Uplift Allocation Fixing FTR Funding Abram W. Klein 9 October 2014 Platts Nodal Trader Conference New York City Discussion
More informationASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS
ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS presentation by George Gross Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign University
More informationCalifornia ISO. Q Report on Market Issues and Performance. August 22, Prepared by: Department of Market Monitoring
California Independent System Operator Corporation California ISO Q2 2016 Report on Market Issues and Performance August 22, 2016 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive
More informationDocket No. ER April 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity
California Independent System Operator Corporation June 13, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent
More informationCommitment Cost Enhancements Second Revised Straw Proposal
Commitment Cost Enhancements Second Revised Straw Proposal July 15, 2014 Table of Contents 1. Changes from the Revised Straw Proposal... 3 2. Background... 3 3. Schedule for policy stakeholder engagement...
More informationSuggested Change in Real-time LAP Pricing
Suggested Change in Real-time LAP Pricing Farrokh Rahimi Principal Market Engineer Market Surveillance Committee Meeting November 13, 2006 MRTU LAP Pricing and Settlement as Filed RT components: : Computed
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 43. Capacity Procurement Mechanism... 2 43.1 Applicability... 2 43.2 Capacity Procurement Mechanism Designation... 2 43.2.1 SC Failure to Show Sufficient Local Capacity Area Resource...
More informationAppendix A. - Transmission Constraints. Physical and operational limitations on the transfer of electric power through transmission facilities, which
Appendix A - Transmission Constraints Physical and operational limitations on the transfer of electric power through transmission facilities, which include Contingencies and Nomograms. - Contingency A
More informationRMR and CPM Enhancements Stakeholder Conference Call December 20, 2018
RMR and CPM Enhancements Stakeholder Conference Call December 20, 2018 Keith Johnson Infrastructure & Regulatory Policy Manager Agenda Time Item Presenter 10:00-10:15 1. Stakeholder process and general
More informationPEAK RELIABILITY COORDINATOR FUNDING. Draft Final Proposal. May 28, 2015
PEAK RELIABILITY COORDINATOR FUNDING Draft Final Proposal May 28, 2015 2 Assessment of Peak Reliability Coordinator Charges Draft Final Proposal Table of Contents 1 Introduction... 3 2 Background... 3
More informationDay Ahead Market Enhancements: Updates to Revised Straw Proposal. Workshop June 19, 2018
Day Ahead Market Enhancements: Updates to Revised Straw Proposal Workshop June 19, 2018 Agenda Time Topic Presenter 10:00 10:15 Welcome and Introductions Kristina Osborne 10:15 10:30 Overview Megan Poage
More information5.2 Transmission Congestion Credit Calculation Eligibility.
5.2 Transmission Congestion culation. 5.2.1 Eligibility. (a) Except as provided in Section 5.2.1(b), each FTR Holder shall receive as a Transmission Congestion Credit a proportional share of the total
More informationLong Term FTR Market Education
Long Term FTR Market Education February 7, 2018 Jointly developed and supported by Exelon, DC Energy, and Vitol Agenda Forward Markets Commercial Usage of Long Term FTRs Indications of a Healthy Long Term
More informationEllen Wolfe Resero Consulting for WPTF. February 28, 2018
Western Power Trading Forum Comments on CAISO CRR Auction Efficiency Workshop and Stakeholder Process Ellen Wolfe Resero Consulting for WPTF February 28, 2018 WPTF appreciates the ability to submit these
More informationMemorandum. This memorandum does not require Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Eric Hildebrandt, Executive Director, Market Monitoring Date: November 7, 2018 Re: Department of Market Monitoring
More informationATTACHMENT Q PJM CREDIT POLICY
ATTACHMENT Q PJM CREDIT POLICY C. Financial Transmission Right Auctions Credit requirements described herein for FTR activity are applied separately for each customer account of a Market Participant. FTR
More informationCongestion Revenue Rights Auction Efficiency Track 1B Draft Tariff Language
6.5.1.3 Public Market Information 6.5.1.3.1 Annually, the CAISO shall publish the following information including, but not limited to: (a) Market Clearing Prices for all Aggregated PNodes used in the CRR
More informationCongestion revenue rights auction efficiency
Congestion revenue rights auction efficiency Track 1 draft final proposal Perry Servedio Sr. Market Design Policy Developer February 13, 2018 Three tracks for addressing auction efficiency Track 0: Process
More informationCourse notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing
Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright c 2016 Ross Baldick www.ece.utexas.edu/ baldick/classes/394v/ee394v.html Title Page 1 of 33
More informationWholesale Energy Markets Overview. Jeff Klarer Market Strategist
Wholesale Energy Markets Overview Jeff Klarer Market Strategist Wisconsin Electric Utility Fuel Rules (PSC-116) Fuel Cost Components Fuel for generation (coal, natural gas, uranium, etc.) Energy market
More informationIllinois Power Agency Act and Related Legislation
Craig D. Nelson Vice President Regulatory Affairs & Financial Services November 1, 2007 Topics Implications of Illinois Power Agency Act and related changes to Public Utility Act Expected influence on
More informationCommitment Cost Enhancements Phase 3 Opportunity Cost Methodology. Technical Appendix
Commitment Cost Enhancements Phase 3 Opportunity Cost Methodology Technical Appendix April 22, 2016 Table of Contents 1. Introduction... 3 2. Overview of opportunity cost... 3 3. Opportunity cost model
More informationTABLE OF CONTENTS. Executive Summary... ES-1 1. Market Structure and Design Changes General Market Conditions
TABLE OF CONTENTS Executive Summary... ES-1 1. Market Structure and Design Changes... 1-1 1.1 Introduction/Background...1-1 1.2 Market Design Changes...1-1 1.2.1 Real Time Market Application (RTMA)...1-1
More informationThe cost allocation principles and methodologies in this Attachment Y cover only
31.5 Cost Allocation and Cost Recovery 31.5.1 The Scope of Attachment Y Cost Allocation 31.5.1.1 Regulated Responses The cost allocation principles and methodologies in this Attachment Y cover only regulated