QUARTERLY ACTIVITIES REPORT September 2017

Size: px
Start display at page:

Download "QUARTERLY ACTIVITIES REPORT September 2017"

Transcription

1 ASX ANNOUNCEMENT 30 October 2017 QUARTERLY ACTIVITIES REPORT September 2017 Altura is fully funded into production following completion of its US$110 million debt facility Successful placement to international institutions and sophisticated investors raised a further A$26 million to progress Stage 2 expansion Definitive Feasibility Study for Stage 2 expansion of the Project targeted for completion in Q New and revised binding Offtake Agreements signed covering 90% of initial planned production levels Upgraded JORC Ore Reserve and Mineral Resource estimates, including significantly increased portions in the Proved and Measured categories Construction activities at Altura s Pilgangoora mine site continued during the quarter Mining development has progressed ahead of schedule with three separate stages of mining opened and producing ore Project commissioning remains on track for Q First lithium concentrate sales remains on target for Q Construction progress at Altura Lithium Operation at Pilgangoora Altura Mining Limited ABN Level 2, 23 Barrack Street Perth WA 6000 PO Box Z5369 St. George s Terrace WA 6831 T F cosec@alturamining.com alturamining.com

2 LITHIUM ALTURA LITHIUM Pilgangoora (Western Australia - 100% AJM) Project Funding During the September quarter Altura completed a project funding package for construction and commissioning of the Pilgangoora Lithium Project in the Pilbara region of Western Australia (see ASX release on 28 July 2017). Completion of the funding package was the final prerequisite to enable the Company to finish construction of the mine and move into production in 1H The key details of the facility are: Senior secured loan notes issued to raise a total of US$110 million Leading US and Swiss based investment management groups to provide the loan note facility package Funding was delivered in two (2) tranches with Tranche 1 (approximately US$33 million) received on 8 August 2017 and Tranche 2 (US$77 million) received on 25 September 2017 Placement In early October Altura completed a A$26 million (before costs) placement to international institutions and sophisticated investors. The Company plans to use the funds to rapidly progress a Stage 2 expansion study at the 100%-owned and fully-funded Altura Lithium Project, where Stage 1 construction remains on schedule for first lithium concentrate production in the June Quarter The funds will also be used by Altura for exploration and general working capital reserves. Offtake Agreements During the quarter Altura signed two (2) binding offtake agreements (BOA) for a minimum total of 200,000 tonnes of 6% grade spodumene concentrate per year representing more than 90% of initial planned Stage 1 annual production (see ASX release on 10 July 2017). These BOA s comprised: A new agreement signed with leading Chinese battery producer Shaanxi J&R Optimum Energy Co., Ltd ( J&R Optimum Energy ) A revised agreement with prominent Chinese based lithium and battery materials processor Lionergy Limited ( Lionergy ) so that the terms of both BOA s are aligned The key terms of the BOA s are: Minimum of 100,000 dry metric tonnes (dmt) per annum of 6% grade spodumene concentrate (pro-rated) with first product sales to commence before 30 June 2018 Term of BOA of 5 years minimum Minimum price of US$550 dmt (FOB) and a maximum price of US$950 dmt (FOB) for the first three (3) years of the BOA (based on 6% Li 2 0 per dmt) Annual pricing to be agreed via consideration of current market pricing information, including but not limited to indices for spodumene (if available); prices published or announced by other Page 2 of 9

3 companies and movement in lithium carbonate prices, subject to the floor and ceiling price for first three (3) years The completion of the BOA s was a significant milestone for Altura and its offtake partners, and provided significant support for the advanced development of the Pilgangoora Lithium Project. Upgraded Ore Reserve and Mineral Resource Estimates Subsequent to the quarter end, Altura announced upgraded JORC Ore Reserve and Mineral Resource estimates for the Pilgangoora Lithium Project. These estimates were calculated after further closely spaced infill drilling conducted between May and July 2017, and included for the first time a significant portion in the Proved and Measured categories. The improved numbers have enhanced the Company s knowledge of the orebody and significantly reduced the risks commonly associated with grade control for start-up projects. The Ore Reserve and Mineral Resource estimation work was undertaken by geological and mine engineering services consultants, Cube Consulting Pty Ltd. Ore Reserve Estimate October 2017 JORC Category Cut-off Li 2 O% Ore (million tonnes) Li 2 O (%) Fe 2 O 3 (%) Contained Li 2 O (tonnes) Proved 0.43% ,000 Probable 0.43% ,000 TOTAL 0.43% ,000 Mineral Resource Estimate October 2017 JORC Category Cut-off Li 2 O% Ore (million tonnes) Li 2 O (%) Fe 2 O 3 (%) Contained Li 2 O (tonnes) Measured 0.43% ,000 Indicated 0.43% ,000 Total 0.43% ,000 Inferred 0.43% For further information on both the Ore Reserve and Mineral Resource estimates, please refer to the ASX announcement on 24 October Stage 2 Feasibility Study During the quarter Altura commenced work on a Stage 2 expansion study at its Pilgangoora lithium project, to explore and identify expansion opportunities to significantly increase project scale and future production levels. Page 3 of 9

4 The expansion plan is aimed at increasing production to 450,000 tonnes per annum of spodumene concentrate, from the start-up capacity of 220,000tpa, and is aligned with the growth plans of Altura s Chinese offtake partners. The study will look at engineering design for additional process plant modules to deliver the increased production tonnage, along with the necessary additional water, power supply and logistics to support the additional production capacity. The expansion Definitive Feasibility Study is expected to be delivered early in Mine Development Works Since commencing mining on site in May 2017, Altura s mining contractors NRW Mining and Civil, have made significant progress in developing the pit and using the waste material to complete the construction of the majority of mining related infrastructure. Thus far three separate stages of mining have been opened up and all are producing ore. Approximately 50,000 tonnes of ore has currently been mined with a further 50,000 tonnes expected to be stockpiled on the ROM by December Despite having Ore available for mining NRW has been targeting waste material for construction of general mine infrastructure. This includes: - All intra mine haul roads are now in place and sheeted - Magazines and bulk explosives storage facilities commissioned - Mobile equipment workshops commissioned - Run of Mine (ROM) pad is 90% complete - All bulk earthworks complete on the Tailings Storage Facility (TSF). Total volume placed from the pit in the TSF exceeded 1 Million tonnes. Progression of the concrete works for the process plant, looking west Page 4 of 9

5 Process Plant Construction Construction of the process plant was commenced by Altura s construction partners Civmec in May 2017 and has proceeded rapidly since. A summary of the progress made by the plant construction team includes: - 80% of all concrete civil works now complete, with approximately 4,500m 3 of concrete poured - Primary and Secondary crusher steelwork 50% complete - Erection of secondary screening building almost complete - Power station building has been constructed and Electrical works has commenced - A significant number of conveyors have either been assembled or erected in position - High Pressure Grinding Rolls (HPGR) and Ball Mill assembly has commenced In line with the accelerated pace of construction and assembly of the process plant has been the deliveries to site of the individual items of plant equipment. In excess of 90% of all equipment for the process plant is now on site, including all major items. Altura chartered an entire ship to bulk transport all equipment arriving from South Africa which contained 43 containers and 53 break bulk items. Recent equipment that has arrived include: - Ball Mill, HPGR and Apron Feeder - Dense Media Separation (DMS) modules - Thickeners - Screens - Conveyors Deliveries of plant equipment to Pilgangoora Page 5 of 9

6 Three separate areas of mining are currently producing ore Tailings Storage Facility under construction Page 6 of 9

7 Flotation cells being unloaded on site COAL COAL ASSETS DIVESTMENT The Company has also previously stated its intention to divest its interests in both the Delta and Tabalong coal assets, and now that the funding of the Pilgangoora Lithium Project has been completed, it will be able to pursue a number of options for sale of the coal assets. During the September quarter Altura progressed several due diligence and project reviews with international mining groups for potential divestment of the coal assets. During 2017 the substantial coal price recovery has delivered new interest in the coal assets with the Company engaged with additional potential asset buyers. Altura advised during the September quarter that it had received the final approval for its Forestry Permit (IPPKH) from the Indonesian Minister for Forestry for its 70% owned Suryaraya Permata Khatulistiwa (SPK) IUP in the northern area of the Tabalong Coal Project in South Kalimantan, Indonesia. The approved IPPKH with an area of hectares allows for the mining pit, waste dumps, mine infrastructure and haul road. The IPPKH approval will allow mining of the project to commence and adds significant value to the Tabalong Coal Project. About Coal Coal is a plentiful natural source of energy. Thermal coal provides a reliable fuel for electricity generation with Indonesia now the world s largest exporter of thermal coal products. Higher value PCI (pulverised coal) and coking coal are used in the production of steel. Page 7 of 9

8 SCHEDULE OF MINING TENEMENTS The following mining tenements were held by the Company at the end of the quarter: Location Tenement Interest Pilbara, Western Australia E 45/ % E 45/ % E 45/ % E 45/ % E 45/ % P 45/ % M 45/ % M 45/ % M 45/ % L 45/ % L 45/ % L 45/ % L 45/ % L 45/ % L 45/ % Tanami, Northern Territory ELA % ELA % EL % EL % Delta, East Kalimantan PT Delta Ultima Coal 33⅓% Tabalong, South Kalimantan PT Suryaraya Permata Khatulistiwa 70% PT Suryaraya Cahaya Cemerlang 70% PT Suryaraya Pusaka 70% PT Kodio Multicom 56% PT Marangkayu Bara Makarti 56% Catanduanes, Philippines COC 182 (Area 3) Catanduanes 100% Albay region, Philippines COC 200 (Area 4) Rapu-Rapu 100% Bislig region, Philippines COC 202 (Area 17) Surigao del Sur 100% The following mining tenements were acquired during the quarter: Location Tenement Interest Pilbara, Western Australia M45/ % L45/ % Page 8 of 9

9 Competent Persons Statements The information in this report that relates to the Mineral Resource for the Pilgangoora lithium deposit is based on information compiled by Mr Stephen Barber. Mr Barber is a Member of the Australasian Institute of Mining and Metallurgy. Mr Barber is the Senior Resource Geologist at Altura Mining Limited and has sufficient experience that is relevant to the style of mineralisation under consideration and to the activity of mineral resource estimation to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Barber consents to the inclusion in the report of the matters based on this information in the form and context in which it appears. The information in this report that relates to the Ore Reserve for the Pilgangoora lithium deposit is based on information compiled by Mr Quinton de Klerk. Mr de Klerk is a Fellow of the Australasian Institute for Mining and Metallurgy. Mr de Klerk is a Director and Principal Consultant of Cube Consulting Pty Ltd and has sufficient experience that is relevant to the activity of ore reserve estimation to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr de Klerk consents to the inclusion in the report of the matters based on this information in the form and context in which it appears. The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement on 24 October Further, all material assumptions and technical parameters underpinning the mineral resource and ore reserve estimates in that announcement continue to apply and have not materially changed. About Altura Mining Limited (ASX: AJM) Altura is building a leading position in the independent supply of lithium raw materials, with a world-class Altura Lithium Project at Pilgangoora to become Australia s next major hard rock lithium product supplier in Altura has an experienced in-house team focussed on delivering the Altura Lithium Project into production. The project is the most advanced stage, near-term producing lithium project; coupled with solid offtake partners and a market providing substantial growth opportunities to ensure positive shareholder returns. For further information, please visit or phone: Company: Media: James Brown, Managing Director +61 (0) Michael Weir / Cameron Gilenko Paul Mantell, Executive Director +61 (0) Citadel- MAGNUS Page 9 of 9

For personal use only

For personal use only ] 28 April 2016 QUARTERLY ACTIVITIES REPORT March 2016 Highlights Lithium Feasibility Study completed with the following key findings: Annual production of 215,000 tonnes (average) of spodumene concentrate

More information

For personal use only

For personal use only ALTURA MINING LIMITED INVESTOR UPDATE 20 November 2013 James Brown Managing Director www.alturamining.com ASX: AJM DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura or the

More information

For personal use only

For personal use only ] 30 October 2015 QUARTERLY ACTIVITIES REPORT September 2015 Highlights Lithium Updated Mineral Resource Estimate at Altura s 100% owned Pilgangoora Lithium project of 26.06 million tonnes @ 1.20% Li 2

More information

ALTURA MINING LIMITED ANNUAL GENERAL MEETING

ALTURA MINING LIMITED ANNUAL GENERAL MEETING ALTURA MINING LIMITED ANNUAL GENERAL MEETING 19 November 2013 James Brown Managing Director www.alturamining.com ASX: AJM DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura

More information

Charging forward with Lithium. Investor Update. August Pilgangoora Lithium: World Class Near Term Production Project

Charging forward with Lithium. Investor Update. August Pilgangoora Lithium: World Class Near Term Production Project Charging forward with Lithium Investor Update August 2017 Pilgangoora Lithium: World Class Near Term Production Project Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura

More information

Pathway to Production

Pathway to Production For personal use only Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining

More information

For personal use only

For personal use only alturamining.com ASX : AJM ANNUAL GENERAL MEETING PRESENTATION 27 November 2014 DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura or the Company ). It should not be considered

More information

ANNUAL GENERAL PRESENTATION

ANNUAL GENERAL PRESENTATION ANNUAL GENERAL MEETING PRESENTATION 18 November 2015 Charging forward with lithium Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura or the Company ). It should not be considered

More information

WODGINA ORE RESERVE COMMENTARY

WODGINA ORE RESERVE COMMENTARY ASX ANNOUNCEMENT 4 May 2018 WODGINA ORE RESERVE COMMENTARY Mineral Resources Limited (ASX:MIN; MRL) refers to its announcement on 1 May 2018 titled Wodgina Mineral Resource and Ore Reserve Update and its

More information

For personal use only

For personal use only U 15 March 2011 ASX ANNOUNCEMENT Further drilling results confirms additional shallow and thick mineralisation at Pilgangoora Lithium Project WA Pilgangoora Lithium (Western Australia) 100% Altura Mining

More information

PILGANGOORA UPDATE: EXCELLENT PROGRESS WITH STAGE 1 CONSTRUCTION AND DEVELOPMENT AND DSO OPERATION

PILGANGOORA UPDATE: EXCELLENT PROGRESS WITH STAGE 1 CONSTRUCTION AND DEVELOPMENT AND DSO OPERATION ASX/Media Announcement 27 February 2018 PILGANGOORA UPDATE: EXCELLENT PROGRESS WITH STAGE 1 CONSTRUCTION AND DEVELOPMENT AND DSO OPERATION First spodumene concentrate on track for late Q2 with Stage 1

More information

For personal use only

For personal use only ] 31 October 2011 QUARTERLY ACTIVITIES REPORT September 2011 Highlights Coal Mining approvals now received at Tabalong Coal Project targeting production in 2012. Process commenced to obtain the Forestry

More information

For personal use only

For personal use only ANNUAL REPORT 2013 Annual Report 2013 Altura Mining Limited A ALTURA IS MINING ITS VISION Delta Coal Mine One-third Altura owned Balikpapan, Indonesia WHAT S INSIDE 3 4 6 8 Strategy and Outcomes The Altura

More information

Strong progress on construction and supply contracts puts Battery Minerals on track for commissioning in November

Strong progress on construction and supply contracts puts Battery Minerals on track for commissioning in November ASX Announcement 7 th March 2018 Montepuez Development Update Strong progress on construction and supply contracts puts Battery Minerals on track for commissioning in November TEMPORARY CONSTRUCTION CAMP

More information

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY POSITIVE IMPROVEMENTS IN KEY PROJECT PARAMETERS FURTHER ENHANCES THE ECONOMICS OF THE PROJECT

More information

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA 3 MAY 2017 LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA Highlights New zone of spodumene pegmatites discovered, with main body outcropping along 1300 metres in strike extent Widths up

More information

For personal use only

For personal use only 19 October 2016 Australian Securities Exchange (ASX) Level 40, Central Park 152-158 St Georges Terrace Perth WA 6000 HIGHLIGHTS: SPODUMENE BEARING PEGMATITE STRIKE EXTENDED Recent work identifies Spodumene

More information

PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION

PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION ASX / MEDIA ANNOUNCEMENT 2 January 2019 PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION Terms agreed with both Ganfeng and Great

More information

ANNUAL REPORT TURA ANNUAL REPORT ALTURA ANNUAL AL REPORT 2015 ALTURA ANNUAL REPORT R 2015 A

ANNUAL REPORT TURA ANNUAL REPORT ALTURA ANNUAL AL REPORT 2015 ALTURA ANNUAL REPORT R 2015 A ANNUAL REPORT REPORT ALTURA ANNUAL REPORT ALTURA ANNUAL REPORT ALTURA ANNUA NUAL REPORT ALTURA ANNUAL REPORT ALTURA ANNUAL REPORT ALTURA A TURA ANNUAL REPORT ALTURA ANNUAL REPORT ALTURA ANNUAL AL REPORT

More information

LITHIUM PROJECT TRANSACTION AND $3.6M CAPITAL RAISING

LITHIUM PROJECT TRANSACTION AND $3.6M CAPITAL RAISING 18 December 2015 Company Announcements Office Australian Securities Exchange LITHIUM PROJECT TRANSACTION AND $3.6M CAPITAL RAISING Dakota Minerals Limited (ASX:DKO) ( Dakota or the Company ) has entered

More information

Developing NT s First Lithium Resource

Developing NT s First Lithium Resource Developing NT s First Lithium Resource Mining The Territory Conference Darwin August 2017 ASX code: CXO 2 Developing the first Lithium Resource in the NT Core has established the first Lithium Resource

More information

For personal use only

For personal use only Kangaroo Resources Limited ABN: 38 120 284 040 ASX Code: KRL 29 December 2010 KANGAROO UNVEILS $277M TRANSACTION TO BECOME LEADING INDONESIAN COAL PRODUCER ACQUIRES WORLD-SCALE THERMAL COAL ASSET AND FORGES

More information

For personal use only

For personal use only Sandfire Resources NL ABN 55 105 154 185 Level 2, 31 Ventnor Ave, West Perth Western Australia 6005 Phone: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: info@sandfire.com.au Web: www.sandfire.com.au ASX/Media

More information

Strong progress on construction at Montepuez

Strong progress on construction at Montepuez ASX Announcement 23 July 2018 June 2018 Quarterly Activities Report Strong progress on construction at Montepuez Montepuez Graphite Project Primary crusher commissioned HIGHLIGHTS Construction of tailings

More information

o Placement and Framework Agreement Sinomine to invest A$10,000,000 via a share placement in Prospect at A$0.05 per share.

o Placement and Framework Agreement Sinomine to invest A$10,000,000 via a share placement in Prospect at A$0.05 per share. PROSPECT EXECUTES CONDITIONAL OFFTAKE AND CONDITIONAL PLACEMENT AND FRAMEWORK AGREEMENT TO FULLY FUND CONSTRUCTION OF MINE AND PLANT FOR PROSPECT S ARCADIA LITHIUM PROJECT Highlights: Prospect Resources

More information

For personal use only

For personal use only ENTITLEMENT ISSUE PRESENTATION April 2015 DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura or the Company ). It should not be considered as an invitation or offer to subscribe

More information

For personal use only

For personal use only ASX Code: GMM A Multi Asset, Rare Metal Development Company Disclaimer Competent Persons Statement James Bay The information in this report that relates to Mineral Resources is based on work completed

More information

For personal use only

For personal use only 30 July 2018 Quarterly Report for the period ending 30 June 2018 ASX: AVZ HIGHLIGHTS Manono Lithium Project, DRC JORC compliant Mineral Resource Estimate to be completed by end of July 2018 AVZ commences

More information

Authier Lithium Project Advances to the Definitive Feasibility Stage

Authier Lithium Project Advances to the Definitive Feasibility Stage December 2017 ASX: SYA Authier Lithium Project Advances to the Definitive Feasibility Stage Disclaimer Forward Looking Statements This presentation may contain certain forward looking statements. Such

More information

For personal use only

For personal use only T +61 2 8823 3179 E info@cokal.com.au Level 5, 56 Pitt Street, Sydney NSW 2000 ABN 55 082 541 437 (ASX: CKA) www.cokal.com.au ASX ANNOUNCEMENT / MEDIA RELEASE 11 October 2017 Robust Production Achieved

More information

Pilgangoora: a world class lithium and tantalum project

Pilgangoora: a world class lithium and tantalum project Pilgangoora: a world class lithium and tantalum project Ken Brinsden, Managing Director/CEO December Quarterly Results Presentation 25 January 2019 ASX: PLS ACCESS THE QUARTERLY INVESTOR, ANALYST AND MEDIA

More information

March 2018 Quarterly Report 17 April Summary

March 2018 Quarterly Report 17 April Summary March 2018 ly Report 17 April 2018 Summary 2 million wet metric tonnes shipped in the March C1 cash cost of A$41/wmt FOB; Full cash cost of A$62/wmt CFR Average realised price of A$59/wmt CFR, inclusive

More information

For personal use only

For personal use only 27 NOVEMBER 2018 AGM MANAGING DIRECTOR ADDRESS AND PRESENTATION Attached is the presentation provided to shareholders today at the Company s Annual General Meeting. For more information, please contact:

More information

For personal use only

For personal use only NOVEMBER 2016 Investor Presentation Charging Ahead at the Authier Lithium Project ASX: SYA Sourcing the raw materials of the future Buoyant Lithium Macro DEMAND SUPPLY Renewable grid storage Transportation

More information

Developing First Lithium Resource in NT

Developing First Lithium Resource in NT Developing First Lithium Resource in NT RIU Conference Sydney & Melbourne September 2017 ASX code: CXO DISCLAIMER 2 3 Developing the first Lithium Resource in the NT Core has established the first Lithium

More information

A New Growth Story in Western Australian Gold

A New Growth Story in Western Australian Gold A New Growth Story in Western Australian Gold Gold production imminent following execution of mining alliance & toll milling agreements Cash flow by Q4 2016 Outstanding exploration upside in world-class

More information

Developing an Advanced Lithium Project in Quebec, Canada

Developing an Advanced Lithium Project in Quebec, Canada Developing an Advanced Lithium Project in Quebec, Canada November 2017 ASX: SYA International Lithium & Graphite Conference, Hong Kong Disclaimer Forward Looking Statements This presentation may contain

More information

6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION

6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION 6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION Birimian Limited (ASX: BGS; Birimian or the Company) encloses an amended presentation for the Africa Down Under Conference in relation to a correction

More information

BMO 2018 Global Metals and Mining Conference

BMO 2018 Global Metals and Mining Conference BMO 2018 Global Metals and Mining Conference Corporate Overview February 2018 2018 Hollywood, Florida Disclaimer This presentation has been prepared and issued by Kidman Resources Limited ( the Company

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 March 2017 ASX: CXO Test work Produces High Quality 6% Spodumene Concentrate HIGHLIGHTS Initial metallurgical test work demonstrates the Grants Prospect at the Finniss Lithium Project

More information

For personal use only

For personal use only ASX QUARTERLY REPORT MARCH 216 Quarterly Report March 216 Highlights 29 April 216 Maiden JORC resource of 131.1Mt @7.9% TGC at the Mahenge Project including 37.6Mt @1.2% TGC or 16.7Mt@ 11.1% TGC Largest

More information

The following is an Inside Briefing interview with Pilbara Minerals CEO, Mr Neil Biddle

The following is an Inside Briefing interview with Pilbara Minerals CEO, Mr Neil Biddle The Company Announcements Officer Australian Securities Exchange Ltd via electronic lodgement The following is an Inside Briefing interview with Pilbara Minerals CEO, Mr Neil Biddle In this interview,

More information

For personal use only

For personal use only ` Dated: 14 April 2015 PHOENIX SUSPENDS SMALL MINING PROJECTS TO FOCUS ON NORTON JV AND HEAP LEACH ASX: PXG KEY POINTS Completion of mining at Kintore West in April 2015 Final milling campaign at Greenfields

More information

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016 Sourcing the raw materials of the future ASX: SYA JULY 2016 Authier Lithium Project JORC Resource Overview Disclaimer COMPETENT PERSON STATEMENTS Authier - The information in this report that relates to

More information

REPLACEMENT INVESTOR PRESENTATION

REPLACEMENT INVESTOR PRESENTATION 19 July 2018 REPLACEMENT INVESTOR PRESENTATION On 18 July 2018, Birimian Limited (ASX: BGS; Birimian or the Company) released a presentation entitled 2018 PFS Roadshow Presentation (Presentation) (BGS,

More information

ASX ANNOUNCEMENT DEFINITIVE FEASIBILITY STUDY DELIVERS EXCELLENT RESULTS AT PILGANGOORA LITHIUM PROJECT

ASX ANNOUNCEMENT DEFINITIVE FEASIBILITY STUDY DELIVERS EXCELLENT RESULTS AT PILGANGOORA LITHIUM PROJECT % U 26 September 2016 ASX ANNOUNCEMENT DEFINITIVE FEASIBILITY STUDY DELIVERS EXCELLENT RESULTS AT PILGANGOORA LITHIUM PROJECT KEY FINDINGS OF DEFINITIVE FEASIBILITY STUDY Confirmation that Altura s Pilgangoora

More information

Africa Down Under. Arcadia Project Sizing for the Future

Africa Down Under. Arcadia Project Sizing for the Future Africa Down Under Arcadia Project Sizing for the Future Disclaimer & Competent Person s Statements The information contained in this presentation or subsequently provided to any recipient of this presentation

More information

Achmmach Tin Project, Morocco DFS complete, Funding Underway. Melbourne Mining Club, 17 July 2018 Russell Clark, CEO

Achmmach Tin Project, Morocco DFS complete, Funding Underway. Melbourne Mining Club, 17 July 2018 Russell Clark, CEO Achmmach Tin Project, Morocco DFS complete, Funding Underway Melbourne Mining Club, 17 July 2018 Russell Clark, CEO DISCLAIMER Summary of information This presentation has been prepared by and is the sole

More information

REALM SET TO ACQUIRE INDONESIAN COAL EXPLORATION PROJECT

REALM SET TO ACQUIRE INDONESIAN COAL EXPLORATION PROJECT Company Announcements ASX Limited Exchange Plaza 2 The Esplanade PERTH WA 6000 By Electronic Lodgement 12 April 2011 REALM SET TO ACQUIRE INDONESIAN COAL EXPLORATION PROJECT Highlights Option secured to

More information

For personal use only

For personal use only September 2017 ly Report 20 October 2017 Another strong quarter sees Atlas become net cash-positive Highlights Net cash generated from operations of $15m in the September after interest and financial instruments

More information

14 March ASX Announcements Platform Bridge Street Sydney NSW 2000

14 March ASX Announcements Platform Bridge Street Sydney NSW 2000 ABN 95 112 425 788 14 March 2016 ASX Announcements Platform Bridge Street Sydney NSW 2000 Pilbara Minerals Presentation Global Institutional Roadshow Resources Rising Stars Investor Lunch- Australia We

More information

INVESTOR PRESENTATION

INVESTOR PRESENTATION Suite 9, 5 Centro Ave, Subiaco WA 6008 P.O. Box 457, West Perth, WA 6872, Australia Ph+61 8 9286 3045 Fax: +61 8 9226 2027 info@birimian.com ABN 11 113 931 105 12 September 2016 via electronic lodgement

More information

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY 14 November 2011 JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY Board approves Commencement of Bankable Feasibility Study Jambreiro Pre-Feasibility Study

More information

Wetar Copper Project Expansion Update - Commencement

Wetar Copper Project Expansion Update - Commencement For ASX Market Release: 7th January 2015 Wetar Copper Project Expansion Update - Commencement HIGHLIGHTS Daewoo funds of USD45M received Contract negotiations on major contracts well advanced Orders placed

More information

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA 13 July 2012 NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA This release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The

More information

BALAMA PROJECT UPDATE

BALAMA PROJECT UPDATE 16 June 2016 SYRAH ANNOUNCES COMPANY UPDATE AND FULLY UNDERWRITTEN A$194 MILLION CAPITAL RAISING Syrah Resources Limited (ASX:SYR) ( Syrah or the Company ) is pleased to provide a Balama Project development

More information

SHEFFIELD SIGNS TAURUS DEBT FACILITY AND EPC CONTRACT

SHEFFIELD SIGNS TAURUS DEBT FACILITY AND EPC CONTRACT SHEFFIELD SIGNS TAURUS DEBT FACILITY AND EPC CONTRACT Sheffield Resources Limited ( Sheffield, the Company ) (ASX: SFX) is pleased to announce the signing of two key commercial agreements ( Agreements

More information

For personal use only

For personal use only 20 June 2017 SIANA GOLD PROJECT AND COMPANY UPDATE Key Points Siana Gold Project, Philippines Key milestones achieved with underground development prior to suspension of underground activities: o Combined

More information

Cokal Receives Full Forestry Approval For BBM Mine, Haul Road & Port

Cokal Receives Full Forestry Approval For BBM Mine, Haul Road & Port T +61 7 3225 4574 E info@cokal.com.au Level 4, Bowman House, 276 Edward Street, Brisbane QLD 4000 PO Box 7122, Brisbane QLD 4001 ABN 55 082 541 437 (ASX: CKA) www.cokal.com.au ASX ANNOUNCEMENT / MEDIA

More information

September Quarterly Report

September Quarterly Report September Quarterly Report Kasbah Resources Limited ASX : KAS 1 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation, including information as to the

More information

For personal use only

For personal use only GRAPHMADA GRAPHITE MINE OPERATIONAL UPDATE HIGHLIGHTS Bass Metals Ltd nearing completion of Stage 1 of the optimisation program: the establishment of 6000 tonnes per annum (tpa) production of premium graphite

More information

Achmmach Tin Project, Morocco DFS complete, Funding Underway. IMARC, 31 October 2018 Russell Clark, CEO

Achmmach Tin Project, Morocco DFS complete, Funding Underway. IMARC, 31 October 2018 Russell Clark, CEO Achmmach Tin Project, Morocco DFS complete, Funding Underway IMARC, 31 October 2018 Russell Clark, CEO DISCLAIMER Summary of information This presentation has been prepared by and is the sole responsibility

More information

PERFORMANCE UPDATE FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013

PERFORMANCE UPDATE FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013 FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013 AUSTRALIAN AND INDONESIA FOCUS PRODUCTION AND EXPLORATION ASSETS Bird s Head project Production and cash flow in

More information

For personal use only

For personal use only 31 July 2012 Beacon Hill Resources Plc / ASX: BHU / AIM: BHR / Sector: Mining Beacon Hill Resources Plc ( Beacon Hill or the Group ) Commencement of Phase II Expansion, Production Update and Convertible

More information

FINNISS LITHIUM. PROJECT Sydney Resources Round-Up Conference May ASX code: CXO

FINNISS LITHIUM. PROJECT Sydney Resources Round-Up Conference May ASX code: CXO FINNISS LITHIUM PROJECT Sydney Resources Round-Up Conference May 2017 ASX code: CXO DISCLAIMER 2 3 WHY INVEST IN CXO 2017 Drilling re-commences this month to build on Core s Lithium Resource at Finniss

More information

For personal use only

For personal use only 21 st July 2016 UPDATE ON LAKE JOHNSTON LITHIUM PROJECT Highlights Geochemical sampling technicians commenced field work Chemical analysis applied for finger printing of Lake Johnston pegmatites Two new

More information

For personal use only

For personal use only Quarterly Activities Report for the period ended 30 September 2018 ASX ANNOUNCEMENT 31 October 2018 Highlights Manono Scoping Study confirms potential for a world-class, high margin, long life mining project

More information

Strategic Entry into the Lithium Market

Strategic Entry into the Lithium Market Sourcing the raw materials of the future ASX: SYA APRIL 2016 Investor Presentation Strategic Entry into the Lithium Market The Green Energy Revolution Creating Demand for Graphite & Lithium for Use in

More information

For personal use only

For personal use only a Level 14, 31 Queen Street Melbourne, Victoria 3000 t +61 3 8610 8633 f +61 3 8610 8666 e info@aruntaresources.com.au www.aruntaresources.com.au ABN 73 089 224 402 20 August 2015 ASX ANNOUNCEMENT (ASX:

More information

TUNKILLIA GOLD PROJECT

TUNKILLIA GOLD PROJECT TUNKILLIA GOLD PROJECT Positive Scoping Study establishes that Mungana (ASX: MUX) can become costcompetitive gold producer in South Australia Highlights Technical and economic assessment provides confidence

More information

Offtake and Mining FINNISS LITHIUM PROJECT

Offtake and Mining FINNISS LITHIUM PROJECT Offtake and Mining FINNISS LITHIUM PROJECT Company Update December 2017 ASX code: CXO DISCLAIMER The information in this report that relates to Exploration Results and Mineral Resources is based on information

More information

Company Presentation ASX:TAW

Company Presentation ASX:TAW ASX RELEASE 16 March 2018 ASX:TAW CORPORATE DIRECTORY Non-Executive Chairman Robert Benussi Managing Director Mark Calderwood Non-Executive Directors Robert Vassie Mark Turner Wei (Vicki) Xie Joint Company

More information

For personal use only

For personal use only 03 MAY 2016 PROPOSED ACQUISITION OF AN ADVANCED LITHIUM DEPOSIT IN CANADA Sayona Mining Limited (ASX: SYA) ("Sayona" or the "Company") is pleased to announce it has signed a binding term sheet, subject

More information

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B For the period ending 30 September 2017

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B For the period ending 30 September 2017 ASX ANNOUNCEMENT ASX: NLI. Frankfurt: ORM 25 October 2017 CORPORATE DIRECTORY Non Executive Chair John Fitzgerald President & CEO David J Frances Executive Technical Director Francis Wedin Non Executive

More information

Kidman signs lithium processing MOU as part of strategy to accelerate Mt Holland project in WA

Kidman signs lithium processing MOU as part of strategy to accelerate Mt Holland project in WA July 27th, 2016 Kidman Resources Limited ABN 88 143 526 096 Corporate Details: ASX Code: KDR Issued capital: 237.3M ordinary shares 47.45 listed options (KDRO) Substantial Shareholders: Capri Holdings

More information

ASX Announcement $26M CAPITAL RAISING TO POSITION BLACKHAM FOR TRANSITION TO +100,000OZ PER ANNUM GOLD PRODUCER 1

ASX Announcement $26M CAPITAL RAISING TO POSITION BLACKHAM FOR TRANSITION TO +100,000OZ PER ANNUM GOLD PRODUCER 1 Not for release to US wire services or distribution in the United States of America 20 March 2019 Highlights ASX Announcement $26M CAPITAL RAISING TO POSITION BLACKHAM FOR TRANSITION TO +100,000OZ PER

More information

For personal use only

For personal use only % U 11 April 2016 ASX ANNOUNCEMENT FEASIBILITY STUDY DELIVERS EXCELLENT RESULTS AT PILGANGOORA LITHIUM PROJECT KEY FINDINGS OF FEASIBILITY STUDY Annual Production of 215,000 tonnes (average) of spodumene

More information

QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018

QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018 30 April 2018 QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018 The Board of European Lithium Limited (ASX:EUR, FRA:PF8, VSE:ELI)(the Company) is pleased to present its activities

More information

Deutsche Bank Access Asia Conference

Deutsche Bank Access Asia Conference Deutsche Bank Access Asia Conference Corporate Overview February May 2018 2018 Singapore Disclaimer This presentation has been prepared and issued by Kidman Resources Limited ( the Company ). It contains

More information

For personal use only

For personal use only ACN 072 692 365 Report for September Quarter 26 October 2016 ASX Code: HEG, HEGOA CORPORATE A subscription agreement was signed with Bao Industry Pty Ltd (01.08.2016) for a number of placements to raise

More information

Visible Lithium Mineralisation extended to depth by Diamond Drilling

Visible Lithium Mineralisation extended to depth by Diamond Drilling ASX Announcement 28 July 2016 Visible Lithium Mineralisation extended to depth by Diamond Drilling Wide zones of lithium-bearing pegmatite confirmed to depth with step out diamond drilling at the Goulamina

More information

Quarterly Activities Report September 2018

Quarterly Activities Report September 2018 Quarterly Activities Report September 2018 Mining commenced at Plomosas Mine for total capital cost of US$275,000 Toll treatment and offtake agreements executed with Grupo Mexico Bankable Feasibility Study

More information

Glencore Finances Matrix into Copper Production Summary

Glencore Finances Matrix into Copper Production Summary 19 October 2006 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 Dear Sir, ANNOUNCEMENT ABN 42 082 593 235 Electronic

More information

Disclaimer. Forward Looking Statements

Disclaimer. Forward Looking Statements 1 Disclaimer This presentation has been prepared by Birimian Limited ABN 11 113 931 105 (Company or BGS) for general information purposes only. The presentation is not and should not be considered as an

More information

Wetar Development Update - Mobilisation HIGHLIGHTS

Wetar Development Update - Mobilisation HIGHLIGHTS For ASX Market Release: 12 January 2014 Wetar Development Update - Mobilisation HIGHLIGHTS Large landing craft commences Fuel supply by ship commences 200 tonne crane mobilised to site Whim Creek Plant

More information

Merlin Diamonds Limited

Merlin Diamonds Limited Merlin s Limited 24 October 2017 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By E-Lodgement REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2017 Merlin s Limited

More information

For personal use only

For personal use only ABN 37 103 515 037 Level 3 256 Adelaide Terrace Septimus Roe Square Perth Western Australia 6000 Australia PO Box 3074 East Perth Western Australia 6892 Australia T: +61 8 9366 8800 F: +61 8 9366 8805

More information

SEPTEMBER 2015 QUARTERLY REPORT

SEPTEMBER 2015 QUARTERLY REPORT 28 October 2015 SEPTEMBER 2015 QUARTERLY REPORT Paringa Resources Limited ( Paringa or Company ) (ASX:PNL) is pleased to present its quarterly report for the period ending September 30, 2015. Highlights

More information

Large-Flake Graphite Production and developing Expandable Graphite Manufacturing

Large-Flake Graphite Production and developing Expandable Graphite Manufacturing Large-Flake Graphite Production and developing Expandable Graphite Manufacturing 121 Singapore Investor Conference May 2018 Company Overview Bass Metals Ltd (ASX:BSM) is a Large-Flake Graphite Producer

More information

For personal use only

For personal use only QUARTERLY REPORT OCTOBER TO DECEMBER 2017 Highlights Outlook for March Quarter 2018 TUNGSTEN & MULTI COMMODITIES Molyhil, NT Australia Continued strength in tungsten and molybdenum pricing price fuels

More information

A$74 Million Loan Package from NAIF

A$74 Million Loan Package from NAIF ASX Release Wednesday 20 February 2019 Highlights A$74 Million Loan Package from NAIF Board of the Northern Australia Infrastructure Facility (NAIF) approves Investment Decision for A$74 million Beyondie

More information

TIRIS URANIUM PROJECT EXPLOITATION LICENCE GRANTED KEY MILESTONE ACHIEVED FOR PROJECT MOMENTUM FOR DEVELOPMENT BUILDING

TIRIS URANIUM PROJECT EXPLOITATION LICENCE GRANTED KEY MILESTONE ACHIEVED FOR PROJECT MOMENTUM FOR DEVELOPMENT BUILDING 18 DECEMBER 2018 TIRIS URANIUM PROJECT EXPLOITATION LICENCE GRANTED KEY MILESTONE ACHIEVED FOR PROJECT MOMENTUM FOR DEVELOPMENT BUILDING Aura Energy Limited (AEE:ASX, AURA: AIM) is pleased to announce

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: DKO 31 October 2016 CORPORATE DIRECTORY Non-Executive Chair John Fitzgerald Managing Director & CEO David J Frances Executive Technical Director Dr. Francis Wedin Non-Executive Director

More information

For personal use only

For personal use only 18 April 2018 CAPITAL RAISING TO ADVANCE DEVELOPMENT OF THE AUTHIER LITHIUM PROJECT Not for distribution to U.S. newswire services or for dissemination in the United States KEY HIGHLIGHTS Oversubscribed

More information

For personal use only

For personal use only ASX Announcement ASX: ERM ABN: 53 117 086 745 12 June 2014 Emmerson secures landmark transaction with Evolution Mining Emmerson Joint Venture with Evolution Mining (ASX: EVN) to fast-track exploration

More information

Thackaringa Cobalt Project Pre Feasibility Study

Thackaringa Cobalt Project Pre Feasibility Study 4 July 2018 ASX Limited 20 Bridge Street Sydney NSW 2000 ASX Announcement For immediate release Broken Hill Prospecting Limited ARBN 003 453 503 Suite 1002, Level 10, 171 Clarence Street, Sydney NSW 2000

More information

For personal use only

For personal use only ASX RELEASE 7 September 2015 INVESTMENT HIGHLIGHTS Developing a large scale coking coal basin Two exceptionally well located coking coal deposits Combined Resources of 536.3 Mt Amaam North: Project F:

More information

AZUMAH MINING LEASES GRANTED

AZUMAH MINING LEASES GRANTED AZUMAH MINING LEASES GRANTED WA GOLD PROJECT, GHANA ASX & Media Release ASX Code AZM 28 th July 2014 Perth-based gold explorer and developer Azumah Resources Limited (ASX:AZM) (Azumah or the Company) is

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 21 January 2015 SIGNIFICANT RESOURCE PROJECT ACQUISITION INTERNATIONAL GOLDFIELDS TO ACQUIRE PROSPECTIVE MINING & EXPLORATION PERMITS WITH POLYMETALLIC JORC RESOURCE HIGHLIGHTS International

More information

RECORD DIAMOND RECOVERIES AT LULO

RECORD DIAMOND RECOVERIES AT LULO ASX Announcement 3 August Lulo achieves a series of production records in July, including more Special diamonds in one month than in the entire previous half year Production Highlights July month Record

More information