1 Electricity Industry Bill Request for additional information by Finance and Expenditure Committee The additional information sought by the committee on 17 February 2010 is set out in the following tables. The following documents are included in this package: o Chronology of New Zealand Electricity Reform o Discussion Paper Improving Electricity Market Performance, August 2009, Volume I o Discussion Paper, August 2009, Vol. II o Summary Note on Recommendations, taking account of submissions, October 2009 o Cabinet Paper Ministerial Review of the Electricity Market, 13 November 2009 o * Officials paper to ETAG Meeting 3, 12 May 2009, Market Governance and Regulation: Key Considerations Assessing Options o Frank Wolak, An assessment of the performance of the New Zealand wholesale electricity market, 2009 ( the Wolak Report ), 19 May 2009 o * MED advice to Minister on the Wolak Report (with two reports from consultants as separate attachments, from Concept Consulting and from Concept Economics) All documents except the two marked with an * are available on the internet and hyperlinks are provided in the tables. Ministry of Economic Development February

2 History of electricity reforms A history of reform in the electricity industry A comprehensive chronology electricity reform is available on the Ministry of Economic Development website. Key dates are: o 1987 ECNZ established (an SOE) o 1988 Transpower set up as a subsidiary of ECNZ o 1992 Corporatisation of Electricity Supply Authorities o 1993 Electricity Act 1992 come into effect (deregulation - removal of statutory monopolies) o 1994 Transpower separated from ECNZ; Information Disclosure Regulations promulgated (for lines and retail) o 1996 Contact Energy separated from ECNZ; competitive wholesale electricity market commenced operation o 1998 ECNZ split into three SOEs; ownership separation of line and energy businesses in the Electricity Industry Reform Act o 1999 Contact Energy privatised. o 2000/2001 Further electricity sector reforms. Framework for new electricity governance self-regulation put in place with provision for Crown entity if industry self regulation failed. Commerce Act amended to enable Commission to control businesses which breach thresholds set by Commission. EIRA amended to relax rules on ownership of generation by lines. o 2003 Electricity Commission established o 2004 New electricity market arrangements established under new Electricity Governance Regulations and Rules 2003 o 2004 Further reforms. Electricity Act amended to reflect establishment of Electricity Commission. EIRA amended. o 2008 Electricity Industry Reform Amendment Act o 2008 Commerce Amendment Act puts in place an improved regulatory regime for electricity lines businesses o 2009 Ministerial review of electricity market and Electricity Industry Bill introduced Chronology of New Zealand Electricity Reform

3 Electricity Spot Market An explanation of how the electricity spot market works All electricity flowing through the national grid goes through the spot market (or pool ). Generators compete in an auction (every half-hour 24/7) to have their plant despatched by the System Operator (SO). If they are successful in the auction (ie get despatched to generate) they get paid the auction clearing price for that half-hour. The clearing price or spot price is the price offered by the most expensive generating plant that the SO needs to despatch in order to match supply and demand (ie keep the lights on). Generators receive no spot market revenues for plant which is not despatched. Buyers of wholesale electricity (retailers, traders and major users) pay the spot price for the electricity they use. A key assumption of this auction is that competitive pressures (to be despatched and receive spot market revenue) will force generators to offer their generation plant at close to their marginal costs of production. While all electricity (on the grid) goes through the spot market, around 90 percent is covered by (fixed price) hedge contracts, which removes exposure to the spot price. The way hedge contracts work is explained in A short primer on the electricity market (see Further Information ). Note that vertically integrated generator-retailers have an internal hedge since they both receive and pay the spot price. Discussion Document Vol. II, Appendix 3, A short primer on the electricity market. See in particular paras (pp 28-32)

4 Wolak report A copy of Professor Wolak s report to the Commerce Commission, and officials response to this report. Wolak report The Wolak report was released by the Commerce Commission in May It concluded that generators had exercised market power in the spot market in dry years and over-charged by $4.3 billion in the period Wolak used a competitive benchmark of short-run marginal costs (SRMC: essentially operating costs) to calculate the level of overcharging (market power rents). The Ministerial Review identified a number of serious reservations about the report, including: o Underestimation of the opportunity cost of hydro, that is, the value of water preserved for later use. This is crucial, since it is efficient for spot prices to rise to reflect the increasing risk or probability of water shortages, given the very serious and prolonged economic and social consequences of actually running out of water o Underestimation of the opportunity cost of gas, and overestimating its availability, particularly in the light of the decline of the Maui gas field o SRMC price levels are not sufficient to cover the costs of building new capacity and ensuring security of supply. (The Commerce Commission appears to accept this crucial point) o The analysis was done in hindsight, and assumes perfect foresight on the part of decision-makers, with no apparent allowance for the uncertainties that parties face in the real world, such as future demand, plant reliability and hydro inflows. A more useful benchmark of wholesale market performance is to compare average hedge contract prices over time with the cost of MED s response to the Wolak report (not available on the internet) Discussion Document Vol. I, para (p38) Discussion Document Vol. II, Appendix 13 (pp 90-95)

5 building new capacity, or long run marginal cost (LRMC). ETAG concluded that, using the LRMC benchmark, there is no clear evidence of the sustained or prolonged exercise of market power. Nonetheless, there are concerns about the potential to exercise market power in the wholesale market (spot and hedge), and about insufficient competition in the retail market. Accordingly, the Bill seeks to improve competition (which Wolak recommended) through: o Asset swaps between SOEs (Wolak also recommended further breakup of generation) o Developing a more liquid hedge market (to facilitate competition and new entry in both generation and retail) o Allowing lines companies to retail electricity o Providing a transmission hedging mechanism o Facilitating demand-side participation in the wholesale market o Promoting smart meters and tariffs o Encouraging consumers to shop around

6 Objectives of the Electricity Authority Explanation as to why environmental sustainability was removed from the objective of the Electricity Authority The aim is to narrow the objectives (and functions) of the Electricity Authority. This is intended to ensure the EA focuses on its key role of rule-making and enforcement to achieve an efficient, reliable and competitive market. In addition, environmental (and social) objectives are best delivered through generic policies (such as the RMA and climate change policies) rather than on a sector-specific basis. This minimises distortions in resource allocation across the economy. It is not considered best practice to give regulators multiple objectives requiring complex trade-offs. This greatly complicates their work, can involve them in making trade-offs that are best taken by Ministers (eg between social objectives and efficiency), and makes it difficult to hold them accountable for performance. Discussion Document Vol. I, para (p67) Official s paper to ETAG meeting 3 (not available on the internet)

7 New matters to be included in the Electricity Industry Participation Code Why does the Bill not provide more detail on the specification of the new matters that must be included in the Code (clause 45)? The Bill does not go into prescriptive detail regarding these new matters because the issues are technically very complicated. There is a high risk of perverse outcomes or unintended consequences if measures are not very carefully designed. This means that hard-wiring details into the Bill runs a high risk of poor outcomes, or requiring legislative amendments further down the track. Why does the Bill allow so much time for completion of the new matters? The detailed specifications need to be carefully designed, subject to cost-benefit analysis, and carefully consulted on. Much of this work is well underway with the Electricity Commission s Market Development Programme. The Bill gives the EA a year (following its establishment) to put in place the new matters. This is considered quite challenging given the technical complexity of the work (and the long-term consequences of getting it wrong). For the same reason, the Minister needs a three year window to regulate if the EA does not succeed in putting in place satisfactory measures (or provide satisfactory reasons why not). Complex regulations of this nature are highly likely to need fine-tuning

8 Electricity Industry Reform Act 1998 Further information on the roll-back of EIRA (letting lines companies back into retailing) and on whether this is likely to lead to competition problems. The objective of allowing lines back into retailing is to increase the level of competition in retailing: o The Ministerial Review identified weak retail competition as a significant problem in the electricity market especially outside the main centres. Discussion Document Vol. II, Appendix 18 (pp ) o This weak competition has resulted in high and increasing retail margins, especially for residential consumers. Retail margins are high compared to overseas (Australia and the UK) and compared to estimated costs. The electricity market has changed substantially since 1998 (when the Electricity Industry Reform Act, or EIRA, was passed), making it unnecessary to retain all of the prohibitions on lines businesses retailing electricity (and building generation). o Lines businesses are now subject to effective price control provisions (or information disclosure in the case of trusts), which prevent them cross-subsidising contestable businesses like retailing and generation. This was not the case in o We now have an electricity regulator with strong powers to regulate to require open access to lines. This was not the case in 1998, when industry self-governance and ineffective general competition law applied. o Arms-length use of system agreements between lines and retailers are now well-established in the industry (as a result of the

9 reforms). This was not the case in 1998, when new entrant retailers found it very difficult to negotiate use-of-system agreements with vertically integrated lines and retail businesses. That is, the 1998 reforms succeeded in getting independent retailers into the market, and this means that ownership separation is no longer needed. However, some rules are still needed to prevent lines companies from trying to (re-)introduce discriminatory elements into use-of system arrangements. The main rules are: corporate separation and compliance with arms-length rules; and requirements for transparent and non-discriminatory useof-system agreements. Also, ownership separation has been retained between lines and large generator-retailers (with more than 100MW of grid-connected generation). o Note that the original 1998 legislation has been progressively relaxed by successive governments as a result of the factors noted earlier. As a consequence, lines businesses can already retail as much electricity as they wish, provided only that they build enough (renewables) generation first. In effect, it is this latter restriction which is being removed

10 Asset swaps More information on the Tekapo A & B asset swaps Cabinet Paper, para (pp7-15) and on the impact on the Discussion Document Vol. II, efficiency of the whole Appendix 15 (pp ) Waitaki scheme. Also, information on the costs and benefits of alternative options considered. The Ministerial Review considered a range of asset re-configuration options. These included: o Setting up a new SOE comprising the Huntly station and Manapouri and transferring Tekapo A and B to Genesis o Transferring Huntly to Solid Energy and Manapouri to Genesis o Transferring the Lower Waitaki hydro stations (Benmore, Aviemore and Waitaki) to Genesis and e3p and p40 to Meridian o Transferring Manapouri to Genesis and e3p and p40 to Meridian o Transferring Tekapo A and B to Genesis. The costs (including contingency costs) for these options are set out in the discussion paper and the appendices to the Summary Note on Recommendations (see Further Information ). The discussion paper also assessed the level of benefits that would need to be achieved in order to cover these costs. With regard to Tekapo A and B, the benefits of transferring the stations to Genesis are expected to be: o Allowing and encouraging Genesis to enter the retail market in the South Island. Note that this has already occurred in anticipation of the transfer: Genesis has made a vigorous entry into the Dunedin market, offering prices on average $200/year less than Contact o Providing a diversity of views on the value of stored water, and improving competition in the wholesale market. (At present Meridian has 70 percent of New Zealand s hydro storage: this will reduce to 50 percent after the transfer) o Encouraging Genesis to consider itself a South Island generator, likely leading to more competition in new generation build. Summary Note on Recommendations, pp

11 Some concerns have been raised about the potential loss of efficiency of water use on the Waitaki river chain. The Ministerial Review allowed a contingency of up to 1 percent loss of efficiency as a result of increased water spill. This level of loss has an NPV (net present value) of $21m. Meridian has argued that the efficiency loss could be up to 3 percent. It says it will need to operate Lake Pukaki at a higher average level in order to be sure it can meet minimum river flow requirements at Waitaki in dry years (and higher average lake levels increases the risk of hydro spills during high inflows). The Government considers this unlikely, because Meridian and Genesis will be required to enter into a water management agreement. The agreement is intended to ensure that Meridian can meet minimum river flow conditions (as well as flood control). Some commentators have also argued that Genesis is likely to run Lake Tekapo at a higher average level than Meridian, increasing the risk of hydro spill from Tekapo. Again this is considered unlikely. Spilled water amounts to wasting valuable fuel: it makes no commercial sense to do this. Note that the level of spill generally appears to have declined since the split of ECNZ (as per the following chart). This is to be expected: competition increases incentives to use fuel efficiently. However, at the time of the split, some commentators (as now) argued that competition would result in more hydro spill and a less efficient electricity system

12 4,500 NZ Hydro Storage (GWh) ECNZ split into 3 SOEs 3,000 1, Weekly Spill (GWh) ,000 Annual Spill (GWh) 4,000 3,000 2,000 1,

13 Competition in the electricity market Information about current competition that exists and how effective it is has been in constraining prices, and what the Bill is expected to do to competition The review concluded that although a large part of the increase in electricity prices over the last decade is justified: o Retail prices have risen faster than underlying increases in generation costs; Cabinet Paper, para (pp4-21) o Retail margins in many areas are high and retail competition is weaker outside the main centres (and particularly in the South Island); and o Some generators have market power in dry years. The review also concluded that sufficient new generation is being built and the quality and diversity of investment in generation is generally good. The Discussion Paper, Volume II, contains a review of competition in and the performance of the wholesale market (Appendix 13) and the Retail market (Appendix 14). (See Further Information ). The Cabinet paper has a detailed discussion of the causes of the weaknesses identified above, and main remedies. In summary, the causes and remedies are: o Transmission constraints. Remedies: improve processes for approving grid upgrades; introduce transmission hedges o SOE generator-retailers are not well-balanced geographically (resulting in weaker retail competition). Remedies: SOE asset swaps Discussion Document, Vol. II, Wholesale Market (Appendix 13, pp ); Retail Market (Appendix 14, pp )

14 (physical and virtual) o Absence of a liquid hedge market combined with vertical integration between generator-retailers (discouraging competition and new entry). Remedies: provide for a more liquid hedge market; allow lines businesses into retail o Multiplicity of complex line tariffs (making it costly for new retailers). Remedies: more standardisation of line tariffs o Apparent reluctance of consumers to switch retailers. Remedies: promote consumer switching o Weak competition in the wholesale market at times, especially in dry years. Remedies: improved demand-side participation; liquid hedge market; abolish reserve energy scheme; better disclosure and monitoring of wholesale market information; smart meters and tariffs

Comment on issues raised by Committee members on 21 April 2010

Comment on issues raised by Committee members on 21 April 2010 Electricity Industry Bill Comment on issues raised by Committee members on 21 April 2010 1. This note provides further comment on a number of issues raised by Committee members on Wednesday 21 April. 2.

More information

Competition, Reliability and Hedge Market Developments in NZ. Carl Hansen New Zealand Electricity Authority

Competition, Reliability and Hedge Market Developments in NZ. Carl Hansen New Zealand Electricity Authority Competition, Reliability and Hedge Developments in NZ Carl Hansen New Zealand Electricity Authority Outline Overview of the NZ electricity system and markets The EA s policy framework Role and overall

More information

ELECTRICITY AUTHORITY

ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY DRAFT DECISION (28 JUNE 2017) IN RELATION TO THE EXPANSION OF THE NGAWHA POWER STATION 8 AUGUST 2017 Electricity Retailers Association of New Zealand PO Box 25596, Featherston Street,

More information

Better energy. MERIDIAN ENERGY LIMITED RESULTS PRESENTATION YEAR ENDING 30th June 2014

Better energy. MERIDIAN ENERGY LIMITED RESULTS PRESENTATION YEAR ENDING 30th June 2014 Better energy MERIDIAN ENERGY LIMITED RESULTS PRESENTATION YEAR ENDING 30th June 2014 Disclaimer The information in this presentation was prepared by Meridian Energy with due care and attention. However,

More information

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0)

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0) Ghana Power Sector Review of Reform Programme Ray Tomkins (ECA) ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0)20 7604 4545 / fax +44 (0)20 7604 4547 www.eca-uk.com

More information

Regulation of the NZ electricity market. Presentation to EMAN 410 Students, University of Otago 19 July 2013 Carl Hansen

Regulation of the NZ electricity market. Presentation to EMAN 410 Students, University of Otago 19 July 2013 Carl Hansen Regulation of the NZ electricity market Presentation to EMAN 410 Students, University of Otago 19 July 2013 Carl Hansen Overview Current regulatory arrangements for electricity Overview of NZ electricity

More information

stated. This Ruling applies is the issue Manager. b) of Asteron A Life PO P Box 2198 Wellington W 6140 New N Zealand Telephone: T

stated. This Ruling applies is the issue Manager. b) of Asteron A Life PO P Box 2198 Wellington W 6140 New N Zealand Telephone: T Office O of the Chief Tax Counsel Te T Tari o te Rōia Tāke Matua Asteron A Life 555 Featherstonn Street PO P Box 2198 Wellington W 6140 New N Zealand Telephone: T 044 890-1500 Facsimile F Numbers: Chief

More information

Electricity Policy Options - Evaluation of Regulated Market, Single Buyer and Amalgamated SOE models

Electricity Policy Options - Evaluation of Regulated Market, Single Buyer and Amalgamated SOE models Electricity Policy Options - Evaluation of Regulated Market, Single Buyer and Amalgamated SOE models 17 July 2006 Preface (added December 2006) This document was prepared by MED and does not represent

More information

Powering today, protecting tomorrow. MERIDIAN ENERGY LIMITED annual results roadshow presentation

Powering today, protecting tomorrow. MERIDIAN ENERGY LIMITED annual results roadshow presentation Powering today, protecting tomorrow Disclaimer The information in this presentation was prepared by Meridian Energy with due care and attention. However, the information is supplied in summary form and

More information

IT S OUR FUTURE. MERIDIAN ENERGY LIMITED 2017 ANNUAL RESULTS PRESENTATION

IT S OUR FUTURE. MERIDIAN ENERGY LIMITED 2017 ANNUAL RESULTS PRESENTATION IT S OUR FUTURE. MERIDIAN ENERGY LIMITED 2017 ANNUAL RESULTS PRESENTATION That we are a sustainable business is increasingly important to all our stakeholders, and offers significant benefits Meridian

More information

Powering today, protecting tomorrow. MERIDIAN ENERGY LIMITED I investor roadshow presentation

Powering today, protecting tomorrow. MERIDIAN ENERGY LIMITED I investor roadshow presentation Powering today, protecting tomorrow Disclaimer The information in this presentation was prepared by Meridian Energy with due care and attention. However, the information is supplied in summary form and

More information

Meridian Energy NZX retail investor presentation

Meridian Energy NZX retail investor presentation Meridian Energy NZX retail investor presentation 1 October 2018 Attached is a presentation Meridian Energy Limited is making at NZX retail investor evenings in early October 2018. ENDS Neal Barclay Chief

More information

King Country Energy Limited. Independent Adviser s Report. In Respect of the Full Takeover Offer by King Country Energy Holdings Limited

King Country Energy Limited. Independent Adviser s Report. In Respect of the Full Takeover Offer by King Country Energy Holdings Limited King Country Energy Limited Independent Adviser s Report In Respect of the Full Takeover Offer by King Country Energy Holdings Limited November 2015 Statement of Independence Simmons Corporate Finance

More information

Annual Report 2013/14 COMPETITION RELIABILITY EFFICIENCY

Annual Report 2013/14 COMPETITION RELIABILITY EFFICIENCY Annual Report 2013/14 COMPETITION RELIABILITY EFFICIENCY We re working to enhance competition for buying and selling electricity. We focus on facilitating consumer participation and reducing barriers to

More information

2017 Winter review. Final report. 22 March Market Performance

2017 Winter review. Final report. 22 March Market Performance 2017 Winter review Final report 22 March 2018 Market Performance Executive summary The winter of 2017 was characterised by an extended period of low hydro inflows in the South Island. The Electricity Authority

More information

Generation investment in a liberalised electricity market. 28 March 2008

Generation investment in a liberalised electricity market. 28 March 2008 Generation investment in a liberalised electricity market 28 March 2008 Darryl Biggar Australian Competition and Consumer Commission Australian Energy Regulator Investment in electricity markets Demand

More information

Submission on. Consultation Paper. Managing locational price risk proposal. Electric Power Optimization Centre. University of Auckland

Submission on. Consultation Paper. Managing locational price risk proposal. Electric Power Optimization Centre. University of Auckland Submission on P Consultation Paper E O Managing locational price risk proposal C by Electric Power Optimization Centre University of Auckland Professor Andy Philpott Dr Golbon Zakeri Dr Geoff Pritchard

More information

CRAIGS QUEENSTOWN INVESTOR DAY. MERIDIAN ENERGY LIMITED MANAGEMENT PRESENTATION

CRAIGS QUEENSTOWN INVESTOR DAY. MERIDIAN ENERGY LIMITED MANAGEMENT PRESENTATION CRAIGS QUEENSTOWN INVESTOR DAY. MERIDIAN ENERGY LIMITED MANAGEMENT PRESENTATION Meridian a reminder. $7b company, listed in 2013, 51% Government owned New Zealand s largest generator, from purely renewable

More information

Powering today, protecting tomorrow

Powering today, protecting tomorrow Powering today, protecting tomorrow Disclaimer The information in this presentation was prepared by Meridian Energy with due care and attention. However, the information is supplied in summary form and

More information

Coordination and generation of of transmission investment

Coordination and generation of of transmission investment Coordination and generation of of transmission investment John John Gleadow Senior Senior Advisor Transmission Presented to to the the Transmission Advisory Group 19 19 April 2007 Purpose of this presentation

More information

Request for Advice on Cost Recovery for Mandated Smart Metering Infrastructure

Request for Advice on Cost Recovery for Mandated Smart Metering Infrastructure FINAL REPORT Request for Advice on Cost Recovery for Mandated Smart Metering Infrastructure Commissioners Pierce Henderson Spalding 30 November 2010 Reference: EPR0018 Final Report EMBARGO until 22 December

More information

Input methodologies review related party transactions

Input methodologies review related party transactions ISBN no. 978-1-869456-20-7 Project no. 14.20/16104 Public version Input methodologies review related party transactions Final decision and determinations guidance Date of publication: 21 December 2017

More information

HEDGE MARKETS AND VERTICAL INTEGRATION IN THE NEW ZEALAND ELECTRICITY SECTOR

HEDGE MARKETS AND VERTICAL INTEGRATION IN THE NEW ZEALAND ELECTRICITY SECTOR 12 th October 2004 HEDGE MARKETS AND VERTICAL INTEGRATION IN THE NEW ZEALAND ELECTRICITY SECTOR A Report for Contact Energy Project Team: Graham Shuttleworth Tim Sturm TABLE OF CONTENTS EXECUTIVE SUMMARY

More information

WE RE WORKING TO BUILD A BETTER FUTURE

WE RE WORKING TO BUILD A BETTER FUTURE WE RE WORKING TO BUILD A BETTER FUTURE As a 100% renewable energy generator, and as a retailer, our business has always walked hand in hand with the environment. But building a sustainable future is much

More information

Branch Name Commerce Commission Wellington NEW ZEALAND 27 June 2011 ISBN:

Branch Name Commerce Commission Wellington NEW ZEALAND 27 June 2011 ISBN: Draft decision Minor Capital Expenditure and Operating Expenditure Allowances, and Quality Standards to apply to Transpower for the Remainder Period of Regulatory Control Period 1 Branch Name Commerce

More information

MERIDIAN ENERGY LIMITED 2019 INTERIM RESULTS PRESENTATION

MERIDIAN ENERGY LIMITED 2019 INTERIM RESULTS PRESENTATION MERIDIAN ENERGY LIMITED 219 INTERIM RESULTS PRESENTATION M E R I D I A N E N E R G Y L I M I T E D 2 1 9 I N T E R I M R E S U L T S P R E S E N T A T I O N H I G H L I G H T S 18% increase in interim

More information

2018 INTERIM RESULTS PRESENTATION. MERIDIAN ENERGY LIMITED

2018 INTERIM RESULTS PRESENTATION. MERIDIAN ENERGY LIMITED 2018 INTERIM RESULTS PRESENTATION. MERIDIAN ENERGY LIMITED Opening comments. Challenges of two significant dry periods in 2017 749 GWH of new Australian generation capacity Retail platform decision in

More information

King Country Energy Limited. Independent Adviser s Report. In Respect of the Full Takeover Offer by the King Country Energy Joint Venture

King Country Energy Limited. Independent Adviser s Report. In Respect of the Full Takeover Offer by the King Country Energy Joint Venture King Country Energy Limited Independent Adviser s Report In Respect of the Full Takeover Offer by the King Country Energy Joint Venture December 2017 Statement of Independence Simmons Corporate Finance

More information

Managing electricity price risk. A guide for consumers

Managing electricity price risk. A guide for consumers Managing electricity price risk A guide for consumers About the Electricity Authority The Electricity Authority is an independent Crown entity tasked by the Electricity Industry Act 2010 to promote competition

More information

Meridian Energy Ltd A Research Report

Meridian Energy Ltd A Research Report Meridian Energy Ltd A Research Report October 2, 2013 L8, Wakefield House 90 The Terrace P.O. Box 93 Wellington New Zealand Tel (644) 934 8740 info@tdb.co.nz Principal contacts for this report: Philip

More information

INTRODUCTION. Meridian Energy Limited 2018 Annual Results Presentation 2

INTRODUCTION. Meridian Energy Limited 2018 Annual Results Presentation 2 THE LONG RUN M E R I D I A N E N E R G Y L I M I T E D 2 0 1 8 A N N U A L R E S U L T S P R E S E N T A T I O N INTRODUCTION Meridian Energy Limited 2018 Annual Results Presentation 2 A S N A P S H O

More information

Utilizing FDI to improve infrastructure Electricity: - Case Studies of Chile and New Zealand

Utilizing FDI to improve infrastructure Electricity: - Case Studies of Chile and New Zealand 2008/SOM3/IEG/SEM2/004 Session: I Utilizing FDI to improve infrastructure Electricity: - Case Studies of Chile and New Zealand Submitted by: UNCTAD Seminar on Recent Trends on Investment Liberalization

More information

Financial and Operational Results Six months ended 31 December FEBRUARY 2012

Financial and Operational Results Six months ended 31 December FEBRUARY 2012 Six months ended 31 December 2011 23 FEBRUARY 2012 Disclaimer This financial and operational results presentation dated 23 February 2012 provides additional comment on the media release and market release

More information

Wairakei Ring Investment Proposal. Project Reference: CTNI_TRAN-DEV-01. Attachment A GIT Results

Wairakei Ring Investment Proposal. Project Reference: CTNI_TRAN-DEV-01. Attachment A GIT Results Wairakei Ring Investment Proposal Project Reference: CTNI_TRAN-DEV-01 Attachment A GIT Results December 2008 Document Revision Control Document Number/Version 001/Rev A Description Wairakei Ring Investment

More information

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner Contents 1. The restriction of subsidies and policy priorities. 2.

More information

Presentation to Investor Briefing. May 2010

Presentation to Investor Briefing. May 2010 P t ti t Presentation to Investor Briefing May 2010 Agenda TrustPower Key Facts FY2010 Financial i Performance and Operations Overview Competitor Benchmarking and Shareholder Returns Regulatory Environment

More information

HVDC Inter-Island Link Upgrade Project. Investment Proposal. Part V Project Costs

HVDC Inter-Island Link Upgrade Project. Investment Proposal. Part V Project Costs HVDC Inter-Island Link Upgrade Project Investment Proposal Part V Project Costs Transpower New Zealand Limited 2005. All rights reserved 1 SUMMARY... 3 2 BACKGROUND... 4 3 APPROACH TO ESTIMATING COSTS...

More information

Resource Adequacy and Managing Unilateral Market Power in Wholesale Electricity Markets

Resource Adequacy and Managing Unilateral Market Power in Wholesale Electricity Markets Resource Adequacy and Managing Unilateral Market Power in Wholesale Electricity Markets Frank A. Wolak Department of Economics Stanford University Stanford, CA 94305-6072 wolak@zia.stanford.edu http://www.stanford.edu/~wolak

More information

Financial Transmission Rights Markets: An Overview

Financial Transmission Rights Markets: An Overview Financial Transmission Rights Markets: An Overview Golbon Zakeri A. Downward Department of Engineering Science, University of Auckland October 26, 2010 Outline Introduce financial transmission rights (FTRs).

More information

October Leading Energy

October Leading Energy October 2012 Leading 2 Introduction Welcome to your update on the key issues and challenges for New Zealand s electricity generation and retail companies in FY12. We take a look at how the sector dealt

More information

Can the Commonwealth drive infrastructure?

Can the Commonwealth drive infrastructure? Can the Commonwealth drive infrastructure? Professor Henry Ergas Deloitte Australia and SMART Infrastructure Facility, University of Wollongong 2014 Melbourne Institute Economic and Social Outlook Conference

More information

Labour will establish NZ Inc to drive growth and keep our wealth in New Zealand for future generations.

Labour will establish NZ Inc to drive growth and keep our wealth in New Zealand for future generations. 1 Labour will establish NZ Inc to drive growth and keep our wealth in New Zealand for future generations. NZ Inc will: create the NZ Inc Sovereign Wealth Fund (NZ Inc) that will take dividends from our

More information

Electricity Price Review - Options paper

Electricity Price Review - Options paper Electricity Price Review - Options paper ASX submission 15 March 2019 paper 1/10 Contacts For general enquiries, please contact: Bradley Campbell Head of Commodities ASX Limited T: +61 (0)2 9227 0492 E:

More information

Derivative market design & performance. Masterclass for the Restructured Electricity Industry August 2005 CEEM, 2005

Derivative market design & performance. Masterclass for the Restructured Electricity Industry August 2005 CEEM, 2005 Derivative market design & performance Masterclass for the Restructured Electricity Industry 24-26 August 2005 CEEM, 2005 Participant motivation for trading electricity derivatives: price-risk management

More information

1. Half Year Results November Investor Briefing 2018 Half Year Results 8 November 2018

1. Half Year Results November Investor Briefing 2018 Half Year Results 8 November 2018 1. Half Year Results November 2018 Investor Briefing 2018 Half Year Results 8 November 2018 Contents FY19 first half highlights Retail overview Generation and wholesale market overview Overview of financial

More information

Clearing Manager. Financial Transmission Rights. Prudential Security Assessment Methodology. 18 September with September 2015 variation

Clearing Manager. Financial Transmission Rights. Prudential Security Assessment Methodology. 18 September with September 2015 variation Clearing Manager Financial Transmission Rights Prudential Security Assessment Methodology with September 2015 variation 18 September 2015 To apply from 9 October 2015 Author: Warwick Small Document owner:

More information

BUSINESS COUNCIL OF AUSTRALIA SUBMISSION TO THE ENERGY REFORM IMPLEMENTATION GROUP SEPTEMBER 2006

BUSINESS COUNCIL OF AUSTRALIA SUBMISSION TO THE ENERGY REFORM IMPLEMENTATION GROUP SEPTEMBER 2006 BUSINESS COUNCIL OF AUSTRALIA SUBMISSION TO THE ENERGY REFORM IMPLEMENTATION GROUP SEPTEMBER 2006 TABLE OF CONTENTS 1 Introduction...2 2 The Benefits of Past Reform...4 3 Policy Outcomes and Steps for

More information

Briefing for Commerce Committee on Consumer Law Reform Bill: Electricity and Gas Retailer Indemnity

Briefing for Commerce Committee on Consumer Law Reform Bill: Electricity and Gas Retailer Indemnity Briefing for Commerce Committee on Consumer Law Reform Bill: Electricity and Gas Retailer Indemnity Introduction Document MED 008 12 June 2012 1. The purpose of this paper is to assist the Committee in

More information

EMA Submission. to the. Electricity Authority. on the. Transmission Pricing Methodology Issues and Proposal (Second Issues Paper)

EMA Submission. to the. Electricity Authority. on the. Transmission Pricing Methodology Issues and Proposal (Second Issues Paper) EMA Submission to the Electricity Authority on the Transmission Pricing Methodology Issues and Proposal (Second Issues Paper) Submitted July 26 2016 About the EMA The EMA has a membership of more than

More information

Condensed Interim Financial Statements and Review. Balancing Pool. For the three months ended March 31, 2018 (Unaudited)

Condensed Interim Financial Statements and Review. Balancing Pool. For the three months ended March 31, 2018 (Unaudited) Condensed Interim Financial Statements and Review Balancing Pool For the three months ended March 31, 2018 (Unaudited) NOTICE OF NO AUDITOR S REVIEW OF INTERIM FINANCIAL STATEMENTS The accompanying unaudited

More information

AUGUST ENERGY RETAIL CONTRACTS REVIEW Unfair contract terms

AUGUST ENERGY RETAIL CONTRACTS REVIEW Unfair contract terms AUGUST 2016 ENERGY RETAIL CONTRACTS REVIEW Unfair contract terms Contents Purpose 3 Relationship between this Report and the Telecommunications Report 3 Introduction 4 Purpose of the Energy Retail project

More information

Consumer Law Reform: Meridian Energy Group Oral Submission

Consumer Law Reform: Meridian Energy Group Oral Submission Consumer Law Reform: Meridian Energy Group Oral Submission Gillian Blythe, Regulatory Affairs Manager, Meridian Alannah MacShane, Regulatory Affairs Advisor, Meridian 24 May 2012 Overview 1. Overview of

More information

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA 22 October 2018 PRESENTATION TO THE ABSA POWER, UTILITIES AND INFRASTRUCTURE INSIGHT SERIES Dr Grové Steyn 1 THE ORIGINAL RATIONALE FOR

More information

Electricity markets, perfect competition and energy shortage risks

Electricity markets, perfect competition and energy shortage risks lectric ower ptimization entre lectricity markets, perfect competition and energy shortage risks Andy hilpott lectric ower ptimization entre University of Auckland http://www.epoc.org.nz joint work with

More information

Mighty River Power Reports Increase in Net Profit and Underlying Earnings

Mighty River Power Reports Increase in Net Profit and Underlying Earnings NEWS RELEASE 21 February 2013 Mighty River Power Reports Increase in Net Profit and Underlying Earnings FINANCIAL RESULTS FOR THE SIX MONTHS ENDED 31 DECEMBER 2012¹ Highlights Net Profit After Tax increased

More information

Waste Electrical and Electronic Equipment Directive (WEEE) Conclusions of Implementation Review supplementary paper

Waste Electrical and Electronic Equipment Directive (WEEE) Conclusions of Implementation Review supplementary paper Waste Electrical and Electronic Equipment Directive (WEEE) Conclusions of Implementation Review supplementary paper Introduction 1. In March 2006 the DTI published the findings and recommendations from

More information

Advice to the Minister on the Economic Regulatory Framework for the public water services sector in Ireland

Advice to the Minister on the Economic Regulatory Framework for the public water services sector in Ireland Advice to the Minister on the Economic Regulatory Framework for the public water services sector in Ireland DOCUMENT TYPE: REFERENCE: Advice Paper CER/14/076 DATE ISSUED: 31 March 2014 Non-technical summary

More information

Submission on the GIC s Statement of Intent and Levy for FY2017

Submission on the GIC s Statement of Intent and Levy for FY2017 5 February 2016 Glenda MacBain Corporate Services Manager Gas Industry Company Wellington Vector Limited 101 Carlton Gore Road PO Box 99882, Newmarket Auckland 1149, New Zealand www.vector.co.nz Corporate

More information

STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018

STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018 STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018 INTRODUCTION SSE is working towards its vision of being a leading energy company in a low carbon world by focusing on core businesses of regulated

More information

COMMENTS ON VOLUNTARY PEER REVIEW OF COMPETITION LAW AND POLICY IN JAMAICA 1. Submission by JAMAICA AYT

COMMENTS ON VOLUNTARY PEER REVIEW OF COMPETITION LAW AND POLICY IN JAMAICA 1. Submission by JAMAICA AYT FIFTH UNITED NATIONS CONFERENCE TO REVIEW ALL ASPECTS OF THE SET OF MULTILATERALLY AGREED EQUITABLE PRINCIPLES AND RULES FOR THE CONTROL OF RESTRICTIVE BUSINESS PRACTICES Antalya, Turkey, 14 18 November

More information

Retail Bond Offer Investor Presentation

Retail Bond Offer Investor Presentation Retail Bond Offer Investor Presentation Dorian Devers, Chief Financial Officer Louise Tong, Head of Capital Markets & Tax Joint Lead Managers February 2019 Important Notice The offer of debt securities

More information

COMMERCE COMMISSION Regulation of Electricity Distribution Businesses Review of the Information Disclosure Regime

COMMERCE COMMISSION Regulation of Electricity Distribution Businesses Review of the Information Disclosure Regime COMMERCE COMMISSION Regulation of Electricity Distribution Businesses Review of the Information Disclosure Regime Process Paper: Implementation of the New Disclosure Requirements 30 April 2008. Network

More information

Auctioning Carbon Units in Australia s Carbon Pricing Mechanism

Auctioning Carbon Units in Australia s Carbon Pricing Mechanism Auctioning Carbon Units in Australia s Carbon Pricing Mechanism submission: Legislative instrument for auctioning carbon units 28 February 2012 Emma Herd T: 61 2 8254 8967 eherd@westpac.com.au A division

More information

Cut the. bull. buying your first home is. possible! First Home Buyers Guide

Cut the. bull. buying your first home is. possible! First Home Buyers Guide Cut the bull buying your first home is possible! First Home Buyers Guide INTRODUCTION Buying your first home can seem daunting but it doesn t have to be. At Loan Market we specialise in helping first home

More information

MLC Wholesale Index Plus Product Guide

MLC Wholesale Index Plus Product Guide MLC Wholesale Index Plus Product Guide Preparation date 5 July 2017 Issued by: The Trustee and Responsible Entity, MLC Investments Limited ABN 30 002 641 661 AFSL 230705 The purpose of this Product Guide

More information

Simplified disclosure prospectus for an offer of fixed rate senior bonds 27 November 2009

Simplified disclosure prospectus for an offer of fixed rate senior bonds 27 November 2009 Joint Lead Manager Joint Lead Manager Co-Manager Simplified disclosure prospectus for an offer of fixed rate senior bonds 27 November 2009 This is a simplified disclosure prospectus in relation to an offer

More information

ASX New Zealand Electricity Futures & Options

ASX New Zealand Electricity Futures & Options ASX New Zealand Electricity Futures & Options Disclaimer of Liability Information provided is for educational purposes and does not constitute financial product advice. You should obtain independent advice

More information

HVDC component of Transpower s proposed variation to the Transmission Pricing Methodology

HVDC component of Transpower s proposed variation to the Transmission Pricing Methodology + HVDC component of Transpower s proposed variation to the Transmission Pricing Methodology Decisions and reasons 14 August 2015 932889v7 Contents 1. Introduction 1 2. The Authority has decided to proceed

More information

83C Questions and Answers

83C Questions and Answers 83C Questions and Answers (2) Section 1.7.4.1 Can the Evaluation Team provide guidance on the scope and amount of information that could be requested from ISO-NE, and the expected magnitude of any associated

More information

CLICK TO EDIT. Annual Results Investor Briefing 3 May 2016

CLICK TO EDIT. Annual Results Investor Briefing 3 May 2016 CLICK TO EDIT Annual Results Investor Briefing 3 May 2016 Disclaimer This presentation has been prepared by Trustpower Limited(Trustpower) in relation to a proposed demerger transaction(demerger). Information:

More information

Models for estimating the performance of electricity markets with hydroelectric reservoir storage

Models for estimating the performance of electricity markets with hydroelectric reservoir storage Models for estimating the performance of electricity markets with hydroelectric reservoir storage Andy Philpott Ziming Guan May 12, 2013 Abstract We describe some new results of an empirical study of the

More information

AUFLS information paper

AUFLS information paper AUFLS information paper Contents 1 Introduction... 1 2 The under-frequency management challenge... 1 3 Overview of current arrangements... 3 3.1 The current AUFLS exemptions... 4 4 Initiatives to address

More information

THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA

THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA A STRATEGIC APPROACH TO COMPETITIVENESS SCOPE, FOCUS AND PROCESS Sofía,

More information

The Association of Corporate Treasurers Interest Representative Register ID:

The Association of Corporate Treasurers Interest Representative Register ID: The Association of Corporate Treasurers Interest Representative Register ID: 64617562334-37 Comments in response to Review of the markets in Financial Instruments Directive (MiFID) The European Commission

More information

SNOWY HYDRO LIMITED STATEMENT OF CORPORATE INTENT 2014

SNOWY HYDRO LIMITED STATEMENT OF CORPORATE INTENT 2014 SNOWY HYDRO LIMITED STATEMENT OF CORPORATE INTENT 2014 1. INTRODUCTION This for Snowy Hydro Limited ( Snowy Hydro or the Company ) continues a focus on the continued development and augmentation of Snowy

More information

Managing Locational Price Risk: Options

Managing Locational Price Risk: Options Managing Locational Price Risk: Options Session 2, 29 October 2009 Tim Street Grant Read (EGR Consulting) Alistair Dixon (KEA3) Agenda Background Problem definition Options Evaluation Initial preferred

More information

Meridian Energy Cross-Submission. Transmission Pricing Methodology: Second issues paper Supplementary Refinements Consultation

Meridian Energy Cross-Submission. Transmission Pricing Methodology: Second issues paper Supplementary Refinements Consultation Meridian Energy Cross-Submission Transmission Pricing Methodology: Second issues paper Supplementary Refinements Consultation 24 March 2017 INTRODUCTION The Electricity Authority seeks cross-submissions

More information

Transpower New Zealand Investor presentation November 2015

Transpower New Zealand Investor presentation November 2015 Transpower New Zealand Investor presentation November 2015 Alex Ball Chief Financial Officer 0064 277038919 alex.ball@transpower.co.nz Chris Sutherland Treasurer 0064 21994925 chris.sutherland@transpower.co.nz

More information

Meridian Share Offer Initial Public Offering of Ordinary Shares in Meridian Energy Limited Investment Statement and Prospectus 20 September 2013

Meridian Share Offer Initial Public Offering of Ordinary Shares in Meridian Energy Limited Investment Statement and Prospectus 20 September 2013 Meridian Share Offer Initial Public Offering of Ordinary Shares in Meridian Energy Limited Investment Statement and Prospectus 20 September 2013 Important Information (The information in this section is

More information

Understanding Risk and Preparing the RFP

Understanding Risk and Preparing the RFP Understanding Risk and Preparing the RFP Table of Contents Excerpts from Risk Allocation Primer... A Sample term sheet... B Description of disasters... C Excerpts from Risk Allocation Primer Please note

More information

Transmission pricing methodology: second issues paper supplementary consultation cross-submission

Transmission pricing methodology: second issues paper supplementary consultation cross-submission 24 March 2017 Mr Carl Hansen Chief Executive Electricity Authority PO Box 10041 Wellington 6143 VECTOR LIMITED 101 CARLTON GORE ROAD PO BOX 99882 AUCKLAND 1149 NEW ZEALAND +64 9 978 7788 / VECTOR.CO.NZ

More information

2007 annual results. supporting information. 15 August 2007

2007 annual results. supporting information. 15 August 2007 2007 annual results supporting information 15 August 2007 Vector Group financial highlights Year ended 30 June $m 2007 2006 % Change 2005 EBITDA 610.0 578.6 +5.4 466.1 EBIT 369.0 362.7 +1.7 307.2 NPATA

More information

Will ETS promote appropriate investment in low-emission technologies?

Will ETS promote appropriate investment in low-emission technologies? Will ETS promote appropriate investment in low-emission technologies? Dr Iain MacGill Joint Director, CEEM Emissions Trading: Getting Key Design Elements Right Third CEEM Annual Conference Sydney, November

More information

Impact Summary: Modernising the correction of errors in PAYE information

Impact Summary: Modernising the correction of errors in PAYE information Impact Summary: Modernising the correction of errors in PAYE information Section 1: General information Purpose Inland Revenue is solely responsible for the analysis and advice set out in this Impact Summary,

More information

Oxford Energy Comment March 2009

Oxford Energy Comment March 2009 Oxford Energy Comment March 2009 Reinforcing Feedbacks, Time Spreads and Oil Prices By Bassam Fattouh 1 1. Introduction One of the very interesting features in the recent behaviour of crude oil prices

More information

November 28, FSB Policy Framework for Addressing Shadow Banking Risks in Securities Lending and Repos (29 August 2013) (the Policy Framework ) 1

November 28, FSB Policy Framework for Addressing Shadow Banking Risks in Securities Lending and Repos (29 August 2013) (the Policy Framework ) 1 - November 28, 2013 By email to fsb@bis.org Secretariat of the Financial Stability Board c/o Bank for International Settlements CH-4002, Basel Switzerland Re: FSB Policy Framework for Addressing Shadow

More information

STATEMENT OF CORPORATE INTENT April 2018 Electra Group

STATEMENT OF CORPORATE INTENT April 2018 Electra Group STATEMENT OF CORPORATE INTENT April 2018 Electra Group Electra Group Statement of Corporate Intent Page 1 of 11 ELECTRA GROUP STATEMENT OF CORPORATE INTENT APRIL 2018 1. Business mission The mission of

More information

Water Potential developments in the commercialisation of the sludge treatment and recycling market

Water Potential developments in the commercialisation of the sludge treatment and recycling market Water 2020 Potential developments in the commercialisation of the sludge treatment and recycling market Wessex Water June 2015 Executive summary Improving the efficiency, quality and sustainability of

More information

South East Europe Electricity Market options paper

South East Europe Electricity Market options paper EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT DIRECTORATE C - Conventional Energies Electricity & Gas Brussels, 5 December 2005 DG TREN/C2/MS South East Europe Electricity Market options

More information

Development Contributions Policy 2018: Springvale Urban Expansion Area and Otamatea West

Development Contributions Policy 2018: Springvale Urban Expansion Area and Otamatea West Development Contributions Policy 2018: Urban Expansion Area and West 1 P a g e Development Contributions Policy 2018: Urban Expansion Area and West Originator: Damien Wood, Development Engineer Contact

More information

MERIDIAN ENERGY LIMITED CONDENSED INTERIM FINANCIAL STATEMENTS FOR THE SIX MONTHS TO 31 DECEMBER 2018

MERIDIAN ENERGY LIMITED CONDENSED INTERIM FINANCIAL STATEMENTS FOR THE SIX MONTHS TO 31 DECEMBER 2018 MERIDIAN ENERGY LIMITED CONDENSED INTERIM FINANCIAL STATEMENTS FOR THE SIX MONTHS TO 31 DECEMBER FINANCIALS MERIDIAN ENERGY LIMITED CONDENSED INTERIM FINANCIAL STATEMENTS AS AT AND FOR THE SIX MONTHS TO

More information

20 years operation of the Nordic electricity market

20 years operation of the Nordic electricity market ENERGY 20 years operation of the Nordic electricity market ADB Regional Energy Trade Workshop September 8-9, 2014 Manila Dr. Per Christer Lund 1 SAFER, SMARTER, GREENER Electricity market world wide 2

More information

Agreement on Access to the Wholesale Market for Electrical Power in Norway

Agreement on Access to the Wholesale Market for Electrical Power in Norway Agreement on Access to the Wholesale Market for Electrical Power in Norway (The Balance Agreement) between Statnett SF (hereinafter called Statnett) and The Balance Responsible Market Player (hereinafter

More information

Brazilian Power Sector: Lessons from the Past, Challenges Going Forward

Brazilian Power Sector: Lessons from the Past, Challenges Going Forward Brazilian Power Sector: Lessons from the Past, Challenges Going Forward Johns Hopkins University School of Advanced International Studies Washington, D.C. October 5, 2011 Ashley C. Brown Executive Director,

More information

Comprehensive Review of BC Hydro: Phase 1 Final Report

Comprehensive Review of BC Hydro: Phase 1 Final Report Comprehensive Review of BC Hydro: Phase 1 Final Report ii Table of Contents 1. Executive Summary 1 1.1 Enhancing Regulatory Oversight of BC Hydro 1 1.2 New Rates Forecast 3 1.3 Next Steps 5 2. Strategic

More information

Genesis Energy broader energy exposure funds higher dividend

Genesis Energy broader energy exposure funds higher dividend Genesis Energy broader energy exposure funds higher dividend We value Genesis, relative to its peers, at the top end of the indicative price range Genesis Energy (GNE) will be floated on 17 April 2014.

More information

Simplified Disclosure Prospectus. for an offer of interest bearing capital bonds. Arranger, Organising Participant and Joint Lead Manager

Simplified Disclosure Prospectus. for an offer of interest bearing capital bonds. Arranger, Organising Participant and Joint Lead Manager Simplified Disclosure Prospectus for an offer of interest bearing capital bonds. This Prospectus is a Simplified Disclosure Prospectus for an offer of capital bonds that will rank in priority to the ordinary

More information

Report by the Study Group to Discuss an Ideal Electricity Futures Market (Summary)

Report by the Study Group to Discuss an Ideal Electricity Futures Market (Summary) Report by the Study Group to Discuss an Ideal Electricity Futures Market (Summary) April 2018 Commerce and Service Industry Policy Group Office of Director for Commodity Market I. Meetings of the Study

More information

REVIEW OF THE ROYALTY REGIME FOR MINERALS DISCUSSION PAPER (OCTOBER 2012)

REVIEW OF THE ROYALTY REGIME FOR MINERALS DISCUSSION PAPER (OCTOBER 2012) Submission to Ministry of Business, Innovation and Employment on REVIEW OF THE ROYALTY REGIME FOR MINERALS DISCUSSION PAPER (OCTOBER 2012) INTRODUCTION 1 Straterra 1 welcomes the opportunity to submit

More information

Submission by the Telecommunications Carriers Forum on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill

Submission by the Telecommunications Carriers Forum on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill Submission by the Telecommunications Carriers Forum on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill Introduction 1. This submission is made by the Telecommunications Carriers

More information