1 Brazilian Power Sector: Lessons from the Past, Challenges Going Forward Johns Hopkins University School of Advanced International Studies Washington, D.C. October 5, 2011 Ashley C. Brown Executive Director, Harvard Electricity Policy Group John F. Kennedy School of Government, Harvard University Of Counsel, Dewey & LeBoeuf 1

2 Overview of Power Sector (1998) 65,134 MW Installed Capacity (1998) 95%+ Hydro Need for Thermal Expansion National Ownership of generation and transmission State owns distribution companies Nationalization completed in 1970 s 5% Demand Growth (1999) 2

3 Overview, con t Three Systems: South / South-Central Northeast Isolated Systems Heaviest Load in South / South-Central region Hydro facilities located on only a few rivers 3

4 Overview, con t Many hydro plants are multiple use: Electricity Water / irrigation Navigation Generating resources far from load centers Procel Efficiency Program 4

5 Overview, con t Generating and Transmission Sectors well planned and operated Deteriorated distribution networks High non-technical losses Some vertical integration at State levels 45% Rural Electrification 1 Nuclear unit; 2 others planned 1 Huge Bi-national plant 5

6 Socio/Economic Context Massive Government Debt Real Plan Inflation declining Pressing social needs Skewed demographic and geographic distribution of wealth Partly first world / partly third world 6

7 Motivation For Privatization Macro-Economic Considerations - Primary Government Debt Recover Debts Owed by States to National Government Pressing Social Needs Satisfy Loan Conditions Micro-Economic Considerations - Secondary Improve Performance of Distribution Sector Inability to Raise Capital Needed to Meet Growing Demand 7

8 Goals of Privatization Primary Objective: Maximize Revenues from Sale of Assets Part of Overall Economic liberalization Finance System Expansion 8

9 Sector Considerations Secondary or Tertiary Delayed Creation of Regulatory Structure Delayed Consideration of Market Structure and Rules Inadequate Attention to Need for Promoting Thermal Development 9

10 The Plans Distribution Sector Entirely Privatized (Where BNDES Controlled) Generating Sector Privatized (Where BNDES Controlled) State retention of Transmission + Itaipu and Angra 10

11 Flaws in the Plans Complexity of Unbundling and Privatizing Hydro Generation Water Rights and Priorities of use Upstream/Downstream Issues Asymmetry in Hydro-Thermal Competition High Productivity of the Generation and Transmission Sector Privatization Before Creation of Regulatory and Market Institutions 11

12 Flaws in the Plans, Con t Lack of Balance Between Micro and Macro Economic Considerations Underestimate of Currency Risks Asymmetry Between Fuel Market and Electric Sector Needs Emphasis on Short Term Results Inadequate Consideration of Transition Problems 12

13 Institutional Responsibility For Privatization BNDES Given Main Responsibility Ministry of Mines and Energy Only to Coordinate Sector State Owned Companies Precluded from Obtaining Independent Advice Role of State Governments 13

14 Incentives for Investors Price Caps Without Productivity Expectations General Absence of Social Expectations Mandate Pre-existing Contracts for Generators with Distributors Annex V Throughput Assurances for Distributors 14

15 Course of Privatization Revenues from Sale of Distribution Companies Generally Exceeded Minimum Average Premium over Minimum = 45% Sale of Generators Generally Required Long Term Sales Contracts to Attract Investors State Financing Central to Many Transactions (26% from BNDES alone) Most of Distribution Sector Privatized (17 companies) 15

16 Course of Privatization, Con t Generation Largely Not Privatized (4 companies) Inability to Privatize FURNAS, CHESF, and Eletronorte Inability to Attract Significant Thermal Investment CEMIG Controversy Current Inability to Attract Private Investors (e.g. COPEL, CELG) Increasing Concentration of Private Investors 16

17 Results from Consumer Perspective Shortage of Supply and Rationing Service Quality Problems Prospect of Huge Increases in Rates (33-50% over Next Few Years) No Appreciable Expansion of Service 17

18 Reasons for Consumer Disappointments Drought Failure to Diversify Resource Portfolio Disincentives for Private Investment Perversity of Incentives Lack of Productivity Expectation Inability to Distinguish Between Cost Cutting and Productivity Gains Ex Post Creation of Regulatory Regime Lack of Coherent Market Structure 18

19 Results from Investor Perspective Substantial Financial Losses Assumption of Uncontrollable Risks Fuel Market Currency Fluctuation Artificial Price Constraints (Unlinked to costs) Inability to Enforce Contracts e.g. Annex V 19

20 Results from Investor Perspective, Con t Asymmetrical Market Privatization before Regulation Skewed and Uncertain Market Rules and Conditions Distributors Unwilling to take Long Term Contract Risks in Face of Uncertainty Generators Unwilling to Risk Capital in Absence of Contracts or Market Rules 20

21 Reasons for Investor Disappointment Unreal Expectations Created by Initial Incentives Decline in Value of Real Drought Macro-Economic and Political Concerns Trump Micro- Economic Considerations Inflation Fears Opposition to Any Form of Indexing Unwillingness to Impose New Obligations on State- Owned Companies (e.g. Annex V) Lack of Regulatory Independence Mismatch Between Gas and Electric Markets 21

22 Reasons for Investor Disappointment, Con t Failure to Break Monopoly in Natural Gas Market Imbalance Between Incentives and Regulatory Rules (e.g. Rio Light) Legal Uncertainties Regarding Contracts (e.g. CEMIG) Uncertain Relationship Between License Conditions and Subsequent Regulations Service Quality Standards Expansion of Service Availability Technology Transfer Affiliate Transactions Unknown Market Rules With Full Market Opening in

23 Short Term: Government Responses to Problems (Cardoso Government) Ad Hoc Socialization of Risks, Not Clarification of Market Socialization of Annex V and Angra II Liabilities (BNDES + Tariff Increases) State Owned Generators Relieved of Obligation Socialization of Fuel Risks Petrobras Assumption of Risk for 12 Month Periods Socialization of Thermal Investment Petrobras as Strategic Investor in Sector 23

24 Short Term: Government Response to Problems con t (Cardoso Government) Creation of Crisis Management Chamber (CGC) Mandatory 20% Curtailment of Use & Rationing Disbanding of MAE Strengthen ANEEL s Jurisdiction over Market Design Mandate that 95% of all Generation Output be Sold Long Term Segregation of Old Energy from Thermal Energy Make Dispatch Protocols more Thermal Friendly 24

25 Short Term: Government Responses to Problems, con t (Cardoso Government) Dispatch Regime changed from Cost Based to Bid Based Reinforce Independence of ONS Subsidize Gas Imports from Bolivia Implementation of LMP Transmission Pricing New Incentive to Promote Use of Renewables Promotion of Rural Electrification 25

26 Long Term: Market Reform (Lula Government) 1. MAE Replaced by CCEE (Government Tie Breaker) 2. Creation of EPE a. Data and Analysis b. Aggregation of Demand c. Auction Design d. Transmission Planning and Auction 26

27 Long Term: Market Reform (Lula Government) con t 3. Creation of Modified Single Buyer Model a. Distributors Submit Forecasts b. EPE Aggregates Forecasts and Designs Auction i. Old Energy ii. iii. New Energy 3-5 Year Auctions iv. Contractual Responsibilities Allocated Proportional With Demand (Joint Liability) v. Limits on Distribution Company Trading 27

28 Long Term: Market Reform (Lula Government) con t 4. Creation of Free Market 5. Luz Para Todos 6. Renewable Set Asides 28

29 Challenges Going Forward 1. Lack of Energy Market (Mainly a Capacity Market) 2. Minimal Supply Flexibility for Distributors 3. Limitations on Hydro (No Reservoirs) 29

30 Challenges Going Forward con t 4. Primitive State of Natural Gas Market a. Petrobras Market Power i. Disinterested in Gas ii. Flaring of Gas iii. Dominant Position in Thermal Generation iv. Vertical Market Power v. Take or Pay vi. No Storage (except LNG Tanks) b. No Open Access (New Gas Law) c. No Secondary Capacity d. Disconnect Between Gas and Electric Regulation 30

31 Challenges Going Forward con t 5. Reform of Energy Pricing 6. Transmission Pricing 7. Energy Efficiency 8. Smart Grid Deployment 9. Reliability 31

Electric Industry Privatization and Restructuring: Lessons from Brazil

Electric Industry Privatization and Restructuring: Lessons from Brazil Electric Industry Privatization and Restructuring: Lessons from Brazil New England Chapter International Association for Energy Economics Massachusetts Institute of Technology Cambridge, MA March 27, 2002

More information

Comparison Case Study: Two Neighbors in Contrast: The Restructuring of the Power Sectors of Argentina and Brazil

Comparison Case Study: Two Neighbors in Contrast: The Restructuring of the Power Sectors of Argentina and Brazil Session 22 Comparison Case Study: Two Neighbors in Contrast: The Restructuring of the Power Sectors of Argentina and Brazil PURC/ARSESP Training Sao Paulo, S.P., Brazil October 22-26, 2012 Ashley Brown

More information

POWER SECTOR REFORM IN BRAZIL: CHALLENGES TO PRIVATE INVESTMENT. Michael B. Rosenzweig Senior Vice President. Carlos Pabon-Agudelo Senior Consultant

POWER SECTOR REFORM IN BRAZIL: CHALLENGES TO PRIVATE INVESTMENT. Michael B. Rosenzweig Senior Vice President. Carlos Pabon-Agudelo Senior Consultant POWER SECTOR REFORM IN BRAZIL: CHALLENGES TO PRIVATE INVESTMENT by Michael B. Rosenzweig Senior Vice President Carlos Pabon-Agudelo Senior Consultant Sarah P. Voll Vice President Jose Simoes Neto Executive

More information

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner Contents 1. The restriction of subsidies and policy priorities. 2.

More information

Disclaimer. All figures are in BR GAAP. 2/12.

Disclaimer. All figures are in BR GAAP. 2/12. Cemig Distribuição 2nd Tariff Review Technical Note n.º 33/2008-SRE/ANEEL Disclaimer Some statements contained in this presentation are forward-looking statements within the meaning of the US Securities

More information

APIMEC Presentation August 2011

APIMEC Presentation August 2011 APIMEC Presentation August 2011 Disclaimer This presentation may include forward-looking statements of future events or results according to regulations of the Brazilian and international securities and

More information

ELECTRICITY GENERATION

ELECTRICITY GENERATION ELECTRICITY GENERATION World s Largest Producers 2010 TW/h Total 21.325,0 (100%) USA 4.325,9 (20,3%) China 4.206,5 (19,7%) Japan Russian 1.145,3 1.036,8 (5,4%) (4,9%) India Canada 922,3 629,9 (4,3%) (3,0%)

More information

Brazilian Electricity System in the World

Brazilian Electricity System in the World Brazilian Electricity System in the World USA China Japan Russian India Canada Germany France Brazil South Korea 1.115,10 1.183,70 993,1 1.040,00 869,8 824,5 634,1 664,5 596,8 637,3 542,4 574,6 467,4 463,1

More information

The Financial Crisis and Implications for U.S.-Mexico Brazil s New Natural Gas Law

The Financial Crisis and Implications for U.S.-Mexico Brazil s New Natural Gas Law ... as appeared in... Published by WorldTrade Executive, a part of Thomson Reuters Volume 17, Number 5 May 31, 2009 The Financial Crisis and Implications for U.S.-Mexico Brazil s New Natural Gas Law By

More information

Novembro de EDP Energias do Brasil

Novembro de EDP Energias do Brasil Novembro de 2009 EDP Energias do Brasil Disclaimer This presentation may include forward-looking statements of future events or results according to regulations of the Brazilian and international securities

More information

Evolution of Electricity Markets in U.S.A.

Evolution of Electricity Markets in U.S.A. Evolution of Electricity Markets in U.S.A. Florence School of Regulation Florence, Italy July 1, 2014 Ashley C. Brown Executive Director, Harvard Electricity Policy Group Harvard Kennedy School Harvard

More information

EVA (Economic Value Added) analysis Brazilian Electricity Sector Executive Summary. February, 2018

EVA (Economic Value Added) analysis Brazilian Electricity Sector Executive Summary. February, 2018 EVA (Economic Value Added) analysis Brazilian Electricity Sector 2011-2016 Executive Summary February, 2018 Disclaimer The information contained herein is of a general nature and based on authorities that

More information

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA 22 October 2018 PRESENTATION TO THE ABSA POWER, UTILITIES AND INFRASTRUCTURE INSIGHT SERIES Dr Grové Steyn 1 THE ORIGINAL RATIONALE FOR

More information

Market Surveillance. Lessons Learned in Latin America. Prepared by: Ms Beatriz Arizu For: The World Bank Energy Forum.

Market Surveillance. Lessons Learned in Latin America. Prepared by: Ms Beatriz Arizu For: The World Bank Energy Forum. Market Surveillance Lessons Learned in Latin America Prepared by: Ms Beatriz Arizu For: The World Bank Energy Forum February 2003 Electricity Markets in Latin America Organized Power Markets are today

More information

1Q10 Results. This report presents cumulative data January through March 2010 compared with the same period in the previous year.

1Q10 Results. This report presents cumulative data January through March 2010 compared with the same period in the previous year. 1 st Quarter 2010 For Earnings Immediate Results Release 1Q10 Results Curitiba, Brazil, May 12, 2010 Companhia Paranaense de Energia - Copel (BM&FBOVESPA: CPLE3, CPLE5, CPLE6 / NYSE: ELP / LATIBEX: XCOP),

More information

20 years operation of the Nordic electricity market

20 years operation of the Nordic electricity market ENERGY 20 years operation of the Nordic electricity market ADB Regional Energy Trade Workshop September 8-9, 2014 Manila Dr. Per Christer Lund 1 SAFER, SMARTER, GREENER Electricity market world wide 2

More information

Japanese ODA Loan. Ex-ante Evaluation

Japanese ODA Loan. Ex-ante Evaluation Japanese ODA Loan Ex-ante Evaluation 1. Name of the Program Country: The Islamic Republic of Pakistan Project: Energy Sector Reform Program Loan Agreement Signed: June 4, 2014 Loan Amount: 5,000 million

More information

Smile of satisfaction.

Smile of satisfaction. Smile of satisfaction. Financial Statements Balance Sheets as of December 31, 2005 and 2004 Parent Company Assets 2005 2004 2005 2004 reclassified reclassified Current assets Cash and cash equivalent 259.996

More information

1Q14. 1Q14 Highlights. Conference Call 1Q14 with Simultaneous Translation. Net Operating Revenue of R$1.7 billion in 1T14, 48.9% higher than 1Q13

1Q14. 1Q14 Highlights. Conference Call 1Q14 with Simultaneous Translation. Net Operating Revenue of R$1.7 billion in 1T14, 48.9% higher than 1Q13 1Q14 São Paulo, May 15, 2014: CESP - Companhia Energética de São Paulo (BM&FBOVESPA: CESP3, CESP5 and CESP6), the largest hydroelectric power generator in the State of São Paulo and one of the largest

More information

Results for the Third Quarter of 2009

Results for the Third Quarter of 2009 For Immediate Release Results for the Third Quarter of 2009 Curitiba, Brazil, November 11, 2009 - Companhia Paranaense de Energia - COPEL (BOVESPA: CPLE3, CPLE5, CPLE6 / NYSE: ELP / LATIBEX: XCOP), a company

More information

Company Overview Market Overview and Business Strategy Financial Overview Development Key Takeaways

Company Overview Market Overview and Business Strategy Financial Overview Development Key Takeaways 1 Company Overview Market Overview and Business Strategy Financial Overview Development Key Takeaways 2 COMPANY OVERVIEW 3 About AES Gener Operations in 4 markets: SIC and SING in Chile, SIN in Colombia

More information

Electricity Sector Regulatory Developments, Opportunities and Challenges

Electricity Sector Regulatory Developments, Opportunities and Challenges Indonesian Energy and Infrastructure Seminar Electricity Sector Regulatory Developments, Luke Devine Hadiputranto, Hadinoto & Partners is a member of Baker & McKenzie International, a Swiss Verein with

More information

UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013

UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013 UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET Ingmar Sterzing CEIC Seminar April 10, 2013 1 Ingmar Sterzing, Pittsburgh, PA, 2013 UK and ERCOT Strikingly Similar Similar generation infrastructure

More information

SPP Reserve Sharing Group Operating Process

SPP Reserve Sharing Group Operating Process SPP Reserve Sharing Group Operating Process Effective: 1/1/2018 1.1 Reserve Sharing Group Purpose In the continuous operation of the electric power network, Operating Capacity is required to meet forecasted

More information

Obstacles to Trade and Compatibility of Market Rules in Southeast Europe

Obstacles to Trade and Compatibility of Market Rules in Southeast Europe Obstacles to Trade and Compatibility of Market Rules in Southeast Europe Findings/ Recommendations of SEETEC Final Draft Report Athens Forum June 22st, 2006 REM-1202-47RP-I-0006 National wholesale markets

More information

Two Critical Barriers to Transmission Development: Siting & Cost Allocation

Two Critical Barriers to Transmission Development: Siting & Cost Allocation Two Critical Barriers to Transmission Development: Siting & Cost Allocation TAPS Conference Portland, Maine October 19, 2009 Ashley C. Brown Executive Director, Harvard Electricity Policy Group John F.

More information

Electricity Industry Bill

Electricity Industry Bill Electricity Industry Bill Request for additional information by Finance and Expenditure Committee The additional information sought by the committee on 17 February 2010 is set out in the following tables.

More information

Major FERC Initiatives

Major FERC Initiatives Major FERC Initiatives 2006-2011 BUSINESS PRACTICE STANDARDS FOR ELECTRIC UTILITIES MAJOR PROPOSALS: RM05-5-000 FERC proposed to incorporate by reference the first set of standards for business practice

More information

COPEL ANNOUNCES THIRD QUARTER 2003 RESULTS

COPEL ANNOUNCES THIRD QUARTER 2003 RESULTS FOR IMMEDIATE RELEASE COPEL ANNOUNCES THIRD QUARTER 2003 RESULTS Curitiba, Brazil, November 20, 2003 Companhia Paranaense de Energia Copel (NYSE: ELP / LATIBEX: XCOP / BOVESPA: CPL3, CPL6), a leading Brazilian

More information

Southern California Edison Stakeholder Comments. Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013

Southern California Edison Stakeholder Comments. Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013 Southern California Edison Stakeholder Comments Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013 Submitted by Company Date Submitted Paul Nelson (626) 302-4814 Jeff Nelson (626)

More information

Risk Factors. We are exposed to fluctuations in fuel prices

Risk Factors. We are exposed to fluctuations in fuel prices Risk Factors We are exposed to fluctuations in fuel prices Fuel is our most significant operating cost, accounting for 81.7 percent of our total expenses in 2014. Whether and to what extent we can pass

More information

Presentation Results of March 2018

Presentation Results of March 2018 Presentation Results of 2017 March 2018 Disclaimer This presentation may contain forward-looking statements. Such statements are not statements of historical facts but reflect the beliefs and expectations

More information

2Q15. 2Q15 Results. Conference Call 2Q15 with Simultaneous Translation. Date: 08/19/2015

2Q15. 2Q15 Results. Conference Call 2Q15 with Simultaneous Translation. Date: 08/19/2015 2Q15 São Paulo, August 14, 2015: CESP - Companhia Energética de São Paulo (BM&FBOVESPA: CESP3, CESP5 & CESP6), releases its financial results for the second quarter of 2015 (2Q15). The statements were

More information

2010 Latin America Regulated Industries Conference

2010 Latin America Regulated Industries Conference Companhia Paranaense de Energia COPEL 2010 Latin America Regulated Industries Conference January 19-21, 2010 Investor Relations 1 Investor Relations Agenda Brazilian Data Copel s Highlights Corporate Structure

More information

Fiscal Year Highlights. Conference Call 2013 with Simultaneous Translation

Fiscal Year Highlights. Conference Call 2013 with Simultaneous Translation 2013 São Paulo, March 21, 2014: CESP - Companhia Energética de São Paulo (BM&FBOVESPA: CESP3, CESP5 and CESP6), the largest hydroelectric power generator in the State of São Paulo and one of the largest

More information

Re: Implementation of the Alternative Energy Portfolio Standards Act of 2004 Docket No. L

Re: Implementation of the Alternative Energy Portfolio Standards Act of 2004 Docket No. L 201 California Street, Suite 630 San Francisco, California 94111 September 3, 2014 Via Electronic Filing Rosemary Chiavette, Secretary PA Public Utilities Commission PO Box 3265 Harrisburg, PA 17105-3265

More information

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. ELETROBRÁS ELETROBRÁS PERFORMANCE DURING THE SECOND QUARTER 2003

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. ELETROBRÁS ELETROBRÁS PERFORMANCE DURING THE SECOND QUARTER 2003 BOVESPA: ELET3, ELET6 LATIBEX: XELTO, XELB ADR: CAIFY, CAIGY CENTRAIS ELÉTRICAS BRASILEIRAS S.A. ELETROBRÁS MARKETLETTER June ELETROBRÁS PERFORMANCE DURING THE SECOND QUARTER www.eletrobras.gov.br invest@eletrobras.gov.br

More information

Georgian National Electricity Regulatory Commission

Georgian National Electricity Regulatory Commission Georgian National Electricity Regulatory Commission Resolution # 3 1 July, 1998 Tbilisi On Approval of the Electricity Tariff Methodology, Setting Rules and Procedures. On the recent stage of the reform

More information

Over 90% of the portfolio is invested in these 5 companies:

Over 90% of the portfolio is invested in these 5 companies: d Rio de Janeiro, July 25 th, 2017 A lot has happened in Brazil (and the world) since we started 4 years ago. Despite many headwinds and high volatility we are proud of the team s discipline and the evolution

More information

3Q17. 3Q17 Results. Conference Call 3Q17 with Simultaneous Translation. Data: 14/11/2017 Portuguese

3Q17. 3Q17 Results. Conference Call 3Q17 with Simultaneous Translation. Data: 14/11/2017 Portuguese 3Q17 São Paulo, November 10, 2017: CESP - Companhia Energética de São Paulo (B3: CESP3, CESP5 e CESP6) releases its results for third quarter of 2017 (3Q2017). The statement were produced according to

More information

Outline. Background & Motivation Reserve Modeling Framework. Results. Types of improvements COMPETES simulations

Outline. Background & Motivation Reserve Modeling Framework. Results. Types of improvements COMPETES simulations Outline Background & Motivation Reserve Modeling Framework Types of improvements COMPETES simulations Results Challenges Arising from Wind Quack! Source: Flexibility in 21st Century Power Systems, NREL

More information

ELECTRICITY REFORM STATUS IN ROMANIA AND THE ASSESMENT OF THE DISTRIBUTION PRIVATIZATION REQUIERMENTS

ELECTRICITY REFORM STATUS IN ROMANIA AND THE ASSESMENT OF THE DISTRIBUTION PRIVATIZATION REQUIERMENTS ELECTRICITY REFORM STATUS IN ROMANIA AND THE ASSESMENT OF THE DISTRIBUTION PRIVATIZATION REQUIERMENTS Gh. Indre M. Indre I. Conecini Romania Electricity industry is facing in the whole world radical changes

More information

BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008

BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008 BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008 Attached is management s discussion and analysis of Brookfield Renewable Power Inc. (formerly Brookfield Power Inc. and

More information

The Mexican Electricity Sector: Economic, Legal and Political Issues

The Mexican Electricity Sector: Economic, Legal and Political Issues The Mexican Electricity Sector: Economic, Legal and Political Issues Victor G. Carreon-Rodriguez Centro de Investigacion y Docencia Economicas Guillermo Govela-Martínez Secretaría de Energía, MEXICO Stanford

More information

A STUDY ON CAPACITY UTILIZATION AND THE EFFICIENCY OF FINANCIAL MANAGEMENT OF NATIONAL THERMAL POWER CORPORATION LIMITED NEW DELHI

A STUDY ON CAPACITY UTILIZATION AND THE EFFICIENCY OF FINANCIAL MANAGEMENT OF NATIONAL THERMAL POWER CORPORATION LIMITED NEW DELHI A STUDY ON CAPACITY UTILIZATION AND THE EFFICIENCY OF FINANCIAL MANAGEMENT OF NATIONAL THERMAL POWER CORPORATION LIMITED NEW DELHI Nasir Rashid* and Dr. B. Manivannan** *PhD Research Scholar, Dept. of

More information

Report by the Study Group to Discuss an Ideal Electricity Futures Market (Summary)

Report by the Study Group to Discuss an Ideal Electricity Futures Market (Summary) Report by the Study Group to Discuss an Ideal Electricity Futures Market (Summary) April 2018 Commerce and Service Industry Policy Group Office of Director for Commodity Market I. Meetings of the Study

More information

GDF SUEZ Energy France Business line. Henri Ducré

GDF SUEZ Energy France Business line. Henri Ducré GDF SUEZ Energy France Business line Henri Ducré Key business figures * Leading positions in gas and electricity in France 1 st gas supplier 2 nd producer and supplier of electricity 1 st player in the

More information

COPEL ANNOUNCES FIRST QUARTER 2004 RESULTS

COPEL ANNOUNCES FIRST QUARTER 2004 RESULTS FOR IMMEDIATE RELEASE COPEL ANNOUNCES FIRST QUARTER 2004 RESULTS Curitiba, Brazil, March 14, 2004 Companhia Paranaense de Energia - COPEL (NYSE: ELP / LATIBEX: XCOP / BOVESPA: CPLE3, CPLE5, CPLE6), a leading

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

Within-Hour Capacity Markets in the Northwest. July 22, John Wellschlager Bonneville Power, Trading Floor Account Executive

Within-Hour Capacity Markets in the Northwest. July 22, John Wellschlager Bonneville Power, Trading Floor Account Executive Within-Hour Capacity Markets in the Northwest July 22, 2015 John Wellschlager Bonneville Power, Trading Floor Account Executive Slide 1 Why is BPA in the market for within-hour capacity? BPA s physical

More information

enersis 1H 2013 results

enersis 1H 2013 results 07 25 2013 enersis 1H 2013 results Highlights Average demand 1 growth in LatAm reaches +3.5% improving the trend vs 1Q13 The GAP of hydro generation caused by the persistence of droughts in the region

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent Of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions For The Imposition Of Mitigation Measures... 2 39.2.1

More information

Support mechanisms for RES-e

Support mechanisms for RES-e Support mechanisms for RES-e Regional ECREEE Training Workshop on National Renewable Energy Policy and Incentive Schemes Praia, 9-11 April 2012 Sofía Martínez International Relations Department Table of

More information

Realized. 9.86% 717 Sale completed 25% 80 Transfer, to Taesa, completed. In progress

Realized. 9.86% 717 Sale completed 25% 80 Transfer, to Taesa, completed. In progress DISINVESTMENT PLAN Company Stake % Amount R$ mn TOTAL 797 Realized Status 9.86% 717 Sale completed 25% 80 Transfer, to Taesa, completed In progress 100% 367 1 Absorbed by Cemig, on March 31, 2018. Tender

More information

Company Presentation 1Q 2015

Company Presentation 1Q 2015 Company Presentation 1Q 215 1 2 AGENDA 1. SIC OVERVIEW 2. COLBÚN OVERVIEW A. OPERATIONS B. FINANCIALS C. PROJECTS 2 3 SECTOR SEGMENTATION 3 SUB-SECTORS GENERATION TRANSMISSION DISTRIBUTION Regulated sectors

More information

COMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS

COMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS COMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS February 8 th, 2019 NV Energy appreciates the opportunity to comment

More information

Financial Transmission Rights Markets: An Overview

Financial Transmission Rights Markets: An Overview Financial Transmission Rights Markets: An Overview Golbon Zakeri A. Downward Department of Engineering Science, University of Auckland October 26, 2010 Outline Introduce financial transmission rights (FTRs).

More information

CONCESSIONS, MARKETS AND PUBLIC POLICY IN THE BRAZILIAN POWER SECTOR

CONCESSIONS, MARKETS AND PUBLIC POLICY IN THE BRAZILIAN POWER SECTOR CONCESSIONS, MARKETS AND PUBLIC POLICY IN THE BRAZILIAN POWER SECTOR A Paper by Ashley C. Brown Executive Director, Harvard Electricity Policy Group Harvard Kennedy School Harvard University Of Counsel

More information

Senate Bill No. 146 Senator Spearman

Senate Bill No. 146 Senator Spearman Senate Bill No. 146 Senator Spearman CHAPTER... AN ACT relating to energy; requiring certain electric utilities in this State to file with the Public Utilities Commission of Nevada a distributed resources

More information

OREGON Rule 15 GENERAL RULES AND REGULATIONS CURTAILMENT PLAN FOR ELECTRIC ENERGY Page 1

OREGON Rule 15 GENERAL RULES AND REGULATIONS CURTAILMENT PLAN FOR ELECTRIC ENERGY Page 1 CURTAILMENT PLAN FOR ELECTRIC ENERGY Page 1 Introduction In Order No. 93-084, entered January 19, 1993, the Public Utility Commission of Oregon ordered the Company and other regulated electric utilities

More information

Resource Adequacy and Managing Unilateral Market Power in Wholesale Electricity Markets

Resource Adequacy and Managing Unilateral Market Power in Wholesale Electricity Markets Resource Adequacy and Managing Unilateral Market Power in Wholesale Electricity Markets Frank A. Wolak Department of Economics Stanford University Stanford, CA 94305-6072 wolak@zia.stanford.edu http://www.stanford.edu/~wolak

More information

Comments of PacifiCorp on the Consolidated EIM Initiatives

Comments of PacifiCorp on the Consolidated EIM Initiatives Comments of PacifiCorp on the Consolidated EIM Initiatives Submitted by Company Date Submitted Christine Kirsten christine.kirsten@pacificorp.com 916-207-4693 PacifiCorp June 30, 2017 Introduction PacifiCorp

More information

2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules

2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules 1 2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules 2.2 2-3, Table 2-2: Please indicate for Columns C and D whether or not an average expected value

More information

Chapter 5 - Macroeconomic and Expenditure Framework

Chapter 5 - Macroeconomic and Expenditure Framework Chapter 5 - Macroeconomic and Expenditure Framework 5.1 Introduction Macroeconomic stability 42 and efficient utilisation of public resources are essential conditions for economic growth and poverty reduction.

More information

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic

More information

Annual Public Meeting of Analysts and Investors 2011

Annual Public Meeting of Analysts and Investors 2011 Annual Public Meeting of Analysts and Investors 2011 MAURO ARCE CEO ARMANDO SHALDERS NETO Administrative Officer MITUO HIROTA Generation Officer VICENTE OKAZAKI CFO / IRO December 14, 2011 Summary 1. Sector

More information

BRICS: An electricity tariffs comparison. Nivalde J. de Castro Roberto Brandão Jairo de Bastos Alves Paola Dorado

BRICS: An electricity tariffs comparison. Nivalde J. de Castro Roberto Brandão Jairo de Bastos Alves Paola Dorado BRICS: An electricity tariffs comparison Nivalde J. de Castro Roberto Brandão Jairo de Bastos Alves Paola Dorado Introduction BRICS are countries that have similar socioeconomic characteristics - Large

More information

hydro thermal portfolio management

hydro thermal portfolio management hydro thermal portfolio management presentation @ Schloss Leopoldskron 8 Sep 004 contents. thesis initiation. context 3. problem definition 4. main milestones of the thesis 5. milestones presentation 6.

More information

Nuclear Revenue Certainty

Nuclear Revenue Certainty Nuclear Revenue Certainty Middle East Nuclear Power Briefing 2015 Abu Dhabi 13-14 Oct 2015 Edward Kee 0 The NECG slides that follow are not a complete record of the presentation and discussion. The views

More information

9M10 Results. This report presents cumulative data from January through September 2010 (9M10) compared with the same period in the previous year.

9M10 Results. This report presents cumulative data from January through September 2010 (9M10) compared with the same period in the previous year. 9M10 Earnings For Immediate Results Release 9M10 Results Curitiba, Brazil, November 9, 2010 - Companhia Paranaense de Energia - COPEL (BM&FBOVESPA: CPLE3, CPLE5, CPLE6 / NYSE: ELP / LATIBEX: XCOP), a company

More information

MMC Norilsk Nickel: OGK-3 3 Acquisition Building the Leading Russian Power Company. Investor Presentation. Moscow, Russia.

MMC Norilsk Nickel: OGK-3 3 Acquisition Building the Leading Russian Power Company. Investor Presentation. Moscow, Russia. MMC Norilsk Nickel: OGK-3 3 Acquisition Building the Leading Russian Power Company Investor Presentation Moscow, Russia 26 March 2007 Disclaimer The information contained herein has been prepared using

More information

NOTE OF DG ENERGY & TRANSPORT ON DIRECTIVES 2003/54-55 AND REGULATION 1228\03 IN THE ELECTRICITY AND GAS INTERNAL MARKET

NOTE OF DG ENERGY & TRANSPORT ON DIRECTIVES 2003/54-55 AND REGULATION 1228\03 IN THE ELECTRICITY AND GAS INTERNAL MARKET NOTE OF DG ENERGY & TRANSPORT ON DIRECTIVES 2003/54-55 AND REGULATION 1228\03 IN THE ELECTRICITY AND GAS INTERNAL MARKET THIS DOCUMENT IS NOT BINDING ON THE COMMISSION EXEMPTIONS FROM CERTAIN PROVISIONS

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) California Independent System ) Docket No. ER99-3339-000 Operator Corporation ) ) REQUEST FOR REHEARING OF THE CALIFORNIA INDEPENDENT

More information

The North Seas Countries Offshore Grid Initiative

The North Seas Countries Offshore Grid Initiative The North Seas Countries Offshore Grid Initiative Deliverable 1 - final report This report identifies areas where the incompatibility of national market and regulatory regimes acts as a barrier to coordinated

More information

This text is a translation, provided for information only. The original text in Portuguese is the legally valid version.

This text is a translation, provided for information only. The original text in Portuguese is the legally valid version. .. EARNINGS RELEASE 2Q 2010 1 (Figures in R$ 000, except where otherwise stated) ---------- 2Q10 HEADLINES Ebitda of R$ 874 million, and Adjusted Ebitda of R$ 1.1 Billion Net income of R$ 291 million,

More information

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing I. Day Ahead and Real Time Energy and Ancillary Services Pricing Prices that Accurately Reflect the Marginal Cost of

More information

Hydro power in Nepal Bishal Thapa Nepal Power Summit 2013

Hydro power in Nepal Bishal Thapa Nepal Power Summit 2013 Hydro power in Nepal Bishal Thapa PRE REQUISITES: OPENING MARKETS, POWER TRADING 2 Outline Reflections on Indian Power Markets Nepal Diagnosis of the paralysis Managed Competition A model for Nepal s hydro

More information

FILE COPT FOR OFFICIAL USE ONLY. Public Disclosure Authorized. Document of The World Bank. Report No. 2411b-BR. Public Disclosure Authorized

FILE COPT FOR OFFICIAL USE ONLY. Public Disclosure Authorized. Document of The World Bank. Report No. 2411b-BR. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY STAFF APPRAISAL REPORT BRAZIL COPEL

More information

3 Calculation of Unforced Capacity (UCAP)

3 Calculation of Unforced Capacity (UCAP) 3 Calculation of Unforced Capacity (UCAP) This section addresses the methodologies for calculating unforced capacity (UCAP) of capacity assets. 3.1 Calculation of UCAP 3.1.1 Before every base auction and

More information

NPCC Regional Reliability Reference Directory # 5 Reserve

NPCC Regional Reliability Reference Directory # 5 Reserve NPCC Regional Reliability Reference Directory # 5 Task Force on Coordination of Operations Revision Review Record: December 2 nd, 2010 October 11 th, 2012 Adopted by the Members of the Northeast Power

More information

(Blackline) VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL

(Blackline) VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL VOLUME NO. III Page No. 879 SCHEDULING PROTOCOL Table of Contents SP 1 SP 1.1 OBJECTIVES, DEFINITIONS AND SCOPE Objectives SP 1.2 Definitions SP 1.2.1 Master

More information

Proposed Reserve Market Enhancements

Proposed Reserve Market Enhancements Proposed Reserve Market Enhancements Energy Price Formation Senior Task Force December 14, 2018 Comprehensive Reserve Pricing Reform The PJM Board has determined that a comprehensive package inclusive

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent Of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions For The Imposition Of Mitigation Measures... 2 39.2.1

More information

Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14

Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14 Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14 Introduction On April 28, 2003, the Federal Energy Regulatory Commission (FERC or Commission)

More information

ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY

ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY Stephen Woodhouse 3 November 2015 AGENDA ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY To be covered in this session: What is flexibility? Reality and misconceptions

More information

Centrais Eletricas Brasileiras SAEletrobras

Centrais Eletricas Brasileiras SAEletrobras CREDIT OPINION Centrais Eletricas Brasileiras SA-Eletrobras Update Following Outlook Change to Negative Update Summary Rating Rationale The Ba3 corporate family rating considers Eletrobras' dominant position

More information

Opportunities & Challenges by. Nadeem Babar Orient Power Company Ltd. November 2015

Opportunities & Challenges by. Nadeem Babar Orient Power Company Ltd. November 2015 Opportunities & Challenges by Nadeem Babar Orient Power Company Ltd November 2015 1 The Opportunity Market offers long term opportunities of growth for those who understand the risks Half of Power produced

More information

Amendment to extend exceptional dispatch mitigated energy settlement rules and modify residual imbalance energy settlement rules

Amendment to extend exceptional dispatch mitigated energy settlement rules and modify residual imbalance energy settlement rules California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Nancy Saracino, Vice President, General Counsel & Chief Administrative Officer Date: September 7, 2012 Re:

More information

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia By Mollalign Abebe Ethiopian Electricity Agency November 27, 2006 1 Four parts of the Presentation: Policy,

More information

Eletrobrás. Marketletter

Eletrobrás. Marketletter Eletrobrás Marketletter June/2000 INDEX I BALANCE SHEET 1 II STATEMENT OF INVESTMENTS 4 III CAPITAL STRUCTURE 5 IV TWELVE MONTH BALANCE SHEET - SUMMARY 6 V TWELVE MONTH RATIOS - SUMMARY 9 VI STOCK MARKET

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2016/17 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

The political-economy of power sector reform in South Africa. Prof Anton Eberhard

The political-economy of power sector reform in South Africa. Prof Anton Eberhard The political-economy of power sector reform in South Africa Prof Anton Eberhard Graduate School of Business University of Cape Town & Board of the National Electricity Regulator Overview istorical development

More information

Nova Scotia Utility and Review Board

Nova Scotia Utility and Review Board Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S., c.0, as amended -and- IN THE MATTER OF A Proceeding Concerning Sales of Renewable Low Impact Electricity Generated

More information

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704 EUROPEA U IO THE EUROPEA PARLIAMT THE COU CIL Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 ER 173 CODEC 704 LEGISLATIVE ACTS A D OTHER I STRUMTS Subject: REGULATION OF THE EUROPEAN PARLIAMENT

More information

29 June 2016 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the All TSOs proposal for methodology for congestion

More information

CID Methodology Explanatory note

CID Methodology Explanatory note 29 June 2016 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the All TSOs proposal for methodology for congestion

More information

Mobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance. Ana Carvajal

Mobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance. Ana Carvajal Mobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance Ana Carvajal Istanbul, November 2015 The Context: Gaps in long term finance Infrastructure Financing gap estimated

More information

Regional Power Market Challenges and Opportunities from Nepalese perspective

Regional Power Market Challenges and Opportunities from Nepalese perspective Regional Power Market Challenges and Opportunities from Nepalese perspective Hitendra Dev Shakya Director, Power Trade Department, Nepal Electricity Authority Outline of the Presentation 1. Energy sector

More information

ECONOMIC AND FINANCIAL CRISIS ON POWER SECTOR INVESTMENTS IN LCR

ECONOMIC AND FINANCIAL CRISIS ON POWER SECTOR INVESTMENTS IN LCR ASSESSING THE IMPACT OF THE ECONOMIC AND FINANCIAL CRISIS ON POWER SECTOR INVESTMENTS IN LCR COLOMBIA, PERU and JAMAICA Sustainable Development Department LCR - Energy Unit The World Bank Outline Introduction

More information