For personal use only
|
|
- Jessie Ellis
- 5 years ago
- Views:
Transcription
1 REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2011 ASX Code: XCD Ord Shares on Issue: 90,500,436 Key Points: Chairman: Patrick O Connor Managing Director: Ian Culbert Finance Director: Stephen Belben Registered Office 2,187m diamond drilling programme on Moabsvelden undertaken during quarter together with extensive washability testwork programme. Moabsvelden resource increased to 66.3mt in-situ and upgraded from Indicated to Measured. In addition to a 20% increase in the total tonnage, selective geological modeling on a ply by ply basis has resulted in qualitative increases to the total resource. Mining right application for Moabsvelden well advanced and will be submitted shortly. Application for regulatory approval to acquire two new coal projects, Roodepoort and Bankfontein, submitted. Appoint of key South African personnel made and new office established in Middelburg, Mpumalanga. Level 9, 105 St Georges Terrace Perth WA 6000 Postal: GPO Box 2575 Perth WA 6001 T: +61 (8) F +61 (8) South Africa 4/B Midland Office Park Middelburg, Mpumalanga 1050 T: +27 (13) F: +27 (13) ABN: Moabsvelden (XCD 74%) The drilling programme completed during the quarter resulted in an increased and upgraded JORC compliant resource of 66.3 million tonnes (Measured 63,745,154 tonnes, Indicated 2,393,471 tonnes) for the Company s 74% owned Moabsvelden project. The completion during the quarter of a 29 hole diamond drilling programme for a total of 2,187m reduced the average drill spacing on the project from approximately 550m to 250m and elevated the geological confidence from Indicated to Measured, the highest level of geological confidence. In addition to upgrading geological confidence in the Moabsvelden resource, the recent drilling programme increased the total resource by almost 11 million tonnes. The additional tonnages have been developed in the southern portion of the project area, where previous drilling had not defined the extension of the large 2. The mean strip ratio (cubic metres of waste to each tonne of coal) for the project is 1.95:1 with much of the early anticipated production expected to be mined at strip ratios well below this already low figure (refer Figure 1 below). Xceed Resources Limited is an Australian based public company engaged in the acquisition of mineral projects in Southern Africa. The company s primary focus is the development of coal projects located within South Africa s premier coal fields, which are supported by established infrastructure and are readily capable of reaching their markets. The company s first project is the Moabsvelden thermal coal project situated in the Witbank coal field. Subject to regulatory approval, Moabsvelden is expected to have a mine life in excess of 10 years with the potential to produce export quality as well as domestic quality thermal coal from an open-cast, low strip mine.
2 As indicated in Figure 1 below, the coal resource extends throughout the project area save for the south west corner where a paleo high has replaced the coal. It is expected that the coal wash plant will be located in this area where there is no coal. For personal use only Figure 1 Strip Ratio contour map The updated resource is based on a total of 39 NQ diamond holes for a total of 2,868 metres. The average drill spacing and average depth is 250m and 73.5m respectively. On behalf of its 74% owned subsidiary, Neosho Trading 86 (Pty) Ltd, the Company appointed Gemecs (Pty) Ltd, an independent consultancy, to undertake all logging and sample preparation. Core samples were analysed at Noko Laboratory Services in South Africa, according to ISO standards. Gemecs were also tasked with geological modelling and reporting. Gemecs imported all data to GBIS (a commonly used geological database) against which the data was validated. The verified data set was used by Gemecs to construct a geological model from base principles using Gemcom Minex TM geological modelling software. Gemecs applied a seam thickness cut-off of < 0.5m excluded and have reported the following Gross in situ coal resource for the Moabsvelden Project in accordance with the JORC Code.
3 Moabsvelden GTIS resources tonnage, September 2011 Raw Qualities (Air Dry) (m 2 ) Thickness Tonnes RD AS IM CV () VM TS DAFV Waste (m 2 ) MBV pt8 Measured SM S4U&S4L ,076, ,937,552 MBV pt8 Measured SBA S2A , ,147,224 MBV pt8 Measured SBB S2A ,775, ,377 MBV pt8 Measured SBC S2A ,431, ,049 MBV pt8 Measured SBD S2U ,043, ,060 MBV pt8 Measured SBE S2L ,017, ,769 MBV pt8 Measured SBF S2L ,588, ,181 TOTAL Measured ,745, ,644,212 Raw Qualities (Air Dry) (m 2 ) Thickness Tonnes RD AS IM CV () VM TS DAFV Waste (m 2 ) MBV pt8 Indicated SBA S2A , ,023,028 MBV pt8 Indicated SBC S2U , MBV pt8 Indicated SBD S2U , ,956 MBV pt8 Indicated SBE S2L , ,840 MBV pt8 Indicated SBF S2L , ,816 TOTAL Indicated ,393, ,048,647 Measured & TOTAL Indicated 66,138,625 Moabsvelden Washability Results Full washability curves for product qualities ranging from a 25.5MJ primary product to a 26.6MJ primary product have been developed. The table below (split between the Measured resource and the Indicated resource), illustrates the product qualities and theoretical yields assuming a 26MJ primary product and a 20MJ secondary product. The results of the washability testwork indicate that the combined average theoretical coal product yield to produce a 26.0 primary product and a 20 secondary product is 63% with a substantial component being an export quality product. It is stressed that practical yields and actual product qualities will be different, and that optimization studies are necessary as part of the feasibility study to determine the best product mix to be produced having regard to the availability of markets and the ability of the Company to deliver to those markets.
4 26 CV Prime Product Primary product for a 26.0 CV Middling for 20 CV (m2) Thick ness Tonnes PWD PYL PAS PIM PCV PVM PTS SWD SYL SAS SIM SCV SVM STS Total Yield MBV pt8 Measured SM MBV pt8 Measured SBA MBV pt8 Measured SBB MBV pt8 Measured SBC MBV pt8 Measured SBD MBV pt8 Measured SBE MBV pt8 Measured SBF Total Measured ,745, Primary product for a 26.0 CV Middling for 20 CV (m2) Thick ness Tonnes PWD PYL PAS PIM PCV PVM PTS SWD SYL SAS SIM SCV SVM STS Total Yield MBV pt8 Indicated SBB S2A MBV pt8 Indicated SBC S2A MBV pt9 Indicated SBD S2U MBV pt10 Indicated SBE S2L MBV pt11 Indicated SBF S2L Total Indicated ,393, Mining Right Application During the quarter work continued on the Mining Works Programme and Social and Labour Plan for the Moabsvelden project in preparation for the submitting an application for a mining right by the Company s 74% subsidiary Neosho Trading. The application for a Mining Right will be submitted to the Department of Mineral Resources shortly. New Properties In June, the Company s wholly owned subsidiary, Focus Investments Pty Ltd (FCI), entered into a binding heads of agreement with a local South African company, Hampfuna Mining & Exploration Pty Limited (HMPL), the holder of two coal prospecting rights; Roodepoort 40, in the Witbank coal field and Bankfontein 215 in the Ermelo coal field. The heads of agreement provides for FCI to acquire up to 70% in two new companies to be established to hold each of the prospecting rights. During the September quarter application was made in terms of Section 11 of the Mineral and Petroleum Resources Development Act (2002) for Ministerial consent to the acquisition by Xceed of a 70% interest in each of the Roodepoort and Bankfontein thermal coal projects. At the same time, the drafting of definitive agreements covering the transactions was completed during the quarter and they are expected to be executed by the parties shortly.
5 Appointments and New Office Establishment During the quarter the Company made two senior appointments to our staff in South Africa. Mr Boetie Jewaskiewitz has been appointed General Manager South Africa and heads up our South African operations. Mr Gerhard Visagé has been appointed Business Development Manager and is responsible for liaison with Government, business partners and all interested and affected parties. Both appointees are qualified mining engineers and are highly experienced in the development and operation of coal mines in South Africa and elsewhere. The Company has also established a new office in Middelburg, Mpumalanga as part of the process of gearing up for the development of Moabsvelden Colliery as well as other projects. Cash on hand As of 30 September 2011, total cash on hand amounted to $10.04 million. Plans for December Quarter During the December quarter it is planned to: Complete the Mining Work Programme (preliminary mine planning, site layout, preliminary marketing studies and financial modeling) for Moabsvelden Complete the Social and Labour Plan (detailing human resource planning and local economic development participation) for the Moabsvelden Project Lodge a Mining Right Application for Moabsvelden with the Department of Mineral Resources Continue with the Environmental Impact Study at Moabsvelden Commence a feasibility study for Moabsvelden Execute definitive legal agreements for the acquisition of the Roodepoort and Bankfontein properties. For further information regarding the Company, please contact the Company on or refer to For and on behalf of the Board of Xceed Resources Limited Ian Culbert Managing Director 26 October 2011 Competent Persons Statement: Information in this announcement that relates to exploration results, mineral resources or ore reserves in respect of the Moabsvelden Thermal project is based on information compiled by Mr Kobus Dippenaar, Pr.Sci.Nat, B.Sc Hons (Geology), GSSA, who is a senior coal geologist at Gemecs (Pty) Ltd who have consulted to the Company. Gemecs is a recognised Overseas Professional Organisation. Mr Dippenaar has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration, Mineral Resources and Ore Reserves. Mr Dippenaar consents to the inclusion in the presentation of the matters based on his information in the form and context in which it appears.
For personal use only
28 August 2012 REVISED INVESTOR PRESENTATION Xceed Resources Limited (ASX: XCD) advises that it has amended its investor presentation to exclude references made to share price targets published in broker
More informationFor personal use only
ASX Code: HDG Fully paid shares: 47,354,029 Announcement to the Australian Stock Exchange 15 th March 2011 Unlisted options: 2,800,000 Option to Earn Majority Interest in a Second Coal Prospect within
More informationQUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2018
31 July 2018 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2018 HIGHLIGHTS Revision to the Sese JV Environmental and Social Impact Assessment to 500MW and associated increase in coal mining
More informationASX Announcement / Media Release
ASX Announcement / Media Release 20 March 2019 CORRECTION TO THE RESOURCE AND RESERVE DISCLOSURE Following a review of Universal Coal plc s (Universal) Mineral Resources and Ore Reserves summary information
More informationSOUTH32 APPROVES KLIPSPRUIT LIFE EXTENSION PROJECT
27 November 2017 outh32 Limited (Incorporated in Australia under the Corporations Act 2001 (Cth)) (ACN 093 732 597) AX / LE / JE hare Code: 32 ADR:OUHY IIN: AU000000320 south32.net OUTH32 APPROVE KLIPPRUIT
More informationFor personal use only
Ikwezi Mining Limited December 2016 Disclaimer NOT FINANCIAL PRODUCT ADVICE The provision of this document is not and should not be considered as financial product advice, investment advice or recommendation.
More informationFor personal use only
Quarterly Activities Report for the period ended 30 September 2018 ASX ANNOUNCEMENT 31 October 2018 Highlights Manono Scoping Study confirms potential for a world-class, high margin, long life mining project
More informationQuarterly Activities Report & Appendix 5B
31 JULY 2018 Quarterly Activities Report & Quarter Ending June 30, 2018 Lustrum Minerals Limited (ASX: LRM) (Lustrum) (Company) is pleased to provide a summary of its activities for the three (3) months
More informationDeveloping two highly prospective QLD coal projects. Company Overview. 28 November 2008
Developing two highly prospective QLD coal projects Company Overview 28 November 2008 Disclaimer This presentation ("Presentation") has been prepared by East Energy Resources Ltd ( EER") based on information
More information20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa
10 August 2018 ASX: MOD 20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa T3 plant throughput capacity increased to 3Mtpa, a 20% increase to the PFS Base Case Sedgman appointed as Feasibility
More informationFor personal use only
a Level 14, 31 Queen Street Melbourne, Victoria 3000 t +61 3 8610 8633 f +61 3 8610 8666 e info@aruntaresources.com.au www.aruntaresources.com.au ABN 73 089 224 402 20 August 2015 ASX ANNOUNCEMENT (ASX:
More informationAn energy resources company. Management Presentation Extraordinary General Meeting 5 September 2008
An energy resources company Management Presentation Extraordinary General Meeting 5 September 2008 DISCLAIMER The information in this presentation is an overview and does not contain all information necessary
More informationPacific American Coal Corporate Presentation April 2018
Pacific American Coal Corporate Presentation April 2018 DISCLAIMER This presentation has been prepared by Pacific American Coal Limited. ( PAK or the "Company"). This presentation may not be reproduced,
More informationFor personal use only
Exploring a World-class Iron Ore Project in Nigeria Dr Ian Burston Non-Executive Chairman 27 February 2012 Disclaimer / Competent Person Forward-looking Statements This presentation contains forward-looking
More informationABN Interim Financial Report 31 December 2017
ABN 64 612 531 389 Interim Financial Report CONTENTS DIRECTORS REPORT... 2 AUDITOR S INDEPENDENCE DECLARATION... 5 CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME. 6 CONDENSED
More informationDECEMBER 2013 QUARTERLY REPORT
30 January 2014 ASX ANNOUNCEMENT DECEMBER 2013 QUARTERLY REPORT The Board of Paringa Resources Ltd ( Paringa or the Company ) (ASX:PNL) is pleased to present its quarterly report for the period ending
More informationFor personal use only
30 April 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDING 31 MARCH 2015 Sun rising over the Save River Diamonds Project HIGHLIGHTS The Board of Directors of Mustang Resources Ltd (ASX: MUS) ( Mustang
More informationFor personal use only
Kangaroo Resources Limited ABN: 38 120 284 040 ASX Code: KRL 29 December 2010 KANGAROO UNVEILS $277M TRANSACTION TO BECOME LEADING INDONESIAN COAL PRODUCER ACQUIRES WORLD-SCALE THERMAL COAL ASSET AND FORGES
More informationFor personal use only
30 July 2018 Quarterly Report for the period ending 30 June 2018 ASX: AVZ HIGHLIGHTS Manono Lithium Project, DRC JORC compliant Mineral Resource Estimate to be completed by end of July 2018 AVZ commences
More informationFor personal use only
MARCH 2012 QUARTERLY REPORT PERTH, Western Australia, April 30, 2012: Coalspur Mines Limited ( Coalspur or Company ) (ASX: CPL, TSX: CPT) is pleased to present its quarterly report for the three months
More informationDRILLING TO RE-COMMENCE AT FOUR EAGLES GOLD PROJECT
ASX ANNOUNCEMENT 13 DECEMBER 2016 DRILLING TO RE-COMMENCE AT FOUR EAGLES GOLD PROJECT RC and Air Core drilling to re-commence at the Four Eagles Gold Project in mid-january 2017 Proposed drilling programme
More informationQuarterly Activities Report For The Period Ending 30 September 2018
Quarterly Activities Report For The Period Ending 30 September 2018 31 October 2018 HIGHLIGHTS The feasibility study drilling program on the Caula Vanadium-Graphite Project in Northern Mozambique was completed
More informationFor personal use only ABN
ABN 33 124 792 132 Financial statements for the half year ended 30 June 2011 Corporate directory Corporate directory Board of Directors Mr Murray McDonald Mr Ian Cowden Ms Emma Gilbert Company Secretary
More informationQuarterly Report for the period ended 31 December 2013
CAPITAL STRUCTURE Shares on Issue: 192.5m Unlisted Options: 0.5m Market Cap: $4.8 m (as at 31 December 2013) Click here for latest share price (ASX: LMR) 31 January 2014 Quarterly Report for the period
More informationLARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA
3 MAY 2017 LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA Highlights New zone of spodumene pegmatites discovered, with main body outcropping along 1300 metres in strike extent Widths up
More informationFor personal use only
8 June 2018 ASX ANNOUNCEMENT PROGRAMME OF WORK APPROVAL MUNDA GOLD MINE HIGHLIGHTS POW received and planning underway to commence drilling JORC2012 resource 511,000t @ 2.82g/t Au for 46,337 ounces Au*
More informationFor personal use only
3 July 2017 ASX: MOD MOD Enters Agreement to Sell Sams Creek Gold Project for A$3.8 million MOD to receive total consideration of A$3.8 million for the sale of Sams Creek MOD to retain up to 15% interest
More informationFor personal use only
ASX ANNOUNCEMENT 27 OCTOBER 2016 METALLURGICAL TESTWORK CONFIRMS LOW NUGGET GOLD DISTRIBUTION AT FOUR EAGLES GOLD PROJECT Metallurgical testwork on Four Eagles Gold Project shows good recoveries with high
More informationFor personal use only
INTRA ENERGY CORPORATION LIMITED ABN 65 124 408 751 HALF YEAR FINANCIAL REPORT 31 DECEMBER 2012 Contents Directors Report 3 Financial Statements 7 Condensed Consolidated Statement of Comprehensive Income
More informationCONSOLIDATED ZINC LIMITED ACN INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2017
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER CORPORATE DIRECTORY Registered and Corporate Office Level 1, Suite 1 35-37 Havelock Street West Perth WA 6005 Telephone: (+61 8) 9322 3406 Facsimile:
More informationFor personal use only
QUARTERLY ACTIVITIES REPORT FOR THE 3 MONTH PERIOD ENDING 31 DECEMBER 2016 31 January 2017 HIGHLIGHTS FOR THE QUARTER Shareholders approved the acquisition of a 70% interest in the advanced and highly
More informationFor personal use only
U 15 March 2011 ASX ANNOUNCEMENT Further drilling results confirms additional shallow and thick mineralisation at Pilgangoora Lithium Project WA Pilgangoora Lithium (Western Australia) 100% Altura Mining
More informationFor personal use only
03 MAY 2016 PROPOSED ACQUISITION OF AN ADVANCED LITHIUM DEPOSIT IN CANADA Sayona Mining Limited (ASX: SYA) ("Sayona" or the "Company") is pleased to announce it has signed a binding term sheet, subject
More informationFor personal use only
Southern Hemisphere Mining Limited ABN: 17 140 494 784 283 Rokeby Road SUBIACO, WA Australia, 6008 Postal Address: PO Box 52 WEST PERTH, WA Australia, 6872 Phone: +61 (0) 8 6141 3500 Fax: +61 (0) 8 6141
More informationSIGNIFICANTLY IMPROVED PACKAGE OF COAL ASSETS IN INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 7 April 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationFor personal use only
Name of entity Information Form and Checklist Annexure I (Mining Entities) ABN/ARBN/ARSN Matador Mining Limited 45 612 912 393 This Annexure forms part of the Information Form and Checklist supplied by
More informationMETALS FINANCE LIMITED SIGNS HEADS OF AGREEMENT WITH TEXAS AND OKLAHOMA COAL CO LIMITED
FOR MARKET RELEASE 6 th March 2014 Company Announcements Office Australian Securities Exchange METALS FINANCE LIMITED SIGNS HEADS OF AGREEMENT WITH TEXAS AND OKLAHOMA COAL CO LIMITED Highlights Metals
More informationBassari Resources Limited ACN
Bassari Resources Limited ACN 123 939 042 Half Year Report - 30 June 2017 ACN 123 939 042 DIRECTORS REPORT FOR THE HALF YEAR ENDED 30 JUNE 2017 Your Directors submit the consolidated financial statements
More informationFor personal use only
ACN 072 692 365 Report for September Quarter 26 October 2016 ASX Code: HEG, HEGOA CORPORATE A subscription agreement was signed with Bao Industry Pty Ltd (01.08.2016) for a number of placements to raise
More informationA B N
A B N 9 8 0 0 8 9 0 5 3 8 8 HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2007 DIRECTORS REPORT The directors present their report together with the consolidated financial report for the half-year ended 31 December
More informationFor personal use only INTERIM FINANCIAL REPORT
INTERIM FINANCIAL REPORT for the half-year ended 31 December 2014 CONTENTS CORPORATE INFORMATION... 2 DIRECTORS REPORT... 3 AUDITOR S DECLARATION OF INDEPENDENCE... 7 DIRECTORS DECLARATION... 8 CONSOLIDATED
More informationFor personal use only
Mount Magnet South NL ABN 93 096 635 246 Quarterly Activities & Cashflow Report 30 September 2011 Summary Upgraded Mineral Resource Estimate at Kirkalocka finalised increasing Indicated category by 13%
More informationINDOCHINE MINING LIMITED AND CONTROLLED ENTITIES ACN Half Year Report for the half-year ended 31 December 2011
INDOCHINE MINING LIMITED AND CONTROLLED ENTITIES ACN 141 677 385 Half Year Report for the half-year ended INDOCHINE MINING LIMITED AUSTRALIA: Suite 1, Level 3, 275 George St Sydney NSW 2000 T +61 2 8246
More informationASX ANNOUNCEMENT 18 SEPTEMBER More High Grade Results at the Zara Gold Project in Eritrea
ASX ANNOUNCEMENT 18 SEPTEMBER 2007 More High Grade Results at the Zara Gold Project in Eritrea Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited
More informationEmerging Producer in the. Murchison Goldfields
Emerging Producer in the Kirkalocka Gold Project Update April 2012 Murchison Goldfields ASX:MUM Release of Feasibility Study Released April 2, 2012 Demonstrates the recommissioning of Kirkalocka is economic
More informationFor personal use only
ABN 65 009 131 533 Titanium Sands Limited (Formerly Windimurra Vanadium Limited) Interim Financial Report for the Half Year Ended 31 December 2016 1 Contents Page Corporate information 2 Directors report
More informationBAUXITE RESOURCES LIMITED INTERIM FINANCIAL REPORT ABN FOR THE HALF-YEAR ENDED 31 DECEMBER 2017
BAUXITE RESOURCES LIMITED ABN 72 119 699 982 INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2017 This interim financial report does not include all the notes of the type normally included
More informationQUARTERLY ACTIVITIES REPORT
BLINA MINERALS NL ASX ANNOUNCEMENT Board: 31 July 2017 David Porter Non-Executive Director Brett Fraser Non-Executive Chairman Jay Stephenson Non-Executive Director Capital Structure: QUARTERLY ACTIVITIES
More informationFor personal use only
27 December 2017 ASX ANNOUNCEMENT ASX: ASN, ASNOB Anson Closes 20m Share Placement With Strategic Investor Highlights: Zhongfan completes 20m share placement raising $1.76m Placement proceeds to be used
More informationVisible Lithium Mineralisation extended to depth by Diamond Drilling
ASX Announcement 28 July 2016 Visible Lithium Mineralisation extended to depth by Diamond Drilling Wide zones of lithium-bearing pegmatite confirmed to depth with step out diamond drilling at the Goulamina
More informationQUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016
31 January 2017 ASX RELEASE ASX:AWV QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016 HIGHLIGHTS Exploration and geotechnical drilling program completed at Big Springs. High grade zones intersected
More informationAZUMAH MINING LEASES GRANTED
AZUMAH MINING LEASES GRANTED WA GOLD PROJECT, GHANA ASX & Media Release ASX Code AZM 28 th July 2014 Perth-based gold explorer and developer Azumah Resources Limited (ASX:AZM) (Azumah or the Company) is
More informationTUNKILLIA GOLD PROJECT
TUNKILLIA GOLD PROJECT Positive Scoping Study establishes that Mungana (ASX: MUX) can become costcompetitive gold producer in South Australia Highlights Technical and economic assessment provides confidence
More informationKilmain Project Collaborative opportunities in Queensland for exploration, resource development and investment with JOGMEC Presentation Colin
Kilmain Project Collaborative opportunities in Queensland for exploration, resource development and investment with JOGMEC Presentation Colin Randall, Managing Director Allegiance Coal Limited 26 February
More information14 May 2013 ASX Code: AGS COMPANY PRESENTATION
ASX ANNOUNCEMENT 14 May 2013 ASX Code: AGS COMPANY PRESENTATION No. of pages: 24 Please find attached a copy of a Company presentation to be made by the MD, Mr Steve Johnston, at RIU Sydney Resources Round-up
More informationCORPORATE PRESENTATION. Enclosed is the corporate presentation David Sumich delivered at the Africa Down Under conference in Perth this week.
4 September 2009 ASX Code: DMM Company Announcements Office ASX Limited Exchange Centre 20 Bridge Street SYDNEY NSW 2000 Via e lodgement CORPORATE PRESENTATION Enclosed is the corporate presentation David
More informationQUARTERLY ACTIVITIES REPORT September 2017
ASX ANNOUNCEMENT 30 October 2017 QUARTERLY ACTIVITIES REPORT September 2017 Altura is fully funded into production following completion of its US$110 million debt facility Successful placement to international
More informationWHITEHAVEN COAL LIMITED (ASX: WHC) ANNUAL RESULTS FOR THE YEAR ENDING 30 JUNE 2007
WHITEHAVEN COAL LIMITED ABN 68 124 425 396 Ground Floor, Ann Place 895 Ann Street Fortitude Valley QLD 4006 PO Box 2440 Fortitude Valley BC QLD 4006 Ph: 07 3000 5690 Fax: 07 3000 5699 Web: www.whitehaven.net.au
More informationFor personal use only
25 July 2013 ASX Code: BAB, AIM Code: BGL QUARTERLY ACTIVITY REPORT FOR THE THREE MONTHS ENDED 30 JUNE 2013 Highlights Exploration and Resource Development Resources upgraded at the Gryphon and Edwards
More informationASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management
ASX ANNOUNCEMENT 31 October 2017 ASX Code: HOR Management Mr Michael Fotios Non-Executive Chairman Mr Neil Porter Non-Executive Director Mr Alan Still Non-Executive Director Issued Capital Shares: 194.6
More informationFor personal use only
ASX AND MEDIA RELEASE ASX Code: CRE TSX Code: CRA FFT Code: CRE5 SHARE INFORMATION ASX Share Price: Issued Shares: Market Cap: A$0.051 1,077.9m A$55.0m Unlisted options: 32.3m By Electronic Lodgement 6
More informationFor personal use only
MARCH 2011 QUARTERLY REPORT Equatorial Resources Limited ( Equatorial or the Company ) is pleased to present its quarterly report for the period ended 31 March 2011. HIGHLIGHTS Drilling commenced at the
More informationNuCoal to acquire Plashett Coal Project
ASX Announcement 20 February 2012 NuCoal to acquire Plashett Coal Project Highlights: Plashett Coal Project is located strategically between NuCoal s existing Doyles Creek and Savoy Hill Projects. Plashett
More informationQuarterly Report for the Period Ended 31 December 2013
ABN 63 124 706 449 Address: Postal: Phone: Fax: Email: Level 1, 95 Canning Highway South Perth, WA 6151, Australia PO Box 6731, East Perth WA 6892, Australia 61 8 9221 6813 61 8 9474 9304 admin@nexmetals.com
More informationFor personal use only
Minemakers Limited Namibian Marine Phosphate (Pty) Limited PHOSPHATES 2012, MOROCCO Andrew Drummond Executive Chairman Important Information This presentation is not a prospectus nor an offer of securities
More informationABN: 303. Phone: +61 (0)( ASX: HRRR ABN Highlights m. of is defined by when it was terminated at. drilled from L7_0023.
Heron Resources Limited ABN: 303 068 263 098 Level1, 37 Ordd Street, West Perth WA 6005 Phone: +61 (0)( 8 9215 44444 Website: www.heronresources.com.auu Email: info@heronresouces.com.auu ASX: HRRR ABN
More informationSIGNIFICANT GOLD INTERCEPTS AT PIGIBO PROSPECT
10 July 2009 Company Announcements Office Australian Stock Exchange Ltd This press release is not for dissemination in the United States and shall not be disseminated to United States news services. SIGNIFICANT
More informationFor personal use only
ASX ANNOUNCEMENT 13 February 2013 ASX Code: AGS No. of pages: 24 COMPANY PRESENTATION Please find attached a copy of a Company presentation to be made by the MD, Mr Steve Johnston, at the 2013 RIU Explorers
More informationFor personal use only
ame of entity Information Form and Checklist Annexure I (Mining Entities) AB/ARB/ARS TT Mines Limited AC 107 244 039 This Annexure forms part of the Information Form and Checklist supplied by the entity
More informationDECEMBER 2014 QUARTERLY REPORT
30 January 2015 ASX Announcement DECEMBER 2014 QUARTERLY REPORT Paringa Resources Limited ( Paringa or Company ) (ASX:PNL) is pleased to present its quarterly report for the period ending 31 December 2014.
More informationFor personal use only
International Coal Limited INTERNATIONAL COAL LIMITED (ABN 65 149 197 651) FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2013 Page 1 of 17 Interim Financial Report for the Half Year Ended 31 December
More informationGraynic Completes Joint Venture for Central American Nickel Assets
ASX Release 10 July 2009 Graynic Completes Joint Venture for Central American Nickel Assets Key Points Joint Venture Agreement completed for Nichromet s Nickel Assets in Guatemala Provides Graynic with
More informationAeon Metals Limited. Quarterly Report For the three months ending 30 June ASX Announcement 31 July 2018
ASX Announcement 31 July 2018 Quarterly Report For the three months ending 30 June 2018 Aeon Metals Limited ABN 91 121 964 725 Level 7, 88 Pitt Street, Sydney, NSW 2000, Australia P.O. Box 8155, GCMC.
More informationQUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2009 HIGHLIGHTS
45 Ventnor Avenue, West Perth WA 6005 PO Box 829, West Perth WA 6872 (08) 9389 4450 Fax: (08) 9389 4400 0418 928 180 wayne@eagleeyemetals.com ABN 11 113 931 105 30 October 2009 The Company Announcements
More informationFor personal use only
ASX ANNOUNCEMENT 21 January 2015 SIGNIFICANT RESOURCE PROJECT ACQUISITION INTERNATIONAL GOLDFIELDS TO ACQUIRE PROSPECTIVE MINING & EXPLORATION PERMITS WITH POLYMETALLIC JORC RESOURCE HIGHLIGHTS International
More informationFor personal use only
IKWEZI MINING LIMITED (Incorporated in Bermuda with registered company number 45349) ARBN 151 258 221 REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2013 CONTENTS DIRECTORS REPORT 1 INDEPENDENT AUDITORS REVIEW
More informationASX Release EXERCISE OF UNLISTED OPTIONS APPENDIX 3B & 708A NOTICE. Company Details. Contact Details. Media Enquiries.
ASX Release 22 April 2014 EXERCISE OF UNLISTED OPTIONS APPENDIX 3B & 708A NOTICE Company Details ASX Code: STB Share Price $0.21 Market Cap $27M Shares on issue 129M Company options 21M Cash at Bank $10M
More informationFor personal use only
21 st July 2016 UPDATE ON LAKE JOHNSTON LITHIUM PROJECT Highlights Geochemical sampling technicians commenced field work Chemical analysis applied for finger printing of Lake Johnston pegmatites Two new
More informationFor personal use only
(Formerly Fission Energy Ltd) ACN 119 057 457 ASX QUARTERLY REPORT FOR PERIOD ENDED 30 TH JUNE 2013 Mt Thirsty Cobalt Nickel Oxide Project positive results continue Highlights Further metallurgical test
More informationFor personal use only
19 October 2016 Australian Securities Exchange (ASX) Level 40, Central Park 152-158 St Georges Terrace Perth WA 6000 HIGHLIGHTS: SPODUMENE BEARING PEGMATITE STRIKE EXTENDED Recent work identifies Spodumene
More informationAppointment of Mr. Andre Liebenberg to Danakali Board
ASX Release 2 October 2017 Appointment of Mr. Andre Liebenberg to Danakali Board The board of Danakali Limited (ASX:DNK) (Danakali or the Company) is pleased to announce the appointment of Mr. Andre Liebenberg
More informationFor personal use only
29 July 2016 QUARTERLY REPORT For the Period Ending 30 June 2016 Redstone Resources Limited (ASX Code: RDS) ( Redstone or the Company ) presents its quarterly report for the period ending 30 June 2016
More informationFor personal use only
Big Assets + Leverage = Big Opportunity Presentation to Investor Express August 2012 Disclaimer and Important Information Forward Looking Statements This document may include forward looking statements.
More informationDeveloping Export Thermal Coal Projects in the USA March 2012
Developing Export Thermal Coal Projects in the USA March 2012 Investment Highlights TheMarket Increasing demand and opportunities for Powder River Basin- Export Thermal Coal to Asia Company has commenced
More informationFor personal use only
31 December 2017 ASX Code: GPR GEOPACIFIC RESOURCES LIMITED ACN 003 208 393 info@geopacific.com.au www.geopacific.com.au PROJECTS PNG Woodlark Gold CAMBODIA Kou Sa Copper/ Gold FIJI: Sabeto & Vuda Gold-Copper
More informationAgreement to Acquire Remaining Interest in the Golden Ridge Gold and Nickel Project
10 July 2012 ASX/Media Announcement ABN: 44 103 423 981 Tel: +61 8 9322 6974 Fax: +61 8 9486 9393 email: dcrook@pioresources.com.au Address: 21 Ord Street West Perth Western Australia Postal: PO Box 1787
More informationQUARTERLY REPORT APRIL TO JUNE 2014
QUARTERLY REPORT APRIL TO JUNE 2014 Highlights Outlook for September Quarter 2014 TUNGSTEN & MOLYBDENUM Molyhil NT. Revised ore reserve extends mine life to 6 years Metallurgical testwork confirm ore sorting
More information6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION
6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION Birimian Limited (ASX: BGS; Birimian or the Company) encloses an amended presentation for the Africa Down Under Conference in relation to a correction
More informationFor personal use only
ASX Announcement ASX: ERM ABN: 53 117 086 745 12 June 2014 Emmerson secures landmark transaction with Evolution Mining Emmerson Joint Venture with Evolution Mining (ASX: EVN) to fast-track exploration
More informationINVESTOR PRESENTATION
MEDUSA MINING LIMITED ABN: 60 099 377 849 Suite 10. 100 Mill Point Road South Perth WA 6151 PO Box 122 South Perth WA 6951 Telephone: 618-94741330 Facsimile: 618-94741342 Email: admin@medusamining.com.au
More informationRusina Mining NL ABN Interim financial report for the half-year ended 31 December 2008
ABN 51 009 242 451 Interim financial report for the half-year ended 31 December 2008 Corporate Directory Directors Mr Gordon Getley Mr Robert Gregory Mr Philip Fillis Mr Antony Butler Chairman/Non Executive
More informationASX RELEASE 30 January 2018 ASX Code: POZ. QUARTERLY REPORT Period Ending 31 December Summary:
30 January 2018 ASX Code: POZ QUARTERLY REPORT Period Ending 31 December 2017 Summary: Blina Diamond Project (100% POZ) Granting of all four Mining Leases and Agreements with Traditional Owners paves the
More informationOverview. ASX Release Monday 10 December ASX Code: SAU
ASX Release Monday 10 December 2018 ASX Code: SAU Shares on Issue: 55.8m Share Price: $0.17 Market Capitalisation: $9.5m Assets WA, Australia Cannon Gold Mine (100%) Glandore Gold Project (75%*) Cowarna
More informationArafura Resources Limited
Arafura Resources Limited Australian Uranium & Rare Earths Conference 2013 16-17 July 2013, Fremantle Disclaimer Important Notice This presentation contains certain statements which may constitute forward-looking
More informationFor personal use only
ASX Announcement 26 July 2013 COMPANY DETAILS ABN: 62 147 346 334 QUARTERLY REPORT PRINCIPAL AND REGISTERED OFFICE Potash West NL Suite 3 23 Belgravia Street Belmont WA 6104 POSTAL ADDRESS PO Box 588 Belmont
More informationFor personal use only
ASX Announcement 3 March 2016 - Gross diamond revenues of A$32.5 million in the March 2016 Quarter demonstrate the ability for Lulo s alluvial diamond mining operations to generate strong cash flows A
More informationFor personal use only
ASX Announcement / Media Release 15 October 2014 Quarterly Activities Report Highlights Corporate Strategic investment by Ichor Coal NV of A$24.5 million to fund development of NCC Roodekop Further investment
More informationFor personal use only
ASX QUARTERLY REPORT MARCH 216 Quarterly Report March 216 Highlights 29 April 216 Maiden JORC resource of 131.1Mt @7.9% TGC at the Mahenge Project including 37.6Mt @1.2% TGC or 16.7Mt@ 11.1% TGC Largest
More informationGOLD RESERVES INCREASED BY 155% TO 2.15 MILLION OUNCES AT SIMBERI GOLD PROJECT
ASX:ALD TSX:ALG AIM:AGLD 10 September 2010 Media Release This press release is not for dissemination in the United States and shall not be disseminated to United States news services. GOLD RESERVES INCREASED
More informationInvesting in Tin Seminar London 5 th December 2011
Investing in Tin Seminar London 5 th December 2011 Disclaimer This presentation has been prepared by Consolidated Tin Mines Ltd (CSD) based on information from its own and third party sources and is not
More information